Client End User Employer Consultant Contractor Manufacturer Supplier Development of Infrastructure and Public Realm for Al Noud (Al Khrair) Al Ain Package 2 Abu Dhabi Housing Authority Al Ain City Municipality (AACM) ALDAR Projects LLC AECOM Middle East, Abu Dhabi Combined Group Contracting Emirates (L.L.C.), Abu Dhabi M/s. Orient Concrete Products Factory, Sharjah M/s. Orient Concrete Products Factory, Sharjah Material UPHC Bike Rack for Street Scape Works (Alternative) Project Name AND-IN-CGC-P2-ZZ-XX-MT-SS-00019 S.No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Contents Compliance checklist Specification/s Contract & Manufacturer's Drawings Catalogue/Brochure Recent Test Certificates BOQ Previous approvals Sample Warranty License/s of Manufacturer & Agent CoC Cert. of Manufacturer & Agent Certificate of Origin Certificate of Manufacture Complying Standards copy ISO Certifications Method Statement of Work Design Calculation General Approval Product Certification Appointment Letter of Agent for foreign Co. Bill of Lading Packing List Applicator/Sub contractor Submittal Plant Calibration Certificate Concrete Mix Design and Waterproofing Paint Data Sheet Estidama Material Compliance REPORT ON DETERMINATION OF PARTICLE SIZE DISTRIBUTION OF AGGREGATES Client Address Consultant Contractor Project Name Project No. Project Location Sample Description Sampling Location Source Sender's Ref. Sampling Method Sampling Date Sampled by Test Location : : : : : : : : : : : : : : : Orient Concrete Products Factory LLC Sharjah, UAE No Specific Consultant No Specific Contractor Matreial Testing NP NP 0-5mm (Lime Stone) NP NP NP ASTM D 75-14 30/05/2023 ## 12:00 AM Client M Lab - Al Qouz Report No. Lab. Sample No Lab. Project No Sample Certificate Sample Size ( Kg ) Lot No. Lot Size ( Kg ) Sample Brought by Date Received Date Test Started Date Test Completed Report Date Tested by Page : : : : : : : : : : : : : : 1 of 1 AGR-2305/9083 AGQ-2305/4394 P-6776 NP 50 NP NP Client 30/05/2023 30/05/2023 01/06/2023 01/06/2023 DPN Presence of Non representative Material (%) : Nil RESULTS Sieve Size (mm) Cumulative Percentage Passing 5.0 100 2.36 83 1.18 59 0.600 36 0.300 26 0.150 20 0.075 16 Initial Sample Preparation Method : BS 812: Part 102: 1989: Cls. 6 Test Specimen Preparation Method : BS 812: Part 103: Sec. 103-1: 1985:Amd. 6003 Test Method : BS 812: Part 103: Sec. 103-1: 1985:Amd. 6003 Test Method Variation : None Remarks : None Remarks : Specification limits we 0-25 5.0 2 0-5 Note: This test is accredited by Emirates International Accreditation Center. ccr cred cr cred ediittation Cent ntter nt er . er. er Authorized Signatory Results relate only to the item tested. This report shall not be reproduced except in full, without the written approval of the laboratory. R-AWS-002-a Issued ON:9/4/2016 Issue no.01 REPORT ON CHEMICAL ANALYSIS OF AGGREGATE Page 1 of 2 Client Address Consultant Cotractor Project Name Project No. Project Location Sample Description Sampling Location Source Sender Ref No. : : : : Report No. Lab Project No. Lab Ref No. : AGR-2305/9082,9089,9075,9088,9092 : P-6776 : AGQ-2305/4394 Test Data Item : : : : : Orient Concrete Products Factory LLC Sharjah, UAE No Specific Consultant No Specific Contractor Material Testing Not Provided Not Provided 0-5 mm lime stone Not Provided Not Provided Not Provided Date of Sampling Sampled by Sample Brought in by Date Sample Received Sample Identification Sample Size (kg) Lot Size ( m3/Ton ) Lot No. Sampling Method Test Location : : : : : : : : : : 30/05/2023 Client Client 30/05/2023 Not Provided 50 Not Provided Not Provided ASTM D 75-14 Mlab Al Quoz Date Test Started Date Test Completed Report Date Tested by : : : : 30/05/2023 01/06/2023 01/06/2023 MSK Test Name Test Standard Test Result 1 Sulphate (SO3) (% by mass of dry aggregate) BS 812 : Part 118 : 1988 : Cls. 5 (Water Soluble) 0.02 2 Chloride (Cl) (% by mass of dry aggregate) BS 812 : Part 117 : 1988 Cls. 9 (Water Soluble) <0.01 3 Sulphate (SO3) (% by mass of dry aggregate) BS 812 : Part 118 : 1988 : Cls. 6 (Acid Soluble) 0.05 4 Chloride (Cl) (% by mass of dry aggregate) BS 812 : Part 117 : 1988 Appendix C (Acid Soluble) 0.05 5 Organic Impurities ASTM C 40-99 Lighter than Standard Reference Solution No. Test Specimen Preparation Test Method Variation Remarks : : : : : : : BS 812: Part 118: 1988: Cls. 5.4 (Water Soluble-Sulphate) BS 812: Part 117: 1988: Cls. 8 (Water Soluble-Chloride) BS 812: Part 118: 1988: Cls. 6.3 (Acid Soluble Sulphate) BS 812: Part 117: 1988: Appendix C (Acid Soluble Chloride) ASTM C 702: 1998 (Organic Impurities) None None Continued P/2 Results related only to the items tested. This test report shall not be reproduced except in full, without the written approval of the laboratory. R-AWS-15a Issue No:01 Issues Date:01/11/2016 REPORT ON POTENTIAL ALKALI REACTIVITY OF AGGREGATES Page 2 of 2 Client : Orient Concrete Products Factory LLC Address : Sharjah, UAE Consultant Contractor : No Specific Consultant : No Specific Contractor Project Name : Material Testing Project No. : Not Provided Project Location : Not Provided Report No. : AGR-2305/9084 Lab. Sample No : AGQ-2305/4394 Lab. Project No : P-6776 Sample Identification : Not Provided Sample Size ( Kg ) : 50 Lot No. : Not Provided Sample Description : 0-5 mm lime stone Lot Size ( m3/Ton ) : Not Provided Sampling Location : Not Provided Sample Brought by : Client Source : Not Provided Date Received : 30/05/2023 Sender's Ref. : Not Provided Date Test Started : 30/05/2023 Sampling Method : ASTM D 75-14 Sampling Date/Time : 30/05/2023 Sampled by : Client Sample Brought in by : Client Results Date Test Completed : 01/06/2023 Report Date : 01/06/2023 Tested by : MSK SC (Average) : 236.9mmol/l RC (Average) : 533.3mmol/l Conclusion: The Correlation between Reduction in Alkalinity (Rc) and Dissolved Silica (Sc) indicates that the Aggregate is considered Innocuous. Test Specimen Preparation : ASTM C 289-07 Cls. 6 Test Method Test Method Variation Remarks 5.0 : : : 2 ASTM C 289-07 Cls. 7 to 10 None None 0-5 Authorized Signatory Result relate only to the item tested. This report shall not be reproduced except in full, without the written approval of the laboratory. R-AWS-15a Issue No:01 Issues Date:01/11/2016 White Cement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onstruction Chemicals CON MIX MegaFlow 1000 Polycarboxylated Superplasticiser DESCRIPTION MegaFlow 1000 is a modified polycarboxylate ether based superplasticiser. Having unique carboxylic ether polymer with long lateral chains, it is an effective cement dispersant, fluidifier and high range water reducer as compared to conventional superplasticisers. STANDARDS USES ASTM C494, Type D & G, BS EN 934 - 2 MegaFlow 1000 is specially intended for use in self compacting concrete, high strength concrete, durable concrete containing GGBS, micro silica, fly ash, etc. It is used in ready-mix concrete where extra ordinary slump retention is required in hot weather conditions. Extremely useful in high fines concrete. ADVANTAGES • Produces free flowing concrete without segregation and bleeding • High strength concrete with low water content • Produces self compacting concrete without segregation • Improved surface finish • Improved adhesion to reinforcing & stressing steel • Lower permeability, better resistance to carbonation • Increased flexural strengths • Good slump retention for longer time • Remarkably superior performance than normal superplasticiser TYPICAL PROPERTIES at 25°C PROPERTY TEST METHOD VALUE Component - Single Form - Liquid Colour - Brown Specific Gravity ASTM C494 1.10 +/- 0.02 Air Entrainment - Up to 1% over Control Mix Chloride Content BS EN 480-10 Nil to BS EN 934-2 pH ASTM C494 5-7 COMPATIBILITY Meg aFl o w 1000 can be used with all types of cements and cementitious material like fly ash, GGBS, micro silica etc. It should not be premixed with other admixtures. DOSAGE Recommended dosage is 0.5 - 2% by weight of cementitious material. Higher dosage can be used after verification of performance by conducting lab and site trials. Optimum dosage of Meg aFl o w 1000 and effect on concrete properties such as workability, strength, setting time, etc. are best assessed after preliminary tests on site using the actual materials of mixes under consideration. For self compacting concrete, a viscosity enhancer CC/MF13/Ver3/01/09 1/2 Technical Datasheet Construction Chemicals CON MIX MegaFlow 1000 Meg aA d d VE is recommended at a dosage between 1.0 - 2.0 ltrs per cubic meter. EFFECT OF OVERDOSING Overdosing may result in higher workability and delay in setting. In such cases, provided the concrete is properly cured, the ultimate strength will generally be higher than the regular concrete. PACK SIZE 20 ltr, 200 ltr, 1000 ltr and Bulk DISPENSING Meg aFl o w 1000 should be dispensed into the concrete mixer together with the mixing water. GENERAL INFORMATION Shelf Life 12 months from date of manufacture when stored under warehouse conditions in original unopened packing. Extreme temperature/humidity may reduce shelf life. Cleaning Clean all equipments and tools with water immediately after use. HEALTH & SAFETY PPE’s Gloves, goggles & suitable mask must be worn. Precautions Contact with skin, eyes, etc. must be avoided. If swallowed seek medical attention immediately. Hazard Regarded as non-hazardous for transportation. Disposal Do not reuse containers. To be disposed off as per local rules and regulations. Additional Information TECHNICAL SERVICE Refer MSDS. Available on request. CONMIX Technical Services are available on request for on site support to assist in the correct use of its products. Manufacturer: CONMIX LTD. P.O. Box 5936, Sharjah, United Arab Emirates Tel: +971 6 5314155 Fax: +971 6 5314332 Email: conmix@conmix.com Sales Office : Tel: +971 6 5682422 Fax: +971 6 5681442 www.conmix.com It is the customer’s responsibility to satisfy themselves by checking with the company that the information is still current at the time of use. The customer must be satisfied that the product is suitable for the use intended. All products comply with the properties shown on current data sheets. Conmix however do not warrant or guarantee the installation of the products as it does not have any control over installation or end use of the product. All information and in particular the recommendations relating to application and end use are given in good faith. The products are guaranteed against any manufacturing defects and are sold subject to Conmix standard terms and conditions of sale. CC/MF13/Ver3/01/09 2/2 Technical Datasheet Steel MTC Finished Product Test Reports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age : 1 of 1 Contractor Address Client Consultant Project Project No Project Location Sample description Concrete Source Mix details Sample certificate No. Lot No. Lot Size (m3) Sampled by Sender's Ref. Structural reference : : : : : : : : : : : : : : : : Orient Concrete Products Factory LLC P.O.Box- 150856, Sharjah, UAE NP NP Material Testing CT-267 NP Concrete Cubes (150x150x150)mm NP NP NP Contractor - Report No Lab Ref. No Lab. Project No. : CR-2306/6826 : CQ-2306/3309 : P-6776 Date of casting Date test started Date test completed Test location : : : : Date & Time Received Brought in by Report Date : : : 19/06/2023-08:20 am Contractor 