2023 SEAL OF GOOD LOCAL GOVERNANCE FOR BARANGAY Year Under Review: CY 2022 Data Capture Form SGLGB Form No. 2 Core Governance Area No. 1: Financial Administration and Sustainability 1.1 Compliance with the Barangay Full Disclosure Policy (BFDP) MINIMUM REQUIREMENT MEANS OF VERIFICATION 1.1.1 Posted the following CY 2022 financial documents in the BFDP board, pursuant to DILG MC No. 2014-81 and DILG MC No. 2022-027: YES NO Instruction: Put a check ✓ on the box that corresponds to your assessment. BFDP Monitoring Form A of the DILG Advisory dated March 25, 2022 Photo Documentation of the BFDP board displaying the following documents: ANNUAL REPORT ANNUAL REPORT a. Barangay Financial Report a. Barangay Financial Report; b. Barangay Budget; b. Barangay Budget; c. Summary of Income and Expenditures; c. Summary of Income and Expenditures; d. 20% Component of the IRA Utilization; d. 20% Component of the IRA Utilization; e. Annual Procurement Plan or Procurement List; e. Annual Procurement Plan or Procurement List; QUARTERLY REPORT QUARTERLY REPORT f. List of Notices of Award (4th Quarter of CY 2022); f. List of Notices of Award (4th Quarter of CY 2022); and and MONTHLY REPORT MONTHLY REPORT g. Itemized Monthly Collections and Disbursements (Oct-Dec, CY 2022). g. Itemized Monthly Collections and Disbursements (Oct-Dec, CY 2022). October 2022 November 2022 December 2022 1.1.2 Accomplished prescribed BFR form with the "stamp receipt" of the Office of the C/M Accountant. YES NO Instruction: Put a check ✓ on the box that corresponds to your assessment. PROCESSING OF RESULTS YES NO Barangay Financial Report on Statement of Receipt and Expenditure (Annex 7) REMARKS Met all the minimum requirements on Compliance with the Barangay Full Disclosure Policy (BFDP)? 1 1.2. Innovations on revenue generation or exercise of corporate powers MINIMUM REQUIREMENT MEANS OF VERIFICATION 1.2.1 Increase in local resources in 2022. YES NO Instruction: Put a check ✓ on the box that corresponds to your assessment. Barangay Budget Preparation Form 2 of 2021 and 2022 Total amount obtained from local resources in: CY 2021: CY 2022: Percentage Increase: REMARKS PROCESSING OF RESULTS YES NO Met the minimum requirement on innovations on revenue generation or exercise of corporate powers? 1.3. Approval of the Barangay Budget on the Specified Timeframe MINIMUM REQUIREMENT MEANS OF VERIFICATION 1.3.1 Presence of a Barangay Appropriation Ordinance approved on or before December 31, 2021. YES NO Instruction: Put a check ✓ on the box that corresponds to your assessment. Approved Barangay Appropriation Ordinance Date of Approval: Consideration: Approval until March 31, 2022 YES NO Instruction: Put a check ✓ on the box that corresponds to your assessment. PROCESSING OF RESULTS YES NO REMARKS Met the minimum requirement on Approval of the Barangay Budget on the Specified Timeframe? 1.4. Allocation for Statutory Programs and Projects as Mandated by Laws and/or Other Issuances MINIMUM REQUIREMENT MEANS OF VERIFICATION 1.4.1 With allocated funds for the following statutory programs and projects: YES NO Approved Barangay Appropriation Ordinance Instruction: Put a check ✓ on the box that corresponds to your assessment. a. Senior Citizens (per R.A. 9994 and DBM Local Budget Memorandum No. 82); b. Persons with Disability (per R.A. 7277 and DBM Local Budget Memorandum No. 82); c. At least 20% of the IRA is allocated for development programs (DILG-DBM JMC No. 2017-01); d. At least 1% of the IRA/NTA for the Barangay Council for the Protection of Children (BCPC) per RA 9344; 2 e. At least 5% from total budget allocated for GAD plans and programs per RA 9710. PROCESSING OF RESULTS YES NO REMARKS Met the minimum requirement on Allocation for Statutory Programs and Projects as Mandated by Laws and/or Other Issuances? 1.5. Posting of the Barangay Citizens’ Charter (CitCha) MINIMUM REQUIREMENT MEANS OF VERIFICATION 1.5.1 Barangay Citizens’ Charter posted at a conspicuous place. (e.g., barangay hall, market, transport terminal or multi-purpose hall) YES NO YES NO Photo documentation of the Barangay CitCha (name of the barangay should be visible) Instruction: Put a check ✓ on the box that corresponds to your assessment. PROCESSING OF RESULTS REMARKS Met the minimum requirement on the posting of Barangay CitCha 1.6. Release of the Sangguniang Kabataan (SK) Funds by the Barangay MINIMUM REQUIREMENT MEANS OF VERIFICATION 1.6.1 Compliance with Section 20 of the SK Reform Act of 2015 and Item 3.2 of DBM-DILG-NYC JMC No. 1, s. 2019 dated January 23, 2019: YES NO Instruction: Put a check ✓ on the box that corresponds to your assessment. 