PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice has been prepared from the technical requirements in the existing standards of major industrial users, contractors, or standards organizations. By harmonizing these technical requirements into a single set of Practices, administrative, application, and engineering costs to both the purchaser and the manufacturer should be reduced. While this Practice is expected to incorporate the majority of requirements of most users, individual applications may involve requirements that will be appended to and take precedence over this Practice. Determinations concerning fitness for purpose and particular matters or application of the Practice to particular project or engineering situations should not be made solely on information contained in these materials. The use of trade names from time to time should not be viewed as an expression of preference but rather recognized as normal usage in the trade. Other brands having the same specifications are equally correct and may be substituted for those named. All Practices or guidelines are intended to be consistent with applicable laws and regulations including OSHA requirements. To the extent these Practices or guidelines should conflict with OSHA or other applicable laws or regulations, such laws or regulations must be followed. Consult an appropriate professional before applying or acting on any material contained in or suggested by the Practice. This Practice is subject to revision at any time. © Process Industry Practices (PIP), Construction Industry Institute, The University of Texas at Austin, 3925 West Braker Lane (R4500), Austin, Texas 78759. PIP Member Companies and Subscribers may copy this Practice for their internal use. Changes or modifications of any kind are not permitted within any PIP Practice without the express written authorization of PIP. Authorized Users may attach addenda or overlays to clearly indicate modifications or exceptions to specific sections of PIP Practices. Authorized Users may provide their clients, suppliers and contractors with copies of the Practice solely for Authorized Users’ purposes. These purposes include but are not limited to the procurement process (e.g., as attachments to requests for quotation/ purchase orders or requests for proposals/contracts) and preparation and issue of design engineering deliverables for use on a specific project by Authorized User’s client. PIP’s copyright notices must be clearly indicated and unequivocally incorporated in documents where an Authorized User desires to provide any third party with copies of the Practice. PUBLISHING HISTORY July 2008 April 2014 January 2020 Issued Complete Revision Reaffirmation w/Ed Rev Not printed with State funds Copyright Process Industry Practices Provided by Accuris under license with PIP No reproduction or networking permitted without license from Accuris Order Number: 02390549 Sold to:A&J DEFTEK CONSULTANTS [014421] - JISHAQ@AJDEFTEK.COM, Not for Resale,2023-06-19 12:16:35 UTC ~iP PROCESS ’ N D US REAFFIRMATION W/EDITORIAL REVISION January 2020 TR Y PRACTI CES Process Control PIP PCFTE100 Thermowell Fabrication Details Table of Contents 1. 