KINGDOM OF SAUDI ARABIA ROYAL COMMISSION FOR JUBAIL AND YANBU ROYAL COMMISSION IN RAS AL KHAIR INDUSTRIAL CITY CONTRACT NO. 08C-C12 CONSTRUCTION & MOBILIZATION OF TRUCKS WEIGHT STATIONS ATTACHMENT “F” SPECIAL SPECIFICATIONS PART 1 SCOPE OF WORK AND MEASUREMENT FOR PAYMENT KINGDOM OF SAUDI ARABIA ROYAL COMMISSION FOR JUBAIL AND YANBU ROYAL COMMISSION IN RAS AL KHAIR INDUSTRIAL CITY CONTRACT NO. 12C – C12 CONSTRUCTION & MOBILIZATION OF TRUCKS WEIGHT STATIONS SCOPE OF WORK AND MEASUREMENT FOR PAYMENT INDEX ITEM NO. TITLE PAGE NO. SECTION 1.0 INTRODUCTION 1.01 PURPOSE F-1-1 1.02 FACILITIES DESCRIPTION F-1-1 1.03 CONTRACT DESCRIPTION F-1-1 SECTION 2.0 SCOPE OF WORK 2.01 GENERAL F-1-2 2.02 DESCRIPTION OF TERMS FOR PAY ITEMS F-1-7 2.03 DESIGNATED PAY ITEMS F-1-9 SECTION 3.0 MEASUREMENT FOR PAYMENT 3.01 GENERAL F-1-42 3.02 METHOD OF MEASUREMENT F-1-42 3.03 UNIT OF MEASUREMENT F-1-44 F-1-i SECTION 1.0 INTRODUCTION 1.01 PURPOSE The purpose of Attachment F is to define the scope and quality standards for the installation of twelve (12) High Speed Weigh In Motion (HSWIM) stations including all necessary civil, electrical, structural, geotechnical, telecommunications and instrumentation disciplinespecific works in accordance with the Contract drawings and specifications. 1.02 FACILITIES DESCRIPTION The HSWIM stations will be constructed to reduce the passage of overweight and unsafe vehicles across Royal Commission’s (RC) highways. The stations will increase the transit efficiency for the large percentage of trucks and buses (commercial vehicles) moving across Jubail and Ras Al-Khair that are compliant with RC requirements. 1.03 CONTRACT DESCRIPTION As part of the ongoing development of the RIC, the Royal Commission proposes to complete a fully functioning High Speed Weigh In Motion (HSWIM) virtual weigh station network useable by the Royal Commission to monitor and control overweight vehicles passing within Jubail Industrial City (JIC) and Ras Al-Khair Industrial City (RIC). F-1-1 Contract No. 08C-C12 SECTION 2.0 SCOPE OF WORK 2.01 GENERAL The Works comprise the procurement and installation of twelve (12) High Speed Weigh In Motion (HSWIM) stations at specified locations to reduce the passage of overweight and unsafe vehicles across the Royal Commission (RC) highways. The contract consists of the following Work: Asphalt removal and concrete reinstatement Overhead Gantry Steel Frame structure Low Voltage Power Distribution System Grounding and Bonding System Lightning Protection System Data Transmission Network using GSM technology HSWIM Equipment for data collection and transmission The Contractor shall be required to work in the areas currently being developed. The roads and utility systems in these areas are operational and will remain in operation during the period of performance of this Contract. The Contractor will ensure that no (or minimal) disruption is caused to the normal civic activity and operation of utilities and services during the performance of Work under this Contract. The area outside the limit of Work affected by contract activities shall be kept clean at all times. The Work shall include all testing of the supplied materials at factories, testing all the Works at the Site, systems testing and monitoring as required. All Works shall be performed in accordance with the specifications and data sheets included in Attachment “F”. The Contractor is entirely responsible for ordering and procuring materials using the details and information shown on the Contract drawings, specifications and Contractors proposed detailed working drawings. The Contractor shall be responsible for maintenance of landscaping and all required systems for the specified period. The Contractor is entirely responsible for the following works and these are to be included within the relevant rates in the Schedule of Quantities: - The Contractor is advised that the groundwater table is high in the Work area(s) and shall take all necessary precautions to protect all permanent Work and adjacent work F-1-2 Contract No. 08C-C12 areas, including plantings and landscaping, from water damage during the performance of the Work. The Contractor shall use a combination of dewatering and shoring to prevent water damage. Discharge water from the dewatering process must be disposed of into the existing storm drainage system. - The Contractor shall monitor and control all traffic to maximize safety and minimize disruption on roads entering or adjacent to Site activities. The Contractor shall be responsible for flagmen, temporary diversions, barricades, and traffic signs during the performance of the Work. - The Contractor shall be responsible for performing all construction surveys, including verification of survey control points provided by the Royal Commission, to properly layout the Work in accordance with the Contract Drawings, including Contractor’s determination of control lines, grades, elevations, earthwork quantities and intermediate benchmarks, etc. At the commencement of the Work. The Contractor shall submit to the Royal Commission for approval an overall survey plan describing the surveys to be performed. The Contractor’s survey crew shall be supervised by an English-speaking surveyor, whose qualifications shall be submitted to the Royal Commission for approval. Intermediate benchmarks shall be established by Contractor at spacing exceed spacing of no more than 500 meters, unless otherwise approved by the Royal Commission. Check levels shall be run over the entire benchmark network and all rod readings on turning points and benchmarks shall be to the nearest millimeter. All rod readings for ground points shall be to the nearest centimeter. The Contractor shall perform all surveys to support and justify quantities for payment, as set forth in Attachment “H”, Price and Payment Provisions, inclusive of necessary profiles, cross-sections and calculations. - The Contractor shall be responsible for preparing all detailed shop drawings necessary for performing the Work, including detailing of drawings and standards provided by the Royal Commission and by the Contractor’s subcontractors or sub-suppliers. All calculations pertaining to the Contractor’s proposed sub-suppliers for major equipment, as well as associated all shop drawings, shall be subject to review by the Royal Commission. - The Contractor shall review all Contract Drawings issued by the Royal Commission for interference or conflict in the location of the Work and shall promptly advise the Royal Commission of any interference or conflict found in the drawings or subsequently discovered during the performance of the Work. In addition, the Contractor shall propose a solution to the Royal Commission to resolve any such issue, taking into consideration the overall requirements of the Work set forth in the Contract. F-1-3 Contract No. 08C-C12 - The Contractor shall be responsible for taking all necessary measures for protecting existing, installed utilities in the area of the Work, including survey, location, identification of utility type, marking, and protection of utilities to prevent breach or damage. No mechanical excavation is permitted within one (1) meter of pipelines, duct banks, or electrical/communication cables, or other distance established by ARAMCO, SEC, and STC, whichever is greater. - The Contractor shall comply with all Royal Commission and other third party security and access requirements for the Site to ensure protection of workers and facilities, including entrances at designated points with prescribed personnel and vehicle passes for Contractor’s staff, its subcontractors and sub-suppliers, and visitors. In addition, the Contractor shall plan its Work on Site so as not to interfere with or obstruct other operating facilities near or adjacent to the Site. - The Contractor shall prepare and submit a mobilization or phasing plan prior to the commencement of construction activities, for Royal Commission review, to ensure an organized and safe environment to support scheduled construction activities 2.01 SUBMIT INITIAL DOCUMENTS AND START CONSTRUCTION Submittal of Initial Documents and Start of Construction (as defined in SC-37) shall consist of construction of laydown area, mobilization of portable offices, personnel, construction of fence around Site working area, and all other incidental necessary to be performed prior to commencement of the Work, Submit Initial Documents and Start Construction shall also include furnishing the following submittals to the Royal Commission: Submittal 1. Contract schedule. 