24/06/2023 Curing Condition Age on start of test Tested by Approved by : : : : Water curing 60 Days MI QK 20/04/2023 19/06/2023 22/06/2023 M. Lab - Al Qouz Test Results Lab. Sample No. CQ-2306/3309/1 CQ-2306/3309/2 Client's Ref. No. 1 2 3 Normal Normal Normal Condition of specimen when received Dimension of specimen CQ-2306/3309/3 73mm dia & height 150mm cores vertically drilled from the concrete cubes (mm) Curing Condition Normal Reinforcement ( If any ) Orientation of core 3 (Saturated) - Kg/m Density of specimen - Nil Nil Nil Vertical Vertical Vertical 2260 2230 2250 Mass of oven dried specimen (g) 1389.7 1372.5 1380.6 Mass of specimen after soaking period min (30 ± 5) (g) 1405.6 1390.5 1397.6 1.1 1.3 1.2 1.5 1.4 Measured Absorption (%) Corrected absorption (%) Average corrected absorption 1.3 (%) Sampling method Test Method Lab Curing & Storage Conditions Density Measurement Method Dimension Measurement Method Method Variation Remarks 1.4 : : : : : : : BS EN 12350-1 : 2009 BS 1881: Part 122:2011 CL-6 BS EN 12390-2 : 2009 BS EN 12390-7 : 2009 BS EN 12390-1 : 2012 None None This report is electronically approved. It does not require any Stamp/Signature. Results relate only to the items tested. This report shall not be reproduced except in full, without the written approval of laboratory R-CWS-004-a Rev. No:01, Issued on:12/09/2019 ﻧﻤﻮﺫﺝ ﺍﻋﺘﻤﺎﺩ ﻣﻮﺍﺩ Material Approval Form Application No: 202303369130 Version: 2 Date: Project Details Project Name Contract No Contractor Consultant Client 2023-09-12 ﺑﻴﺎﻧﺎﺕ ﺍﻟﻤﺸﺮﻭﻉ ﻣﺮﺣﻠﻪ ﺃﻭﻟﻰ- ﺍﻟﻨﻮﺩ-ﺧﺪﻣﺎﺕ ﺗﺼﻤﻴﻢ ﺍﻟﺒﻨﻴﺔ ﺍﻟﺘﺤﺘﻴﺔ ﻭﺍﻟﻤﺮﺍﻓﻖ ﺍﻟﻌﺎﻣﺔ ﻟﻤﻨﻄﻘﺔ ﺍﻟﺨﺮﻳﺮ Infrastructure & Public Realm design service in Al Khrair- Al Noud-Stage1 P154001/2022/C/002 A ﺷﺮﻛﺔ ﺍﻟﺸﺨﺺ- ﺷﺮﻛﺔ ﻧﺎﻳﻞ ﻭﺑﻦ ﺣﺮﻣﻞ ﻫﻴﺪﺭﻭﺍﻛﺴﺒﻮﺭﺕ ﻟﻤﺎﻟﻜﻬﺎ ﻧﺎﻳﻞ ﺭﺍﺷﺪ ﺳﻴﻒ ﺍﻟﺸﺎﻣﺴﻲ ﺍﻟﻮﺍﺣﺪ ﺫ ﻡ ﻡ NAEL AND BIN HARMAL HYDROEXPORT NAYEL RASHED .SAIF ALSHAMSI - SOLE PROPRIETORSHIP L.L.C ﺍﻟﻌﻴﻦ- ﺍﻳﻜﻮﻡ ﻣﻴﺪﻝ ﺍﻳﺴﺖ ﻟﻴﻤﺘﺪ AECOM MIDDLE EAST LIMITED. - AL AIN ﻡ.ﻡ.ﺍﻟﺪﺍﺭ ﻟﻠﻤﺸﺎﺭﻳﻊ ﺫ .ALDAR PROJECTS L.L.C Material Details Material Type Spec. Ref. BOQ Ref Material Description (One/ make, model etc) Intended Usage Manufacturer/ Source Supplier/Applicator ﻣﻮﺍﺩ ﺭﻱ ﻭ ﺗﺠﻤﻴﻞ ﺣﺪﺍﺋﻖ Particular Specification: 13.8 d/6/5-A to E PRECAST STREET FRUNITURE-CONCRETE BENCHEs (Bench Type-1,2 & 3), RUBBISH BINS & BIKE RACK Street Scaping Works ﻣﺼﻨﻊ ﺍﻟﺸﺮﻕ ﻟﻠﻤﻨﺘﺠﺎﺕ ﺍﻻﺳﻤﻨﺘﻴﺔ Orient Concrete Factory L.L.C, UAE ﻣﺼﻨﻊ ﺍﻟﺸﺮﻕ ﻟﻠﻤﻨﺘﺠﺎﺕ ﺍﻻﺳﻤﻨﺘﻴﺔ Orient Concrete Factory L.L.C, UAE Sub-Contractor 121686 2023-09-12 10:43 ﺍﺳﻢ ﺍﻟﻤﺸﺮﻭﻉ ﺭﻗﻢ ﺍﻟﻌﻘﺪ ﺍﺳﻢ ﺍﻟﻤﻘﺎﻭﻝ ﺍﺳﻢ ﺍﻻﺳﺘﺸﺎﺭﻱ ﺍﺳﻢ ﺍﻟﻤﺎﻟﻚ ﺗﻔﺎﺻﻴﻞ ﺍﻟﻤﺎﺩﺓ ﻧﻮﻉ ﺍﻟﻤﺎﺩﺓ ﺍﻟﺮﻗﻢ ﺍﻟﻤﺮﺟﻌﻲ ﻟﻠﻤﻮﺍﺻﻔﺎﺕ ﺍﻟﺮﻗﻢ ﺍﻟﻤﺮﺟﻌﻲ ﻟﻘﺎﺋﻤﺔ ﺟﺪﻭﻝ ﺍﻟﻜﻤﻴﺎﺕ ، ﻭﺻﻒ ﺍﻟﻤﺎﺩﺓ )ﻧﻮﻉ ﺍﻟﻤﺎﺩﺓ ( ﺍﻟﻤﻮﺩﻳﻞ، ﻣﺼﻨﻌﺔ ﻣﻦ ﺍﻟﻐﺮﺽ ﻣﻦ ﺍﻻﺳﺘﺨﺪﺍﻡ ﺍﻟﻤﺼﻨﻊ/ ﺍﻟﻤﺼﺪﺭ ﺍﻟﻤﻄﺒﻖ/ ﺍﻟﻤﻮﺭﺩ ﺍﻟﻤﻘﺎﻭﻝ ﺍﻟﻔﺮﻋﻲ ﺻﻔﺤﺔ1 ﻣﻦ2 ﺭﻗﻢ ﺍﻟﻤﻌﺎﻣﻠﺔ 202303369130 Conditions 1) Endorsed with Notes This endorsement is based on successful performance evaluation (done by engineer) of projects not under AACM and also Engineer's advice of delays in project. Nevertheless the observations made in previous submittal IMAS # 202302923395 shall hold and be complied with whenever the deliveries take place. Final Recommendation: Technical Reviewer: Approved 2. The project consultant and contractor must carry out all quality assurance and control procedures for the material supplied for the project 121686 2023-09-12 10:43 :ﺍﻟﺘﻮﺻﻴﺔ ﺍﻟﻨﻬﺎﺋﻴﺔ ﻣﻮﺯﻩ ﺧﻠﻔﺎﻥ ﺳﻌﻴﺪ ﻣﺤﻤﺪ ﺍﻟﻤﺤﺮﺯﻯ 1. The project consultant and contractor shall be fully responsible for approving the materials from the approved list, and their conformity with the standard specifications and project contractual documents. ﺍﻟﺸﺮﻭﻁ :ﺍﻟﻤﺮﺍﺟﻊ ﺍﻟﻔﻨﻲ ﻳﺘﺤﻤﻞ ﺍﺳﺘﺸﺎﺭﻱ ﻭﻣﻘﺎﻭﻝ ﺍﻟﻤﺸﺮﻭﻉ ﺍﻟﻤﺴﺆﻭﻟﻴﺔ ﺍﻟﻜﺎﻣﻠﺔ ﻋﻦ ﺍﻋﺘﻤﺎﺩ.1 ﻭﻣﻄﺎﺑﻘﺘﻬﺎ ﻟﻠﻤﻮﺍﺻﻔﺎﺕ ﺍﻟﻘﻴﺎﺳﻴﺔ ﻭﻭﺛﺎﺋﻖ،ﺍﻟﻤﻮﺍﺩ ﻣﻦ ﺍﻟﻘﺎﺋﻤﺔ ﺍﻟﻤﻌﺘﻤﺪﺓ .ﺍﻟﻤﺸﺮﻭﻉ ﺍﻟﺘﻌﺎﻗﺪﻳﺔ ﻳﺠﺐ ﻋﻠﻰ ﺍﺳﺘﺸﺎﺭﻱ ﻭﻣﻘﺎﻭﻝ ﺍﻟﻤﺸﺮﻭﻉ ﺍﻟﻘﻴﺎﻡ ﺑﺠﻤﻴﻊ ﺇﺟﺮﺍﺀﺍﺕ.2 .ﺿﻤﺎﻥ ﻭﺿﺒﻂ ﺍﻟﺠﻮﺩﺓ ﻟﻠﻤﺎﺩﺓ ﺍﻟﻤﻮﺭﺩﺓ ﻟﻠﻤﺸﺮﻭﻉ ﺻﻔﺤﺔ2 ﻣﻦ2 ﺭﻗﻢ ﺍﻟﻤﻌﺎﻣﻠﺔ 202303369130 <J a ; ll q C.. ~ :> I ! II Cij--1b D E PART M E NT OF MUN I CIPA LI TI E S AND T RANSPORT .li.JA .l~ I [ j~ Material Approval Form Application No: 202302923395 Version: 2 Date: ~ ""' 2023-08-08 Project Details ;i_ui..J .. Project Name Contract No Contractor Consultant Client Material Details Material Type Spec. Ref. 4.b. Y' -..l..,... -''I - Y...F"' - ~ 'I ~ -~ u 1 4.c. ~ _·- -'1 4.S..>'-"=· f'·f'· ~ wl .)L."l> l w "l> .Jli.o.ll4.S ~ .COMBINED GROUP CONTRACTING EMIRATES L.L.C J .J\.i.J\ ~I AECOM MIDDLE EAST LIMITED. -ALAIN f'·f' ) t:!.Jt...&...ll )..l.!l .ALDAR PROJECTS L.L.C ~WI~\ oJWI ~l..l.:>. ~ .J t.f.J ..ll_,... Drawing: 60678749-SHT-40-NOUD-LS-0601 & 2701 d/6/5 A-C Precast Concrete Benches Type B 1- without Backrest, Type B2 with Wood Backrest, Type B3- Single Unit ~Li:i o..lWI (_,i w\.i....:,lyJl ~yJI ~)\ J .J..l.?- :\.....i\..9.] ~ yJI ~)I w4..s.JI , o..lWI (_,.i} o..lWI w.....:..J (J!..l_,...11 ' 0-" ~ Street Scape Works - wWl...ll - · •·.ll · . 0..J'""'~ M/s. Orient Concrete Products Factory ,Sharjah ~':i l Supplier/Applicator ..lh.ll~.) ~~-~~~J~f'fol ~':i l Manufacturer/ Source - wL...l.::>.. ~ Infrastructure & Public Realm design service in AI Khrair- AI Noud-Stage2 P 154001 /2022/C/002 B BOQ Ref Material Description (One/ make, model etc) Intended Usage :i.....,WI <..:r .-.;~\ ..Y"'" · -'1 .J 4.ii.:..:i.ll WI .. .. . - wWl...ll - · •·. ll · . 0..J'""'~ M/s. Orient Concrete Products Factory ,Sharjah ~\/.)~\ ~1/ ..l.JyJI Sub-Contractor 121686 2023-08-09 12:46 Uok.JI ~.J 202302923395 WARRANTY CERTIFICATE PROJECT NAME : Development of Infrastructure and Public Realm for Al Noud (Al Khrair) Al Ain - Package 2 LOCATION OF THE PROJECT : Al Ain- UAE CLIENT : M/s Abu Dhabi Housing Authority CONTRACTOR : M/s Combined Group Contracting Emirates L.L.C MATER/PRODUCT : Supply of Precast Concrete Bike Rack SUPPLIER Orient Concrete Products DURATION OF WARRANTY FIVE(5) Years Orient Concrete Products Factory will provide Five years warranty from the TOC to the original purchaser for products used as intended. This assurance of product quality is applicable where products have been correctly selected and installed considering the type of usage and it is subjected to the following: * Colour variances and appearance of efflorescence do not constitute a part of warranty claim. * Warranty does not cover subsidiary accessories excluding precast. * Damage caused by improper installations or deterioration caused by chemicals or fertilizers are not covered by this warranty. * Warranty does not cover damage resulting from excessive loading, sub- grade settlement or movement, contact with paint, discoloration due to airborne contamination, staining, improper sealing or any damage resulting from other material or system such as drainage. *Warranty does not cover any forces of nature. All Warranty claims must be made prior to the removal of the defective product warranty claims will be reviewed by Company representative and may require samples of products for analysis. The warranty does not include removal, installation or transportation to replace the material. The repair or replacement covered under warranty does not include any civil, mechanical or electrical works, site works / handling and it’s limited to Orient Concrete Products Factory materials only. Date : Ref : ORIENT CONCRETE PRODUCTS FACTORY L.L.C . ﺫ ﻣﺻﻧﻊ ﺍﻟﺷﺭﻕ ﻟﻠﻣﻧﺗﺟﺎﺕ ﺍﻷﺳﻣﻧﺗﻳﺔ.ﻡ.ﻡ P.O. Box: 150856, Sharjah, UAE T: +971 6 543 0832 F: +971 6 543 0831 E: info@ost.ae W:www.ost.ae ﺭﺧﺼﺔ ﺻﻨﺎﻋﻴﺔ Industrial License License Details ﺗﻔﺎﺻﻴﻞ ﺍﻟﺮﺧﺼﺔ ﺭﻗﻢ ﺍﻟﺮﺧﺼﺔ 534877 ﺭﻗﻢ ﺍﻟﺴﺠﻞ License No.ﺗﺎﺭﻳﺦ ﺍﻹﺻﺪﺍﺭ 12-10-2005 Issue Date Registration No.ﺗﺎﺭﻳﺦ ﺍﻹﻧﺘﻬﺎﺀ 11-10-2024 Expiry Date ﺍﻻﺳﻢ ﺍﻟﺘﺠﺎﺭﻱ ﻣﺼﻨﻊ ﺍﻟﺸﺮﻕ ﻟﻠﻤﻨﺘﺠﺎﺕ ﺍﻻﺳﻤﻨﺘﻴﺔ ﺫ.ﻡ.ﻡ ﺍﻟﺸﻜﻞ ﺍﻟﻘﺎﻧﻮﻧﻲ ﺷﺮﻛﺔ ﺫﺍﺕ ﻣﺴﺆﻭﻟﻴﺔ ﻣﺤﺪﻭﺩﺓ ORIENT CONCRETE PRODUCTS FACTORY L.L.C Trade Name Limited Liability Company Legal status License Members ﺃﻃﺮﺍﻑ ﺍﻟﺮﺧﺼﺔ ﺭﻗﻢ ﺍﻟﻤﺴﺘﺜﻤﺮ ﺍﺳﻢ ﺍﻟﻤﺴﺘﺜﻤﺮ ﺍﻟﺠﻨﺴﻴﺔ ﺭﻗﻢ ﺍﻟﻬﻮﻳﺔ /ﺍﻟﺠﻮﺍﺯ ﺍﻟﺼﻔﺔ ﺍﻟﺤﺼﺺ Investor No Investor Name Nationality ID \ Passport No Type Shares ﻏﺴﺎﻥ ﻧﻌﻤﻪ ﺣﻤﺪ ﻋﻤﺎﺭﻩ ﺳﺎﻧﺖ ﻛﻴﺘﺲ ﻭﻧﺎﻓﻴﺲ GHASSAN NUMA HAMED IMARA Saint Kitts and Nevi ﺳﺎﻟﻢ ﺑﻦ ﺳﺎﻟﻢ ﺑﻦ ﺧﻤﻴﺲ ﺍﻟﻬﻮﻟﻰ ﺍﻟﺴﻮﻳﺪﻯ ﺍﻹﻣﺎﺭﺍﺕ SALIM BINSALIM BINKHAMIS ALHOLY ALSUWAIDI UAE 81852 784197632615320 7752 784196532513254 ﺷﺮﻳﻚ Partner ﺷﺮﻳﻚ Partner 90.0 % 10.0 % ﺍﻟﻤﺪﻳﺮ ﻏﺴﺎﻥ ﻧﻌﻤﻪ ﺣﻤﺪ ﻋﻤﺎﺭﻩ ﺃﻧﺸﻄﺔ ﺍﻟﺮﺧﺼﺔ ﺻﻨﺎﻋﺔ ﺍﻟﻤﻨﺘﺠﺎﺕ ﺍﻷﺳﻤﻨﺘﻴﺔ ﺍﻟﻤﻘﻮﺍﺓ ﺑﺎﻷﻟﻴﺎﻑ ﺍﻟﺰﺟﺎﺟﻴﺔ,ﺻﻨﺎﻋﺔ ﺍﻟﺤﺠﺮ ﺍﻟﺼﻨﺎﻋﻲ ﺍﻟﻌﻨﻮﺍﻥ ﺍﻟﺸﺎﺭﻗﺔ-ﺍﻟﺼﺠﻌﺔ ﺻﻨﺎﻋﻴﺔ/ﺍﻟﺸﺎﺭﻗﺔ-ﺷﺎﺭﻉ ﺍﻹﻣﺎﺭﺍﺕ ﻣﻜﺘﺐ-ﺃﺭﺽ ﻣﺴﻮﺭﺓ-ﺷﺒﺮﺓ ﻣﻠﻚ ﻏﺴﺎﻥ ﻧﻌﻤﻪ ﺣﻤﺪ ﻋﻤﺎﺭﺓ ﺍﻟﻬﺎﺗﻒ ﺍﻟﻤﺘﺤﺮﻙ: 0507247624 ﺻﻨﺪﻭﻕ ﺍﻟﺒﺮﻳﺪ: ﺍﻟﺸﺎﺭﻗﺔ 150856 ﺍﻟﺒﺮﻳﺪ ﺍﻻﻟﻜﺘﺮﻭﻧﻲ: info@ost.ae Notes ﺍﻟﻤﻼﺣﻈﺎﺕ --ﻃﻠﺐ ﺗﻐﻴﻴﺮ ﺟﻨﺴﻴﺔ ﻏﺴﺎﻥ ﻧﻌﻤﻪ ﺣﻤﺪ ﻋﻤﺎﺭﻩ ﺗﺎﺭﻳﺦ ﺍﻟﻄﺒﺎﻋﺔ 24-10-2023 Printing Date ﺭﻗﻢ ﺍﻟﻤﺴﺘﺨﺪﻡ 104644 User Name - This document is official. It doesn't need to be stamped or signed. To view license details please visit SEDD web site: www.sedd.ae ﻫﺬﻩ ﺍﻟﻮﺛﻴﻘﺔ ﺭﺳﻤﻴﺔ ﻭﻻ ﺗﺤﺘﺎﺝ ﻟﺨﺘﻢ ﺃﻭ ﺗﻮﻗﻴﻊ.ﻟﻠﺘﺄﻛﺪ ﻣﻦ ﺻﺤﺔ ﺍﻟﺒﻴﺎﻧﺎﺕ ﻳﺮﺟﻰ ﺯﻳﺎﺭﺓ ﻣﻮﻗﻊ ﺍﻟﺪﺍﺋﺮﺓwww.sedd.ae : - It is prohibited to distribute advertisements in public places and residential areas. -ﻳﻤﻨﻊ ﺗﻮﺯﻳﻊ ﺍﻹﻋﻼﻧﺎﺕ ﻓﻲ ﺍﻷﻣﺎﻛﻦ ﺍﻟﻌﺎﻣﺔ ﻭﺍﻷﺣﻴﺎﺀ ﺍﻟﺴﻜﻨﻴﺔ. 8008000 www.sedd.ae ﺷﻬﺎﺩﺓ ﺳﺠﻞ ﺻﻨﺎﻋﻴﺔ Industrial Register Certificate License Details ﺗﻔﺎﺻﻴﻞ ﺍﻟﺮﺧﺼﺔ ﺭﻗﻢ ﺍﻟﺮﺧﺼﺔ 534877 ﺭﻗﻢ ﺍﻟﺴﺠﻞ ﺭﺃﺱ ﺍﻟﻤﺎﻝ License No.ﺗﺎﺭﻳﺦ ﺍﻹﺻﺪﺍﺭ 12-10-2005 Issue Date Registration No.ﺗﺎﺭﻳﺦ ﺍﻹﻧﺘﻬﺎﺀ 11-10-2024 Expiry Date Capital 300000 ﺍﻻﺳﻢ ﺍﻟﺘﺠﺎﺭﻱ ﻣﺼﻨﻊ ﺍﻟﺸﺮﻕ ﻟﻠﻤﻨﺘﺠﺎﺕ ﺍﻻﺳﻤﻨﺘﻴﺔ ﺫ.ﻡ.ﻡ ﺍﻟﺸﻜﻞ ﺍﻟﻘﺎﻧﻮﻧﻲ ﺷﺮﻛﺔ ﺫﺍﺕ ﻣﺴﺆﻭﻟﻴﺔ ﻣﺤﺪﻭﺩﺓ ﺍﻟﻤﺪﻳﺮ ﻏﺴﺎﻥ ﻧﻌﻤﻪ ﺣﻤﺪ ﻋﻤﺎﺭﻩ ﺃﻧﺸﻄﺔ ﺍﻟﺮﺧﺼﺔ ﺻﻨﺎﻋﺔ ﺍﻟﻤﻨﺘﺠﺎﺕ ﺍﻷﺳﻤﻨﺘﻴﺔ ﺍﻟﻤﻘﻮﺍﺓ ﺑﺎﻷﻟﻴﺎﻑ ﺍﻟﺰﺟﺎﺟﻴﺔ,ﺻﻨﺎﻋﺔ ﺍﻟﺤﺠﺮ ﺍﻟﺼﻨﺎﻋﻲ ﺍﻟﻌﻨﻮﺍﻥ ﺍﻟﺸﺎﺭﻗﺔ-ﺍﻟﺼﺠﻌﺔ ﺻﻨﺎﻋﻴﺔ/ﺍﻟﺸﺎﺭﻗﺔ-ﺷﺎﺭﻉ ﺍﻹﻣﺎﺭﺍﺕ ﻣﻜﺘﺐ-ﺃﺭﺽ ﻣﺴﻮﺭﺓ-ﺷﺒﺮﺓ ﻣﻠﻚ ﻏﺴﺎﻥ ﻧﻌﻤﻪ ﺣﻤﺪ ﻋﻤﺎﺭﺓ ﺗﺎﺭﻳﺦ ﺍﻟﻄﺒﺎﻋﺔ 24-10-2023 Printing Date ﺭﻗﻢ ﺍﻟﻤﺴﺘﺨﺪﻡ ORIENT CONCRETE PRODUCTS FACTORY L.L.C Trade Name Limited Liability Company Legal status 104644 User Name - This document is official. It doesn't need to be stamped or signed. To view license details please visit SEDD web site: www.sedd.ae ﻫﺬﻩ ﺍﻟﻮﺛﻴﻘﺔ ﺭﺳﻤﻴﺔ ﻭﻻ ﺗﺤﺘﺎﺝ ﻟﺨﺘﻢ ﺃﻭ ﺗﻮﻗﻴﻊ.ﻟﻠﺘﺄﻛﺪ ﻣﻦ ﺻﺤﺔ ﺍﻟﺒﻴﺎﻧﺎﺕ ﻳﺮﺟﻰ ﺯﻳﺎﺭﺓ ﻣﻮﻗﻊ ﺍﻟﺪﺍﺋﺮﺓwww.sedd.ae : - It is prohibited to distribute advertisements in public places and residential areas. -ﻳﻤﻨﻊ ﺗﻮﺯﻳﻊ ﺍﻹﻋﻼﻧﺎﺕ ﻓﻲ ﺍﻷﻣﺎﻛﻦ ﺍﻟﻌﺎﻣﺔ ﻭﺍﻷﺣﻴﺎﺀ ﺍﻟﺴﻜﻨﻴﺔ. 8008000 www.sedd.ae 11. CoC Cert. of Manufacturer & Agent Nil Date Ref. : 23-01-2023 : - Combined Group Contracting Emirates LLC Al Ain, UAE Project : Infrastructure and Landscaping works (Package 2), Al Khrair (Al Noud), Al Ain Subject : Regional Material To whom it may concern Orient Concrete Products Factory hereby certify that the proposed material for the abovementioned project comprises of the following information. 1. 2. 3. 