1 Viet Nam Investment Environment & Industrial Zones 2023 Kotra

advertisement
INFORMATION ON
INVESTMENT ENVIRONMENT
AND
INDUSTRIAL ZONES
IN VIETNAM
KOTRA HANOI – FIA VIETNAM
2023
TABLE OF CONTENT
INVESTMENT ENVIRONMENT IN AN GIANG........................................................................... 1
BINH LONG INDUSTRIAL ZONE .......................................................................................................................... 5
BINH HOA INDUSTRIAL ZONE ............................................................................................................................. 8
XUAN TO INDUSTRIAL ZONE ............................................................................................................................. 12
INVESTMENT ENVIRONMENT IN BA RIA – VUNG TAU ...................................................... 20
MY XUAN B1- TIEN HUNG INDUSTRIAL PARK ............................................................................................. 23
CAI MEP INDUSTRIAL PARK ............................................................................................................................... 25
CHAU DUC INDUSTRIAL PARK .......................................................................................................................... 27
DONG XUYEN INDUSTRIAL PARK .................................................................................................................... 29
INVESTMENT ENVIRONMENT IN BAC GIANG ...................................................................... 33
HOA PHU INDUSTRIAL ZONE ............................................................................................................................. 37
QUANG CHAU INDUSTRIAL ZONE .................................................................................................................... 40
DINH TRAM INDUSTRIAL ZONE........................................................................................................................ 46
VAN TRUNG INDUSTRIAL ZONE ....................................................................................................................... 49
SONG KHE – NOI HOANG SOUTH INDUSTRIAL ZONE ................................................................................ 52
SONG KHE – NOI HOANG NORTH INDUSTRIAL ZONE ............................................................................... 55
INVESTMENT ENVIRONMENT IN BAC KAN ........................................................................... 60
THANH BINH INDUSTRIAL ZONE ..................................................................................................................... 63
INVESTMENT ENVIRONMENT IN BAC LIEU ......................................................................... 69
TRA KHA INDUSTRIAL ZONE ............................................................................................................................. 72
LANG TRAM INDUSTRIAL ZONE ...................................................................................................................... 74
INVESTMENT ENVIRONMENT IN BAC NINH......................................................................... 78
QUE VO I INDUSTRIAL ZONE ............................................................................................................................. 83
QUE VO II INDUSTRIAL ZONE ........................................................................................................................... 89
QUE VO III INDUSTRIAL ZONE .......................................................................................................................... 93
TIEN SON INDUSTRIAL ZONE ............................................................................................................................ 96
YEN PHONG INDUSTRIAL ZONE (PHASE I, II) ............................................................................................. 104
YEN PHONG II-C INDUSTRIAL ZONE ............................................................................................................. 109
DAI DONG - HOAN SON INDUSTRIAL ZONE ................................................................................................ 112
VSIP BAC NINH INDUSTRIAL ZONE ............................................................................................................... 118
VSIP BAC NINH INDUSTRIAL ZONE – BUSINESS HUB............................................................................... 124
VSIP BAC NINH II INDUSTRIAL ZONE ........................................................................................................... 127
THUAN THANH II INDUSTRIAL ZONE ........................................................................................................... 130
THUAN THANH III INDUSTRIAL ZONE .......................................................................................................... 133
NAM SON HAP LINH INDUSTRIAL ZONE ...................................................................................................... 135
GIA BINH I INDUSTRIAL ZONE ........................................................................................................................ 138
INVESTMENT ENVIRONMENT IN BEN TRE ......................................................................... 143
GIAO LONG INDUSTRIAL ZONE ...................................................................................................................... 146
AN HIEP INDUSTRIAL ZONE ............................................................................................................................. 149
PHU THUAN INDUSTRIAL ZONE ..................................................................................................................... 151
INVESTMENT ENVIRONMENT IN BINH DINH .................................................................... 154
BECAMEX VSIP BINH DINH .............................................................................................................................. 158
NHON HOI INDUSTRIAL PARK - PARK A ...................................................................................................... 162
PHU TAI INDUSTRIAL PARK ............................................................................................................................. 166
INVESTMENT ENVIRONMENT IN BINH DUONG ................................................................ 169
BECAMEX-BAUBANG INUDSTRIAL PARK .................................................................................................... 173
BINH AN INUDSTRIAL PARK ............................................................................................................................ 187
DAI DANG INUDSTRIAL PARK ......................................................................................................................... 189
DAI DANG INUDSTRIAL PARK ......................................................................................................................... 191
MAI TRUNG INUDSTRIAL PARK...................................................................................................................... 192
KIM HUY INUDSTRIAL PARK ........................................................................................................................... 194
INVESTMENT ENVIRONMENT IN BINH PHUOC ................................................................. 198
VIET KIEU INDUSTRIAL ZONE ........................................................................................................................ 202
BECAMEX – BINH PHUOC INDUSTRIAL ZONE ........................................................................................... 204
BINH DUONG MAPLETREE INUDSTRIAL PARK ......................................................................................... 205
MINH HUNG SIKICO INDUSTRIAL ZONE ...................................................................................................... 207
INVESTMENT ENVIRONMENT IN BINH THUAN ................................................................. 211
PHAN THIET PHASE 1 INDUSTRIAL PARK ................................................................................................... 215
PHAN THIET PHASE 2 INDUSTRIAL PARK ................................................................................................... 220
HAM KIEM I INDUSTRIAL PARK ..................................................................................................................... 224
HAM KIEM II INDUSTRIAL PARK ................................................................................................................... 228
SONG BINH INDUSTRIAL PARK ....................................................................................................................... 232
TUY PHONG INDUSTRIAL PARK ..................................................................................................................... 236
TAN DUC INDUSTRIAL PARK ........................................................................................................................... 239
SON MY 1 INDUSTRIAL PARK .......................................................................................................................... 242
SON MY 2 INDUSTRIAL PARK .......................................................................................................................... 244
INVESTMENT ENVIRONMENT IN CA MAU........................................................................... 247
KHANH AN INDUSTRIAL ZONE ....................................................................................................................... 249
HOA TRUNG INDUSTRIAL ZONE ..................................................................................................................... 253
SONG DOC INDUSTRIAL ZONE ........................................................................................................................ 255
INVESTMENT ENVIRONMENT IN CAN THO ........................................................................ 259
TRA NOC 1 INDUSTRIAL ZONE ........................................................................................................................ 262
TRA NOC 2 INDUSTRIAL ZONE ........................................................................................................................ 264
HUNG PHU 1 INDUSTRIAL ZONE ..................................................................................................................... 266
HUNG PHU 2A INDUSTRIAL ZONE .................................................................................................................. 268
HUNG PHU 2B INDUSTRIAL ZONE .................................................................................................................. 270
VINH THANH INDUSTRIAL ZONE (STATE 1)................................................................................................ 274
INVESTMENT ENVIRONMENT IN CAO BANG ...................................................................... 277
DE THAM INDUSTRIAL ZONE .......................................................................................................................... 281
CHU TRINH INDUSTRIAL ZONE ...................................................................................................................... 283
INVESTMENT ENVIRONMENT IN DA NANG ........................................................................ 287
DANANG HI-TECH PARK.................................................................................................................................... 292
DA NANG HI-TECH PARK .................................................................................................................................. 293
LIEN CHIEU INDUSTRIAL ZONE ..................................................................................................................... 297
HOA CAM - PHASE I INDUSTRIAL ZONE ...................................................................................................... 301
EXPANDED HOA KHANH INDUSTRIAL ZONE ............................................................................................. 304
INVESTMENT ENVIRONMENT IN DAK LAK ......................................................................... 309
INVESTMENT ENVIRONMENT IN DAK NONG ..................................................................... 314
TAM THANG INDUSTRIAL PARK .................................................................................................................... 317
NHAN CO INDUSTRIAL ZONE .......................................................................................................................... 319
INVESTMENT ENVIRONMENT IN DIEN BIEN ..................................................................... 322
INVESTMENT ENVIRONMENT IN DONG NAI ...................................................................... 326
AMATA INDUSTRIAL ZONE .............................................................................................................................. 329
BAU XEO INDUSTRIAL ZONE ........................................................................................................................... 330
HO NAI INDUSTRIAL ZONE............................................................................................................................... 332
INVESTMENT ENVIRONMENT IN DONG THAP ................................................................... 336
TAN KIEU INDUSTRIAL ZONE.......................................................................................................................... 339
INVESTMENT ENVIRONMENT IN GIA LAI ........................................................................... 342
TRA DA INDUSTRIAL ZONE .............................................................................................................................. 347
SOUTH PLEIKU INDUSTRIAL ZONE ............................................................................................................... 349
INVESTMENT ENVIRONMENT IN HA GIANG ...................................................................... 353
BINH VANG INDUSTRIAL ZONE ...................................................................................................................... 357
INVESTMENT ENVIRONMENT IN HA NAM .......................................................................... 362
DONG VAN I INDUSTRIAL ZONE ..................................................................................................................... 365
DONG VAN II INDUSTRIAL ZONE ................................................................................................................... 369
DONG VAN III INDUSTRIAL ZONE .................................................................................................................. 374
DONG VAN IV INDUSTRIAL ZONE .................................................................................................................. 377
HOA MAC INDUSTRIAL ZONE.......................................................................................................................... 381
CHAU SON INDUSTRIAL ZONE ........................................................................................................................ 386
THANH LIEM INDUSTRIAL ZONE ................................................................................................................... 390
THAI HA INDUSTRIAL ZONE ............................................................................................................................ 392
INVESTMENT ENVIRONMENT IN HA TINH ......................................................................... 397
GIA LACH INDUSTRIAL ZONE ......................................................................................................................... 400
VUNG ANG ECONOMIC ZONE .......................................................................................................................... 403
PHU VINH INDUSTRIAL ZONE ......................................................................................................................... 407
VUNG ANG I INDUSTRIAL ZONE ..................................................................................................................... 410
CAU TREO INTERNATIONAL BORDER GATE ECONOMIC ZONE ......................................................... 412
INVESTMENT ENVIRONMENT IN HAI DUONG ................................................................... 417
DAI AN INDUSTRIAL ZONE ............................................................................................................................... 421
DAI AN EXPANSION INDUSTRIAL ZONE ....................................................................................................... 426
LAI CACH INDUSTRIAL ZONE ......................................................................................................................... 431
AN PHAT HIGH-TECHNOLOGY INDUSTRIAL PARK ................................................................................. 435
AN PHAT 1 INDUSTRIAL ZONE ........................................................................................................................ 439
CONG HOA INDUSTRIAL ZONE ....................................................................................................................... 442
CAM DIEN – LUONG DIEN INDUSTRIAL ZONE (VSIP HAI DUONG) ...................................................... 446
LAI VU INDUSTRIAL ZONE ............................................................................................................................... 450
PHU THAI (NAM TAI) INDUSTRIAL ZONE .................................................................................................... 453
TAN TRUONG INDUSTRIAL ZONE .................................................................................................................. 458
NAM SACH INDUSTRIAL ZONE........................................................................................................................ 463
PHUC DIEN INDUSTRIAL ZONE ....................................................................................................................... 467
INVESTMENT ENVIRONMENT IN HAI PHONG ................................................................... 473
DEEP C INDUSTRIAL ZONES ............................................................................................................................ 477
TRANG DUE INDUSTRIAL PARK ..................................................................................................................... 480
NAM DINH VU INDUSTRIAL ZONE ................................................................................................................. 486
TIEN THANH INDUSTRIAL ZONE .................................................................................................................... 489
INVESTMENT ENVIRONMENT IN HANOI ............................................................................. 493
HOA LAC HI- TECH PARK ................................................................................................................................. 497
QUANG MINH I INDUSTRIAL ZONE................................................................................................................ 504
QUANG MINH II INDUSTRIAL ZONE .............................................................................................................. 507
HANOI SOUTHERN SUPPORTING INDUSTRIAL PARK ............................................................................. 510
PHU NGHIA INDUSTRIAL ZONE ...................................................................................................................... 513
THACH THAT- QUOC OAI INDUSTRIAL ZONE............................................................................................ 516
THANG LONG INDUSTRIAL ZONE .................................................................................................................. 519
NAM THANG LONG INDUSTRIAL ZONE ....................................................................................................... 522
SAI DONG B INDUSTRIAL ZONE ...................................................................................................................... 525
NOI BAI INDUSTRIAL ZONE ............................................................................................................................. 528
CONG VIEN CONG NGHE THONG TIN INDUSTRIAL PARK ..................................................................... 531
SACH SOC SON INDUSTRIAL ZONE ................................................................................................................ 532
INVESTMENT ENVIRONMENT IN HAU GIANG ................................................................... 536
SONG HAU INDUSTRIAL PARK ........................................................................................................................ 539
INVESTMENT ENVIRONMENT IN HO CHI MINH................................................................ 542
DONG NAM INDUSTRIAL ZONE ....................................................................................................................... 546
HIEP PHUOC INDUSTRIAL PARK .................................................................................................................... 550
LE MINH XUAN 3 INDUSTRIAL ZONE ............................................................................................................ 553
LE MINH XUAN INDUSTRIAL ZONE ............................................................................................................... 557
TAN PHU TRUNG INDUSTRIAL ZONE ............................................................................................................ 560
TAN THUAN EXPORT PROCESSING ZONE ................................................................................................... 564
TAY BAC CU CHI INDUSTRIAL ZONE ............................................................................................................ 568
VINH LOC INDUSTRIAL PARK ......................................................................................................................... 572
INVESTMENT ENVIRONMENT IN HOA BINH ...................................................................... 577
LUONG SON INDUSTRIAL PARK ..................................................................................................................... 580
DA RIVER LEFT-BANK INDUSTRIAL PARK ................................................................................................. 583
BINH PHU INDUSTRIAL PARK.......................................................................................................................... 585
NHUAN TRACH INDUSTRIAL PARK ............................................................................................................... 586
LAC THINH INDUSTRIAL PARK ...................................................................................................................... 588
YEN QUANG INDUSTRIA1:E41AL PARK ........................................................................................................ 589
INVESTMENT ENVIRONMENT IN HUNG YEN ..................................................................... 593
PHO NOI A INDUSTRIAL PARK ........................................................................................................................ 597
THANG LONG II INDUSTRIAL ZONE .............................................................................................................. 605
MINH DUC INDUSTRIAL ZONE ........................................................................................................................ 614
MINH QUANH INDUSTRIAL ZONE .................................................................................................................. 619
YEN MY INDUSTRIAL ZONE ............................................................................................................................. 623
YEN MY II INDUSTRIAL ZONE ......................................................................................................................... 627
CLEAN INDUSTRIAL PARK ............................................................................................................................... 631
INDUSTRIAL PARK NO.3 .................................................................................................................................... 633
INDUSTRIAL PARK NO.4 .................................................................................................................................... 635
INVESTMENT ENVIRONMENT IN KHANH HOA .................................................................. 639
SUOI DAU INDUSTRIAL ZONE .......................................................................................................................... 645
NINH THUY INDUSTRIAL ZONE ...................................................................................................................... 649
INVESTMENT ENVIRONMENT IN KIEN GIANG .................................................................. 654
TAC CAU INDUSTRIAL ZONE ........................................................................................................................... 658
INVESTMENT ENVIRONMENT IN KON TUM ........................................................................ 662
INVESTMENT ENVIRONMENT IN LAI CHAU ....................................................................... 667
INVESTMENT ENVIRONMENT IN LAM DONG ..................................................................... 672
PHU HOI INDUSTRIAL ZONE ............................................................................................................................ 675
LOC SON INDUSTRIAL ZONE ........................................................................................................................... 677
INVESTMENT ENVIRONMENT IN LANG SON ...................................................................... 681
DONG BANH INDUSTRIAL PARK ..................................................................................................................... 685
HUU LUNG INDUSTRIAL PARK ........................................................................................................................ 687
INVESTMENT ENVIRONMENT IN LAO CAI .......................................................................... 690
DONG PHO MOI INDUSTRIAL ZONE .............................................................................................................. 694
TANG LOONG INDUSTRIAL ZONE .................................................................................................................. 696
INVESTMENT ENVIRONMENT IN LONG AN ........................................................................ 700
DUC HO III-HONG DAT IZ INDUSTRIAL PARK ............................................................................................ 705
HUU THANH IDICO INDUSTRIAL ZONE ........................................................................................................ 708
TAN DUC INDUSTRIAL ZONE ........................................................................................................................... 710
LONG HAU INDUSTRIAL PARK........................................................................................................................ 713
AN THANH INDUSTRIAL ZONE ........................................................................................................................ 715
TAN KIM INDUSTRIAL PARK ........................................................................................................................... 717
INVESTMENT ENVIRONMENT IN NAM DINH ..................................................................... 721
MY TRUNG INDUSTRIAL ZONE ....................................................................................................................... 725
HOA XA INDUSTRIAL ZONE ............................................................................................................................. 728
BAO MINH INDUSTRIAL ZONE ........................................................................................................................ 735
RANG DONG TEXTILE INDUSTRIAL ZONE .................................................................................................. 739
INVESTMENT ENVIRONMENT IN NGHE AN ........................................................................ 743
WHA INDUSTRIAL ZONE 1 - NGHE AN .......................................................................................................... 747
HOANG MAI I INDUSTRIAL PARK .................................................................................................................. 751
VSIP NGHE AN I INDUSTRIAL PARK .............................................................................................................. 753
VSIP NGHE AN II INDUSTRIAL PARK............................................................................................................. 758
NAM CAM INDUSTRIAL ZONE ......................................................................................................................... 761
INVESTMENT ENVIRONMENT IN NINH BINH .................................................................... 768
GIAN KHAU INDUSTRIAL ZONE ...................................................................................................................... 771
TAM DIEP I INDUSTRIAL ZONE ....................................................................................................................... 773
KHANH PHU INDUSTRIAL ZONE ..................................................................................................................... 774
INVESTMENT ENVIRONMENT IN NINH THUAN................................................................. 778
DU LONG INDUSTRIAL ZONE ........................................................................................................................... 782
PHUOC NAM INDUSTRIAL ZONE .................................................................................................................... 784
INVESTMENT ENVIRONMENT IN PHU THO ........................................................................ 789
PHU HA INDUSTRIAL PARK .............................................................................................................................. 793
CAM KHE INDUSTRIAL PARK .......................................................................................................................... 795
INVESTMENT ENVIRONMENT IN PHU YEN......................................................................... 799
HOA HIEP 1 INDUSTRIAL ZONE ...................................................................................................................... 802
HOA HIEP 2 INDUSTRIAL ZONE ...................................................................................................................... 806
AN PHU INDUSTRIAL ZONE .............................................................................................................................. 810
DONG BAC SONG CAU INDUSTRIAL ZONE – ZONE 1 ................................................................................ 813
DONG BAC SONG CAU INDUSTRIAL ZONE – ZONE 2 ................................................................................ 818
INVESTMENT ENVIRONMENT IN QUANG BINH................................................................. 823
NORTH-WEST DONG HOI INDUSTRIAL ZONE ............................................................................................ 826
NORTH DONG HOI INDUSTRIAL ZONE ......................................................................................................... 829
NORTH-WEST QUAN HAU INDUSTRIAL ZONE ........................................................................................... 832
CAM LIEN INDUSTRIAL ZONE ......................................................................................................................... 835
BANG INDUSTRIAL ZONE.................................................................................................................................. 838
HON LA PORT INDUSTRIAL ZONE ................................................................................................................. 841
HON LA II INDUSTRIAL ZONE ......................................................................................................................... 845
WESTERN GATE INDUSTRIAL ZONE ............................................................................................................. 848
INVESTMENT ENVIRONMENT QUANG NAM ....................................................................... 852
DONG QUE SON INDUSTRIAL ZONE .............................................................................................................. 857
TAM HIEP PORT INDUSTRIAL AND LOGISTIC PARK INDUSTRIAL ZONE ......................................... 861
NORTH CHU LAI INDUSTRIAL ZONE ............................................................................................................. 864
THUAN YEN INDUSTRIAL ZONE ..................................................................................................................... 867
CHU LAI PORT INDUSTRIAL & LOGISTIC PARK ....................................................................................... 870
TAM THANG II INDUSTRIAL ZONE ................................................................................................................ 874
CHU LAI - TRUONG HAI AUTOMOTIVE MECHANICAL INDUSTRIAL ZONE ..................................... 877
DIEN NAM- DIEN NGOC INDUSTRIAL ZONE................................................................................................ 879
TAM ANH- KOREA INDUSTRIAL PARK ......................................................................................................... 884
AGRO-FORESTRY INDUSTRIAL PARK .......................................................................................................... 886
EXPANDED TAM THANG INDUSTRIAL ZONE ............................................................................................. 888
INVESTMENT ENVIRONMENT IN QUANG NGAI ................................................................. 892
DUNG QUAT INDUSTRIAL TOWN .................................................................................................................... 897
VSIP QUANG NGAI ............................................................................................................................................... 899
INVESTMENT ENVIRONMENT IN QUANG NINH ................................................................ 904
DONG MAI INDUSTRIAL ZONE ........................................................................................................................ 908
TEXHONG HAI HA INDUSTRIAL ZONE ......................................................................................................... 911
HAI YEN INDUSTRIAL ZONE ............................................................................................................................ 914
CAI LAN INDUSTRIAL ZONE ............................................................................................................................ 917
INVESTMENT ENVIRONMENT IN QUANG TRI .................................................................... 922
NAM DONG HA INDUSTRIAL ZONE ................................................................................................................ 927
QUAN NGANG INDUSTRIAL ZONE.................................................................................................................. 931
LAO BAO SPECIAL ECONOMIC – COMMERCIAL ZONE .......................................................................... 938
DONG NAM QUANG TRI ECONOMIC ZONE ................................................................................................. 944
AMBER TAY BAC HO XA INDUSTRIAL PARK .............................................................................................. 952
INVESTMENT ENVIRONMENT IN SOC TRANG .................................................................... 959
AN NGHIEP INDUSTRIAL ZONE ....................................................................................................................... 963
TRAN DE INDUSTRIAL ZONE ........................................................................................................................... 963
INVESTMENT ENVIRONMENT IN SON LA ............................................................................ 965
MAI SON INDUSTRIAL ZONE ............................................................................................................................ 969
VAN HO INDUSTRIAL ZONE ............................................................................................................................. 972
INVESTMENT ENVIRONMENT IN TAY NINH ....................................................................... 976
INVESTMENT ENVIRONMENT IN THAI BINH ..................................................................... 981
CAU NGHIN IDICO INDUSTRIAL ZONE ......................................................................................................... 985
LIEN HA THAI (GREEN iP-1) INDUSTRIAL PARK ........................................................................................ 989
TIEN HAI INDUSTRIAL ZONE ........................................................................................................................... 991
INVESTMENT ENVIRONMENT IN THAI NGUYEN............................................................... 995
DIEM KHUY ZONE A INDUSTRIAL ZONE ..................................................................................................... 999
SONG DONG II INDUSTRIAL ZONE ............................................................................................................... 1002
YEN BINH INDUSTRIAL ZONE........................................................................................................................ 1004
SONG CONG I INDUSTRIAL ZONE ................................................................................................................ 1006
NAM PHO YEN INDUSTRIAL ZONE ............................................................................................................... 1008
INVESTMENT ENVIRONMENT IN THANH HOA ................................................................ 1012
NGHI SON ECONOMIC ZONE ......................................................................................................................... 1017
LAM SON-SAO VANG HIGH-TECH INDUSTRIAL ZONE .......................................................................... 1019
HOANG LONG INDUSTRIAL ZONE ............................................................................................................... 1023
BIM SON A INDUSTRIAL ZONE ...................................................................................................................... 1028
BIM SON B INDUSTRIAL ZONE ...................................................................................................................... 1031
DINH HUONG - TAY BAC GA INDUSTRIAL ZONE ..................................................................................... 1034
LE MON INDUSTRIAL ZONE ........................................................................................................................... 1043
INVESTMENT ENVIRONMENT IN THUA THIEN HUE...................................................... 1049
PHU BAI INDUSTRIAL ZONE ........................................................................................................................... 1052
TU HA INDUSTRIAL ZONE............................................................................................................................... 1055
LA SON INDUSTRIAL PARK ............................................................................................................................ 1057
PHONG DIEN INDUSTRIAL PARK .................................................................................................................. 1059
QUANG VINH INDUSTRIAL PARK ................................................................................................................. 1062
PHU DA INDUSTRIAL PARK ............................................................................................................................ 1064
SAIGON-CHANMAY INDUSTRIAL PARK AND NON-TARIFF ZONE ..................................................... 1067
INVESTMENT ENVIRONMENT IN TIEN GIANG................................................................. 1072
LONG GIANG INDUSTRIAL PARK ................................................................................................................. 1075
DICH VU DAU KHI SOAI RAP INDUSTRIAL PARK .................................................................................... 1078
INVESTMENT ENVIRONMENT IN TRA VINH ..................................................................... 1082
LONG DUC INDUSTRIAL ZONE ...................................................................................................................... 1085
INVESTMENT ENVIRONMENT IN TUYEN QUANG ........................................................... 1090
HOA PHU INDUSTRIAL ZONE ......................................................................................................................... 1093
INVESTMENT ENVIRONMENT IN VINH LONG .................................................................. 1096
HOA PHU INDUSTRIAL ZONE ......................................................................................................................... 1100
BINH MINH INDUSTRIAL ZONE ..................................................................................................................... 1100
INVESTMENT ENVIRONMENT IN VINH PHUC .................................................................. 1104
BA THIEN I INDUSTRIAL ZONE ..................................................................................................................... 1109
BA THIEN II INDUSTRIAL ZONE .................................................................................................................... 1113
TAM DUONG II INDUSTRIAL ZONE - ZONE A............................................................................................ 1117
BINH XUYEN INDUSTRIAL ZONE .................................................................................................................. 1120
KHAI QUANG INDUSTRIAL ZONE ................................................................................................................. 1127
BINH XUYEN II INDUSTRIAL ZONE .............................................................................................................. 1133
DONG SOC INDUSTRIAL PARK ...................................................................................................................... 1138
INVESTMENT ENVIRONMENT IN YEN BAI ........................................................................ 1142
AN GIANG
INVESTMENT ENVIRONMENT IN AN GIANG
USD/VND
23.510
GENERAL INFORMATION
▪ Area: 3.536,68 km2
Area, Population
▪ Population: 1.909,5 thousand people (2022)
▪ Located in the key economic region of Vietnam’s Mekong Delta including Can Tho, An Giang,
Kien Giang, Ca Mau
Geographical Location
▪ Located near the Kingdom of Cambodia with a border of nearly 100 km (with An Giang bordergate economic zone, identified as one of the national key economic zones, with 02 international
border gates: Tinh Bien and Vinh Xuong and 01 national border gate: Khanh Binh)
▪ Located in the center of 3 big cities, including: Ho Chi Minh - Can Tho and Phnom Penh (Kingdom
of Cambodia) with the respective distances of 180km - 60km and 80km (from the Khanh Binh
national border gate); At the same time, it is the gateway and the center of the Mekong sub-region
Adjacent provinces
▪ Dong Thap province to the Northeast, Kien Giang province to the the Southwest, Can Tho city the
Southeast borders
2022 statistic:
▪ Real GRDP: 102.720 billion VND (4.38 billion USD)
▪ GRDP growth: 6.87%
▪ Real GRDP per capita: 48,424 million VND (2.105,4 thousand USD)
GRDP
▪ Economic Structure:
- Industry and Construction: 14.84%
- Service: 45.91%
- Agriculture, Forestry and Fishery: 35.72%
- Product tax - product subsidies: 3.53%
2021 statistic:
▪ Industry - Construction growth: 10.90%
▪ Agriculture, forestry and fishery growth: 3.16%
Industry growth
▪ Service growth: 8.66%
▪ Import – Export:
- Export turnover: 1.158.6 million USD
- Import turnover: 220.2 million USD
PCI
▪ Score: 62.37 – ranked 54th out of 63 cities and provinces in Vietnam (2022)
SOCIAL INFRASTRUCTURE
1
▪ Roadway: National Road 91 (route Long Xuyen - Chau Doc - Tinh Bien), National Road N1 (route
Chau Doc - Ha Tien), National Road 91C (route An Phu). Ongoing projects: route connecting
National Road 91 and Long Xuyen bypass; the route linking Tan Chau - Chau Doc region connecting
3 provinces of Dong Thap, An Giang and Kien Giang; Upgrading the inter-provincial road
connecting Chau Phu district with Hon Dat district, Kien Giang province (DT.945).
Transportation
▪ Expressway: Chau Doc - Can Tho - Soc Trang expressway has a total length of 188.2 km. It is
expected to be implemented from 2023 - 2025. The project has been submitted to the National
Assembly for decision on investment policy by the Government.
▪ Waterway: 03 major ports: My Thoi seaport, Binh Long domestic port, Chau Doc passenger port
▪ Airway: from the center of the province can be connected to Can Tho International Airport, Can
Tho city via National Road 91.
Electricity
▪ Supplied from the national power network
Water
▪ Quality underground water is mainly used in water supply system
Education
▪ 01 major university (An Giang University), 02 vocational colleges (An Giang Vocational College
and An Giang Medical College).
Medicare
▪ 06 provincial hospitals, 13 district hospitals and private hospitals
INVESTMENT CONDITION
Human resource
▪ Around 54% of population in working age (2021)
Education level
▪ Trained labor rate: 68% (2022)
▪ The minimum salary for the province is applied as follows:
- Area II: including: Long Xuyen City, Chau Doc City
Salary
- Area III: including: Tan Chau Town, Chau Phu District, Chau Thanh District, Thoai Son District
- Area IV: including: : Phu Tan districts, Tri Ton districts, Tinh Bien districts, Cho Moi districts, An
Phu districts
▪ Incentives according to government regulations:
Exemption and reduction for land and water rent fee
Investment incentives
- Preferential tax rates and exemption period, reduction for corporate income tax.
Import tax exemption
▪ Prioritized Projects:
- High-tech agricultural, Digital transformation, Sustainable development.
Fields Attracting
Investment
- Projects using high technology, modern techniques; ecological environment preservation.
- Development of trade, service and tourism.
- Construction and development of infrastructure and transport.
- Development of education, training, health.
2
Map
An Giang Department of Planning and Investment
Address: No 3 Le Trieu Kiet, My Binh Ward, Long Xuyen City, An Giang
Contact
Tel: 0296.3852 913
Fax: 0296.3853380
E-mail: sokhdt@angiang.gov.vn
3
LIST OF INDUSTRIAL ZONES IN AN GIANG
No
Industrial zone Name
1
Vam Cong Industrial Zone
Total Area
(ha)
193,3
Occupancy
Rate
0%
Status
2
Hoi An Industrial Zone
100
0%
Licensed
3
Dinh Thanh Industrial Zone
155
0%
Licensed
4
Binh Hoa Industrial Zone
98,68
98,68%
In operation
Binh Hoa Industrial Zone – Expanded area
120
0%
In land clearance process
5
Binh Long Industrial Zone
21,5
100%
In operation
6
Xuan To Industrial Zone
11,6
36,6%
In operation
Xuan To Industrial Zone – Expanded area
82
0%
Licensed
In land clearance process
AN GIANG’S LOCATION MAP OF INDUSTRIAL ZONES
4
BINH LONG INDUSTRIAL ZONE
GENERAL INFORMATION
National Road 91, Binh Long district, An Giang Province, Vietnam
ADDRESS
INVESTOR
CONTACT PERSON
LOCATION
INVESTMENT AREA
MINIMUM WAGE
LEASE TERM
MINIMUM LEASE AREA
LIMIT FOR
CONSTRUCTION
HEIGHT
PERMITTED
CONSTRUCTION RATE
PLANNED AREA
FACTORY AVAILABLE
FOR RENT
OPERATION STATUS
OCCUPANCY RATE AND
NUMBER OF PROJECTS
NUMBER OF KOREAN
PROJECTS
An Giang Economic Zone Authority
▪ Address: No 2, 20 Street, My Hoa Ward, Long Xuyen City, An Giang province, Vietnam.
▪ Tel: (84-296) 3955994
▪ Website: http://www.bqlkkt.angiang.gov.vn
▪ Mr Nguyen Thanh Cuong – Head of An Giang Economic Zone Authority - Email:
ntcuong@angiang.gov.vn
- 33 Km from Long Xuyen City Center
- 40 Km from My Thoi Port
- 215 Km from Ho Chi Minh City
Priority Sectors for
Agricultural processing and fishery industry, supporting industries for
Investment
feeding, planting and agricultural processing and fishery for inbound
need and export, garment and leather shoes, food processing, consumer
goods, mechanical engineering.
Restricted Sectors for
According to Article 9, Law of Investment No. 61/2020/QH14 on
Investment
17/06/2020
[Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
▪ Start date: 2005
▪ End date: 2055
2,400 m2
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Residential Planning regulation (QCXDVN 01: 2008/BXD)
Construction area is not more than 65% of the total leased land lot
▪ Total area: 114 ha
▪ Total vacant leasable area: Unavailable
▪ Total area: Unavailable
▪ In operation
▪ 100%
▪ 10 Projects
▪ 02 projects
▪ Land lease fee: 55 USD/m2 /year
▪ Payment : Every year
▪ Management fee: 0.4 USD/m2/month (included VAT)
▪ Electricity fee: 0,05 USD/kWh .According to the Circular by Ministry of Industry and Trade,
valid from March 16th, 2015 (excluded VAT) for voltage from 22KV-110KV.
OPERATING FEE
▪ Water fee: 7,333 VND (~0.31 USD) /m3 (excluded VAT)
▪ Wastewater treatment fee: 27,963 VND (~1.19 USD)/m3 (excluded VAT)
INFRASTRUCTURE AND FACILITY
BIDV, Vietin Bank, Vietcombank, Agribank
FINANCIAL
INSTITUTION
3 km from Chau Phu Tax Office
TAX SERVICE, STATE
23 km from Chau Doc State Treasury Office
FINANCE OFFICE
22 km from Customs Agency Chau Doc
CUSTOMS SERVICE
LEASE FEE
POST OFFICE
2 km from Vietnam Post Office
MEDICARE
POLICE, PUBLIC
SECURITY
UNIVERSITIES,
TRAINING FACILITIES,
ETC.
5 km from Chau Phu General Hospital
1 km from Chau Phu Police Station
11 km from Chau Phu Vocational Education Center
5
WORKER'S CHILD
EDUCATION FACILITY
ONE-STOP SERVICE
5 Km from the zone
ROAD WIDTH
IT & TELECOMMUNICATION
FACILITIES
EMERGENCY POWER
GENERATOR
FIRE-FIGHTING
FACILITY
Main road: 7m, 2 lanes
3 Km from the nearest Facility
The telecommunication system complies with international standards and is always available for
communication demand with high data transmission service
Available
Available. Water supply system for firefighting is located along each road.
ACTUAL VIEW
6
LIST OF SOME NOTABLE TENANTS
No.
Company Name
Nationality
Location
1
Chang Woo Jin Vina Food Company
Limited
Korea
Lot D
2
Kovie Vina Company Limited
Korea
Lot D
3
Hoa Phat Seafood Processing Import and
Export Joint Stock Company
Binh Long Company Limited
Vietnam
Lot A
Vietnam
Lot E
Dong A Seafood Import and Export
Company Limited
Cuu Long Seafood Import and Export
Joint Stock Company
An Giang Food vegetables Joint Stock
Company
Vietnam
Lot B
Vietnam
Lot C
Vietnam
Lot D
8
An Giang Fish meal Import and Export
Company Limited
Vietnam
Lot A
9
An Giang Water and Electricity Joint
Stock Company
Vietnam
An Giang Port Joint Stock Company
Vietnam
4
5
6
7
10
Business line
Sweet potato starch
and rice noodle
processing factory
Fish fat and fish meal
processing factory
Frozen
seafood
processing factory
Seafood processing
factory
Seafood processing
factory
Seafood processing
factory
Food
vegetables
processing factory
Fish fat and fish meal
processing factory
Water
supply
construction for Binh
Long Industrial Zone
Port exploration at
Binh Long River
7
BINH HOA INDUSTRIAL ZONE
GENERAL INFORMATION
▪ Binh Hoa Commune, Chau Thanh District, An Giang Province
ADDRESS
INVESTOR
CONTACT PERSON
LOCATION
INVESTMENT AREA
MINIMUM WAGE
LEASE TERM
MINIMUM LEASE AREA
LIMIT FOR
CONSTRUCTION HEIGHT
PERMITTED
CONSTRUCTION RATE
PLANNED AREA
FACTORY AVAILABLE
FOR RENT
OPERATION STATUS
OCCUPANCY RATE AND
NUMBER OF PROJECTS
NUMBER OF KOREAN
PROJECTS
An Giang Economic Zone Authority
▪ Address: No 2, 20 Street, My Hoa Ward, Long Xuyen City, An Giang province, Vietnam.
▪ Tel: (84-296) 3955994
▪ Website: http://www.bqlkkt.angiang.gov.vn
▪ Mr Nguyen Thanh Cuong – Head of An Giang Economic Zone Authority - Email:
ntcuong@angiang.gov.vn
- Located in the three-cornered Lo Te, near National Road 91 and Provincial road 941
- 15 Km from Long Xuyen City Center
- 23 Km from My Thoi Port
- 205 Km from Ho Chi Minh City
Priority Sectors
Manufacturing and processing sport shoes, garment; producing animal
for Investment
foodstuff, plastic, cosumer goods, processing agro-aqua-animal
products; food, vegetables; mechanical industries, manufacturing
machinery and equipment.
Restricted
According to Article 9, Law of Investment No. 61/2020/QH14 on
Sectors for
17/06/2020
Investment
[Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
▪ Start date: 2007
▪ End date: 2057
400 m2
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Residential Planning regulation (QCXDVN 01: 2008/BXD)
▪ Total area: 100 ha
▪ Total vacant leasable area: 1,32 ha
None
▪ Current area: In operation
▪ Expanded area: In land clearance process
Current area: 98,68%, 19 projects
02 projects
▪ Land lease fee: 50 USD/m2 /year (excluded VAT)
▪ Payment : Every year
▪ Management fee: 0.4 USD/m2/month (included VAT)
▪ Electricity fee: 0,05 USD/kWh .According to the Circular by Ministry of Industry and
Trade, valid from March 16th, 2015 (excluded VAT) for voltage from 22KV-110KV.
OPERATING FEE
▪ Water fee: 11,428 VND (~0.487 USD) /m3 (excluded VAT)
▪ Wastewater treatment fee: 29,250 VND (~1.247 USD)/m3 (excluded VAT)
INFRASTRUCTURE AND FACILITY
Agribank, Techcombank, Sacombank,Vietinbank
FINANCIAL INSTITUTION
LEASE FEE
TAX SERVICE, STATE
FINANCE OFFICE
CUSTOMS SERVICE
2 km from Chau Thanh -Thoai Son Tax office
POST OFFICE
3 km from Chau Thanh Post Office
MEDICARE
POLICE, PUBLIC
SECURITY
UNIVERSITIES, TRAINING
FACILITIES
WORKER DORMITORY
WORKER'S CHILD
EDUCATION FACILITY
3.7 km from Chau Thanh General Hospital
23 km from My Thoi Custom Agency
2.3 km from Chau Thanh Police station
15 km from An Giang University
1 km from the zone
1 km from the zone
8
ONE-STOP SERVICE
3 km from Public Service Center
ROAD WIDTH
IT & TELECOMMUNICATION
FACILITIES
EMERGENCY POWER
GENERATOR
FIRE-FIGHTING FACILITY
Road Width: 8-15m m, 2 lanes
The telecommunication system complies with international standards and is always available
for communication demand with high data transmission. Provider: FPT, VNPT and Viettel
Non applicable
Available. Water supply system for firefighting is located along each road.
LAYOUT PLAN
LOCATION MAP
9
ACTUAL VIEW
LIST OF SOME NOTABLE TENANTS
No
Company Name
Nationality
Location
Bussiness line
1
Tien Bo Limited Company
Vietnam
Lot C2
Construction
steel
manufacturing factoty
2
Truong Thang Limited Company
Vietnam
Lot C2
3
An Giang Centrifugal concrete
Joint Stock Company
Vietnam
Lot C2
Centrifugal
concrete
culvert
manufacturing
factory
Centrifugal concrete pile
manufacturing factory
10
4
An Giang Building One Member
Limited Company
Vietnam
Lot C2
5
An Giang Water and Electricity
Joint Stock Comapny
Vietnam
Lot C1
6
Oriental
Company
Limited
Thailand
Lot K
7
An
Giang
Company
Samho
Limited
Korea
8
Pacific Energy One
Limited Company
Member
Vietnam
Lot C6
Producing solar energy
9
Lu An Garment Limited Company
China
Lot C4
Producing
and
outsourcing garment
10
NV Apparel Limited Company
Thailand
Lot C1
Producing
and
outsourcing garment
11
Thanh Nhuy Huy One Member
Limited Company
Vietnam
Lot C2
Producing blankets and
pillows
12
Thang Loi Restaurant
Vietnam
The area adjacent
to Road number 1
Catering service in Binh
Hoa Industrial Zone
13
Chi Cong Joint Stock Company
Vietnam
Lot C2
Food processing , barrel
and industrial equipment
production.
14
Angimexpharm Medicine
Stock Company
Foodant Limited Company
Vietnam
Lot C4
Vietnam
Lot C2
Limited
United of Kingdom
Lot K
Limited
Korea
Lot C6
Medicine trading and
production
Agricultural processing
factoty
Producing
and
outsourcing footwears and
shoes
Producing
and
outsourcing footwears and
handbags
Vegetables
processing
factoty
15
Garment
Footwear
Joint
Lot C3,C5
16
Ching Luh
Company
17
Samduk
Company
18
Phuc Tien Agricultural Product
Joint Stock Company
Vietnam
Lot C2
19
Spectre An Giang Vietnam
Garment and Technology Limited
Company
Denmark
Lot C6
Vietnam
11
Hot asphalt concrete and
Centrifugal
concrete
culvert
manufacturing
factory
Water supply construction
for BinhHoa Industrial
Zone
Producing
and
outsourcing garment
Producing
and
outsourcing footwear
Garment production
XUAN TO INDUSTRIAL ZONE
GENERAL INFORMATION
ADDRESS
INVESTOR
CONTACT PERSON
LOCATION
INVESTMENT AREA
MINIMUM WAGE
LEASE TERM
MINIMUM LEASE AREA
LIMIT FOR
CONSTRUCTION HEIGHT
PERMITTED
CONSTRUCTION RATE
PLANNED AREA
FACTORY AVAILABLE FOR
RENT
OPERATION STATUS
Tinh Bien District, Tinh Bien Town, An Giang Province
An Giang Economic Zone Authority
▪ Address: No 2, 20 Street, My Hoa Ward, Long Xuyen City, An Giang province, Vietnam.
▪ Tel: (84-296) 3955994
▪ Website: http://www.bqlkkt.angiang.gov.vn
▪ Mr Nguyen Thanh Cuong – Head of An Giang Economic Zone Authority - Email:
ntcuong@angiang.gov.vn
▪ Located along National Road 91
▪ 1 km from Tinh Bien International Border Gate
▪ 120 km from Phnom Penh, Cambodia.
▪ 75 km from Long Xuyen City Center
▪ 84 km from My Thoi Port
▪ 252 km from Ho Chi Minh City
Priority Sectors for
Production and oursourcing of garment, footwear, athletic shoes,
Investment
agricultural products processing and beverages,packaging
industry,electronicassembly industry
Restricted Sectors
According to Article 9, Law of Investment No. 61/2020/QH14 on
for Investment
17/06/2020
[Area 4] According to Decree 90/2019/NĐ▪CP dated 15th November 2019
▪ Start date: 2022
▪ End date: 2072
54,110 m2
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Residential Planning regulation (QCXDVN 01: 2008/BXD)
▪ Total area: 31.69 ha
▪ Total vacant leasable area: 20.09 ha
None
▪ In operation
OCCUPANCY RATE AND
NUMBER OF PROJECTS
Occupancy Rate: 36,6%
NUMBER OF KOREAN
PROJECTS
None
▪ Land lease fee: 59 USD/m2/year
▪ Payment : Every year
▪ Management fee: 0.5 USD/m2/year
▪ Electricity fee: as regulated by the Government
▪ Water fee: 2,871 VND (~ 0.12 USD)/m3
OPERATING FEE
▪ Wastewater treatment fee: 27,963 VND (~ 1.19 USD/m3 ), estimated fee because the
wastewater treatment factory is under construction.
INFRASTRUCTURE AND FACILITY
Vietcombank, Sacombank,Maritimebank
FINANCIAL INSTITUTION
LEASE FEE
TAX SERVICE, STATE
FINANCE OFFICE
CUSTOMS SERVICE
7.1 km from Tinh Bien Tax Department
LOGISTICS
None
POST OFFICE
1.7 km from Tinh Bien Post Office
MEDICARE
8.3 km from Tinh Bien General Hospital
POLICE, PUBLIC SECURITY
UNIVERSITIES, TRAINING
FACILITIES, ETC.
WORKER'S CHILD
EDUCATION FACILITY
7.2 km from the zone
1 km from Tinh Bien Customs Department
2 km from Tinh Bien Vocational Education Center
Non applicable
12
ONE-STOP SERVICE
10 km from the zone
ROAD WIDTH
IT & TELECOMMUNICATION
FACILITIES
EMERGENCY POWER
GENERATOR
FIRE-FIGHTING FACILITY
Road Width: 8-15m m, 2 lanes
Telecommunication systems and international standards are always ready to meet the
communication needs
Non applicable
Available. Water supply system for firefighting is located along each road.
LAYOUT PLAN
LOCATION MAP
ACTUAL VIEW
13
LIST OF SOME NOTABLE TENANTS
No
Company Name
Nationality
Location
Business Line
1
Sportline Limited Company
Taiwan
From Lot C1 to C8
Garment production
2
Xuan To Agricultural Products
Processing Limited Company
Vietnam
From Lot A1 to A4
Garment production
14
LIST OF FDI ENTERPRISES INVESTING IN AN GIANG PROVINCE
No.
Stt
Name of Investors
Investment
Capital
(USD)
Nationality
Bussiness line
Address
Lot K, Binh Hoa
Industrial Park Binh Hoa
Commune, Chau Thanh
District, An Giang
Province
Lot D, Binh Long
Industrial Park, Binh
Long Commune, Chau
Phu District, An Giang
Province
Binh Hoa Industrial Park,
Chau Thanh District, An
Giang Province
1
Oriental Garment An
Giang One Member Co.,
Ltd
9.000.000
Hong Kong
Investment project and
construction of a factory to
process garments for export
2
Chang Woo Jin Vina
Food Co., Ltd
1.000.000
Korea
Investment project to build
a factory processing sweet
potato starch and vermicelli
3
An Giang SAMHO Co.,
Ltd
70.000.000
Korea
4
Kovie Vina Co., Ltd
8.000.000
Korea
5
Lu An Co., Ltd
30.000.000
China
Investment project in
Footwear manufacturing
and processing factory for
export
Project to build a factory to
process fishmeal and fish
fat from by-products of
pangasius and basa fish
Garment factory project
6
Apparel NV Co., Ltd
25.000.000
Thailand
7
Ching Luh Shoes
45.000.000
England
8
Spectre Real Estate A/S
Company
11.000.000
Denmark
9
Samduk Vietnam Co., Ltd
10.000.000
Korea
10
Grand Sport Inc Somoa
Company
Cty Grand Sport Inc
Somoa
13.000.000
Somoa
11
Victoria Hangzhou One
Member Co., Ltd
Angimex Kitoku Joint
Venture Company
8.800.000
Hong Kong
4.500.000
Japan
200.000
Philippines
12
13
Branch of Jollibee
Vietnam Co., Ltd
15
Garment factory project
Garment
Hotel business
Rice production and rice
export
The project of establishing a
fast food chain in Long
Xuyen
Lot D, Binh Long
Industrial Park, Chau Phu
District, An Giang
Province
Lot C4 Binh Hoa
Industrial Park, Chau
Thanh District, An Giang
Province
Lot C1 Binh Hoa
Industrial Park, Chau
Lot K Binh Hoa Industrial
Park, Chau Thanh
District, An Giang
Province
Lot C6 Binh Hoa
Industrial Park, Chau
Thanh District, An Giang
Province
Lot C6 Binh Hoa
Industrial Park, Chau
Thanh District, An Giang
Province
Lot 8 Xuan To Industrial
Park, Tinh Bien District,
An Giang Province
Lô 8,KCN Xuân Tô,
huyện Tịnh Biên, tỉnh An
Giang
No. 1 Le Loi, Chau Doc
City, An Giang
National Road 91, My
Thoi Ward, Long Xuyen
City, An Giang Province
Co.opMart Long Xuyen
Supermarket, No. 12,
Nguyen Hue A, My Long
Ward, Long Xuyen City,
An Giang Province
Siêu thị co.opMart
Branch of MM Mega
Market Co., Ltd
(Vietnam)
17.811.000
15
Hoang Kim - CNC Co.,
Ltd
7.842.105
Korea
16
Branch of ACACI.T
Vietnam Co., Ltd in An
Giang
100.000
Singapore
Computer installation
consulting service
17
Branch of KFC VN Joint
Venture Company
Limited
Chi nhánh Công ty Liên
doanh TNHH KFC VN
Lotteria Co., Ltd. branch
in An Giang
319.000
Thailand
Thái Lan
Processing and trading
food, fast food
Chế biến và kinh doanh
thực phẩm, thức ăn nhanh
326.190
Korea
Processing and trading food
and beverages
0
Japan
Maintenance and servicing
of tractors, harvesters,
agricultural and forestry
machine tools
Factory manufacturing and
processing bags
14
18
Thailand
MM Mega Market Long
Xuyen Center
Complex entertainment
centers and residential areas
19
Branch of Kubota
Vietnam Co., Ltd
20
Great Canyon Co., Ltd
350.000
Hong Kong
21
Fistex An Giang One
Member Co., Ltd
400.000
Taiwan
22
VPDD of DKSH
Technology Technology
Co., Ltd in An Giang
0
Switzerland
Displaying, introducing and
consulting products
23
Branch of Victoria Hotel
Hangzhou Co., Ltd Vitoria Mountain Sam
Tourist Village
Lotteria Vietnam Co.,
Ltd. Branch in An Giang
0
Hong Kong
Hotel business
0
Korea
Processing and trading food
and beverages
24
Garment factory
25
Angimex-Kitoku Co.,
Ltd-Ba The Branch
1.600.000
Japan
Producing specialty rice and
rice-based products for
export..
26
New Horizon Vietnam
Co., Ltd
5.197.349
Israel
Investment in production
and trading of all-male giant
freshwater prawns
27
Representative Office of
Bach Ma Ceramic Co.,
Ltd. (Vietnam) AG
0
Malaysia
Displaying, introducing and
consulting products
16
414 Tran Hung Dao, My
Phuoc Ward, Long Xuyen
city, An Giang province
My Luong town, Cho Moi
district, An Giang
province
No. 11 Luong Van Cu,
My Long Ward, Long
Xuyen City, An Giang
Province
Số 11 Lương Văn Cù,
phường Mỹ Long,
TP.Long Xuyên, tỉnh An
Giang
No. 59B, Ly Tu Trong,
My Long Ward, Long
Xuyen city, An Giang
province
Co.opMart Long Xuyen
Supermarket, No. 12,
Nguyen Hue A, My Long
Ward, Long Xuyen City,
An Giang
Siêu thị co.opMart
No. 20/7B, My Quoi
clump, p. My Quy, Long
Xuyen city, An Giang
province
Tan Hoa handicraft
cluster (Lo Su residential
cluster - Tan Hoa
commune), Tan Hoa
commune, Phu Tan
district, An Giang
province
Ham Nghi Street, Binh
Khanh 5 Hamlet, Binh
Khanh Ward, Long
Xuyen City, An Giang
No. 46/11/5 and 46/11/6
Tran Hung Dao, Dong
Thanh B cluster, My
Thanh ward, Long Xuyen
city, An Giang province
Vinh Dong B Hamlet,
Sam Nui Ward, Chau Doc
city, An Giang province
No. 92 Nguyen Trai, My
Long Ward, Long Xuyen
city, An Giang province
Son Hoa Hamlet, Vong
Dong Commune, Thoai
Son District, An Giang
Province
Thanh Phu Hamlet, Binh
Thanh Commune, Chau
Thanh District, An Giang
Province
No. 130/1.Tran Hung
Dao, ward. My Phuoc,
28
Binh Minh Partners
Import-Export Co., Ltd
5.000
Finland
Garment
29
Anh Duong Plant
Protection Import Export
Joint Stock Company
175.000
Canada
Buying and selling
fertilizers and pesticides
30
An Giang Branch-CJ
VINA AGRI Co., Ltd
0
Korea
Representative office of
Anh Duong Plant
Protection Import Export
Joint Stock Company
JIC Vietnam Co., Ltd
Cty TNHH MTV JIC Việt
Nam
0
Canada
Producing feed for
livestock, poultry, aquatic
products
Exhibition, introduction,
consultation
product
31
15.000.000
Japan
33
Branch of LG VINA
Cosmetics Co., Ltd in AN
GIANG
290.000
Korea
Project for production of
protective materials
insulation (hot) - calcium
silicate insulation and
processing (cold) urethane
insulation
Cosmetics business
34
De Nhat Badminton Co.,
Ltd
350.000
Korea
Badminton factory
2.506.684
Korea
Cinema business
32
35
Lottecinema Vietnam Co.,
Ltd
36
Werterwer Co., Ltd
197.345
Germany
37
LG Vina Cosmetics Co.,
Ltd
19.111
Korea
38
Loc Troi - Vien Thi Joint
Stock Company
3.000.000
Vietnam China
39
J.Y Co., Ltd. International
12.924.629
Hong Kong
40
Wilmar Argo Vietnam
Co., Ltd
1.984.000
Singapore
17
Cosmetics business
Production of plant seeds;
Propagation and care of
agricultural seedlings;
Consulting on agronomy,
agricultural technology
Producing stuffed animals,
garments, hats, socks,
slippers, pillows,
backpacks, bags
Processing Industry
Long Xuyen city, An
Giang province
50 Le Van Luong, My
Phuoc Ward, Long Xuyen
city, An Giang Province.
My Binh Hamlet, Nhon
My Commune, Cho Moi
District, An Giang
Province
No. 1249E/63, Binh Duc
Ward, Long Xuyen city,
An Giang province.
24/C Tran Hung Dao, My
Xuyen Ward, Long
Xuyen City, An Giang
province
Tan Trung Industrial and
Handicraft Cluster, Phu
Tan District, An Giang
Province..
3rd floor, 9 Tran Hung
Dao, My Xuyen ward,
Long Xuyen city, An
Giang province
No. 346, My Hoa hamlet,
My Luong town, Cho Moi
district, An Giang
province
5th floor, Vincom Long
Xuyen Shopping Center,
My Binh Ward, Long
Xuyen City, An Giang
Province
My Khanh Commune,
Binh Khanh Ward, Long
Xuyen City, An Giang
Province
No. 24/12 Tran Hung
Dao, My Binh ward, Long
Xuyen city, An Giang
province.
Hoa Tan Hamlet, Dinh
Thanh Commune, Thoai
Son District, An Giang
Province.
Long Dinh Hamlet, Long
Dien A Commune, Cho
Moi District, An Giang
Province
Long Hoa 2 Hamlet, Long
Hoa Commune, Phu Tan
District, An Giang
Province
[- This Page is intentionally left blank -]
18
BA RIA – VUNG TAU
19
INVESTMENT ENVIRONMENT IN BA RIA – VUNG TAU
USD/VND 23.510
GENERAL INFORMATION
Area
Population
Geographical Location
Adjacent provinces
1987 km2
1,178 million people (2022)
▪ Ba Ria – Vung Tau is located in Southeast region.
▪ Located at the Southeast region. There is a common boundary line of 16.33 km long with Ho Chi
Minh City in the west
▪ The province is adjacent to Dong Nai province in the North, with Ho Chi Minh City. Ho Chi
Minh City is in the west, with Binh Thuan province in the east, and the South is bordered by the
East Sea.
2022 statistic:
GRDP
▪ Nominal GRDP (billion
VND):
390.293
(16,478488494828 billion USD)
▪ Real GRDP (billion VND):
224.480
(9,4777411864049 billion USD)
▪ GRDP growth:
7,15%
▪ GRDP per capita (million
VND/year):
331,10
(45183 USD)
▪ Economic structure:
- Industry - Construction:
70,37%
- Agriculture. forestry and
fishery:
5,87%
- Service:
15,98%
▪ Industry - Construction growth: 5,39%
Industry growth
Import - Export
Key Industry
PCI
Ranking
▪ Agriculture, forestry and
fishery growth:
2,40%
▪ Service growth:
21,06%
Import turnover (billion USD):
9,30
(Growth rate: 0,101)
Export turnover (billion USD):
0,64
(Growth rate: 0,0874)
▪ Key industrial products: oil and gas production, processing and manufacturing industry,
production and distribution
of electricity, hot water, steam
▪ In addition, the province focuses on producing canned beer, liquefied butane and natural gas
70.26
4
SOCIAL INFRASTRUCTURE
Transportation
Electricity
Water
▪ Roadway: The main roads connecting important districts and communes in the province are also
asphalted such as provincial roads 328, 329, Lang Cat - Long Son roads, provincial roads 44, 52,
Phuoc Buu - Ho Tram roads... The main roads connecting important districts and communes in the
province are also asphalted such as provincial roads 328, 329, Lang Cat - Long Son roads,
provincial roads 44, 52, Phuoc Buu - Ho Tram roads...
▪ Waterway: Ba Ria - Vung Tau province has 110km of inland waterways, with more than 60 ports,
inland wharves, 21 river channels and canals with regular waterways.
▪ The province has a thermal power plant. The total electricity output produced by Ba Ria Thermal
Power Company is more than 41.91 billion kWh.
▪ BR - VT currently has 30 medium and small-scale water reservoirs, these reservoirs have the
function of supplying water for agriculture, domestic use, industry and services. The total amount
of water stored in dams is 308 million m3, of which the useful capacity is about 276.06 million m3.
Water supply for domestic use in the province is taken from 8 water reservoirs: Da Den, River Ray,
Song Hoa, Kim Long, Nui Nhan, Da Bang, Suoi Cac, Chau Pha (excluding Con Dao district). In
which, Da Den reservoir and Song Ray lake are the main and main supply sources for people in the
whole province.
20
Education & Training
Medicare
▪ 453 preschools and high schools, 137 elementary schools, 90 middle schools and 37 high schools.
In particular, there are nearly 280 schools meeting national standards, accounting for 60%.
▪ At the provincial level, there are only 3 medical facilities: Ba Ria Hospital is received from Chau
Thanh district hospital with a size of 300 beds, Le Loi Hospital with a scale of 180 beds. At the
district level, there were only two health centers in Long Dat and Xuyen Moc districts. Most
communes and wards do not have medical stations. The total number of hospital beds/ten thousand
people has 9.96 beds.
INVESTMENT CONDITION
Human resource
54,9% of population are in the working age (2022)
Education level
Trained labor rate: 67% (2022)
▪ The minimum salary for the province is applied as follows:
- Area I (4,680,000 VND/month): Vung Tau City, Phu My Town
- Area II (4,160,000 VND/month): Ba Ria City
Salary
- Area III (3,640,000 VND/month): Long Dien, Dat Do, Xuyen Moc, Chau Duc, Con Dao District.
- Area IV (3,250,000 VND/month): N/A
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum
wages paid to employees working under employment contracts)
Investment incentives
Fields Attracting
Investment
Investment attraction
situation
Industrial zones
▪ Incentives according to government regulations:
- Exemption and reduction for land and water rent fee
- Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
▪ Prioritized projects:
- Industrial field: electronics, consumer goods
- Agriculture: modern agricultural production models
- Service: finance and banking; entertainment center...
▪ Investment capital growth in the area in 2022 reached VND 41,655.1 billion, an increase of
8.64% over the same period last year, of which: Foreign direct investment capital was VND
9,017.4 billion
My Xuan Industrial Park B1 – Conac
My Xuan Industrial Park B1- Tien Hung
Cai Mep Industrial Park
Chau Duc Industrial Park
Phu My 3 Intensive Industrial Park
Da Bac Industrial Park
My Xuan Industrial Park B1- Dai Duong
Dat Do Industrial Park
Map
21
▪ Address: 198, Bach Dang, Ba Ria – Vung Tau city, Ba Ria – Vung Tau
Contact
▪ Tel: (84-254) 3852401
▪ Email: Nhauyen83@gmail.com
▪ Contact person: Nha Uyen
22
MY XUAN B1- TIEN HUNG INDUSTRIAL PARK
GENERAL INFORMATION
Address
My Xuan B1 – Tien Hung Industrial Park, My Xuan Ward , Phu My town, Ba Ria – Vung Tau
Province, Vietnam
TIEN HUNG PRODUCING - TRADING CO.,LTD
Investor
Contact Person
Location
[Vị trí KCN]
Nêu bật vị trí thuận lợi của
KCN
Investment Sectors
Các lĩnh vực đầu tư
61, Street No. 17, My Thai Area 2-S4, Tan Phu Ward, District 7, Ho Chi Minh City
▪ Tel: 028 38552757
▪ Email : info@tienhungcorp.com
▪ Website:www.tienhungcorp..com
VÕ TUẤN CƯỜNG – Phó Giám đốc – 0913637638 – votuancuong638@gmail.com
Adjacent location [Các khu vực xung quanh]
- 60 km from HO CHI MINH city/ the capital
- 70 km from Tan Son Nhat airport
- 20 km from Long Thanh airport
- 15 km from Cai Mep port
- 2 km from 51 highway
Priority Sectors for
Industry of mechanical manufacture, repair and assembly
Investment
Industry of processing forestry, agricultural products
Light industry: leather shoes, garment, stationery, plastic things...
Assembling industry of electronics, refrigeration electricity.
Industry of construction materials.
And some other light industrial branches …
Investment Restricted
Sectors
Minimum wage
Lease term
Minimum Lease Area
Permitted Construction
Rate
Land area
[Diện tích đất]
Factory Available for Rent
Operation Status
Occupancy Rate and
Number of Projects
No. of Korean projects
Lease fee
Polluted industries
4,680,000 VND/month
From 2023 to 2056
20.000 m2 (2 Ha)
Permissible building rate
- Factory construction area: 70%
- Operating area] : 50%
▪
▪
▪
▪
Total area: 200 Ha
Total leasable area: 138 Ha
Total vacant leasable area: 10 Ha
Total area with full infrastructure ready to build factory: 10 Ha
▪ Total area: 16.000 m2
▪ Total vacant leasable area 4.800 m2
▪ Active
▪ 81%
▪ 26 Projects
▪8
▪ Land lease fee: 135USD/m2
▪ Factory lease fee: 3.9 USD/m2/month
23
Operating fee
▪ Management fee: 0.4 USD/m2/year
▪ Electricity fee: according EVN
▪ Water fee: 12.500 đồng/m3
▪ Wastewater treatment fee: 0.4USD/m3
INFRASTRUCTURE AND FACILITY
Layout plan
24
CAI MEP INDUSTRIAL PARK
GENERAL INFROMATION
Address: Cai Mep Industrial Park, Road 965, Tan Phuoc Ward and Phuoc Hoa Ward, Phu My Town, Ba Ria Vung Tau Province.
Infrastructure development
enterprise
Saigon Construction Corporation – One member limited
- Address: 18A Dinh Tien Hoang, Dakao Ward, District 1, Ho Chi Minh City
- Phone number: 028 39 104 801
- Email: info@saigoncons.com.vn
- Website: saigoncons.com.vn
Contact:
Industrial park location:
-
Tên: Nguyễn Phúc Nhật Yên
-
Chức vụ: Chuyên viên Ban Quản lý Khu công nghiệp Cái Mép.
