Bitte decken Sie die schraffierte Fläche mit einem Bild ab. Please cover the shaded area with a picture. (24,4 x 7,6 cm) Cristian Martínez Internship Project Release and aprobation of VW ISIR´s Amount to collect: $462,047.00 Space for Sender Information Internal 9 February 2019 Author, © ContiTech AG 2 Problem statement Lack of training to use the BeOn portal by quality staff 40 part numbers with no approbatory note in PPAP Different targets among Quality and Sales departments Space for Sender Information Internal Aims 1 The creation of documentary packages for the releasing of ISIRs to VW. 2 Obtaining of the aprobatory note for the ISIR of the samples sent to VW 3 Take over the record of positive notes from VW and re-process in case of failure) . Space for Sender Information Internal Problem meassurement * Part numbers with note 6 rating have been classified as “conditioned until mayor test path inspection” Space for Sender Information Internal Root Cause analysis for note 3 Dimensional: There was not fund any part number with note 3 at this test. Laboratory: Conditioned to O-Ring test conclusion Fit: It is conditioned until mayor test path inspection Space for Sender Information Internal Action Plan Preparation of samples Releasing of ISIR to VW Validation of gauges Fit test Creation of documentary appendix Receipt of evaluation of Samples Training to quality staff for the use of BeOn Tracking of samples notes emitted by VW Uploading of documents to BeOn Deliver of VDA Cover Sheet to Sales department Sending of ISIR to VW Space for Sender Information Internal Fit Test Flowchart for production inspection. Space for Sender Information Internal › 1. Clamping of flanges of side A. › 2. Clamping of flanges of side B › 3. Verification of tube geometry of side A › 4. Verification of tube geometry of side B 9 February 2019 Author, © ContiTech AG Adrián Miranda, © ContiTech AG 11 Creation of documentary appendix Space for Sender Information Internal 9 February 2019 Author, © ContiTech AG 12 Improvement Detection Scheduling Of the cause for the reject of Note 1 in the samples sent in the past year of activities for the preparation of samples Visual help Metrics . For the preparation of samples and indicators for the control of the project Space for Sender Information Internal Challenges Availability of parts in the warehouse. Deficient organization at the tooling room Training in the BeOn System Quality staff turnover Delay in the deliver of parts by the warehouse Defects in the parts used to make the fit test Space for Sender Information Internal Lines defects Collision between the tube and the wall of the blocks. Space for Sender Information Internal 2/9/2019 15 O-Rings defects detected in parts Change of the color of the O-Ring. It must be purple. Breaks in the O-Ring of parts given by Warehouse Space for Sender Information Internal 9 February 2019 Author, © ContiTech AG 16 Warehouse audit protocol 01 Application escalation system 02 FIFO Audit 03 Validation of physical condition of finished product Space for Sender Information Internal Learned Lessons Organize The handling My time, activities and space of work. of Clients portals to upload PPAPs Preparation Importance of Of samples and documentary appendix for PPAPs Working in team Detect Working Parts of the process that can be improved Under pressure Space for Sender Information Internal 01 02 03 The checking of the notes emitted by VW for the samples sent on January and act according to the results. February The preparation and release of samples and PPAP of AUDI PHEV part numbers. February-March Support the creation of the documentary system for the PPAP of G05, G07 and G20 projects of BMW.Space for Sender Information February Internal Flow Process diagram for the release of samples & ISIR to VW A Iniciar B ¿La pieza cumple se encuentra dentro de las tolerancias permitidas? Levantamiento de escantillones Retrabajo ¿La pieza cumple se encuentra dentro de las tolerancias permitidas? Enviar a Laboratorio para prueba de materiales VW recibe la muestra y el CPM Emisión de estudios ¿Los escantillones están en buen estado? Llevar a mantenimiento Se envía a Metrología para pruebas dimensionales Emisión de estudios ¿La muestra pasó las pruebas dimensionales, de laboratorio y montaje? Toma de evidencia gráfica Ingresar a SAP Se emite nota aprobatoria ¿Hay existencias en almacén del NP? Almacén hace surtido de piezas Se emite nota 3 o 6 Solicitar corrida de producción Empaquetar las piezas para envío Se expide copia del VDA cover sheet a Ventas Llevar piezas a embarques Preparación de paquete documental Hacer solicitud al almacén FIN Cargar documentos al sistema BeOn Entrega de piezas a Calidad Realización de prueba de montaje A Enviar CPM al cliente. B Space for Sender Information Internal 9 February 2019 Author, © ContiTech AG 20