PLAN GENERAL NOTES (CONSTRUCTION) GENERAL NOTES (DESIGN CRITERIA) 1. STANDARD SPECIFICATION : ALL WORKS SHALL COMPLY WITH DPWH STANDARD SPECIFICATION FOR HIGHWAYS, BRIDGES AND AIRPORTS REVISED 2013 SPECIAL PROVISION AND SUPPLEMENTAL SPECIFICATIONS PERTAINING TO THIS PROJECT, CONDITIONS OF CONTRACT (INT'L) FOR WORKS OF CIVIL ENGINEERS CONSTRUCTION, 2ND EDITION, PREPARED BY F.I.D.I.C. SHALL ALSO GOVERN. 1.0 THIS DESIGN CRITERIA IS BASED ON THE DESIGN CRITERIA OF THE DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS PROPOSED AND IMPLEMENTED BRIDGE PROJECTS. 1.1 SPECIFICATIONS STANDARD SPECIFICATION FOR HIGHWAY BRIDGES, 16TH EDITION, 1996, ADOPTED BY THE AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO) 2. DIMENSIONS UNLESS OTHERWISE SPECIFIED, ALL DIMENSIONS WHICH CONTROL POINTS AND ELEVATIONS ARE MEASURED IN METERS. DESIGN GUIDELINES, CRITERIA AND STANDARDS, DPWH. INCLUDE STATIONING, DISTANCES BETWEEN NATIONAL STRUCTURAL CODE OF THE PHILIPPINES, NSCP VOL. I, 2010 3. ALIGNMENT AND GRADE NO ALTERATION OR CHANGE IN ALIGNMENT AND GRADE SHALL BE MADE UNLESS EXISTING FIELD CONDITION SO WARRANT AND ONLY UPON WRITTEN ORDER BY THE ENGINEERS AND APPROVED BY THE PROPER AUTHORITY CONCERNED. DPWH DEPARTMENT ORDER NO. 75 SERIES OF 1992 1.2 LOADS 1.2.1 DEAD LOAD A. PLAIN CONCRETE B. REINFORCED CONCRETE C. STRUCTURAL STEEL D. FILL MATERIALS E. WEARING SURFACE 4. REMOVAL OF EXISTING STRUCTURES AND OBSTRUCTIONS A. ALL WORKS SHALL COMPLY WITH CLAUSE 39 "REQUIREMENTS AND CONDITIONS OF CONTRACTS", VOLUME-1 OF THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS AND HIGHWAYS, 2013. B. PORTION OF EXISTING UTILITIES, SUCH AS WATER MAINS, IRRIGATION CHANNELS, TELEPHONE POST AND TRUNK LINES ETC., THAT MAY CAUSE OBSTRUCTIONS TO THE CONSTRUCTION OF THIS PROJECT SHALL BE RELOCATED BY THE ENTITY OR OWNER CONCERNED, EXTREME PRECAUTIONS SHALL BE EXERCISED. DAMAGED THEREOF SHALL BE THE ACCOUNT OF THE CONTRACTOR. 23 kN/m³ 24 kN/m³ 77 kN/m³ 19 kN/m³ 1.05 kPa 1.2.2 LIVE LOAD LIVE LOADING SHALL BE AASHTO MS-18 (HS20-44) TRUCK LOAD 5. SUB - GRADE, SUB - BASE AND BASE TRUCK LOADING A. UNSUITABLE SUB - GRADE MATERIAL SHALL BE EXCAVATED BELOW THE GROUND SURFACE TO THE REQUIRED WIDTH AND DEPTH, THE AREA TO BE EXCAVATED SHALL BE BACKFIELD WITH APPROVED MATERIAL. 36 kN 144 kN 144 kN B. NO EMBANKMENT MATERIALS SHALL BE PLACE UNTIL THE FOUNDATION IS STABLE. 4.27 m 4.27 - 9.0 m 6. CONCRETE AND CONCRETE PAVEMENT A. ALL CONCRETE TO BE USED IN THIS PROJECT SHALL BE CLASS "A" UNLESS OTHERWISE INDICATED. B. NO ADMIXTURES OR ADDITIVES WILL BE ALLOWED FOR ALL CONCRETE WORKS WITHOUT PRIOR APPROVAL FROM THE SECRETARY OF DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS OR HIS DULY REPRESENTATIVE. C. TRAFFIC SHALL BE REQUIRED TO REDUCE SPEED WHEN PASSING THE VICINITY OF THE NEWLY LAID CONCRETE PAVEMENT UNTIL SUCH TIME THAT IT HAS OBTAINED THE FOURTEEN (14) DAYS REQUIRED STRENGTH. 