Phone: 973-509-9456 Fax: 973-509-9460 Fieldstone Middle School - NRCSD The Challenge: The North Rockland Central School District wanted a nice seamless floor system to replace the old terrazzo in the cafeteria at Fieldstone Middle School. There were different sections of the floor that were supported differently or had different substrates. The school district wanted to find a cost-effective system that could tie together all of the sections of the cafeteria for an attractive, uniform look. The Solution: ECI was chosen to provide a system for the school because of its continued success installing seamless floors in several other schools. The cafeteria brought challenges that ECI’s expertise was essential in finding solutions for. The NRCSD, custodian, and principal were very pleased and satisfied with the results. Phone: 973-509-9456 Fax: 973-509-9460 These are some examples of the floor in the cafeteria’s different areas. As you can see, there is deterioration and cracking that needed to be addressed. Phone: 973-509-9456 Fax: 973-509-9460 After initial preparations of the floor were complete, our proprietary vinyl-flake system was applied. Phone: 973-509-9456 Fax: 973-509-9460 Below are some pictures of the finished flooring system.