JOB SAFETY AND ENVIRONMENTAL ANALYSIS WORKSHEET (Note: Revisions to the JSEA are shown in bold italic print) Tools and or Equipment required: Division Office / Project: Job Location & Details: JSEA No: Rev. No.: Date Prepared: JSEA Participants: PPE Requirements: Responsible Supervisor: Approved by PM or nominee: Helmet Shoes/Boots Gloves Glasses Face Shield Harness Vest Respirator Ear Plugs JOB STEP HAZARDS IDENTIFIED CONTROLS REQUIRED (Eg. Remove overhead cable or isolate/sheath (Eg. Set Up Crane) (Eg. Electrocution from 11Kv Cables) overhead or monitor with spotter) Training PPE Needs July 2011 Page 1 of 1 Date: ACTION BY/RECORD (Eg. Supervisor)