KINGDOM OF SAUDI ARABIA
ROYAL COMMISSION FOR JUBAIL AND YANBU
ROYAL COMMISSION IN RAS AL KHAIR INDUSTRIAL CITY
CONTRACT NO. 08C-C12
CONSTRUCTION & MOBILIZATION OF TRUCKS WEIGHT STATIONS
ATTACHMENT “F”
SPECIAL SPECIFICATIONS
PART 1
SCOPE OF WORK AND
MEASUREMENT FOR PAYMENT
KINGDOM OF SAUDI ARABIA
ROYAL COMMISSION FOR JUBAIL AND YANBU
ROYAL COMMISSION IN RAS AL KHAIR INDUSTRIAL CITY
CONTRACT NO. 12C – C12
CONSTRUCTION & MOBILIZATION OF TRUCKS WEIGHT STATIONS
SCOPE OF WORK AND
MEASUREMENT FOR PAYMENT
INDEX
ITEM NO.
TITLE
PAGE NO.
SECTION 1.0
INTRODUCTION
1.01
PURPOSE
F-1-1
1.02
FACILITIES DESCRIPTION
F-1-1
1.03
CONTRACT DESCRIPTION
F-1-1
SECTION 2.0
SCOPE OF WORK
2.01
GENERAL
F-1-2
2.02
DESCRIPTION OF TERMS FOR PAY ITEMS
F-1-7
2.03
DESIGNATED PAY ITEMS
F-1-9
SECTION 3.0
MEASUREMENT FOR PAYMENT
3.01
GENERAL
F-1-42
3.02
METHOD OF MEASUREMENT
F-1-42
3.03
UNIT OF MEASUREMENT
F-1-44
F-1-i
SECTION 1.0
INTRODUCTION
1.01
PURPOSE
The purpose of Attachment F is to define the scope and quality standards for the installation
of twelve (12) High Speed Weigh In Motion (HSWIM) stations including all necessary civil,
electrical, structural, geotechnical, telecommunications and instrumentation disciplinespecific works in accordance with the Contract drawings and specifications.
1.02
FACILITIES DESCRIPTION
The HSWIM stations will be constructed to reduce the passage of overweight and unsafe
vehicles across Royal Commission’s (RC) highways. The stations will increase the transit
efficiency for the large percentage of trucks and buses (commercial vehicles) moving across
Jubail and Ras Al-Khair that are compliant with RC requirements.
1.03
CONTRACT DESCRIPTION
As part of the ongoing development of the RIC, the Royal Commission proposes to
complete a fully functioning High Speed Weigh In Motion (HSWIM) virtual weigh station
network useable by the Royal Commission to monitor and control overweight vehicles
passing within Jubail Industrial City (JIC) and Ras Al-Khair Industrial City (RIC).
F-1-1
Contract No. 08C-C12
SECTION 2.0
SCOPE OF WORK
2.01
GENERAL
The Works comprise the procurement and installation of twelve (12) High Speed Weigh In
Motion (HSWIM) stations at specified locations to reduce the passage of overweight and
unsafe vehicles across the Royal Commission (RC) highways.
The contract consists of the following Work:







Asphalt removal and concrete reinstatement
Overhead Gantry Steel Frame structure
Low Voltage Power Distribution System
Grounding and Bonding System
Lightning Protection System
Data Transmission Network using GSM technology
HSWIM Equipment for data collection and transmission
The Contractor shall be required to work in the areas currently being developed. The roads
and utility systems in these areas are operational and will remain in operation during the
period of performance of this Contract. The Contractor will ensure that no (or minimal)
disruption is caused to the normal civic activity and operation of utilities and services during
the performance of Work under this Contract.
The area outside the limit of Work affected by contract activities shall be kept clean at all
times.
The Work shall include all testing of the supplied materials at factories, testing all the
Works at the Site, systems testing and monitoring as required. All Works shall be performed
in accordance with the specifications and data sheets included in Attachment “F”.
The Contractor is entirely responsible for ordering and procuring materials using the details
and information shown on the Contract drawings, specifications and Contractors proposed
detailed working drawings.
The Contractor shall be responsible for maintenance of landscaping and all required systems
for the specified period.
The Contractor is entirely responsible for the following works and these are to be included
within the relevant rates in the Schedule of Quantities:
-
The Contractor is advised that the groundwater table is high in the Work area(s) and
shall take all necessary precautions to protect all permanent Work and adjacent work
F-1-2
Contract No. 08C-C12
areas, including plantings and landscaping, from water damage during the performance
of the Work. The Contractor shall use a combination of dewatering and shoring to
prevent water damage. Discharge water from the dewatering process must be disposed
of into the existing storm drainage system.
-
The Contractor shall monitor and control all traffic to maximize safety and minimize
disruption on roads entering or adjacent to Site activities. The Contractor shall be
responsible for flagmen, temporary diversions, barricades, and traffic signs during the
performance of the Work.
-
The Contractor shall be responsible for performing all construction surveys, including
verification of survey control points provided by the Royal Commission, to properly
layout the Work in accordance with the Contract Drawings, including Contractor’s
determination of control lines, grades, elevations, earthwork quantities and intermediate
benchmarks, etc.
At the commencement of the Work. The Contractor shall submit to the Royal
Commission for approval an overall survey plan describing the surveys to be performed.
The Contractor’s survey crew shall be supervised by an English-speaking surveyor,
whose qualifications shall be submitted to the Royal Commission for approval.
Intermediate benchmarks shall be established by Contractor at spacing exceed spacing of
no more than 500 meters, unless otherwise approved by the Royal Commission. Check
levels shall be run over the entire benchmark network and all rod readings on turning
points and benchmarks shall be to the nearest millimeter. All rod readings for ground
points shall be to the nearest centimeter.
The Contractor shall perform all surveys to support and justify quantities for payment, as
set forth in Attachment “H”, Price and Payment Provisions, inclusive of necessary
profiles, cross-sections and calculations.
-
The Contractor shall be responsible for preparing all detailed shop drawings necessary
for performing the Work, including detailing of drawings and standards provided by the
Royal Commission and by the Contractor’s subcontractors or sub-suppliers.
All calculations pertaining to the Contractor’s proposed sub-suppliers for major
equipment, as well as associated all shop drawings, shall be subject to review by the
Royal Commission.
-
The Contractor shall review all Contract Drawings issued by the Royal Commission for
interference or conflict in the location of the Work and shall promptly advise the Royal
Commission of any interference or conflict found in the drawings or subsequently
discovered during the performance of the Work. In addition, the Contractor shall
propose a solution to the Royal Commission to resolve any such issue, taking into
consideration the overall requirements of the Work set forth in the Contract.
F-1-3
Contract No. 08C-C12
-
The Contractor shall be responsible for taking all necessary measures for protecting
existing, installed utilities in the area of the Work, including survey, location,
identification of utility type, marking, and protection of utilities to prevent breach or
damage. No mechanical excavation is permitted within one (1) meter of pipelines, duct
banks, or electrical/communication cables, or other distance established by ARAMCO,
SEC, and STC, whichever is greater.