2. Execution Plan. 3. Organization chart and approval of Key Personnel resume. 4. Insurance certificates. 5. Project Quality Control Plan (See RC Specification 01450 Revision 2 —"Guideline Specification for Project Quality Control" dated 16 July 2012) including preliminary Schedule of Method of Statements and Inspection and Test Plan (ITPs), details of the Contractor's proposed independent Testing Agency(ies) with sample Test Report forms and examples of Contractor's Inspection Checklists. 6. Security program. 7. Procurement program including shipping and delivery schedule (See RC Specification 01650.1.04.B, "Project Delivery Requirements" for required Program contents). 8. Employment of Saudi Arabian citizens. 9. Detailed quantity take-off of Issued for Construction (IFC) drawings in a format agreed with the Royal Commission. 10. As-built documents program. F-1-4 Contract No. 08C-C12 11. List of plant and equipment. 12. Company Environmental, Safety and Health Program. 13. Construction phase Environmental, Safety and Health Program. 14. Technical submittal program (See RC Specification 01 45 00 Part 1.06 – “Submittal” for required Program contents.) 15. Report for the pre-construction survey of existing conditions and site grades. 16. Plan of laydown areas. 17. Project signs “two boards”. 2.01.01 COMPLETE CONTRACT Complete Contract shall include demobilization of all Works in preparation for and removal of the Site, upon satisfactory completion of the Project, of all Contractor owned materials, equipment and facilities including trimming, shaping, cleaning, clearing, disposal of surplus materials and any other Work and labor necessary to leave the Site in a clean and safe condition in a manner acceptable to the Royal Commission together with furnishing the required documentation in accordance with the relevant conditions of the Contract including the following submittals: 1. All Operations and Maintenance data including Operation and Maintenance manuals (to be submitted in final form before the date of Initial Acceptance). 2. Spare parts lists. 3. As-built drawings and final quantities. 4. Operating consumables date. 5. Final documentation for Initial Acceptance package. 2.02 DESCRIPTION OF TERMS FOR PAY ITEMS A. Unit prices shall include all general requirements and obligations, including, submittals, testing and setting to work, performing the Work as shown and specified in the Contract documents, to provide fully functional systems and facilities as identified herein. B. The scope description of each item shall be understood to include, the words “... all as shown and specified” at the end of the scope description. C. The unit prices for excavation or for items in which excavation and backfilling is required shall include: 1. 2. 3. 4. Excavation in any type of soil and rock including concrete and asphalt cutting; Earthwork supports; Dewatering and well-point system(s). Keeping excavation free from water, including disposal of water; Searching, locating, exposing, supporting and protecting existing utilities and structures; F-1-5 Contract No. 08C-C12 5. 6. 7. 8. 9. 10. 11. D. Leveling or grading and compacting; Disposal of unsatisfactory and surplus excavated material to a designated approved area to be nominated by Royal Commission Construction representative; Backfilling with suitable material and compacting; Restoration of surfaces, fences, lighting to its original form and level; Coordination with, protection of, and if necessary diversion/relocation of existing utilities; Testing and quality control; and Cable route marker. The scope of items containing cast-in-situ reinforced concrete and pre-cast concrete shall include the following, if applicable: 1. 2. Formwork; Excavating as above, placing, compacting, finishing, stripping, crossing and testing; 3. Plain concrete mud mat; 4. Coarse aggregate, fine aggregate, cement, water and all additives and admixtures where applicable; 5. Construction joints; 6. Fusion bonded epoxy coated steel reinforcement shall be included for fabrication, complete with tie wire supports, spacers and welding; 7. All formwork, supports, block out, joints water stops, bolts, sleeves, inserts, anchors, fiberglass steps/ladder and other fixtures related to structure; 8. Mixing, pouring and curing of concrete, and removal of formwork; 9. Transporting, installing and adjusting of pre-cast concrete elements; and 10. Tanking, membrane, waterproofing, protection coating, PVC or polyethylene sheet under mud mat, weep holes, pockets, metal embedded items in concrete, miscellaneous metal work; all as shown and noted on drawings. E. The scope of items for ductile iron pipework shall include external coating, wrapping and sleeves protection. F. The scope of items involving valves, equipment and the like, shall include identification labels and external protection of buried sections. G. The scope of items in which pipework is included shall include allowance for bends, junctions, tees, couplings, flexible couplings, connectors and other associated fittings and accessories, jointing, thrust blocks, stop ends and warning tape. H. The scope of items involving ducts and duct banks shall include allowance for bends, junctions, expansion joints in duct banks, plugging ends, jointing nylon draw strings, other associated fittings, accessories and warning tape and Mandrel test. F-1-6 Contract No. 08C-C12 I. The scope of items involving road surfacing and paving shall include allowance for resetting covers and frames to catch pits, manholes, hand holes, chambers, surface boxes and the like to final levels. J. The scope of items involving concrete curbs shall include necessary transition sections, curb cuts, curves and stop ends. K. Interfacing with adjacent Contracts shall be included in the scope of relevant items. L. The scope of landscaping items shall include the provision of necessary screens to protect the planting against wind, blown sand and debris. Screens to protect plants from watering and maintenance shall also be provided. M. The scope shall include all required traffic control and signs to complete the Work as per Royal Commission requirements. F-1-7 Contract No. 08C-C12 2.03 DESIGNATED PAY ITEMS This section defines the Scope of the designated pay items in table 1, schedule of quantities, and prices “Section 2 – Form of Proposal”. GR GENERAL REQUIREMENTS GR-01 00 00 GENERAL ITEMS GR-01 18 00 Project Utility Sources GR-01 18 00-01 SEC Connection Fees and