Datasheet PIPELINE FORGING DATASHEETS Prepared for: Woodside Energy Pty Ltd Prepared by: Genesis Lvl 1, 1100 Hay Street, West Perth 6005 Tel: +61 8 9320 0100 Fax: +61 8 9320 0180 www.genesisoilandgas.com Project Title: Document No.: Client Document No.: Greater Enfield EPCI J45041B-U-DS-20002 AP038504-9.3.68-M5210 Rigid Pipeline Anchor Forgings Rev Date Description Issued by Checked by A1 23/10/2015 Issued for IDC NLI ALO B1 27/10/2015 Issued for Review NLI ALO C1 04/11/2015 Issued for Enquiry Confidential – Do not disclose without authorisation © Copyright Genesis Oil and Gas Consultants, Ltd. Printed copy is uncontrolled Nigel Lim Approved by PAU Alexander Lockett Paul Auret 2015.11.04 12:10:22 +08'00' Client Approval Project Title: Document & Rev No: Document Title: Greater Enfield EPCI J45041B-U-DS-20002 PIPELINE FORGING DATASHEETS HOLDS LIST HOLD [HOLD1] SECTION DESCRIPTION None Information contained in this document is the work product of Genesis Oil & Gas Consultants and embodies confidential and proprietary information of Genesis and/or its client. This document and all information herein is confidential, and may not be used, reproduced or distributed without prior authorization. Confidential – Do not disclose without authorisation © Copyright Genesis Oil and Gas Consultants, Ltd. Printed copy is uncontrolled Page 2 of 24 Project Title: Document & Rev No: Document Title: Greater Enfield EPCI J45041B-U-DS-20002 PIPELINE FORGING DATASHEETS CONTENTS ABBREVIATIONS ................................................................................................................. 4 1.0 INTRODUCTION .......................................................................................................... 5 1.1 Project Description............................................................................................... 5 1.2 Document Purpose .............................................................................................. 6 1.3 Document Scope ................................................................................................. 6 2.0 NOTES......................................................................................................................... 7 3.0 DATASHEET ................................................................................................................ 8 4.0 3.1 NPS 16 CS Anchor Flange .................................................................................. 8 3.2 NPS 16 CS Hang-Off Collar ............................................................................... 11 3.3 NPS 10 CS Anchor Flange ................................................................................ 13 3.4 NPS 10 CS Hang-Off Collar ............................................................................... 16 REFERENCES ........................................................................................................... 19 4.1 COMPANY Provided Documents ....................................................................... 19 4.2 CONTRACTOR Provided Documents................................................................ 19 APPENDIX A TYPICAL PIPELINE FORGING DESIGNS ............................................... 20 APPENDIX B ADDITIONAL CONTRACTOR REQUIREMENTS .................................... 22 B.1 Manufacturing Data ........................................................................................... 22 B.2 Chemical Properties .......................................................................................... 23 B.3 NDE ................................................................................................................... 23 a. UT of Forgings .......................................................................................... 