Uploaded by Fiaz Hussain

Hot Work JSA FSD

advertisement
JOB SAFETY ANALYSIS
Document No.
HSE-FRM-002
Release Date
August 31, 2018
Revision
00
Page
1 of 1
Elite Engineering Pvt. Ltd.
Construction of Vertical PMG Tanks
Job In-charge
Zeeshan Nissar
Location:
PSO Depot Faisalabad
Date:
20 December 2023
Task
Description:
Hot Work for Shells Erection of Fire water/PSO Depo
PPEs Required:
Safety Helmet,` Safety Shoes, Gloves, Safety Visible Jackets.
Step
Project Name:
1
Job Activities
List the key job steps
required to perform the
task. In the sequence that
they are to be carried out.
Mobilization of
equipment, Tools, and
Manpower
Hazards
List the identified hazards with
each step.
 Un-inducted, Un-trained/
Unskilled workforce.
 Non-Inspected tools and
equipment.
 Unfamiliarity with
emergency procedures.
 Unawareness of sitespecific hazards.
 Unawareness of restricted
areas.
 Moving of pedestrian on
vehicle route may lead to
personal injury / fatality.
 Non-Vaccinated workers.
 Entry of personnel with
Covid symptoms.
Risk Rating
S x L =R
Preventive Measures
List the controls measures required.
 Appoint only those workers who are
well trained and authorized.
 Educate all workers about safe
working environment.
 No one shall be in line of fire while
doing job or heavy equipment &
vehicle operation.
 Use only pre-inspected tools.
 Staff/workers must be inducted prior
to commence job.
 Trained and skilled workforce shall be
selected for safe and smooth
execution.
 Site specific hazards must be shared
to workforce i.e., heavy equipment &
vehicle operation.
 Only trained and assessed personnel
shall be deputed for power tools and
critical roles.
Risk Level
S
L
R.R
L/M/H
4
3
12
Medium
Responsible
Authority
Department/pers
on to implement it
HSSE Engineer
Site Engineer
JOB SAFETY ANALYSIS
Document No.
HSE-FRM-002
Release Date
August 31, 2018
Revision
00
Page
1 of 1
Elite Engineering Pvt. Ltd.
 Vehicle movement on nondesignated path may lead
to vehicle accident,
personal injury/Fatality.
 Un-tied load/materials
2
Hot Work
 Damaged /faulty tool.
 Flammable combustible
material.
 Incompetent welders and
team member.
 Fire and explosion.
 10km/hr. speed limit shall be
maintained all the time.
 Flagman to escort all vehicles to
designated /Communicate traffic rout
layout to all drivers, operators, and
workers.
 Implement vehicle free zone and
pedestrian free zone as per traffic
layout plan.
 Educate all drivers about safe parking
of vehicles in case of an emergency.
 Inspect welding machine and power
tool for safe operation.
 Proved machine with earth leakage
circuit breakers.
 Entry of non-certified tools and
equipment not allowed.
4
3
12
Medium
HSSE Engineer
Site Engineer
JOB SAFETY ANALYSIS
Document No.
HSE-FRM-002
Release Date
August 31, 2018
Revision
00
Page
1 of 1
Elite Engineering Pvt. Ltd.
Electric Shocks.
Electrocution /burns.
Eye damage / skin effects
Wounds / cuts
Electrocution / Physical
injury
 Equipment and material
damage





 Ensure that welding team is
experienced and trained.
 Fire watchman also be designated.
 Keep extinguishing equipment in
ready condition.
 Wear long sleeved coverall, leather
apron
 Enclose the hot work area through
fireproof & fire blanket tarpaulin.
 Ensure the worksite is free from
flammable / toxic material by safe
preparation.
 JSA & PTW must be available at site
 Welding equipment to be powered
off after the job.
 Make sure no spark or hot material is
present even after the job.
 Housekeeping of area should be done
after each job.
Project Engineer: ______Zeeshan Nissar_____ Signature: ____________________________ Date: _______12 December 2023_______ _
HSE Representative:
_____Fiaz Hussain_____ Signature: ___________________________ Date: _____12 December 2023_________ __