4. Location of Manufacturing – Sharjah, United Arab Emirates Distance from manufacturing Location to site – 160 Km Mode of Transport – Land Where it is used in the project – External landscape. Thanks & Regards, For Orient Concrete Products Factory. ORIENT CONCRETE PRODUCTS FACTORY L.L.C . ﻡ. ﻡ. ﻣﺻﻧﻊ ﺍﻟﺷﺭﻕ ﻟﻠﻣﻧﺗﺟﺎﺕ ﺍﻷ ﺳﻣﻧﺗﻳ ﺔ ﺫ P.O. Box: 150856, Sharjah, UAE T: +971 6 543 0832 F: +971 6 543 0831 E: info@ost.ae W:www.ost.ae Certificate of Registration This is to certify that Environmental Management System of ORIENT CONCRETE PRODUCTS FACTORY Plot 13680 Emirates Industrial City Behind Sajaa Police StationSajaa Industrial City, Sharjah, UAE is in accordance with the requirements of the following standard ISO 14001:2015 (Environmental Management System) SCOPE MANUFACTURING OF ARCHITECTURAL AND ORDINARY PRECAST CONCRETE, CAST STONE AND GRC PRODUCTS (IAF CODE:16) Certificate Number : 240823029714 Registration Date : Initial st 1 nd Surveillance Date : To verify certificate, visit at : 2 Surveillance Date : Certificate Expiry Date : www.arscert.com https://uafaccreditation.org https://www.iafcertsearch.org/ 24-Aug-2023 24-Jul-2024 24-Jul-2025 23-Aug-2026 Issued by ARS Assessment Private Limited Managing Director CB-MS-3926 UAF Address : 400, North Center Dr, STE 202, Norfolk, VA 23502, United States of America : This certificate remains the property of ARS and must be returned to ARS on Cancellation or Suspension of the certificate Validity of the certificate is subject to successful completion of surveillance audits. Further clarification regarding the scope of this certificate and the applicability of standard may be obtained by consulting the Organisation on info@arscert.com ™ Certificate of Compliance This is to certify that Occupational Health & Safety Management System of ORIENT CONCRETE PRODUCTS FACTORY Plot 13680 Emirates Industrial City Behind Sajaa Police StationSajaa Industrial City, Sharjah, UAE is in accordance with the requirements of the following standard ISO 45001:2018 (Occupational Health & Safety Management System) SCOPE MANUFACTURING OF ARCHITECTURAL AND ORDINARY PRECAST CONCRETE, CAST STONE AND GRC PRODUCTS Certificate Number : 240823039715 To verify certificate, visit at : www.arscert.com Registration Date : Initial st 1 nd Surveillance Date : 2 Surveillance Date : Certificate Expiry Date : 24-Aug-2023 24-Jul-2024 24-Jul-2025 23-Aug-2026 Issued by ARS Assessment Private Limited Managing Director ™ ARS Address : 3/29, Vinamra Khand, Gomtinagar - 226010, Lucknow, U.P., India This certificate remains the property of ARS and must be returned to ARS on Cancellation or Suspension of the certificate Validity of the certificate is subject to successful completion of surveillance audits. Further clarification regarding the scope of this certificate and the applicability of standard may be obtained by consulting the Organisation on info@arscert.com QUALITY CONTROL PROCEDURE FOR PRODUCTION AND SUPPLY OF ARCHITECTURAL PRECAST & CAST STONE Ref.No.: QA-QCP-B1 Rev.No. 00 Date : 25.11.2017 Page : 1 of 15 ORIENT CONCRETE PRODUCT QA-QCP-B1 QUALITY CONTROL PROCEDURE FOR PRODUCTION AND SUPPLY OF ARCHITECTURAL PRECAST AND CAST STONE QA-QCP-B1 NOV.2017 REV.- 00 QUALITY CONTROL PROCEDURE FOR PRODUCTION AND SUPPLY OF ARCHITECTURAL PRECAST & CAST STONE Ref.No.: QA-QCP-B1 Rev.No. 00 Date : 25.11.2017 Page : 2 of 15 REVISION RECORD This cover page is a record of all revisions of the document identified above by number and title. All previous cover pages are hereby superseded. Rev. No. Date Prepared by Checked by Approvals Description and Page Numbers of Revisions All printed copies are UNCONTROLLED and not subject to revision control. The Master copy of latest revision of this document is available on the Project Server managed by QAQC department. QA-QCP-B1 NOV.2017 REV.- 00 QUALITY CONTROL PROCEDURE FOR PRODUCTION AND SUPPLY OF ARCHITECTURAL PRECAST & CAST STONE Ref.No.: QA-QCP-B1 Rev.No. 00 Date : 25.11.2017 Page : 3 of 15 Table of Contents 1.0 PURPOSE ..................................................................................................................................................... 4 2.0 SCOPE........................................................................................................................................................... 4 3.0 REFERENCES ............................................................................................................................................. 4 4.0 DEFINITIONS & ABBREVIATIONS ......................................................................................................... 4 5.0 RESPONSIBILITIES .................................................................................................................................... 5 6.0 RESPONSIBILITY MATRIX ....................................................................................................................... 6 7.0 PROCEDURES ............................................................................................................................................ 6 7.1 7.2 8.0 INSPECTION CRITERIA ............................................................................................................................... 6 INSPECTION AND TESTING DURING PRODUCTION ..................................................................................... 7 CONTROL OF INSPECTION, MEASURING AND TEST EQUIPMENT ............................................. 8 RECORDS SHALL SHOW: ........................................................................................................................................... 9 x EQUIPMENT REFERENCE/SERIAL NUMBER & MODEL ........................................................................................ 9 x DESCRIPTION ................................................................................................................................................... 9 x MANUFACTURER OR SUPPLIER ......................................................................................................................... 9 x CALIBRATION FREQUENCY (IN MONTHS).......................................................................................................... 9 x DATE OF LAST CALIBRATION AND NAME OF PERSON OR COMPANY WHO PERFORMED IT .................................. 9 x METHOD OF CALIBRATION, CALIBRATION REPORT AND STANDARD CALIBRATED AGAINST ............................. 9 x STATUS (ACCEPTED OR REJECTED), IF REJECTED, ACTION TAKEN .................................................................... 9 9.0 PRODUCT INDENTIFICATION AND TRACEABILITY ......................................................................... 9 10.0 PROCESS CONTROL ............................................................................................................................ 9 11.0 GENERAL INSPECTION AND TESTING .......................................................................................... 10 12.0 PRE – POUR INSPECTION ................................................................................................................. 11 13.0 CONCRETE MIX INSPECTION AND TESTING ............................................................................... 12 14.0 CONCRETE CUBE TESTING .............................................................................................................. 12 15.0 FINAL INSPECTION AND APPROVAL ............................................................................................. 13 16.0 INSPECTION AND TEST STATUS .................................................................................................... 13 17.0 PRODUCT HANDLING, STORAGE, PACKAGING, PRESERVATION AND DELIVERY ........ 13 18.0 NON-CONFORMITY INSPECTION .................................................................................................... 14 19.0 FORMS ..................................................................................... ERROR! BOOKMARK NOT DEFINED. INSPECTION AND/OR TEST REQUEST ................................... ERROR! BOOKMARK NOT DEFINED. QA-QCP-B1 NOV.2017 REV.- 00 QUALITY CONTROL PROCEDURE FOR PRODUCTION AND SUPPLY OF ARCHITECTURAL PRECAST & CAST STONE Ref.No.: QA-QCP-B1 Rev.No. 00 Date : 25.11.2017 Page : 4 of 15 1.0 PURPOSE The purpose of this document is to laydown various quality control activities required for Architectural Precast Concrete Works and to ensure that all works are carried out in accordance with the approved shop drawings and contract specification and achieved required degree of quality. 2.0 SCOPE The scope of this Quality Control Procedure is to describe the procedures that Orient Concrete Product will adopt in fabrication and delivery of Architectural Precast and Cast Stone x x x x x x x Receiving, Inspection of Cement, Aggregates, Admixture, Water and Other Materials Preparation of Concrete Mix Inspection and Testing of Concrete Mixes, Cube Tests and Sampling Inspection of Mould Fabrication and Assembly Final Inspection of Precast Elements after Production Non-Conformance Report Handling And Storing 3.0 REFERENCES 4.0 DEFINITIONS & ABBREVIATIONS COMPANY ORIENT CONCRETE PRODUCT PQP PROJECT Quality Plan QCP Quality Control Procedure ITP Inspection and Test Plan MES Method Statement TRA Task Risk Assessment QA/QC Quality Assurance/Quality Control NCR Non Conformance Report ITR Inspection and/or Testing Request MAR Material Approval Request TRA Task Risk Assessment QA-QCP-B1 NOV.2017 REV.- 00 QUALITY CONTROL PROCEDURE FOR PRODUCTION AND SUPPLY OF ARCHITECTURAL PRECAST & CAST STONE Ref.No.: QA-QCP-B1 Rev.No. 00 Date : 25.11.2017 Page : 5 of 15 5.0 RESPONSIBILITIES Technical/Operation Manager x Operation Manager is responsible for overall management of this project and all operation involved in accordance with contract requirements. x Review/approved the procedures/systems and monitoring their effectiveness throughout the execution of works. x Ensure that relevant staff member are aware of the requirements as per project specification x Responsible for reviewing and approving factory production and implementing schedules and ensuring performance of production equipment. Production Engineer x Responsible for quality control/assurance, ensure all works are in compliance with the Method Statement, ITP and Project Specification. x Ensure works are being carried out in accordance with approved materials and shop drawings. x Responsible for recording, keeping and documentation of related inspection reports. x Ensure that the concerned work force is familiar with proper performance of activity in accordance with requisite quality standards by use of approved materials and finish schedules, drawings in reference to associated hazards and mitigated effect of the situation. He will be responsible for co-ordination with other disciplines also. Supervising chart and drawing production x Responsible for supervising the works to ensure full compliance with HSE requirements and procedures and to ensure that the work crew is familiar with the safety requirements of this activity. x Regularly pay casting yard visits to ensure that safety is being exercised at site as per requirement. x Promptly report accidents, incidents and near-misses Foreman x Responsible for execution of works as per specified requirements, recommendations of the manufacturer of the product, relevant method statement and finishing schedules Independent Testing Laboratory x Sampling and conducting field testing according to the instructions of the Engineer and in accordance with the project specifications x To ensure that the required number of samples are taken from site pouring concrete for the cubes testing. x Issuing and reviewing all laboratory test result reports. x Keeping a daily log of all the inspection requests submitted by the construction supervisor. x Filling and compiling controlled copies of all test reports under the supervision and instructions of the Engineer. QA-QCP-B1 NOV.2017 REV.