23 b. MT of Finished Surfaces ........................................................................... 23 c. VT ............................................................................................................. 24 d. NDE Operators Qualification ..................................................................... 24 B.4 Documentation .................................................................................................. 24 Confidential – Do not disclose without authorisation © Copyright Genesis Oil and Gas Consultants, Ltd. Printed copy is uncontrolled Page 3 of 24 Project Title: Document & Rev No: Document Title: Greater Enfield EPCI J45041B-U-DS-20002 PIPELINE FORGING DATASHEETS ABBREVIATIONS API American Petroleum Institute ASME American Society of Mechanical Engineers ASTM American Society for Testing and Materials BS British Standard CE Carbon Equivalent CO2 Carbon Dioxide CRA Corrosion Resistant Alloy CS Carbon Steel DNV Det Norske Veritas EN Euronorm EPCI Engineering, Procurement, Construction, Installation FPSO Floating Production and Storage ID Inner Diameter ISO International Standards Organisation MPS Manufacturing Procedures Specification MT Magnetic Particle Examination MTO Material Take-Off NPS Nominal Pipe Size OD Outer Diameter PCM Composition Parameter PIP Pipe-In-Pipe PO Purchase Order QA Quality Assurance RFQ Request for Quotation UT Ultrasonic Examination VT Visual Examination 3LPP 3 Layer Polypropylene Confidential – Do not disclose without authorisation © Copyright Genesis Oil and Gas Consultants, Ltd. Printed copy is uncontrolled Page 4 of 24 Project Title: Document & Rev No: Document Title: Greater Enfield EPCI J45041B-U-DS-20002 PIPELINE FORGING DATASHEETS 1.0 INTRODUCTION 1.1 Project Description The Greater Enfield Development is a proposed greenfield development located to the west of Company’s existing Enfield and Vincent assets as shown in Figure 1. Figure 1-1 - Laverda Geographical Location The Development will exploit 3 oil accumulations and is shown in : Norton-over-Laverda (NoL) Laverda Canyon (LC) and; Cimatti The full subsea system includes a total of 14 wells, 12 of which are included in the first phase which is the subject of this Scope. These are as follows: 7 production wells 5 oil wells and 1 gas well in the Laverda area 1 oil well at Cimatti The gas well is a future well. Provision for it is included in the base scope, but the tree will not be installed or commissioned as part of the first phase of the Greater Enfield Development which is covered by this Scope. The production wells are tied back to the Ngujima-Yin FPSO via a 16” OD wet insulated carbon steel flowline and a 10” ID flexible production riser. There are 6 water injection (WI) wells: 3 are for pressure support of Laverda Canyon, 3 are for Cimatti. They provide low salinity injection water from the FPSO via a 10” OD carbon steel flowline and a 10” ID flexible riser. Confidential – Do not disclose without authorisation © Copyright Genesis Oil and Gas Consultants, Ltd. Printed copy is uncontrolled Page 5 of 24 Project Title: Document & Rev No: Document Title: Greater Enfield EPCI J45041B-U-DS-20002 PIPELINE FORGING DATASHEETS Figure 1-2 - Laverda Field Schematic 1.2 Document Purpose This document provides the supply of pipeline forgings on the Greater Enfield EPCI contract. The pipeline forgings shall be located on pipeline and subsea structure piping interfaces for both the NPS 16 production and NPS 10 WI flowlines. This document shall be read with reference to the documents listed in Section 4.0. 