-
Số điện thoại: 0374 233 298
-
Email: banquanlykcncaimep@gmail.com
- Located in the southern key economic region; convenient transportation by road,
waterway and air.
- The national deep-water port system, in the group V port system of Ho Chi Minh
City, Ba Ria - Vung Tau and Dong Nai, can receive ships with a tonnage of up to
200,000DWT.
- Convenient transportation system:
+ The road system connects with National Highway 51 (Ho Chi Minh City - Vung
Tau).
+ 70km from the center of Ho Chi Minh City.
+ 40km from Vung Tau city center.
+ 55km from Bien Hoa city center.
+ In the industrial park, there is a railway station of the Ho Chi Minh City - Bien Hoa
- Vung Tau railway line.
Investment fields:
Cai Mep Industrial Park is entitled to receive the industries of food processing, foodstuffs,
processing petrochemical products, petroleum, chemical industry, metallurgy and serving
heavy industry; does not accept investment projects in 05 types of industries that are at
risk of causing serious environmental pollution, including processing tapioca starch,
processing rubber latex, producing basic chemicals (with water generation). industrial
waste), dyeing and tanning;
(According to Decision No. 2005/QD-BXD dated October 27, 2005 of the Ministry of
Construction approving the adjustment of detailed planning of Cai Mep Industrial
Park, Ba Ria - Vung Tau province and Decision No. 1683/QD- BTNMT dated
November 14, 2006 of the Ministry of Natural Resources and Environment on the
approval of the Environmental Impact Assessment Report)
Minimum wage:
N/A
Lease term
To 10/5/2052.
Minimum rental area:
According to businesses’ demand
Building height limit and
building scale:
Construction density 60%, average height 1.5 stories and land use coefficient 0.9 times
(According to Decision No. 2005/QD-BXD dated October 27, 2005 of the Ministry of
Construction on approval detailed planning of Cai Mep Industrial Park, Ba Ria - Vung
Tau province).
Land area:
- Total area: 670.0875ha
25
- Area of industrial land for lease: 462,5352ha
- Vacant land area for rent: 138,5189ha
- Area with infrastructure ready for factory construction: more than 50ha
Factory for rent:
None
Operation status:
In Operation
Occupancy rate and number of
projects:
-
69,86%
-
19 projects
Number of Korean investment
projects:
02 projects
- Polypropylene factory and Liquefied petroleum gas underground storage (Hyosung
Vina Chemical Co., Ltd.).
- Hyosung Vina Chemicals Port (Hyosung Vina Chemicals Co., Ltd.).
Lease fee:
The sub-lease price of land use rights is determined depending on the location and sublease area at each time of leasing.
Operating fee:
- Management fee: determined at the time of contract negotiation and negotiation.
- Electricity charges: Enterprises directly sign contracts with Phu My Town Power
Company
- Water charges: Enterprises directly sign contracts with Toc Tien Water Supply
Company Limited.
- Waste water treatment fee: determined at the time of contract negotiation and
negotiation.
- Waste treatment fee: The enterprise directly signs a contract with the unit with the
function of collecting, transporting and treating waste.
INFRASTRUTURE
- The road system is planned according to standards, including road systems: 34m, 40m.
- Power supply system: 110/22kV line. Water supply system from Toc Tien water supply plant (D150 – D300).
- Rainwater collection and drainage system (D600 – D2000).
- Wastewater collection and treatment system according to Vietnamese standards.
- Gas supply system for projects in need.
- Communication system, fire protection, trees,
26
CHAU DUC INDUSTRIAL PARK
GENERAL INFORMATION
Address [Địa chỉ]
Investor
[DN phát triển hạ tầng]
Contact Person
Location
Investment Sectors
Floor 9, Sonadezi Building, No.1, Street 1, Bien Hoa 1 IP, An Binh Ward, Bien Hoa City, Dong
Nai Province
Công ty CP Sonadezi Châu Đức / Sonadezi Chau Duc Shareholding Company
▪ Address: Chau Duc Industrial Park, Chau Duc Distrtict, Ba Ria – Vung Tau Province, Viet
Nam.
▪ Tel: 84-251-8860784/8860785
▪ Email: sales@sonadezichauduc.com.vn
▪ Website: www.sonadezichauduc.com.vn hoặc www.sonadezi.com.vn
Mr Vu Quan – Sales Manager – 0389.33.66.88 – vuquan79@gmail.com
Adjacent location
15 km from Ba Ria city, 44 km from Vung Tau city, 75 km from HCM city
54 km from Long Thanh airport
85 km from Tan Son Nhat airport
- 16 km from Thi Vai port
- 19 km from Cai Mep port
- 21 km from Go Dau port
- Connect directly to The National Road No. 56
- 13 km from The National Road No.51
- 40 km from Ho Chi Minh – Long Thanh – Dau Giay Expressway
Priority Sectors for Investment
Electronic components parts, computer and semi-conductors assembling industry;
Plastic products, household appliances;
Car accessories, manufacturing and assembling automobiles;
Production of new materials and nanotechnologies;
High grade garment and textile, footwear (excluding dying and tanning process), etc.
Investment Restricted Sectors
Rubber processing;
Manufacturing basic chemicals (generating industrial wastewater);
Steel refinery from wasted metal in discontinuous furnace technology;
Industries that are not priority in the Industrial Park and industries that are not welcome or
restricted in the Industrial Park (according to Directive No. 43-CT/TU dated August 6th,
2014 of the Board of Provincial Committee).
Minimum wage
Lease term
[Regional minimum wage] Chau Duc Industrial Park is located in region 3, Minimum salary is
3,640,000 VND
To the year 2058
Minimum Lease Area
1 ha
Limit for Construction
Height
According to the national technical regulation on construction planning QCVN01: 2021/BXD
Permitted Construction
Rate
The maximum net construction density of a land lot for building factories and warehouses is
70%. For land plots for factory construction with more than 05 floors used for production, the
maximum net construction density is 60%.
According to the national technical regulation on construction planning QCVN01: 2021/BXD
Land area
▪
▪
▪
▪
Total area: 1.556 ha
Total leasable area: 1.108,9 ha
Total vacant leasable area: 561,69 ha
Total area with full infrastructure ready to build factory: 83 ha
27
Factory Available for Rent
Operation Status
Occupancy Rate and
Number of Projects
No. of Korean projects
Lease fee
▪ Total area: 7.510 m2
▪ All Sonadezi Chau Duc Company’s Ready-Built-Factories are leased.
In operation: 42 investors/infrastructure construction and expected completion: 17 investors/site
clearance: Prepare and approve compensation plan for site clearance accumulated up to the time
of BIZA report April 2023: 1,328.55 ha remaining area 156.27 ha]
▪ 49,35%
▪ 88 projects
▪ 30 projects
▪ Land lease fee: 95 USD/m2/ to the year 2058
▪ Factory lease fee: N/A
Operating fee
▪ Management fee: 0.5 USD/m2
▪ Electricity fee:
According to Decision No. 1062/QD-BCT dated May 4, 2023 of the Ministry of Industry and
Trade, the unit price of electricity for voltage level from 22KV to below 110KV applies as follows:
-
Giờ cao điểm
:
VND 2.959/kWh
-
Peak time
:
VND 2,9591/kWh
-
Giờ thấp điểm
:
VND 1.037/kWh
-
Off peak
:
VND 1,037/kWh
-
Giờ bình thường
:
VND 1.604/kWh
-
Normal time
:
VND 1,604/kWh
▪ Water fee: [Cước nước]
Price according to regulations of Ba Ria – Vung Tau province.
▪ Wastewater treatment fee: [Phí xử lý nước thải] khoảng 0,32 USD / m3
According to the State regulations, the volume of wastewater is calculated by 80% of the
supplied water volume.
▪ Waste treatment fee:[Phí xử lý chất thải] N/A
INFRASTRUCTURE AND FACILITY
Distance from the nearest Banking, nearest State Tax and Finance Agency, nearest Logistic Center, Universities, Training
facilities, etc., Road width, …
The utility infrastructure around the area and the distance from the area to those facilities:
Credit institutions: Vietcombank, Sacombank, BIDV in Phu My: 15km
Tax office, Customs: Phu My Customs Branch / Phu My Customs: 18km;
Logistics: Thi Vai Seaport, Cai Mep Seaport: 16-19km,
Post Office: Suoi Nghe Post Office 5km
Medical facilities: Ba Ria Hospital / Ba Ria Hospital: 15km,
Universities & vocational training institutions, Human resource facilities, Dormitories for workers,
Educational facilities for children of workers: Ngo Quyen High School: 7km, Quang Trung Secondary School: 5km, Suoi Nghe
Primary School: 3km;
Road system & width:
- East-West Road (Song Hanh Street): 80m, 8 lanes, 2m median strip, 14m sidewalk;
- Northern road (Main axis): 50m, 6 lanes (4m/lane), 2m median strip, 12m sidewalk;
- Southern road (Main axis): 54m, 6 lanes (4m/lane), median strip 6m, sidewalk 12m;
- Main roads include roads 05 - 12 - 15 25: 32m, 4 car lanes (3m/lane), sidewalks: 10m;
- Main road 08: 29m, 4 lanes (3m/lane), sidewalk: 8.5m;
- Internal road: 29m, 2 lanes for cars (4.5m/lane), sidewalk: 10m.
Post and telecommunications infrastructure; Backup generator; Fire protection utilities: equipped
28
DONG XUYEN INDUSTRIAL PARK
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Sectors
Minimum wage
Phường Rạch Dừa, thành phố Vũng Tàu, tỉnh Bà Rịa – Vũng Tàu
Name of Investor: Dong Xuyen and Phu My 1 Industrial Park Infrastructure Investment and
Exploitation Company (IZICO Company)
▪ Address / Address: No. 20, 3/2 Street, Ward 8, Vung Tau City, Ba Ria-Vung Tau Province
Tel: 02543.593.440
▪ Email: izico@gmail.com
▪ Website: www.izico.com.vn
Name - Position - Mobile: - Email:
Nguyễn Ngọc Sơn –Director - Email: sonizico@gmail.com
- Dong Xuyen Industrial Park is located along National Highway 51A
- Distance to big city: 125km from Ho Chi Minh city by road, about 50 nautical miles by sea;
About 7km from Vung Tau city center
- Nearest seaport: 37km from Phu My Port in Ba Ria-Vung Tau province and 38km from Thi VaiCai Mep Port in Ba Ria-Vung Tau province
- Nearest airport: To Long Thanh international airport (Dong Nai province): 80km
- Nearest railway station: To Bien Hoa station (Dong Nai province): 87km
Priority Sectors for Investment
- Oil and gas service industry
- Marine service industry
- General clean industries
4.680.000 VND/ month
Lease term
Thời hạn cho thuê
Minimum Lease Area
To 31/10/2046
Limit for Construction
Height
- Factory construction area 30m
- Operating area 1-7 floors
Permitted Construction
Rate
- Factory construction area up to 70%
- 50% operating area
Land area
Factory Available for Rent
Operation Status
Occupancy Rate and
Number of Projects
No. of Korean projects
Lease fee
No require
▪
▪
▪
▪
Total area: 160,81 ha
Total leasable area: 137,47 ha
Total vacant leasable area: 0
Total area with full infrastructure ready to build factory: 0
▪ Total area: none
▪ Total vacant leasable area: 0
▪ Active/
▪ 100%
▪ 90 project
▪ None
▪ Land lease fee: 1,76 USD/m2/year
▪ Factory lease fee: none
29
Operating fee
- Industrial park management fee: according to regulations of the People's Committee of Ba RiaVung Tau province
- Waste water treatment fee: Treatment unit price for 01m3 of local wastewater with pollution
levels from column A to column B of QCVN 40/2011/BTNMT before being discharged into the
wastewater treatment plant's collection system is 4,400 VND/m3; from column B QCVN
40/2011/BTNMT is 9,800 VND/m3 (unit price includes VAT)
- Other fees: fees and charges as prescribed by the State
- Electricity price: According to the selling price of electricity provided by Vung Tau City Power
Company directly to investors in the industrial park.
- Price of water supply: 12,500 VND/m3 (VAT not included)
INFRASTRUCTURE AND FACILITY
- Infrastructure:
+ Internal road system: The road of the Industrial Park has a road surface structure of hot asphalt concrete with a total length of
9.22 km. The entire system of roads in the IZ has been fully invested and built to meet the needs of investors in the IZ. The traffic
system includes: the main road of the industrial zone: Road No. 1, 45m wide; The remaining roads have width from 22m to 30m .
+ Power supply system: Power is taken from 110/22KV intermediate transformer station located at Road No. 1 of the Industrial
Park. From the intermediate substation to build a 22KV overhead line to supply power to the whole industrial park
+ Water supply system: The entire water supply for Dong Xuyen Industrial Park uses the water source of Vung Tau Water Supply
Joint Stock Company with a capacity of 35,000m3/day.
+ Communication system: Vung Tau is a focal point of the international fiber optic system, so it is very convenient. In Dong Xuyen
Industrial Park, it is also invested to build a fiber optic cable and communication network installed according to the requirements
of each factory.
- Centralized wastewater treatment plant: Waste water is treated locally in each enterprise, then according to the wastewater
collection system, it is brought to the centralized wastewater treatment station of the Industrial Park. Dong Xuyen Industrial Park
has built and put into use a centralized wastewater treatment plant system with a capacity of 3,000m3/day and night, ensuring
wastewater treatment for all investors in the industrial park.
+ Quality after treatment: Currently, the concentrated wastewater treatment plant in Dong Xuyen Industrial Park is applying column
B standards QCVN 40/2011/BTNMT (according to environmental protection commitments and discharge permits) before
discharging. to the receiving environment.
- Service and service works: In Dong Xuyen Industrial Park, an operation center has also been built on Road No. 1 of the Industrial
Park.
30
[- This Page is intentionally left blank -]
31
BAC GIANG
32
INVESTMENT ENVIRONMENT IN BAC GIANG
GENERAL INFORMATION
▪ Area: 3,895.9 km2
Area, Population
▪ Population: 1.89 million
▪ Bac Giang province is included in Hanoi capital region, on the economic corridor of Lang Son Hanoi - Hai Phong- Quang Ninh.
Geographical Location
Adjacent provinces
▪ It is 50 kilometres from Bac Giang city to Hanoi center and Noi Bai international airport, 130
kilometres to Hai Phong and Cai Lan ports and 110 kilometres to Huu Nghi border gate (Lang Son
province).
▪ Lang Son Province to the north, Thai Nguyen Province to the northwest and Hanoi Capital to the
southwest, Hai Duong & Bac Ninh Province to the south, Quang Ninh Province to the east.
2022 statistic:
▪ GRDP: 155,876 billion VND (6.5 billion USD)
▪ GRDP growth: 19,3%
▪ GRDP per capita: 3.400USD/year
GRDP
▪ Economic Structure:
- Industry and Construction: 62.30%
- Service: 22.08%
- Agriculture, Forestry and Fishery: 14.90%
2022 statistic:
▪ Industry - Construction growth: 26.65%
Industry growth
▪ Agriculture, forestry and fishery growth: 1.97%
▪ Service growth: 7.49%
PCI
▪ Score: 72.80 – ranked 2nd out of 63 cities and provinces in Vietnam (2022)
SOCIAL INFRASTRUCTURE
▪ Roadway: Including Hanoi – Lang Son expressway and 05 National Routes: National Route 1,
National Route 31, National Route 37, National Route 17, National Route 279 and Vanh Dai 5 of
Hanoi capital, convenient connections to economic centers, airports, seaports
Transportation
▪ Railway: Including Hanoi – Lang Son route (trading to China); Hanoi – Bac Giang (Kep) – Quang
Ninh. Especially, Kep station has been put into operation for international transport, contributing to
improving the transport capacity for the entire Hanoi – Lang Son route through China to Europe.
▪ Waterway: Including Cau River, Thuong River and Luc Nam River.
▪ Airway: 50 minutes from Noi Bai International Airport by car.
Electricity
▪ Supplied from the national power network with 01 500kV station, 03 220kV stations and 16 110kV
stations in the entire province
33
▪ Quality underground water is mainly used in water supply system
Water
▪ 02 plants with capacity of 25,000 to 50,000 m3/day & night and clean water supply plans in the
district satisfy living and production demands of the industrial parks and clusters in the province
Education
▪ 01 university, 05 colleges, 06 professional intermediate schools and 25 vocational training centers and
institutions, in which, there are 02 high-quality vocational colleges: College of Industrial Technologies
and Vietnam – Korea Vocational College of Technology.
Medicare
▪ Modern hospital system including the provincial General Hospital, Obstetric and Pediatric Hospital,
Oncology Hospital, General Hospital and Ophthalmic Hospital and Medical Centers in all the districts
and Bac Giang city.
INVESTMENT CONDITION
Human resource
▪ About 1.2 million people of working age (2022)
Education level
▪ Trained labor rate: 74% (2022)
▪ The minimum salary for the province is applied as follows (see appendix for detail amount):
- Area III including Bac Giang city, Viet Yen Districts, Yen Dung Districts, Hiep Hoa Districts, Tan
Yen Districts, Lang Giang Districts: 3.640.000 VND/month or 17.500 per hour.
Salary
- Area IV including Yen The Districts, Luc Ngan Districts, Son Dong Districts, Luc Nam Districts:
3.250.000 VND/month or 15.600 per hour.
▪ The lowest wage for trained labor (including those trained by the enterprises) must be at least 7%
higher than the above referenced basic salary.
▪ Incentives according to government regulations:
- Exemption and reduction for land and water rent fee
Investment incentives
- Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
▪ Industry: Focus on attracting industries and products:
- Mechanical engeering, manufacture, food-processing, water supply, electronic products,
wastewatermangement and treatment, computers and optical products, manufacture of electrical
equipment (mainly batteries), garment and textile, products from rubber and plastic..
Fields Attracting
Investment
▪ Tourism, Trade - Service:
- Cultural – spiritual tourism; history – culture; eco-re-sport; community tourism; high-class sport
tourism (golf tourism)
▪ Agriculture: Attract business to invest in the formation of specialized agricultural production areas to
serves as a basis for concentration, land accumulation, development in the direction of effiency, hightech agriculture, smart and clean agriculture.
34
Map
Bac Giang Department of Planning and Investment
Address: Nguyen Gia Thieu Street, Bac Giang City, Bac Giang
Tel: (84-204) 3 854 317
E-mail: so_khdt_vt@bacgiang.gov.vn
Website: https://skhdt.bacgiang.gov.vn
Contact
Center for Investment Promotion and Enterprise Development Bac Giang/Korea Desk Bac Giang
Address: 164 Xuong Giang Street, Bac Giang City, Bac Giang
Mr: Dong Anh Quan – Director of the Center
Tel: 0904 109 996
E-mail: anhquanskhdt@gmail.com
Website: https://ipcbacgiang.com
35
LIST OF INDUSTRIAL ZONES IN BAC GIANG
No
Industrial zone Name
Total Area (ha)
Occupancy Rate
Status
1
Dinh Tram Industrial Zone
127
100%
In operation
2
Quang Chau Industrial Zone
426
100%
In operation
Quang Chau Industrial Zone (expand)
90
100%
In operation
3
Van Trung (Fujiang) Industrial Zone
238
100%
In operation
4
Van Trung (S&G) Industrial Zone
113
100%
In operation
5
Hoa Phu Industrial Zone
208
91%
In operation
Hoa Phu Industrial Zone – expand phase 1
85
0%
Under
construction
6
Song Khe – Noi Hoang Industrial Zone
150
100%
In operation
7
Viet Han Industrial Zone
50
100%
In operation
8
Tan Hung Industrial Zone
105,3
0%
Under
construction
9
Yen Lu Industrial Zone
377
4%
In operation
BAC GIANG LOCATION MAP OF INDUSTRIAL ZONES
36
HOA PHU INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Sectors
Minimum wage
Lease term
Lot HC – Hoa Phu Industrial Park, Mai Dinh Commune, Hiep Hoa District, Bac Giang Province
Hoa Phu Invest Co., Ltd
▪ Address: Lot HC – Hoa Phu Industrial Park, Mai Dinh Commune, Hiep Hoa District, Bac
Giang Province
▪ Tel: 0204 358 6868
▪ Email: hoaphu@phumygroup.com.vn
▪ Website: www.hoaphuip.com.vn
Name - Position - Mobile: - Email:
Le Cong Long
093 6941989
Email: lelong@phumygroup.com.vn
Adjacent location
- 45km from Ha Noi city
- 40km from Bac Giang Province
- 20km from Noi Bai airport;
- 110km from Hai Phong port;
- 150km from Lang Son border gate
Priority Sectors for
Encourage the production industry that is not harmful to the
Investment
environment (assembly, electronic components, ...)
Investment Restricted
Industries that affect the environment (textiles, plating, ...)
Sectors
3.640.000 VND/person/month (According to Decree 38/2022/ND-CP)
▪ End date: 20/05/2066
Minimum Lease Area
10.000m2
Limit for Construction
Height
The number of floors is limited to 5 floors no limit to the height of each floor
Permitted Construction
Rate
Construction density: 3.5
Planned area
Factory Available for Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean projects
Lease fee
Operating fee
▪ Total area: 292ha
▪ Total area is filled: 207ha
▪ The total remaining area is in the process of clearing ground: 85ha
▪ Total area: None
▪ Active and continues to be in the ground clearance phase of expanded 85ha section. This site is
expected to be handed over in the fourth quarter of 2023.
207ha area: 95% filled
85ha is in the process of clearing ground
Total projects in Hoa Phu Industrial Park: 27
▪ 6 projects
▪ Land lease fee: Depending on the location and size of the area
▪ Management fee: 11.750 VND/m2/year
▪ Electricity fee: According to the unit price of Vietnam Electricity (EVN)
▪ Water fee: 11.000 VND/m3
▪ Wastewater treatment fee: 9.900 VND/m3
(The above costs do not include VAT)
37
INFRASTRUCTURE AND FACILITY
Financial institution
Vietcombank, Vietinbank
Tax service, State finance
office
Internal Service
Customs Service
Internal Service
Logistics
Internal Service
Post office
Internal Service
Medicare
19 km to Bac Ninh General Hospital
Police, public security
24/7 security service.
Universities, training
facilities, etc.
10 km from nearest University
Recruitment
Available From the 02 towns, Thắng Town and Chờ Town, with the population of 220,000
Worker dormitory
Internal Service
Worker's child education
facility
NA
One-stop service
Internal Office
Road Width
Main entrance: 77 m width
IT & Tele-communication
Facilities of Industrial
Zone
Telecommunication systems and international standards are always ready to meet the
communication needs
Emergency Power
generator
Available in the zone
Fire-fighting facility
Fire brigade station away from 1km; extinguishing water pipe and fire hydrants are located
along the main roads and branches in the park.
Layout Plan
38
Location Map
39
QUANG CHAU INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Quang Chau Commune, Viet Yen District, Bac Giang Province
Investor
Saigon – Bac Giang Industrial Park Corp.
▪ Address: Quang Chau Industrial Zone, Bac Giang Province
▪ Tel: (84-204) 356 6888
▪ Fax: (84-204) 386 8449
▪ Website: http://www.kinhbaccity.vn/news/
Contact Person
▪ Tran Thi Huong - Sales & Marketing Deputy Manager – (84) 915 636 139 tthuong.kbc@gmail.com/ tthuong@kinhbaccity.com
Location
- 15 Km from Bac Giang City Center
- 40 Km from Noi Bai International Airport
- 115 Km from Hai Phong Seaport
- 500 m from Highway No.01 and 15 Km from Hanoi – Lang Son (border with China) –
NanNing (China) Railway
Priority Sectors for Investment
Engineering, manufacturing and assembling automobiles and
motorcycles; Production of electronics and home appliances;
supporting industry; textiles, etc. (Decision No. 1062/QĐUBND on 07/07/2016)
Restricted Sectors for
Investment
As regulated by Bac Giang Authority
Investment Area
Minimum wage
[Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term
▪ Start date: 2006
▪ End date: 2056
Minimum Lease Area
1.86 ha
Limit for Construction
Height
18 m
Permitted Construction
Rate
60%
Planned area
▪ Total area: 426 ha
▪ Total vacant leasable area: Unavailable
▪ Total area with full infrastructure ready to build factory: Unavailable
Factory Available for
Rent
▪ Total area: Unavailable
Operation Status
▪ In operation
Occupancy Rate and
Number of Projects
▪ 100%
▪ 40 projects
Number of Korean
Projects
5 projects
Lease fee
▪ Land lease fee: 75 USD/m2
▪ Factory lease fee: 3.5 USD/m2/month
▪ Payment:
- Method: Bank Transfer in VND
- Period: 40% after signing In-principle Agreement + 40 % after signing Land Sublease Contract
+ 20% after Land Hand-over
Operating fee
▪ Management fee: USD 0.5/sqm/year (excluded VAT)
▪ Electricity fee: According to the Circular by Ministry of Industry and Trade, valid from March
16th, 2015 (excluded VAT) for voltage from 22KV-110KV.
▪ Water fee: 12,000 VND /m3 (excluded VAT)
40
▪ Wastewater treatment fee: VND 9,400 / m3 (excluded VAT)
INFRASTRUCTURE AND FACILITY
Financial institution
VietinBank
Tax service, State
finance office
7 Km from Vietnam State Treasury in Viet Yen District
6 Km from the nearest Customs Agency
Customs Service
25 Km from ICD Tien Son, Bac Ninh
Logistics
Kerry Integrated Logistics JSC, Dragon Logistics
Post office
2 km from Vietnam Post Office
Medicare
- Bac Ninh General Hospital is 7km from IP.
- Bac Giang General Hospital is 5 km from IP.
Police, public security
700 m
Universities, training
facilities, etc.
8 Km from Bac Giang Agriculture and Forestry University
Recruitment
Available
Worker dormitory
2 Km
Worker's child
education facility
2 Km
One-stop service
15 Km
Road Width
▪ Main road: 32m, 4 lanes;
▪ By Road: 23m, 2 lanes
IT & Telecommunication
Facilities of Industrial
Zone
Available
Emergency Power
generator
Available
Fire-fighting facility
Available
41
Layout Plan
Location Map
42
Actual View
43
LIST OF TENANTS
No
Name of Company
Nationality
1
Nichirin Vietnam Co.,Ltd
Japan
2
Inoue Vietnam Co.,Ltd
Japan
3
Hosiden Vietnam (Bac Giang) Co.,Ltd
4
L&C Tech Vietnam Co.,Ltd Co.,Ltd
Taiwan
5
Umec Vietnam Co.,Ltd
Taiwan
6
Crystal Martin (VN) Co.,Ltd
Hong Kong
Crystal Intimate (VN) Co.,Ltd
Hong Kong
7
ShunSin Technology Co.,Ltd
China
8
Vietnam Tequ Hope Animal Feed Co.,Ltd
China
9
Wintek Vietnam Co.,Ltd
10
LY Vietnam Co.,Ltd
11
Trung Nguyen Instant Coffee Jsc.
12
NewHope Hanoi – (Bac Giang Branch)
13
Vinafor Bac Giang Plywood Single-Member Co.,Ltd
14
Si flex Vietnam Co.,Ltd
South Korea
15
Luxshare ICT (Vietnam) Co.,Ltd
Hong Kong
16
Ja Solar Vietnam Co.,Ltd Co.,Ltd
Hong Kong
17
Lens Technology Vietnam Co.,Ltd
Hong Kong
18
Blue & Green Home Articles Viet Nam Co.,Ltd
19
Kinh Bac Services Corporation
20
Samkwang Vietnam Co.,Ltd
21
Lien Minh (LIMICO) Co.,Ltd
22
HIQ VINA Co.,Ltd
South Korea
23
T/S Vina Co.,Ltd
South Korea
24
Exwin Co.,Ltd
Taiwan
25
Lucky Dragon Co.,Ltd
Taiwan
26
Electric Motocyce Yadea Vietnam Co.,Ltd
China
27
Jufeng New Marterials Vietnam Co.,Ltd
China
28
Et Solar Technology (Vietnam) Co.,Ltd
China
29
Fu Hong Co.,Ltd
China
30
Huimei Precisions Plastics Co.,Ltd
China
31
BOI Vietnam Co.,Ltd
China
32
Fousine Vietnam Technology Co.,Ltd
33
Jiafeng Packaging Vietnam Co.,Ltd
China
34
Degoo Adhesive (Vietnam) Co.,Ltd
China
35
Great Uninon International Vietnam Co.,Ltd
China
36
Chen Feng New Materials Vietnam Co.,Ltd
China
37
Naise New Materials Vietnam Co.,Ltd
China
38
RunYang Technology Vietnam Co.,Ltd
China
39
FuYu Precision Componen Co.,Ltd
China
South Korea
Taiwan
China
Vietnam
China
Vietnam- Japan
China
Vietnam
South Korea
Vietnam
Hong Kong
44
40
Cheng Loong Viet Nam Investment Co.,Ltd
China
45
DINH TRAM INDUSTRIAL ZONE
GENERAL INFORMATION
Address
▪ Hoang Ninh Commune, Viet Yen district, Bac Giang Province
Investor
Infrastructure Development Company of Industrial Park in Bac Giang
▪ Address: Song Khe –Noi Hoang Industrial Park (the Northern area),
Bac Giang
▪ Tel: (84-204) 3 866 767
▪ Fax: (84-204) 3 866 767
▪ Email: congtypthtkcn@bacgiang.gov.vn
Contact Person
▪ Mr. Nguyen Van Nhien – Sale Director – (84) 913 030 201 - nhiennv_ctptht@bacgiang.gov.vn
Location
▪ 13 Km from Bac Giang City Center
▪ 45 Km from Noi Bai International Airport
▪ 110 Km from Hai Phong Seaport
▪ 500 m from Highway No.01 and 15 Km from Hanoi – Lang Son (border with China) – NanNing
(China) Railway
Priority Sectors for Investment
Electronics, High Technology
Restricted Sectors for Investment
Polluted Sector
Investment Area
Minimum wage
[Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term
▪ Start date: 2004
▪ End date: 17/06/2054.
Minimum Lease Area
10,000 m2
Limit for Construction
Height
Factory area: 3 levels
Operating area: 2 levels
Permitted
Construction Rate
65%
Planned area
▪ Total area: 127 ha
▪ Total industrial land: 93 ha
▪ Total vacant leasable area: 0 ha
Factory Available for
Rent
▪ Total area: NA
Operation Status
▪ In operation
Occupancy Rate and
Number of Projects
▪ 100%
▪ 54 projects
Number of Korean
Projects
▪ 2 projects
Lease fee
▪ Land lease fee: 60 USD/m2
▪ Factory lease fee: NA
Operating fee
▪ Management fee: 11,120 VND (~0.4USD)/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 12,072 VND (~0.52 USD)/m3 (production)
▪ Wastewater treatment fee: 9,000 VND (~0.39 USD)/m3
INFRASTRUCTURE AND FACILITY
Financial institution
None
Tax service, State
finance office
10 km from nearest Tax Service Department
46
Located inside the industrial zone
Customs Service
NA
Logistics
Nhat Tin Logistic within 11 km
Post office
Bac Giang Post Office within 11 km
Medicare
Viet Yen General Hospital within 5km, Bac Giang General Hospital within 10 km
Police, public security
• 3km from nearest Police Station
• Industrial Park’s security team keeps watching 24/24h
Universities, training
facilities, etc.
• 10 Km from Kinh Bac University
Recruitment
None
Worker dormitory
None
Worker's child
education facility
None
One-stop service
17.8 km from Yen Dung District One – Stop service
Road Width
NA
IT & Telecommunication
Facilities of Industrial
Zone
Modern communication system reaches the international standard and ready to meet full demands
concerning on national and international communication services.
Emergency Power
generator
None
Fire-fighting facility
Extinguishing water pipe and fire hydrants are located along the main roads and branches in the park.
Layout Plan
47
Actual View
48
VAN TRUNG INDUSTRIAL ZONE
GENERAL INFORMATION
Address
▪ Viet Yen District, Bac Giang Province
Investor
Fugiang Company (Taiwan Foxconn Group)
▪ Address: Van Trung Industrial Park, Viet Yen District, Bac Giang Province
▪ Tel: (84-204) 3661 968
▪ Fax: (84-221) 3 974 624
▪ Website: www.fugiang.com
▪ Email: contact.fugiang@gmail.com
Contact Person
Mr. Nguyen Manh Dung – Head of Project Department – (84) 904 868 557 manhdung.fugiang@gmail.com
Location
- 10 Km from Bac Giang City Center
- 45 Km from Noi Bai International Airport
- 110 Km from Hai Phong Seaport
- 110 km from Cai Lan Deep Sea Port Quang Ninh
- 500 m from Highway No.01 and 15 Km from Hanoi – Lang Son (border with China) –
NanNing (China) Railway
Priority Sectors for Investment
Electronics, High Technology
Restricted Sectors for Investment
Polluted Sectors
Investment Area
Minimum wage
[Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term
▪ Start date: 24/12/2009
▪ End date: 12/11/2065
Minimum Lease Area
10,000 m2
Limit for Construction
Height
Factory area: 3 levels
Operating area: 2 levels
Permitted Construction
Rate
60%
Planned area
▪ Total area: 238.3 ha
Phase I: 150 ha
Phase II: 88.3 ha
▪ Total vacant leasable area: 0 ha
Factory Available for Rent
▪ Total area: NA
Operation Status
▪ In operation
Occupancy Rate and
Number of Projects
100% with 97 projects
Number of Korean Projects
21
Lease fee
▪ Land lease fee: 80 USD/m2/over project life
Operating fee
▪ Management fee: 0.5 /m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 12,072 VND (~0.52 USD)/m3/year
▪ Wastewater treatment fee: 9,000 VND (~0.39 USD)/m3
INFRASTRUCTURE AND FACILITY
Financial institution
Vietcombank and Agribank within 5km
49
Tax service, State finance
office
3 km from nearest Tax Service Department
Customs Service
Located inside the industrial zone
Logistics
NA
Post office
Nhat Tin Logistic within 5 km
Medicare
Bac Giang Post Office within 11 km
Police, public security
Bac Giang General Hospital within 10 km
Universities, training
facilities, etc.
• 3km from nearest Police Station
• Industrial Park’s security team keeps watching 24/24h
Recruitment
• 10 Km from Kinh Bac University
Worker dormitory
None
Worker's child education
facility
None
One-stop service
17.8 km from Yen Dung District One – Stop service
Road Width
Main Road: 4 lanes; 33/25m width
Route Road: 2 lanes; 18 m width
IT & Tele-communication
Facilities of Industrial
Zone
Modern communication system reaches the international standard and ready to meet full
demands concerning on national and international communication services.
Emergency Power
generator
2 power generators with 400kVA and 180kVA capacity
Fire-fighting facility
Available in the zone
Layout Plan
50
Location Map
Actual View
51
SONG KHE – NOI HOANG SOUTH INDUSTRIAL ZONE
GENERAL INFORMATION
Address
▪ Yen Dung District, Bac Giang Province
Investor
Bac Giang FuJi Development JSC
▪ Address: Song Khe-Noi Hoang Industrial Park (the Northern area),
Bac Giang
▪ Tel: (84-204) 6529 010
▪ Fax: (84) 918 273 656
▪ Website: http://fujiip.com/ko/
Contact Person
▪ Mr. Giang – (84) 913 275 656 - giangnguyen@fujiip.com
▪ Mr. Nguyen Anh Van – (84) 986 832 704 - Vanfuji.ip@gmail.com
Location
- 7 Km from Bac Giang City Center
- 45 Km from Noi Bai International Airport
- 90 Km from Hai Phong Seaport
- 1km from Highway No.01
Investment Area
Priority Sectors for
Investment
High Technology
Restricted Sectors for
Investment
Garment and Chemical
Minimum wage
[Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term
▪ Start date: 22/5/2013
▪ End date: 22/5/2063
Minimum Lease
Area
10,000 m2
Limit for
Construction Height
- Factory area: 4 levels
- Operating area: 4 levels
Permitted
Construction Rate
Factory area: 60%
Operating area: 40%
Planned area
▪ Total area: 45 ha
▪ Total Industrial Land: 32.8 ha (Phase I)
Factory Available
for Rent
No
Operation Status
▪ In operation
Occupancy Rate and
Number of Projects
▪ 100%
▪ 20 projects
Number of Korean
Projects
7
Lease fee
▪ Land lease fee: 65 USD/m2
▪ Factory lease fee: 2.8 – 3.2USD/m2/month
Operating fee
▪ Management fee: 11,120 VND (~0.5USD)/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 12,072 VND (~0.51 USD)/m3
▪ Wastewater treatment fee: 9,000 VND (~0.38 USD)/m3
INFRASTRUCTURE AND FACILITY
Financial institution
Vietcombank Branch Song Khe, Agribank
52
Tax service, State
finance office
4 km from nearest Tax Service Department
Customs Service
6km from Bac Giang Customs Deaprtment
Logistics
Nhat Tin Logistic within 7 km
Post office
Bac Giang Post Office within 11 km
Medicare
Bac Giang General Hospital within 5 km
Police, public
security
5 km from nearest Police Station
Universities, training
facilities, etc.
11.5 Km from Bac Giang Agriculture and Forestry University
Recruitment
Support recruitment is available
Worker dormitory
None
Worker's child
education facility
None
One-stop service
11 km from Yen Dung District One – Stop service
Road Width
Main Road: 4 lanes; 33 m width
Internal Road: 2 lanes; 23 m width
IT & Telecommunication
Facilities of
Industrial Zone
Modern communication system reaches the international standard and ready to meet full demands
concerning on national and international communication services.
Emergency Power
generator
Available
Fire-fighting facility
Available
Layout Plan
Location Map
53
Actual View
54
SONG KHE – NOI HOANG NORTH INDUSTRIAL ZONE
GENERAL INFORMATION
Address
▪ Song Khe Commune, Yen Dung District, Bac Giang Province
Investor
Infrastructure Development Company of Industrial Park in Bac Giang
▪ Address: Song Khe-Noi Hoang Industrial Park (the Northern area),
Bac Giang
▪ Tel: (84-204) 355 9266
▪ congtypthtkcn@bacgiang.gov.vn
Contact Person
▪ Mr. Nguyen Van Nhien – Sale Director – (84) 913 030 201 - nhiennv_ctptht@bacgiang.gov.vn
Location
- 5 Km from Bac Giang City Center
- 45 Km from Noi Bai International Airport
- 110 Km from Hai Phong Seaport
- 110 Km from Cai Lan Quang Ninh Deep Sea Port
- 1km from Highway No.01
Investment Area
Priority Sectors for
Investment
High-tech industry, clean industry
Restricted Sectors for
Investment
Restricted Heavy industry, industries affecting the environment
Minimum wage
[Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term
▪ End date: 12/11/2066
Minimum Lease Area
10,000 m2
Limit for Construction
Height
- Factory area: 3 levels
- Operating area: 2 levels
Permitted Construction
Rate
Factory area: 60%
Operating area: 60%
Planned area
▪ Total area: 105 ha
▪ Total area with full infrastructure ready to build factory: 175ha
Factory Available for
Rent
No
Operation Status
In operation
Occupancy Rate and
Number of Projects
▪ 100%
▪ 20 projects
Number of Korean
Projects
6
Lease fee
▪ Land lease fee: 65 USD/m2
Operating fee
▪ Management fee: 10,000 VND (¬0.47USD) /m2/year
▪ Infrastructure maintenance fee: 4,600 VND/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 12,072 VND (~0.51 USD)/m3
▪ Wastewater treatment fee: 9,000 VND (~0.38 USD)/m3
INFRASTRUCTURE AND FACILITY
Financial institution
Vietcombank Branch Song Khe, Agribank
Tax service, State
finance office
4 km from nearest Tax Service Department
Customs Service
6km from Bac Giang Customs Deaprtment
55
Logistics
Nhat Tin Logistic within 7 km
Post office
Bac Giang Post Office within 11 km
Medicare
Bac Giang General Hospital within 5 km
Police, public security
5 km from nearest Police Station
Universities, training
facilities, etc.
11.5 Km from Bac Giang Agriculture and Forestry University
Recruitment
Support recruitment is available
Worker dormitory
None
Worker's child
education facility
None
One-stop service
11 km from Yen Dung District One – Stop service
Road Width
Main Road: 4 lanes; 33 m width
Internal Road: 2 lanes; 23 m width
IT & Telecommunication
Facilities of Industrial
Zone
Modern communication system reaches the international standard and ready to meet full
demands concerning on national and international communication services.
Emergency Power
generator
Available
Fire-fighting facility
Available
Layout Plan
Location Map
56
57
[- This Page is intentionally left blank -]
58
BAC KAN
59
INVESTMENT ENVIRONMENT IN BAC KAN
USD/VND
23.510
GENERAL INFORMATION
Area, Population
▪ Area: 4,859.96 km2
▪ Population: 0.4547 million (2022 statistic)
Geographical Location
▪ Located in the Northeast region, due north of the capital Hanoi
▪ Located 160 km from Hanoi
Adjacent provinces
▪ Cao Bang Province to the north, Lang Son Province to the East, Thai Nguyen
Province to the South, Tuyen Quang Province to the west.
GRDP
Industry growth
PCI
2022 statistic:
▪ GRDP: 8,297 billion VND
(0.35 billion USD)
▪ GRDP growth: 6.01 %
▪ GRDP per capita: 1,970 USD/year
▪ Economic structure:
- Industry - Construction: 16.1 %;
- Agriculture. forestry and fishery: 28.9 %;
- Service: 51 %;
- Tax on Goods: 3 %
2022 statistic:
▪ Industry - Construction growth: 8.96 %
▪ Agriculture, forestry and fishery growth: 3.83%
▪ Service growth: 6.25%
▪ Score: 65.15– ranked 35 out of 63 cities and provinces in Vietnam. (2022)
SOCIAL INFRASTRUCTURE
Transportation
▪ Roadway: Bac Kan has National Highway No. 3 passing from Cao Bang, Thai
Nguyen to Ha Noi.National highway 3b connects north kanj with Lang Son.The
connecting route from Ba Be Lake to Tuyen Quang is also under construction
▪ Railway: None
▪ Waterway: None
Electricity
Supplied from the national power network
Water
The limited water resources development in the province is managed by the
communes through better water management practices (government supported
initiatives)
Education
▪ 0 university, 01colleges,
Medicare
▪ 8 hospitals
INVESTMENT CONDITION
Human resource
▪ 80% of population are in the working age (2022)
Education level
▪ Trained labor rate: 00% (2022)
Salary
▪ The minimum salary for the province is applied as follows:
- Area III: Bac Kan city
- Area IV: Other District
▪ The lowest wage for trained labor (including those trained by the enterprises)
must be at least 7% higher than the above referenced basic salary
Investment incentives
Exemption and reduction for land and water rent fee
- Preferential tax rates and exemption period, reduction for corporate income tax.
60
-Import tax exemption
Fields Attracting Investment
▪ Prioritized projects:
Mining, forest products, agriculture
High technology, industrial electronics, information technology; mechanical
engineering products;
- Supporting industry;
Map
(Add Province map)
Contact
Department of Planning and Investment
▪ Address: No 9 Truong Chinh, Phung Chi Kien, Bac Kan
▪ Tel: 0209 3878 217
▪ Fax :
▪ Email: sokhdt@backan.gov.vn
▪ Contact person: Tran Cong Hoa
61
LIST OF INDUSTRIAL ZONES
No
Industrial zone Name
Total Area (ha)
Occupancy Rate
Status
1
Thanh Binh Industrial Zone
73.5
100%
In Operation
LOCATION MAP OF INDUSTRIAL ZONES
62
THANH BINH INDUSTRIAL ZONE
GENERAL INFORMATION
ADDRESS
Thanh Thinh commune, Cho Moi district, Bac Kan Province, Vietnam
INVESTOR
Bac Kan Industrial Zone Infrastructure Development Company
▪ Address: Thanh Binh commune, Cho Moi district, Bac Kan
▪ Tel: (84-209) 3 865 232
Fax: (84-209) 3 865 232
▪ Email: congtypthtbk@gmail.com
CONTACT
PERSON
Mr. Ma Doan Hieu- Department of Professional Management
Mobile: (84) 982 385 575- Email: madoanhieu@gmail.com
LOCATION
▪ 35 km to Bac Kan city
▪ 120 km to Ha Noi
▪ 120 km from Noi Bai International Airport
▪ 230 km to Hai Phong Port
INVESTMENT
AREA
Priority Sectors for
Investment
▪ Processing agricultural and forestry products;
▪ Processing minerals, non-ferrous metals;
▪ Manufacturing and assembling mechanics;
▪ Production of building materials
▪ Eco-friendly Industries High technology, industrial electronics,
information technology; mechanical engineering products;
- Supporting industry;
Restricted Sectors
None
MINIMUM WAGE
[Area 4] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
MINIMUM LEASE
AREA
50 years
LIMIT FOR
CONSTRUCTION
HEIGHT
PERMITTED
CONSTRUCTION
RATE
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential
Planning regulation (QCXDVN 01: 2008/BXD)
Construction area is not more than 65% of the total leased land lot
PLANNED AREA
▪ Total area: 72,5 ha
▪ Total vacant leasable area: Unavailable
FACTORY
AVAILABLE FOR
RENT
No
OPERATION
STATUS
▪ In operation
OCCUPANCY
RATE AND
NUMBER OF
PROJECTS
▪ 100%
▪ 12 Projects
NUMBER OF
KOREAN
PROJECTS
0 projects
LEASE FEE
OPERATING FEE
▪ Management fee: 9 800 VND /m2/year (excluded VAT)
63
▪ Electricity fee: According to the Circular by Ministry of Industry and Trade, valid from March 16th,
2015 (excluded VAT) for voltage from 22KV-110KV.
▪ Water fee: 11 300 VND (~0.37 USD) /m3 (excluded VAT)
▪ Wastewater treatment fee: 7 100 VND (~0.3 USD)/m3 (excluded VAT)
INFRASTRUCTURE AND FACILITY
FINANCIAL
INSTITUTION
BIDV, Vietin Bank, Agribank
TAX SERVICE,
STATE FINANCE
OFFICE
4 km to Tax Department and State Treasury of Cho Moi
CUSTOMS SERVICE
35 km to Customs Department of Bac Kan province
LOGISTICS
POST OFFICE
6 km m to Post Office of Cho Moi district
MEDICARE
3 km to Cho Moi General Hospital
POLICE, PUBLIC
SECURITY
5 km to Police station of Cho Moi district
UNIVERSITIES,
TRAINING
FACILITIES, ETC.
50 km to Thai Nguyen University
WORKER
DORMITORY
None
WORKER'S CHILD
EDUCATION
FACILITY
500m from the zone
ONE-STOP
SERVICE
ROAD WIDTH
Main road:, 2 lanes
IT & TELECOMMUNICATION
FACILITIES
Fully-communication system ensures national and international contact easily, include telephone,
mobile phone, Fax, Internet..
EMERGENCY
POWER
GENERATOR
Available
FIRE-FIGHTING
FACILITY
Available. Water supply system for firefighting is located along each road.
LAYOUT PLAN
64
LOCATION MAP
ACTUAL VIEW
.
65
LIST OF SOME NOTABLE TENANTS
No.
Company Name
Nationality
Location
1
Misaki Vietnam Co., Ltd.
Japan
A5+A6
2
Ba Be Agricultural Comnany
Vietnam
D
3
Nam A Bac Kan Company Limited
Vietnam
D
4
Khanh Linh Gas Company.,Ltd
Vietnam
F1+F2
5
Kim An An Company Limited
Vietnam
B1
6
Hong Ngoc Plywood Join Stock Company.
Vietnam
E1
7
8
Ke Go Company Limited
Anh Binh Plywood Company Limited
Vietnam
Vietnam
G1
F2
9
Lechenwood Vietnam Co., Ltd.
China
E1
10
Govina Investment Joint Stock Company
Vietnam
D1
11
Materials and Complete Equipment ExportImport Corporation (MATEXIM)
Beer and Beverage joint stock Bac Kan Company
Vietnam
F2
Vietnam
B1
12
66
[- This Page is intentionally left blank -]
67
BAC LIEU
68
INVESTMENT ENVIRONMENT IN BAC LIEU
USD/VND
23.510
GENERAL INFORMATION
Area
Population
Geographical
Location
Adjacent
provinces
2468,7 km2
0,204 million people (2022)
▪ Bac Lieu is located in Mekong Delta River region.
Bac Lieu is a province on the Ca Mau peninsula, the southernmost land of Vietnam
The province shares a common border connecting Hau Giang and Kien Giang provinces in the northwest,
Soc Trang in the northeast, Ca Mau in the southwest, and the East Sea in the southeast. Bac Lieu has a 56
km long coastline connecting with important seas such as Ganh Hao, Nha Mat and Cai Cung.
2022 statistic:
GRDP
Industry
growth
Import Export
Key Industry
PCI
Ranking
▪ Real GRDP (billion VND):
31.744
▪ GRDP growth:
9,60%
▪ GRDP per capita (million VND/year):
60.53
(1,38 billion USD)
(2,787 USD)
▪ Economic structure:
- Industry - Construction:
19,31%
- Agriculture. forestry and fishery:
41,62%
- Service:
34,10%
▪ Industry - Construction growth:
14,45%
▪ Agriculture, forestry and fishery growth:
3,12%
▪ Service growth:
2.32%
Import turnover (billion USD):
0,55
Export turnover (billion USD):
853,00
(Growth rate: 9.92%)
Agriculture still represents a very important part in Bac Lieu. The province is the Bac Lieu is a center for
hatchery production, shrimp farming and processing
61.25
55
SOCIAL INFRASTRUCTURE
▪ Roadway: National Road 1A (route Hanoi – Bac Ninh – Lang Son), National Road North Song Hau. There
are provincial road namely ĐT.982, ĐT.977B, ĐT.979B, ĐT.982B.
Transportation
▪ Water way" Bac Lieu has two natural rivers located in the north and south of the province: Ganh Hao river
- the natural boundary with Ca Mau province and Cai river - the natural boundary with Hau Giang province.
▪ Bac Lieu has attracted 3,200MW LNG Power Project and 8 completed wind power projects put into
operation, with a capacity of nearly 470MW, ranking third in the country. These projects are the main
Electricity
drivers of local GRDP growth. In addition, the Bac Lieu Liquefied Natural Gas (LNG) Power Project with
an investment of 4 billion USD is being implemented
▪ Regarding the source of fresh water for production and people's daily life, it is mainly rain water, partly
supplemented from the Hau river water source. In which, the water source from Hau River is estimated to
Water
flow into Bac Lieu about 1.4 billion m3/year.
Education &
Training
▪ The province has 79 public preschools and kindergartens, 119 primary schools, 62 junior high schools, and
20 high schools.
INVESTMENT CONDITION
Human
resource
57,7% of population are in the working age (2022)
Education level Trained labor rate: 69,43% (2022)
▪ The minimum salary for the province is applied as follows:
Salary
- Area I (4,680,000 VND/month): N/A
69
- Area II (4,160,000 VND/month): Bac Lieu City
- Area III (3,640,000 VND/month): Gia Rai Town, Hoa Binh District
- Area IV (3,250,000 VND/month): Hong Dan, Phuoc Long, Vinh Loi, Dong Hai District
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages
paid to employees working under employment contracts)
▪ Incentives according to government regulations:
- Exemption and reduction for land and water rent fee
- Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
▪ Bac Lieu strives to become the center of shrimp seed production, farming and processing, the center of
Fields
shrimp industry of the country.
Attracting
Currently, the province is aiming to become one of the clean energy centers of the country by 2030, with a
Investment
focus on wind power, solar power and gas power.
▪ Up to now, the province has attracted 184 projects, of which: 167 domestic projects with a total registered
Investment
investment capital of more than 53 trillion VND; 17 foreign projects with a total registered capital of more
attraction
than 4.5 billion USD and many other motivational projects.
situation
Tra Kha Industrial Zone
Industrial zones Lang Tram Industrial Zone
Ninh Quoi Industrial Zone
Investment
incentives
Map
Bac Lieu Department of Planning and Investment
▪ Address: Provincial administrative center, Bac Lieu city, Bac Lieu
Contact
▪ Tel: 0291. 3823874
▪ Email: skhdt@baclieu.gov.vn
70
▪ Contact person:
- Mr. Pham Thanh Hien - Deputy Director of Department of Planning and Investment
LIST OF INDUSTRIAL ZONES IN BAC LIEU PROVINCE
No
Industrial zone Name
Total Area (ha)
Occupancy Rate
Status
1
Tra Kha Industrial Zone
64.86
100%
In Operation
2
Lang Tram Industrial Zone
377
N/A
Licensed in 1/2022
LOCATION MAP OF INDUSTRIAL ZONES
71
TRA KHA INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Ward 8, Bac Lieu city, Bac Lieu province.
Investor
Bac Lieu Industrial Park Infrastructure Development Company
▪ Address: No. 294, 23/8 Street, Tra Kha A Area, Ward 8, Bac Lieu City, Bac Lieu Province
▪ Tel: 0781-3954811
Contact Person
Ngo Huu Tien – Director.
Tel: 0913892414.
Location
Investment Sectors
Minimum wage
Lease term
Permitted Construction
Rate
Adjacent location:
Tra Kha Industrial Park is located in Ward 8, Bac Lieu Town:
3km from Bac Lieu town center
25km from the multi-purpose seaport
125km from Can Tho airport, 65km from Ca Mau airport
The internal road connects directly with the existing National Road 1A and the bypass of
National Highway 1A (under construction). Water transport is adjacent to Bac Lieu - Ca Mau
river, ensuring traffic for 1,000 tons.
Priority Sectors for
N/A
Investment
Investment Restricted
N/A
Sectors
[Area 2] According to Decree 38/2022/ND-CP
50 years
+ Building 1 floor: < 65%
+ Building 2 floors: <55%
+ Building on 3 floors: <40%
Planned area
Factory Available for Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean projects
Lease fee
Operating fee
▪ Total area: 64.86 ha
▪ Total vacant leasable area: 9,343.6 m2
▪ Total area with full infrastructure ready to build factory: 44.112 ha
▪ Total area: 2,772.4 m2
▪ Active
25 projects, Occupancy Rate: 98.04%
0
▪ Land lease fee: 1,935 VND (USD 0.082)/m2/year
▪ Factory lease fee: N/A
▪ Management fee: 0.35 USD/m2/year
▪ Electricity fee: 0.05 USD/month
▪ Water fee: 0.4 USD/m3
▪ Wastewater treatment fee: 0.28 USD/m3
INFRASTRUCTURE AND FACILITY
Internal transportation system:
+ Main road (4 lanes)
+ Side branch road (2 lanes)
72
Power system:
The power supply system has a voltage of 110/22KV with a power capacity of 16MVA
Water supply system:
The water supply system has the highest capacity of 2,500m3/day.
Wastewater treatment system:
Waste water from factories in the industrial park will be treated centrally with a capacity of 2,400m3/day.
Human Resources
The population in Bac Lieu province is 913,481 people, of which the population of working age is 542,528 people,
accounting for 57.7% of the total population of the province. In the near future, Bac Lieu will invest over 241 billion VND in
the employment program in the 2021 - 2025 period and implement the Vocational training project for rural workers with a
total investment of 544 billion VND. By 2020, the proportion of trained workers in Bac Lieu will reach 63.44%, the number
of workers with certificates and diplomas will reach 23.97%.
In Bac Lieu province, there were 34,132 people working in the entire enterprise sector, up 7.68%, of which 31,311 people
were employed in non-state enterprises.
Thus, Bac Lieu can completely provide labor for investors in both quantity and quality.
Investment incentives
- Incentives for corporate income tax: 10% preferential rate for a period of 15 years
- Reducing VAT on imported goods in order to create fixed assets and import equipment, machinery and raw materials for
production in accordance with the law on import and export taxes;
- Increase or decrease land use levy and land rent incentives for land resource tax; raise the deductible value when
determining taxable income.
Picture:
73
LANG TRAM INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Hamlet Xom Moi, Tan Thanh Commune, Gia Rai Town, Bac Lieu Province;
Investor
Bac Lieu Industrial Park Infrastructure Development Company
▪ Address: No. 294, 23/8 Street, Tra Kha A Area, Ward 8, Bac Lieu City, Bac Lieu Province
▪ Tel: 0781-3954811
Contact Person
Location
Investment Sectors
Minimum wage
Lease term
Permitted Construction
Rate
N/A
Adjacent location:
Distance from Bac Lieu town center: 55km, Ca Mau city: 15km
Ca Mau Airport: 11km, Can Tho Airport: 180km
To seaport Bac Lieu: 55km
Priority Sectors for
Investment
Investment Restricted
Sectors
Seafood processing industry, services and industries serving
aquaculture and fishing.
N/A
[Area 2] According to Decree 38/2022/ND-CP
50 years
+ Building 1 floor: < 65%
+ Building 2 floors: <55%
+ Building on 3 floors: <40%
Planned area
Factory Available for Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean projects
Lease fee
Operating fee
▪ Total area: 94.19 ha
▪ Total vacant leasable area: N/A
▪ Total area with full infrastructure ready to build factory: 63.33
▪ Total area: N/A
▪ Active
N/A
0
▪ Land lease fee: 1,935 VND (USD 0.082)/m2/year
▪ Factory lease fee: N/A
▪ Management fee: 0.35 USD/m2/year
▪ Electricity fee: 0.05 USD/month
▪ Water fee: 0.4 USD/m3
▪ Wastewater treatment fee: 0.28 USD/m3
INFRASTRUCTURE AND FACILITY
Internal transportation system:
The internal road in the industrial park connects directly with National Highway 1A with a length of about 300m, and at the same
time connects to Quan Lo - Phung Hiep Highway about 15km.
Water supply system:
Water transport is adjacent to Bac Lieu - Ca Mau rivers, ensuring traffic for 1,000 tons of vehicles
Communication:
Fully meet postal and telecommunications services in the industrial park.
74
Picture:
75
[- This Page is intentionally left blank -]
76
BAC NINH
77
INVESTMENT ENVIRONMENT IN BAC NINH
USD/VND
23.510
GENERAL INFORMATION
▪ Area: 822,7 km2
Area, Population
▪ Population: 1.488.250 people
▪ Located in the Northern key economic region, Ha Noi capital region as well as two major economic
corridors: Con Minh – Lao Cai – Ha Noi – Hai Phong – Quang Ninh and Nanning– Lang Son – Ha
Noi – Hai Phong – Quang Ninh.
Geographical Location
▪ It is adjacent to and 30km away from Ha Noi capital, 32km from Noi Bai International Airport,
110km from Hai Phong Seaport.
▪ Important routes running through such as 1A, 18, 38 national highways, Trans-Vietnam railway to
China; connecting the province with economic, cultural and commercial centers of the North.
Adjacent provinces
▪ Bac Giang Province to the north, Hanoi Capital City to the west and southwest, Hai Duong
Province to the east, Hung Yen Province to the south.
2022 statistics:
▪ GRDP: 133,609 billion VND (at constant 2010 prices)
▪ GRDP growth: 7.39%
▪ GRDP per capita: 6,696 USD
GRDP
▪ Economic Structure:
- Industry and Construction: 76.5%
- Service: 17.2%
- Agriculture, Forestry and Fishery: 2.5%
- Product Tax: 3.8%
2022 statistic:
▪ Industry - Construction growth: 6.49%
▪ Agriculture, forestry and fishery growth: 0.52%
▪ Service growth: 13.67%
Industry growth
▪ Product Tax: 2.83%
▪ Import – Export:
- Export turnover: 45.1 billion USD
- Import turnover: 38.5 billion USD
PCI
▪ Score: 69.08 – ranked 7h out of 63 cities and provinces in Vietnam (2022)
SOCIAL INFRASTRUCTURE
Transportation
▪ Roadway: National Road 1A (route Hanoi – Bac Ninh – Lang Son), National Road 18 (route Noi
Bai Airport – Bac Ninh – Ha Long), National Road 38 (route Bac Ninh – Hai Duong – Hai Phong),
78
National Road 1B new (Lang Son – Thai Nguyen), National Road 17 (Hanoi- Thai Nguyen). Bridge
Phat Tich- Dai Dong with a total length of 1,518 m is under construction.
▪ Railway: Railway route Hanoi - Bac Ninh – Ha Long; Railway route Hanoi- Dong Dang
▪ Waterway: 06 major ports: Dap Cau port; Dap Cau Glass Factory and floating glass Port ; Duc
Long Port (both river ports and dry ports); Ben Ho port, Kenh Vang Port, Tri Phương Port.
▪ Airway: 30 km from Noi Bai International Airport by National Road 18.
Electricity
▪ Supplied from the national power network; 9% annual growth.
▪ Quality underground water is mainly used in water supply system
▪ In urban area: 08 water stations, in which 06 stations in operation with total capacity of 33,000
m3/day
Water
▪ In rural area: 39 clean water supply construction in operation with 240,000 m3/day-night capacity
▪ In industrial zones, industrial clusters: 04 water stations in operation with total capacity of 24,400
m3/day
Education
▪ 6 Universities, 8 Colleges and 58 schools and vocational training centers in the province.
Medicare
▪ 20 public and private hospitals
INVESTMENT CONDITION
Human resource
▪ Labor force of the province is quite young and the trained labor force which accounts for 77%
Education level
▪ Trained labor rate: 34.1%
▪ The minimum salary for the province is applied as follows (see appendix for detail amount):
Salary
- Area II: including: Bac Ninh City, Tu Son town, Que Vo, Tien Du, Yen Phong, Thuan Thanh, Gia
Binh, Luong Tai District
▪ The lowest wage for trained labor (including those trained by the enterprises) must be at least 7%
higher than the above referenced basic salary
▪ Incentives according to government regulations:
Exemption and reduction for land and water rent fee
Investment incentives
- Preferential tax rates and exemption period, reduction for corporate income tax.
Import tax exemption
▪ Prioritized Projects:
- High-tech industry; Supporting industry, modern, environmentally friendly (semiconductor
industry, chip manufacturing,…)
Fields Attracting
Investment
- Hi-tech agriculture; clean agriculture;
- New occupations on the industrial platform 4.0;
- Service trades having advantages and high added value: Health care, education and training,
international financial services, logistics and other modern services.
79
- Investment in construction of infrastructure works, development of urban areas, high-class service
and trade complexes, high-class eco-resort,…
Map
Bac Ninh Department of Planning and Investment
Address: No 6 Ly Thai To, Suoi Hoa Ward, Bac Ninh
Contact
Tel: (84-241) 3 824 902
Fax: (84-241) 3 825 777
E-mail: skhdt@bacninh.gov.vn
80
LIST OF INDUSTRIAL ZONES IN BAC NINH
No
Industrial zone Name
Total Area (ha)
Occupancy Rate
Status
1
Que Vo I Industrial Zone
611
100%
In operation
2
Que Vo II Industrial Zone – Phase 1
269.48
70%
In operation
Que Vo II Industrial Zone – Phase 2
277
0%
Licensed
3
Que Vo III Industrial Zone
303.8
55%
In operation
4
Tien Son Industrial Zone
350
100%
In operation
5
Yen Phong Industrial Zone – Phase 1
344
100%
In operation
Yen Phong Industrial Zone – Phase 2
314
60%
In operation
Yen Phong II-C Industrial Zone
221
20%
In operation
6
Dai Dong - Hoan Son Industrial Zone
400
In operation
7
VSIP Bac Ninh Industrial Zone
700
Phase I: 100%
Phase II: 0%
100%
VSIP Bac Ninh (Business Hub)
20
0%
In operation
8
VSIP Bac Ninh 2 Industrial Zone
273
0%
Under Construction
9
10
Thuan Thanh I Industrial Zone
Thuan Thanh II Industrial Zone
250
250
0%
100%
Under Construction
In operation
11
Thuan Thanh III Industrial Zone
300
100%
In operation
12
Nam Son Hap Linh Industrial Zone
300
0%
In operation
13
Gia Binh I Industrial Zone
300
100%
Under Construction
14
Gia Binh II Industrial Zone
250
0%
Licensed
15
Hanaka Industrial Zone
74
60%
In operation
16
An Viet – Que Vo 6 Industrial Zone
78,68
0%
applying for
permission
81
In operation
BAC NINH’S LOCATION MAP OF INDUSTRIAL ZONES
82
QUE VO I INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Nam Son and Phuong Lieu commune, Que Vo district, Bac Ninh Province, Vietnam
Investor
KinhBac City Development Holding Corporation
▪ Address: Lot B7, Que Vo Industrial park, Phuong Lieu commune, Que Vo district, Bac Ninh
province, Vietnam.
