Rolls-Royce Corporation M250-C47 COMMERCIAL ENGINE BULLETIN (CEB) Technical Publications Index June 1, 2023 Rolls-Royce COMMERCIAL ENGINE BULLETIN INDEX CEB No. Subject 72-6001 Engine, Turbine, Release of No. 5 Labyrinth Date Published Revision Number Date Revised 2 03-17-00 Compliance Requirement Compliance Completed 10-31-96 Seal Air Tube Slip Joint - Replacement 72-6002 Engine, Compressor, Scroll Assembly, 07-30-97 Replacement 72-6003 Engine Assembly, Self-Sealing Quick Disconnect Fuzz Burning Chip Detector - Reissue Cancelled 11-15-97 Add 72-6004 Engine Assembly - Electrical Harness 02-22-99 Clamping Changes 72-6005 Engine, Gearbox Assembly, Gearbox Cover 01-07-99 Assembly With Splitline Flange Clearance Cut - Replace A-72-6006 Engine, Accessory Gearbox Assembly - 01-15-98 4 10-04-01 12-21-98 1 05-12-08 07-30-97 3 04-28-99 09-30-85 12 03-06-19 06-30-97 2 10-08-08 02-27-98 2 10-12-99 06-10-98 1 11-18-98 02-15-98 1 03-31-98 11-15-97 2 03-02-09 Improved No. 3 and No. 4 Bearings - Install 72-6007 Engine, Compressor Assembly, Release of New Number One Bearing Housing to Reduce One Hertz Whine 72-6008 Engine, Fuel and Control - Release of New Accessory Harness and Anti-ice Tube C47B Only 72-6009 Model 250 Engine or Module Conversion Authorization 72-6010 Engine, Gearbox Assembly - N2 Spare Pad Activation Hardware for C47B Engines Installed in Bell 407 Aircraft Only 72-6011 Engine, Compressor Assembly, Compressor Rear Support - New Stationary Seal Coating 72-6013 Engine, Turbine Assembly - Reidentification 12-15-97 of Fourth Stage Turbine Wheel 72-6014 Engine, Power and Accessory Gearbox PTO Gearshaft Grooves - Add 72-6015 Engine, Compressor Assembly - Removal of Compressor Vent Gaskets 72-6016 Engine Assembly, Self-Sealing Quick Disconnect, Fuzz Burning Chip Detector Add M250-C47 INDEX Revised June 1, 2023 PAGE 1 OF 11 Rolls-Royce COMMERCIAL ENGINE BULLETIN INDEX CEB No. Subject 72-6017 Engine, Turbine Assembly, Horizontal Date Published Revision Number Date Revised 04-30-98 2 11-30-98 07-01-89 4 11-05-99 07-31-98 2 02-10-14 11-22-99 2 02-22-10 12-14-98 1 08-12-99 12-31-93 7 03-29-18 11-05-99 3 05-03-10 06-30-00 3 03-06-19 2 10-17-00 9 04-30-18 Compliance Requirement Compliance Completed Fireshield - Replace 72-6019 Engine, Accessory Gearbox Oil Filter Housing - Add Bronze Bushings to “Oil In”, “Oil Out”, and “Bypass” Ports 72-6020 Engine, Turbine Assembly - Gas Producer Turbine Support - Replace 72-6021 Engine, Compressor Assembly - Release of 11-17-98 New Number One Bearing Scavenge Tube 72-6022 Canceled Prior To Publication 72-6023 Engine, Turbine Assembly - Recoating Of Power Turbine Inner Shaft 72-6025 Engine, Compressor Assembly, Release of New Number One Bearing Assembly to Reduce One Hertz Whine 72-6026 Engine, Turbine Assembly, Authorization to Reidentify Semi–Finished 2nd Stage Nozzles 72-6028 Engine, Gearbox Assembly - Release Of New Helical Torquemeter Gearshaft Assemblies and Internal Retaining Rings (Damper) 72-6029 Engine, Turbine Assembly - Release of New Engine Rear Mount Assembly 72-6030 Engine Assembly - Self Sealing, Quick 07-06-99 Disconnect, Fuzz Burning Chip