Page No: 1 of 1 INSPECTION AND TEST PLAN ITP Re : Rev : 0 Date : 24.03.15 FOR ISOLATOR ITEM Reference Activity Document Criteria MEP SubContractor Engrs. Sub-Contractor Engineer/QAQC Engineer Specification Specification EX I R Sub-Contractor Engineer/QAQC Engineer Specification, Approved Material Submittals Free from physical damage, Make & part/ catalogue no. as per approved material submittal EX I R I R I I I I I I No. 1 2 Ensure that all material are according to specification Ensure that all delivered material at site are as per approved material submittal Ensure that all shop drawing are approved Inspection for installation of disconnect switches as per approved drawing Inspection for installation of disconnect switches cables as per approved drawing Testing of disconnect switches cables RESPONSIBILITY CODE Acceptance Responsibility EX R Execution Review (Documents only) Shop drawing submittal EX Drawing issued for construction schedule Approved Drawings, General Position, location & height of EX specification: Q-35 And installation Relevant standards Approved Drawings, IR testing 100MW minimum at EX specification, Method 500V.d.c. and other parameters statement And DEWA Specification, DEWA And IEE IR testing 100MW minimum at EX Regulation 500V.d.c. LEGEND M Monitoring (info,no paperwork or inspection involved) H Holdpoint( onsite work inspection) I Inspection W 3 4 5 6 Sub-Contractor Engineer Sub-Contractor Site Engineer Sub-Contractor Site Engineer Sub-Contractor Site Engineer Witness (onsite check, no paperwork involved) MEP CSCEC QA/QC Consultant Verification Document Material Submittal Drawing Submittal