VOLUME II STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES AND AIRPORTS PART A – FACILITIES FOR THE ENGINEER PART B – OTHER GENERAL REQUIREMENTS PART C – EARTHWORKS (100 – 107) 100 Clearing and Grubbing 101 Removal of Structures and Obstructions 102 Excavation 103 Structural Excavation 104 Embankment 105 Subgrade and Preparation 106 Compaction Equipment and Density Control Strips 107 Overhaul PART D – SUBBASE AND BASE COURSE (200 – 208) 200 Aggregate Subbase Course 201 Aggregate Base Course 202 Crushed Aggregate Base Course 203 Lime Stabilized Road Mix Base Course 204 Portland Cement Stabilized Road Mix Base Course 205 Asphalt Stabilized Road Mix Base Course 206 Chemically Stabilized Road Mix Subbase/Base Course 207 Portland Cement Treated Plant Mix Base Course 208 Aggregate Stockpile PART E – SURFACE COURSES (300-313; no 312) 300 Aggregate Surface Coat 301 Bituminous Prime Coat 302 Bituminous Tack Coat 303 Bituminous Seal Coat 304 Bituminous Surface Treatment 304A Slurry System for Road Surface Treatment 305 Bituminous Penetration Macadam Pavement 306 Bituminous Road Mix Surface Course 307 Bituminous Plant-Mix Surface Course – General 308 Bituminous Plant-Mix Surface Course, Cold Laid 309 Bituminous Plant-Mix Surface (Stockpile Maintenance Mixture) 310 311 313 Bituminous Concrete Surface Course, Hot Laid Portland Cement Concrete Pavement Rock Asphalt, Hot Laid PART F – BRIDGE CONSTRUCTION (400-416) 400 Piling 401 Railing 402 Timber Structures 403 Metal Structures 404 Reinforcing Steel 405 Structural Concrete 406 Prestressed Concrete Structures 407 Concrete Structures 408 Steel Bridges 409 Welded Structural Steel 410 Treated and Untreated Timber 411 Paint 412 Elastomeric Bearing Pad 413 Pre-Molded Joint Filler for Concrete Paving and Structural Construction 414 Forms and Falseworks 415 Elastomeric, Hot-Applied Joint Sealant with Single-Sized Aggregates for Bridge Expansion Joints 416 Carbon Fiber PART G – DRAINAGE AND SLOPE PROTECTION (500-520; 517 then 520) 500 Pipe Culverts and Storm Drains 501 Underdrains 502 Manholes, Inlets and Catch Basins 503 Drainage Steel Grating with Frame 504 Cleaning and Reconditioning Existing Drainage Structures 505 Riprap and Grouted Riprap 506 Stone Masonry 507 Rubble Concrete 508 Hand-Laid Rock Embankment 509 Sheet Piles 510 Concrete Slope Protection 511 Gabions and Mattresses 512 Erosion Control Mats, Roving and Cellular Confinement System VOLUME II STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES AND AIRPORTS 513 514 515 516 517 520 Permanent Ground Anchors Shotcrete (Concrete Spray) Mechanically-Stabilized Earth (MSE) Retaining Walls Wet Stone Masonry (Cobble Stone) Drain Pipe Hydroseeding PART H – MISCELLANEOUS STRUCTURES (600-622; 614 then 618, 620 & 622) 600 Curb and/or Gutter 601 Sidewalk 602 Monuments, Markers and Guard Posts 603 Guardrails 604 Fencing 605 Road Sign 606 Pavement Markings 607 Reflective Pavement Studs 608 Topsoil 609 Sprigging 610 Sodding 611 Tree Planting 612 Reflective Thermoplastic Stripping Material (Solid Form) 613 Concrete Joint Sealant (Hot-Poured Elastic and Cold Applied Types) 614 Waterstops 618 Reflectorized Thermoplastic Rumble Strips 620 Chevron Signs 622 Coconet Bio-Engineering Solutions PART I – MATERIALS DETAILS (700-735; 716 then, 719, 726, 727, 729, 733-735) 700 Hydraulic Cement 701 Construction Lime (Hydrated) 702 Bituminous Materials 703 Aggregates 703A Mineral Fillers 704 Masonry Units 705 Joint Materials 706 Concrete Clay, Plastic and Fiber Pipe 707 708 709 710 711 712 713 714 715 716 719 726 727 729 733 734 735 Metal Pipe Chemical Admixture for Concrete Paints Reinforcing Steel and Wire Rope Fence and Guardrail Structural Metal Treated and Untreated Timber Water Geotextiles Drilling Slurry Epoxy-Resin-Base Bonding System