Alteration & Addition (Lecture Notes) Alteration Works Works done to existing building to keep update with the contemporary standards & use Addition works Works done to existing building to enhance space and volume for enjoyment Government Departments Concerned Same as new works, A&A works always involve the following major government departments - Lands Department -Town Board/ Planning Department -Buildings Department -Fire Services Department Major Ordinances Major ordinances to come across and comply with for the A&A works include: -Building Ordinance The Buildings Ordinance (BO) aims to regulate the planning, design and construction of buildings and associated works on private land. Yhis Ordinance prescribes building design and construction standards. -Town Planning Ordinance The Ordinance makes provision for the systematic preparation and approval of plans for the lay-out of areas of Hong Kong as well as for the types of building suitable for erection there. It empowers the making of statutory plans or Outline Zoning plans. -Land Lease A land lease is not an ordinance in deed but a contract signed by the Government, through the LandsD in the capacity of a landlord, with a land 1 owner for the use of a piece of land. The land owner is obliged to comply with the lease conditions. The LandsD will take appropriate lease enforcement actions including re-entry in the capacity as the landlord when breaches of lease conditions are established. -Fire Safety (Buildings) Ordinance The Fire Safety (Buildings) Ordinance (the “FS(B)O”) came into operation on 1 July 2007. The purpose of this ordinance is to provide better protection from fire risk for visitors, occupants and users of pre-1987 composite buildings (partly for domestic purposes and partly for non-domestic purposes) and domestic buildings (more than 3 storeys) (target buildings) by upgrading the buildings to current fire safety standards. Owners/occupiers of such buildings are required to improve the fire safety measures which include fire service installations and equipment as well as fire safety construction of the building. -Fire Safety (Commercial Building) Ordinance The purpose of this ordinance is to provide better protection from fire risk for visitors, occupants and users of prescribed commercial premises such as banking hall, supermarket or shopping arcade exceeding 230 sq.m and specified commercial buildings like pre-1987 buildings used for the purposes of office, business, trade or any entertainment, by upgrading the premises or buildings to current fire safety standards. Owners/occupiers of such premises or buildings are required to improve the fire safety measures including the fire service installations and equipment as well as the fire safety construction of the building. -Hong Kong Airport (Control of Obstructions) Ordinance This Ordinance prescribes the height restrictions of buildings for safety of air flights. -Antiques & Monuments Ordinance This Ordinance prohibits any work being carried out on declared and proposed monument site without a permit issued by the Secretary for Development. Accordingly, unless a permit under section 6 of Cap.53 has been obtained and a copy of such produced to the Buildings Department, plans for building works affecting a building which has been declared a Monument or a Proposed Monument may be disapproved. 2 Buildings Regulations & Relevant Documents - Building Regulations The Building Ordinance lays down the minimum standard of public health and safety on building works. Public health covers lighting & ventilation, provision of sanitary fitments and drainage, lane, open space, floor height, density, etc. Safety includes site safety during construction, structural safety and fire safety provisions. The Building Ordinance includes a set of building regulations which elaborate on the various requirements of the Building Ordinance. Thus the Buildings Ordinance is said to be the “Basic Law” or backbone to regulate/control the building works while Building Regulations provide the “flesh” and lay down technical requirements. Here are some of the main building regulations: • • • • • • • Building (Administration) Regulations Building (Construction) Regulations Building (Demolition) Regulations Building (Planning) Regulations Building (Standards of Sanitary Fitments, Plumbing, Drainage Works &Latrines) Regulations Building (Ventilation Systems) Regulations Building (Minor Works) Regulation - Codes of Practice The Ordinance and its subsidiary Regulations are passed as laws by the Legislative Council. However, the Building Authority has published from time to time Codes of Practice, Design Manuals and Guidelines that further elaborate/explain on the technical requirements of the regulations. Major codes of practice include: • • Code of Practice for Building Works for Lifts & Escalators Code of Practice for the Structural Use of Steel 2005 3 • • Code of Practice for Fire Safety in Buildings 2011 Codes of Practice for Minimum Fire Service Installations and Equipment and Inspection, Testing and Maintenance of Installations and Equipment 2012 (this Code is published by the Fire Services Department) - Design Manuals There are several but the main one is: • Design Manual-Barrier Free Access 2008 The manual specifies the requirements to provide to persons with a disability like wheel chair users, persons with visual/hearing impairment for the means of access such as ramp, disable lift , tactile guide path etc. as well as the appropriate facilities for their use once inside the premises e.g. disable toilet., visual alarms etc. - Guidelines Here are the three main guidelines for A&A works • General Guidelines on Minor Works Control System As the name indicates, it sets out the procedures and requirements for regulating the minor works. These procedures and requirements are simpler than the system of prior approval and consent of the Building Authority for carrying out building works. • Technical Guidelines on minor Works Control System This document gives the contractors who are interested in carrying out “minor works” under the “simplified requirements” a clear understanding of the new “minor works control system”. Apart from identifying their legal responsibilities, technical guidance, recommended design and details, and safety instructions for complying with this legislation are provided to facilitate contractors carrying out the minor works. 