Report No: 22PNG0004 / MT/ 001
Sheet 1 of 2
Test Date: 26th – Jan - 2023
Port Moresby - Unit 11, Section 53, Lot 15 & 16, Ume St, Gordons, NCD, Papua New Guinea
Tel: +675 7999 8700
Applus PNG Ltd: 1-15480
MAGNETIC PARTICLE WELD TEST REPORT
Client:
Client Address:
Project/Job:
Item & Area of Item Tested:
Client Request No:
Technical Procedure No:
Acceptance Criteria:
Surface Preparation:
Equipment Details:
Method of Magnetization:
Demagnetization:
NACAP Niugini Ltd
Site:
C/- Deloitte Touché Tohmatsu Level 12 Deloitte Tower
KRURP (Kutubu Refinery Upgrade Repair Project)
MPI on Piping
Laydown 7 - Moro
2057-NDT-MT-003
TP-03-01-47 Rev 4
ASME B31.3 2020
As Welded
2057-ICC-04.04-001
ASME V 2021
Carbon Steel
Contract/Order No:
Test Standard:
Material Specification/Type:
AC Yoke (03-01-212)
Lighting Equipment:
Magnetic Flow Method –
AC
No
Current Source & Strength:
>1000 Lux Inspection
Torch
220 V AC
-
Test Media (Manufacturer):
Ardrox 8901W & 800/3 (Chemetall) Visible, Wet
Comments/Restrictions:
Key to Imperfection Abbreviations
BT
Burn Through
KC
Crack, Crater
PL
Linear Porosity
SMH
Hammer Mark
SUC
Undercut
EC
KL
PU
SMT
SXP
Elongated Cavity
Crack, Longitudinal
Uniform Porosity
Tool Mark (chipping mark)
Excessive Penetration
C
GP
KT
SED
SPT
Complies
Gas Pore
Crack, Transverse
Excessive Dressing (Under flushing)
Surface Pitting
DNC
HiLo
LP
SGI
SRC
Does Not Comply
Linear Misalignment
Incomplete Root Penetration
Incompletely Filled Groove
Root Concavity (suck back)
A
IL
LR
SGS
SSP
Absence of Discontinuities
Linear Inclusion (slag line)
Lack of Root Fusion
Shrinkage Groove
Spatter
NRD
IN
PG
SMG
STS
No Recordable Discontinuities
Inclusion
Localised Porosity
Grinding Mark
Torn Surface
Test Results: (All measurements are in millimeters)
Identification
4-DH-3004-01
Test Personnel:
Description
W.02
Process
GTAW
Size
80mm
Results
NRD
C/DNC
C
Willy Sirait
MT Pcn Lev 2
Accredited for compliance
with ISO/IEC 17025 - Testing
Signatory:
Accreditation No. 20469
Report Date:
26th January 2023
Disclaimer
This report is the Copyright of Applus PNG Ltd and was prepared expressly for the customer as nominated on the front cover. Neither Applus PNG Ltd nor any person acting on its behalf (a) makes any warranty, express or implied, with respect to the use of any information or methods disclosed in this
report or (b) assumes any liability with respect to the use of any information or methods disclosed in this report. Any recipient of this document, by their acceptance or use of this document, releases Applus PNG Ltd and their affiliates from any liability for direct, indirect, consequential or special loss or
damage whether arising in contract, warranty, express or implied, tort or otherwise, and irrespective of fault, negligence and strict liability. Information related to test item traceability is client supplied.
Email copies of this report are not official unless authenticated and signed by Applus PNG Ltd and are not to be modified in any manner without Applus PNG Ltd express written consent
L5-PNG-004 Rev 2
Port Moresby - Unit 11, Section 53, Lot 15 & 16, Ume St, Gordons, NCD, Papua New Guinea
Tel: +675 7999 8700
Applus PNG Ltd: 1-15480
PHOTOGRAPHS
4-DH-3004-01 W:02
Photo 1: Overview of all Welds and HAZ Area.
L5-PNG-004 Rev 2
Report No: 22PNG0004 / MT/ 001
Sheet 2 of 2
Test Date: 26th – Jan - 2023
Port Moresby - Unit 11, Section 53, Lot 15 & 16, Ume St, Gordons, NCD, Papua New Guinea
Tel: +675 7999 8700
Applus PNG Ltd: 1-15480
L5-PNG-004 Rev 2
Report No: 22PNG0004 / MT/ 001
Sheet 3 of 2
Test Date: 26th – Jan - 2023