Uploaded by Bi Ya

Topic 01 - 02 Introduction to Construction Industry L1

advertisement
L01: Introduction to Construction Industry
Construction: is a coordinated team effort of all those involved in providing the owner with a project as
defined in the contract documents.
Participants in the construction stage: The owner team, The design team, the contractor team, and the
supplier team.
The successful project depends on the


How well participants understand their roles and responsibilities and those of others.
How well they carry out these roles and meet the expectations of other participants.
The team members’ commitment to: Communication, Coordination, and Cooperation
can greatly affect the attitude of the project team members to achieve a successful project, that is:




Constructed on schedule,
Meets the owner’s requirements
Within budget, and
With no unresolved claims and disputes
Benefits of Working as a team

Increased Productivity




Cost Savings


Minimized interruptions allow focus on the schedule.
Lower overhead costs and quicker transition to new projects for the team.
Better Team Morale



Fewer contract modifications and claims.
Faster Project Completion



Quicker answers to questions reduce downtime.
Less rework needed.
Fewer claims and disputes, reducing paperwork.
Common goals foster a positive attitude.
Increased motivation
Fewer Claims and Delays


A cooperative team is more likely to resolve conflicts.
Creative problem-solving is more likely.
These benefits highlight the value of teamwork in enhancing efficiency, reducing costs, and improving the
quality of construction projects.
Obstacles to Teamwork in Construction

Personality Conflicts/ adversarial personalities



Labor Issues



Causes conflict and inefficiency.
May lead to cutting corners or overtime work.
Product Delays



Owner-induced changes can disrupt plans.
May require contract document modifications, affecting schedules.
Unreasonable Schedules



Delay progress.
Requires additional time and effort for revisions.
Scope Changes



Contract disputes or slowdowns delay projects.
Increases labor costs and may require contract time extensions.
Faulty/incomplete/inaccurate Contract Documents



Diverse team members may not gel well.
Professionalism is crucial to overcome personal differences.
Unavailable materials need substitution.
Expedited shipping costs extra and affects timelines.
Ineffective Management & Poor Communication


Poor planning and coordination delay projects.
Leads to unexpected costs and efforts.
These obstacles highlight the challenges that can impede effective teamwork and must be proactively
managed to ensure the success of construction projects.
Lecture 02: Roles and Responsibilities of the Parties Involved in Contract
Administration
Participants are required to:




Know the documents used during construction.
Understand the role of each participant.
Meet the expectations of other participants.
Communicate with each other
Roles and Responsibilities of the Owner
1. Providing Contractor with Information: The owner must furnish the contractor with essential
details, including site surveys and legal clearances, for the project to proceed.

Example: Before construction begins, the owner provides topographic maps and utility
locations.
2. Payments Fees associated with the work: The owner is tasked with taking care of all approval
costs and any other charges that the project might incur.
3. Scheduled Payments to Contractor: Payments to the contractor are laid out in the agreement,
and the owner has the discretion to hold back payments under specific situations.
4. Halting Work for Valid Reasons: The owner reserves the right to pause the construction
activities for justifiable reasons.
5. Assuming the Work: If the contractor fails to meet the contract terms or start the project, the
owner can step in and take over the construction tasks.

Example: If the contractor is behind schedule by a month, the owner might step in and
hire additional labor.
6. Managing Multiple Contracts: The owner can give out separate contracts for the project and is
responsible for overseeing the coordination unless a construction manager is appointed. The
owner should also consider the ramifications of hiring separate contractors.
7. Site Cleanup: If the contractor neglects to clean up the construction site, the owner has the
authority to undertake the cleanup and deduct the costs from the contractor's payment.
8. Contract Termination: The owner can end the contract if the contractor doesn't adhere/comply
to the agreed-upon terms.

Example: If the contractor uses substandard materials, the owner has the right to
terminate the contract.
Participants' Expectations from the Owner

Contingency Plans: Stakeholders expect the owner to understand that project plans may change
and to have extra funds set aside for such instances.

Information Availability: Both the Architect/Engineer (A/E) and the contractor expect the owner
to provide all required information for the project.

Accessibility and Promptness: The owner should be readily available for decision-making and
should quickly handle payment processes and document approvals.


Example: If a change in materials is needed, the owner swiftly approves or denies the
request, may ask for revisions before approving, or could require multiple rounds of
revisions.
Reasonableness: The owner is expected to make demands that align with the original intent of
the contract documents.
Roles and Responsibilities of the Architect/Engineer (A/E)
1. Act as Owner's Representative: The A/E serves as the go-between for the owner and the
contractor, providing updates to the owner and potentially offering full-time project oversight if
the owner requests it.

Example: The A/E may hold weekly meetings with the owner to update them on project
milestones and challenges.
2. Monitor Project Progress: The A/E is responsible for ensuring that the work aligns with the
contract's terms, focusing on quality and adherence to specifications. They can also reject work
that doesn't meet standards.

Example: The A/E may visit the site to inspect the quality of concrete being poured and
reject it if it does not meet specified standards.
3. Advise on Milestone Payments: The A/E advises the owner when it's appropriate to make
payments to the contractor based on completed work stages.

