Uploaded by nidhindineshct

SWW Risk Assessment

advertisement
Document ID No :
MARAFIQ-SAUR O&M CO.
MaSa-QHSE-SF-67
Page 4 of 23
Rev: 1
RISK ASSESSMENT
Date of issue: 01-Apr-2020
Sr.
No.
1
Potential hazard
(what can cause harm?)
Job steps
Mobilization
Severity /
consequences
(what can go
wrong to who?)
 Sharp edges of Pipe
 Cut & Wound
Existing control
Measures




Non Barricade at
work area

Accidents /
hitting



Follow MaSa
QHSE PPE
procedure MaSa
– QHSE-SP-05
Follow MaSa
QHSE Permit to
Work procedure
MaSa – QHSESP-02
Initial Risk
( l x L = Risk
level)
PROPRIETARY NOTICE
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MASA. ANY DISCLOSURE OR USE IS EXPRESSLY PROHIBITED EXCEPT UPON WRITTEN
PERMISSION BY MASA.
( l x L = Risk
level)
 Ensure all employees use
mandatory PPE
2x 2=04
Follow manual
handle Procedure
# MaSa –QHSESP -36 Rev-2
Follow MaSa
QHSE Vehicle
& Traffic
Management
procedure MaSa
– QHSE-SP-11
Obtain MaSa
QHSE
inspection and
get sticker for
the equipment
Maintain check
Additional control measures
Residual
risk
3x2=06
 Proper communication
between workers for
carrying the materials
 Handle the pipe and
material with care and more
people carry the materials.
 Use PVC coated gloves
 Keep the Pipe in Designated
area
 Conduct Tool box meeting
 Provide Method of
statement

All the mirrors of the
vehicle shall keep clear and
in place.

Clear all the access at site.

Unload from and on to stable
ground.
 Arrange flag man to avoid
collision of vehicle.
 Observe speed limit at site
and follow.
IMPORTANT
Only document with stamps are considered official.
2x1=02
3x1=03
Document ID No :
MARAFIQ-SAUR O&M CO.
MaSa-QHSE-SF-67
Page 5 of 23
Rev: 1
RISK ASSESSMENT
Date of issue: 01-Apr-2020
Sr.
No.
Severity /
consequences
(what can go
wrong to who?)
Potential hazard
(what can cause harm?)
Job steps
Existing control
Measures
Initial Risk
( l x L = Risk
level)
Additional control measures
Residual
risk
( l x L = Risk
level)
list of the
equipment
 Hot weather
conditions

Physical
injury
Dehydration
Heat stress.





QHSE Permit
to Work
procedure MaSa
– QHSE-SP-02
3x3=09
Provide rest shelter at site.
Ensure drinking water is
available at site.
 Maintain time intervals to
the employees.
 Provide proper awareness
to the employees on heat
stress and its
consequences.
 Provide welfare facilities to
the employees such as
drinking water, eye wash
point, first aid box. etc.
3x1=03
 Provide ORS (Oral
Dehydration salt)

Social Interaction




Covid -19
Ill health
Fatigue
Fatality


Follow the
guidelines of
Ministry of
Health to
prevent Corona
virus.
Ensure all
PROPRIETARY NOTICE
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MASA. ANY DISCLOSURE OR USE IS EXPRESSLY PROHIBITED EXCEPT UPON WRITTEN
PERMISSION BY MASA.
5x2=10
 Follow heat stress index &

display at site.
 Provide hand washing
facility to employees.
 Provide sanitizer at rest
shelter
 Ensure all the employees
are using face mask
 Ensure all are washing
IMPORTANT
Only document with stamps are considered official.
5 x1= 5
Document ID No :
MARAFIQ-SAUR O&M CO.
MaSa-QHSE-SF-67
Page 6 of 23
Rev: 1
RISK ASSESSMENT
Date of issue: 01-Apr-2020
Sr.
No.
Potential hazard
(what can cause harm?)
Job steps
Severity /
consequences
(what can go
wrong to who?)
Existing control
Measures
Initial Risk
( l x L = Risk
level)
employees are
taken Covid-19
vaccination at
least first dose.
2
Asphalt Cutting