Detector Add C47M Only A-72-6032 Engine Assembly - Inspection Of The New Cancelled Self-Sealing Magnetic Chip Detectors A-72-6033 Engine, Compressor Assembly - New 06-09-00 Compressor scroll A-72-6034 Engine, Turbine - One-Time Inspection For 02-23-00 Overtemperature Damage 72-6036 Engine, Combustion Section - Release of 08-04-00 Standard Combustion Liner A-72-6037 Engine, Turbine - Inspection of 1st-Stage 03-29-00 Nozzle Shield Dome M250-C47 INDEX Revised June 1, 2023 PAGE 2 OF 11 Rolls-Royce COMMERCIAL ENGINE BULLETIN INDEX CEB No. Subject 72-6040 Engine, Turbine Assembly - Replacement Date Published Revision Number Date Revised 08-23-01 1 03-21-02 3 02–03–04 03–05–04 2 02-18-05 08-24-04 1 04-19-05 3 05-25-09 3 01-19-09 Compliance Requirement Compliance Completed of 3rd-stage Nozzle 72-6042 Engine, Turbine Assembly - Replacement 03-21-02 Of 4th-Stage Nozzle 72-6043 Engine, Main Accessory Gearbox - Release 04-25-02 of Rework And Reidentified Lip Seals A-72-6044 Engine, Compressor Assembly - 06-21-02 Replacement of Splined Compressor Rotor Adapter 72–6047 Engine, Oil Pump Assembly - Release of 06–22–04 New Oil Pump Gear Shafts A-72-6048 Engine, Turbine Assembly - Inspection of 10–01–03 4th-Stage Turbine Wheels (23066744) 72-6049 Engine, Gearbox Assembly - Release of 10-13-04 New Pinion and Gear Set, Low Speed Gearbox A-72-6050 Engine, Turbine Section - Inspection of Rolls–Royce Model 250-C47B Third–Stage Turbine Wheels (6898663) 72-6051 Engine, Turbine Assembly - Release of New 2nd-Stage Turbine Splined Adapter and Spline Lock Nut 72-6052 Engine, Gearbox Assembly - Replacement 02-07-05 of Breather Gear Seal 72-6053 Engine, Gearbox Assembly - Release of 02-09-07 New Centrifugal Breather Gearshaft with Molybdenum Coating A-72-6054 Engine, Turbine Assembly - New Threshold Cancelled Event Recording And New Steady-State Operation Avoidance Range Limit 72-6055 Engine, Compressor Rear Support 09-20-05 Assembly - Inspect #2 Bearing Lock Key Slot Radii A-72-6056 Engine, Gearbox Assembly - Inspection 06-30-05 And Rework of Gearbox Housings A-72-6060 Engine, Turbine Assembly - Power Turbine 10-09-06 Outer Shaft M250-C47 INDEX Revised June 1, 2023 PAGE 3 OF 11 Rolls-Royce COMMERCIAL ENGINE BULLETIN INDEX CEB No. Subject 72-6061 Engine - Gearbox Assembly - New Power Date Published Revision Number Date Revised 08-17-07 5 02-08-17 08-08-07 2 02-22-08 12-30-89 3 02-04-08 06-20-14 2 07-23-21 07-30-80 4 01-14-10 04-11-11 2 04-25-22 04-30-12 3 11-28-18 12-14-12 1 08-12-13 12-18-13 1 05-19-14 03-18-13 2 12-18-13 06-17-13 1 03-24-14 03-04-13 2 03-24-14 05-14-14 2 07-29-14 06-27-14 3 01-04-17 Compliance Requirement Compliance Completed Gears 72-6062 Engine - Gearbox Assembly - New 15 HP Spare Drive Gearshaft 72-6063 Engine, Accessory Gearbox Assembly, Flanged Studs for Compressor Mounting Boss Repair 72-6064 Engine - Turbine - Power Turbine Support Rework and Reidentification on Series IV Engines 72-6065 Engine, Power and Accessory Gearbox Cover Assembly Turbine Support Studs -Replace 72-6067 Engine, Compressor Assembly Replacement of No. 2 Bearing 72-6068 M250-C47B, C47M, C30R/3M Series Engine Enhancement Kit 