Metering Charges, 30A Works and charges pertaining to power supply connection and metering unit charges by SEC. GR-01 50 00 Temporary Facilities and Controls GR-01 51 00 Temporary Utilities GR-01 51 00-01 Temporary service disconnection and reconnection This shall include disconnection and reconnection of all utilities such as power, potable, storm water, irrigation water etc. as needed in order to complete the permanent works. GR-01 52 00 Construction Facilities GR-01 52 00-001 Royal Commission Manual Camp Accommodation Costs Royal Commission Manual Accommodation Camp Costs shall be a lump sum provided by the Contractor, which consists of the costs of Manual Camp Accommodation only, as necessary to comply with the Special Condition entitled Royal Commission Accommodation and Messing Facilities. If and when this amount is exhausted, the Contractor remains responsible without reimbursement to utilize Royal Commission Accommodation and Messing Facilities in accordance with this Special Condition. If the lump sum amount is under-utilized, then payment will only be reimbursed up to the amount calculated based on the actual camp man-days utilized. Calculation of the Lump Sum: Based on the data under Special Conditions “Royal Commission Accommodations and Messing Facilities” for Categories III, IV and V as a minimum, the Contractor will calculate quantity of mandays by period. The lump sum amount will be the total monetary amount resulting from quantity of man-days by period, multiplied by the Royal F-1-8 Contract No. 08C-C12 Commission rates as indicted in the Special Condition ‘Royal Commission Accommodation and Messing Facilities’. The calculation details to support the amount will be prepared by the Contractor and presented upon request. In the event the Royal Commission directs changes and extra work that impacts the labor resource requirements, similar detail as determined by the Royal Commission must be developed and provided as support for adjustments to the lump sum amount. F-1-9 Contract No. 08C-C12 GR-01 55 26 GR-01 55 26-01 Traffic Control Traffic Management and Control Charges All Works necessary to maintain the safe flow of traffic during the construction but not limited to submittal of traffic diversion plan to Royal Commission for approval by Roads Department, maintenance, relocation and removal on completion of traffic diversions, directional and warning signs, temporary barriers and other temporary measures as may be necessary for traffic safety and control whether shown on the Contract drawings or otherwise. Particular requirements shown on the Contract drawings for such temporary work shall be included under this item and shall not be separately measured for payment under any other items. All traffic management plans shall be submitted to Royal Commission Roads Department for approval prior to commencement of the work. All work shall be performed per Contract drawings and Contract documents. GR-01 78 43 GR-01 78 43-01 Spare Parts Spare Parts Shall include procurement, transportation and delivery of the spare parts of the Schedule of Quantities and Prices. The Contractor shall indicate the individual price of each. In addition, the Contractor shall also indicate the manufacturer’s recommended spares part required for three (3) years operation of the HSWIM system. Also, the Contractor shall include in its tender the corresponding supplier’s certificate, the bidder has to guarantee at least ten (10) years availability for spare parts for all devices and system installed and technical assistance for all devices and system installed. GR-01 79 00 Demonstration and Training GR-01 79 00-01 Instruction and familiarization of Royal Commission Operation and Maintenance Personnel The period of training and familiarization will be prior to initial acceptance. The presence of Royal Commission O&M personnel and Royal Commission O&M Contractor’s personnel, or others as directed by the Royal Commission at the Site during the training and familiarization shall not constitute interference with the Contractor’s performance of the Work. The Contractor shall submit details of project specific training material documents, schedule and duration of the training to Royal Commission for review and approval prior to commencement of training. SW1 SITE CIVIL WORKS SW1-02 00 00 Existing Conditions SW1-02 41 19 Selective Demolition SW1-02 41 19-01 Existing Asphalt Road Shall include machine cut and demolition of existing asphalt road including asphalt pavements, aggregate courses and shoulders. The item shall also F-1-10 Contract No. 08C-C12 include disposal of demolished materials to Royal Commission designated disposal area . SW1-02 41 19-02 Existing Parking Lot Shall include machine cut and demolition of existing parking lot including asphalt pavements, aggregate courses and wheel stoppers. The item shall also include disposal of demolished materials to Royal Commission designated disposal area . SW1-02 41 19-03 Existing Curb Demolition of existing curbs including concrete foundations. The item shall also include disposal of demolished materials to Royal Commission designated disposal area. SW1-02 41 19-04 Existing Concrete Barrier, 500 mm wide Demolition of existing concrete barrier and disposal of demolished materials to Royal Commission designated disposal area . SW1-02 41 19-05 Existing Marl Fill Demolition of existing marl fill and disposal of demolished materials to Royal Commission designated disposal area . SW1-02 41 19-06 Existing Guardrail Removal and storage/disposal of existing guardrail to the designated area as per the engineer’s instruction. SW1-02 41 19-07 Overside Drain with Splash Pad Demolition of existing overside drain including concrete base, rip-rap and splash pad. The item shall also include disposal of demolished materials to Royal Commission designated disposal area. This shall also include partial demolition and reinstatement of existing swale for a complete construction. SW1-02 41 19-08 Existing Median Cable Removal and storage/disposal of existing median cable to the designated area as per the engineer’s instruction. SW1-03 00 00 Concrete SW1-03 30 00 Cast-In Place Concrete SW1-03 30 00-01 Concrete Pavement; 300 mm thick Supply and construction of concrete pavement including cast-in place concrete, polymer grid layers, longitudinal joints, transverse weakened plane joints and concrete-asphalt pavement connection . This item also includes reinstatement of asphalt pavement at concrete pavement interface after construction of concrete pavement. SW1-03 30 00-02 Concrete Barrier; Type 'A' F-1-11 Contract No. 08C-C12 Supply and construction of concrete barrier including excavation, backfilling, formwork, cast-in place reinforced concrete and painting. SW1-03 30 00-03 Concrete Barrier; Transition Section Type 'T' Supply and construction of concrete barrier including excavation, backfilling, formwork, cast-in place reinforced concrete and painting. SW1-03 30 00-04 Concrete Barrier; Type '1A' Supply and construction of concrete barrier including excavation, backfilling, formwork, cast-in place reinforced concrete and painting. SW1-03 30 00-05 Concrete Barrier; Type '3A' Supply and construction of concrete barrier including excavation, backfilling, formwork, cast-in place reinforced concrete and painting. SW1-03 30 00-06 Telecom Cabinet Foundation; 800 mm length x 800 mm width x 900 mm height Supply and construction of telecom cabinet foundation including excavation, disposal of excavated materials, damp