- 00 QUALITY CONTROL PROCEDURE FOR PRODUCTION AND SUPPLY OF ARCHITECTURAL PRECAST & CAST STONE Ref.No.: QA-QCP-B1 Rev.No. 00 Date : 25.11.2017 Page : 6 of 15 6.0 RESPONSIBILITY MATRIX ACTIVITY PARTIES OCP Project Execution Plan Permits Review of Project Specification Review of Approved Construction Drawing and Related Documents Required Resources Equipment Calibration Plan Project Quality Forms Develop Testing Schedule Supply and Maintenance of Equipment Supply of Manpower Supply mix concrete Supply of Moulds Coordination of Site Activities Execution of Precast works Delivery of Precast elements Surface preparation and repairing INSPECTION AND TESTING Verification of Equipment Validity Control Of Monitoring and Calibration Equipment Accomplishment of Forms Mock-up and Trial Mix Sampling And Testing of Materials Tagging and Marking Progress of Works Inspection and Testing Report Laboratory Reports 7.0 7.1 x R A Responsible Accountable C I Consulted Informed CONTRACTOR CLIENT R R R R A A A A C C C C R R R R R I I I A I I I C I I A A A A C C I I R R R A A A I I I R R R R A A C C I I I I R R R R R R R R R REMARKS Refer to ITP For more details The party who does something as part of their job or role to do a specific task. The party to justify actions or decisions made to deliver the completed task. (Accountable is also Responsible) The party whose opinions are sought by the responsible party. The party that should be kept up to date on progress with the task. PROCEDURES Inspection Criteria The following general inspection and test criteria will be conformed to either prior to, or during, the production processes at the factory. QA-QCP-B1 NOV.2017 REV.- 00 QUALITY CONTROL PROCEDURE FOR PRODUCTION AND SUPPLY OF ARCHITECTURAL PRECAST & CAST STONE Ref.No.: QA-QCP-B1 Rev.No. 00 Date : 25.11.2017 Page : 7 of 15 x x x 7.2 Specific details relative to this project shall be contained in the Inspection and Test Plan (ITP), which shall be read in conjunction with Project Quality Plan (PQP) and this Quality Control Procedure (QCP). All tests shall be performed as per applicable international standards & project specifications, in strict compliance with customer requirements. Receiving and inspection frequency of concrete raw materials, rebars and others items specified on the drawing shall be carried out in accordance with the project quality plan and specification. Inspection and Testing during production In general, all tests specified during the course of the work (i.e., during precast unit production) shall be carried out by approved third party laboratory. Some additional tests will nonetheless take place in approve independent testing laboratory (e.g., tests on fresh concrete and certain additional compressive strength tests).The details shall be mentioned in related ITP; nonetheless, the following is a brief overview of inspection/testing particularity during production. a) Cement: Cement test certificates shall be obtained from the supplier with each delivery. The test certificate should confirm the chemical composition and physical test information conforming to an appropriate standard and confirm that the cement is fresh. Cement shall comply with ASTM C150. b) Aggregates: All types of aggregates used for concrete works shall be tested as specified under BS and ASTM standard. The specified tests shall be carried out by the main contractor through approved independent laboratory; sieve analysis will be conducted in-house or 3rt Party Testing Facilities and tests results for delivered aggregates will be recorded. Storekeeper shall retain approved sample of aggregates for comparison at the time of receiving inspection. Aggregates shall comply with the requirements of BS 882. c) Water: Water shall be tested by approved external laboratory, whenever required to do so by the Engineer. Water shall comply with BS 3148 / BS EN 1008. The water sample shall be taken from batching plant. d) Concrete mix: Proposed concrete mix shall be prepared in compliance of criteria prescribed by the specification. Designed to obtain the desired 28 days compressive strength and durability requirements. Tested as specified by the main contractor under specification clause 13.0. The specified tests on hardened concrete (strength and durability) shall be carried out by/through approved independent laboratory or in-house after client’s approval; testing of fresh concrete (slump & temperature) as well as additional tests (e.g., compressive strength prior to 7 days or early strength cubes) shall be conducted in-house or independent laboratory. Sampling of raw concrete materials prior to independent testing shall be conducted in the presence and approval of the client. Testing frequency will carried out in line with the requirement of project specification. e) Steel: The type of steel, size and origin shall be as specified and approved by client. Test certificates / mill reports shall be obtained from the supplier. Typically the QA-QCP-B1 NOV.2017 REV.- 00 QUALITY CONTROL PROCEDURE FOR PRODUCTION AND SUPPLY OF ARCHITECTURAL PRECAST & CAST STONE Ref.No.: QA-QCP-B1 Rev.No. 00 Date : 25.11.2017 Page : 8 of 15 certificates and reports should indicate conformance to applicable standards in line with the project specification. No independent testing is anticipated during production. Steel reinforcement shall comply with BS 4449. As Per specification clause 15.5 minimum500 N /mm2 tensile strength reinforcement shall be used. f) Inspection of delivered material shall be conducted in line with OST material receipt procedure. The receiving inspection of cement, sand, aggregates and steel, will in particular ensure that these are delivered with necessary mill test certificates. These certificates shall be verified by Production Engineer. g) Concrete additives shall be measured, checked and recorded on computer print-out for computerized batching plant. Admixtures shall comply with BS EN 480. Each delivery of admixture shall a company with the relevant and up to date test report. Storage of chemical shall comply the manufacturer MSDS and HSE requirements. h) Raw materials sampling and inspection for concrete ingredients, rebars and embedded items shall be carried out in accordance with the project specification. 8.0 CONTROL OF INSPECTION, MEASURING AND TEST EQUIPMENT x x Objective: To ensure that any inspection, measuring or test equipment is fit for purpose and has been properly calibrated, within the specified time scale, by a competent individual or company, and that record of calibration are kept, and equipment is properly marked.All equipment used for inspecting, measuring and testing of process control shall be registered, controlled and calibrated as per specification and standards. x The QA/QC Engineer is responsible for the registration off all factory inspection, measuring and test equipment. He shall ensure that calibration is performed by recognized competent companies and that the calibration is performed against known standards. x All calibrated equipment shall be clearly marked with: x The equipment reference number. Calibration due date. Any known deviation . All calibrated equipment shall have a signed certificate of calibration issued by the company performing the calibration. Any rejected equipment shall be removed from service by the QA/QC Engineer and shall not be used until it has been repaired and recalibrated. QA-QCP-B1 NOV.2017 REV.- 00 QUALITY CONTROL PROCEDURE FOR PRODUCTION AND SUPPLY OF ARCHITECTURAL PRECAST & CAST STONE Ref.No.: QA-QCP-B1 Rev.No. 00 Date : 25.11.2017 Page : 9 of 15 Records shall show: Equipment reference/serial number & model x x Description x Manufacturer or supplier x Calibration frequency (in months) x Date of last calibration and name of person or company who performed it x Method of calibration, calibration report and standard calibrated against x Status (accepted or rejected), if rejected, action taken x 9.0 Records of calibration for factory and sites equipment shall be maintained at the factory. Records shall be filed in order. PRODUCT INDENTIFICATION AND TRACEABILITY Objective: To ensure that products and materials are correctly identified and remain traceable to the Customer’s satisfaction, and that only approved materials are used. x Identification of materials and products used in the factory or in the factory production process shall be maintained by the QA/QC Engineer during all stages of production and installation. This requirement remains valid from the time of receipt through to final inspection and release. x Methods of identification shall be appropriate to the type of product and shall be used to record production information for identification and traceability purpose. x All consignments of production materials received by the factory shall be inspected and allocated to specific storage areas by the QA/QC Engineer or responsible foreman. x Material Status List for each project shall be retained in the project file by QA/QC Engineer. It is. The responsibility of QA/QC Engineer to verify that all materials are approved for use. 10.0 PROCESS CONTROL Objective: To ensure that process operations are planned and controlled and that proper inspections are performed and recorded during the production process. x All production processes shall be planned by Production Engineer to ensure adequate levels of resources, personnel and controls are applied at each stage to give a product and service conforming to Client’s requirements. QA-QCP-B1 NOV.2017 REV.- 00 QUALITY CONTROL PROCEDURE FOR PRODUCTION AND SUPPLY OF ARCHITECTURAL PRECAST & CAST STONE Ref.No.: QA-QCP-B1 Rev.No. 00 Date : 25.11.2017 Page : 10 of 15 x Construction and installation activities shall be planned by Factory Manager to ensure adequate resources are available to perform the work at each stage of the project. He shall generate project work programmes. x Process control parameters are monitored at the factory and shall be recorded in accordance with these procedures and factory Work Instructions. x Process control shall be ensured by a series of inspections performed and signed for by the relevant area of activity foreman under the direction of Operation Manager. Production Engineer shall be responsible for monitoring and maintaining records of all inspections. Process control inspections and test are: x Material receipt, including cut & bent rebar (performed at approved cut & bent facility [Delivery note + accompanying records] Material receipt, concrete ingredients such as ( Cement, Admixture & Aggregates ) Delivery note, mill certificate + accompanying records] Mould fabrication, installation & inspectionConcrete mix inspection and testing Precast units demoulding and handling Precast units repair & finishing Precast units curing, application of curing compound & approval Final inspection and delivery to site x x x x x x x 11.0 GENERAL INSPECTION AND TESTING Objective: To ensure that the materials conform to specification as required by the Customer and, to ensure verification that all requisitioned material has been correctly supplied, checked and recorded. Inspections and tests shall be appropriate to the type and criticality of the work x On delivery Production Engineer will check the stockpiles to ensure that no overspill has, or is likely to, occur as a result of the delivery. x Aggregate storage shall be free draining and so located as to minimize the possibility of contamination. x Deliveries of cement shall be inspected by the batching plant operator who shall check the delivery note and mill certificate. Production Engineer shall verify supplier’s certificate against the relevant standard. Third party test shall be arranged if required by the Customer. x Reinforcement bars shall be inspected and logged from time it arrives on the production site, in accordance with specification requirements. x All project quality requirements shall be as stated in Quality Control Program (QCP) and in Inspection and Test Plans (ITP). QA-QCP-B1 NOV.2017 REV.