1.6.1.1. If the barangay is with Barangay-SK Agreement for the annual or semestral or quarterly release/deposit: MOVs for 1.6.1.1: a) Copy of the written agreement; and b) Proof of deposit reflecting the Account No./ Name of Barangay SK (1 deposit slip for annual, 2 deposit slips for semestral, 4 deposit slips for quarterly MOV for 1.6.1.2: 1.6.1.2. If the barangay is without an agreement with the SK, but with current account: a) 12 monthly deposit slips reflecting the Account No. / Name of Barangay SK MOV for 1.6.1.3: 1.6.1.3. If the barangay is without SK Officials or with SK Officials but no quorum and/or No SK Bank Account: a) Proof of transfer of the 10% SK fund to the trust fund of the barangay such as deposit slip or Official Receipt or corresponding legal form/document issued by the city/municipal treasurer if the barangay opted that the corresponding SK fund be kept as trust fund in the custody of the C/M treasurer. 3 MOV for 1.6.2: Presence of Approved Annual Barangay Youth Investment 1.6.2 Program (ABYIP) for CY 2022 (Applicable only for Barangays with 5 and above SK officials) YES Certification from the C/MLGOO on current number of SK officials Please supply information Total Number of SK Officials: NO If with 5 and above SK officials: Instruction: Put a check ✓ on the box that corresponds to your assessment. Approved Annual Barangay Youth Investment Program (ABYIP) for 2022 REMARKS PROCESSING OF RESULTS YES NO Met all minimum requirements on Release of the Sangguniang Kabataan (SK) Funds by the Barangay? 1.7. Conduct of Barangay Assembly for CY 2022 (2nd Semester) MINIMUM REQUIREMENT MEANS OF VERIFICATION 1.7.1 Conducted the 2nd semester Barangay Assembly for CY 2022 ( via any modality, i.e., online, face-to-face, hybrid). YES NO Post Activity Report on the conduct of the 2nd semester barangay assembly duly signed/approved by the Punong Barangay (Annex D of DILG MC No. 2022-131) Instruction: Put a check ✓ on the box that corresponds to your assessment. PROCESSING OF RESULTS YES NO REMARKS Met the minimum requirement on Conduct of Barangay Assembly for CY 2022 (2nd Semester)? Core Governance Area No. 2: Disaster Preparedness 2.1. Functionality of the Barangay Disaster Risk Reduction and Management Committee (BDRRMC) MINIMUM REQUIREMENT MEANS OF VERIFICATION Established BDRRMC with its composition compliant to the 2.1.1 Provisions of NDRRMC, DILG, DBM, and CSC JMC No. 2014-01 YES Executive Order or similar issuance creating the BDRRMC compliant to composition requirements covering CY 2022. NO Instruction: Put a check ✓ on the box that corresponds to your assessment. Approved Barangay Disaster Risk Reduction and Management 2.1.2 (BDRRM) Plan covering CY 2022 Date of EO or similar issuance: Approved BDRRM Plan CY 2022 Coverage Year: YES NO Instruction: Put a check ✓ on the box that corresponds to your assessment. 4 Allocation of 5% of the Estimated Revenue from Regular 2.1.3 Sources as BDRRM Fund YES NO Instruction: Put a check ✓ on the box that corresponds to your assessment. Enacted Appropriation Ordinance To compute % allocation for BDRRMF: (BDRRMF Allocated / Estimated Total Revenue from Regular Sources) x 100 Please supply the following information: Estimated revenue from regular sources: Amount of BDRRMF for FY 2022: Percent-allocation for BDRRMF: 2.1.4 Physical/Financial Accomplishment: To compute Physical Accomplishment Rate: YES NO Instruction: Put a check ✓ on the box that corresponds to your assessment. a. At least 50% accomplishment of the physical targets in the BDRRM Plan (Total number of activities/projects accomplished / Total number of activities/projects reflected in the BDRRM plan) x 100 Please supply the following information: % of programs, project, and activities are completed Accomplishment Report OR b. At least 50% fund utilization of the 70% To compute % utilization: component of CY 2022 BDRRMF (Total Amount Utilized)/(Total Amount Allocated) x 100 Preparedness component as of December 31, 2022. Please supply the following information: Amount utilized (as of Dec. 31, 2022): Amount allocated for LDRRMF CY 2022 (Preparedness component): Percent-utilization for BDRRMF: Annual Report on the utilization of the LDRRMF PROCESSING OF RESULTS YES NO REMARKS Met all minimum requirements on the Functionality of the Barangay Disaster Risk Reduction and Management Committee (BDRRMC)? 