RAGHAV CONTRACTING. L.L.C.
DATE:
EMPLOYEES SAFETY INDUCTION RECORD SHEET
Client
Main Contractor
Contractor
: Gulf Data Hub (GDH)
: CHC Building Contracting
: Site & Power DK
Consultant
: Sudlows DMCC
Project name
: Gulf Data Hub Facilities Building 4
Raghav Project No. : 180162
MEP Sub Contractor : Raghav Contracting LLC
Location
: Dubai Silicon Oasis
Raghav Sub Contractor :
Preferred language:
Safety induction topic: General site safety rules & regulations
Company safety policy
Usage of personal protective equipment
Safe manual lifting
Working safety near the floor/shaft/lift openings
Safe usage of ladders
Safe usage of scaffolding
Safe handling & lifting of materials with crane
Statutory HSE requirement’s advised
Fire prevention & fire protection techniques
Housekeeping at work place
Health & environmental protection
Electrical safety
Fall protection
Emergency evacuation plan &assembly point
Traffic management
First aid treatment
Others(please specify)
License no. and classification (for drivers and operator only):Participation
I hereby agree to adhere to the occupational HSE policy outlined during the workplace induction and will comply with any
reasonable health and safety induction by workplace management or their representative. I understand and agree that my
failure to comply with the rules and regulations presented during induction and any additional health, safety and
environmental rules and regulations provided are ground for my immediate dismissal from site.
S.N.
PARTICIPANT
DESIGNATION
EMIRATES ID No.
COMPANY
SIGNATURE
1
2
3
4
5
6
7
8
9
10
Comments:
INDUCTED BY
NAME
Page 1 of 1
SIGNATURE
DATE
Ref. No.: RAG/HSE/M/FO/001