VOLUME II
STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES AND AIRPORTS
PART A – FACILITIES FOR THE ENGINEER
PART B – OTHER GENERAL REQUIREMENTS
PART C – EARTHWORKS (100 – 107)
100
Clearing and Grubbing
101
Removal of Structures and Obstructions
102
Excavation
103
Structural Excavation
104
Embankment
105
Subgrade and Preparation
106
Compaction Equipment and Density Control Strips
107
Overhaul
PART D – SUBBASE AND BASE COURSE (200 – 208)
200
Aggregate Subbase Course
201
Aggregate Base Course
202
Crushed Aggregate Base Course
203
Lime Stabilized Road Mix Base Course
204
Portland Cement Stabilized Road Mix Base Course
205
Asphalt Stabilized Road Mix Base Course
206
Chemically Stabilized Road Mix Subbase/Base Course
207
Portland Cement Treated Plant Mix Base Course
208
Aggregate Stockpile
PART E – SURFACE COURSES (300-313; no 312)
300
Aggregate Surface Coat
301
Bituminous Prime Coat
302
Bituminous Tack Coat
303
Bituminous Seal Coat
304
Bituminous Surface Treatment
304A
Slurry System for Road Surface Treatment
305
Bituminous Penetration Macadam Pavement
306
Bituminous Road Mix Surface Course
307
Bituminous Plant-Mix Surface Course – General
308
Bituminous Plant-Mix Surface Course, Cold Laid
309
Bituminous Plant-Mix Surface (Stockpile Maintenance Mixture)
310
311
313
Bituminous Concrete Surface Course, Hot Laid
Portland Cement Concrete Pavement
Rock Asphalt, Hot Laid
PART F – BRIDGE CONSTRUCTION (400-416)
400
Piling
401
Railing
402
Timber Structures
403
Metal Structures
404
Reinforcing Steel
405
Structural Concrete
406
Prestressed Concrete Structures
407
Concrete Structures
408
Steel Bridges
409
Welded Structural Steel
410
Treated and Untreated Timber
411
Paint
412
Elastomeric Bearing Pad
413
Pre-Molded Joint Filler for Concrete Paving and Structural Construction
414
Forms and Falseworks
415
Elastomeric, Hot-Applied Joint Sealant with Single-Sized Aggregates for Bridge Expansion Joints
416
Carbon Fiber
PART G – DRAINAGE AND SLOPE PROTECTION (500-520; 517 then 520)
500
Pipe Culverts and Storm Drains
501
Underdrains
502
Manholes, Inlets and Catch Basins
503
Drainage Steel Grating with Frame
504
Cleaning and Reconditioning Existing Drainage Structures
505
Riprap and Grouted Riprap
506
Stone Masonry
507
Rubble Concrete
508
Hand-Laid Rock Embankment
509
Sheet Piles
510
Concrete Slope Protection
511
Gabions and Mattresses
512
Erosion Control Mats, Roving and Cellular Confinement System
VOLUME II
STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES AND AIRPORTS
513
514
515
516
517
520
Permanent Ground Anchors
Shotcrete (Concrete Spray)
Mechanically-Stabilized Earth (MSE) Retaining Walls
Wet Stone Masonry (Cobble Stone)
Drain Pipe
Hydroseeding
PART H – MISCELLANEOUS STRUCTURES
(600-622; 614 then 618, 620 & 622)
600
Curb and/or Gutter
601
Sidewalk
602
Monuments, Markers and Guard Posts
603
Guardrails
604
Fencing
605
Road Sign
606
Pavement Markings
607
Reflective Pavement Studs
608
Topsoil
609
Sprigging
610
Sodding
611
Tree Planting
612
Reflective Thermoplastic Stripping Material (Solid Form)
613
Concrete Joint Sealant (Hot-Poured Elastic and Cold Applied Types)
614
Waterstops
618
Reflectorized Thermoplastic Rumble Strips
620
Chevron Signs
622
Coconet Bio-Engineering Solutions
PART I – MATERIALS DETAILS
(700-735; 716 then, 719, 726, 727, 729, 733-735)
700
Hydraulic Cement
701
Construction Lime (Hydrated)
702