-
The Contractor shall comply with all Royal Commission and other third party security
and access requirements for the Site to ensure protection of workers and facilities,
including entrances at designated points with prescribed personnel and vehicle passes for
Contractor’s staff, its subcontractors and sub-suppliers, and visitors.
In addition, the Contractor shall plan its Work on Site so as not to interfere with or
obstruct other operating facilities near or adjacent to the Site.
-
The Contractor shall prepare and submit a mobilization or phasing plan prior to the
commencement of construction activities, for Royal Commission review, to ensure an
organized and safe environment to support scheduled construction activities
2.01
SUBMIT INITIAL DOCUMENTS AND START CONSTRUCTION
Submittal of Initial Documents and Start of Construction (as defined in SC-37) shall
consist of construction of laydown area, mobilization of portable offices, personnel,
construction of fence around Site working area, and all other incidental necessary to be
performed prior to commencement of the Work, Submit Initial Documents and Start
Construction shall also include furnishing the following submittals to the Royal
Commission:
Submittal
1. Contract schedule.
2. Execution Plan.
3. Organization chart and approval of Key Personnel resume.
4. Insurance certificates.
5. Project Quality Control Plan (See RC Specification 01450 Revision 2 —"Guideline
Specification for Project Quality Control" dated 16 July 2012) including preliminary
Schedule of Method of Statements and Inspection and Test Plan (ITPs), details of the
Contractor's proposed independent Testing Agency(ies) with sample Test Report forms
and examples of Contractor's Inspection Checklists.
6. Security program.
7. Procurement program including shipping and delivery schedule (See RC
Specification 01650.1.04.B, "Project Delivery Requirements" for required Program
contents).
8. Employment of Saudi Arabian citizens.
9. Detailed quantity take-off of Issued for Construction (IFC) drawings in a format
agreed with the Royal Commission.
10. As-built documents program.
F-1-4
Contract No. 08C-C12
11. List of plant and equipment.
12. Company Environmental, Safety and Health Program.
13. Construction phase Environmental, Safety and Health Program.
14. Technical submittal program (See RC Specification 01 45 00 Part 1.06 – “Submittal”
for required Program contents.)
15. Report for the pre-construction survey of existing conditions and site grades.
16. Plan of laydown areas.
17. Project signs “two boards”.
2.01.01
COMPLETE CONTRACT
Complete Contract shall include demobilization of all Works in preparation for and
removal of the Site, upon satisfactory completion of the Project, of all Contractor owned
materials, equipment and facilities including trimming, shaping, cleaning, clearing,
disposal of surplus materials and any other Work and labor necessary to leave the Site in
a clean and safe condition in a manner acceptable to the Royal Commission together
with furnishing the required documentation in accordance with the relevant conditions
of the Contract including the following submittals:
1. All Operations and Maintenance data including Operation and Maintenance manuals
(to be submitted in final form before the date of Initial Acceptance).
2. Spare parts lists.
3. As-built drawings and final quantities.
4. Operating consumables date.
5. Final documentation for Initial Acceptance package.
2.02
DESCRIPTION OF TERMS FOR PAY ITEMS
A.
Unit prices shall include all general requirements and obligations, including,
submittals, testing and setting to work, performing the Work as shown and specified
in the Contract documents, to provide fully functional systems and facilities as
identified herein.
B.
The scope description of each item shall be understood to include, the words “... all
as shown and specified” at the end of the scope description.
C.
The unit prices for excavation or for items in which excavation and backfilling is
required shall include:
1.
2.
3.
4.
Excavation in any type of soil and rock including concrete and asphalt cutting;
Earthwork supports;
Dewatering and well-point system(s). Keeping excavation free from water,
including disposal of water;
Searching, locating, exposing, supporting and protecting existing utilities and
structures;
F-1-5
Contract No. 08C-C12
5.
6.
7.
8.
9.
10.
11.
D.
Leveling or grading and compacting;
Disposal of unsatisfactory and surplus excavated material to a designated
approved area to be nominated by Royal Commission Construction
representative;
Backfilling with suitable material and compacting;
Restoration of surfaces, fences, lighting to its original form and level;
Coordination with, protection of, and if necessary diversion/relocation of
existing utilities;
Testing and quality control; and
Cable route marker.
The scope of items containing cast-in-situ reinforced concrete and pre-cast concrete
shall include the following, if applicable:
1.
2.
Formwork;
Excavating as above, placing, compacting, finishing, stripping, crossing and
testing;
3.
Plain concrete mud mat;
4.
Coarse aggregate, fine aggregate, cement, water and all additives and
admixtures where applicable;
5.
Construction joints;
6.
Fusion bonded epoxy coated steel reinforcement shall be included for
fabrication, complete with tie wire supports, spacers and welding;
7.
All formwork, supports, block out, joints water stops, bolts, sleeves, inserts,
anchors, fiberglass steps/ladder and other fixtures related to structure;
8.
Mixing, pouring and curing of concrete, and removal of formwork;
9.
Transporting, installing and adjusting of pre-cast concrete elements; and
10. Tanking, membrane, waterproofing, protection coating, PVC or polyethylene
sheet under mud mat, weep holes, pockets, metal embedded items in concrete,
miscellaneous metal work; all as shown and noted on drawings.
E.
The scope of items for ductile iron pipework shall include external coating,
wrapping and sleeves protection.
F.
The scope of items involving valves, equipment and the like, shall include
identification labels and external protection of buried sections.
G.
The scope of items in which pipework is included shall include allowance for bends,
junctions, tees, couplings, flexible couplings, connectors and other associated fittings
and accessories, jointing, thrust blocks, stop ends and warning tape.
H.
The scope of items involving ducts and duct banks shall include allowance for
bends, junctions, expansion joints in duct banks, plugging ends, jointing nylon draw
strings, other associated fittings, accessories and warning tape and Mandrel test.
F-1-6
Contract No. 08C-C12
I.
The scope of items involving road surfacing and paving shall include allowance for
resetting covers and frames to catch pits, manholes, hand holes, chambers, surface
boxes and the like to final levels.
J.
The scope of items involving concrete curbs shall include necessary transition
sections, curb cuts, curves and stop ends.
K.
Interfacing with adjacent Contracts shall be included in the scope of relevant items.
L.
The scope of landscaping items shall include the provision of necessary screens to
protect the planting against wind, blown sand and debris. Screens to protect plants
from watering and maintenance shall also be provided.
M.
The scope shall include all required traffic control and signs to complete the Work as
per Royal Commission requirements.
F-1-7
Contract No. 08C-C12
2.03
DESIGNATED PAY ITEMS
This section defines the Scope of the designated pay items in table 1,
schedule of quantities, and prices “Section 2 – Form of Proposal”.