2.2. Extent of Risk Assessment and Early Warning System (EWS) MINIMUM REQUIREMENT MEANS OF VERIFICATION 2.2.1 Conducted an activity in relation to Risk Assessment in the barangay not earlier than 2019 YES NO Instruction: Put a check ✓ on the box that corresponds to your assessment. Post-Activity Report of activities such as Climate and Disaster Risk Assessment, Participatory Disaster Risk Assessment, BDRRM Planning, etc. Please supply the following information: Activity Title: Date of Activity: 5 Photo documentation of the certified Barangay Risk/Hazard Map 2.2.2 A certified Barangay Risk/Hazard Map YES NO Instruction: Put a check ✓ on the box that corresponds to your assessment. Photo documentation of EWS for the top two (2) hazards in the barangay An established Early Warning System for at least the top two 2.2.3 (2) hazards present in the barangay YES NO Instruction: Put a check ✓ on the box that corresponds to your assessment. TOP 1 Hazard: TOP 2 Hazard: PROCESSING OF RESULTS YES NO REMARKS Met all minimum requirements on the Extent of Risk Assessment and Early Warning System (EWS)? 2.3. Extent of Preparedness For Effective Response And Recovery MINIMUM REQUIREMENT MEANS OF VERIFICATION Photo documentation of the permanent/alternate evacuation center A barangay must have a permanent or alternate evacuation 2.3.1 center YES NO Instruction: Put a check ✓ on the box that corresponds to your assessment. Permanent evacuation center OR Alternate evacuation center Please supply the following information: Location: Location: A barangay must have the following disaster 2.3.2 supplies/equipment: YES NO Photo Documentation of disaster supplies equipment Instruction: Put a check ✓ on the box that corresponds to your assessment. a. Communication equipment (i.e., 2 way radio,mobile phone) b. Rescue vehicle/Barangay patrol c. Generator set/alternative sources of energy d. First aid kit e. Flashlight with batteries f. Personal Protective Equipment (PPE) PROCESSING OF RESULTS YES NO REMARKS Met all minimum requirements on the Extent of Preparedness For Effective Response And Recovery? Core Governance Area No. 3: Safety, Peace and Order 6 3.1. Functionality of the Barangay Anti-Drug Abuse Council (BADAC) MINIMUM REQUIREMENT MEANS OF VERIFICATION Organized BADAC with its composition and appropriate 3.1.1 committees (Committees on Operations and on Advocacy) compliant to DILG-DDB JMC No. 2018-01 YES NO Instruction: Put a check ✓ on the box that corresponds to your assessment. Established Rehabilitation Referral Desk with Designated Duty 3.1.2 Officer YES NO 3.1.4 NO NO NO Transmittal of CIR (stamp received) to CADAC/MADAC and Local PNP Unit Instruction: Put a check ✓ on the box that corresponds to your assessment. 3.1.6 Physical/Financial Accomplishment: YES Approved BADAC Plan of Action Instruction: Put a check ✓ on the box that corresponds to your assessment. Submission of Consolidated Information Report (CIR) to CADAC/MADAC and Local PNP Unit. YES Approved Barangay Appropriation Ordinance Instruction: Put a check ✓ on the box that corresponds to your assessment. Approved BADAC Plan of Action covering 2022 as year under review YES 3.1.5 NO EO or similar issuance establishing the Rehabilitation Referral Desk Instruction: Put a check ✓ on the box that corresponds to your assessment. 