for Concrete Coal Tar Surface Treatment Non-shrink Grout Protective Coating for Concrete Zinc (Hot-Dip Galvanized Coatings on Iron and Steel Products) Stone Mastic Asphalt Porous Asphalt Mixture VOLUME II STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES AND AIRPORTS PART A – FACILITIES FOR THE ENGINEER 1 Engineer’s Compound Office including furniture, appliances and equipment 100 (2) 100 (3) Lump sum Laboratory including furniture, appliances and equipment Survey equipment 2 3 4 5 6 Maintenance of office and laboratory Consumables (deemed included on others) Vehicles Vehicle operations Progress photograph Month No Pay Item Each Month Each PART B – OTHER GENERAL REQUIREMENTS B.1 B.2 and B.3 Contractor’s compound Office, stores, workshops, latrines, accommodations, including fencing No provision for Contractor’s compound Medical room, first aid facilities; and Medical Aide (deemed included on others) B.4 B.4 (1) B.4 (2) B.4 (3) B.4 (4) B.4 (5) B.4 (6) B.4 (7) Construction Survey and Staking Construction survey and staking Slope, reference and C&G stakes Centerline re-establishment Culvert survey and staking Bridge survey and staking Retaining wall survey and staking Grade finishing stakes (one-time measurement only) B.4 (8) Permanent monuments and markers B.4 (9) Miscellaneous survey and staking B.4 (10) Miscellaneous survey and staking * - No Pay Item 100 (4) 101 Removal of Structures and Obstructions 101 (1) Removal of Actual Structures and Obstructions 101 (2) Removal of Actual Structures and Obstructions 101 (3) Removal of Actual Structures and Obstructions 101 (4) Removal of Actual Structures and Obstructions * * Kilometer Kilometer Kilometer Each Lump sum Lump sum Kilometers Each Hour Lump sum PART C – EARTHWORKS Hectare Each Lump sum Each Square meter Linear meter Cubic meter Cubic meter Cubic meter Cubic meter Surplus suitable = Suitable required – suitable from excavation Cost includes land obtaining and disposal Separate Pay Item for excess roadway or borrow excavation 103 Structural Excavation 103 (1) Structure Excavation Don’t include: Beyond 450mm neat line offset; for separate pay items (culvert excavation, roadway excavation, excavation of undisturbed ground before taking elevations, FTG with d >1.5m); water; rehandled materials; concrete 103 (2) Bridge Excavation (inside 450mm neat lines) 103 (3) Foundation Fill 103 (4) Excavation ordered below plan elevation (also, deeper than 1.5m, for Part K) 103 (5) Shoring, cribbing and related work (also, deeper than 1.5m, for Part K) 103 (6) Pipe culverts and drain excavation * * Lump sum Each Subsidiary obligation if not on Pay Item 102 Excavation 102 (1) Unsuitable Excavation (net volume in original position) 102 (2) Surplus Common Excavation 102 (3) Surplus Rock Excavation 102 (4) Surplus Unclassified Excavation * * Government expense if errors are from Engineer’s initial references 100 Clearing and Grubbing 100 (1) Clearing and Grubbing Clearing and Grubbing Individual Removal of Trees, Small (150mm to 900mm) Individual Removal of Trees, Large (>900mm) Includes backfilling and disposal Separate Pay Item for excess roadway or borrow excavation Cubic meter Cubic meter Cubic meter Cubic meter Lump sum Cubic meter VOLUME II STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES AND AIRPORTS 104 Embankment 104 (1) Embankment 104 (2) Selected Borrow for topping, Case 1 104 (3) Selected Borrow for topping, Case 2 104 (4) Earth Berm * Includes compaction 105 Subgrade Preparation 105 (1) Subgrade Preparation (Common Material) 105 (2) Subgrade Preparation (Existing Pavement) 105 (3) Subgrade Preparation (Unsuitable Material) * 106 106.4 PART E – SURFACE COURSE Cubic meter Cubic meter Cubic meter Meter Square meter Square meter Square meter 107 Overhaul 107 (1) Overhaul (no Overhaul for excavations) 107 (2) Overhaul of Borrow, Case 1 (no Case 2 – Borrow chosen by contractor) Cubic meter kilometer Cubic meter kilometer Subsidiary obligation if not on Pay Item PART D – SUBBASE AND BASE COURSE 200 201 202 203 Aggregate Subbase Course Aggregate Base Course Crushed Aggregate Base Course Lime-Stabilized Road Mix Base Course (New or Salvaged Soil-Aggregate) Portland Cement Stabilized Road Mix Base Course (New or Salvaged Soil-Aggregate) Asphalt Stabilized Road Mix Base Course (New or Salvaged Soil-Aggregate) Chemically Stabilized Road Mix Subbase/ Base Course Polymer-Based Chemical Soil Additive Portland Cement Treated Plant Mix Base Course (New or Salvaged Soil-Aggregate) Aggregate Stockpile (average end area method) 204 205 206 207 208 * Aggregate Surface Course Gravel Surface Course Crushed Aggregate Surface Course Cubic meter 301 301 (1) 302 (2) Bituminous Prime Coat MC – Cut-back Asphalt RC – Cut-back Asphalt Square meter 302 301 (1) 302 (2) Bituminous Tack Coat RC – Cut-back Asphalt Emulsified Asphalt Square meter 303 303 (1) 303 (2) 303 (3) 303 (4) Bituminous Seal Coat Cover Aggregate, Type ___ MC ___ Cut-back Asphalt RC ___ Cut-back Asphalt Asphalt Cement Penetration Grade Tonne 304 304 (1) 304 (2) 304 (3) 304 (4) 304 (5) Bituminous Surface Treatment Aggregate Grading Asphalt Cement Penetration Grade RC ___ Cut-back Asphalt MC ___ Cut-back Asphalt Emulsified Asphalt Tonne 304A (1) 304A (2) 304A (3) Slurry Surface Treatment (SST) Slurry Seal Micro-surfacing Square meter Square meter Square meter 305 305 (1) 305 (2) 305 (3) 305 (4) Bituminous Penetration Macadam Pavement Aggregates Asphalt Cement RC ___ Cut-back Asphalt Emulsified Asphalt Tonne 306 306 (1) 306 (2) Bituminous Road Mix Surface Course Aggregate Bituminous Material Tonne Includes compaction Compaction Equipment and Density Control Strips Incidental to work item. Trial sections included in BOQ will only be paid once * 300 300 (1) 300 (2) Includes compaction Cubic meter Cubic meter Cubic meter Cubic meter Cubic meter Cubic meter Liter Cubic meter Cubic meter - * * Less aggregate moisture weight Different Gs, but no unit cost adjustment VOLUME II STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES AND AIRPORTS 307 Bituminous Plant Mix Surface Course – General * * 308 Asphalt grade may be changed 1 step w/o change in unit cost No acceptance and final payment until test passed, except Brgy Roads Bituminous Plant Mix Surface Course, Cold Laid * * Square meter Square meter No deduction in bituminous material Batch weights are not permitted as method of measurement 309 Bituminous Plant Mix Surface Course, Stockpile Maintenance Mixture Cubic meter 310 310 (1) Bituminous Concrete Surface Course, Hot Laid Asphaltic Concrete with Lahar as Fine Aggregate Replacement Hot Rolled Asphalt with Lahar as Fine Aggregate Replacement Square meter 311 311 (1) 311 (2) 311 (3) 311 (4) 311 (5) 311 (6) 311 (7) Portland Cement Concrete Pavement Unreinforced Reinforced Reinforced with Wire Mesh Unreinforced with Coralline Materials as Coarse Aggregate Reinforced with Coralline Materials as Coarse Aggregate Unreinforced with Dolomites as Aggregates Reinforced with Dolomites as Aggregates Square meter * Accepted in lot: • 1000 l.m per lane • 500 l.m per two lanes • L < ½ lot, include in previous • L > ½ lot, add 1 lot • Other areas to be included in 1 lot Adjusted acdg to actual strength and thk No acceptance and final payment until thickness test, except brgy roads Don’t include curb and gutter * * * 313 Rock Asphalt, Hot Laid PART F – BRIDGE CONSTRUCTION 400.5 Piles 400 (1) Untreated Timber Piles, furnished 400 (2) Treated Timber Piles, preservative, furnished 400 (3) Steel H-Piles, furnished 400 (4) Precast Concrete Piles, furnished 