GR
GENERAL REQUIREMENTS
GR-01 00 00
GENERAL ITEMS
GR-01 18 00
Project Utility Sources
GR-01 18 00-01
SEC Connection Fees and Metering Charges, 30A
Works and charges pertaining to power supply connection and metering unit
charges by SEC.
GR-01 50 00
Temporary Facilities and Controls
GR-01 51 00
Temporary Utilities
GR-01 51 00-01
Temporary service disconnection and reconnection
This shall include disconnection and reconnection of all utilities such as
power, potable, storm water, irrigation water etc. as needed in order to
complete the permanent works.
GR-01 52 00
Construction Facilities
GR-01 52 00-001
Royal Commission Manual Camp Accommodation Costs
Royal Commission Manual Accommodation Camp Costs shall be a lump
sum provided by the Contractor, which consists of the costs of Manual Camp
Accommodation only, as necessary to comply with the Special Condition
entitled Royal Commission Accommodation and Messing Facilities. If and
when this amount is exhausted, the Contractor remains responsible without
reimbursement to utilize Royal Commission Accommodation and Messing
Facilities in accordance with this Special Condition. If the lump sum amount
is under-utilized, then payment will only be reimbursed up to the amount
calculated based on the actual camp man-days utilized.
Calculation of the Lump Sum: Based on the data under Special Conditions
“Royal Commission Accommodations and Messing Facilities” for Categories
III, IV and V as a minimum, the Contractor will calculate quantity of mandays by period. The lump sum amount will be the total monetary amount
resulting from quantity of man-days by period, multiplied by the Royal
F-1-8
Contract No. 08C-C12
Commission rates as indicted in the Special Condition ‘Royal Commission
Accommodation and Messing Facilities’. The calculation details to support
the amount will be prepared by the Contractor and presented upon request.
In the event the Royal Commission directs changes and extra work that
impacts the labor resource requirements, similar detail as determined by the
Royal Commission must be developed and provided as support for
adjustments to the lump sum amount.
F-1-9
Contract No. 08C-C12
GR-01 55 26
GR-01 55 26-01
Traffic Control
Traffic Management and Control Charges
All Works necessary to maintain the safe flow of traffic during the
construction but not limited to submittal of traffic diversion plan to Royal
Commission for approval by Roads Department, maintenance, relocation and
removal on completion of traffic diversions, directional and warning signs,
temporary barriers and other temporary measures as may be necessary for
traffic safety and control whether shown on the Contract drawings or
otherwise. Particular requirements shown on the Contract drawings for such
temporary work shall be included under this item and shall not be separately
measured for payment under any other items. All traffic management plans
shall be submitted to Royal Commission Roads Department for approval
prior to commencement of the work. All work shall be performed per
Contract drawings and Contract documents.
GR-01 78 43
GR-01 78 43-01
Spare Parts
Spare Parts
Shall include procurement, transportation and delivery of the spare parts of
the Schedule of Quantities and Prices. The Contractor shall indicate the
individual price of each. In addition, the Contractor shall also indicate the
manufacturer’s recommended spares part required for three (3) years
operation of the HSWIM system. Also, the Contractor shall include in its
tender the corresponding supplier’s certificate, the bidder has to guarantee at
least ten (10) years availability for spare parts for all devices and system
installed and technical assistance for all devices and system installed.
GR-01 79 00
Demonstration and Training
GR-01 79 00-01 Instruction and familiarization of Royal Commission Operation and
Maintenance Personnel
The period of training and familiarization will be prior to initial acceptance.
The presence of Royal Commission O&M personnel and Royal Commission
O&M Contractor’s personnel, or others as directed by the Royal Commission
at the Site during the training and familiarization shall not constitute
interference with the Contractor’s performance of the Work. The Contractor
shall submit details of project specific training material documents, schedule
and duration of the training to Royal Commission for review and approval
prior to commencement of training.
SW1
SITE CIVIL WORKS
SW1-02 00 00
Existing Conditions
SW1-02 41 19
Selective Demolition
SW1-02 41 19-01 Existing Asphalt Road
Shall include machine cut and demolition of existing asphalt road including
asphalt pavements, aggregate courses and shoulders. The item shall also
F-1-10
Contract No. 08C-C12
include disposal of demolished materials to Royal Commission designated
disposal area .
SW1-02 41 19-02 Existing Parking Lot
Shall include machine cut and demolition of existing parking lot including
asphalt pavements, aggregate courses and wheel stoppers. The item shall also
include disposal of demolished materials to Royal Commission designated
disposal area .
SW1-02 41 19-03 Existing Curb
Demolition of existing curbs including concrete foundations. The item shall
also include disposal of demolished materials to Royal Commission
designated disposal area.
SW1-02 41 19-04 Existing Concrete Barrier, 500 mm wide
Demolition of existing concrete barrier and disposal of demolished materials
to Royal Commission designated disposal area .
SW1-02 41 19-05 Existing Marl Fill
Demolition of existing marl fill and disposal of demolished materials to
Royal Commission designated disposal area .
SW1-02 41 19-06 Existing Guardrail
Removal and storage/disposal of existing guardrail to the designated area as
per the engineer’s instruction.
SW1-02 41 19-07 Overside Drain with Splash Pad
Demolition of existing overside drain including concrete base, rip-rap and
splash pad. The item shall also include disposal of demolished materials to
Royal Commission designated disposal area. This shall also include partial
demolition and reinstatement of existing swale for a complete construction.
SW1-02 41 19-08 Existing Median Cable
Removal and storage/disposal of existing median cable to the designated area
as per the engineer’s instruction.
SW1-03 00 00 Concrete
SW1-03 30 00 Cast-In Place Concrete
SW1-03 30 00-01 Concrete Pavement; 300 mm thick
Supply and construction of concrete pavement including cast-in place
concrete, polymer grid layers, longitudinal joints, transverse weakened plane
joints and concrete-asphalt pavement connection .
This item also includes reinstatement of asphalt pavement at concrete
pavement interface after construction of concrete pavement.
SW1-03 30 00-02 Concrete Barrier; Type 'A'
F-1-11
Contract No. 08C-C12
Supply and construction of concrete barrier including excavation, backfilling,
formwork, cast-in place reinforced concrete and painting.
SW1-03 30 00-03 Concrete Barrier; Transition Section Type 'T'
Supply and construction of concrete barrier including excavation, backfilling,
formwork, cast-in place reinforced concrete and painting.
SW1-03 30 00-04 Concrete Barrier; Type '1A'
Supply and construction of concrete barrier including excavation, backfilling,
formwork, cast-in place reinforced concrete and painting.
SW1-03 30 00-05 Concrete Barrier; Type '3A'
Supply and construction of concrete barrier including excavation, backfilling,
formwork, cast-in place reinforced concrete and painting.
SW1-03 30 00-06 Telecom Cabinet Foundation; 800 mm length x 800 mm width x 900 mm
height
Supply and construction of telecom cabinet foundation including excavation,
disposal of excavated materials, damp proofing, formwork, reinforced
concrete, waterproofing and backfilling.
SW1-03 30 00-07 Electrical Panel Board Foundation; 800 mm length x 600 mm width x 900 mm
height
Supply and construction of telecom cabinet foundation including excavation,
damp proofing, formwork, reinforced concrete, waterproofing and
backfilling.
SW1-03 30 00-08
Handhole; 1,200 mm length x ,1200 mm width x 1,100 mm height
Supply and construction of reinforced concrete handholes including
excavation, disposal of excavated materials, backfilling, reinforced concrete
handhole, damp proofing, formwork and waterproofing.
SW1-05 00 00
SW1-05 12 00
SW1-05 12 00-01
Metal
Structural Steel Framing
Overhead Road Gantry; TWS-1
Supply and construction of Overhead Road Gantry for TWS-1
including walkway.
SW1-05 12 00-02
Overhead Road Gantry; TWS-2
Supply and construction of Overhead Road Gantry for TWS-2 including
walkway.
Overhead Road Gantry; TWS-3
Supply and construction of Overhead Road Gantry for TWS-3 including
walkway.
SW1-05 12 00-03
F-1-12
Contract No. 08C-C12
SW1-05 12 00- Overhead Road Gantry; TWS-4
Supply and construction of Overhead Road Gantry for TWS-4 including
walkway.
SW1-05 12 00-05
Overhead Road Gantry; TWS-5
Supply and construction of Overhead Road Gantry for TWS-5 including
walkway .
SW1-05 12 00-06
Overhead Road Gantry; TWS-6
Supply and construction of Overhead Road Gantry for TWS-6 including
walkway .
SW1-05 12 00-07
Overhead Road Gantry; TWS-7A
Supply and construction of Overhead Road Gantry for TWS-7A including
walkway .
SW1-05 12 00-08
Overhead Road Gantry; TWS-7B
Supply and construction of Overhead Road Gantry for TWS-7B including
walkway .
SW1-05 12 00-09
Overhead Road Gantry; TWS-8A
Supply and construction of Overhead Road Gantry for TWS-8A including
walkway .
SW1-05 12 00-10
Overhead Road Gantry; TWS-8B
Supply and construction of Overhead Road Gantry for TWS-8B including
walkway .
SW1-05 12 00-11
Overhead Road Gantry; TWS-9
Supply and construction of Overhead Road Gantry for TWS-9 including
walkway .
SW1-05 12 00-12
Overhead Road Gantry; TWS-10
Supply and construction of Overhead Road Gantry for TWS-10 including
walkway .
SW1-05 52 00
Metal Railing
Supply and installation of galvanized steel guardrail with end terminals
including steel posts and steel blocks with concrete foundation. This Item
also include excavation, backfilling, disposal of unused materials and
foundation waterproofing.
SW1-10 00 00
Specialties
SW1-10 14 53
Traffic Signage
F-1-13
Contract No. 08C-C12
SW1-10 14 53-01
Relocation of existing road sign assembly supported on single tubular
post
Removal and re-installation of existing road sign assembly supported on
single tubular post. Shall include demolition and disposal of existing
foundation, construction of new concrete foundation, excavation, backfilling,
disposal of unused materials and foundation waterproofing.
SW1-10 14 53-02
Relocation of existing road sign assembly supported on dual tubular post
Removal and re-installation of existing road sign assembly supported on dual
tubular post. Shall include demolition and disposal of existing foundation,
construction of new concrete foundation, excavation, backfilling, disposal of
unused materials and foundation waterproofing.
SW1-10 14 53-03
Road sign assembly supported on single tubular post
Installation of existing road sign assembly supported on single tubular post.
Shall include demolition and disposal of existing foundation, construction of
new concrete foundation, excavation, backfilling, disposal of unused
materials and foundation waterproofing.
Supply and installation of post mounted road signs with concrete foundation
and related earthworks. This item also include excavation, backfilling,
disposal of unused materials and foundation waterproofing.
SW1-31 00 00
Earthworks
SW1-31 23 00
Excavation and Fill
SW1-31 23 00-01
SW1-31 23 00-02
Selected Fill
Shall include clearing and excavating from designated Royal Commission
borrow pits, transporting, spreading, leveling, grading, compacting to finished
grade levels and formation of slopes. The Works shall also include the
required laboratory tests.
Trial trenches/excavations
Provision of trial trenches/excavations (manually) as required for locating
existing underground feature/utilities such as potable water, treated sewage
effluent (TSE), storm water drainage, sanitary sewage, electrical and
telecommunication systems, foundations, etc. as directed by Royal
Commission for interfacing utilities coordination with adjacent boundaries
and other related Contracts. All discoveries are to be recorded and scaled
drawing(s) produced, showing locations, coordinates, dimensions, levels,
type and function of utilities as per Royal Commission requirements.
SW1-31 25 00
Erosion and Sedimentation Controls
F-1-14
Contract No. 08C-C12
SW1-31 25 00-01
SW1-31 63 23
Aggregate Erosion Protection (AEP); 150 mm thick
Supply and construction of aggregate erosion protection.
Bored Concrete Piles
SW1-31 63 23-01
Concrete piles for TWS-1
Shall include construction of cast-in place reinforced concrete bored pile
foundations with reinforced concrete pile caps, anchor plates, anchor bolts,
base plates, nuts, washers and cement grouts. The item shall also include
excavation, dewatering, disposal of excavated material to RC designated
disposal area, backfilling and waterproofing. Shall also include pile integrity
and load testing.
This item also includes removal of concrete curbs and slope protection which
require for the construction of gantry foundations and complete reinstatement
of concrete curbs and slope protection after completion of gantry foundation
construction.
SW1-31 63 23-02
Concrete piles for TWS-2
Shall include construction of cast-in place reinforced concrete bored pile
foundations with reinforced concrete pile caps, anchor plates, anchor bolts,
base plates, nuts, washers and cement grouts. The item shall also include
excavation, dewatering, disposal of excavated material to RC designated
disposal area, backfilling and waterproofing. Shall also include pile integrity
and load testing.
This item also includes removal of concrete curbs and slope protection which
require for the construction of gantry foundations and complete reinstatement
of concrete curbs and slope protection after completion of gantry foundation
construction.
SW1-31 63 23-03
Concrete piles for TWS-3
Shall include construction of cast-in place reinforced concrete bored pile
foundations with reinforced concrete pile caps, anchor plates, anchor bolts,
base plates, nuts, washers and cement grouts.
The item shall also include excavation, dewatering, disposal of excavated
material to RC designated disposal area, backfilling and waterproofing. Shall
also include pile integrity and load testing.
This item also includes removal of concrete curbs and slope protection which
require for the construction of gantry foundations and complete reinstatement
of concrete curbs and slope protection after completion of gantry foundation
construction.
SW1-31 63 23-04
Concrete piles for TWS4Shall include construction of cast-in place reinforced concrete bored pile
foundations with reinforced concrete pile caps, anchor plates, anchor bolts,
base plates, nuts, washers and cement grouts.