4 • Practical Guidebook for Adaptive Re-use of & Alteration &Addition Works to Heritage Buildings 2012 As its title indicates, this Practice Guidebook mainly provides design guidelines as well as safety and health requirements under the BO for A&A works done to adapt reuse of heritage buildings. - Practice Notes & Joint Practice Notes for APs, RSEs &RGEs The Building Authority (BA) issues practice notes to authorized persons (AP), registered structural engineers (RSE) and registered geotechnical engineers (RGE) from time to time to inform these building professionals how the BA applies and enforces the provisions of the Buildings Ordinance (BO) and its subsidiary regulations. PNAPs are now categorized into three parts according to the nature of their contents. PNAPs with the prefix letters (ADM) relating to the general administration of the Buildings Department (BD) and other administrative matters relating to plan approval, issue of consent and occupation permits and related matters; PNAPs with the prefix letters (APP) explain how the BA applies and enforces the provisions of the BO and its regulations, and PNAPs with the prefix letters (ADV) are of general advisory nature, promoting good practices to the practitioners in the building industry. Alteration & Addition Building Plan Approval & Work Consent - Statutory Actors AP, RSE, RGE, RGBC/RSC Any person who intends to carry out alteration or addition building works in existing premises is required by law to appoint an authorized person, and where necessary a registered structural engineer, to prepare and submit plans for the approval of Building Authority under the Buildings Ordinance. He is also required to appoint a registered general building contractor (RGBC) or registered specialist contractor (RSC), as the case may be, to carry out the building works. 5 Authorized Person (AP) is the co-ordinators of building works. Registered Structural Engineer (RSE) and Registered Geotechnical Engineer (RGE) are responsible respectively for the structural elements and geotechnical aspects of building works, while RGBC is responsible for the carrying out the building works Duties of these statutory actors are: (a) to supervise the carrying out of the building works in accordance with the supervision plan (AP to provide periodic supervision; RGBC to provide continuous supervision) ; (b) to notify the Building Authority if there is any contravention of the Building Ordinance and its regulations; and (c) to comply generally with the Building Ordinance - Authorized Person There are 3 lists in the BD's AP register -architect, engineer & surveyor. Applicant can apply for inclusion in one or more of the lists. To qualify for inclusion in the list or register, the applicant must be a (i) Registered architect (RA), registered professional engineer (RPE) in the structural or civil engineering discipline or registered professional surveyor (RPS); He/she has (ii) A continuous period of 1 year practical experience gained in Hong Kong within the 3 years preceding the date of his application; and is (iii) Recommended by the respective Registration Committee (RC) for inclusion in the respective register (s) i.e. AP (A), AP(E) or AP(S) - Normal Building Control Procedure • AP prepares & submits plans to BD for approval, normally get approval from BD within 60 days or 30 days under the fast track 6 procedure for simple A&A works; plans deemed to be approved within the specified period if no written reply by the BD; • Consent application Usually consent is applied for (which spends another 28 days) after approval of the building plans is given. Consent is deemed to be granted by the BD within the specified period even though no reply is given. • Concurrent Procedure for Approval & Consent For simple A&A works, where works do not involve the structure of the building and do not affect the fundamental issues or referrals to other Government departments/offices (except Fire Services Department) are not necessary, the concurrent or simultaneous applications for approval and consent will be processed within 30 days • Completion of A&A Works (Form 14) Upon completion of the A&A works, a certificate of completion of building works not resulting in a new building (Forms BA14) together with two sets of record plans, should be submitted to the BD in accordance with Building (Administration) Regulation 25, certifying works being carried out in accordance with the provisions of the Ordinance and regulations. While there is no statutory time limit under the Buildings Ordinance for processing such certificate, the Buildings Department will generally give a reply within 28 days advising on the acceptance of the completed works or the outstanding issues to be rectified. (APP-13) - Flow