1. The definition of pressure vessels is:
A. A container designed to withstand internal or external pressure
B. A vessel for the containment of process fluids with or without
internal pressure
C. A container designed to operate below atmospheric pressure
D. A container no greater than 8” in cross section
Answer: A
Pressure Vessel Inspector API-510 Real Dumps
2. The internal inspection interval must be reviewed whenever changes
occur that could affect the degradation of the vessel.
In which of the following situations does a review of the internal
interval need not be conducted?
A. operating temperature increases
B. operating pressure decreases
C. operating pressure increases
D. fluid composition changes
Answer: B
Pressure Vessel Inspector API-510 Real Dumps
3. At the discretion of ________, on-stream inspection may be
substituted for internal inspection.
A. An engineer experienced in corrosion
B. The owner-user of the pressure vessel
C. An engineer experienced in pressure vessel design
D. The authorized pressure vessel inspector
Answer: D
Pressure Vessel Inspector API-510 Real Dumps
4. When both the ownership and the location of a pressure vessel are
changed, what must be done?
A. The vessel must be inspected and certified by the original vessel
manufacturer
B. The vessel must be externally and internally inspected prior to re-use
C. The vessel must be inspected externally and certified by the
owner/user
D. A new nameplate shall be attached to the vessel
Answer: B
Pressure Vessel Inspector API-510 Real Dumps
5. Which of the following will vessel rerating involve:
A. Calculations from either the manufacturer or an owner-user
engineer experienced in pressure vessels
B. Review Inspection records verify the pressure vessel has been in the
proposed service previously
C. Use of Non-Code requirements as established in accordance with the
alternative rules of API 572
D. Calculations from only a manufacturer experienced in pressure
vessels
Answer: A
Pressure Vessel Inspector API-510 Real Dumps
6. When a crack is discovered in a vessel that is in a highly stressed area,
what action should you recommend to be considered as a first step in
any effort to correct the flaw?
A. Call in a pressure vessel engineer
B. Design an overlay patch to completely cover the affected area that
has rounded corners
C. Using an insert patch, to completely remove the affected area
D. Removing the crack using by grinding and inspect using an NDE
procedure before repair by welding
Answer: A
Pressure Vessel Inspector API-510 Real Dumps
7. Temporary repairs to pressure vessels:
A. must be replaced with permanent repairs during the next scheduled
shutdown.
B. may remain in place for long periods if approved by the pressure
vessel engineer.
C. may remain in place for long periods if approved by the APIauthorized pressure vessel inspector.
D. may remain in place permanently if approved by the pressure vessel
engineer and the API authorized pressure vessel inspector.
Answer: B
Pressure Vessel Inspector API-510 Real Dumps
8. The pressure vessel owner/user is required to maintain a permanent
and progressive record.
These records shall contain all but which of the following?
A. Names of all authorized inspection personnel
B. Operating and inspection history
C. Construction and design information
D. Repair, alteration, and re-rating information
Answer: A
Pressure Vessel Inspector API-510 Real Dumps
9. When does the API-510 Inspection Code apply?
A. Vessels constructed to API-572
B. Vessels after they have been placed in service
C. Pressure vessel being fabricated to ASME Section VIII, Division 1 or 2
D. Only pressure vessels being fabricated for refinery/petro-chemical
service
Answer: B
Pressure Vessel Inspector API-510 Real Dumps
10. What should contain in a progressive record for a pressure vessel?
A. Construction and design information, operating and inspection
history
B. A complete weld map from the original construction plans
C. The exact location on a facility plan
D. The schedule and piping sizes for the vessel
Answer: A