Scattering of dust
particles
 Eye Injury

Ensure all
employees are
registered in
Twalkana

Follow MaSa
QHSE PPE
procedure MaSa
– QHSE-SP-05
Department
manager will
ensure that the
PPE used by its
employees is
suitable.
Need for PPE
Identified
Define the
Hazard
Select the PPE
for use
Follow MaSa





PROPRIETARY NOTICE
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MASA. ANY DISCLOSURE OR USE IS EXPRESSLY PROHIBITED EXCEPT UPON WRITTEN
PERMISSION BY MASA.
Additional control measures
Residual
risk
( l x L = Risk
level)
hands frequently.
 Maintain social distance
 Ensure all employees
following Covid-19
protocols.
3x3=09
 If any symptoms found in
any person, immediately
send the person along with
the contacted persons to
quarantine immediately.
 Ensure that tools are in
good working condition.
 Equipment and Operator
must be Marafiq approved
 Use proper PPE to avoid
the direct hitting
 Use face shield
 Use ear plugs or ear muff.
 The Edges of the must be
protected by guards.
 The equipment will inspect
by MaSa representative
and maintain check list
 Trained people will use the
Equipment.
 The equipment must use as
per manufactures standard
IMPORTANT
Only document with stamps are considered official.
3x1=03
Document ID No :
MARAFIQ-SAUR O&M CO.
MaSa-QHSE-SF-67
Page 7 of 23
Rev: 1
RISK ASSESSMENT
Date of issue: 01-Apr-2020
Sr.
No.
Potential hazard
(what can cause harm?)
Job steps
Severity /
consequences
(what can go
wrong to who?)
Existing control
Measures

3
Manual Excavation
Near the Existing
Marafiq Sanitary
Waste Water line

Sharp Edges of
tools
Initial Risk
( l x L = Risk
level)





( l x L = Risk
level)
QHSE Permit
to work
procedure MaSa
– QHSE-SP-02
Follow all PTW
requirements
 Cut or wound

Additional control measures
Residual
risk

Follow MaSa
QHSE PPE
procedure MaSa
– QHSE-SP-05
Department
manager will
ensure that the
PPE used by its
employees is
suitable.
Need for PPE
Identified
Define the
Hazard
Select the PPE
for use
Follow MaSa
QHSE Permit to
Work procedure
PROPRIETARY NOTICE
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MASA. ANY DISCLOSURE OR USE IS EXPRESSLY PROHIBITED EXCEPT UPON WRITTEN
PERMISSION BY MASA.
3x2=06







Proper safety precautions
taken.
Excavation will be done
only after getting the
approval from the TSD
department
Shoring should be in place
in depth of the trench
Ensure all employees are
using PPE to protect from
sharp edges.
First Aid Kit shall keep at
site.
Ensure that tools are in
good working condition
Appropriate PPE while
excavating
Never block access and
egress routes with
materials and equipment.
IMPORTANT
Only document with stamps are considered official.
3x1=03
Document ID No :
MARAFIQ-SAUR O&M CO.
MaSa-QHSE-SF-67
Page 8 of 23
Rev: 1
RISK ASSESSMENT
Date of issue: 01-Apr-2020
Sr.
No.
Potential hazard
(what can cause harm?)
Job steps
Severity /
consequences
(what can go
wrong to who?)
Existing control
Measures
Initial Risk
( l x L = Risk
level)
Additional control measures

MaSa – QHSESP-02



Hitting buried utilities
 Property
damage
 Electric Shock





Follow MaSa
QHSE
Excavation
procedure MaSa
– QHSE-SP-22
Identified need
for excavation
Access risk and
document
control measure
Obtain
Excavation
Work request
prior to start the
work
Apply control
Measure and
PROPRIETARY NOTICE
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MASA. ANY DISCLOSURE OR USE IS EXPRESSLY PROHIBITED EXCEPT UPON WRITTEN
PERMISSION BY MASA.
Residual
risk
( l x L = Risk
level)
Adherence to site safety
signage
Always maintain good
housekeeping.
Keep the soil 1 M away
from the designated area



4x4=16


Completed mark-outs of
utilities
Use non sharp tools.
Support existing
utilities using Tie Off
to control the sagging
Identify & mark the
existing utilities using
Marafiq approved
drawing
Coordinate with
SCECO to confirm no
any electrical cable
before start job through
CPO
IMPORTANT
Only document with stamps are considered official.
4 x2 = 8
Document ID No :
MARAFIQ-SAUR O&M CO.
MaSa-QHSE-SF-67
Page 9 of 23
Rev: 1
RISK ASSESSMENT
Date of issue: 01-Apr-2020
Sr.
No.
Potential hazard
(what can cause harm?)
Job steps

