WHS INSPECTION CHECKLIST
Site name
Date
[Click/tap to enter details]
[Click/tap to select date]
Project or job name
Job or contract number (if applicable)
[Click/tap to enter details]
[Click/tap to enter details]
Person carrying out site inspection (name and position)
[Click/tap to enter details]
Contractor (if applicable)
[Click/tap to enter details]
Contractor’s Site Supervisor
Contact number
[Click/tap to enter details]
[Click/tap to enter details]
All non-conformances must be rectified immediately, or date set for completion, and actions
documented.
Documents
Inspection item
Yes
No
N/A
Is there a WHS Management Plan covering
this job, if required?
☐
☐
☐
Are safe work method statements (SWMS)
available for all high risk site activities currently
being undertaken?
☐
☐
☐
Does the SWMS identify site specific hazards
and controls related to the work being carried
out?
☐
☐
☐
Are workers on site working in accordance with
their SWMS?
☐
☐
☐
Yes
No
N/A
☐
☐
☐
Comments or actions
[Where are SWMSs kept?]
Induction
Inspection item
Have all workers undergone site specific
induction training prior to starting work on site?
RBH:
Updated: 26-11-2023
Comments or actions
[White card sighted?]
page 1 | 10
OFFICIAL
OFFICIAL
Consultation
Inspection item
Yes
No
N/A
☐
☐
☐
Yes
No
N/A
Site security: Is the site securely fenced or
barricaded to protect occupants and outside
pedestrians, and to prevent unauthorised
access?
☐
☐
☐
Are all materials stored within the secured work
site, site shed or vehicles?
☐
☐
☐
Are there designated entry and exit points with
ID checks?
☐
☐
☐
Signage: Are site safety rules available and
displayed on site?
☐
☐
☐
When fencing is erected, is there a clearly
visible sign with the name and phone number,
(including an after-hours emergency telephone
number) of the Principal Contractor with
appropriate construction and PPE signage
displayed?
☐
☐
☐
Traffic control: Is vehicle and pedestrian
traffic adjacent to the site directed and
controlled using signage, fencing and
controllers?
☐
☐
☐
If required is a Traffic Management Plan in
place?
☐
☐
☐
Yes
No
N/A
☐
☐
☐
Are toolbox talks held prior to site works
commencing, and then weekly, or more
frequently as required?
Comments or actions
Work adjacent to traffic corridor
Inspection item
Comments or actions
Emergencies
Inspection item
Where is the nearest phone in case of an
emergency?
RBH:
Updated: 26-11-2023
Comments or actions
[Click/tap to enter location]
page 2 | 10
OFFICIAL
OFFICIAL
Inspection item
Yes
No
N/A
Is an emergency or incident procedure
displayed on site and are workers aware of the
procedure?
☐
☐
☐
Are there suitable fire extinguishers on site (for
example, hot work minimum 4.5 kg) and have
fire extinguishers been serviced in last six
months and tag stamped?
☐
☐
☐
Is there an adequately stocked first aid kit on
site? (Equivalent to Type B kit plus items
identified as required from carrying out a risk
assessment.)
☐
☐
☐
Is there a qualified first aid person on site? One
first aid person for up to 25 workers for high
risk work.
☐
☐
☐
Is there an accident or injury book or register
on site?
☐
☐
☐
Yes
No
N/A
Are there washing facilities, adequate fresh
cool drinking water, clean toilet, lunch and
change rooms and bins available? (For
example, one toilet per 20 workers.)
☐
☐
☐
Is rubbish and waste containers on site?
☐
☐
☐
Is the site area clear of rubbish or scattered
materials?
☐
☐
☐
Is documentation available for any waste or
hazardous material disposed of offsite? For
example, tip docket.
☐
☐
☐
Comments or actions
[Click/tap to enter name/s]
Site amenities
Inspection item
RBH:
Updated: 26-11-2023
Comments or actions
page 3 | 10
OFFICIAL
OFFICIAL
Working at heights
Inspection item
Yes
No
N/A
Prevention of falls if work area is above 2
metres and within 2 metres of the edge. Are
guard rails or scaffolding or harness being
used?
☐
☐
☐
Is area below (fall zone) fenced or barricaded
with warning signage, or spotter below?