3.1.3 Allocation of substantial amount for anti-illegal drugs initiative YES Executive Order or similar issuance creating the BADAC with its composition and appropriate committees (Committees on Operations and on Advocacy) Instruction: Put a check ✓ on the box that corresponds to your assessment. a. At least 50% accomplishment of the physical targets in the BADAC Plan of Action Annual BADAC Accomplishment and Fund Utilization Report submitted not later than the 20th day of January (stamp received) to the CADAC/MADAC To compute Physical Accomplishment Rate: (Total number of activities/projects accomplished / Total number of activities/projects reflected in the BADAC Plan of Action) x 100 Please supply the following information: % of programs, project, and activities are completed OR To compute % utilization: (Total Amount Utilized)/(Total Amount Allocated) x 100 b. At least 50% fund utilization rate of the PAPs in the BADAC Plan of Action Please supply the following information: Amount utilized (as of Dec. 31, 2022): Amount allocated for BADAC PAPs: Percent-utilization: 7 PROCESSING OF RESULTS YES NO REMARKS Met all minimum requirements on the Functionality of the Barangay Anti-Drug Abuse Council (BADAC)? 3.2. Functionality of the Barangay Peace and Order Committee (BPOC) MINIMUM REQUIREMENT MEANS OF VERIFICATION Organized BPOC through an Executive Order or Sangguniang Barangay Resolution, with its composition compliant to the 3.2.1 provisions of EO 366 s. of 1996 YES NO Instruction: Put a check ✓ on the box that corresponds to your assessment. Approved Barangay Peace and Order and Public Safety (BPOPS) Plan in accordance to DILG MC 2017-142 covering 2022 as year 3.2.2 under review YES NO Executive Order or similar issuance indicating correct membership in accordance to the EO 366 s. of 1996 Approved BPOPS Plan Instruction: Put a check ✓ on the box that corresponds to your assessment. 3.2.3 Physical/Financial Accomplishment: YES NO Instruction: Put a check ✓ on the box that corresponds to your assessment. a. At least 50% accomplishment of the physical targets in the BPOPS Plan Accomplishment Report (in any format) submitted to the C/M POC on the prescribed schedules (stamp received) To compute Physical Accomplishment Rate: (Total number of activities/projects accomplished / Total number of activities/projects reflected in the BPOPS Plan) x 100 Please supply the following information: % of programs, project, and activities are completed OR b. At least 50% fund utilization rate of the PAPs in the BPOPs Plan PROCESSING OF RESULTS YES NO To compute % utilization: (Total Amount Utilized)/(Total Amount Allocated) x 100 Please supply the following information: Amount utilized (as of Dec. 31, 2022): Amount allocated for Peace and Order PAPs: Percent-utilization: REMARKS Met all minimum requirements on the Functionality of the Barangay Peace and Order Committee (BPOC)? 3.3. Functionality of the Lupong Tagapamayapa (LT) MINIMUM REQUIREMENT MEANS OF VERIFICATION 3.3.1 Organized Lupong Tagapamayapa YES NO Appointment of the Lupong Tagapamayapa Instruction: Put a check ✓ on the box that corresponds to your assessment. 8 3.3.2 Systematic maintenance of records (record of cases) YES 3.3.3 Instruction: Put a check ✓ on the box that corresponds to your assessment. For barangays of cities: Computer database with searchable information For barangays of cities: 2 photos with caption of the computer database with searchable information For barangays of municipalities: Manual Records (Case Record Book) OR Digital Record Filing (scanned copy of KP files) For barangays of municipalities: 1 photo, with caption on the manual and digital file Conducted monthly meetings for the administration of the Katarungang Pambarangay YES 3.3.4 NO NO Instruction: Put a check ✓ on the box that corresponds to your assessment. Attendance of LT to KP training or seminar not earlier than 2019 YES NO NO Certified true copy of any proof of training such as Certificate of Completion and/or Participation (at least 1) Instruction: Put a check ✓ on the box that corresponds to your assessment. PROCESSING OF RESULTS YES Copies of minutes of meetings with attendance sheets (at least 3 minutes covering meetings conducted in 2022) REMARKS Met the minimum requirement on theFunctionality of the Lupong Tagapamayapa (LT)? 3.4. Organization and Strengthening Capacities of Barangay Tanod MINIMUM REQUIREMENT MEANS OF VERIFICATION 3.4.1 Organized Barangay Tanod YES NO Instruction: Put a check ✓ on the box that corresponds to your assessment. Attendance of barangay tanod to necessary training not earlier 3.4.2 than 2019 YES NO Certified true copy of any proof of training such as Certificate of Completion and/or Participation (at least 1) Instruction: Put a check ✓ on the box that corresponds to your assessment. PROCESSING OF RESULTS YES EO or similar issuance on the organization of the Barangay Tanod covering 2022 REMARKS NO Met all minimum requirements on the Organization and Strengthening Capacities of Barangay Tanod? 