Falling in to trenches
Severity /
consequences
(what can go
wrong to who?)
 Major Injury
Existing control
Measures





Follow MaSa
QHSE
Excavation
procedure MaSa
– QHSE-SP-22
Identified need
for excavation
Access risk and
document
control measure
Obtain
Excavation
Work request
prior to start the
work
Apply control
Measure and
insect inspection
PROPRIETARY NOTICE
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MASA. ANY DISCLOSURE OR USE IS EXPRESSLY PROHIBITED EXCEPT UPON WRITTEN
PERMISSION BY MASA.
Initial Risk
( l x L = Risk
level)
Additional control measures

4 x 3= 12






During excavation work
the surrounding areas
must be maintained in an
orderly and tidy
condition.
All excavation access and
egress shall be inspected
daily and complete
barricade and signs must
be posted.
Assign trained/competent
person to conduct the task
No-one enters an
unsupported unsafe
trench
Support materials on site
before excavation starts.
Only use designated
walkways.
Workplace tidiness
maintained by cleaning
up during work, at end of
day to avoid slips and
trips – clean before go
IMPORTANT
Only document with stamps are considered official.
Residual
risk
( l x L = Risk
level)
4x2=8
Document ID No :
MARAFIQ-SAUR O&M CO.
MaSa-QHSE-SF-67
Page 10 of 23
Rev: 1
RISK ASSESSMENT
Date of issue: 01-Apr-2020
Sr.
No.
Job steps
Potential hazard
(what can cause harm?)
 Trips and Slip
Severity /
consequences
(what can go
wrong to who?)
 Property
Damage
 Muscular or
skeletal
injuries
Existing control
Measures








Follow MaSa
QHSE Work at
Height
procedure MaSa
– QHSE-SP-12
Identify the
work at Height
Try to avoid
work at height
Provide
necessary
training,
information and
instruction
Follow MaSa
QHSE Ladder
Safety
procedure MaSa
– QHSE-SP-13
Safe ladder will
use
Ladder must
place in safe and
secure place
PROPRIETARY NOTICE
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MASA. ANY DISCLOSURE OR USE IS EXPRESSLY PROHIBITED EXCEPT UPON WRITTEN
PERMISSION BY MASA.
Initial Risk
( l x L = Risk
level)
Additional control measures



4 x 3=12












Close monitoring HSE
and supervision team.
First aid kit must be
available at site
All tools must be
inspected on daily basis.
All person must be
competent for Job
Ensure the excavated area
is properly dewatered.
SCBA must be available
at site
Follow Marafiq Confined
space procedure
Maintain confined space
log sheet
PTWC must obtain prior
to start the work.
Gas test will be done at
site
Keep the equipment away
from excavated area.
Provide ventilation
Provide Tripod
Standby must be
available.
Provide safety harness,
lifeline and fall arrester
IMPORTANT
Only document with stamps are considered official.
Residual
risk
( l x L = Risk
level)
4 x 2=8
Document ID No :
MARAFIQ-SAUR O&M CO.
MaSa-QHSE-SF-67
Page 11 of 23
Rev: 1
RISK ASSESSMENT
Date of issue: 01-Apr-2020
Sr.
No.
4
Potential hazard
(what can cause harm?)
Job steps
Shoring
 Trips and Slip
Severity /
consequences
(what can go
wrong to who?)
 Property
Damage
 Muscular or
skeletal
injuries
Existing control
Measures
 Follow MaSa
QHSE Work at
Height procedure
MaSa – QHSESP-12
Initial Risk
( l x L = Risk
level)
Additional control measures

4x2=08



 Follow MaSa
QHSE Ladder
Safety procedure
MaSa – QHSESP-13


Close monitoring HSE
and supervision team.
First aid kit must be
available at site
All tools must be
inspected on daily basis.
All person must be
competent for Job
Gas test will be done at
site
Keep the equipment away
from excavated area.
Residual
risk
( l x L = Risk
level)
4x1=4
 Follow MaSa
QHSE Confined
Space procedure
MaSa – QHSESP-20

