1.1.1 Steam piping network data: Joint sizes: Record the sizes of the steam piping joints, 2-inch and 3-inch joints. Schedule: The schedule of the steam piping joints is 160, which represents the pipe thickness. According to API 574, Fourth Edition, Nov 2016. Steam pipe 2-inch Sch 160 nominal thickness is 8.74 mm, and 3-inch Sch 16 nominal thickness is 11.13 mm which matches with the actual thickness of pipe in site. Total number of inspected joints: Determine the total count of joints that have been inspected in the steam piping network. No of 2-inch joints =559 joints & No of 3-inch joints =546 joints. The total number found was 1105 joints. 1.1.2 Inspection time & cost data: Inspection time per joint: Collect the data on the time taken to inspect each joint using the PAUT technique. Table 1 PAUT Inspection Times Joint Size Inspection Time (PAUT) 2 inches /Sch 160 6 minutes 3 inches /Sch 160 5 minutes Inspection time per joint: Record the inspection time required for each joint when using the RT technique. Table 2 Radiography Inspection Times Joint Size Inspection Time (Radiography) 2 inches /Sch 160 30 minutes 3 inches /Sch 160 25 minutes Inspection cost per joint: Gather data on the cost incurred for inspecting each joint using RT Inspection 25 USD/Joint and PAUT inspection:11 USD/Joint. By collecting and analyzing this data, the research project will be able to compare the inspection time and cost between PAUT and RT techniques in the steam piping network. This data will provide valuable insights into the efficiency and cost-effectiveness of each method, supporting the evaluation of PAUT as a potential replacement for RT. 1.2 Inspection Time Comparison 1.2.1 Time Calculation Total time for 2-inch PAUT inspection: 6 minutes/joint * 559 joints = 3,354 minutes Total time for 3-inch PAUT inspection: 5 minutes/joint * 546 joints = 2,730 minutes Total time for 2-inch radiography inspection: 30 minutes/joint * 559 joints = 16,770 minutes Total time for 3-inch radiography inspection: 25 minutes/joint * 546 joints = 13,650 minutes Table 3 Inspection Time Comparison Joint Size Inspection Time (PAUT) Inspection Time (Radiography) 2 inches 3,354 minutes 16,770 minutes 3 inches 2,730 minutes 13,650 minutes Total 6,084 minutes 30,420 minutes 1.2.2 Time Savings Calculation: Total time savings with PAUT: 30,420 minutes (radiography) - 6,084 minutes (PAUT) = 24,336 minutes Time Savings Percentage: Time savings percentage = (24,336 minutes / 30,420 minutes) * 100 = 79.94% Based on the provided data, PAUT offers significant time savings compared to radiography for both 2-inch and 3-inch joints. The total time savings with PAUT in this scenario is approximately 24,336 minutes, resulting in a time savings percentage of nearly 79.94%. PAUT vs RT inspection time comparison 35000 30420 Time/minutes 30000 25000 20000 16770 13650 15000 10000 6084 5000 3354 2730 0 2-inches Inspection time/minutes (PAUT) 3-inches Total Inspection time/minutes (Radiography) Figure 1 Inspection time comparison using bar chart showed time optimization after PAUT adoption. 1.3 Inspection Cost Comparison: To calculate the cost reduction percentage, we can compare the total costs of PAUT and RT inspections for each month. Figure 2 Inspection cost comparison on the 1st &2nd quarter of 2023. Using the calculated total costs from excel sheet calculations stated in figure: -January: PAUT total cost: $2,684 USD RT total cost: $6,100 USD -February: PAUT total cost: $1,397 USD RT total cost: $3,175 USD -March: PAUT total cost: $1,034 USD RT total cost: $2,350 USD -April: PAUT total cost: $1,705 USD RT total cost: $3,875 USD -May: PAUT total cost: $2,530 USD RT total cost: $5,750 USD -June: PAUT total cost: $2,805 USD RT total cost: $6,375 USD To calculate the cost reduction percentage, we can use the formula: Cost Reduction Percentage = [(RT Total Cost - PAUT Total Cost) / RT Total Cost] * 100 Calculating the cost reduction percentage for each month: January: [(6100 - 2684) / 6100] * 100 = 56.06% February: [(3175 - 1397) / 3175] * 100 = 55.99% March: [(2350 - 1034) / 2350] * 100 = 56.07% April: [(3875 - 1705) / 3875] * 100 = 55.98% May: [(5750 - 2530) / 5750] * 100 = 55.97% June: [(6375 - 2805) / 6375] * 100 = 56.05% The cost reduction percentages for each month range from approximately 55.97% to 56.07%. Cost Reduction (Phased Array) 7000 USD 6 375 USD 6 100 USD 5 750 6000 Cost/USD 5000 USD 3 875 4000 USD 3 175 USD 2 684 3000 USD 2 530 USD 2 350 2000 USD 2 805 USD 1 705 USD 1 397 USD 1 034 1000 244 127 94 1 2 3 155 230 255 4 5 6 0 0 Month No of inspected joints PAUT cost RT cost Figure 3 Cost reduction achieved by adoption of PAUT as alternative to RT. 7