9 3.5. Barangay Initiatives During Health Emergencies MINIMUM REQUIREMENT MEANS OF VERIFICATION Organized Barangay Health and Emergency Response Team 3.5.1 (BHERT) with its composition compliant to the provisions of DILG MC No. 2020-023 YES NO Instruction: Put a check ✓ on the box that corresponds to your assessment. Poster or tarpaulin containing the active telephone and/or cellphone Numbers of the Barangay, Punong Barangay and 3.5.2 BHERT Members posted in conspicuous public places within the barangay jurisdiction YES NO YES NO EO or similar issuance on the organization of BHERTs Photo documentation of poster and/or tarpaulin Instruction: Put a check ✓ on the box that corresponds to your assessment. PROCESSING OF RESULTS REMARKS Met all minimum requirements on the Barangay Initiatives During Health Emergencies? 3.6. Conduct of Monthly Barangay Road Clearing Operations (BaRCO) MINIMUM REQUIREMENT MEANS OF VERIFICATION Monthly BarCo Reports for October-December 2022 3.6.1 Conducted BaRCO on a monthly basis in 2022 YES NO YES NO Instruction: Put a check ✓ on the box that corresponds to your assessment. PROCESSING OF RESULTS REMARKS Met all minimum requirements on the Conduct of Monthly Barangay Road Clearing Operations (BaRCO)? Essential Governance Area No. 1: Social Protection and Sensitivity 4.1. Functionality of Barangay Violence Against Women (VAW) Desk MINIMUM REQUIREMENT MEANS OF VERIFICATION Established Barangay VAW Desk and designated Barangay VAW 4.1.1 Desk Officer YES NO Executive Order or similar issuance on the establishment of Barangay VAW Desk and designated VAW Desk Officer Instruction: Put a check ✓ on the box that corresponds to your assessment. 10 Attendance of the Barangay VAW Desk Officer to at least one (1) training/orientation related to gender-sensitive handling of 4.1.2 VAW Cases not earlier than 2019 YES NO Instruction: Put a check ✓ on the box that corresponds to your assessment. Approved 2022 Barangay Gender and Development (GAD) Plan 4.1.3 and Budget YES NO NO NO Monthly Accomplishment Reports for CY 2022 (October-December 2022) Instruction: Put a check ✓ on the box that corresponds to your assessment. Updated database on VAW cases reported to the barangay, 4.1.5 with the following information at the minimum: YES Approved 2022 Barangay Gender and Development (GAD) Plan and Budget Instruction: Put a check ✓ on the box that corresponds to your assessment. Submission of Monthly Accomplishment Reports on the incidence of VAW and violence against children (VAC) to 4.1.4 C/MSWDO and C/MLGOO within 10 working days of the ensuing month (stamp received), pursuant to the Advisory dated March 3, 2021 YES Certified true copy of any proof of training such as Certificate of Completion and/or Participation (at least 1) Updated database on VAW cases reported to the barangay Instruction: Put a check ✓ on the box that corresponds to your assessment. Total number of VAW cases received Total number of cases documented for violating RA 9262 Total number of cases documented for violating other VAW-related laws Assistance provided to victim-survivors 4.1.6 Physical/Financial Accomplishment: YES NO Instruction: Put a check ✓ on the box that corresponds to your assessment. a. At least 50% accomplishment of the physical targets in the GAD Plan OR b. At least 50% fund utilization rate of the CY 2022 GAD Budget CY 2022 GAD Accomplishment Report To compute Physical Accomplishment Rate: (Total number of activities/projects accomplished / Total number of activities/projects reflected in the GAD Plan) x 100 Please supply the following information: % of programs, project, and activities are completed To compute % utilization: (Total Amount Utilized)/(Total Amount Allocated) x 100 Please supply the following information: Amount utilized (as of Dec. 31, 2022): Amount allocated for GAD PAPs: Percent-utilization: 11 PROCESSING OF RESULTS YES NO REMARKS Met all minimum requirements on the Functionality of Barangay Violence Against Women (VAW) Desk? 4.2. Access to Health and Social Welfare Services in the Barangay MINIMUM REQUIREMENT MEANS OF VERIFICATION 4.2.1 Presence of a Barangay Health Station/Center YES NO Instruction: Put a check ✓ on the box that corresponds to your assessment. 