Falling in to trenches
 Major Injury

Follow MaSa
QHSE
Excavation
Safety
procedure MaSa
– QHSE-SP-22

4 x 3= 12


PROPRIETARY NOTICE
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MASA. ANY DISCLOSURE OR USE IS EXPRESSLY PROHIBITED EXCEPT UPON WRITTEN
PERMISSION BY MASA.
During excavation work
the surrounding areas
must be maintained in an
orderly and tidy
condition.
All excavation access and
egress shall be inspected
daily and complete
barricade and signs must
be posted.
Assign trained/competent
IMPORTANT
Only document with stamps are considered official.
4x2=08
Document ID No :
MARAFIQ-SAUR O&M CO.
MaSa-QHSE-SF-67
Page 12 of 23
Rev: 1
RISK ASSESSMENT
Date of issue: 01-Apr-2020
Sr.
No.
5
Job steps
Installation of
Dewatering Pump
Potential hazard
(what can cause harm?)
 Fall of materials or
Severity /
consequences
(what can go
wrong to who?)
 Major Injury
equipment
 Fire
 Trips and Slip
 Property
Damage
 Muscular or
skeletal
injuries
Existing control
Measures
Initial Risk
( l x L = Risk
level)


Follow MaSa
QHSE Hot
Work procedure
MaSa – QHSESP-35
 Follow MaSa
QHSE Hand &
power tool
procedure MaSa
– QHSE-SP-25
 Follow MaSa
QHSE Work at
Height procedure
MaSa – QHSESP-12
PROPRIETARY NOTICE
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MASA. ANY DISCLOSURE OR USE IS EXPRESSLY PROHIBITED EXCEPT UPON WRITTEN
PERMISSION BY MASA.
Additional control measures

3x3=09




person to conduct the task
 No-one enters an
unsupported unsafe
trench
 Support materials on site
before excavation starts.
 Only use designated
walkways.
 Workplace tidiness
maintained by cleaning
up during work, at end of
day to avoid slips and
trips – clean before go
Barricade the area and post
signage’s to prevent un
authorized entry
Only use designated
walkways.
Keep walk ways clear.
Place Dip tray at site
Make proper grounding to the
equipment.

4x2=08


Close monitoring HSE
and supervision team.
First aid kit must be
available at site
All tools must be
inspected on daily basis.
IMPORTANT
Only document with stamps are considered official.
Residual
risk
( l x L = Risk
level)
3x1=03
4x1=04
Document ID No :
MARAFIQ-SAUR O&M CO.
MaSa-QHSE-SF-67
Page 13 of 23
Rev: 1
RISK ASSESSMENT
Date of issue: 01-Apr-2020
Sr.
No.
Job steps
Potential hazard
(what can cause harm?)
Severity /
consequences
(what can go
wrong to who?)
Existing control
Measures
Initial Risk
( l x L = Risk
level)
Additional control measures
 Follow MaSa
QHSE Ladder
Safety procedure
MaSa – QHSESP-13

 Follow MaSa
QHSE Confined
Space procedure
MaSa – QHSESP-







6
Cutting pipe by using
grinder
 Rotating part of the
Power Tool
 Dust
 Minor Cuts



Follow MaSa
QHSE PPE
procedure MaSa
– QHSE-SP-05
Department
manager will
ensure that the
PPE used by its
employees is
suitable.
Need for PPE
Identified
PROPRIETARY NOTICE
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MASA. ANY DISCLOSURE OR USE IS EXPRESSLY PROHIBITED EXCEPT UPON WRITTEN
PERMISSION BY MASA.
Use appropriate PPE to carry
out the work.

Conduct tool box talk prior to
start the job

Promptly wash contaminated
skin with soap and water
Provide eye wash station at
site.
Seek medical attention if
symptoms persist.
Make proper communication



( l x L = Risk
level)
All person must be
competent for Job
Ensure the excavated area
is properly dewatered.
Follow Marafiq Confined
space procedure
Maintain confined space
log sheet
PTWC must obtain prior
to start the work.
Gas test will be done at
site
Keep the equipment away
from excavated area.
SCBA & Tripod must be
available at site

