INFORMATION ON INVESTMENT ENVIRONMENT AND INDUSTRIAL ZONES IN VIETNAM KOTRA HANOI – FIA VIETNAM 2023 TABLE OF CONTENT INVESTMENT ENVIRONMENT IN AN GIANG........................................................................... 1 BINH LONG INDUSTRIAL ZONE .......................................................................................................................... 5 BINH HOA INDUSTRIAL ZONE ............................................................................................................................. 8 XUAN TO INDUSTRIAL ZONE ............................................................................................................................. 12 INVESTMENT ENVIRONMENT IN BA RIA – VUNG TAU ...................................................... 20 MY XUAN B1- TIEN HUNG INDUSTRIAL PARK ............................................................................................. 23 CAI MEP INDUSTRIAL PARK ............................................................................................................................... 25 CHAU DUC INDUSTRIAL PARK .......................................................................................................................... 27 DONG XUYEN INDUSTRIAL PARK .................................................................................................................... 29 INVESTMENT ENVIRONMENT IN BAC GIANG ...................................................................... 33 HOA PHU INDUSTRIAL ZONE ............................................................................................................................. 37 QUANG CHAU INDUSTRIAL ZONE .................................................................................................................... 40 DINH TRAM INDUSTRIAL ZONE........................................................................................................................ 46 VAN TRUNG INDUSTRIAL ZONE ....................................................................................................................... 49 SONG KHE – NOI HOANG SOUTH INDUSTRIAL ZONE ................................................................................ 52 SONG KHE – NOI HOANG NORTH INDUSTRIAL ZONE ............................................................................... 55 INVESTMENT ENVIRONMENT IN BAC KAN ........................................................................... 60 THANH BINH INDUSTRIAL ZONE ..................................................................................................................... 63 INVESTMENT ENVIRONMENT IN BAC LIEU ......................................................................... 69 TRA KHA INDUSTRIAL ZONE ............................................................................................................................. 72 LANG TRAM INDUSTRIAL ZONE ...................................................................................................................... 74 INVESTMENT ENVIRONMENT IN BAC NINH......................................................................... 78 QUE VO I INDUSTRIAL ZONE ............................................................................................................................. 83 QUE VO II INDUSTRIAL ZONE ........................................................................................................................... 89 QUE VO III INDUSTRIAL ZONE .......................................................................................................................... 93 TIEN SON INDUSTRIAL ZONE ............................................................................................................................ 96 YEN PHONG INDUSTRIAL ZONE (PHASE I, II) ............................................................................................. 104 YEN PHONG II-C INDUSTRIAL ZONE ............................................................................................................. 109 DAI DONG - HOAN SON INDUSTRIAL ZONE ................................................................................................ 112 VSIP BAC NINH INDUSTRIAL ZONE ............................................................................................................... 118 VSIP BAC NINH INDUSTRIAL ZONE – BUSINESS HUB............................................................................... 124 VSIP BAC NINH II INDUSTRIAL ZONE ........................................................................................................... 127 THUAN THANH II INDUSTRIAL ZONE ........................................................................................................... 130 THUAN THANH III INDUSTRIAL ZONE .......................................................................................................... 133 NAM SON HAP LINH INDUSTRIAL ZONE ...................................................................................................... 135 GIA BINH I INDUSTRIAL ZONE ........................................................................................................................ 138 INVESTMENT ENVIRONMENT IN BEN TRE ......................................................................... 143 GIAO LONG INDUSTRIAL ZONE ...................................................................................................................... 146 AN HIEP INDUSTRIAL ZONE ............................................................................................................................. 149 PHU THUAN INDUSTRIAL ZONE ..................................................................................................................... 151 INVESTMENT ENVIRONMENT IN BINH DINH .................................................................... 154 BECAMEX VSIP BINH DINH .............................................................................................................................. 158 NHON HOI INDUSTRIAL PARK - PARK A ...................................................................................................... 162 PHU TAI INDUSTRIAL PARK ............................................................................................................................. 166 INVESTMENT ENVIRONMENT IN BINH DUONG ................................................................ 169 BECAMEX-BAUBANG INUDSTRIAL PARK .................................................................................................... 173 BINH AN INUDSTRIAL PARK ............................................................................................................................ 187 DAI DANG INUDSTRIAL PARK ......................................................................................................................... 189 DAI DANG INUDSTRIAL PARK ......................................................................................................................... 191 MAI TRUNG INUDSTRIAL PARK...................................................................................................................... 192 KIM HUY INUDSTRIAL PARK ........................................................................................................................... 194 INVESTMENT ENVIRONMENT IN BINH PHUOC ................................................................. 198 VIET KIEU INDUSTRIAL ZONE ........................................................................................................................ 202 BECAMEX – BINH PHUOC INDUSTRIAL ZONE ........................................................................................... 204 BINH DUONG MAPLETREE INUDSTRIAL PARK ......................................................................................... 205 MINH HUNG SIKICO INDUSTRIAL ZONE ...................................................................................................... 207 INVESTMENT ENVIRONMENT IN BINH THUAN ................................................................. 211 PHAN THIET PHASE 1 INDUSTRIAL PARK ................................................................................................... 215 PHAN THIET PHASE 2 INDUSTRIAL PARK ................................................................................................... 220 HAM KIEM I INDUSTRIAL PARK ..................................................................................................................... 224 HAM KIEM II INDUSTRIAL PARK ................................................................................................................... 228 SONG BINH INDUSTRIAL PARK ....................................................................................................................... 232 TUY PHONG INDUSTRIAL PARK ..................................................................................................................... 236 TAN DUC INDUSTRIAL PARK ........................................................................................................................... 239 SON MY 1 INDUSTRIAL PARK .......................................................................................................................... 242 SON MY 2 INDUSTRIAL PARK .......................................................................................................................... 244 INVESTMENT ENVIRONMENT IN CA MAU........................................................................... 247 KHANH AN INDUSTRIAL ZONE ....................................................................................................................... 249 HOA TRUNG INDUSTRIAL ZONE ..................................................................................................................... 253 SONG DOC INDUSTRIAL ZONE ........................................................................................................................ 255 INVESTMENT ENVIRONMENT IN CAN THO ........................................................................ 259 TRA NOC 1 INDUSTRIAL ZONE ........................................................................................................................ 262 TRA NOC 2 INDUSTRIAL ZONE ........................................................................................................................ 264 HUNG PHU 1 INDUSTRIAL ZONE ..................................................................................................................... 266 HUNG PHU 2A INDUSTRIAL ZONE .................................................................................................................. 268 HUNG PHU 2B INDUSTRIAL ZONE .................................................................................................................. 270 VINH THANH INDUSTRIAL ZONE (STATE 1)................................................................................................ 274 INVESTMENT ENVIRONMENT IN CAO BANG ...................................................................... 277 DE THAM INDUSTRIAL ZONE .......................................................................................................................... 281 CHU TRINH INDUSTRIAL ZONE ...................................................................................................................... 283 INVESTMENT ENVIRONMENT IN DA NANG ........................................................................ 287 DANANG HI-TECH PARK.................................................................................................................................... 292 DA NANG HI-TECH PARK .................................................................................................................................. 293 LIEN CHIEU INDUSTRIAL ZONE ..................................................................................................................... 297 HOA CAM - PHASE I INDUSTRIAL ZONE ...................................................................................................... 301 EXPANDED HOA KHANH INDUSTRIAL ZONE ............................................................................................. 304 INVESTMENT ENVIRONMENT IN DAK LAK ......................................................................... 309 INVESTMENT ENVIRONMENT IN DAK NONG ..................................................................... 314 TAM THANG INDUSTRIAL PARK .................................................................................................................... 317 NHAN CO INDUSTRIAL ZONE .......................................................................................................................... 319 INVESTMENT ENVIRONMENT IN DIEN BIEN ..................................................................... 322 INVESTMENT ENVIRONMENT IN DONG NAI ...................................................................... 326 AMATA INDUSTRIAL ZONE .............................................................................................................................. 329 BAU XEO INDUSTRIAL ZONE ........................................................................................................................... 330 HO NAI INDUSTRIAL ZONE............................................................................................................................... 332 INVESTMENT ENVIRONMENT IN DONG THAP ................................................................... 336 TAN KIEU INDUSTRIAL ZONE.......................................................................................................................... 339 INVESTMENT ENVIRONMENT IN GIA LAI ........................................................................... 342 TRA DA INDUSTRIAL ZONE .............................................................................................................................. 347 SOUTH PLEIKU INDUSTRIAL ZONE ............................................................................................................... 349 INVESTMENT ENVIRONMENT IN HA GIANG ...................................................................... 353 BINH VANG INDUSTRIAL ZONE ...................................................................................................................... 357 INVESTMENT ENVIRONMENT IN HA NAM .......................................................................... 362 DONG VAN I INDUSTRIAL ZONE ..................................................................................................................... 365 DONG VAN II INDUSTRIAL ZONE ................................................................................................................... 369 DONG VAN III INDUSTRIAL ZONE .................................................................................................................. 374 DONG VAN IV INDUSTRIAL ZONE .................................................................................................................. 377 HOA MAC INDUSTRIAL ZONE.......................................................................................................................... 381 CHAU SON INDUSTRIAL ZONE ........................................................................................................................ 386 THANH LIEM INDUSTRIAL ZONE ................................................................................................................... 390 THAI HA INDUSTRIAL ZONE ............................................................................................................................ 392 INVESTMENT ENVIRONMENT IN HA TINH ......................................................................... 397 GIA LACH INDUSTRIAL ZONE ......................................................................................................................... 400 VUNG ANG ECONOMIC ZONE .......................................................................................................................... 403 PHU VINH INDUSTRIAL ZONE ......................................................................................................................... 407 VUNG ANG I INDUSTRIAL ZONE ..................................................................................................................... 410 CAU TREO INTERNATIONAL BORDER GATE ECONOMIC ZONE ......................................................... 412 INVESTMENT ENVIRONMENT IN HAI DUONG ................................................................... 417 DAI AN INDUSTRIAL ZONE ............................................................................................................................... 421 DAI AN EXPANSION INDUSTRIAL ZONE ....................................................................................................... 426 LAI CACH INDUSTRIAL ZONE ......................................................................................................................... 431 AN PHAT HIGH-TECHNOLOGY INDUSTRIAL PARK ................................................................................. 435 AN PHAT 1 INDUSTRIAL ZONE ........................................................................................................................ 439 CONG HOA INDUSTRIAL ZONE ....................................................................................................................... 442 CAM DIEN – LUONG DIEN INDUSTRIAL ZONE (VSIP HAI DUONG) ...................................................... 446 LAI VU INDUSTRIAL ZONE ............................................................................................................................... 450 PHU THAI (NAM TAI) INDUSTRIAL ZONE .................................................................................................... 453 TAN TRUONG INDUSTRIAL ZONE .................................................................................................................. 458 NAM SACH INDUSTRIAL ZONE........................................................................................................................ 463 PHUC DIEN INDUSTRIAL ZONE ....................................................................................................................... 467 INVESTMENT ENVIRONMENT IN HAI PHONG ................................................................... 473 DEEP C INDUSTRIAL ZONES ............................................................................................................................ 477 TRANG DUE INDUSTRIAL PARK ..................................................................................................................... 480 NAM DINH VU INDUSTRIAL ZONE ................................................................................................................. 486 TIEN THANH INDUSTRIAL ZONE .................................................................................................................... 489 INVESTMENT ENVIRONMENT IN HANOI ............................................................................. 493 HOA LAC HI- TECH PARK ................................................................................................................................. 497 QUANG MINH I INDUSTRIAL ZONE................................................................................................................ 504 QUANG MINH II INDUSTRIAL ZONE .............................................................................................................. 507 HANOI SOUTHERN SUPPORTING INDUSTRIAL PARK ............................................................................. 510 PHU NGHIA INDUSTRIAL ZONE ...................................................................................................................... 513 THACH THAT- QUOC OAI INDUSTRIAL ZONE............................................................................................ 516 THANG LONG INDUSTRIAL ZONE .................................................................................................................. 519 NAM THANG LONG INDUSTRIAL ZONE ....................................................................................................... 522 SAI DONG B INDUSTRIAL ZONE ...................................................................................................................... 525 NOI BAI INDUSTRIAL ZONE ............................................................................................................................. 528 CONG VIEN CONG NGHE THONG TIN INDUSTRIAL PARK ..................................................................... 531 SACH SOC SON INDUSTRIAL ZONE ................................................................................................................ 532 INVESTMENT ENVIRONMENT IN HAU GIANG ................................................................... 536 SONG HAU INDUSTRIAL PARK ........................................................................................................................ 539 INVESTMENT ENVIRONMENT IN HO CHI MINH................................................................ 542 DONG NAM INDUSTRIAL ZONE ....................................................................................................................... 546 HIEP PHUOC INDUSTRIAL PARK .................................................................................................................... 550 LE MINH XUAN 3 INDUSTRIAL ZONE ............................................................................................................ 553 LE MINH XUAN INDUSTRIAL ZONE ............................................................................................................... 557 TAN PHU TRUNG INDUSTRIAL ZONE ............................................................................................................ 560 TAN THUAN EXPORT PROCESSING ZONE ................................................................................................... 564 TAY BAC CU CHI INDUSTRIAL ZONE ............................................................................................................ 568 VINH LOC INDUSTRIAL PARK ......................................................................................................................... 572 INVESTMENT ENVIRONMENT IN HOA BINH ...................................................................... 577 LUONG SON INDUSTRIAL PARK ..................................................................................................................... 580 DA RIVER LEFT-BANK INDUSTRIAL PARK ................................................................................................. 583 BINH PHU INDUSTRIAL PARK.......................................................................................................................... 585 NHUAN TRACH INDUSTRIAL PARK ............................................................................................................... 586 LAC THINH INDUSTRIAL PARK ...................................................................................................................... 588 YEN QUANG INDUSTRIA1:E41AL PARK ........................................................................................................ 589 INVESTMENT ENVIRONMENT IN HUNG YEN ..................................................................... 593 PHO NOI A INDUSTRIAL PARK ........................................................................................................................ 597 THANG LONG II INDUSTRIAL ZONE .............................................................................................................. 605 MINH DUC INDUSTRIAL ZONE ........................................................................................................................ 614 MINH QUANH INDUSTRIAL ZONE .................................................................................................................. 619 YEN MY INDUSTRIAL ZONE ............................................................................................................................. 623 YEN MY II INDUSTRIAL ZONE ......................................................................................................................... 627 CLEAN INDUSTRIAL PARK ............................................................................................................................... 631 INDUSTRIAL PARK NO.3 .................................................................................................................................... 633 INDUSTRIAL PARK NO.4 .................................................................................................................................... 635 INVESTMENT ENVIRONMENT IN KHANH HOA .................................................................. 639 SUOI DAU INDUSTRIAL ZONE .......................................................................................................................... 645 NINH THUY INDUSTRIAL ZONE ...................................................................................................................... 649 INVESTMENT ENVIRONMENT IN KIEN GIANG .................................................................. 654 TAC CAU INDUSTRIAL ZONE ........................................................................................................................... 658 INVESTMENT ENVIRONMENT IN KON TUM ........................................................................ 662 INVESTMENT ENVIRONMENT IN LAI CHAU ....................................................................... 667 INVESTMENT ENVIRONMENT IN LAM DONG ..................................................................... 672 PHU HOI INDUSTRIAL ZONE ............................................................................................................................ 675 LOC SON INDUSTRIAL ZONE ........................................................................................................................... 677 INVESTMENT ENVIRONMENT IN LANG SON ...................................................................... 681 DONG BANH INDUSTRIAL PARK ..................................................................................................................... 685 HUU LUNG INDUSTRIAL PARK ........................................................................................................................ 687 INVESTMENT ENVIRONMENT IN LAO CAI .......................................................................... 690 DONG PHO MOI INDUSTRIAL ZONE .............................................................................................................. 694 TANG LOONG INDUSTRIAL ZONE .................................................................................................................. 696 INVESTMENT ENVIRONMENT IN LONG AN ........................................................................ 700 DUC HO III-HONG DAT IZ INDUSTRIAL PARK ............................................................................................ 705 HUU THANH IDICO INDUSTRIAL ZONE ........................................................................................................ 708 TAN DUC INDUSTRIAL ZONE ........................................................................................................................... 710 LONG HAU INDUSTRIAL PARK........................................................................................................................ 713 AN THANH INDUSTRIAL ZONE ........................................................................................................................ 715 TAN KIM INDUSTRIAL PARK ........................................................................................................................... 717 INVESTMENT ENVIRONMENT IN NAM DINH ..................................................................... 721 MY TRUNG INDUSTRIAL ZONE ....................................................................................................................... 725 HOA XA INDUSTRIAL ZONE ............................................................................................................................. 728 BAO MINH INDUSTRIAL ZONE ........................................................................................................................ 735 RANG DONG TEXTILE INDUSTRIAL ZONE .................................................................................................. 739 INVESTMENT ENVIRONMENT IN NGHE AN ........................................................................ 743 WHA INDUSTRIAL ZONE 1 - NGHE AN .......................................................................................................... 747 HOANG MAI I INDUSTRIAL PARK .................................................................................................................. 751 VSIP NGHE AN I INDUSTRIAL PARK .............................................................................................................. 753 VSIP NGHE AN II INDUSTRIAL PARK............................................................................................................. 758 NAM CAM INDUSTRIAL ZONE ......................................................................................................................... 761 INVESTMENT ENVIRONMENT IN NINH BINH .................................................................... 768 GIAN KHAU INDUSTRIAL ZONE ...................................................................................................................... 771 TAM DIEP I INDUSTRIAL ZONE ....................................................................................................................... 773 KHANH PHU INDUSTRIAL ZONE ..................................................................................................................... 774 INVESTMENT ENVIRONMENT IN NINH THUAN................................................................. 778 DU LONG INDUSTRIAL ZONE ........................................................................................................................... 782 PHUOC NAM INDUSTRIAL ZONE .................................................................................................................... 784 INVESTMENT ENVIRONMENT IN PHU THO ........................................................................ 789 PHU HA INDUSTRIAL PARK .............................................................................................................................. 793 CAM KHE INDUSTRIAL PARK .......................................................................................................................... 795 INVESTMENT ENVIRONMENT IN PHU YEN......................................................................... 799 HOA HIEP 1 INDUSTRIAL ZONE ...................................................................................................................... 802 HOA HIEP 2 INDUSTRIAL ZONE ...................................................................................................................... 806 AN PHU INDUSTRIAL ZONE .............................................................................................................................. 810 DONG BAC SONG CAU INDUSTRIAL ZONE – ZONE 1 ................................................................................ 813 DONG BAC SONG CAU INDUSTRIAL ZONE – ZONE 2 ................................................................................ 818 INVESTMENT ENVIRONMENT IN QUANG BINH................................................................. 823 NORTH-WEST DONG HOI INDUSTRIAL ZONE ............................................................................................ 826 NORTH DONG HOI INDUSTRIAL ZONE ......................................................................................................... 829 NORTH-WEST QUAN HAU INDUSTRIAL ZONE ........................................................................................... 832 CAM LIEN INDUSTRIAL ZONE ......................................................................................................................... 835 BANG INDUSTRIAL ZONE.................................................................................................................................. 838 HON LA PORT INDUSTRIAL ZONE ................................................................................................................. 841 HON LA II INDUSTRIAL ZONE ......................................................................................................................... 845 WESTERN GATE INDUSTRIAL ZONE ............................................................................................................. 848 INVESTMENT ENVIRONMENT QUANG NAM ....................................................................... 852 DONG QUE SON INDUSTRIAL ZONE .............................................................................................................. 857 TAM HIEP PORT INDUSTRIAL AND LOGISTIC PARK INDUSTRIAL ZONE ......................................... 861 NORTH CHU LAI INDUSTRIAL ZONE ............................................................................................................. 864 THUAN YEN INDUSTRIAL ZONE ..................................................................................................................... 867 CHU LAI PORT INDUSTRIAL & LOGISTIC PARK ....................................................................................... 870 TAM THANG II INDUSTRIAL ZONE ................................................................................................................ 874 CHU LAI - TRUONG HAI AUTOMOTIVE MECHANICAL INDUSTRIAL ZONE ..................................... 877 DIEN NAM- DIEN NGOC INDUSTRIAL ZONE................................................................................................ 879 TAM ANH- KOREA INDUSTRIAL PARK ......................................................................................................... 884 AGRO-FORESTRY INDUSTRIAL PARK .......................................................................................................... 886 EXPANDED TAM THANG INDUSTRIAL ZONE ............................................................................................. 888 INVESTMENT ENVIRONMENT IN QUANG NGAI ................................................................. 892 DUNG QUAT INDUSTRIAL TOWN .................................................................................................................... 897 VSIP QUANG NGAI ............................................................................................................................................... 899 INVESTMENT ENVIRONMENT IN QUANG NINH ................................................................ 904 DONG MAI INDUSTRIAL ZONE ........................................................................................................................ 908 TEXHONG HAI HA INDUSTRIAL ZONE ......................................................................................................... 911 HAI YEN INDUSTRIAL ZONE ............................................................................................................................ 914 CAI LAN INDUSTRIAL ZONE ............................................................................................................................ 917 INVESTMENT ENVIRONMENT IN QUANG TRI .................................................................... 922 NAM DONG HA INDUSTRIAL ZONE ................................................................................................................ 927 QUAN NGANG INDUSTRIAL ZONE.................................................................................................................. 931 LAO BAO SPECIAL ECONOMIC – COMMERCIAL ZONE .......................................................................... 938 DONG NAM QUANG TRI ECONOMIC ZONE ................................................................................................. 944 AMBER TAY BAC HO XA INDUSTRIAL PARK .............................................................................................. 952 INVESTMENT ENVIRONMENT IN SOC TRANG .................................................................... 959 AN NGHIEP INDUSTRIAL ZONE ....................................................................................................................... 963 TRAN DE INDUSTRIAL ZONE ........................................................................................................................... 963 INVESTMENT ENVIRONMENT IN SON LA ............................................................................ 965 MAI SON INDUSTRIAL ZONE ............................................................................................................................ 969 VAN HO INDUSTRIAL ZONE ............................................................................................................................. 972 INVESTMENT ENVIRONMENT IN TAY NINH ....................................................................... 976 INVESTMENT ENVIRONMENT IN THAI BINH ..................................................................... 981 CAU NGHIN IDICO INDUSTRIAL ZONE ......................................................................................................... 985 LIEN HA THAI (GREEN iP-1) INDUSTRIAL PARK ........................................................................................ 989 TIEN HAI INDUSTRIAL ZONE ........................................................................................................................... 991 INVESTMENT ENVIRONMENT IN THAI NGUYEN............................................................... 995 DIEM KHUY ZONE A INDUSTRIAL ZONE ..................................................................................................... 999 SONG DONG II INDUSTRIAL ZONE ............................................................................................................... 1002 YEN BINH INDUSTRIAL ZONE........................................................................................................................ 1004 SONG CONG I INDUSTRIAL ZONE ................................................................................................................ 1006 NAM PHO YEN INDUSTRIAL ZONE ............................................................................................................... 1008 INVESTMENT ENVIRONMENT IN THANH HOA ................................................................ 1012 NGHI SON ECONOMIC ZONE ......................................................................................................................... 1017 LAM SON-SAO VANG HIGH-TECH INDUSTRIAL ZONE .......................................................................... 1019 HOANG LONG INDUSTRIAL ZONE ............................................................................................................... 1023 BIM SON A INDUSTRIAL ZONE ...................................................................................................................... 1028 BIM SON B INDUSTRIAL ZONE ...................................................................................................................... 1031 DINH HUONG - TAY BAC GA INDUSTRIAL ZONE ..................................................................................... 1034 LE MON INDUSTRIAL ZONE ........................................................................................................................... 1043 INVESTMENT ENVIRONMENT IN THUA THIEN HUE...................................................... 1049 PHU BAI INDUSTRIAL ZONE ........................................................................................................................... 1052 TU HA INDUSTRIAL ZONE............................................................................................................................... 1055 LA SON INDUSTRIAL PARK ............................................................................................................................ 1057 PHONG DIEN INDUSTRIAL PARK .................................................................................................................. 1059 QUANG VINH INDUSTRIAL PARK ................................................................................................................. 1062 PHU DA INDUSTRIAL PARK ............................................................................................................................ 1064 SAIGON-CHANMAY INDUSTRIAL PARK AND NON-TARIFF ZONE ..................................................... 1067 INVESTMENT ENVIRONMENT IN TIEN GIANG................................................................. 1072 LONG GIANG INDUSTRIAL PARK ................................................................................................................. 1075 DICH VU DAU KHI SOAI RAP INDUSTRIAL PARK .................................................................................... 1078 INVESTMENT ENVIRONMENT IN TRA VINH ..................................................................... 1082 LONG DUC INDUSTRIAL ZONE ...................................................................................................................... 1085 INVESTMENT ENVIRONMENT IN TUYEN QUANG ........................................................... 1090 HOA PHU INDUSTRIAL ZONE ......................................................................................................................... 1093 INVESTMENT ENVIRONMENT IN VINH LONG .................................................................. 1096 HOA PHU INDUSTRIAL ZONE ......................................................................................................................... 1100 BINH MINH INDUSTRIAL ZONE ..................................................................................................................... 1100 INVESTMENT ENVIRONMENT IN VINH PHUC .................................................................. 1104 BA THIEN I INDUSTRIAL ZONE ..................................................................................................................... 1109 BA THIEN II INDUSTRIAL ZONE .................................................................................................................... 1113 TAM DUONG II INDUSTRIAL ZONE - ZONE A............................................................................................ 1117 BINH XUYEN INDUSTRIAL ZONE .................................................................................................................. 1120 KHAI QUANG INDUSTRIAL ZONE ................................................................................................................. 1127 BINH XUYEN II INDUSTRIAL ZONE .............................................................................................................. 1133 DONG SOC INDUSTRIAL PARK ...................................................................................................................... 1138 INVESTMENT ENVIRONMENT IN YEN BAI ........................................................................ 1142 AN GIANG INVESTMENT ENVIRONMENT IN AN GIANG USD/VND 23.510 GENERAL INFORMATION ▪ Area: 3.536,68 km2 Area, Population ▪ Population: 1.909,5 thousand people (2022) ▪ Located in the key economic region of Vietnam’s Mekong Delta including Can Tho, An Giang, Kien Giang, Ca Mau Geographical Location ▪ Located near the Kingdom of Cambodia with a border of nearly 100 km (with An Giang bordergate economic zone, identified as one of the national key economic zones, with 02 international border gates: Tinh Bien and Vinh Xuong and 01 national border gate: Khanh Binh) ▪ Located in the center of 3 big cities, including: Ho Chi Minh - Can Tho and Phnom Penh (Kingdom of Cambodia) with the respective distances of 180km - 60km and 80km (from the Khanh Binh national border gate); At the same time, it is the gateway and the center of the Mekong sub-region Adjacent provinces ▪ Dong Thap province to the Northeast, Kien Giang province to the the Southwest, Can Tho city the Southeast borders 2022 statistic: ▪ Real GRDP: 102.720 billion VND (4.38 billion USD) ▪ GRDP growth: 6.87% ▪ Real GRDP per capita: 48,424 million VND (2.105,4 thousand USD) GRDP ▪ Economic Structure: - Industry and Construction: 14.84% - Service: 45.91% - Agriculture, Forestry and Fishery: 35.72% - Product tax - product subsidies: 3.53% 2021 statistic: ▪ Industry - Construction growth: 10.90% ▪ Agriculture, forestry and fishery growth: 3.16% Industry growth ▪ Service growth: 8.66% ▪ Import – Export: - Export turnover: 1.158.6 million USD - Import turnover: 220.2 million USD PCI ▪ Score: 62.37 – ranked 54th out of 63 cities and provinces in Vietnam (2022) SOCIAL INFRASTRUCTURE 1 ▪ Roadway: National Road 91 (route Long Xuyen - Chau Doc - Tinh Bien), National Road N1 (route Chau Doc - Ha Tien), National Road 91C (route An Phu). Ongoing projects: route connecting National Road 91 and Long Xuyen bypass; the route linking Tan Chau - Chau Doc region connecting 3 provinces of Dong Thap, An Giang and Kien Giang; Upgrading the inter-provincial road connecting Chau Phu district with Hon Dat district, Kien Giang province (DT.945). Transportation ▪ Expressway: Chau Doc - Can Tho - Soc Trang expressway has a total length of 188.2 km. It is expected to be implemented from 2023 - 2025. The project has been submitted to the National Assembly for decision on investment policy by the Government. ▪ Waterway: 03 major ports: My Thoi seaport, Binh Long domestic port, Chau Doc passenger port ▪ Airway: from the center of the province can be connected to Can Tho International Airport, Can Tho city via National Road 91. Electricity ▪ Supplied from the national power network Water ▪ Quality underground water is mainly used in water supply system Education ▪ 01 major university (An Giang University), 02 vocational colleges (An Giang Vocational College and An Giang Medical College). Medicare ▪ 06 provincial hospitals, 13 district hospitals and private hospitals INVESTMENT CONDITION Human resource ▪ Around 54% of population in working age (2021) Education level ▪ Trained labor rate: 68% (2022) ▪ The minimum salary for the province is applied as follows: - Area II: including: Long Xuyen City, Chau Doc City Salary - Area III: including: Tan Chau Town, Chau Phu District, Chau Thanh District, Thoai Son District - Area IV: including: : Phu Tan districts, Tri Ton districts, Tinh Bien districts, Cho Moi districts, An Phu districts ▪ Incentives according to government regulations: Exemption and reduction for land and water rent fee Investment incentives - Preferential tax rates and exemption period, reduction for corporate income tax. Import tax exemption ▪ Prioritized Projects: - High-tech agricultural, Digital transformation, Sustainable development. Fields Attracting Investment - Projects using high technology, modern techniques; ecological environment preservation. - Development of trade, service and tourism. - Construction and development of infrastructure and transport. - Development of education, training, health. 2 Map An Giang Department of Planning and Investment Address: No 3 Le Trieu Kiet, My Binh Ward, Long Xuyen City, An Giang Contact Tel: 0296.3852 913 Fax: 0296.3853380 E-mail: sokhdt@angiang.gov.vn 3 LIST OF INDUSTRIAL ZONES IN AN GIANG No Industrial zone Name 1 Vam Cong Industrial Zone Total Area (ha) 193,3 Occupancy Rate 0% Status 2 Hoi An Industrial Zone 100 0% Licensed 3 Dinh Thanh Industrial Zone 155 0% Licensed 4 Binh Hoa Industrial Zone 98,68 98,68% In operation Binh Hoa Industrial Zone – Expanded area 120 0% In land clearance process 5 Binh Long Industrial Zone 21,5 100% In operation 6 Xuan To Industrial Zone 11,6 36,6% In operation Xuan To Industrial Zone – Expanded area 82 0% Licensed In land clearance process AN GIANG’S LOCATION MAP OF INDUSTRIAL ZONES 4 BINH LONG INDUSTRIAL ZONE GENERAL INFORMATION National Road 91, Binh Long district, An Giang Province, Vietnam ADDRESS INVESTOR CONTACT PERSON LOCATION INVESTMENT AREA MINIMUM WAGE LEASE TERM MINIMUM LEASE AREA LIMIT FOR CONSTRUCTION HEIGHT PERMITTED CONSTRUCTION RATE PLANNED AREA FACTORY AVAILABLE FOR RENT OPERATION STATUS OCCUPANCY RATE AND NUMBER OF PROJECTS NUMBER OF KOREAN PROJECTS An Giang Economic Zone Authority ▪ Address: No 2, 20 Street, My Hoa Ward, Long Xuyen City, An Giang province, Vietnam. ▪ Tel: (84-296) 3955994 ▪ Website: http://www.bqlkkt.angiang.gov.vn ▪ Mr Nguyen Thanh Cuong – Head of An Giang Economic Zone Authority - Email: ntcuong@angiang.gov.vn - 33 Km from Long Xuyen City Center - 40 Km from My Thoi Port - 215 Km from Ho Chi Minh City Priority Sectors for Agricultural processing and fishery industry, supporting industries for Investment feeding, planting and agricultural processing and fishery for inbound need and export, garment and leather shoes, food processing, consumer goods, mechanical engineering. Restricted Sectors for According to Article 9, Law of Investment No. 61/2020/QH14 on Investment 17/06/2020 [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries ▪ Start date: 2005 ▪ End date: 2055 2,400 m2 In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning regulation (QCXDVN 01: 2008/BXD) Construction area is not more than 65% of the total leased land lot ▪ Total area: 114 ha ▪ Total vacant leasable area: Unavailable ▪ Total area: Unavailable ▪ In operation ▪ 100% ▪ 10 Projects ▪ 02 projects ▪ Land lease fee: 55 USD/m2 /year ▪ Payment : Every year ▪ Management fee: 0.4 USD/m2/month (included VAT) ▪ Electricity fee: 0,05 USD/kWh .According to the Circular by Ministry of Industry and Trade, valid from March 16th, 2015 (excluded VAT) for voltage from 22KV-110KV. OPERATING FEE ▪ Water fee: 7,333 VND (~0.31 USD) /m3 (excluded VAT) ▪ Wastewater treatment fee: 27,963 VND (~1.19 USD)/m3 (excluded VAT) INFRASTRUCTURE AND FACILITY BIDV, Vietin Bank, Vietcombank, Agribank FINANCIAL INSTITUTION 3 km from Chau Phu Tax Office TAX SERVICE, STATE 23 km from Chau Doc State Treasury Office FINANCE OFFICE 22 km from Customs Agency Chau Doc CUSTOMS SERVICE LEASE FEE POST OFFICE 2 km from Vietnam Post Office MEDICARE POLICE, PUBLIC SECURITY UNIVERSITIES, TRAINING FACILITIES, ETC. 5 km from Chau Phu General Hospital 1 km from Chau Phu Police Station 11 km from Chau Phu Vocational Education Center 5 WORKER'S CHILD EDUCATION FACILITY ONE-STOP SERVICE 5 Km from the zone ROAD WIDTH IT & TELECOMMUNICATION FACILITIES EMERGENCY POWER GENERATOR FIRE-FIGHTING FACILITY Main road: 7m, 2 lanes 3 Km from the nearest Facility The telecommunication system complies with international standards and is always available for communication demand with high data transmission service Available Available. Water supply system for firefighting is located along each road. ACTUAL VIEW 6 LIST OF SOME NOTABLE TENANTS No. Company Name Nationality Location 1 Chang Woo Jin Vina Food Company Limited Korea Lot D 2 Kovie Vina Company Limited Korea Lot D 3 Hoa Phat Seafood Processing Import and Export Joint Stock Company Binh Long Company Limited Vietnam Lot A Vietnam Lot E Dong A Seafood Import and Export Company Limited Cuu Long Seafood Import and Export Joint Stock Company An Giang Food vegetables Joint Stock Company Vietnam Lot B Vietnam Lot C Vietnam Lot D 8 An Giang Fish meal Import and Export Company Limited Vietnam Lot A 9 An Giang Water and Electricity Joint Stock Company Vietnam An Giang Port Joint Stock Company Vietnam 4 5 6 7 10 Business line Sweet potato starch and rice noodle processing factory Fish fat and fish meal processing factory Frozen seafood processing factory Seafood processing factory Seafood processing factory Seafood processing factory Food vegetables processing factory Fish fat and fish meal processing factory Water supply construction for Binh Long Industrial Zone Port exploration at Binh Long River 7 BINH HOA INDUSTRIAL ZONE GENERAL INFORMATION ▪ Binh Hoa Commune, Chau Thanh District, An Giang Province ADDRESS INVESTOR CONTACT PERSON LOCATION INVESTMENT AREA MINIMUM WAGE LEASE TERM MINIMUM LEASE AREA LIMIT FOR CONSTRUCTION HEIGHT PERMITTED CONSTRUCTION RATE PLANNED AREA FACTORY AVAILABLE FOR RENT OPERATION STATUS OCCUPANCY RATE AND NUMBER OF PROJECTS NUMBER OF KOREAN PROJECTS An Giang Economic Zone Authority ▪ Address: No 2, 20 Street, My Hoa Ward, Long Xuyen City, An Giang province, Vietnam. ▪ Tel: (84-296) 3955994 ▪ Website: http://www.bqlkkt.angiang.gov.vn ▪ Mr Nguyen Thanh Cuong – Head of An Giang Economic Zone Authority - Email: ntcuong@angiang.gov.vn - Located in the three-cornered Lo Te, near National Road 91 and Provincial road 941 - 15 Km from Long Xuyen City Center - 23 Km from My Thoi Port - 205 Km from Ho Chi Minh City Priority Sectors Manufacturing and processing sport shoes, garment; producing animal for Investment foodstuff, plastic, cosumer goods, processing agro-aqua-animal products; food, vegetables; mechanical industries, manufacturing machinery and equipment. Restricted According to Article 9, Law of Investment No. 61/2020/QH14 on Sectors for 17/06/2020 Investment [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries ▪ Start date: 2007 ▪ End date: 2057 400 m2 In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning regulation (QCXDVN 01: 2008/BXD) ▪ Total area: 100 ha ▪ Total vacant leasable area: 1,32 ha None ▪ Current area: In operation ▪ Expanded area: In land clearance process Current area: 98,68%, 19 projects 02 projects ▪ Land lease fee: 50 USD/m2 /year (excluded VAT) ▪ Payment : Every year ▪ Management fee: 0.4 USD/m2/month (included VAT) ▪ Electricity fee: 0,05 USD/kWh .According to the Circular by Ministry of Industry and Trade, valid from March 16th, 2015 (excluded VAT) for voltage from 22KV-110KV. OPERATING FEE ▪ Water fee: 11,428 VND (~0.487 USD) /m3 (excluded VAT) ▪ Wastewater treatment fee: 29,250 VND (~1.247 USD)/m3 (excluded VAT) INFRASTRUCTURE AND FACILITY Agribank, Techcombank, Sacombank,Vietinbank FINANCIAL INSTITUTION LEASE FEE TAX SERVICE, STATE FINANCE OFFICE CUSTOMS SERVICE 2 km from Chau Thanh -Thoai Son Tax office POST OFFICE 3 km from Chau Thanh Post Office MEDICARE POLICE, PUBLIC SECURITY UNIVERSITIES, TRAINING FACILITIES WORKER DORMITORY WORKER'S CHILD EDUCATION FACILITY 3.7 km from Chau Thanh General Hospital 23 km from My Thoi Custom Agency 2.3 km from Chau Thanh Police station 15 km from An Giang University 1 km from the zone 1 km from the zone 8 ONE-STOP SERVICE 3 km from Public Service Center ROAD WIDTH IT & TELECOMMUNICATION FACILITIES EMERGENCY POWER GENERATOR FIRE-FIGHTING FACILITY Road Width: 8-15m m, 2 lanes The telecommunication system complies with international standards and is always available for communication demand with high data transmission. Provider: FPT, VNPT and Viettel Non applicable Available. Water supply system for firefighting is located along each road. LAYOUT PLAN LOCATION MAP 9 ACTUAL VIEW LIST OF SOME NOTABLE TENANTS No Company Name Nationality Location Bussiness line 1 Tien Bo Limited Company Vietnam Lot C2 Construction steel manufacturing factoty 2 Truong Thang Limited Company Vietnam Lot C2 3 An Giang Centrifugal concrete Joint Stock Company Vietnam Lot C2 Centrifugal concrete culvert manufacturing factory Centrifugal concrete pile manufacturing factory 10 4 An Giang Building One Member Limited Company Vietnam Lot C2 5 An Giang Water and Electricity Joint Stock Comapny Vietnam Lot C1 6 Oriental Company Limited Thailand Lot K 7 An Giang Company Samho Limited Korea 8 Pacific Energy One Limited Company Member Vietnam Lot C6 Producing solar energy 9 Lu An Garment Limited Company China Lot C4 Producing and outsourcing garment 10 NV Apparel Limited Company Thailand Lot C1 Producing and outsourcing garment 11 Thanh Nhuy Huy One Member Limited Company Vietnam Lot C2 Producing blankets and pillows 12 Thang Loi Restaurant Vietnam The area adjacent to Road number 1 Catering service in Binh Hoa Industrial Zone 13 Chi Cong Joint Stock Company Vietnam Lot C2 Food processing , barrel and industrial equipment production. 14 Angimexpharm Medicine Stock Company Foodant Limited Company Vietnam Lot C4 Vietnam Lot C2 Limited United of Kingdom Lot K Limited Korea Lot C6 Medicine trading and production Agricultural processing factoty Producing and outsourcing footwears and shoes Producing and outsourcing footwears and handbags Vegetables processing factoty 15 Garment Footwear Joint Lot C3,C5 16 Ching Luh Company 17 Samduk Company 18 Phuc Tien Agricultural Product Joint Stock Company Vietnam Lot C2 19 Spectre An Giang Vietnam Garment and Technology Limited Company Denmark Lot C6 Vietnam 11 Hot asphalt concrete and Centrifugal concrete culvert manufacturing factory Water supply construction for BinhHoa Industrial Zone Producing and outsourcing garment Producing and outsourcing footwear Garment production XUAN TO INDUSTRIAL ZONE GENERAL INFORMATION ADDRESS INVESTOR CONTACT PERSON LOCATION INVESTMENT AREA MINIMUM WAGE LEASE TERM MINIMUM LEASE AREA LIMIT FOR CONSTRUCTION HEIGHT PERMITTED CONSTRUCTION RATE PLANNED AREA FACTORY AVAILABLE FOR RENT OPERATION STATUS Tinh Bien District, Tinh Bien Town, An Giang Province An Giang Economic Zone Authority ▪ Address: No 2, 20 Street, My Hoa Ward, Long Xuyen City, An Giang province, Vietnam. ▪ Tel: (84-296) 3955994 ▪ Website: http://www.bqlkkt.angiang.gov.vn ▪ Mr Nguyen Thanh Cuong – Head of An Giang Economic Zone Authority - Email: ntcuong@angiang.gov.vn ▪ Located along National Road 91 ▪ 1 km from Tinh Bien International Border Gate ▪ 120 km from Phnom Penh, Cambodia. ▪ 75 km from Long Xuyen City Center ▪ 84 km from My Thoi Port ▪ 252 km from Ho Chi Minh City Priority Sectors for Production and oursourcing of garment, footwear, athletic shoes, Investment agricultural products processing and beverages,packaging industry,electronicassembly industry Restricted Sectors According to Article 9, Law of Investment No. 61/2020/QH14 on for Investment 17/06/2020 [Area 4] According to Decree 90/2019/NĐ▪CP dated 15th November 2019 ▪ Start date: 2022 ▪ End date: 2072 54,110 m2 In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning regulation (QCXDVN 01: 2008/BXD) ▪ Total area: 31.69 ha ▪ Total vacant leasable area: 20.09 ha None ▪ In operation OCCUPANCY RATE AND NUMBER OF PROJECTS Occupancy Rate: 36,6% NUMBER OF KOREAN PROJECTS None ▪ Land lease fee: 59 USD/m2/year ▪ Payment : Every year ▪ Management fee: 0.5 USD/m2/year ▪ Electricity fee: as regulated by the Government ▪ Water fee: 2,871 VND (~ 0.12 USD)/m3 OPERATING FEE ▪ Wastewater treatment fee: 27,963 VND (~ 1.19 USD/m3 ), estimated fee because the wastewater treatment factory is under construction. INFRASTRUCTURE AND FACILITY Vietcombank, Sacombank,Maritimebank FINANCIAL INSTITUTION LEASE FEE TAX SERVICE, STATE FINANCE OFFICE CUSTOMS SERVICE 7.1 km from Tinh Bien Tax Department LOGISTICS None POST OFFICE 1.7 km from Tinh Bien Post Office MEDICARE 8.3 km from Tinh Bien General Hospital POLICE, PUBLIC SECURITY UNIVERSITIES, TRAINING FACILITIES, ETC. WORKER'S CHILD EDUCATION FACILITY 7.2 km from the zone 1 km from Tinh Bien Customs Department 2 km from Tinh Bien Vocational Education Center Non applicable 12 ONE-STOP SERVICE 10 km from the zone ROAD WIDTH IT & TELECOMMUNICATION FACILITIES EMERGENCY POWER GENERATOR FIRE-FIGHTING FACILITY Road Width: 8-15m m, 2 lanes Telecommunication systems and international standards are always ready to meet the communication needs Non applicable Available. Water supply system for firefighting is located along each road. LAYOUT PLAN LOCATION MAP ACTUAL VIEW 13 LIST OF SOME NOTABLE TENANTS No Company Name Nationality Location Business Line 1 Sportline Limited Company Taiwan From Lot C1 to C8 Garment production 2 Xuan To Agricultural Products Processing Limited Company Vietnam From Lot A1 to A4 Garment production 14 LIST OF FDI ENTERPRISES INVESTING IN AN GIANG PROVINCE No. Stt Name of Investors Investment Capital (USD) Nationality Bussiness line Address Lot K, Binh Hoa Industrial Park Binh Hoa Commune, Chau Thanh District, An Giang Province Lot D, Binh Long Industrial Park, Binh Long Commune, Chau Phu District, An Giang Province Binh Hoa Industrial Park, Chau Thanh District, An Giang Province 1 Oriental Garment An Giang One Member Co., Ltd 9.000.000 Hong Kong Investment project and construction of a factory to process garments for export 2 Chang Woo Jin Vina Food Co., Ltd 1.000.000 Korea Investment project to build a factory processing sweet potato starch and vermicelli 3 An Giang SAMHO Co., Ltd 70.000.000 Korea 4 Kovie Vina Co., Ltd 8.000.000 Korea 5 Lu An Co., Ltd 30.000.000 China Investment project in Footwear manufacturing and processing factory for export Project to build a factory to process fishmeal and fish fat from by-products of pangasius and basa fish Garment factory project 6 Apparel NV Co., Ltd 25.000.000 Thailand 7 Ching Luh Shoes 45.000.000 England 8 Spectre Real Estate A/S Company 11.000.000 Denmark 9 Samduk Vietnam Co., Ltd 10.000.000 Korea 10 Grand Sport Inc Somoa Company Cty Grand Sport Inc Somoa 13.000.000 Somoa 11 Victoria Hangzhou One Member Co., Ltd Angimex Kitoku Joint Venture Company 8.800.000 Hong Kong 4.500.000 Japan 200.000 Philippines 12 13 Branch of Jollibee Vietnam Co., Ltd 15 Garment factory project Garment Hotel business Rice production and rice export The project of establishing a fast food chain in Long Xuyen Lot D, Binh Long Industrial Park, Chau Phu District, An Giang Province Lot C4 Binh Hoa Industrial Park, Chau Thanh District, An Giang Province Lot C1 Binh Hoa Industrial Park, Chau Lot K Binh Hoa Industrial Park, Chau Thanh District, An Giang Province Lot C6 Binh Hoa Industrial Park, Chau Thanh District, An Giang Province Lot C6 Binh Hoa Industrial Park, Chau Thanh District, An Giang Province Lot 8 Xuan To Industrial Park, Tinh Bien District, An Giang Province Lô 8,KCN Xuân Tô, huyện Tịnh Biên, tỉnh An Giang No. 1 Le Loi, Chau Doc City, An Giang National Road 91, My Thoi Ward, Long Xuyen City, An Giang Province Co.opMart Long Xuyen Supermarket, No. 12, Nguyen Hue A, My Long Ward, Long Xuyen City, An Giang Province Siêu thị co.opMart Branch of MM Mega Market Co., Ltd (Vietnam) 17.811.000 15 Hoang Kim - CNC Co., Ltd 7.842.105 Korea 16 Branch of ACACI.T Vietnam Co., Ltd in An Giang 100.000 Singapore Computer installation consulting service 17 Branch of KFC VN Joint Venture Company Limited Chi nhánh Công ty Liên doanh TNHH KFC VN Lotteria Co., Ltd. branch in An Giang 319.000 Thailand Thái Lan Processing and trading food, fast food Chế biến và kinh doanh thực phẩm, thức ăn nhanh 326.190 Korea Processing and trading food and beverages 0 Japan Maintenance and servicing of tractors, harvesters, agricultural and forestry machine tools Factory manufacturing and processing bags 14 18 Thailand MM Mega Market Long Xuyen Center Complex entertainment centers and residential areas 19 Branch of Kubota Vietnam Co., Ltd 20 Great Canyon Co., Ltd 350.000 Hong Kong 21 Fistex An Giang One Member Co., Ltd 400.000 Taiwan 22 VPDD of DKSH Technology Technology Co., Ltd in An Giang 0 Switzerland Displaying, introducing and consulting products 23 Branch of Victoria Hotel Hangzhou Co., Ltd Vitoria Mountain Sam Tourist Village Lotteria Vietnam Co., Ltd. Branch in An Giang 0 Hong Kong Hotel business 0 Korea Processing and trading food and beverages 24 Garment factory 25 Angimex-Kitoku Co., Ltd-Ba The Branch 1.600.000 Japan Producing specialty rice and rice-based products for export.. 26 New Horizon Vietnam Co., Ltd 5.197.349 Israel Investment in production and trading of all-male giant freshwater prawns 27 Representative Office of Bach Ma Ceramic Co., Ltd. (Vietnam) AG 0 Malaysia Displaying, introducing and consulting products 16 414 Tran Hung Dao, My Phuoc Ward, Long Xuyen city, An Giang province My Luong town, Cho Moi district, An Giang province No. 11 Luong Van Cu, My Long Ward, Long Xuyen City, An Giang Province Số 11 Lương Văn Cù, phường Mỹ Long, TP.Long Xuyên, tỉnh An Giang No. 59B, Ly Tu Trong, My Long Ward, Long Xuyen city, An Giang province Co.opMart Long Xuyen Supermarket, No. 12, Nguyen Hue A, My Long Ward, Long Xuyen City, An Giang Siêu thị co.opMart No. 20/7B, My Quoi clump, p. My Quy, Long Xuyen city, An Giang province Tan Hoa handicraft cluster (Lo Su residential cluster - Tan Hoa commune), Tan Hoa commune, Phu Tan district, An Giang province Ham Nghi Street, Binh Khanh 5 Hamlet, Binh Khanh Ward, Long Xuyen City, An Giang No. 46/11/5 and 46/11/6 Tran Hung Dao, Dong Thanh B cluster, My Thanh ward, Long Xuyen city, An Giang province Vinh Dong B Hamlet, Sam Nui Ward, Chau Doc city, An Giang province No. 92 Nguyen Trai, My Long Ward, Long Xuyen city, An Giang province Son Hoa Hamlet, Vong Dong Commune, Thoai Son District, An Giang Province Thanh Phu Hamlet, Binh Thanh Commune, Chau Thanh District, An Giang Province No. 130/1.Tran Hung Dao, ward. My Phuoc, 28 Binh Minh Partners Import-Export Co., Ltd 5.000 Finland Garment 29 Anh Duong Plant Protection Import Export Joint Stock Company 175.000 Canada Buying and selling fertilizers and pesticides 30 An Giang Branch-CJ VINA AGRI Co., Ltd 0 Korea Representative office of Anh Duong Plant Protection Import Export Joint Stock Company JIC Vietnam Co., Ltd Cty TNHH MTV JIC Việt Nam 0 Canada Producing feed for livestock, poultry, aquatic products Exhibition, introduction, consultation product 31 15.000.000 Japan 33 Branch of LG VINA Cosmetics Co., Ltd in AN GIANG 290.000 Korea Project for production of protective materials insulation (hot) - calcium silicate insulation and processing (cold) urethane insulation Cosmetics business 34 De Nhat Badminton Co., Ltd 350.000 Korea Badminton factory 2.506.684 Korea Cinema business 32 35 Lottecinema Vietnam Co., Ltd 36 Werterwer Co., Ltd 197.345 Germany 37 LG Vina Cosmetics Co., Ltd 19.111 Korea 38 Loc Troi - Vien Thi Joint Stock Company 3.000.000 Vietnam China 39 J.Y Co., Ltd. International 12.924.629 Hong Kong 40 Wilmar Argo Vietnam Co., Ltd 1.984.000 Singapore 17 Cosmetics business Production of plant seeds; Propagation and care of agricultural seedlings; Consulting on agronomy, agricultural technology Producing stuffed animals, garments, hats, socks, slippers, pillows, backpacks, bags Processing Industry Long Xuyen city, An Giang province 50 Le Van Luong, My Phuoc Ward, Long Xuyen city, An Giang Province. My Binh Hamlet, Nhon My Commune, Cho Moi District, An Giang Province No. 1249E/63, Binh Duc Ward, Long Xuyen city, An Giang province. 24/C Tran Hung Dao, My Xuyen Ward, Long Xuyen City, An Giang province Tan Trung Industrial and Handicraft Cluster, Phu Tan District, An Giang Province.. 3rd floor, 9 Tran Hung Dao, My Xuyen ward, Long Xuyen city, An Giang province No. 346, My Hoa hamlet, My Luong town, Cho Moi district, An Giang province 5th floor, Vincom Long Xuyen Shopping Center, My Binh Ward, Long Xuyen City, An Giang Province My Khanh Commune, Binh Khanh Ward, Long Xuyen City, An Giang Province No. 24/12 Tran Hung Dao, My Binh ward, Long Xuyen city, An Giang province. Hoa Tan Hamlet, Dinh Thanh Commune, Thoai Son District, An Giang Province. Long Dinh Hamlet, Long Dien A Commune, Cho Moi District, An Giang Province Long Hoa 2 Hamlet, Long Hoa Commune, Phu Tan District, An Giang Province [- This Page is intentionally left blank -] 18 BA RIA – VUNG TAU 19 INVESTMENT ENVIRONMENT IN BA RIA – VUNG TAU USD/VND 23.510 GENERAL INFORMATION Area Population Geographical Location Adjacent provinces 1987 km2 1,178 million people (2022) ▪ Ba Ria – Vung Tau is located in Southeast region. ▪ Located at the Southeast region. There is a common boundary line of 16.33 km long with Ho Chi Minh City in the west ▪ The province is adjacent to Dong Nai province in the North, with Ho Chi Minh City. Ho Chi Minh City is in the west, with Binh Thuan province in the east, and the South is bordered by the East Sea. 2022 statistic: GRDP ▪ Nominal GRDP (billion VND): 390.293 (16,478488494828 billion USD) ▪ Real GRDP (billion VND): 224.480 (9,4777411864049 billion USD) ▪ GRDP growth: 7,15% ▪ GRDP per capita (million VND/year): 331,10 (45183 USD) ▪ Economic structure: - Industry - Construction: 70,37% - Agriculture. forestry and fishery: 5,87% - Service: 15,98% ▪ Industry - Construction growth: 5,39% Industry growth Import - Export Key Industry PCI Ranking ▪ Agriculture, forestry and fishery growth: 2,40% ▪ Service growth: 21,06% Import turnover (billion USD): 9,30 (Growth rate: 0,101) Export turnover (billion USD): 0,64 (Growth rate: 0,0874) ▪ Key industrial products: oil and gas production, processing and manufacturing industry, production and distribution of electricity, hot water, steam ▪ In addition, the province focuses on producing canned beer, liquefied butane and natural gas 70.26 4 SOCIAL INFRASTRUCTURE Transportation Electricity Water ▪ Roadway: The main roads connecting important districts and communes in the province are also asphalted such as provincial roads 328, 329, Lang Cat - Long Son roads, provincial roads 44, 52, Phuoc Buu - Ho Tram roads... The main roads connecting important districts and communes in the province are also asphalted such as provincial roads 328, 329, Lang Cat - Long Son roads, provincial roads 44, 52, Phuoc Buu - Ho Tram roads... ▪ Waterway: Ba Ria - Vung Tau province has 110km of inland waterways, with more than 60 ports, inland wharves, 21 river channels and canals with regular waterways. ▪ The province has a thermal power plant. The total electricity output produced by Ba Ria Thermal Power Company is more than 41.91 billion kWh. ▪ BR - VT currently has 30 medium and small-scale water reservoirs, these reservoirs have the function of supplying water for agriculture, domestic use, industry and services. The total amount of water stored in dams is 308 million m3, of which the useful capacity is about 276.06 million m3. Water supply for domestic use in the province is taken from 8 water reservoirs: Da Den, River Ray, Song Hoa, Kim Long, Nui Nhan, Da Bang, Suoi Cac, Chau Pha (excluding Con Dao district). In which, Da Den reservoir and Song Ray lake are the main and main supply sources for people in the whole province. 20 Education & Training Medicare ▪ 453 preschools and high schools, 137 elementary schools, 90 middle schools and 37 high schools. In particular, there are nearly 280 schools meeting national standards, accounting for 60%. ▪ At the provincial level, there are only 3 medical facilities: Ba Ria Hospital is received from Chau Thanh district hospital with a size of 300 beds, Le Loi Hospital with a scale of 180 beds. At the district level, there were only two health centers in Long Dat and Xuyen Moc districts. Most communes and wards do not have medical stations. The total number of hospital beds/ten thousand people has 9.96 beds. INVESTMENT CONDITION Human resource 54,9% of population are in the working age (2022) Education level Trained labor rate: 67% (2022) ▪ The minimum salary for the province is applied as follows: - Area I (4,680,000 VND/month): Vung Tau City, Phu My Town - Area II (4,160,000 VND/month): Ba Ria City Salary - Area III (3,640,000 VND/month): Long Dien, Dat Do, Xuyen Moc, Chau Duc, Con Dao District. - Area IV (3,250,000 VND/month): N/A (Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages paid to employees working under employment contracts) Investment incentives Fields Attracting Investment Investment attraction situation Industrial zones ▪ Incentives according to government regulations: - Exemption and reduction for land and water rent fee - Preferential tax rates and exemption period, reduction for corporate income tax. - Import tax exemption ▪ Prioritized projects: - Industrial field: electronics, consumer goods - Agriculture: modern agricultural production models - Service: finance and banking; entertainment center... ▪ Investment capital growth in the area in 2022 reached VND 41,655.1 billion, an increase of 8.64% over the same period last year, of which: Foreign direct investment capital was VND 9,017.4 billion My Xuan Industrial Park B1 – Conac My Xuan Industrial Park B1- Tien Hung Cai Mep Industrial Park Chau Duc Industrial Park Phu My 3 Intensive Industrial Park Da Bac Industrial Park My Xuan Industrial Park B1- Dai Duong Dat Do Industrial Park Map 21 ▪ Address: 198, Bach Dang, Ba Ria – Vung Tau city, Ba Ria – Vung Tau Contact ▪ Tel: (84-254) 3852401 ▪ Email: Nhauyen83@gmail.com ▪ Contact person: Nha Uyen 22 MY XUAN B1- TIEN HUNG INDUSTRIAL PARK GENERAL INFORMATION Address My Xuan B1 – Tien Hung Industrial Park, My Xuan Ward , Phu My town, Ba Ria – Vung Tau Province, Vietnam TIEN HUNG PRODUCING - TRADING CO.,LTD Investor Contact Person Location [Vị trí KCN] Nêu bật vị trí thuận lợi của KCN Investment Sectors Các lĩnh vực đầu tư 61, Street No. 17, My Thai Area 2-S4, Tan Phu Ward, District 7, Ho Chi Minh City ▪ Tel: 028 38552757 ▪ Email : info@tienhungcorp.com ▪ Website:www.tienhungcorp..com VÕ TUẤN CƯỜNG – Phó Giám đốc – 0913637638 – votuancuong638@gmail.com Adjacent location [Các khu vực xung quanh] - 60 km from HO CHI MINH city/ the capital - 70 km from Tan Son Nhat airport - 20 km from Long Thanh airport - 15 km from Cai Mep port - 2 km from 51 highway Priority Sectors for Industry of mechanical manufacture, repair and assembly Investment Industry of processing forestry, agricultural products Light industry: leather shoes, garment, stationery, plastic things... Assembling industry of electronics, refrigeration electricity. Industry of construction materials. And some other light industrial branches … Investment Restricted Sectors Minimum wage Lease term Minimum Lease Area Permitted Construction Rate Land area [Diện tích đất] Factory Available for Rent Operation Status Occupancy Rate and Number of Projects No. of Korean projects Lease fee Polluted industries 4,680,000 VND/month From 2023 to 2056 20.000 m2 (2 Ha) Permissible building rate - Factory construction area: 70% - Operating area] : 50% ▪ ▪ ▪ ▪ Total area: 200 Ha Total leasable area: 138 Ha Total vacant leasable area: 10 Ha Total area with full infrastructure ready to build factory: 10 Ha ▪ Total area: 16.000 m2 ▪ Total vacant leasable area 4.800 m2 ▪ Active ▪ 81% ▪ 26 Projects ▪8 ▪ Land lease fee: 135USD/m2 ▪ Factory lease fee: 3.9 USD/m2/month 23 Operating fee ▪ Management fee: 0.4 USD/m2/year ▪ Electricity fee: according EVN ▪ Water fee: 12.500 đồng/m3 ▪ Wastewater treatment fee: 0.4USD/m3 INFRASTRUCTURE AND FACILITY Layout plan 24 CAI MEP INDUSTRIAL PARK GENERAL INFROMATION Address: Cai Mep Industrial Park, Road 965, Tan Phuoc Ward and Phuoc Hoa Ward, Phu My Town, Ba Ria Vung Tau Province. Infrastructure development enterprise Saigon Construction Corporation – One member limited - Address: 18A Dinh Tien Hoang, Dakao Ward, District 1, Ho Chi Minh City - Phone number: 028 39 104 801 - Email: info@saigoncons.com.vn - Website: saigoncons.com.vn Contact: Industrial park location: - Tên: Nguyễn Phúc Nhật Yên - Chức vụ: Chuyên viên Ban Quản lý Khu công nghiệp Cái Mép. - Số điện thoại: 0374 233 298 - Email: banquanlykcncaimep@gmail.com - Located in the southern key economic region; convenient transportation by road, waterway and air. - The national deep-water port system, in the group V port system of Ho Chi Minh City, Ba Ria - Vung Tau and Dong Nai, can receive ships with a tonnage of up to 200,000DWT. - Convenient transportation system: + The road system connects with National Highway 51 (Ho Chi Minh City - Vung Tau). + 70km from the center of Ho Chi Minh City. + 40km from Vung Tau city center. + 55km from Bien Hoa city center. + In the industrial park, there is a railway station of the Ho Chi Minh City - Bien Hoa - Vung Tau railway line. Investment fields: Cai Mep Industrial Park is entitled to receive the industries of food processing, foodstuffs, processing petrochemical products, petroleum, chemical industry, metallurgy and serving heavy industry; does not accept investment projects in 05 types of industries that are at risk of causing serious environmental pollution, including processing tapioca starch, processing rubber latex, producing basic chemicals (with water generation). industrial waste), dyeing and tanning; (According to Decision No. 2005/QD-BXD dated October 27, 2005 of the Ministry of Construction approving the adjustment of detailed planning of Cai Mep Industrial Park, Ba Ria - Vung Tau province and Decision No. 1683/QD- BTNMT dated November 14, 2006 of the Ministry of Natural Resources and Environment on the approval of the Environmental Impact Assessment Report) Minimum wage: N/A Lease term To 10/5/2052. Minimum rental area: According to businesses’ demand Building height limit and building scale: Construction density 60%, average height 1.5 stories and land use coefficient 0.9 times (According to Decision No. 2005/QD-BXD dated October 27, 2005 of the Ministry of Construction on approval detailed planning of Cai Mep Industrial Park, Ba Ria - Vung Tau province). Land area: - Total area: 670.0875ha 25 - Area of industrial land for lease: 462,5352ha - Vacant land area for rent: 138,5189ha - Area with infrastructure ready for factory construction: more than 50ha Factory for rent: None Operation status: In Operation Occupancy rate and number of projects: - 69,86% - 19 projects Number of Korean investment projects: 02 projects - Polypropylene factory and Liquefied petroleum gas underground storage (Hyosung Vina Chemical Co., Ltd.). - Hyosung Vina Chemicals Port (Hyosung Vina Chemicals Co., Ltd.). Lease fee: The sub-lease price of land use rights is determined depending on the location and sublease area at each time of leasing. Operating fee: - Management fee: determined at the time of contract negotiation and negotiation. - Electricity charges: Enterprises directly sign contracts with Phu My Town Power Company - Water charges: Enterprises directly sign contracts with Toc Tien Water Supply Company Limited. - Waste water treatment fee: determined at the time of contract negotiation and negotiation. - Waste treatment fee: The enterprise directly signs a contract with the unit with the function of collecting, transporting and treating waste. INFRASTRUTURE - The road system is planned according to standards, including road systems: 34m, 40m. - Power supply system: 110/22kV line. Water supply system from Toc Tien water supply plant (D150 – D300). - Rainwater collection and drainage system (D600 – D2000). - Wastewater collection and treatment system according to Vietnamese standards. - Gas supply system for projects in need. - Communication system, fire protection, trees, 26 CHAU DUC INDUSTRIAL PARK GENERAL INFORMATION Address [Địa chỉ] Investor [DN phát triển hạ tầng] Contact Person Location Investment Sectors Floor 9, Sonadezi Building, No.1, Street 1, Bien Hoa 1 IP, An Binh Ward, Bien Hoa City, Dong Nai Province Công ty CP Sonadezi Châu Đức / Sonadezi Chau Duc Shareholding Company ▪ Address: Chau Duc Industrial Park, Chau Duc Distrtict, Ba Ria – Vung Tau Province, Viet Nam. ▪ Tel: 84-251-8860784/8860785 ▪ Email: sales@sonadezichauduc.com.vn ▪ Website: www.sonadezichauduc.com.vn hoặc www.sonadezi.com.vn Mr Vu Quan – Sales Manager – 0389.33.66.88 – vuquan79@gmail.com Adjacent location 15 km from Ba Ria city, 44 km from Vung Tau city, 75 km from HCM city 54 km from Long Thanh airport 85 km from Tan Son Nhat airport - 16 km from Thi Vai port - 19 km from Cai Mep port - 21 km from Go Dau port - Connect directly to The National Road No. 56 - 13 km from The National Road No.51 - 40 km from Ho Chi Minh – Long Thanh – Dau Giay Expressway Priority Sectors for Investment Electronic components parts, computer and semi-conductors assembling industry; Plastic products, household appliances; Car accessories, manufacturing and assembling automobiles; Production of new materials and nanotechnologies; High grade garment and textile, footwear (excluding dying and tanning process), etc. Investment Restricted Sectors Rubber processing; Manufacturing basic chemicals (generating industrial wastewater); Steel refinery from wasted metal in discontinuous furnace technology; Industries that are not priority in the Industrial Park and industries that are not welcome or restricted in the Industrial Park (according to Directive No. 43-CT/TU dated August 6th, 2014 of the Board of Provincial Committee). Minimum wage Lease term [Regional minimum wage] Chau Duc Industrial Park is located in region 3, Minimum salary is 3,640,000 VND To the year 2058 Minimum Lease Area 1 ha Limit for Construction Height According to the national technical regulation on construction planning QCVN01: 2021/BXD Permitted Construction Rate The maximum net construction density of a land lot for building factories and warehouses is 70%. For land plots for factory construction with more than 05 floors used for production, the maximum net construction density is 60%. According to the national technical regulation on construction planning QCVN01: 2021/BXD Land area ▪ ▪ ▪ ▪ Total area: 1.556 ha Total leasable area: 1.108,9 ha Total vacant leasable area: 561,69 ha Total area with full infrastructure ready to build factory: 83 ha 27 Factory Available for Rent Operation Status Occupancy Rate and Number of Projects No. of Korean projects Lease fee ▪ Total area: 7.510 m2 ▪ All Sonadezi Chau Duc Company’s Ready-Built-Factories are leased. In operation: 42 investors/infrastructure construction and expected completion: 17 investors/site clearance: Prepare and approve compensation plan for site clearance accumulated up to the time of BIZA report April 2023: 1,328.55 ha remaining area 156.27 ha] ▪ 49,35% ▪ 88 projects ▪ 30 projects ▪ Land lease fee: 95 USD/m2/ to the year 2058 ▪ Factory lease fee: N/A Operating fee ▪ Management fee: 0.5 USD/m2 ▪ Electricity fee: According to Decision No. 1062/QD-BCT dated May 4, 2023 of the Ministry of Industry and Trade, the unit price of electricity for voltage level from 22KV to below 110KV applies as follows: - Giờ cao điểm : VND 2.959/kWh - Peak time : VND 2,9591/kWh - Giờ thấp điểm : VND 1.037/kWh - Off peak : VND 1,037/kWh - Giờ bình thường : VND 1.604/kWh - Normal time : VND 1,604/kWh ▪ Water fee: [Cước nước] Price according to regulations of Ba Ria – Vung Tau province. ▪ Wastewater treatment fee: [Phí xử lý nước thải] khoảng 0,32 USD / m3 According to the State regulations, the volume of wastewater is calculated by 80% of the supplied water volume. ▪ Waste treatment fee:[Phí xử lý chất thải] N/A INFRASTRUCTURE AND FACILITY Distance from the nearest Banking, nearest State Tax and Finance Agency, nearest Logistic Center, Universities, Training facilities, etc., Road width, … The utility infrastructure around the area and the distance from the area to those facilities: Credit institutions: Vietcombank, Sacombank, BIDV in Phu My: 15km Tax office, Customs: Phu My Customs Branch / Phu My Customs: 18km; Logistics: Thi Vai Seaport, Cai Mep Seaport: 16-19km, Post Office: Suoi Nghe Post Office 5km Medical facilities: Ba Ria Hospital / Ba Ria Hospital: 15km, Universities & vocational training institutions, Human resource facilities, Dormitories for workers, Educational facilities for children of workers: Ngo Quyen High School: 7km, Quang Trung Secondary School: 5km, Suoi Nghe Primary School: 3km; Road system & width: - East-West Road (Song Hanh Street): 80m, 8 lanes, 2m median strip, 14m sidewalk; - Northern road (Main axis): 50m, 6 lanes (4m/lane), 2m median strip, 12m sidewalk; - Southern road (Main axis): 54m, 6 lanes (4m/lane), median strip 6m, sidewalk 12m; - Main roads include roads 05 - 12 - 15 25: 32m, 4 car lanes (3m/lane), sidewalks: 10m; - Main road 08: 29m, 4 lanes (3m/lane), sidewalk: 8.5m; - Internal road: 29m, 2 lanes for cars (4.5m/lane), sidewalk: 10m. Post and telecommunications infrastructure; Backup generator; Fire protection utilities: equipped 28 DONG XUYEN INDUSTRIAL PARK GENERAL INFORMATION Address Investor Contact Person Location Investment Sectors Minimum wage Phường Rạch Dừa, thành phố Vũng Tàu, tỉnh Bà Rịa – Vũng Tàu Name of Investor: Dong Xuyen and Phu My 1 Industrial Park Infrastructure Investment and Exploitation Company (IZICO Company) ▪ Address / Address: No. 20, 3/2 Street, Ward 8, Vung Tau City, Ba Ria-Vung Tau Province Tel: 02543.593.440 ▪ Email: izico@gmail.com ▪ Website: www.izico.com.vn Name - Position - Mobile: - Email: Nguyễn Ngọc Sơn –Director - Email: sonizico@gmail.com - Dong Xuyen Industrial Park is located along National Highway 51A - Distance to big city: 125km from Ho Chi Minh city by road, about 50 nautical miles by sea; About 7km from Vung Tau city center - Nearest seaport: 37km from Phu My Port in Ba Ria-Vung Tau province and 38km from Thi VaiCai Mep Port in Ba Ria-Vung Tau province - Nearest airport: To Long Thanh international airport (Dong Nai province): 80km - Nearest railway station: To Bien Hoa station (Dong Nai province): 87km Priority Sectors for Investment - Oil and gas service industry - Marine service industry - General clean industries 4.680.000 VND/ month Lease term Thời hạn cho thuê Minimum Lease Area To 31/10/2046 Limit for Construction Height - Factory construction area 30m - Operating area 1-7 floors Permitted Construction Rate - Factory construction area up to 70% - 50% operating area Land area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects No. of Korean projects Lease fee No require ▪ ▪ ▪ ▪ Total area: 160,81 ha Total leasable area: 137,47 ha Total vacant leasable area: 0 Total area with full infrastructure ready to build factory: 0 ▪ Total area: none ▪ Total vacant leasable area: 0 ▪ Active/ ▪ 100% ▪ 90 project ▪ None ▪ Land lease fee: 1,76 USD/m2/year ▪ Factory lease fee: none 29 Operating fee - Industrial park management fee: according to regulations of the People's Committee of Ba RiaVung Tau province - Waste water treatment fee: Treatment unit price for 01m3 of local wastewater with pollution levels from column A to column B of QCVN 40/2011/BTNMT before being discharged into the wastewater treatment plant's collection system is 4,400 VND/m3; from column B QCVN 40/2011/BTNMT is 9,800 VND/m3 (unit price includes VAT) - Other fees: fees and charges as prescribed by the State - Electricity price: According to the selling price of electricity provided by Vung Tau City Power Company directly to investors in the industrial park. - Price of water supply: 12,500 VND/m3 (VAT not included) INFRASTRUCTURE AND FACILITY - Infrastructure: + Internal road system: The road of the Industrial Park has a road surface structure of hot asphalt concrete with a total length of 9.22 km. The entire system of roads in the IZ has been fully invested and built to meet the needs of investors in the IZ. The traffic system includes: the main road of the industrial zone: Road No. 1, 45m wide; The remaining roads have width from 22m to 30m . + Power supply system: Power is taken from 110/22KV intermediate transformer station located at Road No. 1 of the Industrial Park. From the intermediate substation to build a 22KV overhead line to supply power to the whole industrial park + Water supply system: The entire water supply for Dong Xuyen Industrial Park uses the water source of Vung Tau Water Supply Joint Stock Company with a capacity of 35,000m3/day. + Communication system: Vung Tau is a focal point of the international fiber optic system, so it is very convenient. In Dong Xuyen Industrial Park, it is also invested to build a fiber optic cable and communication network installed according to the requirements of each factory. - Centralized wastewater treatment plant: Waste water is treated locally in each enterprise, then according to the wastewater collection system, it is brought to the centralized wastewater treatment station of the Industrial Park. Dong Xuyen Industrial Park has built and put into use a centralized wastewater treatment plant system with a capacity of 3,000m3/day and night, ensuring wastewater treatment for all investors in the industrial park. + Quality after treatment: Currently, the concentrated wastewater treatment plant in Dong Xuyen Industrial Park is applying column B standards QCVN 40/2011/BTNMT (according to environmental protection commitments and discharge permits) before discharging. to the receiving environment. - Service and service works: In Dong Xuyen Industrial Park, an operation center has also been built on Road No. 1 of the Industrial Park. 30 [- This Page is intentionally left blank -] 31 BAC GIANG 32 INVESTMENT ENVIRONMENT IN BAC GIANG GENERAL INFORMATION ▪ Area: 3,895.9 km2 Area, Population ▪ Population: 1.89 million ▪ Bac Giang province is included in Hanoi capital region, on the economic corridor of Lang Son Hanoi - Hai Phong- Quang Ninh. Geographical Location Adjacent provinces ▪ It is 50 kilometres from Bac Giang city to Hanoi center and Noi Bai international airport, 130 kilometres to Hai Phong and Cai Lan ports and 110 kilometres to Huu Nghi border gate (Lang Son province). ▪ Lang Son Province to the north, Thai Nguyen Province to the northwest and Hanoi Capital to the southwest, Hai Duong & Bac Ninh Province to the south, Quang Ninh Province to the east. 2022 statistic: ▪ GRDP: 155,876 billion VND (6.5 billion USD) ▪ GRDP growth: 19,3% ▪ GRDP per capita: 3.400USD/year GRDP ▪ Economic Structure: - Industry and Construction: 62.30% - Service: 22.08% - Agriculture, Forestry and Fishery: 14.90% 2022 statistic: ▪ Industry - Construction growth: 26.65% Industry growth ▪ Agriculture, forestry and fishery growth: 1.97% ▪ Service growth: 7.49% PCI ▪ Score: 72.80 – ranked 2nd out of 63 cities and provinces in Vietnam (2022) SOCIAL INFRASTRUCTURE ▪ Roadway: Including Hanoi – Lang Son expressway and 05 National Routes: National Route 1, National Route 31, National Route 37, National Route 17, National Route 279 and Vanh Dai 5 of Hanoi capital, convenient connections to economic centers, airports, seaports Transportation ▪ Railway: Including Hanoi – Lang Son route (trading to China); Hanoi – Bac Giang (Kep) – Quang Ninh. Especially, Kep station has been put into operation for international transport, contributing to improving the transport capacity for the entire Hanoi – Lang Son route through China to Europe. ▪ Waterway: Including Cau River, Thuong River and Luc Nam River. ▪ Airway: 50 minutes from Noi Bai International Airport by car. Electricity ▪ Supplied from the national power network with 01 500kV station, 03 220kV stations and 16 110kV stations in the entire province 33 ▪ Quality underground water is mainly used in water supply system Water ▪ 02 plants with capacity of 25,000 to 50,000 m3/day & night and clean water supply plans in the district satisfy living and production demands of the industrial parks and clusters in the province Education ▪ 01 university, 05 colleges, 06 professional intermediate schools and 25 vocational training centers and institutions, in which, there are 02 high-quality vocational colleges: College of Industrial Technologies and Vietnam – Korea Vocational College of Technology. Medicare ▪ Modern hospital system including the provincial General Hospital, Obstetric and Pediatric Hospital, Oncology Hospital, General Hospital and Ophthalmic Hospital and Medical Centers in all the districts and Bac Giang city. INVESTMENT CONDITION Human resource ▪ About 1.2 million people of working age (2022) Education level ▪ Trained labor rate: 74% (2022) ▪ The minimum salary for the province is applied as follows (see appendix for detail amount): - Area III including Bac Giang city, Viet Yen Districts, Yen Dung Districts, Hiep Hoa Districts, Tan Yen Districts, Lang Giang Districts: 3.640.000 VND/month or 17.500 per hour. Salary - Area IV including Yen The Districts, Luc Ngan Districts, Son Dong Districts, Luc Nam Districts: 3.250.000 VND/month or 15.600 per hour. ▪ The lowest wage for trained labor (including those trained by the enterprises) must be at least 7% higher than the above referenced basic salary. ▪ Incentives according to government regulations: - Exemption and reduction for land and water rent fee Investment incentives - Preferential tax rates and exemption period, reduction for corporate income tax. - Import tax exemption ▪ Industry: Focus on attracting industries and products: - Mechanical engeering, manufacture, food-processing, water supply, electronic products, wastewatermangement and treatment, computers and optical products, manufacture of electrical equipment (mainly batteries), garment and textile, products from rubber and plastic.. Fields Attracting Investment ▪ Tourism, Trade - Service: - Cultural – spiritual tourism; history – culture; eco-re-sport; community tourism; high-class sport tourism (golf tourism) ▪ Agriculture: Attract business to invest in the formation of specialized agricultural production areas to serves as a basis for concentration, land accumulation, development in the direction of effiency, hightech agriculture, smart and clean agriculture. 34 Map Bac Giang Department of Planning and Investment Address: Nguyen Gia Thieu Street, Bac Giang City, Bac Giang Tel: (84-204) 3 854 317 E-mail: so_khdt_vt@bacgiang.gov.vn Website: https://skhdt.bacgiang.gov.vn Contact Center for Investment Promotion and Enterprise Development Bac Giang/Korea Desk Bac Giang Address: 164 Xuong Giang Street, Bac Giang City, Bac Giang Mr: Dong Anh Quan – Director of the Center Tel: 0904 109 996 E-mail: anhquanskhdt@gmail.com Website: https://ipcbacgiang.com 35 LIST OF INDUSTRIAL ZONES IN BAC GIANG No Industrial zone Name Total Area (ha) Occupancy Rate Status 1 Dinh Tram Industrial Zone 127 100% In operation 2 Quang Chau Industrial Zone 426 100% In operation Quang Chau Industrial Zone (expand) 90 100% In operation 3 Van Trung (Fujiang) Industrial Zone 238 100% In operation 4 Van Trung (S&G) Industrial Zone 113 100% In operation 5 Hoa Phu Industrial Zone 208 91% In operation Hoa Phu Industrial Zone – expand phase 1 85 0% Under construction 6 Song Khe – Noi Hoang Industrial Zone 150 100% In operation 7 Viet Han Industrial Zone 50 100% In operation 8 Tan Hung Industrial Zone 105,3 0% Under construction 9 Yen Lu Industrial Zone 377 4% In operation BAC GIANG LOCATION MAP OF INDUSTRIAL ZONES 36 HOA PHU INDUSTRIAL ZONE GENERAL INFORMATION Address Investor Contact Person Location Investment Sectors Minimum wage Lease term Lot HC – Hoa Phu Industrial Park, Mai Dinh Commune, Hiep Hoa District, Bac Giang Province Hoa Phu Invest Co., Ltd ▪ Address: Lot HC – Hoa Phu Industrial Park, Mai Dinh Commune, Hiep Hoa District, Bac Giang Province ▪ Tel: 0204 358 6868 ▪ Email: hoaphu@phumygroup.com.vn ▪ Website: www.hoaphuip.com.vn Name - Position - Mobile: - Email: Le Cong Long 093 6941989 Email: lelong@phumygroup.com.vn Adjacent location - 45km from Ha Noi city - 40km from Bac Giang Province - 20km from Noi Bai airport; - 110km from Hai Phong port; - 150km from Lang Son border gate Priority Sectors for Encourage the production industry that is not harmful to the Investment environment (assembly, electronic components, ...) Investment Restricted Industries that affect the environment (textiles, plating, ...) Sectors 3.640.000 VND/person/month (According to Decree 38/2022/ND-CP) ▪ End date: 20/05/2066 Minimum Lease Area 10.000m2 Limit for Construction Height The number of floors is limited to 5 floors no limit to the height of each floor Permitted Construction Rate Construction density: 3.5 Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean projects Lease fee Operating fee ▪ Total area: 292ha ▪ Total area is filled: 207ha ▪ The total remaining area is in the process of clearing ground: 85ha ▪ Total area: None ▪ Active and continues to be in the ground clearance phase of expanded 85ha section. This site is expected to be handed over in the fourth quarter of 2023. 207ha area: 95% filled 85ha is in the process of clearing ground Total projects in Hoa Phu Industrial Park: 27 ▪ 6 projects ▪ Land lease fee: Depending on the location and size of the area ▪ Management fee: 11.750 VND/m2/year ▪ Electricity fee: According to the unit price of Vietnam Electricity (EVN) ▪ Water fee: 11.000 VND/m3 ▪ Wastewater treatment fee: 9.900 VND/m3 (The above costs do not include VAT) 37 INFRASTRUCTURE AND FACILITY Financial institution Vietcombank, Vietinbank Tax service, State finance office Internal Service Customs Service Internal Service Logistics Internal Service Post office Internal Service Medicare 19 km to Bac Ninh General Hospital Police, public security 24/7 security service. Universities, training facilities, etc. 10 km from nearest University Recruitment Available From the 02 towns, Thắng Town and Chờ Town, with the population of 220,000 Worker dormitory Internal Service Worker's child education facility NA One-stop service Internal Office Road Width Main entrance: 77 m width IT & Tele-communication Facilities of Industrial Zone Telecommunication systems and international standards are always ready to meet the communication needs Emergency Power generator Available in the zone Fire-fighting facility Fire brigade station away from 1km; extinguishing water pipe and fire hydrants are located along the main roads and branches in the park. Layout Plan 38 Location Map 39 QUANG CHAU INDUSTRIAL ZONE GENERAL INFORMATION Address Quang Chau Commune, Viet Yen District, Bac Giang Province Investor Saigon – Bac Giang Industrial Park Corp. ▪ Address: Quang Chau Industrial Zone, Bac Giang Province ▪ Tel: (84-204) 356 6888 ▪ Fax: (84-204) 386 8449 ▪ Website: http://www.kinhbaccity.vn/news/ Contact Person ▪ Tran Thi Huong - Sales & Marketing Deputy Manager – (84) 915 636 139 tthuong.kbc@gmail.com/ tthuong@kinhbaccity.com Location - 15 Km from Bac Giang City Center - 40 Km from Noi Bai International Airport - 115 Km from Hai Phong Seaport - 500 m from Highway No.01 and 15 Km from Hanoi – Lang Son (border with China) – NanNing (China) Railway Priority Sectors for Investment Engineering, manufacturing and assembling automobiles and motorcycles; Production of electronics and home appliances; supporting industry; textiles, etc. (Decision No. 1062/QĐUBND on 07/07/2016) Restricted Sectors for Investment As regulated by Bac Giang Authority Investment Area Minimum wage [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries Lease term ▪ Start date: 2006 ▪ End date: 2056 Minimum Lease Area 1.86 ha Limit for Construction Height 18 m Permitted Construction Rate 60% Planned area ▪ Total area: 426 ha ▪ Total vacant leasable area: Unavailable ▪ Total area with full infrastructure ready to build factory: Unavailable Factory Available for Rent ▪ Total area: Unavailable Operation Status ▪ In operation Occupancy Rate and Number of Projects ▪ 100% ▪ 40 projects Number of Korean Projects 5 projects Lease fee ▪ Land lease fee: 75 USD/m2 ▪ Factory lease fee: 3.5 USD/m2/month ▪ Payment: - Method: Bank Transfer in VND - Period: 40% after signing In-principle Agreement + 40 % after signing Land Sublease Contract + 20% after Land Hand-over Operating fee ▪ Management fee: USD 0.5/sqm/year (excluded VAT) ▪ Electricity fee: According to the Circular by Ministry of Industry and Trade, valid from March 16th, 2015 (excluded VAT) for voltage from 22KV-110KV. ▪ Water fee: 12,000 VND /m3 (excluded VAT) 40 ▪ Wastewater treatment fee: VND 9,400 / m3 (excluded VAT) INFRASTRUCTURE AND FACILITY Financial institution VietinBank Tax service, State finance office 7 Km from Vietnam State Treasury in Viet Yen District 6 Km from the nearest Customs Agency Customs Service 25 Km from ICD Tien Son, Bac Ninh Logistics Kerry Integrated Logistics JSC, Dragon Logistics Post office 2 km from Vietnam Post Office Medicare - Bac Ninh General Hospital is 7km from IP. - Bac Giang General Hospital is 5 km from IP. Police, public security 700 m Universities, training facilities, etc. 8 Km from Bac Giang Agriculture and Forestry University Recruitment Available Worker dormitory 2 Km Worker's child education facility 2 Km One-stop service 15 Km Road Width ▪ Main road: 32m, 4 lanes; ▪ By Road: 23m, 2 lanes IT & Telecommunication Facilities of Industrial Zone Available Emergency Power generator Available Fire-fighting facility Available 41 Layout Plan Location Map 42 Actual View 43 LIST OF TENANTS No Name of Company Nationality 1 Nichirin Vietnam Co.,Ltd Japan 2 Inoue Vietnam Co.,Ltd Japan 3 Hosiden Vietnam (Bac Giang) Co.,Ltd 4 L&C Tech Vietnam Co.,Ltd Co.,Ltd Taiwan 5 Umec Vietnam Co.,Ltd Taiwan 6 Crystal Martin (VN) Co.,Ltd Hong Kong Crystal Intimate (VN) Co.,Ltd Hong Kong 7 ShunSin Technology Co.,Ltd China 8 Vietnam Tequ Hope Animal Feed Co.,Ltd China 9 Wintek Vietnam Co.,Ltd 10 LY Vietnam Co.,Ltd 11 Trung Nguyen Instant Coffee Jsc. 12 NewHope Hanoi – (Bac Giang Branch) 13 Vinafor Bac Giang Plywood Single-Member Co.,Ltd 14 Si flex Vietnam Co.,Ltd South Korea 15 Luxshare ICT (Vietnam) Co.,Ltd Hong Kong 16 Ja Solar Vietnam Co.,Ltd Co.,Ltd Hong Kong 17 Lens Technology Vietnam Co.,Ltd Hong Kong 18 Blue & Green Home Articles Viet Nam Co.,Ltd 19 Kinh Bac Services Corporation 20 Samkwang Vietnam Co.,Ltd 21 Lien Minh (LIMICO) Co.,Ltd 22 HIQ VINA Co.,Ltd South Korea 23 T/S Vina Co.,Ltd South Korea 24 Exwin Co.,Ltd Taiwan 25 Lucky Dragon Co.,Ltd Taiwan 26 Electric Motocyce Yadea Vietnam Co.,Ltd China 27 Jufeng New Marterials Vietnam Co.,Ltd China 28 Et Solar Technology (Vietnam) Co.,Ltd China 29 Fu Hong Co.,Ltd China 30 Huimei Precisions Plastics Co.,Ltd China 31 BOI Vietnam Co.,Ltd China 32 Fousine Vietnam Technology Co.,Ltd 33 Jiafeng Packaging Vietnam Co.,Ltd China 34 Degoo Adhesive (Vietnam) Co.,Ltd China 35 Great Uninon International Vietnam Co.,Ltd China 36 Chen Feng New Materials Vietnam Co.,Ltd China 37 Naise New Materials Vietnam Co.,Ltd China 38 RunYang Technology Vietnam Co.,Ltd China 39 FuYu Precision Componen Co.,Ltd China South Korea Taiwan China Vietnam China Vietnam- Japan China Vietnam South Korea Vietnam Hong Kong 44 40 Cheng Loong Viet Nam Investment Co.,Ltd China 45 DINH TRAM INDUSTRIAL ZONE GENERAL INFORMATION Address ▪ Hoang Ninh Commune, Viet Yen district, Bac Giang Province Investor Infrastructure Development Company of Industrial Park in Bac Giang ▪ Address: Song Khe –Noi Hoang Industrial Park (the Northern area), Bac Giang ▪ Tel: (84-204) 3 866 767 ▪ Fax: (84-204) 3 866 767 ▪ Email: congtypthtkcn@bacgiang.gov.vn Contact Person ▪ Mr. Nguyen Van Nhien – Sale Director – (84) 913 030 201 - nhiennv_ctptht@bacgiang.gov.vn Location ▪ 13 Km from Bac Giang City Center ▪ 45 Km from Noi Bai International Airport ▪ 110 Km from Hai Phong Seaport ▪ 500 m from Highway No.01 and 15 Km from Hanoi – Lang Son (border with China) – NanNing (China) Railway Priority Sectors for Investment Electronics, High Technology Restricted Sectors for Investment Polluted Sector Investment Area Minimum wage [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries Lease term ▪ Start date: 2004 ▪ End date: 17/06/2054. Minimum Lease Area 10,000 m2 Limit for Construction Height Factory area: 3 levels Operating area: 2 levels Permitted Construction Rate 65% Planned area ▪ Total area: 127 ha ▪ Total industrial land: 93 ha ▪ Total vacant leasable area: 0 ha Factory Available for Rent ▪ Total area: NA Operation Status ▪ In operation Occupancy Rate and Number of Projects ▪ 100% ▪ 54 projects Number of Korean Projects ▪ 2 projects Lease fee ▪ Land lease fee: 60 USD/m2 ▪ Factory lease fee: NA Operating fee ▪ Management fee: 11,120 VND (~0.4USD)/m2/year ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: 12,072 VND (~0.52 USD)/m3 (production) ▪ Wastewater treatment fee: 9,000 VND (~0.39 USD)/m3 INFRASTRUCTURE AND FACILITY Financial institution None Tax service, State finance office 10 km from nearest Tax Service Department 46 Located inside the industrial zone Customs Service NA Logistics Nhat Tin Logistic within 11 km Post office Bac Giang Post Office within 11 km Medicare Viet Yen General Hospital within 5km, Bac Giang General Hospital within 10 km Police, public security • 3km from nearest Police Station • Industrial Park’s security team keeps watching 24/24h Universities, training facilities, etc. • 10 Km from Kinh Bac University Recruitment None Worker dormitory None Worker's child education facility None One-stop service 17.8 km from Yen Dung District One – Stop service Road Width NA IT & Telecommunication Facilities of Industrial Zone Modern communication system reaches the international standard and ready to meet full demands concerning on national and international communication services. Emergency Power generator None Fire-fighting facility Extinguishing water pipe and fire hydrants are located along the main roads and branches in the park. Layout Plan 47 Actual View 48 VAN TRUNG INDUSTRIAL ZONE GENERAL INFORMATION Address ▪ Viet Yen District, Bac Giang Province Investor Fugiang Company (Taiwan Foxconn Group) ▪ Address: Van Trung Industrial Park, Viet Yen District, Bac Giang Province ▪ Tel: (84-204) 3661 968 ▪ Fax: (84-221) 3 974 624 ▪ Website: www.fugiang.com ▪ Email: contact.fugiang@gmail.com Contact Person Mr. Nguyen Manh Dung – Head of Project Department – (84) 904 868 557 manhdung.fugiang@gmail.com Location - 10 Km from Bac Giang City Center - 45 Km from Noi Bai International Airport - 110 Km from Hai Phong Seaport - 110 km from Cai Lan Deep Sea Port Quang Ninh - 500 m from Highway No.01 and 15 Km from Hanoi – Lang Son (border with China) – NanNing (China) Railway Priority Sectors for Investment Electronics, High Technology Restricted Sectors for Investment Polluted Sectors Investment Area Minimum wage [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries Lease term ▪ Start date: 24/12/2009 ▪ End date: 12/11/2065 Minimum Lease Area 10,000 m2 Limit for Construction Height Factory area: 3 levels Operating area: 2 levels Permitted Construction Rate 60% Planned area ▪ Total area: 238.3 ha Phase I: 150 ha Phase II: 88.3 ha ▪ Total vacant leasable area: 0 ha Factory Available for Rent ▪ Total area: NA Operation Status ▪ In operation Occupancy Rate and Number of Projects 100% with 97 projects Number of Korean Projects 21 Lease fee ▪ Land lease fee: 80 USD/m2/over project life Operating fee ▪ Management fee: 0.5 /m2/year ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: 12,072 VND (~0.52 USD)/m3/year ▪ Wastewater treatment fee: 9,000 VND (~0.39 USD)/m3 INFRASTRUCTURE AND FACILITY Financial institution Vietcombank and Agribank within 5km 49 Tax service, State finance office 3 km from nearest Tax Service Department Customs Service Located inside the industrial zone Logistics NA Post office Nhat Tin Logistic within 5 km Medicare Bac Giang Post Office within 11 km Police, public security Bac Giang General Hospital within 10 km Universities, training facilities, etc. • 3km from nearest Police Station • Industrial Park’s security team keeps watching 24/24h Recruitment • 10 Km from Kinh Bac University Worker dormitory None Worker's child education facility None One-stop service 17.8 km from Yen Dung District One – Stop service Road Width Main Road: 4 lanes; 33/25m width Route Road: 2 lanes; 18 m width IT & Tele-communication Facilities of Industrial Zone Modern communication system reaches the international standard and ready to meet full demands concerning on national and international communication services. Emergency Power generator 2 power generators with 400kVA and 180kVA capacity Fire-fighting facility Available in the zone Layout Plan 50 Location Map Actual View 51 SONG KHE – NOI HOANG SOUTH INDUSTRIAL ZONE GENERAL INFORMATION Address ▪ Yen Dung District, Bac Giang Province Investor Bac Giang FuJi Development JSC ▪ Address: Song Khe-Noi Hoang Industrial Park (the Northern area), Bac Giang ▪ Tel: (84-204) 6529 010 ▪ Fax: (84) 918 273 656 ▪ Website: http://fujiip.com/ko/ Contact Person ▪ Mr. Giang – (84) 913 275 656 - giangnguyen@fujiip.com ▪ Mr. Nguyen Anh Van – (84) 986 832 704 - Vanfuji.ip@gmail.com Location - 7 Km from Bac Giang City Center - 45 Km from Noi Bai International Airport - 90 Km from Hai Phong Seaport - 1km from Highway No.01 Investment Area Priority Sectors for Investment High Technology Restricted Sectors for Investment Garment and Chemical Minimum wage [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries Lease term ▪ Start date: 22/5/2013 ▪ End date: 22/5/2063 Minimum Lease Area 10,000 m2 Limit for Construction Height - Factory area: 4 levels - Operating area: 4 levels Permitted Construction Rate Factory area: 60% Operating area: 40% Planned area ▪ Total area: 45 ha ▪ Total Industrial Land: 32.8 ha (Phase I) Factory Available for Rent No Operation Status ▪ In operation Occupancy Rate and Number of Projects ▪ 100% ▪ 20 projects Number of Korean Projects 7 Lease fee ▪ Land lease fee: 65 USD/m2 ▪ Factory lease fee: 2.8 – 3.2USD/m2/month Operating fee ▪ Management fee: 11,120 VND (~0.5USD)/m2/year ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: 12,072 VND (~0.51 USD)/m3 ▪ Wastewater treatment fee: 9,000 VND (~0.38 USD)/m3 INFRASTRUCTURE AND FACILITY Financial institution Vietcombank Branch Song Khe, Agribank 52 Tax service, State finance office 4 km from nearest Tax Service Department Customs Service 6km from Bac Giang Customs Deaprtment Logistics Nhat Tin Logistic within 7 km Post office Bac Giang Post Office within 11 km Medicare Bac Giang General Hospital within 5 km Police, public security 5 km from nearest Police Station Universities, training facilities, etc. 11.5 Km from Bac Giang Agriculture and Forestry University Recruitment Support recruitment is available Worker dormitory None Worker's child education facility None One-stop service 11 km from Yen Dung District One – Stop service Road Width Main Road: 4 lanes; 33 m width Internal Road: 2 lanes; 23 m width IT & Telecommunication Facilities of Industrial Zone Modern communication system reaches the international standard and ready to meet full demands concerning on national and international communication services. Emergency Power generator Available Fire-fighting facility Available Layout Plan Location Map 53 Actual View 54 SONG KHE – NOI HOANG NORTH INDUSTRIAL ZONE GENERAL INFORMATION Address ▪ Song Khe Commune, Yen Dung District, Bac Giang Province Investor Infrastructure Development Company of Industrial Park in Bac Giang ▪ Address: Song Khe-Noi Hoang Industrial Park (the Northern area), Bac Giang ▪ Tel: (84-204) 355 9266 ▪ congtypthtkcn@bacgiang.gov.vn Contact Person ▪ Mr. Nguyen Van Nhien – Sale Director – (84) 913 030 201 - nhiennv_ctptht@bacgiang.gov.vn Location - 5 Km from Bac Giang City Center - 45 Km from Noi Bai International Airport - 110 Km from Hai Phong Seaport - 110 Km from Cai Lan Quang Ninh Deep Sea Port - 1km from Highway No.01 Investment Area Priority Sectors for Investment High-tech industry, clean industry Restricted Sectors for Investment Restricted Heavy industry, industries affecting the environment Minimum wage [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries Lease term ▪ End date: 12/11/2066 Minimum Lease Area 10,000 m2 Limit for Construction Height - Factory area: 3 levels - Operating area: 2 levels Permitted Construction Rate Factory area: 60% Operating area: 60% Planned area ▪ Total area: 105 ha ▪ Total area with full infrastructure ready to build factory: 175ha Factory Available for Rent No Operation Status In operation Occupancy Rate and Number of Projects ▪ 100% ▪ 20 projects Number of Korean Projects 6 Lease fee ▪ Land lease fee: 65 USD/m2 Operating fee ▪ Management fee: 10,000 VND (¬0.47USD) /m2/year ▪ Infrastructure maintenance fee: 4,600 VND/m2/year ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: 12,072 VND (~0.51 USD)/m3 ▪ Wastewater treatment fee: 9,000 VND (~0.38 USD)/m3 INFRASTRUCTURE AND FACILITY Financial institution Vietcombank Branch Song Khe, Agribank Tax service, State finance office 4 km from nearest Tax Service Department Customs Service 6km from Bac Giang Customs Deaprtment 55 Logistics Nhat Tin Logistic within 7 km Post office Bac Giang Post Office within 11 km Medicare Bac Giang General Hospital within 5 km Police, public security 5 km from nearest Police Station Universities, training facilities, etc. 11.5 Km from Bac Giang Agriculture and Forestry University Recruitment Support recruitment is available Worker dormitory None Worker's child education facility None One-stop service 11 km from Yen Dung District One – Stop service Road Width Main Road: 4 lanes; 33 m width Internal Road: 2 lanes; 23 m width IT & Telecommunication Facilities of Industrial Zone Modern communication system reaches the international standard and ready to meet full demands concerning on national and international communication services. Emergency Power generator Available Fire-fighting facility Available Layout Plan Location Map 56 57 [- This Page is intentionally left blank -] 58 BAC KAN 59 INVESTMENT ENVIRONMENT IN BAC KAN USD/VND 23.510 GENERAL INFORMATION Area, Population ▪ Area: 4,859.96 km2 ▪ Population: 0.4547 million (2022 statistic) Geographical Location ▪ Located in the Northeast region, due north of the capital Hanoi ▪ Located 160 km from Hanoi Adjacent provinces ▪ Cao Bang Province to the north, Lang Son Province to the East, Thai Nguyen Province to the South, Tuyen Quang Province to the west. GRDP Industry growth PCI 2022 statistic: ▪ GRDP: 8,297 billion VND (0.35 billion USD) ▪ GRDP growth: 6.01 % ▪ GRDP per capita: 1,970 USD/year ▪ Economic structure: - Industry - Construction: 16.1 %; - Agriculture. forestry and fishery: 28.9 %; - Service: 51 %; - Tax on Goods: 3 % 2022 statistic: ▪ Industry - Construction growth: 8.96 % ▪ Agriculture, forestry and fishery growth: 3.83% ▪ Service growth: 6.25% ▪ Score: 65.15– ranked 35 out of 63 cities and provinces in Vietnam. (2022) SOCIAL INFRASTRUCTURE Transportation ▪ Roadway: Bac Kan has National Highway No. 3 passing from Cao Bang, Thai Nguyen to Ha Noi.National highway 3b connects north kanj with Lang Son.The connecting route from Ba Be Lake to Tuyen Quang is also under construction ▪ Railway: None ▪ Waterway: None Electricity Supplied from the national power network Water The limited water resources development in the province is managed by the communes through better water management practices (government supported initiatives) Education ▪ 0 university, 01colleges, Medicare ▪ 8 hospitals INVESTMENT CONDITION Human resource ▪ 80% of population are in the working age (2022) Education level ▪ Trained labor rate: 00% (2022) Salary ▪ The minimum salary for the province is applied as follows: - Area III: Bac Kan city - Area IV: Other District ▪ The lowest wage for trained labor (including those trained by the enterprises) must be at least 7% higher than the above referenced basic salary Investment incentives Exemption and reduction for land and water rent fee - Preferential tax rates and exemption period, reduction for corporate income tax. 60 -Import tax exemption Fields Attracting Investment ▪ Prioritized projects: Mining, forest products, agriculture High technology, industrial electronics, information technology; mechanical engineering products; - Supporting industry; Map (Add Province map) Contact Department of Planning and Investment ▪ Address: No 9 Truong Chinh, Phung Chi Kien, Bac Kan ▪ Tel: 0209 3878 217 ▪ Fax : ▪ Email: sokhdt@backan.gov.vn ▪ Contact person: Tran Cong Hoa 61 LIST OF INDUSTRIAL ZONES No Industrial zone Name Total Area (ha) Occupancy Rate Status 1 Thanh Binh Industrial Zone 73.5 100% In Operation LOCATION MAP OF INDUSTRIAL ZONES 62 THANH BINH INDUSTRIAL ZONE GENERAL INFORMATION ADDRESS Thanh Thinh commune, Cho Moi district, Bac Kan Province, Vietnam INVESTOR Bac Kan Industrial Zone Infrastructure Development Company ▪ Address: Thanh Binh commune, Cho Moi district, Bac Kan ▪ Tel: (84-209) 3 865 232 Fax: (84-209) 3 865 232 ▪ Email: congtypthtbk@gmail.com CONTACT PERSON Mr. Ma Doan Hieu- Department of Professional Management Mobile: (84) 982 385 575- Email: madoanhieu@gmail.com LOCATION ▪ 35 km to Bac Kan city ▪ 120 km to Ha Noi ▪ 120 km from Noi Bai International Airport ▪ 230 km to Hai Phong Port INVESTMENT AREA Priority Sectors for Investment ▪ Processing agricultural and forestry products; ▪ Processing minerals, non-ferrous metals; ▪ Manufacturing and assembling mechanics; ▪ Production of building materials ▪ Eco-friendly Industries High technology, industrial electronics, information technology; mechanical engineering products; - Supporting industry; Restricted Sectors None MINIMUM WAGE [Area 4] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries MINIMUM LEASE AREA 50 years LIMIT FOR CONSTRUCTION HEIGHT PERMITTED CONSTRUCTION RATE In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning regulation (QCXDVN 01: 2008/BXD) Construction area is not more than 65% of the total leased land lot PLANNED AREA ▪ Total area: 72,5 ha ▪ Total vacant leasable area: Unavailable FACTORY AVAILABLE FOR RENT No OPERATION STATUS ▪ In operation OCCUPANCY RATE AND NUMBER OF PROJECTS ▪ 100% ▪ 12 Projects NUMBER OF KOREAN PROJECTS 0 projects LEASE FEE OPERATING FEE ▪ Management fee: 9 800 VND /m2/year (excluded VAT) 63 ▪ Electricity fee: According to the Circular by Ministry of Industry and Trade, valid from March 16th, 2015 (excluded VAT) for voltage from 22KV-110KV. ▪ Water fee: 11 300 VND (~0.37 USD) /m3 (excluded VAT) ▪ Wastewater treatment fee: 7 100 VND (~0.3 USD)/m3 (excluded VAT) INFRASTRUCTURE AND FACILITY FINANCIAL INSTITUTION BIDV, Vietin Bank, Agribank TAX SERVICE, STATE FINANCE OFFICE 4 km to Tax Department and State Treasury of Cho Moi CUSTOMS SERVICE 35 km to Customs Department of Bac Kan province LOGISTICS POST OFFICE 6 km m to Post Office of Cho Moi district MEDICARE 3 km to Cho Moi General Hospital POLICE, PUBLIC SECURITY 5 km to Police station of Cho Moi district UNIVERSITIES, TRAINING FACILITIES, ETC. 50 km to Thai Nguyen University WORKER DORMITORY None WORKER'S CHILD EDUCATION FACILITY 500m from the zone ONE-STOP SERVICE ROAD WIDTH Main road:, 2 lanes IT & TELECOMMUNICATION FACILITIES Fully-communication system ensures national and international contact easily, include telephone, mobile phone, Fax, Internet.. EMERGENCY POWER GENERATOR Available FIRE-FIGHTING FACILITY Available. Water supply system for firefighting is located along each road. LAYOUT PLAN 64 LOCATION MAP ACTUAL VIEW . 65 LIST OF SOME NOTABLE TENANTS No. Company Name Nationality Location 1 Misaki Vietnam Co., Ltd. Japan A5+A6 2 Ba Be Agricultural Comnany Vietnam D 3 Nam A Bac Kan Company Limited Vietnam D 4 Khanh Linh Gas Company.,Ltd Vietnam F1+F2 5 Kim An An Company Limited Vietnam B1 6 Hong Ngoc Plywood Join Stock Company. Vietnam E1 7 8 Ke Go Company Limited Anh Binh Plywood Company Limited Vietnam Vietnam G1 F2 9 Lechenwood Vietnam Co., Ltd. China E1 10 Govina Investment Joint Stock Company Vietnam D1 11 Materials and Complete Equipment ExportImport Corporation (MATEXIM) Beer and Beverage joint stock Bac Kan Company Vietnam F2 Vietnam B1 12 66 [- This Page is intentionally left blank -] 67 BAC LIEU 68 INVESTMENT ENVIRONMENT IN BAC LIEU USD/VND 23.510 GENERAL INFORMATION Area Population Geographical Location Adjacent provinces 2468,7 km2 0,204 million people (2022) ▪ Bac Lieu is located in Mekong Delta River region. Bac Lieu is a province on the Ca Mau peninsula, the southernmost land of Vietnam The province shares a common border connecting Hau Giang and Kien Giang provinces in the northwest, Soc Trang in the northeast, Ca Mau in the southwest, and the East Sea in the southeast. Bac Lieu has a 56 km long coastline connecting with important seas such as Ganh Hao, Nha Mat and Cai Cung. 2022 statistic: GRDP Industry growth Import Export Key Industry PCI Ranking ▪ Real GRDP (billion VND): 31.744 ▪ GRDP growth: 9,60% ▪ GRDP per capita (million VND/year): 60.53 (1,38 billion USD) (2,787 USD) ▪ Economic structure: - Industry - Construction: 19,31% - Agriculture. forestry and fishery: 41,62% - Service: 34,10% ▪ Industry - Construction growth: 14,45% ▪ Agriculture, forestry and fishery growth: 3,12% ▪ Service growth: 2.32% Import turnover (billion USD): 0,55 Export turnover (billion USD): 853,00 (Growth rate: 9.92%) Agriculture still represents a very important part in Bac Lieu. The province is the Bac Lieu is a center for hatchery production, shrimp farming and processing 61.25 55 SOCIAL INFRASTRUCTURE ▪ Roadway: National Road 1A (route Hanoi – Bac Ninh – Lang Son), National Road North Song Hau. There are provincial road namely ĐT.982, ĐT.977B, ĐT.979B, ĐT.982B. Transportation ▪ Water way" Bac Lieu has two natural rivers located in the north and south of the province: Ganh Hao river - the natural boundary with Ca Mau province and Cai river - the natural boundary with Hau Giang province. ▪ Bac Lieu has attracted 3,200MW LNG Power Project and 8 completed wind power projects put into operation, with a capacity of nearly 470MW, ranking third in the country. These projects are the main Electricity drivers of local GRDP growth. In addition, the Bac Lieu Liquefied Natural Gas (LNG) Power Project with an investment of 4 billion USD is being implemented ▪ Regarding the source of fresh water for production and people's daily life, it is mainly rain water, partly supplemented from the Hau river water source. In which, the water source from Hau River is estimated to Water flow into Bac Lieu about 1.4 billion m3/year. Education & Training ▪ The province has 79 public preschools and kindergartens, 119 primary schools, 62 junior high schools, and 20 high schools. INVESTMENT CONDITION Human resource 57,7% of population are in the working age (2022) Education level Trained labor rate: 69,43% (2022) ▪ The minimum salary for the province is applied as follows: Salary - Area I (4,680,000 VND/month): N/A 69 - Area II (4,160,000 VND/month): Bac Lieu City - Area III (3,640,000 VND/month): Gia Rai Town, Hoa Binh District - Area IV (3,250,000 VND/month): Hong Dan, Phuoc Long, Vinh Loi, Dong Hai District (Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages paid to employees working under employment contracts) ▪ Incentives according to government regulations: - Exemption and reduction for land and water rent fee - Preferential tax rates and exemption period, reduction for corporate income tax. - Import tax exemption ▪ Bac Lieu strives to become the center of shrimp seed production, farming and processing, the center of Fields shrimp industry of the country. Attracting Currently, the province is aiming to become one of the clean energy centers of the country by 2030, with a Investment focus on wind power, solar power and gas power. ▪ Up to now, the province has attracted 184 projects, of which: 167 domestic projects with a total registered Investment investment capital of more than 53 trillion VND; 17 foreign projects with a total registered capital of more attraction than 4.5 billion USD and many other motivational projects. situation Tra Kha Industrial Zone Industrial zones Lang Tram Industrial Zone Ninh Quoi Industrial Zone Investment incentives Map Bac Lieu Department of Planning and Investment ▪ Address: Provincial administrative center, Bac Lieu city, Bac Lieu Contact ▪ Tel: 0291. 3823874 ▪ Email: skhdt@baclieu.gov.vn 70 ▪ Contact person: - Mr. Pham Thanh Hien - Deputy Director of Department of Planning and Investment LIST OF INDUSTRIAL ZONES IN BAC LIEU PROVINCE No Industrial zone Name Total Area (ha) Occupancy Rate Status 1 Tra Kha Industrial Zone 64.86 100% In Operation 2 Lang Tram Industrial Zone 377 N/A Licensed in 1/2022 LOCATION MAP OF INDUSTRIAL ZONES 71 TRA KHA INDUSTRIAL ZONE GENERAL INFORMATION Address Ward 8, Bac Lieu city, Bac Lieu province. Investor Bac Lieu Industrial Park Infrastructure Development Company ▪ Address: No. 294, 23/8 Street, Tra Kha A Area, Ward 8, Bac Lieu City, Bac Lieu Province ▪ Tel: 0781-3954811 Contact Person Ngo Huu Tien – Director. Tel: 0913892414. Location Investment Sectors Minimum wage Lease term Permitted Construction Rate Adjacent location: Tra Kha Industrial Park is located in Ward 8, Bac Lieu Town: 3km from Bac Lieu town center 25km from the multi-purpose seaport 125km from Can Tho airport, 65km from Ca Mau airport The internal road connects directly with the existing National Road 1A and the bypass of National Highway 1A (under construction). Water transport is adjacent to Bac Lieu - Ca Mau river, ensuring traffic for 1,000 tons. Priority Sectors for N/A Investment Investment Restricted N/A Sectors [Area 2] According to Decree 38/2022/ND-CP 50 years + Building 1 floor: < 65% + Building 2 floors: <55% + Building on 3 floors: <40% Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean projects Lease fee Operating fee ▪ Total area: 64.86 ha ▪ Total vacant leasable area: 9,343.6 m2 ▪ Total area with full infrastructure ready to build factory: 44.112 ha ▪ Total area: 2,772.4 m2 ▪ Active 25 projects, Occupancy Rate: 98.04% 0 ▪ Land lease fee: 1,935 VND (USD 0.082)/m2/year ▪ Factory lease fee: N/A ▪ Management fee: 0.35 USD/m2/year ▪ Electricity fee: 0.05 USD/month ▪ Water fee: 0.4 USD/m3 ▪ Wastewater treatment fee: 0.28 USD/m3 INFRASTRUCTURE AND FACILITY Internal transportation system: + Main road (4 lanes) + Side branch road (2 lanes) 72 Power system: The power supply system has a voltage of 110/22KV with a power capacity of 16MVA Water supply system: The water supply system has the highest capacity of 2,500m3/day. Wastewater treatment system: Waste water from factories in the industrial park will be treated centrally with a capacity of 2,400m3/day. Human Resources The population in Bac Lieu province is 913,481 people, of which the population of working age is 542,528 people, accounting for 57.7% of the total population of the province. In the near future, Bac Lieu will invest over 241 billion VND in the employment program in the 2021 - 2025 period and implement the Vocational training project for rural workers with a total investment of 544 billion VND. By 2020, the proportion of trained workers in Bac Lieu will reach 63.44%, the number of workers with certificates and diplomas will reach 23.97%. In Bac Lieu province, there were 34,132 people working in the entire enterprise sector, up 7.68%, of which 31,311 people were employed in non-state enterprises. Thus, Bac Lieu can completely provide labor for investors in both quantity and quality. Investment incentives - Incentives for corporate income tax: 10% preferential rate for a period of 15 years - Reducing VAT on imported goods in order to create fixed assets and import equipment, machinery and raw materials for production in accordance with the law on import and export taxes; - Increase or decrease land use levy and land rent incentives for land resource tax; raise the deductible value when determining taxable income. Picture: 73 LANG TRAM INDUSTRIAL ZONE GENERAL INFORMATION Address Hamlet Xom Moi, Tan Thanh Commune, Gia Rai Town, Bac Lieu Province; Investor Bac Lieu Industrial Park Infrastructure Development Company ▪ Address: No. 294, 23/8 Street, Tra Kha A Area, Ward 8, Bac Lieu City, Bac Lieu Province ▪ Tel: 0781-3954811 Contact Person Location Investment Sectors Minimum wage Lease term Permitted Construction Rate N/A Adjacent location: Distance from Bac Lieu town center: 55km, Ca Mau city: 15km Ca Mau Airport: 11km, Can Tho Airport: 180km To seaport Bac Lieu: 55km Priority Sectors for Investment Investment Restricted Sectors Seafood processing industry, services and industries serving aquaculture and fishing. N/A [Area 2] According to Decree 38/2022/ND-CP 50 years + Building 1 floor: < 65% + Building 2 floors: <55% + Building on 3 floors: <40% Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean projects Lease fee Operating fee ▪ Total area: 94.19 ha ▪ Total vacant leasable area: N/A ▪ Total area with full infrastructure ready to build factory: 63.33 ▪ Total area: N/A ▪ Active N/A 0 ▪ Land lease fee: 1,935 VND (USD 0.082)/m2/year ▪ Factory lease fee: N/A ▪ Management fee: 0.35 USD/m2/year ▪ Electricity fee: 0.05 USD/month ▪ Water fee: 0.4 USD/m3 ▪ Wastewater treatment fee: 0.28 USD/m3 INFRASTRUCTURE AND FACILITY Internal transportation system: The internal road in the industrial park connects directly with National Highway 1A with a length of about 300m, and at the same time connects to Quan Lo - Phung Hiep Highway about 15km. Water supply system: Water transport is adjacent to Bac Lieu - Ca Mau rivers, ensuring traffic for 1,000 tons of vehicles Communication: Fully meet postal and telecommunications services in the industrial park. 74 Picture: 75 [- This Page is intentionally left blank -] 76 BAC NINH 77 INVESTMENT ENVIRONMENT IN BAC NINH USD/VND 23.510 GENERAL INFORMATION ▪ Area: 822,7 km2 Area, Population ▪ Population: 1.488.250 people ▪ Located in the Northern key economic region, Ha Noi capital region as well as two major economic corridors: Con Minh – Lao Cai – Ha Noi – Hai Phong – Quang Ninh and Nanning– Lang Son – Ha Noi – Hai Phong – Quang Ninh. Geographical Location ▪ It is adjacent to and 30km away from Ha Noi capital, 32km from Noi Bai International Airport, 110km from Hai Phong Seaport. ▪ Important routes running through such as 1A, 18, 38 national highways, Trans-Vietnam railway to China; connecting the province with economic, cultural and commercial centers of the North. Adjacent provinces ▪ Bac Giang Province to the north, Hanoi Capital City to the west and southwest, Hai Duong Province to the east, Hung Yen Province to the south. 