F-1-15
Contract No. 08C-C12
The item shall also include excavation, dewatering, disposal of excavated
material to RC designated disposal area, backfilling and waterproofing. Shall
also include pile integrity and load testing.
This item also includes removal of concrete curbs and slope protection which
require for the construction of gantry foundations and complete reinstatement
of concrete curbs and slope protection after completion of gantry foundation
construction.
SW1-31 63 23-05
Concrete piles for TWS5Shall include construction of cast-in place reinforced concrete bored pile
foundations with reinforced concrete pile caps, anchor plates, anchor bolts,
base plates, nuts, washers and cement grouts.
The item shall also include excavation, dewatering, disposal of excavated
material to RC designated disposal area, backfilling and waterproofing. Shall
also include pile integrity and load testing.
This item also includes removal of concrete curbs and slope protection which
require for the construction of gantry foundations and complete reinstatement
of concrete curbs and slope protection after completion of gantry foundation
construction.
SW1-31 63 23-06
Concrete piles for TWS6Shall include construction of cast-in place reinforced concrete bored pile
foundations with reinforced concrete pile caps, anchor plates, anchor bolts,
base plates, nuts, washers and cement grouts.The item shall also include
excavation, dewatering, disposal of excavated material to RC designated
disposal area, backfilling and waterproofing. Shall also include pile integrity
and load testing.
This item also includes removal of concrete curbs and slope protection which
require for the construction of gantry foundations and complete reinstatement
of concrete curbs and slope protection after completion of gantry foundation
construction.
SW1-31 63 23-07
Concrete piles for TWS7-A
Shall include construction of cast-in place reinforced concrete bored pile
foundations with reinforced concrete pile caps, anchor plates, anchor bolts,
base plates, nuts, washers and cement grouts.
The item shall also include excavation, dewatering, disposal of excavated
material to RC designated disposal area, backfilling and waterproofing. Shall
also include pile integrity and load testing.
This item also includes removal of concrete curbs and slope protection which
require for the construction of gantry foundations and complete reinstatement
of concrete curbs and slope protection after completion of gantry foundation
construction.
SW1-31 63 23-08
Concrete piles for TWS7-B
F-1-16
Contract No. 08C-C12
Shall include construction of cast-in place reinforced concrete bored pile
foundations with reinforced concrete pile caps, anchor plates, anchor bolts,
base plates, nuts, washers and cement grouts.
The item shall also include excavation, dewatering, disposal of excavated
material to RC designated disposal area, backfilling and waterproofing. Shall
also include pile integrity and load testing.
This item also includes removal of concrete curbs and slope protection which
require for the construction of gantry foundations and complete reinstatement
of concrete curbs and slope protection after completion of gantry foundation
construction.
SW1-31 63 23-09
Concrete piles for TWS8-A
Shall include construction of cast-in place reinforced concrete bored pile
foundations with reinforced concrete pile caps, anchor plates, anchor bolts,
base plates, nuts, washers and cement grouts.
The item shall also include excavation, dewatering, disposal of excavated
material to RC designated disposal area, backfilling and waterproofing. Shall
also include pile integrity and load testing.
This item also includes removal of concrete curbs and slope protection which
require for the construction of gantry foundations and complete reinstatement
of concrete curbs and slope protection after completion of gantry foundation
construction.
SW1-31 63 23-10
Concrete piles for TWS8-B
Shall include construction of cast-in place reinforced concrete bored pile
foundations with reinforced concrete pile caps, anchor plates, anchor bolts,
base plates, nuts, washers and cement grouts.The item shall also include
excavation, dewatering, disposal of excavated material to RC designated
disposal area, backfilling and waterproofing. Shall also include pile integrity
and load testing.
This item also includes removal of concrete curbs and slope protection which
require for the construction of gantry foundations and complete reinstatement
of concrete curbs and slope protection after completion of gantry foundation
construction.
SW1-31 63 23-11
Concrete piles for TWS9Shall include construction of cast-in place reinforced concrete bored pile
foundations with reinforced concrete pile caps, anchor plates, anchor bolts,
base plates, nuts, washers and cement grouts.
The item shall also include excavation, dewatering, disposal of excavated
material to RC designated disposal area, backfilling and waterproofing. Shall
also include pile integrity and load testing.
This item also includes removal of concrete curbs and slope protection which
require for the construction of gantry foundations and complete reinstatement
F-1-17
Contract No. 08C-C12
of concrete curbs and slope protection after completion of gantry foundation
construction.
SW1-31 63 23-12
Concrete piles for TWS10Shall include construction of cast-in place reinforced concrete bored pile
foundations with reinforced concrete pile caps, anchor plates, anchor bolts,
base plates, nuts, washers and cement grouts.The item shall also include
excavation, dewatering, disposal of excavated material to RC designated
disposal area, backfilling and waterproofing. Shall also include pile integrity
and load testing.
This item also includes removal of concrete curbs and slope protection which
require for the construction of gantry foundations and complete reinstatement
of concrete curbs and slope protection after completion of gantry foundation
construction.
SW1-32 00 00
SW1-32 11 16
Exterior Improvements
Sub-Base Courses
Supply and construction of aggregate sub-base course.
SW1-32 11 23
Aggregate Base Courses
Supply and construction of aggregate base course.
SW1-32 11 26
Asphaltic Base Courses
Supply and construction of bituminous concrete speed humps with 45°
diagonal white stripping.
SW1-32 12 16
SW1-32 12 16-01
Asphalt Paving
Surface Course; 70 mm thick
Supply and construction of asphalt surface course including application of
prime coat.
SW1-32 12 16-02
Base Course; 180 mm thick
Supply and construction of asphalt base course including application of
tack coat.
SW1-32 15 40
SW1-32 15 40-01
Crushed Stone Surfacing
Aggregate Mulch; 50 mm thick
Supply and laying of aggregate mulch.
SW1-32 16 00
SW1-32 16 00-01
Curbs, Gutters, Sidewalks, and Driveways
Precast Concrete Curb; Type A1
F-1-18
Contract No. 08C-C12
Supply and installation of precast concrete curb including excavation,
backfilling, mortar bed and concrete haunching.
SW1-32 16 00-02
Precast Concrete Curb; Type B
Supply and installation of precast concrete curb including excavation,
backfilling, mortar bed and concrete haunching.
SW1-32 17 00
SW1-32 17 00-01
Paving Specialties
Painted Road Markings; Straight Arrow
Supply and application of thermoplastic road markings.
SW1-32 17 00-02
Painted Road Markings; Left Arrow
Supply and application of thermoplastic road markings.
SW1-32 17 00-03
Yellow reflective edge line; 200 mm, continuous line
Supply and application of thermoplastic road markings.
SW1-32 17 00-04
Raised Pavement Markers; Non-Reflective, All white
Supply and installation of raised pavement markers.