2 x 2 = 04
Residual
risk
IMPORTANT
Only document with stamps are considered official.
2x1=02
Document ID No :
MARAFIQ-SAUR O&M CO.
MaSa-QHSE-SF-67
Page 14 of 23
Rev: 1
RISK ASSESSMENT
Date of issue: 01-Apr-2020
Sr.
No.
Job steps
Potential hazard
(what can cause harm?)
Severity /
consequences
(what can go
wrong to who?)
Existing control
Measures




7
Tie in to the Existing
SWW pipe Line
 Chemical Contact
 Skin irritation
 Allergy
 Breathing
Issues
Initial Risk
( l x L = Risk
level)
Define the
Hazard
Select the PPE
for use
Follow MaSa
QHSE Permit to
Work procedure
MaSa – QHSESP-02
Follow all PTW
requirements
 Follow MaSa
QHSE Hot Work
procedure MaSa –
QHSE-SP-35
 Identify the Hot
work like
welding,
grinding &
 drilling etc.
 Assess control
and identify
control
measures
 Prevent injury
and Ill health
PROPRIETARY NOTICE
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MASA. ANY DISCLOSURE OR USE IS EXPRESSLY PROHIBITED EXCEPT UPON WRITTEN
PERMISSION BY MASA.
Additional control measures



2 x 2 = 04





Residual
risk
( l x L = Risk
level)
with the MaSa operation
team.
Ensure personnel are
qualified and trained to use
hand tools
Use appropriate PPE to carry
out the work.
Conduct tool box talk prior to
start the job
Promptly wash contaminated
skin with soap and water
Provide eye wash station at
site.
Seek medical attention if
symptoms persist.
Make proper communication
with the MaSa operation
team.
Ensure personnel are
qualified and trained to use
hand tools.
IMPORTANT
Only document with stamps are considered official.
2x1=02
Document ID No :
MARAFIQ-SAUR O&M CO.
MaSa-QHSE-SF-67
Page 15 of 23
Rev: 1
RISK ASSESSMENT
Date of issue: 01-Apr-2020
Sr.
No.
8
Potential hazard
(what can cause harm?)
Job steps
Confined Space

Hazardous
atmospheres
Severity /
consequences
(what can go
wrong to who?)
 Physical
Injury
 Exposure
 Fatality
Existing control
Measures
Initial Risk
( l x L = Risk
level)
Additional control measures
 Follow MaSa
QHSE Hand &
Power Tools
procedure MaSa –
QHSE-SP-25

 Follow MaSa
QHSE Work at
Height procedure
MaSa – QHSESP-12
 Barriers and or traffic cones
shall be implemented to
prevent entry.
 Vehicles, plant and
equipment to be located as
far as reasonably practical
away from confined space.
 All applicable permits must
be completed and approved
prior to entering confined
space.
 Access and egress to work
area/site for construction
vehicles to be planned.
 Isolation of energy sources
 Ladders are to be secured
against displacement.
 Natural or mechanical
ventilation to purge
contaminants and maintain
safe atmosphere if
contaminants are detected.
 Follow MaSa
QHSE Ladder
Safety procedure
MaSa – QHSESP-13
 Follow MaSa
QHSE Confined
Space procedure
MaSa – QHSESP-
PROPRIETARY NOTICE
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MASA. ANY DISCLOSURE OR USE IS EXPRESSLY PROHIBITED EXCEPT UPON WRITTEN
PERMISSION BY MASA.


5 x 3 = 15
Residual
risk
( l x L = Risk
level)
Suitable gloves and protective
clothing to be worn
Keep MSDS at site
Employees must aware of the
use of CPVC cement.
IMPORTANT
Only document with stamps are considered official.
5 x 2 = 10
Document ID No :
MARAFIQ-SAUR O&M CO.
MaSa-QHSE-SF-67
Page 16 of 23
Rev: 1
RISK ASSESSMENT
Date of issue: 01-Apr-2020
Sr.
No.
Severity /
consequences
(what can go
wrong to who?)
Potential hazard
(what can cause harm?)
Job steps
Existing control
Measures
Initial Risk
( l x L = Risk
level)
Additional control measures