2022 statistics: ▪ GRDP: 133,609 billion VND (at constant 2010 prices) ▪ GRDP growth: 7.39% ▪ GRDP per capita: 6,696 USD GRDP ▪ Economic Structure: - Industry and Construction: 76.5% - Service: 17.2% - Agriculture, Forestry and Fishery: 2.5% - Product Tax: 3.8% 2022 statistic: ▪ Industry - Construction growth: 6.49% ▪ Agriculture, forestry and fishery growth: 0.52% ▪ Service growth: 13.67% Industry growth ▪ Product Tax: 2.83% ▪ Import – Export: - Export turnover: 45.1 billion USD - Import turnover: 38.5 billion USD PCI ▪ Score: 69.08 – ranked 7h out of 63 cities and provinces in Vietnam (2022) SOCIAL INFRASTRUCTURE Transportation ▪ Roadway: National Road 1A (route Hanoi – Bac Ninh – Lang Son), National Road 18 (route Noi Bai Airport – Bac Ninh – Ha Long), National Road 38 (route Bac Ninh – Hai Duong – Hai Phong), 78 National Road 1B new (Lang Son – Thai Nguyen), National Road 17 (Hanoi- Thai Nguyen). Bridge Phat Tich- Dai Dong with a total length of 1,518 m is under construction. ▪ Railway: Railway route Hanoi - Bac Ninh – Ha Long; Railway route Hanoi- Dong Dang ▪ Waterway: 06 major ports: Dap Cau port; Dap Cau Glass Factory and floating glass Port ; Duc Long Port (both river ports and dry ports); Ben Ho port, Kenh Vang Port, Tri Phương Port. ▪ Airway: 30 km from Noi Bai International Airport by National Road 18. Electricity ▪ Supplied from the national power network; 9% annual growth. ▪ Quality underground water is mainly used in water supply system ▪ In urban area: 08 water stations, in which 06 stations in operation with total capacity of 33,000 m3/day Water ▪ In rural area: 39 clean water supply construction in operation with 240,000 m3/day-night capacity ▪ In industrial zones, industrial clusters: 04 water stations in operation with total capacity of 24,400 m3/day Education ▪ 6 Universities, 8 Colleges and 58 schools and vocational training centers in the province. Medicare ▪ 20 public and private hospitals INVESTMENT CONDITION Human resource ▪ Labor force of the province is quite young and the trained labor force which accounts for 77% Education level ▪ Trained labor rate: 34.1% ▪ The minimum salary for the province is applied as follows (see appendix for detail amount): Salary - Area II: including: Bac Ninh City, Tu Son town, Que Vo, Tien Du, Yen Phong, Thuan Thanh, Gia Binh, Luong Tai District ▪ The lowest wage for trained labor (including those trained by the enterprises) must be at least 7% higher than the above referenced basic salary ▪ Incentives according to government regulations: Exemption and reduction for land and water rent fee Investment incentives - Preferential tax rates and exemption period, reduction for corporate income tax. Import tax exemption ▪ Prioritized Projects: - High-tech industry; Supporting industry, modern, environmentally friendly (semiconductor industry, chip manufacturing,…) Fields Attracting Investment - Hi-tech agriculture; clean agriculture; - New occupations on the industrial platform 4.0; - Service trades having advantages and high added value: Health care, education and training, international financial services, logistics and other modern services. 79 - Investment in construction of infrastructure works, development of urban areas, high-class service and trade complexes, high-class eco-resort,… Map Bac Ninh Department of Planning and Investment Address: No 6 Ly Thai To, Suoi Hoa Ward, Bac Ninh Contact Tel: (84-241) 3 824 902 Fax: (84-241) 3 825 777 E-mail: skhdt@bacninh.gov.vn 80 LIST OF INDUSTRIAL ZONES IN BAC NINH No Industrial zone Name Total Area (ha) Occupancy Rate Status 1 Que Vo I Industrial Zone 611 100% In operation 2 Que Vo II Industrial Zone – Phase 1 269.48 70% In operation Que Vo II Industrial Zone – Phase 2 277 0% Licensed 3 Que Vo III Industrial Zone 303.8 55% In operation 4 Tien Son Industrial Zone 350 100% In operation 5 Yen Phong Industrial Zone – Phase 1 344 100% In operation Yen Phong Industrial Zone – Phase 2 314 60% In operation Yen Phong II-C Industrial Zone 221 20% In operation 6 Dai Dong - Hoan Son Industrial Zone 400 In operation 7 VSIP Bac Ninh Industrial Zone 700 Phase I: 100% Phase II: 0% 100% VSIP Bac Ninh (Business Hub) 20 0% In operation 8 VSIP Bac Ninh 2 Industrial Zone 273 0% Under Construction 9 10 Thuan Thanh I Industrial Zone Thuan Thanh II Industrial Zone 250 250 0% 100% Under Construction In operation 11 Thuan Thanh III Industrial Zone 300 100% In operation 12 Nam Son Hap Linh Industrial Zone 300 0% In operation 13 Gia Binh I Industrial Zone 300 100% Under Construction 14 Gia Binh II Industrial Zone 250 0% Licensed 15 Hanaka Industrial Zone 74 60% In operation 16 An Viet – Que Vo 6 Industrial Zone 78,68 0% applying for permission 81 In operation BAC NINH’S LOCATION MAP OF INDUSTRIAL ZONES 82 QUE VO I INDUSTRIAL ZONE GENERAL INFORMATION Address Nam Son and Phuong Lieu commune, Que Vo district, Bac Ninh Province, Vietnam Investor KinhBac City Development Holding Corporation ▪ Address: Lot B7, Que Vo Industrial park, Phuong Lieu commune, Que Vo district, Bac Ninh province, Vietnam. ▪ Tel: (84-222) 3634 034 ▪ Website: http://www.kinhbaccity.vn Contact Person ▪ Tran Thi Huong - Sales & Marketing Deputy Manager - Mobile: +84 - 915-636 139 - Email: tthuong.kbc@gmail.com Location - 06 Km from Bac Ninh City Center - 35 Km from Noi Bai International Airport - 110 Km from Hai Phong Seaport - 03 Km from Highway No.01 and 09 Km from Hanoi – Lang Son (border with China) – NanNing (China) Railway Priority Sectors for Investment Electronics industry, high-tech industry and supporting industries, banking, insurance, research and development activities, consulting ... (Decision No. 293/QĐ-UBND on 12/08/2013) Restricted Sectors for Investment Production of iron, steel, construction materials, paper, chemicals, textiles and textile products ... ((Decision No. 293/QĐ-UBND on 12/08/2013) Investment Area Minimum wage [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries Lease term ▪ Phase 1: 2002 - 2052 ▪ Phase 2: 2007 - 2017 Minimum Lease Area 10,000 m2 Limit for Construction Height Permitted Construction Rate In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning regulation (QCXDVN 01: 2008/BXD) Construction area is not more than 65% of the total leased land lot Planned area ▪ Total area: 611 ha ▪ Total vacant leasable area: Unavailable Factory Available for Rent ▪ Total area: 30,000 m2 (4,000-5,000 per factory, expected at the end of 2019) Operation Status ▪ In operation Occupancy Rate and Number of Projects ▪ 100% ▪ 125 Projects Number of Korean Projects ▪ 46 projects Lease fee ▪ Land lease fee: 85 USD/m2 ▪ Factory lease fee: 3.5 USD/m2/month ▪ Payment: - Method: Bank Transfer in VND - Period: 40% after signing In-principle Agreement + 40 % after signing Land Sublease Contract + 20% after Land Hand-over Operating fee ▪ Management fee: 0.5 USD/m2/year (excluded VAT) ▪ Electricity fee: According to the Circular by Ministry of Industry and Trade, valid from March 16th, 2015 (excluded VAT) for voltage from 22KV-110KV. ▪ Water fee: 8,700 VND (~0.37 USD) /m3 (excluded VAT) ▪ Wastewater treatment fee: 7,200 VND (~0.3 USD)/m3 (excluded VAT) 83 INFRASTRUCTURE AND FACILITY Financial institution BIDV, Vietin Bank, Vietcombank, Agribank Tax service, State finance office 6 km from Bac Ninh Tax Office 7 km from Bac Ninh State Treasury Office Customs Service 2 Km from Customs Agency Que Vo 15 Km from ICD Tien Son Logistics 2 Km from the nearest Logistic Center: Yusen Logistics Post office 1 km from Vietnam Post Office Medicare 4 Km from Bac Ninh General Hospital Police, public security 500 m from Que Vo Police Station Universities, training facilities, etc. 500 m from Viet Nhat College Recruitment Kinh Bac will support in recruitment Worker dormitory 5 Km from the zone Worker's child education facility 5 Km from the zone One-stop service 6 Km from the nearest Facility Road Width Main road: 32m, 4 lanes; By Road: 23m, 2 lanes IT & Tele-communication Facilities The telecommunication system complies with international standards and is always available for communication demand with high data transmission s Emergency Power generator Available Fire-fighting facility Available. Water supply system for firefighting is located along each road. Layout Plan 84 Location Map Actual View . 85 LIST OF SOME NOTABLE TENANTS No. Company Name Nationality Location 1 Kinh Bac Service Joint Stock Company Vietnam L3, L4, L7, L8, C3, H16, H17 2 Viet Nhat Joint Stock Company Vietnam E6-1 3 Canon Vietnam Company Limited Japanse B1, B2 4 Jing Heng Metal Treatment Co., Ltd. Taiwan H7-1 5 Nam Viet Hoang Company Limited Vietnam C8-2 6 Vinh Loc Trading Company Limited Vietnam C8-1 7 Viet Duc Construction Company Limited Vietnam C7-1 8 Tid Glass Wall Joint Stock Company Vietnam C7-2 9 Keysheen Company Taiwan K1, 2, 5, 6 10 Vs Industry Vietnam Joint Stock Company Malaysia K4-2D, K4-2E 11 Jebsen & Jessen Packaging Vietnam Company Limited Singapore K1, G4-1 12 Funing Precision Component Company Limited Taiwan C3 13 Elegant Team Manufacturer Limited Liability Company Hongkong I2-03, I2-04 14 Sheng Electric Wire & Cable (Vietnam) Company Taiwan D4-2 15 Tenma Vietnam Limited Liability Company Japanse E1, 16 Ncc Vietnam Co., Ltd China H10 17 Chih Ming Co., Ltd Taiwan H3-3 18 Bujeon Vietnam Electronics Co., Ltd Korea C-2 19 Sentec Hanoi Co., Ltd Taiwan H1, H2, H5, H6 20 Mitac Computer (Vietnam) Limited Liability Company Taiwan L1-2-3-5-6-7, 21 Seiyo Vietnam Limited Liability Company Taiwan D1 22 Goldsun Vinh Nam Packaging Co., Ltd Vietnam H12, T2 23 Liwayway Food Industry Co., Ltd Hanoi Malaysia C4-C5 24 Jenway Technology Vn Co., Ltd Taiwan H4-2 25 Nssb Steel Service Co., Ltd Hanoi Japanse D1 26 Longtech Precision Vietnam Co., Ltd Taiwan E1 27 Toyo Ink Compounds Vietnam Co., Ltd Japanse G9 28 Yamato Industries Vietnam Co., Ltd Japanse E6 29 Vietnam Dragonjet Co., Ltd Taiwan D3 30 Mitac Precision Technology Vietnam Co., Ltd Taiwan G1-3-4-6-8 và E9-1 31 Henry Hardware Industry Co., Ltd Taiwan H7-2 32 Vietnam Teasan Company Limited Korea H3-2 33 Mitac Precision (Vietnam) Co., Ltd Taiwan G1-3-4-6-8 34 Jang Won Tech Vina Co., Ltd. Korea Lô G1 35 Uil Vietnam Company Limited Korea F1 36 Sr Hanoi Daedong Co., Ltd Korea H-04 37 Yuto Packaging Co., Ltd China H-02, H-03, K13, K14, K15 38 Schramm Sscp Hanoi Co., Ltd Hongkong I2-1 39 Spica Elastic Vietnam Company Limited India I2-01, I2-02 40 Hanam Electricity Vina Co., Ltd Korea H2-02 41 Vietnam Enshu Sanko Co., Ltd Japanse H4-2 42 Sakura Paint Viet Nam Co., Ltd Japanse I4-2 86 43 Topla Vietnam Limited Liability Company. Japanse J4 44 Konishi Vietnam Biological Technology Co., Ltd Japanse H8 và H9, 45 Hanoi Doo Sung Tech Co., Ltd Korea J3 46 Eunsung Electronics Vina Co., Ltd Korea K1 47 Bac Ninh Pharmaceutical Joint Stock Company Vietnam C1-1 48 Branch Of Shinhan Vina In Bac Ninh Co., Ltd Korea C7-1 49 Yestech Vina Co., Ltd Korea KT1-C 50 Yoon Il Vietnam Limited Liability Company Korea C8-2 51 Goertek VINA CO., LTD China 52 E Lite Com Company Korea K-08, K-09, K16, K2, K3, L2, L3, L6, L7 K07 53 Mirae Eic Company Korea K-06 54 M&C Electronics Vina Co., Ltd Korea J1 55 Aac Technologies Vietnam Co., Ltd Singapore K4-2F, G10, K4-2 56 Sampo Vina Co., Ltd Korea B8 57 S-Mac Vina Limited Liability Company Korea E8, E7 58 Ethertronics Vina Limited Liability Company Korea K-05 59 Vietnam Woojinwtp Limited Liability Company Korea K-05-2 60 Sit Vina Limited Liability Company Korea K-05-1 61 Vinayama Construction Co., Ltd Japanse H4-1 62 Segyung Vina Co., Ltd Korea H1 63 Son Duong Packaging Factory Vietnam H3-1B 64 Laird Vietnam Co., Ltd UK K10 65 Chau Thai Son Packaging Company Limited Vietnam C1-3 66 Youngbo Vina Co., Ltd Korea G3, G4-2 67 Aq Pacific Company Limited Korea H1-01 68 Galtronics Vietnam Co., Ltd Israel G-01, 69 Sanchine Company Limited (Vietnam) China K-06 70 Sung Il Vina Co., Ltd Korea H3 71 Samho Press Vietnam Co., Ltd Korea C6-1 72 Daeil Tech Vietnam Co., Ltd Korea F4-1 73 Fine Ms Vina Co., Ltd Korea G2 74 Sena Tech Co., Ltd Korea G12-1+H3-1C 75 Sehyun Vina Co., Ltd Korea C1-2 76 Ryong-In Vina Co., Ltd Korea K-1-1 77 Samin Vina Limited Liability Company Korea C7-1, T-1 78 Jsk Vietnam Co., Ltd Korea C6-1 79 Boryeng Company Ltd Korea K12 80 Korea G12-1 81 Hanpad Investment Joint Stock Company - Bac Ninh Branch Vietnam Lege Limited Liability Company Taiwan G11 83 Vonmax Industrial Vietnam Co., Ltd. Taiwan E6 84 Vietnam Hongguang Plastic Co. China E3-3 85 Bac Ninh Ace Vina Co., Ltd Korea G4-3 86 Technology Co., Ltd Packaging Yuzhan Vietnam China H2-01 87 Hanwha Techwin Security Vietnam Co., Ltd Korea O-2 88 Jm Tech Vina Co., Ltd Korea E3-2 87 89 Mys (Group) Vietnam Company Limited China KT1-B, 90 Company Limited Youngwoo Hi-Tech Korea KT1-B-1 91 Jeyeyung Vina Co., Ltd Korea C2-1 92 Nano Tech Co., Ltd Korea J.1 93 Seah Vina Co., Ltd Korea O-1 94 Tops Vina Co., Ltd Korea O-3 95 Esd Company Ltd Korea J.4 96 Vunh Giang Trading Joint Stock Company Vietnam J.3 97 Phuc Son Technology Co., Ltd Japanse J.2 98 Dit Company Ltd Korea N-7 99 Company Limited Lim Korea N-7 100 Anyone Vina Co., Ltd Korea M 101 Nokwon Co. Ltd Korea T-3 88 QUE VO II INDUSTRIAL ZONE GENERAL INFORMATION Address ▪ Ngoc Xa Commune, Que Vo District, Bac Ninh Province Investor Phase 1: City and IP Development & Investment Corporation (IDICO) ▪ Address: 13th floor, Sudico Building, Me Tri Road, My Dinh 1 Ward, Hanoi ▪ Tel: (84-24) 3 787 7937 Fax: (84-24) 3 734 7162 ▪ Email: invest@idicoquevo.com.vn Phase 2: Nhan Dat Tien Co., Ltd. Contact Person Phase 1: Mr. Ho Anh – Investment Manager – 0912 578 589 – hoanh@idicoquevo.com.vn Location ▪ Land: Located next to the National Road 18 (Noi Bai - Ha Long route), 50km away from Hanoi Capital ▪ Seaport: 90km from Cai Lan Seaport; 100 km from Hai Phong Seaport ▪ Airport: 50km from Noi Bai International Airport Investment Area Priority Sectors for Investment Electronics industry, high-tech industry and supporting industries, banking, insurance, research and development activities, consulting ... Restricted Sectors for Investment Production of iron, steel, construction materials, paper, chemicals, textiles and textile products ... Minimum wage [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries Lease term ▪ Start date: 2007 ▪ End date: 2057 Minimum Lease Area 10,000 m2 Limit for Construction Height Permitted Construction Rate In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning regulation (QCXDVN 01: 2008/BXD) Planned area ▪ Total area: - Phase I: 269.48 ha - Phase II: 277 ha Factory Available for Rent None Operation Status ▪ Phase I: In operation ▪ Phase II: Licensed Occupancy Rate and Number of Projects Phase I: 70% Number of Korean Projects Over 10 projects Lease fee ▪ Land lease fee: 87 USD/m2 Operating fee ▪ Management fee: 0.35 USD/m2/year ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: approximately 0.5 USD/m3 ▪ Wastewater treatment fee: 8,000 VND/m3 (~0.35 USD) (include VAT) ▪ Waste treatment fee: According to contract INFRASTRUCTURE AND FACILITY Financial institution Agribank, LienViet Post Bank, Nam Viet Bank Tax service, State finance office 18 km from Bac Ninh Tax office 18 km form Bac Ninh Treasury Office 89 Customs Service 30 km from Bac Ninh ICD Logistics Inside the zone Post office 3.2 km from Que Vo Post Office Medicare 19 km from Bac Ninh General Hospital Police, public security Near the zone Universities, training facilities 20 km from Kinh Bac University Recruitment Supported by IZ developers Worker dormitory NA Worker's child education facility NA One-stop service 10 km from Public Service Center Road Width Road Width: 8-15m m, 2 lanes IT & Telecommunication Facilities The telecommunication system complies with international standards and is always available for communication demand with high data transmission. Provider: FPT, VNPT and Viettel Emergency Power generator NA Fire-fighting facility Available. Water supply system for firefighting is located along each road. Layout Plan Location Map 90 Actual View 91 LIST OF SOME NOTABLE TENANTS No Company Name 1 Chien Thang Industry Co., Ltd. Vietnam Metal scrap recycling 2 E-Zone Tech Vina Co., Ltd Korea Electronic equipment maintenance 3 Bfs Construction And Trading Co., Ltd. Vietnam Service industry 4 Bnc Tiles Jsc Vietnam Building material manufacturing 5 Dai Tan Co., Ltd Vietnam Logistics 6 Vietnam Pharmaceutical Korea 3D glass production 8 Dkpharma Pharmaceutical Factory - Bac Ninh Branch Duoc Khoa Pharmaceutical Join Stock Company Dnr Engineering Vina Limited Liability Company Duong Hong Import Export Co., Ltd Vietnam packing 9 Hancorp Equipment And Material.,Jsc Vietnam Building material manufacturing 10 Highsun Optoelectronic Co., Ltd Korea Plastic products manufacturing 11 Innotek Joint Stock Company Vietnam Motorcycle parts manufacturing 12 Singapore Metal processing Vietnam Motorcycle parts manufacturing 14 Interplex Precision Technology (Hanoi) Co., Ltd Jat Autoparts And Industrial Equipments Manufacturing Joint Stock Company Jmi Viet Nam Co., Ltd Korea Plastic tray manufacture 15 Jmt Vn Co., Ltd Korea Electronic component manufacturing 16 Jungbu Eschem Vietnam Co., Ltd Korea Mobile phone parts manufacturing 17 Jy Tech Co., Ltd Korea Speaker manufacture 18 Kukje Jewelry Vina Co., Ltd Korea Jewelry production 19 Lixco Jsc – Bac Ninh Brach Vietnam Detergent production 20 Osaka Vina.,Jsc Vietnam packing 21 Pyung Ahn Vina (One Member) Co., Ltd Korea Electronic component manufacturing 22 St Vina Co., Ltd Korea Electronic component manufacturing 23 Sunway Precision Steel Corporation Vietnam Steel production 24 Tatra Pharmaceutical Co., Ltd Vietnam Pharmaceutical 7 13 Nationality 92 Bussiness line QUE VO III INDUSTRIAL ZONE GENERAL INFORMATION Address Viet Hung Commune, Que Vo District, Bac Ninh Province Investor EIP Investment Development JSC – TNI Holdings Viet Nam ▪ Address: Viet Hung Commune, Que Vo District, Bac Ninh Province ▪ Email: sale@tniholdings.vn Contact Person Mr. Huan – Sales Executive – Mobile: (84) 989 768 586 –huannm2@tniholdings.vn /huan792003@gmail.com Location ▪ Located next to the National Road 18 (Noi Bai - Ha Long route) ▪ Distance to Hanoi city center: 45 km ▪ Distance to Noi Bai International Airport: 40 km ▪ Distance to Hai Phong port: 80 km ▪ Distance to Cai Lan – Quang Ninh deep seaport: 105 km ▪ Distance to China border checkpoint: 120 km Priority Sectors for Investment Electronics industry, high▪tech industry and supporting industries, banking, insurance, research and development activities, consulting ... Restricted Sectors for Investment Production of iron, steel, construction materials, paper, chemicals, textiles and textile products ... Investment Area Minimum wage [Area 2] According to Decree 90/2019/NĐ▪CP dated 15th November 2019 Lease term ▪ Start date: 2016 ▪ End date: 2066 Minimum Lease Area 10,000 m2 Limit for Construction Height Permitted Construction Rate 1-2 floors for the factory, 1-4 floors for office, maximum height of each one is 4 meters. Entire works of the construction “footprints” is not exceed 65% of the total area of the plot. Planned area ▪ Total area: 303.8 ha ▪ Total vacant leasable area: 120 ha Factory Available for Rent None Operation Status ▪ In operation Occupancy Rate and Number of Projects Occupancy Rate: 55% Number of Korean Projects 10 Lease fee ▪ Land lease fee: 100 USD/m2/whole project life Operating fee ▪ Management fee: 0.5 USD/m2/year ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: 11,500 VND (~ 0.5 USD)/m3 ▪ Wastewater treatment fee: 0.6 USD/m3 for C level, 0.45 USD/m3 for B level, 0.18 USD/ m3 for A level INFRASTRUCTURE AND FACILITY Financial institution Maritime Bank, Vietcombank - Hưng Yên branch, ACB, Agribank, Techcombank Tax service, State finance office 13 km from Bac Ninh Tax Department Customs Service 13 km from Bac Ninh Customs Department Logistics N/A 93 Post office 16 km from Bac Ninh Post Office Medicare 16 km from Bac Ninh General Hospital Police, public security 24/7 security service. Universities, training facilities, etc. 16.2 km from Kinh Bac University Recruitment Support from IZ developers and Bac Ninh IZ Management Board Worker dormitory Worker Dormitory project available and demanding from tenants Worker's child education facility NA One-stop service Inside the zone Road Width Main road 60 m, 36 m and branch road 22 m in width IT & Tele-communication Facilities Telecommunication systems and international standards are always ready to meet the communication needs Emergency Power generator Available in the zone Fire-fighting facility The water supply network for firefighting is designed in conjunction with the potable water supply network, which is located along the roads. The distance among fire hydrants is 120 m -150 m with a diameter of D125 mm. Layout Plan Location Map 94 Actual View LIST OF SOME NOTABLE TENANTS No Company Name Nationality Business Line 1 Tay Dong Co., Ltd Vietnam construction company 2 HS Chemical Co., Ltd Korea Chemical production 3 Plastics & People Co., Ltd Korea Plastic manufacturing 4 Cargill Co., Ltd USA Livestock feed production 95 TIEN SON INDUSTRIAL ZONE GENERAL INFORMATION Address ▪ Tu Son District, Bac Ninh Province Investor Viglacera Corporation JSC ▪ Address: Viglacera Tower, No.1 Thang Long Boulevard, Me Tri, Nam Tu Liem, Hanoi, Vietnam ▪ Tel: (84-24) 3553 6660 ▪ Fax: (84-24) 3553 6671 ▪ Website: http://www.viglacera.com.vn/ Contact Person ▪ Mr. Dang The Nam - Deputy Manager of Business Department – (84) 903 405 099 - namdt.vir@viglaceraland.vn ▪ Ms. Nguyen Ha Phuong – Senior Marketing Executive – (84) 97 344 8994 phuongnh.vir@viglaceraland.vn Location ▪ Land: Located between the existing National Road 1A and the new National Road 1A, 22 km from Hanoi Capital ▪ Seaport: 120 km from Cai lan Sea port, 110 km from hai Phong Sea port ▪ Airport: 30 km from Noi Bai International Airport Priority Sectors for Investment Electronics, Mechanics, High-Tech, Automotive industry Investment Area Restricted Sectors for Investment Heavy-Industry, Textile & dying, Polluting industries Minimum wage [Area 2] According to Decree 157/2018/ND-CP dated 16th November 2018 Lease term ▪ End date: 2049~2056 Minimum Lease Area 10,000 m2 Planned area ▪ Total area: 350 ha Factory Available for Rent NA Operation Status ▪ Active Occupancy Rate/Number of Projects ▪ 100% ▪ 126 projects Number of Korean Projects 43 projects Lease fee Land lease fee: Depend on location and leasing land plot area. Operating fee ▪ Management fee: 0.5 USD/m2/year ▪ Infrastructure maintenance fee: 0.5 USD/m2/year ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: 8,250 VND (~0.37 USD)/m3 ▪ Wastewater treatment fee: 6,500 VND (~0.29 USD)/m3 INFRASTRUCTURE AND FACILITY Financial institution Vietcombank, Vietinbank (inside the zone) Tax service, State finance office 12 Km from Yen Phong District Tax Office and Treasury Department Customs Service Inside the Industrial Zone Logistics Inside the Industrial Zone 96 Post office Inside the Industrial Zone Medicare 7 km from Bac Ninh General Hospital Police, public security Inside the Industrial Zone Universities, training facilities, etc. 4.5 Km from Viglacera Vocational College Recruitment NA Worker dormitory Inside the Industrial Zone Worker's child education facility Inside the Industrial Zone One-stop service NA Road Width Main road: 71 m IT & Telecommunication Facilities of industrial park Telecommunication systems and international standards are always ready to meet the communication needs Emergency Power generator Available Fire-fighting facility Available in the zone Layout Plan Location Map 97 Actual View 98 LIST OF TENANTS No. Company Nationality Business 1 Ngan Son Joint Stock Co. Vietnam Processing tobacco materials 2 Vietnam Tobacco Corp. Vietnam Tobacco production 3 China 4 Vietnam EH Agriculture and Animal Feed Co. Ltd. Thang Long Plastics Joint Stock Co. Vietnam Producing animal feed, admixture to animal feed, mixed animal feed Producing template, model and plastic products 5 A Chau Beer Company Vietnam Beer production 6 TID Door World Joint Stock Co. Vietnam Production of various doors 7 Vietnam 8 Thanh Tung Co. Ltd. (Vina Wrapping and Bottle Cap) TRENDSETTERS FASHIONS CO. LTD. Singapore Construction of warehouse, showroom, trading services Producing garment for export 9 Vietnam Atlantic Welding Rod Co. Ltd. China Producing and trading welding rod 10 Thuan Thanh Services and Trading Production Co. Ltd. Vietnam 11 Vietnam 12 VISSAN Animal Husbandary Products Industry Co. Asia Food Technology Co. Ltd. Warehouse for rent, business agent of glass and building material, processing after-glass goods, window aluminium frame Producing, trading various kinds of frozen food Vietnam Food processing 13 Tien Hung Co. Ltd. Vietnam 14 Vinafco Vietnam Producing wrapping, wheat flour, non-alcohol soft drinks Agent of international transportation, logistics Vietnam 15 Warhouse, goods yard, container yard, bonded warhouse for rent Business in currencies 16 Vietinbank – Tien Son IZ Branch – Bac Ninh Vietnam 17 Institute of Beverage Vietnam 18 Hanoi Construction and Investment Co. Ltd. Vietnam 19 Thanh Nam Glass Co. Vietnam 20 Asean Tire Co. Ltd. Thailand 21 Hoang Hac J.S.C. Vietnam 22 Tien Dat Co. Ltd. Vietnam 23 Duc Viet Trading and Production Co. Vietnam Production of inner tube, tire for motorbike, bycicle and other products from rubber Processing, producing machine details, steel structure and technological equipments Producing, processing and trading metal, comsumption goods Production of CDR, VCD, original disks 24 Dat Viet Industrial Production and Trading J.S.C. LB Vocational Training, Teaching Equipments Co. Ltd. Thai Duong Trading and Advertising Co. (Tisu Paper Co. Ltd.) TCT Tourism and Construction Trading Co. Ltd. Vietnam Processing mechanics, electricity, electronics Vietnam Fine arts for export and equipments for teaching, vocational training Production of printing products and the equivalents Production of interior woodwork in accordance with investment license issued by competent authority 28 Pacific Ocean J.S.C. (Thaicom) Vietnam 29 Tran Hung Dao Mechanics Co. Vietnam 30 Tuong Cat Trading Co. Ltd. (Thai Duong Printing Equipment Co. Ltd.) Bac Ninh Province Post Office Vietnam Producing and trading machines, appliances and mechanic products Producing and trading printing products Vietnam Supply of post and telecom services Niem Tin Viet Technology Development and Investment J.S.C. Vietnam Exploiting logistics, producing high quality panels, industrial arch, products of preservation technology, metallic roofing, covering and the equivalents. 25 26 27 31 32 Vietnam Vietnam 99 Producing, processing and trading agricultural and forestry products Production of buidling materials and equivalent products Production of safety glass 33 K.Long Co. Ltd. Vietnam 34 3H Vinacom Co. Ltd. Korea Garment, embroidery and industrial auxilary materials consumed in domestic market and for export Producing cover of electrical cable 35 Vietnam Producing veterinary medicine 36 Huphavet Diem Uyen Veterinary Medicine Production and Trading Co. Ltd. MTS Vietnam Co. Ltd. Italia 37 Dong Anh Pressure Equipment J.S.C. Vietnam 38 Hau Giang Pharmacy J.S.C Vietnam Production, assemble for consumption and distribution of water heater products Producing, trading mechanic equipments, boiler pressure, gas tank, steel structure, refrigeration Producing pharmaceutical products 39 Vietnam Mechanic products 40 Northern Vietnam Dong Yun Plate Making Co. Ltd. Vinh Thai Co. Ltd. Vietnam 41 Yen Vien Mechanics Factory Co. Ltd. Vietnam Producing, trading electrical fans, electronics, household electricity and other products Producing steel structure 42 Vellpharm Vietnam Pharmacy Co. Ltd. China Producing new medicine for human 43 3C Industry Co. Vietnam Producing, trading electronic appliances 44 Liksin Co. Vietnam Producing compound wrapping 45 Malt Sugar Co. Ltd. Vietnam 46 AQA Industrial Gantry Production Co. Ltd. Vietnam 47 Ngoc Lan Trading and Production Co. Ltd. Vietnam 48 VINAMILK Vietnam 49 Kobelco Vietnam Co., Ltd. Japan Processing, trading beer malt to provide materials for beer factories Erection of double girder gantry, single girder gantry, revolving gantry, chain block crane, winch and gantry appliances Producing and assembling motorbike spare parts to consume in domestic market and for export Producing milk products, beverage and processing products Repair and guarantee construction equipments 50 TISU paper Co., Ltd. Taiwan Process paper 51 Vietnam Supply financial service 52 Bank for Investment and Development – Bac Ninh branch Mai Phuong Co., Ltd. Vietnam 53 Viet Thang Co., Ltd. Vietnam 54 Minh Xuan Joint Stock Company Vietnam Produce thin plastic film for consumption in domestic market and export Process mechanic, assemble and warehouse finished products Produce oil, resin and polymer glue 55 Dainichi Color Vietnam Co., Ltd Japan 56 Thien Thanh Cable Co., Ltd Vietnam Produce and process chromatic grain and blended chromatic plastic grain for export Produce telecommunication cable 57 Bao Viet Company – Bac Ninh branch Vietnam Supply insurance service 58 Ha Thong joint stock company Vietnam 59 Nissin Vietnam electricity Co., Ltd. Japan Process mechanic and manufacture pressure equipments Manufacture electrical products 60 Leadertek precise mechanic Co., Ltd Taiwan Manufacture precise mechanical products 61 Rang Dong Plastic Joint Stock Company Vietnam Produce tole, plastic boards and similar products 62 UHM Vietnam Co., Ltd. Thailand 63 Japan 64 Hanel export-import and manufacturing joint stock company Ngai Mee Vietnam package Co., Ltd. Manufacture water meters and accessories, tube and pipe fittings, valves, equipment, tools and other products related to water Process and assemble electronic components 65 Anh Phuong Co., Ltd. Vietnam 66 Fujikasui environmental technique and energy Co., Ltd. Postal Materials Joint Stock Company Japan 67 Singapore Vietnam 100 Produce package and plastic beads and print color labels on package Building concrete mixing plant Produce products for treating waste water and environmental pollution Manufacture telecommunication cables and similar products 68 Rishi Vietnam Co., Ltd. China Design, manufacture and repair molds with high accuracy and produce high-grade plastic 69 Vietnam Produce beer and soft drink 71 Viet Ha beer and soft drink joint stock company Viglacera Mechanical execution company Vietnam Construction works 72 Huawei - TST Vietnam Joint Stock Company Vietnam Produce telecommunication equipments 73 Armstrong Weston Vietnam Co., Ltd Japan 74 Shihen Vietnam Co., ltd. Japan 75 Tin Thanh Co., Ltd. Vietnam Produce components cut by molds including name sign, marks, labels printed with silk techniques to sell to other export-processing enterprises in Vietnam and to export Manufacture, fabricate and assemble electric and electronic machinery, equipment and components Produce packages and similar products 76 Indo-Trans delivery and logistics joint venture company US 77 Kinyosha Co., Ltd. Japan 78 Lili of France joint venture company Vietnam 79 Sara VNPC Computer Manufacturing Joint Stock Company Tien Quoc Co., Ltd. Vietnam Trong Thanh trade and manufacturing Co., Ltd. Vietnam Industrial Gas Joint Stock Company Vietnam Produce pharmaceutical and functional food, cosmetics, medicinal materials Manufacture and assemble computers and similar products Produce electric equipments, components for motorbike Produce plastic grain and similar products Vietnam Produce industrial gas Truong Hong glass technology development Joint Stock company Vietnam Coffee Corporation Vietnam Japan 86 Sumitomo Vietnam Electric Interconnect products Co., ltd. THK Manufacturing Vietnam Co., Ltd. 87 Bac Ky Investment Joint Stock Company Vietnam 88 Kingmo New Materials Vietnam China 89 AGRIBANK – Bac Ninh branch Vietnam 90 An Viet Mechanic Joint Stock Company Vietnam 91 Vietnam 92 Phuc Lam trade development joint stock company ACECOOK Vietnam Joint Stock Company Produce and process safe glass and similar products Process coffee, nutritional flour, agricultural products and foodstuff, warehouse and similar occupations Produce and trade electronic parts including bearing roller, fixed film roller. `Produce, process, assemble and trade equipments of sliding rails Build factory, warehouse and supply logistic service Produce and trade metal sheet and molybdenum metal products Setting up office of Agribank in Tien Son Industrial park - Bac Ninh province Produce, process and complete steel structures for power sector and transportation sector Produce nutritious food and functional food Japan Produce and process food 93 Tan Tien plastic package joint stock company Vietnam Produce complex film package 94 Hai Thien trade and manufacturing Co., ltd. Vietnam Produce plastic sandals 95 Vinabima Tien Son construction machine joint stock company Vietnam 96 Joyo Mark Vietnam Co., Ltd. Japan 97 ABB Co., Ltd. Switzerland Produce, assemble and trade equipments for cement concrete mixer plant and construction equipments Manufacture and trade all kinds of labels, guide stamps and other printed materials used to attach to other products 1. Manufacture products for measuring, testing, direction and controlling 2. Manufacture motors, generators, electrical transformers, distribution equipment and electrical control 70 80 81 82 83 84 85 Vietnam Vietnam Japan 101 Delivery services (not including shipping agency services, maritime towage services and inland transport services by sea), services of customs declaration, warehousing and logistics services , reverse logistics, retail store services Manufacture rubber rollers and similar products 3. Manufacture electrical wiring devices 4. Produce components and high voltage equipment, medium-and low-voltage and other electrical equipment 5. Produce ball, gears, gearboxes, parts motion control and communication 6. Design, install, repair, maintenance and Supply service of supermarket and restaurants for the industrial park Produce and process all kinds of inkjet printers, components, semi-finished products for inkjet printer, detailed parts for electronic products, all kinds of laser printers, semi-finished components for laser laser Produce PU roofing, painted metal and welding materials Produce and process finished products for treating water, waste water and environmental pollution Produce crane, machinery and equipment for the mill line and recycling line Produce instant noodle, wine and soft drink 98 Tien Du Construction Company Vietnam 99 Canon Co., Ltd. Japan 100 Gia Long Co., Ltd. Vietnam 101 Duc Giang Industrial chemical Co., Ltd Vietnam 102 Keosan Vina Mechanical Co., Ltd. Korea 103 Ngoc Viet service and trade Co., Ltd. Vietnam 104 Vietnam Parkerizing Hanoi Co., Ltd Japan 105 Dai Phat Joint stock company Vietnam 106 COTEC construction joint stock company Vietnam 107 Hawee electromechanic joint stock company Vietnam 108 Thanh Trang Private Enterprise Vietnam 109 Khanh Hoa Co., Ltd. Vietnam 110 Mechanical product export-import state owned one member company limited Vietnam 111 Phi Kha trade in service and manufacturing Co., Ltd. Vietnam 112 Minh Vien Co., Ltd Vietnam Manufacture and trade equipments, products related to water Process metal ware, metal roofing and similar products Produce tightening components such as bolts, nuts, threaded rods, washers, zinc coated metals and similar products Manufacture and assemble aluminum glass and aluminum coating line. Purchase construction materials, aluminum and glass building, glass art, interior decoration materials, plaster ceiling. Manufacture aluminum doors, interior decoration materials. Process engineering products. Produce functional food and tea 113 Kosung Joint stock company Vietnam Produce electrical lines and cables 114 Anh Duc trade joint stock company Vietnam Assemble electronic 115 Phuoc An Co., Ltd. Vietnam Produce agricultural food and drink 116 Akebono Kansei Vietnam Co., Ltd Japan 117 Seojin System Vina Co., Ltd Korea 118 Vietnam 119 Tue Tinh Pharmaceutical Economic – Technical Secondary School Ariston Thermo Vietnam Co., Ltd Produce, manufacture and assemble the plastic parts and products Produce, assemble, fabricate, galvanize and coat all types of aluminum molds Pharmaceutical training 120 Taixin Printing Vina Co., Ltd Korea Produce water heater and other interior products for bathroom Produce and print packages 121 Nam Phuong V.N Co., Ltd Vietnam Produce food 122 Curious Seiki Japan Produce mechanic parts 123 Tomoe Shokai Japan Produce medical equipments Italia 102 Produce and trade materials for surface treatment of metal and corrosion, implement design service, install machinery, spare parts and related technical consulting service; use products to handle the metal parts Produce diapers, tampons, wet paper towel or nonwovens Manufacture and trade mechanical equipments and maintain buildings, warehouses and similar products Manufacture electrical and industrial equipments 124 Sai Gon Ha Noi Petroleum Co., Ltd. Vietnam Produce Gas oil 125 An Phuc Co., Ltd. Vietnam Construct Gas station and provide other services 126 Kinh Bac Star Vietnam Construct Gas station and provide other services 103 YEN PHONG INDUSTRIAL ZONE (PHASE I, II) GENERAL INFORMATION Address Yen Phong District, Bac Ninh Province, Vietnam Investor Viglacera Corporation JSC ▪ Address: Viglacera Tower, No.1 Thang Long Boulevard, Me Tri, Nam Tu Liem, Hanoi, Vietnam ▪ Tel: (84-24) 35536688 ▪ Fax: (84-24) 35537666 ▪ Website: http://www.viglacera.com.vn/ www.viglaceraip.com Contact Person ▪ Mr. Dang The Nam – Business Development Manager – Mobile: (84) 903 405 099 - Email: namdt.vir@viglaceraland.vn ▪ Ms. Nguyen Ha Phuong – Senior Marketing Executive – Mobile: +84 97 344 8994 - Email: phuongnh.vir@viglaceraland.vn Location Yen Phong IP is located next to National Highway No.18 (Noi Bai - Ha Long Highway) from Hanoi to Quang Ninh - To Noi Bai International Airport: 22 km - To Hanoi city: 35 km - To Hai Phong Seaport: 110 km Priority Sectors for Investment Electronics, powers industry, high-techs, material for Investment Area Restricted Sectors for Investment construction and mechanics, pharmaceuticals, foodstuffs, light industry, consumer goods, etc. Minimum wage [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries Lease term Until 2066 Minimum Lease Area 10,000 m2 Planned area Total area: 658 ha - Phase 1: 344 ha - Phase 2: 314 ha Factory Available for Rent Only 2 factories left – Unit size: 5,940 m2/unit Operation Status Active Occupancy Rate & Number of projects ▪ Phase 1: 100% ▪ Phase 2: 60% - 43 projects Number of Korean Projects 47 Lease fee ▪ Land lease fee: 125 USD/m2/whole project life (VAT excluded) ▪ Factory lease fee: 4 USD/m2/month (VAT excluded) Operating fee ▪ Management fee: 0.9 USD/m2/year ▪ Electricity fee: (1) - Normal hours: 1,555 VND/Kwh (equivalent to 0.067 USD/Kwh) (From Monday to Saturday: 4h - 9h30’, 11h30’ - 17h and 20h - 22h; Sunday: 4h - 22h) (2) - Night hours: 1,007 VND/Kwh (equivalent to 0.04 USD/Kwh) (Everyday: 22h - 4h) (3) - Rush hours: 2,871 VND/Kwh (equivalent to 0.123 USD/Kwh) (From Monday to Saturday: 9h30’ - 11h30’ and 17h - 20h/Not Sunday) ▪ Water fee: 9,200 VND/m3 (equivalent 0.4 USD/m3) excluded VAT - monthly payment. ▪ Wastewater treatment fee: 6,500 VND/m3 excluded VAT (equivalent 0.309 USD/m3) - monthly payment. The quantity is defined by 80% the amount of water supply. INFRASTRUCTURE AND FACILITY 104 Financial institution VIETINBANK, VIETCOMBANK, BIDV Tax service, State finance office 12 Km from Yen Phong District Tax Office Customs Service Bac Ninh Custom Office is located in the management center of the IP. All the sealed procedures and claims are carried out timely in enterprises of the IP. Logistics Inside the Industrial Zone Post office 3 Km, inside Yen Phong Industrial Park – 1st phase Medicare Bac Ninh Province Hospital is 10 km from the IP. There is a polyclinic in Yen Phong IP Police, public security Police station is inside the IP. Universities, training facilities, etc. Viglacera Vocational college in Yen Phong Urban area trains 6,000 workers and labors yearly for enterprises in the IP. Recruitment Viglacera will support in recruitment Worker dormitory Yen Phong Urban Area (51 ha) and Yen Phong Dormitories for workers (20 ha) ensure houses,dormitories, apartments for workers in the IP. Worker's child education facility N/A One-stop service N/A Road Width N/A IT & Telecommunication Facilities of industrial park The telecommunication system complies with international standards and is always available for commnunication demand with high data transmission speed. Emergency Power generator N/A Fire-fighting facility Inside the Industrial Zone Layout Plan 105 Location Map Actual View LIST OF SOME NOTABLE TENANTS No. Company Nationality Business 1 Young Jin Vina Co., Ltd Korea 2 Samho Gunyoung Vina Co., Ltd Korea Manufacturing materials made of plastic (phone components) Manufacturing machinery 3 Atlantic Welding Company China Manufacturing welding rod 4 DIC Vina Co., Ltd Korea 5 Thai Hoa Co., Ltd China Manufacturing and processing the raw materials for the production of flexible electronic circuit board Formalin glue 6 AK Investment and Development Co., Ltd Vietnam 7 Hanpo Vina Vietnam 106 Producing wooden pallets, wooden packaging Producing plastic and metal for supporting industry 8 Seil Ens Vietnam Co., Ltd Korea Machining 9 Dae Sun Co., Ltd Korea Refrigeration system 10 Vietnam 11 Aermec Vietnam Manufacturing and Trading Joint Stock Company LogisValley Co., Ltd Air conditioner and clean room equipment Logistics 12 Geo Nation Co., Ltd Korea 13 Shinhan Elevator Company Korea Surface treatment of metalic component Elevator 14 Alpha Food Joint Stock Company Vietnam Food 15 Thien Viet Technology Joint Stock Company Vietnam Mechanical 16 LogisValley Co., Ltd Vietnam Logistics 17 Cty Xây Dựng Tiên Du (TNHH) Vietnam 18 Yulay Tech Vina Co., ltd. Korea 19 Bumchun Precision Vietnam Co., Ltd. Korea 20 Orion Vina Co., Ltd. Korea Manufacturing the mobile phone cover Manufacturing the mental parts of headphones Food and Cakes Products 21 SamSung Electronics Vietnam Co., Ltd. Korea Electronics Products 22 Flexcom Vietnam Co., Ltd. Korea Flexible printed circuit board 23 User Interface Technology Vietnam Co., Ltd. Korea 24 Mobase Vietnam Joint Stock Company Korea 25 Seoul Metal Vietnam Co., Ltd. Korea 26 Em Tech Vietnam Co., Ltd. Korea 27 Intops Vietnam Co., Ltd. Korea 28 Seowonintech Hanoi Co., Ltd. Korea Laser printer components and high tech electronic spare parts Mobile phone cases and refrigerator gasket and high tech electronic spare parts Hi-tech precision screws and other hi-tech electronic parts used for mobile phones, computers and other high tech electronic products Manufacturing and supplying hitech micro SPK & RCV, other audio equipments and electrical & electronic parts Mobile key pads and precision electronic rubber parts Mobile key pads 29 P&TEL Vietnam Co., Ltd. Korea high-tech products 30 Crucialtec Vina Co., Ltd. Korea 31 Hanjin Vietnam chemiscal joint stock company Korea high-tech optical navigation key for cell phone paint products 32 Phat Van Loi Co., Ltd. Vietnam Gas station 33 P&Q Vina Technical Co., Ltd. Korea Mobile Phone cases 34 Lock & Lock HN Co., Ltd. Korea Warehouse 35 M Tech Vietnam Co., Ltd. Korea mobile cover 36 Vietnam hospital service 37 Vietnam Japan hospital construction and consultant joint stock company Toyo Brazing Vietnam Co., Ltd. Japan 38 Sahara Industry Vietnam Co., Ltd. Japan 39 AK Chemtech Co., Ltd. Korea 40 Nano Chem Tech Co., Ltd. Korea 41 Dongsin Tube Glass Co., Ltd. Korea 42 3H Vina Co., Ltd. Korea Processing heat treatment, metal weld and related auxiliary industries Plastic moulding processing and related auxiliary industries Producing paints, solvents for phones, cars, computers and plastics Manufacturing the plastic resin, antistatic protective film and plastic bags Manufacturing glass container for pharmaceutical injection use Manufacturing plastic resin PC, ABS Korea 107 43 Dae Myung Electronics Co., Ltd. Korea 44 Fine Tech Vina Technology Co., Ltd. Korea 45 KCC Vietnam Corporation Korea 46 Dawon Vina Co., Ltd. Korea 47 Nguyen Son Co., ltd. Vietnam Manufacturing painting plate and printing of the cover of mobile phone Food and Cakes Products 48 Muu Sinh GI Co., Ltd. Vietnam Manufacturing furniture 49 Air Liquide Vietnam Co., Ltd. France Manufacturing industrial gas 50 Ottogi Vietnam Co., Ltd. Korea Food products 51 PV Compressed Natural Gas Distribution JSC Vietnam Supply Compressed Natural Gas 52 Halla Investment Co., Ltd. Vietnam Build Offices for lease 53 Vinafco HTNS Korea Logistics 54 Hanaro Korea Logistics 55 Cong Ha Mechanical Company Vietnam Mechanical 56 Airport Services Joint Stock Company Vietnam Logistics 57 Logistics Aviation Joint Stock Company Vietnam Logistics 58 Century Logistics Joint Stock Company Vietnam Logistics 59 Unitech Asia Co., Ltd Korea 60 Tae Sung Eng Vina Co., Ltd Korea Chemicals for the water and sewage treatment industry Automation display device 108 Manufacturing electronic components Manufacturing mold of mobile phone's cover and mold of mobile phone's component made from wood and steel Manufacturing paint YEN PHONG II-C INDUSTRIAL ZONE GENERAL INFORMATION Address Yen Phong District, Bac Ninh Province, Vietnam Investor Viglacera Corporation JSC ▪ Address: Viglacera Tower, No.1 Thang Long Boulevard, Me Tri, Nam Tu Liem, Hanoi, Vietnam ▪ Tel: (84-24) 3553 6660 ▪ Fax: (84-24) 3553 6671 ▪ Website: http://www.viglacera.com.vn/ Contact Person ▪ Mr. Dang The Nam – Business Development Manager – Mobile: (84) 903 405 099 - Email: namdt.vir@viglaceraland.vn ▪ Ms. Nguyen Ha Phuong – Senior Marketing Executive – Mobile: +84 97 344 8994 - Email: phuongnh.vir@viglaceraland.vn Location ▪ 2km from Yen Phong IP ▪ Yen Phong II-C IP is located next to National Road No.18 (Noi Bai - Ha Long Highway) and Hanoi Thai Nguyen Highway. - To Noi Bai International Airport: 20 km - To Hanoi city: 34 km - To Hai Phong Seaport: 112 km Priority Sectors for Investment Electronics, powers industry, high-techs, material for construction and Mechanics, pharmaceuticals, foodstuffs, light industry, consumer goods, etc. Investment Area Restricted Sectors for Investment Polluted sectors Minimum wage [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries Lease term ▪ End date: 2068 Minimum Lease Area 10,000 m2 Planned area Total area: 221 ha Factory Available for Rent N/A Operation Status In Operation Occupancy Rate & Number of projects ▪ Occupancy Rate: 25% ▪ Number of projects: 6 Projects Number of Korean Projects 4 projects Lease fee Land lease fee: 125 USD/m2 (VAT excluded) Operating fee ▪ Management fee: 0.9 USD/m2/year ▪ Electricity fee: (1) - Normal hours: 1,555 VND/Kwh (equivalent to 0.067 USD/Kwh) (From Monday to Saturday: 4h - 9h30’, 11h30’ - 17h and 20h - 22h; Sunday: 4h - 22h) (2) - Night hours: 1,007 VND/Kwh (equivalent to 0.04 USD/Kwh) (Everyday: 22h - 4h) (3) - Rush hours: 2,871 VND/Kwh (equivalent to 0.123 USD/Kwh) (From Monday to Saturday: 9h30’ - 11h30’ and 17h - 20h/Not Sunday) ▪ Water fee: According to regulation of supplier at the using time. ▪ Wastewater treatment fee: According to regulation of supplier at the using time. INFRASTRUCTURE AND FACILITY 109 Financial institution - Shinhan Bank, Vietcom Bank, Vietin Bank, BIDV, Techcom Bank Tax service, State finance office 12 Km from Yen Phong District Tax Office Customs Service Bac Ninh Customs Office is located in the management center of Yen Phong IP which is 2 km from Yen Phong II-C IP. Logistics Inside the Industrial Zone Post office Bac Ninh Post Office has constructed its branch at the center of Yen Phong IP (which is 2 km from Yen Phong II-C IP) with modern informatics technology system for serving multi-service communication such as data transfer, Internet, IP telephone and video conference, etc. Medicare Bac Ninh Province Hospital is 12 km from the IP Yen Phong IP Clinic is 2 km from the IP Police, public security Police station is inside the IP Universities, training facilities, etc. Viglacera Vocational college in Yen Phong Urban area trains 6,000 workers and labors yearly for enterprises in the IP Recruitment Viglacera will support in recruitment Worker dormitory Yen Phong Urban Area (51 ha) and Yen Phong Dormitories for workers (20 ha) ensure houses,dormitories, apartments for workers in the IP. Worker's child education facility 3 Km, inside Yen Phong Industrial Zone – 1st phase One-stop service N/A Road Width N/A IT & Telecommunication Facilities of industrial park The telecommunication system complies with international standards and is always available for commnunication demand with high data transmission speed. Emergency Power generator Available Fire-fighting facility Available. Water supply system for firefighting is located along each road. Layout Plan 110 Location Map Actual View 111 DAI DONG - HOAN SON INDUSTRIAL ZONE GENERAL INFORMATION Address ▪ Dai Dong and Hoan Son Commune, Tien Du District, Bac Ninh Province Investor Saigon Telecommunication and Technologies Corporation – Kinh Bac Group ▪ Address: No.11, Tu Xuong, District 3, Ho Chi Minh City ▪ Tel: (84-8) 3 715 9909 Fax: (84-8) 3 932 2302 Contact Person ▪ Ms. Mai Lan – Sales Deputy Manager - (84) 936368613 – mailan.kbc@gmail.com ▪ Ms. Giang – Sales Executive- (84) 906918668 Location ▪ Land: National Road 1A to Lang Son, National Road 18 to Cai Lan seaport – Quang Ninh, National Road 18 to Noi Bai International Airport. Railway Hanoi – Lang Son – Nan Ning (China) and Yen Vien- Cai Lan- Dong Xing (China) cross the province., 06km from Hanoi ▪ Seaport: 90 km from Hai Phong Seaport and 130 km from Cai Lan Deepwater seaport ▪ Airport: 30km from Noi Bai International Airport Investment Area Priority Sectors for Investment Multi-Industry Restricted Sectors for Investment Production of iron, steel, construction materials, paper, chemicals, textiles and textile products ... Minimum wage [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries Lease term ▪ End date: 2057 Minimum Lease Area 10,000 m2 Limit for Construction Height Permitted Construction Rate In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning regulation (QCXDVN 01: 2008/BXD) Planned area ▪ Total area: Phase I: 272 ha Phase II: 95.8 ha Factory Available for Rent None Operation Status ▪ In operation Occupancy Rate and Number of Projects ▪ Phase I: 100% ▪ Phase II: Under construction, to be in operation in 2020 Number of Korean Projects 93 projects Lease fee ▪ Land lease fee: 81 – 100 USD/m2/whole project life ▪ Factory Lease fee: 3 – 3.5 USD/m2 Operating fee ▪ Management fee: 0.5 USD/m2/year ▪ Infrastructure maintenance fee: 0.2 USD/m2/year ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: 15,000 VND (~ 0.67 USD)/m3 ▪ Wastewater treatment fee: 0.37 USD/m3 INFRASTRUCTURE AND FACILITY Financial institution Navibank, Vietinbank, Vietcombank, Agribank Tax service, State finance office 14 km from Bac Ninh Tax Department 13 km from Bac Ninh Treasury Dearptment Customs Service 15 km from Bac Ninh Customs Office 112 Logistics Inside the Industrial Zone Post office 3 km from nearest Post office Medicare 3 km from Tu Son General Hospital Police, public security 24/7 security service. Universities, training facilities, etc. 17 km from Kinh Bac University Recruitment Support from IZ developers Worker dormitory Worker Dormitory project available and demanding from tenants Worker's child education facility NA One-stop service NA Road Width Main road 57 m – 4 lanes, 36 m and branch road 23 m – 2 lanes IT & Tele-communication Facilities Telecommunication systems and international standards are always ready to meet the communication needs Emergency Power generator Available in the zone Fire-fighting facility The water supply network for firefighting is designed in conjunction with the potable water supply network, which is located along the roads. The distance among fire hydrants is 120 m 150 m with a diameter of D125 mm. Layout Plan 113 Location Map Actual View 114 LIST OF KOREAN TENANTS – PHASE I No. Name of Investors Investment Capital (million USD) 1 LEE JEPUNG; JEIL TECHNICS CO., LTD 0.50 2 SONG MAL SOO 0.47 3 DO INNOVATION CO., LTD 0.60 4 KIM SIIL 0.50 5 DONGWOO PNT 0.60 6 JU HYUN CO., LTD 0.70 7 MPROTEK CO., LTD 1.00 8 VIETNAM JUNGWOO CO., LTD 1.26 9 PARK SANG HYUN, LIM BYUNG TAE 0.50 10 LOT VACUUM CO., LTD 1.00 11 SEO DONG JOE 0.50 12 DEVELOPMENT PLUS CO., LTD 1.00 13 JEONG MYONGCHUL 1.35 14 LINKELECTRONICS CO., LTD 0.80 15 ILGAK METAL CO., LTD 0.52 16 PARK GISOO 0.50 17 SOLITY CO., LTD 2.00 18 MOON YOUNG SIK 0.50 19 SUNGWON TECHWIN COMPANY 0.70 20 COMPANY YOO RIM; JU YOUNGRIM 0.75 21 NOH, TAESU; LEE, SANG KOO 0.50 22 PARK, CHUN SHIK. RYU, SUNG RYONG 0.55 23 MOON KONGUP 0.51 24 RHO PEEL DAE 0.50 25 SEONG LIMSA CO., LTD; YANG KISUNG; OH HEE HAN 0.60 26 SAMJIHITEK CO., LTD; YANG JINSEOK 1.20 27 1.91 28 CHOI HYOUNG SUCK; ICSN Korea, Inc.; ICSN TECHNOLOGIES; KIM JUN IL SIWOOFLEX CO., LTD 29 INNO6 INC 1.00 30 JINHO TECH CO., LTD. 0.28 31 SEOJIN SYSTEM CO., LTD 137.00 32 TEXON CO., LTD 37.90 33 PIAO, HONG LAN; CHOI SANG UNK 0.08 34 HK CO. LTD 0.58 35 KB ADHESIVES CO., LTD 0.50 36 KIM, KYUSUB; LEE, JAESUK 0.51 37 SHINWON METAL CO., LTD 0.50 38 KWON JINHA; BIN CHANWOO 0.50 39 PARK SANG SOO 1.00 40 PS SOFT JOINT STOCK COMPANY; KO SUNG MAN 0.50 41 NC LED CO., LTD 3.80 42 GLOBAL STANDARD TECHNOLOGY KOREA 1.50 115 0.50 43 JEIL TECHNICS CO., LTD 0.50 44 KANG JEABONG; YUN MIJA 5.00 45 ONE SYSTEM JOINT STOCK COMPANY 1.43 46 CO., LTD GSP COMPANY 0.25 47 MS FILTER CO., LTD; KANG JIN SUN 0.24 48 JAEGAL HYUNSEOB; DOO BYOUNG 0.67 49 JANG JAE HYEON 0.70 50 KAIROS COMPANY LIMITED 0.89 51 ANS CO., LTD 0.40 52 SINILL COMPANY LTD 1.00 53 PARK HO YOUNG; KIM JINSEOG; ZHANG GUONAN 0.97 54 SY TECH CO., LTD 1.40 55 COMPANY LIMITED DSR; Ku Ja Kyung 0.70 56 BAEK IN HWAN 2.00 57 Jungang Industry Co., Ltd; Mr. Kim Choong Hwan 0.73 58 Lee Sukki 0.35 59 Han Precision Co., Ltd., Ian Precision Co., Ltd 0.60 60 4.50 61 HANMIFLEXIBLE VINA CO., LTD; HANSUNG P.T.C CO., LTD; SEWON HITEC GM CLEAN TECH CO. LTD 62 CHOI BONG KI 0.50 63 SEJIN INDUSTRY CO., LTD 0.50 64 JK Korea Co., Ltd 0.45 65 KIM KYUNG WHAN 0.94 66 OH JIN SEI 0.60 67 PARK EUNJI; OH JEADO 0.50 68 TAESUNG CO., LTD 2.40 69 MMT LTD 0.40 70 PARK GISOO 0.92 71 Mr. Hwang Joon Heon, Mr. Jung Hee Chan, Mr. Kim Jung Kyun 0.50 72 SJSOLUTION COMPANY LTD 1.00 73 Elnoa Co., Ltd 0.42 74 KIM YOUNGKYU 0.22 75 YUIL SYSTEM CO., LTD 0.30 76 MOON YOUNG SIK 0.50 77 ASTEP CO., LTD 1.00 78 Diawintech Co., Ltd 1.10 79 Withsystem Co., Ltd; DEVELOPMENT PLUS CO., LTD 1.40 80 D-Max Co., Ltd 0.30 81 IAN ELECTRONICS CO., LTD 2.50 82 BAEK WOOIL 0.70 83 YG TECH CO., LTD 3.50 84 DASAN C&P JOINT STOCK COMPANY 4.00 85 HANKYONG C&T CO., LTD 0.45 86 Mr. Kwon Young Woon 0.60 87 ENGINEERING AND CONSTRUCTION COMPANY LIMITED KP 0.60 88 Seojin System Co., Ltd. 27.00 116 0.33 89 MUN SOOGYEONG 3.35 90 HAN JIN CHEMICAL COMPANY 3.90 91 GOMUNDANG PRINTING INC 36.00 92 KIM JIN GWON 0.50 93 SAMSUNG INDUSTRIAL CO., LTD 0.89 117 VSIP BAC NINH INDUSTRIAL ZONE GENERAL INFORMATION Address ▪ Tu Son town, Bac Ninh province, Vietnam Investor ▪ VSIP Bac Ninh Co., Ltd ․ Address: No.1, Huu Nghi Rd, VSIP Bac Ninh, Tu Son town, Bac Ninh province, Vietnam ․ Tel: (84-222) 3 765 668 ․ Fax: (84-222) 3 765 666 ․ Website: http://www.vsip.com.vn/ Contact Person Mr. Cao Phan Tuan (Tony) – Marketing Manager - Mobile: (84) 946 050 520 - Email:Tuan.cp@vsip.com.vn Location - 25 km from Hanoi city - 15 km from Noi Bai International Airport - 130 km from Hai Phong seaport - Adjacent to Hanoi-Thai Nguyen Highway and HW no.18, 10 km from Tu Son railway station. Investment Area Priority Sectors for Investment Electronics, Precision Engineering, FMCG, Automotive components, Logistics, Pharmacy and Medical Devices etc. Restricted Sectors for Investment Polluting industries: dyeing, plating etc. Minimum wage [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries Lease term ▪ Start date: Feb 2007 ▪ End date: Feb 2057 Minimum Lease Area 10,000 m2 Limit for Construction Height Permitted Construction Rate - 25 meters/ 6 storeys - 50% to 60% Planned area ▪ Total area: 700 ha (200 ha for commercial and residential, 500 ha for industrial land) ▪ Total Industrial Land: 500 ha Factory Available for Rent ▪ More than 1 ha Operation Status ▪ In operation Occupancy Rate and Number of Projects ▪ 100 % ▪ 125 projects Number of Korean Projects 17 projects Lease fee ▪ Land lease fee: 140 - 170 USD/m2/whole project life Operating fee ▪ Management fee: 0.07 USD/m2/month ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: 9,000 VND (~0.4 USD)/m3 ▪ Wastewater treatment fee: 4,700 VND (~0.21 USD)/m3 ▪ Waste treatment fee: According to contract with supplier INFRASTRUCTURE AND FACILITY Financial institution Maritime Bank, Vietcombank - Hưng Yên branch, ACB, Agribank, Techcombank 118 Tax service, State finance office 02 km from Tax Agency Customs Service Inside the industrial zone Logistics Inside the industrial zone Post office Inside the industrial zone Medicare 2km from Tu Son Hospital, Medicare Center Police, public security 24/7 security service. Universities, training facilities, etc. 2km from Tu Son Hospital, Medicare Center Recruitment Support from IZ developers Worker dormitory Worker Dormitory project available and demanding from tenants Worker's child education facility 0.5 km from the nearest Facility One-stop service Inside the zone Road Width 45m, 32m and 24m IT & Tele-communication Facilities Telecommunication systems and international standards are always ready to meet the communication needs Emergency Power generator NA Fire-fighting facility The water supply network for firefighting is designed in conjunction with the potable water supply network, which is located along the roads. The distance among fire hydrants is 120 m -150 m with a diameter of D125 mm. Layout Plan Location Map 119 Actual View 120 LIST OF SOME NOTABLE TENANTS No. Name of Tenants Nationality Business Line 1 Linfox Warehouse Bac Ninh Co., Ltd Australia Logistic 2 Emergent Cold Vietnam Ltd. - Bac Ninh Branch Puratos Grand-Place Vietnam Ltd Australia Cold warehouse Belgium Confectionary China Steel processing England & Holand Homecare's product 6 Yuncheng Plate Making (Bac Ninh) Co., Ltd Branch of UNILEVER Vietnam International Company Limited in VSIP Bac Ninh J&C Joel Vietnam Co., Ltd England Theater curtain 7 Bati Ha Noi Co., Ltd France Logistics hub development 8 Indonesia Packaging 9 Dynaplast Packaging (Viet Nam) Co., Ltd - Bac Ninh Branch A&D Viet Nam Limited Japan Blood pressure monitor 10 A.I.S Viet Nam Co., Ltd Japan Motorcycle parts 11 Japan- Hong Kong Can & bottle Japan Carton packaging 13 Asia Packaging Industries Vietnam Co., Ltd – North Branch of Ojitex Hai Phong Co., Ltd. in Bac Ninh Daiichi Denso Buhin Vietnam Co., Ltd Japan 14 Enshu Vietnam Co., Ltd Japan 15 Foster Electric (Bac Ninh) Co., Ltd Japan Lamps, switches for automobile, motorcycle Machine tools and transportation equipment Electronic sound devices 16 Fujikin Bac Ninh Incorporated Japan Steel processing 17 Fujita Vietnam Co., Ltd Japan 18 Hal Vietnam Co., Ltd - Bac Ninh Branch Japan Engine, general purpose parts for motorcycle Automotive parts 19 Ihara Manufacturing Vietnam Co., Ltd Japan Oil pump, water pump for motorcycle 20 Kurabe Industrial Bac Ninh Co., Ltd Japan Electrics wire 21 Malugo Vietnam Co., Ltd Japan Label printing 22 Nakamura Vietnam Co., Ltd Japan Motorcycle parts 23 Nittan Vietnam Co., Ltd Japan Valve for motorcycle 24 Nitto Vietnam Co., Ltd Japan Polarizing material 25 Japan Motorcycle parts 26 Ogino Vietnam Corporation - Bac Ninh Branch Ogino Vietnam Tu Son Co., Ltd Japan Motorcycle parts 27 Printec Ohtomi Co., Ltd Japan Label printing 28 Japan Printing ink Japan Package printing Japan PET bottle preform 31 Sakata Inx Vietnam Co., Ltd Bac Ninh Branch Bac Ninh - Based Branch Office Shoei Vietnam Co., Ltd Suntory Beverage & Food Viet Nam Co., Ltd Toho Precision (Vietnam) Co., Ltd Japan Rubber roll for printer 32 - Japan Precision engineering 33 Hong Kong Electronic parts 34 Biel Crystal Manufactory (Vietnam) Limited Gaoqi Electronics (Vietnam) Co., Ltd Hong Kong Electronic parts 35 Chung Ho Nais Vina Co., Ltd Korea Assembly of water purifier 36 Dreamtech Vietnam Co., Ltd Korea Battery charger 3 4 5 12 29 30 121 37 Ehwa Tech Co., Ltd Korea Grinding stones, diamond stones 38 Foseca Vietnam Co., Ltd Korea Foods and Catering Services 39 HJ Corp Vina Co., Ltd Korea Electronic parts 40 ITM Semiconductor Co., Ltd Korea Electronic parts 41 J World Vina Co., Ltd Korea Tapes 42 Josung Vina Co., Ltd Korea Carrier tape 43 LS Electronic-Devices Vietnam Co., Ltd Korea SIM connector 44 Noroo Vina Co., Ltd Korea Paint for mobile phone 45 RF Tech Bac Ninh Co., Ltd Korea Battery charger 46 Samhwa Paints Vina Co., Ltd Korea Paint for mobile phones 47 Sang-A Frontec Co., Ltd Korea Component materials 48 Sumika Electronic Materials Co., Ltd Korea Electronic parts 49 Taixin Printing Vina Co., Ltd Korea Printing 50 - Korea Electronics parts 51 Wisol Hanoi Ltd Liability Company Korea Electronic parts 52 BE Packaging (Vietnam) PTE LTD Malaysia Packaging 53 Boxpak (Ha Noi) Co., Ltd Malaysia Packaging 54 Richfield Co., Ltd Malaysia Candy & gum packaging 55 Malaysia 56 Santomas Vietnam JSC - Bac Ninh Branch Lintec Ha Noi Vietnam Co., Ltd Singapore Precision plastic gears, molds and mechanical parts Adhesive product 57 Peony Company Limited Singapore Garment and textile 58 Mapletree Logistic Park Co., Ltd Singapore Logistics hub development 59 Branch of SMC Pneumatics (Vietnam) Sole Member Company Limited in Bac Ninh Sorrento Vietnam Share Holding Company The Branch of Behn Meyer Vietnam Co., Ltd in Bac Ninh Sika Limited (VietNam) - Branch in Bac Ninh Singapore Pneumatic cylinder, valve Singapore Furniture Singapore Plastic compounding Switzerland Taiwan Taiwan Mobile phone 65 Fortuna Advanced Materials (Bac Ninh) Co., Ltd Fushan Technology (Vietnam) Limited Liability Company Idea L Print Vietnam Co., Ltd Concrete admixture, waterproofing, concrete repair and protection systems Tapes Taiwan Package printing 66 King Power (Bac Ninh) Co., Ltd Taiwan Generator 67 King Win Material Technology Co., Ltd Bac Ninh Branch Leadlink Bac Ninh Limited Taiwan Steel processing Taiwan Photo printers Taiwan Motorcycle parts 70 Shih Lin Vietnam Electrical Engineering Co., Ltd - Bac Ninh Branch Strong Light Bac Ninh Co., Ltd Taiwan Electronic parts 71 Sunzex Company Limited Taiwan Stationery 72 - Taiwan PCB board testing equipment 73 Taiwan Aluminum products, mold 74 Transaction Branch-Tung Shin Industries Co., Ltd Advanex (Vietnam) Ltd Thailand Springs and precision components 75 Srithai (Ha Noi) Co., Ltd Thailand PET bottle preform 60 61 62 63 64 68 69 122 76 Branch of Avery Dennison (Vietnam) Limited in Bac Ninh USA 77 USA 78 Branch of Suntory Pepsico Vietnam Beverage Co., Ltd in Bac Ninh Unigen Vietnam Ha Noi Co., Ltd 79 ALS East Hanoi JSC Viet Nam 80 An Phu Irradiation JSC – Branch 02 Viet Nam Printed circuit boards, precision mechanical parts Air freight service, on-site air cargo clearance Irradiation services 81 Asia Food Chemical JSC Viet Nam Food additive 82 Autotech Machinery., JSC Viet Nam Precision engineering 83 BW Industrial Development Joint Stock Company Cat An Corporation - Bac Ninh Branch Viet Nam Warehouse, logictic service Viet Nam Viet Nam 86 Dry Cell and Storage Battery Joint Stock Company EC Joint Stock Company Additives, raw materials for the food, animal feed industry. Battery Viet Nam Supporting industry 87 Fortune - Nano Electrical Company Viet Nam Electric equipments 88 Hai Ha Confectionery Joint Stock Company Asia Chemical Corporation (ACC) Viet Nam Confectionery Viet Nam Plastic products Hoang Lam Trading and Foods Technology JSC Kanto Vietnam Corporation Viet Nam Food additive Viet Nam Motorcycle parts Viet Nam Ice-cream and milk 93 Kido Frozen Foods Co., Ltd - Bac Ninh branch KIDO Group Corporation Viet Nam Instant noodle 94 Long Truong Auto JSC Viet Nam Automotive parts 95 Nanosome Techpharma., JSC Vietnam Pharmaceutical 96 Viet Nam Garments Viet Nam Garment Viet Nam Garment 99 Thanh Phat Trading, Commercial and Investment Co., Ltd Binh Minh Infrastructure Investment and Trading JSC Thanh Thu Development and Business Investment Joint Stock Company - Viet Nam Garment 100 Pharmaceutical Company Fito Pharma Viet Nam Traditional pharmacy 101 Viet Nam Telecom products 102 Post & Telecommunication Equipment JSC (POSTEF) - Viet Nam Electrics& Electronics 103 Ton Dong A Bac Ninh Co., Ltd Viet Nam Steel processing 104 Trang An Serpro., JSC Viet Nam Medical equipment 105 VB Pharma Corporation Viet Nam Veterinary medicine 106 Vietnam Supporting Industry JSC Viet Nam Precision engineering 107 Zion Precision Moulds Co., Ltd Viet Nam Precision Moulds 108 Viet Huong Group JSC Vietnam Comestic 109 Vietnam Smart Technology Application and Mechanical Trading Company Limited Viet Nam Precision engineering 84 85 89 90 91 92 97 98 Adhesive technologies display graphics, packaging materials Food & beverage USA 123 VSIP BAC NINH INDUSTRIAL ZONE – BUSINESS HUB GENERAL INFORMATION Address ▪ Tu Son town, Bac Ninh province, Vietnam Investor ▪ VSIP Bac Ninh Co., Ltd ․ Address: No.1, Huu Nghi Rd, VSIP Bac Ninh, Tu Son town, Bac Ninh province, Vietnam ․ Tel: (84-222) 3 765 668 ․ Fax: (84-222) 3 765 666 ․ Website: http://www.vsip.com.vn/ Contact Person Mr. Cao Phan Tuan (Tony) – Marketing Manager - Mobile: (84) 946 050 520 Email:Tuan.cp@vsip.com.vn Location - 25 km from Hanoi city - 15 km from Noi Bai International Airport - 130 km from Hai Phong seaport - Adjacent to Hanoi-Thai Nguyen Highway and HW no.18, 10 km from Tu Son railway station. Priority Sectors for Investment R&D centers, Data center, Design Center, Headquarter Office, hi-tech industries, Showroom & repair Restricted Sectors for Investment Polluting industries: dyeing, plating etc. Investment Area Minimum wage [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries Lease term ▪ Start date: Feb 2007 ▪ End date: Feb 2057 Minimum Lease Area 3,000 m2 Limit for Construction Height Permitted Construction Rate - 25 meters/ 6 storeys - 50% to 60% Planned area ▪ Total area: 20 ha ▪ Total Leasable area: 10 ha Factory Available for Rent ▪ None Operation Status ▪ Available for immediate construction Occupancy Rate and Number of Projects 0% Number of Korean Projects None Lease fee ▪ Land lease fee: 250 USD/m2/whole project life ▪ Payment Accepting Letter of Offer (Booking fee): 10% of land price - Issuance of the Licenses: 30% of land price - Signing of Land Lease Agreement: 30% of land price - Handover: 30% of land price Operating fee ▪ Management fee: 0.07 USD/m2/month ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: 10,000 VND (~0.4 USD)/m3 ▪ Wastewater treatment fee: 4,700 VND (~0.21 USD)/m3 ▪ Waste treatment fee: According to contract with supplier INFRASTRUCTURE AND FACILITY 124 Financial institution Maritime Bank, Vietcombank - Hưng Yên branch, ACB, Agribank, Techcombank Tax service, State finance office 02 km from Tax Agency Customs Service Inside the industrial zone Logistics Inside the industrial zone Post office Inside the industrial zone Medicare 2km from Tu Son Hospital, Medicare Center Police, public security 24/7 security service. Universities, training facilities, etc. 2km from Tu Son Hospital, Medicare Center Recruitment Support from IZ developers Worker dormitory Worker Dormitory project available and demanding from tenants Worker's child education facility 0.5 km from the nearest Facility One-stop service Inside the zone Road Width 45m, 32m and 24m IT & Tele-communication Facilities Telecommunication systems and international standards are always ready to meet the communication needs Emergency Power generator NA Fire-fighting facility The water supply network for firefighting is designed in conjunction with the potable water supply network, which is located along the roads. The distance among fire hydrants is 120 m 150 m with a diameter of D125 mm. Layout Plan 125 Location Map 126 VSIP BAC NINH II INDUSTRIAL ZONE GENERAL INFORMATION Address ▪ Yen Phong district, Bac Ninh province, Vietnam Investor ▪ VSIP Bac Ninh Co., Ltd ․ Address: No.1, Huu Nghi Rd, VSIP Bac Ninh, Tu Son town, Bac Ninh province, Vietnam ․ Tel: (84-222) 3 765 668 ․ Fax: (84-222) 3 765 666 ․ Website: http://www.vsip.com.vn/ Contact Person Mr. Cao Phan Tuan (Tony) – Marketing Manager - Mobile: (84) 946 050 520 - Email: Tuan.cp@vsip.com.vn Location - 25 km from Hanoi city - 15 km from Noi Bai International Airport - 130 km from Hai Phong seaport - Adjacent to Hanoi-Thai Nguyen Highway and HW no.18, 10 km from Tu Son railway station. Priority Sectors for Investment Electronics, Precision Engineering, FMCG, Automotive components, Logistics, Pharmacy and Medical Devices etc. Restricted Sectors for Investment Polluting industries: dyeing, plating etc. Investment Area Minimum wage [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries Lease term ▪ Start date: Feb 2019 ▪ End date: Feb 2069 Minimum Lease Area 10,000 m2 Limit for Construction Height Permitted Construction Rate - 18 meters/ 4 storeys - 50% to 60% Planned area ▪ Total area: 273 ha ▪ Total vacant leasable area: 200 ha Factory Available for Rent ▪ NA Operation Status ▪ Under Construction Occupancy Rate and Number of Projects ▪ 0% Number of Korean Projects None Lease fee ▪ Land lease fee: 110 USD/m2/whole project life ▪ Payment: Accepting Letter of Offer (Booking fee): 10% of land price - Issuance of the Licenses: 30% of land price - Signing of Land Lease Agreement: 30% of land price - Handover: 30% of land price Operating fee ▪ Management fee: 0.07 USD/m2/month ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: 9,000 VND (~0.4 USD)/m3 ▪ Wastewater treatment fee: 4,700 VND (~0.21 USD)/m3 ▪ Waste treatment fee: According to contract with supplier INFRASTRUCTURE AND FACILITY 127 Financial institution Vietcombank, Agribank, Vietinbank Tax service, State finance office 02 km from Tax Agency Customs Service 4 km from the nearest Customs Agency 15 km from the nearest Inland Container Depot Logistics 4 km from the nearest Logistic Center Post office 2 km from the nearest Mailing Post Office Medicare 2km from Yen Phong Hospital, Medicare Center Police, public security 2km from the nearest Police Station Universities, training facilities, etc. 5km from Vocational Training Center Recruitment Support from IZ developers Worker dormitory 0.5km from the nearest Facility Worker's child education facility 0.5 km from the nearest Facility One-stop service Inside the zone Road Width 45m, 32m and 24m IT & Tele-communication Facilities Telecommunication systems and international standards are always ready to meet the communication needs Emergency Power generator NA Fire-fighting facility The water supply network for firefighting is designed in conjunction with the potable water supply network, which is located along the roads. The distance among fire hydrants is 120 m 150 m with a diameter of D125 mm. Layout Plan 128 Location Map 129 THUAN THANH II INDUSTRIAL ZONE GENERAL INFORMATION Address ▪ Thanh Khuong Commune, Thuan Thanh District, Bac Ninh Province Investor Shun – Far Land Deverlopment Co.ltd (Taiwan) ▪ Address: No 77 Thanh Cong, Chua Dan, Dinh Bang wards, Tu Son town, Bac Ninh Province Contact Person N/A Location - Land: Located alongside the National Road 38 and Ho Town, 30km from Hanoi Capital, 12km from Bacninh City - Seaport: 90km from Haiphong seaport - Airport: 55km from Noi Bai International Airport Priority Sectors for Investment Investment Area Restricted Sectors for Investment Electronics, Precision Engineering Polluting industries: dyeing, plating etc. Minimum wage [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries Lease term ▪ Start date: Feb 2011 ▪ End date: Feb 2061 Minimum Lease Area 10,000 m2 Limit for Construction Height Permitted Construction Rate In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning regulation (QCXDVN 01: 2008/BXD) Planned area Total area: 250 ha Factory Available for Rent NA Operation Status In Operation Occupancy Rate and Number of Projects ▪ 100% Number of Korean Projects 16 companies Lease fee ▪ Land lease fee: 50-100 USD/m2 (depending on location and lease area) Operating fee ▪ Management fee: 0.4 - 0.6 USD/m2/year ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: approximately 0.5 USD/m3 ▪ Wastewater treatment fee: 80% of clean water fee ▪ Waste treatment fee: According to contract with suppliers INFRASTRUCTURE AND FACILITY Financial institution Vietcombank, Agribank, Vietinbank Tax service, State finance office 16.9 km from Tax Agency Customs Service 16.4 km from the nearest Customs Agency 22 km from the nearest Inland Container Depot Logistics 10 km from the nearest Logistic Center Post office 800 m from Thuan Thanh Mailing Post Office 130 Medicare 14 km from Yen Phong Hospital, Medicare Center Police, public security 2km from the nearest Police Station Universities, training facilities, etc. 14 km from Bac Ninh University Recruitment Support from IZ developers Worker dormitory N/A Worker's child education facility N/A One-stop service N/A Road Width N/A IT & Tele-communication Facilities Telecommunication systems and international standards are always ready to meet the communication needs Emergency Power generator N/A Fire-fighting facility Available Layout Plan Location Map 131 Actual View 132 THUAN THANH III INDUSTRIAL ZONE GENERAL INFORMATION Address ▪ Thanh Khuong Commune, Thuan Thanh District, Bac Ninh Province Investor ▪ Khai Son company Ltd ․Address: - Head Office: Thuan Thanh 3 Industrial zone, Thanh Khuong Commune, Thuan Thanh District, Bac Ninh province - Representative: Room 5, 15th floor, Plaschem Building, No 562, Nguyen Van Cu St, Long Bien Dist., Hanoi, Viet Nam ․Tel: (84-241) 387 3062/ (84-24) 974 3582/ (84-24) 220 0495 Fax: (84-24) 220 0494 ▪ Trung Quy Investment Stock company Bac Ninh ․Address: 263 Nguyen Trai road, Vo Cuong ward, Bac Ninh city, Bac Ninh province ․Tel/Fax: (84-241) 3 896 099 Contact Person ▪ Mr. Khai – (84) 913 305 029 - Email: Khaisoncompany@gmail.com Location ▪ Land: Located alongside the Provincial Road 282 (Ho - Phu Thuy Route), to the south of Ho Town, 25km from Hanoi Capital, 17km from Bac Ninh City ▪ Seaport: 85 km from Hai Phong seaport ▪ Airport: 47km from Noi Bai International Airport Investment Area Priority Sectors for Investment Electronics, Precision Engineering Restricted Sectors for Investment Polluting industries: dyeing, plating etc. Minimum wage [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries Lease term ▪ Start date: NA ▪ End date: NA Minimum Lease Area 20,000 m2 Limit for Construction Height Permitted Construction Rate In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning regulation (QCXDVN 01: 2008/BXD) Planned area Total area: 300 ha Factory Available for Rent N/A Operation Status In Operation Occupancy Rate and Number of Projects 100% Number of Korean Projects None Lease fee Land lease fee: 50 - 100 USD/m2/whole project life Operating fee ▪ Management fee: 0.794 USD/m2/year ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: approximately 0.515 USD/m3 ▪ Wastewater treatment fee: 0.73 USD/m3 ▪ Waste treatment fee: According to contract with suppliers INFRASTRUCTURE AND FACILITY Financial institution Vietcombank, Agribank, Vietinbank 133 Tax service, State finance office 16.9 km from Tax Agency Customs Service 16.4 km from the nearest Customs Agency Logistics 22 km from the nearest Inland Container Depot Post office 10 km from the nearest Logistic Center Medicare 800 m from Thuan Thanh Mailing Post Office Police, public security 14 km from Yen Phong Hospital, Medicare Center Universities, training facilities, etc. 2km from the nearest Police Station Recruitment 14 km from Bac Ninh University Worker dormitory Support from IZ developers Worker's child education facility NA One-stop service NA Road Width NA IT & Tele-communication Facilities NA Emergency Power generator Telecommunication systems and international standards are always ready to meet the communication needs Fire-fighting facility NA Layout Plan Location Map 134 NAM SON HAP LINH INDUSTRIAL ZONE GENERAL INFORMATION Address Nam Son Commune, Bac Ninh city, Bac Ninh province Investor KinhBac City Development Holding Corporation ▪ Address: Lot B7, Que Vo Industrial park, Phuong Lieu commune, Que Vo district, Bac Ninh province, Vietnam. ▪ Tel: (84.222) 3634034 ▪ Website: http://www.kinhbaccity.vn Contact Person Ms. Tran Thi Huong - Sales & Marketing Deputy Manager Mobile: (+84) 915-636 139 - Email: tthuong.kbc@gmail.com Location - 5 Km from Bac Ninh City Center - 35 Km from Noi Bai International Airport - 110 Km from Hai Phong Seaport - 02 Km from Highway No.01 and 09 Km from Hanoi – Lang Son (border with China) – NanNing (China) Railway Priority Sectors for Investment Electronics industry, high-tech industry and supporting industries, banking, insurance, research and development activities, consulting ... (Decision No. 293/QĐ-UBND on 12/08/2013) Restricted Sectors for Investment Production of iron, steel, construction materials, paper, chemicals, textiles and textile products ... ((Decision No. 293/QĐ-UBND on 12/08/2013) Investment Area Minimum wage [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries Lease term ▪ Start date: 2010 ▪ End date: 2060 Minimum Lease Area 2 ha Limit for Construction Height Regulated by Bac Ninh Authority Permitted Construction Rate Construction area is not more than 60% of the total leased land lot Planned area ▪ Total area: 300 ha ▪ Total vacant leasable area: 180 ha ▪ Total area with full infrastructure ready to build factory: unavailable Factory Available for Rent Not available Operation Status Under Construction and to be completed by 2021/In Land Clearance Process Occupancy Rate and Number of Projects 0% Number of Korean Projects 0 Lease fee ▪ Land lease fee: 125USD/m2 (exclude VAT) ▪ Factory lease fee: N/A ▪ Payment: - Method: Bank Transfer in VND - Period: 40% after signing In-principle Agreement + 40 % after signing Land Sublease Contract + 20% after Land Hand-over Operating fee ▪ Management fee: N/A ▪ Electricity fee: According to the Circular by Ministry of Industry and Trade, valid from March 16th, 2015 (excluded VAT) for voltage from 22KV-110KV. ▪ Water fee: N/A 135 ▪ Wastewater treatment fee: N/A INFRASTRUCTURE AND FACILITY Financial institution BIDV, VIETIN BANK, VIETCOMBANK, AGRIBANK Tax service, State finance office 10km from Bac Ninh finance office 8km from Bac Ninh provincial tax department Customs Service 9 Km from Customs Agency Bac Ninh 10 Km from ICD Tien Son Logistics 5-7 Km from the nearest Logistic Center Post office 3 km from Vietnam Post Office Medicare 3 Km from Bac Ninh General Hospital Police, public security 2km from Police Station Universities, training facilities, etc. 8km from College of electromechanical & construction Recruitment Available Worker dormitory 5 Km Worker's child education facility 5 Km One-stop service 6 Km from the nearest Facility Road Width Main road: 32m, 4 lanes; By Road: 23m, 2 lanes IT & Telecommunication Facilities Under construction Emergency Power generator Available Fire-fighting facility Under construction Layout Plan 136 Location Map 137 GIA BINH I INDUSTRIAL ZONE GENERAL INFORMATION Address Nam Son and Phuong Lieu commune, Que Vo district, Bac Ninh Province, Vietnam Investor KinhBac City Development Holding Corporation ▪ Address: Lot B7, Que Vo Industrial park, Phuong Lieu commune, Que Vo district, Bac Ninh province, Vietnam. ▪ Tel: (84-222) 3634 034 ▪ Website: http://www.kinhbaccity.vn Contact Person ▪ Tran Thi Huong - Sales & Marketing Deputy Manager - Mobile: +84 - 915-636 139 - Email: tthuong.kbc@gmail.com Location - 06 Km from Bac Ninh City Center - 35 Km from Noi Bai International Airport - 110 Km from Hai Phong Seaport - 03 Km from Highway No.01 and 09 Km from Hanoi – Lang Son (border with China) – NanNing (China) Railway Priority Sectors for Investment Electronics industry, high-tech industry and supporting industries, banking, insurance, research and development activities, consulting ... (Decision No. 293/QĐ-UBND on 12/08/2013) Restricted Sectors for Investment Production of iron, steel, construction materials, paper, chemicals, textiles and textile products ... ((Decision No. 293/QĐ-UBND on 12/08/2013) Investment Area Minimum wage [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries Lease term ▪ Phase 1: 2002 - 2052 ▪ Phase 2: 2007 - 2017 Minimum Lease Area 10,000 m2 Limit for Construction Height Permitted Construction Rate In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning regulation (QCXDVN 01: 2008/BXD) Construction area is not more than 65% of the total leased land lot Planned area ▪ Total area: 611 ha ▪ Total vacant leasable area: Unavailable Factory Available for Rent ▪ Total area: 30,000 m2 (4,000-5,000 per factory, expected at the end of 2019) Operation Status ▪ In operation Occupancy Rate and Number of Projects ▪ 100% ▪ 125 Projects Number of Korean Projects ▪ 46 projects Lease fee ▪ Land lease fee: 85 USD/m2 ▪ Factory lease fee: 3.5 USD/m2/month ▪ Payment: - Method: Bank Transfer in VND - Period: 40% after signing In-principle Agreement + 40 % after signing Land Sublease Contract + 20% after Land Hand-over Operating fee ▪ Management fee: 0.5 USD/m2/year (excluded VAT) ▪ Electricity fee: According to the Circular by Ministry of Industry and Trade, valid from March 16th, 2015 (excluded VAT) for voltage from 22KV-110KV. ▪ Water fee: 8,700 VND (~0.37 USD) /m3 (excluded VAT) ▪ Wastewater treatment fee: 7,200 VND (~0.3 USD)/m3 (excluded VAT) INFRASTRUCTURE AND FACILITY 138 Financial institution BIDV, Vietin Bank, Vietcombank, Agribank Tax service, State finance office 6 km from Bac Ninh Tax Office 7 km from Bac Ninh State Treasury Office Customs Service 2 Km from Customs Agency Que Vo 15 Km from ICD Tien Son Logistics 2 Km from the nearest Logistic Center: Yusen Logistics Post office 1 km from Vietnam Post Office Medicare 4 Km from Bac Ninh General Hospital Police, public security 500 m from Que Vo Police Station Universities, training facilities, etc. 500 m from Viet Nhat College Recruitment Kinh Bac will support in recruitment Worker dormitory 5 Km from the zone Worker's child education facility 5 Km from the zone One-stop service 6 Km from the nearest Facility Road Width Main road: 32m, 4 lanes; By Road: 23m, 2 lanes IT & Tele-communication Facilities The telecommunication system complies with international standards and is always available for communication demand with high data transmission s Emergency Power generator Available Fire-fighting facility Available. Water supply system for firefighting is located along each road. Layout Plan 139 Location Map Actual View . 140 [- This Page is intentionally left blank -] 141 BEN TRE 142 INVESTMENT ENVIRONMENT IN BEN TRE GENERAL INFORMATION Area, Population Geographical Location Adjacent provinces ▪ Area: 2.379,7 km2 ▪ Population: 1.298 million (2022 statistic) ▪ Ben Tre is located in Mekong River Delta Region, 86 km away from Ho Chi Minh city and 120 km away from Can Tho city. ▪ Tien Giang Province to the north, Vinh Long to the west and southwest, Tra Vinh Province to the south. 2022 statistic: ▪ GRDP: 63,585.3 billion ▪ GRDP growth: 7.33% GRDP ▪ GRDP per capita: 49 million VND/year ▪ Economic Structure: - Industry and Construction: 20.58% - Service: 40.63% - Agriculture, Forestry and Fishery: 35.37% 2022 statistic: ▪ Industry - Construction growth: 9.1% ▪ Agriculture, forestry and fishery growth: 4.43% Industry growth ▪ Service growth: 0.2% ▪ Import – Export: - Export turnover: 1,510 milion USD - Import turnover: 570 milion USD PCI ▪ Score: 68.04 – ranked 13th out of 63 cities and provinces in Vietnam (2022). SOCIAL INFRASTRUCTURE ▪ Roadway: National highways 57 and 60 connect Ben Tre with the Mekong Delta region and Ho Chi Minh city. Rach Mieu bridge, Ham Luong bridge, and Co Chien bridge play an important role, connecting Tien Giang, Ben Tre and Tra Vinh. Transportation ▪ Waterway: The coastline is 65 km long. Besides, a 6.000 km-long network of rivers and canals (4 major rivers including Tien river, Ba Lai river and Ham Luong river) is an arterial traffic route from Ben Tre to the Southwestern province and Ho Chi Minh city. ▪ Port: - 1 River port: Tan Cang Giao Long. - 3 Fishing port: Binh Thang, An Thuy, An Nhon. Electricity ▪ Supplied from the national power network. Water 143 Capacity of clean water supply 36.000 m3/day. Education ▪ Training Center of Ho Chi Minh city National University in Ben Tre, 2 colleges, 4 vocational secondary schools, 9 vocational training centers, 10 continuing education centers at district and provincial levels. Medicare ▪ 04 provincial hospitals (1 general and 3 specialize hospital), 01 private general hospital, each district has 01 general hospital. INVESTMENT CONDITION Human resource ▪ Around 70.2% of population in working age (2022). Education level ▪ Trained labor rate: 62.09% (2022). ▪ The minimum salary for the province is applied as follows (see appendix for detail amount): - Area II: including: Ben Tre city, Chau Thanh district. - Area III: including: Ba Tri district, Binh Dai district, Mo Cay Nam district. Salary - Area IV: including: Cho Lach district, Giong Trom district, Mo Cay Bac district, Thanh Phu district. ▪ The lowest wage for trained labor (including those trained by the enterprises) must be at least 7% higher than the above referenced basic salary Investment incentives ▪ Incentives according to government regulations: - Preferential tax rates and exemption period, reduction for corporate income tax. ▪ Prioritized Projects: - Projects in construction and infrastructure of industrial zones and clusters. - Projects in tourism and complex resorts on the dunes, riverside, sea tourist; sea tourist areas, coastal urban areas, sea enroachment. - Factory processing value-added products from agriculture and fishery (coconut, shrimpfish, fruit). Fields Attracting Investment - Trade center, supermarket. - Logistic infrastructure (ports, transportation services, warehouses..) - Health, education (high quality), health care centers for the elderly. - Construction and development of residential areas, new urban areas in Ben Tre city and district centers. - Projects in high-tech agriculture. 144 Map Department of Planning and Investment (Ben Tre Start-up and Investment Promotion Center) ▪ Address: 28 Le Dai Hanh Street, Ward An Hoi, Ben Tre City, Ben Tre Province. ▪ Tel: (84-275) 3 825340/ 3 575691 ▪ Email: duyensipcbentre@gmail.com ▪ Website: www.sipcbentre.gov.vn Industrial Zone Authority ▪ Address: 87A, 30/4 Street, Ward An Hoi, Ben Tre City, Ben Tre Province. ▪ Tel: (84-275) 3 817474 ▪ Fax: (84-275) 3 817718 ▪ Email: bqlcn@bentre.gov.vn Contact LIST OF INDUSTRIAL ZONES IN BEN TRE No Industrial zone Name 1 Giao Long Industrial Zone 2 An Hiep Industrial Zone 3 Phu Thuan Industrial Zone Total Area (ha) Occupancy Rate Status 96,3 100% In Operation 72 100% In operation 231,78 0% Under Construction 145 GIAO LONG INDUSTRIAL ZONE GENERAL INFORMATION Address Investor Contact Person Location Investment Sectors Minimum wage Lease term Minimum Lease Area An Phuoc commune and Giao Long commune, Chau Thanh district, Ben Tre province Project Management Board of Infrastructure Development of Industrial Zones ▪ Address: 87A, 30/4 Street, Ward An Hoi, Ben Tre City, Ben Tre Province. ▪ Tel: (84-275) 3 836688 ▪ Fax: (84-275) 3 817675 Mr. Son – Manager – (84) 918820868 ▪ Highway traffic: 06km away from National high way No.60, 12km away from the center of Ben Tre City, ≤ 16Km away from expressway Trung Luong - Ho Chi Minh city. ▪ Port: 4.5 km from Tan Cang Giao Long Port ▪ Airport: 89km from Tan Son Nhat International Airport Priority Sectors for Investment Investment Restricted Sectors Multi-Industry Production of iron, steel, construction materials, chemicals... [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries ▪ Start date: 10/2007 ▪ End date: 10/2077 10,000 m2 Limit for Construction Height Permitted Construction Rate Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean projects Lease fee Operating fee In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning regulation (QCXDVN 01: 2008/BXD) ▪ Total area: 96.3 ha None In operation ▪ Occupancy Rate: 100% ▪ Number of Projects: 36 3 projects ▪ Land lease fee: 206,730 – 320,000 VNĐ/m2/50 years ▪ Management fee and Infrastructure maintenance fee: 5,168 – 6,300 VNĐ/USD/m2/year (VAT not included) ▪ Electricity fee: as regulated by the Government ▪ Water fee: 10,000 VND/m3 ▪ Wastewater treatment fee: 3,101 – 4,200 VNĐ/m3 (VAT not included) List of Projects in Industrial Zone 146 No. Name of Company Nationality Business line 1 Unihwasin Vina Co., Ltd Korea Silkscreen printing 2 Gen Nex Apparel Co., Ltd Green Creative Trading Production Joint Stock Company Wally Vietnam Packaging Co., Ltd Family Vietnam Handbag Textile Co., Ltd Thailand Thailand Make clothes Sewing accessories China China Jea-Must Vietnam Co., Ltd Unisoll Vina Co., Ltd Coronet Vietnam Co., Ltd Himaru Ben Tre Co., Ltd Sigma Vietnam Industry Co., Ltd China Korea Italy Korea China Min Wie Vietnam Co., Ltd Alliance One Garment Co., Ltd Viet World Co., Ltd China Thailand Thailand Furukawa Automotive Systems VN Co., Ltd Jacobi Carbons Vietnam Co., Ltd PungKook Ben Tre 1 TV Co., Ltd Nidec Tosok Precision VN 1 TV Co., Ltd Japan Branch of Puratos Grand-Place Vietnam Co., Ltd Yong Qing International Co., Ltd Genoa Group Co., Ltd Belgium plastic bag Weaving, producing backpacks and bags Garment processing Garment production Synthetic leather production Producing backpacks and bags Producing all kinds of towels, shoes Producing all kinds of towels Make clothes Processing coconut products and noodles, pho Manufacture of car wiring harness Production of activated carbon Producing outsourcing, bags Manufacture of components in car gearboxes Processing cocoa beans Phuong Dong Production Trading Joint Stock Company Dinh Phu My Coconut Co., Ltd CNN An Phat Joint Stock Company Dong Hai Ben Tre Joint Stock Company Kien Giang Canned Food Joint Stock Company Winbee Food & Beverage Production and Business Co., Ltd Vietnam 27 Mekong Plastic Joint Stock Company (Ben Tre Branch) Vietnam Production of plastic and paper packaging 28 Viet Thanh Garment Trading Joint Stock Company Duc Hau Long CNC and Lighting Equipment Joint Stock Company Vietnam Make clothes Vietnam Manufacture of lighting equipment 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 29 France Korea Japan China China Vietnam Vietnam Vietnam Vietnam Vietnam 147 Make clothes Manufacture of all kinds of garments Production of industrial plastic packaging Producing coconut products Production of steel structures Paper production and business Seafood production, canned food Food and confectionery production 30 31 32 33 34 35 Asia Coconut Processing Joint Stock Company Thanh Cong Energy Service Joint Stock Company Ben Tre Packaging One Member Company Limited Nam Viet Pharmaceutical Co., Ltd VietNat One Member Company Limited Vietnam Processing coconut products Vietnam Steam, electricity Vietnam Asean Packaging Import-Export Joint Stock Company Vietnam Producing paper carton packaging Producing functional foods Food production, natural essential oils Producing of paper packaging Vietnam Vietnam 148 AN HIEP INDUSTRIAL ZONE GENERAL INFORMATION Address Investor Contact Person Location Investment Sectors Minimum wage Lease term Minimum Lease Area An Hiep commune, Chau Thanh district, Ben Tre province Project Management Board of Infrastructure Development of Industrial Zones ▪ Address: 87A, 30/4 Street, Ward An Hoi, Ben Tre City, Ben Tre Province. ▪ Tel: (84-275) 3 836688 ▪ Fax: (84-275) 3 817675 Mr. Son – Manager – (84) 918820868 ▪ Highway traffic: 10km away from National high way No.60, 12km away from the center of Ben Tre City, ≤ 16Km away from expressway Trung Luong - Ho Chi Minh city. ▪ Port: 20 km from Tan Cang Giao Long Port ▪ Airport: 97 km from Tan Son Nhat International Airport Priority Sectors for Investment Investment Restricted Sectors Multi-Industry None [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries ▪ Start date: 4/2007 ▪ End date: 4/2077 10,000 m2 Limit for Construction Height Permitted Construction Rate Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean projects Lease fee Operating fee In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning regulation (QCXDVN 01: 2008/BXD) ▪ Total area: 72 None In operation ▪ Occupancy Rate: 100% ▪ Number of Projects: 16 None ▪ Land lease fee: 248.000 VNĐ/m2/50 years ▪ Management fee and Infrastructure maintenance fee: 5.168 VNĐ/USD/m2/year (VAT not included) ▪ Electricity fee: as regulated by the Government ▪ Water fee: 10,000 VND/m3 ▪ Wastewater treatment fee: 3.101 VNĐ/m3 (VAT not included) 149 List of Projects in Industrial Zone No. [STT] Name of Company [Tên dự án] 1 C.P Vietnam Joint Stock Company - Ben Tre Frozen Branch C.P Vietnam C.P. Joint Stock Company - Aqua feed manufacturing and trading industry C.P Vietnam Joint Stock Company Biotechnology Workshop Branch Thailand Viet Uc Co., Ltd. aqua feed Covina Co., Ltd Ben Tre Sugar Joint Stock Company Luong Quoi Coconut CB Co., Ltd - Thanh Vinh CB Factory 1 Australia Vietnam Vietnam Vietnam biotechnology products and chemicals used in shrimp farming Processing coconut products Sugar production Processing coconut products Processing coconut products 8 Luong Quoi Coconut CB Co., Ltd - Thanh Vinh CB Factory 2 Vietnam Processing seafood products 9 Hai Huong Seafood Joint Stock Company CBTS Export Factory Hai Huong Seafood Joint Stock Company CBTA Go Dang An Hiep One Member Co., Ltd Vietnam Processing aquatic food Vietnam Food Processing Vietnam One Member Company Limited Go Dang Ben Tre Truc Giang Seafood Processing Co., Ltd CBTS Hung Vuong Ben Tre Co., Ltd Nam Viet Brick Manufacturing Joint Stock Company Vietnam Seafood processing and fishmeal Food Processing 2 3 4 5 6 7 10 11 12 13 14 15 Nationality [Quốc gia] 150 Thailand Thailand Vietnam Vietnam Vietnam Business line [Ngành nghề kinh doanh] Seafood processing Production of aquatic feed Seafood processing Production of unburnt bricks Seafood processing PHU THUAN INDUSTRIAL ZONE GENERAL INFORMATION Address Investor Contact Person Location Investment Sectors Minimum wage Lease term Minimum Lease Area Phu Thuan commune, Binh Dai district, Ben Tre province Ben Tre Province Civil and Industrial Construction Investment Project Management Board ▪ Address: 14C1 Dong Khoi Boulevard (8th floor of Sacombank building), Ward 4, Ben Tre City, Ben Tre Province. ▪ Tel: (84-275) 3 824798 Mr. Hiep – Manager – (84) 913657856 ▪ Highway traffic: 10km away from National high way No.60, 17km away from the center of Ben Tre City, ≤ 16Km away from expressway Trung Luong - Ho Chi Minh city. ▪ Seaport: 95 km from Cat Lai port, 10 km from Tan Cang Giao Long Port ▪ Airport: 102 km from Tan Son Nhat International Airport Priority Sectors for Investment Investment Restricted Sectors Multi-Industry None [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries ▪ Start date: 4/2007 ▪ End date: 4/2077 10,000 m2 Limit for Construction Height Permitted Construction Rate Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean projects Lease fee Operating fee In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning regulation (QCXDVN 01: 2008/BXD) ▪ Total area: 231 None Under Construction ▪ Occupancy Rate: 0% ▪ Number of Projects: None None ▪ Land lease fee: under construction ▪ Management fee and Infrastructure maintenance fee: under construction ▪ Electricity fee: as regulated by the Government ▪ Water fee: 10,000 VND/m3 ▪ Wastewater treatment fee: under construction 151 [- This Page is intentionally left blank -] 152 BINH DINH 153 INVESTMENT ENVIRONMENT IN BINH DINH USD/VND 23.510 GENERAL INFORMATION Area 6071 km2 Population 1,5 million people (2022) Geographical Location Adjacent provinces ▪ Binh Dinh is located in South Central Coast region. ▪ The province runs 110 km north-sou0th. It lies 1,065km south from Hanoi, 686 km north from Ho Chi Minh City, 300 km south from Da Nang City, and 300 km east from Bo Y Border Gate to Laos in Kon Tum Province. ▪ Binh Dinh is surrounded by Quang Ngai province to the north, Gia Lai province to the east and Phu Yen province to the south. 2022 statistic: GRDP Industry growth Import - Export ▪ Real GRDP (billion VND): 106.349 ▪ GRDP growth: 8,57% ▪ GRDP per capita (million VND/year): 70,79 (4,49014143972979 billion USD) (2997 USD) ▪ Economic structure: - Industry - Construction: 30,05% - Agriculture. forestry and fishery: 27,38% - Service: 38,16% ▪ Industry - Construction growth: ▪ Agriculture, forestry and fishery growth: 8,55% 3,26% ▪ Service growth: 12,61% Import turnover (billion USD): 0.46 (Growth rate: -0,01) Export turnover (billion USD): 1.330 (Growth rate: 20.3%) PCI The major economic sectors of the province are fisheries and mineral, agricultural and forestry processing industries, of which the manufacture of wood products makes Binh Dinh's reputation as a big exporter of furniture. ▪ 70% of its population involving in agricultural activities, including rice, cereal, fruit and vegetable crop cultivation, livestock growing and pepper growing (esp. in some mid-land or mountainous areas where the soil is suitable for the crop). Binh Dinh is also suitable for industrial tree crops such as cashew, acacia and eucalyptus. ▪ With a good number of wood tree plantations in the province and Quy Nhon international Seaport situated in Quy Nhon, there have been some good development and establishment of wood processing and indoor and outdoor furniture factories in Binh Dinh Province. ▪ Whilst most industrial establishments for export purposes concentrates in Quy Nhon or its vicinity, garment plants/factories are usually spread out to districts areas such as Tay Son, Phu Cat, Phu My, Hoai Nhon and Hoai An for accessing to and attracting cheap laborers in the rural areas. 66.65 Ranking 21 Key Industry SOCIAL INFRASTRUCTURE Transportation ▪ Roadway: Roads: National Highway 1A (118 km), National Highway 1D (21.6 km) and National Highway 19 (69.5 km); National Highway 19B (60 km); National Highway 19C (151.4 km); sufficient system of provincial, district and rural roads. ▪ Railway: The national railway (150 km long) going through the province (Dieu Tri is a national station). ▪ Waterway: Quy Nhon international port handling about 4 million tonnes per year. It is the most convenient international gateway between the Central Highlands and neighboring countries of Cambodia and Laos; Thi Nai port handling about 0.8 million tonnes per year. Nhon Hoi port with capacity of 12 million tonnes per year is now under construction. ▪ Airway: Phu Cat Airport (domestic), 30 km from Quy Nhon City. 154 Electricity Water Education & Training Medicare ▪ According to EVN's price frame (for manufacturing industries, the average price is 1,536 VND/kWh - 2,759 VND/kWh) ▪ In accordance with Decision No.1052/QD-UBND dated March 31, 2022 of Binh Dinh Provincial People's Committee - Becamex Industrial Park: 8,500 VND/m3 - Industrial parks: 12,100 VND/m3 ▪ 203 preschools, 243 primary schools, 146 junior high schools, 50 senior high schools, 5 colleges, 3 universities, 01 science center ▪ Proportion of population participating in health insurance: 96.02% ▪ Percentage of health stations with doctors: 100% ▪ Rate of communes meeting national standards on health care: 100% ▪ Number of hospital beds per 10,000 people: 35 beds ▪ Percentage of rural population using hygienic water: 100% INVESTMENT CONDITION Human resource 60% of population are in the working age (2022) Education level Trained labor rate: 60,9% (2022) ▪ The minimum salary for the province is applied as follows: - Area I (4,680,000 VND/month): N/A - Area II (4,160,000 VND/month): N/A Salary - Area III (3,640,000 VND/month): An Nhon town - Area IV (3,250,000 VND/month): The districts of Hoai Nhon, An Lao, Phu Cat, Phu My, Tuy Phuoc, Tay Son, Van Canh, Vinh Thanh, Hoai An (Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages paid to employees working under employment contracts) Investment incentives Fields Attracting Investment Investment attraction situation Industrial zones ▪ Incentives according to government regulations: - Exemption and reduction for land and water rent fee - Preferential tax rates and exemption period, reduction for corporate income tax. - Import tax exemption 5 groups of key sectors: ▪ Industrial development; ▪ Tourism development; ▪ Development of port and logistics services, including seaports and airports; ▪ Development of agriculture, forestry and fishery based on high technology; ▪ Urban economic development in association with urbanization ▪ Total development investment capital in the province by 2022 is estimated at 29,949.7 billion VND, exceeding 10.3% of the year plan and increasing by 10.1% compared to 2021. ▪ State capital reached 5,531.8 billion VND, up 1.2%; non-state capital reached 21,109.7 billion VND, up 4.7%; foreign direct investment capital reached 3,308.2 billion VND. ▪ The localities attracting many projects and investment capital are Quy Nhon city, Hoai Nhon and An Nhon towns, and Tuy Phuoc and Tay Son districts . The province is home to six industrial parks, including Nhon Hoi EZ on the largest land plot of over 14,000 hectares. 155 Map Department of Planning and Investment Binh Dinh ▪ Address: No. 35 Le Loi Street, Quy Nhon City, Binh Dinh Province ▪ Tel: Tel: (84) 0256. 3818888 Contact ▪ Email: Email: ipcbinhdinh@gmail.com ▪ Contact person: - Mr. Nguyen Thuc Dinh - Director - Tel: 84-91401231 - Email: dinhnt@skhdt.binhdinh.gov.vn 156 LIST OF INDUSTRIAL ZONES IN BINH DINH PROVINCE No Industrial zone Name Total Area (ha) Occupancy Rate Status 1 BECAMEX VSIP BINH DINH HOA HOI INDUSTRIAL PARK NHON HOI INDUSTRIAL PARK - PARK A Phu Tai Industrial park 1,425ha 8% in phase I 266.18 ha - Ready for construction and obtaining LURC (Active) In Operation 394ha 58% 345,8 ha 98%. 2 3 4 MAP OF INDUSTRIAL ZONES IN BINH DINH 157 BECAMEX VSIP BINH DINH GENERAL INFORMATION Address Investor Contact Person Location Investment Sectors Subdivision 7, Nhon Hoi Economic Zone, Binh Dinh Province Becamex Binh Dinh Joint Stock Company - Address: 11 Ngo May Str, Nguyen Van Cu Ward, Quy Nhon City, Binh Dinh Province - Tel: 0256 3636 668 - Email: info@becamexbinhdinh.com.vn - Website: www.becamexbinhdinh.com.vn ▪ Hien Nguyen (Bob), Marketing Director, +84 98 9966 936, hien.nt@becamexbinhdinh.com.vn ▪ Kang Ho-dong, Representative in Korea, +82 1053187861, becamex@naver.com - 19km from Quy Nhon City - 32km from Phu Cat Airport - 22km from Quy Nhon International Seaport - 9km from Dieu Tri railway station - 8km to 1A highway, 11km to 1D highway, 18km to 19 highway Priority Sectors for Investment Investment Restricted Sectors Minimum wage Lease term Minimum Lease Area - Electronics & electrical - Automobile manufacture and assembly - Manufaturing mechanical engineering - Products of support industries for hi-tech - Textile and garment industry - Leather and footwear - Food and beverage industry - Logistic, warehouse and support industry - Textile dyeing - Plating Area IV According to Decree 38/2022/ND-CP Start date: 2020 End date : 2070 1 ha Limit for Construction Height According to QCVN 01:2021/BXD national technical regulation on construction planning Permitted Construction Rate The maximum construction density of a land lot for building factories and warehouses is 70%. In case of factory construction with more than 05 floors , the maximum construction density is 60%. Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean projects Lease fee ▪ Total area: 1,425ha (1,000ha for industrial land + 425ha for service & urban land) ▪ Total vacant leasable area: 653ha (would be available in phases) ▪ Total area with full infrastructure ready to build factory: > 200ha N/A ▪ Ready for construction and obtaining LURC (Active) ▪ 8% in phase I ▪ 2 projects ▪ 1 project ▪ Land lease fee: USD60/m2/VAT exclusive ▪ Factory lease fee: N/A 158 Operating fee ▪ Management fee: USD0.07/m2/month/VAT exclusive (10% increase every 5 years) ▪ Electricity fee: Normal hours: VND 1.555/kwh Mon – Sat: (04:00 to 09:30; 11:30 to 17:00; 20:00 to 22:00) Sun: 04:00 to 22:00 Peak hours: VND 2.871/kwh Mon – Sat: (09:30 to 11:30, 17:00 to 20:00) Off-peak hours: VND 1.007/kwh Daily from 22:00 to 04:00 ▪ Water fee: ~USD0.63/m3 ▪ Wastewater treatment fee: USD 0.36/m3 (10% increase every 5 years) INFRASTRUCTURE AND FACILITY Financial institution Tax service, State finance office Customs Service 19km from Bank for Investment and Development of Viet Nam –Binh Dinh Branch (BIDV) 13km from Department of Taxation 23km from State finance office 22km from Customs Agency 22km from the nearest Inland Container Depot Logistics Trans-shipment point of North-South railway station next to the Industrial Park Post office 12.5km from nearest Post office (pick up service available) Medicare 21km from nearest hospital (Binh Dinh General Hospital), walk-in clinics available within 5km Police, public security 13km from nearest Police station, local stations available within 5km Universities, training facilities, etc. 23km from Quy Nhon University Recruitment Worker dormitory Worker's child education facility One-stop service Road Width Job centers in Quy Nhon City ~ 21km Social housing for workers are available provided by Becamex 3km from the nearest Kindergarten 22km from the Public Administration Center of Binh Dinh province Main road: 32.5m, Branch road: 25m Communication Infrastructure of industrial park Available Emergency Power generator Available Fire-fighting facility Available 159 Location/ Map 160 List of Projects in Industrial Zone No Name of Company Investment Value (million USD) Nationality Business line 1 KURZ Vietnam 100 Germany Stamping tech 2 HanHwang Ind 18 Korea Auto parts manufacturing 161 NHON HOI INDUSTRIAL PARK - PARK A GENERAL INFORMATION Address Investor Contact Person Location Investment Sector Minimum wage Nhon Hoi Commune, Phuong Mai peninsular, Quy Nhon City, Binh Dinh Province. Sai Gon - Nhon Hoi Industrial Park Corp., • Address: Lot A2.01, Road N3, Nhon Hoi Industrial Zone, Nhon Hoi Commune, Quy Nhon City, Binh Dinh Province. • Tel: +84 256 3822 427 • Email: kcnnhonhoia@gmail.com • Website: www.nhonhoiip.vn Mr. Phan Vu Tuan - Position: Sales Director - Phone: +84 936 356 656 - Email: tuanpvsnp@gmail.com Adjacent location - 6km from Quy Nhon City; - 1.065km from Ha Noi - the capital; - 30km from Phu Cat Airport; - 8km from Quy Nhon Port; - 15km from Dieu Tri Railway Station; - National high way. • Priority Sectors for Investment - Consumer goods industry group. - Food and pharmaceutical industries. - Construction industry, production of interior - exterior furniture. - Supporting industries; Textile industry; Electronic industry. - Industrial park service industry. • Restricted Sectors for Investment Sectors related to plating process, textile dyeing that pollute the environment. [Area 4] VND 3,640,000 (150 USD/month) - According to Decree 38/2022/ND-CP. Lease term 50 years, from the date investor receives the Decision of Investment Policy/Investment Registration Certificate. Minimum Lease Area 20.000m2 Limit for Construction Height - Factory: Permitted Construction Rate + The height of building depends on the technology line. + If the height of 45 meters or more above the ground must be approved by the Operation Department - Ministry of Defense under the height of works under Decree No. 32/2016 / NDCP of May 6, 2016. - Service building: 5-9 floors - Factory: 70% - Service building: 50% Factory Available for rent - Total area: 394ha - Total vacant leasable area: 126,73ha - Total area with full infrastructure ready to build factory: 126,73ha - Total are: 8.000m2 Operation Status Active Occupancy Rate and Number of Projects - Occupancy rate: 58% - Number of projects: 52 projects Number of Korean projects 0 Planned area 162 Lease fee Operating fee - Land lease fee: Price policy is issued by the Company at different times and may be changed depending on land location, land scale and properties of the project. - Factory lease fee: >1.5 USD/m2/month - Maintenance fee (Phí duy tu): 0,2 USD/m2/year (free for the first 3 years and shall be paid at the fourth year) - Electricity fee: According to Price-list of EVN: (excluding VAT) + Low load hours: 1.100 VND /KWh (22 pm to 4 am). + Peak load hours: 3.076 VND /KWh (9.30 am-11.30 am and 5 pm-8 pm) + Off-peak load hours: 1.685 VND /KWh (other times) - Water fee: 15.800VND/m3 (price in 2023, excluding VAT) - Wastewater treatment fee: According to the regulation of Binh Dinh Province People’s Committee. Current price for referesnce: COD ≤ 75: 5.121 VND/m3 COD ≤ 150: 6.091 VND/m3 151 ≤ COD ≤ 200: 10.446 VND/m3 201 ≤ COD ≤ 300: 15.669 VND/m3 301 ≤ COD ≤ 400: 20.892 VND/m3 401 ≤ COD ≤ 600: 31.338 VND/m3 COD > 600: 41.784 VND/m3 - Waste treatment fee: contact the service supplier for details. INFRASTRUCTURE Energy supply (Electricity) Water supply Wastewater treatment Wastewater type allowed Internal traffic system Floor load capacity (ton/m2) Internet & Tel. connection Situation for foreigners (hotels, leisure time, ...) - Nhon Hoi 1 transformer station 110/22KV with capacity 2x63MVA. - The power grid of 22KV is supplied to the fence of factory - A transformer station shall be installed in the factory by Binh Dinh Power Company in accordance with investor’s needs. - Light electricity system in the IP. - Water pumping station with capacity 24.000m3 /day (phase 1) and 100.000m3/day (phase 2). - Water supply pine line is connected to the fence of the factory. - Fire fighting devices are installed along the internal roads in the IP. Price in 2023: 15.800 VND/m3 (excluding VAT). Pipelines for collecting waste water D=300 to D=600 to Nhon Hoi wastewater treatment plant. - Standard of waste water: Waste water is required to treat to meet - Type B of the National Technical Regulation on Industrial Wastewater (QCVN 40:2011/BTNMT) before being discharged to the drainage wastewater system of the IP. Concrete road with H30-XB80 loading capacity. - Main roads: Lane width: 65-80m; - Branch roads: Lane width: 65m, 45m, 29m, 27m, 20m; - Total length of roads in the IP: 30km; Axle load is 30tons Investors sign contract with service providers (VNPT or Viettel) for using services - Hotels and accommodation locating in Quy Nhon City (6km away from Nhon Hoi A IP). - Restaurant (local food, seafood..) and other entertainment (supermarket, cinema, coffee shop….) 163 List of Projects in the Industrial Park No. Name of Company Nationality Business line 1 Minerals Joint Stock Company - Quy Nhon Vietnam Standard factory area for rent 2 Nhon Hoi Concrete Joint Stock Company Vietnam Concrete factory 3 An Hai Seafood Co., Ltd Vietnam Frozen seafood processing factory 4 Phuc Son Cement single share-holder Co., Ltd Hoa Phat Binh Dinh single share-holder Co., Ltd Silic Mien Trung single share-holder Co., Ltd Taiwan Cement grinding and transfer station Vietnam Electrical refrigeration manufacturing and assembling factory Silicon Metal factory 5 6 Vietnam Vietnam 8 Southern Gas Trading Joint Stock Company, Central Branch in Binh Dinh Petrolimex Da Nang Gas Co., Ltd Vietnam LPG extraction station and painting, tank inspection and maintenance factory. LPG filling station 9 Sa Thach Nhon Hoi Co.,Ltd Vietnam Concrete factory 10 Binh Dinh Power Company Vietnam 11 Bidiphar Non-Betalactam Co., Ltd Vietnam Nhon Hoi 110KV transformer station and branches High-tech Bidiphar pharmaceutical production 12 Bidiphar Betalactam Co., Ltd Vietnam High-tech Bidiphar pharmaceutical production 13 Bidiphar Hi-Tech Co., Ltd Vietnam High-tech Bidiphar pharmaceutical production 14 Thien Phuc Binh Dinh Joint Stock Company Vietnam 15 Rapid Vietnam Bio-Nutrition Joint Stock Company Vietnam 16 Marubeni Lumber Vietnam Co., Ltd Factory producing pharmaceutical glass packaging and industrial gas. The factory produces probiotics extracted from marine fish, fertilizers from marine fish, and feeds from marine fish. Wood and polywood processing factory 17 DPack Co., Ltd Vietnam High-end packaging factory 18 Binh Dinh Telecommunications (VNPT) Vietnam 19 Vietnam 20 Hai Minh Construction Trading Production Joint Stock Company Vinh Khang Glass Co., Ltd Providing telecommunications services in Nhon Hoi Industrial Park - Zone A The factory produces unburnt bricks, commercial concrete and concrete structures. Construction glass processing factory 21 Sao Viet Trading Service Co., Ltd Vietnam 22 Vietnam 23 Long Van Phat Service Investment Production Joint Stock Company Fujiwara Binh Dinh Co., Ltd 24 Phong Dien Power Joint Stock Company Vietnam 25 My Nghe Binh Dinh Joint Stock Company Vietnam 26 Tingco Binh Dinh Joint Stock Company Vietnam 27 Binh Dinh Pharmaceutical - Medical Equipment Joint Stock Company (BIDIPHAR) QUIHUB Industrial Park Investment and Development Joint Stock Company Vietnam 7 28 Japan Vietnam Vietnam Vietnam 164 Factory manufacturing and assembling educational equipment Factory areas, service offices for rent Expanding 110Kv line, Nhon Hoi A Industrial Park transformer station Expanding 110Kv line belonging to Phuong Mai 3 wind power plant Motor vehicle registration center Producing and trading in soft drinks and canned products Building a warehouse to preserve pharmaceuticals, medicinal herbs, medical equipment and vaccines Factories for rent 29 Bao Phat Glass Co., Ltd Vietnam Factory for processing tempered glass 30 Mekong Binh Dinh Co., Ltd Vietnam Factories for rent 31 Duc Toan Binh Dinh Co., Ltd Vietnam 32 Transportation Training Center Vietnam High-end interior and exterior wood processing factory Motor vehicle training center 33 Moveo Binh Dinh Co., Ltd Vietnam 34 B&D Lingerie Vietnam Co., Ltd 35 Fago Animal Feed Co., Ltd Vietnam 36 Thien Bac Co., Ltd Vietnam 37 HD Group Joint Stock Company Vietnam 38 Eco Nhon Hoi Printing & Packaging Co.,Ltd Vietnam Factory producing animal feed - veterinary medicine FAGO Mien Trung. High-end interior and exterior wood processing factory High-end interior and exterior wood processing factory Produce packaging 39 Tan Dai Hung General Co.,Ltd Vietnam Produce wicker & wood furrniture 40 Thach Cat Tien Co.,Ltd Vietnam General service center 41 Central Indoor Furniture Co.,Ltd Vietnam Produce furniture 42 SaiGon Rise Co.,Ltd Vietnam Produce wood products and mattress 42 Tan Dai Nam General Co.,Ltd Vietnam Produce wicker & wood furniture HongKong 165 Exhibition center to introduce automotive auxiliary industry. Textile facrorty PHU TAI INDUSTRIAL PARK GENERAL INFORMATION Lease term Tran Quang Dieu ward, Quy Nhon city, Binh Dinh province. Sai Gon - Nhon Hoi Industrial Park Corp., • Address: Lot A2.01, Road N3, Nhon Hoi Industrial Zone, Nhon Hoi Commune, Quy Nhon City, Binh Dinh Province. • Tel: +84 256 3822 427 • Email: kcnnhonhoia@gmail.com • Website: www.nhonhoiip.vn Mr. Phan Vu Tuan - Position: Sales Director - Phone: +84 936 356 656 - Email: tuanpvsnp@gmail.com Adjacent location Phu Tai Industrial Park is located in Tran Quang Dieu and Bui Thi Xuan wards, Quy Nhon city, located on the intersection of National Highway 1A and National Highway 19; 12km from Quy Nhon seaport; 20km from Phu Cat airport; 2km from Dieu Tri railway station. • Priority Sectors for Investment Processing agricultural, forest products, food, animal feed; Electronic and mechanical assembly; Processing stone of all kinds, producing building materials; Packaging manufacturer; Other industries such as garment, shoes, beer, gas extraction. 2048 Planned area - Total area: 345,80 ha Factory Available for rent - Total are: 8.000m2 Operation Status Active Occupancy Rate and Number of Projects 95% Number of Korean projects 0 Lease fee Land rent: raw land according to provincial regulations, average 1,500 VND/m2 Address Investor Contact Person Location Investment Sector INFRASTRUCTURE Power supply system: complete - Water supply and drainage system: complete - Wastewater and waste treatment system: completed centralized wastewater treatment plant with capacity of 2000m3/day -Telecommunication system, internet: complete - Fire prevention and fighting system: complete - Internal traffic: complete 166 [- This Page is intentionally left blank -] 167 BINH DUONG 168 INVESTMENT ENVIRONMENT IN BINH DUONG USD/VND 23.510 GENERAL INFORMATION Area Population Geographical Location Adjacent provinces 2694,43 km2 0,245 million people (2022) ▪ Binh Duong is located in Southeast region. ▪ Located in the Eastern part of the Southern region of Vietnam, and being the part of the Southern Key Economic Zone. Binh Duong province to the north, Ho Chi Minh City (HCMC) to the south and southwest, Tay Ninh province to the west, and Đong Nai province to the east 2022 statistic: ▪ Nominal GRDP (billion VND): GRDP ▪ Real GRDP (billion VND): 166.000 ▪ GRDP growth: 8,00% ▪ GRDP per capita (million VND/year): 166,00 (7,00865526704665 billion USD) (1891409 USD) ▪ Economic structure: Industry growth Import Export Key Industry PCI Ranking - Industry - Construction: 69,41% - Agriculture. forestry and fishery: 2,95% - Service: 20,15% ▪ Industry - Construction growth: 5,67% ▪ Agriculture, forestry and fishery growth: 3,10% ▪ Service growth: 9,50% Import turnover (billion USD): 25,80 (Growth rate: 0,01) Export turnover (billion USD): 35,70 (Growth rate: 0,09) ▪ High-tech application of livestock production continues to develop with 148 chicken farms; 255 pig farms; 45 duck farms; 01 dairy farm. ▪ The new rural construction program continued to be promoted. ▪ Industrial production index in 2022 increased by 8.8% over the same period. In which, the mining industry increased by 14.8% over the same period; processing and manufacturing industry increased by 8.7%; production and distribution of gas, hot water, steam and air-conditioning electricity increased by 7.7%; water supply, management and treatment of waste and wastewater increased by 9.9%. 65.13 36 SOCIAL INFRASTRUCTURE ▪ Roadway: Transportation - National Road (NR) no. 13, NR no. 14, the HCMC Route and the Trans-Asian Highway. - Binh Duong is only 10–15 kilometres from Tan Son Nhat International Airport and important ports. ▪ Binh Duong has thermal power plants, wind power plants, and solar power plants through investments from Electricity Korea and Denmark▪ ▪ Binh Duong has underground water sources mainly fresh water with 5 main aquifers, including 4 porous aquifers and 1 fissure aquifer. Total underground water potential exploitation reserve in the province is about Water 2,180,000m3/day, equivalent to about 797 million m3/year. Education & 8 Universities, 9 Vocational Schools and 59 Training Centers (as of 2019) Training Medicare N/A INVESTMENT CONDITION Human resource 62% of population are in the working age () Education level Trained labor rate: 80.5 (2021) 169 ▪ The minimum salary for the province is applied as follows: - Area I (4,680,000 VND/month): Thu Dau Mot City, Thuan An, Di An; Ben Cat and Tan Uyen Towns; Bau Bang, Bac Tan Uyen, Dau Tieng, Phu Giao districts - Area II (4,160,000 VND/month): N/A Salary - Area III (3,640,000 VND/month): N/A - Area IV (3,250,000 VND/month): N/A (Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages paid to employees working under employment contracts) Investment incentives Fields Attracting Investment Investment attraction situation ▪ Incentives according to government regulations: - Exemption and reduction for land and water rent fee - Preferential tax rates and exemption period, reduction for corporate income tax. - Import tax exemption Industries (IT, electronics, micro-electronics, biotechnology, robotics, 3D printing, electric vehicles, supporting industries, consumer goods, food and beverage processing). Services such as logistics, warehouse, cold storage, modern infrastructure (urban area, trade center, education and training). For foreign direct investment, from the beginning of the year to December 15, 2022, attracted US$3.1 billion, up 48.8% over the same period. In which: the number of projects with new investment certificates: 69 projects with a total registered capital of 1.9 billion USD (corresponding to a decrease of 2.8% and an increase of 3 times over the same period) and 22 capital adjustment projects (down 18.5% over the same period) with a total capital of 23.7 million USD (equivalent to 2.9% over the same period); the number of projects contributing capital, buying shares 172 projects (up 3.6% over the same period) with a total capital of 1,169.7 million USD (up 74.3% over the same period). Binh Duong has 30 industrial parks (IP) with a total area surface of over 12,670 hectares and an average occupancy rate of 87.4 percent as well as another 12 industrial clusters with a total area surface of 790 hectares and an occupancy rate of 67.4 percent. Some of the most developed IPs in the province include VSIP, VSIP2, My Phuoc IP, and Dong An IP. Particularly for this year, the province has started the construction of two 1,000-hectares industrial parks to increase the supply of industrial land with an eye on foreign investors. Industrial zones The first phase is on the Vietnam-Singapore III (VSIP III) industrial park covering 1,000 hectares in Tan Uyen Town and Bac Tan Uyen District, which started in March. The project with a total investment of US$280 million got the green light from the government in November 2016. This is the 10th project of VSIP, a leading industrial park developer in Vietnam. The other project will be on the 1,000-hectare Cay Truong industrial park in Bau Bang District which is expected to begin in the second quarter of this year. With these IPs, the province would prioritize high-tech tenants and labor-intensive industries such as apparel and footwear. Industrial parks have helped Binh Duong transform from a rural area into an industrial hub. Statistics show that industries and services account for 97 percent of the province’s total economic output. 170 Map Department of Planning and Investment Binh Duong ▪ Address: 4th Floor, Tower A, centralized administrative center of Binh Duong, Le Loi Street Intersection Angle - Hung Vuong Boulevard - Hoa Phu Ward - Ho. Thu Dau Mot - Binh Duong Province ▪ Tel: 0274) 3822926 Contact ▪ Email: sokhdt@binhduong.gov.vn ▪ Contact person: - Mr. Mai Hung Dung - Director 84.913.950.666 dungmh@binhduong.gov.vn 171 LIST OF INDUSTRIAL ZONES IN BINH DUONG PROVINCE No Industrial zone Name Total Area (ha) Occupancy Rate Status 1 BECAMEX BAUBANG 2 Binh An Industrial Park 3400ha 90% In Operation 25,9 ha 96,04%. In Operation 3 Binh Duong Industrial Park 16,5 ha 97% In Operation 4 Dai Dang Industrial Park 274,35 ha 45,82% In Operation 5 Dat Cuoc Industrial Park 212,84 ha 38%. In Operation 6 Dong An Industrial Park 138,7 ha - In Operation 7 Dong An Industrial Park 2 158,1 ha 86,59%. In Operation 8 Kim Huy Industrial Park 213,63 ha 50.52% In Operation 9 Mai Trung Industrial Park 50,55 ha 65% In Operation 376,92 ha 88%. In Operation 10 My Phuoc Industrial Park 172 BECAMEX-BAUBANG INUDSTRIAL PARK GENERAL INFORMATION Address Investor Contact Person Location Investment Sectors Minimum wage Lease term Minimum Lease Area Limit for Construction Height Permitted Construction Rate Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Lai Uyen Commune, Bau Bang District, Binh Duong Province BECAMEX IDC ▪ Address: 08 Hung Vuong street, Hoa Phu ward, Thu Dau Mot city, Binh Duong province, Vietnam ▪ Tel: +84 274 3 822 655 ▪ Email: info@becamex.com.vn ▪ Website: becamex.com.vn ▪ Tran Le Chi Cong- Deputy Director - +84 913 685 916- cong.tlc@becamex.com.vn ▪ Kang Ho-dong - Representative in Korea - +82 1053187861-becamex@naver.com Adjacent location: - 55km from Ho Chi Minh City - 25km from Binh Duong New City - 60km from Tan Son Nhat Int’l airport; - 60km from Cat Lai port; - Adjacent to the national road 13, My Phuoc-Tan Van road Expressway from Ho Chi Minh City-Binh Duong-Binh Phuoc is supposed to be built by 2026. 5km from this expressway Priority Sectors for Electronics, machinery, Investment food processing, automobile parts, new material, Bio, Pharmaceutical, Supporting industry, … Investment Restricted Sectors Natural rubber processing, tanning, washing – cleansing, dyeing, plating/anodizing, basic chemical production, detergent, colorant, printing ink, paper production [Area II] According to Decree 2022/ND-CP dated 15th November 2022 ▪ Start date: April 27, 2016 ▪ End date: April 26, 2066 1ha 50m Maximum 70% of the land area ▪ Total area: 3,400ha (2,000ha for industrial land + 1,400ha for service & urban land) ▪ Total vacant leasable area: 300ha (would be available in phases) ▪ Total area with full infrastructure ready to build factory: 50ha ▪ 30ha Ready for construction and obtaining LURC ▪ 90% ▪ 167 projects 173 Number of Korean projects Lease fee Operating fee ▪ 21 ▪ Land lease fee: USD150/m2(VAT exclusive) ▪ Factory lease fee: USD4~4.5/m2/month (VAT exclusive) ▪ Management fee: USD0.04/m2/month (VAT exclusive) ▪ Electricity fee: - Standard hour: VND1,685/kwh - Off-peak hour: VND1,100/kwh - Peak hour : VND3,076/kwh ▪ Water fee: VND13,800/m3 ▪ Wastewater treatment fee: USD0.25/m3 ▪ Waste treatment fee: None INFRASTRUCTURE AND FACILITY Financial institution Inside of IP. BIDV, Vietcombank, Sacombank, ACB bank, Techcombank.... Tax service, State finance office Inside of IP Customs Service Inside of IP Inside of IP Logistics Inside of IP Post office Inside of IP Medicare Inside of IP. BAUBANG HEALTH CENTER My Phuoc General Hospital, 12km from the IP Inside of IP Police, public security Universities, training facilities, etc. EIU Int’l Univ. German Tech, vocational training centers…… Recruitment Inside of IP Worker dormitory Inside of IP Worker's child education facility Inside of IP One-stop service Inside of IP Road Width Communication Infrastructure of industrial park Emergency Power generator Fire-fighting facility 24~64m VNTT provides ADSL, High-Speed Internet service National grid is connected with two substation Available, inside of IP 174 Location/Map 175 List of Projects in Industrial Zone No Company Name Country Business lines 1 KISWIRE VN CO., LTD (AGM) Korea Details: - Manufacture and processing of steel wires used in automobile manufacturing and related industries; Manufacture and processing of cables used in automobile manufacturing and related industries. 