Bituminous Materials
703
Aggregates
703A
Mineral Fillers
704
Masonry Units
705
Joint Materials
706
Concrete Clay, Plastic and Fiber Pipe
707
708
709
710
711
712
713
714
715
716
719
726
727
729
733
734
735
Metal Pipe
Chemical Admixture for Concrete
Paints
Reinforcing Steel and Wire Rope
Fence and Guardrail
Structural Metal
Treated and Untreated Timber
Water
Geotextiles
Drilling Slurry
Epoxy-Resin-Base Bonding System for Concrete
Coal Tar Surface Treatment
Non-shrink Grout
Protective Coating for Concrete
Zinc (Hot-Dip Galvanized Coatings on Iron and Steel Products)
Stone Mastic Asphalt
Porous Asphalt Mixture
VOLUME II
STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES AND AIRPORTS
PART A – FACILITIES FOR THE ENGINEER
1
Engineer’s Compound
Office including furniture, appliances and equipment
100 (2)
100 (3)
Lump sum
Laboratory including furniture, appliances and equipment
Survey equipment
2
3
4
5
6
Maintenance of office and laboratory
Consumables (deemed included on others)
Vehicles
Vehicle operations
Progress photograph
Month
No Pay Item
Each
Month
Each
PART B – OTHER GENERAL REQUIREMENTS
B.1
B.2 and B.3
Contractor’s compound
Office, stores, workshops, latrines, accommodations,
including fencing
No provision for Contractor’s compound
Medical room, first aid facilities; and
Medical Aide (deemed included on others)
B.4
B.4 (1)
B.4 (2)
B.4 (3)
B.4 (4)
B.4 (5)
B.4 (6)
B.4 (7)
Construction Survey and Staking
Construction survey and staking
Slope, reference and C&G stakes
Centerline re-establishment
Culvert survey and staking
Bridge survey and staking
Retaining wall survey and staking
Grade finishing stakes
(one-time measurement only)
B.4 (8)
Permanent monuments and markers
B.4 (9)
Miscellaneous survey and staking
B.4 (10)
Miscellaneous survey and staking
*
-
No Pay Item
100 (4)
101
Removal of Structures and Obstructions
101 (1)
Removal of Actual Structures and Obstructions
101 (2)
Removal of Actual Structures and Obstructions
101 (3)
Removal of Actual Structures and Obstructions
101 (4)
Removal of Actual Structures and Obstructions
*
*
Kilometer
Kilometer
Kilometer
Each
Lump sum
Lump sum
Kilometers
Each
Hour
Lump sum
PART C – EARTHWORKS
Hectare
Each
Lump sum
Each
Square meter
Linear meter
Cubic meter
Cubic meter
Cubic meter
Cubic meter
Surplus suitable = Suitable required – suitable from
excavation
Cost includes land obtaining and disposal
Separate Pay Item for excess roadway or borrow excavation
103
Structural Excavation
103 (1)
Structure Excavation
Don’t include:
Beyond 450mm neat line offset; for separate pay items
(culvert excavation, roadway excavation, excavation of
undisturbed ground before taking elevations, FTG with d
>1.5m); water; rehandled materials; concrete
103 (2)
Bridge Excavation
(inside 450mm neat lines)
103 (3)
Foundation Fill
103 (4)
Excavation ordered below plan elevation
(also, deeper than 1.5m, for Part K)
103 (5)
Shoring, cribbing and related work
(also, deeper than 1.5m, for Part K)
103 (6)
Pipe culverts and drain excavation
*
*
Lump sum
Each
Subsidiary obligation if not on Pay Item
102
Excavation
102 (1)
Unsuitable Excavation
(net volume in original position)
102 (2)
Surplus Common Excavation
102 (3)
Surplus Rock Excavation
102 (4)
Surplus Unclassified Excavation
*
*
Government expense if errors are from Engineer’s initial
references
100
Clearing and Grubbing
100 (1)
Clearing and Grubbing
Clearing and Grubbing
