Download The Latest D-MSS-DS-23 Dumps To Ensure Your Success Exam : D-MSS-DS-23 Title : Dell MidRange Storage Solutions Design 2023 https://www.passcert.com/D-MSS-DS-23.html 1/4 Download The Latest D-MSS-DS-23 Dumps To Ensure Your Success 1.What is the purpose of the NVMe NVRAM drives in Dell PowerStore? A. Vaulting and read cache B. Read and write cache C. Read cache and metadata D. Vaulting and write cache Answer: D 2.On whicher can a solution architect find guidance for ctatus reported in the PowerStore Manager? A. Cluster, node, and appliance B. Volume, drive, and appliance C. Node, drive, and cluster D. Drive, appliance, and cluster Answer: D 3.What tools can be used to migrate block data from a legacy VNX array to a new Dell Unity XT array? A. SANCopy and PowerPath Migration Enabler B. EMCopy and SANCopy C. PowerPath Migration Enabler and Rsync D. Rsync and EMCopy Answer: A Explanation: Training: Tools for Block and File Data Migration pg 41 - Midrange_Storage_Solutions_Design_PG.pdf 4.What tool automates the collection of host configuration data? A. Grab B. SolVe C. SupportAssist D. My Work Answer: A 5.A customer with a Dell Unity XT 680 asks about enabling the Advanced Deduplication feature. Which configuration is recommended for enabling the feature? A. On All-Flash pools when CPU utilization is at or less than 50% B. On All-Flash pools with free capacity above 20% C. On hybrid pools with free capacity above 20% D. On hybrid pools when CPU utilization is at or less than 50% Answer: A 6.A customer has a Dell Unity XT array with a dynamic pool of six 600 GB drives using RAID 5 protection. They ask you for guidance about their plan to increase capacity by adding seven 600 GB drives with RAID 6 protection. What should be your response? A. Add the drives, then use UEMCLI to change the RAID width B. RAID width set in drive partnership groups cannot be changed 2/4 Download The Latest D-MSS-DS-23 Dumps To Ensure Your Success C. Unisphere allows them to change the RAID width D. Start a new drive partnership group with seven 600 GB drives Answer: B 7.What activity is initiated along with the site evaluation to ensure the solution being sold is supported in a customer environment? A. Implementation B. Remediation C. Sizing D. Design Answer: B 8.Which front-end protocol card in Dell Unity XT 380 offloads processing to save CPU cycles for other operations? A. 4 port Fibre Channel module B. CNA for iSCSI C. 4 port iSCSI module D. CNA for Fibre Channel Answer: B 9.What is the minimum number of IP addresses required for the initial configuration of a stand-alone PowerStore T? A. 4 B. 6 C. 2 D. 8 Answer: A 10.A systems administrator is evaluating a new solution for the deployment of new applications. The solution must offer storage over iSCSI for 50 Hyper-V VMs and storage over SMB to use as a user-shared area. High performance is a requirement, so the administrator has decided on NVMe SSD as the media. Which solution meets these requirements? A. Dell PowerStore T deployed in unified mode B. Dell Unity XT deployed in unified mode C. Dell PowerStore T deployed in block-optimized mode D. Dell PowerStore X deployed in unified mode Answer: A 11.A PowerStore system has been successfully designed in PowerSizer, and the configuration must be created for the customer. What is the most time-efficient way to generate the proposal? A. Export configuration in PowerSizer. Download XML file with storage configuration. Import XML file in Configuration tool. 3/4 Download The Latest D-MSS-DS-23 Dumps To Ensure Your Success B. Export configuration in PowerSizer. Download PPTX export files. Open PPTX file. Copy PowerStore configuration ID. Paste configuration number in Configuration tool. C. Export configuration in PowerSizer. Copy PowerStore configuration ID. Paste configuration number in Configuration tool. D. Export configuration in PowerSizer. Download PPTX export files. Import PPTX file into configuration tool. Answer: C 12.What is the maximum capacity of a file system on a Dell Unity XT 380? A. 32 TB B. 64 TB C. 256 TB D. 128 TB Answer: B Explanation: Training: Midrange Storage Performance Planning (ESSTGD05299) > Best Practices > System Configuration Recommendations. 13.Based on best practices, what should be the first step when designing a new Dell Unity XT solution? A. Gather impl.bin configuration file B. Calculate the aggregate performance of all hardware C. Run netstat on the host D. Meet customer and obtain Live Optics report, if applicable Answer: D 14.What is the maximum number of splits that can be performed for a workload in the PowerStore sizing tool using the split workload toggle? A. 8 B. 2 C. 4 D. 10 Answer: D 15.Which task does the Environment Collection Tool automate? A. Generation of support matrix compliance reports B. Collection of host configuration data C. Problem diagnosis and resolution D. Migration Planning Answer: A 4/4