▪ Tel: (84-222) 3634 034
▪ Website: http://www.kinhbaccity.vn
Contact Person
▪ Tran Thi Huong - Sales & Marketing Deputy Manager - Mobile: +84 - 915-636 139 - Email:
tthuong.kbc@gmail.com
Location
- 06 Km from Bac Ninh City Center
- 35 Km from Noi Bai International Airport
- 110 Km from Hai Phong Seaport
- 03 Km from Highway No.01 and 09 Km from Hanoi – Lang Son (border with China) –
NanNing (China) Railway
Priority Sectors for
Investment
Electronics industry, high-tech industry and supporting industries,
banking, insurance, research and development activities, consulting ...
(Decision No. 293/QĐ-UBND on 12/08/2013)
Restricted Sectors for
Investment
Production of iron, steel, construction materials, paper, chemicals,
textiles and textile products ... ((Decision No. 293/QĐ-UBND on
12/08/2013)
Investment Area
Minimum wage
[Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term
▪ Phase 1: 2002 - 2052
▪ Phase 2: 2007 - 2017
Minimum Lease Area
10,000 m2
Limit for Construction
Height
Permitted Construction
Rate
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Residential Planning regulation (QCXDVN 01: 2008/BXD)
Construction area is not more than 65% of the total leased land lot
Planned area
▪ Total area: 611 ha
▪ Total vacant leasable area: Unavailable
Factory Available for Rent
▪ Total area: 30,000 m2 (4,000-5,000 per factory, expected at the end of 2019)
Operation Status
▪ In operation
Occupancy Rate and
Number of Projects
▪ 100%
▪ 125 Projects
Number of Korean Projects
▪ 46 projects
Lease fee
▪ Land lease fee: 85 USD/m2
▪ Factory lease fee: 3.5 USD/m2/month
▪ Payment:
- Method: Bank Transfer in VND
- Period: 40% after signing In-principle Agreement + 40 % after signing Land Sublease
Contract + 20% after Land Hand-over
Operating fee
▪ Management fee: 0.5 USD/m2/year (excluded VAT)
▪ Electricity fee: According to the Circular by Ministry of Industry and Trade, valid from March
16th, 2015 (excluded VAT) for voltage from 22KV-110KV.
▪ Water fee: 8,700 VND (~0.37 USD) /m3 (excluded VAT)
▪ Wastewater treatment fee: 7,200 VND (~0.3 USD)/m3 (excluded VAT)
83
INFRASTRUCTURE AND FACILITY
Financial institution
BIDV, Vietin Bank, Vietcombank, Agribank
Tax service, State finance
office
6 km from Bac Ninh Tax Office
7 km from Bac Ninh State Treasury Office
Customs Service
2 Km from Customs Agency Que Vo
15 Km from ICD Tien Son
Logistics
2 Km from the nearest Logistic Center: Yusen Logistics
Post office
1 km from Vietnam Post Office
Medicare
4 Km from Bac Ninh General Hospital
Police, public security
500 m from Que Vo Police Station
Universities, training
facilities, etc.
500 m from Viet Nhat College
Recruitment
Kinh Bac will support in recruitment
Worker dormitory
5 Km from the zone
Worker's child education
facility
5 Km from the zone
One-stop service
6 Km from the nearest Facility
Road Width
Main road: 32m, 4 lanes; By Road: 23m, 2 lanes
IT & Tele-communication
Facilities
The telecommunication system complies with international standards and is always available
for communication demand with high data transmission s
Emergency Power
generator
Available
Fire-fighting facility
Available. Water supply system for firefighting is located along each road.
Layout Plan
84
Location Map
Actual View
.
85
LIST OF SOME NOTABLE TENANTS
No.
Company Name
Nationality
Location
1
Kinh Bac Service Joint Stock Company
Vietnam
L3, L4, L7, L8, C3, H16, H17
2
Viet Nhat Joint Stock Company
Vietnam
E6-1
3
Canon Vietnam Company Limited
Japanse
B1, B2
4
Jing Heng Metal Treatment Co., Ltd.
Taiwan
H7-1
5
Nam Viet Hoang Company Limited
Vietnam
C8-2
6
Vinh Loc Trading Company Limited
Vietnam
C8-1
7
Viet Duc Construction Company Limited
Vietnam
C7-1
8
Tid Glass Wall Joint Stock Company
Vietnam
C7-2
9
Keysheen Company
Taiwan
K1, 2, 5, 6
10
Vs Industry Vietnam Joint Stock Company
Malaysia
K4-2D, K4-2E
11
Jebsen & Jessen Packaging Vietnam Company Limited
Singapore
K1, G4-1
12
Funing Precision Component Company Limited
Taiwan
C3
13
Elegant Team Manufacturer Limited Liability Company
Hongkong
I2-03, I2-04
14
Sheng Electric Wire & Cable (Vietnam) Company
Taiwan
D4-2
15
Tenma Vietnam Limited Liability Company
Japanse
E1,
16
Ncc Vietnam Co., Ltd
China
H10
17
Chih Ming Co., Ltd
Taiwan
H3-3
18
Bujeon Vietnam Electronics Co., Ltd
Korea
C-2
19
Sentec Hanoi Co., Ltd
Taiwan
H1, H2, H5, H6
20
Mitac Computer (Vietnam) Limited Liability Company
Taiwan
L1-2-3-5-6-7,
21
Seiyo Vietnam Limited Liability Company
Taiwan
D1
22
Goldsun Vinh Nam Packaging Co., Ltd
Vietnam
H12, T2
23
Liwayway Food Industry Co., Ltd Hanoi
Malaysia
C4-C5
24
Jenway Technology Vn Co., Ltd
Taiwan
H4-2
25
Nssb Steel Service Co., Ltd Hanoi
Japanse
D1
26
Longtech Precision Vietnam Co., Ltd
Taiwan
E1
27
Toyo Ink Compounds Vietnam Co., Ltd
Japanse
G9
28
Yamato Industries Vietnam Co., Ltd
Japanse
E6
29
Vietnam Dragonjet Co., Ltd
Taiwan
D3
30
Mitac Precision Technology Vietnam Co., Ltd
Taiwan
G1-3-4-6-8 và E9-1
31
Henry Hardware Industry Co., Ltd
Taiwan
H7-2
32
Vietnam Teasan Company Limited
Korea
H3-2
33
Mitac Precision (Vietnam) Co., Ltd
Taiwan
G1-3-4-6-8
34
Jang Won Tech Vina Co., Ltd.
Korea
Lô G1
35
Uil Vietnam Company Limited
Korea
F1
36
Sr Hanoi Daedong Co., Ltd
Korea
H-04
37
Yuto Packaging Co., Ltd
China
H-02, H-03, K13, K14, K15
38
Schramm Sscp Hanoi Co., Ltd
Hongkong
I2-1
39
Spica Elastic Vietnam Company Limited
India
I2-01, I2-02
40
Hanam Electricity Vina Co., Ltd
Korea
H2-02
41
Vietnam Enshu Sanko Co., Ltd
Japanse
H4-2
42
Sakura Paint Viet Nam Co., Ltd
Japanse
I4-2
86
43
Topla Vietnam Limited Liability Company.
Japanse
J4
44
Konishi Vietnam Biological Technology Co., Ltd
Japanse
H8 và H9,
45
Hanoi Doo Sung Tech Co., Ltd
Korea
J3
46
Eunsung Electronics Vina Co., Ltd
Korea
K1
47
Bac Ninh Pharmaceutical Joint Stock Company
Vietnam
C1-1
48
Branch Of Shinhan Vina In Bac Ninh Co., Ltd
Korea
C7-1
49
Yestech Vina Co., Ltd
Korea
KT1-C
50
Yoon Il Vietnam Limited Liability Company
Korea
C8-2
51
Goertek VINA CO., LTD
China
52
E Lite Com Company
Korea
K-08, K-09, K16, K2, K3, L2, L3,
L6, L7
K07
53
Mirae Eic Company
Korea
K-06
54
M&C Electronics Vina Co., Ltd
Korea
J1
55
Aac Technologies Vietnam Co., Ltd
Singapore
K4-2F, G10, K4-2
56
Sampo Vina Co., Ltd
Korea
B8
57
S-Mac Vina Limited Liability Company
Korea
E8, E7
58
Ethertronics Vina Limited Liability Company
Korea
K-05
59
Vietnam Woojinwtp Limited Liability Company
Korea
K-05-2
60
Sit Vina Limited Liability Company
Korea
K-05-1
61
Vinayama Construction Co., Ltd
Japanse
H4-1
62
Segyung Vina Co., Ltd
Korea
H1
63
Son Duong Packaging Factory
Vietnam
H3-1B
64
Laird Vietnam Co., Ltd
UK
K10
65
Chau Thai Son Packaging Company Limited
Vietnam
C1-3
66
Youngbo Vina Co., Ltd
Korea
G3, G4-2
67
Aq Pacific Company Limited
Korea
H1-01
68
Galtronics Vietnam Co., Ltd
Israel
G-01,
69
Sanchine Company Limited (Vietnam)
China
K-06
70
Sung Il Vina Co., Ltd
Korea
H3
71
Samho Press Vietnam Co., Ltd
Korea
C6-1
72
Daeil Tech Vietnam Co., Ltd
Korea
F4-1
73
Fine Ms Vina Co., Ltd
Korea
G2
74
Sena Tech Co., Ltd
Korea
G12-1+H3-1C
75
Sehyun Vina Co., Ltd
Korea
C1-2
76
Ryong-In Vina Co., Ltd
Korea
K-1-1
77
Samin Vina Limited Liability Company
Korea
C7-1, T-1
78
Jsk Vietnam Co., Ltd
Korea
C6-1
79
Boryeng Company Ltd
Korea
K12
80
Korea
G12-1
81
Hanpad Investment Joint Stock Company - Bac Ninh
Branch
Vietnam Lege Limited Liability Company
Taiwan
G11
83
Vonmax Industrial Vietnam Co., Ltd.
Taiwan
E6
84
Vietnam Hongguang Plastic Co.
China
E3-3
85
Bac Ninh Ace Vina Co., Ltd
Korea
G4-3
86
Technology Co., Ltd Packaging Yuzhan Vietnam
China
H2-01
87
Hanwha Techwin Security Vietnam Co., Ltd
Korea
O-2
88
Jm Tech Vina Co., Ltd
Korea
E3-2
87
89
Mys (Group) Vietnam Company Limited
China
KT1-B,
90
Company Limited Youngwoo Hi-Tech
Korea
KT1-B-1
91
Jeyeyung Vina Co., Ltd
Korea
C2-1
92
Nano Tech Co., Ltd
Korea
J.1
93
Seah Vina Co., Ltd
Korea
O-1
94
Tops Vina Co., Ltd
Korea
O-3
95
Esd Company Ltd
Korea
J.4
96
Vunh Giang Trading Joint Stock Company
Vietnam
J.3
97
Phuc Son Technology Co., Ltd
Japanse
J.2
98
Dit Company Ltd
Korea
N-7
99
Company Limited Lim
Korea
N-7
100
Anyone Vina Co., Ltd
Korea
M
101
Nokwon Co. Ltd
Korea
T-3
88
QUE VO II INDUSTRIAL ZONE
GENERAL INFORMATION
Address
▪ Ngoc Xa Commune, Que Vo District, Bac Ninh Province
Investor
Phase 1: City and IP Development & Investment Corporation (IDICO)
▪ Address: 13th floor, Sudico Building, Me Tri Road, My Dinh 1 Ward, Hanoi
▪ Tel: (84-24) 3 787 7937
Fax: (84-24) 3 734 7162
▪ Email: invest@idicoquevo.com.vn
Phase 2: Nhan Dat Tien Co., Ltd.
Contact Person
Phase 1: Mr. Ho Anh – Investment Manager – 0912 578 589 – hoanh@idicoquevo.com.vn
Location
▪ Land: Located next to the National Road 18 (Noi Bai - Ha Long route), 50km away from Hanoi
Capital
▪ Seaport: 90km from Cai Lan Seaport; 100 km from Hai Phong Seaport
▪ Airport: 50km from Noi Bai International Airport
Investment Area
Priority Sectors for
Investment
Electronics industry, high-tech industry and supporting industries,
banking, insurance, research and development activities, consulting ...
Restricted Sectors for
Investment
Production of iron, steel, construction materials, paper, chemicals,
textiles and textile products ...
Minimum wage
[Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term
▪ Start date: 2007
▪ End date: 2057
Minimum Lease Area
10,000 m2
Limit for Construction
Height
Permitted
Construction Rate
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential
Planning regulation (QCXDVN 01: 2008/BXD)
Planned area
▪ Total area:
- Phase I: 269.48 ha
- Phase II: 277 ha
Factory Available for
Rent
None
Operation Status
▪ Phase I: In operation
▪ Phase II: Licensed
Occupancy Rate and
Number of Projects
Phase I: 70%
Number of Korean
Projects
Over 10 projects
Lease fee
▪ Land lease fee: 87 USD/m2
Operating fee
▪ Management fee: 0.35 USD/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: approximately 0.5 USD/m3
▪ Wastewater treatment fee: 8,000 VND/m3 (~0.35 USD) (include VAT)
▪ Waste treatment fee: According to contract
INFRASTRUCTURE AND FACILITY
Financial institution
Agribank, LienViet Post Bank, Nam Viet Bank
Tax service, State
finance office
18 km from Bac Ninh Tax office
18 km form Bac Ninh Treasury Office
89
Customs Service
30 km from Bac Ninh ICD
Logistics
Inside the zone
Post office
3.2 km from Que Vo Post Office
Medicare
19 km from Bac Ninh General Hospital
Police, public security
Near the zone
Universities, training
facilities
20 km from Kinh Bac University
Recruitment
Supported by IZ developers
Worker dormitory
NA
Worker's child
education facility
NA
One-stop service
10 km from Public Service Center
Road Width
Road Width: 8-15m m, 2 lanes
IT & Telecommunication
Facilities
The telecommunication system complies with international standards and is always available for
communication demand with high data transmission. Provider: FPT, VNPT and Viettel
Emergency Power
generator
NA
Fire-fighting facility
Available. Water supply system for firefighting is located along each road.
Layout Plan
Location Map
90
Actual View
91
LIST OF SOME NOTABLE TENANTS
No
Company Name
1
Chien Thang Industry Co., Ltd.
Vietnam
Metal scrap recycling
2
E-Zone Tech Vina Co., Ltd
Korea
Electronic equipment maintenance
3
Bfs Construction And Trading Co., Ltd.
Vietnam
Service industry
4
Bnc Tiles Jsc
Vietnam
Building material manufacturing
5
Dai Tan Co., Ltd
Vietnam
Logistics
6
Vietnam
Pharmaceutical
Korea
3D glass production
8
Dkpharma Pharmaceutical Factory - Bac
Ninh Branch Duoc Khoa Pharmaceutical
Join Stock Company
Dnr Engineering Vina Limited Liability
Company
Duong Hong Import Export Co., Ltd
Vietnam
packing
9
Hancorp Equipment And Material.,Jsc
Vietnam
Building material manufacturing
10
Highsun Optoelectronic Co., Ltd
Korea
Plastic products manufacturing
11
Innotek Joint Stock Company
Vietnam
Motorcycle parts manufacturing
12
Singapore
Metal processing
Vietnam
Motorcycle parts manufacturing
14
Interplex Precision Technology (Hanoi)
Co., Ltd
Jat Autoparts And Industrial Equipments
Manufacturing Joint Stock Company
Jmi Viet Nam Co., Ltd
Korea
Plastic tray manufacture
15
Jmt Vn Co., Ltd
Korea
Electronic component manufacturing
16
Jungbu Eschem Vietnam Co., Ltd
Korea
Mobile phone parts manufacturing
17
Jy Tech Co., Ltd
Korea
Speaker manufacture
18
Kukje Jewelry Vina Co., Ltd
Korea
Jewelry production
19
Lixco Jsc – Bac Ninh Brach
Vietnam
Detergent production
20
Osaka Vina.,Jsc
Vietnam
packing
21
Pyung Ahn Vina (One Member) Co., Ltd
Korea
Electronic component manufacturing
22
St Vina Co., Ltd
Korea
Electronic component manufacturing
23
Sunway Precision Steel Corporation
Vietnam
Steel production
24
Tatra Pharmaceutical Co., Ltd
Vietnam
Pharmaceutical
7
13
Nationality
92
Bussiness line
QUE VO III INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Viet Hung Commune, Que Vo District, Bac Ninh Province
Investor
EIP Investment Development JSC – TNI Holdings Viet Nam
▪ Address: Viet Hung Commune, Que Vo District, Bac Ninh Province
▪ Email: sale@tniholdings.vn
Contact Person
Mr. Huan – Sales Executive – Mobile: (84) 989 768 586 –huannm2@tniholdings.vn
/huan792003@gmail.com
Location
▪ Located next to the National Road 18 (Noi Bai - Ha Long route)
▪ Distance to Hanoi city center: 45 km
▪ Distance to Noi Bai International Airport: 40 km
▪ Distance to Hai Phong port: 80 km
▪ Distance to Cai Lan – Quang Ninh deep seaport: 105 km
▪ Distance to China border checkpoint: 120 km
Priority Sectors for
Investment
Electronics industry, high▪tech industry and supporting
industries, banking, insurance, research and development
activities, consulting ...
Restricted Sectors for
Investment
Production of iron, steel, construction materials, paper,
chemicals, textiles and textile products ...
Investment Area
Minimum wage
[Area 2] According to Decree 90/2019/NĐ▪CP dated 15th November 2019
Lease term
▪ Start date: 2016
▪ End date: 2066
Minimum Lease Area
10,000 m2
Limit for Construction Height
Permitted Construction Rate
1-2 floors for the factory, 1-4 floors for office, maximum height of each one is 4 meters.
Entire works of the construction “footprints” is not exceed 65% of the total area of the plot.
Planned area
▪ Total area: 303.8 ha
▪ Total vacant leasable area: 120 ha
Factory Available for Rent
None
Operation Status
▪ In operation
Occupancy Rate and Number of
Projects
Occupancy Rate: 55%
Number of Korean Projects
10
Lease fee
▪ Land lease fee: 100 USD/m2/whole project life
Operating fee
▪ Management fee: 0.5 USD/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 11,500 VND (~ 0.5 USD)/m3
▪ Wastewater treatment fee: 0.6 USD/m3 for C level, 0.45 USD/m3 for B level, 0.18 USD/
m3 for A level
INFRASTRUCTURE AND FACILITY
Financial institution
Maritime Bank, Vietcombank - Hưng Yên branch, ACB, Agribank, Techcombank
Tax service, State finance office
13 km from Bac Ninh Tax Department
Customs Service
13 km from Bac Ninh Customs Department
Logistics
N/A
93
Post office
16 km from Bac Ninh Post Office
Medicare
16 km from Bac Ninh General Hospital
Police, public security
24/7 security service.
Universities, training facilities,
etc.
16.2 km from Kinh Bac University
Recruitment
Support from IZ developers and Bac Ninh IZ Management Board
Worker dormitory
Worker Dormitory project available and demanding from tenants
Worker's child education facility
NA
One-stop service
Inside the zone
Road Width
Main road 60 m, 36 m and branch road 22 m in width
IT & Tele-communication
Facilities
Telecommunication systems and international standards are always ready to meet the
communication needs
Emergency Power generator
Available in the zone
Fire-fighting facility
The water supply network for firefighting is designed in conjunction with the potable water
supply network, which is located along the roads. The distance among fire hydrants is 120
m -150 m with a diameter of D125 mm.
Layout Plan
Location Map
94
Actual View
LIST OF SOME NOTABLE TENANTS
No
Company Name
Nationality
Business Line
1
Tay Dong Co., Ltd
Vietnam
construction company
2
HS Chemical Co., Ltd
Korea
Chemical production
3
Plastics & People Co., Ltd
Korea
Plastic manufacturing
4
Cargill Co., Ltd
USA
Livestock feed production
95
TIEN SON INDUSTRIAL ZONE
GENERAL INFORMATION
Address
▪ Tu Son District, Bac Ninh Province
Investor
Viglacera Corporation JSC
▪ Address: Viglacera Tower, No.1 Thang Long Boulevard, Me Tri, Nam Tu Liem, Hanoi, Vietnam
▪ Tel: (84-24) 3553 6660
▪ Fax: (84-24) 3553 6671
▪ Website: http://www.viglacera.com.vn/
Contact Person
▪ Mr. Dang The Nam - Deputy Manager of Business Department –
(84) 903 405 099 - namdt.vir@viglaceraland.vn
▪ Ms. Nguyen Ha Phuong – Senior Marketing Executive – (84) 97 344 8994 phuongnh.vir@viglaceraland.vn
Location
▪ Land: Located between the existing National Road 1A and the new National Road 1A, 22 km from
Hanoi Capital
▪ Seaport: 120 km from Cai lan Sea port, 110 km from hai Phong Sea port
▪ Airport: 30 km from Noi Bai International Airport
Priority Sectors for
Investment
Electronics, Mechanics, High-Tech, Automotive industry
Investment Area
Restricted Sectors for
Investment
Heavy-Industry, Textile & dying, Polluting industries
Minimum wage
[Area 2] According to Decree 157/2018/ND-CP dated 16th November 2018
Lease term
▪ End date: 2049~2056
Minimum Lease Area
10,000 m2
Planned area
▪ Total area: 350 ha
Factory Available for
Rent
NA
Operation Status
▪ Active
Occupancy
Rate/Number of
Projects
▪ 100%
▪ 126 projects
Number of Korean
Projects
43 projects
Lease fee
Land lease fee: Depend on location and leasing land plot area.
Operating fee
▪ Management fee: 0.5 USD/m2/year
▪ Infrastructure maintenance fee: 0.5 USD/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 8,250 VND (~0.37 USD)/m3
▪ Wastewater treatment fee: 6,500 VND (~0.29 USD)/m3
INFRASTRUCTURE AND FACILITY
Financial institution
Vietcombank, Vietinbank (inside the zone)
Tax service, State
finance office
12 Km from Yen Phong District Tax Office and Treasury Department
Customs Service
Inside the Industrial Zone
Logistics
Inside the Industrial Zone
96
Post office
Inside the Industrial Zone
Medicare
7 km from Bac Ninh General Hospital
Police, public security
Inside the Industrial Zone
Universities, training
facilities, etc.
4.5 Km from Viglacera Vocational College
Recruitment
NA
Worker dormitory
Inside the Industrial Zone
Worker's child
education facility
Inside the Industrial Zone
One-stop service
NA
Road Width
Main road: 71 m
IT & Telecommunication
Facilities of industrial
park
Telecommunication systems and international standards are always ready to meet the communication
needs
Emergency Power
generator
Available
Fire-fighting facility
Available in the zone
Layout Plan
Location Map
97
Actual View
98
LIST OF TENANTS
No.
Company
Nationality
Business
1
Ngan Son Joint Stock Co.
Vietnam
Processing tobacco materials
2
Vietnam Tobacco Corp.
Vietnam
Tobacco production
3
China
4
Vietnam EH Agriculture and Animal Feed Co.
Ltd.
Thang Long Plastics Joint Stock Co.
Vietnam
Producing animal feed, admixture to animal feed,
mixed animal feed
Producing template, model and plastic products
5
A Chau Beer Company
Vietnam
Beer production
6
TID Door World Joint Stock Co.
Vietnam
Production of various doors
7
Vietnam
8
Thanh Tung Co. Ltd. (Vina Wrapping and
Bottle Cap)
TRENDSETTERS FASHIONS CO. LTD.
Singapore
Construction of warehouse, showroom, trading
services
Producing garment for export
9
Vietnam Atlantic Welding Rod Co. Ltd.
China
Producing and trading welding rod
10
Thuan Thanh Services and Trading Production
Co. Ltd.
Vietnam
11
Vietnam
12
VISSAN Animal Husbandary Products
Industry Co.
Asia Food Technology Co. Ltd.
Warehouse for rent, business agent of glass and
building material, processing after-glass goods,
window aluminium frame
Producing, trading various kinds of frozen food
Vietnam
Food processing
13
Tien Hung Co. Ltd.
Vietnam
14
Vinafco
Vietnam
Producing wrapping, wheat flour, non-alcohol soft
drinks
Agent of international transportation, logistics
Vietnam
15
Warhouse, goods yard, container yard, bonded
warhouse for rent
Business in currencies
16
Vietinbank – Tien Son IZ Branch – Bac Ninh
Vietnam
17
Institute of Beverage
Vietnam
18
Hanoi Construction and Investment Co. Ltd.
Vietnam
19
Thanh Nam Glass Co.
Vietnam
20
Asean Tire Co. Ltd.
Thailand
21
Hoang Hac J.S.C.
Vietnam
22
Tien Dat Co. Ltd.
Vietnam
23
Duc Viet Trading and Production Co.
Vietnam
Production of inner tube, tire for motorbike,
bycicle and other products from rubber
Processing, producing machine details, steel
structure and technological equipments
Producing, processing and trading metal,
comsumption goods
Production of CDR, VCD, original disks
24
Dat Viet Industrial Production and Trading
J.S.C.
LB Vocational Training, Teaching
Equipments Co. Ltd.
Thai Duong Trading and Advertising Co.
(Tisu Paper Co. Ltd.)
TCT Tourism and Construction Trading Co.
Ltd.
Vietnam
Processing mechanics, electricity, electronics
Vietnam
Fine arts for export and equipments for teaching,
vocational training
Production of printing products and the
equivalents
Production of interior woodwork in accordance
with investment license issued by competent
authority
28
Pacific Ocean J.S.C. (Thaicom)
Vietnam
29
Tran Hung Dao Mechanics Co.
Vietnam
30
Tuong Cat Trading Co. Ltd. (Thai Duong
Printing Equipment Co. Ltd.)
Bac Ninh Province Post Office
Vietnam
Producing and trading machines, appliances and
mechanic products
Producing and trading printing products
Vietnam
Supply of post and telecom services
Niem Tin Viet Technology Development and
Investment J.S.C.
Vietnam
Exploiting logistics, producing high quality
panels, industrial arch, products of preservation
technology, metallic roofing, covering and the
equivalents.
25
26
27
31
32
Vietnam
Vietnam
99
Producing, processing and trading agricultural and
forestry products
Production of buidling materials and equivalent
products
Production of safety glass
33
K.Long Co. Ltd.
Vietnam
34
3H Vinacom Co. Ltd.
Korea
Garment, embroidery and industrial auxilary
materials consumed in domestic market and for
export
Producing cover of electrical cable
35
Vietnam
Producing veterinary medicine
36
Huphavet Diem Uyen Veterinary Medicine
Production and Trading Co. Ltd.
MTS Vietnam Co. Ltd.
Italia
37
Dong Anh Pressure Equipment J.S.C.
Vietnam
38
Hau Giang Pharmacy J.S.C
Vietnam
Production, assemble for consumption and
distribution of water heater products
Producing, trading mechanic equipments, boiler
pressure, gas tank, steel structure, refrigeration
Producing pharmaceutical products
39
Vietnam
Mechanic products
40
Northern Vietnam Dong Yun Plate Making
Co. Ltd.
Vinh Thai Co. Ltd.
Vietnam
41
Yen Vien Mechanics Factory Co. Ltd.
Vietnam
Producing, trading electrical fans, electronics,
household electricity and other products
Producing steel structure
42
Vellpharm Vietnam Pharmacy Co. Ltd.
China
Producing new medicine for human
43
3C Industry Co.
Vietnam
Producing, trading electronic appliances
44
Liksin Co.
Vietnam
Producing compound wrapping
45
Malt Sugar Co. Ltd.
Vietnam
46
AQA Industrial Gantry Production Co. Ltd.
Vietnam
47
Ngoc Lan Trading and Production Co. Ltd.
Vietnam
48
VINAMILK
Vietnam
49
Kobelco Vietnam Co., Ltd.
Japan
Processing, trading beer malt to provide materials
for beer factories
Erection of double girder gantry, single girder
gantry, revolving gantry, chain block crane, winch
and gantry appliances
Producing and assembling motorbike spare parts
to consume in domestic market and for export
Producing milk products, beverage and processing
products
Repair and guarantee construction equipments
50
TISU paper Co., Ltd.
Taiwan
Process paper
51
Vietnam
Supply financial service
52
Bank for Investment and Development – Bac
Ninh branch
Mai Phuong Co., Ltd.
Vietnam
53
Viet Thang Co., Ltd.
Vietnam
54
Minh Xuan Joint Stock Company
Vietnam
Produce thin plastic film for consumption in
domestic market and export
Process mechanic, assemble and warehouse
finished products
Produce oil, resin and polymer glue
55
Dainichi Color Vietnam Co., Ltd
Japan
56
Thien Thanh Cable Co., Ltd
Vietnam
Produce and process chromatic grain and blended
chromatic plastic grain for export
Produce telecommunication cable
57
Bao Viet Company – Bac Ninh branch
Vietnam
Supply insurance service
58
Ha Thong joint stock company
Vietnam
59
Nissin Vietnam electricity Co., Ltd.
Japan
Process mechanic and manufacture pressure
equipments
Manufacture electrical products
60
Leadertek precise mechanic Co., Ltd
Taiwan
Manufacture precise mechanical products
61
Rang Dong Plastic Joint Stock Company
Vietnam
Produce tole, plastic boards and similar products
62
UHM Vietnam Co., Ltd.
Thailand
63
Japan
64
Hanel export-import and manufacturing joint
stock company
Ngai Mee Vietnam package Co., Ltd.
Manufacture water meters and accessories, tube
and pipe fittings, valves, equipment, tools and
other products related to water
Process and assemble electronic components
65
Anh Phuong Co., Ltd.
Vietnam
66
Fujikasui environmental technique and energy
Co., Ltd.
Postal Materials Joint Stock Company
Japan
67
Singapore
Vietnam
100
Produce package and plastic beads and print color
labels on package
Building concrete mixing plant
Produce products for treating waste water and
environmental pollution
Manufacture telecommunication cables and
similar products
68
Rishi Vietnam Co., Ltd.
China
Design, manufacture and repair molds
with high accuracy and produce high-grade plastic
69
Vietnam
Produce beer and soft drink
71
Viet Ha beer and soft drink joint stock
company
Viglacera Mechanical execution company
Vietnam
Construction works
72
Huawei - TST Vietnam Joint Stock Company
Vietnam
Produce telecommunication equipments
73
Armstrong Weston Vietnam Co., Ltd
Japan
74
Shihen Vietnam Co., ltd.
Japan
75
Tin Thanh Co., Ltd.
Vietnam
Produce components cut by molds including name
sign, marks, labels printed with silk techniques to
sell to other export-processing enterprises in
Vietnam and to export
Manufacture, fabricate and assemble electric and
electronic machinery, equipment and components
Produce packages and similar products
76
Indo-Trans delivery and logistics joint venture
company
US
77
Kinyosha Co., Ltd.
Japan
78
Lili of France joint venture company
Vietnam
79
Sara VNPC Computer Manufacturing Joint
Stock Company
Tien Quoc Co., Ltd.
Vietnam
Trong Thanh trade and manufacturing Co.,
Ltd.
Vietnam Industrial Gas Joint Stock Company
Vietnam
Produce pharmaceutical and functional food,
cosmetics, medicinal materials
Manufacture and assemble computers and similar
products
Produce electric equipments, components for
motorbike
Produce plastic grain and similar products
Vietnam
Produce industrial gas
Truong Hong glass technology development
Joint Stock company
Vietnam Coffee Corporation
Vietnam
Japan
86
Sumitomo Vietnam Electric Interconnect
products Co., ltd.
THK Manufacturing Vietnam Co., Ltd.
87
Bac Ky Investment Joint Stock Company
Vietnam
88
Kingmo New Materials Vietnam
China
89
AGRIBANK – Bac Ninh branch
Vietnam
90
An Viet Mechanic Joint Stock Company
Vietnam
91
Vietnam
92
Phuc Lam trade development joint stock
company
ACECOOK Vietnam Joint Stock Company
Produce and process safe glass and similar
products
Process coffee, nutritional flour, agricultural
products and foodstuff, warehouse and similar
occupations
Produce and trade electronic parts including
bearing roller, fixed film roller.
`Produce, process, assemble and trade equipments
of sliding rails
Build factory, warehouse and supply logistic
service
Produce and trade metal sheet and molybdenum
metal products
Setting up office of Agribank in Tien Son
Industrial park - Bac Ninh province
Produce, process and complete steel structures for
power sector and transportation sector
Produce nutritious food and functional food
Japan
Produce and process food
93
Tan Tien plastic package joint stock company
Vietnam
Produce complex film package
94
Hai Thien trade and manufacturing Co., ltd.
Vietnam
Produce plastic sandals
95
Vinabima Tien Son construction machine joint
stock company
Vietnam
96
Joyo Mark Vietnam Co., Ltd.
Japan
97
ABB Co., Ltd.
Switzerland
Produce, assemble and trade equipments for
cement concrete mixer plant and construction
equipments
Manufacture and trade all kinds of labels, guide
stamps and other printed materials used to attach
to other products
1. Manufacture products for measuring, testing,
direction and controlling
2. Manufacture motors, generators, electrical
transformers, distribution equipment and electrical
control
70
80
81
82
83
84
85
Vietnam
Vietnam
Japan
101
Delivery services (not including shipping agency
services, maritime towage services and inland
transport services by sea), services of customs
declaration, warehousing and logistics services ,
reverse logistics, retail store services
Manufacture rubber rollers and similar products
3. Manufacture electrical wiring devices
4. Produce components and high voltage
equipment, medium-and low-voltage and other
electrical equipment
5. Produce ball, gears, gearboxes, parts motion
control and communication
6. Design, install, repair, maintenance and
Supply service of supermarket and restaurants for
the industrial park
Produce and process all kinds of inkjet printers,
components, semi-finished products for inkjet
printer, detailed parts for electronic products, all
kinds of laser printers, semi-finished components
for laser laser
Produce PU roofing, painted metal and welding
materials
Produce and process finished products for treating
water, waste water and environmental pollution
Produce crane, machinery and equipment for the
mill line and recycling line
Produce instant noodle, wine and soft drink
98
Tien Du Construction Company
Vietnam
99
Canon Co., Ltd.
Japan
100
Gia Long Co., Ltd.
Vietnam
101
Duc Giang Industrial chemical Co., Ltd
Vietnam
102
Keosan Vina Mechanical Co., Ltd.
Korea
103
Ngoc Viet service and trade Co., Ltd.
Vietnam
104
Vietnam Parkerizing Hanoi Co., Ltd
Japan
105
Dai Phat Joint stock company
Vietnam
106
COTEC construction joint stock company
Vietnam
107
Hawee electromechanic joint stock company
Vietnam
108
Thanh Trang Private Enterprise
Vietnam
109
Khanh Hoa Co., Ltd.
Vietnam
110
Mechanical product export-import state owned
one member company limited
Vietnam
111
Phi Kha trade in service and manufacturing
Co., Ltd.
Vietnam
112
Minh Vien Co., Ltd
Vietnam
Manufacture and trade equipments, products
related to water
Process metal ware, metal roofing and similar
products
Produce tightening components such as bolts,
nuts, threaded rods, washers, zinc coated metals
and similar products
Manufacture and assemble aluminum glass and
aluminum coating line. Purchase construction
materials, aluminum and glass building, glass art,
interior decoration materials, plaster ceiling.
Manufacture aluminum doors, interior decoration
materials. Process engineering products.
Produce functional food and tea
113
Kosung Joint stock company
Vietnam
Produce electrical lines and cables
114
Anh Duc trade joint stock company
Vietnam
Assemble electronic
115
Phuoc An Co., Ltd.
Vietnam
Produce agricultural food and drink
116
Akebono Kansei Vietnam Co., Ltd
Japan
117
Seojin System Vina Co., Ltd
Korea
118
Vietnam
119
Tue Tinh Pharmaceutical Economic –
Technical Secondary School
Ariston Thermo Vietnam Co., Ltd
Produce, manufacture and assemble the plastic
parts and products
Produce, assemble, fabricate, galvanize and coat
all types of aluminum molds
Pharmaceutical training
120
Taixin Printing Vina Co., Ltd
Korea
Produce water heater and other interior products
for bathroom
Produce and print packages
121
Nam Phuong V.N Co., Ltd
Vietnam
Produce food
122
Curious Seiki
Japan
Produce mechanic parts
123
Tomoe Shokai
Japan
Produce medical equipments
Italia
102
Produce and trade materials for surface treatment
of metal and corrosion, implement design service,
install machinery, spare parts and related technical
consulting service; use products to handle the
metal parts
Produce diapers, tampons, wet paper towel or
nonwovens
Manufacture and trade mechanical equipments
and maintain buildings, warehouses and similar
products
Manufacture electrical and industrial equipments
124
Sai Gon Ha Noi Petroleum Co., Ltd.
Vietnam
Produce Gas oil
125
An Phuc Co., Ltd.
Vietnam
Construct Gas station and provide other services
126
Kinh Bac Star
Vietnam
Construct Gas station and provide other services
103
YEN PHONG INDUSTRIAL ZONE (PHASE I, II)
GENERAL INFORMATION
Address
Yen Phong District, Bac Ninh Province, Vietnam
Investor
Viglacera Corporation JSC
▪ Address: Viglacera Tower, No.1 Thang Long Boulevard, Me Tri, Nam Tu Liem, Hanoi, Vietnam
▪ Tel: (84-24) 35536688
▪ Fax: (84-24) 35537666
▪ Website: http://www.viglacera.com.vn/ www.viglaceraip.com
Contact Person
▪ Mr. Dang The Nam – Business Development Manager –
Mobile: (84) 903 405 099 - Email: namdt.vir@viglaceraland.vn
▪ Ms. Nguyen Ha Phuong – Senior Marketing Executive –
Mobile: +84 97 344 8994 - Email: phuongnh.vir@viglaceraland.vn
Location
Yen Phong IP is located next to National Highway No.18 (Noi Bai - Ha Long Highway) from Hanoi to
Quang Ninh
- To Noi Bai International Airport: 22 km
- To Hanoi city: 35 km
- To Hai Phong Seaport: 110 km
Priority Sectors for Investment
Electronics, powers industry, high-techs, material for
Investment Area
Restricted Sectors for
Investment
construction and mechanics, pharmaceuticals, foodstuffs, light industry,
consumer goods, etc.
Minimum wage
[Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term
Until 2066
Minimum Lease
Area
10,000 m2
Planned area
Total area: 658 ha
- Phase 1: 344 ha
- Phase 2: 314 ha
Factory Available
for Rent
Only 2 factories left – Unit size: 5,940 m2/unit
Operation Status
Active
Occupancy Rate
& Number of
projects
▪ Phase 1: 100%
▪ Phase 2: 60% - 43 projects
Number of
Korean Projects
47
Lease fee
▪ Land lease fee: 125 USD/m2/whole project life (VAT excluded)
▪ Factory lease fee: 4 USD/m2/month (VAT excluded)
Operating fee
▪ Management fee: 0.9 USD/m2/year
▪ Electricity fee:
(1) - Normal hours: 1,555 VND/Kwh (equivalent to 0.067 USD/Kwh)
(From Monday to Saturday: 4h - 9h30’, 11h30’ - 17h and 20h - 22h; Sunday: 4h - 22h)
(2) - Night hours: 1,007 VND/Kwh (equivalent to 0.04 USD/Kwh)
(Everyday: 22h - 4h)
(3) - Rush hours: 2,871 VND/Kwh (equivalent to 0.123 USD/Kwh)
(From Monday to Saturday: 9h30’ - 11h30’ and 17h - 20h/Not Sunday)
▪ Water fee: 9,200 VND/m3 (equivalent 0.4 USD/m3) excluded VAT - monthly payment.
▪ Wastewater treatment fee: 6,500 VND/m3 excluded VAT (equivalent 0.309 USD/m3) - monthly
payment. The quantity is defined by 80% the amount of water supply.
INFRASTRUCTURE AND FACILITY
104
Financial
institution
VIETINBANK, VIETCOMBANK, BIDV
Tax service, State
finance office
12 Km from Yen Phong District Tax Office
Customs Service
Bac Ninh Custom Office is located in the management center of the IP. All the sealed procedures and
claims are carried out timely in enterprises of the IP.
Logistics
Inside the Industrial Zone
Post office
3 Km, inside Yen Phong Industrial Park – 1st phase
Medicare
Bac Ninh Province Hospital is 10 km from the IP.
There is a polyclinic in Yen Phong IP
Police, public
security
Police station is inside the IP.
Universities,
training facilities,
etc.
Viglacera Vocational college in Yen Phong Urban area trains 6,000 workers and labors yearly for
enterprises in the IP.
Recruitment
Viglacera will support in recruitment
Worker dormitory
Yen Phong Urban Area (51 ha) and Yen Phong Dormitories for workers (20 ha) ensure
houses,dormitories, apartments for workers in the IP.
Worker's child
education facility
N/A
One-stop service
N/A
Road Width
N/A
IT & Telecommunication
Facilities of
industrial park
The telecommunication system complies with international standards and is always available for
commnunication demand with high data transmission speed.
Emergency Power
generator
N/A
Fire-fighting
facility
Inside the Industrial Zone
Layout Plan
105
Location Map
Actual View
LIST OF SOME NOTABLE TENANTS
No.
Company
Nationality
Business
1
Young Jin Vina Co., Ltd
Korea
2
Samho Gunyoung Vina Co., Ltd
Korea
Manufacturing materials made of
plastic (phone components)
Manufacturing machinery
3
Atlantic Welding Company
China
Manufacturing welding rod
4
DIC Vina Co., Ltd
Korea
5
Thai Hoa Co., Ltd
China
Manufacturing and processing the
raw materials for the production of
flexible electronic circuit board
Formalin glue
6
AK Investment and Development Co., Ltd
Vietnam
7
Hanpo Vina
Vietnam
106
Producing wooden pallets, wooden
packaging
Producing plastic and metal for
supporting industry
8
Seil Ens Vietnam Co., Ltd
Korea
Machining
9
Dae Sun Co., Ltd
Korea
Refrigeration system
10
Vietnam
11
Aermec Vietnam Manufacturing and Trading Joint
Stock Company
LogisValley Co., Ltd
Air conditioner and clean room
equipment
Logistics
12
Geo Nation Co., Ltd
Korea
13
Shinhan Elevator Company
Korea
Surface treatment of metalic
component
Elevator
14
Alpha Food Joint Stock Company
Vietnam
Food
15
Thien Viet Technology Joint Stock Company
Vietnam
Mechanical
16
LogisValley Co., Ltd
Vietnam
Logistics
17
Cty Xây Dựng Tiên Du (TNHH)
Vietnam
18
Yulay Tech Vina Co., ltd.
Korea
19
Bumchun Precision Vietnam Co., Ltd.
Korea
20
Orion Vina Co., Ltd.
Korea
Manufacturing the mobile phone
cover
Manufacturing the mental parts of
headphones
Food and Cakes Products
21
SamSung Electronics Vietnam Co., Ltd.
Korea
Electronics Products
22
Flexcom Vietnam Co., Ltd.
Korea
Flexible printed circuit board
23
User Interface Technology Vietnam Co., Ltd.
Korea
24
Mobase Vietnam Joint Stock Company
Korea
25
Seoul Metal Vietnam Co., Ltd.
Korea
26
Em Tech Vietnam Co., Ltd.
Korea
27
Intops Vietnam Co., Ltd.
Korea
28
Seowonintech Hanoi Co., Ltd.
Korea
Laser printer components and high
tech electronic spare parts
Mobile phone cases and refrigerator
gasket and high tech electronic spare
parts
Hi-tech precision screws and other
hi-tech electronic parts used for
mobile phones, computers and other
high tech electronic products
Manufacturing and supplying hitech micro SPK & RCV, other audio
equipments and electrical &
electronic parts
Mobile key pads and precision
electronic rubber parts
Mobile key pads
29
P&TEL Vietnam Co., Ltd.
Korea
high-tech products
30
Crucialtec Vina Co., Ltd.
Korea
31
Hanjin Vietnam chemiscal joint stock company
Korea
high-tech optical navigation key for
cell phone
paint products
32
Phat Van Loi Co., Ltd.
Vietnam
Gas station
33
P&Q Vina Technical Co., Ltd.
Korea
Mobile Phone cases
34
Lock & Lock HN Co., Ltd.
Korea
Warehouse
35
M Tech Vietnam Co., Ltd.
Korea
mobile cover
36
Vietnam
hospital service
37
Vietnam Japan hospital construction and
consultant joint stock company
Toyo Brazing Vietnam Co., Ltd.
Japan
38
Sahara Industry Vietnam Co., Ltd.
Japan
39
AK Chemtech Co., Ltd.
Korea
40
Nano Chem Tech Co., Ltd.
Korea
41
Dongsin Tube Glass Co., Ltd.
Korea
42
3H Vina Co., Ltd.
Korea
Processing heat treatment, metal
weld and related auxiliary industries
Plastic moulding processing and
related auxiliary industries
Producing paints, solvents for
phones, cars, computers and plastics
Manufacturing the plastic resin,
antistatic protective film and plastic
bags
Manufacturing glass container for
pharmaceutical injection use
Manufacturing plastic resin PC,
ABS
Korea
107
43
Dae Myung Electronics Co., Ltd.
Korea
44
Fine Tech Vina Technology Co., Ltd.
Korea
45
KCC Vietnam Corporation
Korea
46
Dawon Vina Co., Ltd.
Korea
47
Nguyen Son Co., ltd.
Vietnam
Manufacturing painting plate and
printing of the cover of mobile
phone
Food and Cakes Products
48
Muu Sinh GI Co., Ltd.
Vietnam
Manufacturing furniture
49
Air Liquide Vietnam Co., Ltd.
France
Manufacturing industrial gas
50
Ottogi Vietnam Co., Ltd.
Korea
Food products
51
PV Compressed Natural Gas Distribution JSC
Vietnam
Supply Compressed Natural Gas
52
Halla Investment Co., Ltd.
Vietnam
Build Offices for lease
53
Vinafco HTNS
Korea
Logistics
54
Hanaro
Korea
Logistics
55
Cong Ha Mechanical Company
Vietnam
Mechanical
56
Airport Services Joint Stock Company
Vietnam
Logistics
57
Logistics Aviation Joint Stock Company
Vietnam
Logistics
58
Century Logistics Joint Stock Company
Vietnam
Logistics
59
Unitech Asia Co., Ltd
Korea
60
Tae Sung Eng Vina Co., Ltd
Korea
Chemicals for the water and sewage
treatment industry
Automation display device
108
Manufacturing electronic
components
Manufacturing mold of mobile
phone's cover and mold of mobile
phone's component made from wood
and steel
Manufacturing paint
YEN PHONG II-C INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Yen Phong District, Bac Ninh Province, Vietnam
Investor
Viglacera Corporation JSC
▪ Address: Viglacera Tower, No.1 Thang Long Boulevard, Me Tri, Nam Tu Liem, Hanoi, Vietnam
▪ Tel: (84-24) 3553 6660
▪ Fax: (84-24) 3553 6671
▪ Website: http://www.viglacera.com.vn/
Contact Person
▪ Mr. Dang The Nam – Business Development Manager –
Mobile: (84) 903 405 099 - Email: namdt.vir@viglaceraland.vn
▪ Ms. Nguyen Ha Phuong – Senior Marketing Executive –
Mobile: +84 97 344 8994 - Email: phuongnh.vir@viglaceraland.vn
Location
▪ 2km from Yen Phong IP
▪ Yen Phong II-C IP is located next to National Road No.18 (Noi Bai - Ha Long Highway) and Hanoi Thai Nguyen Highway.
- To Noi Bai International Airport: 20 km
- To Hanoi city: 34 km
- To Hai Phong Seaport: 112 km
Priority Sectors for Investment
Electronics, powers industry, high-techs, material for construction and
Mechanics, pharmaceuticals, foodstuffs, light industry, consumer goods,
etc.
Investment Area
Restricted Sectors for
Investment
Polluted sectors
Minimum wage
[Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term
▪ End date: 2068
Minimum Lease
Area
10,000 m2
Planned area
Total area: 221 ha
Factory Available
for Rent
N/A
Operation Status
In Operation
Occupancy Rate
& Number of
projects
▪ Occupancy Rate: 25%
▪ Number of projects: 6 Projects
Number of
Korean Projects
4 projects
Lease fee
Land lease fee: 125 USD/m2 (VAT excluded)
Operating fee
▪ Management fee: 0.9 USD/m2/year
▪ Electricity fee:
(1) - Normal hours: 1,555 VND/Kwh (equivalent to 0.067 USD/Kwh)
(From Monday to Saturday: 4h - 9h30’, 11h30’ - 17h and 20h - 22h; Sunday: 4h - 22h)
(2) - Night hours: 1,007 VND/Kwh (equivalent to 0.04 USD/Kwh)
(Everyday: 22h - 4h)
(3) - Rush hours: 2,871 VND/Kwh (equivalent to 0.123 USD/Kwh)
(From Monday to Saturday: 9h30’ - 11h30’ and 17h - 20h/Not Sunday)
▪ Water fee: According to regulation of supplier at the using time.
▪ Wastewater treatment fee: According to regulation of supplier at the using time.
INFRASTRUCTURE AND FACILITY
109
Financial
institution
- Shinhan Bank, Vietcom Bank, Vietin Bank, BIDV, Techcom Bank
Tax service, State
finance office
12 Km from Yen Phong District Tax Office
Customs Service
Bac Ninh Customs Office is located in the management center of Yen Phong IP which is 2 km from Yen
Phong II-C IP.
Logistics
Inside the Industrial Zone
Post office
Bac Ninh Post Office has constructed its branch at the center of Yen Phong IP (which is 2 km from Yen
Phong II-C IP) with modern informatics technology system for serving multi-service communication such
as data transfer, Internet, IP telephone and video conference, etc.
Medicare
Bac Ninh Province Hospital is 12 km from the IP
Yen Phong IP Clinic is 2 km from the IP
Police, public
security
Police station is inside the IP
Universities,
training facilities,
etc.
Viglacera Vocational college in Yen Phong Urban area trains 6,000 workers and labors yearly for
enterprises in the IP
Recruitment
Viglacera will support in recruitment
Worker dormitory
Yen Phong Urban Area (51 ha) and Yen Phong Dormitories for workers (20 ha) ensure
houses,dormitories, apartments for workers in the IP.
Worker's child
education facility
3 Km, inside Yen Phong Industrial Zone – 1st phase
One-stop service
N/A
Road Width
N/A
IT & Telecommunication
Facilities of
industrial park
The telecommunication system complies with international standards and is always available for
commnunication demand with high data transmission speed.
Emergency Power
generator
Available
Fire-fighting
facility
Available. Water supply system for firefighting is located along each road.
Layout Plan
110
Location Map
Actual View
111
DAI DONG - HOAN SON INDUSTRIAL ZONE
GENERAL INFORMATION
Address
▪ Dai Dong and Hoan Son Commune, Tien Du District, Bac Ninh Province
Investor
Saigon Telecommunication and Technologies Corporation – Kinh Bac Group
▪ Address: No.11, Tu Xuong, District 3, Ho Chi Minh City
▪ Tel: (84-8) 3 715 9909
Fax: (84-8) 3 932 2302
Contact Person
▪ Ms. Mai Lan – Sales Deputy Manager - (84) 936368613 – mailan.kbc@gmail.com
▪ Ms. Giang – Sales Executive- (84) 906918668
Location
▪ Land: National Road 1A to Lang Son, National Road 18 to Cai Lan seaport – Quang Ninh,
National Road 18 to Noi Bai International Airport. Railway Hanoi – Lang Son – Nan Ning
(China) and Yen Vien- Cai Lan- Dong Xing (China) cross the province., 06km from Hanoi
▪ Seaport: 90 km from Hai Phong Seaport and 130 km from Cai Lan Deepwater seaport
▪ Airport: 30km from Noi Bai International Airport
Investment Area
Priority Sectors for
Investment
Multi-Industry
Restricted Sectors for
Investment
Production of iron, steel, construction materials, paper, chemicals,
textiles and textile products ...
Minimum wage
[Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term
▪ End date: 2057
Minimum Lease Area
10,000 m2
Limit for Construction
Height
Permitted Construction
Rate
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Residential Planning regulation (QCXDVN 01: 2008/BXD)
Planned area
▪ Total area:
Phase I: 272 ha
Phase II: 95.8 ha
Factory Available for Rent
None
Operation Status
▪ In operation
Occupancy Rate and
Number of Projects
▪ Phase I: 100%
▪ Phase II: Under construction, to be in operation in 2020
Number of Korean Projects
93 projects
Lease fee
▪ Land lease fee: 81 – 100 USD/m2/whole project life
▪ Factory Lease fee: 3 – 3.5 USD/m2
Operating fee
▪ Management fee: 0.5 USD/m2/year
▪ Infrastructure maintenance fee: 0.2 USD/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 15,000 VND (~ 0.67 USD)/m3
▪ Wastewater treatment fee: 0.37 USD/m3
INFRASTRUCTURE AND FACILITY
Financial institution
Navibank, Vietinbank, Vietcombank, Agribank
Tax service, State finance
office
14 km from Bac Ninh Tax Department
13 km from Bac Ninh Treasury Dearptment
Customs Service
15 km from Bac Ninh Customs Office
112
Logistics
Inside the Industrial Zone
Post office
3 km from nearest Post office
Medicare
3 km from Tu Son General Hospital
Police, public security
24/7 security service.
Universities, training
facilities, etc.
17 km from Kinh Bac University
Recruitment
Support from IZ developers
Worker dormitory
Worker Dormitory project available and demanding from tenants
Worker's child education
facility
NA
One-stop service
NA
Road Width
Main road 57 m – 4 lanes, 36 m and branch road 23 m – 2 lanes
IT & Tele-communication
Facilities
Telecommunication systems and international standards are always ready to meet the
communication needs
Emergency Power
generator
Available in the zone
Fire-fighting facility
The water supply network for firefighting is designed in conjunction with the potable water
supply network, which is located along the roads. The distance among fire hydrants is 120 m 150 m with a diameter of D125 mm.
Layout Plan
113
Location Map
Actual View
114
LIST OF KOREAN TENANTS – PHASE I
No.
Name of Investors
Investment Capital (million USD)
1
LEE JEPUNG; JEIL TECHNICS CO., LTD
0.50
2
SONG MAL SOO
0.47
3
DO INNOVATION CO., LTD
0.60
4
KIM SIIL
0.50
5
DONGWOO PNT
0.60
6
JU HYUN CO., LTD
0.70
7
MPROTEK CO., LTD
1.00
8
VIETNAM JUNGWOO CO., LTD
1.26
9
PARK SANG HYUN, LIM BYUNG TAE
0.50
10
LOT VACUUM CO., LTD
1.00
11
SEO DONG JOE
0.50
12
DEVELOPMENT PLUS CO., LTD
1.00
13
JEONG MYONGCHUL
1.35
14
LINKELECTRONICS CO., LTD
0.80
15
ILGAK METAL CO., LTD
0.52
16
PARK GISOO
0.50
17
SOLITY CO., LTD
2.00
18
MOON YOUNG SIK
0.50
19
SUNGWON TECHWIN COMPANY
0.70
20
COMPANY YOO RIM; JU YOUNGRIM
0.75
21
NOH, TAESU; LEE, SANG KOO
0.50
22
PARK, CHUN SHIK. RYU, SUNG RYONG
0.55
23
MOON KONGUP
0.51
24
RHO PEEL DAE
0.50
25
SEONG LIMSA CO., LTD; YANG KISUNG; OH HEE HAN
0.60
26
SAMJIHITEK CO., LTD; YANG JINSEOK
1.20
27
1.91
28
CHOI HYOUNG SUCK; ICSN Korea, Inc.; ICSN TECHNOLOGIES; KIM
JUN IL
SIWOOFLEX CO., LTD
29
INNO6 INC
1.00
30
JINHO TECH CO., LTD.
0.28
31
SEOJIN SYSTEM CO., LTD
137.00
32
TEXON CO., LTD
37.90
33
PIAO, HONG LAN; CHOI SANG UNK
0.08
34
HK CO. LTD
0.58
35
KB ADHESIVES CO., LTD
0.50
36
KIM, KYUSUB; LEE, JAESUK
0.51
37
SHINWON METAL CO., LTD
0.50
38
KWON JINHA; BIN CHANWOO
0.50
39
PARK SANG SOO
1.00
40
PS SOFT JOINT STOCK COMPANY; KO SUNG MAN
0.50
41
NC LED CO., LTD
3.80
42
GLOBAL STANDARD TECHNOLOGY KOREA
1.50
115
0.50
43
JEIL TECHNICS CO., LTD
0.50
44
KANG JEABONG; YUN MIJA
5.00
45
ONE SYSTEM JOINT STOCK COMPANY
1.43
46
CO., LTD GSP COMPANY
0.25
47
MS FILTER CO., LTD; KANG JIN SUN
0.24
48
JAEGAL HYUNSEOB; DOO BYOUNG
0.67
49
JANG JAE HYEON
0.70
50
KAIROS COMPANY LIMITED
0.89
51
ANS CO., LTD
0.40
52
SINILL COMPANY LTD
1.00
53
PARK HO YOUNG; KIM JINSEOG; ZHANG GUONAN
0.97
54
SY TECH CO., LTD
1.40
55
COMPANY LIMITED DSR; Ku Ja Kyung
0.70
56
BAEK IN HWAN
2.00
57
Jungang Industry Co., Ltd; Mr. Kim Choong Hwan
0.73
58
Lee Sukki
0.35
59
Han Precision Co., Ltd., Ian Precision Co., Ltd
0.60
60
4.50
61
HANMIFLEXIBLE VINA CO., LTD; HANSUNG P.T.C CO., LTD;
SEWON HITEC
GM CLEAN TECH CO. LTD
62
CHOI BONG KI
0.50
63
SEJIN INDUSTRY CO., LTD
0.50
64
JK Korea Co., Ltd
0.45
65
KIM KYUNG WHAN
0.94
66
OH JIN SEI
0.60
67
PARK EUNJI; OH JEADO
0.50
68
TAESUNG CO., LTD
2.40
69
MMT LTD
0.40
70
PARK GISOO
0.92
71
Mr. Hwang Joon Heon, Mr. Jung Hee Chan, Mr. Kim Jung Kyun
0.50
72
SJSOLUTION COMPANY LTD
1.00
73
Elnoa Co., Ltd
0.42
74
KIM YOUNGKYU
0.22
75
YUIL SYSTEM CO., LTD
0.30
76
MOON YOUNG SIK
0.50
77
ASTEP CO., LTD
1.00
78
Diawintech Co., Ltd
1.10
79
Withsystem Co., Ltd; DEVELOPMENT PLUS CO., LTD
1.40
80
D-Max Co., Ltd
0.30
81
IAN ELECTRONICS CO., LTD
2.50
82
BAEK WOOIL
0.70
83
YG TECH CO., LTD
3.50
84
DASAN C&P JOINT STOCK COMPANY
4.00
85
HANKYONG C&T CO., LTD
0.45
86
Mr. Kwon Young Woon
0.60
87
ENGINEERING AND CONSTRUCTION COMPANY LIMITED KP
0.60
88
Seojin System Co., Ltd.
27.00
116
0.33
89
MUN SOOGYEONG
3.35
90
HAN JIN CHEMICAL COMPANY
3.90
91
GOMUNDANG PRINTING INC
36.00
92
KIM JIN GWON
0.50
93
SAMSUNG INDUSTRIAL CO., LTD
0.89
117
VSIP BAC NINH INDUSTRIAL ZONE
GENERAL INFORMATION
Address
▪ Tu Son town, Bac Ninh province, Vietnam
Investor
▪ VSIP Bac Ninh Co., Ltd
․ Address: No.1, Huu Nghi Rd, VSIP Bac Ninh, Tu Son town, Bac Ninh
province,
Vietnam
․ Tel: (84-222) 3 765 668
․ Fax: (84-222) 3 765 666
․ Website: http://www.vsip.com.vn/
Contact Person
Mr. Cao Phan Tuan (Tony) – Marketing Manager - Mobile: (84) 946 050
520 - Email:Tuan.cp@vsip.com.vn
Location
- 25 km from Hanoi city
- 15 km from Noi Bai International Airport
- 130 km from Hai Phong seaport
- Adjacent to Hanoi-Thai Nguyen Highway and HW no.18, 10 km from
Tu Son railway station.
Investment Area
Priority Sectors
for Investment
Electronics, Precision Engineering, FMCG,
Automotive components, Logistics, Pharmacy
and Medical Devices etc.
Restricted
Sectors for
Investment
Polluting industries: dyeing, plating etc.
Minimum wage
[Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on
minimum salaries
Lease term
▪ Start date: Feb 2007
▪ End date: Feb 2057
Minimum Lease Area
10,000 m2
Limit for Construction Height
Permitted Construction Rate
- 25 meters/ 6 storeys
- 50% to 60%
Planned area
▪ Total area: 700 ha (200 ha for commercial and residential, 500 ha for
industrial land)
▪ Total Industrial Land: 500 ha
Factory Available for Rent
▪ More than 1 ha
Operation Status
▪ In operation
Occupancy Rate and Number of Projects
▪ 100 %
▪ 125 projects
Number of Korean Projects
17 projects
Lease fee
▪ Land lease fee: 140 - 170 USD/m2/whole project life
Operating fee
▪ Management fee: 0.07 USD/m2/month
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 9,000 VND (~0.4 USD)/m3
▪ Wastewater treatment fee: 4,700 VND (~0.21 USD)/m3
▪ Waste treatment fee: According to contract with supplier
INFRASTRUCTURE AND FACILITY
Financial institution
Maritime Bank, Vietcombank - Hưng Yên branch, ACB, Agribank,
Techcombank
118
Tax service, State finance office
02 km from Tax Agency
Customs Service
Inside the industrial zone
Logistics
Inside the industrial zone
Post office
Inside the industrial zone
Medicare
2km from Tu Son Hospital, Medicare Center
Police, public security
24/7 security service.
Universities, training facilities, etc.
2km from Tu Son Hospital, Medicare Center
Recruitment
Support from IZ developers
Worker dormitory
Worker Dormitory project available and demanding from tenants
Worker's child education facility
0.5 km from the nearest Facility
One-stop service
Inside the zone
Road Width
45m, 32m and 24m
IT & Tele-communication Facilities
Telecommunication systems and international standards are always ready to
meet the communication needs
Emergency Power generator
NA
Fire-fighting facility
The water supply network for firefighting is designed in conjunction with the
potable water supply network, which is located along the roads. The distance
among fire hydrants is 120 m -150 m with a diameter of D125 mm.
Layout Plan
Location Map
119
Actual View
120
LIST OF SOME NOTABLE TENANTS
No.