2 SAMHOO CO., LTD Korea Forging, stamping, pressing and rolling of metal; refining of metal powder Details: Manufacture and processing of zinc oxide, zinc powder 3 KYUNGBANG Vietnam CO., LTD Korea Fiber production 4 SUNWOOD VINA CO., LTD Korea Production of other products from wood; production of products from bamboo, bamboo, straw, shavings and Tet materials Details: Manufacture and processing of wooden doors, wooden door frames, materials from wood, building materials, other products from wood. 5 FINE CHEMICAL Vietnam CO., LTD Korea KYUNGBANG Vietnam CO., LTD SOOHO VINA CO., LTD Korea Fiber production Korea Manufacture of other general-purpose machines Details: Manufacture of static electric paint sprayers, automatic conveyor belts, paint spray chambers (liquid, static electricity), industrial robots, static electric paint mixers. Production of clean rooms used for surface treatment before electrostatic paint coating. Production of static paint dust bombs Production of paint spray solid-state actuators. 8 T.O.P OUTDOOR VINA CO., LTD (LIVE OUTDOOR) Korea Production of exercise equipment, sports equipment Details: Production of tents, tent covers, temporary tents, sheets, carpets, floorboards, ship covers 9 KOLON BINH DUONG INDUSTRIAL CO., LTD/KVT-1 TYPE PRODUCTION PROJECT Korea Tire cord, airbag 10 KOLON BINH DUONG INDUSTRIAL CO., LTD Korea Dormitory 11 JM TEXTILE VINA CO., LTD (JIN MYOUNG CORPORATION LTD) KYUNGBANG Vietnam CO., LTD SEWANG VINA CO., LTD Korea Manufacture of diamond weaving Details: Manufacture and processing of shuttle fabric. Korea Fiber production Korea Manufacture of diamond weaving Details: Manufacture and processing of shuttle fabric. KOREA FINE CHEMICAL Vietnam CO., LTD Korea 6 7 12 13 14 Footwear production Manufacture of plastic label accessories, plastic logos, plastic sheets for the footwear, garment and handbag industries by high-rise, thermal press method 176 15 VINA GLOBAL SEAH CO., LTD Korea Manufacture of other metal products that have not yet been excreted. Details: Networked steel pipe production 16 DSR VINA CO., LTD Korea Manufacture of strands and nets. Details: Manufacture and processing of synthetic ropes used in docking, lifting, and shipbuilding 17 HAN MEN M3 VINA CO., LTD Korea 18 19 20 21 PARK'S VINA CO., LTD TURBO ENTERPRISE KINSCO CO., LTD DONGIL RUBBER BELT VIETNAM CO.,LTD DUKSUNG VINA CO., LTD NCL Vietnam CO., LTD / MARUTSU (Vietnam) CO., LTD Korea Korea Korea Korea MOROFUJI Vietnam CO., LTD Japan 22 23 24 Korea Japan Wood composite production Manufacture of other products from wood; produce products from bamboo, cork, straw, and plaiting materials Details: Producing and processing all kinds of frames, frame stands Producing all kinds of bags and bags made of polythene and paper, Producing related accessories. 25 26 NH ENGINEERING CO., LTD CONDOR Vietnam CO., LTD Japan Japan Manufacturing metal structures. Other production is not yet classified Details: Manufacture, processing and assembly of carpets made of cloth, plastic, wood; manufacture, processing and assembly of cleaning, cleaning tools; manufacture and processing of household products (fiber toilet sheets, indoor slippers, waterspray bath caps); production, processing and assembly of waste products 27 CONDOR Vietnam CO., LTD Japan Other production is not yet classified Details: Manufacture, processing and assembly of carpets made of cloth, plastic, wood; manufacture, processing and assembly of cleaning, cleaning tools; manufacture and processing of household products (fiber toilet sheets, indoor slippers, waterspray bath caps); production, processing and assembly of waste products Japan Production of toys, games Details: Toy manufacturing and processing Japan Garment of clothing (except clothing from fur leather) Details: Production and export of sportswear, men's clothing, women's clothing, bedclothes, underwear, uniforms and the like (BB FACTORY)/ BW CN DEVELOPMENT JSC 28 29 T'S LAB CO., LTD (Factory) / BW CN DEVELOPMENT JOINT STOCK COMPANY ATAGO Vietnam GARMENT CO., LTD 30 AMON Vietnam CO., LTD Japan Manufacture of spare parts and parts for motorized vehicles and motor vehicles Details: Manufacture of electrical wiring sets, rearview mirrors, power lines, car parts. 31 Vietnam SIMON SAFETY INDUSTRIES CO., LTD Japan Footwear production 32 SMF Vietnam CO., LTD Japan spare parts, automobile parts, electric appliances 177 33 TENG TSUN CO., LTD/ TENG TSUN CO., LTD 34 NS MILLENNIUM Vietnam CO., LTD 35 36 37 38 39 LEE WEN_JUNG DAI CHI Vietnam CO., LTD VIET_STAR CO., LTD CHAN SHENG CO., LTD LONG TRIUMPH CO., LTD Taiwan Malaysia_ĐL Taiwan Taiwan Taiwan Taiwan Taiwan Manufacture of products from Plastic Manufacture of suitcases, bags and the like, manufacture of cushions Details: Production of chair and bed mattress of all types Production of metal structures Weaving, raking, grinding, sewing all kinds of clothes (do not carry out the process of washing and dyeing) 40 U TEX CO., LTD Taiwan Basic chemical production detail: Manufacture of finishing dye additives. 41 CAT TR CO., LTD (BICHEN CO., LTD/Mr. BENNY LIN) Taiwan Manufacture of medical, dental, orthopedic and rehabilitation equipment and instruments Details: Producing all kinds of medical equipment.\ 42 SHIH HUNG CO., LTD / MR CHRIS CHANG Taiwan Manufacture of beds, cabinets, tables and chairs 43 EMC VN CO., LTD Taiwan Manufacture of paints, varnishes and similar coatings; manufacture of printing ink and mastics Details: Producing raw materials and additives of all kinds used in the production of paints and oils; production of paints, oils and additives used in the construction, industrial, metal and plastic industries; processing and manufacturing all kinds of sanding materials: water glue, paper glue, tape and paper 44 O_TA PRECISON INDUSTRY CO., LTD YACHT TECHNOLOGY TECHNOLOGY CO., LTD ( Vietnam ) Taiwan Taiwan Manufacture of batteries and accumulators Details: manufacturing all kinds of batteries (batteries, batteries and accumulators).Manufacturing all kinds of UPS; computers and related equipment; battery cover made of plastic; fiberglass processing. 46 CHEN HO TEXTILE CO., LTD (Vietnam) Taiwan Fiber production Details: Manufacture of industrial fibers, textiles and color fibers; Production of thread, thread, thread and thread used in the textile industry. 47 YUE CHANG CO., LTD (Vietnam) Taiwan Fiber production Details: Textiles and colored fibers for industrial use 48 HUGE_BAMBOO TEXTILE INDUSTRIAL CO., LTD Taiwan Textile finishing Details: Manufacture of dyed fabrics (no dyeing processing). 49 POLYTEX FAR EASTERN CO., LTD (Vietnam) Taiwan Fiber production 50 51 52 REN DING TRADE LTD CHAIN YARN Vietnam CO., LTD TAITAN Vietnam CO., LTD Taiwan Taiwan Taiwan 45 Fiber production Manufacture of batteries and accumulators Details: - Manufacture of accumulators; - Manufacture of electrode plate components and battery-related machinery and equipment; - Processing battery materials. 178 53 WOLPAK Vietnam PACKAGING CO., LTD /DDK Vietnam INVESTMENT & DEVELOPMENT CO., LTD Taiwan Trading in real estate, land use rights belonging to owners, users or renters Details: Factory for rent. Building and selling factories. Buy and sell factories .Buy assets attached to land . 54 DAI HAO TEXTILE CO., LTD Taiwan Finishing of textile products Details: Production, processing, dyeing of fabrics, all kinds of textile products, gluing fabrics 55 DE LICACY Vietnam INDUSTRIAL CO., LTD Taiwan Fiber production 56 CAPCO WAI SHING Vietnam CO., LTD Taiwan Producing products from plastic Details: Producing and processing all kinds of plastic clothes hangers, plastic clothespins 57 58 SINGTEC CO., LTD ADVANCE WISDOM CO., LTD (SINGTEC) Taiwan Taiwan Production of knitted fabrics Production of knitted fabrics 59 ALPHA BRAVE CO., LTD Taiwan Manufacture of knitted fabrics, crocheted fabrics and other nonwovens Details: Production of knitted fabrics 60 YU WEI Vietnam CO., LTD Taiwan Non-ferrous metal casting Details: - Manufacture of mold products of all kinds; metal molds; plastic injection mold; mold reinforcement production; Manufacture of mold-fixing components (mold cores, gaskets, punching tools) (Enterprises can only operate after completing investment procedures as prescribed by law); - Manufacture of copper poles; - Producing metal connectors (cast lead, from lead raw materials, not lead recycling) 61 TE ENRICHI CO., LTD Taiwan Manufacture of knitted fabrics, crocheted fabrics and other nonwovens Details: Production of warp knitted fabrics 62 ZHONG JU VIET NAM INDUSTRIAL CO., LTD Taiwan Production of woven fabrics Details: Flat weave, warp fabric 63 HI_TECH J&B Vietnam CO., LTD Taiwan Finishing of textile products Details: Producing and gluing film, making waterproof, coating, fabric gluing 64 LEEDA Vietnam CO., LTD / DDK Vietnam INVESTMENT & DEVELOPMENT CO., LTD T-STAR ELECTRICAL CO., LTD/ DDK INVESTMENT & DEVELOPMENT CO., LTD Vietnam CN SWR CO., LTD (LUXWELL HOLDING CO., LTD) Taiwan Footwear production Details: Footwear Production; Footwear border; Leather Taiwan Installation of electrical systems Taiwan Producing other products from rubber Details: Raw-Edge (RE) loading line; PV/PVC conveyor belts, conveyor belts (Curoa) 67 BRANCH OF A Chau (VN) NUTRITION COMPANY LIMITED IN BINH DUONG Taiwan Production of feed for livestock, poultry and fisheries Details: Production of livestock feed, poultry and aquaculture feed, additives for livestock feed, poultry and aquaculture. Processing of feed for livestock, poultry and fisheries for domestic individuals and organizations 68 PAIHONG Vietnam CO., LTD Taiwan Production of needle weaving, knitting and other nonwoven fabrics Details: Fabrication of all kinds. 65 66 179 69 PAIHONG Vietnam CO., LTD Taiwan Production of needle weaving, knitting and other nonwoven fabrics Details: Fabrication of all kinds. 70 SON YUNG SHYANG Vietnam CO., LTD/ DDK INVESTMENT & DEVELOPMENT CO., LTD. Taiwan Manufacture of paints, varnishes and similar coatings; manufacture of printing ink and mastics Details: Production of paints, oil paints, pigments, printing inks, water-based paints, solvents (Not manufactured or processed at the head office) 71 POLYTEX FAR EASTERN CO., LTD (Vietnam) Taiwan 72 TOP POINT INTERNATIONAL Vietnam CO., LTD / DDK INVESTMENT & DEVELOPMENT CO., LTD. Taiwan Production of bicycles and bicycles for the disabled Details: Manufacture of hooks (brake hands, support legs), suspension tips, frame joints, oil shock absorption cover, oil storage box, chain neck. 73 EVERISE CO., LTD/ EVERYOUNG GROUP CO., LTD / DDK INVESTMENT & DEVELOPMENT CO., LTD Vietnam CN DDK Vietnam INVESTMENT & DEVELOPMENT CO., LTD Taiwan Production of other specialized machines Details: Manufacture and manufacture of machinery and wastewater treatment equipment; drinking water purifier Taiwan Real estate business, land use rights owned by owner, owner or tenant Details: Leasing the factory. Building and selling factories. Buy and sell factories, buy assets associated with land. 75 THUY DUONG INTERNATIONAL CO., LTD (Vietnam) Taiwan Manufacture of knitted fabrics, crocheted fabrics and other nonwovens Details: Producing knitted fabrics (not performing dyeing, washing and bleaching). 76 SPOTY Vietnam CO., LTD / HOTTA VIET NAM CO., LTD TRANSFER Trung Quốc 77 LEEDA Vietnam CO., LTD / DDK INVESTMENT & DEVELOPMENT CO., LTD. Taiwan Footwear production Details: Footwear Production; Footwear border; Leather 78 HUNG Nghiep WAYTEX (Vietnam) CO., LTD/ DDK Vietnam INVESTMENT & DEVELOPMENT CO., LTD Taiwan Manufacture of beds, cabinets, tables and chairs; Manufacture of woven plastic and textioene mesh fabrics; Manufacturer of seats; Manufacture of ready-made goods (except for clothing), Manufacture of tents and umbrellas 79 POLYTEX FAR EASTERN CO., LTD (Vietnam) Taiwan Fiber production Details: - Manufacture and processing of polyester synthetic fiber products including filament long fiber; - Manufacture and processing of short cut cotton fiber (coton spun fiber), natural fiber and synthetic fiber 80 WAYTEX INTERNATIONAL CO., LTD /DDK Vietnam INVESTMENT & DEVELOPMENT CO., LTD TRANSFER MPF Vietnam CO., LTD /DDK INVESTMENT & DEVELOPMENT CO., LTD. Taiwan Production of beds, cabinets, tables, chairs Details: Production of beds, cabinets, tables, chairs Taiwan Production of vehicles and other transportation equipment that have not yet been classified Details: Manufacture of baby strollers, strollers of all types, trolley components 74 81 Manufacture of suitcases, bags and the like, manufacture of seat cushions Details: - Manufacture of bags, tool bags, backpacks, suitcases - Manufacture of bags for pets 180 82 83 LACQUER CRAFT Vietnam FURNITURE CO., LTD /WEALTHY BRIGHT (HK) LIMITED RT INDUSTRIES CO., LTD (LTREE RESOURCES) Taiwan Other production is not yet classified Details: Furniture production, interior decoration. Taiwan Production of other products from wood; production of products from bamboo, bamboo, straw, shavings and Tet materials Details: Wooden sofa production and fabric sofa, mattress Trung Quốc Producing cutlery, hand tools and common metal products Details: hammer, ax, sledgehammer, chisel, mallet…. 84 POWER CREATION INDUSTRIAL CO., LTD 85 GRAND AURORA CO., LTD Taiwan Producing products from plastic Details : Producing packaging from plastic ; plastic zipper, zipper head (do not use plastic scrap materials). 86 FILTRAFINE (Vietnam) CO., LTD Taiwan Manufacture of other metal products that have not yet been excreted Details: Manufacture and processing of filters, filter bags, etc. etc. made of metal parts. 87 88 REN DING TRADING LTD QUAN YU Vietnam INDUSTRIAL CO., LTD / DDK Vietnam INVESTMENT & DEVELOPMENT CO., LTD. TRANSFER Taiwan Taiwan 89 JIA BAO RUI Vietnam CO., LTD Taiwan 90 START WIN INVESTMENT CO., LTD/ DDK Vietnam INVESTMENT & DEVELOPMENT CO., LTD TRANSFER ALTOP Vietnam Precision Stamping Co., Ltd/DDK Vietnam INVESTMENT & DEVELOPMENT CO., LTD Taiwan CALLPACK PRINTING & PACKAGING CO., LTD/ DDK Vietnam INVESTMENT & DEVELOPMENT CO., LTD PHARMA ALIANCE Vietnam CO., LTD/ DDK Vietnam INVESTMENT & DEVELOPMENT CO., LTD Taiwan Taiwan Trading in real estate, land use rights belonging to owners, users or renters Details: Factory for rent. Building and selling factories. Buy and sell factories .Buy assets attached to land . ZHAO SHUN INDUSTRY CO., LTD/ DDK Vietnam INVESTMENT & DEVELOPMENT CO., LTD. TRANSFER Taiwan Manufacturing and processing sandblasting machines, industrial vacuuming equipment, industrial exhaust gas treatment equipment, conveyor systems, ball-shooting machines, polishing machines, iron racks (scaffolding, frames, iron shelves) ); sandblasting. 91 92 93 94 Taiwan Other production n.e.c Details: Manufacture of wooden and metal stairs, manufacture of wooden or metal stair accessories, balustrades, posts, pillar boxes, turners, stair treads, crimping heads .....) Enterprises do not perform plating, processing and coating processing of metal surfaces. Details: Producing hollow plastic sheets Producing other metal products not elsewhere classified Details: Producing and processing stamping products from aluminum alloy (such as lawn mower cylinders, motorcycle engine boxes, automobile gearboxes, etc.) Bicycle front forks, agricultural machinery components, telecommunications equipment radiators, Medical ultrasound machine bottoms, etc.) 181 95 GUAN SHENG POLYMER TECHNOLOGY CO., LTD / DDK Vietnam INVESTMENT & DEVELOPMENT CO., LTD Taiwan Production of Plastic Granules (TPE - Thermoplastic Elastomer and TPR - Thermoplastic Rubber) 96 GOLDEN VIETNAMTEX CO., LTD/ DDK Vietnam INVESTMENT & DEVELOPMENT CO., LTD transfer FUMAO Vietnam MECHANICAL CO., LTD Taiwan Production of ready-made goods (except for clothing) Details: Production and processing of ready-made goods Taiwan Production and processing of oil pressure gauges, high pressure watches, industrial watches GLODEN VIETNAMTEX CO., LTD/DDK Vietnam INVESTMENT & DEVELOPMENT CO., LTD CHEONG MING Vietnam PAPER PACKAGING CO., LTD Taiwan Production and processing of ready-made goods. Taiwan Production of wrinkled paper, wrinkled cardboard, packaging from paper and cardboard Details: Carton box set production, lining paper AMPACS INTERNATIONAL CO., LTD / DDK Vietnam INVESTMENT & DEVELOPMENT CO., LTD SUMMIT ELEC-TECH INDUSTRIAL CO., LTD INDUSTRIAL Vietnam Taiwan Manufacture of wired headphones, wireless headphones Taiwan Manufacture of pumps, compressors, hoses and other valves Manufacture of pumps, compressors, hoses and other valves details: manufacture of solenoid valves from categories 102 FOJO INTERNATIONAL CO., LTD Taiwan Producing products from plastic Processing plastic injection molding, plastic industry. 103 REGA Vietnam CO., LTD Taiwan Production of flower printing processing and digital flower printing on fabrics and paper, production of flower press on fabrics. 104 FUMEI CO., LTD Taiwan manufacturing, processing, manufacturing all kinds of springs 105 SUNFIBER Vietnam Co., Ltd. Taiwan Manufacture of artificial fiber Details: Manufacture of garment materials such as pad, lining, fabric and cotton construction. Doughing from cloth and cotton (no washing process). 106 107 PAIHONG Vietnam CO., LTD YUYING INTERNATIONAL GROUP (HK)CO.,LIMITED/JH INTERNATIONAL TRADE (HK) LIMITED MONOGRAM HOME Vietnam CO., LTD Taiwan Hong Kong Manufacture of fabrics of all kinds. Garment of clothing from leather (except fur leather) Hong Kong Production of beds, cabinets, tables, chairs Details: Manufacture and processing of wooden cabinet door panels and related products made of wood, wooden cabinet body panels and related products made of wood; Production of wood cabinet processing 109 MONOLAND WOOD PRODUCT Vietnam CO., LTD Taiwan 110 RONG DAL WOOD INDUSTRIES CO., LTD Taiwan 111 AMPACS INTERNATIONAL CO., LTD CHEMICAL CANLEN Vietnam CO., LTD Taiwan 97 98 99 100 101 108 112 Taiwan 182 113 114 HONOR TALENT CO.,LTD HAN CHANG INVESTMENT CO., LTD (Vietnam) Taiwan Taiwan 115 MINGZHI VIETNAM PLASTIC CO., LTD Taiwan CYCLETECH (Vietnam) CO., LTD JING, GUANGHUA JIA BAO RUI CO., LTD HONG KONG ZHONGTONG INDUSTRY LIMITED Taiwan 120 CHYFLY . TECHNOLOGY AND TRADING CO., LTD Taiwan 121 TRAN VUNG/ ZHONG YI FENG INTERNATIONAL CO.,LIMITED Taiwan 122 ANTOOL KIMBER TOOLS CO., LTD AN VIET MANUFACTURING CO., LTD (Factory)/ BW CN DEVELOPMENT JSC Taiwan FORTUNA INVESTMENT AND TRADING COMPANY LIMITED Vietnam FORTUNA INVESTMENT AND TRADING CO., LTD (store the file Fortuna 6,000m2) Vietnam 116 117 118 119 123 124 125 126 Do not count the order number because this lot has been split into 3 lots FORTUNA INVESTMENT AND TRADING COMPANY LIMITED Production and processing of plastic beads, plastic components, metal molds Taiwan Taiwan Taiwan USA Producing products from plastic Details: Manufacture of cover products used to cover machinery, equipment and tools Buying and selling building materials, interior decoration products Buying and selling building materials, interior decoration products Vietnam Buying and selling building materials, interior decoration products FORTUNA INVESTMENT AND TRADING COMPANY LIMITED Vietnam FORTUNA INVESTMENT AND TRADING COMPANY LIMITED Vietnam 129 INVESTMENT SERVICES CONSULTING JSC (ISC CO.) Vietnam 130 TAN CAN CAN INVESTMENT JOINT STOCK COMPANY Vietnam Trading in real estate, land use rights belonging to owners, users or renters Details: Factory leasing, buying and selling ready-built factories (according to the provincial planning) 131 HSING CHENG CO., LTD (Vietnam/ Mr. YEH, CHIEHCHENG/ KIM ANH WOOD MANUFACTURER CO., LTD/ VIETNAM CONSTRUCTION INVESTMENT CONSULTATION CO., LTD/ BINH SPRING WINDOWS JOINT STOCK COMPANY / BUSINESS AND DEVELOPMENT JOINT STOCK Vietnam Manufacture of machines for textile, garment and leather industries This class includes: Manufacture of machinery used in the textile, dyeing and sewing industries: specifically for washing, cleaning, wringing, drying, steaming, pressing, bleaching, dyeing, glazing, finishing, coating or impregnating : yarn, textiles, finished textiles 127 128 Buying and selling building materials, interior decoration products Buying and selling building materials, interior decoration products 183 COMPANY DUONG (TDC) transfer 132 CARGILL Vietnam CO., LTD Vietnam Production of feed for livestock, poultry and fisheries Details: Production of livestock, poultry and fisheries feed 133 AN BINH PAPER JOINT STOCK COMPANY _ Vietnam Vietnam Manufacture of pulp, paper and board Details: Producing sets of paper, paper and paperboard 134 SUCCESSFUL FEED PROCESSING CO., LTD Vietnam 135 PHU AN VINH INVESTMENT JOINT STOCK COMPANY/HUNG MINH WOOD CO., LTD/ NGOC LAN COMPANY - DOCTOR KHUONG PHU AN VINH INVESTMENT JOINT STOCK COMPANY BINH DUONG NUTIFOOD NUTRITIONAL FOOD JSC Vietnam DAI THANH PHUONG JSC/ BRANCH OF GY CONSTRUCTION COMPANY LIMITED TRANSFER NGAN HOANG PHAT SERVICES AND REAL ESTATE COMPANY LIMITED Vietnam ANH SAO DUONG JOINT STOCK COMPANY NGAN HOANG PHAT Real Estate Services TRADING COMPANY LIMITED ( LUU VN DIFFERENT TO THI HOI HOA ) HOANG NGAN PHAT REAL ESTATE TRADING SERVICE COMPANY LIMITED (LUU VN DIFFERENT TO THI HOI HOA) TRINH GIA PHAT REAL ESTATE CO., LTD Vietnam MY PHUOC HOSPITAL JOINT STOCK COMPANY INTERNATIONAL DAIRY JOINT STOCK COMPANY Vietnam 136 137 138 139 140 141 142 143 144 145 Manufacture of drugs, pharmaceutical chemicals and medicinal herbs Details: Producing cosmetic products, processing latex Vietnam Vietnam Processing milk and dairy products Details: Production of liquid milk, powdered milk - Processing fresh milk in liquid form, pasteurized milk, bactericidal milk, homogenized or heated - Processing milk-based beverages; Manufacture of ice cream from fresh milk, pasteurized, sterilized, homogenized milk - Manufacture of dried or condensed milk sweetened or unsweetened - Manufacture of milk or solid ice cream; manufacture of butter, yoghurt, cheese or curd - Manufacture of liquid yogurt, manufacture of casein or lac to - Manufacture of ice cream and other edible ice products such as fruit ice cream Building non-residential houses Vietnam Manufacture of other specialized machines Details: Manufacture of woodworking machines, circular saw blades and accessories Vietnam Leasing factory Vietnam Leasing factory Vietnam Vietnam 184 146 147 148 149 150 151 BINH DUONG TOKYO AND INDUSTRIAL SERVICES CO., LTD L&D INVESTMENT MANUFACTURING AND TRADING CO., LTD ARDA CO., LTD SUKMONO VIET NAM CO., LTD (to lease the workshop to Jimmy Food) JIMMY HUNG ANH FOOD CO., LTD (June 2011 under construction) RHINE PRECISION ALLOY (Vietnam) CO., LTD\HTL FURNITURE Vietnam CO., LTD Vietnam Vietnam Ý Netherlands Manufacture of beds, cabinets, tables and chairs Manufacture of pasta, noodles and similar products Netherlands Manufacture of pasta, noodles and similar products Singapore Manufacture of suitcases, bags and the like, manufacture of seat cushions 152 EMIVEST FEEDMILL VIET NAM CO., LTD Malaysia Production of feed for livestock, poultry and fisheries 153 EMIVEST FEEDMILL Vietnam CO., LTD - BRANCH OF VETERINARY DRUG PRODUCTION Malaysia Production of feed for livestock, poultry and fisheries Denmarkh footwear production Denmarkh footwear production Denmarkh footwear production Netherlands Vietnam real estate business 154 ECCO (Vietnam) CO., LTD factory/ BW CN DEVELOPMENT JSC 155 156 157 ECCO (Vietnam) CO., LTD factory/ BW CN DEVELOPMENT JSC ECCO (Vietnam) CO., LTD - Land lease BW BAU BANG DEVELOPMENT CO., LTD BB01/BW INDUSTRIAL DEVELOPMENT JOINT STOCK COMPANY (PROJECT 02 IN BAU BANG Industrial Park) 158 A. Minh signed the contract DKW GLOBAL COMPANY LIMITED (FACTORY) 159 AN VIET PRODUCTION CO., LTD -Land for rent 160 TOP GLOVE Vietnam CO., LTD/INVESTMENT SERVICES CONSULTING JSC (ISC CO.) TRANSFER BW BAU BANG INDUSTRIAL DEVELOPMENT JOINT STOCK COMPANY 161 162 BW INDUSTRIAL DEVELOPMENT JOINT STOCK COMPANY Thái Lan USA Malaysia Manufacture of plastic products Producing products from plastic Details: Manufacture of cover products used to cover machinery, equipment and tools Producing products from plastic Details: Producing gloves from plastic, manufacturing other products from plastic. Netherlands Vietnam Warehousing and storage of goods Netherlands Vietnam Warehousing and storage of goods (store the HQ/TH file basket) 185 163 164 BW INDUSTRIAL DEVELOPMENT JOINT STOCK COMPANY (store the HQ/TH file basket) A.J PLAST PUBLIC COMPANY LIMITED Netherlands Vietnam Warehousing and storage of goods Thái Lan Manufacture products from plastic 165 ARNEPLANT Vietnam CO., LTD (stored in VNam BB) Tây Ban Nha 166 BW BAU BANG DEVELOPMENT CO., LTD BB06 (stored in Chinese BBMR) BW BAU BANG DEVELOPMENT CO., LTD BB05 (stored in Chinese BBMR) Netherlands 167 Manufacture of shoe insoles Netherlands 186 BINH AN INUDSTRIAL PARK GENERAL INFORMATION Address Binh Thang Ward - Di An City - Binh Duong Binh Thang Investment Development Joint Stock Company Investor Investment Sectors Lease term Priority Sectors for Investment ▪ Start date: 2003 Minimum Lease Area N/A Limit for Construction Height Permitted Construction Rate N/A Planned area Operation Status Occupancy Rate and Number of Projects Number of Korean projects Lease fee Garment; Garment accessories; Paper packaging… N/A Total area: 25,9ha N/A ▪ 96,04%. N/A 60 USD/m2 Chưa bao gồm VAT INFRASTRUCTURE AND FACILITY Financial institution Inside of IP. BIDV, Vietcombank, Sacombank, ACB bank, Techcombank.... Tax service, State finance office Inside of IP Customs Service Inside of IP Inside of IP Logistics Inside of IP Post office Inside of IP Police, public security Inside of IP Recruitment Inside of IP Worker dormitory Inside of IP Worker's child education facility Inside of IP One-stop service Inside of IP 187 Fire-fighting facility Available, inside of IP View 188 DAI DANG INUDSTRIAL PARK GENERAL INFORMATION Address Phu Tan Ward - Thu Dau Mot City - Binh Duong Dai Dang Construction and Investment Co., Ltd Investor Investment Sectors Lease term Priority Sectors for Investment ▪ Start date: 2005 Minimum Lease Area N/A Limit for Construction Height Permitted Construction Rate N/A Planned area N/A 274,35 ha Factory Available for Rent N/A Operation Status N/A Occupancy Rate and Number of Projects Number of Korean projects Lease fee Woodworking and interior decoration; Mechanical assembly; Agricultural processing; Power electronics; Garment, packaging, footwear; Assembling and repairing agricultural, forestry and transportation machines ▪ 45,82% N/A 60 USD/m2 Chưa bao gồm VAT INFRASTRUCTURE AND FACILITY Financial institution Inside of IP. BIDV, Vietcombank, Sacombank, ACB bank, Techcombank.... Tax service, State finance office Inside of IP Customs Service Inside of IP Inside of IP Logistics Inside of IP Post office Inside of IP Police, public security Inside of IP Recruitment Inside of IP Worker dormitory Inside of IP 189 Worker's child education facility Inside of IP One-stop service Inside of IP Fire-fighting facility Available, inside of IP 190 DAI DANG INUDSTRIAL PARK GENERAL INFORMATION Address Phu Tan Ward - Thu Dau Mot City - Binh Duong Dai Dang Construction and Investment Co., Ltd Investor Investment Sectors Lease term Priority Sectors for Investment ▪ Start date: 2005 Minimum Lease Area N/A Limit for Construction Height Permitted Construction Rate N/A Planned area N/A 274,35 ha Factory Available for Rent N/A Operation Status N/A Occupancy Rate and Number of Projects Number of Korean projects Lease fee Woodworking and interior decoration; Mechanical assembly; Agricultural processing; Power electronics; Garment, packaging, footwear; Assembling and repairing agricultural, forestry and transportation machines ▪ 45,82% N/A 60 USD/m2 Chưa bao gồm VAT INFRASTRUCTURE AND FACILITY Financial institution Inside of IP. BIDV, Vietcombank, Sacombank, ACB bank, Techcombank.... Tax service, State finance office Inside of IP Customs Service Inside of IP Inside of IP Logistics Inside of IP Post office Inside of IP Police, public security Inside of IP Recruitment Inside of IP Worker dormitory Inside of IP Worker's child education facility Inside of IP 191 One-stop service Fire-fighting facility Inside of IP Available, inside of IP MAI TRUNG INUDSTRIAL PARK GENERAL INFORMATION Address An Tay Commune - Ben Cat Town - Binh Duong Investor Enterprise Construction Investment and Service Mai Trung ▪ Tel: +0907770288 Location Investment Sectors Minimum wage Lease term Adjacent location: - Distance to nearest Big city: Ho Chi Minh City 43 km - Distance to Provincial Center: 18 km from Thu Dau Mot - Distance to nearest Airport: 44 km from Tan Son Nhat - Distance to the nearest railway station: 50 km from Saigon station - Distance to the nearest River Port: Saigon Port 51 km - Distance to the nearest seaport: Cat Lai Port 55 km Priority Sectors for Fine art wood processing industry and interior decoration; Investment Mechanical assembly industry; Agricultural product processing industry - food; Electrical and electronic industry; Garment and leather shoe industry; Light industry and packaging; Industry, assembling and repairing agricultural, forestry and transportation machinery. [Area II] According to Decree 2022/ND-CP dated 15th November 2022 ▪ Start date: 2005 Minimum Lease Area ▪ Smallest rental area: 10000 (m2) Limit for Construction Height Planned area N/A Factory Available for Rent Operation Status ▪ Total planned area: 50.6 (ha) ▪ Area available for rent: 12 (ha) ▪ Smallest rental area: 10000 (m2) ▪ 30ha In operation Occupancy Rate and Number of Projects ▪ 65% Number of Korean projects ▪ None Lease fee ▪ 30 USD/m2 INFRASTRUCTURE AND FACILITY Financial institution Tax service, State finance office Inside of IP. BIDV, Vietcombank, Sacombank, ACB bank, Techcombank.... Inside of IP 192 Customs Service Inside of IP Inside of IP Logistics Inside of IP Post office Inside of IP Medicare Inside of IP. BAUBANG HEALTH CENTER My Phuoc General Hospital, 12km from the IP Inside of IP Police, public security 193 KIM HUY INUDSTRIAL PARK GENERAL INFORMATION Address Investor Investment Sectors Lease term Binh Chuan, Thuan An district, Binh Duong province Kim Huy Industrial Park Development Co., Ltd Address: 27/3 DT 743 – Binh Quoi, Binh Chuan commune, Thuan An town, Binh Duong province. - Telephone: (84-650) 3815015 - Fax: (84-650) 3815014 - Website: www.kcnkimhuy.com.vn - Email: khip@kcnkimhuy.com.vn Priority Sectors for Garment industry, high-grade leather shoes; Mechanical Investment manufacturing and assembly industry; Industrial production of high-grade wooden products; Some other occupations do not pollute the environment. Start date: 2006 Minimum Lease Area N/A Limit for Construction Height Permitted Construction Rate N/A Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean projects Lease fee N/A 213,63 ha Area available for rent: 120 (ha) Smallest rental area: 10000 (m2) N/A N/A 50.52% N/A 60 USD/m2 INFRASTRUCTURE AND FACILITY Financial institution Inside of IP. BIDV, Vietcombank, Sacombank, ACB bank, Techcombank.... Tax service, State finance office Inside of IP Customs Service Inside of IP Inside of IP Logistics Inside of IP Post office Inside of IP Police, public security Inside of IP Recruitment Inside of IP 194 Worker dormitory Inside of IP Worker's child education facility Inside of IP One-stop service Inside of IP Fire-fighting facility Available, inside of IP View 195 [- This Page is intentionally left blank -] 196 BINH PHUOC 197 INVESTMENT ENVIRONMENT IN BINH PHUOC USD/VND 23.510 GENERAL INFORMATION Area Population Geographical Location Adjacent provinces 6,876.76 km2 1,03 million people (2022) ▪ Binh Phuoc is located in Southeast region. ▪ The province is located in the sourthern key economic region, bordering Binh Duong and Dong Nai provinces with developed inđútry, an important bridge between the Southeast region and the Central Highlands regions and the Kingdom of Cambodia with a borderline of 263km ▪ The East adjoins to Lam Dong province and Dong Nai province; the West adjoins to Tay Ninh province and Kingdom of Cambodia; the South adjoins to Binh Duong province; the North adjoins to Dak Nong province and Kingdom of Cambodia. 2022 statistic: ▪ Nominal GRDP (billion VND): GRDP ▪ Real GRDP (billion VND): 49.639 ▪ GRDP growth: 8,42% ▪ GRDP per capita (million VND/year): 85,10 (2,09579734008866 billion USD) (3624 USD) ▪ Economic structure: Industry growth Import - Export Key Industry PCI Ranking - Industry - Construction: 43.19% - Agriculture. forestry and fishery: 21.46% - Service: 31.43% ▪ Industry - Construction growth: 3,19% ▪ Agriculture, forestry and fishery growth: 14,46% ▪ Service growth: 8,62% Import turnover (billion USD): 0,22 (Growth rate: -0,0183) Export turnover (billion USD): 0,39 (Growth rate: 0,1) ▪ Agriculture still represents a very important part of Binh Phuoc economy. The main agricultural crops practiced in Binh Phuoc province are hạt điều, coffee, pepper, rubber tree ▪ Key industrial products: manufacturing industry, electricity generation and water supply industry, waste management and treatment 64.32 43 SOCIAL INFRASTRUCTURE Transportation Electricity Water Education & Training Medicare ▪ Roadway: Bình phuoc connects with the Central Highlands and the Southeast provinces through National Highway 13 and National Highway 14. Curently the provine has 15 intra-provincial roads, 325 urban roads, 2135 commune roads, 241 specialized roads ▪ The province has hydroelectric power plants: Thac Mo, Can Don, and Srok Phu Mieng with a capacity of nearly 400MW that have been operating and contributing an abundent power source for production and daily life of people here. ▪ Binh Phuoc also implements a project to generate electric from solar energy with a capacity of 800MW ▪ Binh Phuoc has many large water plants such as Dong Xoai water plant and water plants: Thac Mo, Phuoc Binh, Binh Long, Loc Ninh, Bu Dang with a capacity of 60.000 m3 per day and night that fully meets the drinking water needs of residents and industrial projects in industrial parks along National highway 13. ▪ The province currently has 149 preschools (including non-public), 173 primary schools, 107 junior high schools, 33 high schools and 8 continuing education centers. ▪ 17 hospitals INVESTMENT CONDITION Human resource 59,9% of population are in the working age (2022) 198 Education level Trained labor rate: 35% (2022) ▪ The minimum salary for the province is applied as follows: - Area I (4,680,000 VND/month): N/A - Area II (4,160,000 VND/month): Dong Xoai City, Chon Thanh Town and Dong Phu District Salary - Area III (3,640,000 VND/month): Phuoc Long, Binh Long Towns and Hon Quan, Loc Ninh, Phu Rieng Districts - Area IV (3,250,000 VND/month): Bu Mang, Bu Mop, Bu Gia Map Districts (Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages paid to employees working under employment contracts) Investment incentives Fields Attracting Investment Investment attraction situation Industrial zones ▪ Incentives according to government regulations: - Exemption and reduction for land and water rent fee - Preferential tax rates and exemption period, reduction for corporate income tax. - Import tax exemption ▪ Incentives from the province: ▪ The preferential tax rate of 10% for a period of 15 years applies to: income of enterprises implementing new investment projects in areas with extramely difficult socio-economic conditions, economic zones (hoa Lu Border Gate Economic Zone) and high-tech zone. ▪ The tax rate of 17% for a period of 10 years applies to: income of enterprises implementing new investment projects in areas with extramely difficult socio-economic conditions ▪ Exemption from import tax on machinery and equipment ▪ Woodworking industry, Food processing industry, Rubber products processing industry, Electronic industry ▪ In 2022, the province has attracted 34 foreign direct investment projects with a registered capital of 114.41 million USD. Minh Hung Industrial Park - Korea. Minh Hung Industrial Park III. Nam Dong Phu Industrial Park Dong Xoai Industrial Park I. Dong Xoai Industrial Park II. Bac Dong Phu Industrial Park Becamex Industrial Park - Binh Phuoc. Chon Thanh Industrial Park I. 199 Map Department of Planning and Investment Binh Phuoc ▪ Address: 626/QL14, Dong Xoai town ▪ Tel: 2713879253 Contact ▪ Email: www.skhdtbinhphuoc.gov.vn ▪ Contact person: - Mr. Vo Sa. Tel: 0271.3879252 Email: sav.skhdt@binhphuoc.gov.vn 200 LIST OF INDUSTRIAL ZONE IN BINH PHUOC No 1 2 3 Industrial Zone Name Dong Xoai I Industrial Zone Dong Xoai II Industrial Zone Dong Xoai III Industrial Zone 4 5 6 7 8 9 10 11 12 13 14 Minh Hung – Korea Industrial Zone Chon Thanh Industrial Zone Chon Thanh II Industrial Zone Becamex - Binh Phuoc Industrial Zone Minh Hung Industrial Zone – Sikico Viet Kieu Industrial Zone Ledana Industrial Zone Hoa Lu Industrial Zone Minh Hung III Industrial Zone Bac Dong Phu Industrial Zone Nam Dong Phu Industrial Zone Total Area (ha) 153,49 ha 84,7ha 120,33ha Occupancy 95% 85% 192.28 ha 100% 98% 100% 15% 38% - 76 ha 2,448 ha 655 ha 101.8 ha 425 ha 348 ha 577.63 ha 317 ha 480 ha Status In operation In operation In operation In operation In operation In operation In operation In operation Under construction Under construction Under construction Under construction Under construction Under construction BINH PHUOC’S LOCATION MAP OF INDUSTRIAL ZONES 201 VIET KIEU INDUSTRIAL ZONE GENERAL INFORMATION Address Investor Contact Person Location Investment Sectors Minimum wage Lease term Minimum Lease Area Planned area Operation Status Occupancy Rate and Number of Projects Number of Korean projects Lease fee Operating fee Thanh Binh commune, Hon Quan district, Binh Phuoc province MINH KHANG INVESTMENT AND DEVELOPMENT JSC ▪ Address: Viet Kieu Industrial Park, Hon Quan District, Binh Phuoc Province ▪ Tel: 0931.808.060 and 0888.818.181 ▪ Email: info@vietkieu-industrialpark.com ▪ Website: vietkieu-industrialpark.com +84 931 808 060 (Mr Hùng) / +84 8888 18181 (Mr Đức) Adjacent location - 2 Km – 0hr05’: To National Highway 13 - 53 Km – 1hr05’: To Hoa Lu Border - 60 Km – 1hr00’: To Thu Dau Mot City, Binh Duong - 106 Km – 2hr45’: To Cat Lai Port - 100 Km – 2hr30’: To Ho Chi Minh City Center Priority Sectors for Rubber processing Investment Plastic, packaging Wood processing, Building materials Mechanics and agricultural machines Power electronics Garment, Textile Mixing animal feed Food and beverage processing [Area 3] According to Decree 38/2022/ND-CP 50 years (2068) 10,000 m2. ▪ Total area: 104ha ▪ Active ▪ 2 projects ▪ None $70-75/m2 ▪ Management fee: 0.04 USD/m2/month. 202 Map 203 BECAMEX – BINH PHUOC INDUSTRIAL ZONE GENERAL INFORMATION Address Investor Contact Person Location Investment Sectors Minimum wage Lease term Planned area Operation Status Lease fee 995, National Highway 14, Minh Thanh Commune, Chon Thanh District, Binh Phuoc Province. Becamex - Binh Phuoc Technical Infrastructure Development Joint Stock Company ▪ Address: No. 08 Hung Vuong Street, Hoa Phu Ward, Thu Dau Mot City, Binh Duong Province, Vietnam ▪ Tel: (+84) 274 3 822 655 ▪ Email: info@becamex.com.vn ▪ Website: https://becamex.com.vn/ N/A Adjacent location - 80 km from Ho Chi Minh City; - 80 km from Tan Son Nhat airport; - 100 km from Tan Cang port and other ports; Priority Sectors for Textile, food processing, production of building materials, Investment electronic components, mechanics,… [Area 2] According to Decree 38/2022/ND-CP 50 years - Total planning area: 1,993 ha. - Natural land of the industrial zone: 1,993 ha. - Land for administrative, service and industrial park management: 73.1 ha - Industrial land for lease: 1393.84 ha. - Land for green trees: 201.15 ha. - Land for technical infrastructure: 30.93 ha. - Land for traffic: 209.6 ha. - Land for warehouse construction: 83.95 ha ▪ Active 680 Million/150m2 Actual view 204 BINH DUONG MAPLETREE INUDSTRIAL PARK GENERAL INFORMATION Address Investor Location Investment Sectors Minimum wage Lease term Minimum Lease Area Limit for Construction Height Permitted Construction Rate Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean projects Lease fee No. 18, Lot L2-1, Tao Force 5 Street, Vietnam - Singapore Industrial Park II, Hoa Phu Ward, Thu Dau Mot City, Binh Duong Province. - Investor's name: Mapletree Urban Business Co., Ltd (Vietnam) - Phone: (0274) 3543688; (0274) 3543678 - Website: www.mapletree.com.vn Adjacent location: - Distance to nearest big city: 31km from Ho Chi Minh - Distance to provincial center: 5 minutes from Binh Duong administrative center - Distance to nearest airport: 32 km (Tan Son Nhat) - Distance to the nearest railway station: 25 km (Song Than) - Distance to the nearest river port: 33 km (Cat Lai) - Distance to the nearest seaport: 31km from Ho Chi Minh Priority Sectors for Electronics, machinery, Investment food processing, automobile parts, new material, Bio, Pharmaceutical, Supporting industry, … Investment Restricted Sectors Natural rubber processing, tanning, washing – cleansing, dyeing, plating/anodizing, basic chemical production, detergent, colorant, printing ink, paper production [Area II] According to Decree 2022/ND-CP dated 15th November 2022 ▪ Start date: 2008 ▪ End date: April 26, 2066 1ha 50m N/A ▪ Total area: 74,87 ha ▪ 30ha Ready for construction and obtaining LURC ▪ 44,95%, ▪ 21 1.8$/m2/month 205 Factory fee Managemnet fee 4 USD/m2 Management fee: 8,500VND/m/month Electricity price: 1,406VND/kwh Clean water price:10,600VND/m3 INFRASTRUCTURE AND FACILITY Financial institution Inside of IP. BIDV, Vietcombank, Sacombank, ACB bank, Techcombank.... Tax service, State finance office Inside of IP Customs Service Inside of IP Inside of IP Logistics Inside of IP Post office Inside of IP Medicare Inside of IP. BAUBANG HEALTH CENTER My Phuoc General Hospital, 12km from the IP Inside of IP Police, public security Universities, training facilities, etc. EIU Int’l Univ. German Tech, vocational training centers…… Recruitment Inside of IP Worker dormitory Inside of IP Worker's child education facility Inside of IP One-stop service Inside of IP Road Width Communication Infrastructure of industrial park Emergency Power generator Fire-fighting facility 24~64m VNTT provides ADSL, High-Speed Internet service National grid is connected with two substation Available, inside of IP 206 MINH HUNG SIKICO INDUSTRIAL ZONE GENERAL INFORMATION Address Investor Location Investment Sectors Minimum wage Lease term Minimum Lease Area Planned area Operation Status Occupancy Rate and Number of Projects Number of Korean projects Lease fee Dong No commune, Hon Quan district.. Minh Hung Sikico Joint Stock Company. The company invests in infrastructure development and construction with a total realized investment capital of 2,260/4,091 billion VND, reaching about 55%. Hamlet 5, Dong No Commune, Hon Quan District, Binh Phuoc Province. Phone: +84 981 555 777 Fax: Email: sales@sikico.com Website: www.minhhungip.vn Adjacent location - 89 km to Ho Chi Minh City - 67 km to Thu Dau Mot - Located on backbone road to Tay Nguyen- a potential supply of raw materials for industries. Priority Sectors for Processing agricultural products & foodstuff, etc Investment Tool machines, food processing machines, interior furnishing, wood production, paper & toys Wood processing Construction materials, mechanics, coating and plating Weaving and dyeing [Area 3] According to Decree 38/2022/ND-CP 30/5/2066 1.2 ha ▪ Total area: 655 ha in area, developed under the model of a complex of Green Industry - Trade - Service. Area available for rent 298 (ha) ▪ Active 37% - 35 secondary enterprises (including 27 foreign enterprises and 08 domestic enterprises) ▪ N/A 68 USD/m2 207 Map INFRASTRUCTRURE Traffic road Main road system: building line 42 – 60m, width 18m Internal road system: building line 18m, width 8m Electricity 110 kv Water Water volume (m3/day): 89.000 m3/day-night Wastewater treatment Maximum treatment capacity (m3/day): 45.000 m3 /day-night Current treatment capacity (m3/day): 25.000 m3 /day-night Garbage disposal Training School Contact Information Internet: 5.500 subscribe 208 [- This Page is intentionally left blank -] 209 BINH THUAN 210 INVESTMENT ENVIRONMENT IN BINH THUAN GENERAL INFORMATION Area, Population ▪ Area: 7,942.46 km2 ▪ Population: 1.2521 million (2022 statistic) Geographical Location ▪ Located in the South Central Coast, adjacent to the key econimic of Viet Nam – Ho Chi Minh city. ▪ Located 198 km from Ho Chi Minh city; 150 km from Vung Tau city; 175 km from Da Lat city, 250 from Nha Trang city and 1,520 km from Hanoi city toward North. Adjacent provinces ▪ Borderd to Lam Dong province to the North, Ninh Thuan province to the North East, Dong Nai province to the West, Ba Ria – Vung Tau to the South West, Eastern Sea to the East. GRDP Industry growth PCI 2022 statistic: ▪ GRDP growth: 7.75 % ▪ GRDP per capita: 77.3 million VND/year ▪ Economic structure: ▪ Industry - Construction growth: 33.51% ▪ Agriculture, forestry and fishery growth: 27.72% ▪ Service growth: 32.51% ▪ Taxes less subsidies on products: 6.23% 2022 statistic: ▪ Industry - Construction growth: 6.66% ▪ Agriculture, forestry and fishery growth: 2.5% ▪ Service growth: 14.88% ▪ Taxes less subsidies on products: 0.51% ▪ Score: 64.39 – ranked 42 out of 63 cities and provinces in Vietnam. (2022) SOCIAL INFRASTRUCTURE Transportation ▪ Roadway: Some important roads including National Highway 1A along the length of the province, passing through Phan Thiet City and 05 districts in the province with a length of 181 km, the South connects Binh Thuan to Dong Nai, Ho Chi Minh City, and Southern provinces; The North connects Binh Thuan to Ninh Thuan, Khanh Hoa, and Northern provinces; National Highway 55 is 152.5 km long, connecting with Ba Ria - Vung Tau - Binh Thuan - Lam Dong; National Highway 28 connecting Phan Thiet to Lam Dong province and others in the Central Highlands area; provincial roads and inter-district roads have been upgraded, repaired and expanded. Furthermore, the expressway passing through Binh Thuan province including Dau Giay - Phan Thiet and Phan Thiet - Vinh Hao sections are in the stage of construction investment and will put into operation in late 2022. Upon completion of expressway project, it takes only 2 hours to travel by car from Ho Chi Minh City to Phan Thiet City; Most industrial Parks of the province are adjacent to National Highway 1A, and there are access roads to it, so the transportation of goods from the Industrial Park to deep-water ports in Southern provinces such as Ba Ria - Vung Tau, Ho Chi Minh City, and Vinh Tan International Port of Binh Thuan Province will be convenient and time-saving. ▪ Railway: The North-South railway passing through the length of the province, amongst that Binh Thuan station located in Ham Thuan Nam district is far 15 km away from Phan Thiet City, has a capable of receiving and transporting goods with great volumes. Besides, Binh Thuan has a railway from Phan Thiet City to Ho Chi Minh City, meeting transportation needs of tourists and experts. ▪ Waterway: Binh Thuan with a 192 km long coastline, adjoining the international maritime route and Vinh Tan International Port that can receive vessels with a tonnage of up to 50,000DWT; Phu Quy Port and Phan Thiet Port of Binh Thuan province can receive vessels up to 1,000 DWT, and Son My International Port in the Southern added to Master plan on development of Vietnam's seaport system in a period of 2021 – 2030 with a vision to 2050 is expected to invest in in a period of 2022 – 2035 and will receive vessels up to 70.000 DWT. 211 ▪ Airway: Binh Thuan has been investing and constructing in Phan Thiet international airport with a scale of grade 4E, a runway length of 3,050m with a designed capacity of 2 million passengers/year, being capable of welcoming new airplanes A350-900, A321, B737, etc. Electricity Binh Thuan has been planning and developing electric transmission network and distribution in association with socio-economic development orientations. The power source has been assuring from the national grid; the electricity quality and the reliability has been increasingly improving, meeting the needs of production and business of investors. Besides, Binh Thuan is one of Vietnam's major energy centers with Vinh Tan Power Center, LNG Son My Gas Power Center, and solar, wind power projects, etc, contributing to ensuring energy security for the region and the whole country. Water Apart from large-capacity hydroelectric lakes such as Ham Thuan - Da Mi, Dai Ninh, ... Binh Thuan has about 30 other large and small irrigation lakes including many lakes with large water reserves such as Song Quao lake - Ham Thuan Bac district with a capacity of 80 million m3, Song Dinh 3 - Ham Tan of 45.5 million m3; Ca Giay lake - Bac Binh district with a capacity of 37 million m3, Long Song river lake - Tuy Phong district with 37 million m3; Song Mong lake - Ham Thuan Nam district with 34 million m3 and other lakes with a capacity of 5-10 million m3. Education ▪ 01 university, 01 colleges, 01 vocational school, 15 proffessional training centers and 9 nonpublic vocational training facilities. Medicare ▪ 14 hospitals INVESTMENT CONDITION Human resource ▪ 53.58% of population are in the working age (2022) Education level ▪ Trained labor rate: 29.2% (2022) Salary ▪ The minimum salary for the province is applied as follows: - Area II: Phan Thiet city - Area III: Ham Thuan Bac and Ham Thuan Nam district, Lagi communce. - Area IV: Duc Linh, Tanh Linh, Phu Quy, Tuy Phong, Phu Quy, Ham Tan, Bac Binh district. ▪ The lowest wage for trained labor (including those trained by the enterprises) must be at least 7% higher than the above minimum salary Investment incentives 1. Incentives on corporate income tax: - High-tech product production projects and auxiliary product production projects will be entitled to the incentive tax rate of 10 % for 15 years, exemption for 4 years and 50% tax reduction for the next 9 years. - Projects not subject to Hi-tech product production and auxiliary product production group will be entitled to exemption for 02 years and 50% tax reduction for the next 04 years. 2. Incentives on import-export tax: Projects will entitled to be free-duty to form fixed assets. 3. Investors are entitles to other supportive and preferential policies according to current regulations. Fields Attracting Investment ▪ Prioritized projects: 1. Field of processing and preserving agricultural products - Project of preservation/warehousr, irradiation/heat treatment for fruits and foodstuffs. - Project of deep processing plant for dragon fruit (soft drinks, wine, jams, fruit jelly, etc) 2. Field of food processing - Project of canned meat and food processing plant. - Project of functional foods manufacturing plant. - Project of manufacturing plant for algae, seaweed and post-salt product. 3. Field of manufacturing medicinal herbd, cosmetics and preparations - Project of madicinal herbs manufacturing plant. - Project of cosmetics and finished product manufacturing plant. 4. Field of manufacturing packing, wooden furniture, building materials, consumer goods, etc - Project of packing manufacturing (do nót produce pulp). - Project of wooden product manufacturing plant. - Project of manufacturung plant for glazed brcks and interior decoration porcelain. - Textile, leather and footwear material manufacturing plant. 212 5. Mechanical and electronic fields - Project of manufacturing plant for freezing systems and refrigeration equipment for agricultural and aquatic produc preservation industry. - Project of Manufacturing and doing out works for machinery and equipment on seafood catching and agricultural mechanics activities. - Project of Manufacturing, and doing out works for systems and equipment of agricultural irrigation. - Project of assembling and manufacturing plant for electric and electronic equipment; wind power, solar power. - Project of Manufacturing plant for automobile parts, and automobile assembly. - Project of Manufacturing plant for steel and aluminum rolling (not making steel or aluminum); processing and assembling mechanical component, nails, screws, etc. 6. Field of manufacturing fertilizer, animal feed - Fertilizer manufacturing plant (not using raw materials). - Project of Processing plant for animal feed of all kinds (not producing fish meal from raw materials). 7. Field of warehouse, logistics service - Warehousing and transshipment services (Logistics). - Chemical storage (not accepting chemicals on the list of banned chemicals and minerals as specified in Appendix II - Law on Investment 2014) 8. Field of titanium minerals processing - Zircon compound processing plant (ZOC). - Artificial Rutin processing plant. - Titanium Ferro processing plant. Map Contact Binh Thuan Industrial Parks Authority ▪ Address: 337 Vo Van Kiet street, Phan Thiet city, Phu Thuy ward, Binh Thuan province ▪ Tel: 0252.3821234 ▪ Fax : 0252.3821234 ▪ Email: bqlkcn@binhthuan.gov.vn LIST OF INDUSTRIAL ZONES No Industrial zone Name Occupancy Rate (%) Status Phan Thiet Phase 1 Industrial Zone Total Area (ha) 68 1 100 In Operation 2 Phan Thiet Phase 2 Industrial Zone 40.7 74.02 In Operation 3 Ham Kiem I Industrial Zone 132.67 59.29 In operation 4 Ham Kiem II Industrial Zone 402 22.5 In Operation 213 5 Song Binh Industrial Zone 300 41.22 6 Tuy Phong Industrial Zone 150 Under construction In Operation 7 Tan Duc Industrial Zone 300 Under Construction 8 Son My 1 Industrial Zone 1,070 Under Construction 9 Son My 2 Industrial Zone 540 Under Legal LOCATION MAP OF INDUSTRIAL ZONES 214 PHAN THIET PHASE 1 INDUSTRIAL PARK GENERAL INFORMATION Address Investor Contact Person Location Investment Sectors Phong Nam commune, Phan Thiet city and Ham Liem commune, Ham Thuan Bac district, Binh Thuan province Name of Investor: Binh Thuan Construction Materials and Minerals Joint Stock Company ▪ Address: 33 Tu Van Tu street, Phu Tring ward, Phan Thiet city, Binh Thuan province ▪ Tel: 02523822060 - 02523824887 ▪ Email: info@bcmc.com.vn ▪ Website: bcmc.com.vn Name: Dang Trung Hieu Position: Director of the Factory Mobile: 0909816592 Email: info@bcmc.com.vn Adjacent location - Situated at the crossroad between National Highway 1A and National Highway 28 - 198 km from Ho Chi Minh city - 250 km from Nha Trang city - 150 km from Da Lat city Priority Sectors for Investment Investment Restricted Sectors Minimum wage [Area II] According to Decree 38/2022/ND-CP Lease term 1998-2048 Minimum Lease Area No request Limit for Construction Height Permitted Construction Rate Planned area Operation Status Occupancy Rate and Number of Projects Number of Korean projects Manufacturing the ceramic tiles, woodwork, interior decoration; clothing industry manufacturing; household appliances manufacturing; mechanics, electronics and electric industry; constructional materials industry; agricultural, forestry and fishery products processing plant; food, fruit, soft drinks processing plant; consumer goods, knitting, leather shoes and household appliances manufacturing; assembling and manufacturing of mechanics, electricity and electronics; clean industries, not polluting the environment, etc. Outside the list of allowed sectors for Investment Lower than 40 m, according to land area From 35% to 70%, according to land area and height ▪ Total area: 68 ha ▪ Total vacant leasable area: 50.23 ha ▪ In Operation ▪ 100% and 39 projects ▪ Non 215 Layout Plan Location Map 216 Actual View INFRASTRUCTURE AND FACILITY The technical infrastructure was completed in roads, electricity, water supply, centralized wastewater treatment systems, etc. The industrial Park is located in the Phan Thiet City, so it is very convenient for transport infrastructure systems, other social infrastructure systems such as housing for workers, markets, schools, hospitals, amusement Parks, and other services, etc. 217 List of Projects in Phan Thiet Phase 1 Industrial Zone No. Name of Company Nationality Business line 1 Trung Nguyen Steel Company Limited Vietnam Car auto parts 2 Vietnam Cotton Joint Stock Company Vietnam Cotton Processing 3 Bac My Joint Stock Company Vietnam Manufacture of Kraft paper 4 Tuynel Phan Thiet Brick Joint Stock Company Thuan Tien Garment Company Limited An Binh Service Trading Manufacturing Company Litmited Dong A Company Limited Vietnam Vietnam Manufacture of brick and warehouses for rent Garments Vietnam Production of pure ice cubes Vietnam Color plated products Thang Long- Binh Thuan Packaging Trading Manufacturing Company Limited Hải Triều Company Limited Vietnam Production of carton packaging Vietnam Seafood Processing and Preservasion South Central Sabeco Trading Company Limited Long Son Gas Joint Stock Company Vietnam Beer and beverage Vietnam Tiumph Furniture Processing - Export Joint Stock Company Hoa Sen Group Joint Stock Company Vietnam Extraction, installation of liquefied gas pipelines Furniture products for export Dong Nam Viet vegetables and Fruits Import- Export Company Limited Phú Nhuận Printing Packaging Joint Stock Company Son Tinh Block Brick Production Factory Thanh Bình Service Trading Manufacturing Company Truong Thinh Building Materials Company Limited 12B Dry Fruits Joint Stock Company Vietnam 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Vietnam Products such as galvanized steel, galvanized steel purlin and plastic products such as PVC pipe, plastic beads, plastic ceiling panels Processing and heating dragon fruit for export Manufacture of paper package Vietnam Block Brick Production Vietnam Glass Processing Vietnam Manufacture of silicat Vietnam Dried Fruits Binh Thuan Car Service Company Limited Ngoc Phuong Car Company Limited Vietnam Trading and repairing all kinds of cars Vietnam Trading and repairing all kinds of cars Ky Lan Seafood Processing Joint Stock Company Lam Quang Dat Company Limited Vietnam Seafood Processing Vietnam Binh Thuan Printing Packaging Joint Stock Company Hoa Phu Joint Venture Company Vietnam Malaysia Manufacture of unburnt building materials Manufacture of paper package and printing Agricultural processing Hong Kong Organic fertilizers Belgium Car auto spare parts and other products Manufacture of premium adhesive paper for export Greenfield Fertilisers Company Limited Cty TNHH IST Vietnam Company Limited SAS Coat Company Limted Vietnam Belize 218 29 Bernecker Vietnam Company Limited German 30 Singapore Japan Manufacture of products from paper 32 Vietnam Intersnack Cashew Company Limited Nakagawa MFG Vietnam Company Limited Kim Do Company Limited Manufacture of pipe rack and steel structure systems Cashew processing Luxembourg 33 Hai Wang Seafood Company Limited Taiwan 34 Universal Communities Company Limited Bex Company Limited Hong Kong Thang Long – Binh Thuan Packaging Production Trading Company Limited Tan Ha Investment Company Limited Vietnam Manufacture of wood products for export Cold Storage for preservation of seafood Manufacture of interior and exterior products from artificial stone Manufacture of Seafood flavor powdercake Manufacture of package from paper Binh Thuan Printing Packaging Joint Stock Company Phu Nhuan Printing Packaging Joint Stock Company Vietnam Manufacture of creasing paper and cover Manufacture of package from paper Vietnam Manufacture of package from paper 31 35 36 37 38 39 Japan Vietnam 219 PHAN THIET PHASE 2 INDUSTRIAL PARK GENERAL INFORMATION Address Investor Contact Person Location Investment Sectors Phong Nam commune, Phan Thiet city and Ham Liem commune, Ham Thuan Bac district, Binh Thuan province Name of Investor: Trung Nguyen Steel Company Limited ▪ Address: Lot 1/3 Phan Thiet Industrial Park, Binh Thuan province ▪ Tel: 02523838850 ▪ Email: congtytrungnguyen@yahoo.com Name: Nguyen Van Thanh Position: General Director Mobile: 0913883023 Email: congtytrungnguyen@yahoo.com Adjacent location - Adjacent to Phan Thiet Industrial Park Phase 1 - 200 km away from Ho Chi Minh city - 250 km from Nha Trang city - 150 km from Da Lat city Priority Sectors for Investment Investment Restricted Sectors Minimum wage Lease term Minimum Lease Area Equipment manufacturing and assembling of electronicsinformatics industry; manufacturing of pharmaceuticals, medical instruments and products; manufacturing of packaging of all kinds, synthetic resins, products from composite materials; mechanical engineering, assembly of power machines and machine tools, manufacturing of complete units, parts, spare parts and components of bicycles, manufacturing of parts for specialuse vehicles and automobiles; mechanical engineering, repairing tools, agriculture-fishery-industry machineries and equipment; manufacturing of the wooden products and interior decoration; manufacturing and assembling civil equipment; manufacturing of purified water and bottled pure water; processing of milk and milk products; building facilities for assorted printing and copying; manufacturing of fire prevention equipment and products; industrial laundry projects; knitting and shoe-leather industry; beverage processing; food processing; Warehouse. Outside the list of allowed sectors for Investment [Area II] According to Decree 38/2022/ND-CP 2007-2057 No request Limit for Construction Height From 1 to 3 floors accoding to land location Permitted Construction Rate Lower than 60% Planned area Operation Status Occupancy Rate and Number of Projects Number of Korean projects ▪ Total area: 40.7 ha ▪ Total vacant leasable area: 31 ha ▪ In Operation ▪ 100% and 11 projects ▪0 220 Layout Plan Location Map Actual View INFRASTRUCTURE AND FACILITY The basic technical infrastructure is invested in traffic roads, electricity, water supply, centralized wastewater treatment systems, etc. 221 The Industrial Park is located in Phan Thiet City, therefore, very convenient for transport infrastructure systems, and other social infrastructure systems such as housing for workers, markets, schools, hospitals, amusement park, and other services, etc. 222 List of Projects in Phan Thiet Phase 2 Industrial Zone No. Name of Company Nationality Business line 1 Trung Nguyen Steel Company Limited Vietnam Warehouse for rent 2 Khang Nong Joint Stock Company Vietnam Fertilizer production 3 Lavite Company Limited Vietnam Cordyceps processing 4 Chien Thang – Binh Thuan Trading and Manufacturing Company Limited Phuong Giang Binh Thuan Import – Export Trading Company Limited Phu Nhuan Printing Packaging Joint Stock Company Phu Thinh Real Estate Investment Company Limited Vietnam Zircon Processing Vietnam Manufacture of package Vietnam Manufacture of package from paper Vietnam Southern Electric Equiqment Experiment Joint Stock Company Chien Thang Biotechnology Company Limited Vietnam Warehouse for rent and production of artificial quartz stone used in the interior Electric Experiment Trans Pacific Seafood Company Limited Jin Guo Yuan Fruits Import – Export Company Limited Japan Production of all kinds of biological products, microbiological feeds for aquaculture Seafood processing China Fruits processing for export 5 6 7 8 9 10 11 Vietnam 223 HAM KIEM I INDUSTRIAL PARK GENERAL INFORMATION Address Investor Contact Person Location Investment Sectors Minimum wage Lease term Minimum Lease Area Ham My and Ham Kiem commune, Ham Thuan Nam district, Binh Thuan province Name of Investor: Hoang Quan Binh Thuan Consulting-Trading-Service Real Estate Joint Stock Company ▪ Address: 198 Nguyen Hoi, Phu Trinh Ward, Phan Thiet City, Binh Thuan Province ▪ Tel: 02523604 579 - 0984884209; Fax: 02523722727 ▪ Website: www.hoangquanbinhthuan.com.vn ▪ Email: hoangquanbinhthuan@hoangquan.com.vn Name: Nguyen Anh Trang Position: General Director Mobile: 0985588585 Email: hoangquanbinhthuan@hoangquan.com.vn Adjacent location - Near National Highway 1A - 5 km from North-South Highway of Phan Thiet – Dau Giay section - 190 km from Ho Chi Minh City (more than 2 hours by car) - 9 km from Phan Thiet city - 10 km from Phan Thiet port, - 110 km from Vinh Tan General Port (Binh Thuan) - 120 km from Cai Mep - Thi Vai Port (Ba Ria-Vung Tau) - 180 km from Cat Lai Port (Ho Chi Minh City) - 4 km from Binh Thuan Station, 9 km from Phan Thiet Station - 30 km from Phan Thiet Airport (The construction has already started and is expected to open in 2023) Priority Sectors for Food processing industry, processing meat and fruit; garment Investment industry, leather shoes (not tanning); assembly industry of machinery and equipment; electric - electronic assembly industry; producing consumer goods, household goods, and packaging of all kinds; Producing ceramic tiles and interior decoration materials; mechanical industry, vehicle assembly; manufacturing wooden products, household products, handicrafts and fine arts; producing soap and cosmetics; assembly mechanics, manufacturing mechanical components; shuttle services and transportation warehousing Investment Restricted Outside the list of allowed sectors for Investment Sectors [Area III] According to Decree 38/2022/ND-CP 2007-2057 No request Limit for Construction Height - Admistrative office: Maximum 10 floors (basement is not excluded) - Factory: From 1 to 5 floors Permitted Construction Rate - Admistrative office: Bulding Density: Lower than 65% - Factory: Bulding Density: Lower than 40% Planned area Operation Status Occupancy Rate and Number of Projects Number of Korean projects ▪ Total area: 132.67 ha ▪ Total vacant leasable area: 90.8 ha ▪ In Operation ▪ 59.3% and 16 projects ▪ 01 project 224 Lease fee Operating fee ▪ Land lease fee: 4-5 USD/m2 per year (Annual payment, VAT excluded); 45 USD/m2 (Onetime payment, VAT excluded) ▪ Management fee: 0,3 USD/m2 per year ▪ Electricity fee: According to State prices ▪ Water fee: 14,000 VND/m3 (VAT excluded) ▪ Wastewater treatment fee: 0.3 USD/m3 x 80% of the total water supply (VAT excluded) Layout Plan 225 Location Map Actual View INFRASTRUCTURE AND FACILITY Social housing area, housing for workers with a total area of 13.5 ha has been gradually finishing with more than 300 apartments and 950 houses, each are built with 1 ground 1 floor. In addition, the items related to entertainment and service areas for workers were put into operation. Technical infrastructure system is built in sync, ensuring the standards of a Green-Clean-Nice-Modern Industrial Park. - Traffic: Main road is 45m, internal road is from 24 to 35m, which is asphalted by hot plastic concrete, is designed to be able to load H30 in compliance with Vietnam standard. - Electric: 110/22KV; capacity 2*63 MVA - Water supply system: The projects is supplied with water by Phan Thiet Water Plant with a capacity of 18,000m3/day-night; The waterworks of Ham Kiem Industrial Park (01 km from the Industrial Park) with a capacity of 20,000m3/day-night is under construction to fulfill the demand of secondary projects. - Contact information: 5,000-telephone lines are linked with telecommunication system of Binh Thuan Province. - Wastewater treatment system: The plant has the capacity of 6,000m3/day-night. 2,000m3/day-night in the first period was put into operation. The enterprises will treat the wastewater internally into column B – Vietnamese standard No. QCVN 40:2011/BTNMT, the centralized wastewater treatment plant will treat wastewater into column A – Vietnamese standard No. QCVN 40: 2011/BTNMT. List of Projects in Ham Kiem I Industrial Zone No. Name of Company Nationality 226 Business line 1 Nam Hong Company Limited Vietnam Warehouse for rent 2 Vietnam Production of steel and concrete structures Bags 5 CK&XD Single-Member Limited Liability Company Hieu Tien Trading and Production Company Limited Thanh Long Thanh Dao Company Limited Binh Thuan Teyaco Company Limited 6 Vietnam Fruita Company Limited Vietnam 7 Nhat Kien Binh Thuan Packaging Company Limited Vietnam Dragon fruit processing and preservation Manufacture of package 8 Nam Hong Company Limited Vietnam Warehouse for rent 9 Fine Fruit Asia Company Limited British Virgin Islands Agricultural processing 10 China Fruits and vegetables processing for export Production of all kinds of plastic packages and dragon fruit for export Production of dragon fruit wine 13 Shenzhen Yuanxing Fruit Company Limited Yuelaimei Import-Export Company Limited Lotus Food Group Joint Stock Company Zenpix Vietnam Company Limited Korea 14 Sun Pim Company Limited Taiwan Manufacture of suitcases, backpacks, bags Tempered glasses 15 Rong Phuong Bac Trading Company Limited Hoang Quan Binh Thuan Consulting – Trading – Service Real Estate Joint Stock Company Lavela Joint Stock Company Vietnam Warehouse for rent Vietnam Warehouse for rent Vietnam Food production 3 4 11 12 16 17 Vietnam Vietnam Vietnam China Japan 227 Agricultural products packing and dragon fruit preservation Yarn and thread production HAM KIEM II INDUSTRIAL PARK GENERAL INFORMATION Address Investor Contact Person Location Investment Sectors Minimum wage Lease term Minimum Lease Area Ham Kiem commune, Ham Thuan Nam district, Binh Thuan province Name of Investor: Binh Tan Investment Joint Stock Company ▪ Address: Lot DH5 - Cluster C7, Road N1, Ham Kiem II Industrial Park, Ham Kiem commune, Ham Thuan Nam district, Binh Thuan province ▪ Tel: 02837540283; Fax: 02837540959 ▪ Email: info@bitasic.com.vn ▪ Website: www.bitasic.com.vn Name: Le Minh Thai Position: General Director Mobile: 0834509288 Email: minhthai.le@bitasic.com.vn Adjacent location - Next to National Highway 1A - 2 km from the North-South expressway of Phan Thiet - Dau Giay section - 12 km from Phan Thiet City, 187 km from Ho Chi Minh City - 12 km from Phan Thiet port - 110 km from Vinh Tan General Port (Binh Thuan Province) - 120 km from Cai Mep - Thi Vai Port (Ba Ria-Vung Tau) - 7 km from Binh Thuan Railway Station - 11 km from Phan Thiet Railway Station - 32 km from Phan Thiet Airport (The construction has been started and expected to put into operation in 2023) Priority Sectors for Spinning - textiles; canned food, beverage processing plant; Investment manufacturing of consumer goods, household goods, packaging of all kinds, leather shoes (non-tanning); mechanical assembly, mechanical component manufacturing; processing wooden household use, handicrafts; processing ceramic and porcelain tiles for interior decoration; assembly of electronics, electrical appliances, computer components, communications, and sensors; cosmetics and preparations processing; Filling of liquefied gas (LPG); warehousing services (intermediate transport and warehouse transport); organic fertilizer manufacturing (without using raw materials); processing the animal, poultry and shrimp feeds (not processing the fishmeal from raw materials); medicinal herbs manufacturing; manufacturing constructional materials, concrete and products from concrete, cement and plaster. Investment Restricted Outside the list of allowed sectors for Investment Sectors [Area III] According to Decree 38/2022/ND-CP 2008-2058 No request Limit for Construction Height - Admistrative office: Maximum 10 floors (basement is not excluded) - Factory: From 1 to 5 floors Permitted Construction Rate - Admistrative office: Bulding Density: Lower than 60% - Factory: Bulding Density: Lower than 60% Planned area Operation Status Occupancy Rate and Number of Projects ▪ Total area: 402 ha ▪ Total vacant leasable area: 261 ha ▪ In Operation ▪ 22.5% and 16 projects 228 Number of Korean projects Lease fee Operating fee ▪ Non ▪ Land lease fee: 55-65 USD/m2 (One-time payment, VAT excluded) ▪ Management fee: 0.5 USD/m2 per year ▪ Electricity fee: According to State prices ▪ Water fee: 14,000 VND/m3 (5% VAT included) ▪ Wastewater treatment fee: 0.42-0.5 USD/m3 (VAT excluded) Layout Plan Location Map 229 Actual View INFRASTRUCTURE AND FACILITY There are 20 blocks of apartments and 72 villas for experts with many utilities to serve the daily life of residents such as kindergartens, schools, fitness centers, and commercial centers, convenience stores, traditional markets, parks, etc. The project provides accommodation for 18,000 employees working in the industrial Parks and surrounding areas. Technical infrastructure system is built in sync, ensuring the standards of a Green-Clean-Nice-Modern Industrial Park. - Internal transportation systems: Two main roads are 40m in width. Other internal roads have the width of 24 - 35m. All roads were asphalted with concrete and designed to be able to load H30 in compliance with Vietnamese standard. - Power supply: 110/22KV; capacity 2x63 MVA - Water supply: The projects are supplied with water by Phan Thiet Water Plant with a capacity of 18,000m3/day-night; The waterworks of Ham Kiem Industrial Park (01 km from the Industrial Park) with a capacity of 20,000m3/day-night is under construction to fulfill the demand of secondary projects. - Contact information: 15,000-telephone lines are linked with telecommunication system of Binh Thuan Province. - Wastewater treatment system: The plant has a capacity of 17,000m3/day-night with 2,500m3/day-night in the first period. The enterprises will treat their wastewater into column B - Vietnamese standard No. QCVN 40:2011/BTNMT, the centralized wastewater treatment plant will treat wastewater into column A- Vietnamese standard No. QCVN 40: 2011/BTNMT. List of Projects in Ham Kiem II Industrial Zone No. Name of Company Nationality Business line 1 Vietnam LPG filling Vietnam Production of plywood Vietnam Footwear processing Taiwan Footwear processing Beliza Shoe materials processing Brunei Shoe materials processing 7 Ho Chi Minh City Petroleum SingleMember Limited Liability Company Dai Ngan Transport Logistics Company Limited Binh Tan Consumer Goods Manufacturing Company Limited Right Rich International Company Limited Thanh Vuong Footwear Accessories And Materials Company Limited Yuan Lin Footwear Materials Company Limited Du Hung Company Limited Taiwan Complete sole shoes processing 8 Hoang Phu Company Limited Taiwan Footwear processing 9 Fu Ding Company Limited Republic of Seychelles Manufacture of sports equipment 10 Sheh Fung Crews Company Limited Taiwan Manufacture of screws 11 Viet Nhat Binh Thuan Company Limited Vietnam Manufacture of iron and steel mechanical products, wastewater treatment system 2 3 4 5 6 230 12 13 14 15 16 Binh Tan Consumer Goods Manufacturing Company Limited Nhat Tan Garment Company Limited Vietnam Production of all kind of shoes Vietnam Garment Phuoc Thanh Electrical Equipment Joint Stock Company Southern Gas Trading Joint Stock Company Golden Accord Holdings Limited Vietnam Warehouse for electrical products Vietnam LPG storage and filling station Republic of Seychelles Production of solar panel components 231 SONG BINH INDUSTRIAL PARK GENERAL INFORMATION Address Investor Contact Person Location Investment Sectors Minimum wage Lease term Song Binh commune, Bac Binh district, Binh Thuan province. Name of Investor: Rang Dong Joint Stock Company ▪ Address: J45 Ton Duc Thang street, Phan Thiet city, Binh Thuan province ▪ Tel: 02523 822301; Fax: 02523832317 ▪ Email: rangdong@rangdonggroup.com.vn ▪ Website: www. rangdonggroup.com.vn Name: Le Van Nhi Position: General Director Mobile: 0918022261 Email: vannhi1977@gmail.com Adjacent location - Located near the major titanium mine (not included in the titanium investigation boundary, 12km away from the mining area) facilitate the transport and process. - 700m from National Highway 28B - 5km from the South-North railway - 2 km from Phan Thiet – Vinh Hao Expressway - 10km from National Highway 1A, - 50km from Phan Thiet City center, and - 60km from the Vinh Tan International Deep-water Port, Tuy Phong district Priority Sectors for Processing sectors: As the only industrial Park which specialized in Investment deep processing of titanium minerals with 03 major product groups and Ancillary product group: - Major product groups + Titanium Clinker, Artificial rutile, fine and superfine Zirconia. + Pigmentum (Anata), Zirconia compounds (such as zirconium oxychloride). + Titanium sponge, titanium alloy. - Ancillary product groups: + Ancillary products are input materials for factories in the main product group: Separation of ore concentrates; Production of sulfuric acid (H2SO4), acid chloride (HCl), sodium hydroxide (NaOH) and other chemical production facilities supporting deep processing. + Group of auxiliary products using products of the main product group: Manufacture of cast iron and steel, welding rods, raw materials for ceramic industry, whiteners, heat-resistant materials (For titanium slag, core rutile group). create, smooth and superfine zircon); Manufacture of paints and raw materials for plastics, coatings, paper, ink and fibers (for pigments, zircon compounds); Metal alloy casting, hot rolling, alloy cold (For the group of porous titanium, metallic titanium, titanium alloy). Titanium ores after extraction from the coastal area of Binh Thuan Province such as Bac Binh - Tuy Phong, Luong Son Sub-region, Northern Phan Thiet Region, Ham Thuan Nam region, Ham Tan region, etc. will be transported to the processing plant in the industrial Park for deep-processing to produce the high economic value products for export and domestic production needs. Investment Restricted Outside the list of allowed sectors for Investment Sectors [Area IV] According to Decree 38/2022/ND-CP 2013-2063 Minimum Lease Area No request Limit for Construction Height Lower than 40 m, according to land area Permitted Construction Rate From 35% to 70%, according to land area and height 232 Planned area Operation Status Occupancy Rate and Number of Projects Number of Korean projects Lease fee Operating fee ▪ Total area: 300 ha ▪ Total vacant leasable area: 202.32 ha ▪ In Operation ▪ 41.23% and 3 projects ▪ Non ▪ Land lease fee: 60-66 USD/m2 (One-time payment, VAT excluded); 4 USD/m2 (Annual payment, VAT excluded) ▪ Management fee: 0.4 USD/m2 per year (VAT excluded) ▪ Electricity fee: According to State prices ▪ Water fee: 0.4 VND/m3 (VAT excluded) ▪ Wastewater treatment fee: 0.5 USD/m3 (VAT excluded) Layout Plan 233 Location Map Actual View INFRASTRUCTURE AND FACILITY Technical infrastructure system is built in sync, ensuring the standards of a modern Industrial Park. - Transport: Transport system in the industrial Parks is arranged in a rectangular grid, among which is 50m wide main road from 28B NHW connecting the functional areas, the other roads connected to the main road to create a smooth transportation system, ensuring to access to each plot. The total length of internal roads is 17.51 km. - Power supply: There is a 110KV/22KV transformer station on D3 road, connected from 110 KV of Dai Ninh - Phan Ri Line to Song Binh Industrial Park, which is the electricity source for the production of the Industrial Park. The total capacity of 02 phases is 126 MVA (period to 2015, the capacity of 63 MVA; period of 2016-2020, the capacity of 63 MVA); 22KV power line connected 63 MVA station (total capacity of 02 phases is 120 MVA) and run along the roads in the industrial Park to provide factories. 234 - Water supply: The daily-life water treatment area is constructing with a capacity of 30,000 m3/day-night, incorporating HDPE, D150cm and D100cm piping systems to reach each land lot in the industrial Park to secondary investors under their demand. - Telecommunications: Communications systems for the industrial park will be paired in the telecommunication network of Binh Thuan Province through the local postal system, and junction boxes shall be connected to gates of the factories in the Industrial Park. - Wastewater treatment system: Industrial & services wastewater must be collected to a central processing system (30,000 m3/daynight) of the Industrial Park and processing to meet the grade A under standards No. QCVN 40:2011/BTNMT. List of Projects in Song Binh Industrial Zone No. Name of Company Nationality Business line 1 Song Binh Minerals Joint Stock Company GPM_RDG Titanium Company Limited Song Binh Minerals Joint Stock Company Vietnam Zircon powder British Virgin Islands Titanium slag processing Vietnam Pigment processing 2 3 235 TUY PHONG INDUSTRIAL PARK GENERAL INFORMATION Address Investor Contact Person Location Investment Sectors Vinh Hao commune, Tuy Phong district, Binh Thuan province. Name of Investor: Tan Dai Tien Limited Company ▪ Address: Service operations area of Tuy Phong Industrial Park, Vinh Hao commune, Tuy Phong district, Binh Thuan province, Vietnam ▪ Tel: 02837815238; Fax: 02837815238 ▪ Email: tandaitienbinhthuan@yahoo.com.vn Name: Ngo Trong Nghia Position: General Director Mobile: 03272033.88 Email: nghia@tpip.vn Adjacent location - 6km from Vinh Tan General Port - 0.9 km from Vinh Hao Railway station - Adjacent to 1 National Highway and Phan Thiet – Vinh Hao – Cao Lam Highway Priority Sectors for Investment Investment Restricted Sectors Minimum wage Lease term Minimum Lease Area Limit for Construction Height Permitted Construction Rate Planned area [Area IV] According to Decree 38/2022/ND-CP 2008-2058 No request - Admistrative office: The height of the ground floor is from 5 to 7m, the remaining floors are from 3 to 5m Factory: No request - Admistrative office: Bulding Density: 40-45% Factory: Building Density: Lower than 70% ▪ Total area: 150 ha ▪ Total vacant leasable area: 97.9 ha Operation Status ▪ Under construction Occupancy Rate and Number of Projects ▪ Under construction Number of Korean projects Lease fee Steel & aluminum rolling industry (no operation of steel & aluminum refining); Manufacturing industry of pharmaceuticals, cosmetics and medical equipment; Agro-forestry-seafood processing industry; Manufacturing industry group of construction materials; Mechanical assembly industry group; Paper industry group (no operation of pulp manufacturing); Manufacturing industry group of household appliances; Manufacturing industry of wood products; Manufacturing industry group of electronics, microelectronics, software; Rubber industry group (no rubber latex processing); Grease blending (no regeneration); Manufacturing and processing industry of products from salt and salt post-products and plastic products; Chemical warehouse and storage (no receipt of chemicals on the list of banned chemicals and minerals defined in Appendix II - the Investment Law of 2014). Outside the list of allowed sectors for Investment ▪ Non ▪ Land lease fee: 40-60 USD/m2 (One-time payment, VAT excluded) 236 Operating fee ▪ Management fee: 0.3 USD/m2 per year (VAT excluded) ▪ Electricity fee: According to State prices ▪ Water fee: According to State prices ▪ Wastewater treatment fee: 0.3 USD/m3 (VAT excluded) Layout Plan Location Map 237 Actual View INFRASTRUCTURE AND FACILITY - Internal traffic roads: Two main roads are 30m in width. Other internal roads have the width of 24 - 18m, have elastic modules under A1 high-quality road and Eyc ≥ 155Mpa, ensuring that containers and other vehicles can transport easily and conveniently. - Electricity: 110/22KV, total capacity of 40 MV, may increase under actual use demand, the power-grid along the roads is 22kV. - Water: Water treatment plant with capacity of 7,500m3/day-night. Main pipeline system is Ø 200 - 300mm, branch pipeline is Ø 150mm - Ø 100mm. - Wastewater treatment system: The plant has a capacity of 4,000m3/day-night with 2,000m3/day-night in the first period. The enterprises will treat their wastewater into column B - Vietnamese standard No. QCVN 40:2011/BTNMT, the centralized wastewater treatment plant will treat wastewater into column A- Vietnamese standard No. QCVN 40: 2011/BTNMT. - Telecommunication: Telecommunication is smooth by using FTTx Internet technology with high speed up to 2.5 Gb/s and postal service to meet investors' demands on Information technology in the Industrial Park. 238 TAN DUC INDUSTRIAL PARK GENERAL INFORMATION Address Investor Contact Person Location Investment Sectors Minimum wage Lease term Minimum Lease Area Planned area Operation Status Occupancy Rate and Number of Projects Number of Korean projects Tan Duc commune, Ham Tan district, Binh Thuan province Name of Investor: Sonadezi Binh Thuan Shareholding Company. ▪ Address: Floor 12th of Sonadezi Tower – No. 1, Street 1, Bien Hoa 1 Industrial Park, An Binh Ward, Bien Hoa City, Dong Nai Province, Vietnam ▪ Tel: 0251883656; Fax: 02518836060 ▪ Email: sonadezibinhthuan@szt.com.vn Name: Phan Thuy Doan Position: Deputy General Manager Mobile: 0943393963 Email: sonadezibinhthuan@szt.com.vn Adjacent location - Adjacent to National Highway 1A, - About 3 km from the boundary of Dong Nai Province - About 60 km from Phan Thiet City - About 95 km from Ho Chi Minh City - 3 km from Phan Thiet – Dau Giay Expressway Priority Sectors for Manufacturing and processing industries such as Food products and Investment beverages; Textiles and weaving of textiles (except Dyeing); Wood and products of wood and cork; Paper and paper products; Pharmaceuticals, medicinal chemical and botanical products; Fabricated metal and other non – metallic mineral products (except Plating); Rubber and plastic products; Computer, electronic and optical products; Electrical equipment; Machinery and equipment; Motor vehicles, other motor vehicles and other transport equipment; Manufacture and distribution of electricity, gas, hot water, steam and air conditioning; Some service activities. Investment Restricted Outside the list of allowed sectors for Investment Sectors [Area IV] According to Decree 38/2022/ND-CP 2021-2071 No request ▪ Total area: 300 ha ▪ Total vacant leasable area: 209.33 ha ▪ Site clearance and compensation works are in progress; Expected investment in the construction of technical infrastructure in 2022 and attraction of secondary projects in 2023. ▪ Non ▪ Non 239 Layout Plan Location Map 240 Actual View 241 SON MY 1 INDUSTRIAL PARK GENERAL INFORMATION Address Investor Contact Person Location Investment Sectors Minimum wage Lease term Minimum Lease Area Son My commune, Ham Tan district, Binh Thuan province Name of Investor: Son My Industrial Park Investment Construction and Trading Infrastructure Joint Stock Company ▪ Address: Son My commune, Ham Tan district, Binh Thuan province ▪ Tel: 0924768568 ▪ Email: info@ipico.com.vn ▪ Website: www.ipico.com.vn Name: Khuong Trung Thuy Position: Chairman of the Board and General Director Mobile: 0924768568 Email: thuy.khuong@ipico.com.vn Adjacent location - Adjacent to 55 National Highway connecting Ba Ria - Vung Tau Province to Binh Thuan Lam Dong - 10 km from La Gi Town - 90 km from Phan Thiet City - 60 km from Thi Vai - Cai Mep Deep-water Port Priority Sectors for Manufacturing the ceramic tiles, woodwork, interior decoration; Investment clothing industry manufacturing; household appliances manufacturing; mechanics, electronics and electric industry; constructional materials industry; agricultural, forestry and fishery products processing plant; food, fruit, soft drinks processing plant; consumer goods, knitting, leather shoes and household appliances manufacturing; assembling and manufacturing of mechanics, electricity and electronics; clean industries, not polluting the environment, etc. Investment Restricted Outside the list of allowed sectors for Investment Sectors [Area II] According to Decree 38/2022/ND-CP 2018-2068 No request Limit for Construction Height - Administrative Office: Depending on operating conditions and terrain - Factory: From 1-3 floors Permitted Construction Rate Buiding density: 45.01% Planned area Operation Status ▪ Total area: 1,070 ha ▪ Total vacant leasable area: 740 ha ▪ The project has approved the investment policy by the Prime Minister and the completed the legal procedures; tasks related to technical infrastructure, site clearance and compensation are in progress (the construction start date is August 30th 2022); expected to attract secondary investors in late 2023. Occupancy Rate and Number of Projects ▪ Non Number of Korean projects ▪ Non 242 Layout Plan 243 SON MY 2 INDUSTRIAL PARK GENERAL INFORMATION Address Location Minimum wage Lease term Minimum Lease Area Planned area Operation Status Son My commune, Ham Tan district, Binh Thuan province Adjacent location - Adjacent to Son My 1 Industrial Park - Next to Nationak Highway 55 connecting to Ba Ria – Vung Tau to Binh Thuan – Lam Dong - 10 km from Lagi commune - 90 km from Phan Thiet city - 60 km from Thi vai – Cai Mep Deep-water Port [Area IV] According to Decree 38/2022/ND-CP ▪ Under legal, is in the process of preparation for investment No request ▪ Total area: 540 ha ▪ Total vacant leasable area: 330 ha ▪ Under legal, is in the process of preparation for investment Occupancy Rate and Number of Projects ▪ Non Number of Korean projects ▪ Non Layout Plan 244 [- This Page is intentionally left blank -] 245 CA MAU 246 INVESTMENT ENVIRONMENT IN CA MAU GENERAL INFORMATION Area and population ▪ Area: 5,221 km2 ▪ Population: 1.2 Million (2022) Geographical Location ▪ Ca Mau province is the southernmost province of Vietnam, in the Mekong Delta. ▪ Ca Mau province is located far from the city. Ho Chi Minh City 350 km and far from Ho Chi Minh City. Can Tho 180 km. Adjacent provinces ▪ Ca Mau province borders Kien Giang province to the North, Bac Lieu province to the Northeast, the East and Southeast borders to the East Sea, and the West and Southwest borders to the Gulf of Thailand. GRDP 2022 statistic: ▪ Real GRDP: 73.529 Billion VND. (3,10 Billion USD) ▪ GRDP growth: 10,41% ▪ GRDP per capita: 60,9 million VND/year. ▪ Economic structure - Industry - Construction: 28,5%; - Agriculture: 34,6%; - Service: 32,9%; - Tax on goods: 4,0%. Industry growth 2022 statistic: ▪ Industry - Construction growth: 1,8% ▪ Agriculture growth: 0,8% ▪ Service growth: 0,7%. PCI Score: 61.60 - Rank: 58th SOCIAL INFRASTRUCTURE Transportation ▪ Roadway: National Highway 1, National Highway 63, Quan Lo - Phung Hiep National Highway, Southern Coastal Corridor Road, Ho Chi Minh Road very well meet the needs of travel, production and transportation of goods of the country. people and businesses inside and outside the province. ▪ Airway: Ca Mau airport is 2 km from the center of Ca Mau city, with a total runway length of 1,500 m. ▪ Waterway: Cua Lon, Tam Giang, Ganh Hao, Bay Hap, Doc, Dam Doi, Cai Tau, Trem Trem rivers are very convenient for waterway transport, freight transport and circulation with the provinces of the River Delta. Kowloon. Ca Mau has 1 seaport and 4 river ports, connecting with Can Tho City and Ho Chi Minh City by waterway through the Ho Chi Minh City - Nam Can route. ▪ Seaport: Nam Can seaport is located upstream of Cua Lon river in Nam Can town, Nam Can district. Currently, the port is capable of receiving ships of 3,000 DWT. Electricity ▪ Electricity supplied from the national grid 220/110/22KW provides electricity for Ca Mau province. Water ▪ Ca Mau has 03 main water sources, including: rainwater, saltwater and groundwater. In addition, there are 3 sources of mineral water, so the water supply system is good and stable. Education & Training ▪ 02 universities, 03 colleges, 01 professional secondary school and vocational education institutions, ... distributed in most localities in the province. Medicare ▪ There are 133 medical examination and treatment facilities in Ca Mau province. In which, there are 15 hospitals; 01 Nursing and rehabilitation hospital; 01 Dermatology Hospital; 21 regional polyclinics; 94 Commune and ward health stations and 01 other medical facility. INVESTMENT CONDITION Human resource ▪ 62,55% of population are in the working age (2022) Education level ▪ Trained labor rate: 34% (2022) Salary ▪ Salary division by region I, II, III: Salary according to regulations of each region. ▪ Minimum wage for skilled workers: According to the agreement between the Enterprise and the employee. Investment incentives ▪ Incentives decided by the government: According to regulations on land rent, corporate income tax, import and export tax. ▪ Incentives decided by the province: None. 247 Fields Attracting Investment ▪ Key projects: Hon Khoai General Seaport Project; Projects on eco-tourism, resort, entertainment,...; the projects of airport urban area, new urban area, ecology, resort and sport in Ca Mau province; infrastructure projects of industrial parks, economic zones, industrial clusters,... ▪ Focused areas: Agricultural, forestry and fishery processing industries; invest in innovation in production technology of new, high-value-added products; The field of energy, renewable energy (wind power, gas power, solar power, biomass power) - orientation in the near future will be to export electricity to foreign countries; Infrastructure of industrial parks, economic zones, industrial clusters; Map Contact Economic Zone Management Board of Ca Mau Province ▪ Address: 91 - 93 Ly Thuong Kiet, Ward 5, Ca Mau City Tel: 0290.3825866 ▪ Fax: 0290.3825477 ▪ Email: banqlkkt@gmail.com. ▪ Person in charge of contact: Duong Hoai Nam - Head of Economic Zone Management Board. 248 LIST OF CA MAU PROVINCE INDUSTRIAL PARK NO. NAME 1 Khanh An Industrial Zone TOTAL AREA (HA) 235,86 OCCUPANCY RATE 100% 2 Hoa Trung Industrial Zone 3 Song Doc Industrial Zone in the South STATUS In operation 326 100% In operation 100 100% In operation KHANH AN INDUSTRIAL ZONE GENERAL INFORMATION Address Located in Khanh An commune, U Minh district, Ca Mau province (adjacent to Ca Mau Gas Electricity - Fertilizer Industrial Complex) Contact Person - Name: Duong Hoai Nam, Position: Head of Economic Zone Management Board. - Phone number: 0913.767.866, Email: duonghoainam71@gmail.com Location - 10 km from the center of Ca Mau City; - 12 km from Ca Mau airport; - 40 km from Song Doc estuary (Tran Van Thoi district, Ca Mau province), 63 km from Nam Can port (Nam Can district, Ca Mau province), 295 km from Can Tho port, 2,000-ton ships can travel easily easy. Areas of investment promotion Investment Area Restricted areas of investment Minimum wage As a multi-industry industrial park, focusing on orienting main business lines such as: port services, agricultural product processing, seafood processing, mechanical industry, animal feed and fertilizer processing industry ; electronic industry, textile, consumer goods production; forestry products processing industry; natural gas liquefaction industry, post-gas industry; construction materials manufacturing industry, packaging production, PA bags, PE bags; recycled plastic pellets, biomass electricity, gas electricity, food CO2, industrial gas. According to regulations of the Law. Minimum regional salary according to 38/2022/ND-CP: Belongs to area III. Minimum Lease Area 49 years. ▪ Starting time: Since the decision to lease the land. ▪ End time: According to the land lease decision. Not specified. Limit for Construction Height - Factory construction area: The height of the building depends on the type of production and the technological line of the factory. - Administrative - service area: Up to 5 floors. Permitted Construction Rate - Factory construction area: Maximum construction density: 70%; The factory has more than 05 floors used for production with a construction density of 60%. - Administrative - service area: 40%. Planned area ▪ Total area: 235.86 ha. ▪ Leaseable area: 164.11 ha. ▪ Area with infrastructure ready for factory construction: No. Lease term Factory Available for Rent None 249 Operation Status In operation Occupancy Rate and Number of Projects 91%. Number of Korean Projects None Lease fee ▪ Land rental cost: Land price along road N1 and D6 road in Khanh An Industrial Park: 450,0000 VND/m2/land lease term (one-time payment form) (applicable only to land areas leased by the State)). ▪ Workshop rental cost: No. Operating fee ▪ Management cost (Infrastructure usage fee): VND 4,872/m2/year. ▪ Electricity cost: According to EVN's price, according to the Electricity Price Notice of Ca Mau province. ▪ Water cost: 10,000 VND/m3 ▪ Waste water treatment fee: There is no specific price. Because the investor's wastewater treatment plant project is being completed, the price list has not been issued. ▪ Waste treatment fee]: No specific price yet. Because the investor's wastewater treatment plant project is being completed, the price list has not been issued. INFRASTRUCTURE AND FACILITY Distance to banks, educational institutions, healthcare, main roads, city center...: 10 km from Ca Mau city center and 12 km from Ca Mau airport, convenient in transactions with Banks, educational institutions, healthcare,... Map 250 LIST OF SOME NOTABLE TENANTS No. Company Name Nationality Bussiness line 1 Ca Mau gas processing plant Vietnam Ca Mau gas processing plant 2 Khanh An water plant construction investment project A Hui Packaging Factory Aquabest Ca Mau unburnt brick construction factory Khanh An service port construction investment project Ca Mau LPG storage and filling station project Factory producing high-tech building materials, light building materials, rare materials Operation Manager of Ca Mau Power Transmission Team Invest in building BTS station and self-standing Antenna 110KV substation and connection line Hong Lam high-tech concrete factory Aquatic feed and microbiological fertilizer processing factory Seafood processing factory Vietnam Khanh An Water Plant Vietnam A Hui Packaging Factory Aquabest Ca Mau unburnt brick construction factory Investment in construction of Khanh An service port Vietnam Seafood processing factory Factory for processing agricultural products and extracting essential oils C.P Ca Mau aqua feed factory Vietnam Factory for processing agricultural products and extracting essential oils C.P Ca Mau aqua feed factory Construction of LPG filling stations and warehouses A Hui Packaging Factory Plastic Investment project to build a wood processing factory Khanh An Wood Power Plant Project Construction of concentrated wastewater treatment plant in Khanh An Industrial Park Vietnam 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Vietnam Vietnam Vietnam Vietnam Vietnam Vietnam Vietnam Vietnam Vietnam Thailand Vietnam Vietnam Vietnam Vietnam 251 Ca Mau LPG storage and filling station project Factory producing high-tech building materials, light building materials, rare materials Operation Manager of Ca Mau Power Transmission Team Invest in building BTS station and self-standing Antenna 110KV substation and connection line Hong Lam high-tech concrete factory Aquatic feed and microbiological fertilizer processing factory Construction of LPG filling stations and warehouses A Hui Packaging Factory - Plastic Investment project to build a wood processing factory Khanh An Wood Power Plant Project Construction of concentrated wastewater treatment plant in Khanh An Industrial Park 21 22 23 24 25 26 Investment project to build Minh Phu Seafood Processing Factory Investment project to build ice factory + Technical zone for production Investment project to build Minh Qui seafood processing factory Investment project to build Minh Phat seafood processing factory Investment project to build Quang Minh Packaging Factory Trung Diep Mekong Packaging Factory Vietnam Investment project to build Minh Phu Seafood Processing Factory Vietnam Investment project to build ice factory + Technical zone for production Investment project to build Minh Qui seafood processing factory Vietnam Vietnam Investment project to build Minh Phat seafood processing factory Vietnam Investment project to build Quang Minh Packaging Factory Trung Diep Mekong Packaging Factory Vietnam 252 HOA TRUNG INDUSTRIAL ZONE GENERAL INFORMATION Address Luong The Tran commune, Cai Nuoc district, Ca Mau province. Contact Person - Name: Duong Hoai Nam, Position: Head of Economic Zone Management Board. - Phone number: 0913.767.866, Email: duonghoainam71@gmail.com Location Surrounding Areas - 05 km from Ca Mau city center; - 07 km from Ca Mau airport; - 48 km from Nam Can port (Nam Can district, Ca Mau province), convenient for both road and waterway traffic. Areas of investment promotion Exporting seafood processing industries, products from animal husbandry, production of animal and poultry feed; Food processing industry, food, biological products, feed for aquaculture and supporting industries for production and processing; mining industry and other building materials production; Warehousing, services Restricted areas of investment According to regulations of the Law. Investment Area Minimum wage Minimum regional salary according to 38/2022/ND-CP: Belongs to area III Lease term 49 years. Minimum Lease Area Not specified. Limit for Construction Height - Factory construction area: Maximum construction height of 20 m. - Administrative - service area: Maximum building height is 25m. Permitted Construction Rate Allowable building density - Factory construction area: 50% - Administrative - service area: up to 40% Planned area ▪ Total area: 326 ha. ▪ Leaseable area: 197.6 ha. ▪ Area with infrastructure ready for factory construction: None Factory Available for Rent None Operation Status In progress of site clearance Occupancy Rate and Number of Projects 11%. Number of Korean Projects 0 projects. Lease fee ▪ Land rental cost: Currently, Hoa Trung Industrial Park has no investor in infrastructure business, so the State directly leases land to investors. Therefore, the price is applied according to the land price issued in the 5-year periodic land price list for the period 2020-2024 according to Decision 41/2019/QD-UBND dated December 20, 2019 of the Provincial People's Committee. and 253 Operating fee Decision 33/2021/QD-UBND dated November 4, 2021 of the Provincial People's Committee on Supplementing the Price List of all types of land every five years for the period 2020-2024 according to Decision 41/2019/QD-UBND December 20, 2019. ▪ Workshop rental cost: No. ▪ Management cost (Infrastructure usage fee): No. ▪ Electricity cost: According to EVN's price, according to the Electricity Price Notice of Ca Mau province. ▪ Water cost: 10,000 VND/m3 ▪ Waste water treatment fee: There is no specific price. Because there are no investors. ▪ Waste treatment fee]: No specific price yet. Because there are no investors. INFRASTRUCTURE AND FACILITY Distance to banks, educational institutions, healthcare, main roads, city center...: Adjacent to National Highway 1A, 5 km from Ca Mau city center, 7 km from Ca Mau airport, convenient in transactions with banks, educational institutions, healthcare,... List of enterprises in Hoa Trung Industrial zone Company Name Nationality Bussiness line No. 1 2 3 4 5 6 7 8 9 10 11 Hoa Trung Seafood Processing Factory Investment project to build Minh Chau import and export seafood processing factory Investment project to build chintin factory and invest in the production of hydrolyzed protein, shrimp powder The factory produces shrimp paste, shrimp meal and products from seafood waste Investment project on factory processing fish cakes, salted fish with chili and fish sauce production. Ice factory Vietnam Dai Duong seafood processing and exporting factory Factory producing food, food materials, raw materials for animal and aquaculture feeds from aquatic by-products Seafood processing plants Vietnam Seafood processing and processing factory Investment project to build seafood processing factory Vietnam Vietnam Vietnam Vietnam Vietnam Vietnam Vietnam Taiwan Vietnam 254 Hoa Trung Seafood Processing Factory Investment project to build Minh Chau import and export seafood processing factory Investment project to build chintin factory and invest in the production of hydrolyzed protein, shrimp powder The factory produces shrimp paste, shrimp meal and products from seafood waste Investment project on factory processing fish cakes, salted fish with chili and fish sauce production. Ice factory Dai Duong seafood processing and exporting factory Factory producing food, food materials, raw materials for animal and aquaculture feeds from aquatic by-products Seafood processing plants Seafood processing and processing factory Investment project to build seafood processing factory SONG DOC INDUSTRIAL ZONE THÔNG TIN TỔNG QUAN Address Phong Dien commune, Tran Van Thoi district, Ca Mau province. Investor Song Doc Industrial Park Infrastructure Investment Construction Joint Stock Company. ▪ Address: Song Doc Industrial Park, Phong Dien Commune, Tran Van Thoi District, Ca Mau Province, Vietnam. Tel: 0902.678.080 ▪ Email: khucongnghiepsongdoc@gmail.com. ▪ Website: No. - Name: Hua Kien Thanh, Position: Director. Contact Person - Phone number: 0902.678.080, - Email: khucongnghiepsongdoc@gmail.com Location - 50 km from Ca Mau city center; - 52 km from Ca Mau airport; - Located adjacent to Song Doc estuary (Tran Van Thoi district, Ca Mau province) about 1.5 km, adjacent to the Gulf of Thailand, 3,000-ton ships can travel easily. Areas of investment promotion Processing aquatic products, processing agricultural and forestry products, repairing ships, processing aquaculture feeds, household products and handicrafts from aquatic shells. Restricted areas of investment According to regulations of the Law. Investment Area Minimum wage Minimum regional salary according to 38/2022/ND-CP: Belongs to regional salary 3. Lease term 49 years. Minimum Lease Area Not specified. Limit for Construction Height Factory construction area: average height 13m; for buildings other than industrial, up to 5 floors. Permitted Construction Rate - Factory construction area: 70% - Administrative - service area: up to 40% Planned area ▪ Total area: 100 ha. ▪ Area with infrastructure ready for factory construction: No. Factory Available for Rent ▪ Total factory space for lease: No. Operation Status [In operation/under construction of infrastructure and expected to be completed in…./in progress of site clearance]: Site clearance in progress. 255 Occupancy Rate and Number of Projects ▪ Occupancy rate and number of projects in the area: No. Number of Korean Projects ▪ Number of Korean projects in the area: 0 projects. Lease fee ▪ Land rental cost: Land rental price for Song Doc Industrial Park Infrastructure Construction Investment Joint Stock Company implementing the Southern Song Doc Industrial Park Infrastructure Investment and Business Project: applied according to land price. promulgated in the 5-year periodic price list of all types of land for the period 2020-2024 according to Decision 41/2019/QD-UBND dated December 20, 2019 of the Provincial People's Committee and Decision 33/2021/QD-UBND dated November 4, 2021 of the Provincial People's Committee on Supplementing the 5-year periodic price list of all types of land for the period 2020-2024 according to Decision 41/2019/QD-UBND dated December 20, 2019; Operating fee ▪ Administration cost (Infrastructure usage fee): No. ▪ Electricity cost: According to EVN's price, according to the Electricity Price Notice of Ca Mau province. ▪ Water cost: 10,000 VND/m3 ▪ Waste water treatment fee: There is no specific price. Because there are no investors. ▪ Waste treatment fee]: No specific price yet. Because there are no investors. INFRASTRUCTURE AND FACILITY Distance to banks, educational institutions, healthcare, main roads, city center...: Adjacent to National Highway 1A, 50 km from Ca Mau city center, 52 km from Ca Mau airport, convenient in transactions with banks, educational institutions, healthcare,... Map 256 [- This Page is intentionally left blank -] 257 CAN THO 258 INVESTMENT ENVIRONMENT IN CAN THO GENERAL INFORMATION Area. Population Geographical Location Area: 1.442,4 km2 Population: 1.295.700 People (2022 statistic) Located in the Northeastei n/South region of Vietnam. Located 1,877 km from Hanoi, 169 km from Ho Chi Minh City , more than 150 km from Ca Mau city, nearly 120 km from Rach Gia , 264 km from Phnom Penh ( Cambodia ). Adjacent provinces GRDP 2022 statistic: GRDP: 117.500 billion VND GRDP growth: 12,64 % GRDP per capita: 85,99 million VND/year Economic structure: - Agriculture, forestry and fishery accounted for 9.65%; - Industry and construction accounted for 31.03%; - Service sector accounted for 52.47%; - Product tax minus product subsidies accounted for 6.85% Industry growth PCI To the north, to the west, to the east, and to the south. The North borders An Giang The East borders Dong Thap and Vinh Long The West borders Kien Giang To the South, it borders Hau Giang . 2022 statistic: Agriculture, forestry and fishery increased by 0.63%; Industry and construction increased by 9.22%; The service sector increased by 8.55%; Product tax minus product subsidies increased by 2.76% Score: 66,94 - ranked 19 out of 63 cities and provinces in Vietnam. (2022) SOCIAL INFRASTRUCTURE Transportation Electricity Roadway: FreeWay: Cần Thơ – Hồ Chí Minh; Châu Đốc – Cần Thơ – Hậu Giang - Sóc Trăng; Cao tốc Lộ Tẻ - Rạch Sỏi Railway: Cần Thơ – Hồ Chí Minh (project) Waterway: Cái Cui Port, Hoàng Diệu Port, Thốt Nốt Port. Other: Cần Thơ International Airport Can Tho Thermal Power Company manages and operates 2 plants with a total capacity of 848 MW, including: Can Tho Thermal Power Plant (188 MW) and O Mon I Thermal Power Plant (660 MW). Water Education Can Tho city currently has 9 universities, 16 colleges, 1 institute, 2 branches and 12 professional secondary schools in the province Medicare In 2020, the city will have 34 hospitals. In which, there are 28 general and specialized hospitals and 7 hospital lines in districts. INVESTMENT CONDITION Human resource 49,51% of population are in the working age (2022) Education level Trained labor rate: 82,12% (2022) Salary The minimum salary for the province is applied as follows: 4.160.000 VND 259 Investment incentives Incentives according to government regulations: Incentives from the province: - Infrastructure investors: During basic construction time, To be exempted from land rent for a maximum of 03 (three) years from the date of issuance of the land lease decision. ect. - Secondary investor: Preferential corporate income tax rate of 17% for 10 years, tax exemption for 2 years and 50% reduction of payable tax for the next 4 years. Fields Attracting Investment Prioritized projects: Industry Map Contact Address: No. 17 Tran Binh Trong street, Ninh Kieu, Can Tho city, Can Tho Tel: (0292) 3830235 Fax: (0292) 3830570 Email: sokhdt@cantho.gov.vn 260 LIST OF INDUSTRIAL ZONES IN CAN THO PROVINCE NO INDUSTRIAL ZONE NAME TOTAL AREA (HA) OCCUPANCY RATE STATUS 1 Tra Noc 1 Industrial Zone 135 99.89% In Operation 2 3 4 Tra Noc 2 Industrial Zone Thot Not Industrial Zone Hung Phu 1 Industrial Zone 155 104 262 93.53% 64.33% 15.82% In Operation In Operation In Operation 5 6 7 Hung Phu 2A Industrial Zone Hung Phu 2B Industrial Zone Vinh Thanh Industrial Zone (phrase 1) 134 67 293.7 43.59% 98.00% -- In Operation In Operation Under construction LOCATION MAP OF INDUSTRIAL ZONES IN CAN THO PROVINCE 261 TRA NOC 1 INDUSTRIAL ZONE GENERAL INFORMATION Address Investor Contact Person Location Investment Sectors Tra Noc ward, Binh Thuy District, Can Tho city CAN THO INDUSTRIAL PARKS INFRASTRUCTURE CONSTRUCTION JSC Address: 72 Mau Than Streets, An Nghiep Ward, Ninh Kieu Distric, Can Tho City Tel: 02923 733 609 – Fax: 02923 830 374 Email: cipcocantho@gmail.com Website: www. xaydunghatangkcncantho.com Name: Mr Vo Ngoc Ho Position: Member of Management Council Email: hongocvo20@gmail.com Adjacent location: - 10 km from Can Tho city center - 1 km from Tra Noc airport, 2.5 km from Can Tho airport - 3 km from Can Tho seaport Priority Sectors for Investment Investment Restricted Sectors Minimum wage Lease term Minimum Lease Area Limit for Construction Height [Area 2] According to Decree 38/2022/ND-CP 50 years N/A - Permitted Construction Rate Planned area N/A Factory Available for Rent N/A Operation Status Occupancy Rate and Number of Projects Number of Korean projects Lease fee Operating fee Food and food processing; mechanical, electrical, electronic, machinery parts manufacturing, automobile industry, building material industry, consumer goods manufacturing industry, pharmaceuticals... N/A N/A ▪ Total area: 130.8 (ha) ▪ Total vacant leasable area: 0.2 (ha) ▪ Active 133 Projects 0 Project ▪ Land lease fee: 40-60 USD/m2/year; ▪ Factory lease fee: 2,5-4,0 USD/m2/year ▪ Management fee: 0.4 USD/m2/year ▪ Electricity fee: 0.05 USD/month ▪ Water fee: 0.4 USD/m3/month ▪ Wastewater treatment fee: 0.28 USD/m3/month 262 263 TRA NOC 2 INDUSTRIAL ZONE GENERAL INFORMATION Address Investor Contact Person Location Investment Sectors Phuoc Thoi ward, O Mon District, Can Tho city CAN THO INDUSTRIAL PARKS INFRASTRUCTURE CONSTRUCTION JSC Address: 72 Mau Than Streets, An Nghiep Ward, Ninh Kieu Distric, Can Tho City Tel: 02923 733 609 – Fax: 02923 830 374 Email: cipcocantho@gmail.com Website: www. xaydunghatangkcncantho.com Name: Mr Vo Ngoc Ho Position: Member of Management Council Email: hongocvo20@gmail.com Adjacent location: - 10 km from Can Tho city center - 1 km from Tra Noc airport, 2.5 km from Can Tho airport - 3 km from Can Tho seaport Priority Sectors for Investment Investment Restricted Sectors Minimum wage Lease term Minimum Lease Area Limit for Construction Height [Area 2] According to Decree 38/2022/ND-CP 50 years N/A - Permitted Construction Rate Planned area N/A Factory Available for Rent N/A Operation Status N/A ▪ Total area: 157.7 (ha) ▪ Total vacant leasable area: 16.5 (ha) ▪ Active Occupancy Rate and Number of Projects 79 projects Number of Korean projects 01 project Lease fee Operating fee Food and food processing; mechanical, electrical, electronic, machinery parts manufacturing, automobile industry, building material industry, consumer goods manufacturing industry, pharmaceuticals... N/A ▪ Land lease fee: 40-60 USD/m2/year; ▪ Factory lease fee: 2,5-4,0 USD/m2/year ▪ Management fee: 0.4 USD/m2/year ▪ Electricity fee: 0.05 USD/month ▪ Water fee: 0.4 USD/m3/month ▪ Wastewater treatment fee: 0.28 USD/m3/month 264 265 HUNG PHU 1 INDUSTRIAL ZONE GENERAL INFORMATION Address Investor Contact Person Location Investment Sectors Minimum wage Lease term Tan Phu ward, Cai Rang district, Can Tho city SAIGON-CANTHO INDUSTRIAL PARK CORPORATION Address: 28, Bui Quang Trinh Street, Phu Thu Ward, Cai Rang District, Can Tho City. Tel: 0292 3918 386 Email: cadif@cantho.gov.vn N/A Adjacent location: - 4km from Can Tho city center - 12km from Can Tho airport to the Southeast - 11km from Can Tho port, 01km from Cai Cui port - 6km from Can Tho Bridge - 2km from National Highway 1A - 180 km from Ho Chi Minh city center Priority Sectors for Food and food processing; mechanical, electrical, electronic, Investment machinery parts manufacturing, automobile industry, building material industry, consumer goods manufacturing industry, pharmaceuticals... Investment Restricted N/A Sectors [Area 2] According to Decree 38/2022/ND-CP 50 years Minimum Lease Area N/A Limit for Construction Height N/A Permitted Construction Rate Planned area N/A Factory Available for Rent N/A Operation Status ▪ Total area: 262 ha ▪ Total vacant leasable area: N/A ▪ Active Occupancy Rate and Number of Projects 79 projects Number of Korean projects 01 project Lease fee Operating fee ▪ Land lease fee: 40-60 USD/m2/year; ▪ Factory lease fee: 2,5-4,0 USD/m2/year ▪ Management fee: 0.4 USD/m2/year ▪ Electricity fee: 0.05 USD/month ▪ Water fee: 0.4 USD/m3/month ▪ Wastewater treatment fee: 0.28 USD/m3/month INFRASTRUCTURE Electricity distribution system 22 kW power source runs along the industrial park. 266 Water system With a clean water plant with a capacity of 5000m3/day and night Internal road Road 1A with a width of 47m Logistics Wastewater treatment system Others There is Cai Cui international port located in the industrial zone ready to serve ships with a tonnage of up to 20,000 tons. with a wastewater treatment plant with a treatment capacity of more than 10,000m3/day Hung Phu 1 Industrial Park also provides a series of other convenient services including: 24/7 security service, fire prevention, logistics, maintenance. maintenance, construction of factories, waste collection, banks,... Location/Map 267 HUNG PHU 2A INDUSTRIAL ZONE GENERAL INFORMATION Address Investor Contact Person Location Tan Phu ward, Cai Rang district, Can Tho city BRANCH OF BMC CAN THO CONSTRUCTION MATERIAL AND TRADE CONSTRUCTION COMPANY LIMITED Address: 48B Ba Trieu street, Tan An Ward, Ninh Kieu District, Can Tho City Tel: 02923 733 609 – Fax: 02923 830 374 Email: cipcocantho@gmail.com Website: www. xaydunghatangkcncantho.com Name: Mr NGUYEN TIEN DUNG Position: Director Mobile: 0939000999 Adjacent location: - 4km from Can Tho city center Investment Sectors Priority Sectors for Investment Investment Restricted Sectors Minimum wage Lease term [Area 2] According to Decree 38/2022/ND-CP 50 years Minimum Lease Area N/A Limit for Construction Height N/A Permitted Construction Rate Planned area N/A Factory Available for Rent N/A Operation Status ▪ Total area: 134 (ha) ▪ Total vacant leasable area: 0.2 (ha) ▪ Active Occupancy Rate and Number of Projects 9 projects Number of Korean projects 0 project Lease fee Operating fee Mechanical manufacturing, electronic assembly, agricultural, aquatic, seafood processing, livestock and poultry frozen, canning, construction materials manufacturing, pharmaceutical production... N/A ▪ Land lease fee: 40-60 USD/m2/year; ▪ Factory lease fee: 2,5-4,0 USD/m2/year ▪ Management fee: 0.4 USD/m2/year ▪ Electricity fee: 0.05 USD/month ▪ Water fee: 0.4 USD/m3/month ▪ Wastewater treatment fee: 0.28 USD/m3/month INFRASTRUCTURE Electricity distribution system Water system 22 kW power source runs along the industrial park. With a clean water plant with a capacity of 5000m3/day and night 268 Internal road Logistics Wastewater treatment system Others Road 1A with a width of 47m There is Cai Cui international port located in the industrial zone ready to serve ships with a tonnage of up to 20,000 tons. with a wastewater treatment plant with a treatment capacity of more than 10,000m3/day Hung Phu 2A Industrial Park also provides a series of other convenient services including: 24/7 security service, fire prevention, logistics, maintenance. maintenance, construction of factories, waste collection, banks,... Location/Map 269 HUNG PHU 2B INDUSTRIAL ZONE GENERAL INFORMATION Address Investor Contact Person Location Investment Sectors Minimum wage Lease term Tan Phu ward, Cai Rang district, Can Tho city CAN THO INDUSTRIAL PARKS INFRASTRUCTURE CONSTRUCTION JSC Address: 72 Mau Than Streets, An Nghiep Ward, Ninh Kieu Distric, Can Tho City Tel: 02923 733 609 – Fax: 02923 830 374 Email: cipcocantho@gmail.com Website: www. xaydunghatangkcncantho.com Name: Mr Vo Ngoc Ho Position: Member of Management Council Email: hongocvo20@gmail.com Adjacent location: - 167km from Ho Chi Minh City - 170km from Tan Son Nhat International Airport, 201km from Long Thanh International Airport - 164km from New Saigon Port, 173km from Cat Lai Port, 220km from Thi Vai Port, 260km from Vung Tau Port Priority Sectors for Mechanical manufacturing, electronic assembly, agricultural, Investment aquatic, seafood processing, livestock and poultry frozen, canning, construction materials manufacturing, pharmaceutical production... Investment Restricted N/A Sectors [Area 2] According to Decree 38/2022/ND-CP 50 years Minimum Lease Area N/A Limit for Construction Height N/A Permitted Construction Rate Planned area N/A Factory Available for Rent N/A ▪ Total area: 62.63 (ha) ▪ Total vacant leasable area: N/A Operation Status ▪ Active Occupancy Rate and Number of Projects 1 project Number of Korean projects 1 project Lease fee Operating fee ▪ Land lease fee: 40-60 USD/m2/year; ▪ Factory lease fee: 2,5-4,0 USD/m2/year ▪ Management fee: 0.4 USD/m2/year ▪ Electricity fee: 0.05 USD/month ▪ Water fee: 0.4 USD/m3/month ▪ Wastewater treatment fee: 0.28 USD/m3/month INFRASTRUCTURE Electricity distribution system 22 kW power source runs along the industrial park. Water system With a clean water plant with a capacity of 5000m3/day and night Internal road Road 1A with a width of 47m 270 Logistics Wastewater treatment system Others There is Cai Cui international port located in the industrial zone ready to serve ships with a tonnage of up to 20,000 tons. with a wastewater treatment plant with a treatment capacity of more than 10,000m3/day Hung Phu 2B Industrial Park also provides a series of other convenient services including: 24/7 security service, fire prevention, logistics, maintenance. maintenance, construction of factories, waste collection, banks,... Location/Map THOT NOT INDUSTRIAL ZONE GENERAL INFORMATION Address Thoi Thuan ward, Thot Not District, Can Tho city 271 Investor Contact Person Location Investment Sectors Minimum wage Lease term CAN THO EXPORT PROCESSING & INDUSTRIAL ZONES AUTHORITY Address: National Route No.91, Thoi Thuan ward, Thot Not district, Can Tho city Tel: 0710.3 854 408 - 0710. 3851 903; Fax: 0710.3 854 408 Email: ttxdhtkcnthotnot@cantho.gov.vn; Website: www. xaydunghatangkcncantho.com Name: Mr Le Van Tran - Position: Director Mobile: 0918.294.880; Email: levantran1964@gmail.com Adjacent location: - 167km from Ho Chi Minh City - 170km from Tan Son Nhat International Airport, 201km from Long Thanh International Airport - 164km from New Saigon Port, 173km from Cat Lai Port, 220km from Thi Vai Port, 260km from Vung Tau Port Priority Sectors for Mechanical manufacturing, electronic assembly, agricultural, Investment aquatic, seafood processing, livestock and poultry frozen, canning, construction materials manufacturing, pharmaceutical production... Investment Restricted N/A Sectors [Area 2] According to Decree 38/2022/ND-CP 50 years Minimum Lease Area N/A Limit for Construction Height N/A Permitted Construction Rate Planned area N/A Factory Available for Rent N/A Operation Status Occupancy Rate and Number of Projects Number of Korean projects Lease fee Operating fee ▪ Total area: 134 (ha) ▪ Total vacant leasable area: 0.2 (ha) ▪ Active 20 projects 0 project ▪ Land lease fee: 40-60 USD/m2/year; ▪ Factory lease fee: 2,5-4,0 USD/m2/year ▪ Management fee: 0.4 USD/m2/year ▪ Electricity fee: 0.05 USD/month ▪ Water fee: 0.4 USD/m3/month ▪ Wastewater treatment fee: 0.28 USD/m3/month INFRASTRUCTURE Electricity distribution system 22 kW power source runs along the industrial park. Water system With a clean water plant with a capacity of 5000m3/day and night Internal road Road 1A with a width of 47m Logistics Wastewater treatment system There is Cai Cui international port located in the industrial zone ready to serve ships with a tonnage of up to 20,000 tons. with a wastewater treatment plant with a treatment capacity of more than 10,000m3/day 272 Others Hung Phu 1 Industrial Park also provides a series of other convenient services including: 24/7 security service, fire prevention, logistics, maintenance. maintenance, construction of factories, waste collection, banks,... Location/Map 273 VINH THANH INDUSTRIAL ZONE (STATE 1) GENERAL INFORMATION Address Investor Contact Person Location Investment Sectors Tra Noc ward, Binh Thuy District, Can Tho city VSIP CAN THO JOINT STOCK COMPANY Address: Vinh Trinh ward, Vinh Thanh district, Can Tho city Name: Mr Bui Chi Vu Mobile: 0907355411 Adjacent location: - 10 km from Can Tho city center - 1 km from Tra Noc airport, 2.5 km from Can Tho airport - 3 km from Can Tho seaport Priority Sectors for Investment Investment Restricted Sectors Minimum wage Lease term Minimum Lease Area Limit for Construction Height [Area 2] According to Decree 38/2022/ND-CP 50 years N/A - Permitted Construction Rate Planned area N/A Factory Available for Rent N/A Operation Status Occupancy Rate and Number of Projects Number of Korean projects Lease fee Operating fee Food and food processing; mechanical, electrical, electronic, machinery parts manufacturing, automobile industry, building material industry, consumer goods manufacturing industry, pharmaceuticals... N/A N/A ▪ Total area: 130.8 (ha) ▪ Total vacant leasable area: 0.2 (ha) ▪ Under construction N/A 0 Project ▪ Land lease fee: N/A; ▪ Factory lease fee: N/A ▪ Management fee: N/A ▪ Electricity fee: N/A ▪ Water fee: N/A ▪ Wastewater treatment fee: N/A 274 [- This Page is intentionally left blank -] 275 CAO BANG 276 INVESTMENT ENVIRONMENT IN CAO BANG USD/VND 23.510 GENERAL INFORMATION Area Population Geographical Location Adjacent provinces 6703,42 km2 0,543 million people (2022) ▪ Cao Bang is located in Northeast region. ▪ Located in North-East of Vietnam, the North and North-East side of the province shares border with Guangxi Province (China) ▪ 286 km from Hanoi Center, 267 km from Noi Bai Airport, 324 km from Hai Phong Port, 125 km from Lang Son ▪ The Province has Guangxi (China) to the North and Northeast, Bac Kan and Lang Son Province to the South and Tuyen Quang Province and Ha Giang Province to the West. 2022 statistic: ▪ Nominal GRDP (billion VND): GRDP ▪ Real GRDP (billion VND): 21.635 ▪ GRDP growth: 5,04% ▪ GRDP per capita (million VND/year): 37,00 (0,49 billion USD) (1612 USD) ▪ Economic structure: Industry growth Import Export Key Industry PCI Ranking - Industry - Construction: 20,76% - Agriculture. forestry and fishery: 21,74% - Service: 53,75% ▪ Industry - Construction growth: 3,91% ▪ Agriculture, forestry and fishery growth: 3,00% ▪ Service growth: 6,01% Import turnover (billion USD): 0,59 (Growth rate: 3,85) Export turnover (billion USD): 0,15 (Growth rate: -0,55) Mineral Processing 56,29 63 SOCIAL INFRASTRUCTURE ▪ Roadway: The road system has total of 4,608 km in length, including national roads, provincial roads, civic roads, roads in districts and villages. National roads run through the province are: National Road 03 (HanoiThai Nguyen- Bac Can- Cao Bang), 4A (Hanoi- Lang Son- Cao Bang) and 34 (connecting the Province and Ha Giang). The Highway Project Dong Dang (Lang Son)- Tra Linh (Cao Bang) is under Geological examination, which will decrease time to travel Hanoi- Cao Bang into 2.5 hours. ▪ Railway: None Transportation ▪ Waterway: The Province has diversified water system: 113 km of Bang Giang River originated from China, 55km of Gam River, 77 km of Bac Vong River, 76 km of Quay Son River. However they are not favourable for waterway development. ▪ Airway: None ▪ Other: Ta Lung International Border gates and 03 main border gates (two-sided) including Tra Linh Border Gate, Soc Giang and Ly Van Border gates and other sub-border gates, open-ways on the borderland between Vietnam and China Cao Bang’s power authority is currently in charge of managing approx. 