2. SCOPe..iriiccr et 2 References ........ccccceeevvvivireeeennennns 2 Process Industry Practices ............cc......... 2 Drawings PCFTE101 — Threaded Tapered Thermowell PCFTE102 — Flanged Tapered Thermowell PCFTE103 — Weld-in Tapered Thermowell PCFTE104 — Socketweld Tapered Thermowell Process Industry Practices Copyright Process Industry Practices Provided by Accuris under license with PIP No reproduction or networking permitted without license from Accuris e Page 1 of 2 Order Number: 02390549 Sold to:A&J DEFTEK CONSULTANTS [014421] - JISHAQ@AJDEFTEK.COM, Not for Resale,2023-06-19 12:16:35 UTC PIP PCFTE200 REAFFIRMATION W/EDITORIAL REVISION Thermocouple Fabrication Details 1. January 2020 Scope This Practice describes the minimum requirements for fabricating threaded, flanged, weld-in, and socketweld tapered thermowells. 2. References Applicable parts of the following Practices shall be considered an integral part of this Practice. The edition in effect on the date of contract award shall be used, except as otherwise noted. Short titles are used herein where appropriate. Process Industry Practices (PIP) — PIP PCCTEOQO01 — Temperature Measurement Design Criteria — PIP PCETEQ01 — Temperature Measurement Guidelines Process Industry Practices Copyright Process Industry Practices Provided by Accuris under license with PIP No reproduction or networking permitted without license from Accuris Page 2 of 2 Order Number: 02390549 Sold to:A&J DEFTEK CONSULTANTS [014421] - JISHAQ@AJDEFTEK.COM, Not for Resale,2023-06-19 12:16:35 UTC 1 3/4"+T U MAXIMUM FLUID 11/16" MAX. BORE 0.260” STAMP THERMOWELL [ MODEL TW 1/8"—y TAG NO. ON WRENCH NO. TAPERED THREADED THERMOWELL PER F | FABRICATION TYPE [T [ THREADED, TAPERED THERMOWELL INSERTION LENGTH T1/7" 71/2" 10 1/2" SPECIFY T 0 3 X | [wlrfu f— FLAT TYPE ™w FABRICATION DETAIL PCFTE101 U DIMENSION INSTALLATION | pPIPE SIZE IN ELBOW LAG EXTENSION NOTE 1 NO EXTENSION (STANDARD) M S X INTO PIPE WELL MATERIAL 316 SS (STANDARD) SPECIFY Ju 2" & SMALLER 3-6" > 6" PERPENDICULAR 3 SPECIFY [r T u NOTES DIMENSION 41/2" | SWAGE UP T0 2" 7 /2 10 1/2" | < 6" 6 8 10"—12" > 12" - INSTALL | LENGTH TO BE SPECIFIED BASED UPON THE THICKNESS OF THE PIPE (OR EQUIPMENT) WHERE THE TW IS INSTALLED. 2) SPECIFY TO TW FABRICATOR: U — INSERTION LENGTH T — LAG EXTENSION M — MATERIAL OF CONSTRUCTION 3) TW TO BE FABRICATED 4) TW TO MEET CRITERIA FROM FOR IN _ELBOW 4 1/2° | PREFERRED INSTALLATION 41/2° |IS IN ELBOW DUE TO 7 1/2 VELOCITY CONSIDERATIONS 10 1/2” NOTES: 1) LAG EXTENSION INSULATION ON (FEET PER SECOND) INSERTION LENGTH "U” 4 1/2" 17 1/2" [10 1/27 120 80 50 50 30 20 THIS TABULATION IS INTENDED TO BE USED ONLY AS A GUIDE. THESE VELOCITIES ARE BASED UPON: 13 GAS VELOCITY BASED UPON FLOWING AIR AT STP 2) THE INSERTION LENGTH IS THE UNSUPPORTED LENGTH ASSUMED TO ALL BE EXPOSED TO THE PROCESS FLUID FLOW. THESE ARE CONSERVATIVE VALUES BASED ON THERMOWELLS INSERTED INTO A PIPE PERPENDICULAR TO THE FLOW. THESE VALUES MAY BE INCREASED FOR LOW MOLECULAR WEIGHT GASES. CALCULATIONS BASED UPON ACTUAL PROCESS CONDITIONS MAY ALLOW THESE VALUES TO BE EXCEEDED. | 5/8" | 1 3/8" HEX NPT\ 1/16” RADIUS LIMITATIONS AR WATER 1/2° 1" NPT \ VELOCITY A SINGLE PROCESS INDUSTRY FABRICATION PIECE CONSTRUCTION OF SHOWN METAL IN PIP (NO WELDING). PCCTEOQO1. PRACTICES DETAILS THREADED TAPERED THERMOWELL FiP PRACTICE REF. PCFTE100 PAGE 1 OF 1 ISSUED: APR 2014 REAFFIRMED: AUG 2019 01 Copyright Process Industry Practices Provided by Accuris under license with PIP No reproduction or networking permitted without license from Accuris Order Number: 02390549 Sold to:A&J DEFTEK CONSULTANTS [014421] - JISHAQ@AJDEFTEK.COM, Not for Resale,2023-06-19 12:16:35 UTC 3/16" — RADIUS Jr1 1/16” BORE 0.260" 1/4" ~T N 1/2" NPT —= ) 7 /) SPECIFY T [AG EXTENSION 2 2 1/4" (STANDARD) X SPECIFY M S X STAMP TW TAG NO.