proofing, formwork, reinforced concrete, waterproofing and backfilling. SW1-03 30 00-07 Electrical Panel Board Foundation; 800 mm length x 600 mm width x 900 mm height Supply and construction of telecom cabinet foundation including excavation, damp proofing, formwork, reinforced concrete, waterproofing and backfilling. SW1-03 30 00-08 Handhole; 1,200 mm length x ,1200 mm width x 1,100 mm height Supply and construction of reinforced concrete handholes including excavation, disposal of excavated materials, backfilling, reinforced concrete handhole, damp proofing, formwork and waterproofing. SW1-05 00 00 SW1-05 12 00 SW1-05 12 00-01 Metal Structural Steel Framing Overhead Road Gantry; TWS-1 Supply and construction of Overhead Road Gantry for TWS-1 including walkway. SW1-05 12 00-02 Overhead Road Gantry; TWS-2 Supply and construction of Overhead Road Gantry for TWS-2 including walkway. Overhead Road Gantry; TWS-3 Supply and construction of Overhead Road Gantry for TWS-3 including walkway. SW1-05 12 00-03 F-1-12 Contract No. 08C-C12 SW1-05 12 00- Overhead Road Gantry; TWS-4 Supply and construction of Overhead Road Gantry for TWS-4 including walkway. SW1-05 12 00-05 Overhead Road Gantry; TWS-5 Supply and construction of Overhead Road Gantry for TWS-5 including walkway . SW1-05 12 00-06 Overhead Road Gantry; TWS-6 Supply and construction of Overhead Road Gantry for TWS-6 including walkway . SW1-05 12 00-07 Overhead Road Gantry; TWS-7A Supply and construction of Overhead Road Gantry for TWS-7A including walkway . SW1-05 12 00-08 Overhead Road Gantry; TWS-7B Supply and construction of Overhead Road Gantry for TWS-7B including walkway . SW1-05 12 00-09 Overhead Road Gantry; TWS-8A Supply and construction of Overhead Road Gantry for TWS-8A including walkway . SW1-05 12 00-10 Overhead Road Gantry; TWS-8B Supply and construction of Overhead Road Gantry for TWS-8B including walkway . SW1-05 12 00-11 Overhead Road Gantry; TWS-9 Supply and construction of Overhead Road Gantry for TWS-9 including walkway . SW1-05 12 00-12 Overhead Road Gantry; TWS-10 Supply and construction of Overhead Road Gantry for TWS-10 including walkway . SW1-05 52 00 Metal Railing Supply and installation of galvanized steel guardrail with end terminals including steel posts and steel blocks with concrete foundation. This Item also include excavation, backfilling, disposal of unused materials and foundation waterproofing. SW1-10 00 00 Specialties SW1-10 14 53 Traffic Signage F-1-13 Contract No. 08C-C12 SW1-10 14 53-01 Relocation of existing road sign assembly supported on single tubular post Removal and re-installation of existing road sign assembly supported on single tubular post. Shall include demolition and disposal of existing foundation, construction of new concrete foundation, excavation, backfilling, disposal of unused materials and foundation waterproofing. SW1-10 14 53-02 Relocation of existing road sign assembly supported on dual tubular post Removal and re-installation of existing road sign assembly supported on dual tubular post. Shall include demolition and disposal of existing foundation, construction of new concrete foundation, excavation, backfilling, disposal of unused materials and foundation waterproofing. SW1-10 14 53-03 Road sign assembly supported on single tubular post Installation of existing road sign assembly supported on single tubular post. Shall include demolition and disposal of existing foundation, construction of new concrete foundation, excavation, backfilling, disposal of unused materials and foundation waterproofing. Supply and installation of post mounted road signs with concrete foundation and related earthworks. This item also include excavation, backfilling, disposal of unused materials and foundation waterproofing. SW1-31 00 00 Earthworks SW1-31 23 00 Excavation and Fill SW1-31 23 00-01 SW1-31 23 00-02 Selected Fill Shall include clearing and excavating from designated Royal Commission borrow pits, transporting, spreading, leveling, grading, compacting to finished grade levels and formation of slopes. The Works shall also include the required laboratory tests. Trial trenches/excavations Provision of trial trenches/excavations (manually) as required for locating existing underground feature/utilities such as potable water, treated sewage effluent (TSE), storm water drainage, sanitary sewage, electrical and telecommunication systems, foundations, etc. as directed by Royal Commission for interfacing utilities coordination with adjacent boundaries and other related Contracts. All discoveries are to be recorded and scaled drawing(s) produced, showing locations, coordinates, dimensions, levels, type and function of utilities as per Royal Commission requirements. SW1-31 25 00 Erosion and Sedimentation Controls F-1-14 Contract No. 08C-C12 SW1-31 25 00-01 SW1-31 63 23 Aggregate Erosion Protection (AEP); 150 mm thick Supply and construction of aggregate erosion protection. Bored Concrete Piles SW1-31 63 23-01 Concrete piles for TWS-1 Shall include construction of cast-in place reinforced concrete bored pile foundations with reinforced concrete pile caps, anchor plates, anchor bolts, base plates, nuts, washers and cement grouts. The item shall also include excavation, dewatering, disposal of excavated material to RC designated disposal area, backfilling and waterproofing. Shall also include pile integrity and load testing. This item also includes removal of concrete curbs and slope protection which require for the construction of gantry foundations and complete reinstatement of concrete curbs and slope protection after completion of gantry foundation construction. SW1-31 63 23-02 Concrete piles for TWS-2 Shall include construction of cast-in place reinforced concrete bored pile foundations with reinforced concrete pile caps, anchor plates, anchor bolts, base plates, nuts, washers and cement grouts. The item shall also include excavation, dewatering, disposal of excavated material to RC designated disposal area, backfilling and waterproofing. Shall also include pile integrity and load testing. This item also includes removal of concrete curbs and slope protection which require for the construction of gantry foundations and complete reinstatement of concrete curbs and slope protection after completion of gantry foundation construction. SW1-31 63 23-03 Concrete piles for TWS-3 Shall include construction of cast-in place reinforced concrete bored pile foundations with reinforced concrete pile caps, anchor plates, anchor bolts, base plates, nuts, washers and cement grouts. The item shall also include excavation, dewatering, disposal of excavated material to RC designated disposal area, backfilling and waterproofing. Shall also include pile integrity and load testing. This item also includes removal of concrete curbs and slope protection which require for the construction of gantry foundations and complete reinstatement of concrete curbs and slope protection after completion of gantry foundation construction. SW1-31 63 23-04 Concrete piles for TWS4Shall include construction of cast-in place reinforced concrete bored pile foundations with reinforced concrete pile caps, anchor plates, anchor bolts, base plates, nuts, washers and cement grouts. F-1-15 Contract No. 08C-C12 The item shall also include excavation, dewatering, disposal of excavated material to RC designated disposal area, backfilling and waterproofing. Shall also include pile integrity and load testing. This item also includes removal of concrete curbs and slope protection