1.3 Document Scope The following anchor forgings are covered by this document: 7 off NPS 16 Anchor Flange Forgings 2 off NPS 16 Hang-Off Collar Forgings 10 off NPS 10 Anchor Flange Forgings 2 off NPS 10 Hang-Off Collar Forgings Refer to Section 2.0 for notes on the datasheets. Confidential – Do not disclose without authorisation © Copyright Genesis Oil and Gas Consultants, Ltd. Printed copy is uncontrolled Page 6 of 24 Project Title: Document & Rev No: Document Title: Greater Enfield EPCI J45041B-U-DS-20002 PIPELINE FORGING DATASHEETS 2.0 NOTES The table below displays the applicable notes as per the datasheets given in Section 3.0. NOTES DESCRIPTION Additional requirements are stated in DNV-OS-F101 and this document. These include, but are not limited to: (1) Section 8, B900 Section 8, C200 Section 8, C600 Section 8, D200 Appendix B of DNV-OS-F101 Appendix D of DNV-OS-F101 Appendix B of this document (2) Refer to Appendix A for sketches of typical pipeline forging designs (3) Vendor shall provide the option to weld overlay clad relevant forgings and associated PUP pieces as per datasheet specification (4) The PUP pieces shall be of the flowline specification and supplied to the Vendor by Contractor. It shall be welded to the flowline side of each anchor forged flange. The PUPs shall be nominal 2D and 1.5D lengths for the NPS 16 anchor flange and NPS 10 anchor flange respectively A pair of PUPs shall be of the flowline specification and supplied to the Vendor by Contractor. It shall be welded to both sides of each forged hangoff collar. The PUPs shall be the following lengths: (5) 500 mm on the pipeline end 4 m on the retrieval end (abandonment and retrieval head) Refer to Appendix A for end designations. (6) Onshore hydrotest shall be performed by Vendor prior to final acceptance. Test caps shall be removed from pipe PUPS after hydrotest. Confidential – Do not disclose without authorisation © Copyright Genesis Oil and Gas Consultants, Ltd. Printed copy is uncontrolled Page 7 of 24 Project Title: Document & Rev No: Document Title: Greater Enfield EPCI J45041B-U-DS-20002 PIPELINE FORGING DATASHEETS 3.0 DATASHEET 3.1 NPS 16 CS Anchor Flange NPS 16 CS Anchor Flange General Quantity - 7 Type - Anchor Flange (Refer Note (2)) Product - Oil Sour Service - Yes (NACE MR0175 / ISO 15156) Sand Service - Yes Subsea Service - Yes / 850 m Water Depth Property Units Values Design Pressure MPa 27.5 Maximum System Pressure Test MPa 30.3 Design Parameters Maximum Design Temperature °C 66 Minimum Design Temperature °C -2 Specified Minimum Yield Strength MPa 485 Specified Minimum Tensile Strength MPa 565 Pipeline Design Code - DNV-OS-F101: 2013 Material Specification - ASTM A694M Material Grade - F70 Cladding Material - Alloy 625 (Refer Note (3)) Material Cladding Thickness mm 3 (Refer Note (3)) Corrosion Allowance mm 0 Supplementary Requirements - Refer Note (1) Maximum CE - 0.42 Confidential – Do not disclose without authorisation © Copyright Genesis Oil and Gas Consultants, Ltd. Printed copy is uncontrolled Page 8 of 24 Project Title: Document & Rev No: Document Title: Greater Enfield EPCI J45041B-U-DS-20002 PIPELINE FORGING DATASHEETS NPS 16 CS Anchor Flange Mating Flowline Linepipe Material - Carbon Steel Grade - DNV SMLS 450S Pipe Dimensions mm Cladding Material - OD T ID 406.4 21.44 363.5 OD T ID 406.4 21.44 357.5 None Cladding Thickness mm - Corrosion Allowance mm 6 Mating Structure Piping Material - Carbon Steel Grade - DNV SMLS 450S Pipe Dimensions mm Cladding Material - Alloy 625 Cladding Thickness mm 3 Corrosion Allowance mm 0 Fabrication PUP Piece - 2 PUP (Refer Note (4)) End Bevel - Square Ends Type of bevel protectors - End Caps Tolerances - DNV-OS-F101: 2013 Certification Level - 3.1 Internal (By Others) - None External (By Others) - 3LPP Insulated - Yes (by others) Marking Requirements - ASTM A694M Ref.