400 (5) Precast, Prestressed Concrete Piles, furnished 400 (6) Structural Steel Sheet Piles, furnished 400 (7) Precast Concrete Sheet Piles, furnished 400 (8) Untreated Timber Piles, driven 400 (9) Treated Timber Piles, driven 400 (10) Steel H-Piles, driven 400 (11) Steel Pipes Pile 400 (12) Structural Steel Sheet Piles, driven 400 (13) Precast Concrete Sheet Piles, driven 400 (14) Precast Concrete Piles, driven 400 (15) Precast, Prestressed Concrete Piles, driven 400 (16) Test Piles, furnished and driven 400 (17) Concrete Piles cast in Drilled Holes 400 (18) Concrete Piles cast in Steel Shells 400 (19) Concrete Piles cast in Steel Pipes 400 (20) Pile Shoes 400 (21) Splices 400 (22) Load Tests 400 (23) Bored Piles (dia. ___ m) 400 (24) Permanent Casing (dia. ___ m) * Added length without added compensation 401 Railing Meter 402 (1) Timber Structures Span * Square meter Meter Meter Meter Meter Meter Meter Meter Meter Meter Meter Meter Meter Meter Meter Meter Meter Meter Meter Meter Each Each Each Meter Meter 403 403 (1) 403 (2) 403 (3) 403 (4) 403 (5) 403 (6) 403 (7) Bracings are incidentals Metal Structures Structural Steel, furnished, fabricated and erected Structural Steel, furnished, fabricated and erected Structural Steel, furnished, fabricated Structural Steel, furnished, fabricated Structural Steel erected Structural Steel erected Structural Steel, furnished, fabricated and erected Kilogram VOLUME II STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES AND AIRPORTS * * * * * * 404 Falseworks are incidental Unit Basis (kilograms) or Lump Sum basis Other metal structures not on Pay Item, include here No separate Pay Item for tests When BOQ does not contain a Pay Item for structural steel, provided will be paid as Item 404, Reinforcing Steel Reinforcing Steel * * * 405 405 (1) 405 (2) 405 (3) 405 (4) 405 (5) When BOQ does not contain a Pay Item for structural steel, provided will be paid as Item 404, Reinforcing Steel No allowance for tie wires, chair bars and likes No payment for splices by Contractor Structural Concrete Class A Class B Class C Class P Seal Concrete * 406 406 (1) 406 (2) 408.4 Steel Bridges * Shall be measured for payment in several items involved. * No allowance for cofferdam, falsework and other expenses 409.4 Welded Structural Steel Shall not be measured unless provided in Special Provisions 410 410 (1) 410 (2) Cubic meter 413 Each Lump sum Concrete Structures Concrete Class A, C & P Concrete Post / Baluster Railings Parapet Walls Piling Structure Excavation Sidewalk Concrete 404 407 (1) Reinforcing Steel Bars Lean Concrete Measurement will not include falsework and likes Elastomeric Bearing Pad Each Preformed Sponge Rubber and Cork Joint Expansion Fillers for Concrete Paving and Structural Construction NONE 414 Forms and Falseworks * Cubic meter Each Cubic meter Linear meter Cubic meter Square meter or Cubic meter Kilogram Cubic meter Cubic meter Paint Shall not be measured 412 Piling, as per Item 400 Includes all Material Requirements 407 405 (1) 405 (2) 405 (3) 400 103 601 Treated and Untreated Timber Timber Treated Timber * 411.4 No deduction on rebars, conduits, weepholes, joint materials and pipes (< 100mm diam) Prestressed Concrete Structures Prestressed Structural Concrete Members (Identification) Prestressed Concrete * * Kilograms Forms and falseworks are incidental Lump sum Subsidiary obligation if not on Contract 415 Elastomeric, Hot-Applied Joint Sealant with Single Sized Aggregates for Bridge Expansion Joints Cubic meter 416 Carbon Fiber (Thk in mm) Square meter PART G – DRAINAGE AND SLOPE PROTECTION 500 500 (1) 500 (2) Pipe Culverts and Storm Drain Pipe Culverts, -mm, Class Storm Drain, -mm, Class - Linear meter VOLUME II STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES AND AIRPORTS * * * * * Sections are measured by number of units Class A bedding, cu.m, under Item 103 Connections are included in linear meter Backfill, cu.m in place, under Item 103 If backfill is not on schedule, payment will be considered included in excavation of backfill material Units 501 501 (1) 501 (2) 501 (3) Underdrains Underdrain, -mm Blind drain Granular backfill filter material for underdrain Linear meter Linear meter Cubic meter 502 502 (1) 502 (2) 502 (3) 502 (4) 502 (5) 502 (6) 502 (7) 502 (8) Manholes, Inlets and Catch Basins Manholes (incl. Junction Box) Inlets, type Catch basins Concrete covers Metal frames and gratings, type Metal frames and covers Adjusting manholes Adjusting catch basins Each Each Each Each Pair Pair Each Each For additional: Concrete, as per Item 405, Structural Concrete Reinforcing bars, ass per Item 404, Reinforcing Steel Cubic meter Kilograms Metal frames and grating Set Concrete, as per Item 405, Structural Concrete Reinforcing bars, ass per Item 404, Reinforcing Steel Cubic meter Kilograms Cleaning and Reconditioning of Existing Drainage Removing, cleaning, stockpiling salvaged culvert pipe Removing, cleaning and relaying salvaged culvert pipe Cleaning culvert pipe in place Reconditioning drainage structures Linear meter Linear meter Linear meter Each * * 503 * * 504 504 (1) 504 (2) 504 (3) 504 (4) * * * Irrespective of kind or size Pipe replacement which cannot be acceptably repaired shall be replaced without added compensation, including excavation and backfill If no Pay Item, pipe removed will be considered in Item 101, Removal of Structures and Obstructions 505 505 (1) 505 (2) 505 (3) 505 (4) 505 (5) 505 (6) 505 (7) 505 (8) 505 (9) Riprap and Grouted Riprap Riprap, Class A Riprap, Class B Riprap, Class C Riprap, Class D Grouted Riprap, Class A Grouted Riprap, Class B Grouted Riprap, Class C Grouted Riprap, Class D Filter layer of granular material * 506 Weepholes are incidental Stone Masonry * 507 508 509 509 (a) 509 (b) 509 (c) Cubic meter Includes foundation earthworks Sheet Piles Sheet Piles (Timber) Sheet Piles (Steel) Sheet Piles (Concrete) * Cubic meter No deduction on weepholes Hand-laid Rock Embankment * Cubic meter No deduction on holes < 1 sq.m Rubble Concrete * Cubic meter Linear meter Paid in full even if not fully driven 510 510 (1) Concrete Slope Protection Bed Course Granular Material 510 (2) Concrete 511 511 (1) Gabions and Mattresses Gabions Cubic meter inplace Cubic meter inplace Cubic meter VOLUME II STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES AND AIRPORTS 511 (2) 511 (3) Mattresses Filter Cloth Cubic meter Square meter 520 Hydroseeding Square meter PART H – MISCELLANEOUS STRUCTURES * 512 512 (1) 512 (1) 512 (1) * * 513 * * 514 514 (1) 514 (2) Includes all necessary (excavation, subgrade, etc.) Erosion Control Mats, Roving and Cellular Confinement System (excluding overlaps) Erosion Control Mat Type ___ Roving Cellular Confinement System Square meter Top soil, Item 608 Turf Establishment: Cubic meter Seeding / mulching Fertilizer, dry method Square meter Tonne Permanent Ground Anchor Linear meter Sum of bonded and unbonded length No change will be made due to Contractor’s alternatives Shotcrete (Concrete Spray) Shotcrete (with reinforcing steel) Shotcrete (with reinforcing fibers) 515.5 Mechanically-Stabilized Earth Retaining Wall 515 (1) Mechanically-Stabilized Earth (MSE) Retaining Wall (Includes earth walls, backing mats, metal parts, hardware cloths, and other such within or attached to MSE RW) 515 (2) Select Granular Fill 515 (3) Structural Backfill Square meter Square meter Cubic meter Cubic meter * * Select Granular Backfill / Structural Backfill Excavation (Item 103, Structure Excavation) * * Concrete (Item 405, Structural