72-6070 Engine Gearbox Assembly - Inspection of 05-07-12 Gearbox Cover 72-6071 Engine, Accessory Gearbox Assembly Improved Torquemeter Thrust (Ball) Bearing - Install 72-6072 Engine, Gearbox Assembly - Release of New Helical Torquemeter Gearshaft Assemblies 72-6073 Engine, Turbine Assembly - 2nd-stage Turbine Wheel Inspection and Peen 72-6074 Engine, Series IV Diffuser Assembly Braze Inspection 72-6075 Engine, Assembly - Inspection of Mag Plugs to Detect Metal Generation from the No. 2 Bearing A-72-6077 Engine - Spur Adapter Gearshaft, Retaining Ring A-72-6078 Engine - Turbine Assembly - Inspection of 3rd Stage Turbine Wheels 6898663 M250-C47 INDEX Revised June 1, 2023 PAGE 4 OF 11 Rolls-Royce COMMERCIAL ENGINE BULLETIN INDEX CEB No. Subject A-72-6079 Engine, Compressor Assembly - Inspection Date Published Revision Number Date Revised 07-29-14 1 08-22-14 09-03-14 1 07-13-15 01-20-15 6 05-18-23 3 02-02-17 2 04-13-22 Compliance Requirement Compliance Completed of Front Support P/N M250-10051, M25010052, M250-10059, M250-10060 72-6080 Engine - No. 5 Bearing Retaining Ring Replacement 72-6081 Engine - Gearbox Assembly Replacement of Oil Delivery Tube (Piccolo Tube) 72-6082 Engine - Turbine, Removal of Aft 11-17-14 Combustion Drain Valve 72-6083 Engine - No. 8 Bearing Manufactured by 03-27-15 NHBB A-72-6085 Engine, Combustion Assembly- Inspection 09-01-16 of Outer Combustion Case P/N M25010404 A-72-6086 Engine, Turbine Section- Replacement of 10-23-18 Rolls-Royce Single-Piece Wire Patch Outer Combustion Case Assemblies 72-6087 M250 Gearbox Oil Check Valve, Guide, 10-16-19 Poppet, Check Valve Replace P/N 23085911 and 6898840 with New P/N M250-10893 or P/N M250-10894 72-6088 Engine, Combustion Section- Replacement 05-10-18 of Combustion Liner 72-6089 Engine, Combustion Assembly- 02-09-18 Replacement of Outer Combustion Case P/N 23030911 72-6090 23058137 Thrust-gas Prod Bearing Plate 12-16-22 M250-C47 INDEX Revised June 1, 2023 PAGE 5 OF 11 Rolls-Royce COMMERCIAL ENGINE BULLETIN INDEX CEB No. Subject 73-6001 Engine, Fuel and Control, Release New Date Published Revision Number Date Revised 10-31-96 2 10-10-97 01-31-97 1 10-15-97 07-31-96 1 08-05-96 08-07-96 1 06-26-97 1 07-13-99 3 06-18-98 Compliance Requirement Compliance Completed 05-15-96 Hardware and Software Version of Assembly, P/N 23064650 73-6002 Cancelled Prior to Publication 73-6003 Engine, Electrical System, Install New Clamping 73-6004 Engine, Fuel and Control, HMU to CEFA Tube Assembly, Replace 73-6005 Cancelled Prior to Publication 73-6006 Cancelled Prior to Publication A-73-6007 Engine, Fuel and Control, Inspection of Main Metering Valve Spring Pin A-73-6008 Engine, Fuel and Control, Inspection of P1 Rate Adjustment Nut 73-6009 Cancelled Prior to Publication A-73-6010 Engine, Fuel and Control, Main Electrical 10-15-96 Harness - Replace A-73-6011 Engine, Fuel and Control, Disconnect of N2 Overspeed A-73-6012 Engine, Fuel and Control - One Time Cancelled 12-197 10-31-96 Inspection of Electronic Control Unit Assembly 73-6013 Engine, Fuel and Control - Rework of CEFA 10-15-97 to Provide Clearance For Self-Sealing Chip Detectors