which require for the construction of gantry foundations and complete reinstatement of concrete curbs and slope protection after completion of gantry foundation construction. SW1-31 63 23-05 Concrete piles for TWS5Shall include construction of cast-in place reinforced concrete bored pile foundations with reinforced concrete pile caps, anchor plates, anchor bolts, base plates, nuts, washers and cement grouts. The item shall also include excavation, dewatering, disposal of excavated material to RC designated disposal area, backfilling and waterproofing. Shall also include pile integrity and load testing. This item also includes removal of concrete curbs and slope protection which require for the construction of gantry foundations and complete reinstatement of concrete curbs and slope protection after completion of gantry foundation construction. SW1-31 63 23-06 Concrete piles for TWS6Shall include construction of cast-in place reinforced concrete bored pile foundations with reinforced concrete pile caps, anchor plates, anchor bolts, base plates, nuts, washers and cement grouts.The item shall also include excavation, dewatering, disposal of excavated material to RC designated disposal area, backfilling and waterproofing. Shall also include pile integrity and load testing. This item also includes removal of concrete curbs and slope protection which require for the construction of gantry foundations and complete reinstatement of concrete curbs and slope protection after completion of gantry foundation construction. SW1-31 63 23-07 Concrete piles for TWS7-A Shall include construction of cast-in place reinforced concrete bored pile foundations with reinforced concrete pile caps, anchor plates, anchor bolts, base plates, nuts, washers and cement grouts. The item shall also include excavation, dewatering, disposal of excavated material to RC designated disposal area, backfilling and waterproofing. Shall also include pile integrity and load testing. This item also includes removal of concrete curbs and slope protection which require for the construction of gantry foundations and complete reinstatement of concrete curbs and slope protection after completion of gantry foundation construction. SW1-31 63 23-08 Concrete piles for TWS7-B F-1-16 Contract No. 08C-C12 Shall include construction of cast-in place reinforced concrete bored pile foundations with reinforced concrete pile caps, anchor plates, anchor bolts, base plates, nuts, washers and cement grouts. The item shall also include excavation, dewatering, disposal of excavated material to RC designated disposal area, backfilling and waterproofing. Shall also include pile integrity and load testing. This item also includes removal of concrete curbs and slope protection which require for the construction of gantry foundations and complete reinstatement of concrete curbs and slope protection after completion of gantry foundation construction. SW1-31 63 23-09 Concrete piles for TWS8-A Shall include construction of cast-in place reinforced concrete bored pile foundations with reinforced concrete pile caps, anchor plates, anchor bolts, base plates, nuts, washers and cement grouts. The item shall also include excavation, dewatering, disposal of excavated material to RC designated disposal area, backfilling and waterproofing. Shall also include pile integrity and load testing. This item also includes removal of concrete curbs and slope protection which require for the construction of gantry foundations and complete reinstatement of concrete curbs and slope protection after completion of gantry foundation construction. SW1-31 63 23-10 Concrete piles for TWS8-B Shall include construction of cast-in place reinforced concrete bored pile foundations with reinforced concrete pile caps, anchor plates, anchor bolts, base plates, nuts, washers and cement grouts.The item shall also include excavation, dewatering, disposal of excavated material to RC designated disposal area, backfilling and waterproofing. Shall also include pile integrity and load testing. This item also includes removal of concrete curbs and slope protection which require for the construction of gantry foundations and complete reinstatement of concrete curbs and slope protection after completion of gantry foundation construction. SW1-31 63 23-11 Concrete piles for TWS9Shall include construction of cast-in place reinforced concrete bored pile foundations with reinforced concrete pile caps, anchor plates, anchor bolts, base plates, nuts, washers and cement grouts. The item shall also include excavation, dewatering, disposal of excavated material to RC designated disposal area, backfilling and waterproofing. Shall also include pile integrity and load testing. This item also includes removal of concrete curbs and slope protection which require for the construction of gantry foundations and complete reinstatement F-1-17 Contract No. 08C-C12 of concrete curbs and slope protection after completion of gantry foundation construction. SW1-31 63 23-12 Concrete piles for TWS10Shall include construction of cast-in place reinforced concrete bored pile foundations with reinforced concrete pile caps, anchor plates, anchor bolts, base plates, nuts, washers and cement grouts.The item shall also include excavation, dewatering, disposal of excavated material to RC designated disposal area, backfilling and waterproofing. Shall also include pile integrity and load testing. This item also includes removal of concrete curbs and slope protection which require for the construction of gantry foundations and complete reinstatement of concrete curbs and slope protection after completion of gantry foundation construction. SW1-32 00 00 SW1-32 11 16 Exterior Improvements Sub-Base Courses Supply and construction of aggregate sub-base course. SW1-32 11 23 Aggregate Base Courses Supply and construction of aggregate base course. SW1-32 11 26 Asphaltic Base Courses Supply and construction of bituminous concrete speed humps with 45° diagonal white stripping. SW1-32 12 16 SW1-32 12 16-01 Asphalt Paving Surface Course; 70 mm thick Supply and construction of asphalt surface course including application of prime coat. SW1-32 12 16-02 Base Course; 180 mm thick Supply and construction of asphalt base course including application of tack coat. SW1-32 15 40 SW1-32 15 40-01 Crushed Stone Surfacing Aggregate Mulch; 50 mm thick Supply and laying of aggregate mulch. SW1-32 16 00 SW1-32 16 00-01 Curbs, Gutters, Sidewalks, and Driveways Precast Concrete Curb; Type A1 F-1-18 Contract No. 08C-C12 Supply and installation of precast concrete curb including excavation, backfilling, mortar bed and concrete haunching. SW1-32 16 00-02 Precast Concrete Curb; Type B Supply and installation of precast concrete curb including excavation, backfilling, mortar bed and concrete haunching. SW1-32 17 00 SW1-32 17 00-01 Paving Specialties Painted Road Markings; Straight Arrow Supply and application of thermoplastic road markings. SW1-32 17 00-02 Painted Road Markings; Left Arrow Supply and application of thermoplastic road markings. SW1-32 17 00-03 Yellow reflective edge line; 200 mm, continuous line Supply and application of thermoplastic road markings. SW1-32 17 00-04 Raised Pavement Markers; Non-Reflective, All white Supply and installation of raised pavement markers. SW1-32 17 00-05 Raised Pavement Markers; One-Way Reflective-Yellow Supply and installation of raised pavement markers. SW1-32 17 00-06 Raised Pavement Markers; One-Way Reflective-Clear Supply and installation of raised pavement