Individual Removal of Trees, Small
(150mm to 900mm)
Individual Removal of Trees, Large (>900mm)
Includes backfilling and disposal
Separate Pay Item for excess roadway or borrow excavation
Cubic meter
Cubic meter
Cubic meter
Cubic meter
Lump sum
Cubic meter
VOLUME II
STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES AND AIRPORTS
104
Embankment
104 (1)
Embankment
104 (2)
Selected Borrow for topping, Case 1
104 (3)
Selected Borrow for topping, Case 2
104 (4)
Earth Berm
*
Includes compaction
105
Subgrade Preparation
105 (1)
Subgrade Preparation (Common Material)
105 (2)
Subgrade Preparation (Existing Pavement)
105 (3)
Subgrade Preparation (Unsuitable Material)
*
106
106.4
PART E – SURFACE COURSE
Cubic meter
Cubic meter
Cubic meter
Meter
Square meter
Square meter
Square meter
107
Overhaul
107 (1)
Overhaul
(no Overhaul for excavations)
107 (2)
Overhaul of Borrow, Case 1
(no Case 2 – Borrow chosen by contractor)
Cubic
meter
kilometer
Cubic
meter
kilometer
Subsidiary obligation if not on Pay Item
PART D – SUBBASE AND BASE COURSE
200
201
202
203
Aggregate Subbase Course
Aggregate Base Course
Crushed Aggregate Base Course
Lime-Stabilized Road Mix Base Course
(New or Salvaged Soil-Aggregate)
Portland Cement Stabilized Road Mix Base Course (New or
Salvaged Soil-Aggregate)
Asphalt Stabilized Road Mix Base Course
(New or Salvaged Soil-Aggregate)
Chemically Stabilized Road Mix Subbase/ Base Course
Polymer-Based Chemical Soil Additive
Portland Cement Treated Plant Mix Base Course (New or
Salvaged Soil-Aggregate)
Aggregate Stockpile (average end area method)
204
205
206
207
208
*
Aggregate Surface Course
Gravel Surface Course
Crushed Aggregate Surface Course
Cubic meter
301
301 (1)
302 (2)
Bituminous Prime Coat
MC – Cut-back Asphalt
RC – Cut-back Asphalt
Square meter
302
301 (1)
302 (2)
Bituminous Tack Coat
RC – Cut-back Asphalt
Emulsified Asphalt
Square meter
303
303 (1)
303 (2)
303 (3)
303 (4)
Bituminous Seal Coat
Cover Aggregate, Type ___
MC ___ Cut-back Asphalt
RC ___ Cut-back Asphalt
Asphalt Cement Penetration Grade
Tonne
304
304 (1)
304 (2)
304 (3)
304 (4)
304 (5)
Bituminous Surface Treatment
Aggregate Grading
Asphalt Cement Penetration Grade
RC ___ Cut-back Asphalt
MC ___ Cut-back Asphalt
Emulsified Asphalt
Tonne
304A (1)
304A (2)
304A (3)
Slurry Surface Treatment (SST)
Slurry Seal
Micro-surfacing
Square meter
Square meter
Square meter
305
305 (1)
305 (2)
305 (3)
305 (4)
Bituminous Penetration Macadam Pavement
Aggregates
Asphalt Cement
RC ___ Cut-back Asphalt
Emulsified Asphalt
Tonne
306
306 (1)
306 (2)
Bituminous Road Mix Surface Course
Aggregate
Bituminous Material
Tonne
Includes compaction
Compaction Equipment and Density Control Strips
Incidental to work item. Trial sections included in BOQ will only be paid once
*
300
300 (1)
300 (2)
Includes compaction
Cubic meter
Cubic meter
Cubic meter
Cubic meter
Cubic meter
Cubic meter
Liter
Cubic meter
Cubic meter
-
*
*
Less aggregate moisture weight
Different Gs, but no unit cost adjustment
VOLUME II
STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES AND AIRPORTS
307
Bituminous Plant Mix Surface Course – General
*
*
308
Asphalt grade may be changed 1 step w/o change in unit
cost
No acceptance and final payment until test passed, except
Brgy Roads
Bituminous Plant Mix Surface Course, Cold Laid
*
*
Square meter
Square meter
No deduction in bituminous material