SW1-32 17 00-05
Raised Pavement Markers; One-Way Reflective-Yellow
Supply and installation of raised pavement markers.
SW1-32 17 00-06
Raised Pavement Markers; One-Way Reflective-Clear
Supply and installation of raised pavement markers.
SW1-32 39 13
SW1-32 39 13-01
Manufactured Metal Bollards
Concrete Filled Ductile Iron Bollard; 150 mm diameter
Supply and construction of ductile iron concrete filled bollards with
concrete foundation. This item also includes excavation, backfilling,
disposal of unused materials and foundation waterproofing.
SW1-33 00 00
SW1-33 40 00
SW1-33 40 00-01
SW1-33 40 00-02
Utilities
Stormwater Utilities
Concrete Encased Reinforced Plastic Mortar (RPM) Pipe; 300 mm
diameter
Supply and installation of concrete encased RPM pipe. The item shall also
include excavation, disposal of unsuitable materials, shoring, dewatering,
pipe beddings, backfilling, warning tape, all fittings and accessories.
Catchpit; 1,400 mm x 1,400 mm
Supply and construction of reinforced concrete catch pit with heavy-duty
galvanized steel grate cover and frame. The item shall also include
excavation, backfilling, disposal of unsuitable materials, shoring, dewatering,
damp roofing, waterproofing, water stopper, reinforcement, formwork,
F-1-19
Contract No. 08C-C12
concrete, FRP ladder and all necessary work required for the complete
construction of catch pit. This shall also include demolition and reinstatement
of road layers to allow the construction of catch pit .
SW1-33 40 00-03
Overside Drain with Splash Pad
Supply and construction of overside drain with splash pad. The work shall
include excavation, backfilling, concrete apron, leveling concrete, grouted
rip-rap, loose rip-rap and dumped rip-rap.
SW1-33 40 00-04
Swale, 1,200 mm wide
Supply and construction of swale including excavation, backfilling, leveling
and disposal of unused materials to the Royal Commission disposal area.
SW2
SW2-27 00 00
SW2-27 05 26
SITE WEIGH IN MOTION (WIM) SYSTEM
Communications
Grounding and Bonding for Communications Systems
Shall include supply and installation of tinned bare copper conductor including,
PVC bonding cables, copper clad steel grounding rods, exothermic weld points,
inspection pits and interconnection of these items to make a complete grounding
system as per Contract drawings and specifications.
SW2-27 05 43
Underground Ducts and Raceways for Communication Systems
SW2-27 05 43-01
HDPE Ducts
Shall include supply and installation of HDPE Ducts including all accessories as
shown on the Contract drawings and specified in the Contract documents.
SW2-34 00 00
SW2-34 41 23
SW2-34 41 23-01
Transportation
Roadway Monitoring Equipment
WIM Units
Supply, installation, testing and commissioning of Weigh In Motion units
complete with road-installed items of two piezo-electric sensors and an inductive
loop per traffic lane and electronic unit installed in a protective roadside cabinet
as shown in Contract Drawings and Specifications.
SW2-34 41 23-02
License Plate Recognition (LPR) Camera
Supply, installation, testing and commissioning of license plate recognition
camera as shown in Contract Drawings and Specifications.
This is all in one digital IP camera, illuminator and integrated computer. The
integrated computer (which is built into the housing) specifically designed for
Automatic Number-Plate Recognition (ANPR) application equipped with lens;
allows the camera itself to recognize any type of vehicle passing in front of the
F-1-20
Contract No. 08C-C12
camera and then run ANP.
SW2-34 41 23-03
CONTEXT Dome Camera
Supply, installation, testing and commissioning of CONTEXT Camera as shown
in Contract Drawings and Specifications.
This is an all-in-one Web-Based Digital Network Speed Dome Camera for
remote surveillance application. It features Pan/Tilt/Zoom capabilities and a CCD
module to distribute compressed live video on to the network via an Ethernet
connection. The device can be controlled via the software Pan/Tilt/Zoom
functionality (or by an external hardware controller) to get the best monitoring
angle easily via a standard browse.
The device is also self-contained Web Server. Users access the Network Dome
Camera just like browsing a website over Internet and can simply perform all the
management, configuration, and monitoring. The device contains an image
compression chipset which is capable of delivering standard JPEG, MJPEG and
real-time video onto your network.
SW2-34 41 23-04
WIM Industrial PC
Supply, installation, testing and commissioning of software and license for WIM
units as shown in Contract Drawings and Specifications.
SW2-34 41 23-05
Software and License for WIM units
Supply, installation, testing and commissioning of software and license for WIM
units as shown in Contract Drawings and Specifications.
SW2-34 41 23-06
Software and License for ANPR and CCTV System
Supply, installation, testing and commissioning of software and license for
ANPR and CCTV System as shown in Contract Drawings and Specifications.
SW2-34 41 23-07
Outdoor Rack Cabinet 33U, IP65
Supply, installation, testing and commissioning of double-skinned IP 65 rated
Outdoor Rack Cabinets. The cabinet shall comprise with Thermostat, cooling fan,
DC-DC Convertor, Terminal blocks, Power regulator, power supply units, Two
PDU 16 Amp multiutility AC Power & sockets, I/O Universal controller, Circuit
breaker, Surge arrestors, Power socket, UPS, door switches and shelves and
space to house industrial PC, HSWIM Controller, Output module unit for
cameras, Terminal blocks for loops connections, Piezo ceramic connections,
grounding and bonding and any other items as shown in Contract Drawings and
Specifications.
SW2-34 41 23-08
FTP CAT 6A Cable
Supply, installation, testing and commissioning of FTP CAT 6A cable including,
cable markers, conduits, fittings and all necessary accessories units as shown in
Contract Drawings and Specifications.
F-1-21
Contract No. 08C-C12
SW3
SITE COMMUNICATION SYSTEM
SW3-33 00 00
Utilities
SW3-33 83 00
Wireless Communications Transmission and Distribution
SW3-33 83 00-01
3G/4G/LTE Router
Supply, installation, testing and commissioning of 3G/4G/LTE Routers as shown
on the Contract drawings and specified in the Contract documents.
SW3-33 83 00-02
SIM Cards
Supply, installation, testing and commissioning of SIM Cards as shown on the
Contract drawings and specified in the Contract documents.
SW3-33 83 00-03
Gigabit Industrial Ethernet L2 Switch, 10 Port + POE
Supply, installation, testing and commissioning of Gigabit Industrial Ethernet L2
Switch, 10 POE + Port as shown on the Contract drawings and specified in the
Contract documents.
SW3-33 83 00-04
Antenna including pole
Supply, installation, testing and commissioning of Antenna including pole as
shown on the Contract drawings and specified in the Contract documents.
SW4
SITE TRAFFIC CONTROL (AT RCJ DATA CENTRE)
SW4-27 00 00 Communications
SW4-27 20 00 Data Communications
SW4-27 20 00-01 WIM Cluster Servers
Supply, installation, testing and commissioning of WIM Cluster Servers. The
WIM server system in the Data Centre shall consist of two servers with
cluster configuration, one primary server and one stand-by server. Each of
the two servers in the cluster shall meet or exceed the minimum requirements
stated under Contract Specifications.