Name of Tenants
Nationality
Business Line
1
Linfox Warehouse Bac Ninh Co., Ltd
Australia
Logistic
2
Emergent Cold Vietnam Ltd. - Bac Ninh
Branch
Puratos Grand-Place Vietnam Ltd
Australia
Cold warehouse
Belgium
Confectionary
China
Steel processing
England & Holand
Homecare's product
6
Yuncheng Plate Making (Bac Ninh) Co.,
Ltd
Branch of UNILEVER Vietnam
International Company Limited in VSIP
Bac Ninh
J&C Joel Vietnam Co., Ltd
England
Theater curtain
7
Bati Ha Noi Co., Ltd
France
Logistics hub development
8
Indonesia
Packaging
9
Dynaplast Packaging (Viet Nam) Co.,
Ltd - Bac Ninh Branch
A&D Viet Nam Limited
Japan
Blood pressure monitor
10
A.I.S Viet Nam Co., Ltd
Japan
Motorcycle parts
11
Japan- Hong Kong
Can & bottle
Japan
Carton packaging
13
Asia Packaging Industries Vietnam Co.,
Ltd – North
Branch of Ojitex Hai Phong Co., Ltd. in
Bac Ninh
Daiichi Denso Buhin Vietnam Co., Ltd
Japan
14
Enshu Vietnam Co., Ltd
Japan
15
Foster Electric (Bac Ninh) Co., Ltd
Japan
Lamps, switches for automobile,
motorcycle
Machine tools and transportation
equipment
Electronic sound devices
16
Fujikin Bac Ninh Incorporated
Japan
Steel processing
17
Fujita Vietnam Co., Ltd
Japan
18
Hal Vietnam Co., Ltd - Bac Ninh Branch
Japan
Engine, general purpose parts for
motorcycle
Automotive parts
19
Ihara Manufacturing Vietnam Co., Ltd
Japan
Oil pump, water pump for motorcycle
20
Kurabe Industrial Bac Ninh Co., Ltd
Japan
Electrics wire
21
Malugo Vietnam Co., Ltd
Japan
Label printing
22
Nakamura Vietnam Co., Ltd
Japan
Motorcycle parts
23
Nittan Vietnam Co., Ltd
Japan
Valve for motorcycle
24
Nitto Vietnam Co., Ltd
Japan
Polarizing material
25
Japan
Motorcycle parts
26
Ogino Vietnam Corporation - Bac Ninh
Branch
Ogino Vietnam Tu Son Co., Ltd
Japan
Motorcycle parts
27
Printec Ohtomi Co., Ltd
Japan
Label printing
28
Japan
Printing ink
Japan
Package printing
Japan
PET bottle preform
31
Sakata Inx Vietnam Co., Ltd Bac Ninh
Branch
Bac Ninh - Based Branch Office Shoei
Vietnam Co., Ltd
Suntory Beverage & Food Viet Nam Co.,
Ltd
Toho Precision (Vietnam) Co., Ltd
Japan
Rubber roll for printer
32
-
Japan
Precision engineering
33
Hong Kong
Electronic parts
34
Biel Crystal Manufactory (Vietnam)
Limited
Gaoqi Electronics (Vietnam) Co., Ltd
Hong Kong
Electronic parts
35
Chung Ho Nais Vina Co., Ltd
Korea
Assembly of water purifier
36
Dreamtech Vietnam Co., Ltd
Korea
Battery charger
3
4
5
12
29
30
121
37
Ehwa Tech Co., Ltd
Korea
Grinding stones, diamond stones
38
Foseca Vietnam Co., Ltd
Korea
Foods and Catering Services
39
HJ Corp Vina Co., Ltd
Korea
Electronic parts
40
ITM Semiconductor Co., Ltd
Korea
Electronic parts
41
J World Vina Co., Ltd
Korea
Tapes
42
Josung Vina Co., Ltd
Korea
Carrier tape
43
LS Electronic-Devices Vietnam Co., Ltd
Korea
SIM connector
44
Noroo Vina Co., Ltd
Korea
Paint for mobile phone
45
RF Tech Bac Ninh Co., Ltd
Korea
Battery charger
46
Samhwa Paints Vina Co., Ltd
Korea
Paint for mobile phones
47
Sang-A Frontec Co., Ltd
Korea
Component materials
48
Sumika Electronic Materials Co., Ltd
Korea
Electronic parts
49
Taixin Printing Vina Co., Ltd
Korea
Printing
50
-
Korea
Electronics parts
51
Wisol Hanoi Ltd Liability Company
Korea
Electronic parts
52
BE Packaging (Vietnam) PTE LTD
Malaysia
Packaging
53
Boxpak (Ha Noi) Co., Ltd
Malaysia
Packaging
54
Richfield Co., Ltd
Malaysia
Candy & gum packaging
55
Malaysia
56
Santomas Vietnam JSC - Bac Ninh
Branch
Lintec Ha Noi Vietnam Co., Ltd
Singapore
Precision plastic gears, molds and
mechanical parts
Adhesive product
57
Peony Company Limited
Singapore
Garment and textile
58
Mapletree Logistic Park Co., Ltd
Singapore
Logistics hub development
59
Branch of SMC Pneumatics (Vietnam)
Sole Member Company Limited
in Bac Ninh
Sorrento Vietnam Share Holding
Company
The Branch of Behn Meyer Vietnam Co.,
Ltd in Bac Ninh
Sika Limited (VietNam) - Branch in Bac
Ninh
Singapore
Pneumatic cylinder, valve
Singapore
Furniture
Singapore
Plastic compounding
Switzerland
Taiwan
Taiwan
Mobile phone
65
Fortuna Advanced Materials (Bac Ninh)
Co., Ltd
Fushan Technology (Vietnam) Limited
Liability Company
Idea L Print Vietnam Co., Ltd
Concrete admixture, waterproofing,
concrete repair and
protection systems
Tapes
Taiwan
Package printing
66
King Power (Bac Ninh) Co., Ltd
Taiwan
Generator
67
King Win Material Technology Co., Ltd Bac Ninh Branch
Leadlink Bac Ninh Limited
Taiwan
Steel processing
Taiwan
Photo printers
Taiwan
Motorcycle parts
70
Shih Lin Vietnam Electrical Engineering
Co., Ltd - Bac Ninh Branch
Strong Light Bac Ninh Co., Ltd
Taiwan
Electronic parts
71
Sunzex Company Limited
Taiwan
Stationery
72
-
Taiwan
PCB board testing equipment
73
Taiwan
Aluminum products, mold
74
Transaction Branch-Tung Shin Industries
Co., Ltd
Advanex (Vietnam) Ltd
Thailand
Springs and precision components
75
Srithai (Ha Noi) Co., Ltd
Thailand
PET bottle preform
60
61
62
63
64
68
69
122
76
Branch of Avery Dennison (Vietnam)
Limited in Bac Ninh
USA
77
USA
78
Branch of Suntory Pepsico Vietnam
Beverage Co., Ltd in Bac Ninh
Unigen Vietnam Ha Noi Co., Ltd
79
ALS East Hanoi JSC
Viet Nam
80
An Phu Irradiation JSC – Branch 02
Viet Nam
Printed circuit boards, precision
mechanical parts
Air freight service, on-site air cargo
clearance
Irradiation services
81
Asia Food Chemical JSC
Viet Nam
Food additive
82
Autotech Machinery., JSC
Viet Nam
Precision engineering
83
BW Industrial Development Joint Stock
Company
Cat An Corporation - Bac Ninh Branch
Viet Nam
Warehouse, logictic service
Viet Nam
Viet Nam
86
Dry Cell and Storage Battery Joint Stock
Company
EC Joint Stock Company
Additives, raw materials for the food,
animal feed industry.
Battery
Viet Nam
Supporting industry
87
Fortune - Nano Electrical Company
Viet Nam
Electric equipments
88
Hai Ha Confectionery Joint Stock
Company
Asia Chemical Corporation (ACC)
Viet Nam
Confectionery
Viet Nam
Plastic products
Hoang Lam Trading and Foods
Technology JSC
Kanto Vietnam Corporation
Viet Nam
Food additive
Viet Nam
Motorcycle parts
Viet Nam
Ice-cream and milk
93
Kido Frozen Foods Co., Ltd - Bac Ninh
branch
KIDO Group Corporation
Viet Nam
Instant noodle
94
Long Truong Auto JSC
Viet Nam
Automotive parts
95
Nanosome Techpharma., JSC
Vietnam
Pharmaceutical
96
Viet Nam
Garments
Viet Nam
Garment
Viet Nam
Garment
99
Thanh Phat Trading, Commercial and
Investment Co., Ltd
Binh Minh Infrastructure Investment and
Trading JSC
Thanh Thu Development and Business
Investment Joint Stock
Company
-
Viet Nam
Garment
100
Pharmaceutical Company Fito Pharma
Viet Nam
Traditional pharmacy
101
Viet Nam
Telecom products
102
Post & Telecommunication Equipment
JSC (POSTEF)
-
Viet Nam
Electrics& Electronics
103
Ton Dong A Bac Ninh Co., Ltd
Viet Nam
Steel processing
104
Trang An Serpro., JSC
Viet Nam
Medical equipment
105
VB Pharma Corporation
Viet Nam
Veterinary medicine
106
Vietnam Supporting Industry JSC
Viet Nam
Precision engineering
107
Zion Precision Moulds Co., Ltd
Viet Nam
Precision Moulds
108
Viet Huong Group JSC
Vietnam
Comestic
109
Vietnam Smart Technology Application
and Mechanical Trading
Company Limited
Viet Nam
Precision engineering
84
85
89
90
91
92
97
98
Adhesive technologies display
graphics, packaging
materials
Food & beverage
USA
123
VSIP BAC NINH INDUSTRIAL ZONE – BUSINESS HUB
GENERAL INFORMATION
Address
▪ Tu Son town, Bac Ninh province, Vietnam
Investor
▪ VSIP Bac Ninh Co., Ltd
․ Address: No.1, Huu Nghi Rd, VSIP Bac Ninh, Tu Son town, Bac Ninh province,
Vietnam
․ Tel: (84-222) 3 765 668
․ Fax: (84-222) 3 765 666
․ Website: http://www.vsip.com.vn/
Contact Person
Mr. Cao Phan Tuan (Tony) – Marketing Manager - Mobile: (84) 946 050 520 Email:Tuan.cp@vsip.com.vn
Location
- 25 km from Hanoi city
- 15 km from Noi Bai International Airport
- 130 km from Hai Phong seaport
- Adjacent to Hanoi-Thai Nguyen Highway and HW no.18, 10 km from
Tu Son railway station.
Priority Sectors for Investment
R&D centers, Data center, Design Center, Headquarter
Office, hi-tech industries, Showroom & repair
Restricted Sectors for Investment
Polluting industries: dyeing, plating etc.
Investment Area
Minimum wage
[Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term
▪ Start date: Feb 2007
▪ End date: Feb 2057
Minimum Lease Area
3,000 m2
Limit for Construction
Height
Permitted Construction
Rate
- 25 meters/ 6 storeys
- 50% to 60%
Planned area
▪ Total area: 20 ha
▪ Total Leasable area: 10 ha
Factory Available for
Rent
▪ None
Operation Status
▪ Available for immediate construction
Occupancy Rate and
Number of Projects
0%
Number of Korean
Projects
None
Lease fee
▪ Land lease fee: 250 USD/m2/whole project life
▪ Payment
Accepting Letter of Offer (Booking fee): 10% of land price
- Issuance of the Licenses: 30% of land price
- Signing of Land Lease Agreement: 30% of land price
- Handover: 30% of land price
Operating fee
▪ Management fee: 0.07 USD/m2/month
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 10,000 VND (~0.4 USD)/m3
▪ Wastewater treatment fee: 4,700 VND (~0.21 USD)/m3
▪ Waste treatment fee: According to contract with supplier
INFRASTRUCTURE AND FACILITY
124
Financial institution
Maritime Bank, Vietcombank - Hưng Yên branch, ACB, Agribank, Techcombank
Tax service, State finance
office
02 km from Tax Agency
Customs Service
Inside the industrial zone
Logistics
Inside the industrial zone
Post office
Inside the industrial zone
Medicare
2km from Tu Son Hospital, Medicare Center
Police, public security
24/7 security service.
Universities, training
facilities, etc.
2km from Tu Son Hospital, Medicare Center
Recruitment
Support from IZ developers
Worker dormitory
Worker Dormitory project available and demanding from tenants
Worker's child education
facility
0.5 km from the nearest Facility
One-stop service
Inside the zone
Road Width
45m, 32m and 24m
IT & Tele-communication
Facilities
Telecommunication systems and international standards are always ready to meet the
communication needs
Emergency Power
generator
NA
Fire-fighting facility
The water supply network for firefighting is designed in conjunction with the potable water
supply network, which is located along the roads. The distance among fire hydrants is 120 m 150 m with a diameter of D125 mm.
Layout Plan
125
Location Map
126
VSIP BAC NINH II INDUSTRIAL ZONE
GENERAL INFORMATION
Address
▪ Yen Phong district, Bac Ninh province, Vietnam
Investor
▪ VSIP Bac Ninh Co., Ltd
․ Address: No.1, Huu Nghi Rd, VSIP Bac Ninh, Tu Son town, Bac Ninh province,
Vietnam
․ Tel: (84-222) 3 765 668
․ Fax: (84-222) 3 765 666
․ Website: http://www.vsip.com.vn/
Contact Person
Mr. Cao Phan Tuan (Tony) – Marketing Manager - Mobile: (84) 946 050 520 - Email:
Tuan.cp@vsip.com.vn
Location
- 25 km from Hanoi city
- 15 km from Noi Bai International Airport
- 130 km from Hai Phong seaport
- Adjacent to Hanoi-Thai Nguyen Highway and HW no.18, 10 km from
Tu Son railway station.
Priority Sectors for
Investment
Electronics, Precision Engineering, FMCG,
Automotive components, Logistics, Pharmacy
and Medical Devices etc.
Restricted Sectors
for Investment
Polluting industries: dyeing, plating etc.
Investment Area
Minimum wage
[Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term
▪ Start date: Feb 2019
▪ End date: Feb 2069
Minimum Lease Area
10,000 m2
Limit for Construction
Height
Permitted Construction
Rate
- 18 meters/ 4 storeys
- 50% to 60%
Planned area
▪ Total area: 273 ha
▪ Total vacant leasable area: 200 ha
Factory Available for Rent
▪ NA
Operation Status
▪ Under Construction
Occupancy Rate and
Number of Projects
▪ 0%
Number of Korean Projects
None
Lease fee
▪ Land lease fee: 110 USD/m2/whole project life
▪ Payment:
Accepting Letter of Offer (Booking fee): 10% of land price
- Issuance of the Licenses: 30% of land price
- Signing of Land Lease Agreement: 30% of land price
- Handover: 30% of land price
Operating fee
▪ Management fee: 0.07 USD/m2/month
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 9,000 VND (~0.4 USD)/m3
▪ Wastewater treatment fee: 4,700 VND (~0.21 USD)/m3
▪ Waste treatment fee: According to contract with supplier
INFRASTRUCTURE AND FACILITY
127
Financial institution
Vietcombank, Agribank, Vietinbank
Tax service, State finance
office
02 km from Tax Agency
Customs Service
4 km from the nearest Customs Agency
15 km from the nearest Inland Container Depot
Logistics
4 km from the nearest Logistic Center
Post office
2 km from the nearest Mailing Post Office
Medicare
2km from Yen Phong Hospital, Medicare Center
Police, public security
2km from the nearest Police Station
Universities, training
facilities, etc.
5km from Vocational Training Center
Recruitment
Support from IZ developers
Worker dormitory
0.5km from the nearest Facility
Worker's child education
facility
0.5 km from the nearest Facility
One-stop service
Inside the zone
Road Width
45m, 32m and 24m
IT & Tele-communication
Facilities
Telecommunication systems and international standards are always ready to meet the
communication needs
Emergency Power
generator
NA
Fire-fighting facility
The water supply network for firefighting is designed in conjunction with the potable water
supply network, which is located along the roads. The distance among fire hydrants is 120 m 150 m with a diameter of D125 mm.
Layout Plan
128
Location Map
129
THUAN THANH II INDUSTRIAL ZONE
GENERAL INFORMATION
Address
▪ Thanh Khuong Commune, Thuan Thanh District, Bac Ninh Province
Investor
Shun – Far Land Deverlopment Co.ltd (Taiwan)
▪ Address: No 77 Thanh Cong, Chua Dan, Dinh Bang wards, Tu Son town, Bac Ninh Province
Contact Person
N/A
Location
- Land: Located alongside the National Road 38 and Ho Town, 30km from Hanoi Capital, 12km
from Bacninh City
- Seaport: 90km from Haiphong seaport
- Airport: 55km from Noi Bai International Airport
Priority Sectors for
Investment
Investment Area
Restricted Sectors for
Investment
Electronics, Precision Engineering
Polluting industries: dyeing, plating etc.
Minimum wage
[Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term
▪ Start date: Feb 2011
▪ End date: Feb 2061
Minimum Lease Area
10,000 m2
Limit for Construction
Height
Permitted Construction
Rate
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Residential Planning regulation (QCXDVN 01: 2008/BXD)
Planned area
Total area: 250 ha
Factory Available for Rent
NA
Operation Status
In Operation
Occupancy Rate and
Number of Projects
▪ 100%
Number of Korean Projects
16 companies
Lease fee
▪ Land lease fee: 50-100 USD/m2 (depending on location and lease area)
Operating fee
▪ Management fee: 0.4 - 0.6 USD/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: approximately 0.5 USD/m3
▪ Wastewater treatment fee: 80% of clean water fee
▪ Waste treatment fee: According to contract with suppliers
INFRASTRUCTURE AND FACILITY
Financial institution
Vietcombank, Agribank, Vietinbank
Tax service, State finance
office
16.9 km from Tax Agency
Customs Service
16.4 km from the nearest Customs Agency
22 km from the nearest Inland Container Depot
Logistics
10 km from the nearest Logistic Center
Post office
800 m from Thuan Thanh Mailing Post Office
130
Medicare
14 km from Yen Phong Hospital, Medicare Center
Police, public security
2km from the nearest Police Station
Universities, training
facilities, etc.
14 km from Bac Ninh University
Recruitment
Support from IZ developers
Worker dormitory
N/A
Worker's child education
facility
N/A
One-stop service
N/A
Road Width
N/A
IT & Tele-communication
Facilities
Telecommunication systems and international standards are always ready to meet the
communication needs
Emergency Power
generator
N/A
Fire-fighting facility
Available
Layout Plan
Location Map
131
Actual View
132
THUAN THANH III INDUSTRIAL ZONE
GENERAL INFORMATION
Address
▪ Thanh Khuong Commune, Thuan Thanh District, Bac Ninh Province
Investor
▪ Khai Son company Ltd
․Address:
- Head Office: Thuan Thanh 3 Industrial zone, Thanh Khuong Commune, Thuan Thanh
District, Bac Ninh province
- Representative: Room 5, 15th floor, Plaschem Building, No 562, Nguyen Van Cu St, Long
Bien Dist., Hanoi, Viet Nam
․Tel: (84-241) 387 3062/ (84-24) 974 3582/ (84-24) 220 0495
Fax: (84-24) 220 0494
▪ Trung Quy Investment Stock company Bac Ninh
․Address: 263 Nguyen Trai road, Vo Cuong ward, Bac Ninh city, Bac Ninh province
․Tel/Fax: (84-241) 3 896 099
Contact Person
▪ Mr. Khai – (84) 913 305 029 - Email: Khaisoncompany@gmail.com
Location
▪ Land: Located alongside the Provincial Road 282 (Ho - Phu Thuy Route), to the south of Ho
Town, 25km from Hanoi Capital, 17km from Bac Ninh City
▪ Seaport: 85 km from Hai Phong seaport
▪ Airport: 47km from Noi Bai International Airport
Investment Area
Priority Sectors for Investment
Electronics, Precision Engineering
Restricted Sectors for
Investment
Polluting industries: dyeing, plating etc.
Minimum wage
[Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term
▪ Start date: NA
▪ End date: NA
Minimum Lease Area
20,000 m2
Limit for Construction
Height
Permitted Construction
Rate
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Residential Planning regulation (QCXDVN 01: 2008/BXD)
Planned area
Total area: 300 ha
Factory Available for Rent
N/A
Operation Status
In Operation
Occupancy Rate and
Number of Projects
100%
Number of Korean Projects
None
Lease fee
Land lease fee: 50 - 100 USD/m2/whole project life
Operating fee
▪ Management fee: 0.794 USD/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: approximately 0.515 USD/m3
▪ Wastewater treatment fee: 0.73 USD/m3
▪ Waste treatment fee: According to contract with suppliers
INFRASTRUCTURE AND FACILITY
Financial institution
Vietcombank, Agribank, Vietinbank
133
Tax service, State finance
office
16.9 km from Tax Agency
Customs Service
16.4 km from the nearest Customs Agency
Logistics
22 km from the nearest Inland Container Depot
Post office
10 km from the nearest Logistic Center
Medicare
800 m from Thuan Thanh Mailing Post Office
Police, public security
14 km from Yen Phong Hospital, Medicare Center
Universities, training
facilities, etc.
2km from the nearest Police Station
Recruitment
14 km from Bac Ninh University
Worker dormitory
Support from IZ developers
Worker's child education
facility
NA
One-stop service
NA
Road Width
NA
IT & Tele-communication
Facilities
NA
Emergency Power
generator
Telecommunication systems and international standards are always ready to meet the
communication needs
Fire-fighting facility
NA
Layout Plan
Location Map
134
NAM SON HAP LINH INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Nam Son Commune, Bac Ninh city, Bac Ninh province
Investor
KinhBac City Development Holding Corporation
▪ Address: Lot B7, Que Vo Industrial park, Phuong Lieu commune, Que Vo district, Bac Ninh province,
Vietnam.
▪ Tel: (84.222) 3634034
▪ Website: http://www.kinhbaccity.vn
Contact Person
Ms. Tran Thi Huong - Sales & Marketing Deputy Manager Mobile: (+84) 915-636 139 - Email: tthuong.kbc@gmail.com
Location
- 5 Km from Bac Ninh City Center
- 35 Km from Noi Bai International Airport
- 110 Km from Hai Phong Seaport
- 02 Km from Highway No.01 and 09 Km from Hanoi – Lang Son (border with China) – NanNing
(China) Railway
Priority Sectors for
Investment
Electronics industry, high-tech industry and supporting industries, banking,
insurance, research and development activities, consulting ... (Decision No.
293/QĐ-UBND on 12/08/2013)
Restricted Sectors for
Investment
Production of iron, steel, construction materials, paper, chemicals, textiles
and textile products ... ((Decision No. 293/QĐ-UBND on 12/08/2013)
Investment Area
Minimum wage
[Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term
▪ Start date: 2010
▪ End date: 2060
Minimum Lease
Area
2 ha
Limit for
Construction
Height
Regulated by Bac Ninh Authority
Permitted
Construction Rate
Construction area is not more than 60% of the total leased land lot
Planned area
▪ Total area: 300 ha
▪ Total vacant leasable area: 180 ha
▪ Total area with full infrastructure ready to build factory: unavailable
Factory Available
for Rent
Not available
Operation Status
Under Construction and to be completed by 2021/In Land Clearance Process
Occupancy Rate
and Number of
Projects
0%
Number of
Korean Projects
0
Lease fee
▪ Land lease fee: 125USD/m2 (exclude VAT)
▪ Factory lease fee: N/A
▪ Payment:
- Method: Bank Transfer in VND
- Period: 40% after signing In-principle Agreement + 40 % after signing Land Sublease Contract + 20%
after Land Hand-over
Operating fee
▪ Management fee: N/A
▪ Electricity fee: According to the Circular by Ministry of Industry and Trade, valid from March 16th,
2015 (excluded VAT) for voltage from 22KV-110KV.
▪ Water fee: N/A
135
▪ Wastewater treatment fee: N/A
INFRASTRUCTURE AND FACILITY
Financial
institution
BIDV, VIETIN BANK, VIETCOMBANK, AGRIBANK
Tax service, State
finance office
10km from Bac Ninh finance office
8km from Bac Ninh provincial tax department
Customs Service
9 Km from Customs Agency Bac Ninh
10 Km from ICD Tien Son
Logistics
5-7 Km from the nearest Logistic Center
Post office
3 km from Vietnam Post Office
Medicare
3 Km from Bac Ninh General Hospital
Police, public
security
2km from Police Station
Universities,
training facilities,
etc.
8km from College of electromechanical & construction
Recruitment
Available
Worker dormitory
5 Km
Worker's child
education facility
5 Km
One-stop service
6 Km from the nearest Facility
Road Width
Main road: 32m, 4 lanes; By Road: 23m, 2 lanes
IT & Telecommunication
Facilities
Under construction
Emergency Power
generator
Available
Fire-fighting
facility
Under construction
Layout Plan
136
Location Map
137
GIA BINH I INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Nam Son and Phuong Lieu commune, Que Vo district, Bac Ninh Province, Vietnam
Investor
KinhBac City Development Holding Corporation
▪ Address: Lot B7, Que Vo Industrial park, Phuong Lieu commune, Que Vo district, Bac Ninh
province, Vietnam.
▪ Tel: (84-222) 3634 034
▪ Website: http://www.kinhbaccity.vn
Contact Person
▪ Tran Thi Huong - Sales & Marketing Deputy Manager - Mobile: +84 - 915-636 139 - Email:
tthuong.kbc@gmail.com
Location
- 06 Km from Bac Ninh City Center
- 35 Km from Noi Bai International Airport
- 110 Km from Hai Phong Seaport
- 03 Km from Highway No.01 and 09 Km from Hanoi – Lang Son (border with China) –
NanNing (China) Railway
Priority Sectors for
Investment
Electronics industry, high-tech industry and supporting industries,
banking, insurance, research and development activities, consulting ...
(Decision No. 293/QĐ-UBND on 12/08/2013)
Restricted Sectors for
Investment
Production of iron, steel, construction materials, paper, chemicals,
textiles and textile products ... ((Decision No. 293/QĐ-UBND on
12/08/2013)
Investment Area
Minimum wage
[Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term
▪ Phase 1: 2002 - 2052
▪ Phase 2: 2007 - 2017
Minimum Lease Area
10,000 m2
Limit for Construction
Height
Permitted Construction
Rate
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Residential Planning regulation (QCXDVN 01: 2008/BXD)
Construction area is not more than 65% of the total leased land lot
Planned area
▪ Total area: 611 ha
▪ Total vacant leasable area: Unavailable
Factory Available for Rent
▪ Total area: 30,000 m2 (4,000-5,000 per factory, expected at the end of 2019)
Operation Status
▪ In operation
Occupancy Rate and
Number of Projects
▪ 100%
▪ 125 Projects
Number of Korean Projects
▪ 46 projects
Lease fee
▪ Land lease fee: 85 USD/m2
▪ Factory lease fee: 3.5 USD/m2/month
▪ Payment:
- Method: Bank Transfer in VND
- Period: 40% after signing In-principle Agreement + 40 % after signing Land Sublease
Contract + 20% after Land Hand-over
Operating fee
▪ Management fee: 0.5 USD/m2/year (excluded VAT)
▪ Electricity fee: According to the Circular by Ministry of Industry and Trade, valid from March
16th, 2015 (excluded VAT) for voltage from 22KV-110KV.
▪ Water fee: 8,700 VND (~0.37 USD) /m3 (excluded VAT)
▪ Wastewater treatment fee: 7,200 VND (~0.3 USD)/m3 (excluded VAT)
INFRASTRUCTURE AND FACILITY
138
Financial institution
BIDV, Vietin Bank, Vietcombank, Agribank
Tax service, State finance
office
6 km from Bac Ninh Tax Office
7 km from Bac Ninh State Treasury Office
Customs Service
2 Km from Customs Agency Que Vo
15 Km from ICD Tien Son
Logistics
2 Km from the nearest Logistic Center: Yusen Logistics
Post office
1 km from Vietnam Post Office
Medicare
4 Km from Bac Ninh General Hospital
Police, public security
500 m from Que Vo Police Station
Universities, training
facilities, etc.
500 m from Viet Nhat College
Recruitment
Kinh Bac will support in recruitment
Worker dormitory
5 Km from the zone
Worker's child education
facility
5 Km from the zone
One-stop service
6 Km from the nearest Facility
Road Width
Main road: 32m, 4 lanes; By Road: 23m, 2 lanes
IT & Tele-communication
Facilities
The telecommunication system complies with international standards and is always available for
communication demand with high data transmission s
Emergency Power
generator
Available
Fire-fighting facility
Available. Water supply system for firefighting is located along each road.
Layout Plan
139
Location Map
Actual View
.
140
[- This Page is intentionally left blank -]
141
BEN TRE
142
INVESTMENT ENVIRONMENT IN BEN TRE
GENERAL INFORMATION
Area, Population
Geographical Location
Adjacent provinces
▪ Area: 2.379,7 km2
▪ Population: 1.298 million (2022 statistic)
▪ Ben Tre is located in Mekong River Delta Region, 86 km away from Ho Chi Minh city
and 120 km away from Can Tho city.
▪ Tien Giang Province to the north, Vinh Long to the west and southwest, Tra Vinh
Province to the south.
2022 statistic:
▪ GRDP: 63,585.3 billion
▪ GRDP growth: 7.33%
GRDP
▪ GRDP per capita: 49 million VND/year
▪ Economic Structure:
- Industry and Construction: 20.58%
- Service: 40.63%
- Agriculture, Forestry and Fishery: 35.37%
2022 statistic:
▪ Industry - Construction growth: 9.1%
▪ Agriculture, forestry and fishery growth: 4.43%
Industry growth
▪ Service growth: 0.2%
▪ Import – Export:
- Export turnover: 1,510 milion USD
- Import turnover: 570 milion USD
PCI
▪ Score: 68.04 – ranked 13th out of 63 cities and provinces in Vietnam (2022).
SOCIAL INFRASTRUCTURE
▪ Roadway: National highways 57 and 60 connect Ben Tre with the Mekong Delta region
and Ho Chi Minh city. Rach Mieu bridge, Ham Luong bridge, and Co Chien bridge play an
important role, connecting Tien Giang, Ben Tre and Tra Vinh.
Transportation
▪ Waterway: The coastline is 65 km long. Besides, a 6.000 km-long network of rivers and
canals (4 major rivers including Tien river, Ba Lai river and Ham Luong river) is an arterial
traffic route from Ben Tre to the Southwestern province and Ho Chi Minh city.
▪ Port:
- 1 River port: Tan Cang Giao Long.
- 3 Fishing port: Binh Thang, An Thuy, An Nhon.
Electricity
▪ Supplied from the national power network.
Water
143
Capacity of clean water supply 36.000 m3/day.
Education
▪ Training Center of Ho Chi Minh city National University in Ben Tre, 2 colleges, 4
vocational secondary schools, 9 vocational training centers, 10 continuing education centers
at district and provincial levels.
Medicare
▪ 04 provincial hospitals (1 general and 3 specialize hospital), 01 private general hospital,
each district has 01 general hospital.
INVESTMENT CONDITION
Human resource
▪ Around 70.2% of population in working age (2022).
Education level
▪ Trained labor rate: 62.09% (2022).
▪ The minimum salary for the province is applied as follows (see appendix for detail
amount):
- Area II: including: Ben Tre city, Chau Thanh district.
- Area III: including: Ba Tri district, Binh Dai district, Mo Cay Nam district.
Salary
- Area IV: including: Cho Lach district, Giong Trom district, Mo Cay Bac district, Thanh
Phu district.
▪ The lowest wage for trained labor (including those trained by the enterprises) must be at
least 7% higher than the above referenced basic salary
Investment incentives
▪ Incentives according to government regulations:
- Preferential tax rates and exemption period, reduction for corporate income tax.
▪ Prioritized Projects:
- Projects in construction and infrastructure of industrial zones and clusters.
- Projects in tourism and complex resorts on the dunes, riverside, sea tourist; sea tourist
areas, coastal urban areas, sea enroachment.
- Factory processing value-added products from agriculture and fishery (coconut, shrimpfish, fruit).
Fields Attracting
Investment
- Trade center, supermarket.
- Logistic infrastructure (ports, transportation services, warehouses..)
- Health, education (high quality), health care centers for the elderly.
- Construction and development of residential areas, new urban areas in Ben Tre city and
district centers.
- Projects in high-tech agriculture.
144
Map
Department of Planning and Investment (Ben Tre Start-up and Investment Promotion
Center)
▪ Address: 28 Le Dai Hanh Street, Ward An Hoi, Ben Tre City, Ben Tre Province.
▪ Tel: (84-275) 3 825340/ 3 575691
▪ Email: duyensipcbentre@gmail.com
▪ Website: www.sipcbentre.gov.vn
Industrial Zone Authority
▪ Address: 87A, 30/4 Street, Ward An Hoi, Ben Tre City, Ben Tre Province.
▪ Tel: (84-275) 3 817474
▪ Fax: (84-275) 3 817718
▪ Email: bqlcn@bentre.gov.vn
Contact
LIST OF INDUSTRIAL ZONES IN BEN TRE
No
Industrial zone Name
1
Giao Long Industrial Zone
2
An Hiep Industrial Zone
3
Phu Thuan Industrial Zone
Total Area (ha)
Occupancy Rate
Status
96,3
100%
In Operation
72
100%
In operation
231,78
0%
Under Construction
145
GIAO LONG INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Sectors
Minimum wage
Lease term
Minimum Lease Area
An Phuoc commune and Giao Long commune, Chau Thanh district, Ben Tre province
Project Management Board of Infrastructure Development of Industrial Zones
▪ Address: 87A, 30/4 Street, Ward An Hoi, Ben Tre City, Ben Tre Province.
▪ Tel: (84-275) 3 836688
▪ Fax: (84-275) 3 817675
Mr. Son – Manager – (84) 918820868
▪ Highway traffic: 06km away from National high way No.60, 12km away from the center of
Ben Tre City, ≤ 16Km away from expressway Trung Luong - Ho Chi Minh city.
▪ Port: 4.5 km from Tan Cang Giao Long Port
▪ Airport: 89km from Tan Son Nhat International Airport
Priority Sectors for
Investment
Investment Restricted
Sectors
Multi-Industry
Production of iron, steel, construction materials, chemicals...
[Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
▪ Start date: 10/2007
▪ End date: 10/2077
10,000 m2
Limit for Construction
Height
Permitted Construction
Rate
Planned area
Factory Available for Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean
projects
Lease fee
Operating fee
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Residential Planning regulation (QCXDVN 01: 2008/BXD)
▪ Total area: 96.3 ha
None
In operation
▪ Occupancy Rate: 100%
▪ Number of Projects: 36
3 projects
▪ Land lease fee: 206,730 – 320,000 VNĐ/m2/50 years
▪ Management fee and Infrastructure maintenance fee: 5,168 – 6,300 VNĐ/USD/m2/year
(VAT not included)
▪ Electricity fee: as regulated by the Government
▪ Water fee: 10,000 VND/m3
▪ Wastewater treatment fee: 3,101 – 4,200 VNĐ/m3 (VAT not included)
List of Projects in Industrial Zone
146
No.
Name of Company
Nationality
Business line
1
Unihwasin Vina Co., Ltd
Korea
Silkscreen printing
2
Gen Nex Apparel Co., Ltd
Green Creative Trading Production Joint
Stock Company
Wally Vietnam Packaging Co., Ltd
Family Vietnam Handbag Textile Co., Ltd
Thailand
Thailand
Make clothes
Sewing accessories
China
China
Jea-Must Vietnam Co., Ltd
Unisoll Vina Co., Ltd
Coronet Vietnam Co., Ltd
Himaru Ben Tre Co., Ltd
Sigma Vietnam Industry Co., Ltd
China
Korea
Italy
Korea
China
Min Wie Vietnam Co., Ltd
Alliance One Garment Co., Ltd
Viet World Co., Ltd
China
Thailand
Thailand
Furukawa Automotive Systems VN Co.,
Ltd
Jacobi Carbons Vietnam Co., Ltd
PungKook Ben Tre 1 TV Co., Ltd
Nidec Tosok Precision VN 1 TV Co., Ltd
Japan
Branch of Puratos Grand-Place Vietnam
Co., Ltd
Yong Qing International Co., Ltd
Genoa Group Co., Ltd
Belgium
plastic bag
Weaving, producing backpacks
and bags
Garment processing
Garment production
Synthetic leather production
Producing backpacks and bags
Producing all kinds of towels,
shoes
Producing all kinds of towels
Make clothes
Processing coconut products
and noodles, pho
Manufacture of car wiring
harness
Production of activated carbon
Producing outsourcing, bags
Manufacture of components in
car gearboxes
Processing cocoa beans
Phuong Dong Production Trading Joint
Stock Company
Dinh Phu My Coconut Co., Ltd
CNN An Phat Joint Stock Company
Dong Hai Ben Tre Joint Stock Company
Kien Giang Canned Food Joint Stock
Company
Winbee Food & Beverage Production
and Business Co., Ltd
Vietnam
27
Mekong Plastic Joint Stock Company
(Ben Tre Branch)
Vietnam
Production of plastic and paper
packaging
28
Viet Thanh Garment Trading Joint Stock
Company
Duc Hau Long CNC and Lighting
Equipment Joint Stock Company
Vietnam
Make clothes
Vietnam
Manufacture of lighting
equipment
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
29
France
Korea
Japan
China
China
Vietnam
Vietnam
Vietnam
Vietnam
Vietnam
147
Make clothes
Manufacture of all kinds of
garments
Production of industrial plastic
packaging
Producing coconut products
Production of steel structures
Paper production and business
Seafood production, canned
food
Food and confectionery
production
30
31
32
33
34
35
Asia Coconut Processing Joint Stock
Company
Thanh Cong Energy Service Joint Stock
Company
Ben Tre Packaging One Member
Company Limited
Nam Viet Pharmaceutical Co., Ltd
VietNat One Member Company Limited
Vietnam
Processing coconut products
Vietnam
Steam, electricity
Vietnam
Asean Packaging Import-Export Joint
Stock Company
Vietnam
Producing paper carton
packaging
Producing functional foods
Food production, natural
essential oils
Producing of paper packaging
Vietnam
Vietnam
148
AN HIEP INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Sectors
Minimum wage
Lease term
Minimum Lease Area
An Hiep commune, Chau Thanh district, Ben Tre province
Project Management Board of Infrastructure Development of Industrial Zones
▪ Address: 87A, 30/4 Street, Ward An Hoi, Ben Tre City, Ben Tre Province.
▪ Tel: (84-275) 3 836688
▪ Fax: (84-275) 3 817675
Mr. Son – Manager – (84) 918820868
▪ Highway traffic: 10km away from National high way No.60, 12km away from the center of
Ben Tre City, ≤ 16Km away from expressway Trung Luong - Ho Chi Minh city.
▪ Port: 20 km from Tan Cang Giao Long Port
▪ Airport: 97 km from Tan Son Nhat International Airport
Priority Sectors for
Investment
Investment Restricted
Sectors
Multi-Industry
None
[Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
▪ Start date: 4/2007
▪ End date: 4/2077
10,000 m2
Limit for Construction Height
Permitted Construction Rate
Planned area
Factory Available for Rent
Operation Status
Occupancy Rate and Number
of Projects
Number of Korean projects
Lease fee
Operating fee
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Residential Planning regulation (QCXDVN 01: 2008/BXD)
▪ Total area: 72
None
In operation
▪ Occupancy Rate: 100%
▪ Number of Projects: 16
None
▪ Land lease fee: 248.000 VNĐ/m2/50 years
▪ Management fee and Infrastructure maintenance fee: 5.168 VNĐ/USD/m2/year (VAT not
included)
▪ Electricity fee: as regulated by the Government
▪ Water fee: 10,000 VND/m3
▪ Wastewater treatment fee: 3.101 VNĐ/m3 (VAT not included)
149
List of Projects in Industrial Zone
No.
[STT]
Name of Company
[Tên dự án]
1
C.P Vietnam Joint Stock Company - Ben Tre
Frozen Branch
C.P Vietnam C.P. Joint Stock Company - Aqua
feed manufacturing and trading industry
C.P Vietnam Joint Stock Company Biotechnology Workshop Branch
Thailand
Viet Uc Co., Ltd. aqua feed
Covina Co., Ltd
Ben Tre Sugar Joint Stock Company
Luong Quoi Coconut CB Co., Ltd - Thanh Vinh
CB Factory 1
Australia
Vietnam
Vietnam
Vietnam
biotechnology products and
chemicals used in shrimp
farming
Processing coconut products
Sugar production
Processing coconut products
Processing coconut products
8
Luong Quoi Coconut CB Co., Ltd - Thanh Vinh
CB Factory 2
Vietnam
Processing seafood products
9
Hai Huong Seafood Joint Stock Company CBTS Export Factory
Hai Huong Seafood Joint Stock Company CBTA
Go Dang An Hiep One Member Co., Ltd
Vietnam
Processing aquatic food
Vietnam
Food Processing
Vietnam
One Member Company Limited Go Dang Ben
Tre
Truc Giang Seafood Processing Co., Ltd
CBTS Hung Vuong Ben Tre Co., Ltd
Nam Viet Brick Manufacturing Joint Stock
Company
Vietnam
Seafood processing and
fishmeal
Food Processing
2
3
4
5
6
7
10
11
12
13
14
15
Nationality
[Quốc gia]
150
Thailand
Thailand
Vietnam
Vietnam
Vietnam
Business line
[Ngành nghề kinh doanh]
Seafood processing
Production of aquatic feed
Seafood processing
Production of unburnt bricks
Seafood processing
PHU THUAN INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Sectors
Minimum wage
Lease term
Minimum Lease Area
Phu Thuan commune, Binh Dai district, Ben Tre province
Ben Tre Province Civil and Industrial Construction Investment Project Management
Board
▪ Address: 14C1 Dong Khoi Boulevard (8th floor of Sacombank building), Ward 4, Ben Tre
City, Ben Tre Province.
▪ Tel: (84-275) 3 824798
Mr. Hiep – Manager – (84) 913657856
▪ Highway traffic: 10km away from National high way No.60, 17km away from the center of Ben
Tre City, ≤ 16Km away from expressway Trung Luong - Ho Chi Minh city.
▪ Seaport: 95 km from Cat Lai port, 10 km from Tan Cang Giao Long Port
▪ Airport: 102 km from Tan Son Nhat International Airport
Priority Sectors for
Investment
Investment Restricted
Sectors
Multi-Industry
None
[Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
▪ Start date: 4/2007
▪ End date: 4/2077
10,000 m2
Limit for Construction
Height
Permitted Construction
Rate
Planned area
Factory Available for Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean projects
Lease fee
Operating fee
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential
Planning regulation (QCXDVN 01: 2008/BXD)
▪ Total area: 231
None
Under Construction
▪ Occupancy Rate: 0%
▪ Number of Projects: None
None
▪ Land lease fee: under construction
▪ Management fee and Infrastructure maintenance fee: under construction
▪ Electricity fee: as regulated by the Government
▪ Water fee: 10,000 VND/m3
▪ Wastewater treatment fee: under construction
151
[- This Page is intentionally left blank -]
152
BINH DINH
153
INVESTMENT ENVIRONMENT IN BINH DINH
USD/VND
23.510
GENERAL INFORMATION
Area
6071 km2
Population
1,5 million people (2022)
Geographical Location
Adjacent provinces
▪ Binh Dinh is located in South Central Coast region.
▪ The province runs 110 km north-sou0th. It lies 1,065km south from Hanoi, 686 km north from Ho
Chi Minh City, 300 km south from Da Nang City, and 300 km east from Bo Y Border Gate to Laos
in Kon Tum Province.
▪ Binh Dinh is surrounded by Quang Ngai province to the north, Gia Lai province to the east and
Phu Yen province to the south.
2022 statistic:
GRDP
Industry growth
Import - Export
▪ Real GRDP (billion VND):
106.349
▪ GRDP growth:
8,57%
▪ GRDP per capita
(million VND/year):
70,79
(4,49014143972979 billion USD)
(2997 USD)
▪ Economic structure:
- Industry - Construction:
30,05%
- Agriculture. forestry and
fishery:
27,38%
- Service:
38,16%
▪ Industry - Construction
growth:
▪ Agriculture, forestry and
fishery growth:
8,55%
3,26%
▪ Service growth:
12,61%
Import turnover (billion USD):
0.46
(Growth rate: -0,01)
Export turnover (billion USD):
1.330
(Growth rate: 20.3%)
PCI
The major economic sectors of the province are fisheries and mineral, agricultural and forestry
processing industries, of which the manufacture of wood products makes Binh Dinh's reputation as
a big exporter of furniture.
▪ 70% of its population involving in agricultural activities, including rice, cereal, fruit and vegetable
crop cultivation, livestock growing and pepper growing (esp. in some mid-land or mountainous
areas where the soil is suitable for the crop). Binh Dinh is also suitable for industrial tree crops such
as cashew, acacia and eucalyptus.
▪ With a good number of wood tree plantations in the province and Quy Nhon international Seaport
situated in Quy Nhon, there have been some good development and establishment of wood
processing and indoor and outdoor furniture factories in Binh Dinh Province.
▪ Whilst most industrial establishments for export purposes concentrates in Quy Nhon or its vicinity,
garment plants/factories are usually spread out to districts areas such as Tay Son, Phu Cat, Phu My,
Hoai Nhon and Hoai An for accessing to and attracting cheap laborers in the rural areas.
66.65
Ranking
21
Key Industry
SOCIAL INFRASTRUCTURE
Transportation
▪ Roadway: Roads: National Highway 1A (118 km), National Highway 1D (21.6 km) and National
Highway 19 (69.5 km); National Highway 19B (60 km); National Highway 19C (151.4 km);
sufficient system of provincial, district and rural roads.
▪ Railway: The national railway (150 km long) going through the province (Dieu Tri is a national
station).
▪ Waterway: Quy Nhon international port handling about 4 million tonnes per year. It is the most
convenient international gateway between the Central Highlands and neighboring countries of
Cambodia and Laos; Thi Nai port handling about 0.8 million tonnes per year. Nhon Hoi port with
capacity of 12 million tonnes per year is now under construction.
▪ Airway: Phu Cat Airport (domestic), 30 km from Quy Nhon City.
154
Electricity
Water
Education & Training
Medicare
▪ According to EVN's price frame (for manufacturing industries, the average price is 1,536
VND/kWh - 2,759 VND/kWh)
▪ In accordance with Decision No.1052/QD-UBND dated March 31, 2022 of Binh Dinh Provincial
People's Committee
- Becamex Industrial Park: 8,500 VND/m3
- Industrial parks: 12,100 VND/m3
▪ 203 preschools, 243 primary schools, 146 junior high schools, 50 senior high schools, 5 colleges, 3
universities, 01 science center
▪ Proportion of population participating in health insurance: 96.02%
▪ Percentage of health stations with doctors: 100%
▪ Rate of communes meeting national standards on health care: 100%
▪ Number of hospital beds per 10,000 people: 35 beds
▪ Percentage of rural population using hygienic water: 100%
INVESTMENT CONDITION
Human resource
60% of population are in the working age (2022)
Education level
Trained labor rate: 60,9% (2022)
▪ The minimum salary for the province is applied as follows:
- Area I (4,680,000 VND/month): N/A
- Area II (4,160,000 VND/month): N/A
Salary
- Area III (3,640,000 VND/month): An Nhon town
- Area IV (3,250,000 VND/month): The districts of Hoai Nhon, An Lao, Phu Cat, Phu My, Tuy
Phuoc, Tay Son, Van Canh, Vinh Thanh, Hoai An
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum
wages paid to employees working under employment contracts)
Investment incentives
Fields Attracting
Investment
Investment attraction
situation
Industrial zones
▪ Incentives according to government regulations:
- Exemption and reduction for land and water rent fee
- Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
5 groups of key sectors: ▪ Industrial development;
▪ Tourism development;
▪ Development of port and logistics services, including seaports and airports;
▪ Development of agriculture, forestry and fishery based on high technology;
▪ Urban economic development in association with urbanization
▪ Total development investment capital in the province by 2022 is estimated at 29,949.7 billion
VND, exceeding 10.3% of the year plan and increasing by 10.1% compared to 2021.
▪ State capital reached 5,531.8 billion VND, up 1.2%; non-state capital reached 21,109.7 billion
VND, up 4.7%; foreign direct investment capital reached 3,308.2 billion VND.
▪ The localities attracting many projects and investment capital are Quy Nhon city, Hoai Nhon and
An Nhon towns, and Tuy Phuoc and Tay Son districts .
The province is home to six industrial parks, including Nhon Hoi EZ on the largest land plot of over
14,000 hectares.
155
Map
Department of Planning and Investment Binh Dinh
▪ Address: No. 35 Le Loi Street, Quy Nhon City, Binh Dinh Province
▪ Tel: Tel: (84) 0256. 3818888
Contact
▪ Email: Email: ipcbinhdinh@gmail.com
▪ Contact person:
- Mr. Nguyen Thuc Dinh - Director
- Tel: 84-91401231
- Email: dinhnt@skhdt.binhdinh.gov.vn
156
LIST OF INDUSTRIAL ZONES IN BINH DINH PROVINCE
No
Industrial zone Name
Total Area (ha)
Occupancy Rate
Status
1
BECAMEX VSIP BINH
DINH
HOA HOI INDUSTRIAL
PARK
NHON HOI INDUSTRIAL
PARK - PARK A
Phu Tai Industrial park
1,425ha
8% in phase I
266.18 ha
-
Ready for construction and
obtaining LURC (Active)
In Operation
394ha
58%
345,8 ha
98%.
2
3
4
MAP OF INDUSTRIAL ZONES IN BINH DINH
157
BECAMEX VSIP BINH DINH
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Sectors
Subdivision 7, Nhon Hoi Economic Zone, Binh Dinh Province
Becamex Binh Dinh Joint Stock Company
- Address: 11 Ngo May Str, Nguyen Van Cu Ward, Quy Nhon City, Binh Dinh Province
- Tel: 0256 3636 668
- Email: info@becamexbinhdinh.com.vn
- Website: www.becamexbinhdinh.com.vn
▪ Hien Nguyen (Bob), Marketing Director, +84 98 9966 936, hien.nt@becamexbinhdinh.com.vn
▪ Kang Ho-dong, Representative in Korea, +82 1053187861, becamex@naver.com
- 19km from Quy Nhon City
- 32km from Phu Cat Airport
- 22km from Quy Nhon International Seaport
- 9km from Dieu Tri railway station
- 8km to 1A highway, 11km to 1D highway, 18km to 19 highway
Priority Sectors for
Investment
Investment Restricted
Sectors
Minimum wage
Lease term
Minimum Lease Area
- Electronics & electrical
- Automobile manufacture and assembly
- Manufaturing mechanical engineering
- Products of support industries for hi-tech
- Textile and garment industry
- Leather and footwear
- Food and beverage industry
- Logistic, warehouse and support industry
- Textile dyeing
- Plating
Area IV According to Decree 38/2022/ND-CP
Start date: 2020
End date : 2070
1 ha
Limit for Construction
Height
According to QCVN 01:2021/BXD national technical regulation on construction planning
Permitted Construction
Rate
The maximum construction density of a land lot for building factories and warehouses is 70%.
In case of factory construction with more than 05 floors , the maximum construction density is
60%.
Planned area
Factory Available for Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean projects
Lease fee
▪ Total area: 1,425ha (1,000ha for industrial land + 425ha for service & urban land)
▪ Total vacant leasable area: 653ha (would be available in phases)
▪ Total area with full infrastructure ready to build factory: > 200ha
N/A
▪ Ready for construction and obtaining LURC (Active)
▪ 8% in phase I
▪ 2 projects
▪ 1 project
▪ Land lease fee: USD60/m2/VAT exclusive
▪ Factory lease fee: N/A
158
Operating fee
▪ Management fee: USD0.07/m2/month/VAT exclusive (10% increase every 5 years)
▪ Electricity fee:
Normal hours: VND 1.555/kwh
Mon – Sat: (04:00 to 09:30; 11:30 to 17:00; 20:00 to 22:00)
Sun: 04:00 to 22:00
Peak hours: VND 2.871/kwh
Mon – Sat: (09:30 to 11:30, 17:00 to 20:00)
Off-peak hours: VND 1.007/kwh
Daily from 22:00 to 04:00
▪ Water fee: ~USD0.63/m3
▪ Wastewater treatment fee: USD 0.36/m3 (10% increase every 5 years)
INFRASTRUCTURE AND FACILITY
Financial institution
Tax service, State finance
office
Customs Service
19km from Bank for Investment and Development of Viet Nam –Binh Dinh Branch (BIDV)
13km from Department of Taxation
23km from State finance office
22km from Customs Agency
22km from the nearest Inland Container Depot
Logistics
Trans-shipment point of North-South railway station next to the Industrial Park
Post office
12.5km from nearest Post office (pick up service available)
Medicare
21km from nearest hospital (Binh Dinh General Hospital), walk-in clinics available within 5km
Police, public security
13km from nearest Police station, local stations available within 5km
Universities, training
facilities, etc.
23km from Quy Nhon University
Recruitment
Worker dormitory
Worker's child education
facility
One-stop service
Road Width
Job centers in Quy Nhon City ~ 21km
Social housing for workers are available provided by Becamex
3km from the nearest Kindergarten
22km from the Public Administration Center of Binh Dinh province
Main road: 32.5m, Branch road: 25m
Communication
Infrastructure of industrial
park
Available
Emergency Power
generator
Available
Fire-fighting facility
Available
159
Location/ Map
160
List of Projects in Industrial Zone
No
Name of Company
Investment Value
(million USD)
Nationality
Business line
1
KURZ Vietnam
100
Germany
Stamping tech
2
HanHwang Ind
18
Korea
Auto parts manufacturing
161
NHON HOI INDUSTRIAL PARK - PARK A
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Sector
Minimum wage
Nhon Hoi Commune, Phuong Mai peninsular, Quy Nhon City, Binh Dinh Province.
Sai Gon - Nhon Hoi Industrial Park Corp.,
• Address: Lot A2.01, Road N3, Nhon Hoi Industrial Zone, Nhon Hoi Commune, Quy Nhon
City, Binh Dinh Province.
• Tel: +84 256 3822 427
• Email: kcnnhonhoia@gmail.com
• Website: www.nhonhoiip.vn
Mr. Phan Vu Tuan
- Position: Sales Director
- Phone: +84 936 356 656
- Email: tuanpvsnp@gmail.com
Adjacent location
- 6km from Quy Nhon City;
- 1.065km from Ha Noi - the capital;
- 30km from Phu Cat Airport;
- 8km from Quy Nhon Port;
- 15km from Dieu Tri Railway Station;
- National high way.
• Priority Sectors for Investment
- Consumer goods industry group.
- Food and pharmaceutical industries.
- Construction industry, production of interior - exterior furniture.
- Supporting industries; Textile industry; Electronic industry.
- Industrial park service industry.
• Restricted Sectors for Investment
Sectors related to plating process, textile dyeing that pollute the environment.
[Area 4] VND 3,640,000 (150 USD/month) - According to Decree 38/2022/ND-CP.
Lease term
50 years, from the date investor receives the Decision of Investment Policy/Investment
Registration Certificate.
Minimum Lease Area
20.000m2
Limit for Construction
Height
- Factory:
Permitted Construction
Rate
+ The height of building depends on the technology line.
+ If the height of 45 meters or more above the ground must be approved by the Operation
Department - Ministry of Defense under the height of works under Decree No. 32/2016 / NDCP of May 6, 2016.
- Service building: 5-9 floors
- Factory: 70%
- Service building: 50%
Factory Available for rent
- Total area: 394ha
- Total vacant leasable area: 126,73ha
- Total area with full infrastructure ready to build factory: 126,73ha
- Total are: 8.000m2
Operation Status
Active
Occupancy Rate and
Number of Projects
- Occupancy rate: 58%
- Number of projects: 52 projects
Number of Korean projects
0
Planned area
162
Lease fee
Operating fee
- Land lease fee: Price policy is issued by the Company at different times and may be changed
depending on land location, land scale and properties of the project.
- Factory lease fee: >1.5 USD/m2/month
- Maintenance fee (Phí duy tu): 0,2 USD/m2/year (free for the first 3 years and shall be paid at
the fourth year)
- Electricity fee:
According to Price-list of EVN: (excluding VAT)
+ Low load hours: 1.100 VND /KWh (22 pm to 4 am).
+ Peak load hours: 3.076 VND /KWh (9.30 am-11.30 am and 5 pm-8 pm)
+ Off-peak load hours: 1.685 VND /KWh (other times)
- Water fee: 15.800VND/m3 (price in 2023, excluding VAT)
- Wastewater treatment fee:
According to the regulation of Binh Dinh Province People’s Committee.
Current price for referesnce:
COD ≤ 75: 5.121 VND/m3
COD ≤ 150: 6.091 VND/m3
151 ≤ COD ≤ 200: 10.446 VND/m3
201 ≤ COD ≤ 300: 15.669 VND/m3
301 ≤ COD ≤ 400: 20.892 VND/m3
401 ≤ COD ≤ 600: 31.338 VND/m3
COD > 600: 41.784 VND/m3
- Waste treatment fee: contact the service supplier for details.
INFRASTRUCTURE
Energy supply (Electricity)
Water supply
Wastewater treatment
Wastewater type allowed
Internal traffic system
Floor load capacity (ton/m2)
Internet & Tel. connection
Situation for foreigners
(hotels, leisure time, ...)
- Nhon Hoi 1 transformer station 110/22KV with capacity 2x63MVA.
- The power grid of 22KV is supplied to the fence of factory
- A transformer station shall be installed in the factory by Binh Dinh Power Company in
accordance with investor’s needs.
- Light electricity system in the IP.
- Water pumping station with capacity 24.000m3 /day (phase 1) and 100.000m3/day (phase 2).
- Water supply pine line is connected to the fence of the factory.
- Fire fighting devices are installed along the internal roads in the IP.
Price in 2023: 15.800 VND/m3 (excluding VAT).
Pipelines for collecting waste water D=300 to D=600 to Nhon Hoi wastewater treatment plant.
- Standard of waste water: Waste water is required to treat to meet
- Type B of the National Technical Regulation on Industrial Wastewater (QCVN
40:2011/BTNMT) before being discharged to the drainage wastewater system of the IP.
Concrete road with H30-XB80 loading capacity.
- Main roads: Lane width: 65-80m;
- Branch roads: Lane width: 65m, 45m, 29m, 27m, 20m;
- Total length of roads in the IP: 30km;
Axle load is 30tons
Investors sign contract with service providers (VNPT or Viettel) for using services
- Hotels and accommodation locating in Quy Nhon City (6km away from Nhon Hoi A IP).
- Restaurant (local food, seafood..) and other entertainment (supermarket, cinema, coffee
shop….)
163
List of Projects in the Industrial Park
No.
Name of Company
Nationality
Business line
1
Minerals Joint Stock Company - Quy Nhon
Vietnam
Standard factory area for rent
2
Nhon Hoi Concrete Joint Stock Company
Vietnam
Concrete factory
3
An Hai Seafood Co., Ltd
Vietnam
Frozen seafood processing factory
4
Phuc Son Cement single share-holder Co.,
Ltd
Hoa Phat Binh Dinh single share-holder Co.,
Ltd
Silic Mien Trung single share-holder Co., Ltd
Taiwan
Cement grinding and transfer station
Vietnam
Electrical refrigeration manufacturing and
assembling factory
Silicon Metal factory
5
6
Vietnam
Vietnam
8
Southern Gas Trading Joint Stock Company,
Central Branch in Binh Dinh
Petrolimex Da Nang Gas Co., Ltd
Vietnam
LPG extraction station and painting, tank
inspection and maintenance factory.
LPG filling station
9
Sa Thach Nhon Hoi Co.,Ltd
Vietnam
Concrete factory
10
Binh Dinh Power Company
Vietnam
11
Bidiphar Non-Betalactam Co., Ltd
Vietnam
Nhon Hoi 110KV transformer station and
branches
High-tech Bidiphar pharmaceutical production
12
Bidiphar Betalactam Co., Ltd
Vietnam
High-tech Bidiphar pharmaceutical production
13
Bidiphar Hi-Tech Co., Ltd
Vietnam
High-tech Bidiphar pharmaceutical production
14
Thien Phuc Binh Dinh Joint Stock Company
Vietnam
15
Rapid Vietnam Bio-Nutrition Joint Stock
Company
Vietnam
16
Marubeni Lumber Vietnam Co., Ltd
Factory producing pharmaceutical glass
packaging and industrial gas.
The factory produces probiotics extracted from
marine fish, fertilizers from marine fish, and
feeds from marine fish.
Wood and polywood processing factory
17
DPack Co., Ltd
Vietnam
High-end packaging factory
18
Binh Dinh Telecommunications (VNPT)
Vietnam
19
Vietnam
20
Hai Minh Construction Trading Production
Joint Stock Company
Vinh Khang Glass Co., Ltd
Providing telecommunications services in Nhon
Hoi Industrial Park - Zone A
The factory produces unburnt bricks,
commercial concrete and concrete structures.
Construction glass processing factory
21
Sao Viet Trading Service Co., Ltd
Vietnam
22
Vietnam
23
Long Van Phat Service Investment
Production Joint Stock Company
Fujiwara Binh Dinh Co., Ltd
24
Phong Dien Power Joint Stock Company
Vietnam
25
My Nghe Binh Dinh Joint Stock Company
Vietnam
26
Tingco Binh Dinh Joint Stock Company
Vietnam
27
Binh Dinh Pharmaceutical - Medical
Equipment Joint Stock Company
(BIDIPHAR)
QUIHUB Industrial Park Investment and
Development Joint Stock Company
Vietnam
7
28
Japan
Vietnam
Vietnam
Vietnam
164
Factory manufacturing and assembling
educational equipment
Factory areas, service offices for rent
Expanding 110Kv line, Nhon Hoi A Industrial
Park transformer station
Expanding 110Kv line belonging to Phuong Mai
3 wind power plant
Motor vehicle registration center
Producing and trading in soft drinks and canned
products
Building a warehouse to preserve
pharmaceuticals, medicinal herbs, medical
equipment and vaccines
Factories for rent
29
Bao Phat Glass Co., Ltd
Vietnam
Factory for processing tempered glass
30
Mekong Binh Dinh Co., Ltd
Vietnam
Factories for rent
31
Duc Toan Binh Dinh Co., Ltd
Vietnam
32
Transportation Training Center
Vietnam
High-end interior and exterior wood processing
factory
Motor vehicle training center
33
Moveo Binh Dinh Co., Ltd
Vietnam
34
B&D Lingerie Vietnam Co., Ltd
35
Fago Animal Feed Co., Ltd
Vietnam
36
Thien Bac Co., Ltd
Vietnam
37
HD Group Joint Stock Company
Vietnam
38
Eco Nhon Hoi Printing & Packaging Co.,Ltd
Vietnam
Factory producing animal feed - veterinary
medicine FAGO Mien Trung.
High-end interior and exterior wood processing
factory
High-end interior and exterior wood processing
factory
Produce packaging
39
Tan Dai Hung General Co.,Ltd
Vietnam
Produce wicker & wood furrniture
40
Thach Cat Tien Co.,Ltd
Vietnam
General service center
41
Central Indoor Furniture Co.,Ltd
Vietnam
Produce furniture
42
SaiGon Rise Co.,Ltd
Vietnam
Produce wood products and mattress
42
Tan Dai Nam General Co.,Ltd
Vietnam
Produce wicker & wood furniture
HongKong
165
Exhibition center to introduce automotive
auxiliary industry.
Textile facrorty
PHU TAI INDUSTRIAL PARK
GENERAL INFORMATION
Lease term
Tran Quang Dieu ward, Quy Nhon city, Binh Dinh province.
Sai Gon - Nhon Hoi Industrial Park Corp.,
• Address: Lot A2.01, Road N3, Nhon Hoi Industrial Zone, Nhon Hoi Commune, Quy Nhon
City, Binh Dinh Province.