4.2.2 Appointment of Barangay Health Worker (BHW) YES NO 4.2.4 NO NO EO or similar issuance on the appointment of BNS Instruction: Put a check ✓ on the box that corresponds to your assessment. Availability of health services in the Barangay Health Station/Center (BHS/C): YES EO or similar issuance on the appointment of BHW Instruction: Put a check ✓ on the box that corresponds to your assessment. 4.2.3 Appointment of Barangay Nutrition Scholar (BNS) YES Photo documentation of the BHS/C Instruction: Put a check ✓ on the box that corresponds to your assessment. Photo documentations of the operations of the BHS/C Barangay Issuances on the provision of health services a. Immunization b. Maternal and child healthcare c. Family Planning d. Health Education PROCESSING OF RESULTS YES NO REMARKS Met all minimum requirements on the Access to Health and Social Welfare Services in the Barangay? 4.3. Functionality of the Barangay Development Council (BDC) MINIMUM REQUIREMENT MEANS OF VERIFICATION Organized BDC with its composition compliant to Section 107 of 4.3.1 RA 7160 YES NO EO or similar issuance organizing the BDC with its composition compliant to Section 107 of RA 7160 Instruction: Put a check ✓ on the box that corresponds to your assessment. 12 Conducted public hearings/ barangay assemblies for public 4.3.2 consultation YES NO Instruction: Put a check ✓ on the box that corresponds to your assessment. Barangay Development Plan with BDC and SB Resolutions adopting such 4.3.3 Approved Barangay Development Plan YES NO Instruction: Put a check ✓ on the box that corresponds to your assessment. 4.3.4 Physical/Financial Accomplishment: YES NO Minutes (at least 2) of the public hearings/barangay assemblies with attendance sheet CY 2022 Accomplishment Report of the BDP Instruction: Put a check ✓ on the box that corresponds to your assessment. a. At least 50% accomplishment of the physical targets in the BDP To compute Physical Accomplishment Rate: (Total number of activities/projects accomplished / Total number of activities/projects reflected in the BDP) x 100 Please supply the following information: % of programs, project, and activities are completed OR b. At least 50% fund utilization rate of the CY 2022 BDP Budget To compute % utilization: (Total Amount Utilized)/(Total Amount Allocated) x 100 Please supply the following information: Amount utilized (as of Dec. 31, 2022): Amount allocated for PAPs in the BDP: Percent-utilization: PROCESSING OF RESULTS YES NO REMARKS Met all minimum requirements on the Functionality of the Barangay Development Council (BDC)? 4.4. Implementation of the Kasambahay Law MINIMUM REQUIREMENT MEANS OF VERIFICATION 4.4.1 Kasambahay desk with a designated Kasambahay Desk Officer (KDO) YES NO Instruction: Put a check ✓ on the box that corresponds to your assessment. 4.4.2 Maintenance/updating of Kasambahay Masterlist YES NO YES NO EO or similar issuance designating a Kasambahay Desk and a KDO Updated Kasambahay Report Form 2 (Kasambahay Masterlist) as of December 2022 Instruction: Put a check ✓ on the box that corresponds to your assessment. PROCESSING OF RESULTS REMARKS Met all minimum requirements on the Implementation of the Kasambahay Law? 13 4.5. Functionality of the Barangay Council for the Protection of Children (BCPC) MINIMUM REQUIREMENT MEANS OF VERIFICATION Organization of the Barangay Council for Protection of Children 4.5.1 (BCPC) with its composition compliant to the provisions of DILG MC No. 2021-039 YES NO Instruction: Put a check ✓ on the box that corresponds to your assessment. Attendance of the Members of the Barangay Council for Protection of Children (BCPC) to at least one (1) 4.5.2 training/orientation related to their functions not earlier than 2019 YES NO NO 4.5.5 NO NO NO Updated Localized Flow Chart of Referral System Instruction: Put a check ✓ on the box that corresponds to your assessment. 