! GateValveComponent GATEwhichOpenandClosefluidflowwithoutchangein flowdirection Handwheel Yoke Stem Gland Glandpacking(Seal) Bonnet Backseat Body 083 WedDis 343 Seatring Gate valve testing and maintenance 1- Purpose of using Gate Valve on stream Gate Valve is used to open and close the flow only. Not commonly used in flow control with the following components. GateValveComponent GATEwhichOpenandClosefluidflowwithoutchangein flowdirection Handwheel Yoke Stem Gland Glandpacking(Seal) Bonnet Backseat Body 083 WedDis 343 Seatring 2- Operation (open-closed) of Gate Valve 3- The Hydrostatic Test for Gate Valve requires 3 parts, Shell, Seat, and Backseat The hydro-testing according to API 598. The valve standard is ASME B16.34 PressureTesting-GateValve Pressure/HydrostaticTestperAPI598forGateValve ASMEB16.34Standard; 1.BackseatTest 2.ShellTest 3.ClosureTests(SeatTests)-Bothside Pressure RatingClass Valve MaximumOperatingPressure(MOP)/ Standard PressureRating ANSI 300 B16.341 740 BODYWCBST EM 13CR FIG.NO 0312F-5 @100°FMOP~410 DISC HF SERIALNO. OP @800°FM HF SEAT NameplateofAGateValve Credit:ASME816.34,API598 !"#$%&'($)$*&( REPORT THIS AD ***Gate Valve – Hydrotest Backseat; The Hydrostatic Backseat Test must be tested at a pressure of not less than 1.1 times the Maximum Operating Pressure by fully opening the valve and releasing the gland of the gate valve to check for leaks through the Backseat. PressureTesting-GateValve HydrostaticBackseatTestperAPI598forGateValveASMEB16.34 Standard; Fullyopen,andthepackingglandlooseorpackingnotinstalled BackseatTestPressure≥1.1xPressureRating(MOP)at38°C Novisualevidenceofleakagethroughthebackseat Gandlos BACKSE ATTEST Detectleakagethrough TheBackseat FullyOpen tredit.Aur363441338emadr.sos.com ***Gate Valve – Hydrotest Shell; Hydrostatic Shell Test must be tested at a pressure not less than 1.5 times the Maximum Operating Pressure by opening the valve partially open and tightening the gland to get the pressure. Then check for leaks through Shell. ***Gate Valve – Hydrotest Seat; Hydrostatic Closure Test or Seat Test, continue to test from Shell Test at the pressure not less than 1.1 times of Maximum Operating Pressure by closing the valve fully closed and then checking the leak through Seat and Disk. Both tests must be done on two (2) – Side of Gate Valve. ***Valve – Pressure Test Duration; Valve ‘s minimum hydrostatic/pneumatic pressure test, according to the table in API 598, where the test duration is the time we spend checking the valve leak after The pressure can be maintained at Test pressure. !"#$%&'($)$*&( Line Blind LINE BLIND REPORT THIS AD SHARE THIS: ! " LIKE THIS: Like Be the first to like this. Related Flow direction of Valve – Part 3 ( Globe valve ) September 15, 2017 IN "PIPING" Flow direction of Valve – Part 5 ( Butterfly valve ) September 18, 2017 IN "PIPING" Globe Valve components and working December 10, 2019 IN "API 570 - PI" One thought on “Gate valve testing and maintenance” Afzalmeraj OCTOBER 23, 2022 AT 2:40 PM Dear friends. I inform you that I need specification and testing of valves like Ball valves and Gate valve, butterfly valve etc. Note: it’s urgent please. ! Liked by 1 person REPLY Leave a Reply Your email address will not be published. Required fields are marked * Comment * Name * Email * Website POST COMMENT Notify me of new comments via email. Notify me of new posts via email. PREVIOUS Erosion in Refinery, Petrochemical Plant NEXT SMTS and Allowable Stress ! !"#$%&'($)$*&( Line Blind LINE BLIND REPORT THIS AD Translation Teua Lugha Imedhaminiwa na Google Tafsiri Subscribe to Blog via Email Enter your email address to subscribe to this blog and receive notifications of new posts by email. Email Address SUBSCRIBE Join 313 other subscribers Follow AMARINE Followers Blog Stats 1,463,659 hits Start a Blog at WordPress.com. Follow