• Tel: +84 256 3822 427
• Email: kcnnhonhoia@gmail.com
• Website: www.nhonhoiip.vn
Mr. Phan Vu Tuan
- Position: Sales Director
- Phone: +84 936 356 656
- Email: tuanpvsnp@gmail.com
Adjacent location
Phu Tai Industrial Park is located in Tran Quang Dieu and Bui Thi Xuan wards, Quy Nhon
city, located on the intersection of National Highway 1A and National Highway 19; 12km
from Quy Nhon seaport; 20km from Phu Cat airport; 2km from Dieu Tri railway station.
• Priority Sectors for Investment
Processing agricultural, forest products, food, animal feed; Electronic and mechanical
assembly; Processing stone of all kinds, producing building materials; Packaging
manufacturer; Other industries such as garment, shoes, beer, gas extraction.
2048
Planned area
- Total area: 345,80 ha
Factory Available for rent
- Total are: 8.000m2
Operation Status
Active
Occupancy Rate and
Number of Projects
95%
Number of Korean projects
0
Lease fee
Land rent: raw land according to provincial regulations, average 1,500 VND/m2
Address
Investor
Contact Person
Location
Investment Sector
INFRASTRUCTURE
Power supply system: complete
- Water supply and drainage system: complete
- Wastewater and waste treatment system: completed centralized wastewater treatment plant with capacity of 2000m3/day
-Telecommunication system, internet: complete
- Fire prevention and fighting system: complete
- Internal traffic: complete
166
[- This Page is intentionally left blank -]
167
BINH DUONG
168
INVESTMENT ENVIRONMENT IN BINH DUONG
USD/VND
23.510
GENERAL INFORMATION
Area
Population
Geographical
Location
Adjacent
provinces
2694,43 km2
0,245 million people (2022)
▪ Binh Duong is located in Southeast region.
▪ Located in the Eastern part of the Southern region of Vietnam, and being the part of the Southern Key
Economic Zone.
Binh Duong province to the north, Ho Chi Minh City (HCMC) to the south and southwest, Tay Ninh province
to the west, and Đong Nai province to the east
2022 statistic:
▪ Nominal GRDP (billion VND):
GRDP
▪ Real GRDP (billion VND):
166.000
▪ GRDP growth:
8,00%
▪ GRDP per capita (million VND/year):
166,00
(7,00865526704665 billion USD)
(1891409 USD)
▪ Economic structure:
Industry
growth
Import Export
Key Industry
PCI
Ranking
- Industry - Construction:
69,41%
- Agriculture. forestry and fishery:
2,95%
- Service:
20,15%
▪ Industry - Construction growth:
5,67%
▪ Agriculture, forestry and fishery growth:
3,10%
▪ Service growth:
9,50%
Import turnover (billion USD):
25,80
(Growth rate: 0,01)
Export turnover (billion USD):
35,70
(Growth rate: 0,09)
▪ High-tech application of livestock production continues to develop with 148 chicken farms; 255 pig farms; 45
duck farms; 01 dairy farm.
▪ The new rural construction program continued to be promoted.
▪ Industrial production index in 2022 increased by 8.8% over the same period. In which, the mining industry
increased by 14.8% over the same period; processing and manufacturing industry increased by 8.7%;
production and distribution of gas, hot water, steam and air-conditioning electricity increased by 7.7%; water
supply, management and treatment of waste and wastewater increased by 9.9%.
65.13
36
SOCIAL INFRASTRUCTURE
▪ Roadway:
Transportation - National Road (NR) no. 13, NR no. 14, the HCMC Route and the Trans-Asian Highway.
- Binh Duong is only 10–15 kilometres from Tan Son Nhat International Airport and important ports.
▪ Binh Duong has thermal power plants, wind power plants, and solar power plants through investments from
Electricity
Korea and Denmark▪
▪ Binh Duong has underground water sources mainly fresh water with 5 main aquifers, including 4 porous
aquifers and 1 fissure aquifer. Total underground water potential exploitation reserve in the province is about
Water
2,180,000m3/day, equivalent to about 797 million m3/year.
Education &
8 Universities, 9 Vocational Schools and 59 Training Centers (as of 2019)
Training
Medicare
N/A
INVESTMENT CONDITION
Human
resource
62% of population are in the working age ()
Education level Trained labor rate: 80.5 (2021)
169
▪ The minimum salary for the province is applied as follows:
- Area I (4,680,000 VND/month): Thu Dau Mot City, Thuan An, Di An; Ben Cat and Tan Uyen Towns; Bau
Bang, Bac Tan Uyen, Dau Tieng, Phu Giao districts
- Area II (4,160,000 VND/month): N/A
Salary
- Area III (3,640,000 VND/month): N/A
- Area IV (3,250,000 VND/month): N/A
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages paid to
employees working under employment contracts)
Investment
incentives
Fields
Attracting
Investment
Investment
attraction
situation
▪ Incentives according to government regulations:
- Exemption and reduction for land and water rent fee
- Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
Industries (IT, electronics, micro-electronics, biotechnology, robotics, 3D printing, electric vehicles, supporting
industries, consumer goods, food and beverage processing). Services such as logistics, warehouse, cold storage,
modern infrastructure (urban area, trade center, education and training).
For foreign direct investment, from the beginning of the year to December 15, 2022, attracted US$3.1 billion,
up 48.8% over the same period. In which: the number of projects with new investment certificates: 69 projects
with a total registered capital of 1.9 billion USD (corresponding to a decrease of 2.8% and an increase of 3
times over the same period) and 22 capital adjustment projects (down 18.5% over the same period) with a total
capital of 23.7 million USD (equivalent to 2.9% over the same period); the number of projects contributing
capital, buying shares 172 projects (up 3.6% over the same period) with a total capital of 1,169.7 million USD
(up 74.3% over the same period).
Binh Duong has 30 industrial parks (IP) with a total area surface of over 12,670 hectares and an average
occupancy rate of 87.4 percent as well as another 12 industrial clusters with a total area surface of 790 hectares
and an occupancy rate of 67.4 percent.
Some of the most developed IPs in the province include VSIP, VSIP2, My Phuoc IP, and Dong An IP.
Particularly for this year, the province has started the construction of two 1,000-hectares industrial parks to
increase the supply of industrial land with an eye on foreign investors.
Industrial
zones
The first phase is on the Vietnam-Singapore III (VSIP III) industrial park covering 1,000 hectares in Tan Uyen
Town and Bac Tan Uyen District, which started in March.
The project with a total investment of US$280 million got the green light from the government in November
2016. This is the 10th project of VSIP, a leading industrial park developer in Vietnam.
The other project will be on the 1,000-hectare Cay Truong industrial park in Bau Bang District which is
expected to begin in the second quarter of this year. With these IPs, the province would prioritize high-tech
tenants and labor-intensive industries such as apparel and footwear.
Industrial parks have helped Binh Duong transform from a rural area into an industrial hub. Statistics show that
industries and services account for 97 percent of the province’s total economic output.
170
Map
Department of Planning and Investment Binh Duong
▪ Address: 4th Floor, Tower A, centralized administrative center of Binh Duong, Le Loi Street Intersection
Angle - Hung Vuong Boulevard - Hoa Phu Ward - Ho. Thu Dau Mot - Binh Duong Province
▪ Tel: 0274) 3822926
Contact
▪ Email: sokhdt@binhduong.gov.vn
▪ Contact person:
- Mr. Mai Hung Dung - Director
84.913.950.666
dungmh@binhduong.gov.vn
171
LIST OF INDUSTRIAL ZONES IN BINH DUONG PROVINCE
No
Industrial zone Name
Total Area (ha)
Occupancy Rate
Status
1
BECAMEX BAUBANG
2
Binh An Industrial Park
3400ha
90%
In Operation
25,9 ha
96,04%.
In Operation
3
Binh Duong Industrial Park
16,5 ha
97%
In Operation
4
Dai Dang Industrial Park
274,35 ha
45,82%
In Operation
5
Dat Cuoc Industrial Park
212,84 ha
38%.
In Operation
6
Dong An Industrial Park
138,7 ha
-
In Operation
7
Dong An Industrial Park 2
158,1 ha
86,59%.
In Operation
8
Kim Huy Industrial Park
213,63 ha
50.52%
In Operation
9
Mai Trung Industrial Park
50,55 ha
65%
In Operation
376,92 ha
88%.
In Operation
10
My Phuoc Industrial Park
172
BECAMEX-BAUBANG INUDSTRIAL PARK
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Sectors
Minimum wage
Lease term
Minimum Lease Area
Limit for Construction
Height
Permitted Construction
Rate
Planned area
Factory Available for Rent
Operation Status
Occupancy Rate and
Number of Projects
Lai Uyen Commune, Bau Bang District, Binh Duong Province
BECAMEX IDC
▪ Address: 08 Hung Vuong street, Hoa Phu ward, Thu Dau Mot city, Binh Duong province,
Vietnam
▪ Tel: +84 274 3 822 655
▪ Email: info@becamex.com.vn
▪ Website: becamex.com.vn
▪ Tran Le Chi Cong- Deputy Director - +84 913 685 916- cong.tlc@becamex.com.vn
▪ Kang Ho-dong - Representative in Korea - +82 1053187861-becamex@naver.com
Adjacent location:
- 55km from Ho Chi Minh City
- 25km from Binh Duong New City
- 60km from Tan Son Nhat Int’l airport;
- 60km from Cat Lai port;
- Adjacent to the national road 13, My Phuoc-Tan Van road
 Expressway from Ho Chi Minh City-Binh Duong-Binh Phuoc is supposed to be built by 2026.
5km from this expressway
Priority Sectors for
Electronics, machinery,
Investment
food processing, automobile parts,
new material,
Bio,
Pharmaceutical,
Supporting industry,
…
Investment Restricted
Sectors Natural rubber processing,
tanning, washing – cleansing, dyeing, plating/anodizing, basic
chemical production, detergent, colorant, printing ink,
paper production
[Area II] According to Decree 2022/ND-CP dated 15th November 2022
▪ Start date: April 27, 2016
▪ End date: April 26, 2066
1ha
50m
Maximum 70% of the land area
▪ Total area: 3,400ha (2,000ha for industrial land + 1,400ha for service & urban land)
▪ Total vacant leasable area: 300ha (would be available in phases)
▪ Total area with full infrastructure ready to build factory: 50ha
▪ 30ha
Ready for construction and obtaining LURC
▪ 90%
▪ 167 projects
173
Number of Korean projects
Lease fee
Operating fee
▪ 21
▪ Land lease fee: USD150/m2(VAT exclusive)
▪ Factory lease fee: USD4~4.5/m2/month (VAT exclusive)
▪ Management fee: USD0.04/m2/month (VAT exclusive)
▪ Electricity fee:
- Standard hour: VND1,685/kwh
- Off-peak hour: VND1,100/kwh
- Peak hour
: VND3,076/kwh
▪ Water fee: VND13,800/m3
▪ Wastewater treatment fee: USD0.25/m3
▪ Waste treatment fee: None
INFRASTRUCTURE AND FACILITY
Financial institution
Inside of IP. BIDV, Vietcombank, Sacombank, ACB bank, Techcombank....
Tax service, State finance
office
Inside of IP
Customs Service
Inside of IP
Inside of IP
Logistics
Inside of IP
Post office
Inside of IP
Medicare
Inside of IP. BAUBANG HEALTH CENTER
My Phuoc General Hospital, 12km from the IP
Inside of IP
Police, public security
Universities, training
facilities, etc.
EIU Int’l Univ. German Tech, vocational training centers……
Recruitment
Inside of IP
Worker dormitory
Inside of IP
Worker's child education
facility
Inside of IP
One-stop service
Inside of IP
Road Width
Communication
Infrastructure of industrial
park
Emergency Power
generator
Fire-fighting facility
24~64m
VNTT provides ADSL, High-Speed Internet service
National grid is connected with two substation
Available, inside of IP
174
Location/Map
175
List of Projects in Industrial Zone
No
Company Name
Country
Business lines
1
KISWIRE VN CO., LTD (AGM)
Korea
Details: - Manufacture and processing of steel wires used in
automobile manufacturing and related industries; Manufacture and processing of cables used in automobile
manufacturing and related industries.
2
SAMHOO CO., LTD
Korea
Forging, stamping, pressing and rolling of metal; refining of
metal powder
Details: Manufacture and processing of zinc oxide, zinc
powder
3
KYUNGBANG Vietnam CO.,
LTD
Korea
Fiber production
4
SUNWOOD VINA CO., LTD
Korea
Production of other products from wood; production of
products from bamboo, bamboo, straw, shavings and Tet
materials
Details: Manufacture and processing of wooden doors, wooden
door frames, materials from wood, building materials, other
products from wood.
5
FINE CHEMICAL Vietnam CO.,
LTD
Korea
KYUNGBANG Vietnam CO.,
LTD
SOOHO VINA CO., LTD
Korea
Fiber production
Korea
Manufacture of other general-purpose machines
Details: Manufacture of static electric paint sprayers, automatic
conveyor belts, paint spray chambers (liquid, static electricity),
industrial robots, static electric paint mixers. Production of
clean rooms used for surface treatment before electrostatic
paint coating. Production of static paint dust bombs Production
of paint spray solid-state actuators.
8
T.O.P OUTDOOR VINA CO.,
LTD (LIVE OUTDOOR)
Korea
Production of exercise equipment, sports equipment
Details: Production of tents, tent covers, temporary tents,
sheets, carpets, floorboards, ship covers
9
KOLON BINH DUONG
INDUSTRIAL CO., LTD/KVT-1
TYPE PRODUCTION PROJECT
Korea
Tire cord, airbag
10
KOLON BINH DUONG
INDUSTRIAL CO., LTD
Korea
Dormitory
11
JM TEXTILE VINA CO., LTD
(JIN MYOUNG CORPORATION
LTD)
KYUNGBANG Vietnam CO.,
LTD
SEWANG VINA CO., LTD
Korea
Manufacture of diamond weaving
Details: Manufacture and processing of shuttle fabric.
Korea
Fiber production
Korea
Manufacture of diamond weaving
Details: Manufacture and processing of shuttle fabric.
KOREA FINE CHEMICAL
Vietnam CO., LTD
Korea
6
7
12
13
14
Footwear production
Manufacture of plastic label accessories, plastic logos, plastic
sheets for the footwear, garment and handbag industries by
high-rise, thermal press method
176
15
VINA GLOBAL SEAH CO., LTD
Korea
Manufacture of other metal products that have not yet been
excreted. Details: Networked steel pipe production
16
DSR VINA CO., LTD
Korea
Manufacture of strands and nets. Details: Manufacture and
processing of synthetic ropes used in docking, lifting, and
shipbuilding
17
HAN MEN M3 VINA CO., LTD
Korea
18
19
20
21
PARK'S VINA CO., LTD
TURBO ENTERPRISE
KINSCO CO., LTD
DONGIL RUBBER BELT
VIETNAM CO.,LTD
DUKSUNG VINA CO., LTD
NCL Vietnam CO., LTD /
MARUTSU (Vietnam) CO., LTD
Korea
Korea
Korea
Korea
MOROFUJI Vietnam CO., LTD
Japan
22
23
24
Korea
Japan
Wood composite production
Manufacture of other products from wood; produce products
from bamboo, cork, straw, and plaiting materials
Details: Producing and processing all kinds of frames, frame
stands
Producing all kinds of bags and bags made of polythene and
paper, Producing related accessories.
25
26
NH ENGINEERING CO., LTD
CONDOR Vietnam CO., LTD
Japan
Japan
Manufacturing metal structures.
Other production is not yet classified
Details: Manufacture, processing and assembly of carpets made
of cloth, plastic, wood; manufacture, processing and assembly
of cleaning, cleaning tools; manufacture and processing of
household products (fiber toilet sheets, indoor slippers, waterspray bath caps); production, processing and assembly of waste
products
27
CONDOR Vietnam CO., LTD
Japan
Other production is not yet classified
Details: Manufacture, processing and assembly of carpets made
of cloth, plastic, wood; manufacture, processing and assembly
of cleaning, cleaning tools; manufacture and processing of
household products (fiber toilet sheets, indoor slippers, waterspray bath caps); production, processing and assembly of waste
products
Japan
Production of toys, games
Details: Toy manufacturing and processing
Japan
Garment of clothing (except clothing from fur leather)
Details: Production and export of sportswear, men's clothing,
women's clothing, bedclothes, underwear, uniforms and the
like
(BB FACTORY)/ BW CN
DEVELOPMENT JSC
28
29
T'S LAB CO., LTD (Factory)
/ BW CN DEVELOPMENT
JOINT STOCK COMPANY
ATAGO Vietnam GARMENT
CO., LTD
30
AMON Vietnam CO., LTD
Japan
Manufacture of spare parts and parts for motorized vehicles
and motor vehicles
Details: Manufacture of electrical wiring sets, rearview mirrors,
power lines, car parts.
31
Vietnam SIMON SAFETY
INDUSTRIES CO., LTD
Japan
Footwear production
32
SMF Vietnam CO., LTD
Japan
spare parts, automobile parts, electric appliances
177
33
TENG TSUN CO., LTD/ TENG
TSUN CO., LTD
34
NS MILLENNIUM Vietnam CO.,
LTD
35
36
37
38
39
LEE WEN_JUNG
DAI CHI Vietnam CO., LTD
VIET_STAR CO., LTD
CHAN SHENG CO., LTD
LONG TRIUMPH CO., LTD
Taiwan
Malaysia_ĐL
Taiwan
Taiwan
Taiwan
Taiwan
Taiwan
Manufacture of products from Plastic
Manufacture of suitcases, bags and the like, manufacture of
cushions
Details: Production of chair and bed mattress of all types
Production of metal structures
Weaving, raking, grinding, sewing all kinds of clothes (do not
carry out the process of washing and dyeing)
40
U TEX CO., LTD
Taiwan
Basic chemical production
detail: Manufacture of finishing dye additives.
41
CAT TR CO., LTD (BICHEN CO.,
LTD/Mr. BENNY LIN)
Taiwan
Manufacture of medical, dental, orthopedic and rehabilitation
equipment and instruments
Details: Producing all kinds of medical equipment.\
42
SHIH HUNG CO., LTD / MR
CHRIS CHANG
Taiwan
Manufacture of beds, cabinets, tables and chairs
43
EMC VN CO., LTD
Taiwan
Manufacture of paints, varnishes and similar coatings;
manufacture of printing ink and mastics
Details: Producing raw materials and additives of all kinds used
in the production of paints and oils; production of paints, oils
and additives used in the construction, industrial, metal and
plastic industries; processing and manufacturing all kinds of
sanding materials: water glue, paper glue, tape and paper
44
O_TA PRECISON INDUSTRY
CO., LTD
YACHT TECHNOLOGY
TECHNOLOGY CO., LTD
( Vietnam )
Taiwan
Taiwan
Manufacture of batteries and accumulators
Details: manufacturing all kinds of batteries (batteries, batteries
and accumulators).Manufacturing all kinds of UPS; computers
and related equipment; battery cover made of plastic; fiberglass
processing.
46
CHEN HO TEXTILE CO., LTD
(Vietnam)
Taiwan
Fiber production
Details: Manufacture of industrial fibers, textiles and color
fibers; Production of thread, thread, thread and thread used in
the textile industry.
47
YUE CHANG CO., LTD
(Vietnam)
Taiwan
Fiber production
Details: Textiles and colored fibers for industrial use
48
HUGE_BAMBOO TEXTILE
INDUSTRIAL CO., LTD
Taiwan
Textile finishing
Details: Manufacture of dyed fabrics (no dyeing processing).
49
POLYTEX FAR EASTERN CO.,
LTD (Vietnam)
Taiwan
Fiber production
50
51
52
REN DING TRADE LTD
CHAIN YARN Vietnam CO., LTD
TAITAN Vietnam CO., LTD
Taiwan
Taiwan
Taiwan
45
Fiber production
Manufacture of batteries and accumulators
Details: - Manufacture of accumulators; - Manufacture of
electrode plate components and battery-related machinery and
equipment; - Processing battery materials.
178
53
WOLPAK Vietnam PACKAGING
CO., LTD /DDK Vietnam
INVESTMENT &
DEVELOPMENT CO., LTD
Taiwan
Trading in real estate, land use rights belonging to owners,
users or renters
Details: Factory for rent. Building and selling factories. Buy
and sell factories .Buy assets attached to land .
54
DAI HAO TEXTILE CO., LTD
Taiwan
Finishing of textile products
Details: Production, processing, dyeing of fabrics, all kinds of
textile products, gluing fabrics
55
DE LICACY Vietnam
INDUSTRIAL CO., LTD
Taiwan
Fiber production
56
CAPCO WAI SHING Vietnam
CO., LTD
Taiwan
Producing products from plastic
Details: Producing and processing all kinds of plastic clothes
hangers, plastic clothespins
57
58
SINGTEC CO., LTD
ADVANCE WISDOM CO., LTD
(SINGTEC)
Taiwan
Taiwan
Production of knitted fabrics
Production of knitted fabrics
59
ALPHA BRAVE CO., LTD
Taiwan
Manufacture of knitted fabrics, crocheted fabrics and other
nonwovens
Details: Production of knitted fabrics
60
YU WEI Vietnam CO., LTD
Taiwan
Non-ferrous metal casting
Details: - Manufacture of mold products of all kinds; metal
molds; plastic injection mold; mold reinforcement production;
Manufacture of mold-fixing components (mold cores, gaskets,
punching tools) (Enterprises can only operate after completing
investment procedures as prescribed by law); - Manufacture of
copper poles; - Producing metal connectors (cast lead, from
lead raw materials, not lead recycling)
61
TE ENRICHI CO., LTD
Taiwan
Manufacture of knitted fabrics, crocheted fabrics and other
nonwovens
Details: Production of warp knitted fabrics
62
ZHONG JU VIET NAM
INDUSTRIAL CO., LTD
Taiwan
Production of woven fabrics
Details: Flat weave, warp fabric
63
HI_TECH J&B Vietnam CO., LTD
Taiwan
Finishing of textile products
Details: Producing and gluing film, making waterproof,
coating, fabric gluing
64
LEEDA Vietnam CO., LTD / DDK
Vietnam INVESTMENT &
DEVELOPMENT CO., LTD
T-STAR ELECTRICAL CO.,
LTD/ DDK INVESTMENT &
DEVELOPMENT CO., LTD
Vietnam CN
SWR CO., LTD (LUXWELL
HOLDING CO., LTD)
Taiwan
Footwear production
Details: Footwear Production; Footwear border; Leather
Taiwan
Installation of electrical systems
Taiwan
Producing other products from rubber
Details: Raw-Edge (RE) loading line; PV/PVC conveyor belts,
conveyor belts (Curoa)
67
BRANCH OF A Chau (VN)
NUTRITION COMPANY
LIMITED IN BINH DUONG
Taiwan
Production of feed for livestock, poultry and fisheries
Details: Production of livestock feed, poultry and aquaculture
feed, additives for livestock feed, poultry and aquaculture.
Processing of feed for livestock, poultry and fisheries for
domestic individuals and organizations
68
PAIHONG Vietnam CO., LTD
Taiwan
Production of needle weaving, knitting and other nonwoven
fabrics
Details: Fabrication of all kinds.
65
66
179
69
PAIHONG Vietnam CO., LTD
Taiwan
Production of needle weaving, knitting and other nonwoven
fabrics
Details: Fabrication of all kinds.
70
SON YUNG SHYANG Vietnam
CO., LTD/ DDK INVESTMENT
& DEVELOPMENT CO., LTD.
Taiwan
Manufacture of paints, varnishes and similar coatings;
manufacture of printing ink and mastics
Details: Production of paints, oil paints, pigments, printing
inks, water-based paints, solvents (Not manufactured or
processed at the head office)
71
POLYTEX FAR EASTERN CO.,
LTD (Vietnam)
Taiwan
72
TOP POINT INTERNATIONAL
Vietnam CO., LTD / DDK
INVESTMENT &
DEVELOPMENT CO., LTD.
Taiwan
Production of bicycles and bicycles for the disabled
Details: Manufacture of hooks (brake hands, support legs),
suspension tips, frame joints, oil shock absorption cover, oil
storage box, chain neck.
73
EVERISE CO., LTD/
EVERYOUNG GROUP CO., LTD
/ DDK INVESTMENT &
DEVELOPMENT CO., LTD
Vietnam CN
DDK Vietnam INVESTMENT &
DEVELOPMENT CO., LTD
Taiwan
Production of other specialized machines
Details: Manufacture and manufacture of machinery and
wastewater treatment equipment; drinking water purifier
Taiwan
Real estate business, land use rights owned by owner, owner or
tenant
Details: Leasing the factory. Building and selling factories.
Buy and sell factories, buy assets associated with land.
75
THUY DUONG
INTERNATIONAL CO., LTD
(Vietnam)
Taiwan
Manufacture of knitted fabrics, crocheted fabrics and other
nonwovens
Details: Producing knitted fabrics (not performing dyeing,
washing and bleaching).
76
SPOTY Vietnam CO., LTD /
HOTTA VIET NAM CO., LTD
TRANSFER
Trung Quốc
77
LEEDA Vietnam CO., LTD / DDK
INVESTMENT &
DEVELOPMENT CO., LTD.
Taiwan
Footwear production
Details: Footwear Production; Footwear border; Leather
78
HUNG Nghiep WAYTEX
(Vietnam) CO., LTD/ DDK
Vietnam INVESTMENT &
DEVELOPMENT CO., LTD
Taiwan
Manufacture of beds, cabinets, tables and chairs; Manufacture
of woven plastic and textioene mesh fabrics; Manufacturer of
seats; Manufacture of ready-made goods (except for clothing),
Manufacture of tents and umbrellas
79
POLYTEX FAR EASTERN CO.,
LTD (Vietnam)
Taiwan
Fiber production
Details: - Manufacture and processing of polyester synthetic
fiber products including filament long fiber; - Manufacture and
processing of short cut cotton fiber (coton spun fiber), natural
fiber and synthetic fiber
80
WAYTEX INTERNATIONAL
CO., LTD /DDK Vietnam
INVESTMENT &
DEVELOPMENT CO., LTD
TRANSFER
MPF Vietnam CO., LTD /DDK
INVESTMENT &
DEVELOPMENT CO., LTD.
Taiwan
Production of beds, cabinets, tables, chairs
Details: Production of beds, cabinets, tables, chairs
Taiwan
Production of vehicles and other transportation equipment that
have not yet been classified
Details: Manufacture of baby strollers, strollers of all types,
trolley components
74
81
Manufacture of suitcases, bags and the like, manufacture of
seat cushions
Details: - Manufacture of bags, tool bags, backpacks, suitcases
- Manufacture of bags for pets
180
82
83
LACQUER CRAFT Vietnam
FURNITURE CO., LTD
/WEALTHY BRIGHT (HK)
LIMITED
RT INDUSTRIES CO., LTD (LTREE RESOURCES)
Taiwan
Other production is not yet classified
Details: Furniture production, interior decoration.
Taiwan
Production of other products from wood; production of
products from bamboo, bamboo, straw, shavings and Tet
materials
Details: Wooden sofa production and fabric sofa, mattress
Trung Quốc
Producing cutlery, hand tools and common metal products
Details: hammer, ax, sledgehammer, chisel, mallet….
84
POWER CREATION
INDUSTRIAL CO., LTD
85
GRAND AURORA CO., LTD
Taiwan
Producing products from plastic
Details : Producing packaging from plastic ; plastic zipper,
zipper head (do not use plastic scrap materials).
86
FILTRAFINE (Vietnam) CO.,
LTD
Taiwan
Manufacture of other metal products that have not yet been
excreted
Details: Manufacture and processing of filters, filter bags, etc.
etc. made of metal parts.
87
88
REN DING TRADING LTD
QUAN YU Vietnam
INDUSTRIAL CO., LTD / DDK
Vietnam INVESTMENT &
DEVELOPMENT CO., LTD.
TRANSFER
Taiwan
Taiwan
89
JIA BAO RUI Vietnam CO., LTD
Taiwan
90
START WIN INVESTMENT CO.,
LTD/ DDK Vietnam
INVESTMENT &
DEVELOPMENT CO., LTD
TRANSFER
ALTOP Vietnam Precision
Stamping Co., Ltd/DDK Vietnam
INVESTMENT &
DEVELOPMENT CO., LTD
Taiwan
CALLPACK PRINTING &
PACKAGING CO., LTD/ DDK
Vietnam INVESTMENT &
DEVELOPMENT CO., LTD
PHARMA ALIANCE Vietnam
CO., LTD/ DDK Vietnam
INVESTMENT &
DEVELOPMENT CO., LTD
Taiwan
Taiwan
Trading in real estate, land use rights belonging to owners,
users or renters
Details: Factory for rent. Building and selling factories. Buy
and sell factories .Buy assets attached to land .
ZHAO SHUN INDUSTRY CO.,
LTD/ DDK Vietnam
INVESTMENT &
DEVELOPMENT CO., LTD.
TRANSFER
Taiwan
Manufacturing and processing sandblasting machines,
industrial vacuuming equipment, industrial exhaust gas
treatment equipment, conveyor systems, ball-shooting
machines, polishing machines, iron racks (scaffolding, frames,
iron shelves) ); sandblasting.
91
92
93
94
Taiwan
Other production n.e.c
Details: Manufacture of wooden and metal stairs, manufacture
of wooden or metal stair accessories, balustrades, posts, pillar
boxes, turners, stair treads, crimping heads .....) Enterprises
do not perform plating, processing and coating processing of
metal surfaces.
Details: Producing hollow plastic sheets
Producing other metal products not elsewhere classified
Details: Producing and processing stamping products from
aluminum alloy (such as lawn mower cylinders, motorcycle
engine boxes, automobile gearboxes, etc.) Bicycle front forks,
agricultural machinery components, telecommunications
equipment radiators, Medical ultrasound machine bottoms,
etc.)
181
95
GUAN SHENG POLYMER
TECHNOLOGY CO., LTD / DDK
Vietnam INVESTMENT &
DEVELOPMENT CO., LTD
Taiwan
Production of Plastic Granules
(TPE - Thermoplastic Elastomer and TPR
- Thermoplastic Rubber)
96
GOLDEN VIETNAMTEX CO.,
LTD/ DDK Vietnam
INVESTMENT &
DEVELOPMENT CO., LTD
transfer
FUMAO Vietnam MECHANICAL
CO., LTD
Taiwan
Production of ready-made goods (except for clothing)
Details: Production and processing of ready-made goods
Taiwan
Production and processing of oil pressure gauges, high pressure
watches, industrial watches
GLODEN VIETNAMTEX CO.,
LTD/DDK Vietnam
INVESTMENT &
DEVELOPMENT CO., LTD
CHEONG MING Vietnam PAPER
PACKAGING CO., LTD
Taiwan
Production and processing of ready-made goods.
Taiwan
Production of wrinkled paper, wrinkled cardboard, packaging
from paper and cardboard
Details: Carton box set production, lining paper
AMPACS INTERNATIONAL
CO., LTD / DDK Vietnam
INVESTMENT &
DEVELOPMENT CO., LTD
SUMMIT ELEC-TECH
INDUSTRIAL CO., LTD
INDUSTRIAL Vietnam
Taiwan
Manufacture of wired headphones, wireless headphones
Taiwan
Manufacture of pumps, compressors, hoses and other valves
Manufacture of pumps, compressors, hoses and other valves
details: manufacture of solenoid valves from categories
102
FOJO INTERNATIONAL CO.,
LTD
Taiwan
Producing products from plastic
Processing plastic injection molding, plastic industry.
103
REGA Vietnam CO., LTD
Taiwan
Production of flower printing processing and digital flower
printing on fabrics and paper, production of flower press on
fabrics.
104
FUMEI CO., LTD
Taiwan
manufacturing, processing, manufacturing all kinds of springs
105
SUNFIBER Vietnam Co., Ltd.
Taiwan
Manufacture of artificial fiber Details: Manufacture of garment
materials such as pad, lining, fabric and cotton construction.
Doughing from cloth and cotton (no washing process).
106
107
PAIHONG Vietnam CO., LTD
YUYING INTERNATIONAL
GROUP (HK)CO.,LIMITED/JH
INTERNATIONAL TRADE (HK)
LIMITED
MONOGRAM HOME Vietnam
CO., LTD
Taiwan
Hong Kong
Manufacture of fabrics of all kinds.
Garment of clothing from leather (except fur leather)
Hong Kong
Production of beds, cabinets, tables, chairs
Details: Manufacture and processing of wooden cabinet door
panels and related products made of wood, wooden cabinet
body panels and related products made of wood; Production of
wood cabinet processing
109
MONOLAND WOOD PRODUCT
Vietnam CO., LTD
Taiwan
110
RONG DAL WOOD
INDUSTRIES CO., LTD
Taiwan
111
AMPACS INTERNATIONAL
CO., LTD
CHEMICAL CANLEN Vietnam
CO., LTD
Taiwan
97
98
99
100
101
108
112
Taiwan
182
113
114
HONOR TALENT CO.,LTD
HAN CHANG INVESTMENT
CO., LTD (Vietnam)
Taiwan
Taiwan
115
MINGZHI VIETNAM PLASTIC
CO., LTD
Taiwan
CYCLETECH (Vietnam) CO.,
LTD
JING, GUANGHUA
JIA BAO RUI CO., LTD
HONG KONG ZHONGTONG
INDUSTRY LIMITED
Taiwan
120
CHYFLY . TECHNOLOGY AND
TRADING CO., LTD
Taiwan
121
TRAN VUNG/ ZHONG YI FENG
INTERNATIONAL CO.,LIMITED
Taiwan
122
ANTOOL KIMBER TOOLS CO.,
LTD
AN VIET MANUFACTURING
CO., LTD (Factory)/ BW CN
DEVELOPMENT JSC
Taiwan
FORTUNA INVESTMENT AND
TRADING COMPANY LIMITED
Vietnam
FORTUNA INVESTMENT AND
TRADING CO., LTD (store the
file Fortuna 6,000m2)
Vietnam
116
117
118
119
123
124
125
126
Do not count the order number
because this lot has been split into
3 lots
FORTUNA INVESTMENT AND
TRADING COMPANY LIMITED
Production and processing of plastic beads, plastic components,
metal molds
Taiwan
Taiwan
Taiwan
USA
Producing products from plastic
Details: Manufacture of cover products used to cover
machinery, equipment and tools
Buying and selling building materials, interior decoration
products
Buying and selling building materials, interior decoration
products
Vietnam
Buying and selling building materials, interior decoration
products
FORTUNA INVESTMENT AND
TRADING COMPANY LIMITED
Vietnam
FORTUNA INVESTMENT AND
TRADING COMPANY LIMITED
Vietnam
129
INVESTMENT SERVICES
CONSULTING JSC (ISC CO.)
Vietnam
130
TAN CAN CAN INVESTMENT
JOINT STOCK COMPANY
Vietnam
Trading in real estate, land use rights belonging to owners,
users or renters
Details: Factory leasing, buying and selling ready-built
factories (according to the provincial planning)
131
HSING CHENG CO., LTD
(Vietnam/ Mr. YEH, CHIEHCHENG/ KIM ANH WOOD
MANUFACTURER CO., LTD/
VIETNAM CONSTRUCTION
INVESTMENT CONSULTATION
CO., LTD/ BINH SPRING
WINDOWS JOINT STOCK
COMPANY / BUSINESS AND
DEVELOPMENT JOINT STOCK
Vietnam
Manufacture of machines for textile, garment and leather
industries
This class includes: Manufacture of machinery used in the
textile, dyeing and sewing industries: specifically for washing,
cleaning, wringing, drying, steaming, pressing, bleaching,
dyeing, glazing, finishing, coating or impregnating : yarn,
textiles, finished textiles
127
128
Buying and selling building materials, interior decoration
products
Buying and selling building materials, interior decoration
products
183
COMPANY DUONG (TDC)
transfer
132
CARGILL Vietnam CO., LTD
Vietnam
Production of feed for livestock, poultry and fisheries
Details: Production of livestock, poultry and fisheries feed
133
AN BINH PAPER JOINT STOCK
COMPANY _ Vietnam
Vietnam
Manufacture of pulp, paper and board
Details: Producing sets of paper, paper and paperboard
134
SUCCESSFUL FEED
PROCESSING CO., LTD
Vietnam
135
PHU AN VINH INVESTMENT
JOINT STOCK
COMPANY/HUNG MINH
WOOD CO., LTD/ NGOC LAN
COMPANY - DOCTOR
KHUONG
PHU AN VINH INVESTMENT
JOINT STOCK COMPANY
BINH DUONG NUTIFOOD
NUTRITIONAL FOOD JSC
Vietnam
DAI THANH PHUONG JSC/
BRANCH OF GY
CONSTRUCTION COMPANY
LIMITED TRANSFER
NGAN HOANG PHAT
SERVICES AND REAL ESTATE
COMPANY LIMITED
Vietnam
ANH SAO DUONG JOINT
STOCK COMPANY
NGAN HOANG PHAT Real Estate
Services TRADING COMPANY
LIMITED ( LUU VN DIFFERENT
TO THI HOI HOA )
HOANG NGAN PHAT REAL
ESTATE TRADING SERVICE
COMPANY LIMITED (LUU VN
DIFFERENT TO THI HOI HOA)
TRINH GIA PHAT REAL
ESTATE CO., LTD
Vietnam
MY PHUOC HOSPITAL JOINT
STOCK COMPANY
INTERNATIONAL DAIRY
JOINT STOCK COMPANY
Vietnam
136
137
138
139
140
141
142
143
144
145
Manufacture of drugs, pharmaceutical chemicals and medicinal
herbs
Details: Producing cosmetic products, processing latex
Vietnam
Vietnam
Processing milk and dairy products
Details: Production of liquid milk, powdered milk - Processing
fresh milk in liquid form, pasteurized milk, bactericidal milk,
homogenized or heated - Processing milk-based beverages; Manufacture of ice cream from fresh milk, pasteurized,
sterilized, homogenized milk - Manufacture of dried or
condensed milk sweetened or unsweetened - Manufacture of
milk or solid ice cream; manufacture of butter, yoghurt, cheese
or curd - Manufacture of liquid yogurt, manufacture of casein
or lac to - Manufacture of ice cream and other edible ice
products such as fruit ice cream
Building non-residential houses
Vietnam
Manufacture of other specialized machines
Details: Manufacture of woodworking machines, circular saw
blades and accessories
Vietnam
Leasing factory
Vietnam
Leasing factory
Vietnam
Vietnam
184
146
147
148
149
150
151
BINH DUONG TOKYO AND
INDUSTRIAL SERVICES CO.,
LTD
L&D INVESTMENT
MANUFACTURING AND
TRADING CO., LTD
ARDA CO., LTD
SUKMONO VIET NAM CO.,
LTD (to lease the workshop to
Jimmy Food)
JIMMY HUNG ANH FOOD CO.,
LTD (June 2011 under
construction)
RHINE PRECISION ALLOY
(Vietnam) CO., LTD\HTL
FURNITURE Vietnam CO., LTD
Vietnam
Vietnam
Ý
Netherlands
Manufacture of beds, cabinets, tables and chairs
Manufacture of pasta, noodles and similar products
Netherlands
Manufacture of pasta, noodles and similar products
Singapore
Manufacture of suitcases, bags and the like, manufacture of
seat cushions
152
EMIVEST FEEDMILL VIET
NAM CO., LTD
Malaysia
Production of feed for livestock, poultry and fisheries
153
EMIVEST FEEDMILL Vietnam
CO., LTD - BRANCH OF
VETERINARY DRUG
PRODUCTION
Malaysia
Production of feed for livestock, poultry and fisheries
Denmarkh
footwear production
Denmarkh
footwear production
Denmarkh
footwear production
Netherlands Vietnam
real estate business
154
ECCO (Vietnam) CO., LTD factory/ BW CN DEVELOPMENT
JSC
155
156
157
ECCO (Vietnam) CO., LTD factory/ BW CN DEVELOPMENT
JSC
ECCO (Vietnam) CO., LTD - Land
lease
BW BAU BANG
DEVELOPMENT CO., LTD
BB01/BW INDUSTRIAL
DEVELOPMENT JOINT STOCK
COMPANY
(PROJECT 02 IN BAU BANG
Industrial Park)
158
A. Minh signed the contract
DKW GLOBAL COMPANY
LIMITED (FACTORY)
159
AN VIET PRODUCTION CO.,
LTD -Land for rent
160
TOP GLOVE Vietnam CO.,
LTD/INVESTMENT SERVICES
CONSULTING JSC (ISC CO.)
TRANSFER
BW BAU BANG INDUSTRIAL
DEVELOPMENT JOINT STOCK
COMPANY
161
162
BW INDUSTRIAL
DEVELOPMENT JOINT STOCK
COMPANY
Thái Lan
USA
Malaysia
Manufacture of plastic products
Producing products from plastic
Details: Manufacture of cover products used to cover
machinery, equipment and tools
Producing products from plastic
Details: Producing gloves from plastic, manufacturing other
products from plastic.
Netherlands Vietnam
Warehousing and storage of goods
Netherlands Vietnam
Warehousing and storage of goods
(store the HQ/TH file basket)
185
163
164
BW INDUSTRIAL
DEVELOPMENT JOINT STOCK
COMPANY
(store the HQ/TH file basket)
A.J PLAST PUBLIC COMPANY
LIMITED
Netherlands Vietnam
Warehousing and storage of goods
Thái Lan
Manufacture products from plastic
165
ARNEPLANT Vietnam CO., LTD
(stored in VNam BB)
Tây Ban Nha
166
BW BAU BANG
DEVELOPMENT CO., LTD BB06 (stored in Chinese BBMR)
BW BAU BANG
DEVELOPMENT CO., LTD BB05 (stored in Chinese BBMR)
Netherlands
167
Manufacture of shoe insoles
Netherlands
186
BINH AN INUDSTRIAL PARK
GENERAL INFORMATION
Address
Binh Thang Ward - Di An City - Binh Duong
Binh Thang Investment Development Joint Stock Company
Investor
Investment Sectors
Lease term
Priority Sectors for
Investment
▪ Start date: 2003
Minimum Lease Area
N/A
Limit for Construction
Height
Permitted Construction
Rate
N/A
Planned area
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean projects
Lease fee
Garment; Garment accessories; Paper packaging…
N/A
Total area: 25,9ha
N/A
▪ 96,04%.
N/A
60 USD/m2 Chưa bao gồm VAT
INFRASTRUCTURE AND FACILITY
Financial institution
Inside of IP. BIDV, Vietcombank, Sacombank, ACB bank, Techcombank....
Tax service, State finance
office
Inside of IP
Customs Service
Inside of IP
Inside of IP
Logistics
Inside of IP
Post office
Inside of IP
Police, public security
Inside of IP
Recruitment
Inside of IP
Worker dormitory
Inside of IP
Worker's child education
facility
Inside of IP
One-stop service
Inside of IP
187
Fire-fighting facility
Available, inside of IP
View
188
DAI DANG INUDSTRIAL PARK
GENERAL INFORMATION
Address
Phu Tan Ward - Thu Dau Mot City - Binh Duong
Dai Dang Construction and Investment Co., Ltd
Investor
Investment Sectors
Lease term
Priority Sectors for
Investment
▪ Start date: 2005
Minimum Lease Area
N/A
Limit for Construction
Height
Permitted Construction
Rate
N/A
Planned area
N/A
274,35 ha
Factory Available for Rent
N/A
Operation Status
N/A
Occupancy Rate and
Number of Projects
Number of Korean projects
Lease fee
Woodworking and interior decoration; Mechanical assembly;
Agricultural processing; Power electronics; Garment, packaging,
footwear; Assembling and repairing agricultural, forestry and
transportation machines
▪ 45,82%
N/A
60 USD/m2 Chưa bao gồm VAT
INFRASTRUCTURE AND FACILITY
Financial institution
Inside of IP. BIDV, Vietcombank, Sacombank, ACB bank, Techcombank....
Tax service, State finance
office
Inside of IP
Customs Service
Inside of IP
Inside of IP
Logistics
Inside of IP
Post office
Inside of IP
Police, public security
Inside of IP
Recruitment
Inside of IP
Worker dormitory
Inside of IP
189
Worker's child education
facility
Inside of IP
One-stop service
Inside of IP
Fire-fighting facility
Available, inside of IP
190
DAI DANG INUDSTRIAL PARK
GENERAL INFORMATION
Address
Phu Tan Ward - Thu Dau Mot City - Binh Duong
Dai Dang Construction and Investment Co., Ltd
Investor
Investment Sectors
Lease term
Priority Sectors for
Investment
▪ Start date: 2005
Minimum Lease Area
N/A
Limit for Construction
Height
Permitted Construction
Rate
N/A
Planned area
N/A
274,35 ha
Factory Available for Rent
N/A
Operation Status
N/A
Occupancy Rate and
Number of Projects
Number of Korean projects
Lease fee
Woodworking and interior decoration; Mechanical assembly;
Agricultural processing; Power electronics; Garment, packaging,
footwear; Assembling and repairing agricultural, forestry and
transportation machines
▪ 45,82%
N/A
60 USD/m2 Chưa bao gồm VAT
INFRASTRUCTURE AND FACILITY
Financial institution
Inside of IP. BIDV, Vietcombank, Sacombank, ACB bank, Techcombank....
Tax service, State finance
office
Inside of IP
Customs Service
Inside of IP
Inside of IP
Logistics
Inside of IP
Post office
Inside of IP
Police, public security
Inside of IP
Recruitment
Inside of IP
Worker dormitory
Inside of IP
Worker's child education
facility
Inside of IP
191
One-stop service
Fire-fighting facility
Inside of IP
Available, inside of IP
MAI TRUNG INUDSTRIAL PARK
GENERAL INFORMATION
Address
An Tay Commune - Ben Cat Town - Binh Duong
Investor
Enterprise Construction Investment and Service Mai Trung
▪ Tel: +0907770288
Location
Investment Sectors
Minimum wage
Lease term
Adjacent location:
- Distance to nearest Big city: Ho Chi Minh City 43 km
- Distance to Provincial Center: 18 km from Thu Dau Mot
- Distance to nearest Airport: 44 km from Tan Son Nhat
- Distance to the nearest railway station: 50 km from Saigon station
- Distance to the nearest River Port: Saigon Port 51 km
- Distance to the nearest seaport: Cat Lai Port 55 km
Priority Sectors for
Fine art wood processing industry and interior decoration;
Investment
Mechanical assembly industry; Agricultural product processing
industry - food; Electrical and electronic industry; Garment and
leather shoe industry; Light industry and packaging; Industry,
assembling and repairing agricultural, forestry and transportation
machinery.
[Area II] According to Decree 2022/ND-CP dated 15th November 2022
▪ Start date: 2005
Minimum Lease Area
▪ Smallest rental area: 10000 (m2)
Limit for Construction
Height
Planned area
N/A
Factory Available for Rent
Operation Status
▪ Total planned area: 50.6 (ha)
▪ Area available for rent: 12 (ha)
▪ Smallest rental area: 10000 (m2)
▪ 30ha
In operation
Occupancy Rate and
Number of Projects
▪ 65%
Number of Korean projects
▪ None
Lease fee
▪ 30 USD/m2
INFRASTRUCTURE AND FACILITY
Financial institution
Tax service, State finance
office
Inside of IP. BIDV, Vietcombank, Sacombank, ACB bank, Techcombank....
Inside of IP
192
Customs Service
Inside of IP
Inside of IP
Logistics
Inside of IP
Post office
Inside of IP
Medicare
Inside of IP. BAUBANG HEALTH CENTER
My Phuoc General Hospital, 12km from the IP
Inside of IP
Police, public security
193
KIM HUY INUDSTRIAL PARK
GENERAL INFORMATION
Address
Investor
Investment Sectors
Lease term
Binh Chuan, Thuan An district, Binh Duong province
Kim Huy Industrial Park Development Co., Ltd
Address: 27/3 DT 743 – Binh Quoi, Binh Chuan commune, Thuan An town, Binh Duong
province.
- Telephone: (84-650) 3815015
- Fax: (84-650) 3815014
- Website: www.kcnkimhuy.com.vn
- Email: khip@kcnkimhuy.com.vn
Priority Sectors for
Garment industry, high-grade leather shoes; Mechanical
Investment
manufacturing and assembly industry; Industrial production of
high-grade wooden products; Some other occupations do not
pollute the environment.
Start date: 2006
Minimum Lease Area
N/A
Limit for Construction
Height
Permitted Construction
Rate
N/A
Planned area
Factory Available for Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean projects
Lease fee
N/A
213,63 ha
Area available for rent: 120 (ha)
Smallest rental area: 10000 (m2)
N/A
N/A
50.52%
N/A
60 USD/m2
INFRASTRUCTURE AND FACILITY
Financial institution
Inside of IP. BIDV, Vietcombank, Sacombank, ACB bank, Techcombank....
Tax service, State finance
office
Inside of IP
Customs Service
Inside of IP
Inside of IP
Logistics
Inside of IP
Post office
Inside of IP
Police, public security
Inside of IP
Recruitment
Inside of IP
194
Worker dormitory
Inside of IP
Worker's child education
facility
Inside of IP
One-stop service
Inside of IP
Fire-fighting facility
Available, inside of IP
View
195
[- This Page is intentionally left blank -]
196
BINH PHUOC
197
INVESTMENT ENVIRONMENT IN BINH PHUOC
USD/VND 23.510
GENERAL INFORMATION
Area
Population
Geographical
Location
Adjacent
provinces
6,876.76 km2
1,03 million people (2022)
▪ Binh Phuoc is located in Southeast region.
▪ The province is located in the sourthern key economic region, bordering Binh Duong and Dong Nai
provinces with developed inđútry, an important bridge between the Southeast region and the Central
Highlands regions and the Kingdom of Cambodia with a borderline of 263km
▪ The East adjoins to Lam Dong province and Dong Nai province; the West adjoins to Tay Ninh province and
Kingdom of Cambodia; the South adjoins to Binh Duong province; the North adjoins to Dak Nong province
and Kingdom of Cambodia.
2022 statistic:
▪ Nominal GRDP (billion VND):
GRDP
▪ Real GRDP (billion VND):
49.639
▪ GRDP growth:
8,42%
▪ GRDP per capita (million VND/year): 85,10
(2,09579734008866 billion USD)
(3624 USD)
▪ Economic structure:
Industry growth
Import - Export
Key Industry
PCI
Ranking
- Industry - Construction:
43.19%
- Agriculture. forestry and fishery:
21.46%
- Service:
31.43%
▪ Industry - Construction growth:
3,19%
▪ Agriculture, forestry and fishery growth: 14,46%
▪ Service growth:
8,62%
Import turnover (billion USD):
0,22
(Growth rate: -0,0183)
Export turnover (billion USD):
0,39
(Growth rate: 0,1)
▪ Agriculture still represents a very important part of Binh Phuoc economy. The main agricultural crops
practiced in Binh Phuoc province are hạt điều, coffee, pepper, rubber tree
▪ Key industrial products: manufacturing industry, electricity generation and water supply industry, waste
management and treatment
64.32
43
SOCIAL INFRASTRUCTURE
Transportation
Electricity
Water
Education &
Training
Medicare
▪ Roadway: Bình phuoc connects with the Central Highlands and the Southeast provinces through National
Highway 13 and National Highway 14. Curently the provine has 15 intra-provincial roads, 325 urban roads,
2135 commune roads, 241 specialized roads
▪ The province has hydroelectric power plants: Thac Mo, Can Don, and Srok Phu Mieng with a capacity of
nearly 400MW that have been operating and contributing an abundent power source for production and daily
life of people here.
▪ Binh Phuoc also implements a project to generate electric from solar energy with a capacity of 800MW
▪ Binh Phuoc has many large water plants such as Dong Xoai water plant and water plants: Thac Mo, Phuoc
Binh, Binh Long, Loc Ninh, Bu Dang with a capacity of 60.000 m3 per day and night that fully meets the
drinking water needs of residents and industrial projects in industrial parks along National highway 13.
▪ The province currently has 149 preschools (including non-public), 173 primary schools, 107 junior high
schools, 33 high schools and 8 continuing education centers.
▪ 17 hospitals
INVESTMENT CONDITION
Human resource
59,9% of population are in the working age (2022)
198
Education level
Trained labor rate: 35% (2022)
▪ The minimum salary for the province is applied as follows:
- Area I (4,680,000 VND/month): N/A
- Area II (4,160,000 VND/month): Dong Xoai City, Chon Thanh Town and Dong Phu District
Salary
- Area III (3,640,000 VND/month): Phuoc Long, Binh Long Towns and Hon Quan, Loc Ninh, Phu Rieng
Districts
- Area IV (3,250,000 VND/month): Bu Mang, Bu Mop, Bu Gia Map Districts
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages paid
to employees working under employment contracts)
Investment
incentives
Fields Attracting
Investment
Investment
attraction
situation
Industrial zones
▪ Incentives according to government regulations:
- Exemption and reduction for land and water rent fee
- Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
▪ Incentives from the province:
▪ The preferential tax rate of 10% for a period of 15 years applies to: income of enterprises implementing
new investment projects in areas with extramely difficult socio-economic conditions, economic zones (hoa
Lu Border Gate Economic Zone) and high-tech zone.
▪ The tax rate of 17% for a period of 10 years applies to: income of enterprises implementing new investment
projects in areas with extramely difficult socio-economic conditions
▪ Exemption from import tax on machinery and equipment
▪ Woodworking industry, Food processing industry, Rubber products processing industry, Electronic industry
▪ In 2022, the province has attracted 34 foreign direct investment projects with a registered capital of 114.41
million USD.
Minh Hung Industrial Park - Korea.
Minh Hung Industrial Park III.
Nam Dong Phu Industrial Park
Dong Xoai Industrial Park I.
Dong Xoai Industrial Park II.
Bac Dong Phu Industrial Park
Becamex Industrial Park - Binh Phuoc.
Chon Thanh Industrial Park I.
199
Map
Department of Planning and Investment Binh Phuoc
▪ Address: 626/QL14, Dong Xoai town
▪ Tel: 2713879253
Contact
▪ Email: www.skhdtbinhphuoc.gov.vn
▪ Contact person:
- Mr. Vo Sa.
Tel: 0271.3879252
Email: sav.skhdt@binhphuoc.gov.vn
200
LIST OF INDUSTRIAL ZONE IN BINH PHUOC
No
1
2
3
Industrial Zone Name
Dong Xoai I Industrial Zone
Dong Xoai II Industrial Zone
Dong Xoai III Industrial Zone
4
5
6
7
8
9
10
11
12
13
14
Minh Hung – Korea Industrial Zone
Chon Thanh Industrial Zone
Chon Thanh II Industrial Zone
Becamex - Binh Phuoc Industrial Zone
Minh Hung Industrial Zone – Sikico
Viet Kieu Industrial Zone
Ledana Industrial Zone
Hoa Lu Industrial Zone
Minh Hung III Industrial Zone
Bac Dong Phu Industrial Zone
Nam Dong Phu Industrial Zone
Total Area (ha)
153,49 ha
84,7ha
120,33ha
Occupancy
95%
85%
192.28 ha
100%
98%
100%
15%
38%
-
76 ha
2,448 ha
655 ha
101.8 ha
425 ha
348 ha
577.63 ha
317 ha
480 ha
Status
In operation
In operation
In operation
In operation
In operation
In operation
In operation
In operation
Under construction
Under construction
Under construction
Under construction
Under construction
Under construction
BINH PHUOC’S LOCATION MAP OF INDUSTRIAL ZONES
201
VIET KIEU INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Sectors
Minimum wage
Lease term
Minimum Lease Area
Planned area
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean
projects
Lease fee
Operating fee
Thanh Binh commune, Hon Quan district, Binh Phuoc province
MINH KHANG INVESTMENT AND DEVELOPMENT JSC
▪ Address: Viet Kieu Industrial Park, Hon Quan District, Binh Phuoc Province
▪ Tel: 0931.808.060 and 0888.818.181
▪ Email: info@vietkieu-industrialpark.com
▪ Website: vietkieu-industrialpark.com
+84 931 808 060 (Mr Hùng) / +84 8888 18181 (Mr Đức)
Adjacent location
- 2 Km – 0hr05’: To National Highway 13
- 53 Km – 1hr05’: To Hoa Lu Border
- 60 Km – 1hr00’: To Thu Dau Mot City, Binh Duong
- 106 Km – 2hr45’: To Cat Lai Port
- 100 Km – 2hr30’: To Ho Chi Minh City Center
Priority Sectors for
Rubber processing
Investment
Plastic, packaging
Wood processing, Building materials
Mechanics and agricultural machines
Power electronics
Garment, Textile
Mixing animal feed
Food and beverage processing
[Area 3] According to Decree 38/2022/ND-CP
50 years (2068)
10,000 m2.
▪ Total area: 104ha
▪ Active
▪ 2 projects
▪ None
$70-75/m2
▪ Management fee: 0.04 USD/m2/month.
202
Map
203
BECAMEX – BINH PHUOC INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Sectors
Minimum wage
Lease term
Planned area
Operation Status
Lease fee
995, National Highway 14, Minh Thanh Commune, Chon Thanh District, Binh Phuoc
Province.
Becamex - Binh Phuoc Technical Infrastructure Development Joint Stock
Company
▪ Address: No. 08 Hung Vuong Street, Hoa Phu Ward, Thu Dau Mot City, Binh
Duong Province, Vietnam
▪ Tel: (+84) 274 3 822 655
▪ Email: info@becamex.com.vn
▪ Website: https://becamex.com.vn/
N/A
Adjacent location
- 80 km from Ho Chi Minh City;
- 80 km from Tan Son Nhat airport;
- 100 km from Tan Cang port and other ports;
Priority Sectors for
Textile, food processing, production of building materials,
Investment
electronic components, mechanics,…
[Area 2] According to Decree 38/2022/ND-CP
50 years
- Total planning area: 1,993 ha.
- Natural land of the industrial zone: 1,993 ha.
- Land for administrative, service and industrial park management: 73.1 ha
- Industrial land for lease: 1393.84 ha.
- Land for green trees: 201.15 ha.
- Land for technical infrastructure: 30.93 ha.
- Land for traffic: 209.6 ha.
- Land for warehouse construction: 83.95 ha
▪ Active
680 Million/150m2
Actual view
204
BINH DUONG MAPLETREE INUDSTRIAL PARK
GENERAL INFORMATION
Address
Investor
Location
Investment Sectors
Minimum wage
Lease term
Minimum Lease Area
Limit for Construction
Height
Permitted Construction
Rate
Planned area
Factory Available for Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean projects
Lease fee
No. 18, Lot L2-1, Tao Force 5 Street, Vietnam - Singapore Industrial Park II, Hoa Phu Ward,
Thu Dau Mot City, Binh Duong Province.
- Investor's name: Mapletree Urban Business Co., Ltd (Vietnam)
- Phone: (0274) 3543688; (0274) 3543678
- Website: www.mapletree.com.vn
Adjacent location:
- Distance to nearest big city: 31km from Ho Chi Minh
- Distance to provincial center: 5 minutes from Binh Duong administrative center
- Distance to nearest airport: 32 km (Tan Son Nhat)
- Distance to the nearest railway station: 25 km (Song Than)
- Distance to the nearest river port: 33 km (Cat Lai)
- Distance to the nearest seaport: 31km from Ho Chi Minh
Priority Sectors for
Electronics, machinery,
Investment
food processing, automobile parts,
new material,
Bio,
Pharmaceutical,
Supporting industry,
…
Investment Restricted
Sectors Natural rubber processing,
tanning, washing – cleansing, dyeing, plating/anodizing, basic
chemical production, detergent, colorant, printing ink,
paper production
[Area II] According to Decree 2022/ND-CP dated 15th November 2022
▪ Start date: 2008
▪ End date: April 26, 2066
1ha
50m
N/A
▪ Total area: 74,87 ha
▪ 30ha
Ready for construction and obtaining LURC
▪ 44,95%,
▪ 21
1.8$/m2/month
205
Factory fee
Managemnet fee
4 USD/m2
Management fee: 8,500VND/m/month
Electricity price: 1,406VND/kwh
Clean water price:10,600VND/m3
INFRASTRUCTURE AND FACILITY
Financial institution
Inside of IP. BIDV, Vietcombank, Sacombank, ACB bank, Techcombank....
Tax service, State finance
office
Inside of IP
Customs Service
Inside of IP
Inside of IP
Logistics
Inside of IP
Post office
Inside of IP
Medicare
Inside of IP. BAUBANG HEALTH CENTER
My Phuoc General Hospital, 12km from the IP
Inside of IP
Police, public security
Universities, training
facilities, etc.
EIU Int’l Univ. German Tech, vocational training centers……
Recruitment
Inside of IP
Worker dormitory
Inside of IP
Worker's child education
facility
Inside of IP
One-stop service
Inside of IP
Road Width
Communication
Infrastructure of industrial
park
Emergency Power
generator
Fire-fighting facility
24~64m
VNTT provides ADSL, High-Speed Internet service
National grid is connected with two substation
Available, inside of IP
206
MINH HUNG SIKICO INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Investor
Location
Investment Sectors
Minimum wage
Lease term
Minimum Lease Area
Planned area
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean
projects
Lease fee
Dong No commune, Hon Quan district..
Minh Hung Sikico Joint Stock Company.
The company invests in
infrastructure development and construction with a total realized investment
capital of 2,260/4,091 billion VND, reaching about 55%.
Hamlet 5, Dong No Commune, Hon Quan District, Binh Phuoc Province.
Phone: +84 981 555 777
Fax:
Email: sales@sikico.com
Website: www.minhhungip.vn
Adjacent location
- 89 km to Ho Chi Minh City
- 67 km to Thu Dau Mot
- Located on backbone road to Tay Nguyen- a potential supply of raw materials
for industries.
Priority Sectors for
Processing agricultural products & foodstuff, etc
Investment
Tool machines, food processing machines, interior
furnishing, wood production, paper & toys
Wood processing
Construction materials, mechanics, coating and plating
Weaving and dyeing
[Area 3] According to Decree 38/2022/ND-CP
30/5/2066
1.2 ha
▪ Total area: 655 ha in area, developed under the model of a complex of Green
Industry - Trade - Service. Area available for rent
298 (ha)
▪ Active
37% - 35 secondary enterprises
(including 27 foreign enterprises and 08 domestic enterprises)
▪ N/A
68 USD/m2
207
Map
INFRASTRUCTRURE
Traffic road
Main road system: building line 42 – 60m, width 18m Internal road system: building line 18m, width 8m
Electricity
110 kv
Water
Water volume (m3/day): 89.000 m3/day-night
Wastewater treatment
Maximum treatment capacity (m3/day): 45.000 m3 /day-night Current treatment capacity (m3/day): 25.000 m3 /day-night
Garbage disposal
Training School
Contact Information
Internet: 5.500 subscribe
208
[- This Page is intentionally left blank -]
209
BINH THUAN
210
INVESTMENT ENVIRONMENT IN BINH THUAN
GENERAL INFORMATION
Area, Population
▪ Area: 7,942.46 km2
▪ Population: 1.2521 million (2022 statistic)
Geographical Location
▪ Located in the South Central Coast, adjacent to the key econimic of Viet Nam – Ho Chi Minh
city.
▪ Located 198 km from Ho Chi Minh city; 150 km from Vung Tau city; 175 km from Da Lat
city, 250 from Nha Trang city and 1,520 km from Hanoi city toward North.
Adjacent provinces
▪ Borderd to Lam Dong province to the North, Ninh Thuan province to the North East, Dong
Nai province to the West, Ba Ria – Vung Tau to the South West, Eastern Sea to the East.
