AHMAD FARAZ TAIYABI INSPECTION ENGINEER MANGAF, KUWAIT Tel: - +965-94077949 E-mail- ahmadtaiyabi@gmail.com OBJECTIVE: Working in an organization providing opportunities to excel in the specialized field to contribute to the growth of the company with my experience, skills & knowledge. SUMMARY: Having more than 23 years’ experience in Inspection, Design, Construction & installation in Oil & Gas, Commercial & industrial projects as a Mechanical Engineer for pipeline, piping, EPC & MEP works. 1. JOB PROFILE & RESPONSILBILITY: Perform Pre Inspection Meeting (PIM) at initial project stage for review of PO and project requirements. Inspection of Raw materials (Plates, Pipes, Flanges, Gaskets, Bolt & Nuts, welding consumable etc.) and review the Material Test Certificates (MTCs) as per applicable material code and client specification. Monitoring / Witnessing of all the Welding related activities (before, during and after) as per client approved Inspection Test Plan, Quality Control procedures, approved GA drawings, WPS & client specification etc. Witness of Welding Procedure Qualification and Welder Performance Qualification test. Witness of PMI test, Hardness test, tensile test, bend test, impact test, macroscopic examination and review of all test reports according to applicable standard, client approved procedure and project specification. Perform the Stage wise inspection of fabrication as per ITP and approved GA drawing etc. Monitor and witness of welding parameters for the Processes such as SMAW, GTAW, GMAW & SAW etc... Witness of Non Destructive Tests (NDT) such as Ultrasonic test, Penetrant test, Magnetic Particle test, Visual and Leak Testing etc… and review the supplier reports. RT films interpretation and reports review as per project specification and standard. Witness of visual and final dimension inspection as per procedure, ITP and approved GA drawing etc. Witness of Weld repair activities as per client approved WPS. Punch List preparation before Hydro Test. Witness of thickness measurement on dish end, plates, flanges, piping etc. Issue of Non- conformance reports & verification of Corrective/Preventive action of supplier. Review of Daily Welding reports, Weld summary, PWHT report and chart. Witness of Hydrostatic test, Pneumatic test, filled water test, vacuum box test, Shop trial Run test, Performance test, NPSH test, Strip test etc. as per client approved procedures and applicable standard. Witness of Hydro shell test, Hydro seat test & pneumatic seat test, Gas test, Torque test, operational test, trial fit test for valves. In service inspection at Oil wellhead as painting and insulation inspection of above ground Piping system, piping supports, metallic structure, Skids, storage tanks, Valves, Flanges, Bolts and nuts etc. Witness of Surface preparation & painting inspection activities for buried new pipe lines as visual, DFT Holiday inspection of Field Joint Coating (HBE-FJC), full holiday inspection of FBE coating before lowering and back filling. Witness of Surface preparation & painting inspection activities for pressure vessels, Crane Structures, Various Furnace Accessories Assembly, Piping Assemblies, Centrifugal Pumps, Valves etc. Witness of Coating inspection of Single Layer External FBE coating of line pipes Witness of the final inspection for equipment as internal assembly check, Verification of Name plate, internal cleaning, marking and Packing inspection etc… Preparing daily and weekly inspection reports and issuing Inspection Release Certificate (IRC). Coordination with client inspectors for inspections of Hold and Witness Point. Actively involved and participated during progress meetings (internal & external) Familiar in reading/review of GA & fabrication drawings and interpreting welding symbols. Review of supplier drawings, reports, procedure & documents such as all NDT reports, WPS, PQR, WPQ, weld map, NDE operator qualification, PWHT report and chart, NDE procedures, supplier inspection report and Manufacture Data Book (MDB) etc. As per client specification and standard. To Forecast and plan the requirement of QC departments in the area of authority, with respect to owner Quality requirements as per the relevant documents/ Project Quality Manuals etc. In depth understanding of various safety methods & proven skills handling various issues relating to quality measures for safeguarding Heath, Safety and Environment (HSE) and H2S. An effective communicator with exceptional analytical, negotiation and relationship management and problems solving skills with project management Preparing and monitoring of fabrication sequencing as per codes and standards during fabrication work is performed in accordance with the approved