85km of 110kV power network, more than 600km of 35kV power network. Besides national power network, Cao Bang has developed its own such as Cun stream hydroelectricity plant in Cao Bang town, Na Tau hydroelectricity plant in Quang Hoa district, etc. Electricity The province is constructing Na Loa hydroelectricity plant which is the ever largest hydroelectricity plant of the province to serve local household and production needs. Cao Bang town is supply water by a water treatment station using French technology and other townlets were Water supplied by gravity water supplies. 277 Education & Training Medicare ▪ 02 colleges; 03 technical high schools; 04 vocational centers. ▪ There are 38 public medical facilities, including Cao Bang General Hospital, Cao Bang Hospital of Traditional Medicine, 14 District General Hospitals and many Medical Clinics located in districts. INVESTMENT CONDITION Human resource 65.67% of population are in the working age (2022) Education level Trained labor rate: 48,2% (2022) ▪ The minimum salary for the province is applied as follows: - Area I (4,680,000 VND/month): N/A - Area II (4,160,000 VND/month): N/A Salary - Area III (3,640,000 VND/month): Cao Bang City - Area IV (3,250,000 VND/month): Trung Khanh, Ha Quang, Bao Lac, Bao Lam, Ha Lang, Hoa An, Nguyen Binh, Phuc Hoa, Thach An, Tra Linh, Thong Nong, Quang Uyen district (Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages paid to employees working under employment contracts) Investment incentives Fields Attracting Investment ▪ Incentives according to government regulations: - Exemption and reduction for land and water rent fee - Preferential tax rates and exemption period, reduction for corporate income tax. - Import tax exemption ▪ Prioritized projects: Manufacturing of new materials and energies, products of high technology, biotechnology, Information Technology; mechanism; aquaculture, agro-forestry cultivation, salt production; the production of artificial seed, plant seeds and new animal breeds; utilizing the advantages of high technology and modern techniques; ecological environment protection. Investment attraction situation Up to now, Cao Bang has 17 FDI projects with the total investment capital is about 36.43 million US dollars. Investors mainly come from China Industrial zones Cao Bang's Cao Bang Border Gate Economic Zone, which is divided into four regions. Each region has one key economic border gate which directly connects with China's border gate system., including Ta Lung, Soc Giang, Ta Linh, Ly Van. It used to have 2 industrial zones, including Chu Trinh, De Tham. However, De Tham Ip has been converted to industrial complex, while Chu Trinh IP is under construction. Map Cao Bang Department Of Planning And Investment Contact ▪ Address: No. 30, Xuan Truong Street, Hop Giang Ward, Cao Bang City, Cao Bang Province. 278 ▪ Tel: (84-206) 3 852 182 ▪ Email: sokhdt@caobang.gov.vn ▪ Contact person: - Mr. Be Xuan Tien - Head of Cao Bang Department Of Planning And Investment 279 LIST OF INDUSTRIAL ZONES IN CAO BANG No. Industrial zone Name Total Area (ha) Occupancy Rate Status 1 De Tham Industrial Zone 92.21 ha 15.81% In Operation 2 Chu Trinh Industrial Zone 81 ha 0% 3 Cao Bang Economic Zone 30,130 ha N/A 4 Tra Linh Border Gate Economic Zone N/A N/A Under Construction, Ready in 2020 Active, Under construction Active, Under construction CAO BANG’S LOCATION MAP OF INDUSTRIAL ZONES 280 DE THAM INDUSTRIAL ZONE GENERAL INFORMATION ▪ Hoang Dinh Giong Road, Hop Giang Ward, Cao Bang City, Cao Bang province Address Investor Minimum wage Department of Urban Management - People’s Committe of Cao Bang City ▪ Address: No. 032 Dam Quang Trung street, Hop Giang Ward, Cao Bang city, Cao Bang Province ▪ Tel: (84-206) 3 852 500 Fax: (84-206) 3 854 643 ▪ Email: quanlydothi.thixa@gmail.com Contact person of Cao Bang Economic Zone Management Board: ▪ Mr. Nguyen Kien Cuong- Head of Management Board(84) 912 695 168 - cuongnk@caobang.gov.vn ▪ Mr. Nguyen Van Thanh- Head of Department of Environment and Natural Resource Management - (84) 912 221 563 - thanhnv@caobang.gov.vn ▪ 280 km to Hanoi Center ▪ 310 km to Hai Phong Deep Sea Port ▪ 250 km to Noi Bai International Airport Priority Sectors for • Precision mechanical engineering industry; electronics industry, Investment information technology; consumer goods industry (textiles, footwear, ceramics ...) • Agro-forestry processing industry • Other industries such as manufacturing high-class construction materials, packaging, assembling and manufacturing motorbike spare parts ... Restricted Sectors for Polluted Industries Investment [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries Lease term 50 years Minimum Lease Area Unlimited Limit for Construction Height Permitted Construction Rate Planned area N/A Contact Person Location Investment Area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean Projects Lease fee N/A ▪ Total area: 92.21 ha ▪ Total leasable area: 79.5 ha N/A In Operation ▪ Occupancy rate: 15.81% ▪ Number of projects: 02 None ▪ Land lease fee: 2,760 VND (~ 0.12 USD)/m2/year ▪ Infrastructure maintenance fee: 828 VND (~0.037 USD)/m2 ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: 11,500 VND (~ 0.5 USD)/m3 ▪ Wastewater Treatment: N/A ▪ Waste Treatment: N/A INFRASTRUCTURE AND FACILITY Operating fee Financial institution Tax service, State finance office Customs Service BIDV, Vietcombank, Vietinbank, LienViet PostBank, Agribank,… have their bank branches located nearby ▪ Located nearby the IZ ▪ 2 km to Customs Department of Cao Bang Logistics N/A Post office Cao Bang Post Office is located nearby the IZ Medicare ▪ 1 km to Cao Bang Hospital of Traditional Medicine ▪ 2 km to Cao Bang General Hospital 281 Police, public security Located nearby Police station of Cao Bang city and Police Station of Cao Bang Province Universities, training facilities, etc. Recruitment ▪ 4 km to Cao Bang Vocational School, 15 km to Cao Bang Economic Technical School Worker dormitory Not available Worker's child education facility One-stop service 9 kindergartens are located nearby (0.5-2 km) Road Width N/A IT & Telecommunication Facilities Emergency Power generator Fire-fighting facility Full service available for domestic and international communication via telecommunication, Fax, Internet N/A N/A N/A Available Layout Plan Location Map Actual View N/A 282 CHU TRINH INDUSTRIAL ZONE GENERAL INFORMATION Address Investor Location Chu Trinh commune, Cao Bang city, Cao Bang province Cao Bang Industrial Park Infrastructure Development Company ▪ 10km to Cao Bang Center Investment Area Priority Sectors for Investment Lease term 50 years Minimum Lease Area Limit for Construction Height Permitted Construction Rate 1ha Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean Projects Lease fee Operating fee • Warehouses, wharves, yards and warehouses for transshipment of goods, production and processing of agricultural, forestry and fishery products, production, business and import-export services N/A 60% for factory building 40% for managing area ▪ Total area: 80,941 ha ▪ Total leasable area: 54,655 ha N/A In Operation ▪ Occupancy rate: 0.5% None 20-30 USD 0.2USD/m2 INFRASTRUCTURE AND FACILITY BIDV, Vietcombank, Vietinbank, LienViet PostBank, Agribank,… have their bank branches Financial institution located nearby N/A One-stop service Road Width IT & Telecommunication Facilities Emergency Power generator N/A Full service available for domestic and international communication via telecommunication, Fax, Internet N/A 283 Layout Plan Actual View N/A 284 [- This Page is intentionally left blank -] 285 DA NANG 286 INVESTMENT ENVIRONMENT IN DA NANG GENERAL INFORMATION Area, Population ▪ Area: 1.285 km2 ▪ Population: 1,189,275 people (2021 statistic) Geographical Location Located in the Central of Vietnam. Adjacent provinces ▪ Thua Thien Hue province to the north ▪ Quang Nam province to the south. 2022 statistic: GRDP ▪ GRDP: 125.219 billion VND ▪ GRDP growth: 14,05% ▪ GRDP per capita: 4.313 USD/year (102.6 millionVND) ▪ Economic structure: - Industry - Construction: 20,43 %; - Agriculture. forestry and fishery: 1,95 %; - Service: 63,38 %; - Tax on Goods: 9,24 % 2022 statistic: Industry growth PCI ▪ Industry - Construction growth: 6,39 % ▪ Agriculture, forestry and fishery growth: 3,39 % ▪ Service growth: 17,85 % ▪ Score: 68.52 – ranked 09 out of 63 cities and provincesin Vietnam. (2021) SOCIAL INFRASTRUCTURE ▪ Roadway: The system of roads inside and outside the city is constantly being expanded and constructed, linkingthe city center with neighboring urban areas. - Being the Eastern gateway to the Pacific Ocean of the East-West Economic Corridor connecting Laos, NortheastThailand and Myanmar, strengthening Da Nang's connection with neighboring countries in Indochina,creating opportunities to develop a modern logistics cluster and a modern trade center serving Southeast Asia. Transportation - Along with National Highway 1A, National Highway 14B and Ho Chi Minh Road running along the domestic border to the South of Vietnam, the Da Nang - Quang Ngai Expressway with a length of 130km and a width of 26m facilitates the circulation of goods and economic development in the region, connecting Da Nang with ChuLai Open Economic Zone, Dung Quat Economic Zone and Central Highlands cities such as Kon Tom, Pleiku andBuon Ma Thuot. - La Son - Tuy Loan Expressway of 80 km long, from LaSon junction (Thua Thien Hue) to Tuy Loan junction (DaNang) is to strengthen the connection between provinces in the Central Key Economic Zone. ▪ Railway: The Ministry of Transport has approved to relocate the existing railway station out of the city center 287 and build a dedicated passenger and freight station. Thus, by integrating and enhancing the connectivity ofthese infrastructures, the potential for tourism and logistics of Da Nang has been enhanced, forming a stronglogistics cluster for the expanded Da Nang region. ▪ Seaway: Tien Sa seaport with a capacity of 12 millionDWT can receive general cargo ships with a tonnage of 50,000 DWT, container ships of 4,000 TEUs, passengerships of 150,000 GRT; 25 container ships/week, with international shipping routes to Hong Kong, Singapore, Japan, Taiwan, South Korea, Europe, U.S.A and countriesaround the world. The current cargo handling capacity is estimated at 8 million tons/year. The city is calling for investment in Lien Chieu Port in the North of the city with a capacity of 50,000 DWT to meet the economic development of the city in particular and the central region in general in the coming time. AfterLien Chieu Port is invested and operated, Tien Sa Port will be converted into a tourist port. ▪ Airway: Da Nang Airport is one of the three largest andmost modern international airports in Vietnam, with a capacity of 15 million passengers annually, including 31 direct international routes to Da Nang with a total frequency of 480 trips/week. The city is promoting the construction of terminal T3 of the Da Nang International Airport with a capacity of 30 million passengers per year,increasing the capacity of Da Nang International Airport to 42 million passengers per year. ▪Education and training institutions in the city are providing training in the Education direction of multi-disciplinaryand multi-field with prioritized areas including tourism,information technology, high technology, logistics and international business. The whole city currently has 06 professional intermediate schools, 13 colleges, 17 universities and 03 international universities including Pegasus (Singapore), AUV (USA) and VNUK (UK). ▪More than 64,000 graduates annually, 112/398 schoolsthat meet national standards, there are joint programs between the University of Da Nang and foreign universities (in English, Japanese and French). ▪ The number of general hospitals in the city is 13, of which there are 08 private Medicare hospitals, 09 specialized hospitals and 01 international general hospital (Vinmec),with 03 hospitals having international departments including Da Nang General Hospital, Hoan My Hospitaland Family Hospital), together with 07 commune/ward medical centers. ▪ Number of human resources in the health sector: the totalnumber of doctors in the city is 1,824, of which 82.5% are working in public hospitals and 17.5% are working inprivate hospitals. 288 INVESTMENT CONDITION ▪ In 2021, the labor force aged over 15 working in economic sectors is 534,865 Human resource people, accounting for 45%of the total city population. The trained workforce reached 47.7%. ▪ Labor productivity and average income have steadilyincreased over the Education level years. The education and technical qualifications of the workforce are gradually improving.It is forecasted that by 2025, Da Nang City will have about 690,000 employees, by 2030 there will be about 798,000 employees serving the sectors of service, industry - construction with an average of 75 - 80%; 20-25% respectively and the rest is working in fisheries agriculture - forestry sector. The rate of additional employment will reach 5-5.5%/year, the rate of trainedworkers will reach over 70%. ▪ Regional minimum salary: 161 USD/month ▪ Average salary (USD/month) - Manufacturing Salary + Workers: 203 USD + Engineer: 311 USD + Manager: 621 USD - Service + Office staff: 316 USD + Manager: 1,058 USD Investment incentives Proposed by investors ▪ Prioritized projects: (1) Microelectronics, Fields Attracting Investment mechatronics and opto-electronics, (2) Biotech, (3) information and communication technology (ICT), (4) Automation, Precision mechanics, (5) New energies, nanotech, new materials, (6) Tech applied for petrochemistry and other special industries. Map 289 Da Nang Hi-tech Park and Industrial Zones Authority Contact ▪ Address: Lot A17, Center Road, Hoa Lien Commune,Hoa Vang District, Da Nang City ▪ Tel: (84) 236 3666117 ▪ Email: dhpiza@danang.gov.vn 290 LIST OF INDUSTRIAL ZONES IN DA NANG No Industrial zone Name Occupancy Rate Status Da Nang Hi-tech Park Total Area (ha) 1,128.4 1 42.31% In operation 2 Lien Chieu Industrial Zone 289.35 56.14% In operation 3 Da Nang Industrial Zone 50.1 100% In operation 4 Hoa Khanh Industrial Zone 394 100% In operation Expanded Hoa Khanh Industrial Zone 132.6 100% In operation 5 Da Nang Seafood Service Industrial Zone 50.63 100% In operation 6 Hoa Cam - Phase I Industrial Zone 136.73 100% In operation Hoa Cam - Phase II Industrial Zone 120 0% 7 Hoa Nhon Industrial Zone 360 0% 8 Hoa Ninh Industrial Zone 400 0% Finding Developers Finding Developers Finding Developers DA NANG’S LOCATION MAP OF INDUSTRIAL ZONES 291 DANANG HI-TECH PARK GENERAL INFORMATION Address Hoa Lien Commune, Hoa Vang District, Da Nang City Da Nang Hi-tech Park and Industrial Zones Authority Investor ▪ Address: Lot A17, Center Road, Hoa Lien Commune, Hoa VangDistrict, Da Nang City ▪ Tel: (84) 236 3666117 ▪ Email: dhpiza@danang.gov.vn Contact Person Location Mr. Vu Quang Hung – Director - Mobile: (84) 236 3666117 - Email: hungvq@danang.gov.vn Adjacent location Investment Sectors 22 km from city center; 17 km from Da Nang international airport; 25 km from Tien Sa port; 22 km from Da Nang station. Priority Sectors for (1) Microelectronics, mechatronics and opto- Investment electronics, (2) Biotech, (3) information and communication technology (ICT), (4) Automation, Precision mechanics, (5) New energies, nano tech, new materials, (6) Tech applied for petrochemistry and other specialindustries Investment In accordance with current lawsRestricted Sectors Minimum wage Lease term Minimum LeaseArea Limit for Construction Height Permitted Construction Rate Planned area Zone II According to Decree 38/2022/ND-CP Proposed by investors Proposed by investors 1 – 6 floors 50-60% Total area: 1.128,4 ha Factory Available for Rent Operation Status Active Occupancy Rate and Number of Projects Da Nang Hi-Tech Park has so far attracted 29 projects totalling more than 900 million USD in registered investment capital. Number of Korean Proposed by investors 02 projects Lease fee To be considered for incentives for land rent exemption and reduction under the Government's Decree No. 04/2018/ND-CP dated January 4, 2018 stipulating the preferential mechanisms and policiesfor Da Nang Hi-tech Park 292 DA NANG HI-TECH PARK GENERAL INFORMATION Address ▪ Hoa Lien and Hoa Ninh Communes, Hoa Vang District, Danang City Investor Danang Hi-tech Park and Industrial Zones Authority ▪ Address: Lot A17 Centre Road, Da Nang Hi-tech Park, Hoa Lien, Hoa Vang, Da Nang ▪ Tel: (84-236) 3 211 088 ▪ Email: dhpiza@danang.gov.vn ▪ Website: dhpiza.danang.gov.vn Contact Person ▪ Mr. Pham Truong Son –Head of Da Nang Hi-tech Park and Industrial Zone – (84) 903 502 131 - sonpt.dng@gmail.com/ sonpt@danang.gov.vn ▪ Mr. Nguyen Xuan Dai – Manager of Investment Promotion Department – (84) 905 117 212 - dainx1@danang.gov.vn Location ▪ 5km from Lieu Chieu Port. ▪ 17km from Danang International Airport. ▪ 22km from the center city ▪ 25km from Tien Sa seaport. Priority Sectors for Investment Microelectronics, mechatronics and opto-electronics, Biotechnology, ICT, Automation, Precision mechanics, New energies, nano technology, new materials, Tech applied for petro chemistry and other special industries Restricted Sectors for Investment Restricted by the Law Investment Area Minimum wage [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries Lease term 50~70 years Minimum Lease Area 1ha (Expected average investment rate: 15million USD/ha) Limit for Construction Height In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning regulation (QCXDVN 01: 2008/BXD) Permitted Construction Rate No more than 6 floors- Construction area is not more than 60% of the total leased land lot Planned area ▪ Total area: 1,128.4 ha: - Hi-tech production area: 202.58ha - Logistics and hi-tech services area: 27.45ha - R&D, training and incubation area: 99.93ha - Residential area (31.4ha), Administrative area (28.35ha), Central technical infrastructure area (9.75ha) ▪ Vacant leasable area: 329.96 ha Factory Available for Rent ▪ Ready built factory (RBF) for lease: Under development Operation Status ▪ In operation Occupancy Rate and Number of Projects ▪ Occupancy Rate: 42.31% ▪ Number of Projects: 26 (Total investment: 818 million USD) - Tenants include Tokyo Keiki, Niwa Foundry, Yamato Sewing, Hatsuta Seisakusho, Inaba Rubber, Fujikin International (Japan), Universal Alloy Asia, United States Enterprises (semi conductors) (USA), Trung Nam EMS, ATOMA, Dapharco, Petrolimex (Vietnam), etc Number of Korean Projects ▪ 02 projects, including Dentium, VK Plus Lease fee ▪ Land lease fee: from 0.3 ~ 0.45 USD/m2/year, (depending of type of project and payment method) Operating fee ▪ Management fee: 0.2 USD/m2/year ▪ Electricity fee: N/A 293 ▪ Water fee: N/A ▪ Wastewater treatment fee: 0.2~0.3 USD/m3 INFRASTRUCTURE AND FACILITY Financial institution Bidv, Vietin Bank, Vietcombank, Agribank Tax service, State finance office 13 km from Thanh Khe – Lien Chieu Tax Office 13 km from Thanh Khe – Lien Chieu State Treasury Office Customs Service 9.4 from Hoa Khanh Customs Office Logistics NA Post office 8 km from Hoa Son Post Office/ Medicare 13.8 km far from Lien Chieu Medical Center (25 min by car) 21 km far from Da Nang General Hospital (35min by car) Police, public security 500 m from nearest Police Station Universities, training facilities, etc. 25 universities and colleges in Da Nang City. Far from IZ 4km is some of the popular university and college in Da Nang City such as Da Nang Polytechnic University, Da Nang Pedagogical University, and Da Nang Planning and Economics College… 19 professional secondary schools and 59 vocational training centers. Recruitment Management Board will support in recruitment Worker dormitory NA Worker's child education facility NA One-stop service Da Nang Hi-tech Park and Industrial Zones Authority is in charge of implementing all administrative procedures. Office of Da Nang Hi-tech park and Industrial Zones Authority will be located in Da Nang Hi-tech Park in the early 2020. Road Width ▪ The center route with cross-section width: W = 51m ▪ The subdivision routes with cross-section width: W = 22.5 m ÷ 33m ▪ The internal roads in each functional area with cross-section width: W = 8m ÷15m. ▪ The roads are connected in chessboard arrangement, convenient for transportation in the Park. IT & Tele-communication Facilities The telecommunication system complies with international standards and is always available for communication demand with high data transmission s Power Supply ▪ Danang Hi-Tech Park’s electricity is planned to be supplied by a 110/22KV station with a capacity of 2x63MVA which will be built in Hoa Lien. It is expected that by 2015 one 63MVA transformer will be put into operation ahead. The 110kV double circuit line power station will be connected to the 110kV line from Hoa Khanh to Hai Van Tunnel. ▪ Currently, the 110 kV substation with the capacity of 40MVA has started operation. Emergency Power generator Available Water Supply 10,000 m3 /day-night. Waste-water treatment System ▪ Total capacity: 18.000 m3/day, including 4 modules, each with the capacity of 4.500 m3/day. ▪ Wastewater from projects must reach class B before entering the Waste water treatment plant. Fire-fighting facility Available. Water supply system for firefighting is located along each road. 294 Layout Plan Location Map Actual View 295 296 LIEN CHIEU INDUSTRIAL ZONE GENERAL INFORMATION Address ▪ Hoa Hiep Bac Ward, Lien Chieu District, Da Nang City Investor ▪ Saigon-Danang Investment Corporation (SDN) ․ Address: 61 A Nguyen Van Cu Street, Lien Chieu District, Da Nang City ․ Tel: (84-236) 3 770 998 Fax: (84-236) 3 770 997 ․ Web: www.dananginvest.com Contact Person ▪ Ms. Le Thi Yen Nhi - Business Director – Mobile: (84) 908 312 030 - Email: yennhi.sdn@gmail.com/ nhi.le@dananginvest.com Location ▪ 15 Km from Danang City center ▪ 15 Km from Danang International Airport ▪ 25 Km to Danang Deep Seaport (Tien Sa Terminal) & Located right next to Lien Chieu Deep Seaport (under construction) ▪ Located right next to National Highway 1A and 15 Km from the national North-South railway station. Priority Sectors for Investment ▪ Information technology, biotechnology, automation technology and mechatronics, new materials technology; ▪ Environmental friendly industries, supporting industries in the field of mechanics, precision engineering, electricity - electronics; ▪ High quality service sectors, especially trade, tourism, logistics, health and education. (Decision No. 4286/QD-UBND on 4/7/2016) Restricted Sectors for Investment Production of iron, steel, construction materials, paper, chemicals, textiles and textile products ... Investment Area Minimum wage [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries Lease term ▪ Start date: 1996 ▪ End date: December 12th 2046 (12/12/2046) Minimum Lease Area 1 ha Limit for Construction Height In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning regulation (QCXDVN 01: 2008/BXD) Permitted Construction Rate Construction area is not more than 60% of the total leased land lot Planned area ▪ Total area: 289.35 ha ▪ Total vacant leasable area: 83 ha ▪ Total area with full infrastructure ready to build factory: 63.3 ha Factory Available for Rent ▪ Total area: Unavailable (Planning to build RFB) Operation Status In operation Occupancy Rate and Number of Projects ▪ 53.7% ▪ 25 projects Number of Korean Projects N/A Lease fee ▪ Land lease fee: 90 USD/m2 for the rest of Project’s life to December 12th 2046 (VAT excluded) ▪ Factory lease fee: 3 USD/m2/month (VAT excluded) ▪ Payment: In advance every 3 months of rental - Method: Bank transfer - Period: Deposit 40% after signing In principle Agreement – 55% After signing Land sublease contract – 5% after signing Land handover minutes. Operating fee ▪ Management fee: 0.4 USD/m2/year (before VAT) ▪ Electricity fee: According to the Circular by Ministry of Industry and Trade, valid from March 16th, 2015 (excluded VAT) for voltage from 22KV-110KV. ▪ Water fee: USD 0.37/m3 (Before Taxation and fees) 297 ▪ Wastewater treatment fee: 0.37 – 0.92 USD/ m3 depending on Chemical Oxygen demand (COD) (mg/l) INFRASTRUCTURE AND FACILITY Financial institution There are branches of all popular banks in Danang city Tax service, State finance office ▪ 10 km from Da Nang Tax office ▪ 10 km form Da Nang Treasury Office Customs Service ▪ 6 Km from the nearest Customs Agency (inside Hoa Khanh IZ) ▪ 16km from Da Nang port Logistics VNPOST, Yusen, Logitem, Nippon Konpo, Binh Vinh: 5 km far from the industrial park Post office 4 Km from the nearest Mailing Post Office Medicare Lien Chieu General Hospital 8 km from the IZ Danang General Hospital 15 km from the IZ Police, public security 1 Km from the nearest Police Station Universities, training facilities 25 universities and colleges in Danang City. Far from IPs 4km is some of the popular university and college in Danang City such as Danang Polytechnic University, Danang Pedagogical University, and Danang Planning and Economics College… Recruitment Supported by IZ developers Worker dormitory 5 km from the IZ Worker's child education facility 5 km from the IZ One-stop service 20 Km from the nearest Facility Road Width Roads connecting to land lots with width of 34.50m and 16.50m IT & Tele-communication Facilities Available Emergency Power generator Available Fire-fighting facility Available 298 Layout Plan Location Map 299 Actual View LIST OF PROJECTS IN LIEN CHIEU INDUSTRIAL ZONE No Company Name Nationality 1 Crown Beverage Packaging Danang Co., Ltd. Singapore 2 Endo Chuuzou Vietnam Company Limited Japan 3 Vietnam Craft Beer Company Limited US 4 Danang Chemical Industry Joint Stock Company Vietnam 5 Ngu Hanh Son Cement Joint Stock Company Vietnam 6 Vicem Hai Van Cement Joint Stock Company Vietnam 7 Da Nang Railway Material Company Limited Vietnam 8 875 Construction One Member Company Limited Vietnam 9 Vietnam TBV Joint Stock Company (formerly: Cosani) Vietnam 10 Southern Gas Trading Joint Stock Company Vietnam 11 Non Nuoc Joint Stock Company Vietnam 12 Da Nang Steel Joint Stock Company Vietnam 13 Danang Rubber Joint Stock Company Vietnam 14 Viet A Power Cable Company Limited Vietnam 15 Young Power Co. Ltd. Vietnam 16 Post and Telecommunication Joint Stock Company Vietnam 17 Thinh Phu Company Limited Vietnam 18 Northern Liquefied Gas Company Vietnam 19 Lilama 7 Joint Stock Company Vietnam 20 Song Da Someco Joint Stock Company Vietnam 21 Ton Dong A Joint Stock Company Vietnam 22 Tin Thanh Industrial Steam Co., Ltd Vietnam 23 Tay Ninh Industrial Infrastructure Development Joint Stock Company Vietnam 24 Viet Thai Plastic Joint Stock Company Vietnam 25 Kinh Bac Service Joint Stock Company Vietnam 300 HOA CAM - PHASE I INDUSTRIAL ZONE GENERAL INFORMATION Address ▪ Street No1, Hoa Cam Industrial Park, Hoa Tho Tay Commune, Cam Le District, Da Nang city Investor ▪ Hoa Cam Industrial Zone JSC. ․ Address: Street No1, Hoa Cam Industrial Park ․ Tel: (84) 914 109 667 ․ Fax: (84-236) 3 898 077 ․ Website: hoacamizi.com.vn Contact Person Mr. Nguyen Ba Cong- Head of Sales Department – Mobile: (84) 905 454 479 baconghoacamizi@gmail.com Location Land: 8 km from Da Nang city center, and 8 km from railway station Seaport: 18 km from Tien Sa Seaport Airport: 7 km from Da Nang International Airport Investment Area Priority Sectors for Investment Electric and electronic equipment, assembly, food product, construction material, interior décor, logistics, other industries (cosmetics, packaging..) Restricted Sectors for Investment Polluted Industry Minimum wage [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries Lease term ▪ Start date :30/9/2007 ▪ End date : 08/8/2054 Minimum Lease Area 4,000 m2 Limit for Construction Height In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning regulation (QCXDVN 01: 2008/BXD) Permitted Construction Rate Minimum rate: 50% Maximum rate: 60% Planned area ▪ Total area: - Phase I: 136.73 ha (in which industrial land: 96.13ha; vacant leasable area: 12 ha) - Phase II (Extended): 131 ha Factory Available for Rent NA Operation Status ▪ In operation Occupancy Rate and Number of Projects ▪ 100% Number of Korean Projects N/A Lease fee ▪ Land lease fee: 891,000 VND (~38.2 USD)/m2/whole project life ▪ Payment: One-time payment until 08 August 2054 Operating fee ▪ Management fee: 14,950 VND (~0.64 USD)/m2/year ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: (prescribed by the supplier) ▪ Wastewater treatment fee: Above 100m3: 12,000 VND (~0.51 USD)/m3 Under 100m3: 1,000,000 VND (~42.9 USD)/month INFRASTRUCTURE AND FACILITY Financial institution Vietcombank, ACB, Agribank, Techcombank Tax service, State finance office 03 km from Da Nang Treasury Office 301 Customs Service 5 km from nearest Customs Office 0.2 km to nearest ICD Logistics Located inside the IZ Post office 0.2 km from nearest Post Office Medicare 1 km from nearest Hospital Police, public security 0.1 km from nearest Police Station Universities, training facilities, etc. 6km from Dong A University and Da Nang Foreign Language University Recruitment 1 km from Provincial Human Resources Center Worker dormitory 0.2 km from the IZ Worker's child education facility 8 km from the IZ One-stop service Inside the zone Road Width Main road 60 m, 36 m and branch road 22 m in width IT & Tele-communication Facilities Telecommunication systems and international standards are always ready to meet the communication needs Emergency Power generator Available in the zone Fire-fighting facility Available Layout Plan Location Map 302 Actual View 303 EXPANDED HOA KHANH INDUSTRIAL ZONE GENERAL INFORMATION Address ▪ Hoa Khanh Bac Ward, Hoa Lien & Hoa Son Commune, Lien Chieu District, Da Nang City Investor Minimum wage ▪ Saigon-Danang Investment Corporation (SDN) ․ Address: 61 A Nguyen Van Cu Street, Lien Chieu District, Da Nang City ․ Tel: (84-236) 3 770 998 Fax: (84-236) 3 770 997 ․ Web: www.dananginvest.com ▪ Ms. Le Thi Yen Nhi - Business Director – Mobile: (84) 908 312 030 - Email: yennhi.sdn@gmail.com/ nhi.le@dananginvest.com ▪ 10 Km from Danang City center ▪ 10 Km from Danang International Airport ▪ 20 Km to Danang Deep Seaport (Tien Sa Terminal) 5km to Lien Chieu Deep Seaport ▪ 3 Km from National Highway 1A and 10 Km from the national North-South railway station Priority Sectors for ▪ Information technology, biotechnology, automation technology and Investment mechatronics, new materials technology; ▪ Environmental friendly industries, supporting industries in the field of mechanics, precision engineering, electricity - electronics; ▪ High quality service sectors, especially trade, tourism, logistics, health and education. (Decision No. 4286/QĐ-UBND on 4/7/2016) Restricted Sectors for Heavy-Industry, Textile & dying, Polluting industries Investment [Area 2] According to Decree 157/2018/ND-CP dated 16th November 2018 Lease term End date: March 25th 2054 Minimum Lease Area 1 ha Limit for Construction Height Permitted Construction Rate Planned area In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning regulation (QCXDVN 01: 2008/BXD) Contact Person Location Investment Area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean Projects Lease fee ▪ Total area: 132.6 ha ▪ Total vacant leasable area: 0.9 ha ▪ Total area with full infrastructure ready to build factory: 6.9 ha Total area: Unavailable (Planning to build RFB) In Operation ▪ Occupancy Rate: 100% N/A Operating fee ▪ Land lease fee: USD 110/m2/ for the rest of Project’s life to March 25th 2054 (before VAT) ▪ Factory lease fee: Unavailable ▪ Payment: - Method: Bank transfer - Period: Deposit 40% after signing Inprinciple Agreement – 55%After signing Land sublease contract – 5% after signing Land handover minutes ▪ Management fee: 0.4 USD/m2/year (before VAT) ▪ Electricity fee: According to the Circular by Ministry of Industry and Trade, valid from March 16th, 2015 (excluded VAT) for voltage from 22KV - 110KV. ▪ Water fee: USD 0.37/m3 (Before Taxation and fees) ▪ Wastewater treatment fee: 0.37 – 0.92 USD/ m3 depending on Chemial Oxygen demand (COD) (mg/l) INFRASTRUCTURE AND FACILITY Financial institution There are branches of all popular banks in Danang city. Tax service, State finance office Customs Service 5 Km from the nearest State Tax Office and Treasury Office Logistics 600 m from the nearest Customs Agency in Hoa Khanh IP 11km from Da Nang port [VNPOST, Yusen, Logitem, Nippon Konpo, Binh Vinh] inside the industrial park Post office 4 Km from the nearest Mailing Post Office 304 Medicare Police, public security Lien Chieu General Hospital (Far from IPs 3 km) Danang General Hospital (Far from IPs 10 km) 1 Km from the nearest Police Station Recruitment 25 universities and colleges in Danang City. Far from IPs 4km is some of the popular university and college in Danang City such as Danang Polytechnic University, Danang Pedagogical University, and Danang Planning and Economics College… Available Worker dormitory 5km from the IZ Worker's child education facility One-stop service 5km from the IZ Road Width Roads connecting to land lots with width of 34.50m and 16.50m IT & Telecommunication Facilities of industrial park Emergency Power generator Fire-fighting facility Telecommunication systems and international standards are always ready to meet the communication needs Universities, training facilities, etc. 15 Km from the nearest Facility Available Available in the zone Layout Plan 305 Location Map Actual View 306 [- This Page is intentionally left blank -] 307 DAK LAK 308 INVESTMENT ENVIRONMENT IN DAK LAK USD/VND 23.510 GENERAL INFORMATION Area Population Geographical Location Adjacent provinces 13125,37 km2 1,9 million people (2022) ▪ Dak Lak is located in the Central Highlands region. Dak Lak is 1,410 km far from Hanoi and 350 km from Ho Chi Minh City. - The East borders Khanh Hoa, Phu Yen provinces; - The North borders Gia Lai province; - The South borders Lam Dong, Dak Nong provinces; - The West borders the Kingdom of Cambodia. 2022 statistic: GRDP ▪ Nominal GRDP (billion VND): 58.355 (4,13 billion USD) ▪ Real GRDP (billion VND): 52.481 (2,29 billion USD) ▪ GRDP growth: 8,94% ▪ GRDP per capita (million VND/year): 62,3 (2.630 USD) ▪ Economic structure: - Industry - Construction: 16,48% - Agriculture. forestry and fishery: 36,87% - Service: 42,36% ▪ Industry - Construction growth: 13,46% Industry growth ▪ Agriculture, forestry and fishery growth: Import - Export Key Industry PCI Ranking 4.56% ▪ Service growth: 7.37% Import turnover (billion USD): 3,93 (Growth rate: 0,083) Export turnover (billion USD): 1,50 (Growth rate: 0,3032) ▪ Processing coffee, avocado, cocoa, rubber, pepper ▪ Wind power production, solar power, ▪ Mechanical engineering, assembly, repair 60.91 60 SOCIAL INFRASTRUCTURE ▪ Roadway: National Highway 14 to Ho Chi Minh City (350km), to Gia Lai (180km from Pleiku city) and connecting with Ho Chi Minh Road in Kon Turn province, National Highway 26 to Khanh Hoa (180km from Nha Trang city); National Highway 27 to Lam Dong (200km from Da Lat city) and National Highway 29 to Transportation Phu Yen (185km). ▪ Airway: Buon Ma Thuot Airport is located 7 kilometers southeast of the city center, directly connecting flight routes to Hanoi, Ho Chi Minh City, Da Nang, Thanh Hoa, Vinh, Can Tho, and Hai Phong. Dak Lak electricity generating company can basically ensure to supply sufficient electric power for production and daily life. At present, the electric network has covered all of the communes in the province with 84% of the Electricity households having access to electricity. ▪ A centralized water supply and treatment system will be installed for residents of Buon Ma Thuot city, Buon Water Ho town, and district centers. Education & ▪ 04 universities, 8 colleges, 01 academy. Training Medicare ▪ 06 provincial hospitals, 02 district hospitals and 03 private hospitals INVESTMENT CONDITION Human resource 59.75% of population are in the working age (2022) Education level Trained labor rate: 62% (2022) Salary ▪ The minimum salary for the province is applied as follows (see appendix for detail amount): 309 - Area III: including Buon Ma Thuot - Area IV: including Buon Ho town and remaining districts ▪ The lowest wage for trained labor (including those trained by the enterprises) must be at least 7% higher than the above referenced basic salary Incentives for investment According to the Investment Law, the entire Dak Lak province is eligible for investment incentives, Investment projects in these areas are exempt from land rent for a period of seven to fifteen years, or for the entire term of the lease, depending on the fields of investment incentives and other investment incentive policies as prescribed. Investment incentives Besides, when investing in the field of socialization, investorswill be entitled to land rent exemption in 25 years and a reduction of 70-85% of land rent or 100% exemption for all other areas. Investment support Investment projects in agriculture and rural areas are eligible for policies on access to credit and investment credit support. Investment projects on the technical infrastructure of industrial clusters are supported to invest in items such as centralized wastewater treatment systems; foreign roads; main roads; leveling. Agriculture: Promote large-scale agricultural production; focus on agricultural development in the direction of organic, high-tech applications, associated with preservation, processing, and consumption along the value chain; promote the formation of concentrated, large-scale, bio-secure, and modern livestock production areas; strengthen forest management, protection, and development; and focus on afforestation, contributing to increased forest cover. Industry: Encourage the development of industries with advantages such as deep processing, renewable energy, and mechanical engineering for production and processing in agriculture, animal husbandry, and the software industry while also promoting scientific and technological research. Fields Attracting Trade in services: To encourage investment and the development of commercial centers, supermarkets, and Investment traditional markets mixed with modern ones; to develop and improve the quality and competitiveness of service industries with potential, advantages, and high added value, such as ecotourism, finance, banking, insurance, transportation, logistics, education, health care, science, and so on; to develop the banking system to meet the economy#39;s capital and service needs. Construction: Pay close attention to infrastructure investment in the province#39;s industrial zones and clusters, particularly investment in building a standard- compliant centralized wastewater treatment system. Investment attraction situation Dak Lak has 25 FDI projects with a total investment capital of about 635 million US dollars. 310 Map Department Of Planning And Investment Dak Lak Contact Address: No 08 Tran Hung Dao, Tan Loi Ward, Buon Ma Thuot city Tel: (84-262) 3 852187 Fax: (84-262) 3 852187 E-mail: ttxtdt@khdt.daklak.gov.vn ▪ Contact person: - Mr. Dinh Xuan Ha Tel: 0903585068 Email: hadx@khdt.daklak.gov.vn 311 [- This Page is intentionally left blank -] 312 DAK NONG 313 INVESTMENT ENVIRONMENT IN DAK NONG USD/VND 23.510 GENERAL INFORMATION Area Population Geographical Location Adjacent provinces 6515,6 km2 0,658 million people (2022) ▪ Dak Nong is located in Central Highlands region. ▪ Dak Nong was established in 2004, further to the splitting of Dak Lak province. It covers 651,000 ha located in mountainous region with an average elevation of 600 – 700 meter and with some places up to 1,970 meter high from the sea level. ▪ The province is surrounded by Dak Lak Province in the north, Lam Dong Province on the east and south-east, Binh Phuoc Province. It shares a borderline of 130km with Cambodia with two border gates 2022 statistic: GRDP Industry growth Import - Export Key Industry PCI Ranking ▪ Real GRDP (billion VND): 22.400 ▪ GRDP growth: 7,59% ▪ GRDP per capita (million VND/year): 59,61 (0,96 billion USD) (2542 USD) ▪ Economic structure: - Industry - Construction: 19,61% - Agriculture. forestry and fishery: 37,64% - Service: 38,55% ▪ Industry - Construction growth: 7,87% ▪ Agriculture, forestry and fishery growth: 5,21% ▪ Service growth: 10,40% Import turnover (billion USD): 0,30 (Growth rate: -0,36) Export turnover (billion USD): 1,10 (Growth rate: 0,15) ▪ Agriculture still represents a very important part of Dak Nong economy. The main agricultural crops practiced in Dak Nong province are tea, coffee, pepper, cashew nut, rubber tree and sugar cane. 64.87 38 SOCIAL INFRASTRUCTURE Transportation Electricity Water Education & Training ▪ Roadway: There are national highways No.14, 14C and 28 to Ho Chi Minh city, Đăk Lăk, Lâm Đồng and to other provinces in the south. The province has national border gate in Bu Prăng, Đắk Pơ making it convenient for cross border trading and attracting tourists from Cambodia to Central highland by roadway ▪ Dak ND'rung 1 wind power plant; Dak ND'rung 2; Dak ND'rung 3 has a total capacity of 300MW with a total capital of up to VND 10,000 billion; ▪ Currently, within the province, there are 12 underground water resources monitoring works. ▪ The whole province of Dak Nong had about 387 schools with 5,324 classes and more than 172,000 students. INVESTMENT CONDITION Human resource 59.82% of population are in the working age (2020) Education level Trained labor rate: 45% (2020) ▪ The minimum salary for the province is applied as follows: - Area I (4,680,000 VND/month): N/A Salary - Area II (4,160,000 VND/month): N/A - Area III (3,640,000 VND/month): N/A 314 - Area IV (3,250,000 VND/month): Gia Nghia City; the districts of Cu Jut, Dak Glong, Dak Mil, Dak R'lap, Dak Song, Krong No, Tuy Duc (Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages paid to employees working under employment contracts) Investment incentives Fields Attracting Investment Investment attraction situation Industrial zones ▪ Incentives according to government regulations: - Exemption and reduction for land and water rent fee - Preferential tax rates and exemption period, reduction for corporate income tax. - Import tax exemption High-tech agriculture, agricultural processing, infrastructure development, high-technology, tourism & services, industrial plants (coffee, rubber, cashew), mining ▪ Investment capital in the province is mainly focused on the purpose of electricity production and distribution and agriculture, forestry, forestry and fishery. With a number of key projects such as Dak ND'rung 1 wind power plant; Dak ND'rung 2; Dak ND'rung 3 has a total capacity of 300MW with a total capital of up to VND 10,000 billion; Factory producing and processing high-quality agricultural products with a capacity of 5,000 tons of agricultural products with a total investment of more than 100 billion VND; 03 large-scale pig farms spread across the province with a total investment of 400 billion VND; and some small and medium hydropower plants, etc. Investment capital for social development at current prices in 2022 was estimated at nearly VND 18,473 billion, up 22.42% over the same period last year. ▪ The province has put into operation two industrial parks on a combined area of 327.5 ha and it is making a planning scheme for Nhan Co 2 industrial park on over 800 hectares to facilitate investment in mining and aluminium processing projects. Map Department of Planning and Investment Dak Nong ▪ Address: 23/3 Street, Gia Nghia town, Dak Nong Contact ▪ Tel: 0261.3544333 ▪ Email: skhdt@daknong.gov.vn ▪ Contact person: - Mr. Tran Xuan Hai - Director - Tel: 84-91343642 315 LIST OF INDUSTRIAL ZONES IN DAK NONG PROVINCE No stt 1 2 3 Industrial zone Name Occupancy Rate Tam Thang Industrial zone Total Area (ha) 179,19 77,26% In Operation Nhan Co Industrial zone 148 86,49% Under construction Nhan Co 2 Industrial zone 400 0 Not built yet 316 Status TAM THANG INDUSTRIAL PARK GENERAL INFORMATION Address Tam Thang Commune, Cu Jut District, Dak Nong Province Investor ▪ Tam Thang Industrial Park Infrastructure Development Company - Tel: 02613.683.579; fax: 2613,683.580. - Investment capital: 319,876 billion VND. Location - The altitude is about 400 - 500m above sea level. - Soil: Mainly red basalt soil. - Located on National Highway 14, north of the city. Buon Ma Thuot, Dak Lak province is 18 km, the South is 100 km from Gia Nghia Town, Dak Nong province and 330 km from Ho Chi Minh City. Buon Ma Thuot Airport is about 30km. - Convenience in exchange with Ho Chi Minh City and Ho Chi Minh City. Buon Ma Thuot, Dak Lak province. - The terrain in the industrial park is flat, convenient for the construction of factories and enterprises. Technical infrastructure in the industrial park has basically been completed Priority Sectors for Investment ▪ Processing agricultural and forestry products; production of fertilizers, animal feed, building materials, household appliances. Investment Area Minimum wage Apply regional minimum wages as prescribed by the Government (average actual salary is 5.5 million VND/person/month) Lease term - Time to put into operation: 5/2005. - Operation time: Until October 28, 2052 Planned area ▪ Total area: 179,5 ha ▪ Total leasable area: 128.4 ha ▪ Already used area: 117,6 ha. In Operation Operation Status Occupancy Rate and Number of Projects Number of Korean Projects Lease fee ▪ Occupancy Rate: 77,26% N/A - Land rent and infrastructure use fee: service area: 7 million VND/m2/year; industrial production zone: 6 million VND/m2/year. - Factory rental price: According to current price. - Payment method: Annual payment (cash, bank transfer). - Standard factory: According to current price. - Office: According to current price. INFRASTRUCTURE AND FACILITY - Power supply system: Dak Nong Power Company supplies electricity to enterprise fences; power supply from 110KV Transformer Station - Cu Jut. - Water supply system: Dak Nong Urban Development and Water Supply Joint Stock Company supplies clean water to enterprise fences. - Waste water and waste treatment system: There is an operating wastewater treatment station with a capacity of 4,600 m3/day. - Telecommunications system, internet: Provide to the foot of the enterprise fence. - Internal traffic: Completed, the main road system is 36m wide, with 2 lanes; The internal road system is 11m wide, with 1 lane. 317 Layout Plan 318 NHAN CO INDUSTRIAL ZONE GENERAL INFORMATION Address 4, Nghia Duc ward, Gia Nghia town, Dak Nong province. Investor ▪ Management Board of civil and industrial projects investment project in Dak Nong province - Tel: 02612216460 - Investment capital: 993 billion VND. Location - The altitude is about 600 - 700m above sea level. - Soil: Mainly Basalt red soil - Located far from National Highway 14: 02km; City. Buon Ma Thuot, Dak Lak province 140 km; Gia Nghia town, Dak Nong province 10km and far from the city. Ho Chi Minh is about 240 km. Convenience in trade with the city. Ho Chi Minh and the southern provinces. Priority Sectors for Investment Aluminum electrolysis; manufacturing industry using raw materials from aluminum. Investment Area Minimum wage Apply regional minimum wages as prescribed by the Government (average actual salary is 5.5 million VND/person/month) Lease term - 70 years, since August 11, 2014 Planned area A total area of 148 ha, but has leased 128 ha; the remaining 20 ha has been leveled but has not yet been invested in the construction of industrial park infrastructure. Under construction Operation Status Occupancy Rate and Number of Projects Number of Korean Projects Lease fee ▪ Occupancy Rate: 86,49% N/A Currently, Dak Nong province is building a land rental unit price INFRASTRUCTURE AND FACILITY - Power supply system: Using a newly built 22KV power line (dual highway) from station 110/35/22KV-2x16MVA Gia Nghia Dak Nong to supply electricity to Nhan Co Industrial Park. - Water supply system: Dak Nong Urban Development and Water Supply Joint Stock Company supplies clean water to enterprise fences. - Waste water and waste treatment system: Currently, the total area of Nhan Co Industrial Park is 148 ha, 128 ha has been leased to Tran Hong Quan Metallurgical Company Limited to invest in the project "Dak Nong Aluminum Electrolysis Plant" Therefore, the treatment system invested by Tran Hong Quan Metallurgy Co., Ltd meets the prescribed standards. 319 [- This Page is intentionally left blank -] 320 DIEN BIEN 321 INVESTMENT ENVIRONMENT IN DIEN BIEN USD/VND 23.510 GENERAL INFORMATION Area, Population ▪ Area: 9.541,25 km2 ▪ Population: 635 million people (Statistics 2022) Geographical Location ▪ Dien Bien is a mountainous border province in the Northwest region of Vietnam. ▪ 475 km west from Hanoi Adjacent provinces ▪ The East and Northeast borders Son La Province, the North borders Lai Chau Province, the Northwest borders Yunnan Province (China), the West and Southwest borders Lao PDR. GRDP Statistic 2022: ▪ GRDP: 13,963.91 billion VND ▪ GRDP growth: 10,19% ▪ GRDP per capita: 39,68 million VND/year ▪ Economic structures: - Industry - Construction: 21,25%; - Agriculture, forestry and fishery: 16,93%; - Dịch vụ: 57,41%; - Services: 4,41% Industry growth PCI Statistic 2022: ▪ Industry – Construction growth: 16.11% ▪ Agriculture growth: 5.79% ▪ Service growth: 9.49% ▪ PCI score: 59.85 – Ranked 62nd out of 63 provinces in Vietnam. (2022) SOCIAL INFRASTRUCTURE Transportation Electricity ▪ Roadway: National Highway 12 connects the two provinces of Dien Bien - Lai Chau, National Highway 279 connects the northern mountainous provinces of Quang Ninh, Bac Giang, Lang Son, Bac Kan, Tuyen Quang, Ha Giang, and Laos. Cai, Lai Chau, Son La and Dien Bien. National Highway 6 connects the provinces of Dien Bien, Son La, Hoa Binh, and Hanoi. ▪ Airway: Dien Bien Phu Airport Supplied from the national power network Water ▪ There are 6 water plants (Dien Bien Phu city, Muong Cha, Muong Lay, Dien Bien Dong, Tuan Giao, Tua Chua) and 1 Muong Ang water treatment station. Consumption volume reached more than 7 million m3, commercial water output reached more than 4.9 million m3. Education ▪ 168 preschools, 295 high schools, 17 centers, 04 colleges. Medicare ▪ 02 provincial hospitals, 03 city hospitals, 07 district hospitals INVESTMENT CONDITION Human resource ▪ 58% of the population in working age (2022) Education level ▪ Rate of trained workers: 60% (2022) Salary ▪ The minimum salary for the province is applied as follows: - Area III: Dien Bien Phu city 322 - Area IV: Muong Lay town, Dien Bien, Dien Bien Dong, Muong Ang, Muong Cha, Muong Nhe, Tua Chua, Tuan Giao, and Nam Po districts ▪The lowest salary of trained workers (including employees trained by enterprises) must be at least 7% higher than the above-mentioned base salary. Investment incentives ▪ Exemption and reduction of land rent ▪ Preferential tax rates and duration of corporate income tax exemption and reduction. Dien Bien province (including all districts and Dien Bien Phu city) is located in an area with extremely difficult socio-economic conditions. Therefore, when investing in Dien Bien province, investors are fully entitled to preferential policies and investment support at the highest level in accordance with the provisions of the Investment Law 2020 and related legal documents. Fields Attracting Investment Map Contact Department of Planning and Investment of Dien Bien province ▪ Address: SN 900, group 3, Vo Nguyen Giap street, ward. Muong Thanh, City. Dien Bien Phu - Dien Bien province Tel: 0215 825409 ▪ Fax: 02063853335 ▪ Email: skhdt@dienbien.gov.vn 323 [- This Page is intentionally left blank -] 324 DONG NAI 325 INVESTMENT ENVIRONMENT IN DONG NAI USD/VND 23.510 GENERAL INFORMATION Area Population Geographical Location Adjacent provinces 5903,4 km2 3,255 million people (2022) ▪ Dong Nai is located in Southeast region. ▪ Located in the southern key economic development region ▪ The East borders Binh Thuan province, the Northeast borders Lam Dong province, the Northwest borders Binh Duong and Binh Phuoc provinces, the South borders Ba Ria - Vung Tau province, West borders Ho Chi Minh City. South 2022 statistic: ▪ Nominal GRDP (billion VND): GRDP ▪ Real GRDP (billion VND): 233.979 ▪ GRDP growth: 9,22% ▪ GRDP per capita (million VND/year): 13.404,00 (9.98 billion USD) ( USD) ▪ Economic structure: - Industry - Construction: - Agriculture. forestry and fishery: - Service: Industry growth Import - Export Key Industry PCI Ranking ▪ Industry - Construction growth: 9,06% ▪ Agriculture, forestry and fishery growth: 3,89%; ▪ Service growth: 13,08% Import turnover (billion USD): 1,89 (Growth rate: 0,0115) Export turnover (billion USD): 2,45 (Growth rate: 0,1302) ▪ The mining industry, the processing and manufacturing industry, production and distribution of electricity, gas, hot water, steam 65,67 29 SOCIAL INFRASTRUCTURE Transportation Electricity Water Education & Training Medicare ▪ Roadway: As a province with convenient transportation system with many national arterial roads passing through such as National Highway 1A, National Highway 20, National Highway 51; North - South railway line; Near Saigon port, Tan Son Nhat international airport has created favorable conditions for economic activities in the region as well as trade with the whole country and plays a role in linking the Southeast region with the Central Highlands. ▪ Nhon Trach 3 and 4 Thermal Power Plant Project has a scale of nearly 54 hectares with a total investment of about 1.4 billion USD. The plant's capacity is expected to reach 1.5 thousand MW. Tri An hydropower plant was approved by the Prime Minister in the decision to adjust the national electricity development planning for the period 2011-2020 with a vision to 2030. ▪ Dong Nai river system is one of the three largest river systems of Vietnam (after the Mekong and Red rivers), including: the main Dong Nai river and four major tributaries, the La Nga river on the left bank and the Be river. , Saigon River and Vam Co River on the right bank. ▪ 5 multidisciplinary training universities in Dong Nai province ▪ The grassroots health system in Dong Nai currently has 11 health centers in districts and cities and 170 health stations in communes, wards, towns, hamlets and neighborhoods. Out of 170 medical stations, there are more than 50 medical stations that are seriously degraded and need to be repaired urgently this year. INVESTMENT CONDITION Human resource 55,4% of population are in the working age (2022) Education level Trained labor rate: () Salary ▪ The minimum salary for the province is applied as follows: 326 - Area I (4,680,000 VND/month): Bien Hoa City, Long Khanh City and Nhon Trach, Long Thanh, Vinh Cuu, Trang Bom and Xuan Loc Districts - Area II (4,160,000 VND/month): Dinh Quan, Thong Nhat Districts - Area III (3,640,000 VND/month): Cam My, Tan Phu Districts - Area IV (3,250,000 VND/month): N/A (Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages paid to employees working under employment contracts) ▪ Incentives according to government regulations: - Exemption and reduction for land and water rent fee - Preferential tax rates and exemption period, reduction for corporate income tax. - Import tax exemption Fields Attracting ▪ The mining industry, the processing and manufacturing industry, production and distribution of electricity, gas, hot water, steam Investment Total newly registered capital and projects to increase foreign direct investment (FDI) as of December 20, 2022 reached about US$1,141.47 million, equaling 93.6% over the same period (same period in 2021) reached 1,219.9 million USD).In which: 48 new projects with total registered capital of 491.54 million USD, equal to 90.6% in number of projects and 27.9% increase in registered capital over the same period last year. . There were 92 projects to increase capital with a total additional capital of 649.93 million USD, equal Investment attraction situation to 84.4% of the number of projects and 77.8% of the additional capital compared to the same period last year. Thus, both the number of projects and the registered capital decreased over the same period. The reason is due to the impact of the world economy's decline, which has affected the wave of investment in other countries. In 2022, there were 4,066 newly registered enterprises Investment incentives Map Department of Planning and Investment Dong Nai Contact ▪ Address: No. 2, Nguyen Van Tri, Thanh Binh. Bien Hoa, Dong Nai 327 ▪ Tel: 2513822505 ▪ Email: skhdt@dongnai.gov.vn ▪ Contact person: - Nguyen Huu Nguyen - Director of the Department of Planning and Investment of Dong Nai province. 328 AMATA INDUSTRIAL ZONE GENERAL INFORMATION Address Long Binh Ward - Bien Hoa City - Dong Nai Investor Joint venture between SONADEZI Company and Amata Corp.Public Company- Thailand - Điện thoại : 84-61-991007/893596 - Fax : 84-61-891251 - Website : http://www.amata.com - Email : amatavn@hcm.vnn.vn Location The distance by road from Amata Industrial Park to major cities, railway stations, ports and international airports is as follows: + 32 km from the center of Ho Chi Minh City + 32 km from Saigon station + 4 km from Dong Nai port, 26 km from Tan Cang, 32 km from Saigon port, 40 km from Phu My port. + 32 km from Tan Son Nhat International Airport. Priority Sectors for Investment Investment Area Computers and accessories; food, food processing; manufacturing and assembling electricity, mechanics and electronics; leather products, textiles, apparel, wool, footwear; jewelry and fine arts products; sports equipment, toys; plastic products, all kinds of packaging; industrial products from rubber, ceramics, glass; metal texture; building materials; auto parts, automobile manufacturing; pharmaceuticals, agrochemicals, insecticides; Chemicals, PE fibers, plastic beads, industrial pigments, etc. Minimum wage Apply regional minimum wages as prescribed by the Government Lease term - 50 year Planned area 410 ha, of which 129 ha is developed in phase 1, 100 ha for lease, has been fully developed with quality infrastructure facilities. The rate of leased land accounts for over 90%. Phase 2 develops 261 ha and service area, which is being developed in phases. Active Operation Status Occupancy Rate and Number of Projects Number of Korean Projects Lease fee ▪ Occupancy Rate: 90% * Total number of projects/investing country: 48/12 N/A 40 USD/m2/50 year INFRASTRUCTURE AND FACILITY * Electricity price: 0.073 USD/KWh * Water price: 4,600 VND/m3. * Waste water treatment price: $0.28/m3 * Management fee: 0.08 USD/m2/month 329 BAU XEO INDUSTRIAL ZONE GENERAL INFORMATION Address Street 2A, Bau Xeo Industrial Park, Trang Bom District, Dong Nai Investor Thong Nhat Joint Stock Company Phone: 0251. 3924377 Fax: 0251. 3924692 Email: info@bauxeo.com.vn Website: www.bauxeo.com.vn Location Distance to nearest big city:: 57 km from Ho Chi Minh City Distance to Provincial Center: 24 km from Bien Hoa City Distance to nearest airport: 22 km from Long Thanh airport Distance to the nearest railway station: 2 km from Trang Bom station Distance to the nearest river port: 40 km from Go Dau port Distance to the nearest seaport: 45km . from Cai Mep port Priority Sectors for Investment Investment Area Agricultural product processing industry, food processing, food, animal feed; Wood and plastic industry; textile industry, production of shoes, toys, jewelry; furniture manufacturing industry, interior decoration, office; packaging industry; sports equipment manufacturing industry; electronics and microelectronics industry; mechanical industry (frame stamping, machine building and spare parts); pharmaceutical and stationery manufacturing industry; packaging production, prepress, design and printing industry; industry producing handicrafts, glass, building materials. Minimum wage Apply regional minimum wages as prescribed by the Government Minimum lease area 10000 (m2) Lease term - 50 year Planned area 499.8 (ha) Operation Status Available for leasing: 15ha Active Occupancy Rate and Number of Projects Number of Korean Projects Lease fee ▪ Occupancy Rate: 98.1% N/A 40 USD/m2/50 year INFRASTRUCTURE AND FACILITY Transport infrastructure: Internal roads and complete water supply and drainage system. Power supply infrastructure: Powered from the national grid, with a voltage of 110/22KV (126 MVA). Water supply infrastructure: Meeting the needs of businesses (currently 8,000 m3/day - night) Communication infrastructure: Convenient at home and abroad. Wastewater treatment infrastructure: Centralized wastewater treatment plant with current capacity of 4,000 m3/day.night Layout plan: 330 331 HO NAI INDUSTRIAL ZONE GENERAL INFORMATION Address Long Tho Commune, Nhon Trach District, Dong Nai Province. Investor Nhon Trach Industrial Park Construction Investment One Member Limited Liability Company 6A Location Distance to nearest big city:: Distance from city center. Ho Chi Minh City 40 km along National Highway 1A and Hanoi Highway, Distance to Provincial Center: Distance from city center. Bien Hoa 12 km, Vung Tau city about 90 km. Distance to the nearest airport: 45 km from Tan Son Nhat airport, about 25 km from Long Thanh International Airport (with planning). Distance to the nearest railway station: About 3 km from the nearest railway station, City station. Ho Chi Minh 40 km. Distance to nearest river port: 15km from nearest river port, 40 km from Cat Lai port Distance to the nearest seaport: Distance from the city center. Ho Chi Minh City 40 km along National Highway 1A and Hanoi Highway, Priority Sectors for Agricultural product processing industry, food processing, food, Investment animal feed; Wood and plastic industry; textile industry, production of shoes, toys, jewelry; furniture manufacturing industry, interior decoration, office; packaging industry; sports equipment manufacturing industry; electronics and microelectronics industry; mechanical industry (frame stamping, machine building and spare parts); pharmaceutical and stationery manufacturing industry; packaging production, prepress, design and printing industry; industry producing handicrafts, glass, building materials. Investment Area Minimum wage Apply regional minimum wages as prescribed by the Government (4,420,000 VND – Region I) Minimum lease area 20.000 m2 Lease term - N/A Planned area 496.65 ha, of which phase I is 225.71 ha has been leased, reaching 85%, phase II is 270.94 ha - has been and is in the phase of acquisition, site clearance, ready for lease. Active Operation Status Occupancy Rate and Number of Projects Number of Korean Projects Lease fee ▪ Occupancy Rate: 66% N/A 160 USD/m2 INFRASTRUCTURE AND FACILITY - Electricity: Using the national power source through the 220/22KV station with a capacity of 40MVA invested by Dong Nai Power Company Limited and in the future will invest to upgrade to 80MVA. - Water: Using water from Long Binh water plant (Bien Hoa city) of Dong Nai Water Supply Construction One Member Limited Liability Company with current capacity of 200,000m3/day. - Wastewater treatment: Acceptance limit of wastewater treatment plant - TT: Equivalent to column B of Regulation QCVN 40: 2011/BTNMT. Maximum processing capacity: 4,000m3/day. Current wastewater treatment capacity: 4,000m3/day and night - Process rubbish: Contracting company with a unit with the function of collecting and treating waste - System of fire: Fire hydrants are installed according to regulations on approved roads for fire prevention and fighting in Ho Nai Industrial Park. - Communications: The system connects the cradle to the network of the Dong Nai Post Office through the Ho Nai Industrial Park Post Office. Switchboard capacity of Ho Nai Industrial Park 3,600 numbers, construction and installation of a 1.5 km underground cable line with a total capacity of 3,600 pairs from Ho Nai Industrial Park post office. Layout plan: 332 333 [- This Page is intentionally left blank -] 334 DONG THAP 335 INVESTMENT ENVIRONMENT IN DONG THAP USD/VND 23.510 GENERAL INFORMATION Area Population Geographical Location Adjacent provinces 3383,8 km2 1,6 million people (2022) ▪ Dong Thap is located in Mekong Delta River region. It is located between the Southern Key Economic Zone and the Economic Zone of Can Tho-An Giang-Kien Giang-Ca Mau, influence on both sides by two big cities, Can Tho City and Ho Chi Minh City. The province borders Prey Veng province of Cambodia to the North, Vinh Long province and Can Tho City to the South, An Giang province to the West, Long An and Tien Giang provinces to the East. 2022 statistic: ▪ Nominal GRDP (billion VND): GRDP ▪ Real GRDP (billion VND): 99.376 ▪ GRDP growth: 8,62% ▪ GRDP per capita (million VND/year): 62,10 (4.24 billion USD) (2648 USD) ▪ Economic structure: Industry growth Import Export Key Industry PCI Ranking - Industry - Construction: 22,27% - Agriculture. forestry and fishery: 35,17% - Service: 36,14% ▪ Industry - Construction growth: 12,95% ▪ Agriculture, forestry and fishery growth: 3,52% ▪ Service growth: 10,92% Import turnover (billion USD): 0,80 Export turnover (billion USD): 1,72 (Growth rate: 0,3515) Agricultural sector 69.68 5 SOCIAL INFRASTRUCTURE ▪ Roadway: - National Highways 30, 80, 54, Ho Chi Minh road - 2 international border gates Thuong Phuoc & Dinh Ba. Transportation ▪ Railway & Airway: None ▪ Waterway: Cao Lanh and Sa Dec ports, located on the banks of the Tien River, are capable of receiving ships with a tonnage of up to 5000 DWT. Power supply to the province comes from the national network through the 110 KV transmission line system. Electricity Consists of 2 main sources: 220 Kv Cai Lay substation and Tra Noc thermal power plant Currently, there are 20 urban water plants, 305 centralized water supply stations, and 8.000 drilled wells with hand pumps. Groundwater: Dong Thap has many underground water reservoirs at different depths, this source is very Water abundant, has only been exploited and used for urban and rural living, not yet put into industrial use. The rate of urban households using clean water in 2022 is estimated at 99.4%; The rate of rural households using clean water in 2022 is 88.97%. The province has 01 university; 22 vocational establishments, classified by type, including: 01 Vocational Education & College, 01 Community College, 01 Medical College; 03 Intermediate Schools under the Department of Labour, Invalids and Social Affairs, 01 Vocational School - Transport, 07 vocational education centers and 08 other Training establishments participating in vocational education activities. The province has 168 medical facilities, including: 21 Hospitals; 01 Nursing and rehabilitation hospital; 02 Medicare regional polyclinics; 143 Commune health stations, wards. INVESTMENT CONDITION Human resource 58.87% of population are in the working age (2022) 336 Education level Trained labor rate: 73,6% (2022) ▪ The minimum salary for the province is applied as follows: - Area I (4,680,000 VND/month): N/A - Area II (4,160,000 VND/month): N/A Salary - Area III (3,640,000 VND/month): Cao Lanh city, Sa Dec city - Area IV (3,250,000 VND/month): Hong Ngu City; Districts of Cao Lanh, Chau Thanh, Hong Ngu, Lai Vung, Lap Vo, Tam Nong, Tan Hong, Thanh Binh, Thap Muoi. (Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages paid to employees working under employment contracts) Investment incentives Fields Attracting Investment Investment attraction situation Industrial zones - Investment incentive policies are prescribed in the Law on Investment in 2020 and relevant laws. + Forms of incentives: Corporate income tax incentives, tax exemptions, tax reductions and other incentives according to the provisions of the law on corporate income tax; Exemption from import tax on goods imported to create fixed assets; raw materials, supplies and components imported for production in accordance with the law on import and export tax; Exemption or reduction of land use levy, land rent and land use tax; Depreciation is fast, increasing the amount of expenses deductible when calculating taxable income. + Objects of incentives: investment projects in sectors eligible for investment incentives, or investment projects in areas eligible for investment incentives. - Investment promotion policy issued by the province: + Resolution No. 27/2022/NQ-HDND dated December 9, 2022 of the People's Council of Dong Thap province amending and supplementing a number of policies to encourage socialization in the fields of education and training, vocational training, healthcare, culture, physical training and sports, environment, judicial expertise in Dong Thap province. + Resolution No. 231/2019/NQ-HDND dated April 2, 2019 of the Provincial People's Council on the program to support investment in building technical infrastructure of industrial clusters in Dong Thap province. + Decision No. 23/2016/QD-UBND dated April 8, 2016 of the Provincial People's Committee promulgating the Regulation on a number of preferential policies, encouraging investment, management and exploitation of agricultural clean water supply works. village in Dong Thap province. High-tech agriculture, infrastructure development, agricultural processing, retails, supporting industry, development of local raw materials, processing industry, auxiliary technology,... Up to now, Dong Thap has approved the investment policy of 22 projects, with a total registered capital of 4,079 billion VND, an increase of 37.5% in the number of projects and an increase of 95.2% in capital compared to 2021. Currently, there are 03 Industrial Parks in operation with a total planning area of more than 251.56 ha, Land lease fee: ~30 - 45 USD/m2 for the project life. 1. Tran Quoc Toan Industrial Park 2. Song Hau Industrial Park 3. Sa Dec Industrial Park (132 ha) 4. Dinh Ba International Border Gate Area 5. Thuong Phuoc International Border Gate Area 337 Map Dong Thap Economic Zones Management Authority ▪ Address: 10 Le Van Chanh Street, Ward 1, Cao Lanh City, Dongthap Province ▪ Tel: 84-277 3 878471 Contact ▪ Email: bqlkkt@dongthap.gov.vn ▪ Contact person: - Mr. Nguyen Duy Thanh - Deputy Head of Investment & Construction Management Department - Tel: 84-973785792 338 TAN KIEU INDUSTRIAL ZONE GENERAL INFORMATION Address Tan Kieu commune and My An commune, Thap Muoi district, Dong Thap province Investor + Company name: Dong Thap Construction Materials and Construction Joint Stock Company + Address: No. 03 Ton Duc Thang, Ward 1, Cao Lanh city, Dong Thap province. + Phone number: 02773 858 959 – 0 Contact Person Mr: Nguyen Lam Thai Thinh Position: Director of Industrial Park Management Board Address: No. 03 Ton Duc Thang, Ward 1, Cao Lanh city, Dong Thap province. Phone number: 0942.252.566 Location Altitude above sea level (MSL): +3.2 above National altitude Adjacent to DT.846 and Nguyen Van Tiep Canal; 04 km from the center of My An town, 28 km from Cao Lanh city; 30 km from Tien River and 80 km from Ho Chi Minh City. Distance to Tra Noc airport in Can Tho city: 53 km Lease term Start date: 4/2024 Lease fee There is no specific land rental price (estimated price is about 70 USD/m2/50 years). Planning area The total area is 148.7 hectares. Rental area: 101.8 hectares Occupancy Rate and Number of Projects ▪ 50% Lease fee 30 USD/m2 Number of Korean Projects ▪ 0 projects Layout plan 339 [- This Page is intentionally left blank -] 340 GIA LAI 341 INVESTMENT ENVIRONMENT IN GIA LAI GENERAL INFORMATION Area, Population Geographical Location Adjacent provinces GRDP Industry growth PCI ▪ Area: 15,494.9 Km2 (second-largest province of Vietnam) ▪ Population: 1, 590 Million people (2019) ▪ Gia Lai is located in the northern part of the Central Highlands (“Tay Nguyen” in Vietnamese), and has a strategic position in the Vietnam-Laos-Cambodia Development Triangle. ▪ The Province shares the border with Kon Tum Province on the north, Dak Lak Province on the south, Cambodia on the west, Quang Ngai, Binh Dinh, Phu Yen provinces on the east. 2021 statistic: ▪ GRDP growth: 9.27% ▪ GRDP per capita: 60,45 million VND ▪ Economic structure: - Agriculture, forestry and fishery: 28,39%; - Industry - Construction: 28,43 %; - Service: 39,15% 2022 statistic: ▪ Agriculture, forestry and fishery growth: 4,61% ▪ Industry – Construction growth: 22,56 % ▪ Service growth: 6,70% ▪ Export turnover: 660 million USD ▪ Import turnover: 140 million USD ▪ Score: 64.00– ranked 45th out of 63 cities and provinces in Vietnam (2022) SOCIAL INFRASTRUCTURE Transportation ▪ Roadway: Gia Lai is connected to key cities and economic hubs in the country and neighboring countries via national roads and highways. National Highway 14 goes from Da Nang–Quang Nam to Kon Tum–Gia Lai–Dak Lak–Ho Chi Minh City. National Highway 19, which is 160km long, connects Quy Nhon port in Binh Dinh province to Gia Lai’s capital city Pleiku and Le Thanh International Border Gate in Gia Lai. National Highway 78 connects the Cambodian city of Ratanakiri and northeastern provinces of Cambodia with southern provinces of Laos and Thailand. National Highway 25 connects Gia Lai to Tuy Hoa, Phu Yen province’s capital. Truong Son Dong Road runs from Quang Nam to Gia Lai Province and onto Da Lat. ▪ Airway: Pleiku airport has 6 flights to Ho Chi Minh city, Đà Nẵng and Hanoi everyday Electricity ▪ Gia Lai province has many large rivers that flow through it, which means great potential in hydropower. There are currently 43 hydropower plants with a capacity of 2,194MW, including six large plants with a capacity of 1,907MW; and 37 small- and medium-sized plants with a capacity of 286.95MW. In addition, there are many other small hydropower plants with total installed capacity of nearly 300MW under operation. Some enterprises in the province are also drawing up surveys to develop wind power and solar power projects with a capacity of 300-500 MW/project. Water ▪ There are currently 337 irrigation works (reservoirs, dams, pumping stations) with the irrigation capacity of about 54,239 ha in the Province. Until now, the percentage of households that have access to clean water is about 94%. Every Urban centers, industrial parks and economic zones has been equipped with the drainage system. INVESTMENT CONDITION Human resource ▪ 936.477 people in working age (2022) Education level ▪ Trained labor rate: 59,09% (2022) Salary Investment incentives ▪ The minimum salary for the province is applied as follows: - Area III (3,430,000 VND/month): Pleiku city - Area IV (3,70,000 VND/month): An Khe town, Ayun Pa town; Chu Pah, Chu Prong, Chu Se, Dak Doa, Chu Puh, Phu Thien, Mang Yang, Krong Pa, Kong Chro, K'Bang, Ia Pa, Ia Grai, Duc Co, Dak Po districts ▪ The lowest wage for trained labor(including those trained by the enterprises) must be at least 7% higher than the above referenced basic salary ▪ Incentives according to government regulations: 342 - Exemption and reduction for land and water rent fee - Preferential tax rates and exemption period, reduction for corporate income tax. - Import tax exemption ▪ Province-specific investment support: - Support for development of investment projects and preparation of environmental impact assessment reporting - Support for trade promotion (exhibitions, technology fairs) Fields Attracting Investment ▪ Prioritized projects: - Producing rubber products; - Producing unburnt building materials, autoclaved concrete bricks, foam concrete bricks; - Processing instant coffee and coffee powder (input materials are produced according to UTZ, 4C and VietGAP processes); - Processing pepper products: peppercorns and pepper powder (input materials are produced according to VietGAP process); - Producing and refining animal, poultry and aquatic feed; - Investing in building 5-star hotels, investing in luxury resorts; - Invest in building and exploiting eco-tourism areas with a scale of 20 hectares or more, cultural and historical tourist attractions; - Investment in construction and business of infrastructure of the zone. Investment Attraction ▪ Apart from Le Thanh international border gate economic zone, Gia Lai has 7 industrial zones, including Tra Da in Pleiku city (Occupancy rate: 100%), North Bien Ho, Ham Rong, Tra Ba, Play Ku, Chu Se, and An Khe. ▪ As of February 2022, Gia Lai has attracted 7 FDI projects with the total investment capital of 21.09 million USD. 343 Map Contact Planning and Investment Department Address: 02 Hoang Hoa Tham, Pleiku City, Gia Lai Tel: +84 269 3824414 Email: skhdt@.gialai.gov.vn Web: www.skhdt.gialai.gov.vn 344 LIST OF NOTABLE COMPANIES IN GIA LAI Enterprise HAGL Group 15 Truong Chinh, Pleiku, Gia Lai +84 269 2225888 contact@hagl.com.vn hagl.com.vn Duc Long Group 02 Dang Tran Con, Tra Ba Ward, Pleiku, Gia Lai +84 269 3748367 duclong@duclonggroup.com www.duclonggroup.com Quang Duc Export Sales Limited 29A Truong Chinh, Pleiku, Gia Lai +84 269 2225566 info@quangducgialai.com.vn quangducgialai.com.vn Vinh Hiep Company Limited 404 Le Duan, Pleiku, Gia Lai +84 269 3759699 vinhhiepgl@yahoo.com www.vinhhiepgl.com An Khe Sugar Plant - Branch of Quang Ngai Sugar Joint Stock Company Thanh An Commune, An Khe Town, Gia Lai +84 269 3532084 ankhesugar@gmail.com www.qns.com.vn Duong Van Phat Agricultural and Forest Products Processing Company Limited Chu Ngoc Commune, Krong Pa District, Gia Lai Mobile :+84 983 409791 vanphatphuyen@gmail.com Mien Nui Gia Lai Corporation Business Development 18 Le Hong Phong, Dien Hong Ward, Pleiku, Gia Lai +84 269 3897118 miennuigl@gmail.com Gia Lai Electricity Joint Stock Company 114 Truong Chinh, Pleiku, Gia Lai +84 269 3823604 info@geccom.vn www.geccom.vn Truong Sinh International Scientific Development Co. 1335 Pham Van Dong, Pleiku, Gia Lai +84 269 3865295 truongsinh.gli@gmail.com www.truongsinhgialai.com Classic Coffee Corporation 740 Truong Chinh, Pleiku, Gia Lai +84 269 3746279 lamnguyen.clsc@gmail.com 1 Sector Agriculture, real estate Business size1 Charter capital: 351 million USD Employees: 50 Agriculture, energy, infrastructure, manufacturing – services Charter capital: 126.7 million USD Employees: 106 Manufacturing sector, business services, merchandising Charter capital: 31.1 million USD Employees: 50 Business, agricultural exports, freight Charter capital: 4 million USD Employees: 100 Manufacturing and trading of sugar Charter capital: 83.3 million USD Employees: 577 Wholesale of agricultural and forestry products, refined sugar production, sales of beverages Charter capital: 6.7 million USD Employees: 10 Wholesale agricultural products, rubber, sell cattle, poultry and livestock, animal feed Charter capital: 8.9 million USD Production and trading of electricity, electrical network construction, advisory services, production of centrifugal concrete pillars Charter capital: 82.2 million USD Employees: 430 Veterinary and aquatic medicine production Charter capital: 3.1 million USD Employees: 20 Processing and trade of coffee, sugar, tea Charter capital: 231,000 USD Employees: 07 Note: Charter Capital/Revenue estimates in USD based on conversion rate of 22.500 VND = 1USD 345 LIST OF INDUSTRIAL ZONES IN GIA LAI Industrial zone Name Total Area (ha) Occupancy Rate Status Tra Da Industrial zone 213 ha 100% In operation South Pleiku Industrial Park 191,55 ha The IP will be filled in 2025 Investing in infrastructure construction is underway 346 TRA DA INDUSTRIAL ZONE GENERAL INFORMATION ADDRESS Tra Da commune and Bien Ho commune, Pleiku city INVESTOR Gia Lai Paper Joint Stock Company, Hung Nguyen Coffee Factory, Nutifood Hoang Anh LOCATION - 7 km from Pleiku city center - 5 km from Pleiku airport by detour, 01 km from the crow flies. - About 2 km from National Highway 19, about 4km from National Highway 14 - 166 km from Quy Nhon Seaport - Processing industry of agricultural and forestry products, biofuel production. - Food processing industry, consumer industry. - Animal feed processing industry, chemical industry, agro-forestry product processing. - Mechanical, electrical, electronic and low-pollution industries. INVESTMENT AREA Priority Sectors for Investment MINIMUM WAGE The average income of employees is 6.3 million VND/person/month. LEASE TERM Start date: 2003 End date: 2053 MINIMUM LEASE AREA Not available PLANNED AREA Total area: 213ha FACTORY AVAILABLE FOR RENT Factory for rent: - 1000 m2 - Minimum land plot: 10,000 m2 - Built up area: 500m2 OPERATION STATUS OCCUPANCY RATE AND NUMBER OF PROJECTS NUMBER OF KOREAN PROJECTS In operation Occupancy rate: 100% Attracting nearly 50 domestic and foreign investors N/A LEASE FEE 20-30 USD/m2 (50 Years) OPERATING FEE (NOT INCLUDING VAT) Management fee: 0.4USD/m2 INFRASTRUCTURE AND FACILITY TRANSPORTATION Main road: Width: 15m, Number of lane: 4-6 lanes - ELECTRICITY Power line: 110KV and 500/220KV - 0.05 USD 347 WATER SOURCE 2.678m3/day (TCCN: 40m3/ha/days) - 0.4 USD/m3 LAYOUT PLAN ACTUAL VIEW 348 SOUTH PLEIKU INDUSTRIAL ZONE GENERAL INFORMATION ADDRESS Pleiku city INVESTOR Nam Pleiku-IP-GL CONTACT PERSON Mobile: (+84) 948 859 999 Email: info@saigonvrg.com.vn LOCATION Nam Pleiku Industrial Park is 18km from Pleiku city center, 23km from Pleiku airport, 65km from Kon Tum city, about 160km from Buon Me Thuot city, 170km from Quy Nhon port INVESTMENT AREA Priority Sectors for Investment MINIMUM WAGE N/A LEASE TERM Start date: 2020 End date: N/A MINIMUM LEASE AREA Not available PLANNED AREA Total area: 199.55ha OPERATION STATUS OCCUPANCY RATE AND NUMBER OF PROJECTS NUMBER OF KOREAN PROJECTS Mechanical assembly, production of spare parts, electronic components Consumer production, handicrafts Textile industry Food processing and agricultural products and some other industries In operation Within a year, businesses have deposited 60ha of land, reaching a rental rate of 40% of the project. N/A LEASE FEE 25 USD/m2/46 years (excluding VAT) OPERATING FEE (NOT INCLUDING VAT) Management fee: 0.4USD/m2 INFRASTRUCTURE AND FACILITY The main roads in the industrial park are 32 m wide - 4 lanes TRANSPORTATIO N + Branch roads in the industrial park are 23 m wide - 2 lanes All internal roads are designed and constructed in strict compliance with national regulations, and finished with Asphalt. The internal roads are also equipped with a complete, aesthetic high-pressure lighting system 349 ELECTRICITY The power supply to the industrial park is taken from the 110/35/22KV substation WATER SOURCE 30.000 m3/day LAYOUT PLAN ACTUAL VIEW 350 [- This Page is intentionally left blank -] 351 HA GIANG 352 INVESTMENT ENVIRONMENT IN HA GIANG USD/VND 23.510 GENERAL INFORMATION Area Population 7930 km2 0,892723 million people (2022) ▪ Ha Giang is located in Northeast region. ▪ Located in the North pole of Viet Nam ▪ 318 km to Hanoi ▪ The Province has Van Nam Province - China to the North, Cao Bang Province to the East, Tuyen Quang Adjacent provinces and Yen Bai Province to the South and Lao Cai Province to the West Geographical Location 2022 statistic: GRDP ▪ Nominal GRDP (billion VND): 30.571 (1,3 billion USD) ▪ Real GRDP (billion VND): 16.286 (0,69 billion USD) ▪ GRDP growth: 7,62% ▪ GRDP per capita (million VND/year): 18,24 (776,01 USD) ▪ Economic structure: Industry growth - Industry - Construction: 25,53% - Agriculture. forestry and fishery: 29,37% - Service: 39,80% ▪ Industry - Construction growth: 15,42% ▪ Agriculture, forestry and fishery growth: 4,80% ▪ Service growth: 6,09% Import turnover (billion USD): Import - Export Key Industry PCI Ranking (Growth rate: -0,37) Export turnover (billion USD): Mining industry, processing industry, hydropower 64.39 41 SOCIAL INFRASTRUCTURE Transportation Electricity Water Education & Training Medicare ▪ Roadway: National highway 279, 4C, 34,... National highway 2 is upgraded synchronously; the province also build a bypass of Yen Minh town on national highway 4C; ▪ Waterway: Lo River is a large river in Ha Giang, originating from Luu Lung, Yunnan (China), flowing through the Vietnam - China border (Thanh Thuy area), through Ha Giang and Bac Quang cities to Tuyen Quang. This is the main source of water supply for the central region of the province. Chay River originates from the southwest slope of Tay Con Linh peak and the northeast slope of Kieu Lien Ti peak, the density of tributaries is high (1.1km/km2), the water concentration coefficient reaches 2.0km/km2. ▪ Ha Giang province has approved 77 hydropower projects with a total installed capacity of 1,061 MW. Of which, 36 hydropower plants are generating electricity into the national grid, with a total installed capacity of 725 MW. Lo River is the main source of water supply for the central region of the province. 615 schools at all levels, 98 kindergarten; 80 primary schools; 67 secondary school and 10 high schools N/A INVESTMENT CONDITION Human resource 42.71% of population are in the working age (2022) Education level Trained labor rate: 56.6% (2022) ▪ The minimum salary for the province is applied as follows: Salary - Area I (4,680,000 VND/month): N/A 353 - Area II (4,160,000 VND/month): N/A - Area III (3,640,000 VND/month): Ha Giang City - Area IV (3,250,000 VND/month): Bac Me, Bac Quang, Dong Van, Hoang Su Phi, Meo Vac, Quan Ba, Quang Binh, Vi Xuyen, Xin Man, Yen Minh districts (Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages paid to employees working under employment contracts) ▪ Incentives according to government regulations: - Exemption and reduction for land and water rent fee - Preferential tax rates and exemption period, reduction for corporate income tax. - Import tax exemption Investment ▪ Incentives from the province: incentives Incentives according to government regulations: ▪ Exemption and reduction for land and water rent fee ▪ Preferential tax rates and exemption period, reduction for corporate income tax. ▪ Import tax exemption Fields Attracting Agriculture and Forestry; tourism, services, logistics; agricultural and forestry product processing industry; urban infrastructure and science and technology. Investment In 2022, the whole province has 7 programs and projects using ODA capital to be implemented, including: Class II urban development program (green cities) - Ha Giang province sub-project; Drainage and wastewater treatment city. Ha Giang; Multi-purpose development for ethnic minorities in poor communes of Investment Xin Man district; Repair and improve dam safety (WB8); Construction of residential bridges and local road attraction situation asset management (LRAMP); Basic infrastructure for comprehensive development of Northeast provinces Sub-project of Ha Giang province; Developing grassroots health service delivery system - Ha Giang province subproject. Map 354 Ha Giang Department Of Planning And Investment ▪ Address: No 188, Tran Hung Đao street, Nguyen Trai District, Ha Giang Contact ▪ Tel: 2193866256 ▪ Email: skhdt@hagiang.gov.vn 355 LIST OF INDUSTRIAL ZONES IN HA GIANG No Industrial zone Name 1 Binh Vang Industrial Zone Total Area (ha) 254.77 ha Occupancy Rate 100% HA GIANG’S LOCATION MAP OF INDUSTRIAL ZONES 356 Status In Operation BINH VANG INDUSTRIAL ZONE GENERAL INFORMATION Address ▪ Dao Duc Commune, Vi Xuyen District, Ha Giang Province Investor Management Board of Ha Giang Economic Zone ▪ Address: No. 222, Nguyen Trai street, Ha Giang city, Ha Giang province ▪ Tel: (84-219) 3 860 109 ▪ Email: bqlkkt@hagiang.gov.vn Contact Person Mr. Pham Hong Thang- Head of Investment Department- Location ▪ 1 km to National Road 2, 17 km to the North of Ha Giang City, 2 km to Vi Xuyen Town center to the South ▪ 440 km to Hai Phong Sea Port ▪ 300 km to Noi Bai International Airport Priority Sectors for Investment ▪ Processing of agro-forest products ▪ Mineral processing and metallurgy ▪ Plywood manufacture Restricted Sectors for Investment N/A Investment Area Minimum wage [Area 4] According to Decree 157/2018/ND-CP dated 23rd December Lease term 50 years Minimum Lease Area N/A Limit for Construction Height N/A Permitted Construction Rate N/A Planned area ▪ Total area: 254.77ha - Phase I: 136.86 ha - Phase II: 115.905 ha ▪ Total vacant leasable area: phase II (Phase II has not yet been acquired and cleared) Factory Available for Rent ▪ Total factory land for lease: 100.8 ha Operation Status In Operation Occupancy Rate and Number of Projects ▪ Occupancy rate: 100% ▪ Number of projects: 25 Number of Korean Projects None Lease fee ▪ Land lease fee: 7,104 VND (~0.3 USD) /m2/year Operating fee ▪ Infrastructure maintenance fee: Currently the fee is not yet decided by management board, and not yet collected ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: as regulated by the Government ▪ Wastewater treatment fee: N/A ▪ Waste treatment fee: N/A INFRASTRUCTURE AND FACILITY Financial institution 16 km to bank branches of Agribank, BIDV, VDB Tax service, State finance office ▪ 15 km to Ha Giang Tax Department ▪ 16 km to Ha Giang State Treasury Customs Service 14 km to Ha Giang Customs Office Logistics 34,8 km to Thanh Thuy Border Gate 357 Post office 7 km to Vi Xuyen Post Office Medicare ▪ 9 km to Vi Xuyen General Hospital ▪ 16 km to Ha Giang General Hospital Police, public security 2 km to Police Station of Dao Duc commune 7 km to Police Station of Vi Xuyen district Universities, training facilities, etc. ▪ 17 km to Ha Giang Economic and Technical School Recruitment ▪ 8 km to Ha Giang Job Introduction Center ▪ 15 km to Ha Giang Job Service Center Worker dormitory None Worker's child education facility ▪ 5 km to Dao Duc kindergarten ▪ About 16-20 km to about 10 kindergarten located in Ha Giang city One-stop service N/A Road Width N/A IT & Tele-communication Facilities Available Emergency Power generator N/A Fire-fighting facility Available. All factories when built have to comply fire-fighting standard to be approved. Layout Plan 358 Location Map Actual View 359 [- This Page is intentionally left blank -] 360 HA NAM 361 INVESTMENT ENVIRONMENT IN HA NAM GENERAL INFORMATION Area, Population ▪ Area: 900 km2 ▪ Population: 0.9 million (2022 statistic) Geographical Location ▪ Ha Nam is a province located in the Red River Delta ▪ 50km from Hanoi capital. Adjacent provinces ▪ To the north, to the west, to the east, and to the south. GRDP Industry growth PCI 2022 statistic: ▪ Real GRDP: 46.065,7 billion VND ▪ GRDP growth: 10,82% ▪ GRDP per capita: 3.783 USD/year ▪ Economic structure: - Industry - Construction: 67,3%; - Agriculture. forestry and fishery: 8,0%; - Service: 24,7%; (2 billion USD) 2022 statistic: ▪ Industry - Construction growth: 12,96% ▪ Agriculture, forestry and fishery growth: 1,95% ▪ Service growth: 8,42% ▪ Score: 64 – ranked 46 out of 63 cities and provinces in Vietnam. (2022) SOCIAL INFRASTRUCTURE Transportation ▪ Roadway: National Highway 1A, Hanoi - Ninh Binh Expressway, National Highway 38, National Highway 21A, National Highway 21B, the road connecting two highways Hanoi - Hai Phong and Hanoi - Ninh Binh. ▪ Railway: North-South Railway. ▪ Waterway: Inland waterways. Electricity ▪ The province has a waste-to-energy plant. The province is also constructing the Quang Trach I Thermal Power Plant Water ▪ Ha Nam currently has 41 concentrated clean water plants with a total capacity of 175,000m3/day. The factories use water from the Red River, Day River, Sat River, and Chau River. Education ▪ The province has about 29 high schools with 1 specialized high school, 24 public schools and 4 private schools. In addition, there are 6 Centers of Continuing Education - Vocational Education. Medicare ▪ In addition to the network of medical examination and treatment facilities from the province to the grassroots, the Government has planned a high-quality regional medical center in Phu Ly city with an area of 940ha and more than 7,000 beds. Viet Duc Hospitals 2, Bach Mai 2, Geriatric Hospital 2, Yuzankai Elderly Care Center. INVESTMENT CONDITION Human resource ▪ 55% of population are in the working age (2022) Salary ▪ The minimum salary for the province is applied as follows: - Area III: Phu Ly city, Duy Tien town, Kim Bang district. - Area IV: Ly Nhan, Binh Luc and Thanh Liem districts. Investment incentives ▪ Regarding infrastructure rental incentives: In agricultural production zones with high technology application: Cash support (after investment) for part of the costs of infrastructure construction in project fences, human resource training, market development according to Decree 57 /2018/ND-CP dated April 17, 2018 of the Government. 362 ▪ Regarding tax incentives: For hi-tech application projects, hi-tech product production projects, supporting industry projects, hi-tech agricultural production projects: The preferential tax rate of 10% for 15 years shall be applied. Tax exemption for 4 years, 50% reduction of payable tax for the next 9 years. Other projects investing in industrial parks, investment projects in Thanh Liem, Ly Nhan and Binh Luc districts: Tax exemption for 2 years, 50% reduction of payable tax for the next 4 years. ▪ Policies to support training and recruiting workers: Support in training and recruiting skilled workers for investment enterprises in the province. Direct support for vocational training institutions and according to the provincial vocational training project. Fields Attracting Investment ▪ Mechanical engineering, assembling, automobiles, motorcycles; electricity, electronics, telecommunications, information technology; auxiliary industry, new materials, high-tech industry; processing and preserving agricultural products, food, beverages, milk. ▪ Agriculture applying high technology: Growing and processing clean vegetable, tuber and fruit products with high added value to serve large supermarkets and export; invest in building concentrated breeding areas such as raising clean pigs, dairy cows, beef cattle, breeding cows, poultry and processing products from pork and cows...; agricultural research and development. Map Contact Department of Planning and Investment ▪ Address: No. 15 Tran Phu Street, Phu Ly City, Ha Nam Province. ▪ Tel: 0351.852701 ▪ Fax: 0351.852701 ▪ Email: skhdt@hanam.gov.vn ▪ Contact person: Mr. Dinh Ngoc Duy - Deputy Head of Investment Cooperation Department. Tel: 0913660525. Email: ngocduydinh20@gmail.com. 363 LIST OF INDUSTRIAL ZONES IN HA NAM No Industrial zone Name Occupancy Rate Dong Van I Industrial Zone – Phase I Total Area (ha) 221.2 1 100% In operation Dong Van I Industrial Zone – Phase II 150 0% 2 Dong Van II Industrial Zone 321 94.6% Under land clearance process – to be completed in Q1/2023 In operation 3 Dong Van III Industrial Zone – Phase I 300 75% In operation Dong Van III Industrial Zone – Phase II 223 Dong Van IV Industrial Zone – Phase I 300 Dong Van IV Industrial Zone – Phase II 250 5 Dong Van V Industrial Zone 250 6 Hoa Mac Industrial Zone 131 100% In operation 7 Chau Son Industrial Zone 377 92% In operation 8 Thanh Liem Industrial Zone – Phase I 150 100% In operation Thanh Liem Industrial Zone – Phase II 143 50% In operation Thai Ha Industrial Zone – Phase I 100 50% In operation 4 9 Status Under legal process 100% In operation Under planning Under planning Thai Ha Industrial Zone – Phase II 100 Under construction 10 Chau Giang I Industrial Zone 210 Under planning 11 Chau Giang II Industrial Zone 100 Under planning 12 Kim Bang I Industrial Zone 230 Under planning HA NAM’S LOCATION MAP OF INDUSTRIAL ZONES 364 DONG VAN I INDUSTRIAL ZONE GENERAL INFORMATION Address ▪ Dong Van Commune, Duy Tien District, Ha Nam Investor Ha Nam Industrial Zone Management Board ▪ Address: No. 209 Le Hoan Road, Phu Ly City, Ha Nam Province ▪ Tel: (84-226) 3 85 0569 ▪ Email: bqlkcn@hanam.gov.vn ▪ Mr. Tran Van Kien - Deputy Director of Ha Nam Industrial Zone Management Board - (84) 912 220 129 - kienkcnhanam@gmail.com - Land: near National Road 1 A and Cau Gie – Ninh Binh highway - Seaport: 110 km from Hai Phong port - Airport: 70 km from Noi Bai Airport Priority Sectors Investment on high-tech industry, clean industry, light industry, for Investment and supporting industry. Restricted Sectors Restrict heavy industry, industries affecting the environment. for Investment [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries ▪ Start date: 2007 ▪ End date: 2057 10,000 m2 Contact Person Location Investment Area Minimum wage Lease term Minimum Lease Area Limit for Construction Height Permitted Construction Rate Planned area Factory Available for Rent In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning regulation (QCXDVN 01: 2008/BXD) ▪ Total area: - Phase 1: 221.2 ha - Phase 2: 150 ha None Number of Korean Projects ▪ Phase 1: In operation ▪ Phase 2: Under land clearance process – to be completed in Q1/2023 ▪ Phase 1: - Occupancy Rate: 100% - Number of Projects: 98 32 companies Lease fee ▪ Land lease fee: From 75-100 USD/m2/over project life Operation Status Occupancy Rate and Number of Projects ▪ Management fee: 0.3 USD/m2/year ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: 11,500 VND (~0.5 USD)/m3 ▪ Wastewater treatment fee: From C Level: 0.6 USD/m3; From B Level: 0.42 USD/m3 ( Excluding VAT) INFRASTRUCTURE AND FACILITY Operating fee Financial institution Vietcombank, Vietinbank, Sacombank, BIDV. Tax service, State finance office 12 km from Ha Nam Tax Office and Hanam Treasury office Customs Service Inside the zone Logistics 5 km from nearest Logistic compnay Post office 12 km from Hanam Post office Medicare 12 km from Hanam General Hospital Police, public security 24/7 service inside the zone Universities, training facilities, etc. Recruitment 4 km from Ha Hoa Tien University Worker dormitory NA Worker's child education facility One-stop service NA Road Width NA Supported by the IZ developer Inside the zone 365 IT & Tele-communication Facilities Emergency Power generator Telecommunication: broadband ADSL service, telecommunication with IDD, fiber optic capabilities, leased line Available Fire-fighting facility Available Layout Plan Location map LIST OF TENANTS No Company Name Nationality 1 Nam Son Company Ltd. Vietnam 2 Tam Kim Joint Stock Company Vietnam 3 Tri Huong Company Limited Vietnam 4 VT Industrial Park Station Vietnam 5 Trung Thanh Company Limited Vietnam 6 Ocean private enterprise Vietnam 7 Phuong Nam VN Company Limited Vietnam 8 Vietnam Geotextile Joint Stock Company Vietnam 9 Nguyen Khoa Company Limited Vietnam 10 May 19 Textile One Member Company Limited Vietnam 11 Ha Nam Setfil Water Supply Joint Stock Company Vietnam 12 Nam Duong Company Limited Vietnam 13 NN 1 TV Shoes Thuong Dinh Shoes Company Vietnam 14 Thanh Xuan Company Limited Vietnam 15 Ha Nam Hoan Duong Manufacturing & Trading JSC Vietnam 16 Hong Ha Nutrition Joint Stock Company Vietnam 366 17 Ba An Manufacturing & Trading Joint Stock Company Vietnam 18 Sao Thai Duong Joint Stock Company Branch in Ha Nam Vietnam 19 Viet Phuong Ha Nam Company Limited Vietnam 20 Ha Thanh Company Limited Vietnam 21 Dai Uy Company Limited Vietnam 22 Vietnam 23 International DDNN International Joint Stock Company (Anco) Giang Hong Company Ltd. 24 Ltd. Leo jins Korea 25 Korea VN Engineering Co., Ltd. Korea 26 Shin Myung Vina Co., Ltd. Korea 27 China Fenghua Iron and Steel Co., Ltd China 28 European Plastic Joint Stock Company Vietnam 29 Research and manufacture industry JSC Vietnam 30 Norfolk Hatexco Joint Stock Company Singapore 31 Yen Ha Company Ltd. Vietnam 32 Lucky Sun Electric Wire and Cable Co., Ltd. Vietnam 33 Nishu Paint Joint Stock Company Vietnam 34 CP Thien Phuc Company Vietnam 35 Quang Quan Company Limited Vietnam 36 Lee Vietnam Fine Arts Jewelry Co., Ltd. Korea 37 Yoohan Traditional Fine Arts Co., Ltd Korea 38 KAS Fashion Company Limited Korea 39 Yeedo Hanoi Trading Co., Ltd Korea 40 Vietnam Fashion Co., Ltd. China 41 C-one Packaging Co. Ltd. Korea 42 Youme VN Company Limited Korea 43 Vietnam Jewelry Co., Ltd. - Sunny Korea 44 U&I Hanoi Co. Ltd. Korea 45 Naria Vina Co., Ltd Korea 46 Nhat Ha Joint Stock Company Vietnam 47 Dayeon Bi Jou VN Co., Ltd Korea 48 Shine Fine Arts Co.Ltd Korea 49 VIP New Materials and Investment JSC Vietnam 50 Duc Viet Industry Co., Ltd Vietnam 51 Quynh Hang Company Limited Vietnam 52 Juna Company Limited Japan 53 Jasung Vina Co., Ltd. Korea 54 Vietnam 56 Northern Power Construction Consulting Joint Stock Company Vietnam Bank for Agriculture and Rural Development - Ha Nam branch Hiroshima Energy Supply Co., Ltd. 57 Liaan Vietnam Company Limited Korea 58 Central Seed Joint Stock Company Vietnam 59 Hoa Linh Ha Nam Pharmaceutical Joint Stock Company Vietnam 60 Hankook Al Tec Vina Co., Ltd Korea 61 Lan Chi Ha Nam Investment and Services Co., Ltd. Vietnam 62 Co., Ltd. Senyang Electronics China 55 367 Vietnam Vietnam Japan 63 KMW Vietnam Co., Ltd. Korea 64 Global Ai Tec Co., Ltd. (Dong Van DS) Korea 65 Jungang Industry Vietnam Co., Ltd. Korea 66 Mico Tech Vietnam Co., Ltd. Korea 67 Jinyoung G&T Vietnam Co., Ltd Korea 68 Harim Vina Co., Ltd Korea 69 Fuji Engineering Vietnam Co., Ltd. Japan 70 Daejin Vina Co., Ltd. Korea 71 Co., Ltd. HTCTECH Korea 72 Ha Nam Manufacturing and Environment Equipment Co., Ltd America 73 Seoul Semiconductor Vina Co., Ltd. Korea 74 Co., Ltd. Yu Won NRT Korea 75 Telcon Vina Co., Ltd Korea 76 OM Chemical Co., Ltd. Japan 77 Thanh Dat Investment and Development Joint Stock Company Vietnam 78 Tuan Bach Company Limited Vietnam 79 Abbey Vietnam Joint Stock Company English - Vietnamese 80 JMI H Vietnam Co., Ltd. Korea 81 Young BK Company Limited Korea 82 LMS Vina Co., Ltd branch in Ha Nam Korea 83 CNC Star Sun Limited Company Vietnam 84 Linh Giang Precision Machining Auxiliary Industry Co., Ltd Vietnam 85 Ha Nam Urban Environment Company Limited Vietnam 86 Hai Phong Messer Industrial Gas Co., Ltd - Ha Nam Branch Germany 87 Hanyoung Worldwrap Vina Co., Ltd Korea 368 DONG VAN II INDUSTRIAL ZONE GENERAL INFORMATION Address Dong Van Commune, Duy Tien District, Ha Nam Investor Vietnnam Investment Development Group ▪ Address: Chau Son Commune, Phu Ly, Ha Nam ▪ Tel: (84-226) 625 2137 Fax: (84-226) 625 2138 ▪ Website: http://daianvietnam.com/ ▪ Mr. Huan – Sales Department – Mobile: (84) 989 768 586 – Email: huannm2@tniholdings.vn /huan792003@gmail.com – Distance to Hanoi city center: 45km – Distance to Noi Bai international airport: 70 km – Distance to Hai Phong port: 100 km – Distance to Cai Lan – Quang Ninh port: 105 km – Distance to China border checkpoint: 120 km – Distance to Phu Ly City: 11km Priority Sectors for Investment on high-tech industry, clean industry, light industry, and Investment supporting industry. Restricted Sectors for Restrict heavy industry, industries affecting the environment. Investment [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries Contact Person Location Investment Area Minimum wage Lease term Minimum Lease Area ▪ Start date: 2006 ▪ End date: 2056 10,000 m2 Limit for Construction Height Permitted Construction Rate Planned area In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning regulation (QCXDVN 01: 2008/BXD) Factory Available for Rent ▪ NA Operation Status In Operation Occupancy Rate and Number of Projects Number of Korean Projects ▪ Occupancy Rate: 94.6% (leasable industrial land left: 5ha) ▪ Number of Projects: 103 16 companies Lease fee ▪ Land lease fee: 75 - 85 USD/m2/over project life (until 2056-2063) (Excluding VAT) ▪ Total area: 321 ha ▪ Management fee: 0.35 USD/m2/year ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: 11,500 VND (~0.5 USD)/m3 ▪ Wastewater treatment fee: 0.6 USD/m3 for C level, 0.45 USD/m3 for B level, 0.18 USD/ m3 for A level ▪ Waste treatment fee: 9,000 VND/m3 (~0.4 USD/m3) (Excluding VAT) INFRASTRUCTURE AND FACILITY Operating fee Financial institution Maritime Bank Tax service, State finance office Customs Service 13 km from Tax department of Hai Duong province 14 km from State Treasury in Hai Duong 13 km from Hai Duong Customs Logistics Post office 14 km from the industrial zone Nippon Express、Nippon Konpo、MOL Logistics、Sankyu VNPT and Viettel Post Office inside the zone Medicare 14 km to Hanam General Hospital Police, public security Dong Van II Industrial Park has established a police station near the IP to ensure order and security. 3km to Thanh Dong University. Universities, training facilities, etc. Recruitment Worker dormitory The labor forces from local and from neighboring provinces (Bac Ninh, Thai Binh, Hung Yen, Hai Phong, Quang Ninh...). It is easy to find the workers whom you need in the vicinity. Housing, villa for experts/ employees are working in Dai An IZ. 369 Worker's child education facility One-stop service 5 km from nearest University Road Width Main road: 40 m in width Branch road: 22.5 m in width Telecommunication: broadband ADSL service, telecommunication with IDD, fiber optic capabilities, leased line Telephone: number of line depend on investor’s demand. Available IT & Tele-communication Facilities Emergency Power generator Fire-fighting facility NA Available Layout Plan Location map Actual View 370 LIST OF TENANTS No Company Name Nationality 1 Ata Paint Company Limited Vietnam 2 Sumi Vietnam wiring system Co., Ltd Japan 3 Kalbas Vietnam Company Limited Japan 4 SRE Vietnam Co., Ltd. Japan 5 Pomme International Company Limited Japan 6 Honda Lock VN Co., Ltd Japan 7 Vietnam Electronics Co., Ltd. TACHIBANA Japan 8 Branch of Hanoi Textile and Garment Corporation Vietnam 9 Cargill VN Co., Ltd in Ha Nam America 10 Thong Nhat Electrical Mechanical Joint Stock Company - Ha Nam Branch Vietnam 11 Ha Nam Binh Duong Mechanical Company Limited Vietnam 12 Eidai Vietnam Co., Ltd. Japan 13 Honda Vietnam Branch in Ha Nam Japan 14 Dong Van Clean Water Joint Stock Company Vietnam 15 Ha Dong Hanosimex Textile Joint Stock Company Vietnam 16 Shikoku Cable Vietnam Co., Ltd. Japan 17 Yokowo Vietnam Co., Ltd. Japan 18 Arai Vietnam Company Limited Japan 19 M.O.TEC Vietnam Company Limited Japan 20 Osawa Vietnam Co., Ltd. Japan 21 Ueda Vietnam Company Limited Japan 22 Fujigen Vietnam Co., Ltd. Japan 23 Technomeiji Rubber Vietnam Co., Ltd. Japan 24 Nippon Konpo Vietnam Real Estate Company Limited Japan 25 Ishigaki Vietnam Co., Ltd. Japan 26 Sumiriko Hose Vietnam Co., Ltd. Japan 27 T.Rad Vietnam Company Limited Japan 28 Mavin Foods Joint Venture Company Limited Australia 29 Drilube Vietnam Co., Ltd. Japan 30 Kuwayama Vietnam Co., Ltd. Japan 31 Essa Hi-Tech Co., Ltd. Korea 32 Nissho Vietnam Co., Ltd, Japan 371 33 Nippon Thermostat Vietnam Co., Ltd. Japan 34 Makuroh Paper Vietnam Co., Ltd. Japan 35 Minato Rubber Vietnam Co., Ltd. Japan 36 JCU Vietnam Co., Ltd. Japan 37 Hashima Vietnam Co., Ltd. Japan 38 Afix Vietnam Co., Ltd. Japan 39 Vina Kailo Company Limited Korea 40 Gentherm Vietnam Company Limited Germany 41 Sam Kyoung Vina Co., Ltd. Korea 42 Greenfeed Vietnam Joint Stock Company - Ha Nam Branch Hong Kong 43 Marujyu Vietnam Company Limited Japan 44 Dai Nguyen Textile Co., Ltd. (Vietnam) Taiwan 45 Dai Nguyen Clean Water Co., Ltd. (Vietnam) Taiwan 46 Hanoi Maruito Company Limited Japan 47 NBK Vina Company Limited Korea 48 Kanayama Kasei Vietnam Co., Ltd. Japan 49 Ace Antenna Co. Ltd. Korea 50 Meitoku Engineering Vietnam Co., Ltd. Japan 51 Sinfonia Microtec (Vietnam) Ltd. Japan 52 Kuwana Company Limited Japan 53 Vietnam Textile Garment Import Export Co., Ltd - Ha Nam Branch Japan 54 Green energy Co., Ltd - Ha Nam Vietnam 55 Chien Bian Vietnam Company Limited Hong Kong 56 CS Plastic Vietnam Co., Ltd. Japan 57 Jaehyun Vietnam Co., Ltd. Korea 58 NMS Vietnam Co., Ltd. Japan 59 Gunze Hanoi Company Limited Japan 60 Hachi Vietnam Cosmetics Co., Ltd. Vietnam 61 CJ VINA AGRI COMPANY LIMITED - Ha Nam branch Korea 62 Wooyoung Hi-Tech Vina Co., Ltd Korea 63 TDS Vietnam Co., Ltd. Japan 64 Wing Kwong Industrial Vietnam Co., Ltd Hong Kong 65 Kos Hanoi Company Limited Korea 66 Pacific Company of Vietnam Pacific Vietnam 67 Osung Advanced Materials Vietnam Co., Ltd. Korea 68 Ha Nam Safe Paint Company Limited Vietnam 69 Quang Quan Company Limited Vietnam 70 Ukai Vietnam Company Limited Japan 71 Diamond French Pharmaceutical Pharmaceutical Joint Stock Company Vietnam 72 Origin Vietnam Co., Ltd. Japan 73 Tonghe Vina Science and Technology Co., Ltd. China 74 Branch of Thuan Nhat Automation Electric Co., Ltd in Ha Nam Vietnam 75 Ha Nam YFY Packaging Co., Ltd. Taiwan 76 Aiwado Joint Stock Company Vietnam 77 Wetop Pharmaceutical Joint Stock Company's branch in Ha Nam Vietnam 78 Ishigaki Gomu Kougyo Vietnam Co., Ltd. Japan 79 Kent Warm Vietnam Co., Ltd Japan 372 80 PLK Chemical Co., Ltd Korea 81 Sung Nam Electron Vina Co., Ltd Korea 82 Sam Sung Climate Control Vietnam Co., Ltd. Korea 83 I.J Tech Vina Manufacturing Co., Ltd Korea 84 Gia Phuc Dong Van Company Limited Vietnam 85 Gemtek Vietnam Company Limited Taiwan 373 DONG VAN III INDUSTRIAL ZONE GENERAL INFORMATION Address Dong Van Commune, Duy Tien District, Ha Nam Investor ▪ Dong Van III Industrial Zone Infrastructure Development Investment JSC ․ Address: No. 209 Le Hoan Road, Phu Ly City, Ha Nam Province ▪ Mr. Nguyen Van Luong – Chairman – (84) 913 320 349 - luongqhxd@gmail.com ▪ Ms. Hien – (84) 904333910▪ Land: 45 km from Hanoi, 1 km from Dong Van Railway Station. Near Cau Gie – Ninh Binh Highway, National Road 38, North-South Railway ▪ Seaport: 125 km from Hai Phong port; 145 km from Cai Lan seaport ▪ Airport: 65 km from Noi Bai Aiprort Priority Sectors for Clean industry, light industry, and supporting industry. Investment Restricted Sectors Restrict heavy industry, industries affecting the enviroment for Investment [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries Contact Person Location Investment Area Minimum wage Lease term Minimum Lease Area Limit for Construction Height Permitted Construction Rate Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean Projects Lease fee ▪ Start date: 2017 ▪ End date: 2067 10,000 m2 In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning regulation (QCXDVN 01: 2008/BXD) ▪ Total area: 523 ha - Phase I: 300 ha; Vacant leasable area: 60ha - Phase II: 223 ha ▪ NA ▪ Phase I: In operation ▪ Phase II: Under legal process ▪ Phase I - Occupancy Rate: 75% - Number of Projects: 56 None ▪ Land lease fee: N/A ▪ Management fee: 0.3 USD/m2/year ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: 11,500 VND (~0.5 USD)/m3 ▪ Wastewater treatment fee: 9,000 VND - 12,000 VND (~0.4-0.53 USD)/m3 ▪ Waste treatment fee: 9,000 VND/m3 (~0.4 USD/m3) (Excluding VAT) INFRASTRUCTURE AND FACILITY Operating fee Financial institution Tax service, State finance office Customs Service Maritime Bank Logistics 5 km from nearest Logistic compnay Post office 12 km from Hanam Post office Medicare 12 km from Hanam General Hospital Police, public security Universities, training facilities, etc. Recruitment 24/7 service inside the zone 12 km from Ha Nam Tax Office and Hanam Treasury office 16 km from Ha Nam Customs Service 7km from Ha Hoa Tien University Supported by the IZ developer 374 Worker dormitory NA Worker's child education facility One-stop service NA Road Width NA IT & Telecommunication Facilities Emergency Power generator Fire-fighting facility Layout Plan Telecommunication: broadband ADSL service, telecommunication with IDD, fiber optic capabilities, leased line Inside the zone Available Available Location Map Actual View 375 LIST OF SOME NOTABLE TENANTS No Company Name Nationality 1 Northern Power Construction Consulting Joint Stock Company Vietnam 2 Ducan Environment Technology Joint Stock Company Vietnam 3 Ohtsuka Sangyo Vietnam Co., Ltd. Japan 4 Osawa Vietnam Trading Co., Ltd. Japan 5 Chubutsu Vietnam Co., Ltd. Japan 6 Pronics Hanoi Company Limited Japan 7 TDI Electronics Co., Ltd. Vietnam Japan 8 Seiko Precision Parts Vietnam Co., Ltd. Japan 9 Hojitsu Vietnam Limited Japan 10 Vietnam Plastic Taniguchi Company Limited Japan 11 YKK Vietnam Co., Ltd. - Ha Nam Branch Japan 12 Fuji Electric Industry Vietnam Co., Ltd. Japan 13 Fuji Star Roof Co., Ltd. Japan 14 Ojitex Hai Phong Co., Ltd branch in Ha Nam Japan 15 Tan Cang - Dong Van Ha Nam Joint Stock Company Vietnam 16 Vina Ito Co., Ltd. Japan 17 Hashimoto Cloth Vietnam Co., Ltd. Japan 18 Kajitech Company Limited Japan 19 Vietnam Japan Sawada precision Co., Ltd. Japan 20 Shikoku Cable Vietnam Co., Ltd. - Dong Van III Branch Japan 21 Kuwana Company Limited Japan 22 Branch of Sugiko Vietnam Co., Ltd. in Ha Nam Japan 23 Katolec Global Logistics Vietnam Co., Ltd. Japan 24 Kyosha Vietnam Co., Ltd. Japan 376 DONG VAN IV INDUSTRIAL ZONE GENERAL INFORMATION Address Dai Cuong Commune, Kim bang District, Ha Nam Province Investor Viglacera Corporation (Glass and Ceramics for Construction Corporation) ▪ Address: Tien Son Industrial Park, Hoan Son Commune, Tien Du District, Bac Ninh Province. Head Office: The 2nd Floor, Viglacera Tower, No.1 Thang Long Boulevard, Ha Noi, Vietnam. ▪ Tel: +84 24 35536688 Fax: +84 24 35537666 ▪ Website: www.viglaceraip.com ▪ Mr. Dang The Nam - Deputy Manager of Business Department – (84) 903 405 099 - namdt.vir@viglaceraland.vn ▪ Ms. Nguyen Ha Phuong – Senior Marketing Executive – (84) 97 344 8994 phuongnh.vir@viglaceraland.vn ▪ Land: 50 km from Hanoi, 1 km from Dong Van Railway Station. 7 km from Cau Gie – Ninh Binh Highway, on National Road 38, 5 km from National Road 1A, 5km from North-South Railway ▪ Seaport: 114 km from Hai Phong port; 150 km from Cai Lan seaport ▪ Airport: 80 km from Noi Bai Aiprort Priority Sectors for Electronics, power industry, high techs, material for construction and Investment mechanics, pharmaceuticals, foodstuffs, light industry, consumer goods Restricted Sectors for Polluted sectors Investment [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries Contact Person Location Investment Area Minimum wage Lease term Minimum Lease Area Limit for Construction Height Permitted Construction Rate Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean Projects Lease fee ▪ Start date: 2016 ▪ End date: 2066 10,000 m2 In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning regulation (QCXDVN 01: 2008/BXD) Total area: 550 ha ▪ Phase 1: 300 ha ▪ Phase 2: 250 ha N/A ▪ Phase I: In operation ▪ Phase II: Under construction ▪ Phase I - Occupancy Rate: 100% - Number of Projects: 48 16 projects N/A ▪ Management fee: 0.7 USD/m2/year (excluded 10% VAT) ▪ Electricity fee: (1) - Normal hours: 1,555 VND/Kwh (equivalent to 0.067 USD/Kwh) (From Monday to Saturday: 4h - 9h30’, 11h30’ - 17h and 20h - 22h; Sunday: 4h - 22h) (2) - Night hours: 1,007 VND/Kwh (equivalent to 0.04 USD/Kwh) (Everyday: 22h - 4h) (3) - Rush hours: 2,871 VND/Kwh (equivalent to 0.123 USD/Kwh) (From Monday to Saturday: 9h30’ - 11h30’ and 17h - 20h/Not Sunday) ▪ Water fee: 11,500 VND/m3 (equivalent 0.506 USD/m3) excluded VAT - monthly payment. ▪ Wastewater treatment fee: 9,600 VND/m3 excluded VAT (equivalent 0.45 USD/m3) - monthly payment. The quantity is defined by 80% the amount of water supply. INFRASTRUCTURE AND FACILITY Operating fee Financial institution Vietin Bank, Vietcombank, BIDV Tax service, State finance office Customs Service 15 km from Hanam Tax Office. 16 km from Hanam Treasury Office A customs office is planned to locate at the Administration Center of the Industrial Park in order to deal with customs formalities promptly and properly for enterprises Logistics services, including warehouse solution, shipping and custom clearance are provided inside the industrial park Logistics 377 Post office Medicare Police, public security Ha Nam Post Office with modern informatics technology system for serving multi-service communication such as data transfer, internet, IP telephone and video conference, Bach Mai General Hospital (18 km), Viet Duc General Hospital (17 km), General Hospital of Ha Nam (14.8 km) Security Guard ensures security inside industrial park. Recruitment 4 Universities (Hanoi pedagogical university – Ha Nam branch, Trade university – Ha Nam branch, Hanoi industrial university – Ha Nam branch, Construction university – Ha Nam branch), 4 colleges, 7 secondary schools. Viglacera will support in recruitment Worker dormitory Urban area with around 16.8ha always ensure houses, dormitory, apartment for workers in the IP Worker's child education facility One-stop service Many kindergartens near the industrial park Universities, training facilities, etc. Road Width IT & Telecommunication Facilities Emergency Power generator Fire-fighting facility Land and factory lease, fast-track procedures and convenient services such as catering, security service, accommodation, IT system, water-electrical system implemented and/or supported by our industrial park NA The telecommunication system complies with international standards and is always available for commnunication demand with high data transmission speed Yes Available. Water supply system for firefighting is located along each road. Layout Plan Location Map 378 Actual View LIST OF SOME NOTABLE TENANTS No Company Name Nationality 1 Park Electronics Vina Co., Ltd Korea 2 JT Sensor Vina Co., Ltd Korea 379 3 Sunjin F&F Co., Ltd. Korea 4 Eco wiring system co.ltd Vietnam 5 Henan MNS Meat Co., Ltd Vietnam 6 Ha Hien Thanh Hien Co., Ltd Vietnam 7 Saki Ha Nam Company Limited Vietnam 8 Jeio Vina Co., Ltd. Korea 9 Anam Electronics Vietnam Co., Ltd. Korea 10 Vikohasan Joint Stock Company Vietnam 11 Vu Gia International Co. Ltd. Vietnam 12 S-Tec Vina Co., Ltd Korea 13 Hico Vietnam Company Limited Korea 14 Nanofrance High-tech Manufacturing DP Co., Ltd Ha Nam branch Vietnam 15 Lisal Vina Co., Ltd. Korea 16 Myungsung Hanoi Co., Ltd. Korea 17 Partner Eng Vina Co. Ltd. Korea 18 Dinh Huong Construction and Trading Co., Ltd Vietnam 19 Dong Shin Hanoi Vina Joint Stock Company Vietnam 20 Binh Thuan Development Co., Ltd Vietnam 380 HOA MAC INDUSTRIAL ZONE GENERAL INFORMATION Address Highway 38, Hoa Mac town, Duy Tien district, Ha Nam province, Vietnam Investor Hoa Mac Industrial Park Development Management Co., Ltd (directly under Hoa Phat Urban Development & Construction JSC. - HOA PHAT Group) ▪ Address: No. 39 Nguyen Dinh Chieu – Hai Ba Trung – Ha Noi – Viet Nam ▪ Tel: (84) 243 976 3889 ▪ Fax: (84) 243 976 3890 ▪ Website: www.yenmy2-ip.vn ▪ Ms. Hien - Marketing Manager - (84) 989 383 531 ▪ Ms. Huyen - Marketing Dept - (84) 904 200 035 - 45 kilometers far from Ha Noi (40 minutes driving). There are public buses going from the Industrial Park to Ha Noi every 20 minutes and vice versa. - Located adherent to Highway 38, close to Highways 1A, 1B; and Highway 39 connected with Highway 5, Hanoi - Hai Phong Expressway (Highway 5B) and Highway 18 - Nearby Yen Lenh Red River port - 100 kilometers far from Hai Phong Seaport - 75 kilometers far from Noi Bai International Airport - 8 kilometers far from Dong Van railway station (on North - South Railway) which is a transshipment station inside the region. Priority Sectors - Mechanical assembly and Electronic Industry; for Investment - Food and Agricultural Product Processing; - Garment and Footwear Industry; - High-grade Consumer Goods Manufacturing; - Environmental -friendly Building materials Manufacturing. Restricted Sectors Garment, textile dyeing for Investment [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries Contact Person Location Investment Area Minimum wage Lease term Minimum Lease Area Limit for Construction Height Permitted Construction Rate Planned area ▪ Start date: 2008 ▪ End date: 2058 16,784 m2 In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning regulation (QCXDVN 01: 2008/BXD) ▪ Total area: 131 ha Factory Available for Rent Operation Status ▪ Total area: 3,712 m2 Occupancy Rate and Number of Projects Number of Korean Projects Lease fee ▪ 100% ▪ 42 Projects Operating fee ▪ In operation 16 projects ▪ Land lease fee: N/A ▪ Factory lease fee: 4 USD/m2/month ▪ Payment: - Make a deposit of 20% of the infrastructure rental within 07 days as from the signing date of the MOU - Pay 50% of the infrastructure rental within 07 days as from the signing date of the contract - Pay 30% of the infrastructure rental within 07 days as from the land handover date ▪ Management fee: 0.5 USD/m2/year (Exclude VAT) ▪ Electricity fee: (1) - Normal hour: VND 1,611 /Kwh (equivalent to USD 0.073 /Kwh) Time period applied: - From Monday to Saturday: 4:00 am - 9:30 am; 11:30 am - 5:00 pm; 8:00 pm -10:00 pm - Sunday: 4:00 am - 10:00 pm (2) - Night hour: VND 1,044 /Kwh (equivalent to USD 0.047 /Kwh) Time period applied: Everyday from 10:00 pm to 4:00 am (3) - Peak hour: VND 2,964 /Kwh (equivalent to USD 0.135 /Kwh) 381 Time period applied: - From Mondays to Saturdays: 9:30 am - 11:30 am; 5:00 pm - 8:00 pm - Sundays: no peak hour ▪ Water fee: VND 11,500/m3 (equivalent to USD 0.5/m3) - Monthly payment. ▪ Wastewater treatment fee: VND 11,000/m3 (equivalent to USD 0.48/m3) - Monthly payment. The volume is defined as 80% of supply water volume. INFRASTRUCTURE AND FACILITY Financial institution Tax service, State finance office Customs Service Vietin Bank, BIDV, Agribank, Techcombank Logistics NA Post office From an office of Ha Nam Post Office to the Industrial Park: about 700 meters to serve the demand of enterprises on post and telecommunications services. Duy Tien Health Care Center and Hung Yen General Hospital (4 kilometers far from the Industrial Park) shall meet labor's demand for medical examination and treatment. 