——— ON THE OUTSIDE EDGE OF THE FLANGE MAXIMUM FLUID VELOCITY v_[* LIMITATIONS (FEET PER SECOND) INSERTION LENGTH "U 7" 10” 16” AR 80 50 20 WATER 30 20 15 THIS TABULATION IS INTENDED TO BE USED ONLY AS A GUIDE. THESE VELOCITIES ARE BASED UPON: 1) GAS VELOCITY BASED UPON FLOWING AIR AT STP 2) THE INSERTION LENGTH IS THE UNSUPPORTED LENGTH ASSUMED TO ALL BE EXPOSED TO AIR FLOW. THESE ARE CONSERVATIVE VALUES BASED ON THERMOWELLS INSERTED INTO A PIPE PERPENDICULAR TO THE FLOW. THESE VALUES MAY BE INCREASED FOR LOW MOLECULAR WEIGHT GASES. CALCULATIONS BASED UPON ACTUAL PROCESS CONDITIONS MAY ALLOW THESE VALUES TO BE EXCEEDED. U DIMENSION INSTALLATION IN PIPE ELBOW PERPENDICULAR INTO PIPE TANKS, VESSELS PIPE SIZE 2" & SMALLER =5 > 6" u DIMENSION 7" o 10” < 6" — INSTALL 7 PREFERRED INSTALLATION 6— 8 >8 | ——— 10 16" Copyright Process Industry Practices Provided by Accuris under license with PIP No reproduction or networking permitted without license from Accuris NOTES SWAGE UP T0 2" 7 v WELL [ ] INDUSTRY FABRICATION PRACTICES =g P DETAILS IS IN ELBOW DUE TO VELOCITY CONSIDERATIONS REVIEW VESSEL FOR INTERNAL OBSTRUCTIONS (TRAYS, MIXERS, MATERIAL |316 SS (STANDARD) |SPECIFY R |FLANGE RATING AND SIZE (INCLUDE_SPECIAL FINISH, IF REQ'D) 11/2° 150§ RF 11/2" 300# RF SPECIFY NOTES: 1) LAG EXTENSION LENGTH TO BE SPECIFIED BASED UPON THE THICKNESS OF INSULATION ON THE PIPE (OR EQUIPMENT) WHERE THE TW IS INSTALLED. 2) SPECIFY TO TW FABRICATOR; U — INSERTION LENGTH T — LAG EXTENSION M — MATERIAL OF CONSTRUCTION R — FLANGE SIZE AND RATING 3) FLANGE MATERIAL SHALL BE THE SAME AS THE THERMOWELL MATERIAL. 4) MANUFACTURER SHALL SPECIFY THAT THE THERMOWELL IS DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH ASME CODE FOR PRESSURE VESSELS AND PIPING. 5) STRAIGHT OR STEPPED SHANK WELL SHALL NOT BE SUBSTITUTED WITHOUT VELOCITY LIMIT CALCULATIONS. 6) TW TO MEET CRITERIA FOR CONSTRUCTION SHOWN IN PIP PCCTEOO1. PROCESS IN FLBOW v DETAIL PCFTE102 = < PENETRATION DOUBLE WELD X OO0 w|C FULL THERMOWELL MODEL NO. [ TYPE W FLANGED THERMOWELL PER FABRICATION F FABRICATION TYPE F FLANGED, TAPERED THERMOWELL INSERTION LENGTH RF FLANGE (F) (PER ASME B16.5) 5/8" l~——— PRACTICE FLANGED TAPERED THERMOWELL REF. PCFTE100 PAGE 1 OF 1 ISSUED: APR 1999 REAFFIRMED: AUG 2019 PCFTE102 ETC.) Order Number: 02390549 Sold to:A&J DEFTEK CONSULTANTS [014421] - JISHAQ@AJDEFTEK.COM, Not for Resale,2023-06-19 12:16:35 UTC STAMP TW MODEL NUMBER ON END OF TW BORE 0.260” N | 2 1y~ ¥pr N PYWW\ ] /\/\/\/\/ FABRICATION TYPE [W__[WELD=IN_TAPERED THERMOWELL U INSERTION LENGTH B 21/2" M Ju EXTENSION X SPECIFY M WELL MATERIAL S 3165S (STANDARD) X SPECIFY J* [ (NOTE 1) INSTALLATION INTO PIPE |< 4” >4 U NOTES DIMENSION 2 1/2" | SWAGE UP TO 4" 4 1/7 — — — — | INSTALL 41/2" IN ELBOW | PREFERRED INSTALLATION IS IN_ELBOW DUE_TO VELOCITY CONSIDERATIONS 4) TW SHOWN CONSTRUCTION Copyright Process Industry Practices Provided by Accuris under license with PIP No reproduction or networking permitted without license from Accuris R PROCESS INDUSTRY FABRICATION THERMOWELL IS DESIGNED AND CODE FOR PRESSURE VESSELS FOR SIZE ] 3) MANUFACTURER SHALL SPECIFY THAT THE CONSTRUCTED IN ACCORDANCE WITH ASME AND PIPING. CRITERIA PIPE 2" & SMALLER PERPENDICULAR 