Report No: 22PNG0004 / MT/ 001 Sheet 1 of 2 Test Date: 26th – Jan - 2023 Port Moresby - Unit 11, Section 53, Lot 15 & 16, Ume St, Gordons, NCD, Papua New Guinea Tel: +675 7999 8700 Applus PNG Ltd: 1-15480 MAGNETIC PARTICLE WELD TEST REPORT Client: Client Address: Project/Job: Item & Area of Item Tested: Client Request No: Technical Procedure No: Acceptance Criteria: Surface Preparation: Equipment Details: Method of Magnetization: Demagnetization: NACAP Niugini Ltd Site: C/- Deloitte Touché Tohmatsu Level 12 Deloitte Tower KRURP (Kutubu Refinery Upgrade Repair Project) MPI on Piping Laydown 7 - Moro 2057-NDT-MT-003 TP-03-01-47 Rev 4 ASME B31.3 2020 As Welded 2057-ICC-04.04-001 ASME V 2021 Carbon Steel Contract/Order No: Test Standard: Material Specification/Type: AC Yoke (03-01-212) Lighting Equipment: Magnetic Flow Method – AC No Current Source & Strength: >1000 Lux Inspection Torch 220 V AC - Test Media (Manufacturer): Ardrox 8901W & 800/3 (Chemetall) Visible, Wet Comments/Restrictions: Key to Imperfection Abbreviations BT Burn Through KC Crack, Crater PL Linear Porosity SMH Hammer Mark SUC Undercut EC KL PU SMT SXP Elongated Cavity Crack, Longitudinal Uniform Porosity Tool Mark (chipping mark) Excessive Penetration C GP KT SED SPT Complies Gas Pore Crack, Transverse Excessive Dressing (Under flushing) Surface Pitting DNC HiLo LP SGI SRC Does Not Comply Linear Misalignment Incomplete Root Penetration Incompletely Filled Groove Root Concavity (suck back) A IL LR SGS SSP Absence of Discontinuities Linear Inclusion (slag line) Lack of Root Fusion Shrinkage Groove Spatter NRD IN PG SMG STS No Recordable Discontinuities Inclusion Localised Porosity Grinding Mark Torn Surface Test Results: (All measurements are in millimeters) Identification 4-DH-3004-01 Test Personnel: Description W.02 Process GTAW Size 80mm Results NRD C/DNC C Willy Sirait MT Pcn Lev 2 Accredited for compliance with ISO/IEC 17025 - Testing Signatory: Accreditation No. 20469 Report Date: 26th January 2023 Disclaimer This report is the Copyright of Applus PNG Ltd and was prepared expressly for the customer as nominated on the front cover. Neither Applus PNG Ltd nor any person acting on its behalf (a) makes any warranty, express or implied, with respect to the use of any information or methods disclosed in this report or (b) assumes any liability with respect to the use of any information or methods disclosed in this report. Any recipient of this document, by their acceptance or use of this document, releases Applus PNG Ltd and their affiliates from any liability for direct, indirect, consequential or special loss or damage whether arising in contract, warranty, express or implied, tort or otherwise, and irrespective of fault, negligence and strict liability. Information related to test item traceability is client supplied. Email copies of this report are not official unless authenticated and signed by Applus PNG Ltd and are not to be modified in any manner without Applus PNG Ltd express written consent L5-PNG-004 Rev 2 Port Moresby - Unit 11, Section 53, Lot 15 & 16, Ume St, Gordons, NCD, Papua New Guinea Tel: +675 7999 8700 Applus PNG Ltd: 1-15480 PHOTOGRAPHS 4-DH-3004-01 W:02 Photo 1: Overview of all Welds and HAZ Area. L5-PNG-004 Rev 2 Report No: 22PNG0004 / MT/ 001 Sheet 2 of 2 Test Date: 26th – Jan - 2023 Port Moresby - Unit 11, Section 53, Lot 15 & 16, Ume St, Gordons, NCD, Papua New Guinea Tel: +675 7999 8700 Applus PNG Ltd: 1-15480 L5-PNG-004 Rev 2 Report No: 22PNG0004 / MT/ 001 Sheet 3 of 2 Test Date: 26th – Jan - 2023