SW4-27 20 00-02 Windows OS Server Licenses (Hosts and Virtual Machines)
Supply, installation, testing and commissioning of Windows OS Server
Licenses (Hosts and Virtual Machines) as shown on the Contract drawings
and specified in the Contract documents.
SW4-27 20 00-03 Database License
Supply, installation, testing and commissioning of Database License as
shown on the Contract drawings and specified in the Contract documents.
F-1-22
Contract No. 08C-C12
SW4-27 20 00-04 Ethernet Cable
Supply, installation, testing and commissioning of Ethernet Cable as shown
on the Contract drawings and specified in the Contract documents.
SW4-27 20 00-05 42 U Rack
Supply, installation, testing and commissioning of 42U rack including UPS
with 2-hour battery backup, fiber patch panels and patch chords and any
other items as shown on the Contract drawings and specified in the Contract
documents.
SW5
SITE TRAFFIC MANAGEMENT CENTRE
SW5-27 00 00
Communications
SW5-27 20 00
Data Communications
SW5-27 20 00-01 Workstations
Supply, installation, testing and commissioning of Workstations as shown on
the Contract drawings and specified in the Contract documents
SW5-27 20 00-02
Windows License
Supply, installation, testing and commissioning of Windows License as
shown on the Contract drawings and specified in the Contract documents
SW5-27 20 00-03 24" Workstation Monitor
Supply, installation, testing and commissioning of 23" Workstation Monitors
as shown on the Contract drawings and specified in the Contract documents
SW5-27 20 00-04
Dual Monitor Stand for Desk
Supply, installation, testing and commissioning of Dual Monitor Stand for
Desk as shown on the Contract drawings and specified in the Contract
documents.
SW5-27 20 00-05
Laser Printer
Supply, installation, testing and commissioning of Laser Printer as shown on
the Contract drawings and specified in the Contract documents.
SW5-27 20 00-06
Violations Management Software
Supply, installation, testing and commissioning of Violations Management
Software as shown on the Contract drawings and specified in the Contract
documents.
SW5-27 20 00-07
WIM Reporting Software
F-1-23
Contract No. 08C-C12
Supply, installation, testing and commissioning of WIM Reporting Software
with traffic reports, alarm reports and violation reports as shown on the
Contract drawings and specified in the Contract documents.
SW5-27 20 00-08 Integration of WIM Alarms/Signals into the Existing Software
All works and materials necessary for integration of WIM
Alarms/Signals/Information into the Existing Software as shown on the
Contract drawings and specified in the Contract documents.
F-1-24
Contract No. 08C-C12
SW6
SITE ELECTRICAL SYSTEM
SW6-26 00 00 Electrical Works
SW6-26 05 19 Low Voltage Electrical Power Conductors and Cables
Shall include supply and installation of 600/1,000V CU/XLPE/SWA/PVC,
CU/XLPE/PVC & CU/PVC (E) type cables laid in trench direct buried or in
duct ways including splices, taps, termination, protection connection and
identifications and any other items required. Except for the length of duct
banks at crossings being covered under separate pay items, the Work shall
also include making trenches, providing cable tiles, warning tape, sand bed
and surround to cables and backfilling of the excavated trench where
necessary.
All Works to be inclusive of all testing and commissioning and expenses
associated with this Work as shown on the Contract drawings and as
specified in the Contract documents.
SW6-26 05 26 Grounding and Bonding for Electrical Systems
Shall include supply and installation of tinned bare copper conductor
including, PVC bonding cables, copper clad steel grounding rods, exothermic
weld points, inspection pits and interconnection of these items to make a
complete grounding system as per Contract drawings and specifications.
SW6-26 06 20.26
Single receptacle outlet; 13A, weather proof
Supply and installation of power receptacles complete with cover plates and
all accessories including utility boxes, bolts, screws, supports as shown in
drawings. Receptacle shall be SASO compliant and as required by Royal
Commission (RC) including Royal Commission Specifications and
Guidelines, IP-65 for special type. All type of receptacles shall be grounding
type and fully functional including testing and commissioning as per Royal
Commission Specifications and Guidelines Section 262726 and, applicable
standards including UL and NFPA 70/NEC.
SW6-26 24 16
Panel Boards
Supply and installation of power panels including the incoming circuit
breaker and MCBs, bus bars for power, grounding and neutral, enclosure
with hinged cover, bolts, supports including anchor bolts and all components
and accessories required for complete and fully functional installation
including testing and commissioning as per Royal Commission
Specifications and Guidelines Section 262416 and applicable standards
including UL standard.
F-1-25
Contract No. 08C-C12
SW6-26 28 00 Low-Voltage Circuit Protective Devices
SW6-26 28 00-11
Molded Case Circuit Breakers (MCCB)
Supply, installation, testing and commissioning of Main Circuit Breaker
(MCB) complete with enclosure with hinged cover, bolts, support including
anchor bolts and all component and accessories required. Grounding system
to be fully functional in compliance with the Royal Commission Guideline
Specifications and applicable standards including UL and as shown on the
Contract drawings and specified in the Contract documents.
SW6-26 56 13
Lighting Poles and Standards
SW6-26 56 13-01
Relocation of Street Lighting Poles
Shall include removal and relocating street lighting poles, relocating the pole
foundation, dismantling the cables from both ends and any associated works
as required to complete the works as shown on the Contract drawings and
specified in the Contract documents.
SW6-26 56 13-02
Cables
Shall include supply, installation, testing and commissioning of 600/1,000V
XLPE/SWA/PVC insulated copper cable and XLPE/PVC grounding cable by
laying in trench direct buried or in duct ways, splices, taps, termination,
protection connection and identifications. Except for the length of duct banks
at crossings being covered under separate items, the Work shall also include
making trenches, tags, ties, cable markers, cable tiles, warning tape, sand bed
and surround to cables and backfilling of the excavated trench all as shown
on the Contract drawings and specified in the Contract document.
SW6-33 00 00
SW6-33 71 19
UTILITIES
Concrete Encased Duct bank
Shall include supply and construction of low voltage reinforced concrete duct
bank, including supply and installation of uPVC ducts, couplings and
associated fittings, duct spacers, jointing, grounding wires, draw wires,
excavation, dewatering, reinforced concrete bed and surround, expansion
joints, waterproofing, warning tape, red concrete or paint on top of concrete,
backfilling and compaction, lug and cable/duct seal and making all ducts
clear of obstruction on completion and reinstatement of the ground as per
Contract drawing and specified in the Contract documents.