construction procedure, specification and correct materials, attending daily meeting. (Production and safety) Implement the permit to work system. Responsible for Conducting Daily Tool Box Talk and providing Safety awareness to the Crew members. Familiar in Erection of Hook up spools in Utility Station and Pumps, Equipment’s, and vessels. Daily Progress Report follows up. Prepare the one week look ahead schedule that needs to be submitted to the Planning department for review and inputs to draw up the final execution plan for the piping department. Proper arrangement of equipment and manpower based on the site without delaying of production daily bases. Performing construction and scrapping activities. Supervise the team for timely and accurate work execution. Ensure that all the work activities in safe condition and get completed as per the quality norms and as per project specifications. Participating and preparing of task risk assessment for the given job to categorize and measure the precaution for the task, carry out job safely. Responsible for establishing, promote and maintaining a safe and hazard free working environment. Formulates and develops safety policies and procedures with the help of the HSE Department. Maintaining proper housekeeping of the work location. Installation of Oil & Gas pipeline & Piping works. Ensuring the HSE procedure and precautions to do the work safely. Controlling the pipeline, piping and equipment erection and alignment. Pre-commissioning and commissioning of the completed facilities. Arranging the work execution plan and arranging the required resources. Ensuring the work procedure as per KOC standard and specification. Dealing with subcontractor and suppliers for the work arrangement. Ensuring the QC/QA for the executed work to maintain the client satisfaction. Possess in depth knowledge of proposal and planning, study & implementation of P&ID Drawings, Installation of pipelines & piping in KOC as per codes standards & procedures, site supervision, quantity surveying, estimation, billing & verification, co-ordination, Hydro test & field engineering. Installation of pipeline for various projects Under Project Management West Kuwait. Installation of Fire water line including fire hydrant and hose reel. Monitoring and managing with the inspection team for checking the spools, welding, radiography & Hydro test. Installation of fire suppression system piping. Procurement of equipment and materials. Prepared detailed records of the estimate provided a break up, which included the material cost and the materials required for the project. Compiled the cost of the subcontractors and all the indirect cost that occurred in the project. Ensured that the work was done within the estimate by visiting the site regularly. Coordinated with the other departments and prepared technical proposals for the organization. Work Experience: 1-i) Al-Ghanim International Company (Oil & Gas Division) November 2017 to Present (more than two years) POSITION: Project Engineer (Mechanical) Duties & Responsibilities: Co-ordination work with M/S Heisco for fabrication of drain and slurry vessel. Currently involve in the Water Management Project of KOC for the installation of HVAC System for four nos. of substation in GC, 3, 4, 7 & 21. 1-ii) Al-Ghanim International Company (Oil & Gas Division) August 2012 to June 2015(about three years) POSITION: Construction Engineer (Mechanical) Seconded to KOC Duties & Responsibilities: Inspection Installation & supervision of Pipeline & Piping works of Oil & Gas projects under Projects Management West Kuwait. Completed construction of New Export Maintenance Workshop for Export Maintenance & Integrated Security System Building Phase-II project in South Tank Farm (KOC). Ministry had given appreciation letter for the efforts to complete the Integrated Security System Phase-II building project. To Manage Plumbing, Firefighting, & other related Mechanical construction works. Supervision of a multi-disciplined construction Team to obtain accepted KOC contract specifications. Issue work permits (Hot & cold) to contractors & sub-contractors in green field as per the approved drawings & review applicable job safety analysis (JSA). Ensure all site safety precaution before issuing permit to start the work. Constructability review of technical drawings & writing comments. Ensure contractor is following all KOC standards, specification & approved drawings during work execution related to plumbing, fire protection, requirements. Follow up of Daily, weekly and monthly work activities and reports. Follow up contractor’s work program up to the final acceptance by Company. Sign off the contractor’s checklist for completed works as per KOC standards & procedure, giving suggestion, comments & timeline. 