markers. SW1-32 39 13 SW1-32 39 13-01 Manufactured Metal Bollards Concrete Filled Ductile Iron Bollard; 150 mm diameter Supply and construction of ductile iron concrete filled bollards with concrete foundation. This item also includes excavation, backfilling, disposal of unused materials and foundation waterproofing. SW1-33 00 00 SW1-33 40 00 SW1-33 40 00-01 SW1-33 40 00-02 Utilities Stormwater Utilities Concrete Encased Reinforced Plastic Mortar (RPM) Pipe; 300 mm diameter Supply and installation of concrete encased RPM pipe. The item shall also include excavation, disposal of unsuitable materials, shoring, dewatering, pipe beddings, backfilling, warning tape, all fittings and accessories. Catchpit; 1,400 mm x 1,400 mm Supply and construction of reinforced concrete catch pit with heavy-duty galvanized steel grate cover and frame. The item shall also include excavation, backfilling, disposal of unsuitable materials, shoring, dewatering, damp roofing, waterproofing, water stopper, reinforcement, formwork, F-1-19 Contract No. 08C-C12 concrete, FRP ladder and all necessary work required for the complete construction of catch pit. This shall also include demolition and reinstatement of road layers to allow the construction of catch pit . SW1-33 40 00-03 Overside Drain with Splash Pad Supply and construction of overside drain with splash pad. The work shall include excavation, backfilling, concrete apron, leveling concrete, grouted rip-rap, loose rip-rap and dumped rip-rap. SW1-33 40 00-04 Swale, 1,200 mm wide Supply and construction of swale including excavation, backfilling, leveling and disposal of unused materials to the Royal Commission disposal area. SW2 SW2-27 00 00 SW2-27 05 26 SITE WEIGH IN MOTION (WIM) SYSTEM Communications Grounding and Bonding for Communications Systems Shall include supply and installation of tinned bare copper conductor including, PVC bonding cables, copper clad steel grounding rods, exothermic weld points, inspection pits and interconnection of these items to make a complete grounding system as per Contract drawings and specifications. SW2-27 05 43 Underground Ducts and Raceways for Communication Systems SW2-27 05 43-01 HDPE Ducts Shall include supply and installation of HDPE Ducts including all accessories as shown on the Contract drawings and specified in the Contract documents. SW2-34 00 00 SW2-34 41 23 SW2-34 41 23-01 Transportation Roadway Monitoring Equipment WIM Units Supply, installation, testing and commissioning of Weigh In Motion units complete with road-installed items of two piezo-electric sensors and an inductive loop per traffic lane and electronic unit installed in a protective roadside cabinet as shown in Contract Drawings and Specifications. SW2-34 41 23-02 License Plate Recognition (LPR) Camera Supply, installation, testing and commissioning of license plate recognition camera as shown in Contract Drawings and Specifications. This is all in one digital IP camera, illuminator and integrated computer. The integrated computer (which is built into the housing) specifically designed for Automatic Number-Plate Recognition (ANPR) application equipped with lens; allows the camera itself to recognize any type of vehicle passing in front of the F-1-20 Contract No. 08C-C12 camera and then run ANP. SW2-34 41 23-03 CONTEXT Dome Camera Supply, installation, testing and commissioning of CONTEXT Camera as shown in Contract Drawings and Specifications. This is an all-in-one Web-Based Digital Network Speed Dome Camera for remote surveillance application. It features Pan/Tilt/Zoom capabilities and a CCD module to distribute compressed live video on to the network via an Ethernet connection. The device can be controlled via the software Pan/Tilt/Zoom functionality (or by an external hardware controller) to get the best monitoring angle easily via a standard browse. The device is also self-contained Web Server. Users access the Network Dome Camera just like browsing a website over Internet and can simply perform all the management, configuration, and monitoring. The device contains an image compression chipset which is capable of delivering standard JPEG, MJPEG and real-time video onto your network. SW2-34 41 23-04 WIM Industrial PC Supply, installation, testing and commissioning of software and license for WIM units as shown in Contract Drawings and Specifications. SW2-34 41 23-05 Software and License for WIM units Supply, installation, testing and commissioning of software and license for WIM units as shown in Contract Drawings and Specifications. SW2-34 41 23-06 Software and License for ANPR and CCTV System Supply, installation, testing and commissioning of software and license for ANPR and CCTV System as shown in Contract Drawings and Specifications. SW2-34 41 23-07 Outdoor Rack Cabinet 33U, IP65 Supply, installation, testing and commissioning of double-skinned IP 65 rated Outdoor Rack Cabinets. The cabinet shall comprise with Thermostat, cooling fan, DC-DC Convertor, Terminal blocks, Power regulator, power supply units, Two PDU 16 Amp multiutility AC Power & sockets, I/O Universal controller, Circuit breaker, Surge arrestors, Power socket, UPS, door switches and shelves and space to house industrial PC, HSWIM Controller, Output module unit for cameras, Terminal blocks for loops connections, Piezo ceramic connections, grounding and bonding and any other items as shown in Contract Drawings and Specifications. SW2-34 41 23-08 FTP CAT 6A Cable Supply, installation, testing and commissioning of FTP CAT 6A cable including, cable markers, conduits, fittings and all necessary accessories units as shown in Contract Drawings and Specifications. F-1-21 Contract No. 08C-C12 SW3 SITE COMMUNICATION SYSTEM SW3-33 00 00 Utilities SW3-33 83 00 Wireless Communications Transmission and Distribution SW3-33 83 00-01 3G/4G/LTE Router Supply, installation, testing and commissioning of 3G/4G/LTE Routers as shown on the Contract drawings and specified in the Contract documents. SW3-33 83 00-02 SIM Cards Supply, installation, testing and commissioning of SIM Cards as shown on the Contract drawings and specified in the Contract documents. SW3-33 83 00-03 Gigabit Industrial Ethernet L2 Switch, 10 Port + POE Supply, installation, testing and commissioning of Gigabit Industrial Ethernet L2 Switch, 10 POE + Port as shown on the Contract drawings and specified in the Contract documents. SW3-33 83 00-04 Antenna including pole Supply, installation, testing and commissioning of Antenna including pole as shown on the Contract drawings and specified in the Contract documents. SW4 SITE TRAFFIC CONTROL (AT RCJ DATA CENTRE) SW4-27 00 00 Communications SW4-27 20 00 Data Communications SW4-27 20 00-01 WIM Cluster Servers Supply, installation, testing and commissioning of WIM Cluster Servers. The WIM server system in the Data Centre shall consist of two servers with cluster configuration, one primary server and one stand-by server. Each of the two servers in the cluster shall meet or exceed the minimum requirements stated under Contract Specifications. SW4-27 20 00-02 Windows OS Server Licenses (Hosts and Virtual Machines) Supply, installation, testing and commissioning of Windows OS Server Licenses (Hosts and Virtual Machines) as shown on the Contract drawings and specified in the Contract documents. SW4-27 20 00-03 Database License Supply, installation, testing and commissioning of Database License as shown on the Contract drawings and specified in the Contract documents. F-1-22 Contract No. 08C-C12 SW4-27 20 00-04 Ethernet