☐
☐
☐
Are tools secured?
☐
☐
☐
If team has installed roof safety mesh, has a
Roof Safety Mesh Handover Certificate been
completed and copy left with site owner? (CoP
Safe Work on Roofs Part 1)
☐
☐
☐
Ladders: Are ladders in good condition,
industrial rated with a visible rating sticker,
secured top or bottom, extended at least 1
metre above top platform and are timber or
fibreglass when working near electrical
equipment?
☐
☐
☐
Scaffolding: If the scaffold is under erection,
has a safety barrier been set up near the
scaffolding base?
☐
☐
☐
Is proper ladder access provided to scaffold
working decks (fixed top/bottom)?
☐
☐
☐
Is scaffolding secured against tipping?
☐
☐
☐
Are the planks secure and platforms fully
decked?
☐
☐
☐
Does scaffolding of 4 metres or more have a
relevant scaff tag or handover certificate?
☐
☐
☐
Are handrails, midrails and toe boards in place
along the full length of working deck of the
scaffold?
☐
☐
☐
Mobile scaffolds: Do mobile scaffolds have
lockable wheels and are the wheels locked?
☐
☐
☐
Is safe internal ladder access available above 2
metres?
☐
☐
☐
RBH:
Updated: 26-11-2023
Comments or actions
[Monthly certification on site?]
page 4 | 10
OFFICIAL
OFFICIAL
Inspection item
Yes
No
N/A
Is the height less than 3 times the width of the
base?
☐
☐
☐
Do outriggers have to be used?
☐
☐
☐
Have overhead electrical hazards been
considered?
☐
☐
☐
Yes
No
N/A
Documentation: Do plant operators have
appropriate licences for the work?
☐
☐
☐
Does all machinery have registration and
permits?
☐
☐
☐
Are Safety Check logbooks for machinery
being completed?
☐
☐
☐
Specific plant: Is traffic control in place if
required?
☐
☐
☐
Do backhoes, excavators, bobcats, cranes,
boom pumps, EWP’s have appropriate signs?
☐
☐
☐
Is plant in good order (visual inspection – no oil
leaks, hydraulic hoses okay, etc)?
☐
☐
☐
Is the Safe Working Load indicated on the
boom of all cranes, EWP, lifts? (Division 1)
☐
☐
☐
Are licensed persons involved with mobile
crane movements and are slings and cranes in
good order, and is there evidence of
inspections of these?
☐
☐
☐
Do vehicles have reverse alarms and rotating
orange lights where necessary?
☐
☐
☐
Are workers wearing high visibility clothing in
the vicinity of traffic/mobile plant?
☐
☐
☐
Are operators of EWP that can exceed 11
metres, licenced? (Division 1)
☐
☐
☐
Comments or actions
Mobile plant and equipment
Inspection item
RBH:
Updated: 26-11-2023
Comments or actions
[Licences verified?]
[Licences verified?]
page 5 | 10
OFFICIAL
OFFICIAL
Inspection item
Yes
No
N/A
☐
☐
☐
Yes
No
N/A
Are barricades, fences, or signage along and
around trenches?
☐
☐
☐
Are excavations greater than 1.5 metres
benched, battered, shored or certified by a
Geotechnical Engineer to prevent collapse and
is safe ladder access provided?
☐
☐
☐
Is spoil deposited on downhill side of trench or
excavation?
☐
☐
☐
Yes
No
N/A
Have existing services been verified and are
workers aware of safe practices or regulations
if working close to power lines and/or
underground or hidden services? (For
example, Dial Before You Dig.)
☐
☐
☐
Have gas, electricity and other services been
located and isolated or disconnected?
☐
☐
☐
Are stockpiled materials covered to prevent
erosion by wind and rain, or dampened with
water to reduce windblown dust?
☐
☐
☐
If dust is a problem, does the fence installed
around the site have a cloth barrier to act as a
windbreak?
☐
☐
☐
Is plant not in use switched off and key
removed?
Comments or actions
Excavation and trenching work
Inspection item
Comments or actions
Demolition work
Inspection item
RBH:
Updated: 26-11-2023
Comments or actions
page 6 | 10
OFFICIAL
OFFICIAL
Personal protective equipment (PPE)
Inspection item
Yes
No
N/A
Are safety helmets, boots and high visibility
vests being worn by all persons on the work
site?