Concrete) Gabions (Item 511, Gabions and Mattresses) Cubic meter Cubic meter / Lump sum Cubic meter Cubic meter 516 Wet Stone Masonry (Cobblestone) Linear meter 517 Drain Pipe Linear meter 600 600 (1) 600 (2) 600 (3) 600 (4) 600 (5) 600 (6) Curbs and/or Gutter Concrete Curb (Cast in place) Concrete Gutter (Cast in place) Curb and Gutter (Cast in place) Concrete Curb (Precast) Concrete Piece (Precast) Curb and Gutter (Precast) Linear meter Linear meter Linear meter Piece Piece Piece 601 Sidewalk Square meter 602 602 (1) 602 (2) 602 (3) 602 (4) Monuments, Markers and Guide Posts Right-of-Way monuments Maintenance marker posts Kilometer posts Guide posts Each Each Each Each 603 603 (1) 603 (2) 603 (3a) 603 (3b) 603 (4) Guardrail Guardrail (Wire rope or Wire Cable) Cable Guardrail (Chain Link Fabric) Metal Guardrail (Metal Beam) Including Post Metal Beam End Piece Guardrail (Timber) Linear meter Linear meter Linear meter Each Linear meter 604 604 (1) 604 (2) 604 (3) 604 (4) Fencing Fencing (Barbed wire) Fencing (Chain Link Fence Fabric) Fencing (Posts) Fencing (Gates) Linear meter Linear meter Each Each 605 605 (1) 605 (2) 605 (3) Road Signs Warning Signs Regulatory Signs Informatory Signs Each 606 606 (1) 606 (2) Pavement Markings Pavement markings (Premixed Reflectorized) Pavement markings (Reflectorized Thermoplastic) Square meter 607 Reflectorized Pavement Stud Each VOLUME II STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES AND AIRPORTS 607 (1) 607 (2) Reflectorized Pavement Stud (Flush Type) Reflectorized Pavement Stud (Raised Profile Type) 608 608 (1) 608 (2) Topsoil Furnishing and Placing Topsoil Placing Topsoil Cubic meter 609 Sprigging 100 Square meter 610 Sodding Square meter 611 611 (1) 611 (2) Tree Planting Trees (Furnishing and Transplanting) Trees (Transplanting) Each 612 612 (1) 612 (2) Reflectorized Thermoplastic Stripping Material (Solid Form) Reflectorized Thermoplastic Pavement Markings (White) Reflectorized Thermoplastic Pavement Markings (Yellow) Square meter 613 Kilograms 613 (1) 613 (2) Concrete Joint Sealant (Hot-Poured Elastic and Cold-Applied Types) Concrete Joint Sealant (Hot-Poured Elastic Type) Concrete Joint Sealant (Cold-Applied Type) 614 614-1 614-2 Waterstop Waterstop, ___mm. width Waterstop Meter Lump sum 618 Reflectorized Thermoplastic Rumble Strips Square meter 620 Chevron Signs Each 622 622 (1) 622 (2) 622 (3) Coconet Bio-Engineering Solutions Coco-net Coco-logs / Fascine Vegetation *PART I – MATERIAL DETAILS 715 715.8.1 715.8.2 715.8.3 (*) 715.8.4 719.4 726 Square meter Linear meter Square meter Geotextile Geotextile from pavement lines Separation Geotextile Drainage Geotextile Paving Fabric Hydraulic Filter Silt Fence Temporary Silt Fence Remaining Sediment Removed sediment Excavation, backfill, bedding and cover material are separate pay items Square meter Square meter Square meter Square meter Square meter Linear meter Cubic meter Epoxy-Resin-Based Bonding System for Concrete Shall not be measured and paid for separately, but included in Contract price Coal Tar Surface Treatment Square meter 727.5 Epoxy-Resin-Based Bonding System for Concrete Shall not be measured and paid for separately, but included in Contract price 729.5 Protective Coating for Concrete Shall not be measured and paid for separately 733.8 Zinc (Hot-Dip Galvanization) Coating for Iron and Steel Products Shall not be measured and paid for separately 734 Stone Mastic Asphalt with Cellulose Fiber Surface Course, Hot Laid No deduction for weight of bituminous material Batchweights not permitted Asphalt grade may be changed 1 step w/o change in unit cost Porous Asphalt Pavement with Polymer Modified Bitumen No compensation when Asphalt Cement is rained and returned to Contractor * * * 735 * Square meter Square meter