GENERAL NOTES DN25 1) FOR INFORMATION NOT SHOWN, REFER TO VESSEL DATA SHEET. 2) UNLESS OTHERWISE NOTED ATTACHMENTS WELDED TO THE VESSEL ARE THE RESPONSIBILITY OF THE VESSEL VENDOR. 3) DAVIT ARM “E” SHALL BE SUCH THAT END SWING OVER LOAD TO BE LIFTED ( SAFETY VALVE ETC.) OR EXTEND A MINIMUM OF 230 BEYOND PLATFORM IN THE DESIGNATED LET-DOWN AREA, WHICHEVER IS GREATER. 4) DAVIT CAPACITY “W” IS THE MAXIMUM ALLOWABLE LIFTED WEIGHT ALL DAVITS (EXPECT AS NOTED IN THE TABLE BELOW) SHALL BE DESIGNED FOR A MAXIMUM “W” OF 450Kg. 5) LOAD “P” =2.25W THIS ALLOWS FOR A VERTICAL LOAD LINE PULL EQUAL TO LIFTED WEIGHT+25%MPACT. 6) MATERIAL: DAVIT:- GALVANISED CARBON STEEL UNLESS NOTED OTHERWISE. VESSEL ATTACHMENTS:- SEE VESSEL DATA SHEET. 7) THE DISTANCE FROM STRUCTRUAL STEEL TO CENTRE OF DAVIT IS LIMITED TO THE DEPTH OF THE BOTTOM DAVIT SUPPORT. 8) ALL DIMENSIONS IN MILLIMETERS UNLESS NOTED OTHERWISE. 9) FILL VENT HOLE WITH MASTIC AFTER WELDING. 11) THIS DRAWING IS TO BE CONSIDERED AS PRELIMINARY. ALL INFORMATION IS TO BE CHECKED AND VERIFIED BY CALCULATION BY VESSEL VENDOR, INCLUDING LOCAL STRESSES IN VESSEL SHELL/HEAD. DAVIT PIPE DESIGN (SEE NOTE 9) (3600 MAX. FOR DN100 PIPE) (5400 MAX. FOR DN150 PIPE) DN100 (SEE NOTE 7) PIPE SIZE & SCHEDULE MAX. “W” (Kg) DN100 SCHEDULE 40 350 MAX. P X E (Kg.m) 740 DN100 SCHEDULE 40 980 DN100 SCHEDULE 40 1960 DN100 SCHEDULE 40 2820 (SEE NOTE 3) DAVIT GUIDE MOUNTED ON PLATFORM MEMBER GENERAL ARRANGEMENT AND DETAILS OF DAVIT FOR COLUMNS 2000-3SD-MV00-M0019 1 19/04/11 0 31/3/11 ISSUED FOR FEED ISSUED FOR APPROVAL PP PP AKM SK GSS TSB SK GSS TSB SK 5636-STD-MD-B-029 1OF1 1