GRDP
Industry growth
PCI
2022 statistic:
▪ GRDP growth: 7.75 %
▪ GRDP per capita: 77.3 million VND/year
▪ Economic structure:
▪ Industry - Construction growth: 33.51%
▪ Agriculture, forestry and fishery growth: 27.72%
▪ Service growth: 32.51%
▪ Taxes less subsidies on products: 6.23%
2022 statistic:
▪ Industry - Construction growth: 6.66%
▪ Agriculture, forestry and fishery growth: 2.5%
▪ Service growth: 14.88%
▪ Taxes less subsidies on products: 0.51%
▪ Score: 64.39 – ranked 42 out of 63 cities and provinces in Vietnam. (2022)
SOCIAL INFRASTRUCTURE
Transportation
▪ Roadway: Some important roads including National Highway 1A along the length of the
province, passing through Phan Thiet City and 05 districts in the province with a length of 181
km, the South connects Binh Thuan to Dong Nai, Ho Chi Minh City, and Southern provinces;
The North connects Binh Thuan to Ninh Thuan, Khanh Hoa, and Northern provinces; National
Highway 55 is 152.5 km long, connecting with Ba Ria - Vung Tau - Binh Thuan - Lam Dong;
National Highway 28 connecting Phan Thiet to Lam Dong province and others in the Central
Highlands area; provincial roads and inter-district roads have been upgraded, repaired and
expanded. Furthermore, the expressway passing through Binh Thuan province including Dau
Giay - Phan Thiet and Phan Thiet - Vinh Hao sections are in the stage of construction
investment and will put into operation in late 2022. Upon completion of expressway project,
it takes only 2 hours to travel by car from Ho Chi Minh City to Phan Thiet City; Most industrial
Parks of the province are adjacent to National Highway 1A, and there are access roads to it,
so the transportation of goods from the Industrial Park to deep-water ports in Southern
provinces such as Ba Ria - Vung Tau, Ho Chi Minh City, and Vinh Tan International Port of
Binh Thuan Province will be convenient and time-saving.
▪ Railway: The North-South railway passing through the length of the province, amongst that
Binh Thuan station located in Ham Thuan Nam district is far 15 km away from Phan Thiet
City, has a capable of receiving and transporting goods with great volumes. Besides, Binh
Thuan has a railway from Phan Thiet City to Ho Chi Minh City, meeting transportation needs
of tourists and experts.
▪ Waterway: Binh Thuan with a 192 km long coastline, adjoining the international maritime
route and Vinh Tan International Port that can receive vessels with a tonnage of up to
50,000DWT; Phu Quy Port and Phan Thiet Port of Binh Thuan province can receive vessels
up to 1,000 DWT, and Son My International Port in the Southern added to Master plan on
development of Vietnam's seaport system in a period of 2021 – 2030 with a vision to 2050 is
expected to invest in in a period of 2022 – 2035 and will receive vessels up to 70.000 DWT.
211
▪ Airway: Binh Thuan has been investing and constructing in Phan Thiet international airport
with a scale of grade 4E, a runway length of 3,050m with a designed capacity of 2 million
passengers/year, being capable of welcoming new airplanes A350-900, A321, B737, etc.
Electricity
Binh Thuan has been planning and developing electric transmission network and distribution
in association with socio-economic development orientations. The power source has been
assuring from the national grid; the electricity quality and the reliability has been increasingly
improving, meeting the needs of production and business of investors. Besides, Binh Thuan is
one of Vietnam's major energy centers with Vinh Tan Power Center, LNG Son My Gas Power
Center, and solar, wind power projects, etc, contributing to ensuring energy security for the
region and the whole country.
Water
Apart from large-capacity hydroelectric lakes such as Ham Thuan - Da Mi, Dai Ninh, ... Binh
Thuan has about 30 other large and small irrigation lakes including many lakes with large
water reserves such as Song Quao lake - Ham Thuan Bac district with a capacity of 80 million
m3, Song Dinh 3 - Ham Tan of 45.5 million m3; Ca Giay lake - Bac Binh district with a capacity
of 37 million m3, Long Song river lake - Tuy Phong district with 37 million m3; Song Mong
lake - Ham Thuan Nam district with 34 million m3 and other lakes with a capacity of 5-10
million m3.
Education
▪ 01 university, 01 colleges, 01 vocational school, 15 proffessional training centers and 9 nonpublic vocational training facilities.
Medicare
▪ 14 hospitals
INVESTMENT CONDITION
Human resource
▪ 53.58% of population are in the working age (2022)
Education level
▪ Trained labor rate: 29.2% (2022)
Salary
▪ The minimum salary for the province is applied as follows:
- Area II: Phan Thiet city
- Area III: Ham Thuan Bac and Ham Thuan Nam district, Lagi communce.
- Area IV: Duc Linh, Tanh Linh, Phu Quy, Tuy Phong, Phu Quy, Ham Tan, Bac Binh district.
▪ The lowest wage for trained labor (including those trained by the enterprises) must be at least
7% higher than the above minimum salary
Investment incentives
1. Incentives on corporate income tax:
- High-tech product production projects and auxiliary product production projects will be
entitled to the incentive tax rate of 10 % for 15 years, exemption for 4 years and 50% tax
reduction for the next 9 years.
- Projects not subject to Hi-tech product production and auxiliary product production group
will be entitled to exemption for 02 years and 50% tax reduction for the next 04 years.
2. Incentives on import-export tax: Projects will entitled to be free-duty to form fixed assets.
3. Investors are entitles to other supportive and preferential policies according to current
regulations.
Fields Attracting Investment
▪ Prioritized projects:
1. Field of processing and preserving agricultural products
- Project of preservation/warehousr, irradiation/heat treatment for fruits and foodstuffs.
- Project of deep processing plant for dragon fruit (soft drinks, wine, jams, fruit jelly, etc)
2. Field of food processing
- Project of canned meat and food processing plant.
- Project of functional foods manufacturing plant.
- Project of manufacturing plant for algae, seaweed and post-salt product.
3. Field of manufacturing medicinal herbd, cosmetics and preparations
- Project of madicinal herbs manufacturing plant.
- Project of cosmetics and finished product manufacturing plant.
4. Field of manufacturing packing, wooden furniture, building materials, consumer goods, etc
- Project of packing manufacturing (do nót produce pulp).
- Project of wooden product manufacturing plant.
- Project of manufacturung plant for glazed brcks and interior decoration porcelain.
- Textile, leather and footwear material manufacturing plant.
212
5. Mechanical and electronic fields
- Project of manufacturing plant for freezing systems and refrigeration equipment for
agricultural and aquatic produc preservation industry.
- Project of Manufacturing and doing out works for machinery and equipment on seafood
catching and agricultural mechanics activities.
- Project of Manufacturing, and doing out works for systems and equipment of agricultural
irrigation.
- Project of assembling and manufacturing plant for electric and electronic equipment; wind
power, solar power.
- Project of Manufacturing plant for automobile parts, and automobile assembly.
- Project of Manufacturing plant for steel and aluminum rolling (not making steel or
aluminum); processing and assembling mechanical component, nails, screws, etc.
6. Field of manufacturing fertilizer, animal feed
- Fertilizer manufacturing plant (not using raw materials).
- Project of Processing plant for animal feed of all kinds (not producing fish meal from raw
materials).
7. Field of warehouse, logistics service
- Warehousing and transshipment services (Logistics).
- Chemical storage (not accepting chemicals on the list of banned chemicals and minerals as
specified in Appendix II - Law on Investment 2014)
8. Field of titanium minerals processing
- Zircon compound processing plant (ZOC).
- Artificial Rutin processing plant.
- Titanium Ferro processing plant.
Map
Contact
Binh Thuan Industrial Parks Authority
▪ Address: 337 Vo Van Kiet street, Phan Thiet city, Phu Thuy ward, Binh Thuan province
▪ Tel: 0252.3821234
▪ Fax : 0252.3821234
▪ Email: bqlkcn@binhthuan.gov.vn
LIST OF INDUSTRIAL ZONES
No
Industrial zone Name
Occupancy Rate (%)
Status
Phan Thiet Phase 1 Industrial Zone
Total Area
(ha)
68
1
100
In Operation
2
Phan Thiet Phase 2 Industrial Zone
40.7
74.02
In Operation
3
Ham Kiem I Industrial Zone
132.67
59.29
In operation
4
Ham Kiem II Industrial Zone
402
22.5
In Operation
213
5
Song Binh Industrial Zone
300
41.22
6
Tuy Phong Industrial Zone
150
Under construction
In Operation
7
Tan Duc Industrial Zone
300
Under Construction
8
Son My 1 Industrial Zone
1,070
Under Construction
9
Son My 2 Industrial Zone
540
Under Legal
LOCATION MAP OF INDUSTRIAL ZONES
214
PHAN THIET PHASE 1 INDUSTRIAL PARK
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Sectors
Phong Nam commune, Phan Thiet city and Ham Liem commune, Ham Thuan Bac district, Binh
Thuan province
Name of Investor: Binh Thuan Construction Materials and Minerals Joint Stock Company
▪ Address: 33 Tu Van Tu street, Phu Tring ward, Phan Thiet city, Binh Thuan province
▪ Tel: 02523822060 - 02523824887
▪ Email: info@bcmc.com.vn
▪ Website: bcmc.com.vn
Name: Dang Trung Hieu
Position: Director of the Factory
Mobile: 0909816592
Email: info@bcmc.com.vn
Adjacent location
- Situated at the crossroad between National Highway 1A and National Highway 28
- 198 km from Ho Chi Minh city
- 250 km from Nha Trang city
- 150 km from Da Lat city
Priority Sectors for
Investment
Investment Restricted
Sectors
Minimum wage
[Area II] According to Decree 38/2022/ND-CP
Lease term
1998-2048
Minimum Lease Area
No request
Limit for Construction
Height
Permitted Construction
Rate
Planned area
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean projects
Manufacturing the ceramic tiles, woodwork, interior decoration;
clothing
industry
manufacturing;
household
appliances
manufacturing; mechanics, electronics and electric industry;
constructional materials industry; agricultural, forestry and fishery
products processing plant; food, fruit, soft drinks processing plant;
consumer goods, knitting, leather shoes and household appliances
manufacturing; assembling and manufacturing of mechanics,
electricity and electronics; clean industries, not polluting the
environment, etc.
Outside the list of allowed sectors for Investment
Lower than 40 m, according to land area
From 35% to 70%, according to land area and height
▪ Total area: 68 ha
▪ Total vacant leasable area: 50.23 ha
▪ In Operation
▪ 100% and 39 projects
▪ Non
215
Layout Plan
Location Map
216
Actual View
INFRASTRUCTURE AND FACILITY
The technical infrastructure was completed in roads, electricity, water supply, centralized wastewater treatment systems, etc.
The industrial Park is located in the Phan Thiet City, so it is very convenient for transport infrastructure systems, other social
infrastructure systems such as housing for workers, markets, schools, hospitals, amusement Parks, and other services, etc.
217
List of Projects in Phan Thiet Phase 1 Industrial Zone
No.
Name of Company
Nationality
Business line
1
Trung Nguyen Steel Company Limited
Vietnam
Car auto parts
2
Vietnam Cotton Joint Stock Company
Vietnam
Cotton Processing
3
Bac My Joint Stock Company
Vietnam
Manufacture of Kraft paper
4
Tuynel Phan Thiet Brick Joint Stock
Company
Thuan Tien Garment Company
Limited
An Binh Service Trading
Manufacturing Company Litmited
Dong A Company Limited
Vietnam
Vietnam
Manufacture of brick and warehouses
for rent
Garments
Vietnam
Production of pure ice cubes
Vietnam
Color plated products
Thang Long- Binh Thuan Packaging
Trading Manufacturing Company
Limited
Hải Triều Company Limited
Vietnam
Production of carton packaging
Vietnam
Seafood Processing and Preservasion
South Central Sabeco Trading
Company Limited
Long Son Gas Joint Stock Company
Vietnam
Beer and beverage
Vietnam
Tiumph Furniture Processing - Export
Joint Stock Company
Hoa Sen Group Joint Stock Company
Vietnam
Extraction, installation of liquefied
gas pipelines
Furniture products for export
Dong Nam Viet vegetables and Fruits
Import- Export Company Limited
Phú Nhuận Printing Packaging Joint
Stock Company
Son Tinh Block Brick Production
Factory
Thanh Bình Service Trading
Manufacturing Company
Truong Thinh Building Materials
Company Limited
12B Dry Fruits Joint Stock Company
Vietnam
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Vietnam
Products such as galvanized steel,
galvanized steel purlin and plastic
products such as PVC pipe, plastic
beads, plastic ceiling panels
Processing and heating dragon fruit
for export
Manufacture of paper package
Vietnam
Block Brick Production
Vietnam
Glass Processing
Vietnam
Manufacture of silicat
Vietnam
Dried Fruits
Binh Thuan Car Service Company
Limited
Ngoc Phuong Car Company Limited
Vietnam
Trading and repairing all kinds of cars
Vietnam
Trading and repairing all kinds of cars
Ky Lan Seafood Processing Joint Stock
Company
Lam Quang Dat Company Limited
Vietnam
Seafood Processing
Vietnam
Binh Thuan Printing Packaging Joint
Stock Company
Hoa Phu Joint Venture Company
Vietnam
Malaysia
Manufacture of unburnt building
materials
Manufacture of paper package and
printing
Agricultural processing
Hong Kong
Organic fertilizers
Belgium
Car auto spare parts and other
products
Manufacture of premium adhesive
paper for export
Greenfield Fertilisers Company
Limited
Cty TNHH IST Vietnam Company
Limited
SAS Coat Company Limted
Vietnam
Belize
218
29
Bernecker Vietnam Company Limited
German
30
Singapore
Japan
Manufacture of products from paper
32
Vietnam Intersnack Cashew Company
Limited
Nakagawa MFG Vietnam Company
Limited
Kim Do Company Limited
Manufacture of pipe rack and steel
structure systems
Cashew processing
Luxembourg
33
Hai Wang Seafood Company Limited
Taiwan
34
Universal Communities Company
Limited
Bex Company Limited
Hong Kong
Thang Long – Binh Thuan Packaging
Production Trading Company Limited
Tan Ha Investment Company Limited
Vietnam
Manufacture of wood products for
export
Cold Storage for preservation of
seafood
Manufacture of interior and exterior
products from artificial stone
Manufacture of Seafood flavor
powdercake
Manufacture of package from paper
Binh Thuan Printing Packaging Joint
Stock Company
Phu Nhuan Printing Packaging Joint
Stock Company
Vietnam
Manufacture of creasing paper and
cover
Manufacture of package from paper
Vietnam
Manufacture of package from paper
31
35
36
37
38
39
Japan
Vietnam
219
PHAN THIET PHASE 2 INDUSTRIAL PARK
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Sectors
Phong Nam commune, Phan Thiet city and Ham Liem commune, Ham Thuan Bac district,
Binh Thuan province
Name of Investor: Trung Nguyen Steel Company Limited
▪ Address: Lot 1/3 Phan Thiet Industrial Park, Binh Thuan province
▪ Tel: 02523838850
▪ Email: congtytrungnguyen@yahoo.com
Name: Nguyen Van Thanh
Position: General Director
Mobile: 0913883023
Email: congtytrungnguyen@yahoo.com
Adjacent location
- Adjacent to Phan Thiet Industrial Park Phase 1
- 200 km away from Ho Chi Minh city
- 250 km from Nha Trang city
- 150 km from Da Lat city
Priority Sectors for
Investment
Investment Restricted
Sectors
Minimum wage
Lease term
Minimum Lease Area
Equipment manufacturing and assembling of electronicsinformatics industry; manufacturing of pharmaceuticals, medical
instruments and products; manufacturing of packaging of all
kinds, synthetic resins, products from composite materials;
mechanical engineering, assembly of power machines and
machine tools, manufacturing of complete units, parts, spare parts
and components of bicycles, manufacturing of parts for specialuse vehicles and automobiles; mechanical engineering, repairing
tools, agriculture-fishery-industry machineries and equipment;
manufacturing of the wooden products and interior decoration;
manufacturing and assembling civil equipment; manufacturing of
purified water and bottled pure water; processing of milk and milk
products; building facilities for assorted printing and copying;
manufacturing of fire prevention equipment and products;
industrial laundry projects; knitting and shoe-leather industry;
beverage processing; food processing; Warehouse.
Outside the list of allowed sectors for Investment
[Area II] According to Decree 38/2022/ND-CP
2007-2057
No request
Limit for Construction Height
From 1 to 3 floors accoding to land location
Permitted Construction Rate
Lower than 60%
Planned area
Operation Status
Occupancy Rate and Number
of Projects
Number of Korean projects
▪ Total area: 40.7 ha
▪ Total vacant leasable area: 31 ha
▪ In Operation
▪ 100% and 11 projects
▪0
220
Layout Plan
Location Map
Actual View
INFRASTRUCTURE AND FACILITY
The basic technical infrastructure is invested in traffic roads, electricity, water supply, centralized wastewater treatment
systems, etc.
221
The Industrial Park is located in Phan Thiet City, therefore, very convenient for transport infrastructure systems, and other social
infrastructure systems such as housing for workers, markets, schools, hospitals, amusement park, and other services, etc.
222
List of Projects in Phan Thiet Phase 2 Industrial Zone
No.
Name of Company
Nationality
Business line
1
Trung Nguyen Steel Company Limited
Vietnam
Warehouse for rent
2
Khang Nong Joint Stock Company
Vietnam
Fertilizer production
3
Lavite Company Limited
Vietnam
Cordyceps processing
4
Chien Thang – Binh Thuan Trading
and Manufacturing Company Limited
Phuong Giang Binh Thuan Import –
Export Trading Company Limited
Phu Nhuan Printing Packaging Joint
Stock Company
Phu Thinh Real Estate Investment
Company Limited
Vietnam
Zircon Processing
Vietnam
Manufacture of package
Vietnam
Manufacture of package from paper
Vietnam
Southern Electric Equiqment
Experiment Joint Stock Company
Chien Thang Biotechnology Company
Limited
Vietnam
Warehouse for rent and production of
artificial quartz stone used in the
interior
Electric Experiment
Trans Pacific Seafood Company
Limited
Jin Guo Yuan Fruits Import – Export
Company Limited
Japan
Production of all kinds of biological
products, microbiological feeds for
aquaculture
Seafood processing
China
Fruits processing for export
5
6
7
8
9
10
11
Vietnam
223
HAM KIEM I INDUSTRIAL PARK
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Sectors
Minimum wage
Lease term
Minimum Lease Area
Ham My and Ham Kiem commune, Ham Thuan Nam district, Binh Thuan province
Name of Investor: Hoang Quan Binh Thuan Consulting-Trading-Service Real Estate Joint
Stock Company
▪ Address: 198 Nguyen Hoi, Phu Trinh Ward, Phan Thiet City, Binh Thuan Province
▪ Tel: 02523604 579 - 0984884209; Fax: 02523722727
▪ Website: www.hoangquanbinhthuan.com.vn
▪ Email: hoangquanbinhthuan@hoangquan.com.vn
Name: Nguyen Anh Trang
Position: General Director
Mobile: 0985588585
Email: hoangquanbinhthuan@hoangquan.com.vn
Adjacent location
- Near National Highway 1A
- 5 km from North-South Highway of Phan Thiet – Dau Giay section
- 190 km from Ho Chi Minh City (more than 2 hours by car)
- 9 km from Phan Thiet city
- 10 km from Phan Thiet port,
- 110 km from Vinh Tan General Port (Binh Thuan)
- 120 km from Cai Mep - Thi Vai Port (Ba Ria-Vung Tau)
- 180 km from Cat Lai Port (Ho Chi Minh City)
- 4 km from Binh Thuan Station, 9 km from Phan Thiet Station
- 30 km from Phan Thiet Airport (The construction has already started and is expected to open in
2023)
Priority Sectors for
Food processing industry, processing meat and fruit; garment
Investment
industry, leather shoes (not tanning); assembly industry of
machinery and equipment; electric - electronic assembly industry;
producing consumer goods, household goods, and packaging of all
kinds; Producing ceramic tiles and interior decoration materials;
mechanical industry, vehicle assembly; manufacturing wooden
products, household products, handicrafts and fine arts; producing
soap and cosmetics; assembly mechanics, manufacturing mechanical
components; shuttle services and transportation warehousing
Investment Restricted
Outside the list of allowed sectors for Investment
Sectors
[Area III] According to Decree 38/2022/ND-CP
2007-2057
No request
Limit for Construction
Height
- Admistrative office: Maximum 10 floors (basement is not excluded)
- Factory: From 1 to 5 floors
Permitted Construction
Rate
- Admistrative office: Bulding Density: Lower than 65%
- Factory: Bulding Density: Lower than 40%
Planned area
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean projects
▪ Total area: 132.67 ha
▪ Total vacant leasable area: 90.8 ha
▪ In Operation
▪ 59.3% and 16 projects
▪ 01 project
224
Lease fee
Operating fee
▪ Land lease fee: 4-5 USD/m2 per year (Annual payment, VAT excluded); 45 USD/m2 (Onetime payment, VAT excluded)
▪ Management fee: 0,3 USD/m2 per year
▪ Electricity fee: According to State prices
▪ Water fee: 14,000 VND/m3 (VAT excluded)
▪ Wastewater treatment fee: 0.3 USD/m3 x 80% of the total water supply (VAT excluded)
Layout Plan
225
Location Map
Actual View
INFRASTRUCTURE AND FACILITY
Social housing area, housing for workers with a total area of 13.5 ha has been gradually finishing with more than 300 apartments
and 950 houses, each are built with 1 ground 1 floor. In addition, the items related to entertainment and service areas for workers
were put into operation.
Technical infrastructure system is built in sync, ensuring the standards of a Green-Clean-Nice-Modern Industrial Park.
- Traffic: Main road is 45m, internal road is from 24 to 35m, which is asphalted by hot plastic concrete, is designed to be able to
load H30 in compliance with Vietnam standard.
- Electric: 110/22KV; capacity 2*63 MVA
- Water supply system: The projects is supplied with water by Phan Thiet Water Plant with a capacity of 18,000m3/day-night; The
waterworks of Ham Kiem Industrial Park (01 km from the Industrial Park) with a capacity of 20,000m3/day-night is under
construction to fulfill the demand of secondary projects.
- Contact information: 5,000-telephone lines are linked with telecommunication system of Binh Thuan Province.
- Wastewater treatment system: The plant has the capacity of 6,000m3/day-night. 2,000m3/day-night in the first period was put into
operation. The enterprises will treat the wastewater internally into column B – Vietnamese standard No. QCVN 40:2011/BTNMT,
the centralized wastewater treatment plant will treat wastewater into column A – Vietnamese standard No. QCVN 40:
2011/BTNMT.
List of Projects in Ham Kiem I Industrial Zone
No.
Name of Company
Nationality
226
Business line
1
Nam Hong Company Limited
Vietnam
Warehouse for rent
2
Vietnam
Production of steel and concrete
structures
Bags
5
CK&XD Single-Member Limited
Liability Company
Hieu Tien Trading and Production
Company Limited
Thanh Long Thanh Dao Company
Limited
Binh Thuan Teyaco Company Limited
6
Vietnam Fruita Company Limited
Vietnam
7
Nhat Kien Binh Thuan Packaging
Company Limited
Vietnam
Dragon fruit processing and
preservation
Manufacture of package
8
Nam Hong Company Limited
Vietnam
Warehouse for rent
9
Fine Fruit Asia Company Limited
British Virgin Islands
Agricultural processing
10
China
Fruits and vegetables processing for
export
Production of all kinds of plastic
packages and dragon fruit for export
Production of dragon fruit wine
13
Shenzhen Yuanxing Fruit Company
Limited
Yuelaimei Import-Export Company
Limited
Lotus Food Group Joint Stock
Company
Zenpix Vietnam Company Limited
Korea
14
Sun Pim Company Limited
Taiwan
Manufacture of suitcases, backpacks,
bags
Tempered glasses
15
Rong Phuong Bac Trading Company
Limited
Hoang Quan Binh Thuan Consulting –
Trading – Service Real Estate Joint
Stock Company
Lavela Joint Stock Company
Vietnam
Warehouse for rent
Vietnam
Warehouse for rent
Vietnam
Food production
3
4
11
12
16
17
Vietnam
Vietnam
Vietnam
China
Japan
227
Agricultural products packing and
dragon fruit preservation
Yarn and thread production
HAM KIEM II INDUSTRIAL PARK
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Sectors
Minimum wage
Lease term
Minimum Lease Area
Ham Kiem commune, Ham Thuan Nam district, Binh Thuan province
Name of Investor: Binh Tan Investment Joint Stock Company
▪ Address: Lot DH5 - Cluster C7, Road N1, Ham Kiem II Industrial Park, Ham Kiem commune,
Ham Thuan Nam district, Binh Thuan province
▪ Tel: 02837540283; Fax: 02837540959
▪ Email: info@bitasic.com.vn
▪ Website: www.bitasic.com.vn
Name: Le Minh Thai
Position: General Director
Mobile: 0834509288
Email: minhthai.le@bitasic.com.vn
Adjacent location
- Next to National Highway 1A
- 2 km from the North-South expressway of Phan Thiet - Dau Giay section
- 12 km from Phan Thiet City, 187 km from Ho Chi Minh City
- 12 km from Phan Thiet port
- 110 km from Vinh Tan General Port (Binh Thuan Province)
- 120 km from Cai Mep - Thi Vai Port (Ba Ria-Vung Tau)
- 7 km from Binh Thuan Railway Station
- 11 km from Phan Thiet Railway Station
- 32 km from Phan Thiet Airport (The construction has been started and expected to put into
operation in 2023)
Priority Sectors for
Spinning - textiles; canned food, beverage processing plant;
Investment
manufacturing of consumer goods, household goods, packaging of
all kinds, leather shoes (non-tanning); mechanical assembly,
mechanical component manufacturing; processing wooden
household use, handicrafts; processing ceramic and porcelain tiles for
interior decoration; assembly of electronics, electrical appliances,
computer components, communications, and sensors; cosmetics and
preparations processing; Filling of liquefied gas (LPG); warehousing
services (intermediate transport and warehouse transport); organic
fertilizer manufacturing (without using raw materials); processing the
animal, poultry and shrimp feeds (not processing the fishmeal from
raw materials); medicinal herbs manufacturing; manufacturing
constructional materials, concrete and products from concrete,
cement and plaster.
Investment Restricted
Outside the list of allowed sectors for Investment
Sectors
[Area III] According to Decree 38/2022/ND-CP
2008-2058
No request
Limit for Construction
Height
- Admistrative office: Maximum 10 floors (basement is not excluded)
- Factory: From 1 to 5 floors
Permitted Construction
Rate
- Admistrative office: Bulding Density: Lower than 60%
- Factory: Bulding Density: Lower than 60%
Planned area
Operation Status
Occupancy Rate and
Number of Projects
▪ Total area: 402 ha
▪ Total vacant leasable area: 261 ha
▪ In Operation
▪ 22.5% and 16 projects
228
Number of Korean projects
Lease fee
Operating fee
▪ Non
▪ Land lease fee: 55-65 USD/m2 (One-time payment, VAT excluded)
▪ Management fee: 0.5 USD/m2 per year
▪ Electricity fee: According to State prices
▪ Water fee: 14,000 VND/m3 (5% VAT included)
▪ Wastewater treatment fee: 0.42-0.5 USD/m3 (VAT excluded)
Layout Plan
Location Map
229
Actual View
INFRASTRUCTURE AND FACILITY
There are 20 blocks of apartments and 72 villas for experts with many utilities to serve the daily life of residents such as
kindergartens, schools, fitness centers, and commercial centers, convenience stores, traditional markets, parks, etc. The project
provides accommodation for 18,000 employees working in the industrial Parks and surrounding areas.
Technical infrastructure system is built in sync, ensuring the standards of a Green-Clean-Nice-Modern Industrial Park.
- Internal transportation systems: Two main roads are 40m in width. Other internal roads have the width of 24 - 35m. All roads were
asphalted with concrete and designed to be able to load H30 in compliance with Vietnamese standard.
- Power supply: 110/22KV; capacity 2x63 MVA
- Water supply: The projects are supplied with water by Phan Thiet Water Plant with a capacity of 18,000m3/day-night; The
waterworks of Ham Kiem Industrial Park (01 km from the Industrial Park) with a capacity of 20,000m3/day-night is under
construction to fulfill the demand of secondary projects.
- Contact information: 15,000-telephone lines are linked with telecommunication system of Binh Thuan Province.
- Wastewater treatment system: The plant has a capacity of 17,000m3/day-night with 2,500m3/day-night in the first period. The
enterprises will treat their wastewater into column B - Vietnamese standard No. QCVN 40:2011/BTNMT, the centralized
wastewater treatment plant will treat wastewater into column A- Vietnamese standard No. QCVN 40: 2011/BTNMT.
List of Projects in Ham Kiem II Industrial Zone
No.
Name of Company
Nationality
Business line
1
Vietnam
LPG filling
Vietnam
Production of plywood
Vietnam
Footwear processing
Taiwan
Footwear processing
Beliza
Shoe materials processing
Brunei
Shoe materials processing
7
Ho Chi Minh City Petroleum SingleMember Limited Liability Company
Dai Ngan Transport Logistics Company
Limited
Binh Tan Consumer Goods
Manufacturing Company Limited
Right Rich International Company
Limited
Thanh Vuong Footwear Accessories And
Materials Company Limited
Yuan Lin Footwear Materials Company
Limited
Du Hung Company Limited
Taiwan
Complete sole shoes processing
8
Hoang Phu Company Limited
Taiwan
Footwear processing
9
Fu Ding Company Limited
Republic of Seychelles
Manufacture of sports equipment
10
Sheh Fung Crews Company Limited
Taiwan
Manufacture of screws
11
Viet Nhat Binh Thuan Company Limited
Vietnam
Manufacture of iron and steel
mechanical products, wastewater
treatment system
2
3
4
5
6
230
12
13
14
15
16
Binh Tan Consumer Goods
Manufacturing Company Limited
Nhat Tan Garment Company Limited
Vietnam
Production of all kind of shoes
Vietnam
Garment
Phuoc Thanh Electrical Equipment Joint
Stock Company
Southern Gas Trading Joint Stock
Company
Golden Accord Holdings Limited
Vietnam
Warehouse for electrical products
Vietnam
LPG storage and filling station
Republic of Seychelles
Production of solar panel components
231
SONG BINH INDUSTRIAL PARK
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Sectors
Minimum wage
Lease term
Song Binh commune, Bac Binh district, Binh Thuan province.
Name of Investor: Rang Dong Joint Stock Company
▪ Address: J45 Ton Duc Thang street, Phan Thiet city, Binh Thuan province
▪ Tel: 02523 822301; Fax: 02523832317
▪ Email: rangdong@rangdonggroup.com.vn
▪ Website: www. rangdonggroup.com.vn
Name: Le Van Nhi
Position: General Director
Mobile: 0918022261
Email: vannhi1977@gmail.com
Adjacent location
- Located near the major titanium mine (not included in the titanium investigation boundary, 12km
away from the mining area) facilitate the transport and process.
- 700m from National Highway 28B
- 5km from the South-North railway
- 2 km from Phan Thiet – Vinh Hao Expressway
- 10km from National Highway 1A,
- 50km from Phan Thiet City center, and
- 60km from the Vinh Tan International Deep-water Port, Tuy Phong district
Priority Sectors for
Processing sectors: As the only industrial Park which specialized in
Investment
deep processing of titanium minerals with 03 major product groups
and Ancillary product group:
- Major product groups
+ Titanium Clinker, Artificial rutile, fine and superfine Zirconia.
+ Pigmentum (Anata), Zirconia compounds (such as zirconium
oxychloride).
+ Titanium sponge, titanium alloy.
- Ancillary product groups:
+ Ancillary products are input materials for factories in the main
product group: Separation of ore concentrates; Production of sulfuric
acid (H2SO4), acid chloride (HCl), sodium hydroxide (NaOH) and
other chemical production facilities supporting deep processing.
+ Group of auxiliary products using products of the main product
group: Manufacture of cast iron and steel, welding rods, raw
materials for ceramic industry, whiteners, heat-resistant materials
(For titanium slag, core rutile group). create, smooth and superfine
zircon); Manufacture of paints and raw materials for plastics,
coatings, paper, ink and fibers (for pigments, zircon compounds);
Metal alloy casting, hot rolling, alloy cold (For the group of porous
titanium, metallic titanium, titanium alloy).
Titanium ores after extraction from the coastal area of Binh Thuan
Province such as Bac Binh - Tuy Phong, Luong Son Sub-region,
Northern Phan Thiet Region, Ham Thuan Nam region, Ham Tan
region, etc. will be transported to the processing plant in the industrial
Park for deep-processing to produce the high economic value
products for export and domestic production needs.
Investment Restricted
Outside the list of allowed sectors for Investment
Sectors
[Area IV] According to Decree 38/2022/ND-CP
2013-2063
Minimum Lease Area
No request
Limit for Construction
Height
Lower than 40 m, according to land area
Permitted Construction
Rate
From 35% to 70%, according to land area and height
232
Planned area
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean projects
Lease fee
Operating fee
▪ Total area: 300 ha
▪ Total vacant leasable area: 202.32 ha
▪ In Operation
▪ 41.23% and 3 projects
▪ Non
▪ Land lease fee: 60-66 USD/m2 (One-time payment, VAT excluded); 4 USD/m2 (Annual
payment, VAT excluded)
▪ Management fee: 0.4 USD/m2 per year (VAT excluded)
▪ Electricity fee: According to State prices
▪ Water fee: 0.4 VND/m3 (VAT excluded)
▪ Wastewater treatment fee: 0.5 USD/m3 (VAT excluded)
Layout Plan
233
Location Map
Actual View
INFRASTRUCTURE AND FACILITY
Technical infrastructure system is built in sync, ensuring the standards of a modern Industrial Park.
- Transport: Transport system in the industrial Parks is arranged in a rectangular grid, among which is 50m wide main road from
28B NHW connecting the functional areas, the other roads connected to the main road to create a smooth transportation system,
ensuring to access to each plot. The total length of internal roads is 17.51 km.
- Power supply: There is a 110KV/22KV transformer station on D3 road, connected from 110 KV of Dai Ninh - Phan Ri Line to
Song Binh Industrial Park, which is the electricity source for the production of the Industrial Park. The total capacity of 02 phases
is 126 MVA (period to 2015, the capacity of 63 MVA; period of 2016-2020, the capacity of 63 MVA); 22KV power line connected
63 MVA station (total capacity of 02 phases is 120 MVA) and run along the roads in the industrial Park to provide factories.
234
- Water supply: The daily-life water treatment area is constructing with a capacity of 30,000 m3/day-night, incorporating HDPE,
D150cm and D100cm piping systems to reach each land lot in the industrial Park to secondary investors under their demand.
- Telecommunications: Communications systems for the industrial park will be paired in the telecommunication network of Binh
Thuan Province through the local postal system, and junction boxes shall be connected to gates of the factories in the Industrial
Park.
- Wastewater treatment system: Industrial & services wastewater must be collected to a central processing system (30,000 m3/daynight) of the Industrial Park and processing to meet the grade A under standards No. QCVN 40:2011/BTNMT.
List of Projects in Song Binh Industrial Zone
No.
Name of Company
Nationality
Business line
1
Song Binh Minerals Joint Stock
Company
GPM_RDG Titanium Company
Limited
Song Binh Minerals Joint Stock
Company
Vietnam
Zircon powder
British Virgin Islands
Titanium slag processing
Vietnam
Pigment processing
2
3
235
TUY PHONG INDUSTRIAL PARK
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Sectors
Vinh Hao commune, Tuy Phong district, Binh Thuan province.
Name of Investor: Tan Dai Tien Limited Company
▪ Address: Service operations area of Tuy Phong Industrial Park, Vinh Hao commune, Tuy
Phong district, Binh Thuan province, Vietnam
▪ Tel: 02837815238; Fax: 02837815238
▪ Email: tandaitienbinhthuan@yahoo.com.vn
Name: Ngo Trong Nghia
Position: General Director
Mobile: 03272033.88
Email: nghia@tpip.vn
Adjacent location
- 6km from Vinh Tan General Port
- 0.9 km from Vinh Hao Railway station
- Adjacent to 1 National Highway and Phan Thiet – Vinh Hao – Cao Lam Highway
Priority Sectors for
Investment
Investment Restricted
Sectors
Minimum wage
Lease term
Minimum Lease Area
Limit for Construction
Height
Permitted Construction
Rate
Planned area
[Area IV] According to Decree 38/2022/ND-CP
2008-2058
No request
-
Admistrative office: The height of the ground floor is from 5 to 7m, the remaining floors
are from 3 to 5m
Factory: No request
-
Admistrative office: Bulding Density: 40-45%
Factory: Building Density: Lower than 70%
▪ Total area: 150 ha
▪ Total vacant leasable area: 97.9 ha
Operation Status
▪ Under construction
Occupancy Rate and
Number of Projects
▪ Under construction
Number of Korean projects
Lease fee
Steel & aluminum rolling industry (no operation of steel & aluminum
refining); Manufacturing industry of pharmaceuticals, cosmetics and
medical equipment; Agro-forestry-seafood processing industry;
Manufacturing industry group of construction materials; Mechanical
assembly industry group; Paper industry group (no operation of pulp
manufacturing); Manufacturing industry group of household
appliances; Manufacturing industry of wood products;
Manufacturing industry group of electronics, microelectronics,
software; Rubber industry group (no rubber latex processing); Grease
blending (no regeneration); Manufacturing and processing industry
of products from salt and salt post-products and plastic products;
Chemical warehouse and storage (no receipt of chemicals on the list
of banned chemicals and minerals defined in Appendix II - the
Investment Law of 2014).
Outside the list of allowed sectors for Investment
▪ Non
▪ Land lease fee: 40-60 USD/m2 (One-time payment, VAT excluded)
236
Operating fee
▪ Management fee: 0.3 USD/m2 per year (VAT excluded)
▪ Electricity fee: According to State prices
▪ Water fee: According to State prices
▪ Wastewater treatment fee: 0.3 USD/m3 (VAT excluded)
Layout Plan
Location Map
237
Actual View
INFRASTRUCTURE AND FACILITY
- Internal traffic roads: Two main roads are 30m in width. Other internal roads have the width of 24 - 18m, have elastic modules
under A1 high-quality road and Eyc ≥ 155Mpa, ensuring that containers and other vehicles can transport easily and conveniently.
- Electricity: 110/22KV, total capacity of 40 MV, may increase under actual use demand, the power-grid along the roads is 22kV.
- Water: Water treatment plant with capacity of 7,500m3/day-night. Main pipeline system is Ø 200 - 300mm, branch pipeline is Ø
150mm - Ø 100mm.
- Wastewater treatment system: The plant has a capacity of 4,000m3/day-night with 2,000m3/day-night in the first period. The
enterprises will treat their wastewater into column B - Vietnamese standard No. QCVN 40:2011/BTNMT, the centralized
wastewater treatment plant will treat wastewater into column A- Vietnamese standard No. QCVN 40: 2011/BTNMT.
- Telecommunication: Telecommunication is smooth by using FTTx Internet technology with high speed up to 2.5 Gb/s and postal
service to meet investors' demands on Information technology in the Industrial Park.
238
TAN DUC INDUSTRIAL PARK
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Sectors
Minimum wage
Lease term
Minimum Lease Area
Planned area
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean projects
Tan Duc commune, Ham Tan district, Binh Thuan province
Name of Investor: Sonadezi Binh Thuan Shareholding Company.
▪ Address: Floor 12th of Sonadezi Tower – No. 1, Street 1, Bien Hoa 1 Industrial Park, An Binh
Ward, Bien Hoa City, Dong Nai Province, Vietnam
▪ Tel: 0251883656; Fax: 02518836060
▪ Email: sonadezibinhthuan@szt.com.vn
Name: Phan Thuy Doan
Position: Deputy General Manager
Mobile: 0943393963
Email: sonadezibinhthuan@szt.com.vn
Adjacent location
- Adjacent to National Highway 1A,
- About 3 km from the boundary of Dong Nai Province
- About 60 km from Phan Thiet City
- About 95 km from Ho Chi Minh City
- 3 km from Phan Thiet – Dau Giay Expressway
Priority Sectors for
Manufacturing and processing industries such as Food products and
Investment
beverages; Textiles and weaving of textiles (except Dyeing); Wood
and products of wood and cork; Paper and paper products;
Pharmaceuticals, medicinal chemical and botanical products;
Fabricated metal and other non – metallic mineral products (except
Plating); Rubber and plastic products; Computer, electronic and
optical products; Electrical equipment; Machinery and equipment;
Motor vehicles, other motor vehicles and other transport equipment;
Manufacture and distribution of electricity, gas, hot water, steam and
air conditioning; Some service activities.
Investment Restricted
Outside the list of allowed sectors for Investment
Sectors
[Area IV] According to Decree 38/2022/ND-CP
2021-2071
No request
▪ Total area: 300 ha
▪ Total vacant leasable area: 209.33 ha
▪ Site clearance and compensation works are in progress; Expected investment in the
construction of technical infrastructure in 2022 and attraction of secondary projects in 2023.
▪ Non
▪ Non
239
Layout Plan
Location Map
240
Actual View
241
SON MY 1 INDUSTRIAL PARK
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Sectors
Minimum wage
Lease term
Minimum Lease Area
Son My commune, Ham Tan district, Binh Thuan province
Name of Investor: Son My Industrial Park Investment Construction and Trading
Infrastructure Joint Stock Company
▪ Address: Son My commune, Ham Tan district, Binh Thuan province
▪ Tel: 0924768568
▪ Email: info@ipico.com.vn
▪ Website: www.ipico.com.vn
Name: Khuong Trung Thuy
Position: Chairman of the Board and General Director
Mobile: 0924768568
Email: thuy.khuong@ipico.com.vn
Adjacent location
- Adjacent to 55 National Highway connecting Ba Ria - Vung Tau Province to Binh Thuan Lam Dong
- 10 km from La Gi Town
- 90 km from Phan Thiet City
- 60 km from Thi Vai - Cai Mep Deep-water Port
Priority Sectors for
Manufacturing the ceramic tiles, woodwork, interior decoration;
Investment
clothing
industry
manufacturing;
household
appliances
manufacturing; mechanics, electronics and electric industry;
constructional materials industry; agricultural, forestry and fishery
products processing plant; food, fruit, soft drinks processing plant;
consumer goods, knitting, leather shoes and household appliances
manufacturing; assembling and manufacturing of mechanics,
electricity and electronics; clean industries, not polluting the
environment, etc.
Investment Restricted
Outside the list of allowed sectors for Investment
Sectors
[Area II] According to Decree 38/2022/ND-CP
2018-2068
No request
Limit for Construction
Height
- Administrative Office: Depending on operating conditions and terrain
- Factory: From 1-3 floors
Permitted Construction
Rate
Buiding density: 45.01%
Planned area
Operation Status
▪ Total area: 1,070 ha
▪ Total vacant leasable area: 740 ha
▪ The project has approved the investment policy by the Prime Minister and the completed the
legal procedures; tasks related to technical infrastructure, site clearance and compensation are in
progress (the construction start date is August 30th 2022); expected to attract secondary
investors in late 2023.
Occupancy Rate and
Number of Projects
▪ Non
Number of Korean projects
▪ Non
242
Layout Plan
243
SON MY 2 INDUSTRIAL PARK
GENERAL INFORMATION
Address
Location
Minimum wage
Lease term
Minimum Lease Area
Planned area
Operation Status
Son My commune, Ham Tan district, Binh Thuan province
Adjacent location
- Adjacent to Son My 1 Industrial Park
- Next to Nationak Highway 55 connecting to Ba Ria – Vung Tau to Binh Thuan – Lam Dong
- 10 km from Lagi commune
- 90 km from Phan Thiet city
- 60 km from Thi vai – Cai Mep Deep-water Port
[Area IV] According to Decree 38/2022/ND-CP
▪ Under legal, is in the process of preparation for investment
No request
▪ Total area: 540 ha
▪ Total vacant leasable area: 330 ha
▪ Under legal, is in the process of preparation for investment
Occupancy Rate and
Number of Projects
▪ Non
Number of Korean projects
▪ Non
Layout Plan
244
[- This Page is intentionally left blank -]
245
CA MAU
246
INVESTMENT ENVIRONMENT IN CA MAU
GENERAL INFORMATION
Area and
population
▪ Area: 5,221 km2
▪ Population: 1.2 Million (2022)
Geographical
Location
▪ Ca Mau province is the southernmost province of Vietnam, in the Mekong Delta.
▪ Ca Mau province is located far from the city. Ho Chi Minh City 350 km and far from Ho Chi Minh City. Can
Tho 180 km.
Adjacent
provinces
▪ Ca Mau province borders Kien Giang province to the North, Bac Lieu province to the Northeast, the East
and Southeast borders to the East Sea, and the West and Southwest borders to the Gulf of Thailand.
GRDP
2022 statistic:
▪ Real GRDP: 73.529 Billion VND.
(3,10 Billion USD)
▪ GRDP growth: 10,41%
▪ GRDP per capita: 60,9 million VND/year.
▪ Economic structure
- Industry - Construction: 28,5%;
- Agriculture: 34,6%;
- Service: 32,9%;
- Tax on goods: 4,0%.
Industry
growth
2022 statistic:
▪ Industry - Construction growth: 1,8%
▪ Agriculture growth: 0,8%
▪ Service growth: 0,7%.
PCI
Score: 61.60 - Rank: 58th
SOCIAL INFRASTRUCTURE
Transportation
▪ Roadway: National Highway 1, National Highway 63, Quan Lo - Phung Hiep National Highway, Southern
Coastal Corridor Road, Ho Chi Minh Road very well meet the needs of travel, production and transportation
of goods of the country. people and businesses inside and outside the province.
▪ Airway: Ca Mau airport is 2 km from the center of Ca Mau city, with a total runway length of 1,500 m.
▪ Waterway: Cua Lon, Tam Giang, Ganh Hao, Bay Hap, Doc, Dam Doi, Cai Tau, Trem Trem rivers are very
convenient for waterway transport, freight transport and circulation with the provinces of the River Delta.
Kowloon. Ca Mau has 1 seaport and 4 river ports, connecting with Can Tho City and Ho Chi Minh City by
waterway through the Ho Chi Minh City - Nam Can route.
▪ Seaport: Nam Can seaport is located upstream of Cua Lon river in Nam Can town, Nam Can district.
Currently, the port is capable of receiving ships of 3,000 DWT.
Electricity
▪ Electricity supplied from the national grid 220/110/22KW provides electricity for Ca Mau province.
Water
▪ Ca Mau has 03 main water sources, including: rainwater, saltwater and groundwater. In addition, there are 3
sources of mineral water, so the water supply system is good and stable.
Education &
Training
▪ 02 universities, 03 colleges, 01 professional secondary school and vocational education institutions, ...
distributed in most localities in the province.
Medicare
▪ There are 133 medical examination and treatment facilities in Ca Mau province. In which, there are 15
hospitals; 01 Nursing and rehabilitation hospital; 01 Dermatology Hospital; 21 regional polyclinics; 94
Commune and ward health stations and 01 other medical facility.
INVESTMENT CONDITION
Human
resource
▪ 62,55% of population are in the working age (2022)
Education level
▪ Trained labor rate: 34% (2022)
Salary
▪ Salary division by region I, II, III: Salary according to regulations of each region.
▪ Minimum wage for skilled workers: According to the agreement between the Enterprise and the employee.
Investment
incentives
▪ Incentives decided by the government: According to regulations on land rent, corporate income tax, import
and export tax.
▪ Incentives decided by the province: None.
247
Fields
Attracting
Investment
▪ Key projects: Hon Khoai General Seaport Project; Projects on eco-tourism, resort, entertainment,...; the
projects of airport urban area, new urban area, ecology, resort and sport in Ca Mau province; infrastructure
projects of industrial parks, economic zones, industrial clusters,...
▪ Focused areas: Agricultural, forestry and fishery processing industries; invest in innovation in production
technology of new, high-value-added products; The field of energy, renewable energy (wind power, gas power,
solar power, biomass power) - orientation in the near future will be to export electricity to foreign countries;
Infrastructure of industrial parks, economic zones, industrial clusters;
Map
Contact
Economic Zone Management Board of Ca Mau Province
▪ Address: 91 - 93 Ly Thuong Kiet, Ward 5, Ca Mau City
Tel: 0290.3825866
▪ Fax: 0290.3825477
▪ Email: banqlkkt@gmail.com.
▪ Person in charge of contact: Duong Hoai Nam - Head of Economic Zone Management Board.
248
LIST OF CA MAU PROVINCE INDUSTRIAL PARK
NO.
NAME
1
Khanh An Industrial Zone
TOTAL AREA
(HA)
235,86
OCCUPANCY
RATE
100%
2
Hoa Trung Industrial Zone
3
Song Doc Industrial Zone in the South
STATUS
In operation
326
100%
In operation
100
100%
In operation
KHANH AN INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Located in Khanh An commune, U Minh district, Ca Mau province (adjacent to Ca Mau Gas Electricity - Fertilizer Industrial Complex)
Contact Person
- Name: Duong Hoai Nam, Position: Head of Economic Zone Management Board.
- Phone number: 0913.767.866, Email: duonghoainam71@gmail.com
Location
- 10 km from the center of Ca Mau City;
- 12 km from Ca Mau airport;
- 40 km from Song Doc estuary (Tran Van Thoi district, Ca Mau province), 63 km from Nam Can
port (Nam Can district, Ca Mau province), 295 km from Can Tho port, 2,000-ton ships can travel
easily easy.
Areas of investment
promotion
Investment Area
Restricted areas of
investment
Minimum wage
As a multi-industry industrial park, focusing on orienting main
business lines such as: port services, agricultural product processing,
seafood processing, mechanical industry, animal feed and fertilizer
processing industry ; electronic industry, textile, consumer goods
production; forestry products processing industry; natural gas
liquefaction industry, post-gas industry; construction materials
manufacturing industry, packaging production, PA bags, PE bags;
recycled plastic pellets, biomass electricity, gas electricity, food CO2,
industrial gas.
According to regulations of the Law.
Minimum regional salary according to 38/2022/ND-CP: Belongs to area III.
Minimum Lease Area
49 years.
▪ Starting time: Since the decision to lease the land.
▪ End time: According to the land lease decision.
Not specified.
Limit for Construction
Height
- Factory construction area: The height of the building depends on the type of production and the
technological line of the factory.
- Administrative - service area: Up to 5 floors.
Permitted Construction
Rate
- Factory construction area: Maximum construction density: 70%; The factory has more than 05
floors used for production with a construction density of 60%.
- Administrative - service area: 40%.
Planned area
▪ Total area: 235.86 ha.
▪ Leaseable area: 164.11 ha.
▪ Area with infrastructure ready for factory construction: No.
Lease term
Factory Available for
Rent
None
249
Operation Status
In operation
Occupancy Rate and
Number of Projects
91%.
Number of Korean
Projects
None
Lease fee
▪ Land rental cost: Land price along road N1 and D6 road in Khanh An Industrial Park: 450,0000
VND/m2/land lease term (one-time payment form) (applicable only to land areas leased by the
State)).
▪ Workshop rental cost: No.
Operating fee
▪ Management cost (Infrastructure usage fee): VND 4,872/m2/year.
▪ Electricity cost: According to EVN's price, according to the Electricity Price Notice of Ca Mau
province.
▪ Water cost: 10,000 VND/m3
▪ Waste water treatment fee: There is no specific price. Because the investor's wastewater
treatment plant project is being completed, the price list has not been issued.
▪ Waste treatment fee]: No specific price yet. Because the investor's wastewater treatment plant
project is being completed, the price list has not been issued.
INFRASTRUCTURE AND FACILITY
Distance to banks, educational institutions, healthcare, main roads, city center...: 10 km from Ca Mau city center and 12 km from
Ca Mau airport, convenient in transactions with Banks, educational institutions, healthcare,...
Map
250
LIST OF SOME NOTABLE TENANTS
No.
Company Name
Nationality
Bussiness line
1
Ca Mau gas processing plant
Vietnam
Ca Mau gas processing plant
2
Khanh An water plant
construction investment
project
A Hui Packaging Factory Aquabest
Ca Mau unburnt brick
construction factory
Khanh An service port
construction investment
project
Ca Mau LPG storage and filling
station project
Factory producing high-tech
building materials, light
building materials, rare
materials
Operation Manager of Ca Mau
Power Transmission Team
Invest in building BTS station
and self-standing Antenna
110KV substation and
connection line
Hong Lam high-tech concrete
factory
Aquatic feed and
microbiological fertilizer
processing factory
Seafood processing factory
Vietnam
Khanh An Water Plant
Vietnam
A Hui Packaging Factory Aquabest
Ca Mau unburnt brick construction
factory
Investment in construction of
Khanh An service port
Vietnam
Seafood processing factory
Factory for processing
agricultural products and
extracting essential oils
C.P Ca Mau aqua feed factory
Vietnam
Factory for processing agricultural
products and extracting essential
oils
C.P Ca Mau aqua feed factory
Construction of LPG filling
stations and warehouses
A Hui Packaging Factory Plastic
Investment project to build a
wood processing factory
Khanh An Wood Power Plant
Project
Construction of concentrated
wastewater treatment plant in
Khanh An Industrial Park
Vietnam
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Vietnam
Vietnam
Vietnam
Vietnam
Vietnam
Vietnam
Vietnam
Vietnam
Vietnam
Thailand
Vietnam
Vietnam
Vietnam
Vietnam
251
Ca Mau LPG storage and filling
station project
Factory producing high-tech
building materials, light building
materials, rare materials
Operation Manager of Ca Mau
Power Transmission Team
Invest in building BTS station and
self-standing Antenna
110KV substation and connection
line
Hong Lam high-tech concrete
factory
Aquatic feed and microbiological
fertilizer processing factory
Construction of LPG filling stations
and warehouses
A Hui Packaging Factory - Plastic
Investment project to build a
wood processing factory
Khanh An Wood Power Plant
Project
Construction of concentrated
wastewater treatment plant in
Khanh An Industrial Park
21
22
23
24
25
26
Investment project to build
Minh Phu Seafood Processing
Factory
Investment project to build ice
factory + Technical zone for
production
Investment project to build
Minh Qui seafood processing
factory
Investment project to build
Minh Phat seafood processing
factory
Investment project to build
Quang Minh Packaging Factory
Trung Diep Mekong Packaging
Factory
Vietnam
Investment project to build Minh
Phu Seafood Processing Factory
Vietnam
Investment project to build ice
factory + Technical zone for
production
Investment project to build Minh
Qui seafood processing factory
Vietnam
Vietnam
Investment project to build Minh
Phat seafood processing factory
Vietnam
Investment project to build Quang
Minh Packaging Factory
Trung Diep Mekong Packaging
Factory
Vietnam
252
HOA TRUNG INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Luong The Tran commune, Cai Nuoc district, Ca Mau province.
Contact Person
- Name: Duong Hoai Nam, Position: Head of Economic Zone Management Board.
- Phone number: 0913.767.866, Email: duonghoainam71@gmail.com
Location
Surrounding Areas
- 05 km from Ca Mau city center;
- 07 km from Ca Mau airport;
- 48 km from Nam Can port (Nam Can district, Ca Mau province), convenient for both road and
waterway traffic.
Areas of investment
promotion
Exporting seafood processing industries, products
from animal husbandry, production of animal and
poultry feed; Food processing industry, food,
biological products, feed for aquaculture and
supporting industries for production and processing;
mining industry and other building materials
production; Warehousing, services
Restricted areas of
investment
According to regulations of the Law.
Investment Area
Minimum wage
Minimum regional salary according to 38/2022/ND-CP: Belongs to area III
Lease term
49 years.
Minimum Lease Area
Not specified.
Limit for Construction
Height
- Factory construction area: Maximum construction height of 20 m.
- Administrative - service area: Maximum building height is 25m.
Permitted Construction
Rate
Allowable building density
- Factory construction area: 50%
- Administrative - service area: up to 40%
Planned area
▪ Total area: 326 ha.
▪ Leaseable area: 197.6 ha.
▪ Area with infrastructure ready for factory construction: None
Factory Available for Rent
None
Operation Status
In progress of site clearance
Occupancy Rate and
Number of Projects
11%.
Number of Korean Projects
0 projects.
Lease fee
▪ Land rental cost: Currently, Hoa Trung Industrial Park has no investor in infrastructure business,
so the State directly leases land to investors. Therefore, the price is applied according to the land
price issued in the 5-year periodic land price list for the period 2020-2024 according to Decision
41/2019/QD-UBND dated December 20, 2019 of the Provincial People's Committee. and
253
Operating fee
Decision 33/2021/QD-UBND dated November 4, 2021 of the Provincial People's Committee on
Supplementing the Price List of all types of land every five years for the period 2020-2024
according to Decision 41/2019/QD-UBND December 20, 2019.
▪ Workshop rental cost: No.
▪ Management cost (Infrastructure usage fee): No.
▪ Electricity cost: According to EVN's price, according to the Electricity Price Notice of Ca Mau
province.
▪ Water cost: 10,000 VND/m3
▪ Waste water treatment fee: There is no specific price. Because there are no investors.
▪ Waste treatment fee]: No specific price yet. Because there are no investors.
INFRASTRUCTURE AND FACILITY
Distance to banks, educational institutions, healthcare, main roads, city center...: Adjacent to National Highway 1A, 5 km from Ca
Mau city center, 7 km from Ca Mau airport, convenient in transactions with banks, educational institutions, healthcare,...
List of enterprises in Hoa Trung Industrial zone
Company Name
Nationality
Bussiness line
No.
1
2
3
4
5
6
7
8
9
10
11
Hoa Trung Seafood Processing
Factory
Investment project to build
Minh Chau import and export
seafood processing factory
Investment project to build
chintin factory and invest in the
production of hydrolyzed
protein, shrimp powder
The factory produces shrimp
paste, shrimp meal and
products from seafood waste
Investment project on factory
processing fish cakes, salted
fish with chili and fish sauce
production.
Ice factory
Vietnam
Dai Duong seafood processing
and exporting factory
Factory producing food, food
materials, raw materials for
animal and aquaculture feeds
from aquatic by-products
Seafood processing plants
Vietnam
Seafood processing and
processing factory
Investment project to build
seafood processing factory
Vietnam
Vietnam
Vietnam
Vietnam
Vietnam
Vietnam
Vietnam
Taiwan
Vietnam
254
Hoa Trung Seafood Processing
Factory
Investment project to build
Minh Chau import and export
seafood processing factory
Investment project to build
chintin factory and invest in the
production of hydrolyzed
protein, shrimp powder
The factory produces shrimp
paste, shrimp meal and products
from seafood waste
Investment project on factory
processing fish cakes, salted fish
with chili and fish sauce
production.
Ice factory
Dai Duong seafood processing
and exporting factory
Factory producing food, food
materials, raw materials for
animal and aquaculture feeds
from aquatic by-products
Seafood processing plants
Seafood processing and
processing factory
Investment project to build
seafood processing factory
SONG DOC INDUSTRIAL ZONE
THÔNG TIN TỔNG QUAN
Address
Phong Dien commune, Tran Van Thoi district, Ca Mau province.
Investor
Song Doc Industrial Park Infrastructure Investment Construction Joint Stock Company.
▪ Address: Song Doc Industrial Park, Phong Dien Commune, Tran Van Thoi District, Ca Mau
Province, Vietnam.
Tel: 0902.678.080
▪ Email: khucongnghiepsongdoc@gmail.com.
▪ Website: No.
- Name: Hua Kien Thanh, Position: Director.
Contact Person
- Phone number: 0902.678.080,
- Email: khucongnghiepsongdoc@gmail.com
Location
- 50 km from Ca Mau city center;
- 52 km from Ca Mau airport;
- Located adjacent to Song Doc estuary (Tran Van Thoi district, Ca Mau province) about 1.5
km, adjacent to the Gulf of Thailand, 3,000-ton ships can travel easily.
Areas of investment
promotion
Processing aquatic products, processing agricultural
and forestry products, repairing ships, processing
aquaculture feeds, household products and
handicrafts from aquatic shells.
Restricted areas of
investment
According to regulations of the Law.
Investment Area
Minimum wage
Minimum regional salary according to 38/2022/ND-CP: Belongs to regional
salary 3.
Lease term
49 years.
Minimum Lease Area
Not specified.
Limit for Construction
Height
Factory construction area: average height 13m; for buildings other than industrial, up to 5
floors.
Permitted Construction Rate
- Factory construction area: 70%
- Administrative - service area: up to 40%
Planned area
▪ Total area: 100 ha.
▪ Area with infrastructure ready for factory construction: No.
Factory Available for Rent
▪ Total factory space for lease: No.
Operation Status
[In operation/under construction of infrastructure and expected to be
completed in…./in progress of site clearance]: Site clearance in progress.
255
Occupancy Rate and
Number of Projects
▪ Occupancy rate and number of projects in the area: No.
Number of Korean Projects
▪ Number of Korean projects in the area: 0 projects.
Lease fee
▪ Land rental cost: Land rental price for Song Doc Industrial Park
Infrastructure Construction Investment Joint Stock Company implementing
the Southern Song Doc Industrial Park Infrastructure Investment and
Business Project: applied according to land price. promulgated in the 5-year
periodic price list of all types of land for the period 2020-2024 according to
Decision 41/2019/QD-UBND dated December 20, 2019 of the Provincial
People's Committee and Decision 33/2021/QD-UBND dated November 4,
2021 of the Provincial People's Committee on Supplementing the 5-year
periodic price list of all types of land for the period 2020-2024 according to
Decision 41/2019/QD-UBND dated December 20, 2019;
Operating fee
▪ Administration cost (Infrastructure usage fee): No.
▪ Electricity cost: According to EVN's price, according to the Electricity Price Notice of Ca
Mau province.
▪ Water cost: 10,000 VND/m3
▪ Waste water treatment fee: There is no specific price. Because there are no investors.
▪ Waste treatment fee]: No specific price yet. Because there are no investors.
INFRASTRUCTURE AND FACILITY
Distance to banks, educational institutions, healthcare, main roads, city center...: Adjacent to National Highway 1A, 50 km from
Ca Mau city center, 52 km from Ca Mau airport, convenient in transactions with banks, educational institutions, healthcare,...
Map
256
[- This Page is intentionally left blank -]
257
CAN THO
258
INVESTMENT ENVIRONMENT IN CAN THO
GENERAL INFORMATION
Area. Population
Geographical Location
 Area: 1.442,4 km2
 Population: 1.295.700 People (2022 statistic)
 Located in the Northeastei n/South region of Vietnam.
 Located 1,877 km from Hanoi, 169 km from Ho Chi Minh City , more than 150 km
from Ca Mau city, nearly 120 km from Rach Gia , 264 km from Phnom Penh
( Cambodia ).
Adjacent provinces





GRDP
2022 statistic:
 GRDP: 117.500 billion VND
 GRDP growth: 12,64 %
 GRDP per capita: 85,99 million VND/year
 Economic structure:
- Agriculture, forestry and fishery accounted for 9.65%;
- Industry and construction accounted for 31.03%;
- Service sector accounted for 52.47%;
- Product tax minus product subsidies accounted for 6.85%
Industry growth
PCI




To the north, to the west, to the east, and to the south.
The North borders An Giang
The East borders Dong Thap and Vinh Long
The West borders Kien Giang
To the South, it borders Hau Giang .
2022 statistic:
Agriculture, forestry and fishery increased by 0.63%;
Industry and construction increased by 9.22%;
The service sector increased by 8.55%;
Product tax minus product subsidies increased by 2.76%
Score: 66,94 - ranked 19 out of 63 cities and provinces in Vietnam. (2022)
SOCIAL INFRASTRUCTURE
Transportation
Electricity
 Roadway: FreeWay: Cần Thơ – Hồ Chí Minh; Châu Đốc – Cần Thơ – Hậu Giang - Sóc
Trăng; Cao tốc Lộ Tẻ - Rạch Sỏi
 Railway: Cần Thơ – Hồ Chí Minh (project)
 Waterway: Cái Cui Port, Hoàng Diệu Port, Thốt Nốt Port.