[1] Coating and Markings Production Tests (Refer Note (1)) Hydrotest Pressure Onshore Hydrotest Pressure MPa 34.4 (Refer Note (6)) Charpy V-notch Impact Tests Test Temperature Charpy Impact Energy Confidential – Do not disclose without authorisation © Copyright Genesis Oil and Gas Consultants, Ltd. Printed copy is uncontrolled Page 9 of 24 °C J -32 Average – 50 Minimum - 40 Project Title: Document & Rev No: Document Title: Greater Enfield EPCI J45041B-U-DS-20002 PIPELINE FORGING DATASHEETS NPS 16 CS Anchor Flange Room Temperature Tensile Testing Test Temperature °C Room temperature Yield Strength MPa ≥485 Tensile Strength MPa ≥565 Elongation % 18 (in 50mm) HV 270 Hardness Testing Maximum Hardness Corrosion Testing Corrosion Test - DNV-OS-F101: 2013 (Refer Note (1)) NDE NDE Requirements Confidential – Do not disclose without authorisation © Copyright Genesis Oil and Gas Consultants, Ltd. Printed copy is uncontrolled Page 10 of 24 DNV-OS-F101: 2013 (Refer Note (1)) Project Title: Document & Rev No: Document Title: 3.2 Greater Enfield EPCI J45041B-U-DS-20002 PIPELINE FORGING DATASHEETS NPS 16 CS Hang-Off Collar NPS 16 CS Hang-Off Collar General Quantity - 2 Type - Hang-Off Collar (Refer Note (2)) Product - Oil Sour Service - Yes (NACE MR0175 / ISO 15156) Sand Service - Yes Subsea Service - Yes / 850 m Water Depth Property Units Values Design Pressure MPa 27.5 Maximum System Pressure Test MPa 30.3 Design Parameters Maximum Design Temperature °C 66 Minimum Design Temperature °C -2 Specified Minimum Yield Strength MPa 450 Specified Minimum Tensile Strength MPa 530 Pipeline Design Code - DNV-OS-F101: 2013 Material Specification - ASTM A694M Material Grade - F65 Cladding Material - None Material Cladding Thickness mm - Corrosion Allowance mm 6 Supplementary Requirements - Refer Note (1) Maximum CE - 0.42 Material - Carbon Steel Grade - DNV SMLS 450S Mating Flowline Linepipe Pipe Dimensions mm Cladding Material - None Cladding Thickness mm - Corrosion Allowance mm 6 Confidential – Do not disclose without authorisation © Copyright Genesis Oil and Gas Consultants, Ltd. Printed copy is uncontrolled Page 11 of 24 OD T ID 406.4 21.44 363.5 Project Title: Document & Rev No: Document Title: Greater Enfield EPCI J45041B-U-DS-20002 PIPELINE FORGING DATASHEETS NPS 16 CS Hang-Off Collar Fabrication PUP Piece - 2 PUPs (Refer Note(5)) End Bevel - Square Ends Type of bevel protectors - End Caps Tolerances - DNV-OS-F101: 2013 Certification Level - 3.1 Internal (By Others) - None External (By Others) - 3LPP Insulated - Yes (by others) Marking Requirements - ASTM A694M Ref.[1] Coating and Markings Production Tests (Refer Note (1)) Hydrotest Pressure Onshore Hydrotest Pressure MPa 34.4 (Refer Note (6)) Charpy V-notch Impact Tests Test Temperature °C Charpy Impact Energy J -32 Average – 50 Minimum - 40 Room Temperature Tensile Testing Test Temperature °C Room temperature Yield Strength MPa ≥450 Tensile Strength MPa ≥530 Elongation % 18 (in 50mm) HV 250 Hardness Testing Maximum Hardness Corrosion Testing Corrosion Test - DNV-OS-F101: 2013 (Refer Note (1)) NDE NDE Requirements Confidential – Do not disclose without authorisation © Copyright Genesis Oil and Gas Consultants, Ltd. Printed copy is uncontrolled Page 12 of 24 DNV-OS-F101: 2013 (Refer Note (1)) Project Title: Document & Rev No: Document Title: 3.3 Greater Enfield EPCI J45041B-U-DS-20002 PIPELINE FORGING DATASHEETS NPS 10 CS Anchor Flange NPS 10 CS Anchor Flange General Quantity - 10 Type - Anchor Flange (Refer Note (2)) Product - Water Sour Service - No Sand Service - No Subsea Service - Yes / 850 m Water Depth Property Units Values Design Pressure MPa 25.0 Maximum System Pressure Test MPa 27.5 Design Parameters Maximum Design Temperature °C 75 Minimum Design Temperature °C 0 Specified Minimum Yield Strength MPa 450 Specified Minimum Tensile Strength MPa 530 Pipeline Design Code - DNV-OS-F101: 2013 Material Specification - ASTM A694M Material Grade - F65 Cladding Material - None Cladding Thickness mm None Corrosion Allowance mm 3 Material Supplementary Requirements - Refer Note (1) Maximum CE - 0.42 Material - Carbon Steel Grade - DNV SMLS 415 Mating Flowline Linepipe Pipe Dimensions mm Cladding Material - None Cladding Thickness mm - Corrosion Allowance mm 3 Confidential – Do not disclose without authorisation © Copyright Genesis Oil and Gas Consultants, Ltd. Printed copy is uncontrolled Page 13 of 24 OD T ID 273 14.3 244.4 Project Title: Document & Rev No: Document Title: Greater Enfield EPCI J45041B-U-DS-20002 PIPELINE FORGING DATASHEETS NPS 10 CS Anchor Flange Mating Structure Piping Material - Carbon Steel Grade - DNV SMLS 415 Pipe Dimensions mm Cladding Material - OD T ID 273 14.3 244.4 None Cladding Thickness mm - Corrosion Allowance mm 3 Fabrication PUP Piece - 2 PUP (Refer Note (4)) End Bevel - Square Ends Type of bevel protectors - End Caps Tolerances - DNV-OS-F101: 2013 Certification Level - 3.1 Internal (By Others) - None External (By Others) - 3LPP Insulated - Yes (by others) Marking Requirements - ASTM A694M Ref.[1] Coating and Markings Production Tests (Refer Note (1)) Hydrotest Pressure Onshore Hydrotest Pressure MPa 31.3 (Refer Note (6)) Charpy V-notch Impact Tests Test Temperature Charpy Impact Energy °C J -32 Average – 42 Minimum - 35 Room Temperature Tensile Testing Test Temperature °C Room temperature Yield Strength MPa ≥415 Tensile Strength MPa ≥515 Elongation % 20 (in 50mm) HV 300 Hardness Testing Maximum Hardness Corrosion Testing Confidential – Do not disclose without authorisation © Copyright Genesis Oil and Gas Consultants, Ltd. Printed copy is uncontrolled Page 14 of 24 Project Title: Document & Rev No: Document Title: Greater Enfield EPCI J45041B-U-DS-20002 PIPELINE FORGING DATASHEETS NPS 10 CS Anchor Flange Corrosion Test - DNV-OS-F101: 2013 (Refer Note (1)) NDE NDE Requirements Confidential – Do not disclose without authorisation © Copyright Genesis Oil and Gas Consultants, Ltd. Printed copy is uncontrolled Page 15 of 24 DNV-OS-F101: 2013 (Refer Note (1)) Project Title: Document & Rev No: Document Title: 3.4 Greater Enfield EPCI J45041B-U-DS-20002 PIPELINE FORGING DATASHEETS NPS 10 CS Hang-Off Collar NPS 10 CS Hang-Off Collar General Quantity - 2 Type - Hang-Off Collar (Refer Note (2)) Product - Water Sour Service - No Sand Service - No Subsea Service - Yes / 850 m Water Depth Property Units Values Design Pressure MPa 25.0 Maximum System Pressure Test MPa 27.5 Design Parameters Maximum Design Temperature °C 75 Minimum Design Temperature °C 0 Specified Minimum Yield Strength MPa 415 Specified Minimum Tensile Strength MPa 515 Pipeline Design Code - DNV-OS-F101: 2013 Material Specification - ASTM A694M Material Grade - F60 Cladding Material - None Cladding Thickness mm None Corrosion Allowance mm 3 Material Supplementary Requirements - Refer Note (1) Maximum CE - 0.42 Material - Carbon Steel Grade - DNV SMLS 415 Mating Flowline Linepipe Pipe Dimensions mm Cladding Material - None Cladding Thickness mm - Corrosion Allowance mm 3 Confidential – Do not disclose without authorisation © Copyright Genesis Oil and Gas Consultants, Ltd. Printed copy is uncontrolled Page 16 of 24 OD T ID 273 14.3 244.4 Project Title: Document & Rev No: Document Title: Greater Enfield EPCI J45041B-U-DS-20002 PIPELINE FORGING DATASHEETS NPS 10 CS Hang-Off Collar Mating Structure Piping Material - Carbon Steel Grade - DNV SMLS 415 Pipe Dimensions mm Cladding Material - OD T ID 273 14.3 244.4 None Cladding Thickness mm - Corrosion Allowance mm 3 Fabrication PUP Piece - 2 PUPs (Refer Note(5)) End Bevel - Square Ends Type of bevel protectors - End Caps Tolerances - DNV-OS-F101: 2013 Certification Level - 3.1 Internal (By Others) - None External (By Others) - 3LPP Insulated - Yes (by others) Marking Requirements - ASTM A694M Ref.