Batch weights are not permitted as method of
measurement
309
Bituminous Plant Mix Surface Course, Stockpile
Maintenance Mixture
Cubic meter
310
310 (1)
Bituminous Concrete Surface Course, Hot Laid
Asphaltic Concrete with Lahar as Fine Aggregate
Replacement
Hot Rolled Asphalt with Lahar as Fine Aggregate
Replacement
Square meter
311
311 (1)
311 (2)
311 (3)
311 (4)
311 (5)
311 (6)
311 (7)
Portland Cement Concrete Pavement
Unreinforced
Reinforced
Reinforced with Wire Mesh
Unreinforced with Coralline Materials as Coarse Aggregate
Reinforced with Coralline Materials as Coarse Aggregate
Unreinforced with Dolomites as Aggregates
Reinforced with Dolomites as Aggregates
Square meter
*
Accepted in lot:
• 1000 l.m per lane
• 500 l.m per two lanes
• L < ½ lot, include in previous
• L > ½ lot, add 1 lot
• Other areas to be included in 1 lot
Adjusted acdg to actual strength and thk
No acceptance and final payment until thickness test,
except brgy roads
Don’t include curb and gutter
*
*
*
313
Rock Asphalt, Hot Laid
PART F – BRIDGE CONSTRUCTION
400.5
Piles
400 (1)
Untreated Timber Piles, furnished
400 (2)
Treated Timber Piles, preservative, furnished
400 (3)
Steel H-Piles, furnished
400 (4)
Precast Concrete Piles, furnished
400 (5)
Precast, Prestressed Concrete Piles, furnished
400 (6)
Structural Steel Sheet Piles, furnished
400 (7)
Precast Concrete Sheet Piles, furnished
400 (8)
Untreated Timber Piles, driven
400 (9)
Treated Timber Piles, driven
400 (10)
Steel H-Piles, driven
400 (11)
Steel Pipes Pile
400 (12)
Structural Steel Sheet Piles, driven
400 (13)
Precast Concrete Sheet Piles, driven
400 (14)
Precast Concrete Piles, driven
400 (15)
Precast, Prestressed Concrete Piles, driven
400 (16)
Test Piles, furnished and driven
400 (17)
Concrete Piles cast in Drilled Holes
400 (18)
Concrete Piles cast in Steel Shells
400 (19)
Concrete Piles cast in Steel Pipes
400 (20)
Pile Shoes
400 (21)
Splices
400 (22)
Load Tests
400 (23)
Bored Piles (dia. ___ m)
400 (24)
Permanent Casing (dia. ___ m)
*
Added length without added compensation
401
Railing
Meter
402 (1)
Timber Structures
Span
*
Square meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Each
Each
Each
Meter
Meter
403
403 (1)
403 (2)
403 (3)
403 (4)
403 (5)
403 (6)
403 (7)
Bracings are incidentals
Metal Structures
Structural Steel, furnished, fabricated and erected
Structural Steel, furnished, fabricated and erected
Structural Steel, furnished, fabricated
Structural Steel, furnished, fabricated
Structural Steel erected
Structural Steel erected
Structural Steel, furnished, fabricated and erected
Kilogram
VOLUME II
STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES AND AIRPORTS
*
*
*
*
*
*
404
Falseworks are incidental
Unit Basis (kilograms) or Lump Sum basis
Other metal structures not on Pay Item, include here
No separate Pay Item for tests
When BOQ does not contain a Pay Item for structural steel,
provided will be paid as Item 404, Reinforcing Steel
Reinforcing Steel
*
*
*
405
405 (1)
405 (2)
405 (3)
405 (4)
405 (5)
When BOQ does not contain a Pay Item for structural
steel, provided will be paid as Item 404, Reinforcing Steel
No allowance for tie wires, chair bars and likes
No payment for splices by Contractor
Structural Concrete
Class A
Class B
Class C
Class P
Seal Concrete
*
406
406 (1)
406 (2)
408.4
Steel Bridges
* Shall be measured for payment in several items involved.