A-73-6014 Engine, Fuel and Control - FADEC Assembly, Increased N2 Overspeed Trip Cancelled 12-0197 Limit - 250-C47B Only A-73-6015 Engine, Fuel and Control - Release of New HMU Incorporating a Minimum Flow Superseded by CEB A-73-6017 Overspeed Solenoid Valve and New ECU 250-C47B Only 73-6016 Cancelled Prior to Publication A-73-6017 Engine, Fuel and Control - Release of New 12-4-97 HMU Incorporating a Minimum Flow Overspeed Solenoid Valve and New ECU and One-Time Inspection of Internal Components of the ECU M250-C47 INDEX Revised June 1, 2023 PAGE 6 OF 11 Rolls-Royce COMMERCIAL ENGINE BULLETIN INDEX CEB No. Subject 73-6018 Engine, Fuel and Control System, Date Published Revision Number Date Revised 4 12-19-00 2 08-17-98 04-15-99 1 08-16-99 05-07-99 1 08-04-00 11-06-98 4 12-02-03 2 06-08-01 Compliance Requirement Compliance Completed 03-15-97 Permanent Magnet Alternator (PMA) Replace 73-6020 Engine, Fuel and Control, Rework of HMU 06-30-97 to Provide Clearance Cut on Housing 73-6021 Engine, Fuel Control - Hydromechanical 11-26-97 Unit Assembly - Incorporation of a Screened Standpipe 73-6022 Engine, Fuel and Control, Hydromechanical 09-15-97 Unit (HMU) - Overspeed Solenoid Replace 73-6023 Engine, Fuel and Control - Electronic Control Unit (ECU) - Upgrade Software A-73-6024 Engine, Fuel and Control - One-Time Cancelled 7-1598 02-23-98 Inspection of Internal Components of the ECU 73-6025 Engine, Fuel and Control - Release of A 03-08-99 New Hydromechanical Unit (HMU) For C47M Engines 73-6026 Engine, Fuel and Control - Electronic Control Unit (ECU) Upgrade Software 73-6029 Engine, Fuel and Control - Release of New CEFA With Increased By-Pass Valve, Increased Thermal Lockout Temperature and New Filter Element A-73-6030 Engine, Fuel and Control - Inspection of HMU Drive Splines 73-6031 Engine, Fuel and Control - Release of 03-25-99 Flared Fuel Line Seals to Prevent Fuel Leaks A-73-6032 Engine, Fuel And Control - Electronic 11-23-99 Control Unit (ECU) - Upgrade Hardware And Software 73-6033 Engine, Fuel and Control - 04-28-99 Hydromechanical Unit (HMU) - Replace 73-6034 Engine, Fuel And Control - CEFA - Addition 10-11-99 Of A Second Hole For Lockwiring 73-6035 Engine, Fuel And Control - 12-03-99 Hydromechanical Unit (HMU) - Replace M250-C47 INDEX Revised June 1, 2023 PAGE 7 OF 11 Rolls-Royce COMMERCIAL ENGINE BULLETIN INDEX CEB No. Subject 73-6036 Engine, Fuel And Control - Release Of New Date Published Revision Number Date Revised 06-23-00 3 07–01–04 05–08–03 1 05–23–03 09–04–03 1 08-30-04 1 12-23-04 Compliance Requirement Compliance Completed Electronic Control Unit (ECU) 73-6039 Engine, Fuel And Control - 07-31-02 Hydromechanical Unit (HMU) - Incorporate Screened P1 Nozzle A–73–6040 Engine, Fuel And Control - One Time Inspection of Power Lever (PLA) Signal of The HMU A-73-6041 Engine, Fuel Delivery - Release of New Fuel Nozzle A-73-6042 Engine, Fuel And Control - 12–02–03 Hydromechanical Unit (HMU) - Incorporate Dual Element PLA Potentiometer 73-6044 Engine, Fuel And Control - Inspection of 01-07-05 Hydromechanical Unit (HMU) Drive Splines A-73-6045 Engine, Fuel And Control - One Time 12-10-04 