24/7 security service. Medicare Police, public security Universities, training facilities, etc. 20 km to Tax department of Ha Nam province 21 km to State Treasury in Ha Nam Inside Industrial Park Recruitment There is a system of colleges and professional vocational schools in Ha Nam province including 2 Universities, 6 Colleges, 1 Vocational School, 3 Provincial Voactional Centers and some other Vocational Centers, which could satisfy the demand of enterprises in the province for technical workmen. Outstanding Training centers involve as follows: - Ha Hoa Tien University; - Hanoi University of Industry - Hanam branch; - Ha Nam Vocational College; - Ly Nhan Vocational Training and Job Introducing Centers. - National University of Civil Engineering - Hanam branch - Vietnam University of Commerce - Hanam branch IZ developer will support recruitement Worker dormitory NA Worker's child education facility One-stop service NA Road Width 37.5m /2 lanes IT & Telecommunication Facilities Emergency Power generator Fire-fighting facility International-standard telecommunication system is available to satisfy demand for communication, highranking data transmission and international and domestic post service. An optical fiber system is installed underground to every factory. No NA Available 382 Layout Plan Location Map Actual View 383 384 LIST OF TENANTS No Company Name Nationality 1 Novaref Refractories Company Ltd. Vietnam 2 PVC-ME1 Mechanical Co., Ltd Vietnam 3 Vinaglaze Joint Stock Company Vietnam 4 Advanced Material Vietnam Co., Ltd. Japan 5 GP Battery Company Limited (Vietnam) Singapore 6 Vina - Ha Nam Animal Feed Joint Stock Company Vietnam 7 Branch of OSG Vietnam Co., Ltd in Ha Nam Japan 8 Finetek Vietnam Joint Stock Company Korea 9 Keyrin Electronics Vietnam Co., Ltd. Korea 10 Hanoi Elite Group Company Limited Korea 11 Vietnam Byron Holdings Ltd. Japan 12 Sebang Chain Vina Co., Ltd Korea 13 DK Vietnam Company Limited Korea 14 NPI Vietnam Co., Ltd. Korea 15 Guymarc'h - VCN Limited Company in Ha Nam France - VN 16 Dorco Vina Co., Ltd- Ha Nam Branch Korea 17 Dynaox Vietnam Company Limited Japan 18 Ha Nam Nasaco Animal Feed Co., Ltd. Vietnam 19 Cu Tech Vietnam Co., Ltd. Korea 20 Naxis Vietnam Company Limited - Ha Nam Branch Japan 21 Noda Kogyo (Vietnam) Co., Ltd. Japan 22 Dorco Living Vina Co., Ltd Korea 23 Wish Tree Vina Co., Ltd Korea 24 Vietnam Kyodo Seihan Printing Co., Ltd Japan 25 Pretty Vina Co., Ltd America 26 Minami Aso Nouen International Co., Ltd. Japan 27 Ha Nam Kurosu Company Limited Japan 28 Taesung Hitech Vina Co., Ltd Korea 29 Komos Vina Co., Ltd Korea 30 DMR Vina Co., Ltd Korea 385 CHAU SON INDUSTRIAL ZONE GENERAL INFORMATION Address ▪ Chau Son ward, Phu Ly city, Ha Nam province Investor Ha Nam VPID One Member Company Limited (Branch of Vinh Phuc Infrastructure Development Joint Stock Company) ▪ Address: Chau Son Industrial Park, Chau Son Ward, Phu Ly, Ha Nam ▪ Tel: (84-226) 6252 137/ (84-226) 6545556 ▪ Email: kcnchauson@vpid.vn ▪ Nguyen Anh De - (84) 983 282 399 ▪ Ms. Vy Lan - (84) 931 661 999 ▪ Ms. Vu Bich Lien - (84) 976 821 877 ▪ Land: 58 km from Hanoi, 3 km from Dong Van Railway Station, 1 km from National Road 1A ▪ Seaport: 100 km from Hai Phong port; 150 km from Cai Lan seaport, 500m far from Thinh Chau port ▪ Airport: 80 km from Noi Bai Aiprort ▪ Railway: 3km far from Phu Ly station of the Vietnam railway from North to South Priority Sectors Light and high tech industries for Investment Restricted Polluted industries Sectors for Investment [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries Contact Person Location Investment Area Minimum wage Lease term Minimum Lease Area Limit for Construction Height Permitted Construction Rate ▪ Chau Son Industrial Park: Until July 2056 ▪ Expanded Chau Son Industrial Park: Until October 2068 1 ha In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning regulation (QCXDVN 01: 2008/BXD) Factory Available for Rent ▪ Total planned area: 377ha ▪ Vacant leasable area: 30ha Total workshop area: 22,891.0 m2 (05 workshops) Operation Status In operation Occupancy Rate and Number of Projects Number of Korean Projects ▪ Occupancy Rate: 92% ▪ Number of Projects: 133 31 projects Planned area ▪ Land lease fee (including infrastructure): from 75 USD/m2 ▪ Rental price for raw land: 9,000 VND/m2/year (equivalent to 0.39USD/m2/year). Unit price is decided under the Ha Nam Province People’s Committee. Investors in the expanded IP are now enjoying free land rental up to November 2029. ▪ Factory lease fee: 3.3 USD/m2/month - Minimum rent: 05 years - Deposit: 06 month’s rent at minimum ▪ Management fee: 0,35 USD/m2/year Operating fee ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: 11,500 VND (~0.5 USD)/m3 ▪ Wastewater treatment fee: From B level: 9,600 VND (~0.43 USD) /m3 ▪ Waste treatment fee: 9,000 VND/m3 (~0.4 USD/m3)(Excluding VAT) INFRASTRUCTURE AND FACILITY Lease fee Financial institution Vietinbank, Vietcombank, BIDV Tax service, State finance office Customs Service 5.4 km from Hanam Tax Department 3.6 km from Hanam State Treasury 4 km from Hanam Customs Office Logistics NA Post office 3 km from Ha Nam Post Office Medicare 3.2 km from Hanam Hospital Police, public security 1.4 km from Hanam Public Security 386 Universities, training facilities, etc. Recruitment 10.6 km from Ha Hoa Tien University Worker dormitory Under Construction Worker's child education facility One-stop service NA Road Width Emergency Power generator Mai Road width: 32 m, number of lanes: 4) Internal Road (width: 23 m, number of lanes: 2) Viettel telecommunication corporation (Viettel Telecom) is ready to meet demands of 9 - 10 lines/ ha Underground cable is set up to fence of the manufactories. Available Fire-fighting facility Water supply system and extinguishing valves are also installed along all of roads IT & Tele-communication Facilities Supported by the Management Board Supported by Industrial Zone developer Layout Plan 387 Location Map Actual View LIST OF TENANTS No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Company name KangYin Electronic Technology Co., Ltd Espoir Vietnam Co., Ltd ARTPRESTO VIETNAM CO., LTD Enex Vina Company Limited Dream Plastic Company Limited SET Vietnam Co., LTD DongJun Art Craft Co., Ltd Sunlin Vietnam Electronics Co., LTD Daedong Vina Co., LTD JY Plasteel Vina Co., LTD SDS Vina Co., LTD Dream Printing & Package Co., Ltd Samsin Vina Co., Ltd KAVA Vina Co., Ltd ILLJIN COM VINA Co., Ltd NUAS VINA CO., LTD IPN VINA CO.,LTD Business line electronic components producing garment producing Manufacture bag producing Interior and constructive material producing Production of Child toy and plactic products Electronic components producing Jewelry producing electronic components producing Bag hold vegetables and fruits producing Children's bicycles producing electronic components producing Manufacture of paper products Electronic components producing electronic components producing Manufacture of wires and cables for automobiles producing of paper packaging manufacturing plastic products auto parts 388 Nationality Australia Japan Japan Korea Korea Korea Korea Korea Korea Korea Korea Korea Korea Korea Korea Korea Korea Manufacture of screws Korea electronic components producing manufacturing automobile accessorios Korea Korea 21 22 VIET NAM SPECIAL FASTENERS CO.,LTD SONETECK TJ CO.,LTD YURA HARNESS VIET NAM CO.,LTD HANSHIN VINA CO., LTD Long Prosper International Co., Ltd manufacturing antenna cables in car electronic components producing 23 FAVOR UNION VINA CO., LTD electronic components producing 24 25 Led production electronic components producing 26 V POWER INDUSTRIAL CO., LTD SIYOTO VINA ELECTRONIC CO., LTD SI YUAN TECH CO., LTD Korea Taiwan/ HongKong/ China Taiwan/ HongKong/ China Taiwan HongKong 27 BEST FOUR VIET NAM CO.,LTD Production of paper packaging plastic packaging, assembly charger preventive stationery production 28 29 30 31 32 33 Saovang Rubber JSC MTV Vinh Son Ha Nam Co., Ltd Nam Vang Ha Nam JSC Hoa Viet Pharmacy JSC Chau Son Manufacture Co., Ltd Thien Loc Lighting Co., Ltd rubber products producing Construction and workshop rental Manufacture of plastic products Traditional medicines producing Manufacture of plywood panels Led production 18 19 20 389 Taiwan/ HongKong/ China Taiwan/ HongKong/ China Vietnam Vietnam Vietnam Vietnam Vietnam Vietnam THANH LIEM INDUSTRIAL ZONE GENERAL INFORMATION Address Investor Contact Person Location Investment Area Minimum wage Lease term Minimum Lease Area Limit for Construction Height Permitted Construction Rate Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean Projects Lease fee ▪ Thanh Liem Industrial Park, Thanh Phong Commune, Thanh Liem District, Ha Nam Province, Viet Nam CAPELLA LAND JOINT STOCK COMPANY ▪ Address: F26, Vinaconex 9 Tower, Pham Hung Street, Hanoi, Vietnam ▪ Tel: (84-220) 3 562718 Fax: (84-220) 3 727886 ▪ Website: cpliz.com.vn ▪ Ms. Nguyen Thi Hong Chuyen– Sales Director – (84) 964 420 028 - chuyen.cpl@gmail.com ▪ Ms. Ha - Sales Deputy Director - (84) 983 670 928 - hadtt.cpl@gmail.com ▪ Ms Tue – Sales Officer – (84) 35 323 9989 –tueanh.cpl@gmail.com - Located on National Road No 1A, 8km from Ha Noi – Ninh Binh Freeway - 55 Km from Hanoi Capital Center - 4 Km from Phu Ly City, Ha Nam Province - 75 Km from Noi Bai International Airport - 100 Km from Hai Phong International Seaport - 25 Km from Huyndai – Ninh Binh Province - 250 km from China Border Gate, Lang Son Province Priority Sectors for Multi-Industry Investment Restricted Sectors for Restrict heavy industry, industries affecting the environment Investment [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries ▪ Start date: April 2019 ▪ End date: April 2069 10,000 m2 In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning regulation (QCXDVN 01: 2008/BXD) Factory area: 60% Operation area: 60% ▪ Total area: 293 ha - Phase I: 150 ha (fully occupied) - Phase II: 143 ha ▪ Vacant leasable area (Phase II): 70 ha No In operation ▪ Phase I: 100% ▪ Phase II - Occupancy Rate: 50% - Number of Projects: 9 01 ▪ Land lease fee: From 75USD/m2/whole leasing term (50 years from 2019 to 2069) ▪ Payment: - Method: One-time payment, divided into three installments - Period: Deposit: 30%; Second payment: 30% after IRC/ERC; Third payment: 40% after handover leveled land. ▪ Management fee: 10.000VND/m2/year, equivalent to 0.43 USD/m2/year Operating fee ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: about 0.47USD/m3 - Monthly payment ▪ Wastewater treatment fee: about 10.500VND/m3, equivalent to 0.45USD/m3. Customers will sign contract with a Service Environment Company. INFRASTRUCTURE AND FACILITY Financial institution Viet A Bank, BIDV, Vietcombank, Agribank… Tax service, State finance office Customs Service - 7km to Ha Nam to Ha Nam state treasury - 6km to Ha Nam Tax Department 7 km to Ha Nam Customs Agency Logistics 5.5 km from SME Logistic (Le Cong Thanh Street, Phu Ly City) Post office 6 km to Ha Nam Post Office 390 Medicare Police, public security - 8 km to Viet Duc Hospital (Thanh Liem District) - 7 km to Ha Nam Hospital (Truong Trinh Street) - 8 km to Bach Mai Hospital (Thanh Liem District) 6 km to Ha Nam Police (Ly Thuong Kiet Street, Phu Ly City) Recruitment - 13km to Ha Hoa Tien university - 8km to Industrial University (Phu Van Street, Phu Ly City) - 8km to Ha Nam vocational college (Le Hoan Street, Phu Ly City) 6.5km to Job Introduction Center of Ha Nam Province (Tran Quang Khai Street, Phu Ly City) Worker dormitory Near the residential area. No dormitory Worker's child education facility One-stop service A lot of Nursery school arround Thanh Liem district and Phu Ly City Road Width Main Road: 46m; Branch Road: 28m and 20.5m IT & Telecommunication Facilities Emergency Power generator Fire-fighting facility International-standard telecommunication system is available to satisfy demand for communication, high-ranking data transmission and international and domestic post service. An optical fiber system is installed underground to every factory. No Universities, training facilities, etc. 10km (Quang Trung Street, Phu Ly City) Set up along the roads of Industrial Park Layout Plan Location Map Actual View NA 391 THAI HA INDUSTRIAL ZONE GENERAL INFORMATION Minimum wage ▪ Thanh Liem Industrial Park, Thanh Phong Commune, Thanh Liem District, Ha Nam Province, Viet Nam Thai Ha Urban and Industrial Park Investment Joint Stock Company ▪ Address: PG1 – 01 Vincom, Bien Hoa, Phu Ly City, Ha Nam ▪ Tel: 0834188 189 ▪ Website: khucongnghiepthaiha.com.vn ▪ Ms. Nguyen Van Quyen – Sales Executive– Mobile: (84) 834188189 Email: cpdtthaiha@gmail.com ▪ About 28 km from National Highway 1A and the North-South railway; 28km from Hanoi-Ninh Binh expressway; adjacent to the planning road of 5 Belt Road - Hanoi capital; adjacent to Thai Ha bridge, Hung Ha bridge (way to Hung Yen, Hai Duong, Thai Binh, Hai Phong); adjacent to the highway linking axis: Hanoi - Ninh Binh and Hanoi - Hai Phong. ▪ 20km from Phu Ly City, 77 km from Hanoi center, 85 km from Noi Bai airport and 90 km from Hai Phong port Priority Sectors for ▪ Mechanical engineering, assembly, cars and motorcycles. Investment ▪ Electricity, electronics, telecommunications, information technology. ▪ New auxiliary industries and materials. ▪ Processing and preserving agricultural products, food, beverages and milk. ▪ Warehousing and transportation support activities Restricted Sectors for Polluted Investment [Area 4] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries Lease term Until 2069 Minimum Lease Area Limit for Construction Height Permitted Construction Rate Planned area 1ha Address Investor Contact Person Location Investment Area Factory Available for Rent Operation Status 1 – 3 floors 60% ▪ Total planned area: 200ha - Phase I: 100ha; total vacant leasable area: 50 ha - Phase II: 100ha N/A ▪ Phase I: in operation Occupancy Rate and Number of Projects Number of Korean Projects Lease fee ▪ Phase I: - Occupancy Rate: 50% - Number of projects: 5 N/A Financial institution Tax service, State finance office ArigBank, BIDV ▪ Land lease fee: 70 -75 USD/m2/50 years, depending on location, contract signing date ▪ Payment: - Sign contract in principle: 30% deposit - After obtaining investment certificate, business registration in Thai Ha Industrial Park / 60 days from the date of payment deposit: 30% - Receive handover of payment premises: 30% - Sign official contract, notice of issuance of payment certificate: remaining 10% ▪ Management fee: 0.5 USD/m2/year Operating fee ▪ Electricity fee: as regulated by the Government ▪ Water fee: as regulated by the Government ▪ Wastewater treatment fee: 0.5 USD/m3/month ▪ Waste treatment fee: Negotiable INFRASTRUCTURE AND FACILITY Tax Department of Ly Nhan district, State treasury of Ly Nhan district 392 Customs Service 15km from the nearest Customs Agency 30km from the nearest Inland Container Depot Logistics Post office 3km Medicare 15km from Bach Mai Hospital and Viet Duc Hospital (Ha Nam branch) Police, public security Universities, training facilities, etc. Recruitment 1km from the nearest Police Station Worker dormitory 9.63 ha – next to the IZ Worker's child education facility One-stop service Available Road Width 68m, 54m, 36m, 12m IT & Telecommunication Facilities Emergency Power generator Fire-fighting facility Layout Plan Available Within a radius of 10 km, there are 4 high schools and vocational training centers. Support recruiment Not available Fire Police: 1km 393 Location Map Actual View N/A 394 [- This Page is intentionally left blank -] 395 HA TINH 396 INVESTMENT ENVIRONMENT IN HA TINH USD/VND 23.510 GENERAL INFORMATION Area 6026 km2 Population 1,3 million people (2022) Geographical Location ▪ Ha Tinh is located in North Central region. ▪ Located in the North Central area ▪ 340 km (211 miles) to Hanoi Center. The topography is diverse, with mountainous, midland, plain and sea areas. Ha Tinh has 14 large and small rivers and many lakes. Adjacent provinces ▪ The province has Nghe An to the North, Quang Binh to the South, Laos to the West, the East Sea to the east with a coastline of 137km. 2022 statistic: GRDP Industry growth Import - Export ▪ Real GRDP (billion VND): 92.960 ▪ GRDP growth: 3,98% ▪ GRDP per capita (million VND/year): 70,50 (3.96 billion USD) (3.00 USD) ▪ Economic structure: - Industry - Construction: 40,50% - Agriculture. forestry and fishery: 31,50% - Service: 15,00% ▪ Industry - Construction growth: -3,23% ▪ Agriculture, forestry and fishery growth: 0,83% ▪ Service growth: 13,08% Import turnover (billion USD): 3,40 (Growth rate: 0,03) Export turnover (billion USD): 1,80 (Growth rate: -0,1) PCI ▪ Steel and electricity manufacturing ▪ Besides steel and electricity production, the province also produces a number of other key industrial products such as beer and commercial electricity 67.18 Ranking 18 Key Industry SOCIAL INFRASTRUCTURE Transportation Electricity Water ▪ Roadway: Ha Tinh has 130 km (82 miles) of Highway 1A stretching from Ben Thuy Bridge (Vinh City) to Deo Ngang Pass linking Hà TInh and Quang Binh. The Ho Chi Minh Route is the second most important route of the province. Ha Tinh also contains Road 8 which runs from Hong Linh town to Laos and the Viet-Lao highway from Vung Ang Harbour (Ky Anh District) to Laos. ▪ Railway: a railway link to Laos was proposed from Ha Tinh province in 2007 ▪ Waterway: 167.5 km of national inland waterways and 87 km of local provincial waterways. In particular, the national inland waterway route includes: Song La route (13 km), Ngan Sau river (27 km), Song Nghen (38.5 km), Le canal (26 km). ▪ The province's electricity is supplied by Vung Anh thermal power plant ▪ Besides, Ngan Troi hydropower plant with a capacity of 25.5 MW after 5 years of construction has been completed and connected to the national power grid. ▪ In Ha Tinh province, there are 43 facilities licensed to exploit surface water with a total capacity of approximately 161,000 m3/day. Education & Training ▪ 01 University, 238 primary schools, 157 junior high schools and 44 high schools Medicare ▪ 18 public hospitals INVESTMENT CONDITION Human resource 68,9% of population are in the working age (2022) Education level Trained labor rate: 74% (2022) 397 ▪ The minimum salary for the province is applied as follows: - Area I (4,680,000 VND/month): N/A - Area II (4,160,000 VND/month): N/A - Area III (3,640,000 VND/month): Ha Tinh City anh Ky Anh Town Salary - Area IV (3,250,000 VND/month): Hong Linh Town and Cam Xuyen, Can Loc, Duc Tho, Huong Khe, Huong Son, Ky Anh, Nghi Xuan, Thach Ha, Vu Quang, Loc Ha Districts (Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages paid to employees working under employment contracts) Investment incentives Fields Attracting Investment Investment attraction situation Industrial zones ▪ Incentives according to government regulations: - Exemption and reduction for land and water rent fee - Preferential tax rates and exemption period, reduction for corporate income tax. - Import tax exemption ▪ Incentives from the province: - Preferential credit policies - Interest rate support ▪ Prioritized projects: steel manufacture, assembly, electronic products, agricultural products, manufacturing electronic and other industrial fields. Revenue of the FDI sector as of 9/2022 in Ha Tinh province reached 3 billion USD, equivalent to 70,270 billion VND, down 80% compared to the same period in 2021. Ha Vang Industrial Park Vung Ang Industrial Park Dai Kim Industrial Park Gia Lach Industrial Park Phu Vinh Industrial Park Formosa Industrial Park Map Ha Tinh Department of Planning and Investment ▪ Address: No 16, Xo Viet Nghe Tinh, Tran Phu, Ha Tinh Contact ▪ Tel: 0239 3856 750 ▪ Email: sokehoach@hatinh.gov.vn ▪ Contact person: - Tran Viet Ha (Head of the Department). Tel: 0906868468 LIST OF INDUSTRIAL ZONES IN HA TINH 398 No Industrial zone Name Total Area (ha) Occupancy Rate Status 1 Gia Lach Industrial Zone 350 22.7% In Operation 2 Vung Ang Economic Zone 22,781 N/A In Operation 3 Phu Vinh Industrial Zone 200 30% In Operation 4 Vung Ang 1 Industrial Zone 200 92% In Operation 5 56,685 N/A In Operation 4 Cau Treo International Border Gate Economic Zone (Cau Treo IBEZ) Ha Vang Industrial Zone 250 0% Under Construction 7 Hoanh Son Industrial Zone 41.76 0% Under Construction HA TINH’S LOCATION MAP OF INDUSTRIAL ZONES 399 GIA LACH INDUSTRIAL ZONE GENERAL INFORMATION OF INDUSTRIAL ZONE Address Xuan An town, Nghi Xuan district, Ha Tinh Investor Ha Tinh Economic Zone Service Infrastructure Center ▪ Address: Vung Ang Industrial Zone, Ky Thinh Ward, Ky Anh Commune, Ha Tinh ▪ Tel: (84-239) 3 713 999 Fax : (84-239) 3 713 999 Contact Person Location Contact person: ▪ Mr. Pham Anh Tu- Director of Center for Investment Promotion and Human Resource Supply of Ha Tinh Economic Zones- Mail: ipc.hatinhez@gmail.com ▪ Mr. Le Nguyen Kien Cuong - Director - (84) 985 346 168 - lenguyenkiencuong@gmail.com ▪ Mr. Dang Ba Giap - Head of Department - (84) 974 220 090 - dangbagiap@gmail.com ▪ 50 m to National Road 1A, 5 km to Vinh City, 45 km to Ha Tinh City ▪ 25 km to Cua Lo Port ▪ 15km to Vinh Airport, 06 km to Xuan Hai Port Investment priorities Sectors Production of household appliances, mechanical processing, spare parts manufacturing, agro-forestry-fishery processing industry Investment Restricted Sectors Heavy industries Investment Area Minimum wage Lease term [Area 4] According to Decree 90/2019/NĐ-CP dated 15th November 2019 50 years Minimum Lease Area 1.5 ha Limit for Construction Height 1 - 5 floors Permitted Construction Rate N/A Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean Projects Lease fee Operating fee ▪ Total area: 100ha ▪ Total vacant space for rent: 67.56 ha ▪ Total area with full infrastructure ready to build factories: 43.55 ha ▪ Currently, the IZ does not have factory available for rent In Operation ▪ Rate of Occupancy: 25.7% ▪ Number of project: 05 projects None 0.3 USD/m 2 /year ▪ Management fee: None ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: 9,000 VND (~0.4 USD)/m3 for production activities ▪ Wastewater treatment fee: to be defined INFORMATION OF INFRASTRUCTURE AND FACILITY Financial institution Tax service, State finance office Customs Service Logistics 5 km to Agribank branch of Nghi Xuan district 1 km to Vietcombank branch of Xuan An Town 5 km to Tax Department and State Treasury of Nghi Xuan district 42 km to Customs Department of Ha Tinh province N/A 400 Post office 5 km to Post Office of Nghi Xuan district Medicare 6 km to Nghi Xuan General Hospital Police, public security 5 km to Police station of Nghi Xuan district Universities, training facilities, etc. 42 km to Ha Tinh city, where has many universities and technical school located. Recruitment 42 km to Ha Tinh Job Introduction center Worker dormitory N/A Worker's child education facility N/A One-stop service Road Width 44 km to Ha Tinh Public Administration Center N/A Communication Infrastructure of Industrial Zone Available Emergency Power generator N/A Fire-fighting Facility N/A Layout Plan Location map 401 Actual View List of enterprises in the Industrial Park No. Name Nationality Business sector 1 Chau Tuan Export and Import Ltd. Vietnamese Manufacture of paper and packages for export 2 Vinh Plastic & Bag JSC. Vietnamese Manufacture of packages 3 Nghe An LPG Ltd. Vietnamese Processing gas extraction, painting, repairing and verifying gas tank shells 4 Hai Phong Gas Petrolimex Ltd. - Ha Tinh Branch Vietnamese Extraction of LPG 402 VUNG ANG ECONOMIC ZONE GENERAL INFORMATION OF INDUSTRIAL ZONE Address Ky Anh Town, Ha Tinh province Investor Ha Tinh Economic Zone Management Board ▪ Office 1: - Address: Ky Loi, Ky Anh Town, Ha Tinh Province - Tel: (84-239) 3 891 962 Fax : (84-239) 3 868 699 ▪ Office 2: No. 86 Phan Dinh Phung, Ha Tinh City, Ha Tinh Province - Address: Ky Loi, Ky Anh Town, Ha Tinh Province - Tel: (84-239) 3 881 237 Fax: (84-239) 3 882 992 Contact Person Mr Nguyen Van Khoa- Deputy Head of Management BoardMobile: (84) 98 387 6559- Email: nguyenvankhoa.kkt@hatinh.gov.vn Location ▪ 100 km to Vinh City, 50 km to Ha Tinh City ▪ 9 km to Vung Ang port ▪ 65 km to Dong Hoi Airport, 115 km to Vinh Airport Investment priorities Sectors ▪ High-tech; processing technology, supporting industries; Post-steel manufacturing industries. ▪ Eco- tourism - trade. ▪ Seaport; port services, loading, logistics, sea transport. ▪ Social Infrastructure Projects. Investment Restricted Sectors N/A Investment Area Minimum wage Lease term [Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019 No more than 50 years Minimum Lease Area 0.58 ha Limit for Construction Height 1 - 5 floors Permitted Construction Rate Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean Projects 55 - 70% ▪ Total area: 113.8 ha ▪ Total vacant space for rent: 87.06 ha ▪ Total area with full infrastructure ready to build factories: 15.15 ha Currently, the EZ does not have any factory for rent ▪ In Operation ▪ Occupancy rate: 82% ▪ Number of Project: 132 projects None Lease fee ▪ Land lease rate: 0.3 USD/m 2 /year ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: 9,000 VND (~0.4 USD)/m3 for production ▪ Wastewater treatment fee: to be updated Operating fee ▪ Management fee: None ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: 9,000 VND (~0.4 USD)/m3 for production ▪ Wastewater treatment fee: to be updated INFORMATION OF INFRASTRUCTURE AND FACILITY Financial institution ▪ Agribank and Vietinbank branches are located in the EZ ▪ 12 km to Techcombank, Vietcombank, BIDV bank branches of Ky Anh town 403 Tax service, State finance office Customs Service Logistics About 10 km to Tax Department and State Treasury of Ky Anh town 6 km to Customs Office of Vung Ang Port Border Gate Vung Ang Economic Zone has a wide logistical system: from Vung Ang deep seaport and its supporting logistical providers,… Post office 12 km to Ky Anh Post office Medicare 10 km to Ky Anh General Hospital Police, public security 10 km to Ky Anh police station Universities, training facilities, etc. 60-70 km to universities and technical colleges located in Ha Tinh city (of Ha Tinh province) Recruitment Worker dormitory There is an on-site Employment transaction floor of Vung Ang - Ky Anh EZ There are dormitories for individuals and family dormitories Worker's child education facility N/A One-stop service N/A Road Width N/A Communication Infrastructure of Industrial Zone N/A Emergency Power generator N/A Fire-fighting facility Vung Ang Firefighting and Prevention Police Department is located in the EZ; firefighting devices are equipped. Layout Plan 404 Location Map Actual View List of enterprises in the Industrial Park No. 1 Name Rong Mei JSC. Nationality Taiwanese 405 Business sector Paint production: 5,000 tons/year; Mechanical processing, metal processing and coating with a capacity of 10,000 tons of products/year. 2 Shian Yun JSC. Taiwanese 3 Juan Yen Ltd. Taiwanese 4 Morfortune JSC. Taiwanese Construction of factories for rent 5 Goodean Ltd. Taiwanese 6 Huu Sinh Control and Mechanical Construction Ltd. Taiwanese Processing, coating and handling all kinds of steel with a capacity of 36,000 tons of products/year. Production of metal structures 406 Industrial gas production and extraction General processing, including mechanical processing, chemical preparation used in wastewater treatment; factories for rent. PHU VINH INDUSTRIAL ZONE GENERAL INFORMATION OF INDUSTRIAL ZONE Address Investor Contact Person Location ▪ Vung Ang Economic Zone, Ky Anh town, Ha Tinh province Phu Vinh Infrastructure Construction Investment Co., Ltd. ▪ Address: Lien Phu Group, Ky Lien Ward, Ky Anh Commune, Ha Tinh ▪ Tel: (84-239) 3 722 578 Fax : (84-239) 3 722 378 ▪ Email: pv@pvip.com.vn ▪ Ms. Tran Ngoc Linh – Assistant - Mobile: (84) 932 315 368Email: tran0568@gmail.com ▪ Mr. Chang Wei Lin – Sales Deputy Director – Mobile: (84) 932 315 028 – Email: pvwilliam8899@gmail.com ▪ Ms. To Thi Kim Dung – Sales Executive – Mobile: (84) 932 315 848 – Email: tothikimdung.ht@gmail.com ▪ 200 m to National road 1B ▪ 15 km to Vung Ang port ▪ 70 km to Dong Hoi Airport, 120 km to Vinh Airport Investment priorities Sectors ▪ Production and processing of iron and steel products: Hot rolled steel coils, stainless steel, steel bars, round steel, steel pipes, special metals. ▪ Mechanical and electrical industry: Electronics, electronics, industrial and household electricity, information technology, communications and telecommunications. ▪ Manufacture of mechanical industry: components, accessories for assembling vehicles, motors, manufacturing and repairing agricultural mechanics, and equipment used in mining exploitation. ▪ Building materials industry: Producing concrete, cement, fire-proof, heatresistant and ceiling materials. ▪ Other industries Investment Restricted Sectors N/A Investment Area Minimum wage Lease term [Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019 ▪ Start date: 2010 ▪ End date: 2060 Minimum Lease Area 5,000 m2 Limit for Construction Height N/A Permitted Construction Rate N/A Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean Projects Lease fee Operating fee 200 ha Currently, the IZ does not have factory available for rent In Operation ▪ Rate of Occupancy: 30% ▪ Number of Project: 06 projects None ▪ Land lease fee (including: - 65 USD/m2/until 2060 for lease area from 0.5 ha – 2 ha - 55 USD/m2/until 2060 for lease area from above 2 ha ▪ Management fee: 1,350 VND (~0.061 USD) /m2/month ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: 11,000 VND (~0.4 USD)/m3 for production 407 ▪ Wastewater treatment fee: 2,500 VND (~0.27 USD) /m3 INFORMATION OF INFRASTRUCTURE AND FACILITY Financial institution Tax service, State finance office Customs Service Logistics Agribank, Techcombank, BIDV bank branches of Ky Anh town are located nearby 17 km to Tax Department and State Trasury of Ky Anh town 17 km to Vung Ang Customs Office Vung Ang Economic Zone has a wide logistical system: Vung Ang deep seaport and its supporting logistical providers Post office 17 km to Post Office of Ky Anh province Medicare 14 km to Ky Anh General Hospital Police, public security 15 km to Ky Anh Police Universities, training facilities, etc. 60-70 km to universities and technical colleges located in Ha Tinh city (of Ha Tinh province) Recruitment Worker dormitory Worker's child education facility One-stop service Road Width Communication Infrastructure of Industrial Zone Emergency Power generator Fire-fighting Facility There is an on-site Employment transaction floor of Vung Ang - Ky Anh EZ There are dormitories for individuals and family dormitories N/A Phu Vinh gives support to projects in proceeding one-stop service ▪ Main road: 45.5 m wide ▪ Branch road: 11.25 m wide Available, installed to the fence of each factory Self- equipped Available Layout Plan 408 Location map Actual View 409 VUNG ANG I INDUSTRIAL ZONE GENERAL INFORMATION OF INDUSTRIAL ZONE Address Investor Contact Person Location Vung Ang Economic Zone, Ky Anh town, Ha Tinh province Ha Tinh Economic Zone Service Infrastructure Center ▪ Address: Vung Ang Industrial Zone, Ky Thinh Ward, Ky Anh Commune, Ha Tinh ▪ Tel: (84-239) 3 713 999 Fax : (84-239) 3 713 999 ▪ Mr Pham Anh Tu- Director of Center for Investment Promotion and Human Resource Supply of Ha Tinh Economic ZonesMail: ipc.hatinhez@gmail.com ▪ Mr. Le Nguyen Kien Cuong - Director – (84) 985 346 168 Mail: lenguyenkiencuong@gmail.com ▪ Mr. Dang Ba Giap - Head of Department - (84) 974 220 090 – Mail: dangbagiap@gmail.com ▪ 50 m to National Road 1A, 100 km to Vinh City, 50 km to Ha Tinh City ▪ 9 km to Vung Ang Port ▪ 70 km to Dong Hoi Airport, 115 km to Vinh Airport Prioritized Area: N/A Restricted Area N/A Investment Area Minimum wage Lease term [Area 3] According to Decree 157/2018/ND-CP dated 23rd December 50 years Minimum Lease Area N/A Limit for Construction Height N/A Permitted Construction Rate N/A Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean Projects Lease fee Operating fee ▪ Total Area: 200 ha N/A In Operation ▪ Rate of Occupancy: 92% ▪ Number of Project: 26 ▪ None ▪ Land lease fee: 0.3 USD/m2/year ▪ Management fee: None ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: 9,000 VND (~0.4 USD)/m3 for production ▪ Wastewater treatment fee: to be defined INFORMATION OF INFRASTRUCTURE AND FACILITY Financial institution Agribank, Techcombank, BIDV bank branches of Ky Anh town are located nearby Tax service, State finance office Ky Anh Town State Treasury and Tax Department is located nearby the ID (~2 km ) Customs Service Logistics 15-20 km to Vung Ang Customs Office, located in Vung Ang EZ Vung Ang Economic Zone has a wide logistical system: from Vung Ang deep seaport and its supporting logistical providers. 410 Post office Ky Anh Post Office is located in the ID Medicare 600 m to Ky Anh General Hospital Police, public security 500 m to Ky Anh Police station Universities, training facilities, etc. 50-60 km to Ha Tinh city, where has universities and technical schools located Recruitment Worker dormitory There is an on-site Employment transaction floor of Vung Ang - Ky Anh EZ There are dormitories for individuals and family dormitories Worker's child education facility N/A One-stop service N/A Road Width N/A Communication Infrastructure of Industrial Zone Vung Ang Firefighting and Prevention Police Department is located in the EZ; firefighting devices are equipped Emergency Power generator N/A Fire-fighting facility N/A Layout Plan Location Map N/A Actual View 411 CAU TREO INTERNATIONAL BORDER GATE ECONOMIC ZONE GENERAL INFORMATION OF INDUSTRIAL ZONE Address Investor Contact Person Location ▪ Son Kim 1-2 Town, Tay Son Town, Huong Son District, Ha Tinh Province Ha Tinh Economic Zone Management Board ▪ Office 1: - Address: Ky Loi, Ky Anh Town, Ha Tinh Province - Tel: (84-239) 3 891 962 Fax : (84-239) 3 868 699 ▪ Office 2: No. 86 Phan Dinh Phung, Ha Tinh City, Ha Tinh Province - Address: Ky Loi, Ky Anh Town, Ha Tinh Province - Tel: (84-239) 3 881 237 Fax : (84-239) 3 882 992 Mr. Pham Anh Tu- Director of Center for Investment Promotion and Human Resource Supply of Ha Tinh Economic ZoneMobile: (84) 393 868 939/ (84) 989 353 968 ▪ 65 km to Vinh City, 75 km to Ha Tinh City ▪ 80 km to Vung Ang port ▪ 75 km to Vinh Airport Investment priorities Sectors ▪ Production and processing of agro-forest products, fine art product, cosmetics and pharmaceutical products, animal food ▪ Processing and assembling of electronic device, automobile and motor accessories, packaging, mechanicals ▪ Trading and service: supermarkets, hotels, restaurants, eco – tourism ▪ Investment in infrastructural construction (urban infrastructure, water supply and treatment, telecommunication,..) Investment Restricted Sectors Polluted industries Investment Area Minimum wage Lease term [Area 4] According to Decree 90/2019/NĐ-CP dated 15th November 2019 50 years Minimum Lease Area N/A Limit for Construction Height N/A Permitted Construction Rate N/A Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean Projects Lease fee Operating fee 56,685 ha N/A In operation ▪ Occupancy Rate: N/A ▪ Rate of Occupancy: 26 projects None ▪ Land lease fee: Depending on location and projects ▪ Management fee: None ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: 9,000 VND (~0.4 USD)/m3 for production ▪ Wastewater treatment fee: to be defined INFORMATION OF INFRASTRUCTURE AND FACILITY Financial institution Tax service, State finance office Few bank branches located nearby About 30 km to Huong Son Tax Department and State Treasury 412 Customs Service Logistics Vung Ang Customs Service is located far (more than 100 km) from the EZ. Previously, Cau Treo International Border Gate Customs Office was closed. N/A Post office Over 30 km to Huong Son Post Office Medicare Over 40 km to km to Huong Son General Hospital Police, public security Located in the EZ Universities, training facilities, etc. Located in Ha Tinh city, over 110 km to the EZ Recruitment 110 km to Job Introduction Center of Ha Tinh Worker dormitory N/A Worker's child education facility N/A One-stop service About 110 km to Ha Tinh Public Administration Center Road Width N/A Communication Infrastructure of Industrial Zone N/A Emergency Power generator N/A Fire-fighting facility N/A N/A Layout Plan Location Map Actual View 413 414 [- This Page is intentionally left blank -] 415 HAI DUONG 416 INVESTMENT ENVIRONMENT IN HAI DUONG GENERAL INFORMATION Area, Population ▪ Area: 1,662 km2 ▪ Population: about 1.9 million (2022 statistic) Geographical Location ▪ One of Hanoi’s satellite cities, located in the Northern focal economic area and in regional planning of Hanoi Capital City ▪ 57 km from Hanoi, 45 km from Hai Phong, 100 km from Quang Ninh. Adjacent provinces ▪ The Province has Bac Giang Province to the north, Bac Ninh Province to the North West and Quang Ninh Province to the North East, Hai Phong Province to the east, Hung Yen to the west, Thai Binh Province to the south. GRDP Industry growth PCI 2022 statistic: ▪ Real GRDP (billion VND): 169.179 (7,275 billion USD) ▪ GRDP growth: 9,0% ▪ GRDP per capita (million VND/year): 86,9 (3.746 USD) ▪ Economic structure: - Industry - Construction: 60,2% - Agriculture. forestry and fishery: 9,5% - Service: 30,3% 2022 statistic: ▪ Industry - Construction growth: 11,8% ▪ Service growth: 6.8% ▪ Agriculture, forestry and fishery: 3,4% ▪ Score: 65,22– ranked 32th out of 63 cities and provinces in Vietnam (2022) SOCIAL INFRASTRUCTURE Transportation ▪ Roadway: National Road 5 from Hanoi to Hai Phong runs through the Province with total length of 44.8 km, National Road 18 from Bac Ninh, Huong Duong to Cai Lan Port - Quang Ninh runs through the Province with total length of 20 km. Another national roads through the Province are National Road 37, 38, 38B, 10 and Hanoi – Hai Phong Expressway (new Highway 5). ▪ Railway: on the route of Hai Phong – Hai Duong – Hung Yen – Ha Noi – Lang Son – Lao Cai railway, the route Kep – Bai Chay, the route Yen Vien- Cai Lan. ▪ Waterway: Hai Duong domestic port is in the centre of the key economic zone in the Northern delta area. The port is 55 km away from Ha Noi, 90 km away from Noi Bai airport, 55 km away from Hai Phong port, and 120 km away from Cai Lan port – Quang Ninh. ▪ Airway: 75 km to Noi Bai airport (1.5 h car travel); 70 km to Cat Bi Airport (1.5 hour car travel), both through the new Highway 5. Electricity ▪ The capacity satisfies the demands of manufacturing and people living. Water ▪ The capacity satisfies the demands of manufacturing and people living. Education ▪ 06 universities, 06 junior colleges, 02 technical colleges. Medicare ▪ 22 provinical hospital, 5 local polyclinics and 265 clinics in towns. INVESTMENT CONDITION Human resource Salary Investment incentives ▪ About 60% of population in working age (2022) ▪ The minimum salary for the province is applied as follows (see appendix for detail amount): - Area II: Hai Duong City - Area III: Chi LinhTown and Cam Giang, Nam Sach, Kim Thanh, Kim Mon, Gia Loc, Binh Giang, Tu Ky District in Hai Duong Province - Area IV: Thanh Ha, Thanh Mien and Ninh Giang districts ▪ The lowest wage for trained labor (including those trained by the enterprises) must be at least 7% higher than the above referenced basic salary ▪ Incentives according to government regulations: - Exemption and reduction for land and water rent fee - Preferential tax rates and exemption period, reduction for corporate income tax. 417 - Import tax exemption Fields Attracting Investment ▪ Prioritized projects: - Building infrastructure in industrial zones, developing traditional villages, developing non-state owned industries, rural industries and traditional villages Investment attraction situation 17 newly licensed projects with a total registered capital of 59.5 million USD (7 projects outside industrial zones - IZs, total capital 13.7 million USD and 10 projects in industrial zones, total capital 45.7 million USD); 31 projects adjusted to increase capital with a total capital increase of 299.5 million USD (7 projects outside the industrial zone, up 23.4 million USD; 24 projects in the industrial zone, up 276.1 million USD). Map Contact Hai Duong Center for Investment Promotion and Development Consultancy Address: 58 Quang Trung - Quang Trung Ward- Hai Duong City Tel: (84-220) 3 852 344 Fax: (84-220) 3 850 814 418 LIST OF INDUSTRIAL ZONES IN HAI DUONG No Total Area (ha) 135.96 Occupancy Rate Status 95% In Operation Dai An Extended Industrial Zone – Stage I 189.02 85% In Operation Dai An Extended Industrial Zone – Stage II 278.02 0% 2 Lai Cach Industrial Zone 135.42 16.7% To Be Implemented In 2022 In Operation 3 An Phat Hi-Tech Industrial Zone 46.42 89% In Operation 4 An Phat 1 Industrial Zone 180 3% 5 Cong Hoa Industrial Zone 201.23 58% In Land Clearance Process In Operation 6 Cam Dien - Luong Dien (VSIP) Industrial Zone 149.31 100% In Operation 7 Lai Vu Industrial Zone 212.89 90% In Operation 8 Phu Thai Industrial Zone 56.7 100% In Operation 9 Tan Truong Industrial Zone 198.06 100% In Operation Expanded Tan Truong Industrial Zone 112.6 0% Licensed 10 Nam Sach Industrial Zone 62.42 100% In Operation 11 Phuc Dien Industrial Zone 82.88 100% In Operation Expanded Phuc Dien Industrial Zone 214.57 0% In Legal Process 1 Industrial zone Name Dai An Industrial Zone 12 Binh Giang Industrial Zone 450 0% In Legal Process 13 Kim Thanh Industrial Zone 164.98 0% In Legal Process 14 Gia Loc Industrial Zone 198 0% In Legal Process 419 HAI DUONG’S LOCATION MAP OF INDUSTRIAL ZONES 420 DAI AN INDUSTRIAL ZONE GENERAL INFORMATION Address Investor Contact Person Location Investment Area Minimum wage Lease term Minimum Lease Area Limit for Construction Height Permitted Construction Rate Km 51, Highway No.5, Tu Minh Ward, Hai Duong City, Hai Duong Province, Vietnam DAI AN JOINT STOCK COMPANY ▪ Address: Dai An Industrial Zone, Km 51, Highway No.5, Tu Minh Ward, Hai Duong City, Hai Duong Province, Vietnam ▪ Tel: 02203.555.888 ▪ Fax: 02203.786.703 ▪ Website: http://daianvietnam.com/ ▪ Mrs. Tuong Quynh Huong - Deputy General Director – (84) 936 388 477 - huong.tuong@daianvietnam.com ▪ Mrs. Tran Huyen Thanh - Sales and Marketing Department – (84) 906 856 899 - thanh.tran@daianvietnam.com ▪ Mr. Vuong Quoc Trung - Sales and Marketing Department – (84) 945469358 - trung.vuong@daianvietnam.com - 5 km to Hai Duong city center - 50km far from Hanoi Central - 50km far from Hai Phong domestic airport - 80km far from Noi Bai International Airport - 50km far from Hai Phong Sea Port - 80km to Quang Ninh deep water sea port - 7km far from the new Freeway No. 5A Hanoi – Hai Phong - 2km far from Cao Xa Railway Station Priority Sectors for Investment Investment on high-tech industry, clean industry, light industry, and supporting industry. Restricted Sectors for Investment Restrict heavy industry, industries affecting the environment. [Area 1] According to Decree 90/2019/NĐ-CP dated 15th November 2019 ▪ Start date: 2002 ▪ End date: 2052 10,000 m2 In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residental Planning regulation (QCXDVN 01: 2008/BXD) Planned area Total area:135.96 ha Factory Available for Rent Total area: 18,538 m2 Operation Status Occupancy Rate and Number of Projects Number of Korean Projects Lease fee Operating fee In operation ▪ Occupancy Rate: 95% ▪ Number of Projects: 42 11 companies ▪ Land lease fee: 100USD/m2 ▪ Factory lease fee: 25,000 USD/month to 60,000 USD/month ▪ Payment: pay into 3 installments: - 1st installment: 30% of total leasing fee within 5 days after signing MOU. - 2nd installment: 65% of total leasing fee not over 30 days from the 1st installment. - 3rd installment: 5% of total leasing fee before receiving the land use rights. ▪ Management fee: 0.3 USD/m2/year 421 ▪ Infrastructure maintenance fee: 0.4 USD/m2/year ▪ Electricity fee: According to the price of the government EVN (see Appendix) ▪ Water fee: According to the price of Hai Duong clean water supply Co., Ltd ▪ Wastewater treatment fee: FOR ENTERPRISE LEASING THE WORKSHOP Waste water standard fee (VND/m3) *Enterprise leases the workshop: 18,500 (~0.79 USD) *For enterprise with metal index not over B 40%, Fee will be plus 39,000 VND Over 40% not accept *For enterprise with chloride index, mecury index Fee will be plus 39,000 VND over B FOR ENTERPRISE LEASING LAND Waste water standard fee (VND/m3) *QCVN40:2011 Level A: 12,500 (~0.54 USD) *QCVN40:2011 Level B: 14,500 (~0.62 USD) *QCVN40:2011 Over level B - Having <=03 indexes over level B: 17,500 (~0.75 USD) - Having 04 indexes over level B: 19,000 (~0.81 USD) - Having 05 indexes over level B: 20,500 (~0.88 USD) - Having 06 indexes over level B: 22,000 (~0.94 USD) - Having 07 indexes over level B: 23,500 (~1 USD) *QCVN40:2011: For enterprise with metal index Fee will be plus 39,000 VND not over B 40%, over 40% not accept *QCVN40:2011: For enterprise with chloride index, Fee will be plus 39,000 VND mecury index over B ▪ Waste treatment fee: According to the price of the service supplier INFRASTRUCTURE AND FACILITY Financial institution Tax service, State finance office Oceanbank, Vietcombank, BIDV, PG bank, Seabank, Vietinbank, Techcombank,…in the Hai Duong city. 6km to Tax department of Hai Duong province 7km to State Treasury in Hai Duong There is an On- site Customs Office insides Dai An IZ Customs Service Dai An IZ has Inland Container Depot Logistics 4km to Trancy Logistics (Vietnam) in Hai Duong Co., Ltd 4km to BSL Networks Co., Ltd Post office TDT express, VNPT, DHL, FedEx, TNT...door-to-door delivery service Medicare 5km to Hai Duong General Hospital Police, public security 24/7 security service. The guards of Dai An IZ cooperate with the local polices supports to ensure the security for the whole industrial zone. Universities, training facilities, etc. 3km to Thanh Dong University. Recruitment Worker dormitory Worker's child education facility One-stop service The labor forces from local and from neighboring provinces (Bac Ninh, Thai Binh, Hung Yen, Hai Phong, Quang Ninh...). It is easy to find the workers whom you need in the vicinity. Housing, villa for experts/ employees are working in Dai An IZ. 3km to Tu Minh preschool. Dai An IZ has One-stop service. Road Width The internal roads system has the sections: 55m; 39m; 37m; 35.5m; 33m, 17.5m; 15.5m IT & Telecommunication Facilities Telecommunication: broadband ADSL service, telecommunication with IDD, fiber optic capabilities, leased line Telephone: number of line depend on investor’s demand. 422 Emergency Power generator Available Fire-fighting facility Available Layout Plan Location map Actual View 423 LIST OF TENANTS No Company name Nationality Business line 1 Orisel Vietnam Co., Ltd Korea Manufactures and markets electrics application 2 Princeton Biomeditech Vietnam Co., Ltd Korea Medical equipment 3 Daeho Special Steel Vina Co., Ltd Korea Trade and manufactures st ainless steel 4 Silkroad Hanoi Joint Stock Company Korea Manufactures industrial admixtures 5 Shinheung Vina Electrics Co., Ltd Korea Specializes in electronic fields 6 Chemilens Vietnam Joint Stock Company Korea Manufactures chemicallens 7 Hana Motors Joint Stock Company Korea Produces Electric motorcycle 8 Prettl Viet Nam Co., Ltd Korea Manufacturing of electronic sensor parts 9 GD Technology Vina Co., Ltd Korea Manufactures electronic components 10 Eduen Vina Co., Ltd Korea Manufactures electronic components 11 Jinyong HNS Co., Ltd Korea Produces electronic appliances 12 Sumidenso Vietnam Co., Ltd Japan Manufactures and markets electric wire 13 Sumiden Automative Wire Co., Ltd Japan Manufactures electrical wires 14 Aureole Mitani Chemical & Environment Inc Japan 15 Taishodo Vietnam Co., Ltd Japan Storing, diluting and distributing chemical products Produces electronic appliances 16 Tomoken Fire Viet Nam Co., Ltd Japan 17 Trancy Logistic Co., Ltd Japan Manufacturing of fire fighting equipments and other relating services. Logistic distribution 18 PHI Co., Ltd Taiwan Trade and manufactures garment 19 Hulane Electronic Co., Ltd Taiwan Manufactures automotive connectors 20 Wonderful Vietnam Co.,Ltd Taiwan Manufactures electrical connectors 21 Vi Son Yarn Spining JSC Vietnam Manufactures and markets yarns 22 Masan One member Company Limited Vietnam Manufactures food (instant noodle) 23 Petrol Viet Nam Branch Vietnam Trade the services relating the petrol 24 Linh Anh School Equipment JSC Vietnam Produces school equipments 25 Minh Thai Co., LTd Vietnam Agency of wine, beer, beverage … 26 EDV Co., Ltd Vietnam workshop subleasing 27 Ngu Phuc Co., Ltd Vietnam workshop subleasing 28 Laurelton Diamonds Viet Nam Co.,Ltd U.S. Trades and manufactures rough diamonds 29 GCP Vietnam Co.,Ltd U.S. Produces admixtures 424 30 Ge-shen Co., Ltd Malaysia 31 Hinsitsu Screen Vietnam Co., Ltd Malaysia 32 Seiko Vietnam Co., Ltd Malaysia 33 HongKong 34 Vietnam Luen Tai Electrical Equipment Co., Ltd Taishodo Electronics Vietnam Co., Ltd 35 Bonsen Co., Ltd HongKong Manufactures household el ectrical Equipment Co., Ltd equipments Manufacturing and processing, assembling electronic board Manufacturing paper shredder 36 HongKong Printing and embroidering on fabric HongKong Produces electronic appliances 38 DONG QUN ENTERPRISES (HK) LIMITED CHANG JIN CHENG ELECTRICAL (HK) LIMITED Tiens Vietnam Co., Ltd China Manufactures functional food 39 Yuantai Vietnam Co., Ltd China Printing and embroidering on fabric 40 Falcon Vietnam Co., Ltd Singapore Manufactures wooden furniture 41 Memtech Co., Ltd Singapore Producing plastic and metal molds 42 Jemmtec Vietnam Co., Ltd UK Refractory ceramic 37 HongKong 425 Designs and manufactures all kinds of plastic molded products Specializes in producing and printing the label sticker for electrical and electric products, home appliances… Printing and other related services DAI AN EXPANSION INDUSTRIAL ZONE GENERAL INFORMATION Address Investor Contact Person Location Investment Area Minimum wage Lease term Minimum Lease Area Limit for Construction Height Permitted Construction Rate Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean Projects Lease fee Km 51, Highway No.5, Tu Minh Ward, Hai Duong City, Hai Duong Province, Vietnam DAI AN JOINT STOCK COMPANY ▪ Address: Dai An Industrial Zone, Km 51, Highway No.5, Tu Minh Ward, Hai Duong City, Hai Duong Province, Vietnam ▪ Tel: 02203.555.888 ▪ Fax: 02203.786.703 ▪ Website: http://daianvietnam.com/ ▪ Mrs. Tuong Quynh Huong - Deputy General Director – (84) 936 388 477 huong.tuong@daianvietnam.com ▪ Mrs. Tran Huyen Thanh - Sales and Marketing Department – (84) 906 856 899 thanh.tran@daianvietnam.com - 5 km to Hai Duong city center - 50km far from Hanoi Central - 50km far from Hai Phong domestic airport - 80km far from Noi Bai International Airport - 50km far from Hai Phong Sea Port - 80km to Quang Ninh deep water sea port - 7km far from the new Freeway No. 5A Hanoi – Hai Phong - 2km far from Cao Xa Railway Station Priority Sectors for Investment Investment on high-tech industry, clean industry, light industry, and supporting industry. Restricted Sectors for Investment Restrict heavy industry, industries affecting the environment. [Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019 ▪ Start date: 2006 ▪ End date: 2056 10,000 m2 In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residental Planning regulation (QCXDVN 01: 2008/BXD) ▪ Total area: 467.04 ha - Stage 1: 189.02 ha - Stage 2: 278.02 ha (Expected 2021) ▪ Vacant leasable area: 11.751 ha ▪ Total area with full infrastructure ready to build factory: 189.02 ha Total area: 1.537 m2 In Operation ▪ Occupancy Rate of Stage 1: 85% ▪ Number of Projects: 41 26 companies ▪ Land lease fee: 100 USD/m2 ▪ Factory lease fee: 90.000 VND/m2/month ▪ Payment: pay into 3 installments: - 1st installment: 30% of total leasing fee within 5 days after signing contract. - 2nd installment: 65% of total leasing fee not over 30 days from the 1st installment. - 3rd installment: 5% of total leasing fee before receiving the land use rights. 426 Operating fee ▪ Management fee: 0.3 USD/m2/year ▪ Infrastructure maintenance fee: 0.4 USD/m2/year ▪ Electricity fee: According to the price of the government EVN (see Appendix) ▪ Water fee: According to the price of Hai Duong clean water supply Co., Ltd ▪ Wastewater treatment fee: FOR ENTERPRISE LEASING THE WORKSHOP Waste water standard fee (VND/m3) *Enterprise leases the workshop: 18,500 (~0.79 USD) *For enterprise with metal index not over B 40%, Fee will be plus 39,000 VND Over 40% not accept *For enterprise with chloride index, mecury index Fee will be plus 39,000 VND over B FOR ENTERPRISE LEASING LAND Waste water standard fee (VND/m3) *QCVN40:2011 Level A: 12,500 (~0.54 USD) *QCVN40:2011 Level B: 14,500 (~0.62 USD) *QCVN40:2011 Over level B - Having <=03 indexes over level B: 17,500 (~0.75 USD) - Having 04 indexes over level B: 19,000 (~0.81 USD) - Having 05 indexes over level B: 20,500 (~0.88 USD) - Having 06 indexes over level B: 22,000 (~0.94 USD) - Having 07 indexes over level B: 23,500 (~1 USD) *QCVN40:2011: For enterprise with metal index Fee will be plus 39,000 VND not over B 40%, over 40% not accept *QCVN40:2011: For enterprise with chloride index, Fee will be plus 39,000 VND mecury index over B ▪ Waste treatment fee: According to the price of the service supplier INFRASTRUCTURE AND FACILITY Financial institution Tax service, State finance office Oceanbank, Vietcombank, BIDV, PG bank, Seabank, Vietinbank, Techcombank, in the Hai Duong city. 6km to Tax department of Hai Duong province 7km to State Treasury in Hai Duong There is an On- site Customs Office insides Dai An Expansion IZ Customs Service Dai An Expansion IZ has Inland Container Depot Logistics 4km to Trancy Logistics (Vietnam) in Hai Duong Co., Ltd 4km to BSL Networks Co., Ltd Post office TDT express, VNPT, DHL, FedEx, TNT...door-to-door delivery service Medicare 5km to Hai Duong General Hospital Police, public security 24/7 security service. The guards of Dai An IZ cooperate with the local polices supports to ensure the security for the whole industrial zone. Universities, training facilities, etc. 3km to Thanh Dong University. Recruitment Worker dormitory Worker's child education facility One-stop service The labor forces from local and from neighboring provinces (Bac Ninh, Thai Binh, Hung Yen, Hai Phong, Quang Ninh...). It is easy to find the workers whom you need in the vicinity. Housing, villa for experts/ employees are working in Dai An IZ. 3km to Tu Minh preschool. Dai An IZ has One-stop service. Road Width The internal roads system has the sections: 55m; 39m; 37m; 35.5m; 33m, 17.5m; 15.5m IT & Tele-communication Facilities Telecommunication: broadband ADSL service, telecommunication with IDD, fiber optic capabilities, leased line Telephone: number of line depend on investor’s demand. 427 Emergency Power generator Available Fire-fighting facility Available Layout Plan Location map Actual View 428 429 LIST OF TENANTS No 1 2 3 4 5 6 7 Company name Kefico Vietnam Co., Ltd During Vietnam Co., Ltd Namyang Delta Co., Ltd KPF Vietnam Co., Ltd SD Global Viet Nam Co., Ltd DS INV Co., Ltd LB Label Tracing Co., Ltd Nationality Korea Korea Korea Korea Korea Korea Korea 8 Korea 19 ShinYang Metal Viet Nam Co., Ltd Yuhan Precision Vina Co., Ltd Orgel VietNam Co., ltd Fashion Pin Up Vina Co., Ltd Myong Shin Tech Vina Co., Ltd Suntel Vina Co., Ltd DS Global Vina Sangshin Vina Co., Ltd Sepyung ENC Co., Ltd Doosan Electro - Material Vietnam Co., LTd Vina Ilshin Tech Vina Co., Ltd LMS Vina Co., Ltd 20 21 22 23 24 25 26 27 28 SY Global Co., Ltd DY Elecen Vina Co., Ltd Poongsan system Co., Ltd Samsong Industry Co., Ltd HST Networks Vina Co., Ltd GIC Vina Co., Ltd Vina Solar CO., LTD Fuluhashi Viet Nam Co., Ltd Fujikura Kasei Co., Ltd Korea Korea Korea Korea Korea Korea Korea Japan Japan 29 30 Koyo Viet Nam Co., Ltd NISSEI ECO VIETNAM CO., LTD Pan-Continental Metal Materials Viet Nam Company Limited Jin Shan Hardware Vietnam Co., Ltd SK FACADE (VN) Co., Ltd Dolexphar International Pharmaceutical Joint Stock Company Burwitz Joint Stock Company Vescom Co., Ltd Thien An An Co., Ltd CTKF Co., Ltd Taiwoo Technology VN Co., Ltd Hai Duong HaiD Co., Ltd Twins Hai Duong Vietnam Co., Ltd Japan Japan 9 10 11 12 13 14 15 16 17 18 31 32 33 34 35 36 37 38 39 40 41 Korea Business line Produces automobile components and automatic control system Produces automobile components and automatic control system Manufactures garment Manufactures screws The production and inspection of cell phone cover glass manufacturing waste water treatment equipements Production, processing and export of woven labels and printed labels for clothing, hats, shoes. Processing and trading of garment materials and accessories. Manufacturing carton, all types of paper boxes Manufacturing and processing of metal components, aluminum products Manufactures electronic components Korea Korea Korea Music box manufacturing Processing plastic and manufacturing garment accessories Manufactures transmission parts and engine parts Korea Korea Korea Korea Korea Manufactures electronic components Assembly and processing electronic products Manufactures electronic components Assembly and processing electronic products Manufactures electronic components Korea Manufactures electronic components Korea Manufacturing and processing of metal components, aluminum products Manufactures electronic components (tape) Manufactures electronic components Manufactures part for automotive (ETC) Manufactures automatic components for engine equipment Manufactures belt bucker Manufactures part for automotive components Manufactures Solar Aluminum Structure and Parts Wood Palet Coating materials for interior and exterior of two-wheel, four-wheel vehicle. Precision mechanical Manufacturing plastic products Taiwan Manufactures the copper oxide powder, copper cacbonate powder Taiwan Manufactures screwdrives Taiwan Vietnam Manufactures curtain wall Manufacturing functional food Vietnam Vietnam Vietnam Vietnam HongKong Manufacturing fireproof concrete workshop subleasing workshop subleasing Singapore Singapore Manufactures animal feed Manufactures animal feed The Production of Mobil-Phone parts & Precise Electric Goods 430 LAI CACH INDUSTRIAL ZONE GENERAL INFORMATION Address Investor Contact Person Location Investment Area Minimum wage Lease term Km 49, Highway No.5, Lai Cach Town, Cam Giang District, Hai Duong City, Hai Duong Province, Vietnam Dai Duong Co., Ltd ▪ Address: Lai Cach IZ Km 49, Highway No.5, Lai Cach Town, Cam Giang District, Hai Duong City, Hai Duong Province, Vietnam ▪ Tel: (84-220) 3 555 868 ▪ Fax: (84-220) 3 555 916 ▪ Mrs. Tuong Quynh Huong - Deputy General Director – (84) 936 388 477 huong.tuong@daianvietnam.com - 5 km to Hai Duong city center - 50km far from Hanoi Central - 50km far from Hai Phong domestic airport - 80km far from Noi Bai International Airport - 50km far from Hai Phong Sea Port - 82km to Quang Ninh deep water sea port - 7km far from the new Freeway No. 5A Hanoi – Hai Phong - 2km far from Cao Xa Railway Station Priority Sectors for Investment High-tech industry, clean industry, light industry, and supporting industry. Restricted Sectors for Investment Restrict heavy industry, industries affecting the enviroment [Area 2] According to Decree 90/2019/NĐ-CP dated 15th November 2019 End date: January 1st, 2057 Minimum Lease Area 15,000 m2 Limit for Construction Height Factory height may not exceed two floors and may not exceed 14m. Permitted Construction Rate In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residental Planning regulation (QCXDVN 01: 2008/BXD) Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean Projects Lease fee Operating fee ▪ Total area: 135.42 ha ▪ Vacant leasable area: 75.17ha ▪ Total area with full infrastructure ready to build factory: 75.17ha Total area: 1.500 m2 In operation ▪ Occupancy Rate: 16.7% ▪ Number of Projects: 9 03 projects ▪ Land lease fee: 72 USD/m2 to 90 USD/m2 ▪ Payment: pay into 3 installments: - 1st installment: 30% of total leasing fee within 5 days after signing contract. - 2nd installment: 65% of total leasing fee not over 30 days from the 1st installment. - 3rd installment: 5% of total leasing fee before receiving the land use rights. ▪ Management & infrastructure maintenance fee: 20,000 VND/m2/year From 2022: Prices will change according to the Board of Director’s decision, but not more than 15% compared to the previous year. ▪ Electricity fee: According to the price of the government EVN (see Appendix) ▪ Water fee: According to the price of Hai Duong clean water supply Co., Ltd ▪ Wastewater treatment fee: 431 FOR ENTERPRISE LEASING THE WORKSHOP Waste water standard fee (VND/m3) *Enterprise leases the workshop: 18,500 (~0.79 USD) *For enterprise with metal index not over B 40%, Fee will be plus 39,000 VND Over 40% not accept *For enterprise with chloride index, mecury index Fee will be plus 39,000 VND over B FOR ENTERPRISE LEASING LAND Waste water standard fee (VND/m3) *QCVN40:2011 Level A: 12,500 (~0.54 USD) *QCVN40:2011 Level B: 14,500 (~0.62 USD) *QCVN40:2011 Over level B - Having <=03 indexes over level B: 17,500 (~0.75 USD) - Having 04 indexes over level B: 19,000 (~0.81 USD) - Having 05 indexes over level B: 20,500 (~0.88 USD) - Having 06 indexes over level B: 22,000 (~0.94 USD) - Having 07 indexes over level B: 23,500 (~1 USD) *QCVN40:2011: For enterprise with metal index Fee will be plus 39,000 VND not over B 40%, over 40% not accept *QCVN40:2011: For enterprise with chloride index, Fee will be plus 39,000 VND mecury index over B ▪ Waste treatment fee: According to the price of the service supplier INFRASTRUCTURE AND FACILITY Financial institution Tax service, State finance office Oceanbank, Vietcombank, BIDV, PG bank, Seabank, Vietinbank, Techcombank,…in the Hai Duong city. 6km to Tax department of Hai Duong province 7km to State Treasury in Hai Duong There is an On- site Customs Office insides Lai Cach IZ Customs Service Lai Cach IZ has Inland Container Depot Logistics 4km to Trancy Logistics (Vietnam) in Hai Duong Co., Ltd 4km to BSL Networks Co., Ltd Post office TDT express, VNPT, DHL, FedEx, TNT...door-to-door delivery service Medicare 5km to Hai Duong General Hospital Police, public security 24/7 security service. The guards of Lai Cach IZ cooperate with the local polices supports to ensure the security for the whole industrial zone. Universities, training facilities, etc. 4km to Thanh Dong University. Recruitment Worker dormitory The labor forces from local and from neighboring provinces (Bac Ninh, Thai Binh, Hung Yen, Hai Phong, Quang Ninh...). It is easy to find the workers whom you need in the vicinity. Housing, villa for experts/ employees are working in Lai Cach IZ Worker's child education facility 4km to Tu Minh preschool. One-stop service Lai Cach IZ has One-stop service Road Width IT & Telecommunication Facilities The main internal roads system has the sections: 30m - 33m Telecommunication: broadband ADSL service, telecommunication with IDD, fiber optic capabilities, leased line Telephone: number of line depend on investor’s demand. Emergency Power generator Available Fire-fighting facility Available 432 Layout Plan Location Map Actual View 433 434 AN PHAT HIGH-TECHNOLOGY INDUSTRIAL PARK GENERAL INFORMATION Address Km 47, Highway 5, Viet Hoa and Tu Minh ward, Hai Duong city, Hai Duong province Investor An Phat High-Technology Industrial Park Company Limited ▪ Address: Km 47, Highway 5, Viet Hoa and Tu Minh ward, Hai Duong city, Hai Duong province ▪ Tel: (84) 986 888 868 ▪ Website: anphatcomplex.com Contact Person ▪ Pham Van Tuan - General Director - Mobile: (84) 986 888 868 - Email: tuanpv@anphatcomplex.com ▪ Mr. Duc Kien Vuong/Kevin - Deputy Business Development Manager - Mobile: (84) 965666899 – Email: kienvd@anphatholdings.com Location - 2.7 km from Hai Duong City Center, 60 km from Hanoi Center - 85 km from Noi Bai International Airport and 55 km from Cat Bi Airport (Hai Phong city) - 50 km from Hai Phong Port and 55 km from Dinh Vu Port - 0.1 km from Highway 5 Priority Sectors for Investment - Producing plastic bag, industrial packaging, high-tech building material - Producing plastic products, accessories and household appliances - Electronic components - Precision engineering, molding manufacturing - Plastic parts for cars and motorbikes - Manufacturing industries of new and high-tech materials - High-end garment, shoes and textile (not including dyeing and tanning) - Processing wood and high-end furniture - Producing products from paper, carton - Producing building materials - Mechanical processing, steel components - Assembling bicycles, motorbike, cars, specialized transport vehicles Restricted Sectors for Investment - Producing basic chemicals (accruing industrial wastewater) - Steel refining from iron and steel scrap using non-continuous furnace - Non-attracting/restricted-attracting-investment industries in Hai Duong province Investment Area Minimum wage Lease term Minimum Lease Area Limit for Construction Height Permitted Construction Rate Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean Projects Lease fee [Area 2] According to Decree 90/2019/NĐ-CP dated 15th November 2019 End date: November 30, 2056 Negotiation Factory area: up to 21m Factory area: 60 percent of land area ▪ Total area: 46 ha ▪ Total vacant leasable area: 2.9 ha for commercial/ service land ▪ Total area with full infrastructure ready to build factory: around 2 ha Total area: about 40,000 m2 In operation ▪ Occupancy Rate: 89% ▪ Number of Projects:10 None ▪ Land lease fee: 85 USD/m2 plus factory unit construction cost of $200 - $250/m2 ▪ Factory lease fee: 3.2 USD/ m2 (VAT excluded) ▪ Payment: - Method: Bank transfer - Period: Factory lease: on quarterly basis, on the 10th day of the first month of the next period. 435 - Land lease: Payment due is 30 days after the date of contracting at the latest. Operating fee ▪ Management fee: 0.6 USD/m2/year ▪ Electricity fee: According to Government Regulation (See Appendix) INFRASTRUCTURE AND FACILITY Financial institution Tax service, State finance office 3.1 km from BIDV - Thanh Dong Branch 4.0 km from Vietcombank – Hai Duong Branch 3.3 km from Vietinbank – Industrial Park Branch 3.0 km from VPBank – Nguyen Luong Bang Transaction Office 3.9 km from Hai Duong Tax Department 4.4 km from Hai Duong State Treasury 500m from Hai Duong Custom Department Customs Service 5.9 km from Hai Duong Inland Container Depot Logistics Logistics services, including warehouse solution, shipping and custom clearance are provided inside the industrial park Post office 5.0 km from Hai Duong Post Office Medicare 2.8 km from Hai Duong General Hospital Police, public security 1.6 km from Viet Hoa ward Police Station Universities, training facilities, etc. 2.0 km from Hai Duong University 28.0 km from Sao Do University Recruitment Worker dormitory Worker's child education facility One-stop service Road Width IT & Telecommunication Facilities Yes 2.0 km from the dormitory in Hai Duong University Many kindergartens near the industrial park Land and factory lease, fast-track procedures and convenient services such as catering, security service, accommodation, IT system, water-electrical system implemented and/or supported by our industrial park Main road: 50m, 4 lanes Loops: 34m, 2 lanes High-speed internet, international telecommunication, on-demand telephone installation Emergency Power generator Yes Fire-fighting facility Yes 436 Layout Plan 437 Actual View 438 AN PHAT 1 INDUSTRIAL ZONE (Previously: Quoc Tuan – An Binh Industrial Zone) GENERAL INFORMATION Address Quoc Tuan, An Binh, An Lam Commune, Nam Sach District, Hai Duong Province Investor An Phat High-Technology Industrial Park Company Limited ▪ Address: Km 47, Highway 5, Viet Hoa and Tu Minh ward, Hai Duong city, Hai Duong province ▪ Tel: (84) 986 888 868 ▪ Website: anphatcomplex.com Contact Person ▪ Pham Van Tuan - General Director - Mobile: (84) 986 888 868 - Email: tuanpv@anphatcomplex.com ▪ Mr. Duc Kien Vuong/Kevin - Deputy Business Development Manager - Mobile: (84) 965666899 – Email: kienvd@anphatholdings.com Location ▪ 12 km from Hai Duong City Center, 70 km from Hanoi Center ▪ 79 km from Noi Bai International Airport and 54 km from Cat Bi Airport (Hai Phong city) ▪ 50 km from Hai Phong Port and 55 km from Dinh Vu Port ▪ 0 km to Highway 37 - 10 km from Highway 5 Priority Sectors for Investment ▪ Producing plastic bag, industrial packaging, high-tech building material ▪ Producing plastic products, accessories and household appliances ▪ Electronic components - Precision engineering, molding manufacturing ▪ Plastic parts for cars and motorbikes ▪ Manufacturing industries of new and high-tech materials ▪ High-end garment, shoes and textile (not including dyeing and tanning) ▪ Processing wood and high-end furniture ▪ Producing products from paper, carton ▪ Producing building materials ▪ Mechanical processing, steel components ▪ Assembling bicycles, motorbike, cars, specialized transport vehicles Restricted Sectors for Investment ▪ Producing basic chemicals (accruing industrial wastewater) ▪ Steel refining from iron and steel scrap using non-continuous furnace ▪ Non-attracting/restricted-attracting-investment industries in Hai Duong province Investment Area Minimum wage Lease term [Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019 End date: 2070 Minimum Lease Area 1 ha Limit for Construction Height up to 21m Permitted Construction Rate 60% Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean Projects Lease fee ▪ Total area: 180 ha ▪ Total vacant leasable area: 140 ha No RBF Obtained the investment approval from prime Minister and IRC Land handover in Quarter IV, 2021 ▪ Occupancy Rate: 3% ▪ Number of Projects: 1 None ▪ Land lease fee: 75 USD/m2 plus factory unit construction cost of $200 - $250/m2 439 ▪ Payment: - Method: Bank transfer - Period: Factory lease: on quarterly basis, on the 10th day of the first month of the next period. - Land lease: Payment due is 30 days after the date of contracting at the latest. Operating fee ▪ Management fee: 0.6 USD/m2/year ▪ Electricity fee: According to Government Regulation (See Appendix) INFRASTRUCTURE AND FACILITY Financial institution Tax service, State finance office Agribank Vietnam- 500 m BIDV Nam Sach – 500m State Treasury- Nam Sach District- 500m Customs Service Logistics Logistics services, including warehouse solution, shipping and custom clearance are provided inside the industrial park Post office Nam Sach Post office – 1km Medicare Quoc Tuan Mediacal Centre – 200m Nam Sach Hospital – 2km Police, public security Nam Sach District Police station – 2 km Universities, training facilities, etc. Nam Sach High School: 2 km Hai Duong University: 12 km Recruitment Available Worker dormitory Worker's child education facility One-stop service Road Width IT & Telecommunication Facilities Many kindergartens near the industrial park Land and factory lease, fast-track procedures and convenient services such as catering, security service, accommodation, IT system, water-electrical system implemented and/or supported by our industrial park Main road: 50m, 4 lanes Loops: 34m, 2 lanes High-speed internet, international telecommunication, on-demand telephone installation Emergency Power generator Available Fire-fighting facility Available Layout Plan 440 Location Map Actual View 441 CONG HOA INDUSTRIAL ZONE GENERAL INFORMATION Address Investor Contact Person Location Investment Area Minimum wage Lease term Minimum Lease Area Limit for Construction Height Permitted Construction Rate Planned area Factory Available for Rent Operation Status Cong Hoa Ward, Chi Linh Commune, Hai Duong city Cao Su Viet Nam Industrial Zone & Urban Development JSC ▪ Address: No. 12, Nguyen An Street, Hai Tan Ward, Hai Duong City ▪ Tel: (84-220) 3 838 025 Fax: (84-220) 3 838 024 ▪ Email: info@vinaruco.com.vn ▪ Mr. Nguyen Dinh Dang - Head of Planning and Investment Department - (84-220) 3 838 029 ▪ Mr. Phuong – (84) 913215420 - ntphuong2002@gmail.com - Land: Located on National Road 5, No.18 and No.37 - Seaport: 50 km Hai Phong Sea Port and 80 km from Quang Ninh Deep Water sea port - Airport: 80 km from Noi Bai International Airport Priority Sectors for Investment Manufacturing and assembling electric, electronic product, mechanical, automobile and motorbike; textile Restricted Sectors for Investment Polluted Sector [Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019 ▪ Start date: 2008 ▪ End date: 2058 10,000 m2 In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residental Planning regulation (QCXDVN 01: 2008/BXD) ▪ Total area: 201.23 ha ▪ Total Industrial Land area: 145.54 ha ▪ Total area: NA ▪ In operation Occupancy Rate and Number of Projects 58% Number of Korean Projects None Lease fee Operating fee Land lease fee: 65 -75 USD/m2 ▪ Maintainance fee: 0.35 USD/m2/year ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: 0.65 USD/m3 ▪ Wastewater treatment fee: 0.7 USD/m3 INFRASTRUCTURE AND FACILITY Financial institution Tax service, State finance office Customs Service Agribank, Vietin Bank, BIDV 30 km to Tax department of Hai Duong province 29 km to State Treasury in Hai Duong 31 km from Hai Duong Customs Department 442 Logistics N/A Post office TDT express, VNPT, DHL, FedEx, TNT...door-to-door delivery service Medicare 29 km to Hai Duong General Hospital Police, public security 24/7 security service. The guards of Lai Cach IZ cooperate with the local polices supports to ensure the security for the whole industrial zone. Universities, training facilities, etc. 32.4 km to Thanh Dong University. Recruitment The labor forces from local and from neighboring provinces (Bac Ninh, Thai Binh, Hung Yen, Hai Phong, Quang Ninh...). It is easy to find the workers whom you need in the vicinity. Worker dormitory N/A Worker's child education facility N/A One-stop service N/A Road Width IT & Telecommunication Facilities The main internal roads system has the sections: 30m - 33m Telecommunication: broadband ADSL service, telecommunication with IDD, fiber optic capabilities, leased line Telephone: number of line depend on investor’s demand. Emergency Power generator Available Fire-fighting facility Available Layout Plan 443 Location Map Actual View 444 LIST OF SOME NOTABLE TENANTS No. Company name Nationality Business line 1 Vietnam Rubber Industry and Urban Development Joint Stock Company Vietnam 2 Nice Ceramic Company Limited Vietnam 3 Kim Duong Vietnam Consumer Goods Company Limited Poyun Electronics (HD) Vietnam Company Limited China Investing in construction and trading of technical infrastructure system of Republic Industrial Zone, Chi Linh district, province HD in accordance with detailed planning of Cong Hoa Industrial Zone approved by People's Committee of HD Producing and trading in import and export of tiles and other sizes Manufacturing, processing and trading high quality plastic products Manufacturing, processing, trading in speaker components and components and devices related to speakers and sound Manufacturing and processing components of speakers, Amplifier and Amplifier components Manufacturing and processing speaker tubers and components related to speaker roots; speakers and headphones Manufacturing and processing tubers of speakers, frequency, finished products 4 5 6 7 Seychelles Dainty & Gemmy Technology Co., Ltd Vietnam Dong A Vietnam Science and Technology Co., Ltd Hong Kong Sun Acoustis Company Limited Virgin Islands Hong Kong 445 CAM DIEN – LUONG DIEN INDUSTRIAL ZONE (VSIP HAI DUONG) GENERAL INFORMATION Address Investor Contact Person Location Investment Area Minimum wage Lease term Minimum Lease Area Limit for Construction Height ▪ Cam Dien Commune, Cam Giang District, Hai Duong, Vietnam VSIP Hai Duong Co., Ltd ▪ Address: Cam Dien Commune, Cam Giang District, Hai Duong, Vietnam ▪ Tel: +84 220 378 9668 ▪ Fax: +84 220 378 6868 ▪ Website: vsip.com.vn ▪ Le Quoc Han (Robin) - (84) 943 836 839 - han.lq@vsip.com.vn - 40 Km from Hanoi Capital - 60 Km from Hanoi International Airport - 65 Km from Hai Phong Seaport - 25 Km from Highway 5B - Face to National Highway 5A Priority Sectors for Investment Light and high tech industries Restricted Sectors for Investment Polluted industries [Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019 ▪ Start date: When tenants are ready ▪ End date: 5th August 2058 1 ha In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residental Planning regulation (QCXDVN 01: 2008/BXD) Permitted Construction Rate Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean Projects Lease fee Operating fee ▪ Total area: 149.31 ha ▪ Total vacant leasable area: 110 ha (Phase 1) ▪ Total area: NA ▪ In operation 100% N/A ▪ Land lease fee: 85 USD/m2/over project life ▪ Management fee: 1,577 VND (~0.07 USD)/m2/year ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: 13,700 VND (~0.5 USD)/m3 ▪ Wastewater treatment fee: 5,633 VND (~0.25 USD)/m3 INFRASTRUCTURE AND FACILITY Financial institution Tax service, State finance office Vietcombank, VietinBank 15km from the nearest State Tax and Finance Agency 15km from the nearest Customs Agency Customs Service 15km from the nearest Inland Container Depot 446 Logistics 5km from the nearest Logistic Center Post office 3km from the nearest Mailing Post Office Medicare 3km from the nearest local clinic Police, public security 2km from the nearest Police Station Universities, training facilities, etc. 15km from the nearest Universites and Training Center + University of Economic and Technology, University of Medical/ Hai Duong vocational School Recruitment Recruitment support service available Worker dormitory Worker dormitory available within IP Worker's child education facility One-stop service Road Width IT & Telecommunication Facilities Emergency Power generator Fire-fighting facility 2km from the nearest Facility 15km from the nearest Hai Duong provincial Facility Main Road: 56-meter-wide, four lanes Branch Road: 26-Meter-wide, two lanes Telecommunication: broadband ADSL service, telecommunication with IDD, fiber optic capabilities, leased line Telephone: number of line depend on investor’s demand. NA Available Layout Plan Location Map 447 Actual View 448 LIST OF SOME NOTABLE TENANTS No. Company name Nationality Business line 1 Best Pacific Company Limited (Vietnam) Hong Kong 2 Long Star Engineering Co., Ltd. (Vietnam) Seychelles 3 Ehwa Global Company Limited South Korea 4 BW Hai Duong Industrial Construction Company Limited Ta Ting Plastic Co., Ltd. (Hai Duong) Netherlands Vietnam Samoa Jointak Labels (VN) Company Limited BW Hai Duong Industry PT Company Limited - Project 02 Leo (Vietnam) Paper Products Co., Ltd Vietnam Union Materials Company Limited BW Hai Duong Industrial Construction Company Limited - HD 03 Superior EMS Limited (Vietnam) Hong Kong Netherlands Vietnam Hong Kong Producing and trading in knitted fabric, knitting fabric, woven fabric and other non-woven fabrics belonging to industry code 1321 Manufacturing and trading raw materials used for manufacturing shoe soles, shoes from rubber plastic and Eva plastic; Producing and trading catalysts, flocculants and additives Producing and processing grinding stone products with diamonds; manufacturing and processing all kinds of saw blades and drills with diamonds used in industrial production; Performing commercial rights Warehousing and storage services, business and real estate consulting; building offices and workshops for rent Production and trading of l PE and PP plastic bags Manufacturing and trading textile labels, labels, paper hangers, labels, hand-locking silicon Warehousing and storage services, business and real estate consulting; building offices and workshops for rent Producing paper bags, paper cards South Korea Producing Ferrite magnets Netherlands Vietnam Warehousing and storage services, business and real estate consulting; building offices and workshops for rent Hong Kong Producing postcards; making machines Cotton candy; animal music player Production of electric wires and cables of all kinds 5 6 7 8 9 10 11 12 13 14 Tran Phu Electrical Mechanical Joint Stock Company Vina Foam Vietnam Co., Ltd. Vietnam Vietnam Producing fire foam products The Long Airtech Joint Stock Company Vietnam Production of air blowing chamber; production and assembly of equipment and machines used for laboratories and medical; Production of air filter accessories 449 LAI VU INDUSTRIAL ZONE GENERAL INFORMATION Address ▪ Lai Vu commune, Kim Thanh district, Hai Duong province Investor Lai Vu industry Park Company limited ▪ Address: Lai Vu commune, Kim Thanh district, Hai Duong province, Viet Nam ▪ Tel: (84-220) 3 562718 Fax: (84-220) 3 727886 Contact Person ▪ Mrs. Tuong Quynh Huong - Deputy General Director – (84) 936 388 477 huong.tuong@daianvietnam.com ▪ Mrs. Tran Huyen Thanh - Sales and Marketing Department – (84) 906 856 899 thanh.tran@daianvietnam.com Location Investment Area Minimum wage Lease term Minimum Lease Area Limit for Construction Height Permitted Construction Rate Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean Projects Lease fee Operating fee - Land: Next to National Road 5A, 1 km from Tien Trung - Seaport: 40 km from Hai Phong Port - Airport: 40 km from Cat Bi (Hai Phong) airport Priority Sectors for Investment High-tech industry, clean industry, light industry, and supporting industry. Restricted Sectors for Investment Restrict heavy industry, industries affecting the enviroment [Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019 ▪ Start date: 2007 ▪ End date: 2057 10,000 m2 In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residental Planning regulation (QCXDVN 01: 2008/BXD) ▪ Total area: 212.89 ha ▪ Vacant leasable area: 152.5ha ▪ Currently, Lai Vu IZ does not have factory available for rent ▪ In operation ▪ Occupancy Rate: 90% ▪ Number of Projects: 11 project None ▪ Land lease fee: 60 USD/m2 ▪ Management fee: 0.5 USD/m2/year - Annual payment from 5th to 15th January ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: 0.61 USD/m3 - Monthly payment ▪ Wastewater treatment fee: Sewage treatment system is Under contruction INFRASTRUCTURE AND FACILITY Financial institution 5 km from nearest ATM of BIDV, VietinBank Tax service, State finance office 12 km to Tax department of Hai Duong province 11 km to State Treasury in Hai Duong Customs Service 13 km to Hai Duong Customs Office 450 Logistics Trancy Logistics (Vietnam) in Hai Duong Co., Ltd, BSL Networks Co., Ltd Post office TDT express, VNPT, DHL, FedEx, TNT...door-to-door delivery service Medicare 7 km from Nam Sach District Medical Center Police, public security 24/7 security service. Universities, training facilities, etc. 10 km to Hai Duong University. Recruitment Worker dormitory The labor forces from local and from neighboring provinces (Bac Ninh, Thai Binh, Hung Yen, Hai Phong, Quang Ninh...). It is easy to find the workers whom you need in the vicinity. NA Worker's child education facility 3 km to Lai Vu preschool. One-stop service NA Road Width IT & Telecommunication Facilities The main internal roads system has the sections: 30m - 33m Telecommunication: broadband ADSL service, telecommunication with IDD, fiber optic capabilities, leased line Telephone: number of line depend on investor’s demand. Emergency Power generator Available Fire-fighting facility Available Layout Plan Location Map 451 Actual View LIST OF TENANTS No. Company name Nationality Business line 1 Vinashin Precision Mechanical Joint Stock Company Vietnam Manufacturing Lai Vu Industrial Park Company Limited Shipbuilding Electric-Electronic Joint Stock Company Vietnam Vinashin Industrial Development Company Limited Thinh Hung Transport and Construction Material Trading Joint Stock Company Vietnam 6 Enbest Joint Stock Company Vietnam 7 Binh Duong Mechanical and Trading Company Limited Vietnam 8 CAS International Container Joint Stock Company United StatesBritish Virgin Islands-Vietnam 9 Tinh Loi Garment Company Limited Hong Kong 10 Pacific Crystal Textile Co., Ltd. Hong Kong 11 Misawa Engineering Co., Ltd. Japan 2 3 4 5 Vietnam Vietnam non-standard mechanical equipment and hydraulic equipment, hydraulic units; production and manufacture of steel structures; production of grinding nuts Constructing and trading technical infrastructure system of Lai Vu Industrial Park Manufacturing measuring modules and protecting diesel parameters; transmitter protection devices; universal Fabrication of wind pipe systems and accessories Installing transmission lines for commercial concrete stations, supplying commercial concrete for construction projects (mainly supplied to Pacific Textile Project and expanding Tinh Loi Garment Project in Lai Vu Industrial Park) Trading in petrol, oil, liquefied petroleum gas; warehouse business; restaurants, mini supermarkets Manufacturing metal components; producing, processing and trading mechanical products; excess factory rental as prescribed Manufacturing all kinds of international standard container products, manufacturing and assembling mechanical products; Manufacturing and assembling all kinds of components for container production; Manufacturing specialized machinery, equipment and tools for the container industry Manufacturing and trading garment products; Washing, printing, embroidery and performing other processing steps Manufacturing and trading knitted products and raw materials Manufacturing, manufacturing, processing and assembling parts, components, components of angle and motor measuring sensors 452 PHU THAI (NAM TAI) INDUSTRIAL ZONE GENERAL INFORMATION Address Investor Contact Person Location Investment Area Minimum wage Lease term Minimum Lease Area Limit for Construction Height Permitted Construction Rate Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean Projects Lease fee Operating fee ▪ Phu Thai Town, Kim Thanh Distric, Hai Duong Province Nam Tai International Co., Ltd. (Phu Thai IZ West area) ▪ Address: Phu Thai Industrial Park, Phu Thai Town, Kim Thanh District, Hai Duong Province ▪ Tel: (84-220) 3 722 990/1 ▪ Fax: (84-220) 3 722 960 ▪ Email: sales@namtai.vn ▪ Mr. Hoang Vinh Tuan - Sales & Service Manager – (84) 982 594 866 (leaved) - Land: Next to National Road 5A, 1 km from Tien Trung - Seaport: 40 km from Hai Phong Port - Airport: 40 km from Cat Bi (Hai Phong) airport Priority Sectors for Investment High-tech industry, clean industry, light industry, and supporting industry. Restricted Sectors for Investment Restrict heavy industry, industries affecting the enviroment [Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019 ▪ Phu Thai Industrial Park – West area 2003-2050. ▪ Phu Thai Industrial Park – East area 2015-2065. 10,000 m2 In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residental Planning regulation (QCXDVN 01: 2008/BXD) ▪ Total area: 56.7 ha ▪ Ready built factory for lease with the area ranging from 2,520 to 20,000 m2 In operation ▪ Occupancy Rate: 100% ▪ Number of Projects: 42 09 projects ▪ Land lease fee: Depending on location ▪ Management fee: 0.35 USD/m2/month (Pay at the 1st day of the 1st month of each quarter) ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: 14,385 VND (~0.65 USD)/m3 (Monthly Payment) ▪ Wastewater treatment fee: 7,350 VND (~0.33 USD)/m3 - Monthly payment with chargeable volume is counted at 70% of supplied water volume INFRASTRUCTURE AND FACILITY Financial institution Tax service, State finance office Customs Service Logistics BIDV, VietinBank, Vietcombank, Sacombank ATM within 5 km 25 km to Tax department of Hai Duong province 24 km to State Treasury in Hai Duong 25 km to Hai Duong Customs Office Trancy Logistics (Vietnam) in Hai Duong Co., Ltd, BSL Networks Co., Ltd 453 Post office 4 km to Kim Luong Post Office Medicare 1.6 km from Phuc Thanh District Medical Center Police, public security 24/7 security service. Universities, training facilities, etc. 24 km to Hai Duong University. Recruitment Worker dormitory Worker's child education facility One-stop service Road Width IT & Telecommunication Facilities The labor forces from local and from neighboring provinces (Bac Ninh, Thai Binh, Hung Yen, Hai Phong, Quang Ninh...). It is easy to find the workers whom you need in the vicinity. NA 6.5 km to Kinh Mon preschool. NA The main internal roads system has the sections: 30m - 33m Telecommunication: broadband ADSL service, telecommunication with IDD, fiber optic capabilities, leased line Telephone: number of line depend on investor’s demand. Emergency Power generator Available Fire-fighting facility Available Layout Plan Location Map 454 Actual View 455 LIST OF TENANTS No. Company name Nationality Business line 1 Poyun Electronic Co., Ltd. Brunei 2 Vietnam Ripe Lawn Company Limited Hakken Technology Co., Ltd. Japan Production and trading of speaker coils; production and trading of parts related to speakers; audio equipment Production of plastic materials for export 3 British Virgin Islands Hong Kong 6 Vietnam Shop Vac Company Limited Nam Lee International Co., Ltd. Cixing VN Company Limited 7 Nam Ninh Company Limited Vietnam 8 Merrimack River Precision Industry Co., Ltd. (HD) Taiwan 9 Injae Vina Company Limited China 10 Dong Tai VN International Company Limited British Virgin Islands 11 Believe Zone Company Limited Korea - Vietnam 12 Global Resources Group Company Limited Vietnam Nam & Co Co., Ltd. China 4 5 13 14 15 16 17 18 Blue Tec Vina Company Limited Nam Tai International Company Limited Global Wrapper Industrial Co., Ltd Vietnam Nam Tai International Company Limited Fantastic International Ltd. Vietnam Hong Kong Vietnam Manufacturing motor boats; export sports clothing; business motels, food, drink, refreshments, karaoke services Manufacture all kinds of plastic support frames inside and outside of speaker components; detailed plastic accessories of travel products such as suitcases, bags, backpacks; Producing garments made of exported wool; manufacturing and processing toys, paper, notebooks and cards; execute commercial rights Producing garment machinery and equipment; production and trading of garment accessories; delivery, transportation of garments and consumer goods Producing and trading Polyethelene membranes, bags and plastic beads; Trade promotion between Vietnam and foreign countries Manufacturing industrial protective clothing (worn once) Making clothes (except for fur); producing knitting and knitting clothes; trading fabrics, ready-made garments, footwear and other related goods Manufacturing and processing plastic molds for mobile phones and other electronic devices Building factories for rent Hong Kong Production of plastic products Vietnam Building factories for rent Hong Kong Producing all kinds of children's toys Vietnam South Korea 20 Nam Tai International Company Limited Daeil Tech Vietnam Co., Ltd. South Korea 21 Em Vina Company Limited South Korea 22 May Mayfair Company Limited Hai Duong Branch - KTC Electronics VN Co., Ltd. Hong Kong 19 23 Processing, assembling, manufacturing and selling speaker components and related accessories; hardware, equipment and speakers Production of vacuum cleaners, engines, filter bags and vacuum cleaner parts and accessories Manufacturing and processing all kinds of garments Sublease machinery Building factories for rent South Korea 456 Storage and Inspection of electronic component products (Phms for mobile phones) Manufacturing and processing film and adhesive tapes for mobile phones and other electronic devices; Performing import and export rights and distribution rights of wholesale and retail distribution (No wholesale or retail establishment is established) Making garments (except for fur) Store, check and assemble all kinds of rubber, silicone mobile phone components (mobile phone keyboard, back plate to protect the phone, stand, HMT Vina Company Limited South Korea 25 LLP Company Limited United Kingdom - Russia 26 Eno Interlining Vietnam Company Limited Hyon Jin Vietnam Co., Ltd. Singapore 24 pads, mobile keyboard pad, mobile phone key adjustment) Store, check and assemble all kinds of rubber, silicone mobile phone components (mobile phone keyboard, back plate to protect the phone, stand, pads, mobile keyboard pad, mobile phone key adjustment); Commercial rights Trade South Korea Manufacturing and processing fabric fabrication; Performing commercial rights Producing plastic products; China Producing other products from rubber; Manufacturing electronic components; Management consulting activities; Implementation of export rights, import rights and distribution rights Manufacturing and processing products South Korea Outdoor travel, including: canvas tents, sleeping bags, sack bags, suitcases. Manufacturing and processing: wire Hong Kong connection, set of electrical conductors, containers, terminals for electrical and electronic devices Producing toy clothes Kintex Elastic Company Limited Nam Tai International Company Limited Binh Thanh Production and Trading Company Limited Akiflex Vina Company Limited Nam Tai International Company Limited Nam Tai International Company Limited Innovation Group Company Limited (Vietnam) Hae Sung Chemical Vina Co., Ltd. Seychelles Republic and accessories of toys; Production of toys and dolls made of cotton and polyester; Production of backpacks, children's bags, school bags Producing woven wire 39 Wanda Textile Co., Ltd. India - China Manufacturing, processing, pressing plastic products for electronic products from pure silicone resins Production of pillowcases and bed sheets 40 Vietnam Bigfun Leisure Company Limited Nam Tai International Company Limited Ducar Company Limited China Production of plastic products; Commercial rights Vietnam Building warehouses - factories and auxiliary works for rent Production of water pumps, 27 28 29 30 31 32 33 34 35 36 37 38 41 42 TianYe Outdoor Company Limited (Vietnam) Yura Vietnam Company Limited Pamson Industry Vietnam Co., Ltd. Vietnam Vietnam Factory Project - Warehouse G3, G4, G5 belong to batch CN11, CN12 - Eastern subdivision Producing and processing garments South Korea Manufacturing Panel construction Vietnam Construction of factories - warehouses and auxiliary works for lease Construction of factories - warehouses and auxiliary works for lease Production of rubber products Vietnam Thailand South Korea China Pressure washers, generators, portable generators. 457 TAN TRUONG INDUSTRIAL ZONE GENERAL INFORMATION Address ▪ Tan Truong Town, Cam Giang District, Hai Duong city Investor Nam Quang Invesment and Development JSC ▪ Address: Nam Sach IZ, Ai Quoc Ward, Hai Duong ▪ Tel: (84-220) 3 570 666 ▪ Email: namquanghd@gmail.com/ namquang@vidgroup.com.vn Contact Person Location Investment Area Minimum wage Lease term Minimum Lease Area Limit for Construction Height Permitted Construction Rate Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean Projects Lease fee Operating fee ▪ Mr. Huan – Sales Department – (84) 989 768 586 – huannm2@tniholdings.vn /huan792003@gmail.com - Land: 45 km from Hanoi, 55 km from Hai Phong - Seaport: 55 km Hai Phong Sea Port, 60 km from Cai Lan – Quang Ninh port - Airport: 70 km from Noi Bai International Airport; 50 km from Cat Bi – Hai Phong Priority Sectors for Investment High-tech industry, clean industry, light industry, and supporting industry. Restricted Sectors for Investment Restrict heavy industry, industries affecting the enviroment [Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019 ▪ Start date: 2008 ▪ End date: 2058 10,000 m2 In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residental Planning regulation (QCXDVN 01: 2008/BXD) ▪ Total area: 198.06 ha ▪ Total Industrial land: 129.45 ha NA In operation ▪ Occupancy Rate: 100% ▪ Number of Projects: Over 40 01 project ▪ Land lease fee: 80 USD/m2 ▪ Management fee: 0.35 USD/m2/year ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: 11,500 VND (~0.5 USD)/m3 ▪ Wastewater treatment fee: USD 0.6/m3 for C level; USD 0.45/m3 for B level; USD 0.18/m3 for A level (Excluding VAT) INFRASTRUCTURE AND FACILITY Financial institution Tax service, State finance office Customs Service Maritime Bank, Vietcombank, ACB, Agribank, Techcombank... 13 km to Tax department of Hai Duong province 11 km to State Treasury in Hai Duong There is an On- site Customs Office insides Tan Truong IZ Tan Truong IZ has Inland Container Depot 458 Logistics Nippon Express、Nippon Konpo、MOL Logistics、Sankyu、Konoike、Yusen Post office TDT express, VNPT, DHL, FedEx, TNT...door-to-door delivery service Medicare 5km to Hai Duong General Hospital Police, public security 24/7 security service. The guards of Lai Cach IZ cooperate with the local polices supports to ensure the security for the whole industrial zone. Universities, training facilities, etc. 4km to Thanh Dong University. Recruitment Worker dormitory Worker's child education facility One-stop service Road Width IT & Tele-communication Facilities The labor forces from local and from neighboring provinces (Bac Ninh, Thai Binh, Hung Yen, Hai Phong, Quang Ninh...). It is easy to find the workers whom you need in the vicinity. Housing, villa for experts/ employees are working in the IZ 8km to Tu Minh preschool. Tan Truong IZ has One-stop service Road system of centre is 36m wide. Branch road syste, is 24m wide. Street lighting system was installed along the route. Telecommunication: broadband ADSL service, telecommunication with IDD, fiber optic capabilities, leased line Telephone: number of line depend on investor’s demand. Emergency Power generator Available Fire-fighting facility Available Layout Plan Location Map 459 Actual View LIST OF TENANTS No. Company name Nationality Business line 1 UMC VN Electronic Company Limited Japan 2 Iriso VN Electronic Co., Ltd Japan 3 Jaguar International Co., Ltd Hanoi Japan 4 Evergreen Vietnam Screw Industry Co., Ltd Taiwan 5 Japan VSM Production Co., Ltd. Japan Manufacturing, manufacturing and assembling all kinds of electronic machinery, equipment, parts and components Manufacturing connected parts; connecting parts with needle tip; connecting parts for cars; Accurate mechanical and electrical equipment parts Manufacturing and trading in designing, manufacturing and assembling sewing machines and spare parts; execute commercial rights Producing iron shells; stainless steel snail production; copper snail production; mechanical Producing garment products 6 Uniden VN Company Limited Japan 7 Hong Tri Precision Company Limited Taiwan 8 Branch of Sankyu VN Co., Ltd. Japan 9 Pegasus sewing machine company limited Japan 10 YAS Real Estate Company Limited Hong Kong 11 Hitachi Cable VN Company Limited Japan 12 Valqua VN Company Limited Japan 13 Chi Hua VN Company Limited Samoa 460 Producing all kinds of cordless phones and accessories; types of radio transceivers and parts Manufacture of connecting machines; Coaxial Cable; antenna; sublease office Service of leasing and managing factories, warehouses, rental machines and equipment Production of nose overlock industrial sewing machines; 5-stitch stitch machine; type of sewing table; sewing table shaft; Commercial rights Investing in creating offices, factories, warehouses and other facilities; providing machinery rental and supporting equipment for offices, factories and warehouses Manufacturing, processing and assembling all kinds of wires and related semi-finished products; plastic beads for wire sheath; sub-lease of offices and factories; antennas for PC computers Producing twisted pads; synthetic plastic pads Manufacturing motors; generator; total clock; automobile motors, chucks; automotive generator; flywheel sports machine; sports machines; 14 Nishoku Technology VN Company Limited Taiwan 15 IKKA VN Technology Co., Ltd Japan 16 C.P VN Livestock Joint Stock Company (02 Branches in Hai Duong) Japan Toko Mimtech Co., Ltd. Thailand 18 Sankyu Logistics (Vietnam) Co., Ltd. - in Hai Duong Japan 19 Mascot VN Co., Ltd. Denmark 20 Ajinomoto Vietnam Company Japan 21 ICS VN Company Limited Japan 22 Brother Vietnam machine limited company Japan 23 Sansei VN Co., Ltd. Hong Kong 24 Showa Valve Vietnam Co., Ltd. Japan 25 ChangHong Vietnam Engineering Co., Ltd. Seychelles Republic 26 Leong Hup Vietnam Company Limited Malayasia 27 Vietnam Zunow Engineering Co., Ltd. Hong Kong 28 Nam Quang Investment and Construction Joint Stock Company Vietnam 29 Vietnam 30 SBC Vietnam Steel House Joint Stock Company Vifon Joint Stock Company 31 Minh Phu Steel Joint Stock Company - HD Vietnam 32 USFEED CO., LTD America 33 ManGo Vietnam Company Limited Japan 34 Fuji Seiko Innovation Vietnam Company Limited Japan 35 ABSFIL Vina Company Limited South Korea 17 Japan Poland Vietnam 461 manufacturing, processing and assembling plastic parts Manufacturing plastic components of mobile phones; plastic components of computers; consumer plastic products; other plastic products Manufacturing and processing plastic components for cars and motorcycles; Plastic components for office equipment Production of feed for cattle and poultry Production and manufacture of precision metal parts for automatic, automotive, orthodontic systems, medical and dental instruments, hardware and key parts, computers Transport agency services, freight forwarding, customs clearance, warehouse management, warehousing and storage services Producing and processing clothes; building warehouses and yards; commercial rights Building Ajinomoto's products storage and distribution center manufactured and traded in Vietnam Manufacture, process and process metal parts for cars and electronic devices Processing, assembling, manufacturing and selling sewing machines, accessories; repair and resell used sewing machines; carry out business activities according to the above areas Manufacturing and assembling all kinds of parts and details; types of molds; restore, repair and maintain molds; factory lease Manufacturing, processing and assembling valves, sieves and other pipeline materials Processing, mold making, plastic and metal component assemblies; manufacturing and assembling components or finished products; Printed and processed plastic product surface Producing food, poultry and aquatic products; production of raw materials used to produce animal feed, poultry and aquatic products; Production of vitamin and mineral mixtures to supplement feed ingredients Manufacturing, processing and assembling plastic components, parts and products Embellish the ground for construction of traffic infrastructure system, power supply, water supply, communication, wastewater treatment ... to attract investors to build and trade in industrial zones. Production of steel structures; corrugated iron Producing products from rice, starch and starch products; processing food, meat, vegetables; Production of seasoning powder Production of rolled steel coils (P / O steel coils), cold rolled steel coils, galvanized steel coils and steel box tubes (input materials are produced and processed from hot rolled coils). Production of animal feed, poultry and aquatic products: 330,000 tons / year Manufacturing, processing and assembling molds for plastic products and plastic products Manufacturing, processing, manufacturing all kinds of metal parts and products for automatic office equipment, automobile industry and other industries Manufacturing filter parts; environmental materials; consulting and installing waste water treatment 36 Sansei Vina Company Limited Japan 37 Jupiter Vietnam Supply Chain Joint Stock Company in Hai Duong Vietnam 38 Super Foam Enterprise INC Anguilla 39 Sambound Vietnam Company Limited Hong Kong 40 Three-Color Stone Stationery (Vietnam) Co., Ltd. China 462 systems; research and market development of filters, waste water treatment materials, waste water treatment systems; Commercial rights Manufacturing, processing and assembling plastic components and products; types of molds and seals, accessories; print letters and pictures on plastic products; restore, maintain and repair molds; Support businesses to find customers Warehousing and storage of goods; other support services related to transport; freight transport by road; goods support, packaging, loading and unloading services Manufacturing and processing plastic products from plastic particles Production and processing of plastic packaging products for cosmetic industry (makeup powder, lotion, eyelash, lipstick, ...); Manufacturing and processing toys for children (models of plastic toys, robots, animals, ...). Manufacturing and processing: notebooks, envelopes, stationery from paper; file clamps, file folders and school supplies; pen, pencil of all kinds, pencil core NAM SACH INDUSTRIAL ZONE GENERAL INFORMATION Address Investor Contact Person Location Investment Area Minimum wage Lease term Minimum Lease Area Limit for Construction Height ▪ Nam Sach District, Hai Duong Province Nam Quang Invesment and Development JSC ▪ Address: Nam Sach IZ, Ai Quoc Ward, Hai Duong ▪ Tel: (84-220) 3 570 666 ▪ Email: namquanghd@gmail.com/ namquang@vidgroup.com.vn ▪ Mr. Huan – Sales Department – (84) 989 768 586 – huannm2@tniholdings.vn /huan792003@gmail.com - Land: 57 km from Hanoi, - Seaport:56 km Hai Phong Sea Port, 67 km from Cai Lan – Quang Ninh port - Airport: 65 km from Noi Bai International Airport Priority Sectors for Investment High-tech industry, clean industry, light industry, and supporting industry. Restricted Sectors for Investment Restricted heavy industry, industries affecting the enviroment [Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019 ▪ Start date: 2003 ▪ End date: 2053 10,000 m2 In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residental Planning regulation (QCXDVN 01: 2008/BXD) Permitted Construction Rate Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean Projects Lease fee Operating fee ▪ Total area: 62.42 ha ▪ Total Industrial land: 48.08 ha ▪ NA ▪ In operation ▪ Occupancy Rate: 100% ▪ Number of Projects: 18 02 projects ▪ Land lease fee: 45 - 66 USD/m2 ▪ Management fee: 0.35 USD/m2/year ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: 11,500 VND (~0.5 USD)/m3 ▪ Wastewater treatment fee: USD 0.6/m3 for C level; USD 0.45/m3 for B level; USD 0.18/m3 for A level (Excluding VAT) INFRASTRUCTURE AND FACILITY Financial institution Tax service, State finance office Customs Service Logistics Maritime Bank, Vietcombank, ACB, Agribank, Techcombank... 6 km to Tax department of Hai Duong province andState Treasury in Hai Duong 13km from Hai Duong Customs Department Nippon Express、Nippon Konpo、MOL Logistics、Sankyu、Konoike、Yusen 463 Post office TDT express, VNPT, DHL, FedEx, TNT...door-to-door delivery service Medicare 10 km to Hai Duong General Hospital Police, public security 24/7 security service. The guards of Lai Cach IZ cooperate with the local polices supports to ensure the security for the whole industrial zone. Universities, training facilities, etc. 8 km to Hai Duong University. Recruitment Worker dormitory Worker's child education facility One-stop service Road Width IT & Tele-communication Facilities The labor forces from local and from neighboring provinces (Bac Ninh, Thai Binh, Hung Yen, Hai Phong, Quang Ninh...). It is easy to find the workers whom you need in the vicinity. Housing, villa for experts/ employees are working in the IZ 8 km to preschool. Nam Sach IZ has One-stop service Main road: 16.5 m, other road: 13.5 m Telecommunication: broadband ADSL service, telecommunication with IDD, fiber optic capabilities, leased line Telephone: number of line depend on investor’s demand. Emergency Power generator Available Fire-fighting facility Available Layout Plan Location Map 464 Actual View LIST OF TENANTS No. Company name Nationality Business line 1 Co., Ltd. Chyun Jaan Taiwan 2 Haivina Company Limited South Korea 3 Baifar Hai Duong Wood Co., Ltd Vietnam China 4 AP Packaging Co., Ltd (Hanoi) Thailand 5 Tinh Loi Garment Company Limited Hong Kong 6 May Ever-Glory Company Limited China Producing and trading in products made of plastic and rubber Production of sports gloves, industrial gloves, sports clothes, all kinds of shirts and sports apparel Manufacturing and processing plywood products. Performing the right to export, import, and wholesale distribution of goods. Manufacture, print all kinds of cartons, corrugated carton sheets and hard forms Manufacturing and trading all kinds of garment products from textile, knitted, wool and raw materials for textile industry Production of scale clothing 7 VN Toyodenso Company Limited Japan 8 Viet Tuong Company Limited Samoa 9 Aiden VN Company Limited Japan-Hong Kong 10 Vina Okamoto Company Limited Hong Kong 11 LFV Metal VN Company Limited Taiwan 12 First Company - Hai Duong Plastic Chemical Company Limited Dusco vina steel yarn processing company Taiwan 13 14 South Korea Nam Quang Infrastructure Development and Investment Joint Stock Company Vietnam 465 Manufacture parts for cars; multi-purpose parts; Production of ignition coils Producing carpet type 4m / m; Flame retardant preparations Manufacturing circuit boards in PCB, electrical and electronic products; electrical and electronic components; design, drawing drawings and CAD and CAM data for molds of plastic and metal products; Producing all kinds of shoes, boots and gloves; raincoats and wind jackets; Performing commercial rights Producing all kinds of glass products; aluminum door; aluminum windows; door push; aluminum tiles Production of plastic pipes and PVC, HDPE, PPR connectors Producing steel fibers Embellish the ground for construction of traffic infrastructure system, power supply, water supply, communication, wastewater 15 Green Environment Trading Service Co., Ltd Vietnam 16 Hong Gia Joint Stock Company Vietnam 17 Vina Feed Joint Stock Company Vietnam 18 An Phat Plastic and Green Environment Joint Stock Company Vietnam 466 treatment ... to attract investors to build and trade in industrial zones. Industrial waste treatment plant Fabrication of weaving, dyeing, stretching, sewing into tulle curtain products Producing and processing animal feed pellets Investing production lines according to modern Japanese technology and equipment to produce high quality plastic packaging PHUC DIEN INDUSTRIAL ZONE GENERAL INFORMATION Address Investor Contact Person Location Investment Area Minimum wage Lease term Minimum Lease Area Limit for Construction Height ▪ Cam Phuc Town, Cam Giang District, Hai Duong city Nam Quang Invesment and Development JSC ▪ Address: Nam Sach IZ, Ai Quoc Ward, Hai Duong ▪ Tel: (84-220) 3 570 666 ▪ Email: namquanghd@gmail.com/ namquang@vidgroup.com.vn ▪ Mr. Huan – Sales Department – (84) 989 768 586 – huannm2@tniholdings.vn /huan792003@gmail.com - 40 Km from Hanoi Capital - 75 Km from Noi Bai International Airport - 68 Km from Hai Phong Seaport, 127 km from Cai Lan Quang Ninh Sea Port Priority Sectors for Investment High-tech industry, clean industry, light industry, and supporting industry. Restricted Sectors for Investment Restricted heavy industry, industries affecting the enviroment [Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019 ▪ Start date: 2003 ▪ End date: 2053 1 ha In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residental Planning regulation (QCXDVN 01: 2008/BXD) Permitted Construction Rate Planned area Factory Available for Rent ▪ Total area: 82.88 ha ▪ Total area: NA Operation Status ▪ In operation Occupancy Rate and Number of Projects ▪ 100% ▪ 28 projects Number of Korean Projects Lease fee Operating fee None ▪ Land lease fee: Depending on location ▪ Management fee: 0.35/m2/year ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: 15,000 VND (~0.64 USD)/m3 ▪ Wastewater treatment fee: 5,633 VND (~0.25 USD)/m3 INFRASTRUCTURE AND FACILITY Financial institution Tax service, State finance office Vietcombank, VietinBank 15km from the nearest State Tax and Finance Agency 15km from the nearest Customs Agency Customs Service 15km from the nearest Inland Container Depot Logistics Post office 5km from the nearest Logistic Center 3km from the nearest Mailing Post Office 467 Medicare 3km from the nearest local clinic Police, public security 2km from the nearest Police Station Universities, training facilities, etc. 15km from the nearest Universites and Training Center + University of Economic and Technology, University of Medical/ Hai Duong vocational School Recruitment Recruitment support service available Worker dormitory Worker dormitory available within IP Worker's child education facility One-stop service Road Width IT & Tele-communication Facilities Emergency Power generator Fire-fighting facility 2km from the nearest Facility 15km from the nearest Hai Duong provincial Facility Widths of main road system of the IZ are 30m and 23.25m. Branch road’s width is 17.5m. The road system in the industrial park is completely asphalted with concrete and is illuminated by modern high pressure lamps. The internal telecommunication network is connected from the industrial zone’s switchboard to factories through the underground cable system to ensure high-speed, uninterrupted transmission of information. Other services such as the Internet, mail, newspapers are provided by the postal service network of Hai Duong province. The water supply network for firefighting is designed in conjunction with the potable water supply network, which is located along the roads. The distance among fire hydrants is 120m 150m with a diameter of D125mm. Available None Layout Plan Location Map Actual View 468 469 LIST OF TENANTS No. Company name 1 Towada VN Electronic Co., Ltd 2 Brother Vietnam Industrial Company Limited 3 Nissei VN Technology Company Limited Taisei Hanoi Electronic Company Limited 4 Nationality Business line Hong Kong Manufacturing and trading in manufacturing and assembling electric and electronic components and equipment; high-tech digital equipment and products; machinery, equipment, tools and fixtures for production, business, manufacture and assembly; outsource processing of materials, components and products for the above business activities Manufacture all kinds of printers, fax machines, electronic devices and multi-functions; types of accessories and spare parts; research and development activities; repairing and re-exporting these products to foreign markets Manufacturing plastic lenses; metal parts; molds; Machining components and mold details Producing electric wires, sheathed wires and electric wire sheaths; electric and electronic machinery, equipment, components; producing all kinds of raw materials for production of the above-mentioned products; Commercial rights Production and assembly of springs, stroke switches and technical axes Production of textile products Japan Singapore Japan-Hong Kong 5 Matex VN Company Limited 6 Kim Thuy Phuc Company Limited China 7 Atarih Precision Vietnam Co., Ltd. Japan 8 Mizuho Precision Vietnam Co., Ltd. Japan-Hong Kong 9 Siam Steel VN Company Limited 10 Kuroda Kagaku VN Company Limited 11 Vinh Han Precision Technology Vietnam Co., Ltd. 12 Viet Nhat Transport Company Limited - Hai Duong Branch 13 Posco Vietnam Holdings Company Limited Japan-Korea 14 Branch of Aureole BCD Company Limited Leo VN Electronics Company Limited Japan 15 16 Meijitsu Tongda VN Company Limited Hong Kong Thailand-Japan Japan Taiwan Japan - Vietnam Hong Kong Japan 470 Manufacture precision mechanical stamping parts; production of molds and mold details; exercise the right to import and export, wholesale distribution and retail of registered goods Manufacturing, trading and assembling all kinds of injection molds and molds, metal springs, precision shaft springs for automatic office equipment and other machinery and electronic equipment; stamping parts, spare parts and components for other types of automatic office equipment. Producing, manufacturing and assembling products from rolled steel; perform stamping, punching, shaping, bending, cutting, and cutting products of steel products Manufacturing, processing, assembling and selling parts, details, plastic components for automatic office equipment and other electrical and electronic equipment; plastic components used for transport vehicles; Precision molds and parts for molds. Mold manufacturing; mold machining and repair; manufacturing, processing and repairing plastic components; mold parts Building warehouses with a scale of 4,370m2; import and export goods delivery and transport services, and goods loading and unloading charges Producing and processing steel products; Sublease excess factory built; Carrying out activities of buying and selling goods Manufacturing plastic components used in cars and in electronic components Manufacture of high-tech metal parts, parts and components; pressed metal parts; molds; mechanical and electronic products Manufacturing and processing all kinds of labels and decals; perform import and export rights and distribution 17 SSK VN Company Limited 18 20 Sanyu Seimitsu Vietnam Company Limited Fuji Seiko Vietnam Company Limited Teikoku VN Company Limited 21 Honwu VN Co., Ltd. 22 Jupiter VN Logistics Joint Stock Company Japan - Vietnam 23 Arion Electric Company Limited Japan 24 Fit VN Company Limited 25 Fuji Chemi Vietnam Company Limited 26 Nam Quang Investment and Construction Joint Stock Company Vietnam 27 Vietnam Lifting Equipment Joint Stock Company Vietnam 28 Truong Phu Joint Stock Company Vietnam 19 Japan Japan-Taiwan Hong Kong Japan Taiwan Hong Kong Japan Manufacture electrostatic brushes; producing decals, adhesive tapes of all kinds; sponge production; factory lease Production of electrical and electronic components, plastic parts and products Manufacture all kinds of shaft, shaft, spring and screw parts; Other parts, details, components Manufacturing all kinds of components in photocopiers, fax machines; machining of office machine parts; Other surface treatment Manufacturing, processing and processing shoe boxes; packing box; cans; packing paper, paper sacks, paper plates, hangers, shoe covers, cartons, paperboard, lining, foil, gift wrap, paper tray; products made of paper pulp or paperboard, sandpaper, paper bags, lock bags and paper. Producing and trading in plastic products. Produce and trade user manuals for the above products. Trading and providing warehousing and storage services; providing and trading transportation services Production of control equipment, components and parts Manufacturing and trading plastic parts and components for electronic products, office machines, household appliances and others. Excessive office and factory leasing. Implementing the right to export and import and distribute components according to HS code registered Execute import and export rights and distribution rights for new chemical and materials products and synthetic plastics for industrial use Embellish the ground for construction of traffic infrastructure system, power supply, water supply, communication, wastewater treatment ... to attract investors to build and trade in industrial zones. Constructing workshops to manufacture, sell, install lifting and lowering equipment, conveying machinery and equipment for industrial, agricultural, transportation, mechanical and automation industries to meet domestic market Production of telecommunication cables of all kinds [- This Page is intentionally left blank -] 471 HAI PHONG 472 INVESTMENT ENVIRONMENT IN HAI PHONG GENERAL INFORMATION Area, Population ▪ Area: 1,526 km2 ▪ Population: 2.09million (2022 statistic) Geographical Location ▪ Located in the Northeastern region of Vietnam. ▪ Located105 km from Ha Noi. Adjacent provinces ▪ To the north: Quang Ninh province ▪ To the west: Hai Duong province ▪ To the east: Bac Bo bay ▪ To the south: Thai Binh province GRDP Industry growth PCI 2022 statistic: ▪ GRDP: 365,000 billion VND (14.6 billion USD) ▪ GRDP growth: 12.32% ▪ GRDP per capita: 7,517 USD/year ▪ Economic structure: - Industry - Construction: 53.68%; - Agriculture. forestry and fishery: 3.61%; - Service: 36.98%; - Tax on Goods: 5.73% 2022 statistic: ▪ Industry - Construction growth: 15.56% ▪ Agriculture, forestry and fishery growth: 1.21% ▪ Service growth: 9.06% ▪ Score: 70.76 – ranked 03 out of 63 cities and provinces in Vietnam. (2022) ▪ Score: 70.61 – ranked 02 out of 63 cities and provinces in Vietnam. (2021) SOCIAL INFRASTRUCTURE Transportation ▪ Roadway: National way: QL5, QL10, QL37 Highway: Ha Noi – Hai Phong, Ha Noi – Quang Ninh Highway at the seaside: Quang Ninh – Hai Phong – Ninh Binh ▪ Railway: Ha Noi – Hai Phong ▪ Inland waterway:2,700 km, account for 40% national inland waterway; connect to almost provinces in the North of Vietnam ▪ Seaway: 125km long coastline Port city with 35 seaports Lach Huyen international deep-water port; have sea freights direct routes to Europe (33 days), Eastern US (45 days), Western US (25 days), India (18 days)... ▪ Airway: Cat Bi international airport Domestic flights to: Da Nang, Pleiku, Buon Ma Thuot, Nha Trang, Phu Quoc, Ho Chi Minh City. International flights to: Incheon (Korea), Osaka (Japan), Bangkok (Thailand), Singapore. Hai Phong 1 & 2 Thermal Power Plant located in Tam Hung commune, Thuy Nguyen district, Hai Phong city: Electricity Capacity of 4x300MW Total investment of more than 1.2 billion USD equivalent to about 24,000MW Producing 7.2 billion kWh electricity each year, providing a large amount of electricity for the national grid. 473 The power production cycle of the plant includes 2 main equipments: boiler and turbine, generator with power transmission system including 2 distribution 220kv and 110kv. Water 8 water treatment plants in Hai Phong with a total capacity of 380,000 m3/day can serve all kinds of needs with water quality up to WHO standards. Furthermore, in each rural district, there are small water treatment plants that meet all local needs. Education ▪ 05 universities and academies, 02 research institutes, 16 colleges, 26 junior colleges and nearly 60 vocational schools in the city Medicare ▪12 hospitals and 04 institutes INVESTMENT CONDITION Human resource ▪ 50.2% of population are in the working age (2022) Education level ▪ Trained labor rate: 35% (2022) Salary ▪ The minimum salary for the city is applied as follows: - Area I: 4.680.000 VND ▪ The lowest wage for trained labor (including those trained by the enterprises) must be at least 7% higher than the above referenced basic salary Investment incentives a. Offers in Economic Zones - 10% corporate income tax rate for 15 years; Tax exemption for 4 years, 50% reduction of payable tax for the next 9 years; - Exemption from land rental to serve investment projects during capital construction under projects approved by competent authorities, but not exceeding 03 years from the date of issuance of land lease decisions. - Tax exemption for goods imported to create fixed assets, raw materials, supplies and components imported for production of the project. b. Incentives in industrial zones outside economic zones - Corporate income tax rate of 17% for 10 years; Tax exemption for 2 years, 50% reduction of tax payable for the next 4 years; - Exemption from land rent in accordance with current law - Tax exemption for goods imported to create fixed assets, raw materials, supplies and components imported for production of the project. c. Incentives for Export Processing Enterprise (EPE) Apply incentives to goods of export processing enterprises, exempt from export tax, import tax and value added. - Conditions of preferential treatment: + Production projects specialized for export; + Register for operation as an export processing enterprise according to the provisions of law. Fields Attracting Investment Hi-tech industry, seaport - logistics, tourism - trade; focusing on attracting large and high-tech projects that play a leading role and make great contributions to the city. Contact Hai Phong Economic Zone Authority ▪ Address: 24 Cu Chinh Lan street, Hong Bang district, Hai Phong city. ▪Tel:(+84) 02253.569.170 ▪ Fax : ▪ Email: banquanlykkt@haiphong.gov.vn ▪ Contact person: Mr. Le Trung Kien – Chairman LIST OF INDUSTRIAL ZONES No Industrial zone Name Total Area (ha) Occupancy Rate Status 1 Trang Due industrial zone 394.27 97.97% In operation 2 Japan – Hai Phong industrial zone 153 100% In operation 3 MP Dinh Vu industrial zone 234.1 96.97% In operation 474 4 Dinh Vu industrial zone 541.46 96.73% In operation 5 Do Son Hai Phong industrial zone 155.2 96.91% In operation 6 An Duong industrial zone 196.1 83.26% In operation 7 VSIP urban, industrial and trading zone 507.6 76.07% In operation 8 Industrial zone and marine services 132.7 92.6% In operation 9 Nam Cau Kien industrial zone 263.47 54.4% In operation 10 Nam Dinh Vu non-tariff and industrial zone (zone 1) Nam Dinh Vu industrial zone (zone 2) 1,329.11 29.27% In operation 513.4 20.57% In operation 526.81 2.44% In operation 13 Hai Phong international gateway port industrial zone Xuan Cau non-tariff and industrial zone 751.95 0% Under legal 14 Tien Thanh industrial zone 410.46 0% Under legal 11 12 475 LIST OF PLANNING INDUSTRIAL ZONE TO 2030 No Industrial zone Name No Industrial zone Name 1 Trang Due 3 industrial zone 7 Tien Lang 1 & 2 industrial zone 2 Cau Cuu industrial zone 8 Nam Trang Cat industrial zone 3 Giang Bien industrial zone 9 Cai Trap Island industrial zone 4 An Hoa industrial zone 10 Thuy Nguyen industrial zone 5 Vinh Quang industrial zone 11 An Hung – Dai Ban industrial zone 6 Kien Thuy industrial zone 12 Nam Cau Kien 2 industrial zone LOCATION MAP OF INDUSTRIAL ZONES AND ECONOMIC ZONE 476 DEEP C INDUSTRIAL ZONES GENERAL INFORMATION Address Investor Contact Person Location Investment Sectors Minimum wage Lease term Minimum Lease Area Dong Hai 2 Ward, Hai An District, Hai Phong city Name of Investor: DEEP C Industrial Zones ▪ Address: Harbourview Office Tower, 12 Tran Phu, Hai Phong city, Vietnam ▪ Tel: +84 2253836169 ▪ Email: info@deepc.vn ▪ Website:www.deepc.vn Koo Hyeji – Head of Korea Desk - +82 10 9792 3302 – hyeji.koo@deepc.vn Adjacent location - 07 km from city center; - 05 km from Cat Bi internationalairport; - Directly connected to Hai Phong Port; 15km to Lach Huyen Deep Sea Port (100,000 DWT vessel) - Directly connected to Hanoi – Hai Phong – Quang Ninh – China Border expressway Priority Sectors for Renewable Energy, Electronic, Mechanical, Petrochemical. Investment Investment Restricted Follow restricted industry list of Hai Phong city Sectors Area 01According to Decree 38/2022/ND-CP ▪ Start date: 06/05/2009 ▪ End date: 06/05/2059 10,000 m2 Limit for Construction Height Following regulation of Airport Height Safety Limit Permitted Construction Rate Planned area 60% Factory Available for Rent ▪ Total area: 1,500 ▪ Total vacant leasable area: 750 ▪ Total area with full infrastructure ready to build factory:400 ▪ 200,000 m2 Ready built Factory from Sub-Developers (BW, KCN, Core5) Operation Status Ready for lease Occupancy Rate and Number of Projects 140+ Projects 50% occupancy Number of Korean projects 21 Lease fee ▪ Land lease fee: Depend on location, size ▪ Factory lease fee: Depend on location, size Operating fee ▪ Management fee: to be discussed ▪ Electricity fee: follow EVN rate ▪ Water fee: 20,200 VND/m3 ▪ Wastewater treatment fee: to be discussed ▪ Waste treatment fee: to be discussed 477 Layout plan INFRASTRUCTURE AND FACILITY Banking service inside Industrial Zone 2km to Custom Agency Logistic Center within Industrial Zone Petrochemical Zone within Industrial Zone Strong cooperation with Local Universities& Vocational school List of Korean Projects in DEEP C Industrial Zones No. Name of Company Business line 1 Daesun Vina Co., Ltd Portable Butane gas 2 Dong Nam Petrovina Co., Ltd Insulating oil 3 YTG Vina Co.,Ltd Bobbin Manufacturing 4 INNOREX Vina Co., Ltd Automotive parts 5 Pantra Vina Co., Ltd Rubber parts for automotive 6 Suhil Vina Co., Ltd Optical cable components 7 KFS Vina Co., Ltd Casting & Molding facilities 8 Haewon Vina Co., Ltd Automotive parts 9 PHA VIETNAM Co., Ltd Automotive parts 10 YMP PLUS COMPANY LIMITED Automotive parts 11 Dong Yang Vina Industry Co., Ltd Automotive parts 12 Mi Chang Vietnam Company Limited Automotive parts 13 SEM DIAMOND CO., LTD Diamond precision Tools 14 SEM MICRO CO., LTD Precison tool for semiconductor 15 Ecoluxveko Co., Ltd Lighting Assembly 478 16 G Food Co., Ltd Sesame Oil 17 LS Metal VINA Copper Pipe 479 TRANG DUE INDUSTRIAL PARK GENERAL INFORMATION Address Investor Contact Person Location Investment Sectors Minimum wage Lease term Minimum Lease Area Limit for Construction Height Permitted Construction Rate Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Le Loi Commune, An Duong District, Hai Phong City Sai Gon – Hai Phong Industrial Park Corporation ▪ Address:Le Loi Commune, An Duong District, Hai Phong City ▪ Tel: (+84.225) 324-2668 ▪ Email: info@trangdue-ip.com.vn ▪ Website:trangdue-ip.com.vn Contact Name: Nguyen Thi Hong Hanh Position: Sales and Marketing Director Mobile: (+84) 982-990-505 Email: hanh.nguyen@trangdue-ip.com.vn + Distance to Ha Noi Capital: 102km + Distance to Hai Phong City Center: 15km + Distance to Cat Bi International Airport: 15km + Distance to the Ha Noi – Hai Phong Railway station: 15km + Distance to Thuong Ly river port: 15km + Distance to the Hai Phong seaport: 15km Priority Sectors for Investment High-tech fields, Supporting industries, Industries producing environmentally friendly products, etc. Investment Restricted Sectors Textile Dyeing The minimum wageapplying toRegion 1in accordance with Decree No. 38/2022/ND-CP issued on 01/07/2022 is VND 4,680,000/person/month 50 years: - Trang Due IP phase I: 2006-2056 - Trang Due IP phase II: 2014-2064 - Trang Due 3 IP: Expected 2023-2073 - Minimum rental area (m2): + Land lease: 20,000m2 + Warehouse for rent: 6,000m2 + 4.0m +/- 0,1m 70% total subleased land area - The total area (m2 or hectare): 1,088ha in which: - Trang Due Industrial Park Phase 1: 187ha - Trang Due Industrial Park Phase 2: 214ha - Trang Due 3 Industrial Park: 687ha - The area available for rent (m2 or hectare): 687ha + Trang Due Industrial Park Phase 1&2: 100% occupied. + Trang Due Industrial Park 3: 687ha + Warehouse: 12,000m2 - Operation status (as of end of 2020): + Trang Due Industrial Park Phase 1&2: 401ha (100% active) + Trang Due Industrial Park 3: 687ha (Under legal procedures) - The rate of occupancy % (as of end of 2020): + Trang Due Industrial Park Phase 1&2: 100% occupied. + Trang Due Industrial Park 3: 0% (under legal procedures) -Number of projects: 112 projects 480 Number of Korean projects Lease fee Operating fee ▪ ~70 projects ▪ Land lease fee: ▪ Factory lease fee: 5 USD/m2/month (not including VAT) ▪ Management fee: 0.5 USD/m2/year ▪ Electricity fee: + Peak hours: 2,871 VND/Kwh + Normal hours: 1,555 VND/Kwh + Idle hours: 1,007 VND/Kwh ▪ Water fee: 21,500 VND/m3 (not including VAT) ▪ Wastewater treatment fee: 13.000 VND/m3 ▪ Waste treatment fee: Layout plan INFRASTRUCTURE AND FACILITY Financial institution Tax service, State finance office Customs Service Distance from the nearest Banking: SHINHAN BANK, WORRIBANK inside the IP (0.5km) Distance from the nearast State Tax and Finance Agency: 5km Distance from the nearest Customs Agency: 18km Distance from the nearest Inland Container Depot: 27km Logistics Distance from the nearest Logistic Center: 35km Post office Distance from the nearest Mailing Post Office: 5km Medicare Distance from the nearest Hospital: 4km Police, public security Distance from the nearest Police Station: 1.5km Universities, training facilities, etc. 6km Recruitment Worker dormitory Support recruitment Distance from the nearest Facility: inside the IP (0.5km) Worker's child education facility Distance from the nearest Facility: 4km One-stop service Distance from the nearest Facility: 3km 481 Road Width Communication Infrastructure of industrial park + Main road: 40m (6 car lanes) + Branch road: 23m Available Emergency Power generator Available Fire-fighting facility Available List of enterprises in Trang Due Industrial Zone No. Name of Company Business line Nationality 1 Tan Huy Hoang Manufactory of foam, foam helmet liner Viet Nam 2 HP 2 Painting Co.,Ltd Producing powder coating, water paint Viet Nam 3 VLC packaging JSC Producing PP woven fertilizer Viet Nam 4 SIVICO JSC Viet Nam 5 Asia plastic JSC Manufactory of high-end packaging and reflective road marking paint Producing plastic pipe 6 Manufactory of shoes and leather products 7 Hai Phong International Fashion company EH Hai Phong Viet Nam Co.,Ltd 8 Hoang Nam Co.,Ltd Manufactory of wood chipboard Viet Nam 9 Bucheon Viet Nam Co.,Ltd Manufactory of electrical cable Korea 10 Dongjin Techwin Vina Co,Ltd Korea 11 Crystal Sweater Viet Nam Co.,Ltd Manufactory of plastic components, electronic components, household electronic products and preprocessed plastic beads Project on manufacturing shirt products 12 LG Electronic Viet nam Hai Phong Co.,Ltd 13 Kansai Felt VN Co.,Ltd 14 Steelflex Co.,Ltd 15 16 Dong Yang Hai Phong Electronics Co.,Ltd Bluecom Vina Co.,Ltd 17 Dong Do Electronics Hai Phong Co.,Ltd 18 Samnec International JSC 19 Meiko Viet Nam Co.,Ltd 20 Aichi Tokei Denki Viet Nam Co.,Ltd Manufactory of animal feed Project of high-tech electronic products, automotive electronic components, energy-saving household goods production… Manufactory of components for automotive & computer drives and other devices, components in electrical devices Manufacture and assembly of combined frames, transmission equipment and electrical components for interior products Project on manufacturing electronic products' details, spare parts and plastic components Manufactory of TV speakers, vibration motor (for phone), bluetooth headsets Project of electronic factory DongDo produces printed circuit boards for mobile phone, battery charger for mobile phone and other products Manufacture and assembly of electric fans, steam fans Manufactory of plastic components, assembly plastic sheet and plastic molding for office machinery equipments Factory of processing and assembling components, semi-finished products and finished products of gas meters, electronic water meters, mechanical water meters. 