- 00 QUALITY CONTROL PROCEDURE FOR PRODUCTION AND SUPPLY OF ARCHITECTURAL PRECAST & CAST STONE Ref.No.: QA-QCP-B1 Rev.No. 00 Date : 25.11.2017 Page : 11 of 15 x Inspection and testing during the construction and factory processes shall be verified. x All inspections and tests shall be recorded and shall provide positive identification of the material, components, item or equipment. x Prior to releasing products for installation or delivery to a Client, all inspections and tests shall be performed according to this procedure or the project ITP. x All inspections and tests shall be properly recorded and records shall be maintained until the completion certificate is received from the Client. x Operation Manager is responsible for ensuring that agreements for changes are given in writing by the Customer. Where the instruction is given verbally, appropriate letter shall be sent to confirm verbal instruction. x In the event where inspection or testing indicate a nonconformance to specification, applicable procedures and/or contract requirements, the procedure for control of non-confirming product will be implemented, and necessary NCR issued, followed up and closed to the satisfaction of client. 12.0 PRE – POUR INSPECTION Objective: To ensure that all precast panel casting beds and moulds, that are to be used on the project, are prepared in accordance with Customer approved shop drawing and specifications. x Production Engineer shall be responsible for ensuring that all pre-pour inspections are properly done. Factory Manager shall detail the requirements of the new work and highlight specific Customer requirements, including; standards, specifications, inspections, tests special requirements and quality standards. x On completion of preparatory work on moulds, This inspection shall verify the following: x x x x x x x x x The mould is dimensionally correct and within specified tolerances. The reinforcement is correct with regards to size, spacing, cover, completeness and the steel is free of mill scale. The casting bed or mould is free of debris and is clean. All criteria of the drawing or specification are satisfied. That only approved material are being used. No other factors exist that could affect the finished quality. That all parties fully understand the requirements and can implement these. That the workforce is familiar with, and have been instructed in, the method statement Production work on any mould shall not commence until the first unit produced has been inspected and approved. QA-QCP-B1 NOV.2017 REV.- 00 QUALITY CONTROL PROCEDURE FOR PRODUCTION AND SUPPLY OF ARCHITECTURAL PRECAST & CAST STONE Ref.No.: QA-QCP-B1 Rev.No. 00 Date : 25.11.2017 Page : 12 of 15 x All personnel authorized to perform subsequent inspections will have attended the first off inspection and will have signed the inspection form to indicate their awareness of the required standards and specifications. x Production Engineer shall be made aware of approved materials in the Materials Status for the new work during the first off inspections. x QA/QC Engineer shall maintain records of all material and production inspections. 13.0 CONCRETE MIX INSPECTION AND TESTING Objective: To ensure that concrete conforms to Customer specification and is tested and recorded. x All concrete mix designs shall be approved by the client and as per agreed sample. Approval shall only be given if the following criteria are meet: Concrete mix design is in accordance with the Customer specification. Batching plants has been set for the correct mix design. Concrete temperature has been recorded and meets specification. Transportation, pouring and vibrating requirements of concrete are known and are in place prior to pouring. Arrangements are in place to monitor these requirements throughout the pouring operations. x Operation Manager shall ensure that Engineer has been instructed on the requirements. Providing the arrangements and requirements stipulated above are met as per approval. x Production Engineer shall be responsible for ensuring that transportation, pouring, vibrating, finishing, protection of finished products and curing are all performed in accordance with project specification. x Engineer shall retain records of the concrete mix design forms and daily batching plant report. 14.0 x x CONCRETE CUBE TESTING Objective: To ensure that concrete mix designs conform to Company specifications. Dependent on the requirements of the Client, concrete cube testing for compressive strength and durability requirements shall be performed by the approved third party testing laboratory. Approved testing laboratory shall be performed where the Customer does not require external testing of materials. The testing requirements shall be identified either from the Customer documents, or Inspection and Test Plan, by the QA/QC Engineer. QA-QCP-B1 NOV.2017 REV.- 00 QUALITY CONTROL PROCEDURE FOR PRODUCTION AND SUPPLY OF ARCHITECTURAL PRECAST & CAST STONE Ref.No.: QA-QCP-B1 Rev.No. 00 Date : 25.11.2017 Page : 13 of 15 x Tests shall only be conducted by individuals who are competent, and authorized in writing. Tests shall be performed in the on-site approved testing laboratory. A record shall be kept by the engineer of all cubes taken for test. x Records of external test results shall be maintained. A copy of external test results shall be placed in the project file. Engineer shall forward the original test results to the Client if required. 15.0 FINAL INSPECTION AND APPROVAL Objective: To ensure that all precast components are made according to Customer specifications and drawing and are inspected prior to leaving the factory. x x x x x 16.0 Inspection and Test Plan, where prepared, shall give the requirements for final inspection. Any repair required shall be conducted in strict compliance with approved repair material and approved repair methodology. The final inspection shall be performed, immediately prior to the unit leaving the factory. The final inspection may be further subject to consultant/customer approval, as may be agreed and documented. Final finishes such as local smoothness, colour, aggregates exposure and polished face shall be checked by the engineer as per the approved sample by the client. Shape and architectural features as per shop drawing shall be checked thoroughly prior to dispatch and packaging INSPECTION AND TEST STATUS x The inspection and test status shall be recorded by Engineer at each stage of production against the requirements of the Inspection and Test Plan. This ensures that only conforming products continue to pass through the production cycle. x Records shall maintained by Engineer to reflect acceptance or rejection status of the product inspections and test at the various process stages, and any authorized concession. 17.0 PRODUCT HANDLING, STORAGE, PACKAGING, PRESERVATION AND DELIVERY x Materials and products used during factory installation and process activities are controlled to ensure the integrity of the items is maintained to a documented quality level. Operation Manager has overall responsibility for all material and products, used at the factory. x Materials and products, regardless of source or size, are handled so as to prevent or minimize damage and deterioration. Engineer shall ensure that suitable handling equipment for all task is provided to the factory personnel, and that the personnel are instructed in the correct use of QA-QCP-B1 NOV.2017 REV.- 00 QUALITY CONTROL PROCEDURE FOR PRODUCTION AND SUPPLY OF ARCHITECTURAL PRECAST & CAST STONE Ref.No.: QA-QCP-B1 Rev.No. 00 Date : 25.11.2017 Page : 14 of 15 handling equipment for the work tasks they perform. The responsibility for this instruction may be delegated to the foremen responsible in each area or activity. x All items shall be stored in suitable areas and in conditions appropriate to the finished product. Storage areas shall be provided at the factory for all production materials and finished units of production. Storage areas shall be clearly identified and maintained in a clean and tidy condition. Where appropriate storage areas shall be clearly marked. The responsibility for designating storage areas shall rest with General Foreman. The area foremen are responsible for maintenance and marking of the storage areas. x Loading foreman shall be responsible for ensuring the safe loading of units onto the transport vehicles. All units shall be properly identified and inspected prior to being loaded; this shall be verified by the Loading Foreman against the Delivery Note. x Preservation of stored material shall, where stipulated by the Customer, be performed at all stages to conform to Customer needs and/or Inspection and Test Plan or Method Statement. This activity shall be the responsibility of the storekeeper (for items held in the warehouse) and the area foreman (where items are stored externally), and shall be performed in line with details of preservation supplied by the Customer. x Delivery of materials, precast units or equipment from the factory shall be performed to ensure that transportation is appropriate to the quantity, quality and size of the deliverable. This responsibility shall rest with the Loading Foreman. All deliveries shall be recorded on Delivery Note prepared by the Storekeeper or Loading Charge Hand or Garage Foreman (for delivery of materials or precast units or equipment, respectively), checked by the Loading Foreman and given to the driver of the vehicle. The driver shall ensure that on delivery the Delivery Note is signed by the recipient. The signed Delivery Note shall be returned by the driver to Engineer. 18.0 NON-CONFORMITY INSPECTION x Raise a NCR detailing any corrective action taken or needed. They shall promptly execute and co-ordinate actions to close out the NCR. x Employees with responsibility for actioning NCRs shall review the NCR and propose nonconformance disposition and corrective action to eliminate the cause of deficiency. The proposal shall be realistic and meaningful taking into account the nature of the nonconformance and the factors necessary to eliminate it. The proposed corrective action shall be discussed and agreed . The action party shall implement agreed corrective action within time scale. QA-QCP-B1 NOV.2017 REV.- 00 QUALITY CONTROL PROCEDURE FOR PRODUCTION AND SUPPLY OF ARCHITECTURAL PRECAST & CAST STONE Ref.No.: QA-QCP-B1 Rev.No. 00 Date : 25.11.2017 Page : 15 of 15 19.0 APPENDICES ¾ ¾ ¾ INSPECTION TEST PLAN METHOD STATEMENT FORM & CHECKLIST QA-QCP-B1 NOV.2017 REV.