Inspection of The Hydrmechanical Unit (HMU) P1 Nozzle A-73-6046 Engine, Fuel And Control - Cancelled 05-27-05 Hydromechanical Unit (HMU) Procedures 06-22-09 For Checking P1 Nozzle Screen For Contamination 73-6048 Engine, Fuel And Control - Introduction of 01-29-07 5 02-07-11 3 06-01-16 Reversionary Governor Electronic Control Unit (ECU) 73-6050 Engine, Fuel and Control Hydromechanical Unit Assembly Improved Design Power Lever Angle (PLA) 09-20-10 Cancelled 11/1/10 and Metering Valve (MV) Potentiometers 73-6051 Engine, Fuel and Control - Goodrich Model 04-23-09 EMC-35A Hydromechanical Unit (HMU) - Cancelled One-Time Inspection of Relief Valve Wall 09-07-09 Thickness 73-6052 Engine, Fuel & Control - 12-03-12 Triumph (Goodrich) Electronic Control Unit (ECU) - Overspeed Protection System (OSPS) Power Supply Design Improvement M250-C47 INDEX Revised June 1, 2023 PAGE 8 OF 11 Rolls-Royce COMMERCIAL ENGINE BULLETIN INDEX CEB No. Subject 73-6054 Engine, Fuel and Control - Date Published Revision Number Date Revised 03-29-10 2 12-20-10 09-09-13 2 10-20-14 01-07-13 4 03-28-16 08-23-13 4 12-02-21 09-16-13 2 04-30-19 11-07-13 2 09-16-14 05-29-14 1 09-03-14 4 10-13-20 Compliance Requirement Compliance Completed Hydromechanical Unit (HMU) - One-Time Torque of Metering Head Regulator Cover Bolts 73-6055 Engine - Fuel Nozzle Spray Tip/Inner Air Shroud Replacement A-73-6056 Engine, Fuel & Control - Electronic Control Unit Assembly 73-6057 Engine, Fuel & Control - Electronic Control Unit Assembly 73-6058 Engine, Fuel & Control - Electronic Control Unit Assembly A-73-6059 Engine, Fuel & Control - Overspeed Adapter 73-6060 Engine, Fuel & Control - New ECU Software A-73-6061 Engine Fuel and Control- FPPU(Fuel Pump 06-24-15 and Power Unit) 73-6062 Engine, Electronic Engine Control-EEC 09-17-15 73-6063 Engine, Fuel and Control- Electronic 02-29-16 Control Unit (ECU)- One-Time Inspection of Reversionary Governor Board 73-6064 Engine, Fuel and Control – New ECU 02-14-22 Software -C47M 73-6065 Engine, Fuel Delivery - Fuel Nozzle Screen 03-18-20 Inspection M250-C47 INDEX Revised June 1, 2023 PAGE 9 OF 11 Rolls-Royce COMMERCIAL ENGINE BULLETIN INDEX CEB No. Subject 74-6001 Engine, Ignition System - Relocation of Date Published Revision Number Date Revised 08-04-00 2 06-04-02 10-31-05 1 11-18-08 Compliance Requirement Compliance Completed Ignition Lead 74-6002 Engine, Control System - Replace the Full Authority Digital Engine Control (FADEC) Exciter with the Non-FADEC Exciter on the FADEC Controlled 250 Engine Model 250C47 Series 74-6003 Engine, Ignition System- Repair or 06-23-17 Replacement of Select Rolls-Royce P/N 6899093 (Unison P/N 10-614950-1) Ignition Exciters M250-C47 INDEX Revised June 1, 2023 PAGE 10 OF 11 Rolls-Royce COMMERCIAL ENGINE BULLETIN INDEX CEB No. Subject 75-6001 Engine, Air System - Bleed Valve With Date Published Revision Number Date Revised Compliance Requirement Compliance Completed 01–30–03 Improved Durability 75-6002 Air System, Valve, Anti-Ice - Rework of 09-05-11 Anti-Ice Valve M250-C47 INDEX Revised June 1, 2023 PAGE 11 OF 11
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )