SECTION 07 62 00 - FLASHING PART 1 GENERAL 1.1 SUMMARY A. 1.2 SYSTEM DESCRIPTION A. 1.3 Section includes gutters and downspouts. Sheet Metal System: Conform to criteria of SMACNA "Architectural Sheet Metal Manual." 1. Gutters: SMACNA Details for half round gutters. 2. Downspouts: SMACNA Details for circular downspouts. SUBMITTALS A. Shop Drawings: Indicate material profile, jointing pattern, jointing details, fastening methods, flashings, termination, and installation details. PART 2 PRODUCTS 2.1 SHEET METAL FLASHING AND TRIM A. 2.2 COMPONENTS A. 2.3 2.4 Product Description: Sheet metal gutters, downspouts, collector boxes, and accessories. Aluminum and Alloy Sheet and Plate: ASTM B209. ACCESSORIES A. Compatible material with flashing metal. B. Gutter and Downspout Anchorage Devices: In accordance with SMACNA requirements. C. Gutter Supports: Straps and brackets in accordance with SMACNA Figure 1-20A. D. Downspout Supports: Straps. FABRICATION A. Fabricate gutters, downspouts and collection boxes to profiles indicated. B. Gutters: 4” half-round in configuration indicated by SMACNA Figure 1-3A. C. Gutter Accessories: Profiled to suit gutters and downspouts. D. Downspout Boots and Collection Boxes: aluminum. FLASHING Old Towne Creek Structure Repairs 076200 - 1 08/03/2016 E. Fabricate gutters to accommodate expansion. Provide expansion joint at maximum 50’ o.c. F. Form components to shape indicated on Drawings, accurate in size, square, and free from distortion or defects. Form pieces in longest practical lengths. G. Fabricate cleats and starter strips of same material as sheet, to interlock with sheet. H. Hem exposed edges on underside 1/2 inch ; miter and seam corners. Fabricate vertical faces with bottom edge formed outward 1/4 inch and hemmed to form drip. I. Form material with soldier seams, except where otherwise indicated. PART 3 EXECUTION 3.1 EXAMINATION A. 3.2 Verify membrane termination and base flashings are in place, sealed, and secure. INSTALLATION A. Secure gutters and downspouts in place using screw fasteners. B. Furnish gutter supports constructed of same metal as gutters, spaced at 3'-0" o.c. per SMACNA plate 13, Chart 9.Apply plastic cement compound between metal work and felt flashings. C. Fit components tight in place. Make corners square, surfaces true and straight in planes, and lines accurate to profiles. D. Install gutters level. E. Connect downspouts to existing storm sewer system at Ground Floor level. Seal connection watertight. F. Seal joints watertight. END OF SECTION FLASHING Old Towne Creek Structure Repairs 076200 - 2 08/03/2016