- 00 Ref. No.: QA-MS-B-3 METHOD STATEMENT FOR PRODUCTION Rev. No. 00 AND SUPPLY OF PRECAST Date : 25.11.2017 ARCHITECTURAL PRECAST & CAST STONE Page : 1 of 12 ORIENT CONCRETE PRODUCT METHOD STATEMENT FOR PRODUCTION AND SUPPLY OF PRECAST ARCHITECTURAL PRECAST & CAST STONE Ref. No.: QA-MS-B-3 METHOD STATEMENT FOR PRODUCTION Rev. No. 00 AND SUPPLY OF PRECAST Date : 25.11.2017 ARCHITECTURAL PRECAST & CAST STONE Page : 2 of 12 REVISION RECORD This cover page is a record of all revisions of the document identified above by number and title. All previous cover pages are hereby superseded and are to be destroyed. Rev. No. 00 Rev. Date Nov-2017 Prepared by Checked by Approvals Description and Page Numbers of Revisions OCP All printed copies are UNCONTROLLED and not subject to revision control. The Master copy of latest revision of this document is available on the Project Server managed by QAQC department. Ref. No.: QA-MS-B-3 METHOD STATEMENT FOR PRODUCTION Rev. No. 00 AND SUPPLY OF PRECAST Date : 25.11.2017 ARCHITECTURAL PRECAST & CAST STONE Page : 3 of 12 Table of Contents 1.0 PURPOSE & SCOPE ..................................................................................................................................... 4 2.0 REFERENCES ................................................................................................................................................ 4 3.0 DEFINITIONS & ABBREVIATONS ............................................................................................................. 4 4.0 RESPONSIBILITIES ...................................................................................................................................... 5 4.1 TECHNICAL/ OPERATION MANAGER ..................................................................................................... 5 4.2 4.3 5.6 PRODUCTION ENGINEER ................................................................................................................................ 5 QC ENGINEER ............................................................................................................................................... 5 FOREMAN ....................................................................................................................................................... 6 6 TOOLS AND EQUIPMENTS ............................................................................................................................ 6 7 PROCEDURES ................................................................................................................................................... 6 7.1 RESOURCES ................................................................................................................................................... 6 7.1.1 FACTORY ............................................................................................................................................... 6 7.1.2 TECHNICAL/MATERIAL APPROVAL ............................................................................................. 6 7.1.3 REINFORCEMENT BAR ............................................................................................................................... 7 7.1.4 EMBEDDED ITEMS & DEVICES ................................................................................................................... 7 7.1.5 FORMWORKS ............................................................................................................................................. 7 7.2 PRE-POUR PRODUCTION ................................................................................................................................ 8 7.2.1 FABRICATION TOLERANCE ............................................................................................................. 8 7.2.2 REINFORCEMENT WORK ........................................................................................................................... 8 7.2.3 MOULD PREPARATION ............................................................................................................................... 8 7.2.4 CONCRETE POURING AND VIBRATION ........................................................................................ 9 7.2.5 CONCRETE TESTING .......................................................................................................................... 9 7.2.6 CONCRETING IN HOT WEATHER .......................................................................................................... 10 7.3 POST-POUR PRODUCTION ............................................................................................................................ 10 7.3.1 EXPOSE FINISHING ........................................................................................................................... 10 7.3.2 DELIVERY ............................................................................................................................................ 10 8 HSE REQUIREMENTS .................................................................................................................................... 11 8.1 9 10 SAFETY PRECAUTION .......................................................................................................................... 11 QA/QC REQUIREMENTS ............................................................................................................................... 11 ATTACHMENT ............................................................................................................................................. 12 APPENDIX A – INSPECTION TEST PLAN ......................................................................................................... 12 APPENDIX B – CHECKLIST .................................................................................................................................. 12 APPENDIX C – PCI MANUAL ............................................................................................................................... 12 Ref. No.: QA-MS-B-3 METHOD STATEMENT FOR PRODUCTION Rev. No. 00 AND SUPPLY OF PRECAST Date : 25.11.2017 ARCHITECTURAL PRECAST & CAST STONE Page : 4 of 12 1.0 PURPOSE & SCOPE The purpose of this Method Statement is to describe the procedures that Orient Concrete Product will adopt the production and transportation of the precast architectural concrete and cast stone in accordance with Quality Control Procedure, Shop drawings, Project Specification and Related Standard. This Method Statement will refer to technical/architectural aspects of the method of construction for the precast elements Production and delivery of precast concrete elements as detailed on contract drawings and approved shop drawings consist of: x Production, Delivery and Storage of Precast Architectural Element and Cast In stone Products. This method statement shall read in conjunction with below reference documents. 2.0 REFERENCES Sn Document No Document Title 1 QA-QCP-B-1-00 Quality Control Procedure 2 QA-ITP- B-2-00 Inspection Test Plan 3 PCI Manual 117 Manual for Architectural Precast Concrete Product 4 Project Specification 5 Approved Shop Drawing Manual for Quality Control for Plants and Production of Precast Concrete Products 8 PCI Mnl 116 3.0 DEFINITIONS & ABBREVIATONS MES Method Statement MAR Material Approval Request QCP Quality Control Procedure ITP Inspection and Test Plan TRA Task Risk Assessment PCI Precast Concrete Institute Ref. No.: QA-MS-B-3 METHOD STATEMENT FOR PRODUCTION Rev. No. 00 AND SUPPLY OF PRECAST Date : 25.11.2017 ARCHITECTURAL PRECAST & CAST STONE Page : 5 of 12 4.0 RESPONSIBILITIES 4.1 x x x x x x x TECHNICAL/ OPERATION MANAGER Responsible for reviewing and approving factory production and implementing schedules and ensuring performance of production equipment. Review the Method Statements prior to execution and explain the same to his subordinates Provide the necessary information, material, equipment, and machinery to his team to carry out the job. Ensuring Work execution is being carried out as per project specifications and approved method of statement. Ensuring all Precast works are in safe conditions Stop all unsafe work activities. Ensure that all new employees in the company are provided with a copy of the policy statement, receive such induction training as may be laid down in procedures, are issued with personal protective equipment as required and their personal responsibilities as set out in this manual 4.2 PRODUCTION ENGINEER x x x x x Ensure that the concerned work force is familiar with proper performance of activity in accordance with requisite quality standards by use of approved materials and finish schedules, drawings in reference to associated hazards and mitigated effect of the situation. He will be responsible for co-ordination with other disciplines also. Review fabrication drawing and carried out the implementation of method of statement. Reporting to factory manager for daily production activities Ensure that all new employees in the company are provided with a copy of the policy statement, receive such induction training as may be laid down in procedures, are issued with personal protective equipment as required and their personal responsibilities as set out in this manual. Set a personal example with regard to health and safety matters. 4.3 QC ENGINEER x x x x x x Conduct inspections and monitor the required tests as per the relevant Method Statement and ITP. Ensure that personnel are fully aware of the quality requirements relevant to their discipline and work. Ensure that the workers under his command fully understand the procedures and hazards involved in the job. Responsible for the development of a QA/QC and inspection program which meets the provisions of the appropriate specifications. Verify by test or inspection that products used comply with contractual requirements before they are utilized. Manage and oversee project quality to ensure compliance to codes, standards, regulations, equipment specific specifications, and QMS requirements. Ref. No.: QA-MS-B-3 METHOD STATEMENT FOR PRODUCTION Rev. No. 00 AND SUPPLY OF PRECAST Date : 25.11.2017 ARCHITECTURAL PRECAST & CAST STONE Page : 6 of 12 x Identify problems, find plausible solutions and implement those solutions to achieve objectives of the project. 5.6 FOREMAN x x x x x x 6 Ensure that the workers under his command fully understand the procedures and hazards involved in the job. Execution of all sides of Concrete Precast works in accordance to the method statement. Making regular check-ups ensuring all machinery and equipment related to the activity are working properly. Ensure that properly documented quality records are maintained as per established Method Statement, ITP. Stop all unsafe work activities. Set a personal example with regard to health and safety matters. TOOLS AND EQUIPMENTS Equipment that shall be used in production of precast concrete elements. x x x x x x x x 7 Batching plant Fork lift Poker Vibrator Slump cones Cube moulds Concrete thermometers Polisher/ Buffing Disk Electrical Grinder PROCEDURES 7.1 RESOURCES 7.1.1 FACTORY Precast Factory shall be sufficient and in full capacity to covered the whole production line, storage and access for incoming and outgoing deliveries of the project. Site Plan as attached on Appendix B. 7.1.2 TECHNICAL/MATERIAL APPROVAL Shop Drawing, Sample, & Materials shall be subjected to approval of Contractor/Client through Approval Request. Ref. No.: QA-MS-B-3 METHOD STATEMENT FOR PRODUCTION Rev. No. 00 AND SUPPLY OF PRECAST Date : 25.11.2017 ARCHITECTURAL PRECAST & CAST STONE Page : 7 of 12 Shop drawing and design concept shall be submitted for Contractor/Client approval and requirement The Concrete Mix Design ingredients as per the required grades and as per the Specifications will be submitted to Contractor/Client for review and approval. Approved concrete ready mix suppliers & trial mixes of approved mix design for the Project shall be carried out including all testing in accordance with the project specifications. 