Cable Supply, installation, testing and commissioning of Ethernet Cable as shown on the Contract drawings and specified in the Contract documents. SW4-27 20 00-05 42 U Rack Supply, installation, testing and commissioning of 42U rack including UPS with 2-hour battery backup, fiber patch panels and patch chords and any other items as shown on the Contract drawings and specified in the Contract documents. SW5 SITE TRAFFIC MANAGEMENT CENTRE SW5-27 00 00 Communications SW5-27 20 00 Data Communications SW5-27 20 00-01 Workstations Supply, installation, testing and commissioning of Workstations as shown on the Contract drawings and specified in the Contract documents SW5-27 20 00-02 Windows License Supply, installation, testing and commissioning of Windows License as shown on the Contract drawings and specified in the Contract documents SW5-27 20 00-03 24" Workstation Monitor Supply, installation, testing and commissioning of 23" Workstation Monitors as shown on the Contract drawings and specified in the Contract documents SW5-27 20 00-04 Dual Monitor Stand for Desk Supply, installation, testing and commissioning of Dual Monitor Stand for Desk as shown on the Contract drawings and specified in the Contract documents. SW5-27 20 00-05 Laser Printer Supply, installation, testing and commissioning of Laser Printer as shown on the Contract drawings and specified in the Contract documents. SW5-27 20 00-06 Violations Management Software Supply, installation, testing and commissioning of Violations Management Software as shown on the Contract drawings and specified in the Contract documents. SW5-27 20 00-07 WIM Reporting Software F-1-23 Contract No. 08C-C12 Supply, installation, testing and commissioning of WIM Reporting Software with traffic reports, alarm reports and violation reports as shown on the Contract drawings and specified in the Contract documents. SW5-27 20 00-08 Integration of WIM Alarms/Signals into the Existing Software All works and materials necessary for integration of WIM Alarms/Signals/Information into the Existing Software as shown on the Contract drawings and specified in the Contract documents. F-1-24 Contract No. 08C-C12 SW6 SITE ELECTRICAL SYSTEM SW6-26 00 00 Electrical Works SW6-26 05 19 Low Voltage Electrical Power Conductors and Cables Shall include supply and installation of 600/1,000V CU/XLPE/SWA/PVC, CU/XLPE/PVC & CU/PVC (E) type cables laid in trench direct buried or in duct ways including splices, taps, termination, protection connection and identifications and any other items required. Except for the length of duct banks at crossings being covered under separate pay items, the Work shall also include making trenches, providing cable tiles, warning tape, sand bed and surround to cables and backfilling of the excavated trench where necessary. All Works to be inclusive of all testing and commissioning and expenses associated with this Work as shown on the Contract drawings and as specified in the Contract documents. SW6-26 05 26 Grounding and Bonding for Electrical Systems Shall include supply and installation of tinned bare copper conductor including, PVC bonding cables, copper clad steel grounding rods, exothermic weld points, inspection pits and interconnection of these items to make a complete grounding system as per Contract drawings and specifications. SW6-26 06 20.26 Single receptacle outlet; 13A, weather proof Supply and installation of power receptacles complete with cover plates and all accessories including utility boxes, bolts, screws, supports as shown in drawings. Receptacle shall be SASO compliant and as required by Royal Commission (RC) including Royal Commission Specifications and Guidelines, IP-65 for special type. All type of receptacles shall be grounding type and fully functional including testing and commissioning as per Royal Commission Specifications and Guidelines Section 262726 and, applicable standards including UL and NFPA 70/NEC. SW6-26 24 16 Panel Boards Supply and installation of power panels including the incoming circuit breaker and MCBs, bus bars for power, grounding and neutral, enclosure with hinged cover, bolts, supports including anchor bolts and all components and accessories required for complete and fully functional installation including testing and commissioning as per Royal Commission Specifications and Guidelines Section 262416 and applicable standards including UL standard. F-1-25 Contract No. 08C-C12 SW6-26 28 00 Low-Voltage Circuit Protective Devices SW6-26 28 00-11 Molded Case Circuit Breakers (MCCB) Supply, installation, testing and commissioning of Main Circuit Breaker (MCB) complete with enclosure with hinged cover, bolts, support including anchor bolts and all component and accessories required. Grounding system to be fully functional in compliance with the Royal Commission Guideline Specifications and applicable standards including UL and as shown on the Contract drawings and specified in the Contract documents. SW6-26 56 13 Lighting Poles and Standards SW6-26 56 13-01 Relocation of Street Lighting Poles Shall include removal and relocating street lighting poles, relocating the pole foundation, dismantling the cables from both ends and any associated works as required to complete the works as shown on the Contract drawings and specified in the Contract documents. SW6-26 56 13-02 Cables Shall include supply, installation, testing and commissioning of 600/1,000V XLPE/SWA/PVC insulated copper cable and XLPE/PVC grounding cable by laying in trench direct buried or in duct ways, splices, taps, termination, protection connection and identifications. Except for the length of duct banks at crossings being covered under separate items, the Work shall also include making trenches, tags, ties, cable markers, cable tiles, warning tape, sand bed and surround to cables and backfilling of the excavated trench all as shown on the Contract drawings and specified in the Contract document. SW6-33 00 00 SW6-33 71 19 UTILITIES Concrete Encased Duct bank Shall include supply and construction of low voltage reinforced concrete duct bank, including supply and installation of uPVC ducts, couplings and associated fittings, duct spacers, jointing, grounding wires, draw wires, excavation, dewatering, reinforced concrete bed and surround, expansion joints, waterproofing, warning tape, red concrete or paint on top of concrete, backfilling and compaction, lug and cable/duct seal and making all ducts clear of obstruction on completion and reinstatement of the ground as per Contract drawing and specified in the Contract documents. SW6-33 05 07 Trenches Installation of Utility Piping SW6-33 05 07-13 Horizontal Directional Drilling (HDD) Shall include supply and installation of road crossing steel casing pipe sleeves of specified sizes and lengths by HDD or thrust boring method including all the equipment, labour, excavation, dewatering, traffic safety and control measures, required work permits and approvals from Royal Commission as shown in the Contract drawings and documents. Shall also F-1-26 Contract No. 08C-C12 include providing the corrosion protection paints to steel casing pipe, sand filling in the annular space of pipe sleeve and carrier pipe, filling the gap at the ends with approved filler material and sealant as per RC direction. Contractor should verify the ground condition and seek approval from RC Geotechnical Engineer before proceeding with HDD. The Contractor shall submit a detailed methodology and drawings for execution of HDD works for RC approval prior