* No allowance for cofferdam, falsework and other
expenses
409.4
Welded Structural Steel
Shall not be measured unless provided in Special Provisions
410
410 (1)
410 (2)
Cubic meter
413
Each
Lump sum
Concrete Structures
Concrete Class A, C & P
Concrete Post / Baluster Railings
Parapet Walls
Piling
Structure Excavation
Sidewalk Concrete
404
407 (1)
Reinforcing Steel Bars
Lean Concrete
Measurement will not include falsework and likes
Elastomeric Bearing Pad
Each
Preformed Sponge Rubber and Cork Joint Expansion Fillers for
Concrete Paving and Structural Construction NONE
414
Forms and Falseworks
*
Cubic meter
Each
Cubic meter
Linear meter
Cubic meter
Square meter or
Cubic meter
Kilogram
Cubic meter
Cubic meter
Paint
Shall not be measured
412
Piling, as per Item 400
Includes all Material Requirements
407
405 (1)
405 (2)
405 (3)
400
103
601
Treated and Untreated Timber
Timber
Treated Timber
*
411.4
No deduction on rebars, conduits, weepholes, joint
materials and pipes (< 100mm diam)
Prestressed Concrete Structures
Prestressed Structural Concrete Members (Identification)
Prestressed Concrete
*
*
Kilograms
Forms and falseworks are incidental
Lump sum
Subsidiary obligation if not on Contract
415
Elastomeric, Hot-Applied Joint Sealant with Single Sized
Aggregates for Bridge Expansion Joints
Cubic meter
416
Carbon Fiber (Thk in mm)
Square meter
PART G – DRAINAGE AND SLOPE PROTECTION
500
500 (1)
500 (2)
Pipe Culverts and Storm Drain
Pipe Culverts, -mm, Class Storm Drain, -mm, Class -
Linear meter
VOLUME II
STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES AND AIRPORTS
*
*
*
*
*
Sections are measured by number of units
Class A bedding, cu.m, under Item 103
Connections are included in linear meter
Backfill, cu.m in place, under Item 103
If backfill is not on schedule, payment will be considered
included in excavation of backfill material
Units
501
501 (1)
501 (2)
501 (3)
Underdrains
Underdrain, -mm
Blind drain
Granular backfill filter material for underdrain
Linear meter
Linear meter
Cubic meter
502
502 (1)
502 (2)
502 (3)
502 (4)
502 (5)
502 (6)
502 (7)
502 (8)
Manholes, Inlets and Catch Basins
Manholes (incl. Junction Box)
Inlets, type
Catch basins
Concrete covers
Metal frames and gratings, type
Metal frames and covers
Adjusting manholes
Adjusting catch basins
Each
Each
Each
Each
Pair
Pair
Each
Each
For additional:
Concrete, as per Item 405, Structural Concrete
Reinforcing bars, ass per Item 404, Reinforcing Steel
Cubic meter
Kilograms
Metal frames and grating
Set
Concrete, as per Item 405, Structural Concrete
Reinforcing bars, ass per Item 404, Reinforcing Steel
Cubic meter
Kilograms
Cleaning and Reconditioning of Existing Drainage
Removing, cleaning, stockpiling salvaged culvert pipe
Removing, cleaning and relaying salvaged culvert pipe
Cleaning culvert pipe in place
Reconditioning drainage structures
Linear meter
Linear meter
Linear meter
Each
*
*
503
*
*
504
504 (1)
504 (2)
504 (3)
504 (4)
*
*
*
Irrespective of kind or size
Pipe replacement which cannot be acceptably repaired shall