Entrapment



Suffocation
Loss of
consciousnes
s
injury or
death from
contaminant
s


 Follow MaSa
QHSE Confined
Space procedure
MaSa – QHSESP-


5 x 3 = 15

PROPRIETARY NOTICE
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MASA. ANY DISCLOSURE OR USE IS EXPRESSLY PROHIBITED EXCEPT UPON WRITTEN
PERMISSION BY MASA.
Residual
risk
( l x L = Risk
level)
Gas Test shall be done at
site.
Gas test equipment must be
calibrated.
Arrange stand by person
Excavations/trenches more
than 1.5m deep shall be
benched shored or battered
before entering.
Entry and exit points must
be large enough to avoid
entrapment and for
emergency access
Continuous atmospheric
monitoring of confined
space persons to stop work
and exit confined space if
any of the alarms sound.
Stand-by person/s to
manage confined space
IMPORTANT
Only document with stamps are considered official.
5 x 2=10
Document ID No :
MARAFIQ-SAUR O&M CO.
MaSa-QHSE-SF-67
Page 17 of 23
Rev: 1
RISK ASSESSMENT
Date of issue: 01-Apr-2020
Sr.
No.
Severity /
consequences
(what can go
wrong to who?)
Potential hazard
(what can cause harm?)
Job steps
Existing control
Measures
Initial Risk
( l x L = Risk
level)
Additional control measures



9
Backfilling and
compacting the area

Dust/ Flying Debris

Health hazard
due to flying
debris

Property
damage

Hearing
difficulty




Follow MaSa
QHSE Hand &
Power tool
procedure MaSa
– QHSE- SP-25
Follow MaSa
QHSE
Excavation
procedure MaSa
– QHSE-SP-22
Identified need
for excavation
Access risk and
document
PROPRIETARY NOTICE
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MASA. ANY DISCLOSURE OR USE IS EXPRESSLY PROHIBITED EXCEPT UPON WRITTEN
PERMISSION BY MASA.
Residual
risk
( l x L = Risk
level)
entry permit to work and
account for persons
entering/exiting confined
space.
Stand-by person must not
engage in any other work
whilst observing confined
space entry.
Stand-by person to raise
the alarm in event of an
emergency.
SCBA & Tripod must be
available at site


Only authorized workers
shall operate vibrator
compactor
Compacting machine
shall be inspected and
approved by Marafiq/
MaSa safety department

Use Ear Muff or ear plug

Necessary PPE shall be
used.
3 x 3 = 09
IMPORTANT
Only document with stamps are considered official.
3x1=03
Document ID No :
MARAFIQ-SAUR O&M CO.
MaSa-QHSE-SF-67
Page 18 of 23
Rev: 1
RISK ASSESSMENT
Date of issue: 01-Apr-2020
Sr.
No.
Severity /
consequences
(what can go
wrong to who?)
Potential hazard
(what can cause harm?)
Job steps
Existing control
Measures


 Rotating part of the

Minor injury

equipment

10
Restoration of


Asphalt

Heat

Contact with
Asphalt

Asphalt fumes and 
vapours
Nasal
irritation
Minor burn
Skin
Irritation
Initial Risk
( l x L = Risk
level)
Additional control measures
Residual
risk
( l x L = Risk
level)
control measure
Obtain
Excavation
Work request
prior to start the
work
Apply control
Measure and
insect inspection
Follow MaSa
QHSE Hand &
Power tool
procedure MaSa
– QHSE- SP-25
Guards should
be placed with
Compactor
Follow MaSa
QHSE Vehicle &
Traffic
Management
procedure MaSa
– QHSE- SP-11
PROPRIETARY NOTICE
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MASA. ANY DISCLOSURE OR USE IS EXPRESSLY PROHIBITED EXCEPT UPON WRITTEN
PERMISSION BY MASA.


3x2=06

3x3=09
Ensure all employees are
using mandatory PPE.
Competent people will
conduct the job.
Power tools must be
inspected before and after
use.

PPE will be used

All power tools will be
inspected as per MaSa
checklist.
 Required respirator will
provide to workers.
 Use foot wear, gloves and
eye wear and protective
clothing
IMPORTANT
Only document with stamps are considered official.
3x1=03
3 x1 =3
Document ID No :
MARAFIQ-SAUR O&M CO.
MaSa-QHSE-SF-67
Page 19 of 23
Rev: 1
RISK ASSESSMENT
Date of issue: 01-Apr-2020
Sr.
No.
Potential hazard
(what can cause harm?)
Job steps