2) Naser Mohammed Al Sayer General Trading & contracting Co. WLL, Kuwait [July2015to November 2017] two years 4 month POSITION: Senior Project Engineer (Mechanical) Duties & Responsibilities: Involved as a Senior Project Engineer in Naser Mohammed Al Sayer Car Show Room Abo Fatera and Naser Mohd. Al Sayer Car Show Room Project in Jahra. Involved in the Inspection, Installation of Equipment & materials. 3) RASCO WLL Kuwait [Year October 2010- Sept 2012] about two years POSITION: Senior Project Engineer -Worked as Mechanical. Engineer (Inspection & Installation) with M/S Refrigeration & Air Conditioning Systems Company WLL -KUWAIT Involved in the activities of Inspection, Installation, Cost & Estimation for various tender for KOC, KGOC & KFH. 3) Enkon International Consulting Engineers Pte Ltd Singapore [April 2009 to May 2010] one year one month POSITION: Design Engineer, Mechanical (Fire protection Pipeline, Plumbing Piping, HVAC) -Involved in the design ,Inspection and execution of Ministry of Education & Jurong Town Council projects for Mechanical, Electrical, HVAC, Water supply, Sanitary & Fire protection systems including pipeline and piping works for the services. 4)Kim Seng Heng Construction Co Pvt Ltd, Singapore [December 2007 to March 2009]one year three months. POSITION: Mechanical Engineer (Fire Protection Piping & pipeline) - Inspection, Installation, testing, balancing and commissioning of HVAC, Plumbing and Fire protection systems of major projects (valued at S$150 million). 5) Ghazwa Company for Mechanical & Electrical Works [YEAR 20042007] Three year Two months POSITION: Project Engineer (Mechanical) -Worked as a Mechanical Engineer and involved in BASMAH B high- rise residential building project and estimation of various projects. Inspection of All equipment’s and materials before final submission to consultant and client. 6) Al Khalidiyat Air-conditioning Co WLL, Kuwait [YEAR2002-2004] One and half year POSITION: Project Engineer (Mechanical) -Worked as a Project Engineer & involved in the various projects for inspection of equipment and materials & site works. 7)Al Ahliya Airconditioning Co. WLL,Kuwait[YEAR2001-2002]about one year POSITION: Maintenance Engineer (HVAC) -Worked as a Maintenance Engineer (Cost & Estimation) & involved in the various projects for cost & estimation, pre commissioning & commissioning. 8)Al-Yamama Trd. & Cont., Saudi Arabia/ Avadh Air-conditioning Services, India [YEAR1997-YEAR 2001] Two years in Saudi & about two years in India. POSITION: Project Engineer (Mechanical) Worked as a HVAC Engineer (Maintenance) in King Abdul Aziz Sea Port, Dammam & State Bank of India building, Lucknow U.P. India Uttar Pradesh. ADDITIONAL COURSES -Attended course in Project close out Testing, Commissioning & Handover from Projacs Planning from 18-22 May 2002 in Kuwait. - Attended course in Primavera P6 Project Planning from CADD Center Training Svcs, Lucknow, INDIA from 12-17 June 2010. PROFESSIONAL QUALIFICATIONS: Passed Bachelor of Engineering B.E.(MECHANICAL), first class with distinction from one of the best university GULBARGA UNIVERSITY KARNATKA in the year 1996. COMPUTER SKILLS AUTOCAD, MS EXCEL, MS WORD & PRIMAVERA(P3&P6) PERSONEL DETAILAS: Fluent in English, Hindi, Urdu & to some extent Arabic. Having Valid Kuwait Driving License Comprehensive knowledge of construction materials commonly used in Kuwait & Gulf Countries. Passport No: U-0750168 Date of Issue: 17-08-2020 Place of Issue: Kuwait Date of Birth: 18-Jul-1975 Place of Birth: Mav Nath Bhanjan, India Nationality: Indian Permanent Address: 14, Brahma Nagar Extn. Daliganj Crossing Lucknow (U.P.) India DATE AHMAD FARAZ TAIYABI ~efrig~n &Airconditioning Systems Co. 0 t a._.wj li~ .!.!. ~ ' ,o, . ' .. ·I=t~~ I JWI v-L ·f'·f'· ui.Lt.S:-Jlj ~ Paid up Capital K.D 1,500,000 I= :er,'-· C JAS-ANZ C.R 14594 ......... . . . ... ~- . : OHSAS 18001:2007 - ISO 14001:2004 - ISO 9001:2008 Date: 29/01/2020 Reference: Ras/Let/25/2020 Kuwait To Whom It May Concern It is certified that Mr. Ahmad Faraz Taiyabi - holding Civil ID No 275071802345 - worked with us as From 27/10/2010 Mechanical Engineer up to 20/08/2012 He was given this certificate upon his request. Refrigeration & Air Conditioning Systems Co General Manager ~d,,,. Khalil EITilbani TtAlnt,. - Yt,\1"\AT'V - TlA1"1AIV - TtA,.I • •\ : . : , ~ - TlA,.IA • T: .,..SI.a - .:....._,.s.JI ,,.,TV l,?~~lj.AJ - • ~ I niAI : Shuwaikh Industrial Area No. 3 - Block B - Street 56 - Bldg. 145 / 147 P.O. Box 26681 Safat - Code No. 13127 Kuwait - Fax: 24831802 - Tel.: 24831009- 24831817 - 24831837 - 24812643 E-mail : info@rascokmc.com '. Web: rascokmc.com '-:'·'-"'°