7.1.3 REINFORCEMENT BAR Reinforcement Steel Bars shall be deformed round bars with 500 N/mm² characteristic yield strength - complying with BS 4449, grade 500. Sample of Test and Mill Certificates is presented in the Material Approval Request. Reinforcing steel bars shall be stored properly, covered and away from dust, humidity and other aggressive materials, with named tag labels identifying its size. Sampling of steel shall be selected for testing as per frequency of project specifications. 7.1.4 x x x All Structural Steel Devices embedded in the precast concrete members or used for connections of these members, for lifting, fixing, etc. shall comply with BS EN10025 S275 or ASTM A36/A36M. Welded headed studs shall be in conformance with ASTM A108 and deformed anchor bars with ASTM A706. Approved Spacer blocks manufactured from concrete shall be used. These spacer blocks shall be tied to the links by mild steel tying wire. All reinforcement shall be securely tied together by mild steel tying wire at the intersections of the bars in sufficient numbers such that the entire cage is rigid, and will not be displaced whilst placing the concrete. All loose ends of tying wires shall be bent inwards to avoid any lack of cover to the wire. Welding shall not be used as a means to fix reinforcing bars together unless explicitly agreed to by the Client. 7.1.5 x x x EMBEDDED ITEMS & DEVICES FORMWORKS Production/molds area, storage and curing area, steel yard, batching plant and cranage facilities designated for this particular Project will be presented to the Contractor, the Company and Company’s representatives during their initial inspection visit. Mould to be used for production for precast element are made by Wood and GRP, these moulds shall be of sufficient length and properly constructed in order to achieve the precast element finishes required, as per the approved sections, shop drawings and allowable tolerances. The moulds shall be watertight to prevent any loss of cement slurry during vibration of fresh concrete. Formwork shall be thoroughly cleaned and approved release agent shall be applied before placing the reinforcement. Care shall be taken that the release agent does not contact reinforcement. Ref. No.: QA-MS-B-3 METHOD STATEMENT FOR PRODUCTION Rev. No. 00 AND SUPPLY OF PRECAST Date : 25.11.2017 ARCHITECTURAL PRECAST & CAST STONE Page : 8 of 12 x x x x Forms previously casted concrete shall be thoroughly cleaned of all sawdust, tie wire, shavings and debris. External corners or exposed surface corners shall have chamfer as specified in the drawings. Formwork shall be firmly secured to take the expected load of concrete without any deformation. Care shall be taken to avoid damage to the hardened concrete during removal of forms. Removal of formwork shall commence after concrete has attained sufficient strength without damaging the concrete. Figure 1: Formworks 7.2 PRE-POUR PRODUCTION 7.2.1 FABRICATION TOLERANCE Fabrication tolerances shall be according to the Project's Specifications. PCI Manual for Quality Control for Plants and Production of Architectural Precsat Concrete units PCI MNL-117 will be followed for the tolerances not defined in Specifications. 7.2.2 x The reinforcement cage will be fabricated in the yard, will be transported and placed inside the mould. Inspection will be done prior to close the inner formwork. Placement of steel bars, ties, lifting and anchoring devices shall be within tolerances of the shop drawings. All reinforcing steel shall have a clear cover as indicated on the shop drawings. Approved spacers will be used as necessary to ensure required spacing and cover for reinforcement. 7.2.3 x REINFORCEMENT WORK MOULD PREPARATION Prior to placing concrete, formwork dimensions, formwork stability, edge details and penetrations, connection details, insert locations, types and fixing to reinforcement, Ref. No.: QA-MS-B-3 METHOD STATEMENT FOR PRODUCTION Rev. No. 00 AND SUPPLY OF PRECAST Date : 25.11.2017 ARCHITECTURAL PRECAST & CAST STONE Page : 9 of 12 x x x reinforcement sizes, reinforcement locations, reinforcement cover, reinforcement fixing and form oil effectiveness shall be inspected for compliance with the drawings and specifications. The mould side form/shutter shall be assembled on the casting table, where the elements dimension are marked with respect to the approved drawings by welding or nut bolts system, whenever is convenient for the production activity, considering the number of elements to be cast and lifting position. Form surfaces ( bed and side shutters ) to be in contact with concrete must be treated with an effective approved release agent following the manufacturer recommendation. Form release agent shall be applied before placing of reinforcement steel and other accessories. Ensure mould are clean and free from any contamination before the application of release agent. All conduits that must be pre-installed and grooves/recesses that must be provided in the precast elements shall be additionally checked prior to concreting. All utility openings (if any) will be strictly coordinated with M&E subcontractor, regarding structural suitability (with limitation of size, location and levels). 7.2.4 x x x x x x The concrete pouring shall be from approved concrete mix design. The placing of concrete shall be in accordance with Project specifications. Concrete shall be placed in a uniform manner and properly spread over the area before commencing vibration. Placement and vibration of concrete shall be done properly in order to obtain good compaction and avoid honeycombs and air pockets. Continuous flow of concrete shall be ensured. The QA/QC Engineer assigned to the Project shall strictly abide by the Quality Control Manual and requirement on the project of specification. Concrete shall be compacted with poker vibrators and/or form vibrators running in channels along both sides of the moulds. Vibrators shall have operating frequencies that produce wellconsolidated placements. They shall be moved at a rate so vibration is sufficient to embed coarse aggregate and bring enough paste to the surface for finishing (rate of 1m’/minute). Cold joints are not acceptable. Prior to pouring concrete against an adjacent face (construction joint), the face shall be clean and free of dirt, films, paint, coatings or other foreign matter Vibration shall be done in a careful manner in order to avoid displacement of reinforcement, and other accessories 7.2.5 x x x CONCRETE POURING AND VIBRATION CONCRETE TESTING Temperature and slump test shall be taken for the concrete from each delivery. Slump reading shall be as per the approved mix design. Concrete Temperature shall not exceed the permissible limit of 30 degrees. Sample for production concrete cube tests shall be taken at the average rate of 3 cubes per daily placed concrete. One cube shall be tested at 7 days and 2 cubes for 28 days. For testing purposes, set of mix cubes shall be taken from freshly mixed concrete, cubes will be Ref. No.: QA-MS-B-3 METHOD STATEMENT FOR PRODUCTION Rev. No. 00 AND SUPPLY OF PRECAST Date : 25.11.2017 ARCHITECTURAL PRECAST & CAST STONE Page : 10 of 12 tested to the approved testing laboratory ( if required ) for 7 days and cubes for 28 days respectively 7.2.6 x x x CONCRETING IN HOT WEATHER Concreting operations shall be in strict compliance with ACI 305 “Recommended Practices for Hot Weather Concreting”, ACI 308 “Recommended Practice for Curing Concrete” and CIRIA guide to concrete in Gulf Region. The temperature of the concrete at the time of placing shall not exceed to 30º degree Celsius. Concreting is not permitted once the ambient temperature reach greater than 40º degree. Chilled water shall be used when necessary, in order to ensure that the temperature of the concrete does not exceed 30º degree Celsius. In addition, proper storage of materials shall be ensured. 7.3 POST-POUR PRODUCTION 7.3.1 x x x x x EXPOSE FINISHING The exposed surfaces of the concrete shall be finished properly with wooden hand floats and then troweled smoothly. If necessary, minor damages, blemishes, pinholes and none uniformed surface will be repair using approved repair materials following the procedure of manufacturer recommendation. Any special finishes required or rough surface shall be described in the shop drawings, unless otherwise follow the prescribed in the project specification. Stone finishes shall be obtained as per the approved sample, proper care shall be observed during this process to ensure all element has similar architectural finishes prior to installation at site. Upon completion of final touch up and repair, precast elements shall be stored in a proper and adequate manner, packaging ( if required ) shall be placed to ensure each final product are within the good condition prior to delivery. 7.3.2 DELIVERY Adequate care shall be taken in handling and transporting of precast elements, as so to ensure that they reach their destination without damage. The Project department shall prepare weekly forecast for the delivery, in order to ensure the delivery of required element on scheduled delivery date. Daily coordination between factory and project team at site will ensure the delivery scheduled match with the approved program. Elements shall be transported on flat bed trailers depending upon the precast size. Elements shall be well propped against any movement during transportation. Cranes with adequate capacity and necessary lifting device will be available on site. Ref. No.: QA-MS-B-3 METHOD STATEMENT FOR PRODUCTION Rev. No. 00 AND SUPPLY OF PRECAST Date : 25.11.2017 ARCHITECTURAL PRECAST & CAST STONE Page : 11 of 12 Wooden or polystyrene support shall be provided to ensure the stability of the precast elements. Route for Vehicle/Equipment to Site shall be followed only as directed by traffic department with mandatory road permits for transporting precast elements. We shall study, any special requirement for the transportation of precast element due to height, weight and shape of the panel and appropriate transport solution will be adopted to carry out the task efficiently, safely and cost effectively. 