SW6-33 05 07 Trenches Installation of Utility Piping
SW6-33 05 07-13
Horizontal Directional Drilling (HDD)
Shall include supply and installation of road crossing steel casing pipe
sleeves of specified sizes and lengths by HDD or thrust boring method
including all the equipment, labour, excavation, dewatering, traffic safety and
control measures, required work permits and approvals from Royal
Commission as shown in the Contract drawings and documents. Shall also
F-1-26
Contract No. 08C-C12
include providing the corrosion protection paints to steel casing pipe, sand
filling in the annular space of pipe sleeve and carrier pipe, filling the gap at
the ends with approved filler material and sealant as per RC direction.
Contractor should verify the ground condition and seek approval from RC
Geotechnical Engineer before proceeding with HDD. The Contractor shall
submit a detailed methodology and drawings for execution of HDD works
for RC approval prior to construction.
The Contractor shall be solely responsible for the safety of all parties at the
Worksite. Selection of drilling procedures and equipment shall provide
protection against electrical shock. Grounding mats, grounded equipment,
hot boots, hot gloves, safety glasses and hard hats shall be used. Drilling
equipment shall have an alarm system capable of detecting electrical current.
Magnetic Guidance System (MGS) probe or proven gyroscopic probe and
interface shall be used to provide a continuous and accurate determination of
the location of the drill head during the drilling operation. Guidance system
shall be a proven type and shall be setup and operated by personnel trained
and experienced with this system. The operator shall be aware of any geomagnetic anomalies and shall consider such influences in the operation of the
guidance system if using magnetic system.
All personnel shall be fully trained in their respective duties as part of the
directional drilling crew and in safety. The Contractor must show job history
and reference list of equal or greater size and length of piping involved.
Supervisor must have at least two years directional drilling experience. A
competent and experienced supervisor representing the drilling contractor
shall be present at all times during the actual drilling operations. A
responsible representative who is thoroughly familiar with the equipment and
type work to be performed, must be in direct charge and control of the
operation at all times.
After completion of Works, including the drilling, placing of steel pipe,
polyethylene ducts and sub-ducts, the Contractor shall de-mobilize
equipment and restore the Worksite to its original condition. Any noticeable
surface defects, due to the drilling operation, shall be repaired by the
Contractor.
SW6-33 71 19.13
Electrical Manholes and Handholes
SW6-33 71 19.13-01 Relocation of Existing Electrical Manholes
Relocation of existing electrical manholes including excavation, backfilling,
disposal of unsuitable materials to the RC designated disposal area, removal
of manhole, re-installation of manholes with all necessary earthworks and
concrete works for a complete installation.
F-1-27
Contract No. 08C-C12
SECTION 3.0
MEASUREMENT FOR PAYMENT
3.01
GENERAL
This section defines how pay items, enumerated in Attachment G - Price and Payment
Provisions are measured for payment. The estimated quantities detailed within Attachment
G are for Bid evaluation purposes. Only satisfactorily completed Work will be eligible for
invoicing.
A.
Work Measured
Work shall be measured net as fixed in position and each measurement shall be
taken to the nearest 0.1 meter. This principle shall not apply to dimensions stated in
descriptions.
Unless otherwise stated, no deduction shall be made from items required to be
measured by area for areas of less than 1.00 m2. Deductions shall refer only to areas
within the edges of measured areas; areas, which are at the edges of measured areas,
shall always be deducted irrespective of size.
3.02
METHOD OF MEASUREMENT
This subsection defines the method of measurement of particular items of Work.
A.
B.
Excavation to lower grade levels shall be the net volume of earth before excavation
to lower the grade level of the existing Site to:

The finished grades (adjusted for the required thickness of stone mulch, marl,
S1eet sand fill) in unpaved areas.

Formation levels under proposed roads and pavings.

The bed levels of shrubs and ground cover planting adjusted to the required
thickness of planting soil excluding tree-planting pits in the proposed planting
areas.

The excavation shall be net volume regardless of the method adopted by the
Contractor to execute the Work.
Imported filling material shall be the net volume of imported material less
excavated material used for fill required to fill the Site from existing levels to:
F-1-28
Contract No. 08C-C12

The finished grades (adjusted for the required thickness of stone mulch, marl,
S1eet sand fill) in unpaved areas.

Formation levels under proposed roads and paving.

The bed levels of shrubs and ground cover planting adjusted to the required
thickness of planting soil excluding tree-planting pits in the proposed planting
areas.

The imported filling material shall be net volume regardless of the method
adopted by Contractor to execute the Work.
C.
The measurement for cutting roads shall be measured along the centerline of the
excavation and includes the lengths of road and sidewalk crossed.
D.
The measurement of asphalt surface course, asphalt base course, road base and subbase shall be the area required to fill the excavation as per the required thickness of
each course.
E.
The measurement for curbs shall be along the inside face of the curb.
F.
Measurement for curb marking shall be the length measured along the marked
section of curb.
G.
The measurement of drains, sewers, pipework, ducts and duct bank shall be taken in
the horizontal plane between outer faces of structure and other items, which are
subject to separate measurement.
H.
The measurement of cables or conductors in ducts or direct buried in trench shall be
the straight line horizontal distance between center to center of manholes or main
equipment center or along the trench center line. When changes of direction occur
between points of measurement, coordinates of intermediate points of intersection
shall be used. No adjustment will be made for splices, terminations, tap and offsets
in manhole and chambers for cable staking.
I.
The measurement of pavement markings shall be taken in the horizontal plane
between outer edges.
J.
The measurement of material for asphalt and aggregate courses shall be net volume
regardless of the method adopted by Contractor to execute the Work.
K.
The measurement of planting soil shall be the actual volume to be filled; no
deduction shall be made for the root-ball.
F-1-29
Contract No. 08C-C12
3.03
UNIT FOR MEASUREMENT
Unit
Each (Ea)
Measurement of Payment
-
Paid progressively as Work proceeds, based on percentage of
Work satisfactorily completed, under the cost of materials
delivered to Site to be incorporated into the permanent works.
Payment for material deliveries shall not exceed 50 % of the
amount of the unit price included in the Schedule of Quantities
and Prices. The total payment for material delivery and
installation shall not exceed 80% of the unit rate amount. The
remaining 20% shall be paid upon the successful completion of
the Work including testing and commissioning, if required.
Linear meter (m) -
Paid progressively as Work proceeds, based on percentage of
Work satisfactorily completed, under the cost of materials
delivered to Site to be incorporated into the permanent works.
Payment for material deliveries shall not exceed 50 % of the
amount of the unit price included in the Schedule of Quantities
and Prices. The total payment for material delivery and
installation shall not exceed 80% of the unit rate amount. The
remaining 20% shall be paid upon the successful completion of
the Work including testing and commissioning, if required.
Square meter (m²) -
Paid progressively as Work proceeds, based on percentage of
Work satisfactorily completed.
Cubic meter (m³) -
Paid progressively as Work proceeds, based on percentage of
Work satisfactorily completed.
Lump Sum (LS) -
Payment shall be made in accordance with Table H-2: Payment
Schedule
Man-hour (Mh)
Man-hours actually expended for the execution of the work.