482 Viet Nam Japan UK Hong Kong Korea Japan Italia Korea Korea Korea Viet Nam Japan Japan 21 Trang Due transportation JSC Construction and business operation of factories and warehouses Producing labels and packages, antibacterial and antimildew agents. 22 Baoshen Viet Nam Printing Co.Ltd 23 Insung Hivina Co.,Ltd 24 Kyowa Plastic Industry VN Co.,Ltd 25 26 Steel Flower HP Electronics & Machinery Co.,Ltd Heang sung Electronics Co.,Ltd 27 Heesung Electronics Viet Nam Co.,Ltd 28 Halla Electronics Vina Co.,Ltd 29 Comet Viet Nam Co.,Ltd 30 Hoang Hai Viet Nam packaging JSC Factory of manufacturing and assembling electronic circuit boards, electronic boards for electronic products, telephones, IVI and home appliances Factory manufacturing and assembling components for automatic positioning liquid crystal modules, manufacturing induction plates, and automatic positioning light guide plates Manufacturing components for cell phones and accessories for cars Projects on manufacturing electrical, electronic components, mechanical and mold Manufactory of carton packaging 31 Sungwoo Tech Vina Co.,Ltd Manufacturing electronic components Korea 32 Ohsung vina Co.,Ltd Manufacturing accessories for LED screens and OLED TVs Korea 33 Công Ty TNHH Hansung PTC Vina 34 LG Display Vietnam Haiphong Co.,Ltd 35 HT solar Viet Nam Co.,Ltd 36 WooSung Electronics VN Co.,Ltd 37 HKT Electronics Viet Nam Co.,Ltd 38 HKTM Vina Company 39 Thien Bao Hai Phong Co.,Ltd 40 HS Color Co.,Ltd 41 Ilshintech Việt Nam Co.,Ltd 42 SL Electronics Co.,Ltd 43 DongA-Hwasung Co.,Ltd 44 LG Innotek VNHP Co.,Lyd 45 Seongho Tech vina Co.,Ltd 46 EST Vina Co.,Ltd 47 Products plastics Jingguang Co.,Ltd Manufactory of plastic products, molds, plasticmechanical jigs for electronics, automobiles and other industrial products. Project for steel product production Viet Nam Hong Kong Japan Korea Korea Korea Korea Korea Viet Nam Korea Manufacturing and processing plastic OLED screens for mobile devices, smart watches, tablets, OLED TV screens Projects on manufacturing batteries and solar panels Korea Manufacturing electronic components for mobile phones and motor vehicles Manufacturing components for mobile phones, components for infotainment systems on vehicles. Manufacturing conveyor belts and factory automatic machines and providing maintenance services by conveyors and automatic machines used in factories. Manufacturing safety fence, automation system, ... Construction and business operation of factories Korea China Korea Korea Viet Nam Manufacturing components for mobile phones, components for infotainment systems on vehicles. Manufacturing accessories for mobile phones, printing on adhesive tape products, nylon, board used for phone screens, printing on electronic components Projects on manufacturing washing machine accessories, refrigerators, motor vehicles Project on manufacturing plastic products, processing plastic molds, processing rubber products, processing metal molds Manufactory of camera module Korea Assembling and processing heat presses used in the manufacture of electronic products. Assembling and processing automatic assembly machines for telephone components and other products Manufacturing, processing racks, legs, shells ... used in television and other electronic devices, manufacturing nail, screws, metal sheet presses products Manufacturing and processing plastic components for electronic products Korea 483 Korea Korea Korea Korea Korea China 48 Serveone (Viet Nam) Co.,Ltd Warehousing Korea 49 0Kr Ems Viet Nam Co.,Ltd Electronic production Korea 50 LG Chem Engineering Plastics Co.,Ltd Plastic beads production Korea 51 K&P Electronics Việt Nam Co.,ltd Circuit boards for camera modules production Korea 52 Chin Hung Việt Nam Co.,Ltd Manufacturing products from silicon China 53 Seiyo Hai phong Co.,Ltd Plastic components production China 54 Re-tech Hai Phong Co.,Ltd Recycling, processing electronic components 55 Bao Nam investment development services JSC YoungHo Eng Vina Co.,Ltd Renting office Viet Nam Renting office Korea Renting office Viet Nam 58 Thuan Thien Service International Co.,Ltd J2 Engineering Co,Ltd Renting office Viet Nam 59 Bach Thao Duoc Co.,Ltd Pharmaceutical production Viet Nam 60 Groll Plywood Viet Nam Co.<ltd Plywood production China 61 Công ty TNHH SM Tech Việt Nam High technology, metal components Korea 62 Taesung Engineering vina Co.,Ltd Camera components Korea 63 JCV Corp co.,Ltd Fake nails production Korea 64 Tuong Vien Grandpark Co.,Ltd Construction and business operation of factories Viet Nam 65 Central pharmaceuticals No.3 company Pharmaceutical Viet Nam 66 AP-Tech Viet Nam Co.,Ltd Electronic components Korea 67 Yesun Tech Viet Nam Co.,Ltd Gaskets and adhesives production Korea 68 Primzen electronics Co.,Ltd China 69 Power seven Tech JSC Manufacturing connecting equipment in electronic components Electronic components production 70 Van Long Co.,Ltd Technical plastic production 71 Dunam Chemistry Vina Co.,Ltd Plastic beads production Korea 72 Goda Intenational Co.,Ltd Electronic components production Taiwan 73 Ourhome Co.,Ltd Food production Korea 56 57 484 US China Viet Nam 485 NAM DINH VU INDUSTRIAL ZONE GENERAL INFORMATION Address Investor Contact Person Location Investment Sectors Dinh Vu-Cat Hai Economic Zone, Dong Hai 2 Ward, Hai An District, Hai Phong City, Vietnam Sao Do Investment Group JSC ▪ Address: No. 768B Ngo GiaTu Street, Thanh To Ward, Hai An District, Hai Phong City, Vietnam ▪ Tel: (+84) 965 469 469 ▪ Email: sales@saodogroup.com ▪ Website: Namdinhvu.com/saodogroup.com Name - Position - Mobile: - Email: [Mrs. Tran Thi To Loan–Deputy Director–(+84) 945226868 – loantt@saodogroup.com] Adjacent location [Cáckhuvựcxungquanh] - 10 km from Hai Phong city/ 100km from Hanoi the capital; - 15 km from Cat Bi International airport; - 0 km from Nam Dinh Vu port which is located inside the industrial park; - 7km km from Hanoi – Hai Phonghighway/.. Priority Sectors for Investment Investment Restricted Sectors Minimum wage Lease term Minimum Lease Area Limit for Construction Height Permitted Construction Rate Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean projects Lease fee - Logistics, warehousing - Car parts - Electronics, electrical parts, high technology products, industrial products supporting high-tech industry - Mechanism - Plastic& packaging products - Oil & gas - Light industry Follow the list of restricted project of Hai Phong city Region 1: VND 4,680,000/monthAccording to Decree 38/2022/ND-CP ▪ Start date: 06 May 2009 ▪ End date: 06 May 2059 10,000sqm - Factory: 2-3 floors Office, Commercial & service area: up to 9 floors 70% ▪ Total area: 1329ha ▪ Total vacant leasable area: 300ha ▪ Total area with full infrastructure ready to build factory:50ha++ ▪ Totalarea 10,600sqm. Many tenants inside the industrial park providing a large number of factory for rent ▪ Active/Under Construction/Under Construction and to be completed by {year}/In Land Clearance Process Active ▪ Phase 1 (370ha): 100% occupied Phase 2 (960ha): Phase 2.1 (220ha) 80% occupied. Phase 2.2 (280ha) under infrastructure construction. Remaining one develop in the future ▪6 ▪ Land lease fee: USD105/sqm ▪ Factory lease fee: USD4.5-5/sqm/month 486 ▪ Management fee: VND 1,400/sqm/month ▪ Electricity fee: Follow EVN price + 1-3% operation fee ▪ Water fee: VND 16,300/m3 + 3% operation fee (~VND 500/m3) ▪ Wastewater treatment fee: VND 12,000/m3 ▪ Waste treatment fee: Collected and calculated by Urban Environment Company Operating fee Layout plan INFRASTRUCTURE AND FACILITY [CƠ SỞ HẠ TẦNG] Distance from the nearest Banking, nearest State Tax and Finance Agency, nearest Logistic Center, Universities, training facilities, etc., Road Width,… Distance from the nearest banking: 4km Nearest State Tax & Finance Agency: 15km Logistics Center: There are many companies doing different kind of logistics inside the Industrial Park such as warehouse for lease, cold storage, depot, CFS warehouse, parking area, etc. Distance to nearest Universities: 15km Road Width: 23 – 34 – 46m Nam Dinh Vu International Seaport & Liquid Jetties located inside the industrial park saving logistics cost List of Projects in Industrial Zone No. Name of Company Nationality Business line 1 Nam Dinh Vu Port Vietnam Seaport Operation 2 Hai Phong Port Services Vietnam Cold Storage & Container yard 3 Pan Hai An Vietnam & Korea Container yard 4 Polyfill Vietnam Plastic Bead (PE, PP) 5 Bac Viet Vietnam Metal processing 6 GLC Taiwan Air purifier system 7 VICO Vietnam Homecare, Bodycare 8 SIVICO Vietnam Traffic Paint 9 Wiseland Hong Kong Packaging 10 Tapetco Vietnam Jet Fuel storage 11 Iteco Vietnam LNG storage 12 Tam Cang Vietnam Container yard 13 PVOil Vietnam Petrol station 14 Thien Luong Vietnam Car parking 15 Hisun China Terrain vehicle assembling 16 Yunjia China PVC film 17 PolyStyrene Taiwan Plastic Bead (EPS, PP, PS) 487 18 Arnova Korea Paint for construction 19 Yoshino Japan Gypsum board 20 JTS Korea Electronics parts 21 BW Industrial Vietnam RBF 22 An Phat Vietnam Plastic Bead (PBAT) 23 TuongVien Group (TVG) Vietnam RBF & BTS Factory 24 Sea Logistics (SLP) Singapore Warehouse for lease 25 Build Up Hong Kong Clothes hanger 26 Greenworks China Gardening tools 27 Allan Logistics Vietnam Warehouse for lease 28 TTC Vietnam Warehouse for sugar 29 Gaw NP Hong Kong RBF 30 JD Property China Warehouse for lease 31 Dong Li China Packaging 32 Viet Phap Steel Vietnam Steel sheet, pipe 33 ESR Singapore RBF 34 Jeil Korea Cold Warehouse, Container Yard 35 Samsung Engineering AMECC Vietnam & Korea Steel Structure 36 Doosan Korea Steel Structure 37 GFA Vietnam Warehouse, Container Yard 38 Fengmang China Sandpaper 39 Hai Phong Paint Vietnam Paint 40 Mitsubishi Estate Japan Warehouse for lease 41 Fine Tech China Metal hand tools 42 Magnetec Germany Magnetic metal coil in automobile 43 RRC Germany High tech battery 44 Robot Grand Pro China Vacuum Cleaner robot 45 Growatt China Electric car charger 46 Vietwood Russia Wood processing 488 TIEN THANH INDUSTRIAL ZONE GENERAL INFORMATION Address Investor Contact Person Location Investment Sectors Minimum wage Lease term Minimum Lease Area Limit for Construction Height Permitted Construction Rate Planned area Factory Available for Rent Operation Status Tien Thanh and Cap Tien Commune, Tien Lang District, Hai Phong City Tien Thanh Investment Industrial Zone JSC ▪ Address: Tien Lang District, Hai Phong City ▪ Tel: +84(225)3588819 ▪ Email: info@tienthanhiz.com ▪ Website: tienthanhiz.com.vn Dang Thai Son–Chief Of Industrial Zone Management Board- Mobile Number: 0982388831 – tienthanhiz.com.vn Adjacent location - 25 km from Hai Phong center city;95 km from Ha Noi city/ the capital; - 25 km from Cat Bi airport; - 45 km from LachHuyendeepwater port; - 2 km from No.10 Highway; 11km from Ha Noi – Hai Phong Expressway Priority Sectors for Investment Investment Restricted Sectors [Mechanicals; Consume Production; Light Industry; Electronic; Agricultural Processing;Production of construction materials] [Chemical, Battery and Accumulator, Metallurgical, Plating, Dying, Paper Production etc. compliance with Decision No.1338/QD-UBND issued by Hai Phong People Committee] [4,680,000 VND] According to Decree 38/2022/ND-CP ▪ Start date: 27/5/2022 ▪ End date:27/5/2072 1.5 ha Please refer to QVCVN 01:2021/BXD based on land plot area, we only regulate the maximum of floor number as follows: Industry area: max. of 5 floors Administrator area: max.of 5 floors Total Industry and administrator area: max. of 70% land plot area ▪ Total area: 410.46 ha ▪ Total vacant leasable area: 289.11 ha ▪ Total area with full infrastructure ready to build factory: 0 ▪ Totalarea: 0 ▪ Active/Under Construction/Under Construction and to be completed by {year}/In Land Clearance Process [In Land Clearance Process, to be commenced in Q4/2023 ] Occupancy Rate and Number of Projects Number of Korean projects Lease fee ▪ Land lease fee: ▪ Factory lease fee: 489 Operating fee ▪ Management fee: ▪ Electricity fee: ▪ Water fee: ▪ Wastewater treatment fee: ▪ Waste treatment fee: INFRASTRUCTURE AND FACILITY Distance from the nearest Banking, nearest State Tax and Finance Agency, nearest Logistic Center, Universities, training facilities, etc., Road Width,… Bank List: Agribank- 3.7km Lienviet Post Bank: 4.1km VIETNAM PROSPERITY BANK: 4.3 km Tien Lang State Tax Agency:3.7km Logistic Center: 28km Education Facilities: Viet Nam Maritime University25.7 km Hai Phong University16km Vocational College≈12km 490 [- This Page is intentionally left blank -] 491 HA NOI 492 INVESTMENT ENVIRONMENT IN HANOI USD/VND 23.510 GENERAL INFORMATION Area Population Geographical Location 3360 km2 8,435 million people (2022) ▪ Hanoi is located in Red River Delta region. ▪ Bac Giang, Bac Ninh Province to the East; Hung Yen Province to the South East; Vinh Phuc Province to the North, Ha Nam Province to the South; Phu Tho and Hoa Binh Province to the West. Adjacent provinces 2022 statistic: ▪ Nominal GRDP (billion VND): 1.196.000 (50,93 billion USD) ▪ Real GRDP (billion VND): GRDP ▪ GRDP growth: 8,89% ▪ GRDP per capita (million VND/year): 141,80 ( USD) ▪ Economic structure: Industry growth Import - Export PCI Ranking - Industry - Construction: 24,04% - Agriculture. forestry and fishery: 2,08% - Service: 63,22% ▪ Industry - Construction growth: 7,74% ▪ Agriculture, forestry and fishery growth: 2,58% ▪ Service growth: 10,06% Import turnover (billion USD): 40,93 Export turnover (billion USD): 17,10 (Growth rate: 0,103) 66.74 20 SOCIAL INFRASTRUCTURE Transportation Electricity Water Education & Training Medicare ▪ Roadway: National Road 1A from North To South, National Road 2 to Ha Giang, National Road 3 to Bac Kan, Cao Bang, National Road 5 to Hai Phong, the new Hanoi-Hai Phong Expressway; National Road 18 to Quang Ninh, National Road 6 and 32 to Southwest run through the City; Highway Hoa Lac- Hoa Binh (newly completed); Highway Phap Van- Cau Gie (Ha Nam) ▪ Railway: Hanoi is the arrival and departure point for many Vietnam Railways and one trans-national railway to Beijing, China and to Kunming, China. It also has Cat Linh- Ha Dong elevated railway constructed and under testament. ▪ Waterway: A large system of river passes through the City, including Hong, Day, Duong To Lich, Kim Nguu, Lu, Ca Lo, Nhue River. 2 hours from Hai Phong Seaport and Cai Lan – Quang Ninh Seaport by car ▪ Airway: Noi Bai International Airport 45 km to the North ▪ 7 transformer stations and power lines of 200kW and 500kW, 32 transformer stations of 110kV and other lower-voltage wires… ▪ 18 water supply plants with capacity of 4,000 to 98,000 m3 per day ▪ 80 universities, colleges; 182 high schools; 320 vocational centers; 113 scientific research departments ▪ 94 hospitals and medical centers; 577 clinics in villages, districts; 18 Health & Medicine research Institutions. INVESTMENT CONDITION Human resource 68,5% of population are in the working age (2022) Education level Trained labor rate: 72,23% (2022) Salary ▪ The minimum salary for the province is applied as follows: 493 - Area I (4,680,000 VND/month): Ba Dinh, Bac Tu Liem, Cau Giay, Dong Da, Ha Dong, Hai Ba Trung, Hoan Kiem, Hoang Mai, Long Bien, Nam Tu Liem, Tay Ho, Thanh Xuan, Gia Lam, Dong Anh, Soc Son, Thanh Tri, Thuong Tin, Hoai Duc, Thach That, Quoc Oai, Thanh Oai, Me Linh, Chuong My Districts and Son Tay Town - Area II (4,160,000 VND/month): Ba Vi,, Dan Phuong, Phu Xuyen, Phuc Tho, Ung Hoa and My Duc Districts - Area III (3,640,000 VND/month): N/A - Area IV (3,250,000 VND/month): N/A (Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages paid to employees working under employment contracts) ▪ Incentives according to government regulations: - Exemption and reduction for land and water rent fee - Preferential tax rates and exemption period, reduction for corporate income tax. - Import tax exemption Investment ▪ Incentives from the province: incentives ▪ Incentives according to government regulations: - Exemption and reduction for land and water rent fee - Preferential tax rates and exemption period, reduction for corporate income tax. - Import tax exemption ▪ Prioritized projects: - Developing selectively some industries, which are highly beneficial and use high-technologies; eco-civic Fields Attracting agriculture and new villages; high quality human resources and science-technology strength for the needs of Hanoi and nation’s development Investment - Developing Hanoi to become high quality center of services of the Northern Vietnam, national and international area Hanoi attracts 1,692 million USD of FDI in 2022. Of which, 365 new projects were registered with a capital of 233 million USD; there were 202 additional Investment attraction situation projects to increase investment capital with an increase of 834 million USD; Foreign investors contributed capital and bought shares 388 times with a capital of 625 million USD, up 83.8%. Map 494 Hanoi Investment Promotion Center Contact ▪ Address: No. 16, Cat Linh Street, Hanoi, Viet Nam ▪ Tel: (84-24) 926 3455/926 3479 495 LIST OF INDUSTRIAL ZONES IN HANOI No 1 2 3 4 5 6 7 8 9 10 11 Industrial zone Name Hoa Lac Hi-Tech Park Quang Minh I Industrial Zone Quang Minh II Industrial Zone Hanoi Southern Supporting Industrial Park Phu Nghia Industrial Zone Thach That- Quoc Oai Industrial Zone Nam Thang Long Industrial Zone Thang Long Industrial Zone Sai Dong B Industrial Zone Noi Bai Industrial Zone Hanoi- Dai Tu Industrial Zone 12 13 Cong vien cong nghe industrial park Sach Soc Son Industrial Zone Total Area (ha) 1,586 407 344 76.92 Occupancy Rate 40% 100% 40% 30% Status In Operation In Operation In Operation In Operation 170 155 260.87 302 47.3 114.1 40 100% 100% 80% 100% 100% 100% N/A 36 203,8 37% 1% In Operation In Operation In Operation In Operation In Operation In Operation Transferred into Urban Zone Clearing Ground Clearing Ground HANOI’S LOCATION MAP OF INDUSTRIAL ZONES 496 HOA LAC HI- TECH PARK GENERAL INFORMATION OF INDUSTRIAL ZONE Address 29Km, Thang Long Highway, Thach That District, Hanoi Investor Hoa Lac Hi-tech Park Management Board, Ministry of Science and Technology (MOST ▪ Address: Km29, Thang Long Highway, Thach That, Hanoi, Viet Nam ▪ Tel: (84-246) 3 269 295 ▪ Fax: (84-246) 3 269 290 ▪ Website: www.hhtp.gov.vn ▪ Email: info@hhtp.gov.vn Contact Person Location Investment Area Minimum wage Lease term Minimum Lease Area Limit for Construction Height Permitted Construction Rate Planned area Mr. Nguyen Hieu - Vice Director, International Relations and Investment Promotion Department Mobile: (84) 912 682 766 Email: hieunt@hhtp.gov.vn; hieuhhtp@gmail.com ▪ 30 km to Hanoi ▪ 47 km to Noi Bai International Airport ▪ 156 km to Hai Phong Port; 193 km to Cai Lan Port ▪ Km29, Thang Long Highway, Thach That, Hanoi, Viet Nam Investment prioritized Sectors Biotechnology, Information technology, New material technology and Automation technology, regulated in Decision 66/QĐ-TTg dated November 25, 2014 and Decision 13/2017/QĐ-TTg dated April 28, 2017 Investment Restricted Sectors N/A [Area 2] According to Decree 90/2019/NĐ-CP dated 15th November 2019 ▪ 70 years for projects on prioritized sectors; 50 years for other projects 3000m2 1-7 Floor (s) 40%-60% ▪ Total area: 1586 ha ▪ Total vacant leasable area: 673 ha [1065 ha, trong đó đã cho thuê 392 ha (chiếm 36,8% diện tích)] Factory Available for Rent Currently, the Park has no factory available for rent. The Management Board has plan to build factory for rent soon Operation Status In Operation Occupancy Rate and Number of Projects Occupancy Rate: 40% Number of project: about 94 Number of Korean Projects Lease fee Operating fee 04 companies ▪ Land lease fee: 70-90USD depending on location ▪ Infrastructure lease: 50-60 USD/m2/up to 2060 (not including 10% VAT) ▪ Factory lease fee: N/A ▪ Management and Infrastructural Maintenance fee: 0.8 USD/m2//year ▪ Electricity fee: as regulated by the Government (see Appendix) ▪ Water fee: 11,615VND/m3 (~0.5 USD/m3) ▪ Wastewater treatment: Water treatment factory is already constructed recently, and the fee is issued in 2020. INFORMATION OF INFRASTRUCTURE AND FACILITY 497 Financial institution 7-8 km to local bank branch of Agribank, BIDV... Tax service, State finance office 11 km to Tax Department and State Treasury of Thach That district The Management Board is working with Customs Service Hoa Lac Customs Office is located in the High Tech Park Logistics There are some logistics serivce provider operating inside the High Tech Park such as Yusen Logistics, Nippon Express,... Post office 11 km to Thach That Post office Medicare 9 km to Thach That General Hospital; a new hospital will be built in the General Service Area for workers, experts,.. Police, public security Hoa Lac High-tech Police Station is located within the High Tech Park Universities, training facilities, etc. Many new universities and technology institute are built/relocated in the Park, such as FPT University, Vietnam-Japan University (of Vietnam National University), University of Science and Technology of Hanoi,… in order to supply high-quality human resource on Science/Technology Recruitment Available and plentiful, as Hanoi is the education hub of Northern Vietnam and many top institutes of technology are located nearby the Park. Worker dormitory There is a general service area for workers, experts and administrative staffs of the Park Worker's child education facility Available in the General Service Area One-stop service According to Decree No. 74/2017 / ND-CP, The Management Board is allowed to apply the one-stop mechanism in handling administrative procedures under the authority of the Management Board. The "one-stop-shop" mechanism is applied in handling administrative procedures under the authority of other state management agencies and other specialized agencies in the fields of investment and registration of business, land use, construction, labor use and other fields. The Management Board is the leading and coordinating agency with state management agencies and relevant professional agencies in handling administrative procedures under the "one-stop" and "onestop shop" mechanism. information Road Width Lang- Hoa Lac Highway: 6 lanes, 140m wide Communication Infrastructure of Industrial Zone Communication system (telecommunication, internet,..) is provided by VNPT Group with a capacity of 300,000 head numbers. Emergency Power generator Available Fire-fighting facility Available 498 Layout Plan Location Map Actual View 499 LIST OF PROJECTS IN HOA LAC HI-TECH PARK No. Company Name 1. Vietnam Joint Stock Commercial Bank For Industry And Trade (Vietinbank) National Institute Of Information And Communications Strategy- Ministry Of Information And Communications. Directorate For Standard, Metrology And Quality Hti- Science Union Of High Tech Telecommunications 2. 3. 4. Functional Area R&D Nationality Business line Vietnam R&D Vietnam Bank information technology development training center High-tech information and communication center. R&D Vietnam Center of measurement R&D Vietnam Research, development and testing of new space equipment, materials and satellite image processing. Research on automotive engine 5. Nissan Techno Vietnam Co., Ltd. R&D Japan 6. National Satellite Center R&D Vietnam 7. Hanoi Department Of Science And Technology Institute Of Functional Foods R&D Vietnam R&D Vietnam Vietnam Institute Of Science And Technology Government Cipher Committee R&D Vietnam R&D Vietnam 11. Institute Of Technology Application, Ministry Of Science And Technology R&D Vietnam 12. Dt&C Vina Jsc. R&D South Korea 8. 9. 10. 500 Building material facilities for the development of space satellite technology Technology transfer and research center Research on the application and implementation of advanced science and technology in biotechnology, food, functional foods, biomedical, cosmetics and medicinal materials. Building CNC infrastructure for National Network Monitoring Center, National CA Center and CHIP Technology Development Research - Providing a system of core transfer centers and open-transfer research centers in a number of potential technological fields such as electronics, automation, new materials, biomedical, ... - Supporting commercialization of products after research; - Studying electromagnetic compatibility and electrical safety for products, electrical and electronic equipment and other testing methods. - Providing testing services on electromagnetic field compatibility and electrical safety for electrical and electron Vietnam - Korea Institute Of Science And Technology Viettel Military Telecommunications Group Vietnam Diamond Media Jsc. Center Area Vietnam, Korea Vietnam Center Area Vietnam 16. Viettel - Cht Co., Ltd Center Area Vietnam Data center and customer service (project leasing area at the General Service Center) Data storage 17. Vietnam Internet Center Center Area Vietnam Internet center 18. Vietnam Post And Telecommunications Group Center Area Vietnam 19. Viettel Military Telecommunications Group Hoa Lac Nasia Jsc. Center Area Vietnam Supporting the needs of telecommunications - information technology services at Hoa Lac Hi-Tech Park Controlling the entire telecommunication-information technology network in the west of Hanoi capital Office Center Area Vietnam 21. Vietcombank Center Area Vietnam Production of intelligent warning and monitoring devices Banking services 22. Center Area Vietnam CNC center Center Area Vietnam Hotel services 24. Southeast Asia Commercial Joint Stock Bank Financial And Enterprise Development Jsc. Ministry Of Finance Center Area Vietnam Office 25. Fpt Software Hanoi Co., Ltd. Software Park Vietnam Manufacturing and trading in software 26. C.E.O Investment Jsc. Software Park Vietnam 27. Tinh Van Technology Jsc. Software Park Vietnam Building offices for software enterprises. Manufacturing and trading software 28. Vietnam Diamond Media Jsc. Software Park Vietnam Outsourcing and customer service 29. Bkav Jsc. Software Park Vietnam 30. Hoa Lac High-Tech Park Development Co., Ltd Misa Jsc. Software Park Vietnam Mixed Zone N/A Togi Real Estate Financial Investment Jsc. Financial And Enterprise Development Jsc. Hoa Lac Xanh Jsc. Mixed Zone Vietnam Manufacturing network security software Investment and trading in technical infrastructure Researching and developing computer software and manufacturing information-telecommunications products. Educations Mixed Zone Vietnam Mixed Zone Vietnam Establishment of trade and service center area Restaurant Mixed Zone Vietnam Education Department 36. International Education Investment Management Jsc. Embedded System Development Jsc. Mixed Zone Vietnam Embedded system 37. Twitter Beans Coffee Jsc. Mixed Zone Vietnam 38. Mixed Zone Vietnam 39. Hoa Lac High-Tech Park Development Co., Ltd Fpt University Education Vietnam Restaurants, convenience stores, fast food and coffee shops Introducing and trading furniture with high applicability. University 40. C.E.O Investment Jsc. Education Vietnam Training center 41. Education Vietnam University Education Vietnam Training center 43. Vietnam Institute Of Science And Technology Hanoi Department Of Industry And Trade Van Lang University Education Vietnam University 44. H.P.T Foam Crete Joint Stock Company Hi-Tech Industrial Park Vietnam Researching new materials technology, producing HPT-2001 chemicals, 13. 14. 15. 20. 23. 31. 32. 33. 34. 35. 42. R&D 501 Viettel Hi-tech center Italy installing lightweight concrete aggregate gas production line,.. Electronic components and devices, integrated control circuits, industrial robots. Manufacturing and assembling optical cable connector. Infrastructure construction and trading (34.5ha) Manufacture phones and electronic boards. Manufacturing medical equipment; research and development center for technology transfer Manufacturing precision mechanical products and high-class heat treatment. Producing antibiotics Vietnam Producing probiotics Vietnam Infrastructure business investment (225.5ha) 45. Noble Vietnam Electronic Co., Ltd. Hi-Tech Industrial Park Japan 46. Vietnam Oe Tek Group Co., Ltd Taiwan 47. Vietnam Export And Construction Corporation Thuan Phat Imoso Jsc. Hi-Tech Industrial Park Hi-Tech Industrial Park Hi-Tech Industrial Park Hi-Tech Industrial Park 48. 49. Viet Nam - Korea Medical Corporation (Vikomed) 50. Fc Hoa Lac Technology Co., Ltd 51. Medlac Pharma Pharmaceutical Manufacturing Co., Ltd Italy Thanh Ha Jsc. 52. 53. 54. 55. Fpt Hoa Lac High-Tech Park Development Co., Ltd Mobile Telecom Infrastructure And Technical Services Corpartion Vnpt Technology 57. Eco Energy Jsc. (Vietnam Green Energy Co., Ltd) Viettel Military Telecom Group 58. Vinalines Logistics Vietnam Jsc. 59. Felix Vietnam Jsc. 60. Viettel Military Telecom Group 61. Biospring Hoa Lac.,Jsc 62. Evn Hanoi 63. Sao Viet Jsc. 64. Sds Industrial Co., Ltd 65. Viet Chuan Jsc. 66. Htmp Vietnam Mechanical Co., Ltd 67. Hanoi Customs Department 68. Cvi Cosmetic Pharmaceutical Jsc. 69. Hanwha Techwin Co., Ltd 56. Vietnam Vietnam, South Korea Hi-Tech Industrial Park Hi-Tech Industrial Park Hi-Tech Industrial Park Hi-Tech Industrial Park Hi-Tech Industrial Park Hi-Tech Industrial Park Hi-Tech Industrial Park Hi-Tech Industrial Park Hi-Tech Industrial Park Hi-Tech Industrial Park Vietnam Hi-Tech Industrial Park Hi-Tech Industrial Park Vietnam Hi-Tech Industrial Park Hi-Tech Industrial Park Hi-Tech Industrial Park Hi-Tech Industrial Park Vietnam N/A Vietnam Vietnam Manufacture of telecommunication equipment Producing telecommunication products, field cables; Producing solar batteries Produce smart card Vietnam Bonded Vietnam Manufacturing precision mechanical products and high-class heat treatment. (Phase 2 of the FC Company Project) Manufacturing telecom equipment, IT and Viettel CNC products Building Probiotics Biotechnology Research Functional Area for applications in animal husbandry, agriculture, food and pharmaceuticals Electrical engineering services, manage and grid operation Producing solar panels N/A Vietnam Vietnam South Korea Vietnam Hi-Tech Industrial Park Hi-Tech Industrial Park Hi-Tech Industrial Park Vietnam Hi-Tech Industrial Park South Korea 502 Vietnam Vietnam Manufacture piezoelectric pump and graphite sheet for electronic products Researching and applying CAD / CAM / CNC technology to produce highprecision mold products Mold manufacturing factory with advanced technology and high accuracy Headquarters of Ha Tay Customs Department -Technology transfer; development and production of nano-technological products, extraction and transformation technologies to enhance traditional herbal values - Producing medicinal products and functional foods and cosmetics of high economic value Manufacturing parts and components of aircraft engines and industrial turbine gas engines 71. Kannametal Singapore Pte Ltd And Shinki Special Tool Co., Ltd Nidec Corporation 72. Nidec Corporation 73. Kova Paint Co., Ltd 74. Asia Industrial Technology Jsc. 75. 77. Vinsmart Research And Manufacture Jsc. Vinaconex Advanced Compound Stone Jsc. (Vicostone) Style Stone Jsc. 78. Vietnam Stone Processing Jsc. 79. Vinaconex Glass Fiber Reinforced Pipe Jsc. Hit High Technology Development Jsc. 70. 76. 80. Hi-Tech Industrial Park Hi-Tech Industrial Park Hi-Tech Industrial Park Hi-Tech Industrial Park Hi-Tech Industrial Park Hi-Tech Industrial Park Hi-Tech Industrial Park Hi-Tech Industrial Park Hi-Tech Industrial Park Hi-Tech Industrial Park Hi-Tech Industrial Park Singapore Vietnam Development and production of cutting tools Developing, manufacturing and trading brushless DC motors Developing, manufacturing and trading small-sized reducers with high accuracy Research and produce high-class, environmentally friendly nano paint Producing high-quality electrical equipment Constructing a smart electronics factory Vietnam Producing high-class paving stone. Vietnam Vietnam Production of artificial high quality paving stones Producing interior stone Vietnam Producing glass fiber reinforced pipe Vietnam Software technology, electronics and telecommunications, information technology. Software technology, electronics and telecommunications, information technology. Manufacture of fireproof doors Japan Japan Vietnam Vietnam 81. Hti High-Tech Production Science And Technology Union Hi-Tech Industrial Park Vietnam 82. Vina-Sanwa Co., Ltd (Joint Venture Between Vinaconex And SannwaHoldings Corp Japan) State Bank Of Vietnam Hi-Tech Industrial Park Vietnam, Japan Hi-Tech Industrial Park Hi-Tech Industrial Park Vietnam Office Vietnam Infrastructure business (277ha) Hi-Tech Industrial Park N/A Manufacturing large-scale quartz slabs using polymer-squeezed organic adhesive in vacuum environment, with thermal phase with the most advanced technology today producing CNC products Producing and trading smart electronics, capable of transmitting data with UART, RS232 / 485 interfaces 83. 85. Vietnam Construction And Import Export Joint Stock Corporation (Vinaconex) A&A Green Phoenix Jsc. 86. Smart Energy Management Jsc. Hi-Tech Industrial Park N/A 87. Gia Phat Hoa Lac Entertainment Service Jsc. Recreation And Sport Zone Vietnam 84. 503 QUANG MINH I INDUSTRIAL ZONE GENERAL INFORMATION OF INDUSTRIAL ZONE Address ▪ Me Linh district, Hanoi Investor Nam Duc Investment and Development Infrastructure Co.,Ltd ▪ Address: Quang Minh Industrial Zone, Quang Minh Town, Me Linh Dist., Hanoi City ▪ Tel: (84-24) 3 248 4282 Fax: (84-24) 3 813 4514 Contact Person Location Investment Area Minimum wage N/A ▪ 18km to Hanoi Center ▪ 10 km to Phuc Yen Station ▪ 110 km to Hai Phong port ▪ 4 km from Noi Bai Airport Investment priorities Sectors ▪ Electronics, high technology industry ▪ Eco-friendly industry Investment Restricted Sectors Polluted Industries [Area 1] According to Decree 90/2019/NĐ-CP dated 15th November 2019 Lease term N/A Minimum Lease Area N/A Limit for Construction Height N/A Permitted Construction Rate N/A Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean Projects Lease fee Operating fee ▪Total area: 407 ha ▪ Total vacant leasable area: 20 ha ▪ Currently, the IZ does not have factory available for rent ▪ In operation ▪ Occupancy Rate: 100% ▪ Number of Projects: 98 32 companies ▪ Land lease fee: 120 USD/m2 ▪ Building lease fee: 2.0 – 2.5 USD/m2/month ▪ Management fee: 0.3 USD/m2/year ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: ~ 0.6 USD/m3 INFORMATION OF INFRASTRUCTURE AND FACILITY Financial institution Tax service, State finance office Customs Service Logistics Vietcombank, Maritime Bank, ACB, Agribank, Techcombank have their branches near the ID 10 km to Tax Department and State Treasury of Me Linh District 9 km to Bac Thang Long Industrial Zone Customs Office Various fast and convenient means: ▪ Road (many national roads across for domestic transportation); ▪ Sea (Haiphong Seaport (via Hai Phong- Hanoi Expressway), Cai Lan Port, Cua Ong Seaport of Quang Ninh (via Hanoi- Ha Long High Express way); ▪ Air: Noi Bai Airport 504 Post office 8.5 km to Me Linh Post Office Medicare 17 km to Me Linh General Hospital, also, there are many central, national hospitals in Hanoi Urban Area. Police, public security 10 km to Me Linh Police Station Universities, training facilities, etc. There are many universities, colleges and intermediate vocational training in various fields. Recruitment Worker dormitory Worker's child education facility One-stop service Road Width Communication Infrastructure of Industrial Zone Emergency Power generator Fire-fighting facility Hanoi has a redundant source of well-trained labor with many universities, colleges, vocational schools of all sectors. Available dorms for workers and administrative staffs. Available 10 km to Me Linh People’s Committee, which provides one-stop service ▪ Central/main road: 36 m wide ▪ Local/ branch road: 24 m wide Reach international standards, adapt well with communication needs. Underground optical cable system is directly connected to the fence of each enterprise. Available The system reaches national standard, as one fire hydrant is installed every 120m Layout Plan Location Map 505 Actual View 506 QUANG MINH II INDUSTRIAL ZONE GENERAL INFORMATION OF INDUSTRIAL ZONE Address ▪ Me Linh district, Hanoi Investor Hop Quan Investment Company-Taiwan ▪ Address: Quang Minh II Industrial Zone, Me Linh District, Hanoi ▪ Tel: (84-24) 6260 5786/(84-24) 6260 5788 ▪ Fax: (84-24) 6260 5788 Contact Person Location N/A ▪ 18 km to Hanoi Center; 10 km to Phuc Yen Station ▪ 110 km to Hai Phong Port; 120 km to Cai Lan Dêp Port ▪ 03 km to Noi Bai Airport ▪ To the North of North Thang Long- Noi Bai Expressway and Hanoi- Lao Cai Railway, at the head of National Road 18 to Hai Phong Port and Quang Ninh- Cai Lan Deep Port, which creates favorable condition for transportation Investment Area N/A Minimum wage [Area 1] According to Decree 90/2019/NĐ-CP dated 15th November 2019 Lease term N/A Minimum Lease Area N/A Limit for Construction Height N/A Permitted Construction Rate Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean Projects Lease fee Operating fee ▪ Total area: 344ha Currently, the IZ does not have factory available for rent ▪ Management fee: 0.4 USD/m2/year ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: ~0.6 USD/m3 ▪ Rate of Occupancy: 40% ▪ Number of projects: 35 01 ▪ Land lease fee: 120 USD/m2 ▪ Buidling lease: 2.0 – 2.5 USD/m2/month ▪ Management fee: 0.4 USD/m2/year ▪ Electricity fee: as regulated by the Government ▪ Water fee: ~0.6 USD/m3 INFORMATION OF INFRASTRUCTURE AND FACILITY Financial institution Tax service, State finance office Customs Service Logistics Local bank branches of Vietcombank, Maritime Bank, ACB, Agribank, Techcombank are located nearby the IZ 10 km to Tax Office and State Treasury of Me Linh District 9 km to Bac Thang Long Industrial Zone Customs Office Various fast and convenient means: ▪ Road (many national roads across for domestic transportation); ▪ Sea (Haiphong Seaport (via Hai Phong- Hanoi Expressway), Cai Lan Port, Cua Ong Seaport of Quang Ninh (via Hanoi- Ha Long High Express way); ▪ Air: Noi Bai Airport 507 Post office 5km to Me Linh District Post Office, 2 km to Quang Minh Post Office Medicare 13 km to North Thang Long Hospital, Dong Anh District, 15 km to Hanoi E Hospital Police, public security 10 km to Me Linh Police Station Universities, training facilities, etc. There are many universities, colleges and intermediate vocational training in various fields. Recruitment Worker dormitory Worker's child education facility One-stop service Road Width Communication Infrastructure of Industrial Zone Emergency Power generator Fire-fighting facility Hanoi has a redundant source of well-trained labor with many universities, colleges, vocational schools of all sectors. A dorm of 27.8 ha for over 10,000 workers and specialists with park and social services. Available Provided by Me Linh People’s Committee. Main road: 36 m wide Branch road: 24 m wide Modern and standardized telecommunication system to meet the needs of investors N/A The system reaches national standard, fire hydrants are installed in domestic road of the IZ Layout Plan Location map Actual View 508 509 HANOI SOUTHERN SUPPORTING INDUSTRIAL PARK GENERAL INFORMATION OF INDUSTRIAL ZONE Address ▪ Phu Xuyen district, Hanoi Investor N&G Development and Investment Corporation ▪ Address: No. 20, Mai Anh Tuan St., Dong Da Dist., Hanoi City ▪ Tel: (84-24) 3 784 6045 Fax: (84-24) 3 784 6043 ▪ Email: sales@ngcorp.com.vn Contact Person Location Investment Area Minimum wage Lease term Contact person: Mr. Tran Phuong Lam – Sales Department – (84) 90 456 8688 ▪ Land: 30 km to Hanoi Center; 04 km to Phuc Yen Station ▪ Seaport: 85 km to Hai Phong Port ▪ Airport: 60 km to Noi Bai Airporrt Investment prioritized Sectors Electronic supporting industry; mechanical precision industry; Automobile supporting industry; high tech industry, leather shoe supporting industry, textile supporting industry Investment Restricted Sectors N/A [Area 2] According to Decree 90/2019/NĐ-CP dated 15th November 2019 ▪ 70 years for projects on prioritized sector; 50 years for other projects Minimum Lease Area N/A Limit for Construction Height N/A Permitted Construction Rate N/A Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean Projects Lease fee Operating fee ▪ Total area: 76.92 ha ▪ Total industrial land area: 52 ha ▪ Total vacant leasable area: 50 ha Currently, the IZ has no factory available for rent In Operation Occupancy Rate: 30% 2 projects None ▪ Land lease fee: 140 – 180 USD/m2/50 years to 70 years ▪ Factory lease fee: 2 – 3 USD/m2/month ▪ Management fee: 0.3 – 0.7 USD/m2/year ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: ~0.6 USD/m3 INFORMATION OF INFRASTRUCTURE AND FACILITY Financial institution Tax service, State finance office Customs Service Logistics Post office Bank branches of VDB, AgriBank are located nearby. 3.5 km to Phu Xuyen Tax department; 5 km to Phu Xuyen State Treasury 42 km to Ha Tay Customs Office Strategically located at the gateway to the south of Hanoi capital, between two arterial road: Phap Van - Cau Gie highway and National Highway 1A. 4 km to Phu Xuyen Post Office 510 Medicare 4 km to Phu Xuyen Hospital. Police, public security 4.5 km to Phu Xuyen Police station Universities, training facilities, etc. There are many universities, colleges and intermediate vocational training of various fields. Recruitment Worker dormitory Worker's child education facility One-stop service Road Width Communication Infrastructure of Industrial Zone Hanoi has a redundant source of well-trained labor with many universities, colleges, vocational schools of all sectors. A population neighborhood is located near the ID. Available Provided by Phu Xuyen People’s Committee N/A Reach international standards, adapt well with communication needs. Underground optical cable system is directly connected to the fence of each enterprise. Fiber optic cable systems can be connected to telecommunication applications and leased line systems. There are IDD, VoIP, ADSL telephone switchboard. Emergency Power generator Available Fire-fighting facility Available Layout Plan Location Map 511 List of Tenant No. 1 2 Name of project Investment project on production and trading of high-tech supporting industrial products Project of investment in building a factory to produce supporting industry products Nationality Business field Japan Manufacturing mechanical components Vietnam Producing mechanical components,…. 512 PHU NGHIA INDUSTRIAL ZONE GENERAL INFORMATION OF INDUSTRIAL ZONE Address ▪ Km25, National Road 6, Phu Nghia, Chuong My District, Hanoi Investor Phu My Group JSC. ▪ Address: No 24, Ngo Quyen, Van Phuc Ha Dong, Hanoi. ▪ Tel: 0919 18 18 18 ▪ Fax: (+8424) 3311 9807 ▪ Website: http://phumygroup.com.vn/ Contact Person Location Investment Area Minimum wage Lease term Nguyen Thi Thanh Xuan, Director – (84) 9 1918 1818 - Email: sales@phumygroup.com.vn/ thanhxuan@phumygroup.com.vn ▪ 23 km from Hanoi City. ▪ 40 km from Noi Bai Airport. ▪ 120 km from Hai Phong Port. ▪ 10km from National Road 21A. Investment priorities Sectors Technology, industrial manufacturing, supporting industries Investment Restricted Sectors Polluted industries [Area 1] According to Decree 90/2019/NĐ-CP dated 15th November 2019 Lease term : 50 years ▪ Start date : 2008 ▪ End date : 2057 Minimum Lease Area 700m2 Limit for Construction Height ▪ Unlimited Permitted Construction Rate Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean Projects Lease fee Operating fee ▪ 60% ▪ Total area : 170 ha ▪ Total vacant leasable area : N/A ▪ Total area with full infrastructure ready to build factory: 145 Ha ▪ Currently, the IZ does not have factory available for rent ▪ In operation ▪ Occupancy rate: 100% N/A ▪ Land lease fee: 100 USD/m2 ▪ Factory lease fee: to be negotiated ▪ Management fee: 0.5 USD/m2/year ▪ Electricity fee: as regulated by the Government ▪ Water fee: 0.4USD/m3 ▪ Wastewater treatment fee: 0.4USD/m3 ▪ Waste treatment fee: to be negotiated INFORMATION OF INFRASTRUCTURE AND FACILITY Financial institution Internal Sevice Tax service, State finance office Internal Service 513 Internal Service Customs Service Internal Service Logistics Internal Service Post office Internal Sevice Medicare 7km to Chuong My Hospital Police, public security 6km to the nearest police station Universities, training facilities, etc. There are many universities, colleges and intermediate vocational training in various fields. Recruitment Worker dormitory Worker's child education facility One-stop service Road Width Hanoi has a redundant source of well-trained labor with many universities, colleges, vocational schools of all sectors. Available dorms for workers and administrative staffs. Available 4 km to Chuong My People’s Committee, which provides one-stop service ▪ Main road : 30m and 25m width ▪ Internal transport system accounted for 15% of the total area of the industrial zone Communication Infrastructure of Industrial Zone Good Emergency Power generator Available Fire-fighting facility Internal Service (general system for the IZ and each factory’s installation) Layout Plan Location Map 514 Actual View 515 THACH THAT- QUOC OAI INDUSTRIAL ZONE GENERAL INFORMATION OF INDUSTRIAL ZONE Address ▪ Thach That District, Hanoi Investor Ha Tay Investment Development JSC ▪ Address: Thach That – Quoc Oai Industrial Zone, Thach That Dist., Hanoi ▪ Tel: (84-24) 2324 4881 Fax: (84-24) 3394 3204 Contact Person Location ▪ N/A ▪ 20 km to Hanoi Center; 20 km to Hanoi Gas Station ▪ 130 km to Hai Phong port; 150 km to Quang Ninh- Cai Lan Deep Port ▪ 30 km to Noi Bai Airport Investment Sectors priorities Investment Area Investment Restricted Sectors Minimum wage Lease term ▪ Starting date: 2007 ▪ End date: 2057 1 ha Limit for Construction Height N/A Permitted Construction Rate N/A Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean Projects Lease fee Operating fee Polluted Industry [Area 1] According to Decree 90/2019/NĐ-CP dated 15th November 2019 Minimum Lease Area Planned area Mechanical industry, electronic industry, processing food, consumers goods, jewelry, parts of motorbike, automobiles and electrical appliances ▪ Total area: 155 ha ▪ Vacant leasable area: N/A ▪ Currently, the IZ does not have factory available for rent ▪ In operation ▪ Occupancy Rate: 100% ▪ Number of Projects: N/A 06 ▪ Land lease fee: 100 USD/m2 ▪ Management fee: 0.5 USD/m2/year ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: ~0.6 USD/m3 ▪ Waste treatment fee: N/A INFORMATION OF INFRASTRUCTURE AND FACILITY Financial institution Tax service, State finance office Customs Service Logistics There are many bank branches near the IZ 8.5 km to Thach That Tax Department and State Treasury 10 km to Ha Tay Customs Office Various fast and convenient means: ▪ Road (many national roads across for domestic transportation); ▪ Sea (Haiphong Seaport (via Hai Phong- Hanoi Expressway), Cai Lan Port, Cua Ong Seaport of Quang Ninh (via Hanoi- Ha Long High Express way) 516 ▪ Air: Noi Bai Airport Post office 8.5 km to Thach That post office Medicare 4.6 km to Quoc Oai Hospital Police, public security 7.5 km from Thach That Police Station Universities, training facilities, etc. Some civil national universities (such as Posts and Telecommunications Institute of Technology, Hanoi Architecture University,..) and vocational schools are located in Ha Dong city, 20 km from the ID. Recruitment Hanoi has a redundant source of well-trained labor with many universities, colleges, vocational schools of all sectors. Worker dormitory Worker's child education facility One-stop service Road Width Communication Infrastructure of Industrial Zone Available dorms for workers and administrative staffs. N/A 8.5 km to Thach That People’s Committee, which provides one-stop service Main road: 36 m wide Branch road: 24m wide Reach international standards, adapt well with communication needs. Underground optical cable system is directly connected to the fence of each enterprise. Emergency Power generator Available Fire-fighting facility Available Layout Plan Location Map Actual View 517 518 THANG LONG INDUSTRIAL ZONE GENERAL INFORMATION OF INDUSTRIAL ZONE Address ▪ Dong Anh district, Hanoi capital Investor Thang Long Industrial Park Corporation ▪ Address: Thang Long Industrial park, Dong Anh District, Hanoi, Vietnam ▪ Tel: (84-24) 3 881 0620 Fax: (84-24) 3 881 0624 Contact Person Location Investment Area Minimum wage Lease term ▪ N/A ▪ Land: 11 km to Hanoi Center; 10 km to Phu Dien Station, 15 km to Hanoi Railway Station ▪ Seaport: 100 km to Hai Phong port, 115 km to Cai Lan Port ▪ Airport: 11 km to Noi Bai Airporrt Investment priorities Sectors Mechanical Industry, Electronic industry, Precision industry, Light industry, IT, High-tech industry Investment Restricted Sectors Restrict Industries affecting the environment. [Area 1] According to Decree 90/2019/NĐ-CP dated 15th November 2019 ▪ 50 years Minimum Lease Area 1 ha Limit for Construction Height N/A Permitted Construction Rate N/A Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean Projects Lease fee Operating fee ▪ Total area: 302ha ▪ Total leasable area: ▪ Currently, the IZ does not have factory available for rent ▪ In operation ▪ Occupancy Rate: 100% ▪ Number of Projects: 106 projects None ▪ Land lease fee: from 100 USD/m2 ▪ Building lease fee: 7.0 USD/m2/month ▪ Management fee: 1.0 USD/m2/year ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: ~0.6 USD/m3 INFORMATION OF INFRASTRUCTURE AND FACILITY Financial institution Tax service, State finance office Many bank branches are near the ID 11 km to Tax department and State Treasury of Dong Anh District. There is an On- site Customs Office in the IZ Customs Service Located in the Customs Office Logistics Post office Various fast and convenient means: ▪ Road (many national roads across for domestic transportation); ▪ Sea (Haiphong Seaport (via Hai Phong- Hanoi Expressway), Cai Lan Port, Cua Ong Seaport of Quang Ninh (via Hanoi- Ha Long High Express way); ▪ Air: Noi Bai Airport 11 km to Dong Anh post office 519 Medicare 12 km to Dong Anh General Hospital, >20 km to many national hospital in Hanoi urban area. Police, public security 12 km to Police station of Dong Anh District Universities, training facilities, etc. Many universities, colleges and vocational schools are located in Hanoi Recruitment Worker dormitory Worker's child education facility One-stop service Road Width Communication Infrastructure of Industrial Zone Emergency Power generator Firefighting Facility Hanoi has a redundant source of well-trained labor with many universities, colleges, vocational schools of all sectors. Available dorms for workers, specialists and administrative staffs. There are 3 public preschools, 5 private preschools and 10 baby-sitting homes around the ID 13 km to Dong Anh People’s Committee, which provides one-stop service. Main road: 40m wide, 6-lane Local/branch road: 26m, 2-lane Be able to support domestic and international communication via telecommunication, Fax, Internet. Available Available and well-equipped Layout Plan Location map 520 Actual View 521 NAM THANG LONG INDUSTRIAL ZONE GENERAL INFORMATION OF INDUSTRIAL ZONE Address ▪ Thuy Phuong Town, Bac Tu Liem district, Hanoi Investor Hanoi Huaic Industrial Park Development Corporation ▪ Address: Nam Thang Long Industrial Zone, Thuy Phuong, Tu Liem Dist., Hanoi ▪ Tel: (84-24) 3 7523 444/ 3 7523 453 Fax: (84-24) 3 7521 896 Contact Person Location Investment Area Minimum wage ▪ N/A ▪ 15 km to Hanoi Urban area ▪ 6 km to Hanoi Center; 10 km to Phu Dien Station ▪ 115 km to Hai Phong port ▪ 15 km to Noi Bai Airport Investment priorities Sectors Developed towards a green industrial Zone with High tech industry, light industry and civil mechanical industry Investment Restricted Sectors Polluted Industries [Area 1] According to Decree 90/2019/NĐ-CP dated 15th November 2019 Lease term N/A Minimum Lease Area 1 ha Limit for Construction Height In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning regulation (QCXDVN 01: 2008/BXD) Permitted Construction Rate Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects ▪ Total area: 260.87 ha ▪ Vacant leasable area: 10 ha ▪ Currently, the IZ does not have factory available for rent In Operation ▪ Occupancy Rate: 80% ▪ Number of Projects: 87 Number of Korean Projects N/A Lease fee Operating fee ▪ Land lease fee: 120 - 130 USD/m2 ▪ Building lease fee: 3.0 – 4.0 USD/m2/month ▪ Management fee: 1.0 USD/m2/year ▪ Electricity fee: as regulated by the Government ▪ Water fee: ~0.6 USD/m3 INFORMATION OF INFRASTRUCTURE AND FACILITY Financial institution Tax service, State finance office Customs Service Logistics There are many bank branches near IZ. 9 km to Bac Tu Liem Tax Department; 8 km to Bac Tu Liem State Treasury ▪ 10 km to North Hanoi Customs Office ▪ ICD My Dinh is located in North Hanoi Customs Department Various fast and convenient means: ▪ Road (many national roads across for domestic transportation); ▪ Sea (Haiphong Seaport (via Hai Phong- Hanoi Expressway), Cai Lan Port, Cua Ong Seaport of Quang Ninh (via Hanoi- Ha Long High Express way); ▪ Air: Noi Bai Airport 522 Post office 4 km to Tan Xuan VnPost of Tu Liem District. Medicare 7 km to Nguyen Xa Hospital; many national Hospital in Hanoi Urban area. Police, public security 10 km to Bac Tu Liem Police station Universities, training facilities, etc. There are many universities, colleges and intermediate vocational training in various fields. Recruitment Worker dormitory Worker's child education facility One-stop service Road Width Hanoi has a redundant source of well-trained labor with many universities, colleges, vocational schools of all sectors. Available dorms for workers, specialists and administrative staffs. N/A 10 km to Bac Tu Liem People’s Committee, where provides one-stop service ▪ External transport system: 40- 60m ▪ Internal transport system: ranging from 18, 21, 30 m Communication Infrastructure of Industrial Zone Full communication system ensures national and international contact easily, include telephone, mobile phone, Fax, Internet. Emergency Power generator Available Fire-fighting facility Available Layout Plan Location map 523 Actual View 524 SAI DONG B INDUSTRIAL ZONE GENERAL INFORMATION OF INDUSTRIAL ZONE Address ▪ Long Bien district, Hanoi Investor Hanoi Electronic Corp. (HANEL) ▪ Address: No. 2, Chua Boc St., Dong Da Dist., Hanoi City ▪ Tel: (84-24) 3 852 2102 / 3 852 4555 Fax: (84-24) 3 852 5770 ▪ Email: info@hanel.com.vn Contact Person Location Investment Area Minimum wage Lease term ▪ N/A ▪ 8 km to Hanoi Center; 03 km to Gia Lam Station ▪ 87 km to Hai Phong Port; 100 km to Cai Lan Port ▪ 33 km to Noi Bai Airport Investment priorities Sectors Production of food, animal feed; Electronic industry Investment Restricted Sectors Restrict industries affecting the environment [Area 1] According to Decree 90/2019/NĐ-CP dated 15th November 2019 50-70 years Minimum Lease Area N/A Limit for Construction Height N/A Permitted Construction Rate N/A Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean Projects Lease fee Operating fee ▪ Total area: 47.3 ha ▪ Currently, the IZ does not have factory available for rent ▪ In operation ▪ Occupancy Rate: 100% ▪ Number of Projects: 24 8 companies ▪ Land lease fee: 150 –200 USD/m2/50 years ▪ Management fee: 0.6 USD/m2/year ▪ Infrastructure maintenance fee: 1.5 USD/m2/year ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: About 0.6 USD/m3 INFORMATION OF INFRASTRUCTURE AND FACILITY Financial institution Tax service, State finance office Customs Service Logistics Post office There are many bank branches near IZ. Long Bien Tax department and State Treasury is located in the ID ▪ 3 km to Gia Thuy Customs Office ▪ ICD Gia Thuy í located in Gia Thuy Customs Office Various fast and convenient means: road (many national roads across for domestic transportation); Haiphong Seaport (via Hai Phong- Hanoi Expressway), Cai Lan Seaport, Cua Ong Seaport of Quang Ninh (via Hanoi- Ha Long High Express way); Noi Bai Airport (27 km away from the ID) 5 km to Long Bien Post office 525 Medicare 10 km to Bach Mai Hospital and Hanoi Medical University Hospital, and many central, national hospitals in Hanoi Police, public security 4 km to Long Bien Post office Universities, training facilities, etc. There are many universities, colleges and intermediate vocational training in various fields. Recruitment Worker dormitory Worker's child education facility One-stop service Road Width Hanoi has a redundant source of well-trained labor with many universities, colleges, vocational schools of all sectors. Available dorms for workers, specialists and administrative staffs. Available 5 km to Long Bien People’s Committee, where provides one-stop service Main road: 26 m wide Local/ Branch Road: 20.5 m wide Communication Infrastructure of Industrial Zone Full service Emergency Power generator Available Fire-fighting facility Available Layout Plan Location Map 526 Actual View 527 NOI BAI INDUSTRIAL ZONE GENERAL INFORMATION OF INDUSTRIAL ZONE Address ▪ Mai Dinh Town, Quang Tien Commune, Soc Son district, Hanoi Investor Noi Bai Development Co., Ltd ▪ Address: Quang Tien Commune, Soc Son District, Hanoi ▪ Tel: (84-24) 3 582 0332 Fax: (84-24) 3 582 0330 Contact Person Location Investment Area Minimum wage Ms. Tuyen – Client Relationship Manager - (84) 963 741 780 - tuyen.nguyen@nbiz.com.vn ▪ 25 km to Hanoi Center; 10 km to Phuc Yen Station ▪ 120 km to Hai Phong port; 125 km to Cai Lan Airport. ▪ 3 km to Noi Bai Airport Investment priorities Sectors Mechanical Industry, Electronic Industry, Precision Industry, Light Industry, IT,.. Investment Sectors Polluted Sector Restricted [Area 1] According to Decree 90/2019/NĐ-CP dated 15th November 2019 Lease term N/A Minimum Lease Area N/A Limit for Construction Height N/A Permitted Construction Rate N/A Planned area ▪ Total area: 114.1 ha. (Phase I: 100 ha ; Phase II: 14.1 ha ) Factory Available for Rent ▪ Currently, the IZ does not have factory available for rent Operation Status Occupancy Rate and Number of Projects Number of Korean Projects Lease fee Operating fee ▪ In operation ▪ Occupancy rate: 100% ▪ Number of project: N/A None 135 USD/m2 ▪ Management fee: 1 USD/m2/year ▪ Electricity fee: as regulated by the Government ▪ Water fee: ~0.75 USD/m3 INFORMATION OF INFRASTRUCTURE AND FACILITY Financial institution Tax service, State finance office Customs Service Logistics Vietcombank, Agribank near the ID 6.5 km to Soc Son’s State Treasury and Tax Department 10km to Express Delivery Customs Office (Soc Son, Hanoi) Various fast and convenient means: ▪ Road (many national roads across for domestic transportation); ▪ Sea (Haiphong Seaport (via Hai Phong- Hanoi Expressway), Cai Lan Port, Cua Ong Seaport of Quang Ninh (via Hanoi- Ha Long High Express way); ▪ Air: Noi Bai Airport Post office 6.5 km to Soc Son Post Office Medicare 7 km to Soc Son Hospital. There are many national, central hospitals in Hanoi 528 Police, public security 6km to Soc Son Police Station Universities, training facilities, etc. There are many universities, colleges and intermediate vocational training in various fields. Recruitment Worker dormitory Worker's child education facility One-stop service Road Width Hanoi has a redundant source of well-trained labor with many universities, colleges, vocational schools of all sectors. Available dorms for workers and administrative staffs. Available 6.5 km to Soc Son People’s Committee, which provides one-stop service N/A Communication Infrastructure of Industrial Zone Be able to support domestic and international communication via telecommunication, Fax, Internet. Emergency Power generator Available Fire-fighting facility Available Layout Plan Location Map Actual View 529 530 CONG VIEN CONG NGHE THONG TIN INDUSTRIAL PARK GENERAL INFORMATION Address Investors Tan Dan and Minh Tri communes, Soc Son district, Hanoi city HIM LAM JOINT STOCK COMPANY ▪ Address: 234 Ngo Tat To Street, Ward 22, Binh Thanh, Ho Chi Minh City, Vietnam Tel: 02835144348 Geographical features - The East is adjacent to Sai Dong Be Industrial Park - The West is adjacent to Dam Quang Trung Street - The South borders Aeon Long Bien - The North borders on National Highway 5. - 15 minutes from Hanoi city center by car, easy to move to neighboring districts as well as to the northern provinces. Investment sector Technology Minimum wage Lease term [Minimum regional salary according to 38/2022/ND-CP] 50 years Minimum rental area N/A Building height limit N/A Permissible building rate N/A Planned area Total planned area: 36 (ha) Area available for rent: 25.9 (ha) Status Clearing ground Occupancy rate and number of projects in the area Number of Korean projects in the area 37 % Lease fee N,/A Management fee N/A N/A INFRASTRUCTURE Transportation System: The traffic route N1 has a cross section of 18m wide and a total length of 95.95m. The N2 traffic route has a cross section of 25m wide, the total length of the route is 391.55m. Traffic route N3 has a cross section of 17.5m wide, total length of route 302.50m. The traffic route N4 has a cross section of 15m wide, the total length of the route is 84.94m. Traffic route N5 has a cross section of 15m wide, total length of route 137.56(m) Traffic route D1 has a cross section of 25m wide, total length of route 756.54m. Traffic route D2 has a cross section Electricity: National power system (110KV, 220KV...): Underground 22KV power line along industrial road 3, belonging to Sai Dong B Industrial Park. 22/0.4KV transformer station: 6 stations, total capacity: 11100KVA Water: Volume of water (m3/day) from Sai Dong B water supply station to supply water to the area with a flow rate of 3500 m3/day Wastewater treatment: Maximum treatment capacity (m3/day): 3,200 m3/day Factory standard: The centralized wastewater treatment station is built in accordance with the general planning of the Park, with an isolated green space to meet comply with QCVN 01/2008. 531 SACH SOC SON INDUSTRIAL ZONE GENERAL INFORMATION Address Investors Tan Dan and Minh Tri communes, Soc Son district, Hanoi city Geographical features Distance from Noi Bai International Airport: 3.7km Distance from Hanoi city center: 20km Distance from National Highway 5 to Hai Phong: 24.5km Distance from Hai Phong port: 120km, Cai Lan port: 125km Investment sector Information technology, communication, computer software technology, biotechnology, microelectronics technology, precision mechanics, mechatronics, optoelectronics, automation, new materials technology , nanotechnology, environmental technology, clean energy technology. Minimum wage Lease term Minimum rental area Building height limit [Minimum regional salary according to 38/2022/ND-CP] 50 years 01 ha N/A Permissible building rate N/A Planned area ▪ Total area: 302.8ha Status Occupancy rate and number of projects in the area Number of Korean projects in the area Lease cost Clearing Ground 1% DDK Construction Investment Group Joint Stock Company ▪ Address: No. 5, alley 629/15 - Kim Ma Street - Ngoc Khanh Ward - Ba Dinh District - Hanoi City ▪ Tel: 0243.7830464 - 0243.7830465 None Land fee: 260 USD/m2 Fee for using infrastructure: 220 USD - 260 USD/m2/50 years for the manufacturing sector; 250 USD/m2/50 years for logistic projects Management and maintenance fee for industrial park infrastructure: 0.8 USD/m2/year Annual land rent: Applied according to regulations of Hanoi People's Committee Waste water treatment fee: 4,500 VND/m3 Electricity supply price: Applied according to the electricity supply tariff of EVN 532 Water supply price: 8,000 VND/m3 Note: The above prices do not include VAT and are subject to change without prior notice 533 [- This Page is intentionally left blank -] 534 HAU GIANG 535 INVESTMENT ENVIRONMENT IN HAU GIANG USD/VND 23.510 GENERAL INFORMATION Area Population Geographical Location Adjacent provinces 1621 km2 0,729 million people (2022) ▪ Hau Giang is located in Mekong Delta River region. ▪ Belongs to Mekong Delta It borders with Can Tho City, Vinh Long Province on the north, Bac Lieu Province on the south, Soc Trang Province on the east, and Kien Giang Province on the west. 2022 statistic: GRDP Industry growth Import - Export Key Industry PCI Ranking ▪ Real GRDP (billion VND): 48.062 ▪ GRDP growth: 13,94% ▪ GRDP per capita (million VND/year): 65,89 (2,03 billion USD) (2657 USD) ▪ Economic structure: - Industry - Construction: 29,95% - Agriculture. forestry and fishery: 24,06%, - Service: 36,86% ▪ Industry - Construction growth: 6,63% ▪ Agriculture, forestry and fishery growth: -3,00% ▪ Service growth: -2,97% Import turnover (billion USD): 0,35 (Growth rate: -0,02) Export turnover (billion USD): 0,77 (Growth rate: 0,257) Processing, manufacturing, electricity generation and distribution, water supply, waste management and treatment activities, seafood and aquatic product processing, livestock and livestock feed production poultry and aquatic products, manufacturing products from prefabricated metal 68.12 12 SOCIAL INFRASTRUCTURE Transportation Electricity Water ▪ Roadway: The province has 6 national highways with a total length of more than 158 km ▪ Railway: Hau Giang will focus on directing the completion of the project DT926B connecting Can Tho Ca Mau expressway and Soc Trang province, DT925B connecting Vi Thanh city with Can Tho city and connecting to the Can Tho - Ca Mau expressway intersection with Chau Doc - Soc Trang; DT931 to connect with Hong Dan district, Bac Lieu province... to create motivation for local socio-economic development. ▪ Waterway: some main canal routes such as Xa No canal, Quan Lo - Phung Hiep canal, dredging KH9 canal, Lai Hieu canal, 8,000 canal Solar and wind power projects are being approached by investors, the Provincial People's Committee is asking the Ministry of Industry and Trade to submit to the Prime Minister to supplement solar power projects with a total capacity of 900MW and power projects. wind with a total capacity of 350MW in Hau Giang province in the Power Plan VIII in the period of 2021 - 2025. The rate of urban population using clean water 97%, the rate of rural population using clean water 88.95%. This group of targets exceeded the plan. (16) Rate of domestic waste in urban and rural areas is collected and treated 90%, reaching the plan. Education & Training N/A Medicare N/A INVESTMENT CONDITION Human resource of population are in the working age (2022) Education level Trained labor rate: 65,37% (2022) Salary ▪ The minimum salary for the province is applied as follows: 536 - Area I (4,680,000 VND/month): N/A - Area II (4,160,000 VND/month): N/A - Area III (3,640,000 VND/month): Vi Thanh, Nga Bay City and Chau Thanh, Chau Thanh A Districts - Area IV (3,250,000 VND/month): Long My Town, Vi Thuy, Long My, Phung Hiep Districts (Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages paid to employees working under employment contracts) ▪ Incentives according to government regulations: - Exemption and reduction for land and water rent fee Investment incentives - Preferential tax rates and exemption period, reduction for corporate income tax. - Import tax exemption ▪ Prioritized projects: - For Industrial manufacturing: mechanical manufacture, assembly, - For the investment projects in infrastructures in economic zones, rural area; commerce and services: Fields Attracting infrastructures in industrial zones, rural areas, commercial and services centers. Investment - For the environmental fields: Water supply for the industrial zones, rural areas; Solid waste treatment, water waste centralized treatment. Investment attraction No new FDI projects are granted in the year; Accumulated so far, there are 24 FDI projects, with a total registered capital of nearly 607.4 million USD situation Industrial zones 2 industrial zones (Song Hau, Tan Phu Thanh), 8 industrial clusters (CCNs) with a total area of 744 ha. Map Hau Giang Department Of Planning And Investment ▪ Address: No 7, Xo Viet Nghe Tinh Street, Ward 5, Vi Thanh City, Hau Giang Province Contact ▪ Tel: 2933870214 ▪ Email: maunt.skhdt@haugiang.gov.vn ▪ Contact person: - Ms. Nguyen Thi Mau- Deputy Director of Department of Planning and Investment of Hau Giang province LIST OF INDUSTRIAL ZONE 537 No. 1 3 4 Name of industrial zone Song Hau Industrial Park - Phase 1 Central area for operating IT zones Tan Phu Thanh Industrial Park Total area 290,79 ha 12,75 ha 201 ha 538 Occupancy Rate 83% SONG HAU INDUSTRIAL PARK GENERAL INFORMATION Address Investors Dong Phu Commune, Chau Thanh District, Hau Giang Province HIM LAM JOINT STOCK COMPANY ▪ Address: 234 Ngo Tat To Street, Ward 22, Binh Thanh, Ho Chi Minh City, Vietnam Tel: 02835144348 Geographical features - The East is adjacent to Sai Dong Be Industrial Park - The West is adjacent to Dam Quang Trung Street - The South borders Aeon Long Bien - The North borders on National Highway 5. - 15 minutes from Hanoi city center by car, easy to move to neighboring districts as well as to the northern provinces. Investment sector Lease term Agro-fishery processing, production. Machine manufacturing. Production of consumer goods. Producing food, foodstuffs, spare parts for production, daily life,.... [Minimum regional salary according to 38/2022/ND-CP] Since 2009 Minimum rental area N/A Building height limit N/A Permissible building rate N/A Planned area Total planned area: 290.79ha Status In operation Occupancy rate and number of projects in the area Number of Korean projects in the area 83% Lease fee 68 USD/m2 Management fee 0,5USD/m2/year Minimum wage N/A 539 [- This Page is intentionally left blank -] 540 HO CHI MINH 541 INVESTMENT ENVIRONMENT IN HO CHI MINH GENERAL INFORMATION Area, Population ▪ Area: 2,095 km2 ▪ Population: 9,3 million (2022 statistics) Geographical Location ▪ Located in the South region of Vietnam. ▪ Located 1760 km from Hanoi capital Adjacent provinces The city is adjacent to Binh Duong province to the north, with Tay Ninh province to the northwest, with Dong Nai province to the east and northeast, with Ba Ria - Vung Tau province to the southeast, and with Long An and Tien Giang to the west and southwest. GRDP Industry growth PCI 2022 statistics: ▪ GRDP: 1.479.227 billion VND (# 64 billion USD) ▪ GRDP growth: 9,03% ▪ GRDP per capita: 6.770 USD/year ▪ Economic structure: - Industry - Construction: 22,1%; - Agriculture. forestry and fishery: 0,6%; - Service: 64%; - Tax on Goods: 13,3% 2022 statistics: ▪ Industry - Construction growth: 11,95% ▪ Agriculture, forestry and fishery growth: 3,74% ▪ Service growth: 8,37% ▪ Score: 65.86 – ranked 27 out of 63 cities and provinces in Vietnam. (2022) SOCIAL INFRASTRUCTURE Transportation ▪ Roadway: Ho Chi Minh City is 1,760km from Hanoi, 99km from Tay Ninh, 30km from Bien Hoa (Dong Nai), 70km from My Tho, 125km from Vung Tau, 168km from Can Tho, 308km from Dalat, and 375km from Buon Ma Thuot. The City has National Highway 13 which connects Vietnam with the rest of Indochina. ▪ Railway: Thong Nhat express train connects Ho Chi Minh City to Hanoi, through many provinces in Vietnam ▪ Waterway: - Having 110 river & canal routes with the total length of nearly 1,000 km, along with a system of seaports and inland waterways; - Saigon Port as the largest seaport system in Vietnam, having an important strategic position in economic development, acting as an international gateway for foreign trade activities of the whole country ▪ Airway: Tan Son Nhat International Airport, 7km from the city hub to the north, being one of the biggest international airports in Vietnam with the current designed handling capacity of 28 million passengers per year, actual capacity of over 30 million passengers per year & future expansion to 50 million (T3 terminal under construction); operating over 250,000 domestic and international flights yearly with domestic flights to & fro Hanoi, Da Nang City and numerous cities and provinces in all regions across Vietnam as well as international flights to over 30 foreign countries and territories across the world ▪ Other: The ongoing Hochiminh City Metro project – a combination of metro, tramway and monorail with a total length of 225.5km, consisting of 8 urban railway lines with the total length of 169km, 1 tram line of 12.8km and 2 monorail lines of 43.7 km, 175 stations; Line 1 Ben Thanh-Suoi Tien (19.7km long, 14 stations), construction start in 2007 & operation expected in 2024 Electricity Power from the national grid of 500/220/110KV power stations supplies power to Ho Chi Minh City with a capacity of 12,454.2 MW. 542 Water Currently, raw water sources are mainly exploited (up to 94%) from surface water including The Dong Nai river basin and Saigon river basin, and a small part (6%) from groundwater. The total design water supply capacity of current water plants is 2,400,000 m3/day, and the average actual water generation capacity of 2019: is 1,928,000 m3/day. Some of the main parameters of the City's current water supply system are as follows: - Percentage of population with water supply: 100%. - Average consumption of clean water through the city's water supply system: 1.93 million m3/day. - Total design capacity of water plants: 2.40 million m3/day. - Average total capacity of water generation from water plants: 1.53 million m3/day. - Total number of customer connections: 2.14 million. - Total length of clean water transmission and distribution network: 8,200 km. - Rate of loss of clean water loss: 20.85%. Education Ho Chi Minh City has abundant human resources with high technical skills,advanced education system with 75 universities and colleges and 700,000 students Medicare ▪ 128 hospitals and some hundreds of medical examination & treatment facilities INVESTMENT CONDITION Human resource ▪ 8,8% of population (50.557.000 people) are in the working age, about 4.3 million workers (2022) Education level ▪ Trained labor rate: 87,56% (2022) Salary ▪ The minimum salary for the province is applied as follows: - Area I: In Ho Chi Minh City, all districts, Thu Duc city and 4 districts (Nha Be, Binh Chanh, Hoc Mon, Cu Chi) apply the region I minimum wage (minimum wage is 4.68 million VND/month) and 22,500 VND/hour). - Area II: Can Gio district applies the minimum wage in Region II (minimum is 4.16 million VND/month and 20,000 VND/hour). ▪ The lowest wage for trained labor (including those trained by the enterprises) must be at least 7% higher than the above referenced basic salary Investment incentives ▪ Incentives according to government regulations: Corporate Income tax incentives, Exemption of Import Duty and Export Tax, Land rent incentives, Incentives on accelerated depreciation Fields Attracting Investment ▪ Prioritized projects: Prior to attracting the leading technology corporations that are at the top of production chains, have high technology usage, and have strengths in the field of R&D. Prior to investors who are financially strong, have new technologies with high intellectual properties, and are environmentally friendly. Prior to attracting of service industries with high added value and high scientific and technological content; digital economy and application of artificial. Prioritize the information technology industries towards automation, using clean energy, renewable energy 543 Map Contact Department of Planning and Investment ▪ Address: 32 Le Thanh Ton Street, Ben Nghe Ward, Distric 1, Ho Chi Minh City, Viet Nam ▪ Tel: (028).38.293.179 - (028).38.227.495 - (028).38.293.174 ▪ Fax : (84.8) 38295008 – 38290817 ▪ Email: skhdt@tphcm.gov.vn ▪ Website: http://www.dpi.hochiminhcity.gov.vn/ LIST OF INDUSTRIAL ZONES Industrial zone Name Total Area (ha) Occupancy Rate Status Dong Nam Industrial Park 342 ha 95% In operation Hiep Phuoc Industrial Park 597 ha 30% In operation Le Minh Xuan 3 Industrial Park 311 ha 60% In operation Le Minh Xuan Industrial Park 100 ha 100% In operation 544 Tan Phu Trung Industrial Park 542.64 ha 80% In operation Tan Thuan Export Processing Park 300 ha 83% In operation Tay Bac Cu Chi Economic Zone 381,24 ha 98% In operation Vinh Loc Industrial Park 207 ha 94% In operation 545 DONG NAM INDUSTRIAL ZONE GENERAL INFORMATION ADDRESS INVESTOR Provincial Road No.8, Binh My – Hoa Phu Commune, Cu Chi District, Ho Chi Minh City, Vietnam Sai Gon VRG Investmet Corporation CONTACT PERSON Mobile: (+84) 948 859 999 Email: info@saigonvrg.com.vn LOCATION Distance to Ho Chi Minh City Center: 24 km Distance to Thu Dau Mot, Binh Duong: 05 km Distance to Cat Lai Port: 44 km Distance to Cai Mep – Thi Vai deep seaport: 90 km Distance to Tan Son Nhat Airport: 24 km Priority Sectors for Investment Electronics industry, high-tech industry and supporting industries, medical equipment and medicine, food processing, mechanics. Restricted Sectors for Investment Production of iron, steel, construction materials, paper, chemicals, textiles and garment products, v.v INVESTMENT AREA MINIMUM WAGE [Area 1] According to Decree 38/2022/ND-CP dated June 12th, 2022 LEASE TERM Start date: 2008 End date: 2058 MINIMUM LEASE AREA Not available LIMIT FOR CONSTRUCTION HEIGHT In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning Regulation (QCXDVN 01:2008/BXD) PERMITTED CONSTRUCTION RATE PLANNED AREA Total area: 342 ha Total vacant leasable area: 95% occupied FACTORY AVAILABLE FOR RENT OPERATION STATUS OCCUPANCY RATE AND NUMBER OF PROJECTS NUMBER OF KOREAN PROJECTS LEASE FEE Factory for rent: Minimum area for rent: 1,000 m2 Rent contract term: minimum 3 years. Deposit: 3-6 months Land for lease: 2 ha (minimum area) In operation Occupancy rate: 95% 03 For information of land and factory for lease, contact: Mobile: (+84) 948 859 999 (Ms. Janice) Email: info@saigonvrg.com.vn OPERATING FEE (NOT INCLUDING VAT) Management fee: - Land: 0.63 USD/m2/year; - Factory for rent: 0.8 USD/m2/year; Electricity fee: as regulated by the Government 546 Water fee: 0.59 USD/m3/month Wastewater treatment fee: 0.405 USD/m3/month INFRASTRUCTURE AND FACILITY Vietcombank FINANCIAL INSTITUTION TAX SERVICE, STATE FINANCE 15 km to Cu Chi Tax Department OFFICE 27 km to Linh Trung Export Processing Zone Customs Department CUSTOMS SERVICE Not Available LOGISTICS 15 km to Cu Chi Post Office POST OFFICE 20 km to Cu Chi General Hospital MEDICARE 24/7 security service POLICE, PUBLIC SECURITY UNIVERSITIES, TRAINING FACILITIES, ETC. 15 km to Ho Chi Minh City University of Foreign Languages – Information Technology 21 km to Industrial University of Ho Chi Minh City 8 km to Thu Dau Mot University of Binh Duong Province RECRUITMENT Supported by Industrial zone developer WORKER DORMITORY Worker Dormitory project available and demanding from tenants WORKER’S CHILD EDUCATION FACILITY ONE-STOP SERVICE ROAD WIDTH IT & TELE-COMMUNICATION FACILITIES EMERGENCY POWER GENERATOR FIRE-FIGHTING FACILITY Not available Inside the zone Main road: 29 m – 40 m; Branch road: 15 m – 22 m Telecommunication systems are ready to meet the communication needs. Available in the zone The water supply network for firefighting is designed in conjunction with the potable water supply network, which is located along the roads. LAYOUT PLAN 547 LOCATION MAP ACTUAL VIEW 548 LIST OF TENANTS IN DONG NAM IP No. Company name 1 USA Solar panels Austria Pakistan Vietnam Package Medicine Food Flavor Japan Vietnam Package Sanitary equipment Vietnam British Virgin Isl. Taiwan Vietnam Vietnam Vietnam Gas Garment Garment Veterinary medicine Dairy products Electrical equipment Vietnam Vietnam Vietnam South Korea Vietnam Vietnam Candle Package Medicine Rubber spare parts Furniture Furniture 19 20 21 FIRST SOLAR VIETNAM MANUFACTURING COMPANY LTD ALPLA PACKAGING (VIETNAM) COMPANY LIMITED AM VI PHARMACEUTICAL JOINT STOCK COMPANY WESTERN FLAVORS FRAGRANCES PRODUCTION JOINT STOCK COMPANY JAPAN PLUS VIETNAM CO.,LTD NAM DO PRODUCTION TRADING JOINT STOCK COMPANY INDUSTRIAL GAS T.H.T CO., LTD WORLDON (VIET NAM) COMPANY LIMITED SHEICO (VIET NAM) CO., LTD MINH NGAN VETERINARY MEDICINE CO., LTD VIETNAM DAIRY PRODUCTS JOINT STOCK COMPANY TRUONG GIANG ELECTRICAL TRADING PRODUCTION CO., LTD ZHONG SHENG CANDLE COMPANY LIMITED HOANG NAM PRODUCTION COMPANY LIMITED IVC JOINT STOCK COMPANY BANSUK VIETNAM CO.,LTD NHAN HOANG FURNITURE CORPORATION NGOC HOANG GIA MANUFACTURING TRADING CO., LTD SAGOPHAR CO., LTD ANPHACHEM COMPANY LIMITED GCP VIETNAM COMPANY LIMITED Vietnam Vietnam Singapore 22 23 24 25 26 27 28 29 30 31 SHEICO WATERSPORTS (VIETNAM) CO., LTD. TAN HOANG GIA TRADING COMPANY LIMITED MODO LIVING COMPANY LIMITED CJ VINA AGRI CO., LTD. AT&N COMPANY LIMITED HAZEL COSMETIC JOINT STOCK COMPANY BMO INT CO., LTD VINA MOLYMER COMPANY LIMITED GOTIME ECO SCIENCE JOINT STOCK COMPANY GLOBAL SAFEWEAR VIETNAM CO., LTD. Taiwan Vietnam Vietnam South Korea Vietnam Vietnam Korea Japan Vietnam New Zealand Veterinary medicine Food Flavor Construction additives Garment Furniture Furniture Meat processing Cosmetics Cosmetics Machinery Sanitary equipment Cosmetics Safe wear 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Nationality 549 Business line HIEP PHUOC INDUSTRIAL PARK GENERAL INFORMATION Name of industrial park (IP) HIEP PHUOC INDUSTRIAL PARK (Phase 2) Location of IP (city, province and district) Nha Be District Period of operation UP TO SEPTEMBER 23, 2058 Type of IP Total land size of IP (ha) Size of industrial lot/ factory outlet inside the IP) (m2) Total leasable area (ha) Rate of occupancy of IP Nearest ring road light, clean and un-polluted industry, non labor intensive, logistics. 597 ha Total area of Hiep Phuoc Industrial Park Phase 2 is at 597 ha of land with 64 current enterprises 350 Ha 30% Nguyen Van Linh street Distance (km) 13km The nearest national railway Sai Gon station Distance (km) 20 The nearest airport Tan Son Nhat Airport Distance (km) 25km Hiep Phuoc Port: 1km Cat Lai Port : 23 km The nearest port INFRASTRUCTURE Main road system width and number of lanes Internal road system - width and number of lanes Power supply Water supply Sewage treament system INVESTMENT COST Land Road 60m wide Road 25m, 35m wide National grid 45,000 (m3/day) 18,000 597ha Leasing term - year Up to September 23, 2058 Rental price Not available Electricity Price (USD/Kwh) 550 Peak time VND 2,871 Regular time VND 1,555 Peak off time VND 1,007 Price of water supply (USD/m3) Average income per worker (USD/month) VND 10.800/m3 ~ 6.000.000 VND -~ 8.000.000 VND/ tháng INVESTOR INFORMATION Other competitiveness: Focused type of industry/ investment : Name of IP developer ideal location closed to the downtown, convenient for labor recruitment, inside ports, comprehensive infrastructure. light, clean and un-polluted industry, non-labor intensive, logistics. Hiep Phuoc Industrial Park Joint Stock Company. Address: Headquarter: Division B, Road No. 1, Hiep Phuoc Industrial Park, Hiep Phuoc Commune, Nha Be District, HCMC Contact person Mr Tan - Sale & Marketing Deputy Director: (+84) 984865516 email: tan.huong@hiepphuoc.com Sale & Marketing Department: (+84) 964 11 88 33 email: marketing@hiepphuoc.com Location map 551 Layout plan 552 LE MINH XUAN 3 INDUSTRIAL ZONE GENERAL INFORMATION ADDRESS Provincial Road No.10, Le Minh Xuan Commune, Binh Chanh District, Ho Chi Minh City, Vietnam INVESTOR Sai Gon VRG Investmet Corporation CONTACT PERSON Mobile: (+84) 948 859 999 (Ms. Janice) Email: info@saigonvrg.com.vn LOCATION INVESTMENT AREA Priority Sectors for Investment Electronics industry, high-tech industry and supporting industries, medical equipment and medicine, food processing, mechanics. Restricted Sectors for Investment Production of iron, steel, construction materials, paper, chemicals, textiles and garment products, v.v Distance to Outer Ring Road No.3: Directly connected Distance to Ho Chi Minh – Trung Luong Highway: 11 km Distance to Tan Tao Industrial Park: 04 km Distance to Cat Lai Port: 35 km Distance to Cai Mep – Thi Vai deep seaport: 85 km Distance to Tan Son Nhat Airport: 18 km MINIMUM WAGE [Area 1] According to Decree 38/2022/ND-CP dated June 12th, 2022 LEASE TERM Start date: 2014 End date: 2064 MINIMUM LEASE AREA Not available LIMIT FOR CONSTRUCTION HEIGHT In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning Regulation (QCXDVN 01:2008/BXD) PERMITTED CONSTRUCTION RATE PLANNED AREA Total area: 311 ha Total vacant leasable area: not available for lease FACTORY AVAILABLE FOR RENT Factory for rent: Minimum area for rent: 680 m2 Rent contract term: minimum 3 years. Deposit: 3-6 months Land for lease: 1.2 ha (minimum area) OPERATION STATUS In operation OCCUPANCY RATE AND NUMBER OF PROJECTS Occupancy rate: 60% NUMBER OF KOREAN PROJECTS Not available LEASE FEE For further information of land and factory for lease, contact: Mobile: (+84) 948 859 999 (Ms. Janice) Email: info@saigonvrg.com.vn 553 OPERATING FEE (NOT INCLUDING VAT) Management fee: - Land: 0.65 USD/m2/year; - Factory for rent: 0.8 USD/m2/year; Electricity fee: as regulated by the Government Water fee: 0.54 USD/m3/month Wastewater treatment fee: 0.4 USD/m3/month INFRASTRUCTURE AND FACILITY FINANCIAL INSTITUTION Vietcombank, Agribank TAX SERVICE, STATE FINANCE OFFICE CUSTOMS SERVICE 13 km to Binh Chanh Tax Department LOGISTICS Not Available POST OFFICE 06 km to Ba Hom Post Office (Binh Tan, Ho Chi Minh) 15 km to Tan Kien Post Office (Binh Tan, Ho Chi Minh) 12 km to Binh Chanh Post Office (Binh Chanh, Ho Chi Minh) MEDICARE 14 km to Binh Chanh General Hospital 07 km to Quoc Anh General Hospital 09 km to Trieu An General Hospital POLICE, PUBLIC SECURITY UNIVERSITIES, TRAINING FACILITIES, ETC. 24/7 security service 08 km to Ho Chi Minh International College 09 km to South Vietnam Agriculture and Forestry College RECRUITMENT Supported by Industrial zone management board WORKER DORMITORY Not available WORKER’S CHILD EDUCATION FACILITY ONE-STOP SERVICE Not available ROAD WIDTH Zone B: Main road: 18m – 22m; Branch road: 16,5 m Zone A: Main road: 25m – 30m; Branch road: 18 m Telecommunication systems meet the communication needs. IT & TELE-COMMUNICATION FACILITIES EMERGENCY POWER GENERATOR FIRE-FIGHTING FACILITY 34 km to Linh Trung Export Processing Zone Customs Department Not available Available in the zone The water supply network for firefighting is designed in conjunction with the potable water supply network, which is located along the roads. LAYOUT PLAN 554 LOCATION MAP ACTUAL VIEW LIST OF TENANTS IN LE MINH XUAN 3 IP No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 Company name VOLGA VN CORPORATION SIEU THANH MANUFACTURING TRADING INVESTMENT CO., LTD. VI GIA SHOES COMPANY LIMITED BLUE SKY PACKAGING JOINT STOCK COMPANY TAN TIEN SENKO MANUFACTURING COMPANY LIMITED VINH NAM IMPORT EXPORT MANUFACTURING TRADING CO., LTD. CDT PRODUCTION CO., LTD CP PAPER CORPORATION ROEDERS VIETNAM COMPANY LIMITED VIETNAM PAIHO., LTD BEN THANH - HIEU UYEN COMPANY LIMITED ANHNGA MOTOR MANUFACTURING COMPANY LIMITED SONG THANH TEXTILE DYEING COMPANY LIMITED KIEN DANG TEXTILE DYEING COMPANY LIMITED DANG THANH SERVICE TRADING MANUFACTURING CO., LTD. DUC PHU MINH COMPANY LIMITED TAN GIA ANH TEXTILE AND DYEING CO., LTD. THANH PHAT TEXTILE DYEING COMPANY LIMITED TRANG KIEM PRODUCTION TRADING COMPANY LIMITED DUC PHUC TEXTILE DYEING COMPANY LIMITED HOANG LONG TEXTILE DYEING FABRIC YARN CO., LTD THAI BINH DUONG TEXTILE SERVICE TRADING MANUFACTURING CO., LTD. THIEN PHU THINH TRADING MANUFACTURING CO., LTD. VIET PHAT TEXTILE AND DYEING CO., LTD. PHUOC THINH DYEING COMPANY LIMITED DUNG TAM TEXTILE SERVICE TRADING MANUFACTURING CO., LTD. MINH DUC TEXTILE DYEING COMPANY LIMITED ECPVN SAIGON 1 LIMITED LIABILITY COMPANY CHANG YUAN MATERIAL CO., LTD 555 Nationality Vietnam Vietnam Business line Package Plastic equipment Vietnam Vietnam Vietnam Vietnam Shoes Package Machinery Package Vietnam Vietnam Germany Taiwan Vietnam Vietnam Vietnam Vietnam Vietnam Machinery Package Mechanical equipment Garment Machinery Machinery Textile & Dyeing Textile & Dyeing Textile & Dyeing Vietnam Vietnam Vietnam Vietnam Vietnam Vietnam Vietnam Textile & Dyeing Textile & Dyeing Textile & Dyeing Textile & Dyeing Textile & Dyeing Textile & Dyeing Textile & Dyeing Vietnam Vietnam Vietnam Vietnam Textile & Dyeing Textile & Dyeing Textile & Dyeing Textile & Dyeing Vietnam Canada Taiwan Textile & Dyeing Cold storage Molding 30 31 32 33 34 35 36 VINH KIEN THINH MACHINERY - CONSTRUCTION - TRADE SERVICE CO., LTD. KONOHANA VIET NAM PACKAGING PAPER CO., LTD THIEN LONG GLOBAL TRADING AND SERVICE CO., LTD. TAM MINH FOOD COMPANY LIMITED ANAMET VIETNAM COMPANY LIMITED LAM AN PACKAGING SX CO.,LTD SOCIAL BELLA RETAIL VIETNAM COMPANY LIMITED 556 Vietnam Chemicals Japan Vietnam Vietnam Netherland Vietnam Indonesia Package Stationery Food Mechanical equipment Package Cosmetics LE MINH XUAN INDUSTRIAL ZONE GENERAL INFORMATION ADDRESS INVESTOR CONTACT PERSON LOCATION INVESTMENT AREA MINIMUM WAGE LEASE TERM MINIMUM LEASE AREA LIMIT FOR CONSTRUCTION HEIGHT/ PERMITTED CONSTRUCTION RATE PLANNED AREA FACTORY AVAILABLE FOR RENT OPERATION STATUS OCCUPANCY RATE AND NUMBER OF PROJECTS NUMBER OF KOREAN PROJECTS LEASE FEE OPERATING FEE Lot B, Street No. 04, Central Park B, Le Minh Xuan Industrial Zone, Le Minh Xuan ward, Binh Chanh district, Ho Chi Minh city, Vietnam Khang Phuc House Trading Investment Company Limited Address: 550 Kinh Duong Vuong Street, An Lac A ward, Binh Tan district, Ho Chi Minh city, Vietnam. Tel: (84-28) 3875 3021 – 3876 6172 Website: https://www.khangphuchouse.com.vn/ Mr. Trieu - Sales & Marketing Deputy Manager - Mobile: (84) 919490224 - Email: trieu.truong@khangphuchouse.com.vn 18 Km from Ho Chi Minh City Center 18 Km from Tan Son Nhat International Airport 18 Km from Sai Gon Seaport 06 Km from National Highway No. 01A and 06 Km from Provincial Highway No. 10 Priority sectors for investment: Multi – Industry Restricted sectors for investment: Industries that are polluting. [Region 1] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries 1997 – 2047 2.000 m2 In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning regulation (QCXDVN 01: 2008/BXD) Total area: 100 ha Total vacant leasable area: Unavailable Unavailable In operation Occupancy Rate: 100% Number Of Projects: 169 projects 0 project Land and factory lease fee: Unavailable Management fee: 1,400 VND/m2/month (excluded VAT) Electricity fee: According to the Circular by Ministry of Industry and Trade, valid from March 16th, 2015 (excluded VAT) for voltage from 22KV-110KV Water fee: 13,000 VND/m3 (excluded VAT) Wastewater treatment fee: From 9.829 VND and more depending on the level pollution of the waste water (excluded VAT) INFRASTRUCTURE AND FACILITY FINANCIAL INSTITUTION TAX SERVICE, STATE FINANCE OFFICE CUSTOMS SERVICE LOGISTICS POST OFFICE MEDICARE POLICE, PUBLIC SECURITY UNIVERSITIES, TRAINING FACILITIES, ETC. RECRUITMENT WORKER DORMITORY WORKER'S CHILD EDUCATION FACILITY ONE-STOP SERVICE ROAD WIDTH IT&TELECOMUNICATION FFACILITIES EMERGENCY POWER 18 km from Ho Chi Minh Tax Office Inside Le Minh Xuan Industrial Zone Inside Le Minh Xuan Industrial Zone 1 km from Vietnam Post Office Inside Le Minh Xuan Industrial Zone 24/7 security service No planning of universities near Le Minh Xuan Industrial Zone Khang Phuc House Trading Investment Company Limited will support in recruitment Many rental houses and hotels within a radius of 2km 2 Km from the zone Hepza – 35 Nguyen Binh Khiem Street, District 1, HCM City Main roads: road limit: 8 m, 2 lanes By roads: road limit: 5 - 8 m, 2 lanes Inside Le Minh Xuan Industrial Zone 5km from Le Minh Xuan Industrial Zone 557 GENERATOR FIRE- FIGHTING FACILITY LAYOUT PLAN Inside Le Minh Xuan Industrial Zone LOCATION MAP https://goo.gl/maps/kScT5BRBAdbMxGmo8 558 ACTUAL VIEW 559 TAN PHU TRUNG INDUSTRIAL ZONE GENERRAL INFORMATION ADDRESS Northwest Saigon City Development Corporation (SCD) Headquarter: National Highway No.22 (Asian Highway 1), Tram Bom Hamlet, Tan Phu Trung Commune, Cu Chi District, Ho Chi Minh City, VN Tel: (+84.28) 3796 5862 – 37963379 Hotline: (+84) 0934910919 Email: scd@tanphutrung-iz.com Website: www.tanphutrung-iz.com INVESTOR Key shareholders: Kinh Bac City Development Holding Corporation (KBC) under Saigon Invest Group (SGI) Ho Chi Minh City Finance and Investment State-owned company (HFIC) CONTACT PERSON LOCATION Ms. Lan - Sale & Marketing Deputy Director: (+84) 934910919 – (+84) 903370302 lantanphutrung.iz@gmail.com Sale & Marketing Department: (+84.28) 37965862 ttkd.scd.iz@gmail.com Located in the northwest of Ho Chi Minh City, Tan Phu Trung Industrial Zone is on the facade of National Highway No.22, Tan Phu Trung Commune, Cu Chi District. Bordering Tay Ninh Province to the North, Binh Duong Province to the East, Long An Province to the West and Hoc Mon District, Ho Chi Minh City to the South, it belongs to the Northwest City’s urban planning with an area of 6,000 hectares. Details about Tan Phu Trung Industrial Park (IP)’s position (in favor of land transport) Road: 25 km away from Ho Chi Minh City center 55 km away from Moc Bai International Border Gate National Highway No.22: Spanning HCMC center, Tan Binh District, District 12, Hoc Mon District and Cu Chi District (HCMC). This is the route that connects Cu Chi (HCMC) and Moc Bai and Xa Mat international border gates (Tay Ninh province) that border Cambodia. It is one of the roads under the Asian Highway project implemented between HCM City and Cambodia. National Highway No.1A: It is a route running throughout Vietnam which starts from Huu Nghi (Friendship) border gate on the border with China and ends in Nam Can Town, Ca Mau province. Considered as the most important route in Vietnam, Highway No.1A passes through centers of half of the provinces in Vietnam and connects four big cities in Vietnam: Ha Noi, Da Nang, Ho Chi Minh City and Can Tho. Provincial Road No. 8: It connects the key economic triangle area of Long An, Binh Duong provinces and HCMC. Ring Road 3: Starting at Ben Luc - Long Thanh expressway ending at Ho Chi Minh City Trung Luong expressway, will pass through 6 important intersections, including the Ho Chi Minh City - Moc Bai Expressway Interchange belt 3 Cu Chi (HCMC). Ring road 3 intersects National Highway 22 (Hoc Mon) at the route Km 8 + 800 along the route of National Highway 22, parallel to An Ha canal. Ring Road 4: Starting at the intersection with Bien Hoa - Vung Tau Expressway at Km 40 + 000 (Phu My area), towards Long Thanh international airport, intersecting with HCMC Long expressway Thanh - Dau Giay, intersects with National Highway 1A, intersects with National Highway 22 in Cu Chi, crosses Ben Luc town, intersects with Ho Chi Minh City Trung Luong highway, the end point connects to the North-South trunk road in the urban area. Hiep Phuoc port town, HCMC. Ho Chi Minh City-Moc Bai Expressway: the expressway will run side-by-side with National Highway No. 22, starting from an intersection with Ring Road No. 3 and cross the Ring Road 4 in Ho Chi Minh City and ending at the Moc Bai border gate economic zone in Tay Ninh. Ports: 27 km from Saigon Port 35 km from Cat Lai Port 560 30 km away from VICT Port 37 km from Lotus Port Dock load: Saigon Port: * Container depot: 570,000m2 * Wharves: 2,300m * Being able to handle vessels with a maximum load of 50,000 DWT (approximately 50,000 tons) Cat Lai Port: * Container depot: 62,000m2 * Wharves: 296m * Being able to handle vessels with a maximum load of 30,000 DWT (approximately 30,000 tons) VICT Port * Container depot: 99,840m2 * Wharves: 678m * Being able to handle vessels with a maximum load of 40,000 DWT (approximately 40,000 tons) Lotus Port * Container depot: 150,000m2 * Wharves: 300m * Being able to handle vessels of up to 45,000 DWT (equivalent to 45,000 tons) The route from Tan Phu Trung Industrial Zone to Ports: Highway 22 (the Asian Highway) An Suong Flyover Ha Noi Highway or Vo Van Kiet Avenue Cat Lai Port (under Saigon Port) or VICT Port 60 minutes Airports: 60 km away from Long Thanh International Airport (Long Thanh Airport is expected to be a major air transshipment point in Vietnam and the world and is planned to be put into operation in 2023) Capacity: 100 million passengers/year The terminal and cargo capacity is 5 million tons/year 15 km from Tan Son Nhat Domestic & International Airport Capacity: 25 million passengers per year and 400 flights per day The route from Tan Phu Trung Industrial Zone to Tan Son Nhat Airport: Highway 22 (the Asian Highway) An Suong Intersection Truong Chinh Street Hoang Van Thu Street Phan Dinh Giot Street Truong Son Street Tan Son Nhat International Airport 30 minutes INVESTMENT AREA MINIMUM WAGE LEASE TERM MINIMUM LEASE AREA LIMIT FOR CONSTRUCTION HEIGHT PLANNED AREA FACTORY AVAILABLE FOR RENT OPERATION STATUS OCCUPANCY RATE AND NUMBER OF PROJECTS NUMBER OF KOREAN PROJECTS LEASE FEE OPERATING FEE Priority sectors for investment: Multi – Industry Restricted sectors for investment: Industries that are polluting and labor intensive [Region I] According to Decree 38/2022/ND-CP date 12th June 2022 on minimum salaries Start date: 16/12/2004 End date: 16/12/2054 15,000 m2 In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning regulation QCXDVN 01:2008/BXD Total area: 542.64 ha 2,600 m2 In operation Occupancy Rate: 80% Number Of Projects: 112 1 Land lease: The unit price applicable from January 01st, 2015 to December 31, 2019 is 2,310VND/ m2/year (According to the Circular No 3214/TB-CT dated March 25, 2016). Infrastructure lease fee: Please contact sales for details (Hotline: 0934.910.919) Unit price: 12,500 VND/ m2/year Water price: 9,600 VND/m3 561 Wastewater treatment fee: 7,820 VND/m3 Power price: (from 6 KV): according to the price set by the HCMC Power Company, excluding VAT. Normal hours: 1,685 VND/Kwh Off-peak hours: 1,100 VND/Kwh Peak hours: FINACIAL INSTITUTION TAX SERVICE, STATE FINANCE OFFICE CUSTOMS SERVICE LOGISTICS POST OFFICE MEDICARE POLICE, PUBLIC SECURITY UNIVERSITIES, TRAINING FACILITIES, ETC RECRUITMENT WORKER DORMITORY WORKER’S CHILD EDUCATION FACILITY ONE- STOP SERVICE ROAD WIDTH IT&TELECOMUNICAT ION FFACILITIES EMERGENCY POWER GENERATOR FIRE- FIGHTING FACILITY 3,076 VND/Kwh INFRASTRUCTURE AND FACILITY Vietcombank, MB bank, Vietinbank, Agibank 10 km from Tan Phu Trung Zone 25 km from Tan Phu Trung Zone Inside Tan Phu Trung zone 1km from Tan Phu Trung Zone In front of Tan Phu Trung Zone 24/7 security service Universities center planning nearby Tan Phu Trung Zone Support from Near by Tan Phu Trung Zone 1km from Tan Phu Trung Zone Hepza – 35 Nguyen Binh Khiem St, Dist 1, HCM City Roads are synchronously planned under the national standard No. 22 TCVN 276-01 with a load capacity of H.30 Main roads: road limit: 35 - 40m Byroads: road limit: 20 - 25 m Inside Tan Phu Trung Zone 5km from Tan Phu Trung Zone Inside Tan Phu Trung Zone LAYOUT PLAN 562 LOCATION MAP ACTUAL VIEW 563 TAN THUAN EXPORT PROCESSING ZONE GENERAL INFORMATION ADDRESS INVESTOR CONTACT PERSON Tan Thuan Export Processing Zone, Tan Thuan Dong Ward, District 7, Ho Chi Minh City, Viet Nam Tel: 84-28-3770 1777 / 1888 ; 0901 821 669 Mail: marketing@tanthuan.com.vn Web: www.tanthuan.com.vn Key shareholders: Industrial Promotion Company (IPC) Phu My Hung Holdings Group (CT&D) Sale & Marketing Department: 0901 821 669 marketing@tanthuan.com.vn Ideal location closed to the downtown, convenient for labor recruitment, right next to the biggest container port of Vietnam, completed infrastructure, best services, EPZ management experience of foreign experts. Details about Tan Thuan Export Processing Zone (TTZ)’s position (in favor of land transport) Roads: 4 km from Ho Chi Minh City center. 2 km from Phu My Hung New City Center. The nearest national highway (about 0.5 km) - Nguyen Van Linh: has a total length of 17.8 km, connecting from Huynh Tan Phat Street, District 7 to National Highway 1 (the section passing through Binh Chanh), connecting with the highway Ho Chi Minh City Trung Luong; It is considered a significant lifeline for economic development for the southern region of Ho Chi Minh City, connecting with key projects such as Tan Thuan Export Processing Zone, Phu My Hung Urban Area, Hiep Phuoc Power Plant, Hiep Phuoc Industrial Park, Hiep Phuoc Port Urban Area, Hiep Phuoc Port, Phu My Bridge and Thu Thiem New Urban Area. National Highway No.1A: It is a route running throughout Vietnam which starts from Huu Nghi (Friendship) border gate on the border with China and ends in Nam Can Town, Ca Mau province. Considered as the most important route in Vietnam, Highway No.1A passes through centers of half of the provinces in Vietnam and connects four big cities in Vietnam: Ha Noi, Da Nang, Ho Chi Minh City and Can Tho. Ports: 8 km from Cat Lai Port Next to VICT Port LOCATION Dock load: Cat Lai Port: * Container depot: 62,000m2 * Wharves: 296m * Being able to handle 7 container ships at once with a load from 30,000 – 40,000 DWT (over 2.000TEUs). * Loading and unloading capacity: 60 moves/h/vessel VICT Port * Container depot: 99,840m2 * Wharves: 678m * Being able to handle vessels with a maximum load of 25,000 DWT (approximately 25,000 tons). The route from TTZ to Ports: From Huynh Tan Phat St. Vo Chi Cong St. Eastern Ring Road Nguyen Thi Dinh Cat Lai Port (under Saigon Port) (around 30 minutes) or From Huynh Tan Phat St. Ben Nghe St. VICT Port (5-10 minutes). Airports: 48 km away from Long Thanh International Airport (Long Thanh Airport is expected to be a major air transshipment point in Vietnam and the world and is planned to be put into operation in 2023). Capacity: 100 million passengers/year. The terminal and cargo capacity is 5 million tons/year 564 13 km from Tan Son Nhat Domestic & International Airport. Capacity: 25 million passengers per year and 400 flights per day The route from Tan Thuan Export Processing Zone to Tan Son Nhat Airport: Huynh Tan Phat St. Nguyen Tat Thanh St. Ton Duc Thang St. Vo Thi Sau St. Nguyen Van Troi St. Truong Son St. Tan Son Nhat International Airport (30 minutes). National railway – Sai Gon station: 10 km away from the station. INVESTMENT AREA MINIMUM WAGE LEASE TERM MINIMUM LEASE AREA LIMIT FOR CONSTRUCTION HEIGHT PLANNED AREA FACTORY AVAILABLE FOR RENT & OCCUPANCY RATE OPERATION STATUS OCCUPANCY RATE AND NUMBER OF PROJECTS NUMBER OF KOREAN PROJECTS LEASE FEE Priority sectors for investment: light, clean and un-polluted industry, high value added industries, bio-tech industry, trading and services. Restricted sectors for investment: Industries that are polluting and labor intensive [Region I] According to Decree 38/2022/ND-CP date 12th June 2022 on minimum salaries Start date: 23/09/1991 End date: 23/09/2041 1000 m2 for factory leasing 100 m2 for office leasing In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning regulation QCXDVN 01:2008/BXD Total area: 300 ha Area: ~ 30,000 sqm Rate: ~ 10% In operation 250 11 Please contact sales for details (Hotline: 0901 821 669) Management fee: 0.5 USD/m2/month Water price: 12,100VND/m3 Power price: according to the price set by the HCMC Power Company, excluding VAT. OPERATING FEE Normal hours: 2,666 VND/Kwh (4:00~9:30; 11:30~17:00; 20:00~22:00) Off-peak hours: 1,622 VND/Kwh (22:00 ~ 04:00) Peak hours: 4,587 VND/Kwh (9:30 ~ 11:30; 17:00 ~ 20:00) INFRASTRUCTURE AND FACILITY FINANCIAL INSTITUTION TAX SERVICE, STATE FINANCE OFFICE CUSTOMS SERVICE LOGISTICS POST OFFICE MEDICAL FACILITIES POLICE, PUBLIC SECURITY UNIVERSITIES, TRAINING FACILITIES, ETC RECRUITMENT WORKER DORMITORY WORKERS’ CHILD EDUCATION FACILITY Vietcombank Please search District 7 Tax Department Inside Tan Thuan zone Inside Tan Thuan zone Inside Tan Thuan zone Inside Tan Thuan zone 24/7 security service Universities center planning nearby Tan Thuan Zone Support from HEPZA Inside Tan Thuan Zone Inside Tan Thuan Zone 565 ONE- STOP SERVICE ROAD WIDTH IT&TELECOMUNICAT ION FACILITIES EMERGENCY POWER GENERATOR FIRE- FIGHTING FACILITY Hepza – 35 Nguyen Binh Khiem St, Dist 1, HCM City Main roads: 30 m Byroads: 12 – 20 m Inside Tan Thuan Zone Inside Tan Thuan Zone Inside Tan Thuan Zone LAYOUT PLAN 566 LOCATION MAP ACTUAL VIEW 567 TAY BAC CU CHI INDUSTRIAL ZONE GENERAL INFORMATION ADDRESS INVESTOR CONTACT PERSON LOCATION CU CHI COMMERICAL AND INDUSTRIAL DEVELOPING INVESTMENT JOINT STOCK COMPANY (CIDICO) HO: Road D3, Cu Chi Tay Bac Cu Chi Industrial Zone, Tan An Hoi, Cu Chi District, Ho Chi Minh City, VN. Tel: (84.8) 38920587 – 38921737 Fax: (84.8) 38921008 Email: cuchiiz@cidico.com.vn Website: www.cidico.com.vn Key shareholders: Cuchi Commercial and Industrial Developing Investment - Joint Stock Company (Cidico) Ho Chi Minh City Finance and Investment State-Owned Company (HFIC) Planning and Investment Department: Mr. Loi +(84) 0989.048.335 Gmail: doanducloi139@gmail.com Tay Bac Cu Chi Industrial Zone is located on Highway 22 in Ho Chi Minh City, so it is convenient to carry out all procedures quickly. The city's traffic routes have been expanded and built to create favorable conditions for the best transportation of goods to the port, airport and neighboring provinces. Details about Tay Bac Industrial Park (IP)’s position (in favor of land transport) Road: National Highway No.22: Spanning HCMC center, Tan Binh District, District 12, Hoc Mon District and Cu Chi District (HCMC). This is the route that connects Cu Chi (HCMC) and Moc Bai and Xa Mat international border gates (Tay Ninh province) that border Cambodia. It is one of the roads under the Asian Highway project implemented between HCM City and Cambodia. National Highway No.1A: It is a route running throughout Vietnam which starts from Huu Nghi (Friendship) border gate on the border with China and ends in Nam Can Town, Ca Mau province. Considered as the most important route in Vietnam, Highway No.1A passes through centers of half of the provinces in Vietnam and connects four big cities in Vietnam: Ha Noi, Da Nang, Ho Chi Minh City and Can Tho. Provincial Road No. 8: It connects the key economic triangle area of Long An, Binh Duong provinces and HCMC. Ring Road 3: Starting at Ben Luc - Long Thanh expressway ending at Ho Chi Minh City - Trung Luong expressway, will pass through 6 important intersections, including the Ho Chi Minh City - Moc Bai Expressway Interchange belt 3 Cu Chi (HCMC). Ring road 3 intersects National Highway 22 (Hoc Mon) at the route Km 8 + 800 along the route of National Highway 22, parallel to An Ha canal. Ring Road 4: Starting at the intersection with Bien Hoa - Vung Tau Expressway at Km 40 + 000 (Phu My area), towards Long Thanh international airport, intersecting with HCMC - Long expressway Thanh - Dau Giay, intersects with National Highway 1A, intersects with National Highway 22 in Cu Chi, crosses Ben Luc town, intersects with Ho Chi Minh City - Trung Luong highway, the end point connects to the North-South trunk road in the urban area. Hiep Phuoc port town, HCMC. Ho Chi Minh City-Moc Bai Expressway: the expressway will run side-by-side with National Highway No. 22, starting from an intersection with Ring Road No. 3 and cross the Ring Road 4 in Ho Chi Minh City and ending at the Moc Bai border gate economic zone in Tay Ninh. Ports: 35 km from the center of Ho Chi Minh City 40 km from Saigon port, 57 km from Cat Lai port 35 km from Saigon Station 29 km from Tan Son Nhat airport Dock load: Saigon Port: * Container depot: 570,000m2 * Wharves: 2,300m * Being able to handle vessels with a maximum load of 50,000 DWT (approximately 50,000 tons) Cat Lai Port: * Container depot: 62,000m2 568 * Wharves: 296m * Being able to handle vessels with a maximum load of 30,000 DWT (approximately 30,000 tons) VICT Port * Container depot: 99,840m2 * Wharves: 678m * Being able to handle vessels with a maximum load of 40,000 DWT (approximately 40,000 tons) Lotus Port * Container depot: 150,000m2 * Wharves: 300m * Being able to handle vessels of up to 45,000 DWT (equivalent to 45,000 tons) The route from Tay Bac Industrial Zone to Ports: Highway 22 (the Asian Highway) An Suong Flyover Ha Noi Highway or Vo Van Kiet Avenue Cat Lai Port (under Saigon Port) or VICT Port 90 minutes. Airports: 82 km away from Long Thanh International Airport (Long Thanh Airport is expected to be a major air transshipment point in Vietnam and the world and is planned to be put into operation in 2023). Capacity: 100 million passengers/year. The terminal and cargo capacity is 5 million tons/year 29 km from Tan Son Nhat Domestic & International Airport . Capacity: 25 million passengers per year and 400 flights per day The route from Tay Bac Industrial Zone to Tan Son Nhat Airport: Highway 22 (the Asian Highway) An Suong Intersection Truong Chinh Street Hoang Van Thu Street Phan Dinh Giot Street Truong Son Street Tan Son Nhat International Airport 50 minutes INVESTMENT AREA MINIMUM WAGE LEASE TERM LIMIT FOR CONSTRUCTION HEIGHT PERMITTED CONSTRUCTION RATE PLANNED AREA OPERATION STATUS OCCUPANCY RATE AND NUMBER OF PROJECTS NUMBER OF KOREAN PROJECTS LEASE FEE OPERATING FEE Priority sectors for investment: Multi – Industry Restricted sectors for investment: Industries that are polluting and labor intensive [Region I] According to Decree 38/2022/ND-CP date 12th June 2022 on minimum salaries Start date: 30/12/1998 End date: 30/12/2048 In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning regulation QCXDVN 01:2008/BXD Total area: 381,24 ha Step 1- Existing project: 208 ha Step 2- wide grease project: 173,24 ha (not active yet) In operation Occupancy Rate: 98% Number Of Projects: 43 05 Land lease: Infrastructure lease fee: Please contact sales for details (Hotline: (84.8) 38920587) Unit price: 0,5 USD/ m2/year Water price: according to the price set by the water supply service units such as: Saigon Water Corporation (Sawaco), Ho Chi Minh City Irrigation Service Exploit Management Company Limited (Hcm.Imc Co., Ltd) excluding VAT. Wastewater treatment fee: 8.500 VND/m3 Power price: (from 22 KV): according to the price set by the HCMC Power Company, 569 excluding VAT. Normal hours: 1,685 VND/Kwh Off-peak hours: 1,100 VND/Kwh Peak hours: 3,076 VND/Kwh INFRASTRUCTURE AND FACILITY FINACIAL INSTITUTION TAX SERVICE, STATE FINANCE OFFICE CUSTOMS SERVICE LOGISTICS POST OFFICE MEDICARE POLICE, PUBLIC SECURITY UNIVERSITIES, TRAINING FACILITIES, ETC RECRUITMENT WORKER DORMITORY WORKER’S CHILD EDUCATION FACILITY ONE- STOP SERVICE ROAD WIDTH TELECOMMUNICATIO N FACILITIES EMERGENCY POWER GENERATOR FIRE- FIGHTING FACILITY LAYOUT PLAN Vietcombank, ACB Bank, Agibank, BIDV Bank, ... <2 km from Tay Bac Zone < 40 km from Tay Bac Zone Inside Tay Bac zone Inside Tay Bac Zone Such as: VN post, J&T express, Viettel post, DHL,... Beside of Cu Chi Hopital 24/7 security service < 1km from Tay Bac Zone - Sai Gon Polytechnic College Support from Tay Bac Zone Near by Tay Bac Zone < 1km from Tay Bac Zone Hepza – 35 Nguyen Binh Khiem St, Dist 1, HCM City Roads are synchronously planned under the national standard No. 22 TCVN 276-01 with a load capacity of H.30 Main roads: road limit: 35 - 40m Byroads: road limit: 20 - 25 m < 2km from Tay Bac zone < 2km from Tay Bac Zone Inside Tay Bac Zone 570 LOCATION MAP ACTUAL VIEW 571 VINH LOC INDUSTRIAL PARK GENERAL INFORMATION ADDRESS INVESTOR CONTACT PERSON LOCATION INVESTMENT AREA MINIMUM WAGE LEASE TERM MINIMUM LEASE AREA LIMIT FOR CONSTRUCTION HEIGHT/ PERMITTED CONSTRUCTION RATE PLANNED AREA FACTORY AVAILABLE FOR RENT OPERATION STATUS OCCUPANCY RATE AND NUMBER OF PROJECTS NUMBER OF KOREAN PROJECTS LEASE FEE OPERATING FEE FINANCIAL INSTITUTION TAX SERVICE, STATE FINANCE OFFICE POST OFFICE MEDICARE POLICE, PUBLIC SECURITY UNIVERSITIES, TRAINING FACILITIES, ETC. RECRUITMENT WORKER DORMITORY WORKER'S CHILD EDUCATION FACILITY ONE-STOP SERVICE ROAD WIDTH IT&TELECOMUNICATION FFACILITIES EMERGENCY POWER GENERATOR FIRE- FIGHTING FACILITY Lot A59/I, Street No. 07, Vinh Loc industrial Park, Binh Hung Hoa B ward, Binh Tan district, Ho Chi Minh city, Vietnam Vinh Loc Industrial Park Limited Company Address: Lot A59/I, Street No. 07, Vinh Loc industrial Park, Binh Hung Hoa B ward, Binh Tan district, Ho Chi Minh city, Vietnam Tel: (84-28) 3765 0946 Website: https://www.kcnvinhloc.vn/ Ms. Lan Anh - Sales & Service Manager - Mobile: (84) 0902997690 - Email: ntlananh211@yahoo.com 15 Km from Ho Chi Minh City Center 8 Km from Tan Son Nhat International Airport 17 km away from Sai Gon Port Close to the National Highway 1A Priority sectors for investment: Multi – Industry Restricted sectors for investment: Industries that are polluting. [Region 1] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries 1997 – 2053 878 m2 According to Decision 226/QD-SQHKT dated 11/12/2018 of the Department of Planning and Architecture of Ho Chi Minh City Total area: 207 ha Total vacant leasable area: 10.000m2 3.000m2 In operation Occupancy Rate: 94% Number Of Projects: 147 projects 0 project Land and factory lease fee: Unavailable Infrastructure maintenance and reconstruction costs: 0,6 USD/m2/year (excluded VAT) Electricity fee: 4.200VND/khw (excluded VAT) Water fee: 12,100 VND/m3 (excluded VAT) Wastewater treatment fee: From 5.766 VND and more depending on the level pollution of the waste water (excluded VAT) INFRASTRUCTURE AND FACILITY Joint Stock Commercial Bank for Foreign Trade of Vietnam – Saigon North Branch 16 km from Ho Chi Minh Tax Office 1 km from Viettel Post Tan Binh General Clinic 24/7 security service 4,5 km from Ho Chi Minh City University of Food Industry. Ho Chi Minh City Inside Vinh Loc Industrial Park Workers' accommodation Industrial Park Inside Vinh Loc Industrial Park Hepza – 35 Nguyen Binh Khiem Street, District 1, HCM City Main roads: road limit: 8 m, 2 lanes By roads: road limit: 5 - 8 m, 2 lanes Inside Vinh Loc Industrial Park Inside Vinh Loc Industrial Park Inside Vinh Loc Industrial Park 572 LAYOUT PLAN LOCATION MAP 573 ACTUAL VIEW 574 [- This Page is intentionally left blank -] 575 HOA BINH 576 INVESTMENT ENVIRONMENT IN HOA BINH GENERAL INFORMATION Area, Population ▪ Area: 4.596,4 km2 ▪ Population: 875.379 with 30 ethnics (2022 statistic) Geographical Location ▪ Hoa Binh province is located at the gateway to the Northwest region of Vietnam. It is about 74 km far from the center of Hanoi Capital in the direction of National Highway 6 and is a counterbalance area to the West of Hanoi Capital. Adjacent provinces ▪ Adjacent Hanoi Capital to the East, borders Phu Tho province to the North, borders Son La province and Thanh Hoa province to the West and borders Ha Nam province and Ninh Binh province to the Southeast.. GRDP Industry growth PCI 2022 statistic: ▪ GRDP: 32,680 billion VND (1,39 billion USD) ▪ GRDP growth: 9.03% ▪ GRDP per capita: 2.799,83 USD/year ▪ Economic structure: - Industry - Construction: 38, 97%; - Agriculture, forestry and fishery: 22,71%; - Service: 33,18%; - Tax on Goods: 5,14% 2022 statistic: ▪ Industry - Construction growth: 11,44% ▪ Agriculture, forestry and fishery growth: 4,57% ▪ Service growth: 11,08% ▪ Score: 62,81 – ranked 53 out of 63 cities and provinces in Vietnam. (2022) SOCIAL INFRASTRUCTURE Transportation ▪ Roadway: There are important national highways running through the area such as: Ho Chi Minh Road, National Highway 6, National Highwayh 12B, National Highway 21, especially Hoa Lac – Hoa Binh city road has been invested and operated which shortens the traveling time from Hoa Binh city to Hanoi Capital’s center from 120 minutes to less than 60 minutes on average. In addition, the route from Hoa Binh City to Moc Chau district (Son La province) is currently approved by the Prime Minister, when completed, it will reduce the traveling time from Hanoi Capital to Son La province by about 2-3 hours. ▪ Railway: None. ▪ Waterway: None. ▪ Airway: None. Electricity ▪ Supplied from the national power network Water ▪ Supplied by Hoa Binh Clear Water JSC Education Medicare ▪ 05 colleges, 03 technical schools, 10 district-level centers of vocational education and training, 02 vocational education centers and 02 other institutions participating in vocational training at elementary level. Among those, there are 16 public establishments, 06 private establishments in which 03 establishments are managed by the central government and 19 others are managed by the local authority. ▪ 02 provincial hospitals; 9 district hospitals INVESTMENT CONDITION 577 Human resource ▪ 68,5% of population are in the working age (2022) Education level ▪ Trained labor rate: 26,2% (2022) Salary ▪ The minimum salary for the province is applied as follows: - Area III: including: Hoa Binh city, Luong Son, Tan Lac, Kim Boi, Mai Chau, Cao Phong, Yen Thuy, Lac Thuy, Lac Son, Da Bac district. ▪ The lowest wage for trained labor (including those trained by the enterprises) must be at least 7% higher than the above referenced basic salary ▪ Incentives according to government regulations: The project is entitled to incentives in accordance with the Investment Law of Vietnam and other relevant regulations, including: (1) Corporate income tax incentives; Investment incentives (2) Exemption from import tax on goods imported to create fixed assets; raw materials, supplies and components imported for production in accordance with the law on import and export tax; (3) Exemption or reduction of land use levy, land rent, and land use tax; (4) Rapid depreciation, increasing the amount of expenses deductible when calculating taxable income. And other available incentives are regulated by Vietnam Government. Fields Attracting Investment ▪ Prioritized projects: - High technology, industrial electronics, mechanical engineering products; - Supporting industry; - Development of trade, service and tourism; - Construction and development of infrastructure and key projects. Map Contact Hoa Binh Department of Planning and Investment ▪ Address: No 672 Tran Hung Dao, Hoa Binh city ▪ Tel: (84-218) 3 852 111 ▪ Fax: (84-218) 3 853 152 ▪ Email: sokehoach@hoabinh.gov.vn LIST OF INDUSTRIAL PARKS 578 NO. INDUSTRIAL ZONE NAME OCCUPANCY RATE Fully occupied STATUS Luong Son Industrial Park TOTAL AREA (HA) 83.08 1 2 Da River Left-bank Industrial Park 68.37 89.78 Active, the cleared land area left is for auction 3 Yen Quang Industrial Park 200.11 0 Under construction, with available land for rent 4 Binh Phu Industrial Park 214.29 31 In Land clearance process 5 Nhuan Trach Industrial Park 213.68 0 In Land clearance process 6 Lac Thinh Industrial Park 220 0 Currently applying for Investment Policy Decision 7 South Luong Son Industrial Park 204.2 55.69 Currently unavailable 8 Thanh Ha Industrial Park (for DDI projects only) 282.14 0.54 Currently unavailable 579 Active LUONG SON INDUSTRIAL PARK GENERAL INFORMATION Address Hoa Son commune, Luong Son district, Hoa Binh province, next to Ha Noi Investor An Thinh Hoa Binh Real Estate JSC - Address: Luong Son Industrial Park, Km 36 Highway 6, Hoa Son commune, Luong Son district, Hoa Binh province - Tel: 0218 38 23488 - Email: luongsonpark@yahoo.com Contact person Location Investment sectors Mr. Nguyen Tue Vinh - Position: Chief Executive Officer - Tel: 0932.262.789 - Email: luongsonpark@yahoo.com 36 km from Ha Noi center 65 km from Noi Bai International Airport 120 km from Hai Phong deep-water port 22 km from Hoa Lac-Hoa Binh highway - Priority Sectors: Electronic components, garment - Restricted Sectors: Dyeing; billet, aluminum cast iron… production Mininum Wage According to Decree 38/2022/NĐ-CP 4.160.000 VND/month Lease term - Start date: 02/02/2007 - End date: 02/02/2057 Minimum Lease Area 1.600 m2 Limit for Construction Height - Factory construction area: 2 to 3 floors - Operating area: 3 to 5 floors Permitted Construction Rate Planned area Factory available for Rent Operation Status - Factory construction area: 60% - Operating area: 35% - 60% - Total area: 83,082 ha - Total vacant leasable area: 60,46 ha - Total area with full infrastructure ready to build factory: 60,46 ha - Total area: About 3,09ha with 70% already occupied Well-established Occupancy rate and number of projects fully occupied 44 projects Number of Korean projects 9 Lease fee Operating fee - Land lease fee: 60 USD/m2 - 85 USD/m2 - Management fee: 0,3 USD/m2 (7.000VND/m2) - Electricity fee: as regulated by EVN - Water fee: 9.298 VND/m3 - Wastewater treament fee: 9.000 VND/m3 580 LIST OF SOME NOTABLE TENANTS No. Company name Countries Business fields 1 Garment Export manufacturing factory Korea Manufacturing garment for export 2 Investment in building factory of manufacturing and processing incenses, bamboo, joss powder and related products to export at Luong Son industrial park India Processing incenses, bamboo, joss powder 3 Dongah Elecom Co.,LTD establishment project Korea Manufacturing and assembling battery power equipment 4 Almine Viet Nam Co.,LTD establishment project Japan Aluminum alloy product manufacturing and processing 5 Construction of Tessellation Viet Nam - Hoa Binh exporting garment products factory Korea - Finishing of textile products Details: Finishing (printing, washing, embroidering,…) garment; Finishing of textile products; - Remaining other business support activities Details: Import and export of raw materials, equipment and finished products for garment processing. Exercising the right to import and export goods. - Manufacturing ready-made textiles - Manufacturing carpets, blankets and cushions. - Manufacturing knitted and crocheted garments. - Manufacturing other textiles etc. Details: Producing garment products and garment accessories 6 Manufacture personal working uniform factory Japan Manufacturing personal working uniform 7 Project of establishment Transon Vietnam Co.,Ltd Korea 8 Nissin Manufacturing Viet Nam Japan 9 Doosung Tech Viet Nam Factory Korea Production of electronic components: Producing, processing, assembling transformers, resistance rolls and other electronic components, manufacturing, processing, assembling PCB circuit board Manufacturing parts and accessories for automobiles and other motor vehicles Manufacturing and assembling Mobile Phone Components 10 Investment project to produce Led, camera for mobile phones, finger print recognition module and CCTV camera Coasia CM Vina Korea 11 Tongwei Hoa Binh animal feed factory Taiwan 12 The project of manufacturing connector equipment associated with the establishment of CN PLUS VINA Co., Ltd Korea Manufacturing precision connectors for high-definition displays, network equipment and solar power converters 13 The project of manufacturing electronic components Korea Manufacturing electronic components 14 Cap Global Manufacturing Company Korea Manufacture parts and accessories for motor vehicles and other motor vehicles 581 - Manufacturing electronic components Production of cameras for mobile phones (Camera module), LED, fingerprint identification module. Production of components and accessories to produce camera modules; Production of observation cameras; - Repair electronic and optical equipment Details: Repair Camera of mobile phones (camera module) Animal and poultry feed production Detail: Manufacturing, processing, assembling wipers for automobile 15 Melamine paper and furniture factory 16 Viet Nam Etch Home Technology China Taiwan 582 Manufacturing melamine paper - Manufacture of electronic components such as: Conductive frame, ultra-thin thermocouple module, rotary encoder, ultra-thin VCM voice coil drive; - Manufacture of other metal products ; - Manufacture of peripherals. DA RIVER LEFT-BANK INDUSTRIAL PARK GENERAL INFORMATION Address Huu Nghi ward, Hoa Binh city Investor Da Hop Trade JSC - Address: 1st floor, DH12 social housing building, Le Thanh Tong street, group 5, Tan Thinh ward, Hoa Binh city, Hoa Binh province - Tel: 02183 854 926 - Email: dahop@dahop.vn - Website: www.dahop.vn Contact person Location Investment sectors - Name: Vu Thi Hop - Position: Chairman of Directors, General Director - Tel: 036 6477777 - Email: dahop@dahop.vn Adjencent location 64km from Hanoi Capital city, in the center of Hoa Binh city 93 km from Noi Bai Aiprort 150 km from Hai Phong Port 22 km from Hoa Lac-Hoa Binh highway - Priority Sectors: high-tech, low pollution, large-capital industries - Investment: Electronic components, garment, food processing, pharmacy, medical - Restricted Sector: High risk of pollution Mininum Wage According to Decree 38/2022/NĐ-CP 4.160.000 VND/month Lease term - Start date: 30/6/2014 - End date: 30/6/2064 Minimum Lease Area 0,5 ha Limit for Construction Height - Factory construction area: not exceeding 3 floors - Operating area: 1 to 2 floors Permitted Construction Rate - Factory construction area: not exceeding 55% - Operating area: not exceed 60% Planned area Factory available for Rent Operation Status - Total area: 68,37 ha - Total vacant leasable area: 66,39 ha (6ha for auction) - Total area: Approximately 50% Infrastructure completed (110KV substation next to IP; clean water treatment plant, wastewater treatment plant and social housing) Occupancy rate and number of projects 89,78% 32 projects Number of Korean projects 2 Lease fee Operating fee - Land lease fee: 65-100 USD/m2 (based on the land lot) - Management fee: 0.3 USD/m2/year - Electricity fee: As regulated by EVN - Water fee: 10,950 VND/m3 - Wastewater treament fee: 0,3 USD/m3 583 LIST OF SOME NOTABLE TENANTS No 1 Project Trading, Export and Import of Materials; Manufacture of temperature measurement components, including Finished Thermistor and Lead Wire; Manufacture of Machinery Instrument and Tools. Assembly of Machinery Instrument and Tools. Countries Japan Business Fields Manufacture of temperature measurement components. Manufacture of Machinery Instrument and Tools. Assembly of Machinery Instrument and Tools. Products for export and domestic consumption. Trading, Export and Import of Materials for Thermistor and Wire Sensors. 2 High-quality Optical lens factory Japan Manufacturing high quality lenses 3 4 Garment Export manufacturing factory Manufacturing of electronic circuits Korea Japan Manufacturing garment for export - Manufacturing of electronic circuits used for creating equipment: Peripheral equipment, computers, electronic appliances, audiovisual equipment, solar cells; microprocessors; controllers (programmable logic controllers PLC , CNC, ... (Prioritized supporting products, hitech industry); - Collection, treatment of wastewater, exhaust, solid wastes; recycling or wastes; - Leasing unused factory premises. 