1.3 MATERIAL PROPERTIES 1.3.1 REINFORCED CONCRETE 7. DRAINAGE COMPRESSIVE STRENGTH OF CONCRETE AT 28TH DAY, MODULUS OF ELASTICITY OF CONCRETE, A. EXACT LOCATION, SLOPE, OUT FALLS AND INVERT ELEVATIONS OF DRAINAGE STRUCTURES SHALL BE CHECKED IN THE FIELD BY THE ENGINEER, MINOR ADJUSTMENT MAY BE MADE BY THE APPROVAL OF THE ENGINEER TO SUIT ACTUAL FIELD CONDITION. B. EXISTING DRAINAGE STRUCTURE, OR PART THEREOF REMOVED BY THE CONTRACTOR THAT ARE STILL SERVICEABLE SHALL BE UNREAD OVER TO THE GOVERNMENT AND SHALL BE DEPOSITED AT A PLACE WITHIN THE PROJECT SITE DESIGNATED BY THE ENGINEER WITHOUT ANY EXTRA COMPENSATION, EXTREME PRECAUTION SHALL BE EXERCISED BY THE CONTRACTOR NOT TO DAMAGE THESE MATERIALS DURING THE REMOVAL AND HANDLING. B. THE CHECKING OF CONSTRUCTION STAKES BY THE ENGINEER SHALL NOT IN ANY WAY RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITY FOR THE CORRECTNESS THEREOF AND THE CON TRACTOR SHALL CAREFULLY PROTECT AND PRESERVE ALL BENCH MARK, PEGS AND OTHER THINGS USED IN SETTING OUT THE WORK. C. IN THE CASE OF 'CHARGES" OR CHANGE IN CONDITION" WHICH INVOLVES ANY CHANGES IN STAKE OUT, THE CONTRACTOR SHALL COOPERATE WITH THE ENGINEER AND FACILITATE THE PROMPT RE - ESTABLISHMENT OF THE FIELD CONTRACT FOR THE ALTERNATIVE OR ADJUSTED WORK. 9. STANDARD DRAWING THE NECESSARY DRAWING CONTAINED IN THE DPWH STANDARD DRAWING FOR ROAD SHALL BE UTILIZED FOR THE PROJECT UNLESS OTHERWISE A MORE DETAILED. 10. QUANTITY QUANTITY OF VARIOUS WORK ITEM INVOLVED ARE SUBJECT TO DECREASE OR INCREASE DEPENDING ON THE ACTUAL FIELD CONDITION. 11. ACCESS RAMP (B.P. 344 ACCESSIBILITY LAW) PURSUANT TO BATASANG PAMBANSA 344, THE CONTRACTOR SHALL CONSTRUCT ACCESS RAMPS ALLOTTED FOR PERSON WITH DISABILITY (PWD) ON AREAS TO BE IDENTIFIED BY THE PROJECT ENGINEER DURING THE PROJECT IMPLEMENTATION. = = = 20.7 MPa 4730 fc' 21,520 MPa 1.3.2 REINFORCING STEEL REINFORCING STEEL SHALL BE DEFORMED BAR WITH DEFORMATION CONFORMING TO ASTM A 615 (AASHTO M31) GRADE 40 AND EQUIVALENT TO PHILIPPINE TRADE STANDARD (PTS) GRADE 276 REINFORCEMENT BARS MIN. YIELD STRENGTH, 8. CONSTRUCTION STAKES A. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE TRUE AND PROPER SETTING - OUT OF THE WORK OR IMPROVEMENT AND FOR CORRECTNESS OF POSITION, LEVEL, SLOPE AND CONTINUOUS PROFILE GRADE IN ROAD WORK. HE WILL SET CONSTRUCTION STAKES, ESTABLISHING LINES, SLOPE AND CONTINUOUS PROFILE WORK AND OTHER LINE AND BENCH MARK FOR BRIDGE WORK, GRADE IN ROAD PROTECTIVE AND NECESSARY STRUCTURES AND APPURTENANCES CULVERT WORK, AS ARE DEEMED NECESSARY FROM THE REFERENCE DATE TO BE FURNISHED BY THE ENGINEER IN WRITING. fC EC MODULUS OF ELASTICITY STEEL, 1.4 fy = 276 MPa Es = 200, 000 MPa qa = 150 kPa FOUNDATION ASSUMED SOIL BEARING CAPACITY, PLAN STANDARD PORTLAND CEMENT CONCRETE PAVEMENT DETAILS (SHOWING SPECIFICATION AND PLACEMENT OF PLAIN DOWELS AND TIE BARS) DOWELLED EXPANSION JOINT DETAIL TYPICAL PLAN OF TWO LANE PAVEMENT SCALE SECTION SCALE NTS. NTS. SCALE SECTION SECTION SCALE SCALE SCALE NTS. SECTION SECTION SCALE SCALE NTS. SCALE NTS. SECTION NTS. DETAIL OF BAR SPACING ALONG CURVES PLAN (SHOWING FLARING OF EXISTING CONC. PAVEMENT) NTS. WEAKENED GROOVE DETAIL NTS. SCALE ELEVATION (SHOWING ASSEMBLY OF DEFORMED METAL PLATE FOR 4.50m PANEL) SCALE NTS. NTS. NTS. DETAIL OF JOINT RIGID PAVEMENT SCALE NTS. PLAN DPWH QCSED 0.50 W = 6.00m CAST IRON W/ EMBOSSED DPWH QCSED LETTERING 0.50 (WIDTH OF PROPOSED CONCRETING) CONSTRUCT CONCRETE C & G, PRECAST (*See Detail) CONSTRUCT CONCRETE SIDEWALK (*See Detail) PROP. METAL FRAME & GRATING (*See Detail) PROP. METAL FRAME & GRATING (*See Detail) C 1.5% SLOPE CONSTRUCT CONCRETE C & G, PRECAST (*See Detail) CONSTRUCT CONCRETE SIDEWALK (*See Detail) METAL FRAME & GRATING DETAIL (Cast Iron) 1.5% SLOPE CONSTRUCT MANHOLES, 610mm DIA., CONCRETE / CHB (*See Detail) CONSTRUCT MANHOLES, 610mm DIA., CONCRETE / CHB (*See Detail) PROP. INSTALLATION OF PIPE CULVERTS, 610mm. DIA. (24" ∅) CLASS II PROP. INSTALLATION OF PIPE CULVERTS, 610mm. DIA. (24" ∅) CLASS II PROP. PCC PAVEMENT (PLAIN) - CONVENTIONAL METHOD, 230mm. THK. (550f Mpa) 3 days PROP. AGGREGATE SUB-BASE COURSE (t = 0.10m.) TYPICAL ROADWAY CROSS-SECTION A-A SIDEWALK, CURB & GUTTER DETAIL 5.10 0.50 W = 6.00m 0.50 1.10 (SW / DW) (C&G) (WIDTH OF PROPOSED CONCRETING) (C&G) (SW / DW) CONSTRUCT CONCRETE C & G, PRECAST (*See Detail) CONSTRUCT CONCRETE C & G, PRECAST (*See Detail) C CONSTRUCT CONCRETE SIDEWALK / DRIVEWAY (*See Detail) 1.5% SLOPE 1.5% SLOPE PROP. INSTALLATION OF PIPE CULVERTS, 610mm. DIA. (24" ∅) CLASS II CONSTRUCT CONCRETE SIDEWALK / DRIVEWAY (*See Detail) PROP. INSTALLATION OF PIPE CULVERTS, 610mm. DIA. (24" ∅) CLASS II PROP. PCC PAVEMENT (PLAIN) - CONVENTIONAL METHOD, 230mm. THK. (550f Mpa) 7 days PROP. AGGREGATE SUB-BASE COURSE (t = 0.10m.) DRIVEWAY, CURB & GUTTER DETAIL TYPICAL ROADWAY CROSS-SECTION B-B PLAN 1260 E B 6mm THK. MS PLATE METAL FRAME & GRATING (SEE DETAIL) D 353 RCPC RCPC MANHOLE COVER (SEE DETAIL) Ø20 U-BOLT LIFTING HOOK W/ PIPE SLEEVE A 6mm THK. MS PLATE PLAN 2 - 12mmØ WELDED TO PLATE DETAIL "A" 1260 DETAIL "B" TRAVEL WAY 12mmØ TRANSVERSE BAR @ 300mm 3-12mmØ LONG'L TOP BAR 6mm THK. MS PLATE FULL WELD 160 SIDEWALK GUTTER