8 HSE REQUIREMENTS 8.1 SAFETY PRECAUTION All works shall be undertaken in accordance with OCP Company Policy as well as following the HSE guide lines and all individual operations shall be set up and given to ensure that they comply with Safety Requirements. x x x x x x 9 Hazards involved in every activity shall be explained to workers during toolbox meetings. The fabrication of the precast members shall be done within the area allocated inside the production yard. All necessary barricades, safety notices, safety tools, and warning devices shall be clearly displayed at site. Reducing and/or eliminating the human errors which are predominantly causing many untoward incidents. Basic PPE shall be worn by all employees (Safety Shoes, Hand Gloves, Hard Hat, Safety Goggles and High-viz vests) The working place shall be kept clean and tidy. QA/QC REQUIREMENTS x x x x x x x Ensure compliance with the Quality Control Procedure and with the Inspection and Inspection Test Plan. The Contractor shall obtain permission at least 24 hours in advance of any concrete pour. Concrete mix design shall be available on site. Reinforcement steel shall have valid mill certificates Visual inspections and surveys will be made regularly to ensure installation is safe and as per the project requirement. Concrete cubes shall be taken for compressive strength and shall be tested for 7 and 28 days. Proper supervision on the precast works and related operating equipment will be ensured by the site team in charge. Ref. No.: QA-MS-B-3 METHOD STATEMENT FOR PRODUCTION Rev. No. 00 AND SUPPLY OF PRECAST Date : 25.11.2017 ARCHITECTURAL PRECAST & CAST STONE Page : 12 of 12 10 ATTACHMENT APPENDIX A – INSPECTION TEST PLAN APPENDIX B – CHECKLIST APPENDIX C – PCI MANUAL Project Name: Project Number: Document Title: Document Number: Rev. No.: /E^Wd/KEd^dW>E Activity No. Activity Description 1 Preliminary Documents 1.1 Design Calculation, Shop Drawings, Inspection and Test Plan Method Statement & Concrete Mix Design 2 Materials 2.1 Cement Aggregates Water & Admixture Steel Reinforcements Repair Materials & Other material approval 3 Pre- Production Inspection/Verific ation Records Project Specification, Contract Drawings, Contract Documents, Reference Standard Material & Submittals Material approvals Product data sheet As per Project Specification 3.1 Sample Approval As per Project Specification Concrete Mix Design 3.2 Mock Up Elements (if applicable ) Approved Shop drawings YͲ/dWͲͲϮZs͘ϬϬ͕ϮϬϭϳ Acceptance Criteria Inspection Frequency Reference Documents OCP Action Responsibility MC CLIENT TP Once/Beginning Approval of Material & Technical Submittals H H H H Material delivered complying to material approvals / approved drawings/ Project Specification Once/Beginning Material delivery notes / Test Certificate H W R R In accordance with the client acceptance for the exposure and architectural requirement Once/Beginning Approved Sample H H H H As per approved Mock up sample and inspection Once/Beginning Visual Inspection H H H H Technical Project Name: Project Number: Document Title: Document Number: Mould Fabrication Approved Shop drawings Formwork dimensions, shape and feature as per approved shop drawings 3.4 Reinforcement and cast in items Approved Shop drawings Approved Source Types and size of Material 3.5 Concrete Casting 3.6 Fabrication Tolerances 4 Post-Production 4.1 4.2 3.3 Rev. No.: Once/Beginning / or as per agreed frequency Checklist/ Drawing H W S S Clean of loose rust. Diameter, spacing and cover, Support and tightness. In compliance with BS4449 Once/Beginning / or as per agreed frequency Checklist/ Drawing H W S S Approved Mix Design Approved Materials Compliance with the approved sample and mix design Each Elements Batching Plant Report H S S S PCI MNL As per approved Sample 117 As per PCI Tolerance Manual for Architectural Product Each Elements PCI Manual R R R R Polishing/ Exposure Polishing/ Exposure Final surface finishes should match the approved physical sample as agreed. Each Elements EP / 5.5 / K rev. 03 W S S S Handling, Stacking & Packaging Approved method statement As per method statement & Quality Control Procedure Each Elements S S S S YͲ/dWͲͲϮZs͘ϬϬ͕ϮϬϭϳ Project Name: Project Number: Document Title: 4.3 Delivery Document Number: As per Quality procedure All elements to deliver to site shall be secured and free from any damages Each Elements Rev. No.: Delivery Note LEGEND I Inspection – Formal inspection to be undertaken and recorded W Witness Point – Inspection that may be witnessed by relevant party H Hold Point – Work shall not proceed until released by relevant party R Review – Reports / Records or other evidence of compliance is verified S Surveillance – an activity which is subject to ongoing monitoring YͲ/dWͲͲϮZs͘ϬϬ͕ϮϬϭϳ H S S S Project Name: Project Number: Document Title: Document Number: Rev. No.: ŚĞĐŬůŝƐƚ /E^Wd/KEEd^dW>E,<>/^dĨŽƌ͗ ;dŽďĞĐŽŵƉůĞƚĞĚďLJƚŚĞƉĞƌƐŽŶ;ƐͿĚŝƌĞĐƚůLJƌĞƐƉŽŶƐŝďůĞĨŽƌƚŚĞǁŽƌŬͿ ŽŶƚƌĂĐƚEƵŵďĞƌ͗ ŽŶƚƌĂĐƚͬWƌŽũĞĐƚEĂŵĞ͗ ŽŶƚƌĂĐƚŽƌ͗ ^ƵďĐŽŶƚƌĂĐƚŽƌ tŽƌŬ /ƚĞŵƐͬĂĐƚŝǀŝƚŝĞƐƚŽďĞǀĞƌŝĨŝĞĚ Z&d tŽƌŬĂƌĞĂ͗ ZĞĨĞƌĞŶĐĞ /ŶŝƚŝĂůůĞĚͬK< ŚĞĐŬůŝƐƚEƵŵďĞƌ͗ ŽŵŵĞŶƚƐ /ŚĂǀĞĐĂƌƌŝĞĚŽƵƚĂůůŶĞĐĞƐƐĂƌLJŝŶƐƉĞĐƚŝŽŶƐĂŶĚǀĞƌŝĨLJƚŚĂƚƚŚĞĂďŽǀĞŝƚĞŵƐͬĂĐƚŝǀŝƚŝĞƐĐŽŶĨŽƌŵƚŽƚŚĞĐŽŶƚƌĂĐƚ ƐƉĞĐŝĨŝĐĂƚŝŽŶͬĚŽĐƵŵĞŶƚƐ EĂŵĞ͗ ^ŝŐŶĂƚƵƌĞ͗ ĂƚĞ͗ YͲ/dWͲͲϮZs͘ϬϬ͕ϮϬϭϳ Project Name: Document Title: Project Number: Document Number: /ŚĂǀĞĐĂƌƌŝĞĚŽƵƚĂůůŶĞĐĞƐƐĂƌLJŝŶƐƉĞĐƚŝŽŶƐĂŶĚǀĞƌŝĨLJƚŚĂƚƚŚĞĂďŽǀĞŝƚĞŵƐͬĂĐƚŝǀŝƚŝĞƐĐŽŶĨŽƌŵƚŽƚŚĞĐŽŶƚƌĂĐƚ ƐƉĞĐŝĨŝĐĂƚŝŽŶͬĚŽĐƵŵĞŶƚƐ YͲ/dWͲͲϮZs͘ϬϬ͕ϮϬϭϳ Rev. No.: EĂŵĞ͗ ^ŝŐŶĂƚƵƌĞ͗ ĂƚĞ͗ 18. General Approval AAM/MQ/OUT/2023/5461 2أﻏﺴﻄﺲ 2023 اﻟﺴﺎدة / ﻣﺼﻨﻊ اﻟﺸﺮق ﻟﻠﻤﻨﺘﺠﺎت اﻻﺳﻤﻨﺘﻴﺔ اﻟﻤﺤﺘﺮﻣﻴﻦ ﺗﺤﻴﺔ ﻃﻴﺒﺔ وﺑﻌﺪ ،،، اﻟﻤﻮﺿـﻮع :اﻋﺘﻤﺎد ﻣﻨﺘﺠﺎت اﺛﺎث اﻟﻄﺮﻳﻖ ﻣﻦ ﻣﺼﻨﻊ اﻟﺸﺮق ﻟﻠﻤﻨﺘﺠﺎت اﻻﺳﻤﻨﺘﻴﺔ ﺗﻬﺪﻳﻜﻢ ﺑﻠﺪﻳﺔ ﻣﺪﻳﻨﺔ اﻟﻌﻴﻦ أﻃﻴﺐ اﻟﺘﺤﻴﺎت ،ﺑﺎﻻﺷﺎرة إﻟﻰ ﻛﺘﺎﺑﻜﻢ رﻗﻢ ost-23-219اﻟﻮارد إﻟﻴﻨﺎ ﺑﺘﺎرﻳﺦ 27ﻳﻮﻟﻴﻮ ، 2023وﺑﻌﺪ دراﺳﺔ اﻟﻤﺴﺘﻨﺪات اﻟﻤﺮﻓﻘﺔ ﻣﻦ ﻗﺒﻠﻜﻢ ،ﻧﻮد إﻓﺎدﺗﻜﻢ ﺑﺄﻧﻪ ﻻ ﻣﺎﻧﻊ ﻟﺪﻳﻨﺎ ﻣﻦ اﻋﺘﻤﺎد اﻟﻤﻨﺘﺠﺎت اﻟﻤﻮﺿﺤﺔ ادﻧﺎه ﻣﻦ ﻣﺼﻨﻊ اﻟﺸﺮق ﻟﻠﻤﻨﺘﺠﺎت اﻻﺳﻤﻨﺘﻴﺔ ﻟﻼﺳﺘﺨﺪام ﻣﺸﺎرﻳﻊ ﺑﻠﺪﻳﺔ ﻣﺪﻳﻨﺔ اﻟﻌﻴﻦ ﺷﺮﻳﻄﺔ ﺗﺤﻘﻴﻘﻬﺎ ﻟﻤﺘﻄﻠﺒﺎت ﻣﻮاﺻﻔﺎت وﻣﻌﺎﻳﻴﺮ اﻟﺪﻟﻴﻞ اﻹرﺷﺎدي ﻟﺨﺪﻣﺎت اﻟﺒﻨﻴﺔ اﻟﺘﺤﺘﻴﺔ إﻣﺎرة أﺑﻮﻇﺒﻲ و اﻻﻟﺘﺰام ﺑﺎﻟﻤﻼﺣﻈﺎت اﻟﻤﺮﻓﻘﺔ . اﻟﻤﻨﺘﺞ أﺛﺎث اﻟﻄﺮﻳﻖ ﻣﺜﻞ ﻣﻘﺎﻋﺪ ﻟﻠﻤﺸﺎة ،ﻣﻮاﻗﻒ درﺟﺎت ،ﺻﻨﺎدﻳﻖ اﻟﻘﻤﺎﻣﺔ ،أﺣﻮاض اﻟﺰراﻋﺔ ﻣﻊ ﻣﻘﺎﻋﺪ ،ﻣﺸﺒﻜﺎت اﻷﺷﺠﺎر و اﻟﺤﻮاﺟﺰ . ﻋﻠﻤﺎ ﺑﺄن ﺳﻴﺘﻢ إﺟﺮاء ﺗﻘﻴﻴﻢ دوري ﻋﻠﻰ ﻣﺴﺘﻮى اﻟﻤﺸﺮوع ﻟﻠﺘﺤﻘﻖ ﻣﻦ ﻣﻄﺎﺑﻘﺔ اﻟﻤﻨﺘﺠﺎت ﻟﻠﻤﻮاﺻﻔﺎت اﻟﻤﻌﺘﻤﺪة. ﻟﻠﺘﻨﺴﻴﻖ واﻟﺘﻮاﺻﻞ: اﺳﻢ اﻟﻤﻮﻇﻒ اﻹدارة – اﻟﻘﻄﺎع رﻗﻢ اﻟﺘﻮاﺻﻞ ﺑﺨﻴﺘﺔ اﻟﻜﺘﺒﻲ اﻟﺪﻋﻢ اﻟﻔﻨﻲ ﻟﻠﺒﻨﻴﺔ اﻟﺘﺤﺘﻴﺔ 037129651 ﻣﻄﻠﻮب رد ☒ :ﻧﻌﻢ ☐ ﻻ اﻟﻔﺘﺮة اﻟﻤﻄﻠﻮب اﻟﺮد ﺧﻼﻟﻬﺎ ) ( أﻳﺎم ﻋﻤﻞ ،وذﻟﻚ ﻣﻦ ﺧﻼل اﻟﻤﻨﺼﺔ اﻟﻮﻃﻨﻴﺔ )ﻣﺮﺳﺎل( ،أو ﻧﻈﺎم اﻟﻤﺮاﺳﻼت .CTS وﺗﻔﻀﻠﻮا ﺑﻘﺒﻮل ﻓﺎﺋﻖ اﻟﺸﻜﺮ واﻻﺣﺘﺮام، اﻟﻤﺮﻓﻘﺎت: .1 ﻻ ﻳﻮﺟﺪ ﻧﺎﺻﺮ ﻣﻔﺘﺎح ﺳﻠﻄﺎن ﻣﻔﺘﺎح اﻟﻌﺮﻳﺎﻧﻲ ﻣﺪﻳﺮ إدارة اﻟﺪﻋﻢ اﻟﻔﻨﻲ ﻟﻠﺒﻨﻴﺔ اﻟﺘﺤﺘﻴﺔ ﺑﻠﺪﻳﺔ ﻣﺪﻳﻨﺔ اﻟﻌﻴﻦ 1ﻣﻦ 2 AAM/MQ/OUT/2023/5461 2023 أﻏﺴﻄﺲ2 2 ﻣﻦ2 25. Concrete Mix Design and Waterproofing Paint Data Sheet P.O.Box: 150856, Sharjah, UAE -T Tel: +971 65430832 Mob: +971 502247977 ŵĂŝů͗ ǁĞď͗ǁǁǁ͘ŽƐƚ͘ĂĞ KEZdD/y^/'E WƌŽũĞĐƚ ůŝĞŶƚ DĂŝŶŽŶƚƌĂĐƚŽƌ ŽŶƐƵůĂƚĂŶƚ ĞǀĞůŽƉŵĞŶƚ͕/ŶĨƌĂƐƚƌƵĐƚƵƌĞΘWƵďůŝĐZĞĂůŵĨŽƌůEŽƵĚ;ů<ŚƌĂŝƌͿ ůĚĂƌWƌŽƉĞƌƚŝĞƐW:^ Combined Group Contracting Company KD Dŝdž'ƌĂĚĞ͗ĂƐƚ^ƚŽŶĞ ŽŵƉƌĞƐƐŝǀĞ^ƚƌĞŶŐƚŚ͗ϱϬEͬŵŵϮ &ƌĞĞtͬZĂƚŝŽ͗Ϭ͘ϯϱ dĂƌŐĞƚ^ůƵŵƉ͗EŽƚĂƉƉůŝĐĂďůĞ DŝdžĞƚĂŝůƐ DĂƚĞƌŝĂůƐ dLJƉĞ ŐŐƌĞŐĂƚĞ ϬͲϱŵŵ >ŝŵĞƐƚŽŶĞ ĞŵĞŶƚ ŽŶĐƌĞƚĞ ĚĚŝƚŝǀĞ tĂƚĞƌ ^ŽƵƌĐĞ EŽƌƚŚĞƌŶ DŝŶĞƌĂůƐŽ͘ >> tŚŝƚĞWŽƌƚůĂŶĚ ZĂƐů<ŚĂŝŵĂŚ ĞŵĞŶƚ ŽŶŵŝdž ƌŝŶŬŝŶŐ ^ƉĞĐŝĨŝĐ 'ƌĂǀŝƚLJ ŐŐƌĞŐĂƚĞ tĂƚĞƌ ĂďƐŽƌƉƚŝŽŶ ďƐŽƌďĞĚ tĂƚĞƌŝŶ;<ŐͿ Ϯ͘ϳϭ ϯ͘ϵ ϱϵ͘Ϭϵ ϯ͘ϭϱ ϭ͘ϭнͬͲ Ϭ͘ϬϮ ^ĞǁĂ ^^tĞŝŐŚƚ sŽůƵŵĞƉĞƌ ƉĞƌDϯ Dϯ ϭϲϬϬ<ŐƐ Ϭ͘ϱϱ ϰϱϬ<ŐƐ Ϭ͘ϯ ϱ>ƚƌƐ Ϭ͘ϬϬϱ ϭϳϮ>ƚƌƐ Ϭ͘ϭϳϮ dĂƌŐĞƚĞŶƐŝƚLJ;ŬŐͬŵϯͿ ϮϮϮϳ ƐƐƵŵĞŝƌĐŽŶƚĞŶƚ;йͿ ϭ͘ϳ Ϭ͘Ϭϭϳ ϭ͘ϬϬϬ dŽƚĂůsŽůƵŵĞ;DϯͿ NUMERAL VALUES OF COMBINED GRADING BS Sieve Size 10mm 0-5mm Dune Sand 16 20 36 93 100 100 100 1.3 20 99 100 100 100 100 Ϭ͘Ϭϳϱ Ϭ͘ϭϱ Ϭ͘ϲ ϱ ϭϬ ϮϬ ϯϳ͘ϱ BS Limit lower 0 0 10 35 50 95 100 BS Limit upper 3 10 35 55 75 100 100 KD/E'Z/E' ϭϬϬ DdZ/>W^^/E'й Combined Grading 5 9 22 41 43 43 43 ϴϬ ϲϬ ^ >/D/dͲ DdZ/>^KD/E'Z/E' ϰϬ ϮϬ ^>/D/d Ͳ Ϭ Ϭ͘Ϭϳϱ Ϭ͘ϭϱ Ϭ͘ϲ ϱ ^/s^/ŵŵ͘ ϭϬ ϮϬ ϯϳ͘ϱ SILICA SEALER WB (Water based penetrating sealer) Water based, silane-siloxane repellent and sealer water Description Silica Sealer WB is a clear, water-based silane/siloxane sealer for protecting a wide variety of vertical and horizontal surfaces. It provides a cost-effective solution for protecting substrates from water and the elements. It penetrates deeply into new or existing concrete or masonry for maximum protection against water penetration, chloride ion attack, freeze/thaw cycles and weathering. The finished application produces a crystal-clear coating which is resistant to ultra violet rays and is specifically designed to protect and preserve all types of concrete and masonry surfaces. Advantages x Green product x Environment friendly x Easily applied by spray or brush x Breathable with excellent water repellent properties x Free of solvents x Excellent weather resistant properties x Reduces chloride intrusion. x Reduces efflorescence Uses x Protects concrete from ingress of water and chloride ions x Excellent water repellence x Suitable for both new and old concrete x Single part – easy to use x Suitable for application in confined areas Application instruction Silica Sealer WB will penetrate and “stabilise” the substrate. The depth of penetration and its coverage rate are determined by substrate profile, porosity and general condition. Hence for low permeability concretes, penetration will be low, and area covered per litre will be high. It is thus recommended that a general coverage rate of 4m2/litre be observed, noting that this may change according to substrate condition. Any areas of glass should be masked. Plants, grass, Joint sealants, asphalt and bitumen painted areas should be protected during application. Apply silica Sealer WB by Brush, roller or spray machine. A uniform surface appearance (sheen) should be apparent when the required rate of application rate has been achieved. If any matt, porous patches remain, then a further application of Silica sealer WB should be made. Application The correct application rates and overcoating times should be observed, in order to obtain the complete benefits of the protective properties, except where substrate condition dictates different application rates. Number of Coats Theoretical Application rate per coat Over coating time : 2 or 3 (depending on concrete porosity) : 4m2/L : @ 20°C : 2 hours @ 35°C : 1 hour Under no circumstances should the Silica Sealer WB be over coated until the surface is properly dry. Chemical Resistance Silica Sealer WR is resistant to chemical solutions, Mild acids, detergents, soap, grease Ketchup and Oils when exposed for short periods. Information Advanced products of sand LLC products are guaranteed against defective materials and are sold subject to standard terms and condition of sale, copies of which are available on request which are reasonable care it’s taken compiling this technical data sheet, all recommendations regarding the use of product are made without guarantee since the conditions used are beyond the company’ direct control. It is the customer responsibility to satisfy themselves that each product is fit for the purpose for which they indent to use it. Quality Matters All products originating from Advanced products of sand LLC are manufactured under a management system independently certified to confirm to the requirements of the quality, environmental and occupational health & safety standards ISO 9000, ISO 14001 and OHSAS 18001. Limitations x Should not be used at temperature below 4°C x Concrete coated with sealers, coating or curing membranes must be stripped Please Note: All suggestions and application instructions herein are based upon our latest technical experience. Due to the wide variety of individual product conditions, we cannot be held responsible for the material content. These instructions do not release the purchaser/applicator from responsibility to determine the suitability of the product in consideration of any product characteristics. These instructions are to be considered void when a new edition is released. Our general condition of sales and delivery in their latest edition apply. 26. Estidama Material Compliance Certificate