be replaced without added compensation, including
excavation and backfill
If no Pay Item, pipe removed will be considered in Item 101,
Removal of Structures and Obstructions
505
505 (1)
505 (2)
505 (3)
505 (4)
505 (5)
505 (6)
505 (7)
505 (8)
505 (9)
Riprap and Grouted Riprap
Riprap, Class A
Riprap, Class B
Riprap, Class C
Riprap, Class D
Grouted Riprap, Class A
Grouted Riprap, Class B
Grouted Riprap, Class C
Grouted Riprap, Class D
Filter layer of granular material
*
506
Weepholes are incidental
Stone Masonry
*
507
508
509
509 (a)
509 (b)
509 (c)
Cubic meter
Includes foundation earthworks
Sheet Piles
Sheet Piles (Timber)
Sheet Piles (Steel)
Sheet Piles (Concrete)
*
Cubic meter
No deduction on weepholes
Hand-laid Rock Embankment
*
Cubic meter
No deduction on holes < 1 sq.m
Rubble Concrete
*
Cubic meter
Linear meter
Paid in full even if not fully driven
510
510 (1)
Concrete Slope Protection
Bed Course Granular Material
510 (2)
Concrete
511
511 (1)
Gabions and Mattresses
Gabions
Cubic meter inplace
Cubic meter inplace
Cubic meter
VOLUME II
STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES AND AIRPORTS
511 (2)
511 (3)
Mattresses
Filter Cloth
Cubic meter
Square meter
520
Hydroseeding
Square meter
PART H – MISCELLANEOUS STRUCTURES
*
512
512 (1)
512 (1)
512 (1)
*
*
513
*
*
514
514 (1)
514 (2)
Includes all necessary (excavation, subgrade, etc.)
Erosion Control Mats, Roving and Cellular Confinement
System (excluding overlaps)
Erosion Control Mat Type ___
Roving
Cellular Confinement System
Square meter
Top soil, Item 608
Turf Establishment:
Cubic meter
Seeding / mulching
Fertilizer, dry method
Square meter
Tonne
Permanent Ground Anchor
Linear meter
Sum of bonded and unbonded length
No change will be made due to Contractor’s alternatives
Shotcrete (Concrete Spray)
Shotcrete (with reinforcing steel)
Shotcrete (with reinforcing fibers)
515.5
Mechanically-Stabilized Earth Retaining Wall
515 (1)
Mechanically-Stabilized Earth (MSE) Retaining Wall
(Includes earth walls, backing mats, metal parts, hardware
cloths, and other such within or attached to MSE RW)
515 (2)
Select Granular Fill
515 (3)
Structural Backfill
Square meter
Square meter
Cubic meter
Cubic meter
*
*
Select Granular Backfill / Structural Backfill
Excavation (Item 103, Structure Excavation)
*
*
Concrete (Item 405, Structural Concrete)
Gabions (Item 511, Gabions and Mattresses)
Cubic meter
Cubic meter /
Lump sum
Cubic meter
Cubic meter
516
Wet Stone Masonry (Cobblestone)
Linear meter
517
Drain Pipe
Linear meter
600
600 (1)
600 (2)
600 (3)
600 (4)
600 (5)
600 (6)
Curbs and/or Gutter
Concrete Curb (Cast in place)
Concrete Gutter (Cast in place)
Curb and Gutter (Cast in place)
Concrete Curb (Precast)
Concrete Piece (Precast)
Curb and Gutter (Precast)
Linear meter
Linear meter
Linear meter
Piece
Piece
Piece
601
Sidewalk
Square meter
602
602 (1)
602 (2)
602 (3)
602 (4)
Monuments, Markers and Guide Posts
Right-of-Way monuments
Maintenance marker posts
Kilometer posts
Guide posts
Each
Each
Each
Each
603
603 (1)
603 (2)
603 (3a)
603 (3b)
603 (4)
Guardrail
