Customer/Project Information Sheet Date Received by SCE: Individual or Business Name: (Customer / Developer – Tract DBA or LLC ) Address: Email Address: City: State: Attn: Phone No: Legal Contact: Phone No: Zip Code: (Individual responsible for signing contract, paying fees and receiving potential refunds) Address: Email Address: City: State: Zip Code: Primary Field / Site Superintendent / Job Contact: Relationship to Project: Phone No. (Direct Lines ONLY): E-mail Address: Fax No: Project FAX No:Address: City: State: TG Map # or GPS: Zip Code: Major Cross Street: Detailed Project Information Residential: Commercial: Industrial: Agricultural: Service Requested: Overhead: Underground: Indoor Cultivation Tract: Lot(s): Mixed-Light Cultivation Is this project subject to Buy America Compliance? Yes No Approximate start work date for SCE crews: Temporary Service Required: Yes No Your Construction Start Date: Approximate date you would like the job completed and energized: Scope of Project: Panel Size (amps): Service Voltage/Phase: Total Tons of A/C: Total # of A/C Units: Largest A/C Unit (tons): Total HP of Pumps: Total # of Pump Units: Largest Pump (HP): Installing Gas or Electric: Heater: Clothes Dryer: Water Heater: Stove: Gas Meter to be Installed at Property: Oven: Square Footage of Buildings (if multiple buildings give all footages): Homes over 5000 sq. ft larger lots require a Load Schedule. Please contact your electrician for assistance. Solar or Generation Equipment to be installed (If yes, please attach additional descriptions/specifications): Yes Is this project being completed on or near a CalTrans Right Of Way (ROW): 04/19/2022 - Version 8.0 Page |1 Yes No No DS-111 Electric Vehicle Charging - Mandatory. Please select one option. I am interested in one of SCE’s Charge Ready EV Infrastructure programs. • Complete Sections A and B below. • Refer to Additional EV infrastructure program information or Submit a question. I am interested in installing my residential EV project using Tariff Rules 15 and/or 16. • Complete Section B below. I am interested in installing my commercial EV project using Tariff Rules 15, 16, and/or 29. • Please email tepmcommercialev@sce.com for additional submittal requirements. Section A Electric Vehicle Passenger • Refer to Additional Information or Submit a question Medium/Heavy Duty • Refer to Additional Information or Submit a question Charge Station Plug-In Electric Vehicle (PEV) Section B EV Panel Size & Voltage: Main breaker rating: Will the new panel serve any load other than the EV load? Number of Ports: kW of each Port: Future EV expansion or growth at the site? 04/19/2022 - Version 8.0 Will there be load-side management? Page |2 DS-111