[1] Coating and Markings Production Tests (Refer Note (1)) Hydrotest Pressure Onshore Hydrotest Pressure MPa 31.3 (Refer Note (6)) Charpy V-notch Impact Tests Test Temperature Charpy Impact Energy °C J -32 Average – 42 Minimum - 35 Room Temperature Tensile Testing Test Temperature °C Room temperature Yield Strength MPa ≥415 Tensile Strength MPa ≥515 Elongation % 20 (in 50mm) HV 300 Hardness Testing Maximum Hardness Corrosion Testing Confidential – Do not disclose without authorisation © Copyright Genesis Oil and Gas Consultants, Ltd. Printed copy is uncontrolled Page 17 of 24 Project Title: Document & Rev No: Document Title: Greater Enfield EPCI J45041B-U-DS-20002 PIPELINE FORGING DATASHEETS NPS 10 CS Hang-Off Collar Corrosion Test - DNV-OS-F101: 2013 (Refer Note (1)) NDE NDE Requirements Confidential – Do not disclose without authorisation © Copyright Genesis Oil and Gas Consultants, Ltd. Printed copy is uncontrolled Page 18 of 24 DNV-OS-F101: 2013 (Refer Note (1)) Project Title: Document & Rev No: Document Title: Greater Enfield EPCI J45041B-U-DS-20002 PIPELINE FORGING DATASHEETS 4.0 REFERENCES 4.1 REF NO. COMPANY Provided Documents DOCUMENT NAME DOC NUMBER [1] Engineering Standard Subsea Pipeline Spool Fabrication W1000SX4449633 [2] Engineering Standard Piping Fabrication, Installation, Erection and Testing W1000SX3215141 [3] Engineering Standard Pipelines Welding and Non Destructive Testing (NDT) of Corrosion Resistant Alloy (CRA) Clad and Lined Carbon Steel Pipe W1000SN5849397 [4] Standard for Selection of Pipeline and Riser Coatings W1000AX0003 [5] Engineering Standard Pipelines 3 Layer Polyolefin Coatings W1000SX0001 [6] Engineering Standard Pipelines Linepipe Long Term Storage W1000SX8898470 4.2 REF NO. CONTRACTOR Provided Documents DOCUMENT NAME Confidential – Do not disclose without authorisation © Copyright Genesis Oil and Gas Consultants, Ltd. Printed copy is uncontrolled Page 19 of 24 DOC NUMBER Project Title: Document & Rev No: Document Title: Greater Enfield EPCI J45041B-U-DS-20002 PIPELINE FORGING DATASHEETS APPENDIX A TYPICAL PIPELINE FORGING DESIGNS Figure A-1 – NPS 16 Anchor Flange Sketch (PUP pieces not shown) Figure A-2 – NPS 16 Hang-Off Collar Sketch (PUP pieces not shown) Confidential – Do not disclose without authorisation © Copyright Genesis Oil and Gas Consultants, Ltd. Printed copy is uncontrolled Page 20 of 24 Project Title: Document & Rev No: Document Title: Greater Enfield EPCI J45041B-U-DS-20002 PIPELINE FORGING DATASHEETS Figure A-3 – NPS 10 Anchor Flange Sketch (PUP pieces not shown) Figure A-4 – NPS 10 Hang-Off Collar Sketch (PUP pieces not shown) Confidential – Do not disclose without authorisation © Copyright Genesis Oil and Gas Consultants, Ltd. Printed copy is uncontrolled Page 21 of 24 Project Title: Document & Rev No: Document Title: Greater Enfield EPCI J45041B-U-DS-20002 PIPELINE FORGING DATASHEETS APPENDIX B ADDITIONAL CONTRACTOR REQUIREMENTS B.1 Manufacturing Data All forgings shall be in accordance with ASTM A694M and COMPANY supplied specifications referenced in Section 4.0. The Vendor shall have relevant experience with the metallurgical aspects of the forged steel grades and designations including weldability and heat treatment applications and parameters etc. as applicable, for his manufacturing processes. Experience shall be supported by statistical data or test records, as relevant, for the size range and grade to be qualified. The steel shall have been produced