of Normal Procedures Here comes the flow of the building control procedure: • AP prepares & submits plans to BD for approval, normally get approval from BD within 60 days or 30 days under fast track procedure for A&A works; plans deemed to be approved if no reply 7 • • from the BD within the specified period AP notify BD by means of consent application before commencement of works; consent deemed to be obtained within 28 days Upon completion of the building works not resulting in a new building, AP submits certificate to the BD, certifying works being carried out in accordance with the provisions of the Ordinance and regulations. Minor Works Control System A new Minor Works Control System (MWCS) has been fully implemented by the BD on 31 December 2010. If the works fall within the designated minor works items, they may be carried out without the need for obtaining approval and consent from the BD if they are implemented through the simplified requirements under the Minor Works Control System. - Some Main Features of the System • • • • • Simplified Procedures for minor works of smaller scale & lower level of risk No more need of approval & consent from BD Classify minor works into 3 classes, Class I, I & III with descending degree of control i.e. with the least stringent control for Class III works Each class further classified into 7 types of works corresponding to specialization Overall 118 items of minor works classified - Simplified Procedures • First, all notifications should be submitted by the AP /RI if PBP had been appointed, otherwise, they should be submitted by the PRC appointed 8 • For both projects involving Class I and Class II minor works items, notification of commencement in the specified form with prescribed plans, supporting document and site photos should be submitted to the BA at least 7 days before the commencement of works. • After verifying that all works involved are “minor works”, BA acknowledges submission with a unique submission number. • Certificate of completion should be submitted in the specified form with the abovementioned submission number, record plans, supporting document and record photos within 14 days after the completion of works • For projects in which only Class III minor works are involved, notice and certificate of completion should also be submitted in the specified form with record plans or description of works, supporting document and record photos (before and after the completion of works) within 14 days after the completion of works. Some Issues to Consider before A&A works Before attempting the A& A works, check should be made on at least two major statutory documents affecting the development potential of a site, namely the Building Ordinance and the Outline Zoning Plan (with its Schedule of Notes), and the non-statutory document, namely the Lease. The more stringent requirement should be taken if there is conflict among the documents. - Lease Conditions • Is the development potential such as site coverage, plot ratio exceeded? • Whether an additional floor/extension can be added or not • Is DMC be violated by the proposed A&A works such as occupying common /public space? • Whether Lease Modifications or Temporary Waiver will be granted and the amount of premium or waiver fee to be paid. Lease modification is for long term change while Temporary Waiver is 9 for short term change of use. - Outline Zoning Plan Prior to commencement of any A&A works, check the land use zoning of the site/premises on the relevant Outline Zoning Plan (OZP) and the provisions of the Plan to see whether the proposed use of the A&A works is allowed. For example • A&A works creates a use not complying with the outline zoning plan such as setting up a bank in a university (institution) building • If there is a change in use, Section 16 application is to be made to the TPB if the new use falls under Column 2 uses of the OZP • Otherwise rezoning application under S12 may be required but the approval of which is uncertain. - Heritage Building Now, let's look at what we shall pay attention to if A&A works are to be done in historic buildings. A heritage building is taken as either a declared monument or a proposed monument defined under the Antiquities and Monuments Ordinance, or a graded historic building ( in 3 grades of I,II &III) accorded by the Antiquities Advisory Board (AAB), or a proposed graded historic building identified by the AMO Heritage buildings were built long time ago, their design and facilities provided usually do not comply with current building safety and health standards and statutory requirements Submission of proposal for alteration and addition (A&A) works to the Buildings Department (BD) for approval under the Buildings Ordinance (BO) is required 10 A dedicated Heritage Unit (HU) has been set up in the BD to process all building and structural plan submissions involving adaptive re-use of and A&A works to heritage buildings - Antiques and Monuments Ordinance /Office Let's look at the role played by the Antiques and Monuments Ordinance /Office Declared & Proposed Monuments Once a building has been declared as a monument or a proposed monument, the building is legally protected and no person shall undertake building or other works on it without a permit granted by the Antiques Authority /Office under section 6 of the A&MO. The Antiques Authority is not only empowered to prevent alterations, but to impose conditions upon any proposed alterations/additions as he thinks fit, in order to protect the monument Graded Historic Buildings There are three grades