5 Hoa Binh Koyuseni Knitting Factory Korea 6 Long Binh Electronics Co., LTD Korea 7 Bandai Viet Nam Co.,LTD Japan - Manufacture of knitted and crocheted garments; - Finishing of textile products; - Yarn making; - Production of woven fabrics; - Manufacturing other textiles. - Wholesale of other machinery, equipment and spare parts; - Wholesale of fabrics, ready-made goods, shoes. Manufacturing and processing electromagnetic interference filters, Emi filters and auxiliary accessories Processing and assembling electrical and electronic conductor for export 584 BINH PHU INDUSTRIAL PARK GENERAL INFORMATION Address No CC01 Binh Phu Industrial Park, Mong Hoa commune, Hoa Binh city, Hoa Binh province Name of investor: Binh Phu Invest - Address: No CC01 Binh Phu Industrial Park, Mong Hoa commune, Hoa Binh city, Hoa Binh province Investor - Tel: 091 918 1818 - Email: hoaphu.hb@phumygroup.com.vn - Website: binhphuip.com - Name: Chu Duc Phuong Contact person - Position: General Manager - Tel: 091 918 1818 - Email: hoaphu.hb@phumygroup.com.vn Adjencent location Location 18km from Hoa Binh City; 55km from Ha Noi city 80km from Noi Bai airport 160km from Hai Phong port 13 km from Hoa Lac - Hoa Binh highway - Priority Sectors: Enviromentally friendly projects Investment sectors - Restricted Sectors (Lĩnh vực hạn chế đầu tư) Mininum Wage Lease term Minimum Lease Area 4.160.000 VND/ month 50 years Not applicable - Khu xây dựng nhà máy: 5 (projected) Limit for Construction Height - Khu điều hành: 5 (projected) - Khu xây dựng nhà máy: 70% Permitted Construction Rate - Khu điều hành: 40% - Total area: 214,29 ha Planned area Operation Status Occupancy rate and number of projects - Total vacant leasable area: 80 ha (projected) In Land clearance process 50% 585 LIST OF FDI PROJECTS No Project Countries Business Fields 1 Forestry manufacturing factory China Manufacture of plywood, veneers and thin boards NHUAN TRACH INDUSTRIAL PARK GENERAL INFORMATION Address Nhuan Trach and Cu Yen communes, Luong Son district, Hoa Binh province Name of investor: Hoa Phu - Hoa Binh Co.,LTD - Address: Nhuan Trach Industrial park, Luong Son Town, Luong Son district, Hoa Binh province Investor - Tel: 091 918 1818 - Email: hoaphu.hb@phumygroup.com.vn - Website: Nhuantrachip.com - Name: Chu Duc Phuong - Position: General Manager Contact person - Tel: 091 918 1818 - Email: hoaphu.hb@phumygroup.com.vn Adjencent location 35km from Hoa Binh City; 40km from Ha Noi centre Location 60km from Noi Bai airport 150km from Hai Phong port 20km from Hoa Lac-Hoa Binh expressway - Priority Sectors: Enviromentally friendly projects Investment sectors - Restricted Sectors: sectors with high risk of pollution Mininum Wage Minimum Lease Area 4.160.000 VND/month 2010 (m2) - Khu xây dựng nhà máy: 5 Limit for Construction Height - Khu điều hành: 5 - Khu xây dựng nhà máy: 70% Permitted Construction Rate - Khu điều hành: 40% - Total area: 213,68% Planned area - Total vacant leasable area: 149 ha 586 - Total area with full infrastructure ready to build factory: 0% Factory available for Rent Operation Status Occupancy rate and number of projects Lease fee - Total area (tổng diện tích nhà xưởng có thể cho thuê): In Land Clearance Process 0% 50-60 USD/m2 not include VAT Layout map 587 LAC THINH INDUSTRIAL PARK GENERAL INFORMATION Address Lac Thinh Commune, Hang Tram town, Yen Thuy district Investor Name of investor: GREENTEX VINA Contact Tel: 02183 897052 Adjencent location To Hanoi City: 90km, To Hoa Binh city: 70km Location To Noi Bai International airport: 90km; To Cat Bi - Hai Phong: 190km Hai Phong port: 190km Investment sectors Mininum Wage Minimum Lease Area Lease term Manufactures electrical and electronic equipment, information technology, technology incubator. High-tech industry, software technology, electricity, electronics 3.250.000 VND/month 1ha 50 years - Total area: 220ha Planned area - Total area with full infrastructure ready to build factory: 60% Operation Status Occupancy rate and number of projects Lease fee Operating fee Completed land clearance of 113 ha N/A - Land lease fee: 15-35 USD - Factory lease fee: $3 - Management fee: 0,3 USD/m2 - Electricity fee: 0.05 USD - Water fee: 0.4 USD/m3 - Wastewater treament fee: 0.22 USD/m3 Layout map 588 YEN QUANG INDUSTRIA1:E41AL PARK GENERAL INFORMATION Address Yen Quang Village, Ky Son District, Hoa Binh Province Name of investor: An Viet Hoa Binh JSC. - Address: Yen Quang Industrial Park, Quang Tien District, Hoa Binh city, Hoa Binh Province Investor - Tel: 088 988 6068 - Email: info@amberasset.vn - Website: https://yenquangip.com.vn/ - Name: Tran Phuong Lan - Position: Head of Sales & Marketing Department Contact person - Tel: 090 428 1006 - Email: Adjencent location [Các môi trường xung quanh] 43 km from Hanoi City 66 km from Noi Bai International Airport Location 30 km from Son Tay Port (Hanoi) 174 km from Hai Phong deep-water port 200 km from Cai Lan deep-water port (Quang Ninh) 50 km from Hanoi Station Investment sectors - Priority Sectors : Food production & processing; Garment & Leather Footwear; Manufacture of drugs, pharmaceutical chemicals and medicinal herbs; Other processing and manufacturing industries; Telecommunication; Producing products from wood, bamboo, products from straws and plaiting materials; Manufacture of metals and other non-metalic mineral products; Manufacture of automobiles and motor vehicles, means of transport; Production and distributio of steam, hot water, air conditioning and ice production - Restricted Sectors: Environmental polluted industries Mininum Wage 4.160.000 VND - Start date: 2015 Lease term - End date: 2065 Minimum Lease Area Limit for Construction Height Permitted Construction Rate 1 ha - Khu xây dựng nhà máy: 5 floors - Khu điều hành: - Khu xây dựng nhà máy: 70% - Khu điều hành: - Total area: 200.11 ha Planned area - Total vacant leasable area: 130.9 ha 589 Operation Status Occupancy rate and number of projects Infrastructure under construction and to be completed by the first quarter of 2024 3 projects (occupancy rate: 5%) Number of Korean projects Lease fee - Land lease fee: 90-95 USD - Management fee: 0,3 USD/m2/year - Electricity fee: As regulated by EVN Peak hours: 2,759 VND/kW (voltage level 110 kV or more) Normal hours: 970 VND/kW (with voltage level 110 kV or more) Off-peak hours: 1,536 VND/kW (with voltage level 110 KV or more) Operating fee - Water fee: 9.298 VND/m3 for Manufacturing enterprises; 12.387 VND/m3 for services activities - Wastewater treament fee: 9.000 VND/m3/month - Waste treament fee: According to the prescribed price of the unit responsible for handling domestic and hazardous waste 590 [- This Page is intentionally left blank -] 591 HUNG YEN 592 INVESTMENT ENVIRONMENT IN HUNG YEN GENERAL INFORMATION Area, Population Geographical Location Adjacent provinces GRDP Industry growth ▪ Area: 930,2 km2 ▪ Population: 1.284 million (2022 statistic) ▪ Hung Yen province is located in the Red River Delta, in the Northern Key Economic Zone. The Northwest borders with Hanoi city. The East borders with Hai Duong province. The South borders with Thai Binh province. The Southwest borders with Ha Nam province. 2022 statistic: ▪ Real GRDP: 5.570 billion USD ▪ GRDP growth: 13,41%. ▪ GRDP per capita: 4771 USD/year ▪ Economic structure: - Industry - Construction: 63,91%; - Agriculture. forestry and fishery: 7,49%; - Service: 28,60 %; - Tax on Goods: 6,28% 2022 statistic: ▪ Industry - Construction growth: 12,71 % ▪ Agriculture, forestry and fishery growth: 2,48% ▪ Service growth: 21,91% Import turnover (billion USD): Import - Export Export turnover (billion USD): 0.63 billion USD PCI ▪ Score: 67.91– ranked 14 out of 63 cities and provinces in Vietnam. (2021) SOCIAL INFRASTRUCTURE Transportation ▪ Roadway: Hanoi - Hai Phong Expressway (3 km/5 minute drive); Huu Nghi Border Gate (200 km/3h45 minute drive). The province adjacent National Highway 5, adjacent to road 39A, 73km from Hai Phong port, 90km from Cai Lan port... ▪ Railway: Hanoi - Hai Phong railway, connecting the provinces including Hanoi, Hung Yen, Hai Duong, Hai Phong and the northern and southern border provinces, to international border gates. ▪ Waterway: The inland waterway transport route on the Red River and Luoc River is capable of connecting the Northwest provinces to international seaports in Hai Phong and Quang Ninh ▪ Airway: Easy access to Noi Bai international airport by highway with a time of about 45 minutes. Electricity Hung Yen has Waste-to-energy plant, electromechanical power plants Water ▪ The total reserve of underground water (groundwater) that can be exploited in the province is currently over 1.1 million m3/day, of which over 81% of the groundwater reserve is located in the deep aquifer (the aquifer) pleistocene water). Education ▪ Hung Yen has over 400 schools meeting national standards Medicare ▪ About 16 hospitals 593 INVESTMENT CONDITION Human resource ▪ 46,3% of population are in the working age (2022) Education level ▪ Trained labor rate: 65% (2022) Salary ▪ The minimum salary for the province is applied as follows: - Area I, II, III, IV: ▪ The lowest wage for trained labor (including those trained by the enterprises) must be at least 7% higher than the above referenced basic salary Investment incentives ▪ Tax incentives, subsidies, low rent. Fields Attracting Investment ▪ Producing components, electrical and electronic products; Energy; Garment ▪ Prioritizing in industries with high added value, high science and technology content, environmentally friendly, energy, logistics, production and business projects that can participate in the global value chain, especially electronics industry, telecommunications industry, mechanical industry Investment Attraction Situation ▪ 516 projects with total investment capital of 6.313.000.000 USD Map Contact Department of Planning and Investment Address: 8 Chua Chuong Street, Hung Yen City, Hung Yen Province Tel: +84 (221).3.863.456 Email: sokhdt@hungyen.gov.vn Website: https://sokhdt.hungyen.gov.vn/ 594 LIST OF INDUSTRIAL ZONES IN HUNG YEN PROVINCE NO INDUSTRIAL ZONE NAME TOTAL AREA (HA) 688.94 525.7 198 150 280 313.5 143.08 159.71 192.64 100 1 2 3 4 5 6 7 8 9 10 Pho Noi A Industrial Zone Thang Long II Industrial Zone Minh Duc Industrial Zone Minh Quang Industrial Zone Yen My Industrial Zone Yen My II Industrial Zone Clean Industrial Zone No.3 Industrial Zone No.5 Industrial Zone Kim Dong Industrial Zone 11 12 13 Tan Dan Industrial Zone Ly Thuong Kiet – VIDIFI Industrial Zone No. 4 Industrial Zone 14 No. 6 Industrial Zone 308.2 15 No. 7 Industrial Zone 198.56 200 300 390 OCCUPANCY RATE (%) 84% 64.6% 34.2% 40.4% 53% 28.1% 13% 0% 0% STATUS In operation In operation In operation In operation In operation In operation In operation In operation In operation Expand in the period 2021-2030 by 100 ha Under construction Under construction New planned industrial parks by 2030 New planned industrial parks by 2030 New planned industrial parks by 2030 595 LOCATION MAP OF INDUSTRIAL ZONES 596 PHO NOI A INDUSTRIAL PARK GENERAL INFORMATION Address Located in Yen My district, Van Lam district and My Hao town, Hung Yen province Hoa Phat Hung Yen Industrial Park Infrastructure Development Company Limited. - Address: 39 Nguyen Dinh Chieu, Le Dai Hanh Ward, Hai Ba Trung District, Hanoi City. Industrial investor - Tel: 024.39763889 - Fax: 024.39763890 - Contact person: Mr. Cuong- 0918.507.886 Km19, National Highway 5, Hung Yen: Geographical location - 24 km from Hanoi center, 43 km from Noi Bai airport, 101 km from Dinh Vu port (Hai Phong), 130 km from Quang Ninh deep sea port. ▪ Manufacturing and assembling components and equipment of electricity, electronics, refrigeration, optics, telecommunications, products from new technologies and high techniques; ▪ Mechanical engineering; manufacturing and assembling automobiles, motorcycles, medical devices, and other machinery and motor equipment; production of products from prefabricated metal, jewelry; production of corrugated iron, aluminum, steel; ▪ Food production and processing (excluding production of tapioca, vermicelli, MSG, sugar from sugarcane; aquatic and seafood processing; slaughter of cattle and poultry), beverages; Fields of investment attraction ▪ Production of products from paper, wood (excluding wood processing, wood chips from natural wood), plastic (excluding recycling of plastic scrap), rubber, plastics, leather; ▪ Production of pharmaceuticals, cosmetics, packaging, labels; production of building materials (excluding cement, clinker, brick, tile), composite materials, artificial flooring, flexible, superdurable, ultra-light materials; production of industrial gases; ▪ Logistics services, factories for rent. The reception of investment projects in industrial parks must ensure compliance with the investment attraction orientation of Hung Yen province from time to time. Minimum regional wage Area II, minimum wage 4,160,000 VND (USD 177.22) Minimum rental area According to the agreement with the Industrial Park Infrastructure Investor. Limit for Construction Height According to the planning approved by the competent authority. Permitted Construction Rate According to the planning approved by the competent authority. ▪ Scale: 688.94 ha. In which, the area of industrial land for lease is 492.1 ha. ▪ Area of industrial land leased: 412 ha, occupancy rate reached 84%. Planning Area ▪ The remaining industrial land area not leased: About 80 ha. 597 Operation Status Active The industrial park has received 211 investment projects (92 FDI projects and 119 DDI projects), Number of Projects with a total registered investment capital of about 1,169 million USD and 23,387 billion VND. In which, there are 30 projects of Korean investors with registered investment capital of about 468 million USD. ▪ Land sublease price associated with industrial park infrastructure: 125 - 140 USD/m2 ▪ Management cost: USD 0.7/m2/year Lease fee & Operating fee ▪ Electricity costs: According to the general regulations of the Government ▪ Water cost: 13,500 VND/m3 ▪ Wastewater treatment fee: 12,000 VND/m3 INFRASTRUCTURE ▪ Construction site: The land plots have been processed, ready for the construction of the Factory. ▪ Power supply: Power is supplied continuously and stably through 3 110/22KV substations. ▪ Water supply: Industrial park water plant was built with a capacity of 15,000 m3/day. ▪ Waste water and waste treatment: The wastewater treatment plant was built with a total capacity of 6,000 m3/day. Infrastructure ▪ Telephone & Internet: The telecommunications system meets international standards and is always available to meet the needs of communication, high-speed data transmission and domestic and international postal services. The underground fiber optic cable system is directly connected to the fence of each enterprise. ▪ Internal traffic: The system of internal roads is built with a reasonable cross-section, ensuring easy and convenient means of transportation to each factory. Lighting systems are installed along the roads. ▪ Fire prevention: Water supply system with fire hydrants is arranged along the roads of the Industrial Park. ▪ Customs: Hung Yen Customs is currently headquartered about 4 km from the Industrial Park. All sealing and lead clamping procedures are carried out right at the factories in the Industrial Park. Social infrastructure and services ▪ Banking: The system of banks (Vietcombank, Techcombank, ACB, Sacombank, Agribank, Bank for Investment and Development of Vietnam...) has a branch in Pho Noi, 1-2 km from the Industrial Park. . Currently, some banks have set up ATM stations in the Industrial Park, quickly serving all requirements of businesses and employees in the Industrial Park. ▪ Housing for workers: The area near the industrial park has been planned to invest in the construction and development of urban areas and housing areas, ensuring housing needs for 598 industrial park workers. ▪ Hospital: Pho Noi General Hospital (2km away from the Industrial Park) is modernly planned and built to meet the needs of treatment and medical examination and treatment for workers in the Industrial Park. Location/ Map LIST OF TENANTS No Name of Projects Nation Business line 1 Factory producing stainless steel cutlery and fork KOREA 2 KIDO Garment Factory KOREA 3 ALPEC Elevator FACTORY Japan Producing stainless steel knives, spoons, forks and tableware; production of core products, metal polishing wax; and build factories for rent Producing fabric pants and shirts; pants, swimwear; pants, leather jacket; Manufacturing sports shoes and sandals; Producing all kinds of labels for products of pants, shirts, shoes and sandals. Manufacturing and assembling elevators; escalators and hydraulic ladders; Manufacture of electrical panels, medium and low voltage electrical 599 4 Factory for the production of workwear and protective clothing KOREA 5 Factory manufacturing and assembling toys and electrical and electronic mechanical products KOREA 6 Factory manufacturing bearings, mechanical products Japan 7 Factory for processing livestock, poultry and aquatic food Animal and poultry feed processing factory PALFINGER MARINE VIETNAM FACTORY - DAVIT KOREA 8 9 10 KOREA NETHERLANDS The factory produces PE cover material and other plastic products. Mold and spare parts factory KOREA 12 Aluminum factory Hyundai Aluminum Vina KOREA 13 tissue paper factory Japan 14 Relocating the factory producing plastic products and printing plastic packaging labels of all kinds Moving ViKom auto parts manufacturing factory KOREA 16 General Industrial Project IDE Japan 17 Japan 18 Shinjo Pho Noi mechanical factory manufactures and manufactures black long screws. Wassenburg Medical Vietnam Factory NETHERLANDS 19 Vinax Porcelain Factory Japan 20 Japan 21 The factory produces labels and export labels. Tatsumi Seiko Vietnam Factory 22 Dorco Hung Yen razor factory KOREA 23 Factory producing transmission components using inductors China (HK) 11 15 KOREA KOREA Japan 600 equipment; mechanical products; Manufacturing and assembling elevators, escalators and hydraulic ladders; Producing workwear and protective clothing such as: Clothes, gloves, socks... used for cleaning in clean rooms, laboratories Manufacture and assemble children's toys; Manufacture of molds; Manufacture and assemble electrical and electronic equipment accessories; manufacturing Urethame Foam products, manufacturing and assembling products on stamping machine lines, paint spraying machines such as cold storage tanks, auto parts, etc. Manufacture of bearings and mechanical products; Manufacturing and assembling other electrical products Producing animal, poultry and aquatic feed Producing and processing feed for livestock, poultry and other livestock. Manufacture of life-saving systems and equipment mounted on rigs and ships for the shipbuilding and offshore industries Producing PE cover materials and other plastic products. Manufacture of molds and mold spare parts. Factory for rent. Producing aluminum ingots and aluminum products, decorating the surface with heat press technology for aluminum profile products, renting a part of the factory on the premises Producing high-grade tissue paper products from wood pulp and recycled paper to supply domestic and export markets Manufacturing plastic products and printing plastic packaging labels of all kinds Manufacture and assemble motors, motor spare parts, control cables, door moving equipment used in automobiles and industry; Producing and assembling blowers and accessories of blowers; Manufacture of plastic components for automotive equipment. Manufacturing and assembling molds for product production Building factories for rent; provides services related to construction and finishing of factories, installation of industrial production equipment lines Manufacture of steel molds and steel mold details. Manufacture of bolts, screws and tools for the production of bolts and screws Manufacture of WD 440 sterilizer assembly parts, WD 440 sterilizer electronic box and WD 440 sterilizer lift bar; Producing high-grade sanitary ware, Producing image caption labels (Head set label), language annotation labels (Panel sticker) and product labels (Fine label. Producing metal punching products and other mechanical products Manufacture of razor blades, manufacture of razors, eyebrows, manufacture of razor handles, manufacture of molds for the manufacture of cutlery, hand tools, and common metal utensils. 24 DSM Vietnam Factory KOREA 25 Factory that manufactures and assembles all kinds of image processing machines and related parts, components and electrical equipment by high technology Daido DMS Vietnam Factory Japan 27 DSM Vietnam factory expansion project KOREA 28 Branch of CARGIll Vietnam Co., Ltd in Hung Yen America 29 INOX PRODUCTS FACTORY KOREA 30 31 Project to produce Korean products Project of manufacturing plastic products Japan Japan 32 Drossapharm Asia Factory (Vietnam) China (HK) 33 Project of manufacturing precision mechanical products Japan 34 Icam Vietnam factory project. Japan 35 Vietnam Factory MIE Japan 36 Paint and putty factory Japan 37 Greenfeed Vietnam Factory- Hung Yen Branch THAILAND 38 The project of establishing Watanabe Pipe Vietnam Co., Ltd. in Vietnam Japan 39 PALFINGER MARINE VIETNAM FACTORY - BOAT DORCO VINA II FACTORY NETHERLANDS Expanded export label and plate factory Vietnam yamato rubber products factory Japan Factory producing loose parts related to sanitary ware products Japan 26 40 41 42 43 Japan KOREA Japan 601 Manufacture of components for optical game players (PSPs), DVD-RW players; transmission components for car doors. Manufacture of plastic phone cases. Manufacture and assemble document scanners and related parts, components and equipment; manufacturing and assembling printer parts, components and equipment; manufactures and assembles camera parts, components and equipment. Producing and processing steel products of all kinds, by production processes: stamping, cutting, bending, coiling, rolling, riveting, machining, grinding, heat treatment, surface treatment. Manufacturing and assembling components, spare parts and accessories for phones and plastic products. Producing and processing feed for livestock, poultry and aquatic products. Producing stainless steel products Producing welding materials such as: welding rod, welding wire, solder paste, solder powder, solder pellets; Producing products from turpentine as welding materials and serving other manufacturing industries Producing plastic products such as household plastic, auto parts, office machinery Processing pig's small intestine; separation of extracts and chemical essences from the mucous membrane of the small intestine of pigs; classification and processing of sausage casings Design, manufacture and assemble precision plastic components and products such as: electrical wiring harnesses, covers, etc. used for cameras, automobiles, electronics, electrical and other industrial products; Design capacity of 950 tons of products/year Invest in building a factory to produce metal molds; manufacturing plastic parts and metal parts used for cars and motorcycles; manufactures water meters and components in water meters. Include: Move Vietnam MIE factory project from land lot No. D-9, Thang Long II Industrial Park, Hung Yen province to Zone A Pho Noi A Industrial Park; Invest in additional machinery and equipment to increase the capacity of the old project and supplement the production of water meters and details in water meters. Vietnam MIE One Member Limited Liability Company is allowed to apply regulations on export processing enterprises. Production of water-based paints, oil-based paints and putty; Producing high quality animal, poultry and seafood feed Manufacturing, assembling, installing and finishing greenhouses for agricultural cultivation Manufacture of boats, lifeboats, life rafts and rescue boats for the marine and offshore market. Design capacity scale: Invest in building factories and offices for lease. 44 45 Ming Hao Vietnam Electronic Components Factory Factory producing all kinds of cutlery KOREA 46 PLASTIC BENE PRODUCTION KOREA 47 FANCY VIETNAM INDUSTRIAL FACTORY VIETNAM HAPAM CAPACITOR MANUFACTURING FACTORY MANUFACTURING ALUMINUM LCD/OLED TV FRAME ANNEX VIETNAM ELECTRONIC FACTORY China (HK) 48 49 50 CHINA Netherlands Korea 51 MINGHUI VIETNAM FACTORY Singapore 52 Sanitary ware factory China (HK) 53 54 PHAM NGUYEN CAKE FACTORY SUN KANG VIETNAM FACTORY Japan Singapore 55 KOPAC CONCERT FACTORY KOREA 56 PROJECT MANUFACTURING ALUMINUM PHONE CASE - CNC MOBILE PROJECT MANUFACTURING CONCRETE ADDITIVES EXPANDING INOX PRODUCTS FACTORY IDEAL INDUSTRIAL PROJECT 2 KOREA 57 58 59 60 61 62 FACTORY MANUFACTURING, PROCESSING WOODEN FLOORS, MULTIPLE PLANTS FACTORY MANUFACTURING TEMPERATURE LABEL PRODUCTS MOLITEC MANUFACTURING FACTORY PROJECT IN HUNG YEN PROVINCE Production of concrete admixtures China (HK) Producing stainless steel products KOREA Japan Invest in building factories for lease; and provide services related to construction and finishing of factories, offices, installation of industrial production equipment lines, investment consulting.... Invest in building a factory to produce laminated laminate flooring China Producing all kinds of product labels Japan Forging, pressing and rolling metal; mechanical processing and metal coating (excluding plating); manufacturing and manufacturing auto parts, motorcycle parts, agricultural machinery parts and metal household electronic components Invest in building a factory to produce PE film, packaging, shrink film, PE-PET . protective film Producing electronic price list products, laptop battery chargers, plastic TVs PLASTIC PRODUCTS FACTORY Japan 64 FACTORY MANUFACTURING ELECTRONIC PRICE LIST AND BATTERY CHARGER. DSM VIETNAM FACTORY EXPANDING PROJECT for the 2nd time. TSUKUBA VIETNAM'S MOLD MANUFACTURING FACTORY IN PHONOI A INDUSTRIAL PARK KOREA 66 Manufacture of electronic switches for phones, computers, home appliances and other electronic products Manufacture and processing of earphone shells, molds and other parts of headphones for mobile phones and tablets; Producing electronic devices and components for earphones, mobile phones, tablets Producing high-grade sanitary ware; manufacturing water heaters, aluminum profiles and related loose parts for export and domestic consumption; Import of related products for the production of the above mentioned products Production of soft chocolate covered cakes Production of printing ink, silkscreen printing of clothing Producing all kinds of cardboard packaging from roll paper; Factory and warehouse for rent Invest in more machines to produce aluminum phone cases from CNC technology Korea 63 65 Invest in machinery and equipment to produce razor blades. Invest in additional machinery and equipment to increase the capacity of the project "Factory manufacturing labels and export labels Producing rubber products used for electronic devices and motor engines Invest in equipment and production lines for plastic parts related to sanitary ware products Manufacturing and assembling transformers and circuits for phone chargers Manufacturing aluminum LCD/OLED TV frames KOREA KOREA 602 Invest in additional machinery and equipment from undistributed profits to expand the production of plastic products Invest in building factories to manufacture, produce casting molds, and process all kinds of cast products made of aluminum, zinc, magnesium and other 67 68 69 70 71 72 73 SG PRECISION FACTORY ESTABLISHMENT PROJECT HARNESS CABLE PRODUCTION PROJECT AND APPLICATION DEVICES PROJECT FACTORY PRODUCING, PROCESSING HANDLING HAND, HANDLING MATERIAL WITH PLASTIC CONSTRUCTION LIXIL VIETNAM WAREHOUSE PROJECT OF PRODUCTION OF USEFUL PRODUCTS FOR PRINTING CIRCUIT PRODUCTION EQUIPMENT JINXIANDA VIETNAM FACTORY metals; painting and plating of aluminum, zinc, magnesium, other metals and plastic products Research, development, production and processing of precision mechanical components Production of wire harnesses and application equipment Japan Japan Japan Producing and processing hanging baskets, metal hangers covered with plastic. China Invest in building a warehouse to store manufactured products of Lixil Vietnam Co., Ltd Production of plastic solution tanks, frames, racks, metal hangers Producing cables and signal transmission lines for machines Manufacturing and assembling paper shredders of all kinds, plastic laminators Invest in building factories for lease; and provide services related to construction and finishing of factories, offices, installation of industrial production equipment lines, investment consulting.... Invest in building a factory to manufacture molds and plastic products for the electrical, electronic, and household appliances industries Japan Japan China (HK) 74 YOULL ELECTRONIC FACTORY VIETNAM China (HK) 75 IDEAL INDUSTRIAL PROJECT 3 Japan 76 MINGHUI TECHNOLOGY VIETNAM FACTORY China (HK) Producing phone battery charging case, electronic price list cover, laptop battery charging case, TV case, desk phone case, phone earphone case. Producing pins, steel contacts of all kinds. 77 DSM VINA FACTORY Korea 78 BX SHINSEI VIETNAM COMPANY LIMITED PROJECT HAI HAN NEW MATERIAL CO., LTD MARUSHIN SEISAKUSHO VIETNAM PROJECT Japan 79 80 81 AJ TOTAL CONNECTOR Producing and assembling rolling door opening and closing motors, flanges and accessories, rolling door equipment Producing all kinds of PVC flooring China Producing, processing spare parts and auxiliary parts for cars Invest in building and providing cold and dry storage services; storage of frozen and dry goods (CPC 742). Japan KOREA - Manufacture of automobile water pumps: 450 tons/year; - Producing flywheel moving parts for motor vehicles: 50 tons/year; - Manufacture of equipment for changing disc brakes and brake pads for motor vehicles: 15 tons/year 82 HZL GROUP VIETNAM PROJECT China Producing and processing vending machines: 300 products/year (equivalent to 150 tons/year). Provide consulting services on operation and management of vending machines. Provide vending machine repair and maintenance service. 83 84 FACTORY ESTABLISHMENT GRN VIETNAM CO., LTD HANOI BRANCH FACTORY, OFFICE FOR LEASE Japan Factory lease China (HK) 603 Producing, processing and assembling parts and accessories for printers, copiers, fax machines, scanners, multi-function office equipment (walkietalkies), automatic teller machines (ATMs) , money 85 China (HK) 86 FANCY VIETNAM INDUSTRIAL FACTORY 2 PLASTIC FLOORING FACTORY 87 HAIXIN FACTORY NO. 2 China 88 89 Aj total Hanoi – cold storage project PLASTIC PRODUCTS AND MOLD FACTORY KOREA Japan 90 SG PRECISION 2 FACTORY ESTABLISHMENT PROJECT FACTORY PRODUCING FILM FROM PVC AND FILM FROM PAPER Japan 91 China China 604 counters, household electrical appliances, medical equipment, vehicles, industrial machinery equipment Factory producing plastic flooring products Invest in building a factory producing all kinds of PVC flooring Invest in building and providing cold and dry storage services; storage of frozen and dry goods (CPC 742) Invest in building a factory producing plastic trays and plastic films; Manufacture of metal molds and metal jigs; Factory lease Manufacturing and processing precision mechanical components Producing film from PVC and film from paper THANG LONG II INDUSTRIAL ZONE GENERAL INFORMATION Address Located in Yen My district and My Hao town, Hung Yen province. Industrial investor Thang Long II Industrial Park Company Limited - Address: Thang Long II Industrial Park, Yen My district, Hung Yen province. - Tel: (+84-321) 3974620; Fax: (+84-321) 3974624; Geographical location Fields of investment attraction - Contact person: Mr. Nguyen Duc Thang – 0912.173.518; Position: Director. Adjacent to National Highway 5; 30km from Hanoi, about 70km from Hai Phong port, 115km from Quang Ninh deep sea port; adjacent to Pho Noi Textile and Garment Industrial Park Manufacturing precision electronic and mechanical products; mechanical and electronic industries, traffic machinery, production of rubber products for the automobile industry; light industry, industrial gas; manufacture of drugs, vaccines and biological products; optical glass production and high-tech manufacturing industries are encouraged to develop according to the provisions of law; packaging production (excluding paper and board recycling, pulp and paper production). Minimum regional wage Minimum rental area Limit for Construction Height Permitted Construction Rate Planning Area Area II, minimum wage 4,160,000 VND (USD 177.22). According to the agreement with the Industrial Park Infrastructure Investor. According to the planning approved by the competent authority. According to the planning approved by the competent authority. ▪ Scale: 525.7 ha. In which, the area of industrial land for lease is 401.42 ha. ▪ Industrial land area for lease: 259 ha, occupancy rate is 64.6%. ▪ The remaining industrial land area not yet leased: Approximately 142 ha. Operation Status Active Number of Projects In the industrial park, there are 104 foreign investment projects, with a total registered investment capital of about 3,130 million USD. Foreign investors investing in industrial zones are mainly Japanese investors, including a number of large economic groups such as Kyocera, Hoya, Nippon, Daikin, Toto, Panasonic, .. Lease fee & Operating fee ▪ Land lease fee associated with industrial park infrastructure: 130 - 150 USD/m2 ▪ Factory rent: From 126,940 VND/m2 to 163,800 VND/m2 ▪ Management cost: 23,400 VND/m2/month ▪ Electricity cost: According to the general regulations of the Government ▪ Water cost: 13,104 VND/m3 ▪ Waste water treatment fee: 5,850 VND/m3 INFRASTRUCTURE Infrastructure ▪ Construction site: The land plots have been processed, ready for the construction of the Factory. ▪ Power supply: The power supply is stable with a capacity of 216 MVA. ▪ Water supply: The Industrial Park water plant was built with a capacity of 24,000 m3/day. ▪ Waste water and waste treatment: The wastewater treatment plant was built with a total capacity of 15,000 m3/day. ▪ Telephone & Internet: The telecommunications system meets international standards and is always available to meet the needs of communication, high-speed data transmission and domestic and international 605 postal services. The underground fiber optic cable system is directly connected to the fence of each enterprise. ▪ Internal traffic: The system of internal roads is built with a reasonable cross-section, ensuring easy and convenient means of transportation to each factory. Lighting systems are installed along the roads. ▪ Fire prevention: Water supply system with fire hydrants is arranged along the roads of the Industrial Park. In the industrial park, a team of fire prevention and fighting police of Hung Yen Provincial Police has been arranged. Social infrastructure and services ▪ Customs: Hung Yen Customs is currently headquartered about 1 km from the Industrial Park. All sealing and lead clamping procedures are carried out right at the factories in the Industrial Park. ▪ Banking: The system of banks (Vietcombank, Techcombank, ACB, Sacombank, Agribank, Bank for Investment and Development of Vietnam...) has a branch in Pho Noi, 1-2 km from the Industrial Park. . Currently, some banks have set up ATM stations in the Industrial Park, quickly serving all requirements of businesses and employees in the Industrial Park. ▪ Housing for workers: The area near the industrial park has been planned to invest in the construction and development of urban areas and housing areas, ensuring housing needs for industrial park workers. ▪ Hospital: Pho Noi General Hospital (2km away from the Industrial Park) is modernly planned and built to meet the needs of treatment and medical examination and treatment for workers in the Industrial Park. Location/ Map 606 607 LIST OF TENANTS No 1 Name of Projects Hamaden Vietnam Factory Nationality Japan 2 Corona Vietnam Factory Japan 3 Takagi Vietnam Factory Japan 4 Japan 5 Akiyama cold-drawn bar production project SC(Vietnam) BUNKA Factory- Vietnam 6 Factory NIKKISO Vietnam Japan 7 Hoya Glass Disk Vietnam II Japan 8 Japan 9 10 HUNG YEN INDUSTRIAL GAS AND MEDICAL GAS PRODUCTION FACTORY DENYO Vietnam Factory Shindengen Vietnam Factory 11 Ochai Vietnam Factory Japan 12 Mikasa Vietnam Factory Japan 13 Sews-Components Vietnam Factory Musashi Auto Parts Vietnam Factory Mizuno Precision Parts Vietnam Factory Japan 14 15 Japan Japan Japan Japan Japan Business line Manufacture of components for cars and motorcycles; Processing, assembling and packing components and spare parts of cars and motorcycles. Manufacture of plastic and metal accessories and product details (brake pedals, accelerator pedals, steps up and down, logos, logos, etc.) for motor vehicles: Scale: 800,000 units/year (equivalent to 800,000 units/year) equivalent to 8 tons/year); Mechanical processing, surface treatment and surface coating of metal and plastic products for the Company's manufactured products. Scale: 5 tons/year; Precision mold making. Scale: 120 tons/year Manufacture of parts for water purifiers; Producing molds, water fountains, tap products 60 tons of products/year; Expansion project of manufacturing water purifiers; machine parts and sprinklers; Manufacture of molds and faucets. Design capacity scale: 90 tons of products. Producing cold drawn steel bars; Producing all kinds of rolling doors, storm-proof doors, doors; partitions, sliding glass frames; awnings, tents, screens; interior and exterior products; disaster prevention equipment, security equipment, fire prevention equipment. Producing accessories for blowback parts for commercial aircraft, such as: Blocker Door, Bullnose. 2.1. Manufacturing, assembling and processing computers, internet and telecommunications equipment and products, information, spare parts and components for products, such as magnetic disks, computer hard drives and used glass substrates for magnetic memory disk (for hard drive production). 2.2. Research, explore and create solutions for application in the field of computer technology and information technology; and develop technology to create and perfect new technology or new products in computers, internet/telecommunications/information equipment and spare parts and components related to the abovementioned fields and trade in products generated from research and development 2.3. Manufacture of plastic trays to store glass discs in the polishing process. Hoya Glass Disk Vietnam II Co., Ltd. is allowed to apply regulations on export processing enterprises. Producing and filling high quality industrial and medical gas products Manufacture of generators and generator spare parts Manufacture of electronic products for cars, motorcycles and others Manufacture of industrial mechanical accessories such as locks, hooks, rings, latches, clamps, corrugated washers, leaf springs, washers * Producing, researching and developing light construction equipment such as table compactor, vibrating roller compactor, compactor hammer, concrete mixer, reverse roller, submersible pump and power supply * Producing components and spare parts for the abovementioned machinery and equipment Manufacture of electrical and electronic components for cars and motorcycles Producing parts such as camshaft, manual shift lever, automatic control lever, pedal shift lever Manufacturing and processing electronic components and auto parts 608 16 Factory for the production of electrical cables used in the automotive industry Factory Vietnam Japan Manufacture of electrical cables used in the automotive industry Japan 18 Toyota Vietnam Industrial Equipment Factory Japan 19 HITACHI ATEMO HUNG YEN FACTORY THAILAND 20 Established Kyoto Biken Hanoi Laboratories Co., Ltd. Building a factory to produce veterinary drugs SMM VIETNAM FACTORY Japan Manufacture of rubber parts for automobiles, motorcycles, office equipment and other products such as: wire rings, protective devices, covers, seals and washers, rubber gaskets Manufacture of electrical equipment and spare parts for motor vehicles such as: Engines for material handling equipment, axles. Manufacture of transport equipment such as: Motorized forklifts, stackers, trailers. Manufacture of carburetors, throttle valves, air ducts, fuel pump modules, electronic controls for motorcycles, cars and multipurpose engines Production and distribution of veterinary drugs, biological products, microorganisms, chemicals used in veterinary medicine. 22 Construction project of Kyocera high-tech product production complex Japan 23 Panasonic Vietnam – Hung Yen Branch. Japan 24 Topy Fasteners Vietnam factory project Japan 25 Japan 26 Akebono Brake Astra Vietnam Factory Shin-Etsu Vietnam Factory 27 Bando factory (Vietnam) Japan 28 Kawakin Core-tech Vietnam Factory Project Japan 29 Panasonic Appliances Vietnam factory in Hung Yen Japan 30 Kosaka Vietnam Factory Japan 17 21 Japan Japan Manufacture of Lithium iron phosphate used as electrodes for lithium batteries; Crushing Lithium iron phosphate products produced by the Company Construction of high-standard factories, warehouses, infrastructure, offices and other ancillary works for lease by Kyocera's affiliates; provide management consulting services; provides general office administrative management services for investment projects to rent factories and offices in the Complex. Support financial activities for subsidiaries in Vietnam of Panasonic corporation to carry out projects of manufacturing electrical appliances, components, and household electrical products, through activities including but not limited to: the provision of factories, warehouses, operators, technical infrastructure... Producing steel accessories for cars and motorcycles, including: washers, clamps, nut clamps, clamps, counterweights, VTC versions... and other similar products. Manufacture of master cylinders, brake controllers Production of adhesive materials; Manufacture of reflectors for LED light emitting diodes and other semiconductor applications Manufacture of plastic parts for motorcycles such as: Fuel tank cap; water barrier; Fenders; handbrake and throttle protection device; turn signal lights…. Manufacture of conveyor belts. (belt) for motorcycles. Manufactures parts and equipment made of metal and rubber, including anti-seismic equipment, vibration control and reinforcement equipment for bridges and buildings. 2.1. Invest in machinery and equipment for manufacturing, assembling and installing household electrical appliances and household products, including: washing machines of all kinds, refrigerators of all kinds, dryers of all kinds, microwave ovens, etc. types, vacuum cleaners of all kinds, rice cookers of all kinds, presses and grinders of all kinds, irons of all kinds and details, components, semi-finished products used for the above equipment and products. Design capacity: 1,000,000 products/year. 2.2. Design, research and develop household electrical appliances, household products, details, components, semifinished products, materials for equipment and products specified in Section 2.1 of this Article . 2.3. Provide market research services (CPC 86401). 2.4. Provide management consulting services (CPC 865). 2.5. Providing customer care services such as: surveying opinions, recording customer feedback, offering solutions to improve products, quality and services ... for household electrical appliances; household products. Manufacture of motor shafts for industrial trucks 609 31 INVESTMENT PROJECT PRODUCING SMD SURFACE COMPONENTS. Azuma Safety Factory Japan 33 Sanwa vietnam industrial factory project. Japan 34 Seiko Vietnam Industrial Factory Japan 35 Electronic connector manufacturing project Japan 36 Hamatetsu Vietnam Factory Project Tanaka Precision Vietnam Factory Fuji Bakelite Vietnam Factory Japan Project to expand the factory to produce electric cables used in the automotive industry Musashi Auto Parts Vietnam factory expansion project Japan 41 Research and develop technology Hoya Memory Disk NETHERLANDS 42 Tokyo Keiso Vietnam Factory Project Denka Vietnam New Materials Factory Generator production project Factory Ochiai II Project for the production of parts for commercial aircraft wings Matsuda Sangyo Scrap Recycling Factory (Vietnam) Project of Yotsugi Vietnam factory Rotor and Stator production project Japan 32 37 38 39 40 43 44 45 46 47 48 49 Japan Japan Japan Japan Singapore Japan Japan Japan Japan Japan Japan Manufacture of SMD surface-glued components for crystal oscillators; Manufacture, repair and maintenance of molds and accessories for molds Manufacture of lights (reflective) and related parts, reflective signs and related steel poles, reflective nails, rubber traffic poles used in road traffic safety. 2.1. Manufacture of interior parts, plastic seats for automobiles; Design capacity scale: 51.2 tons of products/year. 2.2. Manufacture of molds used for molding plastic products; Design capacity scale: 05 sets/year (equivalent to 5.5 tons of products/year). 2.3. Manufacture of inspection jigs used to inspect plastic interior parts for automobiles; capacity scale 20 sets/year (equivalent to 1.2 tons/year). Sanwa Vietnam Industry Co., Ltd. is allowed to apply regulations on export processing enterprises. Producing stainless steel, aluminum, iron, plastic parts for machinery and equipment such as stepper motors, Ion implants, automatic testing equipment, etc. in semiconductor production lines Producing all kinds of connectors for laptops, printers, copiers, mobile phones. Scale of design capacity; 300 tons of products/year. Producing plastic connectors for laptops, printers, copiers, mobile phones. Design capacity: 200 tons of products/year Manufacture of metal washers, clutches, levers and gearboxes for motorcycles and cars Manufacture of pins, bearings, discs, metal clamps for motorcycles. * Manufacturing and assembling electrical equipment, control equipment for power distribution such as: Circuit breakers, leakage current circuit breakers, circuit breakers parts, cable terminals of electric meters. * Design and manufacture stamping dies used in heat casting and stamping technology. Manufacture of electrical cables used in the automotive industry Invest in additional machinery and equipment to increase the capacity of the production project Camshaft, manual shift lever, automatic control gear lever, gear lever for cars, motorcycles, ships from 3,214,000 products/year (equivalent to 1,240 tons of products/year) to 10,230,000 products/year (equivalent to 3,580 tons of products/year) Research, explore and create solutions for application in the field of computer technology and information technology; and develop technology to create and perfect new technologies or new products in computers, internet/telecommunications/information equipment and spare parts and components related to the above fields to provide the Company Hoya Glass Disk Vietnam II Manufacture of flow meters; Manufacture of water level measuring equipment Manufacture of PVC adhesive tapes for automotive electronics and others Manufacture of generators Manufacture of washers Manufacture of commercial aircraft wing parts such as the Sharklet and the product that joins the gap between the J Panel (Gap cover) and the J Panel (J Panel). Recycling scrap from electrical, electronic, mechanical and semiconductor components Producing products from insulating materials such as jackets, pants, insulating plastic sheets Manufacture of stators and rotor cores for lifting equipment engines and motor vehicles 610 50 51 MICROTECHNO VIETNAM FACTORY JEWELRY PROJECT WITH PREMIUM METAL, GEM Japan Japan 52 TOEI VIETNAM FACTORY PROJECT 53 SECOND TOTO VIETNAM FACTORY PROJECT EIKODO VIETNAM FACTORY PROJECT Tamagawa Electronics Vietnam Factory Japan 56 MITSUBA VIETNAM FACTORY PROJECT IN THANG LONG II INDUSTRIAL PARK Japan 57 ELECTRONIC COMPATIBILITY LAB PROJECT RODAX VIETNAM FACTORY PROJECT Japan 54 55 58 Japan Japan Virtue 59 Project to expand investment in manufacturing SMD surface-glued components Japan 60 PROJECT MANUFACTURING THE DOORS OF BAGGAGE BOXES, BACKWARDS AND COMMERCIAL AIRLINES SUZURAN VIETNAM PRODUCTION FACTORY PROJECT FLOWER FACTORY Japan TOPY FASTENERS VIETNAM FACTORY EXPANDING PROJECT NIPPON MEKTRON FACTORY PROJECT FOOD MANUFACTURING, PROCESSING AND PROCESSING FACTORY. NITTAN VIETNAM FACTORY PROJECT PRODUCTION OF SMD SURFACE SURFACED COMPONENTS Switzerland 61 62 63 64 65 66 67 Manufacture of spare parts and accessories for automobiles, including: oil damper, oil booster valve, stopper and core coil Products from gold, silver and platinum (Platinum): 393,600 products/year (equivalent to 1,200 kg of products/year); Products from Cobarion (Co-Cr alloy): 24,000 products/year (equivalent to 72 kg of products/year); Products from brass (Cu-zn alloy): 24,000 products/year (equivalent to 72 kg of products/year). Producing components for office equipment and telecommunications equipment such as: roller brush, cotton coated roller brush, metal frame and others Manufacture of sanitary ware and sanitary ware-related accessories Candy production Manufacture of electrical components for mobile telecommunications of base stations, broadcasting, telecommunications satellites and public broadcasting, such as: coaxial attenuators, dividers, coaxial splitters, circuit breakers, coaxial filters, duplexers and other components Manufacture of starter motors, generators, horns, electrical relays, electrical conductors, pulse generators and some other electronic products of motorcycles; Manufacture of electrical relays and electrical conductors for automobiles; Manufacture of windshield wipers for cars. Producing all kinds of horns (trumpets) for cars. Manufacture of fuel pumps and auto power generation integrators. Producing cooling fan motors for automobiles; Producing all kinds of motors for motorcycles and cars Provide technical testing and electromagnetic compatibility certification services for electrical and electronic products. Manufacture of components for transmission of industrial machines such as housings, shafts, rims and manufacture of metal precision machinery products. Invest in additional investment in machinery and equipment at the stages of gluing, punching, glazing and printing circuits, cutting edges and cleaning products under the investment project of manufacturing SMD surface-glued components, increasing the production process. Project capacity scale from 2.4 billion products/year (equivalent to 300 tons) to 3.6 billion products/year (305 tons) Manufacture of luggage compartment doors and manufacture of rear flaps and blades in commercial aircraft Japan Invest in building a cotton factory for medical, sanitary and cosmetic use Japan Invest in building a factory to produce, process and pack nutritional drinks. Invest in additional machinery and equipment to increase the capacity of the Topy Fasteners Vietnam Factory project Japan Japan Invest in building a factory to produce printed circuit boards for electronic devices. Invest in building a food production, processing and processing factory. Japan Manufacture of fire alarm system equipment Japan Additional investment in machinery and equipment, increasing the capacity of investment projects to produce SMD surfaceglued components from 6.84 billion products/year (equivalent to 611 68 69 70 71 72 73 74 75 76 77 78 79 80 PRODUCTION EXPANSION PROJECT (2nd time). DAIKIN VIETNAM FACTORY DAINICHI VIETNAM FACTORY PROJECT KOYO VIETNAM FACTORY PROJECT AMAGASAKI PIPE VIETNAM FACTORY PROJECT MARUESU VIETNAM FACTORY PROJECT ITO VIETNAM FACTORY PROJECT CERAMIC PACKAGE PRODUCTION PROJECT FOR OPTICAL CABLE NETWORK HONEYCOMB J-PANEL PRODUCTION PROJECT FOR COMMERCIAL AIRLINES NIKKISO VIETNAM FACTORY II CHAIN MANUFACTURING, PROCESSING AND Assembling FACTORY KAGA ELECTRONICS VIETNAM FACTORY PROJECT ORGANO FACTORY (VIETNAM) IN HUNG YEN PROVINCE Japan Japan Japan Japan Japan Manufacture of metal equipment. Japan Medical device manufacturing Japan Processing and assembling technical ceramic products (Ceramic Package) and connectors for fiber optic networks Japan Manufacture of honeycomb core (Honeycomb J-panel) for the production of J-panel products for commercial aircraft Japan Manufacture of products, parts and equipment from composite materials for commercial aircraft Chain production, processing and assembly Japan Japan THAILAND JEWELRY KHANH MANUFACTURING AND PROCESSING FACTORY PROJECT VIETINAK FACTORY 2 Japan THE SECOND TOTO VIETNAM FACTORY EXPANDING PROJECT. THANG LONG SERVICE STATION II SANWA FELT VIETNAM PROJECT SWCC SHOWA VIETNAM Japan 86 87 88 IPTVN FACTORY PROJECT NFK VIETNAM PROJECT FUJI BAKELITE VIETNAM FACTORY EXPAND Japan Singapore Japan 89 PROCESS LAB PROJECT. MICRON VIETNAM SEWS-COMPONENTS VIETNAM FACTORY PROJECT II PRODUCTION PROJECT OF INDUSTRIAL CUTTING TOOLS ASAHI KASEI ADVANCE VIETNAM PROJECT Japan 81 82 83 84 85 90 91 92 652 tons of products/year) to 7.44 billion products/year (equivalent to 727 tons of products/year) Manufacturing, processing and assembling air conditioners and related spare parts and components of air conditioners Manufacturing and assembling electronic components and products Invest in building a factory to manufacture metal equipment for furniture such as sofa hinges, turntables of all kinds Invest in building a factory for the production of copper fittings for connecting pipes for air conditioners Japan Japan Japan Japan Japan Manufacturing, processing and assembling electrical and electronic equipment for air conditioners and automobiles Manufacturing and assembling wastewater treatment systems; providing maintenance services, maintenance of wastewater treatment systems; chemical preparation Polytetsu used in wastewater treatment system Invest in building a factory to manufacture and process jewelry, imitation jewelry and related details Manufacture of rubber parts for automobiles, motorcycles, office equipment and other products Lease more land, invest in building factories and add machinery and equipment to increase the capacity of the second Toto Vietnam factory project. Invest in building distribution and trading stores for petroleum and petrochemical products Manufacture of components used for copiers and laser printers. Producing connecting wires used for electrical, electronic, household, industrial equipment and means of transport Manufacture of components and spare parts for molds Invest in building a factory producing all kinds of flexible pipes Invest in building factories and supplementing machinery and equipment to increase the capacity of the project of Fuji Bakelite Vietnam Factory Producing metal molds for circuit board production Japan Invest in building a factory to produce electronic components for cars and motorcycles; manufactures electrical wiring for cars and motorcycles Producing industrial cutting tools Japan Manufacture of airbags for cars 612 93 Zipper STEEL FACTORY Japan 94 COLD AKIYAMA-SC (VIETNAM) FUKOKU BUSSAN VIETNAM PROJECT GLASS PRINTING LINE INVESTMENT PROJECT LEAD FOR SURFACE PARTS SMD THIRD TOTO VIETNAM FACTORY PROJECT NAGAOKA VIETNAM PROJECT THE FOURTH TOTO VIETNAM FACTORY PROJECT FACTORY FOR LEASE INVESTMENT PROJECT IN LOT G3-G6 CRYSTAL-OPTECH FACTORY CMOS COMPONENTS PRODUCTION INVESTMENT PROJECT Japan 95 96 97 98 99 100 101 102 103 Japan Japan Japan Japan Japan Japan Producing and processing cold drawn wire (rolled steel) from high-grade alloy steel and stainless steel Manufacture of cables and conductors Investment and installation of lead glass printing line (lead glass frit) for SMD surface-glued components Invest in building a factory for the production of protective equipment Invest in building a factory to produce wire mesh pipes to collect water Invest in building a factory to manufacture sanitary ware and related accessories Invest, build factories and technical infrastructure works for lease Producing glass for smartphone cameras and smart watches. Japan Producing ceramic packages of components used for CMOS sensors Japan Manufacture of crystal oscillators for the automotive industry Japan Manufacture of contactors (probes) for testing electrical contacts. 613 MINH DUC INDUSTRIAL ZONE GENERAL INFORMATION Address Located in My Hao town, Hung Yen province. Industrial investor VNT Infrastructure Investment and Development Joint Stock Company - Address: Minh Duc Industrial Park, My Hao Town, Hung Yen Province. Geographical location Fields of investment attraction - Contact person: Ms. Tuong Quynh Huong – Deputy Director; Phone: 0936.388.477. Km32 National Highway 5 (Hanoi - Hai Phong); 35 km from Hanoi center, 58 km from Noi Bai airport, 65 km from Hai Phong port, 105 km from Quang Ninh deep sea port. ▪ Producing and assembling electrical and electronic components and equipment, refrigeration, telecommunications, products from new and high-tech technologies; ▪ Mechanical engineering; manufacturing and assembling machinery, equipment, automobiles, motorcycles, prefabricated metal products; jewelry; ▪ Producing and processing agricultural and forestry products, food, beverages, animal feed (excluding cattle and poultry slaughter); ▪ Producing products from paper, wood, plastic, rubber, plastic; ▪ Manufacture of pharmaceuticals, cosmetics, paints, packaging, printing, embroidery, labels, building materials, ceramics, glass, textiles (excluding dyeing), leather and footwear (excluding tanning) , furniture, kitchen equipment, concrete admixtures, environmental chemicals, coating materials, detergents; ▪ Logistics services, petrol shops Minimum regional wage Region 2, minimum salary 4,160,000 VND. Minimum rental area According to the agreement with the investor of the industrial park infrastructure. Limit for Construction Height According to the planning approved by the competent authority. Permitted Construction Rate According to the planning approved by the competent authority. Planning Area ▪ Scale: 198 hectares. In which, the area of industrial land for lease is 155 hectares. ▪ Industrial land area for lease: 53 ha, occupancy rate is 34.2%. ▪ The remaining industrial land area not yet leased: Approximately 102 ha. Operation Status Active Number of Projects In the industrial park, there are 31 investment projects (7 FDI projects and 24 DDI projects), with a total registered investment capital of about 1,087 billion VND and 43 million USD. In which, there are 03 projects with Korean investment capital with a total registered investment capital of about 7.9 million USD. Lease fee & Operating fee ▪ Sublease fee of land associated with industrial park infrastructure: 145 - 150 USD/m2 ▪ Management cost: 17,000 VND/m2/year ▪ Electricity cost: According to the general regulations of the Government ▪ Water cost: 15,500 VND/m3 ▪ Waste water treatment fee: 14,500 VND/m3 INFRASTRUCTURE 614 Infrastructure ▪ Construction site: The land plots have been processed, ready for the construction of the Factory. ▪ Power supply: The power supply is stable. ▪ Water supply: The water source is taken from the clean water supply station of Hai Duong Clean Water Trading Joint Stock Company. ▪ Waste water and waste treatment: The wastewater treatment plant was built with a total capacity of 2,500 m3/day. ▪ Telephone & Internet: The telecommunications system meets international standards and is always available to meet the needs of communication, high-speed data transmission and domestic and international postal services. The underground fiber optic cable system is directly connected to the fence of each enterprise. ▪ Internal traffic: The system of internal roads is built with a reasonable cross-section, ensuring easy and convenient means of transportation to each factory. Lighting systems are installed along the roads. ▪ Fire prevention: Water supply system with fire hydrants is arranged along the roads of the Industrial Park. Social infrastructure and services ▪ Customs: Hung Yen Customs is currently headquartered about 6 km from the Industrial Park. All sealing and lead clamping procedures are carried out right at the factories in the Industrial Park. ▪ Banking: The system of banks (Vietcombank, Techcombank, ACB, Sacombank, Agribank, Bank for Investment and Development of Vietnam ...) is located near the industrial park. ▪ Hospital: Pho Noi General Hospital (10 km away from the Industrial Park) is modernly planned and built to meet the needs of treatment and medical examination and treatment for workers in the Industrial Park. Location/ Map 615 616 LIST OF TENANTS No Name of projects Nationality 1 Vegetable and seafood processing factory by vacuum drying technology Factory manufacturing steel structure and lifting equipment Tam Hoang Son Industrial Service Complex Factory Manufacturing mechanical and plastic foam Factory producing composite film, printing on film material and producing artificial wood board Steel structure factory Vietnam Phu Du Garment Factory SPRAY MANUFACTURING FACTORY Factory producing high-class bedding Hiep Hoa specialized car mechanic factory Vietnam Vietnam Factory manufacturing steel structure and lifting equipment Specialized vehicle assembly plant Packaging factory and factory for rent Mechanical factory and factory for rent Vietnam FACTORY MANUFACTURING, ASSEMBLY ELECTRIC BIKE AND CONSTRUCTION FACTORY FOR LEASE TOTAL SERVICES MESA Vietnam FACTORY, OFFICE FOR LEASE PLASTIC ADDITIONAL PRODUCTION PROJECT HUNG YEN VQB TIN MANUFACTURING FACTORY. Vietnam Vietnam Vietnam 24 FACTORY MANUFACTURING, MANUFACTURING GARMENTS, GARMENT ACCESSORIES AND FACTORY FOR LEASE PRODUCTION OF WOMEN SURFACES TIEN GIA CUTTING TOOLS FACTORY ASIA STAR BUILDING MATERIALS FACTORY EXPAND STEEL Structural FACTORY 25 Kerry Integrated Logistics(Hung Yen) CANADA 26 Garment factory for export KOREA 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Business line Vietnam Processing vegetables, fruits and seafood by vacuum drying technology Manufacture of steel structures and lifting equipment Vietnam Factory lease Vietnam Producing gasoline engine water pumps, steel billets and EPS foam products. Production of composite films used to package products, print on films and manufacture wooden boards. Manufacturing all kinds of steel structures, nonstandard goods with steel structures Manufacture of garments for export Producing all kinds of foam Vietnam Vietnam Vietnam Vietnam Vietnam Vietnam Vietnam Vietnam Vietnam Producing auxiliary equipment for the automotive mechanical industry, products for environmental sanitation, labor protection equipment, including: Thin shell products, frame structures, non-standard components , specialized accessories, workwear. Manufacture of steel structures and lifting equipment Manufacturing and assembling special-use vehicles. Production of plastic packaging; 1. Mechanical processing, production of steel products 2. Invest in building factories for rent Manufacturing and assembling electric bicycles. Scale of design capacity: 24,000 units/year. Construction of factory for rent. Scale of area: 22,400m2. Invest in building a service center for warehouse leasing and storing goods. Factory and office for rent Production of plastic additives Producing, electrolysing and refining tin with 99.95% content from tin ingots with 99.75% content; and produce tin wire, tin bar, tin range from 99.75% to 99.95%. Invest in building factories for manufacturing, processing garments, accessories for the garment industry, and leasing factories Vietnam PRODUCTION OF WOMEN SURFACES Vietnam Invest in building a scissor factory of all kinds Vietnam Invest in building a factory to produce all kinds of materials for the construction industry Producing steel frame structure and non-standard steel structure Warehousing, transportation, delivery and distribution services; Import-Export freight forwarding services and Logistics services: Store and preserve records. Capacity 1,500,000 tons of goods/year Producing and processing garments for export and domestic consumption Vietnam 617 27 Investment project to expand garment factory for export KOREA 28 Project to manufacture walls, partitions, and roofing sheets used in Sypanel Vina construction KIM THANH VIETNAM CLEAN ROOM EQUIPMENT FACTORY KOREA 30 GIA HUNG RUBBER SHOOT FACTORY China 31 BUILDING PROJECT FACTORY FOR LEASE - CORE5 HUNG YEN I CO., LTD UK 29 China 618 Additional investment, replacement of machinery and equipment to improve the production capacity of the project of garment factory for export Manufacture of walls, partitions, and roofing sheets used in construction; Production of plastic windows and doors with panels Manufacture of metal equipment for clean rooms. - Producing soundproof, heat-insulating, soundproofing and fire-resistant roofing sheets, partitions and walls with color coated corrugated iron and non-metallic minerals. - Manufacture of metal doors, windows and frames, shutters, gates, room dividers. Producing labor protection boots from synthetic resin Invest in building ready-built factories and auxiliary offices for lease Producing labor protection boots from synthetic resin Invest in building ready-built factories and auxiliary offices for lease MINH QUANH INDUSTRIAL ZONE GENERAL INFORMATION Address Industrial investor Geographical location Fields of investment attraction Located in My Hao town, Hung Yen province. VID Hung Yen Joint Stock Company. - Address: Minh Duc Industrial Park, My Hao Town, Hung Yen Province. - Contact person: Mr. Nguyen Minh Huan; Phone: 0989.768.586. Km32 National Highway 5 (Hanoi - Hai Phong); 35 km from Hanoi center, 58 km from Noi Bai airport, 65 km from Hai Phong port, 105 km from Quang Ninh deep sea port. Electrical, electronic, refrigeration, mechanical, agro-forestry product processing industry, food, highgrade building materials, packaging industry, consumer goods production, light industry and other industries. other clean industry. Minimum regional wage Region 2, minimum salary 4,160,000 VND. Minimum rental area According to the agreement with the investor of the industrial park infrastructure. Limit for Construction Height According to the planning approved by the competent authority. Permitted Construction Rate According to the planning approved by the competent authority. Planning Area ▪ Scale: 150 ha. In which, the area of industrial land for lease is 111.35 ha. ▪ Industrial land area for lease: 46.5 ha, occupancy rate is 40.4%. ▪ The remaining industrial land area not yet leased: Approximately 64 ha. Operation Status Active Number of Projects The IP has received 27 investment projects (10 FDI projects and 17 DDI projects), with a total registered investment capital of about 2,225 billion VND and 98 million USD. Including 01 project of Korean investor with registered investment capital of 280.00 USD. Lease fee & Operating fee ▪ Land sublease price associated with industrial park infrastructure: 125 - 140 USD/m2 ▪ Management cost: 14,000 VND/m2/year ▪ Electricity cost: According to the general regulations of the Government ▪ Water cost: Ngoc Tuan Nagaoka Clean Water Co., Ltd provides directly to investors. INFRASTRUCTURE Infrastructure ▪ Construction site: The land plots have been processed, ready for the construction of the Factory. ▪ Power supply: The power supply is stable. ▪ Water supply: The clean water supply plant was built with a total capacity of 5,500 m3/day. ▪ Waste water and waste treatment: The wastewater treatment plant was built with a capacity of 2,000 m3/day. ▪ Telephone & Internet: The telecommunications system meets international standards and is always available to meet the needs of communication, high-speed data transmission and domestic and international postal services. The underground fiber optic cable system is directly connected to the fence of each enterprise. ▪ Internal traffic: The system of internal roads is built with a reasonable cross-section, ensuring easy and convenient means of transportation to each factory. Lighting systems are installed along the roads. ▪ Fire prevention: Water supply system with fire hydrants is arranged along the roads of the Industrial 619 Social infrastructure and services Park. ▪ Customs: Hung Yen Customs is currently headquartered about 6 km from the Industrial Park. All sealing and lead clamping procedures are carried out right at the factories in the Industrial Park. ▪ Banking: The system of banks (Vietcombank, Techcombank, ACB, Sacombank, Agribank, Bank for Investment and Development of Vietnam ...) is located near the industrial park. ▪ Hospital: Pho Noi General Hospital (10 km away from the Industrial Park) is modernly planned and built to meet the needs of treatment and medical examination and treatment for workers in the Industrial Park. Location/ Map 620 LIST OF TENANTS No 1 Name of Projects NEW BEST WIRE VIETNAM INDUSTRIAL FACTORY PROJECT Nationality Taiwan 2 PROJECT BY JAPANESE SAFETY STANDARDS NAKANO INDUSTRIES VIETNAM Japan 4 PROJECT OF FACTORY, WAREHOUSE, OFFICE FOR LEASE VIETLOG Singapore 5 FACTORY AND WAREHOUSE FOR LEASE DH LOGISTICS PROPERTY MINH QUANG VIETNAM GENERATOR MANUFACTURING FACTORY - ELECTRIC ENGINE SENCI VIETNAM PRODUCTION OF CONCRETE ADDITIONAL MATERIALS SUPERLON HUNG YEN FACTORY Singapore 9 HIGHEND KITCHEN PRODUCTION PROJECT China 10 BURMAY VIETNAM INVESTMENT PROJECT MECHANICAL MANUFACTURING FACTORY, THANG LONG HUNG YEN MECHANICAL JOINT STOCK COMPANY INVESTMENT IN CONSTRUCTION FACTORY, OFFICE FOR LEASE CONTAINER FACTORY MANUFACTURING FACTORY China (HK) INVESTMENT IN CONSTRUCTION FACTORY, OFFICE FOR LEASE PRODUCTION OF PLASTIC HOUSEHOLDS AND FACTORY LEASE 3A PLASTIC ADDITIONAL FACTORY Vietnam 18 STORAGE AND MATERIALS TRADING OF KIEN VUONG COMPANY IN HUNG YEN Vietnam 19 PROJECT FACTORY, OFFICE FOR LEASE TTC Vietnam 3 6 7 8 11 12 13 14 15 16 17 Japan China KOREA Singapore Vietnam Vietnam Vietnam Vietnam Vietnam Vietnam 621 Business line Producing high-grade carbon steel wire, alloy steel wire, stainless steel wire by steel wire tensioning technology Invest in building warehouses to store goods 2.1. Producing drums from metal. 2.2. Exercising the right to export, import, and distribute wholesale (without establishing a wholesale establishment) of goods with HS codes: 4016, 7326, 8309. 2.3. Services related to production (CPC 884, 885). Details: Repairing drums 2.1. Invest in building factories, warehouses, offices and some ancillary works for lease. 2.2. Management consulting and investment consulting services for businesses (CPC 865). Invest in building factories and offices for rent Manufacture of generating sets and generator engines; High pressure car washing machine, water pump of all kinds; 4 stroke gasoline engine Producing raw materials for concrete admixtures, concrete admixtures Manufacture of rubber-based products, such as: Insulation rolls, sheet insulation, exercise mats, foam insulation tapes, insulating tapes, soundproofing materials, foam pads for use in the car Production and processing of kitchen cabinets, kitchen drawers, edge braces and wooden kitchen cabinet partitions Producing hand tools and electric machinery Invest in the construction of a factory to manufacture and process mechanical products for the automotive, motorcycle, household appliances, and furniture industries. Invest in building factories and offices for rent Producing container houses and containers Invest in the construction of a factory to manufacture and construct prefab houses with industrial wood and metal Invest in building factories and offices for rent Investing in building a factory to produce household plastic products and leasing factories and offices Invest in building a factory to produce plastic additives. 2.1. Warehouse and trading of production materials for the food, pharmaceutical, food and industrial additives, animal feed, veterinary medicine, aquatic medicine, aquaculture medicine. 2.2. Dispensing Dextrose from powder to liquid form Invest in building factories and offices for rent 20 DULICO MECHANICAL MANUFACTURING FACTORY AND FACTORY LEASE Vietnam 21 VAN HO LOGISTICS Vietnam 22 23 MINH THU LOGISTICS CENTER AN HUNG THINH PACKAGING FACTORY PROJECT HUNG YEN FACTORY, OFFICE FOR LEASE Vietnam Vietnam 26 JASTAR FURNITURE AND EXTERIOR PRODUCTION FACTORY Vietnam 27 CARTON PACKAGING FACTORY IN HUNG YEN Vietnam 24 25 Vietnam Vietnam 622 Invest in building a factory for the production of lock details and components; mold production; production of copper trees, copper sheet rolls; and for rent factories and offices Investing in construction, providing dry and cold storage services LOGISTICSMINH THU CENTER Invest in building a factory to produce plastic and paper packaging Building factories and offices for rent Invest in building factories, offices and ancillary works for lease. Invest in building a factory to manufacture interior and exterior products made of wood and plastic and lease factories and offices Producing carton packaging from paper YEN MY INDUSTRIAL ZONE GENERAL INFORMATION Address Industrial investor Located in Yen My district, Hung Yen province. Viglacera Industrial Park Development Joint Stock Company Yen My - Hung Yen. - Address: Km 33, new road 39A, Lieu Xa commune, Yen My district, Hung Yen province. Geographical location Fields of investment attraction - Contact person: Mr. Nguyen Anh Tuan – Director; Phone: 0932.309.8888. Adjacent to the new National Highway 39 A; 32 km from Hanoi, about 75 km from Hai Phong port, 118 km from Quang Ninh deep sea port High-tech application; Manufacture of electrical equipment, electronics, computers and optical products; Manufacture of automobiles, motorcycles, machinery, equipment and products from prefabricated metal; Processing and preserving meat, vegetable and fruit products; Beverage production; manufacture of wood products; pharmaceuticals, cosmetics, paints, packaging; Services of Logistics. Minimum regional wage Region 2, minimum salary 4,160,000 VND Minimum rental area According to the agreement with the investor of the industrial park infrastructure Limit for Construction Height According to the planning approved by the competent authority Permitted Construction Rate According to the planning approved by the competent authority Planning Area ▪ Scale: 280 hectares. In which, the area of industrial land for lease is 204 ha. ▪ Industrial land area for lease: 108.3 ha, occupancy rate is 53%. ▪ The remaining industrial land area not yet leased: Approximately 95 ha. Operation Status Active Number of Projects The IP has received 30 investment projects (16 FDI projects and 14 DDI projects), with a total registered investment capital of about 2,020 billion VND and 298 million USD. In which, there are 03 projects of Korean investors with registered investment capital of 36 million USD. Lease fee & Operating fee ▪ Land sub-lease price associated with industrial park infrastructure: 120 - 135 USD/m2 ▪ Management cost: 0.7 USD/m2/year ▪ Electricity cost: According to the general regulations of the Government ▪ Water cost: 13,000 VND/m3 ▪ Waste water treatment fee: 12,000 VND/m3 INFRASTRUCTURE Infrastructure ▪ Construction site: The land plots have been processed, ready for the construction of the Factory. ▪ Power supply: The power supply is stable. ▪ Water supply: Provided by a clean water supply plant outside the IP. ▪ Waste water and waste treatment: The wastewater treatment plant was built with a capacity of 2,000 m3/day. ▪ Telephone & Internet: The telecommunications system meets international standards and is always available to meet the needs of communication, high-speed data transmission and domestic and international postal services. The underground fiber optic cable system is directly connected to 623 Social infrastructure and services the fence of each enterprise. ▪ Internal traffic: The system of internal roads is built with a reasonable cross-section, ensuring easy and convenient means of transportation to each factory. Lighting systems are installed along the roads. ▪ Fire prevention: Water supply system with fire hydrants is arranged along the roads of the Industrial Park. ▪ Customs: Hung Yen Customs is currently headquartered about 3 km from the Industrial Park. All sealing and lead clamping procedures are carried out right at the factories in the Industrial Park. ▪ Banking: The system of banks (Vietcombank, Techcombank, ACB, Sacombank, Agribank, Bank for Investment and Development of Vietnam ...) is located near the industrial park. ▪ Hospital: Pho Noi General Hospital (4 km from the Industrial Park) is modernly planned and built to meet the needs of treatment and medical examination and treatment for workers in the Industrial Park. Location/ Map 624 LIST OF TENANTS No Name of Projects 1 HUNG YEN LOGISTICS PARK I Singapore 2 HUNG YEN LOGISTICS PARK II Singapore 3 HUNG YEN LOGISTICS PARK III Singapore 4 YUSUNG ELECTRONICS VINA JIA YANG PACKAGING FACTORY SANG-A VINA PROJECT Korea Invest in the construction of a logistics center to develop, operate and lease the completed logistics facilities and related technical infrastructures and works; real estate business; providing management services (CPC 742); provides real estate management services (CPC 82202). Invest in the construction of a logistics center to develop, operate and lease the completed logistics facilities and related technical infrastructures and works; real estate business; providing management services (CPC 742); provides real estate management services (CPC 82202). Invest in the construction of a logistics center to develop, operate and lease the completed logistics facilities and related technical infrastructures and works; real estate business; providing management services (CPC 742); provides real estate management services (CPC 82202). Manufacture of engine control devices, sensors and LEDs Samoa Paper packaging production KOREA POLYMERIC PRODUCTS VGH CO., LTD (VIETNAM) FACTORY FUSION GROUP China (DL) YEE WOO VIETNAM WATER FACTORY YEE WOO VIETNAM FACTORY MANUFACTURING CONSTRUCTION SURFACES AND ADDITIONS HUNG YEN TITAN INDUSTRIAL PROJECT China (HK) - Producing all kinds of pneumatic accessories such as: wiper valves, safety valves, connectors, connecting pipes, steam valves, couplings...: 2,000,000 products/year (equivalent to 480 tons/year); - Producing all kinds of plastic pipes, plastic pneumatic pipes (for industrial robots and pneumatic pipes): 1,000,000 meters/year (equivalent to 360 tons/year) Producing synthetic rubber of all kinds and products from synthetic rubber; Producing products from synthetic plastic 2.1. Production, processing and packaging of animal feed. 2.2. Exercising the right to export, import, and distribute wholesale (without establishing a wholesale establishment) of goods with the following file codes: 1902, 1905, 2309.10, 2309.90.20, 3920, 3926, 4201.00.00 , 4203, 4415, 6115, 7323, 7326.20, 8214, 8424.10, 8531, 8703, 9603. 2.3. Providing warehousing and storage services (CPC 742) (only operating since April 2025). Invest in building a factory to produce packaging from cardboard, corrugated paper from cardboard 12 GOODS STORAGE AND AIG MANUFACTURING FACTORY IN HUNG YEN China (HK) 13 PAPER PRODUCTION FACTORY FACTORY MANUFACTURING COMPONENTS FOR ELECTRIC VEHICLES, MOTORCYCLES, GARDEN MACHINERY AND MECHANICAL PRODUCTION China (HK) 5 6 7 8 9 10 11 14 Nationality Business line KOREA Germany Invest in building a factory to produce additives for the construction industry. Singapore 2.1 Invest in building factories, warehouses and ancillary works for lease. 2.2. Warehousing and storage of goods (CPC 742). 2.3. Brokerage services, real estate consulting, real estate management. 2.4. Technical consulting service (CPC 8672). 2.5. Management consulting services (CPC 865). - Centers, warehouses for storing goods and leasing warehouses: 50,000 tons of products; - Production and mixing of food ingredients and food additives: 1,200 tons of products/year Producing paper bags, paper boxes from paper China 2.1. Manufacturing and assembling components, accessories and spare parts: automobiles, motorcycles, mopeds, electric bicycles, electric motorcycles, electric vehicles, generators; agricultural machinery, forestry, gardening machines, mechanical processing. 2.2. Manufacture of metal furniture accessories. 625 15 16 ACEWELL FACTORY (VIETNAM) ECHO PLASTIC FLOOR FACTORY 2.3. Office and factory for rent Manufacture of mechanical components for the automotive and petroleum industry Producing plastic floor panels and PVC films of all kinds. Samoa America 626 YEN MY II INDUSTRIAL ZONE GENERAL INFORMATION Address Industrial investor Located in Yen My district, Hung Yen province Hoa Phat Hung Yen Industrial Park Infrastructure Development Company Limited. - Address: 39 Nguyen Dinh Chieu, Le Dai Hanh ward, Hai Ba Trung district, City. Hanoi. - Tel: 024.39763889 Fax: 024.39763890 ; Geographical location - Contact person: Mr. Cuong- 0918.507.886. Adjacent to Highway 39; about 5km from National Highway 5A, about 3km from Hanoi-Hai Phong highway intersection, about 30km from Hanoi center, 55km from Noi Bai airport, 75km from Hai Phong port, 120km from Quang Ninh deep sea port. Fields of investment attraction Manufacturing and assembling data transmission equipment and components, mobile phones, computers and peripheral devices; software and digital content production; manufacturing and assembling electrical, electronic, refrigeration, optical, telecommunications, automobile, motorbike, and other motorized vehicles, machines and equipment; manufacturing mechanical products, machinery and equipment, manufacturing molds, jewelry, jewelry; metal production (excluding the production of cast iron and steel billets); production of sports equipment, toys, production of building materials (excluding production of cement, clinker, bricks and tiles); manufacturing composite materials, flexible, super-durable, ultra-lightweight materials; industrial gas production; production and processing of agricultural products, food (excluding production of cassava flour, vermicelli, monosodium glutamate, sugar from sugar cane; processing aquatic products, seafood; slaughtering livestock and poultry), beverages, food breed; manufacture of paper products (excluding pulp and paper production), wood (excluding wood processing, wood chips from natural wood), plastic (excluding recycling of plastic scraps), high rubber, plastics, non-metallic minerals and from steel, aluminum and alloys; manufacturing pharmaceuticals, cosmetics, packaging and labels; manufacture of medical equipment; manufacture of chemical products (excluding basic chemicals, detergents, additives, chemical fertilizers, plant protection chemicals); logistics services, warehouses, factories for rent, petrol stations; manufacture of supporting industry products (excluding textiles, garments, leather and shoes) on the list of priority development as prescribed by law and other industries producing Minimum regional wage Minimum rental area Limit for Construction Height Permitted Construction Rate Planning Area products from new and high-tech technologies. Region 2, minimum salary 4,160,000 VND According to the agreement with the investor of the industrial park infrastructure According to the planning approved by the competent authority According to the planning approved by the competent authority ▪ Scale: 313.5 ha. In which, the area of industrial land for lease is 221.83 ha. ▪ Industrial land area for lease: 62.4 hectares, occupancy rate is 28.1%. ▪ The remaining industrial land area not yet leased: Approximately 159 ha. Operation Status Active Number of Projects The IP has received 43 projects (26 DDI projects and 17 FDI projects), with a total registered investment capital of about 2,736 billion VND and 200 million USD. In which, there are 02 projects with investment capital of foreign investors with a registered investment capital of about 15 million USD. 627 Lease fee & Operating fee ▪ Land sub-lease price associated with industrial park infrastructure: 120 - 135 USD/m2 ▪ Management cost: 0.7 USD/m2/year ▪ Electricity cost: According to the general regulations of the Government ▪ Water cost: 13,500 VND/m3 ▪ Waste water treatment fee: 12,000 VND/m3 INFRASTRUCTURE Infrastructure ▪ Construction site: The land plots have been processed, ready for the construction of the Factory. ▪ Power supply: Power is supplied stably with a 110/22KV transformer station with a capacity of 63 MVA. ▪ Water supply: The clean water supply plant was built with a total capacity of 6,000 m3/day. ▪ Waste water and waste treatment: The wastewater treatment plant was built with a total capacity of 3,000 m3/day. ▪ Telephone & Internet: The telecommunications system meets international standards and is always available to meet the needs of communication, high-speed data transmission and domestic and international postal services. The underground fiber optic cable system is directly connected to the fence of each enterprise. ▪ Internal traffic: The system of internal roads is built with a reasonable cross-section, ensuring easy and convenient means of transportation to each factory. Lighting systems are installed along the roads. ▪ Fire prevention: Water supply system with fire hydrants is arranged along the roads of the Industrial Park. Social infrastructure and services ▪ Customs: Hung Yen Customs is currently headquartered about 6 km from the Industrial Park. All sealing and lead clamping procedures are carried out right at the factories in the Industrial Park. ▪ Banking: The system of banks (Vietcombank, Techcombank, ACB, Sacombank, Agribank, Bank for Investment and Development of Vietnam ...) is located near the industrial park. ▪ Hospital: Pho Noi General Hospital (7 km from the Industrial Park) is modernly planned and built to meet the needs of treatment and medical examination and treatment for workers in the Industrial Park. Location/ Map 628 629 LIST OF TENANTS No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Name of Projects Tri-Wall Vina Packaging Factory YAMCO PRECISION VIETNAM FACTORY Nationality China (HK) MING SHIN VIETNAM FACTORY PROJECT MANUFACTURING FOOD CONTAINERS SHINMEI VIETNAM YOUNGMIN HI-TECH VINA INTECH COLOR VIETNAM FACTORY PROJECT KIV BEVERAGE MANUFACTURING FACTORY THE NORTH TRIBECO. China (HK) LAYMAC VIETNAM FACTORY PROJECT OF FACTORY, OFFICE, HOUSE FOR LEASE ENGINE PRODUCTS ASSEMBLY FACTORY VIETNAM RAIDON MECHANICAL GENERATOR ASSEMBLY FACTORY JIANGHUAI GENERATOR ASSEMBLY FACTORY VAKSINDO VIETNAM VETERINARY PROJECT SIMON ELECTRICAL EQUIPMENT FACTORY Japan Japan KOREA China Korea ENGLISH (Cayman) Japan China Business line * Producing packaging from cardboard materials * Producing wooden pallets Manufacturing and processing precision mechanical products, auto parts and components used for electronic equipment. Economic organizations established to implement this investment project may apply regulations on export processing enterprises. Production of paper packaging, production of plastic packaging and printing Producing food containers with aluminum foil, paper, plastic film Producing and processing car steering wheel heating pads, electric car seat pads and related accessories Producing all kinds of colored plastic beads Invest in building a factory to produce auto components Invest in building a factory to produce soy milk, pure drinking water, fruit juice, and carbonated soft drinks Invest in building a factory to manufacture and process mechanical products for washing machines, electric trains, ships, and machine shelves. Invest in building factories, offices and warehouses for rent. China Assembling pressure pumps, 4-stroke gasoline engines, gasoline generators China Generator assembly China Manufacturing and assembling gasoline-powered generators: 27,000 tons/year Manufacturing and assembling gasoline generator components such as: cylinder shield, electric motor, control screen, mounting frame, fuel tank: 110 tons/year Production of veterinary drugs Indonesia Spain China China Invest in the construction of a mold factory; manufacturing and processing plastic products, civil and industrial plastic specifications; assembling civil and industrial electrical equipment Assembling snow removal machines, cultivators, washers, lawn mowers, engines Assembling pressure pumps, generators, 4-stroke gasoline engines, snow removal machines, cultivators, washing machines, lawn mowers 630 CLEAN INDUSTRIAL PARK GENERAL INFORMATION Address Industrial investor Located in Khoai Chau and An Thi districts, Hung Yen province. VTK Hung Yen Industrial Park Investment and Development Company Limited. - Address: Executive office building, Ecopark urban area, Xuan Quan commune, Van Giang district, Hung Yen province, Vietnam. Geographical location Fields of investment attraction - Contact person: Mr. Sun Byung Soo; Position: General Director. Adjacent to the road connecting Hanoi - Hai Phong Expressway and Cau Gie - Ninh Binh Expressway; about 2 km from the intersection to Hanoi - Hai Phong highway, about 35 km from Hanoi center, 50 km from Noi Bai airport, 75 km from Hai Phong port, 120 km from Quang Ninh deep sea port. Manufacture of data transmission equipment and components, mobile phones, computers and peripheral devices; software production, digital content; manufacturing and assembling electrical and electronic equipment and components; manufacturing and assembling automobiles, motorcycles and auto and motorcycle parts; manufacturing machinery and equipment for industry, agriculture and energy; manufacturing precision mechanical products, molds, high-grade steel and components and spare parts for mechanical processing machines; manufacturing composite materials, flexible, superdurable, ultra-lightweight materials; manufacturing supporting technology products according to the Government's regulations; manufacturing in the field of cosmetics and pharmaceuticals with intelligent and automated production processes; produce energy-saving products; warehousing, goods storage, logistics operations Minimum regional wage Region 2, minimum salary 4,160,000 VND Minimum rental area Limit for Construction Height Permitted Construction Rate Planning Area According to the agreement with the Investor According to the planning approved by the competent authority According to the planning approved by the competent authority ▪ Scale: 143.08 ha. In which, the area of industrial land for lease is 100 ha. ▪ Industrial land area for lease: 13 hectares, occupancy rate is 13%. ▪ The remaining industrial land area not yet leased: About 87 ha. Operation Status In operation, the investor is building the infrastructure of the industrial park Number of Projects The IP has received 7 FDI projects of Korean investors, with a total registered investment capital of about 36 million USD. Lease fee & Operating fee ▪ Sub-lease fee of land associated with industrial park infrastructure: 96 - 130 USD/m2 ▪ Management cost: 13,800 VND/m2/year ▪ Electricity cost: According to the general regulations of the Government ▪ Water cost: IP infrastructure investor has not decided yet ▪ Waste water treatment fee: IP infrastructure investor has not decided yet INFRASTRUCTURE Infrastructure The investor is building the infrastructure of the industrial park 631 Social infrastructure and services ▪ Banking: The system of banks is located near the IP. ▪ Hospitals: Some provincial hospitals are near the industrial park, meeting the needs of treatment and medical examination and treatment for industrial park workers. Location/ Map 632 INDUSTRIAL PARK NO.3 GENERAL INFORMATION Address Industrial investor Located in Yen My, Khoai Chau and An Thi districts, Hung Yen province Ecoland Industrial Park Management Joint Stock Company. - Address: C78 Pho Truc, Ecopark Urban Area, Xuan Quan Commune, Van Giang District, Hung Yen Province, Vietnam. - Contact person: Mr. Ho Nam – 0987.803.699; Position: Deputy General Director Geographical location Adjacent to the road connecting Hanoi - Hai Phong Expressway and Cau Gie - Ninh Binh Expressway; about 1 km from the intersection to Hanoi - Hai Phong highway, about 35 km from Hanoi center, 50 km from Noi Bai airport, 75 km from Hai Phong port, 120 km from Quang Ninh deep sea port. Fields of investment attraction Manufacturing electrical equipment, data transmission accessories, mobile phones, computers and peripheral devices; production of communication equipment; manufacture of civil electrical products, manufacture of civil electrical appliances, manufacture of hand tools powered by motor or compressed air; producing shoes; manufacture of electric motors, generators, transformers, electrical distribution and control equipment; production of plastics and synthetic rubber in primary form; manufacture of office machinery and equipment (except for computers and computer peripherals); manufacture beds, cabinets, tables and chairs; manufacture of gymnastics and sports equipment; manufacture toys and games; manufacture of refractory products; manufacture of electric lighting equipment; manufacture of electric lighting equipment; manufacture of metal tanks, tanks and containers; software production, digital content; manufacturing and assembling electrical and electronic equipment and components; manufacturing and assembling automobiles, motorcycles and auto and motorcycle parts; manufacturing machinery and equipment for industry, agriculture and energy; manufacturing precision mechanical products, molds, high-grade steel and components and spare parts for mechanical processing machines; manufacturing composite materials, super-plastic, super-durable, ultra-lightweight materials; manufacturing supporting industry products according to the Government's regulations; manufacturing in the field of cosmetics and pharmaceuticals with intelligent and automated production processes; produce energysaving products; production, business and distribution of clean energy, renewable energy; warehouse, storage of Minimum regional wage Minimum rental area Limit for Construction Height Permitted Construction Rate Planning Area goods; logistics activities and other industries encouraging investment Region 2, minimum salary 4,160,000 VND According to the agreement with the Investor who is building the infrastructure of the Industrial Park According to the planning approved by the competent authority According to the planning approved by the competent authority ▪ Scale: 159.71 ha. In which, the area of industrial land for lease is 115 hectares. ▪ Industrial land area for lease: 0 ha, occupancy rate is 0%. ▪ The remaining industrial land area not yet leased: 115 ha. Operation Status Number of Projects Lease fee & Operating fee The investor is compensating for site clearance and applying for land lease Calling for investment attraction and in the industrial park Calling for investment attraction and in the industrial park 633 INFRASTRUCTURE Infrastructure The investor is building the infrastructure of the industrial park Social infrastructure and services ▪ Banking: The system of banks is located near the IP. ▪ Hospitals: Some provincial hospitals are near the industrial park, meeting the needs of treatment and medical examination and treatment for industrial park workers. Location/ Map 634 INDUSTRIAL PARK NO.4 GENERAL INFORMATION Address Industrial investor Located in An Thi and Kim Dong districts, Hung Yen province Yen My Industrial Park Investment Joint Stock Company. - Address: No. 63 Tran Duy Hung, Trung Hoa, Cau Giay, Hanoi, Vietnam. Geographical location - Contact person: Mr. Nguyen Tuan – 0977.865.455; Position: Director. Adjacent to the road connecting Hanoi - Hai Phong Expressway and Cau Gie - Ninh Binh Expressway; about 3 km from the intersection to Hanoi - Hai Phong highway, about 35 km from Hanoi center, 50 km from Noi Bai airport, 75 km from Hai Phong port, 120 km from Quang Ninh deep sea port Fields of investment attraction Electronics, precision mechanics; light industry, other production and business industries in accordance with the industrial development planning of Hung Yen province Minimum regional wage Region 2, minimum salary 4,160,000 VND Minimum rental area Limit for Construction Height Permitted Construction Rate Planning Area According to the agreement with the investor According to the planning approved by the competent authority According to the planning approved by the competent authority ▪ Scale: 192.64 ha, industrial land for lease is 143 ha.. ▪ Industrial land area for lease: 0 ha, occupancy rate is 0%. ▪ The remaining industrial land area not yet leased: Approximately 143 ha. Operation Status Number of Projects Lease fee & Operating fee The investor is building the infrastructure of the industrial park. Calling for investment attraction and in the industrial park ▪ Land sub-lease price associated with industrial park infrastructure: 115 - 120 USD/m2 ▪ Management cost: 13,800 VND/m2/year ▪ Electricity cost: According to the general regulations of the Government ▪ Water cost: IP infrastructure investor has not decided yet ▪ Waste water treatment fee: IP infrastructure investor has not decided yet INFRASTRUCTURE Infrastructure The investor is building the infrastructure of the industrial park Social infrastructure and services ▪ Banking: The system of banks is located near the IP. ▪ Hospitals: Some provincial hospitals are near the industrial park, meeting the needs of treatment and medical examination and treatment for industrial park workers. Location/ Map 635 636 [- This Page is intentionally left blank -] 637 KHANH HOA 638 INVESTMENT ENVIRONMENT IN KHANH HOA GENERAL INFORMATION Area, Population Geographical Location Adjacent provinces GRDP Growth PCI ▪ Area: 5,199.5 km2 ▪ Population: 1.254 million (2022 statistic) ▪ Located in the South-Central Coast region of Vietnam. ▪ Located 450 km from Ho Chi Minh city and 1.270 km from Hanoi city ▪ Phu Yen province to the north, DakLak and Lam Dong to the west, the sea to the east, and Ninh Thuan province to the south. 2022 statistic: ▪ GRDP: 54,505.2 billion VND (2,32 billion USD) ▪ GRDP growth: 20,7% ▪ GRDP per capita: 3,257 USD/year ▪ Economic structure: - Industry - Construction: 32.39 %; - Agriculture. forestry and fishery: 11.2 %; - Service: 46.54 %; - Tax on Goods: 9.88 % 2022 statistic compared to 2021: ▪ Industry - Construction growth: 24.61 % ▪ Agriculture, forestry and fishery growth: 2.49 % ▪ Service growth: 25.46 % ▪ Score: 67.74 – ranked 16 out of 63 cities and provinces in Vietnam. (2022) SOCIAL INFRASTRUCTURE Transportation ▪ Roadway: Road traffic is smooth to the neighboring provinces and the Central Central Highlands through National Highways 1A, 26, 27C and Deo Ca Tunnel. T ▪ Railway: The North-South railway runs along Khanh Hoa province, with Nha Trang Station as one of the major stations to ensure the transit of passengers and goods to localities in the country. ▪ Waterway: Khanh Hoa province has the orientation to plan 04 inland waterway wharf areas: Van Phong Bay, Nha Phu lagoon, Nha Trang Bay and Cam Ranh Bay to meet the demand of freight and passengers serving the socio - economic development of the province with ship sizes: Container vessels up to 24,000 TEU (Northern Van Phong); General and bulk cargo vessels from 100,000 to 300,000 tons (North/- South Van Phong, Cam Ranh) and passenger ships up to 225,000 GT in all 04 areas. ▪ Airway: Cam Ranh International Airport is the port with the 4th largest passenger transport port in Viet Nam and with the 3rd international passenger traffic ranked in the country. Cam Ranh International Airport is capable in receiving Airbus 320, 321, 300-600, Boeing 767, 777, 747 and equivalent aircraſt * Capacity: 85 flights/day * International flights to: Russia, China, Hong Kong, Korea, Malaysia, Singapore, Uzbekistan * Distance: 35 km south of Nha Trang city center and 10 km north of Cam Ranh. ▪ Marina: to serve tourism. The bay areas of Nha Trang, Cam Ranh, Van Phong are oriented to study the berth, anchor buoys serving cruise ships, yachts to use the above tourism services and study the construction of airports for seaplanes in service of tourism associated with the tourist port. 639 Electricity Khanh Hoa province's electricity grid system is located in the national power grid system with a fairly strong power grid. The province's commercial electricity reached 2,136 billion kWh in 2021, reaching 95.16% compared to 2020, Pmax = 395MW. The main power is supplied by 2 hydroelectric power plants and 01 transformer station 220/110/22KV- 250MVA Nha Trang with capacity (125+250)MVA, Pmax = 278MW that meets the power demand for operation, production and business of investors. Water Khanh Hoa province has 9 factories with a total capacity of 173,500m3/day and night. There are 05 water supply plants outside the Van Phong Economic Zone with a capacity of 91,000m3/day-night. Van Phong economic zone has 04 reservoirs including Dong Dien Lake (100 million m3), Da Ban Lake (75 million m3), Hoa Son Lake (19 million m3), and Tien Du Lake (09 million m3). Education ▪ 06 Special research institution, 09 universities and institutes, 04 junior colleges and over 30 vocational schools in the province and Singapore Vietnam International School. Medicare ▪ Hospital system: Khanh Hoa Provincial General Hospital, Vinmec International Hospital, Saigon - Nha Trang Eye Hospital, 22/12 Hospital, 87 Hospital, Tam Tri Hospital, Saigon General Hospital – Nha Trang, Khanh Hoa Provincial Cancer Hospital, Yersin Nha Trang General Hospital. ▪ Private polyclinics: Tin Duc, Phuc Sinh, Medic, Olympia Polyclinic and family doctor... INVESTMENT CONDITION Human resource ▪ 63,8% of population are in the working age (2022) Education level ▪ Trained labor rate: 83% (2022) Salary ▪ The minimum salary for the province is applied as follows: - Area I: 4,680 million/month - Area II: 4,160 million/month - Area III: 3,640 million/month - Area IV: 3,250 million/month Investment incentives ▪ Incentives according to government regulations: According to the rules of law. ▪ Incentives from the province: Resolution No. 55/2022/QH15 dated June 16, 2022 of the National Assembly on piloting some preferential mechanisms, policies and peculiarities of Khanh Hoa provincedevelopment includes 05 groups of policies with 11 specific policies Fields Attracting Investment ▪ Prioritized projects: On April 13, 2022, the Prime Minister issued Decision 451/QD-TTg approving the task of adjusting the master planning on Van Phong economic zone, Khanh Hoa province until 2040, vision to 2050 with the following important points: * As a multisector integrated economic zone, it plays a leading role in attracting investment. It is an economic development’s main force for the regions and the whole country. The green economy is the foundation with an international container transshipment port and logistics, the urban, services, tourism and industry. All play an important role combining with the development of other economic sectors * As a center of high-class general tourism and entertainment services, which is unique, distinct and modern tourism products and services with high quality, branded and international competitiveness * As an area for sustainable smart urban development with a modern and synchronously developed social infrastructure system full stop 640 Map Contact Department of Planning and Investment ▪ Address: 01 Tran Phu street, Nha Trang city, Khanh Hoa Province ▪ Tel: 0258.3822.906 ▪ Fax : 0258.3822.906 ▪ Email: ▪ Contact person: 0913839438 LIST OF INDUSTRIAL ZONES Industrial Park Location Scale Occupancy rate Status Suoi Dau Industrial Park Suoi Tan commune 136,73 ha 97% occupancy rate In operation www.sudazi.com.vn Cam Lam district Ninh Thuy Industrial Park Ninh Thuy ward Ninh 207,9 ha 35% occupancy rate In operation www.ninhthuyip.com Hoa Town 641 Khatoco Ninh Ich industrial and livestock cluster Ninh Ich commune 35,58 ha Completed In operation infrastructure, Ninh Hoa town occupancy rate reaches 69% Ninh Xuan Cluster Ninh Xuan commune 50 ha The first construction Under contruction procedures are Ninh Hoa town underway Dac Loc Cluster Vinh Phuong commune 34,52 ha 100% occupancy rate In operation 49,77 ha 100% occupancy rate In operation 25,23 ha Completed In operation Nha Trang city Dien Phu Cluster Dien Phu commune Dien Khanh district Dien Phu VCN Cluster Dien Phu commune infrastructure, phase 3 Dien Khanh district expansion investment is underway Dien Phu VCN Cluster Dien Tho commune 50 ha The first construction Under contruction procedures are Dien Khanh district underway Trang E 1 Cluster Suoi Tan commune and 35,2 ha Suoi Cat commune Completed In opertation infrastructure, calling for secondary Cam Lam district investors; occupancy rate reaches 91% Trang E 2 Cluster Suoi Tan commune and 44,68 ha Suoi Cat commune Infrastructure is being completed Cam Lam district 642 Under contruction Song Cau Cluster Song Cau commune 40 ha Completed infrastructure, calling Khanh Vinh district for investors 643 In operation LOCATION MAP OF INDUSTRIAL ZONES 644 SUOI DAU INDUSTRIAL ZONE GENERAL INFORMATION Address Investor Contact Person Location Investment Sectors Minimum wage Lease term Minimum Lease Area Suoi Dau Industrial Zone, Suoi Tan Commune, Cam Lam District, Khanh Hoa Provine Name of Investor: Suoi Dau Industrial Zone Join Stock Comany ▪ Address: Suoi Dau Industrial Zone, Suoi Tan Commune, Cam Lam District, Khanh Hoa Provine ▪ Tel: 0583743249 ▪ Email: info@sudazi.com.vn ▪ Website:www.sudazi.com.vn Mr Tran Dinh Tan Position: General Director Tel: 0944192130 - Located on National Highway 1A - 20km to Nha Trang City - 35km to Cam Ranh Port, Cam Ranh Internation Airport. Priority Sectors for Investment Seafood processing; vegetables, caned food processing; garment; electronics, mechanical engineering… Investment Restricted Sectors Acording to Investment Restricted Sectors 3,640,000 VND/month ▪ Start date: ▪ End date: 21/8/2048 5,000 m2 Limit for Construction Height 5 floors Permitted Construction Rate 70% for 1 floor construction, 60% for 2 floors construction, 50% for 3-5 floors construction Planned area Factory Available for Rent ▪ Total area: 136.73 ha ▪ Total vacant leasable area: 92.05 ha ▪ Total area with full infrastructure ready to build factory: 92.05 ha ▪ Total area: None Operation Status ▪ Active Occupancy Rate and Number of Projects ▪ 97% Number of Korean projects Lease fee ▪ 04 projects ▪ Land lease fee: 8.5 USD/m2/ 5 years ▪ Factory lease fee: None 645 Operating fee ▪ Management fee: None ▪ Electricity fee: Acording to electricity fee of Khanh Hoa Power Company ▪ Water fee: 8,500 VND/m3 ▪ Wastewater treatment fee: 3,000 – 38,300 VND/m3 Layout plan INFRASTRUCTURE AND FACILITY Distance from the nearest Banking, nearest State Tax and Finance Agency, nearest Logistic Center, Universities, training facilities, etc., Road Width,… List of Projects in Industrial Zone No. Name of Company Nationality Business line 1 Seafood processing factory Japan Production of aquatic products 2 Seafood frozen factory for export British Virgin Islands 3 Marine and petroleum precision mechanical equipment factory; shipbuilding and composite components Norway 4 Sports gloves factory Korea 5 Animal feed factory Taiwan Processing, preserving and trading aquatic products and aquatic products Manufacture of marine and petroleum precision mechanical equipment (excluding goods and services when exercising border rights) Producing, trading, processing sports gloves, garment products and exporting all kinds of skating shoes Producing animal feeds, veterinary drugs, probiotics, aquatic veterinary drugs, pond improvers, fertilizers, processing 646 6 Factory producing aquaculture feed and veterinary medicine 7 Factory for manufacturing, processing and installing complete assemblies, pipes and steel structures 8 Seafood processing plants 9 Production of furniture, rattan exports Rapexco - Dai Nam Suoi Dau Branch America 10 Sewing swimwear Hong Kong- China 11 Processing flower paste, packing finished products of household ceramics (excluding sanitary ceramics), fine art ceramics Factory manufacturing mechanical equipment and electrical and electronic equipment Taiwan Seafood processing and preservation factory Sodex Toseco Co., Ltd Malaysia An Phuoc Sunpo Co., Ltd Vietnam - Hong Kong 12 13 14 15 British Virgin Islands Korea Hong Kong- China Norway France 647 agricultural products and functional foods. Producing and trading all kinds of feed, additives, feed ingredients, equipment and supplies for aquaculture; Processing aquatic products for export; Production of veterinary drugs Production, processing and installation of engine compartments, modules, complete assemblies, pipes and steel structures of ships for new construction Processing and preserving seafood and aquatic products Producing products from wood, bamboo (except furniture); manufactures products from bamboo, sedge, straw, twine and furniture Producing and trading in swimwear, beachwear, sportswear and other apparel products, auxiliary materials for the garment industry; Perform machining, re-machining Processing flower paste and packing household ceramic products Invest in building a factory specializing in the production of electrical, electronic and mechanical equipment for the marine, aquaculture, oil and gas industries and shipbuilding. Processing and preserving seafood and aquatic products -Manufacture, export and domestic sales of sports products for professional training and competition; Supply and install professional sports equipment and tools; Construction of civil sports works. Producing bra cup products 16 17 18 Project of processing seafood products and freezing packaging of foods and agricultural products for export Shin Woo Tech Mechanical Factory Japan Il Shin . Food Processing Factory Korea Korea 648 Processing and packaging seafood, agricultural products and fruits; produce solar power for the project's production activities. Producing and manufacturing details and components for mechanical products of all kinds. Processing and preserving aquatic products and aquatic products. NINH THUY INDUSTRIAL ZONE GENERAL INFORMATION Address Investor Location Investment Sectors Minimum wage Ninh Thuy Industrial Zone, Ninh Thuy ward, Ninh Hoa town, Khanh Hoa province Name of Investor: Hoan Cau Van Phong Co,Ltd ▪ Address: 20 Tran Phu, Nha Trang ciy, Khanh Hoa Provine ▪ Tel: (84.58) 6260 222 ▪ Email: marketingip@thanhyen.com ▪ Website:www.ninhthuyip.com This coastal industrial zone is in the south of Van Phong EZ, in Ninh Thuy Ward, Ninh Hoa town. It is 8 km away from National Highway 1A; 18 km to Hoa Huynh station; 10 km to Hon Khoi port; adjacent to South Van Phong general port; and 75 km to Cam Ranh international airport Priority Sectors for Investment Mechanical manufacturing and assembly, refrigeration – electronic, producing home appliances, handicrafts, packing, processing of agriculture and forestry products, producing building materials Investment Restricted Sectors Acording to Investment Restricted Sectors 3,640,000 VND/month Minimum Lease Area ▪ Start date: ▪ End date: 06/2063 5,000 m2 Limit for Construction Height 5 floors Lease term Permitted Construction Rate Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean projects Lease fee Operating fee 70% for 1 floor construction, 60% for 2 floors construction, 50% for 3-5 floors construction ▪ Total area: 207.9 ha ▪ Total vacant leasable area: 152.82 ha ▪ Total area with full infrastructure ready to build factory: 152.82 ha ▪ Total area None ▪ Active phase 1 ▪ Under construction phase 2 ▪ 35% ▪ 05 projects ▪ Land lease fee: ▪ Factory lease fee: None ▪ Management fee: 0.1 USD/m2/year ▪ Electricity fee: acording to electricity fee of Khanh Hoa Power Company ▪ Water fee: 4,750 – 11,700 VND/m3 ▪ Wastewater treatment fee: 0.3 USD/m3 649 Layout plan INFRASTRUCTURE AND FACILITY Distance from the nearest Banking, nearest State Tax and Finance Agency, nearest Logistic Center, Universities, training facilities, etc., Road Width,… List of Projects in Ninh Thuy Industrial Zone No. 1 Name of Company Nationality Business line Japan Cement distribution station 2 Ninh Thuy Cement Distribution Station Seyoung Factory - Hoa Hiep Korea 3 Gyeongnam Insu Warehouse Korea 4 Daeehyup Vietnam Factory Korea 5 Jeil VinaNT . Factory Korea 6 Ninh Hoa export wood chip processing factory Singapore 7 Hankook Factory Korea Production, processing and installation of machine compartment assemblies, modules, tool parts, pipes and steel structures warehouse (capacity: 12,700 m3) containing materials and insulation for repair of machinery and equipment Mechanical processing, construction of insulation by spray method, construction of deck finishing, interior construction of houses on ships for new construction Producing, processing and assembling steel structures for shipbuilding Purchasing and processing paper materials into wood chips for export Producing, processing and assembling steel structures for shipbuilding 650 8 Seafood processing plants Australia 651 Processing and preserving seafood and aquatic products [- This Page is intentionally left blank -] 652 KIEN GIANG 653 INVESTMENT ENVIRONMENT IN KIEN GIANG USD/VND 23.510 GENERAL INFORMATION Area Population Geographical Location Adjacent provinces 6348 km2 1,81 million people (2022) ▪ Kien Giang is located in Mekong Delta River region. Located in the Mekong Delta. It is bounded by An Giang, Hau Giang provinces, Can Tho City in the east and the south - east, Ca Mau Province in the south, and Cambodia in the north. 2022 statistic: ▪ Nominal GRDP (billion VND): GRDP ▪ Real GRDP (billion VND): 68.436 ▪ GRDP growth: 7,70% ▪ GRDP per capita (million VND/year): 66,24 (2,92 billion USD) (2822 USD) ▪ Economic structure: Import - Export Key Industry PCI Ranking - Industry - Construction: 26,26% - Agriculture. forestry and fishery: 41,09% - Service: 30,06% Import turnover (billion USD): 0,16 (Growth rate: 0,24) Export turnover (billion USD): 0,80 (Growth rate: 0,0971) Food processing, supporting industries 62.24 56 SOCIAL INFRASTRUCTURE Transportation Electricity Water ▪ Roadway: National highway system through Kien Giang province, including: 04 national highways 61, 63, 80, road N1 with a length of 292km ▪ Waterway: 2,700 km of rivers, canals and canals being exploited for water transport with 123 routes. In which, the longest route has a distance of 160 km from Rach Gia city to Ca Mau city and the shortest route has a distance of 9.3 km from An Thoi port to Hon Thom commune (Phu Quoc). ▪ Power supply from the National Power station network The inter-district intra-provincial water source belongs to 02 rivers and canals (Cai Be River, Rach Gia - Ha Tien Canal); Independent provincial water source belongs to 2,927 rivers. In addition, Kien Giang waters cover an area of more than 63,000 square kilometers, with a coastline of nearly 200 kilometers and 143 islands, of which 41 are inhabited. INVESTMENT CONDITION Human resource Labor in economic sectors, including agriculture - forestry - fishery accounted for the largest proportion, over 45%, followed by labor in the service sector accounting for more than 39%, labor in industry - construction accounting for more than 39%. of population are in the working age (2022) Education level Trained labor rate: 50% (2022) ▪ The minimum salary for the province is applied as follows: - Area I (4,680,000 VND/month): N/A Salary - Area II (4,160,000 VND/month): Rach Gia, Ha Tien, Phu Quoc City - Area III (3,640,000 VND/month): Kien Luong, Kien Hai, Chau Thanh Districts - Area IV (3,250,000 VND/month): An Bien, An Minh, Rong Rieng, Go Quao, Hon Dat, U Minh Thuong, Tan Hiep, Vinh Thuan, Giang Thanh Districts 654 (Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages paid to employees working under employment contracts) Investment incentives Fields Attracting Investment Investment attraction situation Industrial zones ▪ Incentives according to government regulations: - Exemption and reduction for land and water rent fee - Preferential tax rates and exemption period, reduction for corporate income tax. - Import tax exemption ▪ Incentives from the province: -Land rental exemption: The 1-year land rental unit price is calculated at 0.5% of the land price according to the purpose of using the leased land and the unit price is stable for 5 years. Exemption from paying land rent for 315 years, depending on the investment location and investment industry. Some policies allowed by the Prime Minister to be applied in Phu Quoc island are as follows: - Investment projects in tourism business in Phu Quoc are investment projects in the list A. - All investment projects of domestic and foreign organizations and individuals are entitled to the corporate income tax rate of 10% for 15 years. - 50% income tax reduction for high-income earners. - Policies on entry and exit in Phu Quoc. - Policies on residence in Phu Quoc. Eco-tourism and luxury resort; well-qualified workforce training; infrastructure development for IPs, tourism sites and urban areas; By the end of 2022, the province has withdrawn 294 projects, with a total area of more than 11,866 hectares. Total 5 industrial zones. Currently, Thuan Yen Industrial Park (134 ha) is basically full, Thanh Loc Industrial Park (250 ha) is 46% full. Xeo Ro Industrial Park, Tac Cau Industrial Park, Kien Luong Industrial Park are calling for investment in infrastructure. Map Kien Giang Department of Planning & Investment ▪ Address: No 29, Bach Dang street, Vinh Thanh Van ward, Rach Gia city, Kien Giang province Contact ▪ Tel: 2973862037 ▪ Email: skhdt@kiengiang.gov.vn ▪ Contact person: - Mr. Giang Thanh Khoa - Director of the Department of Planning and Investment of Kien Giang province 655 XEO RO INDUSTRIAL ZONE GENERAL INFORMATION Address Hung Yen commune, An Bien district, Kien Giang province Economic Zone Management Board of Kien Giang Province Investor Location Investment Sectors Minimum wage Lease term 7km from An Bien district center, 15km from Rach Gia airport and 22km from Rach Gia city. This industrial park complex is located on National Highway 63 and the river is adjacent to Cai Lon river, convenient for transporting goods by road and waterway. Priority Sectors for Investment 3,640,000 VND/month ▪ 50 years Minimum Lease Area 10000 (m2) Limit for Construction Height N/A Planned area ▪ Total area: 210.5 (ha) The planning associated with the IZ is the residential - resettlement area with an area of 30.03 ha and the service - commercial area with an area of 71.28 ha. Operation Status ▪ Active Occupancy Rate and Number of Projects ▪ 90% Lease fee Operating fee + Investment and business in technical infrastructure of Xeo Ro Industrial Park Complex (including: Industrial Park, Service Commercial Zone, Residential - Resettlement Area). + Investment in industrial production with such industries as: Processing seafood; food and food processing; mechanical industry; shipbuilding industry; production of building materials and some other industries. ▪ Land lease fee: 15 USD ▪ Factory lease fee: 2 USD ▪ Management fee: 0,5USD/m2/years 656 Layout plan INFRASTRUCTURE AND FACILITY Distance from the nearest Banking, nearest State Tax and Finance Agency, nearest Logistic Center, Universities, training facilities, etc., Road Width,… 657 TAC CAU INDUSTRIAL ZONE GENERAL INFORMATION Address Hoa Phu commune, Chau Thanh district, Kien Giang province Investor N/A Location About 17 km from Rach Gia city center; It is about 5 km from the center of Chau Thanh district Distance to the nearest airport: About 12 km from Rach Gia Airport Distance to the nearest seaport: About 17 km from Rach Gia city center; It is about 5 km from the center of Chau Thanh district Investment Sectors Minimum wage Lease term Minimum Lease Area Priority Sectors for Investment Processing agricultural products, aquatic products, food, manufacturing consumer goods and garments, leather shoes, plastic products, animal feed, livestock and poultry, mechanical and electronic assembly.... 3,640,000 VND/month ▪ 50 years 10000 (m2) Limit for Construction Height N/A Planned area ▪ Total area: 68ha Operation Status Occupancy Rate and Number of Projects Lease fee Operating fee ▪ Active 50% ▪ Land lease fee: 30 USD/m2 ▪ Factory lease fee: 2 USD ▪ Management fee: 0,5USD/m2/years Electricity price: - Normal hours: 1,452 VND/kWh. - Off-peak hours: 918 VND/kWh. - Peak hours: 2,673 VND/kWh. (Note: Price does not include value added tax) Water price: 8,500 VND/m3. 658 Layout plan INFRASTRUCTURE AND FACILITY Distance from the nearest Banking, nearest State Tax and Finance Agency, nearest Logistic Center, Universities, training facilities, etc., Road Width,… 659 [- This Page is intentionally left blank -] 660 KON TUM 661 INVESTMENT ENVIRONMENT IN KON TUM USD/VND 23.510 GENERAL INFORMATION Area Population Geographical Location Adjacent provinces 9676 km2 0,569 million people (2022) ▪ Kon Tum is located in Central Highlands region. Kon Tum is located on the East-West Economic Corridor (sea and continent) and the Central Coast economic arc; Kon Tum has a particularly important geographical position, belonging to the Vietnam - Laos Cambodia Development Triangle area, where there is "the three-border landmark of Vietnam Laos - Cambodia". 2022 statistic: GRDP Industry growth Import - Export Key Industry PCI Ranking ▪ Real GRDP (billion VND): 17.626 ▪ GRDP growth: 9,50% ▪ GRDP per capita (million VND/year): 52,44 (0,757918 billion USD) (2234 USD) ▪ Economic structure: - Industry - Construction: 26,83% - Agriculture. forestry and fishery: 19,75% - Service: 44,80% ▪ Industry - Construction growth: 14,88% ▪ Agriculture, forestry and fishery growth: 6,19% ▪ Service growth: 8,03% Import turnover (billion USD): 0,01 Export turnover (billion USD): 0,32 (Growth rate: 0,1) Producing coffee, rubber, macadamia, sugar cane, cold vegetables - flowers, red ginseng and other rare and precious materials; afforestation associated with forestry economic development; develop beef cattle, dairy cows, goats, freshwater aquatic products and cold sturgeon...; production of renewable energy such as wind power, solar power,... 64.89 37 SOCIAL INFRASTRUCTURE Transportation Electricity Water ▪ Roadway: National Highway 14, National Highway 40, National Highway 24 ... convenient connection to Central provinces, Central Highlands and the whole country. ▪ Power sources based on renewable energy sources besides hydroelectricity that Kon Tum province has potential, especially wind power, solar power.... The water source of 80 irrigation reservoirs in Kon Tum province has a storage capacity of 86% or more of the design capacity, basically ensuring irrigation for the Winter-Spring crop in 20222023. Education & Training N/A Medicare N/A INVESTMENT CONDITION Human resource 49,32% of population are in the working age (2022) Education level Trained labor rate: () Salary ▪ The minimum salary for the province is applied as follows: 662 - Area I (4,680,000 VND/month): N/A - Area II (4,160,000 VND/month): N/A - Area III (3,640,000 VND/month): Kon Tum City, Dak Ha District - Area IV (3,250,000 VND/month): Dak To, Dak Glei, Ia H'Drai, Kon Long, Kon Ray, Ngoc Hoi, Sa Thay, Tu Mo Rong Districts (Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages paid to employees working under employment contracts) Investment incentives Fields Attracting Investment Investment attraction situation ▪ Incentives according to government regulations: - Exemption and reduction for land and water rent fee - Preferential tax rates and exemption period, reduction for corporate income tax. - Import tax exemption Production of renewable energy such as wind power, solar power,... Total registered capital of nearly 172.6 billion VND, 9 projects outside industrial parks and economic zones with total registered capital of 1,483 billion VND; In addition, a number of potential investors and corporations such as: Sun Group, Hung Nhon, Him Lam Joint Stock Company, Nutifood, ... have come to survey and look for investment opportunities in the province. Map Kon Tum Department of Planning & Investment Contact ▪ Address: 12 - Nguyen Viet Xuan - Kon Tum City, Kon Tum Province. 663 ▪ Tel: 2603862710 ▪ Email: skhdt@kontum.gov.vnsokehoachdautu kontum@chinhphu.vn ▪ Contact person: - Mr. Ngo Viet Thanh - Director of Department of Planning and Investment of Kon Tum province 664 [- This Page is intentionally left blank -] 665 LAI CHAU 666 INVESTMENT ENVIRONMENT IN LAI CHAU USD/VND 23.510 GENERAL INFORMATION Area Population Geographical Location Adjacent provinces 9059 km2 0,484146 million people (2022) ▪ Lai Chau is located in Northwest region. It is located 450 km from Hanoi. Lai Chau is located in the northwest of Vietnam. The province shares its borders with Yunnan province (China) to the North, with other provinces of Lao Cai, Yen Bai, and Son La to the East and with Dien Bien to the West and Southwest. The province has a common border with China of 273 km in length. 2022 statistic: GRDP ▪ Nominal GRDP (billion VND): 23.943 (1,029555364 billion USD) ▪ Real GRDP (billion VND): 14.146 (0,608297221 billion USD) ▪ GRDP growth: 9,00% ▪ GRDP per capita (million VND/year): 29,22 (1256,43343330318 USD) ▪ Economic structure: Industry growth Import - Export Key Industry PCI Ranking - Industry - Construction: 39,57% - Agriculture. forestry and fishery: 14,49% - Service: 39,41% ▪ Industry - Construction growth: 14,78% ▪ Agriculture, forestry and fishery growth: 4,77% ▪ Service growth: 5,05% Import turnover (billion USD): 0,03 (Growth rate: 0,057) Export turnover (billion USD): 0,01 (Growth rate: -0,537) Hydropower industry, processing industry 62. 