10
Housekeeping/
Demobilization
Severity /
consequences
(what can go
wrong to who?)
Eye irritation
 Vehicle Collision






Existing control
Measures
Health effect
from
exposure
(Head ache,
skin rash and
fatigue)
Major injury 
Asset
Damage
Falling
Slipping
Trip



 Un even
surface/Wet floor
 Asset
Damage
 Falling
 Slipping

Initial Risk
( l x L = Risk
level)
Additional control measures
Residual
risk
( l x L = Risk
level)
 Workers been trained in the
same work practices.
 Compactor
shall
be
inspected and maintain
check list.
Follow MaSa
QHSE Vehicle
& Traffic
Management
procedure MaSa
– QHSE-SP-11
Pre use vehicle
preparation.
Obtain MaSa
QHSE
inspection and
get sticker for
the equipment
Maintain check
list of the
equipment
Follow MaSa
QHSE House
Keeping
procedure MaSa
PROPRIETARY NOTICE
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MASA. ANY DISCLOSURE OR USE IS EXPRESSLY PROHIBITED EXCEPT UPON WRITTEN
PERMISSION BY MASA.
3x3=09
3x3=09
 Ensure that the Drivers and
equipment operators got
sufficient training to work at
site fully aware about the
Safety rules
 All the materials properly
strap / tie with belt during
Transportation.
 Unwanted materials
should be disposed in a
proper manner.
 Observe speed limit of as
per the site condition
 Use safety shoe and take
care while walking.
 Make sure the area is clear
to walk.
IMPORTANT
Only document with stamps are considered official.
3x1=03
3x1=03
Document ID No :
MARAFIQ-SAUR O&M CO.
MaSa-QHSE-SF-67
Page 20 of 23
Rev: 1
RISK ASSESSMENT
Date of issue: 01-Apr-2020
Sr.
No.
Job steps
Potential hazard
(what can cause harm?)
Severity /
consequences
(what can go
wrong to who?)
Existing control
Measures
 Trip
 Scattered debris or
materials
Minor Injury

Initial Risk
( l x L = Risk
level)
Additional control measures
– QHSE- SP-23
 Appropriate PPE and Mask
shall be used.
 Housekeeping to be
maintained before and after
the work
 Stack all the materials,
tools, barricades etc. in a
designated area properly
away from the access.
Follow MaSa
QHSE House
Keeping
procedure MaSa
– QHSE- SP-23


3x3=09

Ensure personnel are
qualified and trained to work.
Use appropriate PPE to carry
out the work.
Rescue Plan :
Erect safety lifting tripod
Appoint emergency rescue stand by.
Entry inside confined space limited to people wearing full body safety harness and life line should be buckled to tripod.
Extract fainted person using the tripod & life line.
Only trained people will carry out the Job.
Conduct the Tool Box Meeting prior to start the job.
Provide communication devices to all employees.
Provide emergency vehicle at the site.
Clear signage regarding entry permissions
Well-ventilated and clean spaces.
Information on access routes, gates or landmarks
Review records of work-related injuries and illnesses
PROPRIETARY NOTICE
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MASA. ANY DISCLOSURE OR USE IS EXPRESSLY PROHIBITED EXCEPT UPON WRITTEN
PERMISSION BY MASA.
IMPORTANT
Only document with stamps are considered official.
Residual
risk
( l x L = Risk
level)
3x1=03
Document ID No :
MARAFIQ-SAUR O&M CO.
MaSa-QHSE-SF-67
Page 21 of 23
Rev: 1
RISK ASSESSMENT
Date of issue: 01-Apr-2020
Sr.
No.
Job steps
Potential hazard
(what can cause harm?)
Severity /
consequences
(what can go
wrong to who?)
Existing control
Measures
Initial Risk
( l x L = Risk
level)
Additional control measures
Residual
risk
( l x L = Risk
level)
Become familiar with the confined spaces hazards
Entrants must evacuate the confined space if the concentration of oxygen in the confined space goes below 19.5% or above
22.5%.
First aider should be present at site while conduct the Job.
In emergency; Rescue person should wear SCBA apparatus full body safety harness and life line buckled before any entering
inside confined space.
Follow masa Emergency Procedure while working in site: Follow Site commandant instruction.
Collect Communication radio from J2PS SCE before moving to location and be connected in radio. EMERGENCY CALL # 013-341-9911;
MASA EMERGENCY: 341-2111
PROPRIETARY NOTICE