Datasheet
PIPELINE FORGING DATASHEETS
Prepared for:
Woodside Energy Pty Ltd
Prepared by:
Genesis
Lvl 1, 1100 Hay Street, West Perth 6005
Tel: +61 8 9320 0100
Fax: +61 8 9320 0180
www.genesisoilandgas.com
Project Title:
Document No.:
Client Document No.:
Greater Enfield EPCI
J45041B-U-DS-20002
AP038504-9.3.68-M5210 Rigid Pipeline Anchor Forgings
Rev
Date
Description
Issued
by
Checked
by
A1
23/10/2015
Issued for IDC
NLI
ALO
B1
27/10/2015
Issued for Review
NLI
ALO
C1
04/11/2015
Issued for Enquiry
Confidential – Do not disclose without authorisation © Copyright
Genesis Oil and Gas Consultants, Ltd.
Printed copy is uncontrolled
Nigel
Lim
Approved
by
PAU
Alexander
Lockett
Paul Auret
2015.11.04
12:10:22 +08'00'
Client
Approval
Project Title:
Document & Rev No:
Document Title:
Greater Enfield EPCI
J45041B-U-DS-20002
PIPELINE FORGING DATASHEETS
HOLDS LIST
HOLD
[HOLD1]
SECTION
DESCRIPTION
None
Information contained in this document is the work product of Genesis Oil & Gas Consultants
and embodies confidential and proprietary information of Genesis and/or its client. This
document and all information herein is confidential, and may not be used, reproduced or
distributed without prior authorization.
Confidential – Do not disclose without authorisation
© Copyright Genesis Oil and Gas Consultants, Ltd.
Printed copy is uncontrolled
Page 2 of 24
Project Title:
Document & Rev No:
Document Title:
Greater Enfield EPCI
J45041B-U-DS-20002
PIPELINE FORGING DATASHEETS
CONTENTS
ABBREVIATIONS ................................................................................................................. 4
1.0
INTRODUCTION .......................................................................................................... 5
1.1
Project Description............................................................................................... 5
1.2
Document Purpose .............................................................................................. 6
1.3
Document Scope ................................................................................................. 6
2.0
NOTES......................................................................................................................... 7
3.0
DATASHEET ................................................................................................................ 8
4.0
3.1
NPS 16 CS Anchor Flange .................................................................................. 8
3.2
NPS 16 CS Hang-Off Collar ............................................................................... 11
3.3
NPS 10 CS Anchor Flange ................................................................................ 13
3.4
NPS 10 CS Hang-Off Collar ............................................................................... 16
REFERENCES ........................................................................................................... 19
4.1
COMPANY Provided Documents ....................................................................... 19
4.2
CONTRACTOR Provided Documents................................................................ 19
APPENDIX A
TYPICAL PIPELINE FORGING DESIGNS ............................................... 20
APPENDIX B
ADDITIONAL CONTRACTOR REQUIREMENTS .................................... 22
B.1 Manufacturing Data ........................................................................................... 22
B.2 Chemical Properties .......................................................................................... 23
B.3 NDE ................................................................................................................... 23
a.
UT of Forgings .......................................................................................... 23
b.
MT of Finished Surfaces ........................................................................... 23
c.
VT ............................................................................................................. 24
d.
NDE Operators Qualification ..................................................................... 24
B.4 Documentation .................................................................................................. 24
Confidential – Do not disclose without authorisation
© Copyright Genesis Oil and Gas Consultants, Ltd.
Printed copy is uncontrolled
Page 3 of 24
Project Title:
Document & Rev No:
Document Title:
Greater Enfield EPCI
J45041B-U-DS-20002
PIPELINE FORGING DATASHEETS
ABBREVIATIONS
API
American Petroleum Institute
ASME
American Society of Mechanical Engineers
ASTM
American Society for Testing and Materials
BS
British Standard
CE
Carbon Equivalent
CO2
Carbon Dioxide
CRA
Corrosion Resistant Alloy
CS
Carbon Steel
DNV
Det Norske Veritas
EN
Euronorm
EPCI
Engineering, Procurement, Construction, Installation
FPSO
Floating Production and Storage
ID
Inner Diameter
ISO
International Standards Organisation
MPS
Manufacturing Procedures Specification
MT
Magnetic Particle Examination
MTO
Material Take-Off
NPS
Nominal Pipe Size
OD
Outer Diameter
PCM
Composition Parameter
PIP
Pipe-In-Pipe
PO
Purchase Order
QA
Quality Assurance
RFQ
Request for Quotation
UT
Ultrasonic Examination
VT
Visual Examination
3LPP
3 Layer Polypropylene
Confidential – Do not disclose without authorisation
© Copyright Genesis Oil and Gas Consultants, Ltd.
Printed copy is uncontrolled
Page 4 of 24
Project Title:
Document & Rev No:
Document Title:
Greater Enfield EPCI
J45041B-U-DS-20002
PIPELINE FORGING DATASHEETS
1.0 INTRODUCTION
1.1
Project Description
The Greater Enfield Development is a proposed greenfield development located to the west
of Company’s existing Enfield and Vincent assets as shown in Figure 1.
Figure 1-1 - Laverda Geographical Location
The Development will exploit 3 oil accumulations and is shown in :



Norton-over-Laverda (NoL)
Laverda Canyon (LC) and;
Cimatti
The full subsea system includes a total of 14 wells, 12 of which are included in the first phase
which is the subject of this Scope. These are as follows:



7 production wells
5 oil wells and 1 gas well in the Laverda area
1 oil well at Cimatti
The gas well is a future well. Provision for it is included in the base scope, but the tree will not
be installed or commissioned as part of the first phase of the Greater Enfield Development
which is covered by this Scope.
The production wells are tied back to the Ngujima-Yin FPSO via a 16” OD wet insulated carbon
steel flowline and a 10” ID flexible production riser.
There are 6 water injection (WI) wells: 3 are for pressure support of Laverda Canyon, 3 are
for Cimatti. They provide low salinity injection water from the FPSO via a 10” OD carbon steel
flowline and a 10” ID flexible riser.
Confidential – Do not disclose without authorisation
© Copyright Genesis Oil and Gas Consultants, Ltd.
Printed copy is uncontrolled
Page 5 of 24
Project Title:
Document & Rev No:
Document Title:
Greater Enfield EPCI
J45041B-U-DS-20002
PIPELINE FORGING DATASHEETS
Figure 1-2 - Laverda Field Schematic
1.2
Document Purpose
This document provides the supply of pipeline forgings on the Greater Enfield EPCI contract.
The pipeline forgings shall be located on pipeline and subsea structure piping interfaces for
both the NPS 16 production and NPS 10 WI flowlines.
This document shall be read with reference to the documents listed in Section 4.0.
1.3
Document Scope
The following anchor forgings are covered by this document:




7 off NPS 16 Anchor Flange Forgings
2 off NPS 16 Hang-Off Collar Forgings
10 off NPS 10 Anchor Flange Forgings
2 off NPS 10 Hang-Off Collar Forgings
Refer to Section 2.0 for notes on the datasheets.
Confidential – Do not disclose without authorisation
© Copyright Genesis Oil and Gas Consultants, Ltd.
Printed copy is uncontrolled
Page 6 of 24
Project Title:
Document & Rev No:
Document Title:
Greater Enfield EPCI
J45041B-U-DS-20002
PIPELINE FORGING DATASHEETS
2.0 NOTES
The table below displays the applicable notes as per the datasheets given in Section 3.0.
NOTES
DESCRIPTION
Additional requirements are stated in DNV-OS-F101 and this document.
These include, but are not limited to:
(1)

Section 8, B900

Section 8, C200

Section 8, C600

Section 8, D200

Appendix B of DNV-OS-F101

Appendix D of DNV-OS-F101

Appendix B of this document
(2)
Refer to Appendix A for sketches of typical pipeline forging designs
(3)
Vendor shall provide the option to weld overlay clad relevant forgings and
associated PUP pieces as per datasheet specification
(4)
The PUP pieces shall be of the flowline specification and supplied to the
Vendor by Contractor. It shall be welded to the flowline side of each anchor
forged flange. The PUPs shall be nominal 2D and 1.5D lengths for the NPS
16 anchor flange and NPS 10 anchor flange respectively
A pair of PUPs shall be of the flowline specification and supplied to the
Vendor by Contractor. It shall be welded to both sides of each forged hangoff collar. The PUPs shall be the following lengths:
(5)

500 mm on the pipeline end
 4 m on the retrieval end (abandonment and retrieval head)
Refer to Appendix A for end designations.
(6)
Onshore hydrotest shall be performed by Vendor prior to final acceptance.
Test caps shall be removed from pipe PUPS after hydrotest.
Confidential – Do not disclose without authorisation
© Copyright Genesis Oil and Gas Consultants, Ltd.
Printed copy is uncontrolled
Page 7 of 24
Project Title:
Document & Rev No:
Document Title:
Greater Enfield EPCI
J45041B-U-DS-20002
PIPELINE FORGING DATASHEETS
3.0 DATASHEET
3.1
NPS 16 CS Anchor Flange
NPS 16 CS Anchor Flange
General
Quantity
-
7
Type
-
Anchor Flange (Refer Note (2))
Product
-
Oil
Sour Service
-
Yes (NACE MR0175 / ISO 15156)
Sand Service
-
Yes
Subsea Service
-
Yes / 850 m Water Depth
Property
Units
Values
Design Pressure
MPa
27.5
Maximum System Pressure Test
MPa
30.3
Design Parameters
Maximum Design Temperature
°C
66
Minimum Design Temperature
°C
-2
Specified Minimum Yield Strength
MPa
485
Specified Minimum Tensile Strength
MPa
565
Pipeline Design Code
-
DNV-OS-F101: 2013
Material Specification
-
ASTM A694M
Material Grade
-
F70
Cladding Material
-
Alloy 625 (Refer Note (3))
Material
Cladding Thickness
mm
3 (Refer Note (3))
Corrosion Allowance
mm
0
Supplementary Requirements
-
Refer Note (1)
Maximum CE
-
0.42
Confidential – Do not disclose without authorisation
© Copyright Genesis Oil and Gas Consultants, Ltd.
Printed copy is uncontrolled
Page 8 of 24
Project Title:
Document & Rev No:
Document Title:
Greater Enfield EPCI
J45041B-U-DS-20002
PIPELINE FORGING DATASHEETS
NPS 16 CS Anchor Flange
Mating Flowline Linepipe
Material
-
Carbon Steel
Grade
-
DNV SMLS 450S
Pipe Dimensions
mm
Cladding Material
-
OD
T
ID
406.4
21.44
363.5
OD
T
ID
406.4
21.44
357.5
None
Cladding Thickness
mm
-
Corrosion Allowance
mm
6
Mating Structure Piping
Material
-
Carbon Steel
Grade
-
DNV SMLS 450S
Pipe Dimensions
mm
Cladding Material
-
Alloy 625
Cladding Thickness
mm
3
Corrosion Allowance
mm
0
Fabrication
PUP Piece
-
2 PUP (Refer Note (4))
End Bevel
-
Square Ends
Type of bevel protectors
-
End Caps
Tolerances
-
DNV-OS-F101: 2013
Certification Level
-
3.1
Internal (By Others)
-
None
External (By Others)
-
3LPP
Insulated
-
Yes (by others)
Marking Requirements
-
ASTM A694M
Ref.[1]
Coating and Markings
Production Tests (Refer Note (1))
Hydrotest Pressure
Onshore Hydrotest Pressure
MPa
34.4 (Refer Note (6))
Charpy V-notch Impact Tests
Test Temperature
Charpy Impact Energy
Confidential – Do not disclose without authorisation
© Copyright Genesis Oil and Gas Consultants, Ltd.
Printed copy is uncontrolled
Page 9 of 24
°C
J
-32
Average – 50
Minimum - 40
Project Title:
Document & Rev No:
Document Title:
Greater Enfield EPCI
J45041B-U-DS-20002
PIPELINE FORGING DATASHEETS
NPS 16 CS Anchor Flange
Room Temperature Tensile Testing
Test Temperature
°C
Room temperature
Yield Strength
MPa
≥485
Tensile Strength
MPa
≥565
Elongation
%
18 (in 50mm)
HV
270
Hardness Testing
Maximum Hardness
Corrosion Testing
Corrosion Test
-
DNV-OS-F101: 2013 (Refer Note (1))
NDE
NDE Requirements
Confidential – Do not disclose without authorisation
© Copyright Genesis Oil and Gas Consultants, Ltd.
Printed copy is uncontrolled
Page 10 of 24
DNV-OS-F101: 2013 (Refer Note (1))
Project Title:
Document & Rev No:
Document Title:
3.2
Greater Enfield EPCI
J45041B-U-DS-20002
PIPELINE FORGING DATASHEETS
NPS 16 CS Hang-Off Collar
NPS 16 CS Hang-Off Collar
General
Quantity
-
2
Type
-
Hang-Off Collar (Refer Note (2))
Product
-
Oil
Sour Service
-
Yes (NACE MR0175 / ISO 15156)
Sand Service
-
Yes
Subsea Service
-
Yes / 850 m Water Depth
Property
Units
Values
Design Pressure
MPa
27.5
Maximum System Pressure Test
MPa
30.3
Design Parameters
Maximum Design Temperature
°C
66
Minimum Design Temperature
°C
-2
Specified Minimum Yield Strength
MPa
450
Specified Minimum Tensile Strength
MPa
530
Pipeline Design Code
-
DNV-OS-F101: 2013
Material Specification
-
ASTM A694M
Material Grade
-
F65
Cladding Material
-
None
Material
Cladding Thickness
mm
-
Corrosion Allowance
mm
6
Supplementary Requirements
-
Refer Note (1)
Maximum CE
-
0.42
Material
-
Carbon Steel
Grade
-
DNV SMLS 450S
Mating Flowline Linepipe
Pipe Dimensions
mm
Cladding Material
-
None
Cladding Thickness
mm
-
Corrosion Allowance
mm
6
Confidential – Do not disclose without authorisation
© Copyright Genesis Oil and Gas Consultants, Ltd.
Printed copy is uncontrolled
Page 11 of 24
OD
T
ID
406.4
21.44
363.5
Project Title:
Document & Rev No:
Document Title:
Greater Enfield EPCI
J45041B-U-DS-20002
PIPELINE FORGING DATASHEETS
NPS 16 CS Hang-Off Collar
Fabrication
PUP Piece
-
2 PUPs (Refer Note(5))
End Bevel
-
Square Ends
Type of bevel protectors
-
End Caps
Tolerances
-
DNV-OS-F101: 2013
Certification Level
-
3.1
Internal (By Others)
-
None
External (By Others)
-
3LPP
Insulated
-
Yes (by others)
Marking Requirements
-
ASTM A694M
Ref.[1]
Coating and Markings
Production Tests (Refer Note (1))
Hydrotest Pressure
Onshore Hydrotest Pressure
MPa
34.4 (Refer Note (6))
Charpy V-notch Impact Tests
Test Temperature
°C
Charpy Impact Energy
J
-32
Average – 50
Minimum - 40
Room Temperature Tensile Testing
Test Temperature
°C
Room temperature
Yield Strength
MPa
≥450
Tensile Strength
MPa
≥530
Elongation
%
18 (in 50mm)
HV
250
Hardness Testing
Maximum Hardness
Corrosion Testing
Corrosion Test
-
DNV-OS-F101: 2013 (Refer Note (1))
NDE
NDE Requirements
Confidential – Do not disclose without authorisation
© Copyright Genesis Oil and Gas Consultants, Ltd.
Printed copy is uncontrolled
Page 12 of 24
DNV-OS-F101: 2013 (Refer Note (1))
Project Title:
Document & Rev No:
Document Title:
3.3
Greater Enfield EPCI
J45041B-U-DS-20002
PIPELINE FORGING DATASHEETS
NPS 10 CS Anchor Flange
NPS 10 CS Anchor Flange
General
Quantity
-
10
Type
-
Anchor Flange (Refer Note (2))
Product
-
Water
Sour Service
-
No
Sand Service
-
No
Subsea Service
-
Yes / 850 m Water Depth
Property
Units
Values
Design Pressure
MPa
25.0
Maximum System Pressure Test
MPa
27.5
Design Parameters
Maximum Design Temperature
°C
75
Minimum Design Temperature
°C
0
Specified Minimum Yield Strength
MPa
450
Specified Minimum Tensile Strength
MPa
530
Pipeline Design Code
-
DNV-OS-F101: 2013
Material Specification
-
ASTM A694M
Material Grade
-
F65
Cladding Material
-
None
Cladding Thickness
mm
None
Corrosion Allowance
mm
3
Material
Supplementary Requirements
-
Refer Note (1)
Maximum CE
-
0.42
Material
-
Carbon Steel
Grade
-
DNV SMLS 415
Mating Flowline Linepipe
Pipe Dimensions
mm
Cladding Material
-
None
Cladding Thickness
mm
-
Corrosion Allowance
mm
3
Confidential – Do not disclose without authorisation
© Copyright Genesis Oil and Gas Consultants, Ltd.
Printed copy is uncontrolled
Page 13 of 24
OD
T
ID
273
14.3
244.4
Project Title:
Document & Rev No:
Document Title:
Greater Enfield EPCI
J45041B-U-DS-20002
PIPELINE FORGING DATASHEETS
NPS 10 CS Anchor Flange
Mating Structure Piping
Material
-
Carbon Steel
Grade
-
DNV SMLS 415
Pipe Dimensions
mm
Cladding Material
-
OD
T
ID
273
14.3
244.4
None
Cladding Thickness
mm
-
Corrosion Allowance
mm
3
Fabrication
PUP Piece
-
2 PUP (Refer Note (4))
End Bevel
-
Square Ends
Type of bevel protectors
-
End Caps
Tolerances
-
DNV-OS-F101: 2013
Certification Level
-
3.1
Internal (By Others)
-
None
External (By Others)
-
3LPP
Insulated
-
Yes (by others)
Marking Requirements
-
ASTM A694M
Ref.[1]
Coating and Markings
Production Tests (Refer Note (1))
Hydrotest Pressure
Onshore Hydrotest Pressure
MPa
31.3 (Refer Note (6))
Charpy V-notch Impact Tests
Test Temperature
Charpy Impact Energy
°C
J
-32
Average – 42
Minimum - 35
Room Temperature Tensile Testing
Test Temperature
°C
Room temperature
Yield Strength
MPa
≥415
Tensile Strength
MPa
≥515
Elongation
%
20 (in 50mm)
HV
300
Hardness Testing
Maximum Hardness
Corrosion Testing
Confidential – Do not disclose without authorisation
© Copyright Genesis Oil and Gas Consultants, Ltd.
Printed copy is uncontrolled
Page 14 of 24
Project Title:
Document & Rev No:
Document Title:
Greater Enfield EPCI
J45041B-U-DS-20002
PIPELINE FORGING DATASHEETS
NPS 10 CS Anchor Flange
Corrosion Test
-
DNV-OS-F101: 2013 (Refer Note (1))
NDE
NDE Requirements
Confidential – Do not disclose without authorisation
© Copyright Genesis Oil and Gas Consultants, Ltd.
Printed copy is uncontrolled
Page 15 of 24
DNV-OS-F101: 2013 (Refer Note (1))
Project Title:
Document & Rev No:
Document Title:
3.4
Greater Enfield EPCI
J45041B-U-DS-20002
PIPELINE FORGING DATASHEETS
NPS 10 CS Hang-Off Collar
NPS 10 CS Hang-Off Collar
General
Quantity
-
2
Type
-
Hang-Off Collar (Refer Note (2))
Product
-
Water
Sour Service
-
No
Sand Service
-
No
Subsea Service
-
Yes / 850 m Water Depth
Property
Units
Values
Design Pressure
MPa
25.0
Maximum System Pressure Test
MPa
27.5
Design Parameters
Maximum Design Temperature
°C
75
Minimum Design Temperature
°C
0
Specified Minimum Yield Strength
MPa
415
Specified Minimum Tensile Strength
MPa
515
Pipeline Design Code
-
DNV-OS-F101: 2013
Material Specification
-
ASTM A694M
Material Grade
-
F60
Cladding Material
-
None
Cladding Thickness
mm
None
Corrosion Allowance
mm
3
Material
Supplementary Requirements
-
Refer Note (1)
Maximum CE
-
0.42
Material
-
Carbon Steel
Grade
-
DNV SMLS 415
Mating Flowline Linepipe
Pipe Dimensions
mm
Cladding Material
-
None
Cladding Thickness
mm
-
Corrosion Allowance
mm
3
Confidential – Do not disclose without authorisation
© Copyright Genesis Oil and Gas Consultants, Ltd.
Printed copy is uncontrolled
Page 16 of 24
OD
T
ID
273
14.3
244.4
Project Title:
Document & Rev No:
Document Title:
Greater Enfield EPCI
J45041B-U-DS-20002
PIPELINE FORGING DATASHEETS
NPS 10 CS Hang-Off Collar
Mating Structure Piping
Material
-
Carbon Steel
Grade
-
DNV SMLS 415
Pipe Dimensions
mm
Cladding Material
-
OD
T
ID
273
14.3
244.4
None
Cladding Thickness
mm
-
Corrosion Allowance
mm
3
Fabrication
PUP Piece
-
2 PUPs (Refer Note(5))
End Bevel
-
Square Ends
Type of bevel protectors
-
End Caps
Tolerances
-
DNV-OS-F101: 2013
Certification Level
-
3.1
Internal (By Others)
-
None
External (By Others)
-
3LPP
Insulated
-
Yes (by others)
Marking Requirements
-
ASTM A694M
Ref.[1]
Coating and Markings
Production Tests (Refer Note (1))
Hydrotest Pressure
Onshore Hydrotest Pressure
MPa
31.3 (Refer Note (6))
Charpy V-notch Impact Tests
Test Temperature
Charpy Impact Energy
°C
J
-32
Average – 42
Minimum - 35
Room Temperature Tensile Testing
Test Temperature
°C
Room temperature
Yield Strength
MPa
≥415
Tensile Strength
MPa
≥515
Elongation
%
20 (in 50mm)
HV
300
Hardness Testing
Maximum Hardness
Corrosion Testing
Confidential – Do not disclose without authorisation
© Copyright Genesis Oil and Gas Consultants, Ltd.
Printed copy is uncontrolled
Page 17 of 24
Project Title:
Document & Rev No:
Document Title:
Greater Enfield EPCI
J45041B-U-DS-20002
PIPELINE FORGING DATASHEETS
NPS 10 CS Hang-Off Collar
Corrosion Test
-
DNV-OS-F101: 2013 (Refer Note (1))
NDE
NDE Requirements
Confidential – Do not disclose without authorisation
© Copyright Genesis Oil and Gas Consultants, Ltd.
Printed copy is uncontrolled
Page 18 of 24
DNV-OS-F101: 2013 (Refer Note (1))
Project Title:
Document & Rev No:
Document Title:
Greater Enfield EPCI
J45041B-U-DS-20002
PIPELINE FORGING DATASHEETS
4.0 REFERENCES
4.1
REF
NO.
COMPANY Provided Documents
DOCUMENT NAME
DOC NUMBER
[1]
Engineering Standard Subsea Pipeline Spool
Fabrication
W1000SX4449633
[2]
Engineering Standard Piping Fabrication,
Installation, Erection and Testing
W1000SX3215141
[3]
Engineering Standard Pipelines Welding and Non
Destructive Testing (NDT) of Corrosion Resistant
Alloy (CRA) Clad and Lined Carbon Steel Pipe
W1000SN5849397
[4]
Standard for Selection of Pipeline and Riser
Coatings
W1000AX0003
[5]
Engineering Standard Pipelines 3 Layer Polyolefin
Coatings
W1000SX0001
[6]
Engineering Standard Pipelines Linepipe Long
Term Storage
W1000SX8898470
4.2
REF
NO.
CONTRACTOR Provided Documents
DOCUMENT NAME
Confidential – Do not disclose without authorisation
© Copyright Genesis Oil and Gas Consultants, Ltd.
Printed copy is uncontrolled
Page 19 of 24
DOC NUMBER
Project Title:
Document & Rev No:
Document Title:
Greater Enfield EPCI
J45041B-U-DS-20002
PIPELINE FORGING DATASHEETS
APPENDIX A TYPICAL PIPELINE FORGING DESIGNS
Figure A-1 – NPS 16 Anchor Flange Sketch (PUP pieces not shown)
Figure A-2 – NPS 16 Hang-Off Collar Sketch (PUP pieces not shown)
Confidential – Do not disclose without authorisation
© Copyright Genesis Oil and Gas Consultants, Ltd.
Printed copy is uncontrolled
Page 20 of 24
Project Title:
Document & Rev No:
Document Title:
Greater Enfield EPCI
J45041B-U-DS-20002
PIPELINE FORGING DATASHEETS
Figure A-3 – NPS 10 Anchor Flange Sketch (PUP pieces not shown)
Figure A-4 – NPS 10 Hang-Off Collar Sketch (PUP pieces not shown)
Confidential – Do not disclose without authorisation
© Copyright Genesis Oil and Gas Consultants, Ltd.
Printed copy is uncontrolled
Page 21 of 24
Project Title:
Document & Rev No:
Document Title:
Greater Enfield EPCI
J45041B-U-DS-20002
PIPELINE FORGING DATASHEETS
APPENDIX B ADDITIONAL CONTRACTOR
REQUIREMENTS
B.1
Manufacturing Data
All forgings shall be in accordance with ASTM A694M and COMPANY supplied specifications
referenced in Section 4.0. The Vendor shall have relevant experience with the metallurgical
aspects of the forged steel grades and designations including weldability and heat treatment
applications and parameters etc. as applicable, for his manufacturing processes.
Experience shall be supported by statistical data or test records, as relevant, for the size range
and grade to be qualified.
The steel shall have been produced in accordance with CONTRACTOR approved Vendor’s
manufacturing procedures specification (MPS) and with the same equipment and process
route intended to be used for the actual manufacturing of the production forgings. Facilities
and equipment shall be suitable for the purpose of producing the steel forgings and grades as
specified herein and shall be regularly maintained and calibrated as required by consensus
industrial standards.
If part of the work is sub-contracted, the Vendor is fully responsible for making sure that the
sub-contractors meet the same standards and capabilities for the manufacturing process step
as for the Vendor.
The manufacturing process including all heat treatments shall be qualified by physical testing
of the actual product.
Only companies with proven experience of similar application, in particular in regards to
documented weldability of the forged steels, shall be used.
Vendor shall submit:


List of all sub-contractors from steel making through to finished forging.
A complete manufacturing procedure covering all steps from steel making through to
finished forging.
Prior to the manufacture of any forgings, i.e. steel making, Vendor shall submit to
CONTRACTOR for approval, a detailed MPS incorporating all the requirements of this
specification, as well as the requirements of any referenced code and standard. This
document shall describe the procedures to be followed by the Vendor during the manufacture
of the forgings. The procedure shall be submitted immediately after the placement of the
purchase order and prior to any kick-off / pre-production meetings.
The manufacturing procedure shall contain, as a minimum, the following information, but not
limited to:



Material data (Chemical composition with allowable ranges, steel grade etc.)
Steel making and refining processes
Forging procedure (Forging equipment, hot work temperature, forging reduction
ratio, etc.)
Confidential – Do not disclose without authorisation
© Copyright Genesis Oil and Gas Consultants, Ltd.
Printed copy is uncontrolled
Page 22 of 24
Project Title:
Document & Rev No:
Document Title:





B.2
Greater Enfield EPCI
J45041B-U-DS-20002
PIPELINE FORGING DATASHEETS
Heat treatment procedures and controls (Furnace type, heat treatment temperature
limits, method of control, quenching tank, cycle times etc.)
Qualification testing (Sample location map, applicable codes and procedures,
maintaining traceability, certification, mechanical testing etc.)
Machining and surface finishing processes
NDE Procedures and Scan Plans
Quality Assurance (QA) procedures (quality plan, list of Vendors etc.)
Chemical Properties
The final heat analysis for each heat of steel shall be included in the documentation package.
This analysis shall include the calculated CE and PCM values, as applicable.
B.3
NDE
a.
UT of Forgings
All forging shall receive UT in accordance with ASTM A388, SAE AMS-STD-2154, ASTM
E2375 or DNV-OS-F101 Appendix D, Part D prior to shipment from the forging facility.
Volumetric coverage shall be 100 percent with straight-beam from three mutually orthogonal
directions whenever practicable. When scanning with straight-beam from three mutually
orthogonal directions is not practicable, angle-beam may be utilized to effect 100 percent
volumetric coverage.
UT procedures, calibration procedure and scan plans shall be approved by CONTRATOR.
UT acceptance criteria shall be in accordance with SAE AMS-STD-2154 or ASTM E2375
Ultrasonic Class B. Flaws interpreted as cracks or flakes shall be rejected regardless of size.
If UT is performed prior to quality heat treatment, then another UT shall be performed after
quality heat treatment. Additional criteria for UT acceptance shall be sought from COMPANY
documents specified in Section 4.0.
Reference is required regarding NDE operator certification.
b.
MT of Finished Surfaces
All forging shall be examined by wet-fluorescent MT in accordance with MIL-STD-1907, ASTM
E1444 or DNV-OS-F101 Appendix D, Part D. DC magnetizing prods shall not be allowed.
Final MT shall be carried out after final heat treatment, including stress relieving, and
machining.
Surface coverage shall be 100 percent of finish-machined surfaces with magnetization in at
least two mutually perpendicular directions (circumferential and longitudinal for hollow
cylinders or tubulars).
MT procedures, calibration procedures and scanning plans shall be approved by
CONTRATOR.
Remnant-magnetic-field strength (residual magnetism) shall not exceed 15-gauss (750 A/m)
(or 30-60 gauss for Hall-effect gaussmeter) subsequent to MT.
Confidential – Do not disclose without authorisation
© Copyright Genesis Oil and Gas Consultants, Ltd.
Printed copy is uncontrolled
Page 23 of 24
Project Title:
Document & Rev No:
Document Title:
Greater Enfield EPCI
J45041B-U-DS-20002
PIPELINE FORGING DATASHEETS
Acceptance criteria shall be in accordance with MIL-STD-1907 Grade A, ASTM E1444 or as
otherwise specified in the purchase order or CONTRATOR standards and documents
specified in Section 4.0.
c.
VT
All forgings shall receive VT after final heat treatment in compliance with ASME BPVC-V
Article 9. Additionally, a written procedure shall be produced by the Vendor that complies with
ASME BPVC-V Article 9 Para. T-921 and approved by the CONTRACTOR.
All forgings shall receive VT with 100 percent surface coverage of all accessible surfaces to
be free from visible laps, cold shuts, cracks, porosity, slag, excessive scale, and other surface
imperfections. Additional criteria for VT acceptance shall be sought from CONTRATOR
documents specified in Section 4.0.
Additional requirements shall be sought from or DNV-OS-F101 Appendix D, Part D. The
results of all NDT shall be reported in the documentation package for forging.
d.
NDE Operators Qualification
All personnel conducting and evaluating NDE on forgings manufactured in accordance with
the requirements of this specification shall be qualified and certified to Level II of ASNT-SNTTC-IA, or CONTRACTOR approved equivalent, with documented experience on forged steel
products for at least 6 months, of which, shall have been at Level II.
A Level III technician or equivalent shall be responsible for all NDE including development of
Vendor’s NDE procedures and interpretations of indications and defects.
Visual and magnetic particle inspection shall be carried out by qualified inspectors/operators
who have passed the Jaeger No. 2 eyesight test within the past 12 months. A list of proposed
technicians and their qualifications shall be supplied prior to production for CONTRACTOR
review.
Additional requirements shall be sought from or DNV-OS-F101 Appendix D, Part D.
B.4
Documentation
Unless specifically deleted/waived by the RFQ, PO or applicable Vendor specifications, an
additional copy of the documentation package shall be sent to CONTRACTOR. Vendor shall
compile a manufacturing record book (MRB) containing information on all aspects of the
processing of the forging and final supply. It shall contain, as minimum:







Material certification including heat treatment records
Qualification test results
NDE records and certificates
Mechanical test results
Dimensional control records
Weight reports
Inspection release records
The minimum level of material certification shall be “Type 3.1” (i.e. Inspection Certificate 3.1)
in accordance with ISO 10474 or BS EN 10204.