for historic buildings • Grade 1 Historic Buildings Grade 1 historic buildings are buildings with outstanding merits. Every effort should be made to preserve them if possible. • Grade 2 Historic Building Grade 2 historic buildings are buildings with special merit. Efforts should be made to selectively preserve them • Grade 3 Historic Buildings Grade 3 historic buildings are buildings with some merits. Preservation in some form would be desirable. Alternative means could be considered if preservation is not practicable Regulatory compliance checks for alterations and additions. Before we carry out A&A works, we need to 11 - check compliance with the Hong Kong Airport (Control of Obstructions) Ordinance if floor (s) are added to a high rise building under the flight path for heights control in the interest of the safety of aircraft - appoint RSE to check adequacy of existing structure for the A&A works such as adding a fire tank on roof or adding an internal staircase to roof i.e. to check whether the additional loads can be supported by the existing structure(s). -check compliance with barrier free access requirements such as ramp or lift way construction for wheel chair users -pay attention to fire escape and fire compartment requirements when an apartment is to be subdivided into minor units -provide more toilets for the patrons when an office floor is changed into a restaurant in compliance with the Building (Sanitary Fitments …) Regulations -check means of escape and Fire Services (Fire Hazard Abatement) Regulation requirement when installing a gate at the main entrance of building for better security and deterring trespass. It always needs to strike a balance fire escape on the one hand and security on the other. -check Code of Practice for Minimum Fire Service Installations and Equipment when making an opening on floor/roof for an internal staircase to see whether sprinkler is to be installed as a fire curtain during fire. -check protection barrier requirement is complied with when adding new window(s) on upper floor(s) to make sure that windows open above 1100mm from FFL or window guard added Unauthorized Building works - Any works, except exempted works or works under the Small House Policy for the New Territories, carried out without prior approval of plans 12 and consent for commencement from the BD or following the Minor Works Control Scheme, as the case may be, are unauthorized building works -BD is empowered to effect the demolition of these UBWs -The BA has no powers to give retrospective approval or consent for unauthorized building works (UBW). That means you cannot legalize the UBW by following the BD's approval & consent procedures or the Simplified Procedures for minor works after it was built. Some other examples of UBW (Slide 25) The right photo shows an opening formed in the staircase enclosure which adversely affects structural safety and fire resistance requirements The left photo shows large glass panels which do not comply with regulations such as structural safety and fire resistance & compartment requirements (Slide 26) The right photo shows UBW on podium flat roof which blocks fire escape The left photo shows enclosed balcony which does not comply with regulations such as means of escape in case of fire, structural safety etc) (Slide 27) Both pictures in slide 27 show a Metal cage attached to external wall which pose danger if collapse, or do not allow escape in case of fire or to make access for firefighting and rescue more difficult 13 References Building Ordinance and Regulations, Buildings http://www.bd.gov.hk/english/links/index_rellinks.html Department. City University of Hong Kong (2003),'Building Design and Development in Hong Kong", City University of Hong Kong Press, Hong Kong, pp22-57 Codes of Practice and Design Manuals, Buildings Department. http://www.bd.gov.hk/english/documents/index_crlist.html Codes of Practice for Minimum Fire Service Installations and Equipment and Inspection, Testing and Maintenance of Installations and Equipment, 2012 Ed., Fire Services Department. http://www.hkfsd.gov.hk/eng/code.html Cookson Smith, P (2012),'Town Planning Procedures' in Wong, WS & Chan, E (Eds.),'Professional Practice for Architects in Hong Kong', PACE, pp96-113 Fire Services Department (2012),'The Role of Fire Services Department in Building Protection' in Wong, WS & Chan, E (Eds.),'Professional Practice for Architects in Hong Kong', PACE, pp92-95 General Guidelines on Minor Works Control System, Buildings Department. http://www.bd.gov.hk/english/documents/guideline/MWGG.htm Kwong, SY (2012),'Understanding the Building Ordinance' in Wong, WS & Chan, E (Eds.),'Professional Practice for Architects in Hong Kong', PACE, pp 68-72 Lai, WC & Ho, CW (2002),'Planning Buildings for a High Rise Environment : A Review of Building Appeal Decisions', Hong Kong University Press, pp1-16. Practice Guidebook for Adaptive Re-use of and Alteration and Addition Works to Heritage Buildings 2012, Buildings Department. 14 http://www.bd.gov.hk/english/documents/guideline/heritage.pdf Practice Notes for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers, Buildings Department. http://www.bd.gov.hk/english/documents/index_pnap.html Rowlinson, S.M. & Walker, A (1995),'The Construction Industry in Hong Kong', Longman, Hong Kong, pp 35-55 Tong, A(2013),’ Building and development control legislation in Hong Kong’, Pace Publishing Limited. Wong, WS (2012),'Building Plan Submission and Commentaries', in Wong, WS & Chan, E (Eds.),'Professional Practice for Architects in Hong Kong', PACE, pp 73-73-91 15