in accordance with CONTRACTOR approved Vendor’s manufacturing procedures specification (MPS) and with the same equipment and process route intended to be used for the actual manufacturing of the production forgings. Facilities and equipment shall be suitable for the purpose of producing the steel forgings and grades as specified herein and shall be regularly maintained and calibrated as required by consensus industrial standards. If part of the work is sub-contracted, the Vendor is fully responsible for making sure that the sub-contractors meet the same standards and capabilities for the manufacturing process step as for the Vendor. The manufacturing process including all heat treatments shall be qualified by physical testing of the actual product. Only companies with proven experience of similar application, in particular in regards to documented weldability of the forged steels, shall be used. Vendor shall submit: List of all sub-contractors from steel making through to finished forging. A complete manufacturing procedure covering all steps from steel making through to finished forging. Prior to the manufacture of any forgings, i.e. steel making, Vendor shall submit to CONTRACTOR for approval, a detailed MPS incorporating all the requirements of this specification, as well as the requirements of any referenced code and standard. This document shall describe the procedures to be followed by the Vendor during the manufacture of the forgings. The procedure shall be submitted immediately after the placement of the purchase order and prior to any kick-off / pre-production meetings. The manufacturing procedure shall contain, as a minimum, the following information, but not limited to: Material data (Chemical composition with allowable ranges, steel grade etc.) Steel making and refining processes Forging procedure (Forging equipment, hot work temperature, forging reduction ratio, etc.) Confidential – Do not disclose without authorisation © Copyright Genesis Oil and Gas Consultants, Ltd. Printed copy is uncontrolled Page 22 of 24 Project Title: Document & Rev No: Document Title: B.2 Greater Enfield EPCI J45041B-U-DS-20002 PIPELINE FORGING DATASHEETS Heat treatment procedures and controls (Furnace type, heat treatment temperature limits, method of control, quenching tank, cycle times etc.) Qualification testing (Sample location map, applicable codes and procedures, maintaining traceability, certification, mechanical testing etc.) Machining and surface finishing processes NDE Procedures and Scan Plans Quality Assurance (QA) procedures (quality plan, list of Vendors etc.) Chemical Properties The final heat analysis for each heat of steel shall be included in the documentation package. This analysis shall include the calculated CE and PCM values, as applicable. B.3 NDE a. UT of Forgings All forging shall receive UT in accordance with ASTM A388, SAE AMS-STD-2154, ASTM E2375 or DNV-OS-F101 Appendix D, Part D prior to shipment from the forging facility. Volumetric coverage shall be 100 percent with straight-beam from three mutually orthogonal directions whenever practicable. When scanning with straight-beam from three mutually orthogonal directions is not practicable, angle-beam may be utilized to effect 100 percent volumetric coverage. UT procedures, calibration procedure and scan plans shall be approved by CONTRATOR. UT acceptance criteria shall be in accordance with SAE AMS-STD-2154 or ASTM E2375 Ultrasonic Class B. Flaws interpreted as cracks or flakes shall be rejected regardless of size. If UT is performed prior to quality heat treatment, then another UT shall be performed after quality heat treatment. Additional criteria for UT acceptance shall be sought from COMPANY documents specified in