CURB RCPC PLAN 4 - Ø12 W/ Ø12 STIRRUPS @ 200mm METAL FRAME & GRATING (SEE DETAIL) 7 - Ø12 W/ Ø 12 STIRRUPS @ 200mm 100 x 300 x 5mm STOPPER PLATE Ø20 U-BOLT LIFTING HOOK W/ PIPE SLEEVE 3-12mmØ LONG'L BOTTOM BAR SECTION THRU D CONCRETE SIDEWALK AGGREGATE BASE COURSE, t = 0.10M 6mm THK. MS PLATE 6mm THK. MS PLATE 2 - 12mmØ WELDED TO PLATE 2 - 12mmØ WELDED TO PLATE SEE DETAIL "A" AGGREGATE BASE COURSE, t = 0.10M SEE DETAIL "B" 6" x 8" x 16" CHB (PLASTERED) W/ 12mmØ VERT. BAR @ 300mm; 12mmØ HOR. BAR @ EVERY 2 LAYERS 12mmØ TRANSVERSE BAR @ 300mm 3-12mmØ LONG'L TOP BAR 12mmØ WELDED TO PLATE 160 6" x 8" x 16" CHB (PLASTERED) W/ 12mmØ VERT. BAR @ 300mm; 12mmØ HOR. BAR @ EVERY 2 LAYERS 353 Ø20 U-BOLT LIFTING HOOK W/ PIPE SLEEVE FULL WELD Ø20 STEP RUNG @ 300mm Ø20 STEP RUNG @ 300mm 100 x 300 x 5mm STOPPER PLATE 6mm THK. MS PLATE RCPC RCPC 3-12mmØ LONG'L BOTTOM BAR RCPC SECTION THRU E SLOPE STRUCTURE EXCAVATION STRUCTURE EXCAVATION MANHOLE COVER DETAIL LEAN CONCRETE, t = 0.10M MANHOLE COVER REINFORCEMENT SCHEDULE LEAN CONCRETE, t = 0.10M SECTION THRU A SECTION THRU B NOTES: 1. CONCRETE fc' = 21.00 MPa 2. REINFORCING BARS USE STRUCTURAL GRADE DEFORMED BARS, Fy = 276.00 MPa 3. STRUCTURAL STEEL - USE A36 STEEL, Fy = 248.00 MPa 4. STRUCTURAL WELD - USE E-60XX ELECTRODE DIMENSIONS IN MILLIMETERS OTHERWISE INDICATED RCPC Diameter, D Wall Thickness, t in mm mm 24 CURB INLET MANHOLE DETAIL 610 75 Dimension, mm No. of Manhole Cover, N L W T db, mm 3 1260 353 160 12 Bar Reinforcement No. of Bars, pcs. Spacing, mm Long'l Top Bar db, mm Long'l Bottom Bar db, mm Transverse Bar 3 12 3 12 300 CIM COVER REINF. SCHEDULE NOTE: ADOPTED FROM THE APPROVED STANDARD PLANS OF DPWH-NCR-RO PLAN 1260 B D METAL FRAME & GRATING (SEE DETAIL) 12mm THK. MS PLATE C 530 RCPC RCPC MANHOLE COVER (SEE DETAIL) A 12mm THK. MS PLATE 75mmØ PIPE SLEEVE PLAN 2 - 12mmØ WELDED TO PLATE TRAVEL WAY DRIVEWAY GUTTER CURB RCPC 1260 DETAIL "A" DETAIL "B" 12mm THK. MS PLATE FULL WELD 250 PLAN 12mmØ TRANSVERSE BAR @ 75mm 5-12mmØ LONG'L TOP BAR 4 - Ø12 W/ Ø12 STIRRUPS @ 200mm 4-16mmØ LONG'L BOTTOM BAR 75mmØ PIPE SLEEVE METAL FRAME & GRATING (SEE DETAIL) SECTION THRU C 7 - Ø12 W/ Ø 12 STIRRUPS @ 200mm DRIVEWAY 2 - 12mmØ WELDED TO PLATE 2 - 12mmØ WELDED TO PLATE 12mm THK. MS PLATE 12mm THK. MS PLATE 75mmØ PIPE SLEEVE 12mmØ TRANSVERSE BAR @ 75mm 5-12mmØ LONG'L TOP BAR 12mmØ WELDED TO PLATE SEE DETAIL "B" SEE DETAIL "A" Ø12 @ 200mm O.C. AGGREGATE BASE COURSE, t = 0.10M AGGREGATE BASE COURSE, t = 0.10M Ø12 @ 100mm O.C. Ø12 @ 200mm O.C. 250 Ø12 @ 100mm O.C. 530 Ø12 @ 200mm O.C. Ø20 STEP RUNG @ 300mm Ø12 @ 200mm O.C. Ø20 STEP RUNG @ 300mm FULL WELD 12mm THK. MS PLATE RCPC RCPC 4-16mmØ LONG'L BOTTOM BAR RCPC EMBANKMENT