to construction. The Contractor shall be solely responsible for the safety of all parties at the Worksite. Selection of drilling procedures and equipment shall provide protection against electrical shock. Grounding mats, grounded equipment, hot boots, hot gloves, safety glasses and hard hats shall be used. Drilling equipment shall have an alarm system capable of detecting electrical current. Magnetic Guidance System (MGS) probe or proven gyroscopic probe and interface shall be used to provide a continuous and accurate determination of the location of the drill head during the drilling operation. Guidance system shall be a proven type and shall be setup and operated by personnel trained and experienced with this system. The operator shall be aware of any geomagnetic anomalies and shall consider such influences in the operation of the guidance system if using magnetic system. All personnel shall be fully trained in their respective duties as part of the directional drilling crew and in safety. The Contractor must show job history and reference list of equal or greater size and length of piping involved. Supervisor must have at least two years directional drilling experience. A competent and experienced supervisor representing the drilling contractor shall be present at all times during the actual drilling operations. A responsible representative who is thoroughly familiar with the equipment and type work to be performed, must be in direct charge and control of the operation at all times. After completion of Works, including the drilling, placing of steel pipe, polyethylene ducts and sub-ducts, the Contractor shall de-mobilize equipment and restore the Worksite to its original condition. Any noticeable surface defects, due to the drilling operation, shall be repaired by the Contractor. SW6-33 71 19.13 Electrical Manholes and Handholes SW6-33 71 19.13-01 Relocation of Existing Electrical Manholes Relocation of existing electrical manholes including excavation, backfilling, disposal of unsuitable materials to the RC designated disposal area, removal of manhole, re-installation of manholes with all necessary earthworks and concrete works for a complete installation. F-1-27 Contract No. 08C-C12 SECTION 3.0 MEASUREMENT FOR PAYMENT 3.01 GENERAL This section defines how pay items, enumerated in Attachment G - Price and Payment Provisions are measured for payment. The estimated quantities detailed within Attachment G are for Bid evaluation purposes. Only satisfactorily completed Work will be eligible for invoicing. A. Work Measured Work shall be measured net as fixed in position and each measurement shall be taken to the nearest 0.1 meter. This principle shall not apply to dimensions stated in descriptions. Unless otherwise stated, no deduction shall be made from items required to be measured by area for areas of less than 1.00 m2. Deductions shall refer only to areas within the edges of measured areas; areas, which are at the edges of measured areas, shall always be deducted irrespective of size. 3.02 METHOD OF MEASUREMENT This subsection defines the method of measurement of particular items of Work. A. B. Excavation to lower grade levels shall be the net volume of earth before excavation to lower the grade level of the existing Site to: The finished grades (adjusted for the required thickness of stone mulch, marl, S1eet sand fill) in unpaved areas. Formation levels under proposed roads and pavings. The bed levels of shrubs and ground cover planting adjusted to the required thickness of planting soil excluding tree-planting pits in the proposed planting areas. The excavation shall be net volume regardless of the method adopted by the Contractor to execute the Work. Imported filling material shall be the net volume of imported material less excavated material used for fill required to fill the Site from existing levels to: F-1-28 Contract No. 08C-C12 The finished grades (adjusted for the required thickness of stone mulch, marl, S1eet sand fill) in unpaved areas. Formation levels under proposed roads and paving. The bed levels of shrubs and ground cover planting adjusted to the required thickness of planting soil excluding tree-planting pits in the proposed planting areas. The imported filling material shall be net volume regardless of the method adopted by Contractor to execute the Work. C. The measurement for cutting roads shall be measured along the centerline of the excavation and includes the lengths of road and sidewalk crossed. D. The measurement of asphalt surface course, asphalt base course, road base and subbase shall be the area required to fill the excavation as per the required thickness of each course. E. The measurement for curbs shall be along the inside face of the curb. F. Measurement for curb marking shall be the length measured along the marked section of curb. G. The measurement of drains, sewers, pipework, ducts and duct bank shall be taken in the horizontal plane between outer faces of structure and other items, which are subject to separate measurement. H. The measurement of cables or conductors in ducts or direct buried in trench shall be the straight line horizontal distance between center to center of manholes or main equipment center or along the trench center line. When changes of direction occur between points of measurement, coordinates of intermediate points of intersection shall be used. No adjustment will be made for splices, terminations, tap and offsets in manhole and chambers for cable staking. I. The measurement of pavement markings shall be taken in the horizontal plane between outer edges. J. The measurement of material for asphalt and aggregate courses shall be net volume regardless of the method adopted by Contractor to execute the Work. K. The measurement of planting soil shall be the actual volume to be filled; no deduction shall be made for the root-ball. F-1-29 Contract No. 08C-C12 3.03 UNIT FOR MEASUREMENT Unit Each (Ea) Measurement of Payment - Paid progressively as Work proceeds, based on percentage of Work satisfactorily completed, under the cost of materials delivered to Site to be incorporated into the permanent works. Payment for material deliveries shall not exceed 50 % of the amount of the unit price included in the Schedule of Quantities and Prices. The total payment for material delivery and installation shall not exceed 80% of the unit rate amount. The remaining 20% shall be paid upon the successful completion of the Work including testing and commissioning, if required. Linear meter (m) - Paid progressively as Work proceeds, based on percentage of Work satisfactorily completed, under the cost of materials delivered to Site to be incorporated into the permanent works. Payment for material deliveries shall not exceed 50 % of the amount of the unit price included in the Schedule of Quantities and Prices. The total payment for material delivery and installation shall not exceed 80% of the unit rate amount. The remaining 20% shall be paid upon the successful completion of the Work including testing and commissioning, if required. Square meter (m²) - Paid progressively as Work proceeds, based on percentage of Work satisfactorily completed. Cubic meter (m³) - Paid progressively as Work proceeds, based on percentage of Work satisfactorily completed. Lump Sum (LS) - Payment shall be made in accordance with Table H-2: Payment Schedule Man-hour (Mh) Man-hours actually expended for the execution of the work. Set - Paid progressively as work proceed. F-1-30 Contract No. 08C-C12