2) SPECIFY TO TW FABRICATOR: U — INSERTION LENGTH T — LAG EXTENSION M — MATERIAL OF CONSTRUCTION MEET 300 U DIMENSION T & LARGER| LAG |2” (STANDARD) 500 WATER 150 100 THIS TABULATION IS INTENDED TO BE USED ONLY AS A GUIDE. THESE VELOCITIES ARE BASED UPON: 1) GAS VELOCITY BASED UPON FLOWING AIR AT STP 2) THE INSERTION LENGTH IS THE UNSUPPORTED LENGTH ASSUMED TO ALL BE EXPOSED TO THE PROCESS FLUID FLOW. THESE ARE CONSERVATIVE VALUES BASED ON THERMOWELLS INSERTED INTO A PIPE PERPENDICULAR TO THE FLOW. THESE VALUES MAY BE INCREASED FOR LOW MOLECULAR WEIGHT GASES. CALCULATIONS BASED UPON ACTUAL PROCESS CONDITIONS MAY ALLOW THESE VALUES TO BE EXCEEDED. P NOTES: 1) LAG EXTENSION LENGTH TC() BE SPECIFIED)BASED UPON THE THICKNESS OF INSULATION ON THE PIPE (OR EQUIPMENT) WHERE THE TW IS INSTALLED. TO AR o IN ELBOW T 2 [(w]w _ u f THERMOWELL MODEL NO. TYPE WELD—IN _TAPERED THERMOWELL PER FABRICATION DETAIL PCFTE103 [F MAXIMUM VELOCITY LIMITATIONS (FEET PER SECOND) FLUID INSERTION LENGTH "U” 2 1/2" 4 1/7 ['s) [ T ow /e / IN PIP PRACTICES DETAILS & o | PRACTICE WELD—-IN TAPERED THERMOWELL PCCTEOQO1. REF. PCFTE100 PAGE 1 OF 1 ISSUED: NOV 1999 REAFFIRMED: AUG 2019 PCFTE103 Order Number: 02390549 Sold to:A&J DEFTEK CONSULTANTS [014421] - JISHAQ@AJDEFTEK.COM, Not for Resale,2023-06-19 12:16:35 UTC 134+ T | v 11/16” . o0 b V2 NPT\ ) ] I F — MAXIMUM VELOCITY LIMITATIONS (FEET PER SECOND) FLUID BORE 0.260” — ¢ | R < C 1/16" ., RADIUS . 1/4"— - LOW MOLECULAR [F__[FABRICATION TYPE [[S” [ SOCKET—WELD, TAPERED THERMOWELL Y INSERTION LENGTH c D 71/2" 10 1/2 B X 4172 Ju [* EXTENSION (STANDARD) NO pe SPECIFY M WELL MATERIAL S 316 SS (STANDARD) X SPECIFY [» ON THE PIPE (OR EQUIPMENT) WHERE THE TW IS INSTALLED. 2) SPECIFY TO TW FABRICATOR: ) U — INSERTION BASED INSTALLATION | pIPE SIZE u 2" & 41/2" T T SMALLER : PERPENDICULAR | Z < g' 6" INTO PIPE 8 10°-12" S 1o NOTES DIMENSION | SWAGE UP TO 2" 5 10172 o INSTALL IN_ELBOW PREFERRED INSTALLATION ]IS IN ELBOW DUE TO VELOCITY CONSIDERATIONS 2| 41/2" 7RV1/2 | NOTES: 1) LAG EXTENSION LENGTH TO BE SPECIFIED BASED UPON THE THICKNESS OF INSULATION CALCULATIONS U DIMENSION IN ELBOW SPECIFY T LAG_EXTENSION (T) NOTE 1 30 X [wlF (U) WEIGHT GASES. UPON ACTUAL PROCESS CONDITIONS MAY ALLOW THESE VALUES TO BE EXCEEDED. STAMP TW TAG NO. ON SIDE OF TW THERMOWELL MODEL NO. [ TYPE w TAPERED SOCKETWELD THERMOWELL PER FABRICATION DETAIL PCFIE104 INSERTION LENGTH "U” 41/2° |7 1/2° [10 172 AR 120 80 50 WATER 50 30 20 THIS TABULATION IS INTENDED TO BE USED ONLY AS A GUIDE. THESE VELOCITIES ARE BASED UPON: 13 GAS VELOCITY BASED UPON FLOWING AIR AT STP 2) THE INSERTION LENGTH IS THE UNSUPPORTED LENGTH ASSUMED TO ALL BE EXPOSED TO THE PROCESS FLUID FLOW. THESE ARE CONSERVATIVE VALUES BASED ON THERMOWELLS INSERTED INTO A PIPE PERPENDICULAR TO THE FLOW. THESE VALUES MAY BE INCREASED FOR LENGTH T — LAG EXTENSION M — MATERIAL OF CONSTRUCTION 3) TW TO BE FABRICATED FROM A SINGLE PIECE OF METAL (NO WELDING). 4) TW TO MEET CRITERIA FOR CONSTRUCTION SHOWN IN PIP PCCTEQO1. Copyright Process Industry Practices Provided by Accuris under license with PIP No reproduction or networking permitted without license from Accuris PROCESS INDUSTRY FABRICATION SOCKETWELD TAPERED PRACTICES == ' DETAILS W THERMOWELL Order Number: 02390549 Sold to:A&J DEFTEK CONSULTANTS [014421] - JISHAQ@AJDEFTEK.COM, Not for Resale,2023-06-19 12:16:35 UTC . ' PRACTICE REF. PCFTE100 PAGE 1 OF 1 R . R 20 019