SECTION THRU D SLOPE STRUCTURE EXCAVATION STRUCTURE EXCAVATION R.C. MANHOLE COVER DETAIL CONST. JT. CONST. JT. Ø16 @ 150mm O.C. BOTHWAYS Ø12 @ 100mm O.C. BOTHWAYS LEAN CONCRETE, t = 0.10M SECTION THRU A Ø16 @ 150mm O.C. BOTHWAYS Ø12 @ 100mm O.C. BOTHWAYS LEAN CONCRETE, t = 0.10M SECTION THRU B NOTES: 1. CONCRETE fc' = 21.00 MPa 2. REINFORCING BARS USE STRUCTURAL GRADE DEFORMED BARS, Fy = 276.00 MPa 3. STRUCTURAL STEEL - USE A36 STEEL, Fy = 248.00 MPa 4. STRUCTURAL WELD - USE E-60XX ELECTRODE DIMENSIONS IN MILLIMETERS OTHERWISE INDICATED *ADOPTED FROM NCR-RO STANDARD DRAWING DETAILS REINF. CONC. MANHOLE DETAIL MANHOLE COVER REINFORCEMENT SCHEDULE RCPC Diameter, D Wall Thickness, t in mm mm 24 610 75 Dimension, mm No. of Manhole Cover, N L W T 2 1260 530 250 Bar Reinforcement No. of Bars, pcs. db, mm Long'l Bottom Bar db, mm Long'l Top Bar 16 4 12 5 Spacing, mm db, mm Transverse Bar 12 75 RCMH COVER REINF. SCHEDULE NOTE: ADOPTED FROM THE APPROVED STANDARD PLANS OF DPWH-NCR-RO PLAN CONCRETE CURB SIDEWALK LEVEL 1.5% Slope 0.50 8% Slope CONCRETE / ASPHALT PA CONCRETE GUTTER VEMENT CONC. GUTTER CONC. CURB 0.33 0.15 8% AGG. BASE COURSE (0.05m THK.) Slop e 0.19 0.10 8% SL OPE 0.30 TYPICAL SECTION 0.50 0.50 CONCRETE GUTTER CONCRETE CURB ISOMETRIC VIEW 0.50 0.50 0.33 0.20 0.15 8% Slope 0.15 0.18 CONCRETE GUTTER 0.33 0.33 0.18 CONCRETE CURB 0.15 0.01 0.15 0.20 10mm PREFORMED JOINT FILLER 0.10 0.50 CONCRETE CURB & GUTTER DETAILS "D" 0.30 0.10 0.10 REAR ELEV. OF CURB 0.10 0.10 REAR ELEV. OF GUTTER "D" NOTES: CONCRETE SIDEWALK CONCRETE CURB 1. MATERIAL AND CONSTRUCTION REQUIREMENTS SHALL CONFORM TO DPWH STANDARD SPECIFICATIONS FOR HIGHWAYS AND BRIDGES 2004. 2. USE OF MONOFILAMENT POLYPROPYLENE SYNTHETIC FIBERS ( D.O. 95, SERIES 2005 ) AS ADDITIVE TO CONCRETE MIX. CONCRETE GUTTER CURB INLET TYPICAL LAYOUT OF CONCRETE CURB AND GUTTER WITH CURB INLET 3. CONCRETE CURB AND GUTTER SHALL BE CONSIDERED IN THE DESIGN OF PAVED ROADS IF THE FUNCTION IS TO FACILITATE THE CHANNELLING OF SURFACE WATER RUN-OFF THUS PREVENTING THE EROSION OF SHOULDERS AND SLOPE. 4. MINIMUM CURB INLET INTERVAL ("D") 10.00 METERS IN FLOODED AREAS. 5. MINIMUM CURB INLET INTERVAL ("D") 20.00 METERS IN OTHER AREAS. PLAN 4.50m 1.50 0.10 4.50m 1.50 0.10 0.10 4.50m 1.50 0.10 0.10 0.10 0.10 CHLORINATED RUBBERIZED FLOOR PAINT (RED) 0.10 0.50 W = 1.50m 0.20 CONCRETE SIDEWALK / DRIVEWAY 0.20 0.20 0.30 CONCRETE CURB & GUTTER (PRECAST) W = 6.00m. CONCRETE PAVEMENT CL 0.30 0.20 0.20 W = 1.50m 0.50 CONCRETE PAVEMENT CONCRETE CURB & GUTTER (PRECAST) CONCRETE SIDEWALK / DRIVEWAY 0.20 CONC. SIDEWALK / DRIVEWAY PAINTING DET. UP (2% SLOPE) UP (2% SLOPE) PLAN TOP VIEW ACCESSIBILITY RAMP DETAIL ISOMETRIC VIEW