05 57 SOCIAL INFRASTRUCTURE Transportation Electricity Water Education & Training Medicare Transportation is Lai Chau is rather challenging due to its difficult topography. Roadway is the major means in the province. There are 5 national highways running through the province (National highways No. 12, 32, 4D, 279, 100 with the total length of 216 km). National highway no. 12 connects Dien Bien Phu city with China (through Ma Lu Thang border gate). National 4D connects to Sapa town of Lao Cai province. Electricity grid was combined of different lines including 110, 35, 22, 10 and 0.4 KV and transformer systems. The 110KV line is 87 km long; the 35KV line: 688 km; the 22KV line: 0.16km; the 10KV line: 5.9km; the 0.4KV line: 408 km. There are two 110 KV substations with the total capacity of 16,000KV; a 35/6KV substation with capacity of 48.429 KVA; a 22/0.4 KV substation with capacity of 10KVA; 6 10/0.4 KV substations with the total capacity of 920KVA; a 04/10 KV substation with capacity of 1,120K Water supply works mainly meet a water demand in urban areas. There are 390 schools, reaching 64.78% (increasing 14 schools, increasing 2.28% compared to 2021). N/A INVESTMENT CONDITION Human resource 52% of population are in the working age (2022) Education level Trained labor rate: 58.28% (2022) 667 ▪ The minimum salary for the province is applied as follows: - Area I (4,680,000 VND/month): N/A - Area II (4,160,000 VND/month): N/A Salary - Area III (3,640,000 VND/month): Lai Chau City - Area IV (3,250,000 VND/month): The districts of Muong Te, Phong Tho, Sin Ho, Tam Duong, Than Uyen, Tan Uyen, Nam Nhun (Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages paid to employees working under employment contracts) Investment incentives Fields Attracting Investment Investment attraction situation Industrial zones ▪ Incentives according to government regulations: - Exemption and reduction for land and water rent fee - Preferential tax rates and exemption period, reduction for corporate income tax. - Import tax exemption ▪ Incentives from the province: - The preferential tax rate of 10% for a period of 15 years applies to: Newly established enterprises from investment projects in the province. - Tax exemption for 4 years, 50% reduction of tax payable in the next 9 years for newly established enterprises from investment projects in the province. - For employees with household registration in Lai Chau province: The level of support for labor training is from 02 to 03 million VND/person/course. Agricultural production to develop local specialties; application of high technology in agriculture, connectivity between businesses and farmers, sustainable forestry development, renewable energy, mining, building materials production, agricultural and forestry product processing, economic activities at border gates, and tourism. Up to now, Lai Chau has 1 FDI projects with the total investment capital is about 1.5 million US dollars. There are 2 industrial zones which are Muong So IZ (Phong Tho district) covering 200 hectares and Tam Duong IZ (Tam Duong district) covering 200 hectares. Map Department of Planning and Investment Lai Chau ▪ Address: The 7th Floor B Zone administrative center - Lai Chau politics Contact ▪ Tel: (84-213) 3876 501 ▪ Email: so.kh&dt-laichau@chinhphu.vn 668 ▪ Contact person: - Mr. Dang Tran Thang - Director - Tel: 84-913 253 23 669 [- This Page is intentionally left blank -] 670 LAM DONG 671 INVESTMENT ENVIRONMENT IN LAM DONG GENERAL INFORMATION ▪ Area: 9.773 km2 Area, Population Geographical Location ▪ Population: 1,322 million ▪ Located in the subtropical mosoon area with average annual temperature ranging from 18-25o Celcius, at the altitude of 800-1500m above sea level. ▪ Located near Liên Khương International Airport, 30km from Đà Lạt city to the south Adjacent provinces ▪ Lâm Đồng borders Bình Thuận province to the south east, Khánh Hòa anh Ninh Thuậ provinces to the east, Đăk Lăk – Đăk Nông provinces to the north, Đồng Nai – Bình Phước provinces to the west, south west. 2021 statistic: ▪ Nominal GRDP: 81,157 billion VND (3.53 billion USD) ▪ GRDP growth: 2.58% ▪ Nominal GRDP per capita: 65.93 million VND/year GRDP ▪ Economic Structure: - Industry and Construction: 20.03% - Service: 38.88% - Agriculture, Forestry and Fishery: 41.09% 2021 statistic: ▪ Industry - Construction growth: 6.28% Industry growth ▪ Agriculture, forestry and fishery growth: 4.8% ▪ Service growth: -1.84% PCI ▪ Score: 67.26 – ranked 17th out of 63 cities and provinces in Vietnam (2022) SOCIAL INFRASTRUCTURE Transportation ▪ Roadway: National Roads: 20, 27, 28, 55; Provincial roads: 722, 723, 724, 725 connecting south central, southeast anh central highland provineces. ▪ Airway: Liên Khương International Airport, 30km from Đà Lạt city to the south. Electricity ▪ Supplied from the national power network ▪ Quality underground water is mainly used in water supply system Water ▪ In area: 08 water stations in operation with total capacity of 61,000 m3/day 672 ▪ In industrial zones, industrial clusters: 04 water stations in operation with total capacity of 24,400 m3/day Education ▪ 02 universities, 04 colleges, 01 technical schools and 53 vocational training schools in the province. Medicare ▪ 06 provincial hospitals, 12 district hospitals and 01 private hospitals INVESTMENT CONDITION Human resource ▪ Around 60% of population in working age (2021) Education level ▪ Trained labor rate: 18.8% (2021) ▪ The minimum salary for the province is applied as follows (see appendix for detail amount): Salary - Area II: including: Bảo Lộc City - Area III: including: Đức Trọng district ▪ Incentives according to government regulations: Exemption and reduction for land and water rent fee Investment incentives - Preferential tax rates and exemption period, reduction for corporate income tax. Import tax exemption ▪ Prioritized Projects: - High technology, industrial electronics, information technology; mechanical engineering products; - Supporting industry; Fields Attracting Investment - Projects using high technology, modern techniques; ecological environment preservation; research, development and high-technology incubators; - Development of trade, service and tourism; - Construction and development of infrastructure and key projects; - Development of education, training, health, fitness and sports. Map 673 Office of Lam Dong Industrial Zones Authority Address: No 36 Tran Phu, 4 Ward, Dalat City, Lam Dong Province Contact Tel: (84-263) 3 549 106 Fax: (84-263) 3 549 104 E-mail: bqlkcn@lam dong.gov.vn LIST OF INDUSTRIAL ZONES IN LAM DONG No Industrial zone Name Total Area (ha) Occupancy Rate Status 1 Phú Hội Industrial Zone 109 97,9% In operation 2 Lộc Sơn Industrial Zone 183 85,8% In operation 3 Phú Bình Industrial Zone 246 LÂM ĐỒNG’S LOCATION MAP OF INDUSTRIAL ZONES 674 Planning PHU HOI INDUSTRIAL ZONE GENERAL INFORMATION Phú Hội commune, Đức Trọng district, Lâm Đồng Province, Vietnam Address Investor Contact Person Lộc Sơn – Phú Hội Infrastructure Development Company ▪ Address: No 371, Thống Nhất Street, Đức Trọng district, Lâm Đồng province, Vietnam. ▪ Tel: (84-263) 3678 515 ▪ Website: http://liza.lamdong.gov.vn ▪ Võ Văn Hậu - Director - Mobile: +84 - 989-200 272 - Email: hauvv@lamdong.gov.vn Minimum wage - From HCMC: 270 km - From Da Lat: 30 km - From Lien Khuong airport: 03 km - Close to major communications network - Advantages of geographical location: Ho Chi Minh City seaport, Dong Nai, Binh Thuan, Khanh Hoa, main industrial parks in the south. - The labor abundant, stable from local and neighboring provinces. Priority Sectors for processing of manufacturing products for tourism, processing vegetables, Investment seafood, wine, jams, sweets, industrial production of building materials, high quality bricks, processing forestry, wood products, agricultural products, electronics and other industrial sectors [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries Lease term 2005 - 2055 Limit for Construction Height Permitted Construction Rate In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning regulation (QCXDVN 01: 2008/BXD) Construction area is 50%-70% of the total leased land lot Planned area ▪ Total area: 109 ha Operation Status ▪ In operation Occupancy Rate and Number of Projects Number of Korean Projects ▪ 97.9% ▪ 33 Projects ▪ 03 projects Lease fee ▪ Land lease fee: 5.200VND/m2 /year ▪ Payment: - Method: Bank Transfer in VND - Annual payment ▪ Management fee: 0.16 USD/m2/year ▪ Electricity fee: According to the Circular by Ministry of Industry and Trade, Location Investment Area Operating fee 675 Layout Plan 676 LOC SON INDUSTRIAL ZONE GENERAL INFORMATION Lộc Sơn ward, Bảo Lộc City, Lâm Đồng Province, Vietnam Address Investor Contact Person Location Investment Area Minimum wage Lease term Limit for Construction Height Permitted Construction Rate Planned area Lộc Sơn – Phú Hội Infrastructure Development Company ▪ Address: No 371, Thống Nhất Street, Đức Trọng district, Lâm Đồng province, Vietnam. ▪ Tel: (84-263) 3678 515 ▪ Website: http://liza.lamdong.gov.vn ▪ Võ Văn Hậu - Director - Mobile: +84 - 989-200 272 - Email: hauvv@lamdong.gov.vn Close to major communications network From HCMC : 190km From Da Lat : 110km Advantages of geographical location: Ho Chi Minh City seaport, Dong Nai, Binh Thuan, main industrial parks in the south, Lien Khuong airport 80 km from the north. The labor abundant, stable from local and neighboring provinces Priority Sectors processing of coffee, tea, silk, building materials, aluminum production, for Investment paving stones, electronic assembly, processing woods, shoes, clothing industry ... [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries ▪ Start date: 2004 ▪ End date: 2054 In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning regulation (QCXDVN 01: 2008/BXD) ▪ 183 ha Factory Available for Rent None Operation Status In operation Occupancy Rate and Number of Projects Number of Korean Projects ▪ 85.8% ▪ 51 projects 02 projects Lease fee ▪ Land lease fee: 10.800VND/m2 /year ▪ Management fee: 0.16 USD/m2/year ▪ Electricity fee: According to the Circular by Ministry of Industry and Trade ▪ Waste treatment fee: According to contract INFRASTRUCTURE AND FACILITY Operating fee 677 Layout Plan 678 [- This Page is intentionally left blank -] 679 LANG SON 680 INVESTMENT ENVIRONMENT IN LANG SON GENERAL INFORMATION Area and population ▪ Area: 8,310 km2 ▪ Population: 802,090 Million (Data 2022) Geographical location ▪ Lang Son is a mountainous province, located in the Northeast of Vietnam ▪ Lang Son is 154 km from Hanoi by road and 165 km by railway. ▪ Having a border line over 231 km long, there are 02 international border gates, 01 main border gate and 09 auxiliary border gates, openings. Adjacent provinces ▪ The North borders Cao Bang province ▪ The East borders Quang Ninh province and Sung Ta city (Guangxi, China). ▪ The South borders Bac Giang province ▪ The West borders Bac Kan province and Thai Nguyen province. GRDP Figures for 2022: ▪ GRDP Index: 22,683 Billion VND ▪ GRDP Growth: 7.22% ▪ GRDP per capita: 51.72 million VND/person ▪ Economic structure: - Industry - Construction: 24.40%; - Agriculture: 21.10%; - Service: 49.98%; - Product tax: 4.53% Industry growth Figures for 2022: ▪ Processing and manufacturing industry: 10.25% ▪ Total turnover of import and export goods through Lang Son province reached 23,849 million USD ▪ Service increase: 12.49% PCI ▪ According to the announcement of VCCI, with a composite score of 67.88 points, Lang Son province ranked 15th out of 63 provinces and cities in the country, up 21 places compared to 2021; ranked 5th out of 14 provinces in the Northern mountainous region (2022). SOCIAL INFRASTRUCTURE Transportation ▪ Main roads: The arterial traffic routes running through the province such as National Highway 1A (Huu Nghi - Hanoi: 150km), National Highway 4A (Dong Dang - Cao Bang: 118km), National Highway 4B (Lang Son - Mui Port: 118km), National Highway 4B (Lang Son - Mui Port) Pagoda, Quang Ninh: 114km), National Highway 1B (Lang Son - Thai Nguyen: 160km). ▪ Railway: Intermodal railway Hanoi - Lang Son - China. ▪ Waterway: 114km from Mui Chua port - Quang Ninh, 220km from Dinh Vu port Hai Phong. ▪ By air: 152km from Noi Bai International Airport, 135.2km from Van Don Airport. Electricity The whole province has 4 110kV transformer stations, a relatively complete power transmission line system that can supply enough for consumption and production. Currently, 100% of communes are using electricity from the national grid. Water The whole province has a clean water supply system with a total capacity of 50,020m3/day, which can basically fully meet the clean water source for residential areas and a part of the clean water demand for production and business of enterprises. located in the city and surrounding areas. Education & Training ▪ Kindergarten: 232 ▪ Elementary School: 180 681 ▪ Middle School: 141 ▪ Elementary and Middle School: 72 ▪ High School: 26 ▪ Vocational Education Center - GDTX: 09 ▪ Education Center: 01 ▪ Center for Informatics and Foreign Language Education: 01 ▪ Professional school: 01 ▪ College: 04 INVESTMENT CONDITION Human resource ▪ 515,324 people of working age (2022) Education level ▪ Proportion of people with professional training: 50% (2022) Salary ▪ Region III: Minimum monthly salary is 3,640,000 VND, minimum hourly wage is 17,500 VND. Apply to: Lang Son City. ▪ Region IV: Minimum monthly salary is 3,250,000 VND, minimum hourly wage is 15,600 VND. Apply to: Bac Son, Binh Gia, Cao Loc, Chi Lang, Dinh Lap, Huu Lung, Loc Binh, Trang Dinh, Van Lang, Van Quan districts. ▪ The salary paid to employees who have undergone vocational training or vocational training is at least 7% higher than the corresponding regional minimum wage. Investment incentives ▪ Incentives decided by the government - Exemption and reduction of land and water surface rents - Incentives on tax rates and duration of corporate income tax exemption and reduction. - Import duty free ▪ Incentives according to the decision of the province Investment support policy in Lang Son province according to Resolution No. 16/2022/NQ-HDND dated 07/07/2022 (Attached file). Fields Attracting Investment - Agriculture and Forestry - Industry Development - Development of tourism - services - Developing border economy Map Contact Investment Promotion Center - Department of Planning and Investment ▪ Address: No. 2 Hoang Van Thu - Chi Lang Ward, Lang Son City Tel: 025.3816.815 ▪ Email: ttxtdtls@gmail.com 682 683 LIST OF INDUSTRIAL PARKS NO. INDUSTRIAL ZONE NAME OCCUPANCY RATE STATUS Dong Banh Industrial Park TOTAL AREA (HA) 162,13 1 90% In operation 2 Huu Lung Industrial Park 599,76 ha - In operation DONG BANH INDUSTRIAL PARK MAP 684 DONG BANH INDUSTRIAL PARK GENERAL INFORMATION Address Investor Hoa Lac commune, Huu Lung district and Chi Lang town, Chi Lang district, Lang Son province Management Board of Dong Dang - Lang Son Border Gate Economic Zone ▪ Address: Ly Thai To Street, Dong Kinh, Lang Son City, Lang Son ▪ Tel: 0205 3875 708 ▪ Email: banqlktck@langson.gov.vn ▪ Website: https://banqlktck.langson.gov.vn/ Location - Distance from province: 180 km from Hanoi city, 34 km from Lang Son city - Distance from airport: Noi Bai airport 186 km - Distance from port: Cai Lan port 142 km Investment sectors Areas of investment promotion: Areas of investment restriction: Mininum Wage Lease term + Group of industries of mechanical assembly, manufacturing of spare parts; + The industry group produces high-quality plastic parts; + Group of industries producing and assembling electronic components and electronic circuits; + Group of industries producing and processing molds with high technical standards; + Other industrial service industries. none Region IV: Minimum regional salary according to Decree No. 38/2022/ND-CP 50 years Minimum Lease Area not required Limit for Construction Height In accordance with the National Technical Regulation on construction planning (QCVN 01:2021/BXD) Permitted Construction Rate Planned area Factory available for Rent Operation Status Occupancy rate and number of projects Number of Korean projects Lease fee ▪ Total area: 162.13 ha ▪ Area for building factories and warehouses: 110.97 ha Not available yet Infrastructure is being built ▪ Occupancy rate: 33.61 ha (equivalent to 20.73%) ▪ Number of projects in the area: 2 projects None ▪ Land rental cost: 20-30 USD ▪ Factory rental cost: 2 USD 685 Operating fee ▪ Management cost: 0.2USD/m2 ▪ Electricity cost: Rush hour: 0.1 USD Normal: 0.05 USD Off-peak hours: 0.03 USD ▪ Water cost: 0.4 USD/m3 ▪ Waste water treatment fee: 0.3 USD/m3 INFRASTRUCTURE - Industrial production land includes: + Construction of factories and production enterprises; + Building warehouses and yards; - Industrial zone administrative and service land area includes: + Operators and managers of industrial parks; + Banking and financial transaction office; + Product introduction center; + Police station; + Specialized fire prevention and fighting teams in industrial parks; - Technical infrastructure works include: + Water supply station; + Waste water treatment station; + 110KV power station; + Parking lot; - Green land and water surface area, including: + Landscape land; + Isolate green land; + Water surface in the industrial park; LIST OF SOME NOTABLE TENANTS No. Company name Countries Business fields 1 DONG BANH Cement Factory Vietnam Cement production 2 LANG SON CONSTRUCTION JOINT STOCK COMPANY Vietnam Producing concrete and products from cement - cement and gypsum 686 HUU LUNG INDUSTRIAL PARK GENERAL INFORMATION Address Location Investment sectors Ho Son commune and Hoa Thang commune, Huu Lung district The North borders Na Vi village and Dong Gia village, Ho Son commune; The South borders on Suoi Ngang 1 village, Hoa Thang commune; The East borders Hanoi - Lang Son railway; West borders Bac Giang - Lang Son highway. Areas of investment promotion: Areas of investment restriction: Mininum Wage Lease term + Group of industries of mechanical assembly, manufacturing of spare parts; + The industry group produces high-quality plastic parts; + Group of industries producing and assembling electronic components and electronic circuits; + Group of industries producing and processing molds with high technical standards; + Other industrial service industries. none Region IV: Minimum regional salary according to Decree No. 38/2022/ND-CP 50 years Minimum Lease Area not required Limit for Construction Height In accordance with the National Technical Regulation on construction planning (QCVN 01:2021/BXD) Permitted Construction Rate Planned area Factory available for Rent Operation Status ▪ Total area: 599,76 ha Not available yet Infrastructure is being built Occupancy rate and number of projects N/A Number of Korean projects None Lease fee ▪ N/A Operating fee Management fee: 0.2 USD/m2 Electricity price: 0.03 - 0.1 USD / KWh Water price: 0.4 USD/m3 Wastewater treatment: $0.28/m3 INFRASTRUCTURE 687 - Industrial production land includes: + Construction of factories and production enterprises; + Building warehouses and yards; - Industrial zone administrative and service land area includes: + Operators and managers of industrial parks; + Banking and financial transaction office; + Product introduction center; + Police station; + Specialized fire prevention and fighting teams in industrial parks; - Technical infrastructure works include: + Water supply station; + Waste water treatment station; + 110KV power station; + Parking lot; - Green land and water surface area, including: + Landscape land; + Isolate green land; + Water surface in the industrial park; [- This Page is intentionally left blank -] 688 LAO CAI 689 INVESTMENT ENVIRONMENT IN LAO CAI GENERAL INFORMATION Area, Population Area: 6,364.03 km2 Population: 770.60 thousand people (2022) Geographical Location Lao Cai is a highland province, located in the North of Vietnam 245km from Hanoi by road, 296km by railway It borders Ha Giang province to the East, Yen Bai province to the South, Lai Chau province to the West, and Yunnan province (China) to the North. Adjacent provinces 2022 statistic: GRDP - GRDP scale: 68,000 billion VND (2.89 billion USD) GRDP growth rate: 9.02% GRDP per capita: 90 million VND/year Economic structure: Industry - Construction: 44.85% Agriculture, Forestry and Fishery: 13.97% Tourism and Services: 41.18% Goods taxes: 10.16 % 2022 statistic: Industry growth Industry – Construction growth: 8.62 % Agriculture, Forestry and Fishery growth: 4.47 % Services growth: 10.76 % PCI ranked 11th out of 63 cities and provinces in Vietnam (2022) SOCIAL INFRASTRUCTURE Transportation Roadway: Five national highways with a total length of 456km and Noi Bai Lao Cai highway with a length of 72km through the province; 16 provincial roads with a length of 969km and more than 9,500km of rural roads Waterway: The inland waterway system through Lao Cai province has great potential for transportation with 2 major river routes flowing through are the Red River and Chay River with a total length of about 230km. Railway: The province has about 120 km of railways, of which the 62 km section through Lao Cai territory belongs to the railway line maintaining international transport operations Hai Phong - Hanoi - Lao Cai (Vietnam) - Kunming (China). Airway: Sa Pa airport – airport standards of grade 4C, capacity of 1.5 million passengers/year is being invested to soon put into operation. Electricity 231 km of 220KV lines (two 220KV substations) and 450km of 110KV lines (five 110KV substations) Water Water supply system with a total capacity of 109.6 thousand m3/day and night Education Lao Cai province has 01 branch of Thai Nguyen University - Lao Cai campus, 15 vocational education centers (01 college, 01 secondary school, 12 vocational education centers and 01 enterprise with vocational education activities). On average, every year, vocational training institutions recruit and train more than 13,359 people Medicare 5 provincial hospitals, 9 district hospitals and 01 private hospitals 690 INVESTMENT CONDITION Human resource 60% of population in working age (2022) Education level Trained labor rate: 66.7% (2022) Salary The regional minimum wages are applied as follows: Region II: Lao Cai city (minimum salary 4,160,000 VND/month) Region III: Sa Pa town, Bao Thang district (minimum salary 3,640,000 VND/month) Region IV: Districts: Bao Yen, Bat Xat, Muong Khuong, Si Ma Cai, Van Ban (minimum salary 3,250,000 VND/month) Average salary of workers in industrial zones: Foreign-owned enterprises: 6,000,000 VND/person/month; Domestic capital enterprises: 9,500,000 VND/person/month Investment incentives Lao Cai province is always committed to improving the investment and business environment in the direction of transparency and openness, creating the most favorable conditions for investors and businesses. Apply the regulations on preferential policies of the Central Government in relevant legal documents such as land, corporate income tax, import and export tax, investment incentive industries and professions. Fields Attracting Investment Large scale commodity agriculture, application of modern science and technology in the chain of production, processing and consumption of products. Develop processing, manufacturing, mineral processing, agricultural products, processing and assembly in the direction of high technology, clean technology, deep processing, raising the localization rate, quality product quality, environmentally friendly, low energy consumption, creating jobs for many workers. Attract investment in the construction of logistics zones, inland ports, commercial infrastructure, technical infrastructure serving the border gate economy, industrial parks and industrial clusters. The fields of digital economy, digital technology. Strongly attract and develop high-quality and modern tourist service, cultural-spiritual tourism and entertainment service areas, especially advantageous services, green, smart and attractive tourism products, highly competitive lead. Map 691 Lao Cai Department of Planning and Investment Address: Block 2, Nam Cuong ward, Lao Cai citry, Lao Cai province Contact Phone: 02143.840 810 or 02143.840 034 Fax: 02143.823466 Email: skhdt@laocai.gov.vn 692 LIST OF INDUSTRIAL ZONES Industrial zone Name Total Area (ha) Occupancy Rate Status Bac Duyen Hai Industrial zone 85ha 98.2% Currently filled, operating stably, so there is no need to call for investment attraction Dong Pho Moi Industrial zone 100h 86,58% In operation Tang Loong Industrial zone 1,100ha 81,69%; In operation 693 DONG PHO MOI INDUSTRIAL ZONE GENERAL INFORMATION Address Stay in economic zone of Lao Cai border, belonging to Pho Moi Ward, Lao Cai City, closely to Lao Cai international railway station Investor Invest with state budget capital Location Mechanical assembly workshop; electronic production and assembly; processing agricultural and forestry products; storages Minimum wage Lease term Minimum Lease Area Limit for Construction Height Permitted Construction Rate Planned area Operating fee 4.16 million VND/person/month N/A 100ha The average building height of each land lot is 1-2 floors. The average construction density for each specific land lot is 50-55% Total area: 100h Area available for rent: 65ha + Electricity cost: According to the price set by the Ministry of Industry and Trade + Cost of production water: Average 12,000VND/m3 + Cost of wastewater treatment: Average 12,000VND/m3 Operation Status In operation Occupancy Rate and Number of Projects 86,58%; 42 projects (The remaining land fund to expand the Hoa Truong station to serve the development of railway infrastructure when upgrading to 1,435m gauge) Lease fee Land rental cost: 4,000,000VND/m2 694 Map 695 TANG LOONG INDUSTRIAL ZONE GENERAL INFORMATION Address Investor Location Minimum wage Lease term Minimum Lease Area Limit for Construction Height Permitted Construction Rate Phu Nhuan commune and Tang Loong town, Bao Thang district, Lao Cai province. Invest with state budget capital Metallurgy, chemical, mineral extraction and other supporting industries. 3.64 million VND/person/month N/A 587.8ha The average building height of each land lot is 1.5-3 floors. The average construction density for each specific land lot is 40-60%. Planned area Total area: 1,100ha Area available for rent: 587.8ha Operating fee + Electricity cost: According to the price set by the Ministry of Industry and Trade + Cost of production water: 9,000VND/m3 + Cost of household water: 11,000VND/m3 + Cost of wastewater treatment: 16,238.2VND/m3 Operation Status In operation Occupancy Rate and Number of Projects 81,69%; 29 projects (The remaining land fund is limited, mainly high hills and no clear ground, still inhabited interspersed. The purpose of attracting investment projects to produce the following products is Gold, Silver, Copper, Phosphorus….) Lease fee 2,000,000VND/m2 696 Map 697 [- This Page is intentionally left blank -] 698 LONG AN 699 INVESTMENT ENVIRONMENT IN LONG AN GENERAL INFORMATION Area, Population Area: 4,494.93 km2 Population: 1,738,000 people. Long An has 15 administrative units, including 1 city, 01 town, 13 districts; The administrative center is Tan An city. Geographical Location Long An is a province in the Mekong Delta region - has a special position as the gateway between two regions: the Mekong Delta and the Southeast region, bordering the Kingdom of Cambodia and Ho Chi Minh City. Ho Chi Minh City - enjoy the spread of industrial and urban development of the city. Ho Chi Minh. From Ho Chi Minh City, it is easy to move to Long An in about 40-50 minutes, and in Long An there is almost no traffic jam. Adjacent provinces Long An is adjacent to Ho Chi Minh City and Tay Ninh province to the east, to Cambodia to the north, to Dong Thap province to the west and Tien Giang province to the south. GRDP 2022 statistic: GRDP growth: 8.46% GRDP per capita: 90.2 million VND/year (3846 USD/year) Economic structure: - Industry - Construction: 52.33%; - Agriculture, forestry and fishery: 14.72%; - Services: 26.66%; Industry growth 2022 statistic: Industry – Construction increased: 11.15% Agriculture increased: 0.71% Service increase: 21% Import and export: -Export turnover: 6.7 billion USD - Import turnover: 5.1 billion USD PCI ▪ Điểm PCI: 68,45 – Xếp thứ 10 trên 63 tỉnh Việt Nam. (2022) SOCIAL INFRASTRUCTURE Transportation Electricity Roadway: Expressways passing through the province include: Ho Chi Minh City Trung Luong road: connecting Ho Chi Minh City with provinces in the Mekong Delta, Ben Luc - Long Thanh Expressway connecting to Dong Nai and Eastern provinces Southern. National Highway System: 1A, 50, 62, N1, N2 (Ho Chi Minh Road). Waterway: The waterway system managed by the province includes the HCMC route. Ho Chi Minh - Kien Luong, City. Ho Chi Minh City-Moc Hoa, Moc Hoa-Ha Tien, City. Ho Chi Minh - Ha Tien. The whole province has more than 5,261 km of medium voltage lines, 4,929 km of low voltage lines; 20,480 substations with a total capacity of 5,096,023 kVA; 310,108km of 110KV transmission line, 20 110 kV stations with a capacity of 2,032 MVA; 02 220 kV stations with a capacity of 928 MVA. 100% of communes, wards and townships have electricity from the national grid. In addition, in 2021, Long An has granted investment certificates for 2 projects of Long An LNG 1 & 2 thermal power plants, with an expected capacity of 3,000 MW, 700 total investment capital of over 3 billion USD, which will meet the demand for use. electricity for daily life and production and business activities in the province. Water Education Medicare Number of factories/clean water treatment stations at present: there are 36 factories, 1413 rural water supply stations (> 30 households). Total capacity of existing factories and water supply stations: 345,700 m³/day (updated in 2021 is 445,112 m³/day and night, 2022 is 515,112 m³/day). In which: urban wells is 205,700m³/day (updated in 2021 is 220,700m³/day, in 2022 it increases by 290,700 m/day), wells in rural areas are 140,000m³/day (updated in 2021 is 224,412 m³/day). Demand for water according to the approved planning: by 2025 is 511,989m³/day; by 2030 is 627,457 m³/day and night. Long An currently has 2 universities, 1 Pedagogical College, and 39 vocational training institutions. (25 public institutions, accounting for 64%; 14 non-public establishments, accounting for 36%), of which: 3 Vocational Colleges, 6 Vocational Intermediate Schools, 7 Vocational Training Centers, 18 units public institutions, 4 enterprises and 1 cooperative engaged in vocational training... Public health centers including: 29 affiliated units; 15 medical centers at district, town and city level; 5 regional polyclinics and private medical facilities. INVESTMENT CONDITION Human resource According to the statistical yearbook, in 2021, the labor force aged 15 and over will reach 992.7 thousand people. Education level Rate of trained workers: 73.35 (2022) Including degrees and certificates: 32.07% Salary Long An currently has: Area II, III and IV: Area II: VND 4,160,000/month and VND 20,000/hour, applicable to enterprises operating in the area of Region II, including: Tan An city and districts of Ben Luc, Can Duoc, Can Giuoc, Germany Hoa and Thu Thua. Area III: 3,640,000 VND/month and 17,500 VND/hour, applicable to enterprises operating in the area of Region III, including: Kien Tuong town and Chau Thanh, Duc Hue, Tan Tru and Thanh districts. Chemistry. Area IV: 3,250,000 VND/month and 15,600 VND/hour, applicable to enterprises operating in the area of Region IV, including: the remaining districts of the province: Moc Hoa, Tan Hung, Tan Thanh and Vinh Hung. Investment incentives Incentives according to the Government's regulations: Exemption and reduction of land and water rents; Preferential tax rates and duration of corporate income tax exemption and reduction. Import duty free Fields Attracting Investment Agriculture: high quality organic agriculture associated with key products such as rice, vegetables, dragon fruit, lemon, beef,...; high-tech agricultural model combining eco-tourism… Industry: Supporting industry, processing and manufacturing, automation, manufacturing components - electronic equipment and software, microchips, semiconductor industry, artificial intelligence; recycled energy. Developing urban complexes, commerce, entertainment services, combining resort villas and world-class golf courses, etc. Marine economy, maritime services, logistics, finance, import and export. 701 Map Contact Tên cơ quan liên hệ: Sở Kế hoạch và Đầu tư tỉnh Long An ▪ Address / địa chỉ: No. 61, Truong Dinh, Tan An city, tỉnh Long An ▪ Tel: 0272.3886009 ▪ Fax : ▪ Email: skhdt@longan.gov.vn ▪ Contact person: Mr. Nguyen Vu Dat, : Investment Promotion Specialist - Tel: 0394039659 – Email: nguyenvudat@longan.gov.vn 702 LIST OF INDUSTRIAL ZONES No Industrial zone Name Total Area (ha) Occupancy Rate 1 KCN Đức Hòa 1 (Duc Hoa 1 Industrial Park) KCN Xuyên Á (Xuyen A Industrial Park) KCN Tân Đức (Tan Duc Industrial Park) KCN Đức Hòa III (Duc Hoa III Industrial Park) KCN Tân Đô (Tan Do Industrial Park) KCN Hải Sơn (Hai Son Industrial Park) KCN Vĩnh Lộc 2 (Vinh Loc 2 Industrial Park) KCN Nhựt Chánh (Nhut Chanh Industrial Park) KCN Phúc Long (Phuc Long Industrial Park) KCN Phú An Thạnh 257.49 70.64% In operation 302.45 89.80% In operation 545.69 79.06% In operation 330.46 82.01% In operation 209.10 100% In operation 443.29 100% In operation 223.22 93.5% In operation 122.75 97.7% In operation 78.96 100% In operation 352.75 76.07% In operation KCN Thịnh Phát (Thinh Phat Industrial Park) KCN Thuận Đạo (Thuan Dao Industrial Park) KCN Cầu Tràm (Cau Tram Industrial Park) KCN Cầu Cảng Phước Đông (Cau Cang Phuoc Dong IP) KCN Long Hậu (Long Hau Industrial Park) KCN Long Hậu 3 (Long Hau 3 Industrial Park) KCN Tân Kim (Tan Kim Industrial Park) KCN Hoa Binh (Hoa Binh Industrial Park) SUB-TOTAL: 18 IPs 73.47 100% In operation 303.16 100% In operation 61.09 100% In operation 128.88 34.15% In operation 245.50 100% In operation 123.98 56.71% In operation 156.31 94.69% In operation 117.67 85.83% In operation 4,076.23 86.79% 105.48 34.09% In operation 308.39 9.79% In operation 524.14 23.02% In operation 396.00 19.64% In operation 119.20 0.00% In operation In operation 2 3 4 5 6 7 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. Status KCN Trần Anh – Tân Phú (Tran Anh – Tan Phu IP) KCN Nam Thuận (Nam Thuan Industrial Park) KCN Hựu Thạnh (Huu Thanh Industrial Park) KCN Đông Nam Á (Dong Nam A IP) KCN An Nhựt Tân (An Nhut Tan IP) KCN Suntec (Suntec Industrial Park) SUB-TOTAL: 06 IPs 295.43 17.41% 1,748.64 18.07% TOTAL: 24 IPs in operation 5,982.14 65.19% KCN Thế Kỷ (The Ky Industrial Park) KCN Lộc Giang (Loc Giang Industrial Park) 119.19 - Land clearance 466.00 - Land clearance 703 In operation 27. KCN Prodezi (Prodezi Industrial Park) KCN Tandoland (Tandoland Industrial Park) KCN Nam Tân Tập (Nam Tan Tap Industrial Park) KCN Tân Tập (Tan Tap Industrial Park) KCN Quốc Tế Trường Hải 400.00 - Land clearance 250.00 - Land clearance 244.74 - Land clearance 654.00 - Land clearance 162.19 - Land auction 32. KCN Thủ Thừa (Thu Thua Industrial Park) SUB-TOTAL: 08 IPs 188.88 - Land clearance 2,485 - Land clearance 33. 152.21 - 131.19 - 200.00 - 36. KCN Hoàng Lộc (Hoang Loc Industrial Park) KCN Anh Hồng 2 (Anh Hong 2 Industrial Park) KCN Saigon-Mekong (Saigon-Mekong IP) KCN Cửa khẩu Bình Hiệp – Giai đoạn 1 168.50 - 37. KCN Đông Sông Rồ 172.00 - SUB-TOTAL: 05 IPs 823.9 - TOTAL: 13 IPs 3,308.9 Waiting for Prime Minister’s approval Waiting for Prime Minister’s approval Waiting for Prime Minister’s approval - Waiting for Prime Minister’s approval - Inside Long An Bordergate Economic Zone Waiting for Prime Minister’s approval Waiting for Prime Minister’s approval 28. 29. 30. 31. 34. 35. 704 DUC HO III-HONG DAT IZ INDUSTRIAL PARK GENERAL INFORMATION Investor Contact Person Location Investment Sectors Hong Dat – Long An Company ▪ Address: Duc Lap Ha Commune, Duc Hoa District, Long An Province. ▪ Tel: 093 153 9292 – press 4 ▪ Email: congtycophanhongdatlongan@gmail.com Duong Huyen- Admin KCN – 093 153 9292 Adjacent location Distance from Ho Chi Minh City: 05km; Distance from Tan Son Nhat airport: 20 km Distance from Hiep Phuoc port: 40 km Distance from Long An international port: 60 km From Ben Luc - Long Thanh port: 40 km Distance from station/national road/1A: 20 km Priority Sectors for - Group of agricultural product processing projects; Investment - Group of textile and garment projects (not tanning); - Group of electrical, electronic and telecommunications projects; - Group of stationery projects; - Group of projects for processing livestock, poultry and aqua feed (not processing fishmeal, aquatic by-products from fresh aquatic byproducts); - Group of other projects: + Manufacture of children's toys; + Producing technological products; + Support services for the operation of the industrial zone such as office leasing, banking, postal and telecommunications; warehousing services (including cold storage); transportation, delivery, food supply; industrial hygiene; services of collecting and transporting solid waste and hazardous waste to a place for thorough treatment outside the industrial park. Investment Restricted Sectors Minimum wage Lease term Minimum Lease Area Limit for Construction Height Producing iron, steel, cast iron, metallurgy; production (mixing of raw materials), processing, bottling and packaging of plant protection drugs; fertilizer production. 4.160.000 VND ▪ Phase 1: From October 1, 2009 onward ▪ Stage 2: not done yet 5.000m2 2 floors 705 Permitted Construction Rate Land area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects - Factory construction area: 77.39% - Operating area] 1.20% ▪ ▪ ▪ ▪ Total area: 27,3989 ha Total leasable area: 27,3989 ha Total vacant leasable area: 0 ha Total area with full infrastructure ready to build factory: 27,3989 ha ▪ Total area: 0 ha ▪ Active ▪ 100% ▪ 15 projects No. of Korean projects None Lease fee N/A Operating fee [Chi phí vận hành] ▪ Management fee: None ▪ Electricity fee: According to the tariff of Duc Hoa Electricity ▪ Water fee: 10,046 VND/m3 ▪ Wastewater treatment fee: VND 10,454/m3 ▪ Waste treatment fee: VND 6,600,000/wide area LIST OF PROJECTS IN INDUSTRIAL ZONE No. Name of Company Nationality 1 Duc Thi Technology Manufacturing Trading Service Co., Ltd Vietnam 2 Vietnam Lien Nong Joint Stock Company Vietnam 3 World Vision (VN) Co., Ltd. 4 Omega Plant Protection Products Joint Stock Company Vietnam 5 A Chau Hoa Sinh Co., Ltd Vietnam 6 Futai . Joint Stock Company 7 Dat Viet Research - Production Co., Ltd Vietnam 8 Hoang Chau Long An Plastic Trading Co., Ltd Vietnam 9 To Nam Biotech One Member Company Limited Vietnam 10 Golden Lion Fertilizer Co., Ltd Vietnam 11 Golden Agro-Chemical Fertilizer Co., Ltd Vietnam 12 Asia Agros Co., Ltd Vietnam 13 Gap Agro . Co., Ltd Vietnam 14 Global Farm Joint Stock Company Vietnam China China 706 15 C.N.D Aluminum Glass Door Manufacturing and Assembling Co., Ltd 707 Vietnam HUU THANH IDICO INDUSTRIAL ZONE GENERAL INFORMATION / THÔNG TIN TỔNG QUÁT Address Developer Contact Person Location Investment Sectors Minimum wage Huu Thanh ward, Duc Hoa district, Long An province, Vietnam IDICO Corporation - JSC/ Tổng công ty IDICO-CTCP ▪ Tel: +84 39312660 ▪ Email: dautu@idico.com.vn ▪ Website: https://idico.com.vn Vu Anh Luan - Deputy Sales Manager - Mobile: +84 985 614 678 - Email: luan.va@idico.com.vn Adjacent location - Adjacent to border Ho Chi Minh city; - 40km far from center of Ho Chi Minh city - 35 km far from Tan An city of Long An province - 15km far from HCM - Trung Luong expressway - 20km far from National highway No.1A - 52km far from Long An international port - 32km far from Tan Son Nhat international airport - 55km far from Cat Lai port Priority Sectors for Investment: Industrial zone is arranged with the following production types: - Industrial electric machinery, industrial electricity and household electricity; Producing electrical, electronic equipment and electronic components (including production stages in the closed production technology of the Project such as painting, spraying, plating, cleaning metal surfaces with chemicals, etc.); -Manufacturing furniture, interior decoration; wood processing, wood chips from natural wood; construction materials (no cement production, no clinker production, no lime production); construction painting; -Ceramic, Glass, Crystal; -Producing and distributing gas, industrial gas, medical gas; hot water, steam, Vùng II: 4.160.000VND/month Lease term 06/8/2069 Minimum Lease Area 10.000m2 Limit for Construction Height According to the regulations of the Ministry of Construction not in QCVN 01: 2021/BXD Permitted Construction Rate [Tỷ lệ xây dựng] According to the regulations of the Ministry of Construction not in QCVN 01: 2021/BXD Land area Factory Available for Rent Operation Status ▪ ▪ ▪ ▪ Total area: 524,14ha Total leasable area: 395,41ha Total vacant leasable area: 300ha Total area with full infrastructure ready to build factory: 200ha ▪ Total area of planning land: 28ha ▪ Total vacant leasable area: 10.000m2 ▪ Active Đang hoạt động 708 Occupancy Rate and Number of Projects No. of Korean projects Lease fee ▪ 23% ▪ 35 ▪0 ▪0 ▪ Land lease fee: 150$/m2/duration ▪ Factory lease fee: 4.5$/m2/month Operating fee ▪ Management fee: 0.15$/m2/month ▪ Factory Roof rental price: 30,000VND/m2/year ▪ Electricity fee: accordance with regulation of government ▪ Water fee: 12.100VND/m3 ▪ Wastewater treatment fee: ~0,5$/m3 ▪ Waste treatment fee: accordance with regulation of suppliers INFRASTRUCTURE AND FACILITY Distance from the nearest Banking, nearest State Tax and Finance Agency, nearest Logistic Center, Universities, Training facilities, etc., Road width, … Layout plan 709 TAN DUC INDUSTRIAL ZONE GENERAL INFORMATION Address Investor Contact Person Location Investment Sectors Các lĩnh vực đầu tư Lot 8, Duc Hoa Ha Road, Tan Duc Industrial Park, Duc Hoa District, Long An Province, Vietnam Name of Investor: TAN DUC INVESTMENT CORPORATION ▪ Address / Địa chỉ: Lot 8, Duc Hoa Ha Road, Tan Duc Industrial Park, Duc Hoa District, Long An Province, Vietnam ▪ Tel: (+84.272)3761821 ▪ Email: nhtduong@itagroup-vn.com ▪ Website: www.kcntanduc.vn Name - Position - Mobile: - Email: Duong Nguyen Hoang Thuy – Deputy Sales Director- (+84) 899318986- nhtduong@itagroup-vn.com Adjacent location - 28 km from Hochiminh city/ the capital - 23 km from Tan Son Nhat airport - 20 km from Bourbon port - 22 km from Trung Luong highway Priority Sectors for Investment Electrical industry, industrial electricity and household electricity. Electronic industry, informatics, media, telecommunications. Motorcycle, automobile, tractor manufacturing industry. Mechanical industry, precision mechanics, medical instruments. Industry serving oil and gas exploitation and processing. Manufacturing industry of construction steel, steel pipe, plating. Furniture manufacturing industry, interior decoration, building materials. Industry of ceramics, glass, crystal. Plastic and rubber technology (no latex processing). Packaging, prepress, printing, paper industry (no pulp processing). Garment and footwear industry. Food and victuals processing industry. Pharmaceutical and cosmetic manufacturing industry. Minimum wage 4,160,000 VND/month Lease term Minimum Lease Area ▪ Stage 1: From…. Until October 28, 2055 ▪ Stage 2: From…. Until 03/06/2058 3,000 m2 Limit for Construction Height No limit Permitted Construction Rate 60-70% land size Land area Factory Available for Rent ▪ ▪ ▪ ▪ Total area: 545ha Total leasable area: 388.5262 ha Total vacant leasable area: 82ha Total vacent area with full infrastructure ready to build factory: 70ha ▪ Total area: 199.093,22 m2 ▪ Total vacant leasable area: 46.857m2 710 Operation Status Occupancy Rate and Number of Projects No. of Korean projects Lease fee Operating fee ▪ In operation ▪ Stage 1: 94%, Stage 2: 63.15% ▪ 220 projects ▪ 10 ▪ Land lease fee: 185-200 USD/m2 (VAT not included) ▪ Factory lease fee: 2.6-2.8 USD/m2/month ▪ Management fee: 10,018 VND/m2/year ▪ Electricity fee: according to the price of Vienam Electricity Company 3 ▪ Water fee: 14,277 VND/m ▪ Wastewater treatment fee: 3 “Class A” Standard according to “Letter: 394/CV-TADICO 22”: 4,968 VND/m 3 “Class B” Standard according to “Letter: 393/CV-TADICO 22”: 12,790 VND/m ▪ Waste treatment fee: tenants will sign the contract directly with the service suppliers INFRASTRUCTURE AND FACILITY Tan Duc E-city is planned and designed on an area of 387 hectares, which includes homes, villas, apartments and flats. It features lovely green landscaping and it guarantees to satisfy the strictest criterion of a green urban and an ideal living environment. The contemporary urban and residential infrastructure system offers tree-lined roads; street lights; a central park with a beautiful 10ha lake surrounded by green trees; an underground electricity system; a modern information technology infrastructure to supply cable TV and high speed internet; and a water supply and treatment facility. Additionally, there is a modern public service infrastructure, which includes schools, a sports complex, a commercial center, supermarkets, an entertainment area, and medical clinics and hospitals. Regarding safety and security, TTG employs a Security Team of 100 trained and well-equipped individuals who are dedicated, responsible, polite and enthusiastic. 711 Layout plan 712 LONG HAU INDUSTRIAL PARK GENERAL INFORMATION Address Investor Contact Person Location Investment Sectors Ấp 3, xã Long Hậu, huyện Cần Giuộc, tỉnh Long An Name of Investor: Long Hau Company ▪ Address: Long Hau Commune, Can Giuoc District, Long An Province ▪ Tel: (+84) 906 938 599 ▪ Email : sales@longhau.com.vn ▪ Website: https://longhau.com.vn/ Name - Position - Mobile: - Email: Ms Phuong Anh – Korea Desk : (+84) 989 098 288 ; Email: anh.tp@longhau.com.vn Adjacent location - Distance from the center of District 1, HCMC: 19 km - Distance from Tan Son Nhat airport: 25 km - Distance from Saigon Hiep Phuoc port: 03 km - Long An International Port: 22 km - Distance from Ben Luc - Long Thanh Expressway: 05 km Priority Sectors for Investment Investment Restricted Sectors Minimum wage Lease term Thời hạn cho thuê Minimum Lease Area Limit for Construction Height Permitted Construction Rate Land area [Diện tích đất] Factory Available for Rent Group of industries that cause less environmental pollution: Mechanical engineering, metallurgy, food processing, beverage, supporting industries; Projects on garment production, chemical, pharmaceutical and cosmetic manufacturing industries; Instruments manufacturing, medical equipment, packaging, electrical-electronic assembly... Group of industries causing environmental pollution. 4.160.000 VND/ month ▪ June 17, 2057 ▪ Extended Long Hau Industrial Park: Land use term until December 21, 2059 ▪ Long Hau 3 Industrial Park: Land use term until June 21, 2066 Ready-built factory: From 160 m2 - Industrial land: From 5,000 m2 Long Hau Industrial Park: - Factory and warehouse area: Average number of floors: From 02-05 floors. - Area of administrative and service works: Average number of floors: From 02-05 floors. Extended Long Hau Industrial Park: - Factory and warehouse area: Building height: From 02-05 floors. - Area of administrative and service works: Building height: From 09 to 12 floors. Long Hau Industrial Park 3-phase 1: - Factory and warehouse area: Maximum building height: 05 floors. - Area of administrative and service works: Maximum building height: 09 floors. - Factory and warehouse area: ≤70% - Area of administrative and service works: ≤45% - Percentage of trees in the factory premises: ≥20% - Percentage of trees in the premises of administrative and service works: ≥30% ▪ Total area: 411,31 ha. ▪ Total leasable area: 36,4 ha ▪ Total vacant leasable area: 36,4 ha ▪ Total area with full infrastructure ready to build factory: 36,4 ha ▪ Total area: Ready-built factory: 73,700 m2 High-rise factory: 40,000 m2 ▪ Total vacant leasable area: Ready-built factory: 21,000 m2 713 High-rise factory: Phase1: 6,900 m2, Phase 2: 20,000 m2 Operation Status Occupancy Rate and Number of Projects No. of Korean projects Lease fee Operating fee In operation: Long Hau Industrial Park + Long Hau Industrial Park expansion: 249.33 ha; Long Hau 3 Industrial Park: 26.5 ha. KCN Long Hậu 3: đã giải phóng mặt bằng 117,7836,8 ha/ 123,9825 ha, đạt 95%. - Long Hau Industrial Park: 100%. - Expanded Long Hau Industrial Park: 100%. - Long Hau 3 Industrial Park: 55%. ▪ Total 192 projects include: 143 Enterprises lease land, 49 Enterprises rent factories. ▪ 23 projects ▪ Land lease fee : 260 USD/ m2 ▪ Factory lease fee: 5 USD/ m2 ▪ Management fee: Infrastructure fee: 0.042 USD/m2/month ▪ Electricity fee: According to the price of EVN Can Giuoc ▪ Water fee: 9,020 VND/m3 ▪ Wastewater treatment fee: 8,040 VND/m3 ▪ Waste treatment fee: N/A INFRASTRUCTURE AND FACILITY - - In Long Hau Industrial Park, there are HD Bank, Vietin Bank, BIDV, Shinhan Bank...; Ben Luc Customs Branch – Customs Department of Long Hau Industrial Park; Large logistics units such as SLP, Logos, Cobi; The accommodation area is 6.1ha wide with full facilities; supermarket; child school; clinic; gridiron; Police; Fire and Rescue Team; Post and telecommunications infrastructure; power supply; adequate water supply to the enterprise's land plot and factory. Near Long Hau Industrial Park, there are schools from primary to high school in Can Giuoc district, Nha Be district, Hiep Phuoc vocational training school... 714 AN THANH INDUSTRIAL ZONE GENERAL INFORMATION Investor Contact Person Location Investment Sectors Minimum wage Lease term Minimum Lease Area Permitted Construction Rate Land area Factory Available for Rent Operation Status Phu An Thanh - Long An Company Limited ▪ Address / Address: Phu An Thanh Industrial Park, TL 830, An Thanh Commune, Ben Luc District, Long An Province. Tel: 02723655747 ▪ Email: businessanhpat@pat-ip.com ▪ Website: pat-ip.com Nguyen Thanh Quang – Deputy Director - 0903808385 – quan.nguyen@pat-ip.com Adjacent location - Distance from the city. Ho Chi Minh City: 35 km - 40 km from the airport - 40 km from the sand port - Distance from station/national road/ 06 km Priority Sectors for Investment Investment Restricted Sectors ▪ Giai đoạn 1: From 2007 to 2057 2500m2 70% ▪ ▪ ▪ ▪ Total area: 307ha Total leasable area: 211,74ha Total vacant leasable area: 22,47ha Total area with full infrastructure ready to build factory: 211.74 ha ▪ Total area: None ▪ Total vacant leasable area: None ▪ Active ▪ 85,46% ▪ 57 Projects No. of Korean projects ▪ 7 Projects Operating fee Pollution industry. Area II: 4.160.000 VND/Month Occupancy Rate and Number of Projects Lease fee Clean industry, Advanced technology ▪ Land lease fee: 185 USD – 198 USD. ▪ Management fee: 1300VND/m2/month ▪ Electricity fee: According EVN ▪ Water fee: 13.210VND/m3 ▪ Wastewater treatment fee: 11.300 – 17.535 VND/m3 715 Layout plan 716 TAN KIM INDUSTRIAL PARK GENERAL INFORMATION / THÔNG TIN TỔNG QUÁT JMP5+8RX, QL50, Tan Kim, Can Giuoc, Long An Address TAN KIM INDUSTRIAL AND RESIDENTIAL AREA INFRASTRUCTURE DEVELOPMENT CO., LTD ▪ Address / Address: Tan Phuoc KP, Can Giuoc TT, Can Giuoc District, Long An Province Tel: 0272 3875814 ▪ Email: bql.kcn@tankim.com.vn ▪ Website: https://www.tankim.com.vn/ Investor Vo Thi Kim Chi - Assistant Director- 0909801518-Chi.vo@haithanh.com. Contact Person Location - Investment Sectors Minimum wage Adjacent location 15 km from Ho Chi Minh city - 20 km from Tan Son Nht airport - 15 km from Long An International port - 12 km from Hiep Phuoc port - 16 km from Sai Gon port Priority Sectors for Industry causes less environmental pollution Investment Investment Restricted Industry pollutes the environment Sectors [Mức lưong tối thiểu vùng] Area II: VND 4,160,000/month Lease term Thời hạn cho thuê Minimum Lease Area To 25/7/2058 Limit for Construction Height - Factory construction area: Max 19m - Operating area: Up to 19m Permitted Construction Rate Allowed Building Rate - Factory construction area: 60% - Operating area: 40% Land area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects No. of Korean projects Lease fee It has been filled, there is no more land for rent ▪ ▪ ▪ ▪ Total area: 104.1 ha Total leasable area: 69,87 ha Total vacant leasable area: full Total area with full infrastructure ready to build factory:full ▪ Total area 11.577m2 ▪ Total vacant leasable area: full ▪ Active ▪ 96.1 % ▪ 27 projects None ▪ Land lease fee: Currently, the Industrial Park has no industrial land for lease ▪ Factory lease fee: 66,000 VND - 92,000 VND depending on the rental location 717 Operating fee ▪ Management fee: 10,000 VND/m2 excluding VAT [Management fee] ▪ Electricity fee: [Electricity fee] + Normal price bracket: 1,555 (VND/ Kwh) + Peak price bracket: 2,871 (VND/Kwh) + Low price bracket: 1,007 (VND/ Kwh ▪ Water fee: [Water fee]: 13,500 VND/m3 ▪ Wastewater treatment fee: [Wastewater treatment fee] without VAT + Standard treatment: 9,000 VND/m3 + Direct waste connection (< 5m3/day.night): 11,000 VND/m3 + Wastewater exceeding standard (Cod < 200mg/l): 17,000 VND/m3 + Wastewater exceeding standard (Cod > 200mg/l): 50,000 VND/m3 ▪ Waste treatment fee:[Waste treatment fee] according to the contract with the supplier 718 [- This Page is intentionally left blank -] 719 NAM DINH 720 INVESTMENT ENVIRONMENT IN NAM DINH GENERAL INFORMATION Area, Population ▪ Area: 1,668 km2 ▪ Population: 1.877 million (2022 statistic) Geographical Location ▪ Nam Dinh is located in the southern center of the Red River Delta at coordinates 19 054’ to 20040’ North latitude and from 105055’ to 106045 East latitude. ▪ Distance from Hanoi: 90km, from Hai Phong: 75km, from Minh City: 1,058km, from Da Nang: 515km. Adjacent provinces ▪ The North is adjacent to Thai Binh province, the South is Ninh Binh province, the northwest is adjacent to Ha Nam province, The East is adjacent to the sea (the Gulf of Tonkin). GRDP Industry growth PCI 2022 statistic: ▪ Real GRDP: 91,966 billion VND (3.96 billion USD) ▪ GRDP growth: 9.07% ▪ GRDP per capita: 2,150 USD/year ▪ Economic structure: - Industry - Construction: 42,56%; - Agriculture. forestry and fishery: 19,39% - Service: 34.78%; - Tax on Goods: 3.8% 2022 statistic: ▪ Industry - Construction growth: 13.11% ▪ Agriculture, forestry and fishery growth: 3.9% ▪ Service growth: 7.47% ▪ Score: 64.99 – ranked 24 out of 63 cities and provinces in Vietnam. (2021) SOCIAL INFRASTRUCTURE ▪ Roadway: - Main highways: Cau Gie-Ninh Binh Expressway through Nam Dinh province is about 35 minutes by car from Nam Dinh city. - National highway routes such as: National Highway 10, National Highway 37B, National Highway 38B, National Highway 21, National Highway 21B have been built to ensure traffic connection with the Northern Delta provinces and the center of Hanoi City. - The trunk road connects the marine economic zone with the Cau Gie - Ninh Binh expressway (Provincial road 490B); coastal road through Nam Dinh province are under construction, when completed, have greatly contributed to promoting socio-economic development, ensuring national security, international integration of the province. Transportation ▪ Railway: - The North-South railway through Nam Dinh province is 41.2km long, single track, 1,000mm wide, mainly serving passengers going to/from Nam Dinh station from central and southern provinces. - The North-South high-speed railway route has been planned to pass through the area of Nam Dinh province about 36km. ▪ Waterway: - The central river system passes through the province with a total length of 257km including: Red river, Dao river, Ninh Co river, Day river, Quan Lieu canal with many national important inland waterway transport routes passing through the province such as Ba Lat - Hanoi route (through Red River system); Lach Giang - Hanoi route (through the Red river and Ninh Co 721 river system); Quang Ninh - Ninh Binh route (through the Red River, Dao River and Day river system) and Cua Day - Ninh Binh route (through the Day river system); - The local river system is 278km long: Most of the rivers managed by the locality pass through the saltwater sluices under the dike so limit static, only allowing ships <100T to pass through, these rivers are mainly for transportation with short distances in each district, the main routes are of low technical grade IV and grade V. The system of transport routes mainly serves the demand of transporting agricultural products, construction materials between the inner districts, connecting with the waterway system managed by the central government to form a smooth and continuous waterway system. ▪ Other: - Main airport: None. - Routes to the airport: + National Highway 10 to Cat Bi airport; + National Highway 21, National Highway 21B to Noi Bai airport. Electricity Supplied from the national power network Water - Water price: According to general regulations. + Water price for production activities: 13,500 VND/m3 + Domestic water for residential households: 8,200 VND/m3. Education - In Nam Dinh province, there are 16 vocational intermediate schools, colleges and universities, in the school year 2021-2022 there are 34,331 pupils and students, accounting for 9.62% of the total number of students. - Nam Dinh city has a vocational training and job introduction center. Medicare ▪ 08 provincial hospitals, 10 district hospitals and 01 private hospitals INVESTMENT CONDITION Human resource ▪ 57.9% of population are in the working age (2022) Education level ▪ Trained labor rate: 75,5% (2022) Salary ▪ The minimum salary for the province is applied as follows: - Area II: including: Nam Dinh city; - Area III: including: Giao Thuy; Hai Hau, Nghia Hung, Xuan Truong, Nghia Hung, Nam Truc, Truc Ninh, Vu Ban, Y Yen, My Loc District ▪ The lowest wage for trained labor (including those trained by the enterprises) must be at least 7% higher than the above referenced basic salary Investment incentives ▪ Investment procedures shall be settled at a focal agency; the time is greatly shortened compared to general regulations; Investors do not have to pay any service fees except for the prescribed fees. ▪ Investment incentives as prescribed by the Vietnamese Government apply. ▪ In addition to the general regulations, large-scale and important projects are researched by the provincial government in collaboration with investors and submitted to the Government for specific policies to be applied. Fields Attracting Investment ▪ Prioritized projects: Infrastructure of industrial zones and clusters; high-tech industries; spare part manufacturing industry, automobile assembly, electrical and electronic; pharmaceutical production; other industries; High-tech agriculture; trade, service, high-class entertainment; logistics services; education and training services; health care and medical services... 722 Map Contact Department of Planning and Investment ▪ Address No. 172, Han Thuyen Street, Nam Dinh City, Nam Dinh Province City ▪ Tel: (84) 228.3.645.227 Website:http://sokhdt.namdinh.gov.vn ▪ Email: sokhdt@namdinh.chinhphu.vn 723 LIST OF INDUSTRIAL ZONES IN NAM DINH No Total Area (ha) Occupancy Rate Status 1 My Trung Industrial Zone Industrial zone Name 150 30% In operation 2 Hoa Xa Industrial Zone 300 100% In operation 3 Bao Minh Industrial Zone 215 100% In operation 4 Phase I: 520 11.5% 5 Rang Dong Textile Industrial Zone (Aurora IP) Hong Tien Industrial Zone 198.03 Under Land Clearance Process Finding Developers 6 My Thuan Industrial Zone 113.72 Finding Developers 7 Trung Thanh Industrial Zone Finding Developers 8 Xuan Kien Industrial Zone Finding Developers 9 Viet Hai Industrial Zone Finding Developers NAM DINH’S LOCATION MAP OF INDUSTRIAL ZONES 724 MY TRUNG INDUSTRIAL ZONE GENERAL INFORMATION OF INDUSTRIAL ZONE Nam Dinh City, Nam Dinh Province Address Investor Contact Person Location Investment Area Bac Giang FuJi Development JSC ▪ Add: Song Khe-Noi Hoang Industrial Park (the Northern area), Bac Giang ▪ Tel: (84-204) 652 9 010/ (84) 918 273 656 ▪ Website: http://fujiip.com/ko/ Mr. Giang – (84) 913 275 656 - giangnguyen@fujiip.com - Land: 90 km from Ha Noi City Center to the South East, 90 km from Hai phong to the Southwest - Seaport: 90 km from Hai Phong Sea Port to the North East - Airport: 130 km from Noi Bai Airport and 100 km from Cat Bi Airport Investment priorities Sectors Manufacturing and assembling electric, electronic product, mechanical, automobile and motorbike; textile Polluted Sector Investment Restricted Sectors Minimum wage Lease term Minimum Lease Area Limit for Construction Height Permitted Construction Rate Planned area Factory Available for Rent [Area 2] According to Decree 90/2019/NĐ-CP dated 15th November 2019 ▪ Start date: 2006 ▪ End date: 2056 10,000 m2 In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning regulation (QCXDVN 01: 2008/BXD) ▪ Total area: 150 ha ▪ Total Industrial land area: 103 ha ▪ Total area: NA Operation Status ▪ In operation Occupancy Rate and Number of Projects Number of Korean Projects ▪ 30% ▪ 14 projects 01 project Lease fee ▪ Land lease fee: 60 USD/m2 ▪ Management fee: 6,000 VND (~0.26 USD)/m2/year ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: About 11,000 VND (~0.5 USD)/m3 ▪ Wastewater treatment fee: Not constructed ▪ Waste Collection: 350,000 - 400,000 VND (~15- 18 USD)/m3 INFORMATION OF INFRASTRUCTURE AND FACILITY Operating fee Financial institution Tax service, State finance office Customs Service Agribank, Vietin Bank, BIDV 5 km from Nam Dinh Tax Office Nam Dinh Customs Office within 4 km 108 km from Hai Phong Bonded Warehouse Logistics NA Post office 4.3 km from Nam Dinh Post Office Medicare Nam Dinh General Hospital within 4 km Police, public security Inside Industrial Zones Universities, training facilities, etc. Recruitment Luong The Vinh University Nam Dinh Technical Pedagogy University Supported by Nam Dinh Management Board Industrial Zone Worker dormitory NA Worker's child education facility NA 725 One-stop service NA Road Width NA Communication Infrastructure of Industrial Zone Emergency Power generator Fire-fighting facility Telephone network and high speed internet by VNPT None Set up across industrial zones. The distance between fire hydrants is 150m. Layout Plan 726 LIST OF PROJECTS IN INDUSTRIAL ZONE No Company Name Nationality Business line 1 Vietnam Headwork Co., Ltd JAPAN Manufacture motor vehicles 2 YSS Garment Company Limited HONGKONG Manufacture of costumes 3 Nam Phuong Hong Joint Stock Company Vietnam Food Service 4 Vietnam Producing products from prefabricated metal (except machinery and equipment) 5 Hoang Anh Steel Structure and Lifting Equipment Joint Stock Company Cuu Long Investment Joint Stock Company 6 Trung Duc Trading and Trading Co., Ltd Vietnam 7 Phu My Hai private enterprise Vietnam Producing and distributing electricity, gas, hot water, steam and air-conditioning Manufacture motor vehicles 8 Dai Doan Ket Import Export Joint Stock Company Vietnam 9 Phat Cuong Joint Stock Company Vietnam 10 Tan Dan Phu Steel Joint Stock Company Vietnam 11 Song Hong Garment Joint Stock Company Vietnam Processing wood and producing products from wood, bamboo of various species (except beds, wardrobes, tables, chairs); Producing products from straw, plaiting materials and plaiting materials Producing products from prefabricated metal (except machinery and equipment) Producing products from prefabricated metal (except machinery and equipment) Weaving 12 An Khanh Limited Company Vietnam Warehousing and support activities for transportation 13 Nam Lien Joint Stock Company Vietnam Producing packaging and anti-counterfeit stamps 14 PIM Vina Co., Ltd. Korea Instrumentation and control; engines and turbines; pressure equipment and accessories; spare parts for motor vehicles and vehicle engines, including 727 HOA XA INDUSTRIAL ZONE GENERAL INFORMATION OF INDUSTRIAL ZONE My Xa and Loc Hoa Commune, Nam Dinh City, Nam Dinh province Address Investor ▪ Nam Dinh IZ Development and Exploitation Infrastructure Company ․ Address: Pham Ngu Lao Road - Hoa Xa Industrial Zone - Nam Dinh province ․ Tel: (84-228) 3 682 539 Ms. Do Thi Huong - (84-228) 3682 539 - huongdt81.bql@gmail.com Contact Person Location - National Road 10 connecting provinces from Quang Ninh to Ninh Binh links with national road 1 - the main traffic line at the border of Nam Dinh and Ninh Binh - 90 km from Hai Phong Sea Port to the North East - 130 km from Noi Bai Airport and 100 km from Cat Bi Airport Investment Area Investment priorities Manufacturing and assembling electric, electronic product, mechanical, Sectors automobile and motorbike; textile Investment Restricted Polluted Sector Sectors [Area 2] According to Decree 90/2019/NĐ-CP dated 15th November 2019 Minimum wage ▪ Start date: 2003 ▪ End date: 2053 10,000 m2 Lease term Minimum Lease Area Limit for Construction Height Permitted Construction Rate Planned area Factory Available for Rent In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning regulation (QCXDVN 01: 2008/BXD) ▪ Total area: - Total Industrial land area: 285.27 ha - Total leasable area: 204.34 ha - currently 100% industrial land is leased. Instead, factory lease and transfer is available. ▪ Total area: 300 ha Operation Status ▪ In operation Occupancy Rate and Number of Projects Number of Korean Projects ▪ 100% ▪ 126 projects 09 companies ▪ Land lease fee: 65 USD/m2▪ Factory lease fee: 4 USD/m2/month ▪ Payment: - Make a deposit of 20% of the infrastructure rental within 07 days as from the signing date of the MOU - Pay 50% of the infrastructure rental within 07 days as from the signing date of the contract - Pay 30% of the infrastructure rental within 07 days as from the land handover date ▪ Management fee: 2,500 VND (~0.11 USD)/m2/year Operating fee ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: 11,500 VND (~0.5 USD)/m3 ▪ Wastewater treatment fee: 6,500 VND (~0.29 USD)/m3 (Excluding environment protection fee) ▪ Waste treatment fee: 200,000 VND (~9 USD)/m3 with regular solid waste INFORMATION OF INFRASTRUCTURE AND FACILITY Lease fee Financial institution Tax service, State finance office Customs Service Agribank, Vietin Bank, BIDV 5 km from Nam Dinh Tax Office Nam Dinh Customs Office within 4 km 108 km from Hai Phong Bonded Warehouse Logistics NA Post office 4.3 km from Nam Dinh Post Office Medicare Nam Dinh General Hospital within 4 km 728 Police, public security Inside Industrial Zones Universities, training facilities, etc. Recruitment Luong The Vinh University Nam Dinh Technical Pedagogy University Supported by Nam Dinh Management Board Industrial Zone Worker dormitory NA Worker's child education facility One-stop service NA Road Width NA Communication Infrastructure of Industrial Zone Emergency Power generator Fire-fighting facility NA Telephone network and high speed internet by VNPT None Set up across industrial zones. The distance between fire hydrants is 150m. Layout Plan 729 Location Map Actual View 730 LIST OF PROJECTS IN INDUSTRIAL ZONE No Company Name Nationality Business line 1 Nam Dinh Industrial Zone Infrastructure Development and Development Company Mai Van Dang Company Limited Vietnam Real estate business, infrastructure construction Vietnam Manufacture motor vehicles 3 Phu Hai Company Ltd. Vietnam Manufacture of electrical equipment 4 Phu Thinh private enterprise Vietnam 5 Dong Thanh partnership Vietnam Producing machines and equipment not classified in any category Manufacture motor vehicles 6 Thai Quan Company Ltd. Vietnam Manufacture motor vehicles 7 Quang Toan Company Limited Vietnam Producing products from rubber and plastic 8 Thanh Nguyen Company Limited Vietnam Producing products from rubber and plastic 9 Minh Hong Company Limited Vietnam Producing products from rubber and plastic 10 Najimex Joint Stock Company Vietnam 11 Nam Dinh Water Trading Co., Ltd Vietnam Processing wood and producing products from wood, bamboo of various species (except beds, wardrobes, tables, chairs); Producing products from straw, plaiting materials and plaiting materials Exploiting, treating and supplying water 12 Vietnam Manufacture motor vehicles 13 Nam Dinh Industrial Goods Trading Joint Stock Company Hainan Company Limited Vietnam Manufacture motor vehicles 14 Doan Ket Company Limited Vietnam Producing beds, wardrobes, tables, chairs 15 Nam Dinh Electrical Construction Company Ltd. Vinh Ky Company Ltd. Vietnam Manufacture of electrical equipment Vietnam Producing products from rubber and plastic 17 Xuan Tung Company Limited Vietnam Producing products from rubber and plastic 18 Duy Khanh Transport Joint Stock Company Vietnam 19 CP Thuy Dat Vietnam Producing products from prefabricated metal (except machinery and equipment) Manufacturing and processing food; textile 20 Thong Thong Company Limited Vietnam Manufacture of electrical equipment 21 Korea Manufacture of costumes Vietnam Producing beds, wardrobes, tables, chairs 23 Garnet Nam Dinh Garment Company Limited Nam Dinh Forest Products Joint Stock Company Truong Phat Company Limited Vietnam Manufacture motor vehicles 24 Viet Han Electrical Technology Co., Ltd Vietnam Manufacture of electrical equipment 25 Phu Duc Company Limited Vietnam 26 Dai Tan Company Limited Vietnam 27 Nam Dinh Food Industry Joint Stock Company (NADA Beer Joint Stock Company) CP Tasco Company Vietnam Producing machines and equipment not classified in any category Producing products from prefabricated metal (except machinery and equipment) Producing beverages Vietnam Producing products from other non-metallic minerals Vietnam 30 Nam Dinh Investment and Development Bank Branch Tan Truong Phat Company Limited Vietnam Financial service activities (excluding insurance and social insurance) Manufacture of electrical equipment 31 Nam Tan Plastic Joint Stock Company Vietnam Producing products from rubber and plastic 32 Mai Huong Commercial Joint Stock Company Vietnam 2 16 22 28 29 731 Son Nam Textile and Garment Joint Stock Company ARKSUN - Phu Thanh Limited Company Vietnam Vietnam Manufacture of costumes Vietnam 36 Truong Tho Pharmaceutical Joint Stock Company Vinh Truong Joint Stock Company Vietnam Producing medicine, pharmaceutical chemicals and pharmaceutical materials Producing paper and paper products 37 Thanh Hai Company Limited Vietnam Manufacturing and processing food 38 CP Hung Vuong Company Vietnam 39 Hang Quyen Company Limited Vietnam 40 Nam Dinh Garment Joint Stock Company Vietnam Producing products from prefabricated metal (except machinery and equipment) Producing products from prefabricated metal (except machinery and equipment) Manufacture of costumes 41 Hai Hoa Company Limited Vietnam Manufacturing and processing food 42 Duc Phuong Company Limited Vietnam Manufacture motor vehicles 43 Minh Dan Pharmaceutical Joint Stock Company Viet Anh Company Limited Vietnam Vietnam Producing medicine, pharmaceutical chemicals and pharmaceutical materials Producing beds, wardrobes, tables, chairs UNIVERSAL CANDLE VIETNAM CO., LTD Nam Duoc Company Limited China Other manufacturing and processing industries Vietnam Producing medicine, pharmaceutical chemicals and pharmaceutical materials Weaving 33 34 35 44 45 46 47 Hoang Dung Textile and Garment Company Limited Hong Phat Company Limited Vietnam Vietnam 50 Nam Dinh Silk Weaving Joint Stock Company Nam Dinh Textile and Garment Corporation Producing products from prefabricated metal (except machinery and equipment) Producing medicine, pharmaceutical chemicals and pharmaceutical materials Weaving Vietnam Weaving 51 Dinh Cong Company Limited Vietnam Weaving 52 Vietnam Financial service activities (excluding insurance and social insurance) 53 Bank for Agriculture and Rural Development of Nam Dinh, North of Nam Dinh Branch Tran Hong Quan Trade Co., Ltd Vietnam 54 Chau Thanh private enterprise Vietnam Producing and distributing electricity, gas, hot water, steam and air-conditioning Producing products from rubber and plastic 48 Vietnam Weaving Vietnam 49 55 DHTEX textile and garment co.ltd Italy Weaving 56 ARKSUN Vietnam Joint Stock Company China Manufacture of costumes 57 CP Thuy Binh Company Vietnam Weaving 58 Vietnam 59 Viet Trieu Construction Mechanical Joint Stock Company Minh Quang Company Limited 60 CP Duc Thang Vietnam 61 X20 Nam Dinh Company Limited Vietnam Producing machines and equipment not classified in any category Manufacture electronic products, computers and optical products Producing products from prefabricated metal (except machinery and equipment) Weaving 62 Vietnam Producing beverages 63 Tuyet Thanh Production and Trading Service Co., Ltd TCE VINA DENIM Joint Stock Company Korea Weaving 64 DongYang ST Vina Co., Ltd Korea 65 Northern Gas Trading Joint Stock Company - Duyen Hai Branch Bao Minh Company Limited Vietnam 66 Vietnam 732 Metal production 67 Dan Phu commercial private enterprise Vietnam 68 Nam Ninh Packaging Joint Stock Company Vietnam Producing products from prefabricated metal (except machinery and equipment) Packaging manufacturer 69 D.F Zin Company Limited Korea Manufacture of costumes 70 Thanh Binh Company Limited Vietnam Producing products from rubber and plastic 71 Vietnam Industrial Gas Co., Ltd Vietnam Other manufacturing and processing industries 72 Nam Dinh Granite Joint Stock Company Vietnam Producing products from other non-metallic minerals 73 Nam Dinh YoungOne Company Limited Korea Textile 74 Thuy Binh Wool Joint Stock Company Vietnam Lodging 75 TRITON LTD Korea Manufacture of costumes 76 Anh Phat Company Limited Vietnam Weaving 77 Vietnam Producing solar cells, products using solar energy Vietnam Manufacturing and processing food Vietnam 80 Thanh Thuy Green Energy Joint Stock Company Huong Giang Commercial Joint Stock Company Nam Dinh Enterprise Development Support Joint Stock Company Private enterprise Tam Huy Hoang 81 Honlei Duc Ha Joint Stock Company Vietnam Wholesale (excluding automobiles, motors, motorcycles and other motor vehicles) Producing products from prefabricated metal (except machinery and equipment) Manufacture motor vehicles 82 Vietnam 83 Nam Dinh Steel Wire Rope Joint Stock Company Dong Nam Woolen Textile Co., Ltd China Producing products from prefabricated metal (except machinery and equipment Weaving 84 Nam Dinh KATOH Company Limited JAPAN Producing products from rubber and plastic 85 Vietnam 86 Vietnam Joint Stock Commercial Bank for Industry and Trade - ND Branch Cheonghak Gloves Vina Co., Ltd Korea Financial service activities (excluding insurance and social insurance) Manufacture of costumes 87 DNA Investment Joint Stock Company Vietnam Manufacture of costumes 88 Designer Textile Vietnam Co., Ltd. Weaving 89 Nam Ha Pharmaceutical Joint Stock Company Hoang Long Company Limited NEW ZEALAND Vietnam 78 79 90 91 92 93 94 95 96 97 98 99 Vietnam Vietnam Producing medicine, pharmaceutical chemicals and pharmaceutical materials Producing products from prefabricated metal (except machinery and equipment) Producing products from other non-metallic minerals Unburnt Brick Material Joint Stock Company 567 Hoang Lien Pharmaceutical Co., Ltd Vietnam Phuong Thuy Import Export Trading Joint Stock Company International Auto Parts Co., Ltd Vietnam Anh Duc Commercial Wood Joint Stock Company Dai Loc Nam Dinh steel wire mesh Co., Ltd Vietnam Luc Bao Fiber and Synthetic Plastic Joint Stock Company Tan Phu prestressed concrete one member limited company Vietnam Textile Corporation China Producing products from prefabricated metal (except machinery and equipment) Producing chemicals and chemical products Vietnam Producing products from other non-metallic minerals Vietnam Weaving Vietnam Vietnam Vietnam Producing medicine, pharmaceutical chemicals and pharmaceutical materials Weaving Sale and repair of automobiles, motors, motorbikes and other motor vehicles Vietnam 101 Phong Linh Transportation and Trading Co., Ltd ETC Investment and Technology JSC Vietnam Environmental technology 102 Tran Tin Production and Trading Co., Ltd Vietnam Mechanical 100 733 103 Aelim Vina Co., Ltd Korea 104 Vietnam 105 Thuan Phat Production and Trading Service Co., Ltd Viet Thuan Joint Stock Company China-Vietnam Manufacture of costumes 106 Hong Phu Gia Textile Co., Ltd Vietnam Textile 107 Phuc Vinh Transportation Co., Ltd Vietnam Producing products from other non-metallic minerals 108 Duc Chuong Company Limited Vietnam Laundry, cleaning textile and fur products 109 Denmark Manufacture of costumes 110 Specter Vietnam Garment Technology Co., Ltd Santerlon Travel Goods Co., Ltd China Producing suitcases, bags 111 Thanh Bach Shoes Co., Ltd Vietnam China Producing shoes 112 Nam Dinh Fertilizer Joint Stock Company Vietnam Fertilizer 113 Won Young Vina Co., Ltd Korea 114 Hoa Son Company Ltd. Vietnam 115 Viet Nam Nam Dinh Company Limited 116 Viet Thai Joint Stock Company Vietnam 117 Tan Long Steel Pipe Limited Company Vietnam 118 Vietnam 119 Bao Loc Trade and Production Joint Stock Company Giang Nam Cat Joint Stock Company 120 Hanh Thuy Trade & Production Co., Ltd. Vietnam 124 Nox Vina Co., Ltd 125 Forelink Limited 126 Sing Yick One Member Company Limited Vietnam 734 Manufacture motor vehicles BAO MINH INDUSTRIAL ZONE GENERAL INFORMATION OF INDUSTRIAL ZONE Vu Ban district, Nam Dinh province Address Investor Contact Person ▪ Nam Dinh IZ Development and Exploitation Infrastructure Company ․ Address: Pham Ngu Lao Road - Hoa Xa Industrial Zone - Nam Dinh province ․ Tel: (84-228) 3 682 539 Ms. Do Thi Huong - (84-228) 3682 539 - huongdt81.bql@gmail.com Location - National Road 10 connecting provinces from Quang Ninh to Ninh Binh links with national road 1 - the main traffic line at the border of Nam Dinh and Ninh Binh - 90 km from Hai Phong Sea Port to the North East - 130 km from Noi Bai Airport and 100 km from Cat Bi Airport Investment Area Investment priorities Manufacturing and assembling electric, electronic product, mechanical, Sectors automobile and motorbike; textile Investment Restricted Polluted Sector Sectors [Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019 Minimum wage Lease term Minimum Lease Area Limit for Construction Height Permitted Construction Rate Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean Projects Lease fee ▪ Start date: 2007 ▪ End date: 2057 10,000 m2 In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning regulation (QCXDVN 01: 2008/BXD) ▪ Total area: 215ha ▪ Total Industrial Land area: 104.37 ha ▪ Total area: NA ▪ In operation ▪ 100% None Land lease fee: 90 USD/m2 ▪ Management fee: 0.3 USD/m2/year (fixed for 5 years) ▪ Electricity fee: as regulated by the Government (see appendix) ▪ Water fee: 11,400 VND (~0.5 USD)/m3 (household); 8,800 VND (~0.39 USD)/m3 (production) ▪ Wastewater treatment fee: Approximately 0.45 - 0.6 USD/m3 (excluding textile wastewater) ▪ Waste treatment fee: Approximately 0.36 USD/m3 (excluding textile wastewater) ▪ Waste Collection: 30 USD/ton INFORMATION OF INFRASTRUCTURE AND FACILITY Operating fee Financial institution Tax service, State finance office Customs Service Logistics Agribank, Vietin Bank, BIDV 14 km from Nam Dinh Tax Office Nam Dinh Customs Office within 14 km NA Post office 11 km from Nam Dinh Post Office Medicare Nam Dinh General Hospital within 10 km Police, public security Inside Industrial Zones Universities, training facilities, etc. Recruitment Luong The Vinh University Nam Dinh Technical Pedagogy University Supported by Nam Dinh Management Board Industrial Zone Worker dormitory NA 735 Worker's child education facility One-stop service NA Road Width NA Communication Infrastructure of Industrial Zone Emergency Power generator Fire-fighting facility NA Telephone network and high speed internet by VNPT None Set up across industrial zones. The distance between fire hydrants is 150m. Layout Plan Location Map Actual View 736 737 LIST OF PROJECTS IN INDUSTRIAL ZONE No Company Name Nationality Business line 1 Bao Minh Industrial Zone Infrastructure Investment JSC Nam Dinh Forest Products Joint Stock Company Sunrise spinning (Vietnam) Co., Ltd. Vietnam Vietnam Construction and trading of infrastructure, waste water treatment Producing beds, wardrobes, tables, chairs HONGKONG Weaving Japan Manufacture of electrical equipment 2 3 China Weaving 6 Branch of Sumi Vietnam wiring system Co., Ltd. in Nam Dinh province Sunrise Luen Thai Textile and Dyeing Joint Stock Company Smart Shirts Vietnam Co., Ltd. HONGKONG Manufacture of costumes 7 Yulun Textile Weaving Co., Ltd (Vietnam) China Weaving 8 Padmac Vietnam Co., Ltd. 4 5 Manufacture of costumes 9 Smart Shirts Co., Ltd Bao Minh USA Manufacture of costumes 10 Junzhen Garment Co.Ltd China Manufacture of costumes 11 Sunrise Fabric (Vietnam) Co., Ltd. China Textile fibers 12 KAM HING PIECE WORKS CO., LTD HONGKONG Textile 13 Bao Minh Textile Joint Stock Company Vietnam Textile 14 Chentai Weaving Company Limited of Northern Vietnam Herberton private limited company Seychelles Apparel manufacturers 15 Textile 738 RANG DONG TEXTILE INDUSTRIAL ZONE GENERAL INFORMATION OF INDUSTRIAL ZONE ▪ Rang Dong Town, Nghia Hung, Nam Dinh Province, Vietnam Address Investor Rang Dong Infrastructure Investment and Development JSC., HEAD OFFICE ▪ Address: Lot HC3, Rang Dong Textile Industrial Park, Rang Dong Town, Nghia Hung, Nam Dinh Province, Vietnam ▪ Tel: 02288856886 ▪ Website: www.auroraip.vn NORTHERN REGIONAL OFFICE ▪ Address: HCO Building 5th Floor, 44B Ly Thuong Kiet, Hoan Kiem, Hanoi, Vietnam ▪ Tel: 0247305468 Contact Person Location Investment Area Minimum wage Lease term Minimum Lease Area Limit for Construction Height Permitted Construction Rate Planned area Factory Available for Rent Operation Status Occupancy Rate and Number of Projects Number of Korean Projects Lease fee SOUTHERN REGIONAL OFFICE ▪ Address: VTP Building, 2nd Floor, 8 Nguyen Hue Blv., Ben Nghe Ward, District 1, HCMC, Vietnam ▪ Tel: 02839110981 ▪ Ms. Nguyen Thi Quynh Trang – Sale Director cum. CEO’s assistant – Mobile: (84) 8 3989 9988 - Email: trang.nguyenthiquynh@auroraip.vn - Located within Ninh Co Economic Zone - 50km from Nam Dinh City Center; 40 km from Ninh Binh City Center, 75 km from Thai Binh City Center, 130 km from Hanoi City Center; - 150km from Noi Bai International Airport (Hanoi); 145km from Cat Bi Airport (Hai Phong); - 200km from Cai Lan Deep Seaport, 140km from Hai Phong Port, 10Km from Hai Thinh Intermediary Port; - 30km from Cao Bo intersector connecting to the Highway. Investment priorities Fabric manufacturing, Dying, Supporting industry Sectors Investment Restricted No restriction Sectors [Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019 ▪ Start date: 2015 ▪ End date: 30 June 2065 5 ha (Lease area below this threshold is subject to approval on case by case basis) For administrative and service area: 3 – 5 floors For factory area: below 5 floors For administrative and service area: 30% - 40% (various among area) For factory area: 45% (at max of 5 floors and adjusted with construction height in compliance with national standard) ▪ Total area: 2,100 ha - Phase I: 520 ha (2017 -2020: to make 1 billion meters of fabric in the area) - Phase II: 850 ha (2023-2030: increase fabric production to 1.5 billion meters and complete full supply chain in the area) - Phase III: 657 ha (2031-2035: build modern city of trading and service for textile and fashion) ▪ Total vacant leasable area: 350 ha (Phase 1) ▪ Total area with full infrastructure ready to build factory: 520ha (Phase 1) ▪ Total area: Na ▪ In operation 1 project ~ Occupancy rate of 11.5% None ▪ Land lease fee: 70 USD/m2/over project life ▪ Factory lease fee: Not applicable ▪ Payment: 739 - Method: One-time payment for full leasing term - Period: Deposit: 20% of full amount at the time of principle contract 1st period: 20% of full amount at the time of official contract 2nd period: 50% of full amount upon investment certificate 4th period: 10% of full amount upon land use right certificate ▪ Management fee: 0.3 USD/m2/year Operating fee ▪ Electricity fee: At EVN’s list price ▪ Water fee: 0.4 USD/m3 for industrial purpose, 0.5 USD/m3 for living purpose ▪ Wastewater treatment fee: Upon feature of wastewater (average 1 USD/m3) ▪ Waste treatment fee: Upon feature of waste INFORMATION OF INFRASTRUCTURE AND FACILITY Financial institution Tax service, State finance office Customs Service JSC Bank for Foreign Trade of Vietnam (Vietcombank) Vietnam Technological and Commercial JSC Bank (Techcombank) Vietnam Bank for Agriculture and Rural Development(Agribank) Vietnam Bank for Industry and Trade (VietinBank) Bank for Investment and Development of Vietnam (BIDV) 30Km from District Tax Authorities and Treasury office 55Km from Province Tax Authorities and Treasury office 60Km from nearest Customs Agency ICD is available within Logistic Area of IP Logistics Available within IP Post office Available within IP Medicare 2Km from Rang Dong Town Medicare Center 14Km from Nghia Binh Town General Hospital 35Km from Nghia Hung District General Hospital 34Km from Nghia Hung District Police Station A public security unit will be available within IP. Training center is available within IP Police, public security Universities, training facilities, etc. Recruitment Recruitment support service available Worker dormitory Worker dormitory available within IP Worker's child education facility One-stop service 2Km from Rang Dong Kindergarten Road Width Communication Infrastructure of Industrial Zone Emergency Power generator Fire-fighting facility Available 24m with six lanes Optical cable, IDD network available Not available Available Layout Plan 740 Location Map Actual View [- This Page is intentionally left blank -] 741 NGHE AN 742 INVESTMENT ENVIRONMENT IN NGHE AN GENERAL INFORMATION Area, Population ▪ Area: 16.486,49 km2 ▪ Population: 3,4 million (2022 statistic) Geographical Location Nghe An is a located at latitude 18033' to 20001' North latitude, longitude 103052' to 105048' East longitude, in the center of North Central region of Vietnam; The East borders the sea, the South borders Ha Tinh province, the North borders Thanh Hoa province, the West borders the Lao People's Democratic Republic with 468 km of land border, the east coast is 82 km long. Adjacent provinces ▪ The East borders the sea, the South borders Ha Tinh province, the North borders Thanh Hoa province, the West borders the Lao People's Democratic Republic. GRDP Industry growth PCI 2022 statistic: ▪ GRDP: 176.000 billion VND (7.5 billion USD) ▪ GRDP growth: 9,08% ▪ GRDP per capita: 51,34 million VND (2.1 thousand USD) ▪ Economic structure: - Industry - Construction: 33,8%; - Agriculture. forestry and fishery: 22,7%; - Service: 43,5 %. 2022 statistic: ▪ Industry - Construction growth: 10,96% %; ▪ Agriculture, forestry and fishery growth: 4,78%; ▪ Service growth: 10,77%; ▪ Score in 2022: Ranked 23 out of 63 cities and provinces in Vietnam (Up 7 steps compared to 2021). SOCIAL INFRASTRUCTURE Transportation ▪ Roadway: There are 8 national highways passing through the province. In which, there are 3 routes along the North-South direction, 5 transverse routes in the East-West direction connecting with Laos; There is a trans-Asia route from Laos through Thanh Thuy border gate to Cua Lo and Dong Hoi ports. The North-South Expressway passing through the territory of Nghe An province is 134 km long, with a scale of 6 lanes, expected to be completed and put into use in mid-2024. ▪ Railway: With 94 km, stretching from North to South. In which, Vinh Railway Station is rated as the first class station, the third largest passenger and transportation station in the country. ▪ Waterway: The existing Cua Lo port is a large-scale commercial port, with 06 main berths, 3 cargo yards with an area of 9ha, loading and unloading capacity of over 10 million tons/year, receiving ships of 30,000 DWT. Cua Lo deep-water port is planned with 12 berths (ship size 30, 50, 100 thousand DWT), of which 1 berth for ships of 30,000 DWT and 1 berth for ships of 50,000 DWT put into operation by the end of 2025. ▪ Airlineway: Vinh International Airport is less than 15 minutes drive from the city center. The airport has the fastest growth rate in the country and is the main airport of the North Central region; currently investing in more cargo terminals and establishing more domestic and international routes. 743 Electricity The national electricity grid has covered all 21 districts, cities and towns in the province. Many hydropower projects have been completed and will be put into operation such as: Ban Ve, Khe Bo, Hua Na, Ban Coc, Nhan Hac and dozens of other small and medium hydropower plants to ensure stable power supply for production and living. Water The water supply can meet the production, service and daily activities of Nghe An province. Particularly, Vinh city and surrounding areas have a water supply capacity of 90,000m3/day and is expected to increase to 100,000m3/day in the future. Education Nghe An is a province with a multi-disciplinary and multi-field vocational training system with 06 universities, 11 colleges and nearly 70 professional and vocational training schools in the fields of economics, engineering, vocational training, pedagogy, health, culture and art ... fully meet the human resource needs of investors with the rate of trained workers reaching over 65%. Medicare ▪ Nghe An has a synchronous hospital network with modern equipment from the provincial and district levels, regional general clinics and a relatively good commune and ward health network. In which, there are 12 provincial hospitals to fully meet the medical examination and treatment needs of the people and investors such as Nghe An General Hospital with a scale of 1000 beds. High-tech hospitals as satellites for the North Central region such as: Oncology, Cardiology, Obstetrics and Gynecology, Eye, Vinh International,... INVESTMENT CONDITION Human resource ▪ In 2022, the province's labor force aged 15 and over is 1,556 million people, of which those being employed in the economy accounted for 98.7% of the provincial population. The labor structure of Nghe An has shifted in the right direction, increasing the proportion of employees in the industries - construction and services (accounting for 63.4%); The number of employees working in the formal economic sector is increasing rapidly. Every year, new jobs are created for 40-45 thousand people. Education level ▪ In the period of 2021-2022, 129,028 people will be recruited and trained, including 9,581 people at college degrees; intermediate level 18,265 people; primary education, training for less than 3 months 101,182 people; The average employment rate after graduation is over 80.7%; The rate of trained workers in 2022 will reach 67.7%, of which diplomas and certificates will reach 27.4%; The rate of students graduating from middle and high schools entering vocational training is 57 percent. Salary Investment incentives The minimum salary for the province is applied as follows: - Areas in regions where the region II minimum wage is applied: VND 4,160,000/month, including: Vinh city, Cua Lo town and Nghi Loc and Hung Nguyen districts. - Areas in regions where the region III minimum wage is applied: 3,640,000 VND/month, including: Quynh Luu District, Yen Thanh, Dien Chau, Do Luong, Nam Dan, Nghia Dan and Thai Hoa towns , Hoang Mai. - The rest of Nghe An province applies the region IV minimum wage: 3,250,000 VND/month. ▪ Incentives according to government regulations: The project is entitled to investment incentives according to the regulations of the Government of Vietnam for industrial zones in the Southeast Economic Zone (applicable to areas with extremely difficult socio-economic conditions), including: - Corporate income tax: The tax rate of 10% is applied for the first 15 years; in which, tax exemption for 04 years and 50% tax reduction for the next 9 years. - Import and export tax: Exemption from import tax on goods to create fixed assets; Tax exemption for 5 years for raw materials, supplies and components that cannot be produced domestically. ▪ Incentives from the province: Resolution No. 05/2021/NQ-HDND dated August 13, 2021 of the People's Council of Nghe An province promulgates a number of policies to support investment in Nghe An province, period 2021-2025, including: 744 - Support training costs 01 (one) time with the level of 2 million VND / 1 employee for the project with a total investment of 2,300 billion VND and employing more than 2,000 employees; - The provincial budget will support 50% of the cost of implementing investment procedures in the investment preparation step, but not exceeding VND 200 million per project since the project comes into operation. Map Contact South-East Nghe An Economic zone Management Auhtority ▪ Address: No 362- Le Nin street, Hung Phuc Ward, Vinh City, Nghe An Province. ▪ Tel: (0238) 3 835 146 ▪ Fax : ▪ Email: dongnameza@gmail.com ▪ Contact person: 745 LIST OF INDUSTRIAL ZONES IN NGHE AN PROVINCE No Industrial zone Name Total Area (ha) Occupancy Rate Status 1 WHA Industrial Zone 1 Hoang Mai Industrial Park ▪ Phase 1: 75% ▪ Phase 2: 22% N/A In Operation 2 3,200 (Phase 1: 498) 264.77 3 VSIP Industrial Zone 200 ha (Phase 1) 89% (Phase 1) 4 Nam Cam Industrial Zone Zone A: 416.3 Zone B: 122.7 Zone C: 154.7 Zone D: 1,220.9 A: 97.91% B: 87.58% C:100% D: 1% Phase 1: In Operation Phase 2: Under Construction In Operation In Operation NGHE AN’S LOCATION MAP OF INDUSTRIAL ZONES 746 WHA INDUSTRIAL ZONE 1 - NGHE AN GENERAL INFORMATION Address Investor Contact Person Location Investment Area Minimum wage WHA Industrial Zone 1 - Nghe An, Nghi Long Commune, Nghi Loc District, Nghe An Province, Vietnam WHA Industrial Zone Nghe An JSC ▪ Address: Lot AC1-1, WHA Industrial Zone 1 - Nghe An, Nghi Long Commune, Nghi Loc District, Nghe An Province, Vietnam. ▪ Tel: (84-222) 3634 034 ▪ Website: https://www.whavietnam.com/ ▪ Ms. Anchalee Prasertchand - Vice President - Mobile: +66 81 8432253 - Email: anchaleep@whaindustrialestate.com ▪ Ms. Nguyen Thi Ngoc – Senior Manager-Customer Development _ Mobile: +84975457459 _ Email: ngoc.thi.nguyen@whavietnam.com 16km from Cua Lo International Seaport Cluster 17km from Vinh Railway Station 18km from Vinh City / Airport 80km from Nghi Son Deep Sea Port 288km from Hanoi city 306km from Noi Bai airport 360 km from Hai Phong Sea port 1,318km Ho Chi Minh city/ Tan Son Nhat International Airport Priority Sectors for - Industrial: Automotive, Plastics, Light Metals, Textiles/Garments Investment (exclude dyeing), Building Materials - Consumer Goods: Food Processing, Beverages, Value-added Agriculture, Fast Moving Consumer Goods (FMCG), Electrical Appliances - Technology: Electronics, Medical Assembly, Software, Smart Phones, Communications - Logistics: Cold Storage, Inland Container Depot, Modern, Warehouse Logistics, Shipping and Freight Restricted Sectors for Dyeing, tanning Investment [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries Minimum Lease Area ▪ Phase 1: 2017 - 2067 ▪ Phase 2: 2017 - 2067 5,000 m2 Limit for Construction Height Permitted Construction Rate In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning regulation (QCVN 01:2021/BXD), The construction area is not more than 70% of the total leased land lot Planned area Factory Available for Rent ▪ Total reserved area: 2,100 ha ▪ Total leasable area: 498 ha ▪ Total area: Available upon further Discussion Operation Status ▪ In operation Occupancy Rate and Number of Projects ▪ Phase 1: 75% ▪ Phase 2: 22% ▪ 22 Projects ▪ 1 project Lease term Number of Korean Projects Lease fee ▪ Development Fee: 65 USD/m2 (This Rate is valid until December 2023) ▪ Factory lease fee: Available upon further Discussion ▪ Payment: - Method: Bank Transfer in VND - Payment structure: 10% of Total Lease Fee, payable upon signing of MOU 40% of Total Lease Fee, payable upon signing of Land Sublease Agreement (within 2 months from MOU Date) 747 50% of Total Lease Fee, payable before Land Hand-over date (within 1 months from LSA date) ▪ Management fee: VND1,506/m2/month (excluded VAT) Operating fee ▪ Electricity fee: According to the Circular by Ministry of Industry and Trade, valid from March 16th, 2015 (excluded VAT) for voltage from 22KV-110KV. ▪ Treated Water Supply: 11,800 VND/ m3 (excluded VAT) ▪ Wastewater treatment fee: 6,300 VND/ m3 (excluded VAT) Note: Wastewater Test Fee, Wastewater Surcharge Fee (in case of inorganic/heavy metal parameters discharged) : To be provided upon discussion INFRASTRUCTURE AND FACILITY Financial institution BIDV, Vietin Bank, Vietcombank, Agribank, etc Tax service, State finance office Customs Service 17 km from Tax Department of Nghe An province 16 km from Nghe An State Treasury 17.5 Km from Nghe An Provincial Customs Department Post office 2.7 km from Quan Hanh Post Office Medicare 6 Km from Nghi Loc District Hospital 14 Km Nghe An General Hospital 5 km from Nghi Loc District Police Station Police, public security Universities, training facilities, etc. Recruitment Worker dormitory 19 Km from Vinh University Nghi Loc District, Nghe An Province, Labor-Invalids & Social Affairs Department, etc will support in recruitment Opposite the zone (300m) Worker's child education facility One-stop service 2 Km from the zone Road Width Main road: 67m, 4 lanes; By Road: 30m, 2 lanes IT & Tele-communication Facilities Emergency Power generator The telecommunication system complies with international standards and is always available for communication demand with high data transmissions Available Fire-fighting facility Available. - Fire Fighting Station: 24/7 operation with Emergency Team stand by, locating inside Industrial Zone - firefighting hydrant is located along internal roads. 18 Km from the nearest Facility Layout Plan 748 Location Map Actual View 749 LIST OF SOME NOTABLE TENANTS No. Company Name Nationality Location 1 GOERTEK Precision Industry Vietnam Co., Ltd Hong Kong Plot A1-1; A1-2; A1-3; A1-4; A2-1; A2-2; A2-3 2 NAKANO Apparel Co., Ltd Japan Plot A5-7 3 KYUNGSHIN Nghe An Co., Ltd Korea Plot A5-8 4 VINA SUN Energy Investment JSC Vietnam Plot A3-1A 5 TALI International Transport and Trade JSC Vietnam Plot A3-1A 750 HOANG MAI I INDUSTRIAL PARK GENERAL INFORMATION Address Quynh Thien Ward, Hoang Mai Town, Nghe An Province, Vietnam Investor ▪ Address:.9th floor, VEAM Tay Ho Building, Lot D, Zone D1, Phu Thuong Ward, Tay Ho District, Ha Noi ▪ Tel: 024.6269.3838 ▪ Website: htdcorp.vn ▪ Hoang Minh Duc – PR Manager; Tel: 0868003789 Contact Person Location ▪ 12km from Nghi Son deep water Port – Thanh Hoa ▪ 8km from Dong Hoi Port-Nghe An ▪ Adjacent to National Highway No 1A ▪ Near Hanoi – Vinh Highway ▪ 200km from Hanoi ▪ 60km from Vinh International Airport Investment Area Priority Sectors for Investment Minimum wage Lease term Minimum Lease Area Manufacture and assembly of electrical, electronic and telecommunication equipment; Manufacture of chemicals and chemical products; Fine engineering Industry; Footwear manufacturing Industry; Steel manufacturing Industry; Manufacture and assembly of automobile and aircraft components; Agricultural goods and mineral processing – forestry Industry; Construction materials, producing semi-finished building products; Industrial service equipment manufacturing Industry Restricted Sectors for All occupations are unprohibited by Vietnamese law Investment [Area III] 3.640.000 VND ▪ Start date: from the date of signing the contract ▪ End date: February 26th 2071 30,000 m2 Factory Available for Rent Building height limit Factory construction area: 8-40m Operating area: 8-20m Permissible building rate Factory construction area: 70% Operating area: 60% ▪ Total area: 264.77 ha ▪ Total vacant leasable area: 174 ha ▪ Total area with full infrastructure ready to build factory: 174ha ▪ Total area: N/A Operation Status ▪ In operation Occupancy Rate and Number of Projects Number of Korean Projects ▪ 07 Projects N/A Limit for Construction Height Permitted Construction Rate Planned area Lease fee ▪ Land lease fee: 0.06 USD/m2 ▪ Industrial infrastructure fee: 55 USD/m2 ▪ Factory lease fee: N/A ▪ Payment: - After signing Land Sublease Agreement : 10% - After signing Land Sublease Contract: 50% After handing over land: 30% 751 - After handing over the Certificate of Land Use Rights and the value-added invoice: 10% ▪ Management fee: 0.05USD/m2/month ▪ Electricity fee: Peak hour: 0.13 USD/KWh Normal hour: 0.08 USD/KWh Off-peak hour: 0.05 USD/KWh ▪ Water fee: 0.45USD/m3 (According to regulations of the Provincial People’s Committee on clean water price) ▪ Wastewater treatment fee: 0.25 – 0.85 USD/m3 ▪ Waste treatment fee: According to the regulations of the service provider INFRASTRUCTURE AND FACILITY Operating fee Financial institution BIDV, Vietin Bank, Vietcombank, Agribank Tax service, State finance office Logistics 7.8 km from Nghe An Tax Office 30 km from Nghe An State Treasury Office 20 Km from Logistic Center: Nghi Son Logistics Post office 6.3 km from Vietnam Post Office Medicare 6 Km from Quang Khoi General Hospital Universities, training facilities, etc. Road Width 4 Universities, 9 colleges, 14 vocational schools The central road’s axis is of 36 meters in width The main road’s axis is of 22,25 meters in width IT & Tele-communication Facilities Emergency Power generator The telecommunication system complies with international standards and is always available for communication demand with high data transmission s Available Fire-fighting facility Available. Water supply system for firefighting is located along each road. Layout Plan Location Map Actual View . LIST OF SOME NOTABLE TENANTS No. Company Name 1 JUTENG ELECTRONIC TECHNOLOGY (VIETNAM) LIMITED 2 DUC TIN HANOI PRODUCTION TRADING SERVICES BUILDING LIMITED COMPANY NHUA HOANG MAI CORPORATION 3 4 ENVROY VIETNAM JOINT STOCK COMPANY 5 Nationality Location Taiwan B1, B2, CN01 Hoang Mai I Industrial Park Viet Nam DVHC02, Hoang Mai I Industrial Park KHA02, Hoang Mai I Industrial Park Viet Nam Japan A01, Hoang Mai I Industrial Park DONGXU JUTENG ELECTRONIC MATERIAL (VIETNAM) LIMITED Taiwan A08, Hoang Mai I Industrial Park 6 GOOD MAY PAINT INDUSTRY CO., LTD Taiwan A09, Hoang Mai I Industrial Park 7 RUNERGY PV TECHNOLOGY (THAILAND) CO.,LTD Thailand A10, Hoang Mai I Industrial Park 752 VSIP NGHE AN I INDUSTRIAL PARK GENERAL INFORMATION Minimum wage No.8 Dai Lo Huu Nghi, Hung Tay Commune, Hung Nguyen District, Nghe An Province, Viet Nam. VSIP NGHE AN Ltd., Co. ▪ Address: No.8 Dai Lo Huu Nghi, Hung Tay Commune, Hung Nguyen District, Nghe An Province, Viet Nam. ▪ Tel: (84.238) 3763 555 Website: https://www.vsip.com.vn ▪ Ms Hong Anh - Marketing Assistant Manager - Mobile: ++ 84 93 2345 188 - Email: anh.nth@vsip.com.vn - 2 Km from Vinh Center - 4 Km from Vinh Airport - 15 Km from Cua Lo Seaport - 90 Km from Nghi Son Seaport - 290 Km from Ha Noi - 330 Km from Hai Phong Seaport Priority Sectors for Light, Clean & High-tech Industries such as: E&E, F&B, FMCG, Investment Packaging, Pharmaceutical, Automotive components, etc. Restricted Sectors for Heavy Industries which produce high pollution to environment such as: Investment dyeing, rubber, concrete, etc. Region 2 (Pursuant to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries) Lease term ▪ 50 years: 2015 - 2065 Minimum Lease Area 10,000 m2 Limit for Construction Height Permitted Construction Rate Pursuant to Master Plan Amendment Approval of VSIP Nghe An dated 06 Nov 2020: Address Investor Contact Person Location Investment Area For Industrial Land, the maximum building coverage is 70%. The maximum of 03 – 05 storeys is allowed. For Mixed Use Land, e.g. dormitory land, the maximum building coverage is 50%. The maximum of 10 storeys is allowed. Factory Available for Rent ▪ Total IP area: 370 ha ▪ Total vacant leasable area: ~20 ha ▪ Available & supplied by BWID, SIS Nghe An Operation Status ▪ In operation Occupancy Rate and Number of Projects Number of Korean Projects ▪ 89 % ▪ 40 Projects ▪ 03 projects Planned area ▪ Land lease fee: Upon Request ▪ Payment: 10% after signing Letter of Offer + 30 % after having Investment Registration Certificate, Enterprise Registration Certificate + 30% after signing Land Sublease Agreement + 30% after Land Hand-over - Method: Bank Transfer in VND. ▪ Management fee: 1,595 VND/m2/month (excluding VAT) Operating fee ▪ Electricity fee: By EVN ▪ Water fee: 11,958 VND/m3 (excluding VAT) ▪ Wastewater treatment fee: 5,707 VND/m3/ (based on 80% of water consumption) (excluding VAT) INFRASTRUCTURE AND FACILITY Lease fee Financial institution Vietcombank, BIDV, Seabank, Maritimebank, Agribank, etc Tax service, State finance office Customs Service 9 km from Nghe An Tax Office 8 km from Nghe An State Treasury Office 3 Km from Vinh Customs Agency 753 Logistics VN Post, Vietsun, SME, Avina, etc. Post office 1 km from Vietnam Post Office Medicare 6 Km from Nghe An General Hospital Police, public security 2 Km from Hung Nguyen Police Station Universities, training facilities, etc. Recruitment 8 Km from Vinh University Worker dormitory Worker's child education facility One-stop service Road Width VSIP Nghe An support investors in recruitment (job fairs, advertisement, connect universities & investors, etc.) Available for building on VSIP NA’s service land Available from surrounding residential areas. VSIP NA Customer Service coordinates with Dong Nam SEZ to support investors in doing application for licenses. Carriageway with reserve width of 27, 31 & 38m (02 lanes) IT & Tele-communication Facilities Emergency Power generator Supplied by Vietnam Technology & Telecommunication JSC (VNTT) Fire-fighting facility 24/7 VSIP Nghe An Fire Fighting Station, Nghe An Fire Fighting Station Available & supplied by EVN Layout Plan Location Map Actual View 754 Sangwoo’s factory (Korean Garment maker) Luxshare’s dormitory (Hong Kong E&E maker) 755 LIST OF SOME NOTABLE TENANTS No. Company Name Nationality Location 1 Biomass Fuel Vietnam Co., Ltd Japan 18,19 2 An Nam Matsuoka Garment Co., Ltd. Japan C1-01 3 Innovative Manufacturing Solutions Vietnam Co., Ltd. South Korea 24,25 4 SangWoo Vietnam Co., Ltd South Korea 30 5 UMW Equipment Systems (VietNam) Ltd., Co. Malaysia 28B 6 Gift Story Industrial Ltd., Co. Hong Kong 17 7 Luxshare – ICT Nghe An Ltd., Co. Hong Kong 20,21,22,23,27 8 Construction Material of Centre Region JSC Vietnam 28 9 Dat Tien Ltd., Co. Vietnam 26B 10 Hoang Gia Viet Service & Trading Ltd., Co. Vietnam 29 11 Hoang Gia Warehouse Ltd., Co. Vietnam 81 12 ICEM Material & Construction JSC Vietnam 05B 13 Kien Moc Design JSC Vietnam 26 14 Nanoco Vinh Ltd., Co. Vietnam 36 15 Nghe An Industrial Gas JSC Vietnam 12 16 TDV Vietnam Manufacturing & Trading Corporation Ltd. Vietnam 11 17 Viet Duc Glass Commercial JSC Vietnam 05C 18 Vietnam Post Vietnam 13,14,15 19 Vietnam Technology & Telecommunication JSC Vietnam H-05-3,1 20 Great LongView Industrial Co., Ltd. Taiwan 06,16 21 Beckers Nghe An Branch Sweden 07,08 756 22 BCI JSC Vietnam E2-02 23 INDICO Industrial Development Co., Ltd Vietnam E2-02, 82,83 24 Phuong Truc Investment JSC Vietnam 04B 25 Haohui Technology Vietnam Ltd. Co. Vietnam 04A 26 Everwin Precision Vietnam Technology Ltd., Co. Hong Kong D1-1, D1-2 27 Merry- Luxshare (Vietnam) Co., Ltd. Hong Kong 01 28 Woosin Vina Co., Ltd. Korea 32,33 29 SIS Infrastructure Service Co.,ltd Singapore 96,97,98 30 Food 1.6 JSC Vietnam 05A 31 Ngoc Ha Co.,ltd Vietnam 04D 32 Taihing Plastic Metal (Vietnam) Hong Kong 85 33 TOA Electric Japan 92 34 TCS Industrial JSC Vietnam C2 35 Telstar Viet Nam Co.,ltd Vietnam 86 36 Paper Works Printing Ltd Hong Kong 31 37 Gaiwatch Hong Kong E2-02 38 Current Power Hong Kong 05E 757 VSIP NGHE AN II INDUSTRIAL PARK GENERAL INFORMATION Tho Loc commune, Dien Chau District, Nghe An Province, Vietnam Address Investor Minimum wage VSIP Nghe An Co., Ltd ▪ Address: No. 8 Dai lo Huu Nghi, VSIP Nghe An, Hung Tay Town, Hung Nguyen Dist., Nghe An, Vietnam ▪ Tel: (84) 917 31 1818 ▪ Website: www.vsip.com.vn ▪ Ms Hong Anh - Marketing Assistant Manager - Mobile: ++ 84 93 2345 188 - Email: anh.nth@vsip.com.vn - 35 km from VSIP Nghe An I - 37 km from Vinh City Center - 30 km from Vinh International Airport - 23 km from Cua Lo Seaport - 310 km from Hai Phong Seaport - 2.5 km from Highway No.01 Priority Sectors for Light, Clean & High-tech Industries such as: E&E, F&B, FMCG, Investment Packaging, Pharmaceutical, Automotive components, etc. Restricted Sectors Heavy Industries which produce high pollution to environment such as: for Investment rubber, concrete, etc. Region 3 (Pursuant to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries) Lease term 2023-2073 (50 years) Minimum Lease Area 10,000 m2 Limit for Construction Height For Industrial Land, the maximum building coverage permitted is 70% of total area. The maximum number of storey allowed is 05 storeys. Contact Person Location Investment Area Permitted Construction Rate Factory Available for Rent ▪ Total area: 500ha (Phase 1) ▪ Total vacant leasable area: 350ha (Phase 1) ▪ N/A Operation Status ▪ Under development Occupancy Rate and Number of Projects ▪ Under construction Planned area Number of Korean Projects ▪ Land lease fee: Upon Request ▪ Payment: 10% after signing Letter of Offer + 30 % after having Investment Registration Certificate, Enterprise Registration Certificate + 30% after signing Land Sublease Agreement + 30% after Land Hand-over - Method: Bank Transfer in VND. ▪ Management fee: 1,595 VND/m2/month (excluding VAT) Operating fee ▪ Electricity fee: By EVN ▪ Water fee: 11,958 VND/m3 (excluding VAT) ▪ Wastewater treatment fee: 5,707 VND/m3/ (based on 80% of water consumption) (excluding VAT) INFRASTRUCTURE AND FACILITY Lease fee Financial institution Vietcombank, BIDV, Seabank, Maritimebank, Agribank, etc. Tax service, State finance office Customs Service 34 km from Nghe An Tax Office 33 km from Nghe An State Treasury Office 34 km from Nghe An Custom Office Logistics 9 km from the nearest Logistic Center: Nhat Tin Logistics Post office 9 km from Dien Chau Post Office Medicare 12 km from Dien Chau District Medical Center 758 Police, public security 11km from Dien Chau Police Station Universities, training facilities, etc. Recruitment Vinh University, Vinh Industrial University, Vietnam – Korea Vocational College, Vinh Technical University, Vietnam – Germany Vocational College, etc. VSIP Nghe An support investors in recruitment (job fairs, advertisement, connect universities & investors, etc.) Available for building on VSIP NA’s service land Worker dormitory Worker's child education facility One-stop service 3.4 km from the zone Road Width VSIP NA Customer Service coordinates with Dong Nam SEZ to support investors in doing application for licenses Width 7.5m, 11.25m, 22.5m IT & Tele-communication Facilities Emergency Power generator The telecommunication system complies with international standards and is always available for communication demand with high data transmission Available & supplied by EVN Fire-fighting facility 24/7 VSIP Nghe An Fire Fighting Station, Nghe An Fire Fighting Station. Layout Plan Location Map Actual View Under Development Land is available for handover in Q2/2024 759 760 NAM CAM INDUSTRIAL ZONE GENERAL INFORMATION Address ▪ Area A: On the border of Nghi Long, Nghi Thuan ward, Nghi Loc district, Nghe An ▪ Area B: On the border of Nghi Xa and Nghi Long ward, Nghi Loc district, Nghe An ▪ Area C: On the border of Nghi Xa and Nghi Quang ward, Nghi Loc district, Nghe An ▪ Area D: On the border of Nghi Thuan and Nghi Long ward, Nghi Loc district, Nghe An Area A, B, C Nghe An Industrial Zone Development Company ▪ Address: No. 16, Le Hoan Street, Hung Phuc Ward, Vinh City, Nghe An province ▪ Tel: (84-238) 860 0299 Fax: (84-238) 3597 985 Investor Area D Tuan Loc Construction Investment JSC. ▪ Address: 362/14 Ung Van Khiem, Ward 25, Binh Thanh District, Ho Chi Minh City ▪ Tel: (84-28) 6258 5039 Contact Person ▪ Area A,B,C: Mr Sy – Dong Nam Economic Zone Management Board - (84) 913 357 897 tvsykktdn@gmail.com ▪ Area D: Mr Son - (84) 966 66837 - info@xaydungtuanloc.com Location ▪ 18 km to Vinh cỉty ▪ 8 km to Cua Lo Port ▪ 12 km to Vinh airport ▪ 17 km to Vinh station and 2 km to Quan Hanh station Priority Sectors for Investment ▪ Zone A: Steel rolling, metallurgy; Mechanical manufacture; Automobile assembly; Processing of Agricultural and Forrest Product; Processing consumer goods and products for export. ▪ Zone B: Brewery Manufacture ▪ Zone C: heavy industry with high pollutant level such as: Fertilizer processing and chemical industry; Processing products to wood, leather; Mechanical manufacture ; Mineral processing; Building material manufacture,.. Restricted Sectors for Investment N/A Investment Area Minimum wage [Area 4] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries Lease term 50 years Minimum Lease Area N/A Limit for Construction Height N/A Permitted Construction Rate N/A Planned area ▪ Area A: 416.3 ha (industrial land area: 288 ha, vacant leasable area: 6 ha) ▪ Area B: 122.7 ha (industrial land area: 101.6 ha, vacant leasable area: 0 ha) ▪ Area C: 154.7 ha (industrial land area: 110.37 ha, vacant leasable area: 0 ha) ▪ Area D: 1220.9 ha (industrial land area: 932.1 ha, vacant leasable area: 928.34 ha) Factory Available for Rent ▪ Total area: N/A Operation Status ▪ In operation Occupancy Rate and Number of Projects ▪ Rate of Occupancy: - Area A: 97.91% (15 projects) - Area B: 87.58% (15 projects) - Area C: 100% (38 projects) - Area D: 1% (1 project) 761 Number of Korean Projects 02 projects Lease fee ▪ Land lease fee with infrastructure: 0.45USD/m2/year (for all area) ▪ Land lease fee without infrastructure: - For 1,667 VND /m2/year (for A, C,D area); 3,996 VND (~0.176 USD)/m2/year (for B area) ▪ Factory lease fee: - For Area A, B, C: 41,000 VND /m2/year (~ 1.82 USD/ m2/year) (All statistics of 2017) Operating fee ▪ Infrastructure maintenance fee: 2,071 VND (~ 0.09 USD) /m2/year (for Area C) ▪ Electricity fee: as regulated by the Government ▪ Water fee: 11,400 VND (~0.51 USD)/m3 (for all area) ▪ Wastewater treatment fee: 9,568 VND (~0.45 USD)/m3 (for all area) INFRASTRUCTURE AND FACILITY Financial institution 8-10 km to bank branches of Vietcombank, Vietinbank, Agri Bank, LienViet Post Bank Tax service, State finance office 9 km to Tax Department and State Treasury of Nghi Loc Customs Service 6 km to Cua Lo Port Customs Office Logistics 8 km to Cua Lo Port with transport service available there. Post office Nam Cam Post Office is next to the IZ Medicare 7.6 km to Nghi Loc General Hospital; 9.4 km to Cua Lo Town General Hospital Police, public security 9.4 km to Nghi Loc Post Office Universities, training facilities, etc. 10- 25 km to Nghe An’s universities and vocational schools Recruitment 23 km to Nghe An Recruitment Center Worker dormitory N/A Worker's child education facility Nghi Xa Preschool. Nghi Long Preschool, Nghi Quang Preschool are located in the area of the IZ One-stop service 23 km to Nghe An Public Administration Center Road Width ▪ The central roads system: 43m wide ▪ The interior road systems: 22.25m – 43m wide IT & Tele-communication Facilities Systems of optical cable and wired lines Nam Cam Post Office is next to Industrial Park Emergency Power generator Available Fire-fighting facility Available Layout Plan 762 Location Map Actual View 763 LIST OF TENANTS No. Company name Nationality Business line Zone 1 Chau Tien Co., Ltd Vietnam Wall baits manufacture Zone A 2 Huong Lieu Co., Ltd Vietnam Stone manufacture Zone A 3 Hanoi Beer JSC. - Nghe An Vietnam Beer manufacture Zone A 4 Mechanical JSC. No. 9.1 Vietnam Mechanical manufacture Zone A 5 Vietnam Sawn stone and limestone manufacture Zone A 6 Japan-Viet Nghe An Warehouse JSC. Thien Phu Co., Ltd Vietnam Krap paper manufacture Zone A 7 Masan MB Co., Ltd Vietnam Food manufacture Zone A 8 Trung Do JSC. Vietnam High quality construction materials Zone A 9 Vietnam Building material Zone A 10 Construction Investment JSC. and TM 379 Thinh Loc JSC. Vietnam Warehouse service center Zone A 11 Viet Vinh JSC. Vietnam Asbestos cement sheet Zone A 12 Tin Thanh JSC. Vietnam Car service Zone A 13 Tan An Construction JSC. Vietnam Mechanical Factory Project Zone A 14 Dong Tien JSC. Vietnam Garment manufacture Zone A 15 PetroVietnam Nghe An Mineral Corporation Tan A Co., Ltd Vietnam Construction materials production Zone A Vietnam Solar water heater manufacture Zone B Vietnam Alcohol - Beverage manufacture Zone B 18 Hanoi Beer - Alcohol - Beverage Joint Stock Corporation Son Nam JSC. Vietnam CACO3 limestone manufacture Zone B 19 1 TV Son Ha Nghe An Co., Ltd Vietnam Stainless steel products Zone B 20 Choa Viet JSC. Vietnam Food processing Zone B 21 Vietnam PJ Mercury JSC. Vietnam Animal feed Zone B 22 Vietnam Industrial freight forwarding center Zone B Vietnam Storage and factory for rent Zone B 24 Dai Minh Quang Construction Co., Ltd Central Construction Consultant and Investment JSC. Royal Foods Nghe An Co., Ltd Thailand Seafood processing Zone B 25 FRESCOL Thailand Sea products and meat, non-alcoholic beverages Zone B 26 Royal Beverage Co., Ltd Thailand Zone B 27 Thailand Animal feeding production Zone B 29 Royal can Industries Co., Ltd, Nghe An branch Austfeed Nghe An Joint Venture Company Royal Capital Co., Ltd Non-alcoholic beverages, ice, processing milk and dairy products Metal food boxes Thailand Showroom and service center Zone B 30 Viet Duc Trading JSC. Vietnam Tempered glass manufacture Zone B 31 Nghe An super-fine white limestone JSC. Ha An Phat Co., Ltd Vietnam Ultrafine limestone manufacture Zone C Vietnam Stone Processing Zone C Vietnam Unburnt bricks Zone C 34 An Viet Investment and Development JSC. Vinh Mechanical JSC. Vietnam Supporting Industry Zone C 35 Cao Thang Import Export JSC. Vietnam Food processing Zone C 36 Lien Hiep- Nghe An Co., Ltd Vietnam CACO3 limestone manufacture Zone C 37 VIC Trading JSC. Vietnam Animal feed manufacture Zone C 16 17 23 28 32 33 764 Zone B Vietnam Seafood Processing Zone C 39 Hai An Seafood Import Export & Trading Co., Ltd Nghe An Paper Material Co., Ltd Vietnam Paper manufacture Zone C 40 Asia Mineral JSC. Vietnam Ultrafine limestone manufacture Zone C 41 Vietnam White stone processing factory Zone C 42 Consulting and Construction of the Central JSC. Chemical Industry JSC. Vietnam Manufacturing and processing artificial wood Zone C 43 Vietnam Tung Huong JSC. Vietnam Export wood processing enterprises for export Zone C 44 Minh Thai Son JSC. Vietnam Fishmeal manufacture Zone C 45 Tan Ky JSC. Vietnam White limestone fine art stone manufacture Zone C 46 Phihico JSC. Vietnam Wood product manufacture Zone C 47 European Plastic JSC. Vietnam Calcium carbonate resin manufacture Zone C 48 Vietnam Zone C Vietnam Ultra fine limestone and coating enamel manufacture Ultra fine limestone and porcelain enamel 50 VNT Construction Commercial Joint Stock Corporation Construction Trading Joint Stock Corporation. - Ministry of Transport Nghe An Mineral JSC. Vietnam Ultra fine limestone processing Zone C 51 Tien Phong Plastic JSC. Vietnam Plastic products manufacture Zone C 52 Thien Phu Co., Ltd Vietnam Krap paper manufacture Zone C 53 Thien Phu JSC. Vietnam Paper manufacture Zone C 54 Vietnam Steel sheet manufacture Zone C 55 Hoa Sen Nam Cam Nghe An Co., Ltd Tri Viet Energy Co., Ltd Vietnam Northern Massan project Zone C 56 Quy Long general service complex 57 OMYA company 58 60 TAN VIET TRUNG ARTIFICIAL PLANK JSC. Hope Nghe An Animal Feed Co., Ltd. Vietnam BSE Vietnam Electronic Co., Ltd 61 Cargill Vietnam Co., Ltd. 62 Wood World Vietnam Joint Venture Co., Ltd. Agro Nutrition International JSC 38 49 Zone C Vietnam Seafood processing Zone C Switzerland Ultrafine limestone Zone C China Artificial plywood Zone C China Animal feed manufacture Zone C Components and electrical testing equipment Zone C Feed production Zone C Nghe An plywood processing Zone C Malaysia Animal feeding production Zone C Malaysia 66 CP Vietnam Livestock JSC. Thailand Factory producing animal feed for cattle, poultry and handicrafts Home appliance manufacturing electronic components C.P Nghe An animal feed factory Zone C 65 ANT Co., Ltd (HN) - Nghe An Branch Vietnam Gia Nhat Plastic Co., Ltd 67 Nagoya Giken Industrial Co.Ltd Car parts manufacturing project Zone C 68 Becker Industrial Coatings Vietnam Co., Ltd. Tuan Loc Investment Construction JSC. Becker Vietnam paint factory Zone C Infrastructure construction Zone D 59 63 64 69 South Korea The U.S India China Japan Switzerland Vietnam 765 Zone C Zone C [- This Page is intentionally left blank -] 766 NINH BINH 767 INVESTMENT ENVIRONMENT IN NINH BINH USD/VND 23.510 GENERAL INFORMATION Area, Population Area: 1,387.1 Km2 Population: 1.007,6 million (2022 statistic) Geographical Location Ninh Binh has a is the southernmost gateway province in the Northern Delta region, located at the boundary of three geographical areas: the Northwest, the Red River Delta and the North Central Region. Ninh Binh is located at the intersection of three economic regions: the Hanoi region, the Northern Coastal region and the central coastal region. Distance from Hanoi: 95 Km, from Ho Chi Minh City: 1626 km, from Da Nang: 670 km Adjacent provinces GRDP Industry growth PCI To the north, it borders Ha Nam province To the east and northeast, it borders Nam Dinh province across the Day River To the northwest, it borders Hoa Binh province To the south, it borders Thanh Hoa province and the East Sea. 2022 statistic: GRDP: 81.000 billion VND (3.45 billion USD) GRDP growth: 8,62% GRDP per capita: 3500 USD/year Economic structure: - Industry - Construction: 37,81%; - Agriculture. forestry and fishery: 8,85 %; - Service: 36,95%; - Tax on Goods: 16,39% 2022 statistic: Industry - Construction growth: 5,67% Agriculture, forestry and fishery growth: 3,04% Service growth:15,45% Score: 64.22 - ranked 44 out of 63 cities and provinces in Vietnam. (2022) SOCIAL INFRASTRUCTURE Transportation Electricity Water Roadway: The road system contains 01 expressway rout - 24.5 km, 08 national highway routs - 240.79 km; 20 provincial road routs - 272.3 km; district roads - 349.5 km, urban roads - 355.26 km, commune roads - 2,375.26 km and rural roads - 4,386 km. Railway: The North-South railway route is 21.6 km through the province with 4 stations (Ninh Binh station, Cau Yen station, Ghenh station and Dong Giao station), and 10 faraway stations that are convenient for transporting passengers and goods. Waterway: The waterway traffic includes 16 routes of the inland waterway with a total length of nearly 298.8 km. There are 24 inland waterway ports: Ninh Binh port, Ninh Phuc port, and ICD port, 103 cargo wharves, 4 petroleum wharves, and 30 river-cross passenger wharves distributed throughout the province. The electricity network is built relatively evenly throughout the province: Ninh Binh Power Plant with a capacity of 4x25MW; 01 500kV transformer station, 03 220kV transformer stations; 13 110kV substations… Water resources including surface water and underground water. In which, the surface water is the main water resource due to high rainfall, the sea and the river system is quite dense along with many lakes and lowland areas. The large rivers include: Day river, Hoang Long river, Boi river and some other small rivers such as Lang river, Vac river, An river, etc., but Day river is the largest river flowing through Ninh Binh province from Gia Thanh and into the sea at the Cua Day (Day gate). 768 Besides, there are 21 large reservoirs in the province such as Dap Troi, Da Lai, Yen Quang, Yen Thang reservoirs, with a total area of 1,270ha with a storage capacity of about 30 million m3. Education Up to now, the whole province has had 1 university, 4 colleges and 4 vocational and professional intermediate schools training many professions with many types of training. Medicare The province had 421 medical facilities INVESTMENT CONDITION Human resource 48,4% of population are in the working age (2022) Education level Trained labor rate: 14,5% (2022) The minimum salary for the province is applied as follows: - Area II: Ninh Binh city: 4.160.000 VND - Area III: Tam Diep city, Gia Vien district, Yen Khanh district, Hoa Lu district: 3.640.000 VND - Area IV: Nho Quan district, Kim Son district, Yen Mo district: 3.250.000 VNĐ The lowest wage for trained labor: 5.000.000 VND (including those trained by the enterprises) must be at least 7% higher than the above referenced basic salary Salary Investment incentives Investment incentives in Ninh Binh province shall be implemented according to government regulations Fields Attracting Investment Prioritized projects: high technology, modern technology, clean technology, smart manufacturing, manufacturing, assembly and supporting industries for the automobile industry, manufacturing products for agricultural production. Agriculture Sector: high-tech, green, clean, organic, endemic agriculture towards serving the tourism industry; research projects for application and transfer of technology to breed plant and animal breeds; scientific and technological application of aquaculture; develop key and specialty products (OCOP) in an organic direction associated with sustainable tourism development. Cultivation: project of research, transfer and production of high quality plant varieties; projects on research and application of science and technology in farming, preservation, processing and organic farming; Livestock production: livestock breeding project; livestock project towards the organic direction, digital transformation. Fishery sector: project of producing high-tech aquatic breeds; organic aquaculture project; projects on seafood exploitation in coastal waters (clams, oysters, shrimp, crabs...) and offshore fishing. Attracting projects in the field of logistics; projects to build sports training and training centers and establishments; vocational training projects; wastewater treatment in districts, cities and urban areas. Map (Add Province map) Contact Department of Planning and Investment Address: 8 Le Hong Phong Street, Van Giang Ward, Ninh Binh City Tel: 0229.3871.156 Fax : 0229.3873.381 Email: skhdt@ninhbinh.gov.vn Contact person: Dinh Thi Thuy Ngan LIST OF INDUSTRIAL ZONES No Industrial zone Name Total Area (ha) 769 Occupancy Rate Status 1 Gian Khau Industrial Zone 212 100% In Operation 2 Phuc Sơn Industrial Zone 142 93,47% In Operation 3 Khanh Phu Industrial Zone 351 100% In Operation 4 Tam Diep I Industrial Zone 64 100% In Operation 5 Kanh Cu Industrial Zone In Operation 6 Tam Diep II Industrial Zone planning 7 Kim Son Industrial Zone planning 770 GIAN KHAU INDUSTRIAL ZONE GENERAL INFORMATION Address Contact Person Location Investment Sectors Minimum wage Located on the territory of 3 communes Gia Tan, Gia Xuan and Gia Tran, Gia Vien district, Ninh Binh province Mr. Thắng – Position: Head of Investment Management - Mobile: 0913055983 - Email: hoangmanhthang0509@gmail.com Adjacent location: + It is bordered by route ĐT477 to the South. + It is bordered by Gia Tan commune to the North. + It is bordered by Gia Lap commune to the West. + It is bordered by National Highway 1A to the East. Priority Sectors for Mechanical engineering, cement, light industry, food, garment… Investment: Lease term 200-500 USD/person/month. 50 years Minimum Lease Area [Diện tích cho thuê tối thiểu] Limit for Construction Height [Giới hạn chiều cao xây dựng Khu xây dựng nhà máy Khu điều hành] Permitted Construction Rate [Tỷ lệ xây dựng cho phép Khu xây dựng nhà máy Khu điều hành] Planned area Operation Status Occupancy Rate and Number of Projects Lease fee - Planning area: 262 ha - The actual area was established: 162 ha - The remaining area: 100 ha - Planning area 2020: 262 ha - The area of the project is the establishment of new and expanded 2020: 100 ha ▪ Active ▪ 100% ▪ 40 USD/m2 Layout plan 771 INFRASTRUCTURE AND FACILITY - Water: Water is taken from clean water supply station of Hoa Lu district with a capacity of 3,000 m3/day, Ninh Binh Clean Water Supply Company Limited, providing enough clean water for production and daily life. - Power: The power is taken from 110KV power station in the industrial zone. It assures to provide sufficient and stable power supply for production. - Traffic system: The Industrial Zone is located in Gia Vien district which is crossed by National Highway 1A and Route ĐT477. This industrial zone is near Day and Hoang Long river crossing which is convenient for water transportation to Hai Phong, Quang Ninh and Thanh Hoa 772 TAM DIEP I INDUSTRIAL ZONE GENERAL INFORMATION Address Investor Contact Person Location Investment Sectors Minimum wage Lease term Minimum Lease Area Planned area Operation Status Occupancy Rate and Number of Projects Number of Korean projects Lease fee 201 Le Hong Phong, Dong Thanh ward, Ninh Binh city, Ninh Binh province Industrial Park Infrastructure Development Company ▪ Address: 201 Le Hong Phong, Dong Thanh ward, Ninh Binh city, Ninh Binh province ▪ Tel: 0904150979 ▪ Email ▪ Website: Mr. Thắng – Position: Head of Investment Management - Mobile: 0913055983 - Email: hoangmanhthang0509@gmail.com [Tên - Chức vụ - Số điện thoại – Email của người phụ trách] Adjacent location: Tam Diep 1 Industrial Park is located in Quang Son commune (Tam Diep city), about 15 km from Ninh Binh city center, about 3 km from Tam Diep city center. Priority Sectors for Cement Production; footwear and garment production; manufactures Investment: medical equipment… 200-500 USD/person/month. 50 years [Diện tích cho thuê tối thiểu] ▪ Total area: 142 ha ▪ Total vacant leasable area: 9 ha ▪ Active ▪ 93,47% - 18 projects ▪ N/A ▪ Land lease fee: 50 USD/m2 Layout plan INFRASTRUCTURE AND FACILITY Electricity supply, clean water supply, wastewater treatment system... are invested synchronously and modernly, fully meeting the needs of investors participating in production investment in the industrial park. In addition to bui