4.5.6 Physical/Financial Accomplishment: YES Updated database on children Instruction: Put a check ✓ on the box that corresponds to your assessment. Updated Localized Flow Chart of Referral System not earlier than 2019 YES Approved BCPC Annual Work and Financial Plan (AWFP) Instruction: Put a check ✓ on the box that corresponds to your assessment. Database on Children disaggregated by age, sex, ethnicity, with 4.5.4 or with disabilities, OSCY, etc. updated as of December 31, 2022 YES Certified true copy of any proof of training such as Certificate of Completion and/or Participation (at least 1) Instruction: Put a check ✓ on the box that corresponds to your assessment. 4.5.3 Approved BCPC Annual Work and Financial Plan YES Executive Order or similar issuance on the establishment Barangay Council for Protection of Children (BCPC) Instruction: Put a check ✓ on the box that corresponds to your assessment. a. At least 50% completion rate on PPAs in the BCPC Plan OR b. At least 50% utilization rate of CY 2022 BCPC AWFP Budget CY 2022 Approved Accomplishment Report on BCPC Plan To compute Physical Accomplishment Rate: (Total number of activities/projects accomplished / Total number of activities/projects reflected in the BCPC Plan) x 100 Please supply the following information: % of programs, project, and activities are completed To compute % utilization: (Total Amount Utilized)/(Total Amount Allocated) x 100 Please supply the following information: Amount utilized (as of Dec. 31, 2022): Amount allocated for PAPs in the BCPC Plan: Percent-utilization: 14 PROCESSING OF RESULTS YES NO REMARKS Met all minimum requirements on the Functionality of the Barangay Council for the Protection of Children (BCPC)? 4.6. Mechanism for Gender and Development (GAD) MINIMUM REQUIREMENT MEANS OF VERIFICATION 4.6.1 Organized Barangay GAD Focal Point System YES NO EO or similar issuance organizing the Barangay GAD Focal Point System Instruction: Put a check ✓ on the box that corresponds to your assessment. PROCESSING OF RESULTS YES NO REMARKS Met the minimum requirement on the Mechanism for Gender and Development (GAD)? 4.7. Maintenance of Updated Record of Barangay Inhabitants (RBIs) MINIMUM REQUIREMENT MEANS OF VERIFICATION 4.7.1 Updated RBI for two semesters of CY 2022 YES NO Accomplished RBI Form A of two semesters of CY 2022 Instruction: Put a check ✓ on the box that corresponds to your assessment. PROCESSING OF RESULTS YES NO REMARKS Met the minimum requirement on the Maintenance of Updated Record of Barangay Inhabitants (RBIs)? Essential Governance Area No. 2: Business Friendliness and Competitiveness 5.1. Power to Levy Other Taxes, Fees, or Charges MINIMUM REQUIREMENT MEANS OF VERIFICATION Enacted Barangay Tax Ordinance pursuant to Sec. 129 of the 5.1.1 LGC YES NO Instruction: Put a check ✓ on the box that corresponds to your assessment. PROCESSING OF RESULTS YES NO Enacted Barangay Tax Ordinance REMARKS Met the minimum requirement on the Power to Levy Other Taxes, Fees, or Charges? 15 5.2. Compliance to Section 11 of RA 11032 of the Ease of Doing Business Law MINIMUM REQUIREMENT MEANS OF VERIFICATION Enacted Barangay Ordinance relative to Barangay Clearance 5.2.1 fees on business permit and locational clearance for building permit pursuant to DILG MC No. 2019-177 YES NO Instruction: Put a check ✓ on the box that corresponds to your assessment. Approved resolution authorizing the City/Municipal Treasurer to collect fees for Barangay Clearance for Business permit and 5.2.2 locational clearance purposes pursuant to DILG MC No. 2019177. YES NO Enacted Barangay Ordinance relative to Barangay Clearance Fees on business permit and locational clearance for building permit, in accordance with MC No. 2019-177. Approved resolution authorizing the City/Municipal Treasurer to collect fees for Barangay Clearance for Business permit and locational clearance purposes. Instruction: Put a check ✓ on the box that corresponds to your assessment. PROCESSING OF RESULTS YES NO REMARKS Met all minimum requirements on the Compliance to Section 11 of RA 11032 of the Ease of Doing Business Law? 5.3. Issuance of Barangay Clearance not covered by DILG MC No. 2019-177 such as: residency, indigency, etc, within seven (7) working days MINIMUM REQUIREMENT MEANS OF VERIFICATION Presence of a Citizens’ Charter on the issuance of barangay 5.3.1 clearance posted in the barangay hall YES NO Photo documentation of the Citizens’ Charter on the issuance of barangay clearance only (name of the barangay should be visible) Instruction: Put a check ✓ on the box that corresponds to your assessment. PROCESSING OF RESULTS YES NO REMARKS Met the minimum requirement on the Issuance of Barangay Clearance not covered by DILG MC No. 2019-177 such as: residency, indigency, etc, within seven (7) working days? Essential Governance Area No. 3: Environmental Management 6.1. Functionality of the Barangay Ecological Solid Waste Management Committee (BESWMC) MINIMUM REQUIREMENT MEANS OF VERIFICATION 6.1.1 Organized BESWMC with composition compliant to DILG MC No. 2018-112 YES NO EO or similar issuance on the organization of the BESWMC Instruction: Put a check ✓ on the box that corresponds to your assessment. 16 6.1.2 Approved Solid Waste Management Program/Plan with corresponding fund allocation YES NO Instruction: Put a check ✓ on the box that corresponds to your assessment. Attendance of BESWMC to necessary training relative to 6.1.3 promoting environmental protection, preservation and awareness not earlier than 2019 YES NO NO Certified true copy of any proof of training such as Certificate of Completion and/or Participation (at least 1) Instruction: Put a check ✓ on the box that corresponds to your assessment. 6.1.4 Physical/Financial Accomplishment: YES Approved Solid Waste Management Program/Plan with corresponding fund allocation Instruction: Put a check ✓ on the box that corresponds to your assessment. a. At least 50% completion rate on PPAs in the BESWMP OR b. At least 50% utilization rate of CY 2022 BESWM Budget Monthly Accomplishment Reports for 2022 To compute Physical Accomplishment Rate: (Total number of activities/projects accomplished / Total number of activities/projects reflected in the BESWMP) x 100 Please supply the following information: % of programs, project, and activities are completed To compute % utilization: (Total Amount Utilized)/(Total Amount Allocated) x 100 Please supply the following information: Amount utilized (as of Dec. 31, 2022): Amount allocated for PAPs in the BESWM Plan: Percent-utilization: PROCESSING OF RESULTS YES NO REMARKS Met all minimum requirements on the Functionality of the Barangay Ecological Solid Waste Management Committee (BESWMC)? 6.2. Existence of a Solid Waste Management Facility Pursuant to R.A. 9003 MINIMUM REQUIREMENT MEANS OF VERIFICATION 6.2.1 Presence of a Materials Recovery Facility (MRF)/ Materials Recovery System (MRS) YES NO Instruction: Put a check ✓ on the box that corresponds to your assessment. Established MRF operated by the barangay For MRF operated by the barangay: Photo documentation of the MRF/MRF Records of the barangay MRS For MRS: MOA with junkshop; Mechanism to process biodegradable wastes; MOA with service provider for collection/treatment of special, hazardous, and infectious waste 17 Clustered MRF For Clustered MRFs: MOA with the host barangay (applicable for barangay-clustered MRFs); MOA or LGU document indicating coverage of city/municipal MRF (applicable for barangays clustered to the Central MRF of City/Municipality) PROCESSING OF RESULTS YES NO REMARKS Met the minimum requirement on the Existence of a Solid Waste Management Facility Pursuant to R.A. 9003? 6.3. Provision of Support Mechanisms for Segregated Collection MINIMUM REQUIREMENT MEANS OF VERIFICATION 6.3.1 Ordinance or similar issuance on segregation of wastes at-source Enacted Barangay Ordinance or similar issuance on segregation of wastes at-source YES NO YES NO Instruction: Put a check ✓ on the box that corresponds to your assessment. PROCESSING OF RESULTS REMARKS Met the minimum requirement on the Provision of Support Mechanisms for Segregated Collection? We hereby certify that all information contained in this assessment report are true and correct, and are correspondingly supported by MOVs as reviewed by the undersigned. City/Municipal Performance Assessment Team Team Leader Name and Signature of the Team Leader Position/Designation of the Team Leader Assistant Team Leader Name and Signature of the Assistant Team Leader Position/Designation of the Team Leader Team Members Note: Based on the EO re Creation of the CC/M PAT, please list down all the members using the following format: Name and Signature of the Team Member Position/Designation of the Team Member 18