Guardrail (Wire rope or Wire Cable)
Cable Guardrail (Chain Link Fabric)
Metal Guardrail (Metal Beam) Including Post
Metal Beam End Piece
Guardrail (Timber)
Linear meter
Linear meter
Linear meter
Each
Linear meter
604
604 (1)
604 (2)
604 (3)
604 (4)
Fencing
Fencing (Barbed wire)
Fencing (Chain Link Fence Fabric)
Fencing (Posts)
Fencing (Gates)
Linear meter
Linear meter
Each
Each
605
605 (1)
605 (2)
605 (3)
Road Signs
Warning Signs
Regulatory Signs
Informatory Signs
Each
606
606 (1)
606 (2)
Pavement Markings
Pavement markings (Premixed Reflectorized)
Pavement markings (Reflectorized Thermoplastic)
Square meter
607
Reflectorized Pavement Stud
Each
VOLUME II
STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES AND AIRPORTS
607 (1)
607 (2)
Reflectorized Pavement Stud (Flush Type)
Reflectorized Pavement Stud (Raised Profile Type)
608
608 (1)
608 (2)
Topsoil
Furnishing and Placing Topsoil
Placing Topsoil
Cubic meter
609
Sprigging
100 Square meter
610
Sodding
Square meter
611
611 (1)
611 (2)
Tree Planting
Trees (Furnishing and Transplanting)
Trees (Transplanting)
Each
612
612 (1)
612 (2)
Reflectorized Thermoplastic Stripping Material (Solid Form)
Reflectorized Thermoplastic Pavement Markings (White)
Reflectorized Thermoplastic Pavement Markings (Yellow)
Square meter
613
Kilograms
613 (1)
613 (2)
Concrete Joint Sealant (Hot-Poured Elastic and Cold-Applied
Types)
Concrete Joint Sealant (Hot-Poured Elastic Type)
Concrete Joint Sealant (Cold-Applied Type)
614
614-1
614-2
Waterstop
Waterstop, ___mm. width
Waterstop
Meter
Lump sum
618
Reflectorized Thermoplastic Rumble Strips
Square meter
620
Chevron Signs
Each
622
622 (1)
622 (2)
622 (3)
Coconet Bio-Engineering Solutions
Coco-net
Coco-logs / Fascine
Vegetation
*PART I – MATERIAL DETAILS
715
715.8.1
715.8.2
715.8.3
(*) 715.8.4
719.4
726
Square meter
Linear meter
Square meter
Geotextile
Geotextile from pavement lines
Separation Geotextile
Drainage Geotextile
Paving Fabric
Hydraulic Filter
Silt Fence
Temporary Silt Fence
Remaining Sediment
Removed sediment
Excavation, backfill, bedding and cover material are separate
pay items
Square meter
Square meter
Square meter
Square meter
Square meter
Linear meter
Cubic meter
Epoxy-Resin-Based Bonding System for Concrete
Shall not be measured and paid for separately, but included in Contract price
Coal Tar Surface Treatment
Square meter
727.5
Epoxy-Resin-Based Bonding System for Concrete
Shall not be measured and paid for separately, but included in Contract price
729.5
Protective Coating for Concrete
Shall not be measured and paid for separately
733.8
Zinc (Hot-Dip Galvanization) Coating for Iron and Steel Products
Shall not be measured and paid for separately
734
Stone Mastic Asphalt with Cellulose Fiber Surface Course,
Hot Laid
No deduction for weight of bituminous material
Batchweights not permitted
Asphalt grade may be changed 1 step w/o change in unit
cost
Porous Asphalt Pavement with Polymer Modified Bitumen
No compensation when Asphalt Cement is rained and
returned to Contractor
*
*
*
735
*
Square meter
Square meter