 Other: Cần Thơ International Airport
Can Tho Thermal Power Company manages and operates 2 plants with a total capacity of
848 MW, including: Can Tho Thermal Power Plant (188 MW) and O Mon I Thermal Power
Plant (660 MW).
Water
Education
Can Tho city currently has 9 universities, 16 colleges, 1 institute, 2 branches and 12
professional secondary schools in the province
Medicare
In 2020, the city will have 34 hospitals. In which, there are 28 general and specialized
hospitals and 7 hospital lines in districts.
INVESTMENT CONDITION
Human resource
 49,51% of population are in the working age (2022)
Education level
 Trained labor rate: 82,12% (2022)
Salary
 The minimum salary for the province is applied as follows: 4.160.000 VND
259
Investment incentives
 Incentives according to government regulations:
 Incentives from the province:
- Infrastructure investors: During basic construction time, To be exempted from land rent
for a maximum of 03 (three) years from the date of issuance of the land lease decision.
ect.
- Secondary investor: Preferential corporate income tax rate of 17% for 10 years, tax
exemption for 2 years and 50% reduction of payable tax for the next 4 years.
Fields Attracting Investment
 Prioritized projects: Industry
Map
Contact




Address: No. 17 Tran Binh Trong street, Ninh Kieu, Can Tho city, Can Tho
Tel: (0292) 3830235
Fax: (0292) 3830570
Email: sokhdt@cantho.gov.vn
260
LIST OF INDUSTRIAL ZONES IN CAN THO PROVINCE
NO
INDUSTRIAL ZONE NAME
TOTAL AREA
(HA)
OCCUPANCY
RATE
STATUS
1
Tra Noc 1 Industrial Zone
135
99.89%
In Operation
2
3
4
Tra Noc 2 Industrial Zone
Thot Not Industrial Zone
Hung Phu 1 Industrial Zone
155
104
262
93.53%
64.33%
15.82%
In Operation
In Operation
In Operation
5
6
7
Hung Phu 2A Industrial Zone
Hung Phu 2B Industrial Zone
Vinh Thanh Industrial Zone (phrase
1)
134
67
293.7
43.59%
98.00%
--
In Operation
In Operation
Under construction
LOCATION MAP OF INDUSTRIAL ZONES IN CAN THO PROVINCE
261
TRA NOC 1 INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Sectors
Tra Noc ward, Binh Thuy District, Can Tho city
CAN THO INDUSTRIAL PARKS INFRASTRUCTURE CONSTRUCTION JSC
Address: 72 Mau Than Streets, An Nghiep Ward, Ninh Kieu Distric, Can Tho City
Tel: 02923 733 609 – Fax: 02923 830 374
Email: cipcocantho@gmail.com
Website: www. xaydunghatangkcncantho.com
Name: Mr Vo Ngoc Ho
Position: Member of Management Council
Email: hongocvo20@gmail.com
Adjacent location:
- 10 km from Can Tho city center
- 1 km from Tra Noc airport, 2.5 km from Can Tho airport
- 3 km from Can Tho seaport
Priority Sectors for
Investment
Investment Restricted
Sectors
Minimum wage
Lease term
Minimum Lease Area
Limit for Construction
Height
[Area 2] According to Decree 38/2022/ND-CP
50 years
N/A
-
Permitted Construction
Rate
Planned area
N/A
Factory Available for Rent
N/A
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean
projects
Lease fee
Operating fee
Food and food processing; mechanical, electrical, electronic,
machinery parts manufacturing, automobile industry, building
material industry, consumer goods manufacturing industry,
pharmaceuticals...
N/A
N/A
▪ Total area: 130.8 (ha)
▪ Total vacant leasable area: 0.2 (ha)
▪ Active
133 Projects
0 Project
▪ Land lease fee: 40-60 USD/m2/year;
▪ Factory lease fee: 2,5-4,0 USD/m2/year
▪ Management fee: 0.4 USD/m2/year
▪ Electricity fee: 0.05 USD/month
▪ Water fee: 0.4 USD/m3/month
▪ Wastewater treatment fee: 0.28 USD/m3/month
262
263
TRA NOC 2 INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Sectors
Phuoc Thoi ward, O Mon District, Can Tho city
CAN THO INDUSTRIAL PARKS INFRASTRUCTURE CONSTRUCTION JSC
Address: 72 Mau Than Streets, An Nghiep Ward, Ninh Kieu Distric, Can Tho City
Tel: 02923 733 609 – Fax: 02923 830 374
Email: cipcocantho@gmail.com
Website: www. xaydunghatangkcncantho.com
Name: Mr Vo Ngoc Ho
Position: Member of Management Council
Email: hongocvo20@gmail.com
Adjacent location:
- 10 km from Can Tho city center
- 1 km from Tra Noc airport, 2.5 km from Can Tho airport
- 3 km from Can Tho seaport
Priority Sectors for
Investment
Investment Restricted
Sectors
Minimum wage
Lease term
Minimum Lease Area
Limit for Construction
Height
[Area 2] According to Decree 38/2022/ND-CP
50 years
N/A
-
Permitted Construction
Rate
Planned area
N/A
Factory Available for Rent
N/A
Operation Status
N/A
▪ Total area: 157.7 (ha)
▪ Total vacant leasable area: 16.5 (ha)
▪ Active
Occupancy Rate and
Number of Projects
79 projects
Number of Korean
projects
01 project
Lease fee
Operating fee
Food and food processing; mechanical, electrical, electronic,
machinery parts manufacturing, automobile industry, building
material industry, consumer goods manufacturing industry,
pharmaceuticals...
N/A
▪ Land lease fee: 40-60 USD/m2/year;
▪ Factory lease fee: 2,5-4,0 USD/m2/year
▪ Management fee: 0.4 USD/m2/year
▪ Electricity fee: 0.05 USD/month
▪ Water fee: 0.4 USD/m3/month
▪ Wastewater treatment fee: 0.28 USD/m3/month
264
265
HUNG PHU 1 INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Sectors
Minimum wage
Lease term
Tan Phu ward, Cai Rang district, Can Tho city
SAIGON-CANTHO INDUSTRIAL PARK CORPORATION
Address: 28, Bui Quang Trinh Street, Phu Thu Ward, Cai Rang District, Can Tho City.
Tel: 0292 3918 386
Email: cadif@cantho.gov.vn
N/A
Adjacent location:
- 4km from Can Tho city center
- 12km from Can Tho airport to the Southeast
- 11km from Can Tho port, 01km from Cai Cui port
- 6km from Can Tho Bridge
- 2km from National Highway 1A
- 180 km from Ho Chi Minh city center
Priority Sectors for
Food and food processing; mechanical, electrical, electronic,
Investment
machinery parts manufacturing, automobile industry, building
material industry, consumer goods manufacturing industry,
pharmaceuticals...
Investment Restricted
N/A
Sectors
[Area 2] According to Decree 38/2022/ND-CP
50 years
Minimum Lease Area
N/A
Limit for Construction
Height
N/A
Permitted Construction
Rate
Planned area
N/A
Factory Available for Rent
N/A
Operation Status
▪ Total area: 262 ha
▪ Total vacant leasable area: N/A
▪ Active
Occupancy Rate and
Number of Projects
79 projects
Number of Korean
projects
01 project
Lease fee
Operating fee
▪ Land lease fee: 40-60 USD/m2/year;
▪ Factory lease fee: 2,5-4,0 USD/m2/year
▪ Management fee: 0.4 USD/m2/year
▪ Electricity fee: 0.05 USD/month
▪ Water fee: 0.4 USD/m3/month
▪ Wastewater treatment fee: 0.28 USD/m3/month
INFRASTRUCTURE
Electricity distribution
system
22 kW power source runs along the industrial park.
266
Water system
With a clean water plant with a capacity of 5000m3/day and night
Internal road
Road 1A with a width of 47m
Logistics
Wastewater treatment
system
Others
There is Cai Cui international port located in the industrial zone ready to serve ships with a tonnage
of up to 20,000 tons.
with a wastewater treatment plant with a treatment capacity of more than 10,000m3/day
Hung Phu 1 Industrial Park also provides a series of other convenient services including: 24/7
security service, fire prevention, logistics, maintenance. maintenance, construction of factories,
waste collection, banks,...
Location/Map
267
HUNG PHU 2A INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Tan Phu ward, Cai Rang district, Can Tho city
BRANCH OF BMC CAN THO CONSTRUCTION MATERIAL AND TRADE
CONSTRUCTION COMPANY LIMITED
Address: 48B Ba Trieu street, Tan An Ward, Ninh Kieu District, Can Tho City
Tel: 02923 733 609 – Fax: 02923 830 374
Email: cipcocantho@gmail.com
Website: www. xaydunghatangkcncantho.com
Name: Mr NGUYEN TIEN DUNG
Position: Director
Mobile: 0939000999
Adjacent location:
- 4km from Can Tho city center
Investment Sectors
Priority Sectors for
Investment
Investment Restricted
Sectors
Minimum wage
Lease term
[Area 2] According to Decree 38/2022/ND-CP
50 years
Minimum Lease Area
N/A
Limit for Construction
Height
N/A
Permitted Construction
Rate
Planned area
N/A
Factory Available for Rent
N/A
Operation Status
▪ Total area: 134 (ha)
▪ Total vacant leasable area: 0.2 (ha)
▪ Active
Occupancy Rate and
Number of Projects
9 projects
Number of Korean
projects
0 project
Lease fee
Operating fee
Mechanical manufacturing, electronic assembly, agricultural, aquatic,
seafood processing, livestock and poultry frozen, canning,
construction materials manufacturing, pharmaceutical production...
N/A
▪ Land lease fee: 40-60 USD/m2/year;
▪ Factory lease fee: 2,5-4,0 USD/m2/year
▪ Management fee: 0.4 USD/m2/year
▪ Electricity fee: 0.05 USD/month
▪ Water fee: 0.4 USD/m3/month
▪ Wastewater treatment fee: 0.28 USD/m3/month
INFRASTRUCTURE
Electricity distribution
system
Water system
22 kW power source runs along the industrial park.
With a clean water plant with a capacity of 5000m3/day and night
268
Internal road
Logistics
Wastewater treatment
system
Others
Road 1A with a width of 47m
There is Cai Cui international port located in the industrial zone ready to serve ships with a tonnage
of up to 20,000 tons.
with a wastewater treatment plant with a treatment capacity of more than 10,000m3/day
Hung Phu 2A Industrial Park also provides a series of other convenient services including: 24/7
security service, fire prevention, logistics, maintenance. maintenance, construction of factories,
waste collection, banks,...
Location/Map
269
HUNG PHU 2B INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Sectors
Minimum wage
Lease term
Tan Phu ward, Cai Rang district, Can Tho city
CAN THO INDUSTRIAL PARKS INFRASTRUCTURE CONSTRUCTION JSC
Address: 72 Mau Than Streets, An Nghiep Ward, Ninh Kieu Distric, Can Tho City
Tel: 02923 733 609 – Fax: 02923 830 374
Email: cipcocantho@gmail.com
Website: www. xaydunghatangkcncantho.com
Name: Mr Vo Ngoc Ho
Position: Member of Management Council
Email: hongocvo20@gmail.com
Adjacent location:
- 167km from Ho Chi Minh City
- 170km from Tan Son Nhat International Airport, 201km from Long Thanh International
Airport
- 164km from New Saigon Port, 173km from Cat Lai Port, 220km from Thi Vai Port,
260km from Vung Tau Port
Priority Sectors for
Mechanical manufacturing, electronic assembly, agricultural,
Investment
aquatic, seafood processing, livestock and poultry frozen,
canning, construction materials manufacturing, pharmaceutical
production...
Investment Restricted
N/A
Sectors
[Area 2] According to Decree 38/2022/ND-CP
50 years
Minimum Lease Area
N/A
Limit for Construction
Height
N/A
Permitted Construction
Rate
Planned area
N/A
Factory Available for Rent
N/A
▪ Total area: 62.63 (ha)
▪ Total vacant leasable area: N/A
Operation Status
▪ Active
Occupancy Rate and
Number of Projects
1 project
Number of Korean projects
1 project
Lease fee
Operating fee
▪ Land lease fee: 40-60 USD/m2/year;
▪ Factory lease fee: 2,5-4,0 USD/m2/year
▪ Management fee: 0.4 USD/m2/year
▪ Electricity fee: 0.05 USD/month
▪ Water fee: 0.4 USD/m3/month
▪ Wastewater treatment fee: 0.28 USD/m3/month
INFRASTRUCTURE
Electricity distribution
system
22 kW power source runs along the industrial park.
Water system
With a clean water plant with a capacity of 5000m3/day and night
Internal road
Road 1A with a width of 47m
270
Logistics
Wastewater treatment
system
Others
There is Cai Cui international port located in the industrial zone ready to serve ships with a
tonnage of up to 20,000 tons.
with a wastewater treatment plant with a treatment capacity of more than 10,000m3/day
Hung Phu 2B Industrial Park also provides a series of other convenient services including:
24/7 security service, fire prevention, logistics, maintenance. maintenance, construction of
factories, waste collection, banks,...
Location/Map
THOT NOT INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Thoi Thuan ward, Thot Not District, Can Tho city
271
Investor
Contact Person
Location
Investment Sectors
Minimum wage
Lease term
CAN THO EXPORT PROCESSING & INDUSTRIAL ZONES AUTHORITY
Address: National Route No.91, Thoi Thuan ward, Thot Not district, Can Tho city
Tel: 0710.3 854 408 - 0710. 3851 903; Fax: 0710.3 854 408
Email: ttxdhtkcnthotnot@cantho.gov.vn;
Website: www. xaydunghatangkcncantho.com
Name: Mr Le Van Tran - Position: Director
Mobile: 0918.294.880; Email: levantran1964@gmail.com
Adjacent location:
- 167km from Ho Chi Minh City
- 170km from Tan Son Nhat International Airport, 201km from Long Thanh International
Airport
- 164km from New Saigon Port, 173km from Cat Lai Port, 220km from Thi Vai Port, 260km
from Vung Tau Port
Priority Sectors for
Mechanical manufacturing, electronic assembly, agricultural,
Investment
aquatic, seafood processing, livestock and poultry frozen, canning,
construction materials manufacturing, pharmaceutical production...
Investment Restricted
N/A
Sectors
[Area 2] According to Decree 38/2022/ND-CP
50 years
Minimum Lease Area
N/A
Limit for Construction
Height
N/A
Permitted Construction
Rate
Planned area
N/A
Factory Available for Rent
N/A
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean
projects
Lease fee
Operating fee
▪ Total area: 134 (ha)
▪ Total vacant leasable area: 0.2 (ha)
▪ Active
20 projects
0 project
▪ Land lease fee: 40-60 USD/m2/year;
▪ Factory lease fee: 2,5-4,0 USD/m2/year
▪ Management fee: 0.4 USD/m2/year
▪ Electricity fee: 0.05 USD/month
▪ Water fee: 0.4 USD/m3/month
▪ Wastewater treatment fee: 0.28 USD/m3/month
INFRASTRUCTURE
Electricity distribution
system
22 kW power source runs along the industrial park.
Water system
With a clean water plant with a capacity of 5000m3/day and night
Internal road
Road 1A with a width of 47m
Logistics
Wastewater treatment
system
There is Cai Cui international port located in the industrial zone ready to serve ships with a tonnage
of up to 20,000 tons.
with a wastewater treatment plant with a treatment capacity of more than 10,000m3/day
272
Others
Hung Phu 1 Industrial Park also provides a series of other convenient services including: 24/7
security service, fire prevention, logistics, maintenance. maintenance, construction of factories,
waste collection, banks,...
Location/Map
273
VINH THANH INDUSTRIAL ZONE (STATE 1)
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Sectors
Tra Noc ward, Binh Thuy District, Can Tho city
VSIP CAN THO JOINT STOCK COMPANY
Address: Vinh Trinh ward, Vinh Thanh district, Can Tho city
Name: Mr Bui Chi Vu
Mobile: 0907355411
Adjacent location:
- 10 km from Can Tho city center
- 1 km from Tra Noc airport, 2.5 km from Can Tho airport
- 3 km from Can Tho seaport
Priority Sectors for
Investment
Investment Restricted
Sectors
Minimum wage
Lease term
Minimum Lease Area
Limit for Construction
Height
[Area 2] According to Decree 38/2022/ND-CP
50 years
N/A
-
Permitted Construction
Rate
Planned area
N/A
Factory Available for Rent
N/A
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean
projects
Lease fee
Operating fee
Food and food processing; mechanical, electrical, electronic,
machinery parts manufacturing, automobile industry, building
material industry, consumer goods manufacturing industry,
pharmaceuticals...
N/A
N/A
▪ Total area: 130.8 (ha)
▪ Total vacant leasable area: 0.2 (ha)
▪ Under construction
N/A
0 Project
▪ Land lease fee: N/A;
▪ Factory lease fee: N/A
▪ Management fee: N/A
▪ Electricity fee: N/A
▪ Water fee: N/A
▪ Wastewater treatment fee: N/A
274
[- This Page is intentionally left blank -]
275
CAO BANG
276
INVESTMENT ENVIRONMENT IN CAO BANG
USD/VND
23.510
GENERAL INFORMATION
Area
Population
Geographical
Location
Adjacent
provinces
6703,42 km2
0,543 million people (2022)
▪ Cao Bang is located in Northeast region.
▪ Located in North-East of Vietnam, the North and North-East side of the province shares border with Guangxi
Province (China)
▪ 286 km from Hanoi Center, 267 km from Noi Bai Airport, 324 km from Hai Phong Port, 125 km from Lang
Son
▪ The Province has Guangxi (China) to the North and Northeast, Bac Kan and Lang Son Province to the South
and Tuyen Quang Province and Ha Giang Province to the West.
2022 statistic:
▪ Nominal GRDP (billion VND):
GRDP
▪ Real GRDP (billion VND):
21.635
▪ GRDP growth:
5,04%
▪ GRDP per capita (million VND/year):
37,00
(0,49 billion USD)
(1612 USD)
▪ Economic structure:
Industry
growth
Import Export
Key Industry
PCI
Ranking
- Industry - Construction:
20,76%
- Agriculture. forestry and fishery:
21,74%
- Service:
53,75%
▪ Industry - Construction growth:
3,91%
▪ Agriculture, forestry and fishery growth:
3,00%
▪ Service growth:
6,01%
Import turnover (billion USD):
0,59
(Growth rate: 3,85)
Export turnover (billion USD):
0,15
(Growth rate: -0,55)
Mineral Processing
56,29
63
SOCIAL INFRASTRUCTURE
▪ Roadway: The road system has total of 4,608 km in length, including national roads, provincial roads, civic
roads, roads in districts and villages. National roads run through the province are: National Road 03 (HanoiThai Nguyen- Bac Can- Cao Bang), 4A (Hanoi- Lang Son- Cao Bang) and 34 (connecting the Province and Ha
Giang). The Highway Project Dong Dang (Lang Son)- Tra Linh (Cao Bang) is under Geological examination,
which will decrease time to travel Hanoi- Cao Bang into 2.5 hours.
▪ Railway: None
Transportation ▪ Waterway: The Province has diversified water system: 113 km of Bang Giang River originated from China,
55km of Gam River, 77 km of Bac Vong River, 76 km of Quay Son River. However they are not favourable for
waterway development.
▪ Airway: None
▪ Other: Ta Lung International Border gates and 03 main border gates (two-sided) including Tra Linh Border
Gate, Soc Giang and Ly Van Border gates and other sub-border gates, open-ways on the borderland between
Vietnam and China
Cao Bang’s power authority is currently in charge of managing approx. 85km of 110kV power network, more
than 600km of 35kV power network. Besides national power network, Cao Bang has developed its own such as
Cun stream hydroelectricity plant in Cao Bang town, Na Tau hydroelectricity plant in Quang Hoa district, etc.
Electricity
The province is constructing Na Loa hydroelectricity plant which is the ever largest hydroelectricity plant of the
province to serve local household and production needs.
Cao Bang town is supply water by a water treatment station using French technology and other townlets were
Water
supplied by gravity water supplies.
277
Education &
Training
Medicare
▪ 02 colleges; 03 technical high schools; 04 vocational centers.
▪ There are 38 public medical facilities, including Cao Bang General Hospital, Cao Bang Hospital of Traditional
Medicine, 14 District General Hospitals and many Medical Clinics located in districts.
INVESTMENT CONDITION
Human
resource
65.67% of population are in the working age (2022)
Education level Trained labor rate: 48,2% (2022)
▪ The minimum salary for the province is applied as follows:
- Area I (4,680,000 VND/month): N/A
- Area II (4,160,000 VND/month): N/A
Salary
- Area III (3,640,000 VND/month): Cao Bang City
- Area IV (3,250,000 VND/month): Trung Khanh, Ha Quang, Bao Lac, Bao Lam, Ha Lang, Hoa An, Nguyen
Binh, Phuc Hoa, Thach An, Tra Linh, Thong Nong, Quang Uyen district
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages paid to
employees working under employment contracts)
Investment
incentives
Fields
Attracting
Investment
▪ Incentives according to government regulations:
- Exemption and reduction for land and water rent fee
- Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
▪ Prioritized projects:
Manufacturing of new materials and energies, products of high technology, biotechnology, Information
Technology; mechanism; aquaculture, agro-forestry cultivation, salt production; the production of artificial seed,
plant seeds and new animal breeds; utilizing the advantages of high technology and modern techniques;
ecological environment protection.
Investment
attraction
situation
Up to now, Cao Bang has 17 FDI projects with the total investment capital is about 36.43 million US dollars.
Investors mainly come from China
Industrial
zones
Cao Bang's Cao Bang Border Gate Economic Zone, which is divided into four regions. Each region has one key
economic border gate which directly connects with China's border gate system., including Ta Lung, Soc Giang,
Ta Linh, Ly Van. It used to have 2 industrial zones, including Chu Trinh, De Tham. However, De Tham Ip has
been converted to industrial complex, while Chu Trinh IP is under construction.
Map
Cao Bang Department Of Planning And Investment
Contact
▪ Address: No. 30, Xuan Truong Street, Hop Giang Ward, Cao Bang City, Cao Bang Province.
278
▪ Tel: (84-206) 3 852 182
▪ Email: sokhdt@caobang.gov.vn
▪ Contact person:
- Mr. Be Xuan Tien - Head of Cao Bang Department Of Planning And Investment
279
LIST OF INDUSTRIAL ZONES IN CAO BANG
No.
Industrial zone Name
Total Area (ha)
Occupancy Rate
Status
1
De Tham Industrial Zone
92.21 ha
15.81%
In Operation
2
Chu Trinh Industrial Zone
81 ha
0%
3
Cao Bang Economic Zone
30,130 ha
N/A
4
Tra Linh Border Gate Economic Zone
N/A
N/A
Under Construction,
Ready in 2020
Active, Under
construction
Active, Under
construction
CAO BANG’S LOCATION MAP OF INDUSTRIAL ZONES
280
DE THAM INDUSTRIAL ZONE
GENERAL INFORMATION
▪ Hoang Dinh Giong Road, Hop Giang Ward, Cao Bang City, Cao Bang province
Address
Investor
Minimum wage
Department of Urban Management - People’s Committe of Cao Bang City
▪ Address: No. 032 Dam Quang Trung street, Hop Giang Ward, Cao Bang city, Cao Bang
Province
▪ Tel: (84-206) 3 852 500
Fax: (84-206) 3 854 643
▪ Email: quanlydothi.thixa@gmail.com
Contact person of Cao Bang Economic Zone Management Board:
▪ Mr. Nguyen Kien Cuong- Head of Management Board(84) 912 695 168 - cuongnk@caobang.gov.vn
▪ Mr. Nguyen Van Thanh- Head of Department of Environment and Natural Resource
Management - (84) 912 221 563 - thanhnv@caobang.gov.vn
▪ 280 km to Hanoi Center
▪ 310 km to Hai Phong Deep Sea Port
▪ 250 km to Noi Bai International Airport
Priority Sectors for
• Precision mechanical engineering industry; electronics industry,
Investment
information technology; consumer goods industry (textiles,
footwear, ceramics ...)
• Agro-forestry processing industry
• Other industries such as manufacturing high-class construction
materials, packaging, assembling and manufacturing motorbike
spare parts ...
Restricted Sectors for
Polluted Industries
Investment
[Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term
50 years
Minimum Lease Area
Unlimited
Limit for Construction
Height
Permitted Construction
Rate
Planned area
N/A
Contact Person
Location
Investment Area
Factory Available for
Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean
Projects
Lease fee
N/A
▪ Total area: 92.21 ha
▪ Total leasable area: 79.5 ha
N/A
In Operation
▪ Occupancy rate: 15.81%
▪ Number of projects: 02
None
▪ Land lease fee: 2,760 VND (~ 0.12 USD)/m2/year
▪ Infrastructure maintenance fee: 828 VND (~0.037 USD)/m2
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 11,500 VND (~ 0.5 USD)/m3
▪ Wastewater Treatment: N/A
▪ Waste Treatment: N/A
INFRASTRUCTURE AND FACILITY
Operating fee
Financial institution
Tax service, State finance
office
Customs Service
BIDV, Vietcombank, Vietinbank, LienViet PostBank, Agribank,… have their bank branches
located nearby
▪ Located nearby the IZ
▪ 2 km to Customs Department of Cao Bang
Logistics
N/A
Post office
Cao Bang Post Office is located nearby the IZ
Medicare
▪ 1 km to Cao Bang Hospital of Traditional Medicine
▪ 2 km to Cao Bang General Hospital
281
Police, public security
Located nearby Police station of Cao Bang city and Police Station of Cao Bang Province
Universities, training
facilities, etc.
Recruitment
▪ 4 km to Cao Bang Vocational School, 15 km to Cao Bang Economic Technical School
Worker dormitory
Not available
Worker's child education
facility
One-stop service
9 kindergartens are located nearby (0.5-2 km)
Road Width
N/A
IT & Telecommunication Facilities
Emergency Power
generator
Fire-fighting facility
Full service available for domestic and international communication via telecommunication, Fax,
Internet
N/A
N/A
N/A
Available
Layout Plan
Location Map
Actual View
N/A
282
CHU TRINH INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Investor
Location
Chu Trinh commune, Cao Bang city, Cao Bang province
Cao Bang Industrial Park Infrastructure Development Company
▪ 10km to Cao Bang Center
Investment Area
Priority Sectors for
Investment
Lease term
50 years
Minimum Lease Area
Limit for Construction
Height
Permitted Construction
Rate
1ha
Planned area
Factory Available for
Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean
Projects
Lease fee
Operating fee
• Warehouses, wharves, yards and warehouses for transshipment
of goods, production and processing of agricultural, forestry and
fishery products, production, business and import-export services
N/A
60% for factory building
40% for managing area
▪ Total area: 80,941 ha
▪ Total leasable area: 54,655 ha
N/A
In Operation
▪ Occupancy rate: 0.5%
None
20-30 USD
0.2USD/m2
INFRASTRUCTURE AND FACILITY
BIDV, Vietcombank, Vietinbank, LienViet PostBank, Agribank,… have their bank branches
Financial institution
located nearby
N/A
One-stop service
Road Width
IT & Telecommunication Facilities
Emergency Power
generator
N/A
Full service available for domestic and international communication via telecommunication, Fax,
Internet
N/A
283
Layout Plan
Actual View
N/A
284
[- This Page is intentionally left blank -]
285
DA NANG
286
INVESTMENT ENVIRONMENT IN DA NANG
GENERAL INFORMATION
Area, Population
▪ Area: 1.285 km2
▪ Population: 1,189,275 people (2021 statistic)
Geographical Location
Located in the Central of Vietnam.
Adjacent provinces
▪ Thua Thien Hue province to the north
▪ Quang Nam province to the south.
2022 statistic:
GRDP
▪ GRDP: 125.219 billion VND
▪ GRDP growth: 14,05%
▪ GRDP per capita: 4.313 USD/year (102.6 millionVND)
▪ Economic structure:
- Industry - Construction: 20,43 %;
- Agriculture. forestry and fishery: 1,95 %;
- Service: 63,38 %;
- Tax on Goods: 9,24 %
2022 statistic:
Industry growth
PCI
▪ Industry - Construction growth: 6,39 %
▪ Agriculture, forestry and fishery growth: 3,39 %
▪ Service growth: 17,85 %
▪ Score: 68.52 – ranked 09 out of 63 cities and provincesin Vietnam. (2021)
SOCIAL INFRASTRUCTURE
▪ Roadway: The system of roads inside and outside the
city is constantly being expanded and constructed, linkingthe city center with
neighboring urban areas.
- Being the Eastern gateway to the Pacific Ocean of the East-West Economic
Corridor connecting Laos, NortheastThailand and Myanmar, strengthening Da
Nang's
connection with neighboring countries in Indochina,creating opportunities to
develop a modern logistics
cluster and a modern trade center serving Southeast Asia.
Transportation
- Along with National Highway 1A, National Highway 14B and Ho Chi Minh Road
running along the domestic border to the South of Vietnam, the Da Nang - Quang
Ngai Expressway with a length of 130km and a width of 26m facilitates the
circulation of goods and economic development in the region, connecting Da Nang
with ChuLai Open Economic Zone, Dung Quat Economic Zone and Central
Highlands cities such as Kon Tom, Pleiku andBuon Ma Thuot.
- La Son - Tuy Loan Expressway of 80 km long, from LaSon junction (Thua Thien
Hue) to Tuy Loan junction (DaNang) is to strengthen the connection between
provinces in the Central Key Economic Zone.
▪ Railway: The Ministry of Transport has approved to relocate the existing
railway station out of the city center
287
and build a dedicated passenger and freight station. Thus, by integrating and
enhancing the connectivity ofthese infrastructures, the potential for tourism
and
logistics of Da Nang has been enhanced, forming a stronglogistics cluster for the
expanded Da Nang region.
▪ Seaway: Tien Sa seaport with a capacity of 12 millionDWT can receive general
cargo ships with a tonnage of 50,000 DWT, container ships of 4,000 TEUs,
passengerships of 150,000 GRT; 25 container ships/week, with
international shipping routes to Hong Kong, Singapore, Japan, Taiwan, South
Korea, Europe, U.S.A and countriesaround the world. The current cargo handling
capacity is estimated at 8 million tons/year.
The city is calling for investment in Lien Chieu Port in the North of the city with
a capacity of 50,000 DWT to meet the economic development of the city in
particular
and the central region in general in the coming time. AfterLien Chieu Port is
invested and operated, Tien Sa Port will be converted into a tourist port.
▪ Airway: Da Nang Airport is one of the three largest andmost modern
international airports in Vietnam, with a capacity of 15 million passengers
annually, including 31 direct international routes to Da Nang with a total
frequency of 480 trips/week. The city is promoting the construction of terminal
T3 of the Da Nang International Airport with a capacity of 30 million passengers
per year,increasing the capacity of Da Nang International Airport to 42 million
passengers per year.
▪Education and training institutions in the city are providing training in the
Education
direction of multi-disciplinaryand multi-field with prioritized areas including
tourism,information technology, high technology, logistics and international
business. The whole city currently has 06 professional intermediate schools,
13 colleges, 17 universities and 03 international universities including Pegasus
(Singapore), AUV (USA) and VNUK (UK).
▪More than 64,000 graduates annually, 112/398 schoolsthat meet national
standards, there are joint programs between the University of Da Nang and
foreign universities (in English, Japanese and French).
▪ The number of general hospitals in the city is 13, of which there are 08 private
Medicare
hospitals, 09 specialized hospitals and 01 international general hospital
(Vinmec),with 03 hospitals having international departments including Da Nang
General Hospital, Hoan My Hospitaland Family Hospital), together with 07
commune/ward medical centers.
▪ Number of human resources in the health sector: the totalnumber of doctors in
the city is 1,824, of which 82.5% are working in public hospitals and 17.5% are
working inprivate hospitals.
288
INVESTMENT CONDITION
▪ In 2021, the labor force aged over 15 working in economic sectors is 534,865
Human resource
people, accounting for 45%of the total city population. The trained workforce
reached 47.7%.
▪ Labor productivity and average income have steadilyincreased over the
Education level
years. The education and technical qualifications of the workforce are
gradually improving.It is forecasted that by 2025, Da Nang City will have
about 690,000 employees, by 2030 there will be about 798,000 employees
serving the sectors of service, industry - construction with an average of
75 - 80%; 20-25% respectively and the rest is working in fisheries agriculture - forestry sector. The rate of additional employment will reach
5-5.5%/year, the rate of trainedworkers will reach over 70%.
▪ Regional minimum salary: 161 USD/month
▪ Average salary (USD/month)
- Manufacturing
Salary
+ Workers: 203 USD
+ Engineer: 311 USD
+ Manager: 621 USD
- Service
+ Office staff: 316 USD
+ Manager: 1,058 USD
Investment incentives
Proposed by investors
▪ Prioritized projects: (1) Microelectronics,
Fields Attracting
Investment
mechatronics and opto-electronics, (2) Biotech, (3)
information and communication technology (ICT), (4) Automation, Precision
mechanics, (5) New energies, nanotech, new materials, (6) Tech applied for
petrochemistry and other special industries.
Map
289
Da Nang Hi-tech Park and Industrial Zones Authority
Contact
▪ Address: Lot A17, Center Road, Hoa Lien Commune,Hoa Vang District, Da
Nang City
▪ Tel: (84) 236 3666117
▪ Email: dhpiza@danang.gov.vn
290
LIST OF INDUSTRIAL ZONES IN DA NANG
No
Industrial zone Name
Occupancy Rate
Status
Da Nang Hi-tech Park
Total Area
(ha)
1,128.4
1
42.31%
In operation
2
Lien Chieu Industrial Zone
289.35
56.14%
In operation
3
Da Nang Industrial Zone
50.1
100%
In operation
4
Hoa Khanh Industrial Zone
394
100%
In operation
Expanded Hoa Khanh Industrial Zone
132.6
100%
In operation
5
Da Nang Seafood Service Industrial Zone
50.63
100%
In operation
6
Hoa Cam - Phase I Industrial Zone
136.73
100%
In operation
Hoa Cam - Phase II Industrial Zone
120
0%
7
Hoa Nhon Industrial Zone
360
0%
8
Hoa Ninh Industrial Zone
400
0%
Finding
Developers
Finding
Developers
Finding
Developers
DA NANG’S LOCATION MAP OF INDUSTRIAL ZONES
291
DANANG HI-TECH PARK
GENERAL INFORMATION
Address
Hoa Lien Commune, Hoa Vang District, Da Nang City
Da Nang Hi-tech Park and Industrial Zones Authority
Investor
▪ Address: Lot A17, Center Road, Hoa Lien Commune, Hoa VangDistrict, Da Nang
City
▪ Tel: (84) 236 3666117
▪ Email: dhpiza@danang.gov.vn
Contact Person
Location
Mr. Vu Quang Hung – Director - Mobile: (84) 236 3666117
- Email: hungvq@danang.gov.vn
Adjacent location
Investment Sectors
22 km from city center;
17 km from Da Nang international airport;
25 km from Tien Sa port;
22 km from Da Nang station.
Priority Sectors for
(1) Microelectronics, mechatronics and opto-
Investment
electronics, (2) Biotech, (3) information and
communication technology (ICT), (4) Automation, Precision
mechanics, (5) New energies, nano tech, new materials, (6) Tech
applied for petrochemistry and other specialindustries
Investment
In accordance with current lawsRestricted
Sectors
Minimum wage
Lease term
Minimum LeaseArea
Limit for
Construction Height
Permitted
Construction Rate
Planned area
Zone II According to Decree 38/2022/ND-CP
Proposed by investors
Proposed by investors
1 – 6 floors
50-60%
Total area: 1.128,4 ha
Factory Available for
Rent
Operation Status
Active
Occupancy Rate and
Number of Projects
Da Nang Hi-Tech Park has so far attracted 29 projects totalling more
than 900 million USD in registered investment capital.
Number of Korean
Proposed by investors
02
projects
Lease fee
To be considered for incentives for land rent exemption and
reduction under the Government's Decree No. 04/2018/ND-CP dated January 4, 2018
stipulating the preferential mechanisms and policiesfor Da Nang Hi-tech Park
292
DA NANG HI-TECH PARK
GENERAL INFORMATION
Address
▪ Hoa Lien and Hoa Ninh Communes, Hoa Vang District, Danang City
Investor
Danang Hi-tech Park and Industrial Zones Authority
▪ Address: Lot A17 Centre Road, Da Nang Hi-tech Park, Hoa Lien, Hoa
Vang, Da Nang
▪ Tel: (84-236) 3 211 088
▪ Email: dhpiza@danang.gov.vn
▪ Website: dhpiza.danang.gov.vn
Contact Person
▪ Mr. Pham Truong Son –Head of Da Nang Hi-tech Park and Industrial Zone – (84) 903 502 131
- sonpt.dng@gmail.com/ sonpt@danang.gov.vn
▪ Mr. Nguyen Xuan Dai – Manager of Investment Promotion Department –
(84) 905 117 212 - dainx1@danang.gov.vn
Location
▪ 5km from Lieu Chieu Port.
▪ 17km from Danang International Airport.
▪ 22km from the center city
▪ 25km from Tien Sa seaport.
Priority Sectors for
Investment
Microelectronics, mechatronics and opto-electronics, Biotechnology,
ICT, Automation, Precision mechanics, New energies, nano
technology, new materials, Tech applied for petro chemistry and other
special industries
Restricted Sectors for
Investment
Restricted by the Law
Investment Area
Minimum wage
[Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term
50~70 years
Minimum Lease Area
1ha (Expected average investment rate: 15million USD/ha)
Limit for Construction
Height
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential
Planning regulation (QCXDVN 01: 2008/BXD)
Permitted Construction
Rate
No more than 6 floors- Construction area is not more than 60% of the total leased land lot
Planned area
▪ Total area: 1,128.4 ha:
- Hi-tech production area: 202.58ha
- Logistics and hi-tech services area: 27.45ha
- R&D, training and incubation area: 99.93ha
- Residential area (31.4ha), Administrative area (28.35ha), Central
technical infrastructure area (9.75ha)
▪ Vacant leasable area: 329.96 ha
Factory Available for Rent
▪ Ready built factory (RBF) for lease: Under development
Operation Status
▪ In operation
Occupancy Rate and
Number of Projects
▪ Occupancy Rate: 42.31%
▪ Number of Projects: 26 (Total investment: 818 million USD)
- Tenants include Tokyo Keiki, Niwa Foundry, Yamato Sewing, Hatsuta Seisakusho, Inaba
Rubber, Fujikin International (Japan), Universal Alloy Asia, United States Enterprises (semi
conductors) (USA), Trung Nam EMS, ATOMA, Dapharco, Petrolimex (Vietnam), etc
Number of Korean Projects
▪ 02 projects, including Dentium, VK Plus
Lease fee
▪ Land lease fee: from 0.3 ~ 0.45 USD/m2/year, (depending of type of project and payment
method)
Operating fee
▪ Management fee: 0.2 USD/m2/year
▪ Electricity fee: N/A
293
▪ Water fee: N/A
▪ Wastewater treatment fee: 0.2~0.3 USD/m3
INFRASTRUCTURE AND FACILITY
Financial institution
Bidv, Vietin Bank, Vietcombank, Agribank
Tax service, State finance
office
13 km from Thanh Khe – Lien Chieu Tax Office
13 km from Thanh Khe – Lien Chieu State Treasury Office
Customs Service
9.4 from Hoa Khanh Customs Office
Logistics
NA
Post office
8 km from Hoa Son Post Office/
Medicare
13.8 km far from Lien Chieu Medical Center (25 min by car)
21 km far from Da Nang General Hospital (35min by car)
Police, public security
500 m from nearest Police Station
Universities, training
facilities, etc.
25 universities and colleges in Da Nang City. Far from IZ 4km is some of the popular university
and college in Da Nang City such as Da Nang Polytechnic University, Da Nang Pedagogical
University, and Da Nang Planning and Economics College…
19 professional secondary schools and 59 vocational training centers.
Recruitment
Management Board will support in recruitment
Worker dormitory
NA
Worker's child education
facility
NA
One-stop service
Da Nang Hi-tech Park and Industrial Zones Authority is in charge of implementing all
administrative procedures. Office of Da Nang Hi-tech park and Industrial Zones Authority will
be located in Da Nang Hi-tech Park in the early 2020.
Road Width
▪ The center route with cross-section width: W = 51m
▪ The subdivision routes with cross-section width: W = 22.5 m ÷ 33m
▪ The internal roads in each functional area with cross-section width: W =
8m ÷15m.
▪ The roads are connected in chessboard arrangement, convenient for transportation in the Park.
IT & Tele-communication
Facilities
The telecommunication system complies with international standards and is always available for
communication demand with high data transmission s
Power Supply
▪ Danang Hi-Tech Park’s electricity is planned to be supplied by a 110/22KV station with a
capacity of 2x63MVA which will be built in Hoa Lien. It is expected that by 2015 one 63MVA
transformer will be put into operation ahead. The 110kV double circuit line power station will be
connected to the 110kV line from Hoa Khanh to Hai Van Tunnel.
▪ Currently, the 110 kV substation with the capacity of 40MVA has started
operation.
Emergency Power
generator
Available
Water Supply
10,000 m3 /day-night.
Waste-water treatment
System
▪ Total capacity: 18.000 m3/day, including 4 modules, each with the
capacity of 4.500 m3/day.
▪ Wastewater from projects must reach class B before entering the Waste
water treatment plant.
Fire-fighting facility
Available. Water supply system for firefighting is located along each road.
294
Layout Plan
Location Map
Actual View
295
296
LIEN CHIEU INDUSTRIAL ZONE
GENERAL INFORMATION
Address
▪ Hoa Hiep Bac Ward, Lien Chieu District, Da Nang City
Investor
▪ Saigon-Danang Investment Corporation (SDN)
․ Address: 61 A Nguyen Van Cu Street, Lien Chieu District, Da Nang City
․ Tel: (84-236) 3 770 998
Fax: (84-236) 3 770 997
․ Web: www.dananginvest.com
Contact Person
▪ Ms. Le Thi Yen Nhi - Business Director – Mobile: (84) 908 312 030 - Email:
yennhi.sdn@gmail.com/ nhi.le@dananginvest.com
Location
▪ 15 Km from Danang City center
▪ 15 Km from Danang International Airport
▪ 25 Km to Danang Deep Seaport (Tien Sa Terminal) & Located right next to Lien Chieu
Deep Seaport (under construction)
▪ Located right next to National Highway 1A and 15 Km from the national North-South
railway station.
Priority Sectors
for Investment
▪ Information technology, biotechnology, automation technology and
mechatronics, new materials technology;
▪ Environmental friendly industries, supporting industries in the field
of mechanics, precision engineering, electricity - electronics;
▪ High quality service sectors, especially trade, tourism, logistics,
health and education. (Decision No. 4286/QD-UBND on 4/7/2016)
Restricted Sectors
for Investment
Production of iron, steel, construction materials, paper, chemicals,
textiles and textile products ...
Investment Area
Minimum wage
[Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term
▪ Start date: 1996
▪ End date: December 12th 2046 (12/12/2046)
Minimum Lease Area
1 ha
Limit for Construction Height
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Residential Planning regulation (QCXDVN 01: 2008/BXD)
Permitted Construction Rate
Construction area is not more than 60% of the total leased land lot
Planned area
▪ Total area: 289.35 ha
▪ Total vacant leasable area: 83 ha
▪ Total area with full infrastructure ready to build factory: 63.3 ha
Factory Available for Rent
▪ Total area: Unavailable (Planning to build RFB)
Operation Status
In operation
Occupancy Rate and Number
of Projects
▪ 53.7%
▪ 25 projects
Number of Korean Projects
N/A
Lease fee
▪ Land lease fee: 90 USD/m2 for the rest of Project’s life to December 12th 2046 (VAT
excluded)
▪ Factory lease fee: 3 USD/m2/month (VAT excluded)
▪ Payment: In advance every 3 months of rental
- Method: Bank transfer
- Period: Deposit 40% after signing In principle Agreement – 55% After signing Land
sublease contract – 5% after signing Land handover minutes.
Operating fee
▪ Management fee: 0.4 USD/m2/year (before VAT)
▪ Electricity fee: According to the Circular by Ministry of Industry and Trade, valid from
March 16th, 2015 (excluded VAT) for voltage from 22KV-110KV.
▪ Water fee: USD 0.37/m3 (Before Taxation and fees)
297
▪ Wastewater treatment fee: 0.37 – 0.92 USD/ m3 depending on Chemical Oxygen demand
(COD) (mg/l)
INFRASTRUCTURE AND FACILITY
Financial institution
There are branches of all popular banks in Danang city
Tax service, State finance office
▪ 10 km from Da Nang Tax office
▪ 10 km form Da Nang Treasury Office
Customs Service
▪ 6 Km from the nearest Customs Agency (inside Hoa Khanh IZ)
▪ 16km from Da Nang port
Logistics
VNPOST, Yusen, Logitem, Nippon Konpo, Binh Vinh: 5 km far from the industrial park
Post office
4 Km from the nearest Mailing Post Office
Medicare
Lien Chieu General Hospital 8 km from the IZ
Danang General Hospital 15 km from the IZ
Police, public security
1 Km from the nearest Police Station
Universities, training facilities
25 universities and colleges in Danang City. Far from IPs 4km is some of the popular
university and college in Danang City such as Danang Polytechnic University, Danang
Pedagogical University, and Danang Planning and Economics College…
Recruitment
Supported by IZ developers
Worker dormitory
5 km from the IZ
Worker's child education
facility
5 km from the IZ
One-stop service
20 Km from the nearest Facility
Road Width
Roads connecting to land lots with width of 34.50m and 16.50m
IT & Tele-communication
Facilities
Available
Emergency Power generator
Available
Fire-fighting facility
Available
298
Layout Plan
Location Map
299
Actual View
LIST OF PROJECTS IN LIEN CHIEU INDUSTRIAL ZONE
No
Company Name
Nationality
1
Crown Beverage Packaging Danang Co., Ltd.
Singapore
2
Endo Chuuzou Vietnam Company Limited
Japan
3
Vietnam Craft Beer Company Limited
US
4
Danang Chemical Industry Joint Stock Company
Vietnam
5
Ngu Hanh Son Cement Joint Stock Company
Vietnam
6
Vicem Hai Van Cement Joint Stock Company
Vietnam
7
Da Nang Railway Material Company Limited
Vietnam
8
875 Construction One Member Company Limited
Vietnam
9
Vietnam TBV Joint Stock Company (formerly: Cosani)
Vietnam
10
Southern Gas Trading Joint Stock Company
Vietnam
11
Non Nuoc Joint Stock Company
Vietnam
12
Da Nang Steel Joint Stock Company
Vietnam
13
Danang Rubber Joint Stock Company
Vietnam
14
Viet A Power Cable Company Limited
Vietnam
15
Young Power Co. Ltd.
Vietnam
16
Post and Telecommunication Joint Stock Company
Vietnam
17
Thinh Phu Company Limited
Vietnam
18
Northern Liquefied Gas Company
Vietnam
19
Lilama 7 Joint Stock Company
Vietnam
20
Song Da Someco Joint Stock Company
Vietnam
21
Ton Dong A Joint Stock Company
Vietnam
22
Tin Thanh Industrial Steam Co., Ltd
Vietnam
23
Tay Ninh Industrial Infrastructure Development Joint Stock Company
Vietnam
24
Viet Thai Plastic Joint Stock Company
Vietnam
25
Kinh Bac Service Joint Stock Company
Vietnam
300
HOA CAM - PHASE I INDUSTRIAL ZONE
GENERAL INFORMATION
Address
▪ Street No1, Hoa Cam Industrial Park, Hoa Tho Tay Commune, Cam Le District, Da Nang city
Investor
▪ Hoa Cam Industrial Zone JSC.
․ Address: Street No1, Hoa Cam Industrial Park
․ Tel: (84) 914 109 667
․ Fax: (84-236) 3 898 077
․ Website: hoacamizi.com.vn
Contact Person
Mr. Nguyen Ba Cong- Head of Sales Department – Mobile: (84) 905 454 479 baconghoacamizi@gmail.com
Location
Land: 8 km from Da Nang city center, and 8 km from railway station
Seaport: 18 km from Tien Sa Seaport
Airport: 7 km from Da Nang International Airport
Investment Area
Priority Sectors
for Investment
Electric and electronic equipment, assembly, food product, construction
material, interior décor, logistics, other industries (cosmetics, packaging..)
Restricted
Sectors for
Investment
Polluted Industry
Minimum wage
[Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term
▪ Start date :30/9/2007
▪ End date : 08/8/2054
Minimum Lease Area
4,000 m2
Limit for Construction
Height
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential
Planning regulation (QCXDVN 01: 2008/BXD)
Permitted Construction
Rate
Minimum rate: 50%
Maximum rate: 60%
Planned area
▪ Total area:
- Phase I: 136.73 ha (in which industrial land: 96.13ha; vacant leasable area: 12 ha)
- Phase II (Extended): 131 ha
Factory Available for Rent
NA
Operation Status
▪ In operation
Occupancy Rate and
Number of Projects
▪ 100%
Number of Korean
Projects
N/A
Lease fee
▪ Land lease fee: 891,000 VND (~38.2 USD)/m2/whole project life
▪ Payment: One-time payment until 08 August 2054
Operating fee
▪ Management fee: 14,950 VND (~0.64 USD)/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: (prescribed by the supplier)
▪ Wastewater treatment fee:
Above 100m3: 12,000 VND (~0.51 USD)/m3
Under 100m3: 1,000,000 VND (~42.9 USD)/month
INFRASTRUCTURE AND FACILITY
Financial institution
Vietcombank, ACB, Agribank, Techcombank
Tax service, State finance
office
03 km from Da Nang Treasury Office
301
Customs Service
5 km from nearest Customs Office
0.2 km to nearest ICD
Logistics
Located inside the IZ
Post office
0.2 km from nearest Post Office
Medicare
1 km from nearest Hospital
Police, public security
0.1 km from nearest Police Station
Universities, training
facilities, etc.
6km from Dong A University and Da Nang Foreign Language University
Recruitment
1 km from Provincial Human Resources Center
Worker dormitory
0.2 km from the IZ
Worker's child education
facility
8 km from the IZ
One-stop service
Inside the zone
Road Width
Main road 60 m, 36 m and branch road 22 m in width
IT & Tele-communication
Facilities
Telecommunication systems and international standards are always ready to meet the
communication needs
Emergency Power
generator
Available in the zone
Fire-fighting facility
Available
Layout Plan
Location Map
302
Actual View
303
EXPANDED HOA KHANH INDUSTRIAL ZONE
GENERAL INFORMATION
Address
▪ Hoa Khanh Bac Ward, Hoa Lien & Hoa Son Commune, Lien Chieu District, Da Nang City
Investor
Minimum wage
▪ Saigon-Danang Investment Corporation (SDN)
․ Address: 61 A Nguyen Van Cu Street, Lien Chieu District, Da Nang City
․ Tel: (84-236) 3 770 998
Fax: (84-236) 3 770 997
․ Web: www.dananginvest.com
▪ Ms. Le Thi Yen Nhi - Business Director – Mobile: (84) 908 312 030 - Email:
yennhi.sdn@gmail.com/ nhi.le@dananginvest.com
▪ 10 Km from Danang City center
▪ 10 Km from Danang International Airport
▪ 20 Km to Danang Deep Seaport (Tien Sa Terminal) 5km to Lien Chieu Deep Seaport
▪ 3 Km from National Highway 1A and 10 Km from the national North-South railway station
Priority Sectors for
▪ Information technology, biotechnology, automation technology and
Investment
mechatronics, new materials technology;
▪ Environmental friendly industries, supporting industries in the field
of mechanics, precision engineering, electricity - electronics;
▪ High quality service sectors, especially trade, tourism, logistics,
health and education. (Decision No. 4286/QĐ-UBND on 4/7/2016)
Restricted Sectors for
Heavy-Industry, Textile & dying, Polluting industries
Investment
[Area 2] According to Decree 157/2018/ND-CP dated 16th November 2018
Lease term
End date: March 25th 2054
Minimum Lease Area
1 ha
Limit for Construction
Height
Permitted Construction
Rate
Planned area
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential
Planning regulation (QCXDVN 01: 2008/BXD)
Contact Person
Location
Investment Area
Factory Available for
Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean
Projects
Lease fee
▪ Total area: 132.6 ha
▪ Total vacant leasable area: 0.9 ha
▪ Total area with full infrastructure ready to build factory: 6.9 ha
Total area: Unavailable (Planning to build RFB)
In Operation
▪ Occupancy Rate: 100%
N/A
Operating fee
▪ Land lease fee: USD 110/m2/ for the rest of Project’s life to March 25th 2054 (before VAT)
▪ Factory lease fee: Unavailable
▪ Payment:
- Method: Bank transfer
- Period: Deposit 40% after signing Inprinciple Agreement – 55%After signing Land sublease
contract – 5% after signing Land handover minutes
▪ Management fee: 0.4 USD/m2/year (before VAT)
▪ Electricity fee: According to the Circular by Ministry of Industry and Trade, valid from March
16th, 2015 (excluded VAT) for voltage from 22KV - 110KV.
▪ Water fee: USD 0.37/m3 (Before Taxation and fees)
▪ Wastewater treatment fee: 0.37 – 0.92 USD/ m3 depending on Chemial Oxygen demand (COD)
(mg/l)
INFRASTRUCTURE AND FACILITY
Financial institution
There are branches of all popular banks in Danang city.
Tax service, State finance
office
Customs Service
5 Km from the nearest State Tax Office and Treasury Office
Logistics
600 m from the nearest Customs Agency in Hoa Khanh IP
11km from Da Nang port
[VNPOST, Yusen, Logitem, Nippon Konpo, Binh Vinh] inside the industrial park
Post office
4 Km from the nearest Mailing Post Office
304
Medicare
Police, public security
Lien Chieu General Hospital (Far from IPs 3 km)
Danang General Hospital (Far from IPs 10 km)
1 Km from the nearest Police Station
Recruitment
25 universities and colleges in Danang City. Far from IPs 4km is some of the popular university
and college in Danang City such as Danang Polytechnic University, Danang Pedagogical
University, and Danang Planning and Economics College…
Available
Worker dormitory
5km from the IZ
Worker's child education
facility
One-stop service
5km from the IZ
Road Width
Roads connecting to land lots with width of 34.50m and 16.50m
IT & Telecommunication Facilities
of industrial park
Emergency Power
generator
Fire-fighting facility
Telecommunication systems and international standards are always ready to meet the
communication needs
Universities, training
facilities, etc.
15 Km from the nearest Facility
Available
Available in the zone
Layout Plan
305
Location Map
Actual View
306
[- This Page is intentionally left blank -]
307
DAK LAK
308
INVESTMENT ENVIRONMENT IN DAK LAK
USD/VND
23.510
GENERAL INFORMATION
Area
Population
Geographical
Location
Adjacent
provinces
13125,37 km2
1,9 million people (2022)
▪ Dak Lak is located in the Central Highlands region.
Dak Lak is 1,410 km far from Hanoi and 350 km from Ho Chi Minh City.
- The East borders Khanh Hoa, Phu Yen provinces;
- The North borders Gia Lai province;
- The South borders Lam Dong, Dak Nong provinces;
- The West borders the Kingdom of Cambodia.
2022 statistic:
GRDP
▪ Nominal GRDP (billion VND):
58.355
(4,13 billion USD)
▪ Real GRDP (billion VND):
52.481
(2,29 billion USD)
▪ GRDP growth:
8,94%
▪ GRDP per capita (million VND/year):
62,3
(2.630 USD)
▪ Economic structure:
- Industry - Construction:
16,48%
- Agriculture. forestry and fishery:
36,87%
- Service:
42,36%
▪ Industry - Construction growth:
13,46%
Industry growth ▪ Agriculture, forestry and fishery growth:
Import - Export
Key Industry
PCI
Ranking
4.56%
▪ Service growth:
7.37%
Import turnover (billion USD):
3,93
(Growth rate: 0,083)
Export turnover (billion USD):
1,50
(Growth rate: 0,3032)
▪ Processing coffee, avocado, cocoa, rubber, pepper
▪ Wind power production, solar power,
▪ Mechanical engineering, assembly, repair
60.91
60
SOCIAL INFRASTRUCTURE
▪ Roadway: National Highway 14 to Ho Chi Minh City (350km), to Gia Lai (180km from Pleiku city) and
connecting with Ho Chi Minh Road in Kon Turn province, National Highway 26 to Khanh Hoa (180km from
Nha Trang city); National Highway 27 to Lam Dong (200km from Da Lat city) and National Highway 29 to
Transportation
Phu Yen (185km).
▪ Airway: Buon Ma Thuot Airport is located 7 kilometers southeast of the city center, directly connecting flight
routes to Hanoi, Ho Chi Minh City, Da Nang, Thanh Hoa, Vinh, Can Tho, and Hai Phong.
Dak Lak electricity generating company can basically ensure to supply sufficient electric power for production
and daily life. At present, the electric network has covered all of the communes in the province with 84% of the
Electricity
households having access to electricity.
▪ A centralized water supply and treatment system will be installed for residents of Buon Ma Thuot city, Buon
Water
Ho town, and district centers.
Education &
▪ 04 universities, 8 colleges, 01 academy.
Training
Medicare
▪ 06 provincial hospitals, 02 district hospitals and 03 private hospitals
INVESTMENT CONDITION
Human resource 59.75% of population are in the working age (2022)
Education level Trained labor rate: 62% (2022)
Salary
▪ The minimum salary for the province is applied as follows (see appendix for
detail amount):
309
- Area III: including Buon Ma Thuot
- Area IV: including Buon Ho town and remaining districts
▪ The lowest wage for trained labor (including those trained by the enterprises)
must be at least 7% higher than the above referenced basic salary
Incentives for investment
According to the Investment Law, the entire Dak Lak province is eligible for investment incentives, Investment
projects in these areas are exempt from land rent for a period of seven to fifteen years, or for the entire term of
the lease, depending on the fields of investment incentives and other investment incentive policies as prescribed.
Investment
incentives
Besides, when investing in the field of socialization, investorswill be entitled to land rent exemption in 25 years
and a reduction of 70-85% of land rent or 100% exemption for all other areas.
Investment support
Investment projects in agriculture and rural areas are eligible for policies on access to credit and investment
credit support.
Investment projects on the technical infrastructure of industrial clusters are supported to invest in items such as
centralized wastewater treatment systems; foreign roads; main roads; leveling.
Agriculture: Promote large-scale agricultural production; focus on agricultural development in the direction of
organic, high-tech applications, associated with preservation, processing, and consumption along the value
chain; promote the formation of concentrated, large-scale, bio-secure, and modern livestock production areas;
strengthen forest management, protection, and development; and focus on afforestation, contributing to
increased forest cover. Industry: Encourage the development of industries with advantages such as deep
processing, renewable energy, and mechanical engineering for production and processing in agriculture, animal
husbandry, and the software industry while also promoting scientific and technological research.
Fields Attracting
Trade in services: To encourage investment and the development of commercial centers, supermarkets, and
Investment
traditional markets mixed with modern ones; to develop and improve the quality and competitiveness of service
industries with potential, advantages, and high added value, such as ecotourism, finance, banking, insurance,
transportation, logistics, education, health care, science, and so on; to develop the banking system to meet the
economy#39;s capital and service needs.
Construction: Pay close attention to infrastructure investment in the province#39;s industrial zones and clusters,
particularly investment in building a standard- compliant centralized wastewater treatment system.
Investment
attraction
situation
Dak Lak has 25 FDI projects with a total investment capital of about 635 million US dollars.
310
Map
Department Of Planning And Investment Dak Lak
Contact
Address: No 08 Tran Hung Dao, Tan Loi Ward, Buon Ma Thuot city
Tel: (84-262) 3 852187
Fax: (84-262) 3 852187
E-mail: ttxtdt@khdt.daklak.gov.vn
▪ Contact person:
- Mr. Dinh Xuan Ha
Tel: 0903585068
Email: hadx@khdt.daklak.gov.vn
311
[- This Page is intentionally left blank -]
312
DAK NONG
313
INVESTMENT ENVIRONMENT IN DAK NONG
USD/VND 23.510
GENERAL INFORMATION
Area
Population
Geographical Location
Adjacent provinces
6515,6 km2
0,658 million people (2022)
▪ Dak Nong is located in Central Highlands region.
▪ Dak Nong was established in 2004, further to the splitting of Dak Lak province. It covers 651,000
ha located in mountainous region with an average elevation of 600 – 700 meter and with some
places up to 1,970 meter high from the sea level.
▪ The province is surrounded by Dak Lak Province in the north, Lam Dong Province on the east and
south-east, Binh Phuoc Province. It shares a borderline of 130km with Cambodia with two border
gates
2022 statistic:
GRDP
Industry growth
Import - Export
Key Industry
PCI
Ranking
▪ Real GRDP (billion VND):
22.400
▪ GRDP growth:
7,59%
▪ GRDP per capita (million VND/year):
59,61
(0,96 billion USD)
(2542 USD)
▪ Economic structure:
- Industry - Construction:
19,61%
- Agriculture. forestry and fishery:
37,64%
- Service:
38,55%
▪ Industry - Construction growth:
7,87%
▪ Agriculture, forestry and fishery growth:
5,21%
▪ Service growth:
10,40%
Import turnover (billion USD):
0,30
(Growth rate: -0,36)
Export turnover (billion USD):
1,10
(Growth rate: 0,15)
▪ Agriculture still represents a very important part of Dak Nong economy. The main agricultural
crops practiced in Dak Nong province are tea, coffee, pepper, cashew nut, rubber tree and sugar
cane.
64.87
38
SOCIAL INFRASTRUCTURE
Transportation
Electricity
Water
Education & Training
▪ Roadway: There are national highways No.14, 14C and 28 to Ho Chi Minh city, Đăk Lăk, Lâm
Đồng and to other provinces in the south. The province has national border gate in Bu Prăng, Đắk
Pơ making it convenient for cross border trading and attracting tourists from Cambodia to Central
highland by roadway
▪ Dak ND'rung 1 wind power plant; Dak ND'rung 2; Dak ND'rung 3 has a total capacity of 300MW
with a total capital of up to VND 10,000 billion;
▪ Currently, within the province, there are 12 underground water resources monitoring works.
▪ The whole province of Dak Nong had about 387 schools with 5,324 classes and more than
172,000 students.
INVESTMENT CONDITION
Human resource
59.82% of population are in the working age (2020)
Education level
Trained labor rate: 45% (2020)
▪ The minimum salary for the province is applied as follows:
- Area I (4,680,000 VND/month): N/A
Salary
- Area II (4,160,000 VND/month): N/A
- Area III (3,640,000 VND/month): N/A
314
- Area IV (3,250,000 VND/month): Gia Nghia City; the districts of Cu Jut, Dak Glong, Dak Mil,
Dak R'lap, Dak Song, Krong No, Tuy Duc
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum
wages paid to employees working under employment contracts)
Investment incentives
Fields Attracting
Investment
Investment attraction
situation
Industrial zones
▪ Incentives according to government regulations:
- Exemption and reduction for land and water rent fee
- Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
High-tech agriculture, agricultural processing, infrastructure development, high-technology, tourism
& services, industrial plants (coffee, rubber, cashew), mining
▪ Investment capital in the province is mainly focused on the purpose of electricity production and
distribution and agriculture, forestry, forestry and fishery. With a number of key projects such as
Dak ND'rung 1 wind power plant; Dak ND'rung 2; Dak ND'rung 3 has a total capacity of 300MW
with a total capital of up to VND 10,000 billion; Factory producing and processing high-quality
agricultural products with a capacity of 5,000 tons of agricultural products with a total investment
of more than 100 billion VND; 03 large-scale pig farms spread across the province with a total
investment of 400 billion VND; and some small and medium hydropower plants, etc. Investment
capital for social development at current prices in 2022 was estimated at nearly VND 18,473
billion, up 22.42% over the same period last year.