Example: The A/E can recommend that the owner release the next payment after the
foundation is successfully laid.
4. Clarify Contract Documents: The A/E helps explain any ambiguities in the contract documents.

Example: If there's a disagreement on the type of materials to be used, the A/E clarifies
what was originally agreed upon in the contract.
5. Settle Disputes: Should disagreements arise between the contractor and the owner, the A/E works
to resolve them.

Example: In case of a delay, the A/E mediates between the owner and contractor to find
an acceptable solution for both parties.
6. Amend the Contract: The A/E is responsible for making and formalizing any changes to the
original contract, with the consent of both the owner and the contractor.

Example: If the owner wants to add a new feature to the project, the A/E drafts the
modification, which is then signed by all parties.
7. Assess Contractor Submissions (Submittals): The A/E reviews various submissions from the
contractor, like shop drawings and test reports, to ensure they align with the project's goals.

Example: The A/E verifies that the HVAC system proposed by the contractor meets the
specified energy efficiency standards.
8. Conduct Final Inspections: The A/E inspects the work to certify its compliance with the contract
before handing it over to the owner.

Example: The A/E performs a walk-through inspection to check that all fixtures and
finishes meet the contractual requirements.
Participants' Expectations from the A/E

Complete and Error-Free Documents: The owner expects thorough and accurate planning
documents from the A/E.


Leadership and Information Flow: During the construction phase, the owner relies on the A/E's
expertise for updates on progress and quality.


Example: The owner looks to the A/E for guidance when unexpected challenges, like a
materials shortage, occur.
Budget-Conscious Design: The owner counts on the A/E to keep the project within financial
limits.


Example: The owner might request that the A/E double-check the blueprints for any
discrepancies.
Example: The owner expects the A/E to source quality, but budget-friendly materials.
Fairness and Timely Responses: Both the contractor and subcontractors expect the A/E to be
fair in interpreting the contract and quick in processing payments and submissions.

Example: The contractor expects timely approval of payment requests to maintain the
work schedule. Similarly, subcontractors look for prompt payment approvals as their
compensation relies on the contractor getting paid.
Roles and Responsibilities of the Contractor
1. Error Reporting: The contractor should inform the Architect/Engineer (A/E) about any
discrepancies in the contract papers.

Example: If a blueprint has a missing dimension, the contractor alerts the A/E.
2. Product Substitution: Must adhere to protocols for changing materials.

Example: If a specified tile is out of stock, the contractor proposes an alternative.
3. Supervision: Ensures skilled management of the building activities.

Example: The contractor oversees the masonry work to ensure it's up to code.
4. Logistics: Manages the arrival of materials and schedules subcontractors.

Example: Coordinates the timing of steel delivery with the steelworkers' schedule.
5. Financial Assurance: Furnishes necessary bonds and insurance.

Example: Provides a payment bond to guarantee subcontractors will be paid.
6. Safety: Implements and enforces safety measures.

Example: Sets up safety barriers around the construction site.
7. Quality Control: Ensures quality through established procedures.

Example: Does regular inspections to ensure the electrical work is up to standard.
8. Payment: Pays subcontractors and suppliers promptly.

Example: Makes sure electricians are paid soon after their work is complete.
9. Submittals: Provides required project documents to A/E for review.

Example: Sends over the shop drawings of custom cabinetry for approval.
10. Documentation: Supplies the owner with all final project data.

Example: Hands over the operation manuals for the installed HVAC system.
Participants’ Expectations:

The A/E and owner expect the contractor to be competent, financially stable, and reasonable in
pricing.

Subcontractors anticipate proper scheduling, quality control, and timely payments.
Sub-Contractors and Suppliers

Task Assistance: Sub-contractors and suppliers are employed by contractors to help complete the
job.


Contract Bound: They are subject to the same contract terms as the contractor.


Example: If the main contractor is obligated to finish the work in 6 months, the subcontractors also have to abide by this timeline.
Labor and Materials: Sub-contractors usually bring in labor, while suppliers provide materials
for installation.


Example: A sub-contractor may be hired to do specialized electrical work.
Example: Suppliers may provide concrete while subcontractors provide the workers to
pour it.
Additional Services: Suppliers might also offer training, inspections, corrections lists, and
warranty approvals.

Example: A window supplier might inspect the installed windows and offer a warranty
upon approval.
Consultants

Expert Assistance: Consultants offer specialized expertise and may be involved at various
stages, employed by either the A/E, the owner, or the contractor.


Example: A fire protection engineer might be consulted to ensure the building meets
safety standards.
Specializations: Can range from mechanical and electrical engineers to interior designers and
project schedulers.

Example: An interior designer may be consulted for space planning and aesthetics.
Product Representatives

Product Advocacy: These companies promote and sell construction products.


Project Criteria Awareness: Must be aware of specific project requirements, from functionality
to deadlines.


Example: A tile company may pitch their product range to architects and contractors.
Example: If a project needs eco-friendly materials, the representative should be aware
and suggest suitable products.
Consultation and Training: They offer advice on product choices and may offer training,
samples, and inspections.

Example: A roofing material representative might train installers on the correct method of
installation.
Understanding the roles and responsibilities of each party can streamline the construction process and
contribute to a more successful project outcome.
Download