Section 4.0. Reference is required regarding NDE operator certification. b. MT of Finished Surfaces All forging shall be examined by wet-fluorescent MT in accordance with MIL-STD-1907, ASTM E1444 or DNV-OS-F101 Appendix D, Part D. DC magnetizing prods shall not be allowed. Final MT shall be carried out after final heat treatment, including stress relieving, and machining. Surface coverage shall be 100 percent of finish-machined surfaces with magnetization in at least two mutually perpendicular directions (circumferential and longitudinal for hollow cylinders or tubulars). MT procedures, calibration procedures and scanning plans shall be approved by CONTRATOR. Remnant-magnetic-field strength (residual magnetism) shall not exceed 15-gauss (750 A/m) (or 30-60 gauss for Hall-effect gaussmeter) subsequent to MT. Confidential – Do not disclose without authorisation © Copyright Genesis Oil and Gas Consultants, Ltd. Printed copy is uncontrolled Page 23 of 24 Project Title: Document & Rev No: Document Title: Greater Enfield EPCI J45041B-U-DS-20002 PIPELINE FORGING DATASHEETS Acceptance criteria shall be in accordance with MIL-STD-1907 Grade A, ASTM E1444 or as otherwise specified in the purchase order or CONTRATOR standards and documents specified in Section 4.0. c. VT All forgings shall receive VT after final heat treatment in compliance with ASME BPVC-V Article 9. Additionally, a written procedure shall be produced by the Vendor that complies with ASME BPVC-V Article 9 Para. T-921 and approved by the CONTRACTOR. All forgings shall receive VT with 100 percent surface coverage of all accessible surfaces to be free from visible laps, cold shuts, cracks, porosity, slag, excessive scale, and other surface imperfections. Additional criteria for VT acceptance shall be sought from CONTRATOR documents specified in Section 4.0. Additional requirements shall be sought from or DNV-OS-F101 Appendix D, Part D. The results of all NDT shall be reported in the documentation package for forging. d. NDE Operators Qualification All personnel conducting and evaluating NDE on forgings manufactured in accordance with the requirements of this specification shall be qualified and certified to Level II of ASNT-SNTTC-IA, or CONTRACTOR approved equivalent, with documented experience on forged steel products for at least 6 months, of which, shall have been at Level II. A Level III technician or equivalent shall be responsible for all NDE including development of Vendor’s NDE procedures and interpretations of indications and defects. Visual and magnetic particle inspection shall be carried out by qualified inspectors/operators who have passed the Jaeger No. 2 eyesight test within the past 12 months. A list of proposed technicians and their qualifications shall be supplied prior to production for CONTRACTOR review. Additional requirements shall be sought from or DNV-OS-F101 Appendix D, Part D. B.4 Documentation Unless specifically deleted/waived by the RFQ, PO or applicable Vendor specifications, an additional copy of the documentation package shall be sent to CONTRACTOR. Vendor shall compile a manufacturing record book (MRB) containing information on all aspects of the processing of the forging and final supply. It shall contain, as minimum: Material certification including heat treatment records Qualification test results NDE records and certificates Mechanical test results Dimensional control records Weight reports Inspection release records The minimum level of material certification shall be “Type 3.1” (i.e. Inspection Certificate 3.1) in accordance with ISO 10474 or BS EN 10204. Confidential – Do not disclose without authorisation © Copyright Genesis Oil and Gas Consultants, Ltd. Printed copy is uncontrolled Page 24 of 24