☐
☐
☐
Are site workers wearing PPE whilst doing
tasks that require it to be worn (for example,
dust masks, gloves, eye and/or ear
protection)?
☐
☐
☐
Are supervisors and site workers wearing UV
protective equipment, clothing, sunscreen?
☐
☐
☐
Yes
No
N/A
General: Are workers aware that they need to
contact their manager or supervisor
immediately if there is any incident including
one that may affect the environment?
☐
☐
☐
Is excess water from cleaning tools and
equipment and waste contained and not
washed into drains or waterways?
☐
☐
☐
Are excess materials recycled where possible?
☐
☐
☐
Are trees protected during site works?
☐
☐
☐
Are heritage items identified and protected
during works?
☐
☐
☐
Are site vehicles parked where they will not
unduly impact local use of a street or grounds?
☐
☐
☐
Is vehicle access restricted to one stable entry
and exit point to reduce damage to ground or
grassed areas.
☐
☐
☐
Is noise minimised where possible?
☐
☐
☐
Are dust and other particles contained?
☐
☐
☐
Comments or actions
Environmental management
Inspection item
RBH:
Updated: 26-11-2023
Comments or actions
page 7 | 10
OFFICIAL
OFFICIAL
Inspection item
Yes
No
N/A
Is waste disposed of appropriately and in
accordance with regulations or local authority
requirements?
☐
☐
☐
Use of hazardous substances – painting or
cleaning: Are washings contained and not
disposed of down drain or near
drains/waterways?
☐
☐
☐
Are paints and chemicals stored in a lockable
area that has an impervious floor and
ventilation?
☐
☐
☐
Are waste solvents, cleaners and paints sealed
and disposed of in accordance with guidelines
(refer local council)?
☐
☐
☐
Excavation or trenching: Are silt fences and
other sediment control measures in place and
functional, if required?
☐
☐
☐
Are trenches filled in as soon as work is
completed to minimise erosion?
☐
☐
☐
Is any surcharge on ground removed?
☐
☐
☐
Yes
No
N/A
SDS: Is there a Hazardous Chemicals or
Substances Register?
☐
☐
☐
Are copies of safety data sheets (SDS)
available on site for all substances used or
stored on site?
☐
☐
☐
Labelling: Are all containers of chemicals
adequately labelled (including decanted
materials that haven’t been decanted for
immediate use)?
☐
☐
☐
Training: Have site workers read SDS and
controls listed in SWMS?
☐
☐
☐
Comments or actions
Hazardous chemicals or substances
Inspection item
RBH:
Updated: 26-11-2023
Comments or actions
page 8 | 10
OFFICIAL
OFFICIAL
Inspection item
Yes
No
N/A
Ventilation: Is adequate ventilation provided
when chemicals/gas bottles are stored in
vehicles or in use?
☐
☐
☐
Are appropriate control measures in place for
removal of lead-based paint?
☐
☐
☐
Are appropriate control measures in place for
asbestos removal, and work carried out by
licensed person?
☐
☐
☐
Yes
No
N/A
Guards: Do machines or /tools on site have
guards or handles fitted as per manufacturer’s
recommendations? for example, grinder,
circular saw
☐
☐
☐
Electrical: Are electrical leads, plugs and
power tools in good condition and are they
tested and tagged 3-monthly?
☐
☐
☐
Are extension leads off the ground?
☐
☐
☐
Are all power supply outlets protected by earth
leakage devices or RCD’s?
☐
☐
☐
Sheds/builder’s board tested on installation and
then 6-monthly?
☐
☐
☐
Comments or actions
Tools or electrical
Inspection item
Comments or actions
Use of explosive powered tools: When
explosive powered tools are being used, are
warning signs displayed?
Non-conformance issue(s)
Items that can be rectified on the day of the inspection are to be listed on this form. For all other nonconformances, a Site Instruction is to be issued.
Target action
date
Non-conformance issue(s)
Sign off when
completed
1.
RBH:
Updated: 26-11-2023
page 9 | 10
OFFICIAL
OFFICIAL
Target action
date
Non-conformance issue(s)
Sign off when
completed
2.
3.
4.
Inspecting person's name
Signature