▪ The province has put into operation two industrial parks on a combined area of 327.5 ha and it is
making a planning scheme for Nhan Co 2 industrial park on over 800 hectares to facilitate
investment in mining and aluminium processing projects.
Map
Department of Planning and Investment Dak Nong
▪ Address: 23/3 Street, Gia Nghia town, Dak Nong
Contact
▪ Tel: 0261.3544333
▪ Email: skhdt@daknong.gov.vn
▪ Contact person:
- Mr. Tran Xuan Hai - Director
- Tel: 84-91343642
315
LIST OF INDUSTRIAL ZONES IN DAK NONG PROVINCE
No
stt
1
2
3
Industrial zone Name
Occupancy Rate
Tam Thang Industrial zone
Total Area
(ha)
179,19
77,26%
In Operation
Nhan Co Industrial zone
148
86,49%
Under construction
Nhan Co 2 Industrial zone
400
0
Not built yet
316
Status
TAM THANG INDUSTRIAL PARK
GENERAL INFORMATION
Address
Tam Thang Commune, Cu Jut District, Dak Nong Province
Investor
▪ Tam Thang Industrial Park Infrastructure Development Company
- Tel: 02613.683.579; fax: 2613,683.580.
- Investment capital: 319,876 billion VND.
Location
- The altitude is about 400 - 500m above sea level.
- Soil: Mainly red basalt soil.
- Located on National Highway 14, north of the city. Buon Ma Thuot, Dak Lak province is 18 km,
the South is 100 km from Gia Nghia Town, Dak Nong province and 330 km from Ho Chi Minh
City. Buon Ma Thuot Airport is about 30km.
- Convenience in exchange with Ho Chi Minh City and Ho Chi Minh City. Buon Ma Thuot, Dak
Lak province.
- The terrain in the industrial park is flat, convenient for the construction of factories and
enterprises. Technical infrastructure in the industrial park has basically been completed
Priority Sectors for
Investment
▪ Processing agricultural and forestry products; production of
fertilizers, animal feed, building materials, household appliances.
Investment Area
Minimum wage
Apply regional minimum wages as prescribed by the Government (average actual salary is 5.5
million VND/person/month)
Lease term
- Time to put into operation: 5/2005.
- Operation time: Until October 28, 2052
Planned area
▪ Total area: 179,5 ha
▪ Total leasable area: 128.4 ha
▪ Already used area: 117,6 ha.
In Operation
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean
Projects
Lease fee
▪ Occupancy Rate: 77,26%
N/A
- Land rent and infrastructure use fee: service area: 7 million VND/m2/year; industrial production
zone: 6 million VND/m2/year.
- Factory rental price: According to current price.
- Payment method: Annual payment (cash, bank transfer).
- Standard factory: According to current price.
- Office: According to current price.
INFRASTRUCTURE AND FACILITY
- Power supply system: Dak Nong Power Company supplies electricity to enterprise fences; power supply from 110KV
Transformer Station - Cu Jut.
- Water supply system: Dak Nong Urban Development and Water Supply Joint Stock Company supplies clean water to
enterprise fences.
- Waste water and waste treatment system: There is an operating wastewater treatment station with a capacity of 4,600 m3/day.
- Telecommunications system, internet: Provide to the foot of the enterprise fence.
- Internal traffic: Completed, the main road system is 36m wide, with 2 lanes; The internal road system is 11m wide, with 1 lane.
317
Layout Plan
318
NHAN CO INDUSTRIAL ZONE
GENERAL INFORMATION
Address
4, Nghia Duc ward, Gia Nghia town, Dak Nong province.
Investor
▪ Management Board of civil and industrial projects investment project in Dak Nong
province
- Tel: 02612216460
- Investment capital: 993 billion VND.
Location
- The altitude is about 600 - 700m above sea level.
- Soil: Mainly Basalt red soil
- Located far from National Highway 14: 02km; City. Buon Ma Thuot, Dak Lak province 140 km;
Gia Nghia town, Dak Nong province 10km and far from the city. Ho Chi Minh is about 240 km.
Convenience in trade with the city. Ho Chi Minh and the southern provinces.
Priority Sectors for
Investment
Aluminum electrolysis; manufacturing industry using raw materials
from aluminum.
Investment Area
Minimum wage
Apply regional minimum wages as prescribed by the Government (average actual salary is 5.5
million VND/person/month)
Lease term
- 70 years, since August 11, 2014
Planned area
A total area of 148 ha, but has leased 128 ha; the remaining 20 ha has been leveled but has not
yet been invested in the construction of industrial park infrastructure.
Under construction
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean
Projects
Lease fee
▪ Occupancy Rate: 86,49%
N/A
Currently, Dak Nong province is building a land rental unit price
INFRASTRUCTURE AND FACILITY
- Power supply system: Using a newly built 22KV power line (dual highway) from station 110/35/22KV-2x16MVA Gia Nghia Dak Nong to supply electricity to Nhan Co Industrial Park.
- Water supply system: Dak Nong Urban Development and Water Supply Joint Stock Company supplies clean water to
enterprise fences.
- Waste water and waste treatment system: Currently, the total area of Nhan Co Industrial Park is 148 ha, 128 ha has been leased
to Tran Hong Quan Metallurgical Company Limited to invest in the project "Dak Nong Aluminum Electrolysis Plant" Therefore,
the treatment system invested by Tran Hong Quan Metallurgy Co., Ltd meets the prescribed standards.
319
[- This Page is intentionally left blank -]
320
DIEN BIEN
321
INVESTMENT ENVIRONMENT IN DIEN BIEN
USD/VND
23.510
GENERAL INFORMATION
Area, Population
▪ Area: 9.541,25 km2
▪ Population: 635 million people (Statistics 2022)
Geographical Location
▪ Dien Bien is a mountainous border province in the Northwest region of Vietnam.
▪ 475 km west from Hanoi
Adjacent provinces
▪ The East and Northeast borders Son La Province, the North borders Lai Chau
Province, the Northwest borders Yunnan Province (China), the West and Southwest
borders Lao PDR.
GRDP
Statistic 2022:
▪ GRDP: 13,963.91 billion VND
▪ GRDP growth: 10,19%
▪ GRDP per capita: 39,68 million VND/year
▪ Economic structures:
- Industry - Construction: 21,25%;
- Agriculture, forestry and fishery: 16,93%;
- Dịch vụ: 57,41%;
- Services: 4,41%
Industry growth
PCI
Statistic 2022:
▪ Industry – Construction growth: 16.11%
▪ Agriculture growth: 5.79%
▪ Service growth: 9.49%
▪ PCI score: 59.85 – Ranked 62nd out of 63 provinces in Vietnam. (2022)
SOCIAL INFRASTRUCTURE
Transportation
Electricity
▪ Roadway: National Highway 12 connects the two provinces of Dien Bien - Lai
Chau, National Highway 279 connects the northern mountainous provinces of Quang
Ninh, Bac Giang, Lang Son, Bac Kan, Tuyen Quang, Ha Giang, and Laos. Cai, Lai
Chau, Son La and Dien Bien. National Highway 6 connects the provinces of Dien
Bien, Son La, Hoa Binh, and Hanoi.
▪ Airway: Dien Bien Phu Airport
Supplied from the national power network
Water
▪ There are 6 water plants (Dien Bien Phu city, Muong Cha, Muong Lay, Dien Bien
Dong, Tuan Giao, Tua Chua) and 1 Muong Ang water treatment station.
Consumption volume reached more than 7 million m3, commercial water output
reached more than 4.9 million m3.
Education
▪ 168 preschools, 295 high schools, 17 centers, 04 colleges.
Medicare
▪ 02 provincial hospitals, 03 city hospitals, 07 district hospitals
INVESTMENT CONDITION
Human resource
▪ 58% of the population in working age (2022)
Education level
▪ Rate of trained workers: 60% (2022)
Salary
▪ The minimum salary for the province is applied as follows:
- Area III: Dien Bien Phu city
322
- Area IV: Muong Lay town, Dien Bien, Dien Bien Dong, Muong Ang, Muong Cha,
Muong Nhe, Tua Chua, Tuan Giao, and Nam Po districts
▪The lowest salary of trained workers (including employees trained by enterprises)
must be at least 7% higher than the above-mentioned base salary.
Investment incentives
▪ Exemption and reduction of land rent
▪ Preferential tax rates and duration of corporate income tax exemption and
reduction.
Dien Bien province (including all districts and Dien Bien Phu city) is located in an
area with extremely difficult socio-economic conditions. Therefore, when investing
in Dien Bien province, investors are fully entitled to preferential policies and
investment support at the highest level in accordance with the provisions of the
Investment Law 2020 and related legal documents.
Fields Attracting Investment
Map
Contact
Department of Planning and Investment of Dien Bien province
▪ Address: SN 900, group 3, Vo Nguyen Giap street, ward. Muong Thanh, City. Dien
Bien Phu - Dien Bien province
Tel: 0215 825409
▪ Fax: 02063853335
▪ Email: skhdt@dienbien.gov.vn
323
[- This Page is intentionally left blank -]
324
DONG NAI
325
INVESTMENT ENVIRONMENT IN DONG NAI
USD/VND
23.510
GENERAL INFORMATION
Area
Population
Geographical
Location
Adjacent
provinces
5903,4 km2
3,255 million people (2022)
▪ Dong Nai is located in Southeast region.
▪ Located in the southern key economic development region
▪ The East borders Binh Thuan province, the Northeast borders Lam Dong province, the Northwest borders
Binh Duong and Binh Phuoc provinces, the South borders Ba Ria - Vung Tau province, West borders Ho
Chi Minh City. South
2022 statistic:
▪ Nominal GRDP (billion VND):
GRDP
▪ Real GRDP (billion VND):
233.979
▪ GRDP growth:
9,22%
▪ GRDP per capita (million VND/year):
13.404,00
(9.98 billion USD)
( USD)
▪ Economic structure:
- Industry - Construction:
- Agriculture. forestry and fishery:
- Service:
Industry growth
Import - Export
Key Industry
PCI
Ranking
▪ Industry - Construction growth:
9,06%
▪ Agriculture, forestry and fishery growth:
3,89%;
▪ Service growth:
13,08%
Import turnover (billion USD):
1,89
(Growth rate: 0,0115)
Export turnover (billion USD):
2,45
(Growth rate: 0,1302)
▪ The mining industry, the processing and manufacturing industry, production and distribution of electricity,
gas, hot water, steam
65,67
29
SOCIAL INFRASTRUCTURE
Transportation
Electricity
Water
Education &
Training
Medicare
▪ Roadway: As a province with convenient transportation system with many national arterial roads passing
through such as National Highway 1A, National Highway 20, National Highway 51; North - South railway
line; Near Saigon port, Tan Son Nhat international airport has created favorable conditions for economic
activities in the region as well as trade with the whole country and plays a role in linking the Southeast
region with the Central Highlands.
▪ Nhon Trach 3 and 4 Thermal Power Plant Project has a scale of nearly 54 hectares with a total investment
of about 1.4 billion USD. The plant's capacity is expected to reach 1.5 thousand MW. Tri An hydropower
plant was approved by the Prime Minister in the decision to adjust the national electricity development
planning for the period 2011-2020 with a vision to 2030.
▪ Dong Nai river system is one of the three largest river systems of Vietnam (after the Mekong and Red
rivers), including: the main Dong Nai river and four major tributaries, the La Nga river on the left bank and
the Be river. , Saigon River and Vam Co River on the right bank.
▪ 5 multidisciplinary training universities in Dong Nai province
▪ The grassroots health system in Dong Nai currently has 11 health centers in districts and cities and 170
health stations in communes, wards, towns, hamlets and neighborhoods. Out of 170 medical stations, there
are more than 50 medical stations that are seriously degraded and need to be repaired urgently this year.
INVESTMENT CONDITION
Human resource
55,4% of population are in the working age (2022)
Education level
Trained labor rate: ()
Salary
▪ The minimum salary for the province is applied as follows:
326
- Area I (4,680,000 VND/month): Bien Hoa City, Long Khanh City and Nhon Trach, Long Thanh, Vinh
Cuu, Trang Bom and Xuan Loc Districts
- Area II (4,160,000 VND/month): Dinh Quan, Thong Nhat Districts
- Area III (3,640,000 VND/month): Cam My, Tan Phu Districts
- Area IV (3,250,000 VND/month): N/A
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages paid
to employees working under employment contracts)
▪ Incentives according to government regulations:
- Exemption and reduction for land and water rent fee
- Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
Fields Attracting ▪ The mining industry, the processing and manufacturing industry, production and distribution of electricity,
gas, hot water, steam
Investment
Total newly registered capital and projects to increase foreign direct investment (FDI) as of December 20,
2022 reached about US$1,141.47 million, equaling 93.6% over the same period (same period in 2021)
reached 1,219.9 million USD).In which: 48 new projects with total registered capital of 491.54 million USD,
equal to 90.6% in number of projects and 27.9% increase in registered capital over the same period last
year. . There were 92 projects to increase capital with a total additional capital of 649.93 million USD, equal
Investment
attraction situation to 84.4% of the number of projects and 77.8% of the additional capital compared to the same period last
year. Thus, both the number of projects and the registered capital decreased over the same period. The
reason is due to the impact of the world economy's decline, which has affected the wave of investment in
other countries.
In 2022, there were 4,066 newly registered enterprises
Investment
incentives
Map
Department of Planning and Investment Dong Nai
Contact
▪ Address: No. 2, Nguyen Van Tri, Thanh Binh. Bien Hoa, Dong Nai
327
▪ Tel: 2513822505
▪ Email: skhdt@dongnai.gov.vn
▪ Contact person:
- Nguyen Huu Nguyen - Director of the Department of Planning and Investment of Dong Nai province.
328
AMATA INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Long Binh Ward - Bien Hoa City - Dong Nai
Investor
Joint venture between SONADEZI Company and Amata Corp.Public Company- Thailand
- Điện thoại : 84-61-991007/893596
- Fax : 84-61-891251
- Website : http://www.amata.com
- Email : amatavn@hcm.vnn.vn
Location
The distance by road from Amata Industrial Park to major cities, railway stations, ports and
international airports is as follows:
+ 32 km from the center of Ho Chi Minh City
+ 32 km from Saigon station
+ 4 km from Dong Nai port, 26 km from Tan Cang, 32 km from Saigon port, 40 km from Phu My
port.
+ 32 km from Tan Son Nhat International Airport.
Priority Sectors for
Investment
Investment Area
Computers and accessories; food, food processing; manufacturing and
assembling electricity, mechanics and electronics; leather products,
textiles, apparel, wool, footwear; jewelry and fine arts products; sports
equipment, toys; plastic products, all kinds of packaging; industrial
products from rubber, ceramics, glass; metal texture; building
materials; auto parts, automobile manufacturing; pharmaceuticals,
agrochemicals, insecticides; Chemicals, PE fibers, plastic beads,
industrial pigments, etc.
Minimum wage
Apply regional minimum wages as prescribed by the Government
Lease term
- 50 year
Planned area
410 ha, of which 129 ha is developed in phase 1, 100 ha for lease, has been fully developed with
quality infrastructure facilities. The rate of leased land accounts for over 90%. Phase 2 develops
261 ha and service area, which is being developed in phases.
Active
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean
Projects
Lease fee
▪ Occupancy Rate: 90%
* Total number of projects/investing country: 48/12
N/A
40 USD/m2/50 year
INFRASTRUCTURE AND FACILITY
* Electricity price: 0.073 USD/KWh
* Water price: 4,600 VND/m3.
* Waste water treatment price: $0.28/m3
* Management fee: 0.08 USD/m2/month
329
BAU XEO INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Street 2A, Bau Xeo Industrial Park, Trang Bom District, Dong Nai
Investor
Thong Nhat Joint Stock Company
Phone: 0251. 3924377
Fax: 0251. 3924692
Email: info@bauxeo.com.vn
Website: www.bauxeo.com.vn
Location
Distance to nearest big city:: 57 km from Ho Chi Minh City
Distance to Provincial Center: 24 km from Bien Hoa City
Distance to nearest airport: 22 km from Long Thanh airport
Distance to the nearest railway station: 2 km from Trang Bom station
Distance to the nearest river port: 40 km from Go Dau port
Distance to the nearest seaport: 45km . from Cai Mep port
Priority Sectors for
Investment
Investment Area
Agricultural product processing industry, food processing, food,
animal feed; Wood and plastic industry; textile industry, production of
shoes, toys, jewelry; furniture manufacturing industry, interior
decoration, office; packaging industry; sports equipment
manufacturing industry; electronics and microelectronics industry;
mechanical industry (frame stamping, machine building and spare
parts); pharmaceutical and stationery manufacturing industry;
packaging production, prepress, design and printing industry; industry
producing handicrafts, glass, building materials.
Minimum wage
Apply regional minimum wages as prescribed by the Government
Minimum lease area
10000 (m2)
Lease term
- 50 year
Planned area
499.8 (ha)
Operation Status
Available for leasing: 15ha
Active
Occupancy Rate and
Number of Projects
Number of Korean
Projects
Lease fee
▪ Occupancy Rate: 98.1%
N/A
40 USD/m2/50 year
INFRASTRUCTURE AND FACILITY
Transport infrastructure: Internal roads and complete water supply and drainage system.
Power supply infrastructure: Powered from the national grid, with a voltage of 110/22KV (126 MVA).
Water supply infrastructure: Meeting the needs of businesses (currently 8,000 m3/day - night)
Communication infrastructure: Convenient at home and abroad.
Wastewater treatment infrastructure: Centralized wastewater treatment plant with current capacity of 4,000 m3/day.night
Layout plan:
330
331
HO NAI INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Long Tho Commune, Nhon Trach District, Dong Nai Province.
Investor
Nhon Trach Industrial Park Construction Investment One Member Limited Liability Company 6A
Location
Distance to nearest big city:: Distance from city center. Ho Chi Minh City 40 km along National
Highway 1A and Hanoi Highway,
Distance to Provincial Center: Distance from city center. Bien Hoa 12 km, Vung Tau city about 90
km.
Distance to the nearest airport: 45 km from Tan Son Nhat airport, about 25 km from Long Thanh
International Airport (with planning).
Distance to the nearest railway station: About 3 km from the nearest railway station, City station.
Ho Chi Minh 40 km.
Distance to nearest river port: 15km from nearest river port, 40 km from Cat Lai port
Distance to the nearest seaport: Distance from the city center. Ho Chi Minh City 40 km along
National Highway 1A and Hanoi Highway,
Priority Sectors for
Agricultural product processing industry, food processing, food,
Investment
animal feed; Wood and plastic industry; textile industry, production of
shoes, toys, jewelry; furniture manufacturing industry, interior
decoration, office; packaging industry; sports equipment
manufacturing industry; electronics and microelectronics industry;
mechanical industry (frame stamping, machine building and spare
parts); pharmaceutical and stationery manufacturing industry;
packaging production, prepress, design and printing industry; industry
producing handicrafts, glass, building materials.
Investment Area
Minimum wage
Apply regional minimum wages as prescribed by the Government (4,420,000 VND – Region I)
Minimum lease area
20.000 m2
Lease term
- N/A
Planned area
496.65 ha, of which phase I is 225.71 ha has been leased, reaching 85%, phase II is 270.94 ha - has
been and is in the phase of acquisition, site clearance, ready for lease.
Active
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean
Projects
Lease fee
▪ Occupancy Rate: 66%
N/A
160 USD/m2
INFRASTRUCTURE AND FACILITY
- Electricity: Using the national power source through the 220/22KV station with a capacity of 40MVA invested by Dong Nai
Power Company Limited and in the future will invest to upgrade to 80MVA.
- Water: Using water from Long Binh water plant (Bien Hoa city) of Dong Nai Water Supply Construction One Member
Limited Liability Company with current capacity of 200,000m3/day.
- Wastewater treatment: Acceptance limit of wastewater treatment plant - TT: Equivalent to column B of Regulation QCVN 40:
2011/BTNMT. Maximum processing capacity: 4,000m3/day. Current wastewater treatment capacity: 4,000m3/day and night
- Process rubbish: Contracting company with a unit with the function of collecting and treating waste
- System of fire: Fire hydrants are installed according to regulations on approved roads for fire prevention and fighting in Ho Nai
Industrial Park.
- Communications: The system connects the cradle to the network of the Dong Nai Post Office through the Ho Nai Industrial
Park Post Office. Switchboard capacity of Ho Nai Industrial Park 3,600 numbers, construction and installation of a 1.5 km
underground cable line with a total capacity of 3,600 pairs from Ho Nai Industrial Park post office.
Layout plan:
332
333
[- This Page is intentionally left blank -]
334
DONG THAP
335
INVESTMENT ENVIRONMENT IN DONG THAP
USD/VND
23.510
GENERAL INFORMATION
Area
Population
Geographical
Location
Adjacent
provinces
3383,8 km2
1,6 million people (2022)
▪ Dong Thap is located in Mekong Delta River region.
It is located between the Southern Key Economic Zone and the Economic Zone of Can Tho-An Giang-Kien
Giang-Ca Mau, influence on both sides by two big cities, Can Tho City and Ho Chi Minh City.
The province borders Prey Veng province of Cambodia to the North, Vinh Long province and Can Tho City to
the South, An Giang province to the West, Long An and Tien Giang provinces to the East.
2022 statistic:
▪ Nominal GRDP (billion VND):
GRDP
▪ Real GRDP (billion VND):
99.376
▪ GRDP growth:
8,62%
▪ GRDP per capita (million VND/year):
62,10
(4.24 billion USD)
(2648 USD)
▪ Economic structure:
Industry
growth
Import Export
Key Industry
PCI
Ranking
- Industry - Construction:
22,27%
- Agriculture. forestry and fishery:
35,17%
- Service:
36,14%
▪ Industry - Construction growth:
12,95%
▪ Agriculture, forestry and fishery growth:
3,52%
▪ Service growth:
10,92%
Import turnover (billion USD):
0,80
Export turnover (billion USD):
1,72
(Growth rate: 0,3515)
Agricultural sector
69.68
5
SOCIAL INFRASTRUCTURE
▪ Roadway:
- National Highways 30, 80, 54, Ho Chi Minh road
- 2 international border gates Thuong Phuoc & Dinh Ba.
Transportation
▪ Railway & Airway: None
▪ Waterway: Cao Lanh and Sa Dec ports, located on the banks of the Tien River, are capable of receiving ships
with a tonnage of up to 5000 DWT.
Power supply to the province comes from the national network through the 110 KV transmission line system.
Electricity
Consists of 2 main sources: 220 Kv Cai Lay substation and Tra Noc thermal power plant
Currently, there are 20 urban water plants, 305 centralized water supply stations, and 8.000 drilled wells with
hand pumps.
Groundwater: Dong Thap has many underground water reservoirs at different depths, this source is very
Water
abundant, has only been exploited and used for urban and rural living, not yet put into industrial use.
The rate of urban households using clean water in 2022 is estimated at 99.4%; The rate of rural households
using clean water in 2022 is 88.97%.
The province has 01 university; 22 vocational establishments, classified by type, including: 01 Vocational
Education & College, 01 Community College, 01 Medical College; 03 Intermediate Schools under the Department of Labour,
Invalids and Social Affairs, 01 Vocational School - Transport, 07 vocational education centers and 08 other
Training
establishments participating in vocational education activities.
The province has 168 medical facilities, including: 21 Hospitals; 01 Nursing and rehabilitation hospital; 02
Medicare
regional polyclinics; 143 Commune health stations, wards.
INVESTMENT CONDITION
Human
resource
58.87% of population are in the working age (2022)
336
Education level Trained labor rate: 73,6% (2022)
▪ The minimum salary for the province is applied as follows:
- Area I (4,680,000 VND/month): N/A
- Area II (4,160,000 VND/month): N/A
Salary
- Area III (3,640,000 VND/month): Cao Lanh city, Sa Dec city
- Area IV (3,250,000 VND/month): Hong Ngu City; Districts of Cao Lanh, Chau Thanh, Hong Ngu, Lai Vung,
Lap Vo, Tam Nong, Tan Hong, Thanh Binh, Thap Muoi.
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages paid to
employees working under employment contracts)
Investment
incentives
Fields
Attracting
Investment
Investment
attraction
situation
Industrial
zones
- Investment incentive policies are prescribed in the Law on Investment in 2020 and relevant laws.
+ Forms of incentives: Corporate income tax incentives, tax exemptions, tax reductions and other incentives
according to the provisions of the law on corporate income tax; Exemption from import tax on goods imported
to create fixed assets; raw materials, supplies and components imported for production in accordance with the
law on import and export tax; Exemption or reduction of land use levy, land rent and land use tax; Depreciation
is fast, increasing the amount of expenses deductible when calculating taxable income.
+ Objects of incentives: investment projects in sectors eligible for investment incentives, or investment projects
in areas eligible for investment incentives.
- Investment promotion policy issued by the province:
+ Resolution No. 27/2022/NQ-HDND dated December 9, 2022 of the People's Council of Dong Thap province
amending and supplementing a number of policies to encourage socialization in the fields of education and
training, vocational training, healthcare, culture, physical training and sports, environment, judicial expertise in
Dong Thap province.
+ Resolution No. 231/2019/NQ-HDND dated April 2, 2019 of the Provincial People's Council on the program to
support investment in building technical infrastructure of industrial clusters in Dong Thap province.
+ Decision No. 23/2016/QD-UBND dated April 8, 2016 of the Provincial People's Committee promulgating the
Regulation on a number of preferential policies, encouraging investment, management and exploitation of
agricultural clean water supply works. village in Dong Thap province.
High-tech agriculture, infrastructure development, agricultural processing, retails, supporting industry,
development of local raw materials, processing industry, auxiliary technology,...
Up to now, Dong Thap has approved the investment policy of 22 projects, with a total registered capital of 4,079
billion VND, an increase of 37.5% in the number of projects and an increase of 95.2% in capital compared to
2021.
Currently, there are 03 Industrial Parks in operation with a total planning area of more than 251.56 ha,
Land lease fee: ~30 - 45 USD/m2 for the project life.
1. Tran Quoc Toan Industrial Park
2. Song Hau Industrial Park
3. Sa Dec Industrial Park (132 ha)
4. Dinh Ba International Border Gate Area
5. Thuong Phuoc International Border Gate Area
337
Map
Dong Thap Economic Zones Management Authority
▪ Address: 10 Le Van Chanh Street, Ward 1, Cao Lanh City, Dongthap Province
▪ Tel: 84-277 3 878471
Contact
▪ Email: bqlkkt@dongthap.gov.vn
▪ Contact person:
- Mr. Nguyen Duy Thanh
- Deputy Head of Investment & Construction Management Department
- Tel: 84-973785792
338
TAN KIEU INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Tan Kieu commune and My An commune, Thap Muoi district, Dong Thap province
Investor
+ Company name: Dong Thap Construction Materials and Construction Joint Stock Company
+ Address: No. 03 Ton Duc Thang, Ward 1, Cao Lanh city, Dong Thap province.
+ Phone number: 02773 858 959 – 0
Contact Person
Mr: Nguyen Lam Thai Thinh
Position: Director of Industrial Park Management Board
Address: No. 03 Ton Duc Thang, Ward 1, Cao Lanh city, Dong Thap province.
Phone number: 0942.252.566
Location
Altitude above sea level (MSL): +3.2 above National altitude
Adjacent to DT.846 and Nguyen Van Tiep Canal; 04 km from the center of My An town, 28 km
from Cao Lanh city; 30 km from Tien River and 80 km from Ho Chi Minh City.
Distance to Tra Noc airport in Can Tho city: 53 km
Lease term
Start date: 4/2024
Lease fee
There is no specific land rental price (estimated price is about 70 USD/m2/50 years).
Planning area
The total area is 148.7 hectares.
Rental area: 101.8 hectares
Occupancy Rate and
Number of Projects
▪ 50%
Lease fee
30 USD/m2
Number of Korean
Projects
▪ 0 projects
Layout plan
339
[- This Page is intentionally left blank -]
340
GIA LAI
341
INVESTMENT ENVIRONMENT IN GIA LAI
GENERAL INFORMATION
Area, Population
Geographical Location
Adjacent provinces
GRDP
Industry growth
PCI
▪ Area: 15,494.9 Km2 (second-largest province of Vietnam)
▪ Population: 1, 590 Million people (2019)
▪ Gia Lai is located in the northern part of the Central Highlands (“Tay Nguyen” in Vietnamese), and
has a strategic position in the Vietnam-Laos-Cambodia Development Triangle.
▪ The Province shares the border with Kon Tum Province on the north, Dak Lak Province on the
south, Cambodia on the west, Quang Ngai, Binh Dinh, Phu Yen provinces on the east.
2021 statistic:
▪ GRDP growth: 9.27%
▪ GRDP per capita: 60,45 million VND
▪ Economic structure:
- Agriculture, forestry and fishery: 28,39%;
- Industry - Construction: 28,43 %;
- Service: 39,15%
2022 statistic:
▪ Agriculture, forestry and fishery growth: 4,61%
▪ Industry – Construction growth: 22,56 %
▪ Service growth: 6,70%
▪ Export turnover: 660 million USD
▪ Import turnover: 140 million USD
▪ Score: 64.00– ranked 45th out of 63 cities and provinces in Vietnam (2022)
SOCIAL INFRASTRUCTURE
Transportation
▪ Roadway: Gia Lai is connected to key cities and economic hubs in the country and neighboring
countries via national roads and highways. National Highway 14 goes from Da Nang–Quang Nam to
Kon Tum–Gia Lai–Dak Lak–Ho Chi Minh City. National Highway 19, which is 160km long, connects
Quy Nhon port in Binh Dinh province to Gia Lai’s capital city Pleiku and Le Thanh International
Border Gate in Gia Lai. National Highway 78 connects the Cambodian city of Ratanakiri and
northeastern provinces of Cambodia with southern provinces of Laos and Thailand. National Highway
25 connects Gia Lai to Tuy Hoa, Phu Yen province’s capital. Truong Son Dong Road runs from Quang
Nam to Gia Lai Province and onto Da Lat.
▪ Airway: Pleiku airport has 6 flights to Ho Chi Minh city, Đà Nẵng and Hanoi everyday
Electricity
▪ Gia Lai province has many large rivers that flow through it, which means great potential in
hydropower. There are currently 43 hydropower plants with a capacity of 2,194MW, including six large
plants with a capacity of 1,907MW; and 37 small- and medium-sized plants with a capacity of
286.95MW. In addition, there are many other small hydropower plants with total installed capacity of
nearly 300MW under operation. Some enterprises in the province are also drawing up surveys to
develop wind power and solar power projects with a capacity of 300-500 MW/project.
Water
▪ There are currently 337 irrigation works (reservoirs, dams, pumping stations) with the irrigation
capacity of about 54,239 ha in the Province. Until now, the percentage of households that have access
to clean water is about 94%. Every Urban centers, industrial parks and economic zones has been
equipped with the drainage system.
INVESTMENT CONDITION
Human resource
▪ 936.477 people in working age (2022)
Education level
▪ Trained labor rate: 59,09% (2022)
Salary
Investment incentives
▪ The minimum salary for the province is applied as follows:
- Area III (3,430,000 VND/month): Pleiku city
- Area IV (3,70,000 VND/month): An Khe town, Ayun Pa town; Chu Pah, Chu Prong, Chu Se, Dak
Doa, Chu Puh, Phu Thien, Mang Yang, Krong Pa, Kong Chro, K'Bang, Ia Pa, Ia Grai, Duc Co, Dak Po
districts
▪ The lowest wage for trained labor(including those trained by the enterprises) must be at least 7%
higher than the above referenced basic salary
▪ Incentives according to government regulations:
342
- Exemption and reduction for land and water rent fee
- Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
▪ Province-specific investment support:
- Support for development of investment projects and preparation of environmental impact assessment
reporting
- Support for trade promotion (exhibitions, technology fairs)
Fields Attracting
Investment
▪ Prioritized projects:
- Producing rubber products;
- Producing unburnt building materials, autoclaved concrete bricks, foam concrete bricks;
- Processing instant coffee and coffee powder (input materials are produced according to UTZ, 4C
and VietGAP processes);
- Processing pepper products: peppercorns and pepper powder (input materials are produced
according to VietGAP process);
- Producing and refining animal, poultry and aquatic feed;
- Investing in building 5-star hotels, investing in luxury resorts;
- Invest in building and exploiting eco-tourism areas with a scale of 20 hectares or more, cultural and
historical tourist attractions;
- Investment in construction and business of infrastructure of the zone.
Investment Attraction
▪ Apart from Le Thanh international border gate economic zone, Gia Lai has 7 industrial zones,
including Tra Da in Pleiku city (Occupancy rate: 100%), North Bien Ho, Ham Rong, Tra Ba, Play
Ku, Chu Se, and An Khe.
▪ As of February 2022, Gia Lai has attracted 7 FDI projects with the total investment capital of 21.09
million USD.
343
Map
Contact
Planning and Investment Department
Address: 02 Hoang Hoa Tham, Pleiku City, Gia Lai
Tel: +84 269 3824414
Email: skhdt@.gialai.gov.vn
Web: www.skhdt.gialai.gov.vn
344
LIST OF NOTABLE COMPANIES IN GIA LAI
Enterprise
HAGL Group
15 Truong Chinh, Pleiku, Gia Lai +84 269
2225888 contact@hagl.com.vn hagl.com.vn
Duc Long Group
02 Dang Tran Con, Tra Ba Ward, Pleiku, Gia
Lai +84 269 3748367
duclong@duclonggroup.com
www.duclonggroup.com
Quang Duc Export Sales Limited
29A Truong Chinh, Pleiku, Gia Lai
+84 269 2225566 info@quangducgialai.com.vn
quangducgialai.com.vn
Vinh Hiep Company Limited
404 Le Duan, Pleiku, Gia Lai +84 269 3759699
vinhhiepgl@yahoo.com www.vinhhiepgl.com
An Khe Sugar Plant - Branch of Quang Ngai
Sugar Joint Stock Company
Thanh An Commune, An Khe Town, Gia Lai
+84 269 3532084 ankhesugar@gmail.com
www.qns.com.vn
Duong Van Phat Agricultural and Forest
Products Processing Company Limited
Chu Ngoc Commune, Krong Pa District, Gia
Lai Mobile :+84 983 409791
vanphatphuyen@gmail.com
Mien Nui Gia Lai Corporation Business
Development
18 Le Hong Phong, Dien Hong Ward, Pleiku,
Gia Lai +84 269 3897118
miennuigl@gmail.com
Gia Lai Electricity Joint Stock Company
114 Truong Chinh, Pleiku, Gia Lai
+84 269 3823604
info@geccom.vn
www.geccom.vn
Truong Sinh International Scientific
Development Co.
1335 Pham Van Dong, Pleiku, Gia Lai +84 269
3865295 truongsinh.gli@gmail.com
www.truongsinhgialai.com
Classic Coffee Corporation
740 Truong Chinh, Pleiku, Gia Lai
+84 269 3746279 lamnguyen.clsc@gmail.com
1
Sector
Agriculture, real estate
Business size1
Charter capital: 351 million USD
Employees: 50
Agriculture, energy, infrastructure,
manufacturing – services
Charter capital: 126.7 million USD
Employees: 106
Manufacturing sector, business
services, merchandising
Charter capital: 31.1 million USD
Employees: 50
Business, agricultural exports, freight
Charter capital: 4 million USD
Employees: 100
Manufacturing and trading of sugar
Charter capital: 83.3 million USD
Employees: 577
Wholesale of agricultural and forestry
products, refined sugar production,
sales of beverages
Charter capital: 6.7 million USD
Employees: 10
Wholesale agricultural products,
rubber, sell cattle, poultry and
livestock, animal feed
Charter capital: 8.9 million USD
Production and trading of electricity,
electrical network construction,
advisory services, production of
centrifugal concrete pillars
Charter capital: 82.2 million USD
Employees: 430
Veterinary and aquatic medicine
production
Charter capital: 3.1 million USD
Employees: 20
Processing and trade of coffee, sugar,
tea
Charter capital: 231,000 USD
Employees: 07
Note: Charter Capital/Revenue estimates in USD based on conversion rate of 22.500 VND = 1USD
345
LIST OF INDUSTRIAL ZONES IN GIA LAI
Industrial zone Name
Total Area (ha)
Occupancy Rate
Status
Tra Da Industrial zone
213 ha
100%
In operation
South Pleiku Industrial Park
191,55 ha
The IP will be filled
in 2025
Investing in infrastructure construction is
underway
346
TRA DA INDUSTRIAL ZONE
GENERAL INFORMATION
ADDRESS
Tra Da commune and Bien Ho commune, Pleiku city
INVESTOR
Gia Lai Paper Joint Stock Company, Hung Nguyen Coffee Factory, Nutifood Hoang Anh
LOCATION
- 7 km from Pleiku city center
- 5 km from Pleiku airport by detour, 01 km from the crow flies.
- About 2 km from National Highway 19, about 4km from National Highway 14
- 166 km from Quy Nhon Seaport
- Processing industry of agricultural and forestry products, biofuel production.
- Food processing industry, consumer industry.
- Animal feed processing industry, chemical industry, agro-forestry product
processing.
- Mechanical, electrical, electronic and low-pollution industries.
INVESTMENT
AREA
Priority Sectors
for Investment
MINIMUM WAGE
The average income of employees is 6.3 million VND/person/month.
LEASE TERM
 Start date: 2003
 End date: 2053
MINIMUM LEASE
AREA
Not available
PLANNED AREA
 Total area: 213ha
FACTORY
AVAILABLE FOR
RENT
Factory for rent:
- 1000 m2
- Minimum land plot: 10,000 m2
- Built up area: 500m2
OPERATION
STATUS
OCCUPANCY
RATE AND
NUMBER OF
PROJECTS
NUMBER OF
KOREAN
PROJECTS
In operation
Occupancy rate: 100%
Attracting nearly 50 domestic and foreign investors
N/A
LEASE FEE
20-30 USD/m2 (50 Years)
OPERATING FEE
(NOT INCLUDING
VAT)
Management fee: 0.4USD/m2
INFRASTRUCTURE AND FACILITY
TRANSPORTATION
Main road: Width: 15m, Number of lane: 4-6 lanes -
ELECTRICITY
Power line: 110KV and 500/220KV - 0.05 USD
347
WATER SOURCE
2.678m3/day (TCCN: 40m3/ha/days) - 0.4 USD/m3
LAYOUT PLAN
ACTUAL VIEW
348
SOUTH PLEIKU INDUSTRIAL ZONE
GENERAL INFORMATION
ADDRESS
Pleiku city
INVESTOR
Nam Pleiku-IP-GL
CONTACT
PERSON
Mobile: (+84) 948 859 999
Email: info@saigonvrg.com.vn
LOCATION
Nam Pleiku Industrial Park is 18km from Pleiku city center, 23km from Pleiku airport, 65km from Kon
Tum city, about 160km from Buon Me Thuot city, 170km from Quy Nhon port
INVESTMENT
AREA
Priority Sectors for Investment
MINIMUM WAGE
N/A
LEASE TERM
 Start date: 2020
 End date: N/A
MINIMUM LEASE
AREA
Not available
PLANNED AREA
 Total area: 199.55ha
OPERATION
STATUS
OCCUPANCY
RATE AND
NUMBER OF
PROJECTS
NUMBER OF
KOREAN
PROJECTS
Mechanical assembly, production of spare parts, electronic
components
Consumer production, handicrafts
Textile industry
Food processing and agricultural products and some other
industries
In operation
Within a year, businesses have deposited 60ha of land, reaching a rental rate of 40% of the project.
N/A
LEASE FEE
25 USD/m2/46 years (excluding VAT)
OPERATING FEE
(NOT INCLUDING
VAT)
Management fee: 0.4USD/m2
INFRASTRUCTURE AND FACILITY
The main roads in the industrial park are 32 m wide - 4 lanes
TRANSPORTATIO
N
+ Branch roads in the industrial park are 23 m wide - 2 lanes
All internal roads are designed and constructed in strict compliance with national regulations, and
finished with Asphalt. The internal roads are also equipped with a complete, aesthetic high-pressure
lighting system
349
ELECTRICITY
The power supply to the industrial park is taken from the 110/35/22KV substation
WATER SOURCE
30.000 m3/day
LAYOUT PLAN
ACTUAL VIEW
350
[- This Page is intentionally left blank -]
351
HA GIANG
352
INVESTMENT ENVIRONMENT IN HA GIANG
USD/VND
23.510
GENERAL INFORMATION
Area
Population
7930 km2
0,892723 million people (2022)
▪ Ha Giang is located in Northeast region.
▪ Located in the North pole of Viet Nam
▪ 318 km to Hanoi
▪ The Province has Van Nam Province - China to the North, Cao Bang Province to the East, Tuyen Quang
Adjacent provinces
and Yen Bai Province to the South and Lao Cai Province to the West
Geographical
Location
2022 statistic:
GRDP
▪ Nominal GRDP (billion VND):
30.571
(1,3 billion USD)
▪ Real GRDP (billion VND):
16.286
(0,69 billion USD)
▪ GRDP growth:
7,62%
▪ GRDP per capita (million VND/year):
18,24
(776,01 USD)
▪ Economic structure:
Industry growth
- Industry - Construction:
25,53%
- Agriculture. forestry and fishery:
29,37%
- Service:
39,80%
▪ Industry - Construction growth:
15,42%
▪ Agriculture, forestry and fishery growth:
4,80%
▪ Service growth:
6,09%
Import turnover (billion USD):
Import - Export
Key Industry
PCI
Ranking
(Growth rate: -0,37)
Export turnover (billion USD):
Mining industry, processing industry, hydropower
64.39
41
SOCIAL INFRASTRUCTURE
Transportation
Electricity
Water
Education &
Training
Medicare
▪ Roadway: National highway 279, 4C, 34,... National highway 2 is upgraded synchronously; the province
also build a bypass of Yen Minh town on national highway 4C;
▪ Waterway: Lo River is a large river in Ha Giang, originating from Luu Lung, Yunnan (China), flowing
through the Vietnam - China border (Thanh Thuy area), through Ha Giang and Bac Quang cities to Tuyen
Quang. This is the main source of water supply for the central region of the province. Chay River originates
from the southwest slope of Tay Con Linh peak and the northeast slope of Kieu Lien Ti peak, the density of
tributaries is high (1.1km/km2), the water concentration coefficient reaches 2.0km/km2.
▪ Ha Giang province has approved 77 hydropower projects with a total installed capacity of 1,061 MW. Of
which, 36 hydropower plants are generating electricity into the national grid, with a total installed capacity
of 725 MW.
Lo River is the main source of water supply for the central region of the province.
615 schools at all levels, 98 kindergarten; 80 primary schools; 67 secondary school and 10 high schools
N/A
INVESTMENT CONDITION
Human resource
42.71% of population are in the working age (2022)
Education level
Trained labor rate: 56.6% (2022)
▪ The minimum salary for the province is applied as follows:
Salary
- Area I (4,680,000 VND/month): N/A
353
- Area II (4,160,000 VND/month): N/A
- Area III (3,640,000 VND/month): Ha Giang City
- Area IV (3,250,000 VND/month): Bac Me, Bac Quang, Dong Van, Hoang Su Phi, Meo Vac, Quan Ba,
Quang Binh, Vi Xuyen, Xin Man, Yen Minh districts
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages
paid to employees working under employment contracts)
▪ Incentives according to government regulations:
- Exemption and reduction for land and water rent fee
- Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
Investment
▪ Incentives from the province:
incentives
Incentives according to government regulations:
▪ Exemption and reduction for land and water rent fee
▪ Preferential tax rates and exemption period, reduction for corporate income tax.
▪ Import tax exemption
Fields Attracting Agriculture and Forestry; tourism, services, logistics; agricultural and forestry product processing industry;
urban infrastructure and science and technology.
Investment
In 2022, the whole province has 7 programs and projects using ODA capital to be implemented, including:
Class II urban development program (green cities) - Ha Giang province sub-project; Drainage and
wastewater treatment city. Ha Giang; Multi-purpose development for ethnic minorities in poor communes of
Investment
Xin Man district; Repair and improve dam safety (WB8); Construction of residential bridges and local road
attraction situation
asset management (LRAMP); Basic infrastructure for comprehensive development of Northeast provinces Sub-project of Ha Giang province; Developing grassroots health service delivery system - Ha Giang
province subproject.
Map
354
Ha Giang Department Of Planning And Investment
▪ Address: No 188, Tran Hung Đao street, Nguyen Trai District, Ha Giang
Contact
▪ Tel: 2193866256
▪ Email: skhdt@hagiang.gov.vn
355
LIST OF INDUSTRIAL ZONES IN HA GIANG
No
Industrial zone Name
1
Binh Vang Industrial Zone
Total Area (ha)
254.77 ha
Occupancy Rate
100%
HA GIANG’S LOCATION MAP OF INDUSTRIAL ZONES
356
Status
In Operation
BINH VANG INDUSTRIAL ZONE
GENERAL INFORMATION
Address
▪ Dao Duc Commune, Vi Xuyen District, Ha Giang Province
Investor
Management Board of Ha Giang Economic Zone
▪ Address: No. 222, Nguyen Trai street, Ha Giang city, Ha Giang province
▪ Tel: (84-219) 3 860 109
▪ Email: bqlkkt@hagiang.gov.vn
Contact Person
Mr. Pham Hong Thang- Head of Investment Department-
Location
▪ 1 km to National Road 2, 17 km to the North of Ha Giang City, 2 km to Vi Xuyen
Town center to the South
▪ 440 km to Hai Phong Sea Port
▪ 300 km to Noi Bai International Airport
Priority Sectors for
Investment
▪ Processing of agro-forest products
▪ Mineral processing and metallurgy
▪ Plywood manufacture
Restricted Sectors
for Investment
N/A
Investment Area
Minimum wage
[Area 4] According to Decree 157/2018/ND-CP dated 23rd December
Lease term
50 years
Minimum Lease Area
N/A
Limit for Construction Height
N/A
Permitted Construction Rate
N/A
Planned area
▪ Total area: 254.77ha
- Phase I: 136.86 ha
- Phase II: 115.905 ha
▪ Total vacant leasable area: phase II (Phase II has not yet been acquired and cleared)
Factory Available for Rent
▪ Total factory land for lease: 100.8 ha
Operation Status
In Operation
Occupancy Rate and Number of
Projects
▪ Occupancy rate: 100%
▪ Number of projects: 25
Number of Korean Projects
None
Lease fee
▪ Land lease fee: 7,104 VND (~0.3 USD) /m2/year
Operating fee
▪ Infrastructure maintenance fee: Currently the fee is not yet decided by management
board, and not yet collected
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: as regulated by the Government
▪ Wastewater treatment fee: N/A
▪ Waste treatment fee: N/A
INFRASTRUCTURE AND FACILITY
Financial institution
16 km to bank branches of Agribank, BIDV, VDB
Tax service, State finance office
▪ 15 km to Ha Giang Tax Department
▪ 16 km to Ha Giang State Treasury
Customs Service
14 km to Ha Giang Customs Office
Logistics
34,8 km to Thanh Thuy Border Gate
357
Post office
7 km to Vi Xuyen Post Office
Medicare
▪ 9 km to Vi Xuyen General Hospital
▪ 16 km to Ha Giang General Hospital
Police, public security
2 km to Police Station of Dao Duc commune
7 km to Police Station of Vi Xuyen district
Universities, training facilities,
etc.
▪ 17 km to Ha Giang Economic and Technical School
Recruitment
▪ 8 km to Ha Giang Job Introduction Center
▪ 15 km to Ha Giang Job Service Center
Worker dormitory
None
Worker's child education facility
▪ 5 km to Dao Duc kindergarten
▪ About 16-20 km to about 10 kindergarten located in Ha Giang city
One-stop service
N/A
Road Width
N/A
IT & Tele-communication
Facilities
Available
Emergency Power generator
N/A
Fire-fighting facility
Available. All factories when built have to comply fire-fighting standard to be approved.
Layout Plan
358
Location Map
Actual View
359
[- This Page is intentionally left blank -]
360
HA NAM
361
INVESTMENT ENVIRONMENT IN HA NAM
GENERAL INFORMATION
Area, Population
▪ Area: 900 km2
▪ Population: 0.9 million (2022 statistic)
Geographical Location
▪ Ha Nam is a province located in the Red River Delta
▪ 50km from Hanoi capital.
Adjacent provinces
▪ To the north, to the west, to the east, and to the south.
GRDP
Industry growth
PCI
2022 statistic:
▪ Real GRDP: 46.065,7 billion VND
▪ GRDP growth: 10,82%
▪ GRDP per capita: 3.783 USD/year
▪ Economic structure:
- Industry - Construction: 67,3%;
- Agriculture. forestry and fishery: 8,0%;
- Service: 24,7%;
(2 billion USD)
2022 statistic:
▪ Industry - Construction growth: 12,96%
▪ Agriculture, forestry and fishery growth: 1,95%
▪ Service growth: 8,42%
▪ Score: 64 – ranked 46 out of 63 cities and provinces in Vietnam. (2022)
SOCIAL INFRASTRUCTURE
Transportation
▪ Roadway: National Highway 1A, Hanoi - Ninh Binh Expressway, National
Highway 38, National Highway 21A, National Highway 21B, the road connecting
two highways Hanoi - Hai Phong and Hanoi - Ninh Binh.
▪ Railway: North-South Railway.
▪ Waterway: Inland waterways.
Electricity
▪ The province has a waste-to-energy plant. The province is also constructing the
Quang Trach I Thermal Power Plant
Water
▪ Ha Nam currently has 41 concentrated clean water plants with a total capacity of
175,000m3/day. The factories use water from the Red River, Day River, Sat River,
and Chau River.
Education
▪ The province has about 29 high schools with 1 specialized high school, 24 public
schools and 4 private schools. In addition, there are 6 Centers of Continuing
Education - Vocational Education.
Medicare
▪ In addition to the network of medical examination and treatment facilities from the
province to the grassroots, the Government has planned a high-quality regional
medical center in Phu Ly city with an area of 940ha and more than 7,000 beds. Viet
Duc Hospitals 2, Bach Mai 2, Geriatric Hospital 2, Yuzankai Elderly Care Center.
INVESTMENT CONDITION
Human resource
▪ 55% of population are in the working age (2022)
Salary
▪ The minimum salary for the province is applied as follows:
- Area III: Phu Ly city, Duy Tien town, Kim Bang district.
- Area IV: Ly Nhan, Binh Luc and Thanh Liem districts.
Investment incentives
▪ Regarding infrastructure rental incentives: In agricultural production zones with
high technology application: Cash support (after investment) for part of the costs of
infrastructure construction in project fences, human resource training, market
development according to Decree 57 /2018/ND-CP dated April 17, 2018 of the
Government.
362
▪ Regarding tax incentives: For hi-tech application projects, hi-tech product
production projects, supporting industry projects, hi-tech agricultural production
projects: The preferential tax rate of 10% for 15 years shall be applied. Tax
exemption for 4 years, 50% reduction of payable tax for the next 9 years. Other
projects investing in industrial parks, investment projects in Thanh Liem, Ly Nhan
and Binh Luc districts: Tax exemption for 2 years, 50% reduction of payable tax for
the next 4 years.
▪ Policies to support training and recruiting workers: Support in training and
recruiting skilled workers for investment enterprises in the province. Direct support
for vocational training institutions and according to the provincial vocational training
project.
Fields Attracting Investment
▪ Mechanical engineering, assembling, automobiles, motorcycles; electricity,
electronics, telecommunications, information technology; auxiliary industry, new
materials, high-tech industry; processing and preserving agricultural products, food,
beverages, milk.
▪ Agriculture applying high technology: Growing and processing clean vegetable,
tuber and fruit products with high added value to serve large supermarkets and
export; invest in building concentrated breeding areas such as raising clean pigs,
dairy cows, beef cattle, breeding cows, poultry and processing products from pork
and cows...; agricultural research and development.
Map
Contact
Department of Planning and Investment
▪ Address: No. 15 Tran Phu Street, Phu Ly City, Ha Nam Province.
▪ Tel: 0351.852701
▪ Fax: 0351.852701
▪ Email: skhdt@hanam.gov.vn
▪ Contact person: Mr. Dinh Ngoc Duy - Deputy Head of Investment Cooperation
Department. Tel: 0913660525. Email: ngocduydinh20@gmail.com.
363
LIST OF INDUSTRIAL ZONES IN HA NAM
No
Industrial zone Name
Occupancy Rate
Dong Van I Industrial Zone – Phase I
Total
Area (ha)
221.2
1
100%
In operation
Dong Van I Industrial Zone – Phase II
150
0%
2
Dong Van II Industrial Zone
321
94.6%
Under land clearance
process – to be completed in
Q1/2023
In operation
3
Dong Van III Industrial Zone – Phase I
300
75%
In operation
Dong Van III Industrial Zone – Phase II
223
Dong Van IV Industrial Zone – Phase I
300
Dong Van IV Industrial Zone – Phase II
250
5
Dong Van V Industrial Zone
250
6
Hoa Mac Industrial Zone
131
100%
In operation
7
Chau Son Industrial Zone
377
92%
In operation
8
Thanh Liem Industrial Zone – Phase I
150
100%
In operation
Thanh Liem Industrial Zone – Phase II
143
50%
In operation
Thai Ha Industrial Zone – Phase I
100
50%
In operation
4
9
Status
Under legal process
100%
In operation
Under planning
Under planning
Thai Ha Industrial Zone – Phase II
100
Under construction
10
Chau Giang I Industrial Zone
210
Under planning
11
Chau Giang II Industrial Zone
100
Under planning
12
Kim Bang I Industrial Zone
230
Under planning
HA NAM’S LOCATION MAP OF INDUSTRIAL ZONES
364
DONG VAN I INDUSTRIAL ZONE
GENERAL INFORMATION
Address
▪ Dong Van Commune, Duy Tien District, Ha Nam
Investor
Ha Nam Industrial Zone Management Board
▪ Address: No. 209 Le Hoan Road, Phu Ly City, Ha Nam Province
▪ Tel: (84-226) 3 85 0569
▪ Email: bqlkcn@hanam.gov.vn
▪ Mr. Tran Van Kien - Deputy Director of Ha Nam Industrial Zone Management
Board - (84) 912 220 129 - kienkcnhanam@gmail.com
- Land: near National Road 1 A and Cau Gie – Ninh Binh highway
- Seaport: 110 km from Hai Phong port
- Airport: 70 km from Noi Bai Airport
Priority Sectors
Investment on high-tech industry, clean industry, light industry,
for Investment
and supporting industry.
Restricted Sectors Restrict heavy industry, industries affecting the environment.
for Investment
[Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum
salaries
▪ Start date: 2007
▪ End date: 2057
10,000 m2
Contact Person
Location
Investment Area
Minimum wage
Lease term
Minimum Lease Area
Limit for Construction Height
Permitted Construction Rate
Planned area
Factory Available for Rent
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Residential Planning regulation (QCXDVN 01: 2008/BXD)
▪ Total area:
- Phase 1: 221.2 ha
- Phase 2: 150 ha
None
Number of Korean Projects
▪ Phase 1: In operation
▪ Phase 2: Under land clearance process – to be completed in Q1/2023
▪ Phase 1:
- Occupancy Rate: 100%
- Number of Projects: 98
32 companies
Lease fee
▪ Land lease fee: From 75-100 USD/m2/over project life
Operation Status
Occupancy Rate and Number
of Projects
▪ Management fee: 0.3 USD/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 11,500 VND (~0.5 USD)/m3
▪ Wastewater treatment fee:
From C Level: 0.6 USD/m3; From B Level: 0.42 USD/m3
( Excluding VAT)
INFRASTRUCTURE AND FACILITY
Operating fee
Financial institution
Vietcombank, Vietinbank, Sacombank, BIDV.
Tax service, State finance office
12 km from Ha Nam Tax Office and Hanam Treasury office
Customs Service
Inside the zone
Logistics
5 km from nearest Logistic compnay
Post office
12 km from Hanam Post office
Medicare
12 km from Hanam General Hospital
Police, public security
24/7 service inside the zone
Universities, training facilities,
etc.
Recruitment
4 km from Ha Hoa Tien University
Worker dormitory
NA
Worker's child education
facility
One-stop service
NA
Road Width
NA
Supported by the IZ developer
Inside the zone
365
IT & Tele-communication
Facilities
Emergency Power generator
Telecommunication: broadband ADSL service, telecommunication with IDD, fiber
optic capabilities, leased line
Available
Fire-fighting facility
Available
Layout Plan
Location map
LIST OF TENANTS
No
Company Name
Nationality
1
Nam Son Company Ltd.
Vietnam
2
Tam Kim Joint Stock Company
Vietnam
3
Tri Huong Company Limited
Vietnam
4
VT Industrial Park Station
Vietnam
5
Trung Thanh Company Limited
Vietnam
6
Ocean private enterprise
Vietnam
7
Phuong Nam VN Company Limited
Vietnam
8
Vietnam Geotextile Joint Stock Company
Vietnam
9
Nguyen Khoa Company Limited
Vietnam
10
May 19 Textile One Member Company Limited
Vietnam
11
Ha Nam Setfil Water Supply Joint Stock Company
Vietnam
12
Nam Duong Company Limited
Vietnam
13
NN 1 TV Shoes Thuong Dinh Shoes Company
Vietnam
14
Thanh Xuan Company Limited
Vietnam
15
Ha Nam Hoan Duong Manufacturing & Trading JSC
Vietnam
16
Hong Ha Nutrition Joint Stock Company
Vietnam
366
17
Ba An Manufacturing & Trading Joint Stock Company
Vietnam
18
Sao Thai Duong Joint Stock Company Branch in Ha Nam
Vietnam
19
Viet Phuong Ha Nam Company Limited
Vietnam
20
Ha Thanh Company Limited
Vietnam
21
Dai Uy Company Limited
Vietnam
22
Vietnam
23
International DDNN International Joint Stock Company
(Anco)
Giang Hong Company Ltd.
24
Ltd. Leo jins
Korea
25
Korea VN Engineering Co., Ltd.
Korea
26
Shin Myung Vina Co., Ltd.
Korea
27
China Fenghua Iron and Steel Co., Ltd
China
28
European Plastic Joint Stock Company
Vietnam
29
Research and manufacture industry JSC
Vietnam
30
Norfolk Hatexco Joint Stock Company
Singapore
31
Yen Ha Company Ltd.
Vietnam
32
Lucky Sun Electric Wire and Cable Co., Ltd.
Vietnam
33
Nishu Paint Joint Stock Company
Vietnam
34
CP Thien Phuc Company
Vietnam
35
Quang Quan Company Limited
Vietnam
36
Lee Vietnam Fine Arts Jewelry Co., Ltd.
Korea
37
Yoohan Traditional Fine Arts Co., Ltd
Korea
38
KAS Fashion Company Limited
Korea
39
Yeedo Hanoi Trading Co., Ltd
Korea
40
Vietnam Fashion Co., Ltd.
China
41
C-one Packaging Co. Ltd.
Korea
42
Youme VN Company Limited
Korea
43
Vietnam Jewelry Co., Ltd. - Sunny
Korea
44
U&I Hanoi Co. Ltd.
Korea
45
Naria Vina Co., Ltd
Korea
46
Nhat Ha Joint Stock Company
Vietnam
47
Dayeon Bi Jou VN Co., Ltd
Korea
48
Shine Fine Arts Co.Ltd
Korea
49
VIP New Materials and Investment JSC
Vietnam
50
Duc Viet Industry Co., Ltd
Vietnam
51
Quynh Hang Company Limited
Vietnam
52
Juna Company Limited
Japan
53
Jasung Vina Co., Ltd.
Korea
54
Vietnam
56
Northern Power Construction Consulting Joint Stock
Company
Vietnam Bank for Agriculture and Rural Development - Ha
Nam branch
Hiroshima Energy Supply Co., Ltd.
57
Liaan Vietnam Company Limited
Korea
58
Central Seed Joint Stock Company
Vietnam
59
Hoa Linh Ha Nam Pharmaceutical Joint Stock Company
Vietnam
60
Hankook Al Tec Vina Co., Ltd
Korea
61
Lan Chi Ha Nam Investment and Services Co., Ltd.
Vietnam
62
Co., Ltd. Senyang Electronics
China
55
367
Vietnam
Vietnam
Japan
63
KMW Vietnam Co., Ltd.
Korea
64
Global Ai Tec Co., Ltd. (Dong Van DS)
Korea
65
Jungang Industry Vietnam Co., Ltd.
Korea
66
Mico Tech Vietnam Co., Ltd.
Korea
67
Jinyoung G&T Vietnam Co., Ltd
Korea
68
Harim Vina Co., Ltd
Korea
69
Fuji Engineering Vietnam Co., Ltd.
Japan
70
Daejin Vina Co., Ltd.
Korea
71
Co., Ltd. HTCTECH
Korea
72
Ha Nam Manufacturing and Environment Equipment Co., Ltd
America
73
Seoul Semiconductor Vina Co., Ltd.
Korea
74
Co., Ltd. Yu Won NRT
Korea
75
Telcon Vina Co., Ltd
Korea
76
OM Chemical Co., Ltd.
Japan
77
Thanh Dat Investment and Development Joint Stock Company
Vietnam
78
Tuan Bach Company Limited
Vietnam
79
Abbey Vietnam Joint Stock Company
English - Vietnamese
80
JMI H Vietnam Co., Ltd.
Korea
81
Young BK Company Limited
Korea
82
LMS Vina Co., Ltd branch in Ha Nam
Korea
83
CNC Star Sun Limited Company
Vietnam
84
Linh Giang Precision Machining Auxiliary Industry Co., Ltd
Vietnam
85
Ha Nam Urban Environment Company Limited
Vietnam
86
Hai Phong Messer Industrial Gas Co., Ltd - Ha Nam Branch
Germany
87
Hanyoung Worldwrap Vina Co., Ltd
Korea
368
DONG VAN II INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Dong Van Commune, Duy Tien District, Ha Nam
Investor
Vietnnam Investment Development Group
▪ Address: Chau Son Commune, Phu Ly, Ha Nam
▪ Tel: (84-226) 625 2137
Fax: (84-226) 625 2138
▪ Website: http://daianvietnam.com/
▪ Mr. Huan – Sales Department – Mobile: (84) 989 768 586 – Email: huannm2@tniholdings.vn
/huan792003@gmail.com
– Distance to Hanoi city center: 45km
– Distance to Noi Bai international airport: 70 km
– Distance to Hai Phong port: 100 km
– Distance to Cai Lan – Quang Ninh port: 105 km
– Distance to China border checkpoint: 120 km
– Distance to Phu Ly City: 11km
Priority Sectors for
Investment on high-tech industry, clean industry, light industry, and
Investment
supporting industry.
Restricted Sectors for Restrict heavy industry, industries affecting the environment.
Investment
[Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Contact Person
Location
Investment Area
Minimum wage
Lease term
Minimum Lease Area
▪ Start date: 2006
▪ End date: 2056
10,000 m2
Limit for Construction
Height
Permitted Construction
Rate
Planned area
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential
Planning regulation (QCXDVN 01: 2008/BXD)
Factory Available for Rent
▪ NA
Operation Status
In Operation
Occupancy Rate and
Number of Projects
Number of Korean Projects
▪ Occupancy Rate: 94.6% (leasable industrial land left: 5ha)
▪ Number of Projects: 103
16 companies
Lease fee
▪ Land lease fee: 75 - 85 USD/m2/over project life (until 2056-2063) (Excluding VAT)
▪ Total area: 321 ha
▪ Management fee: 0.35 USD/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 11,500 VND (~0.5 USD)/m3
▪ Wastewater treatment fee:
0.6 USD/m3 for C level, 0.45 USD/m3 for B level, 0.18 USD/ m3 for A level ▪ Waste treatment
fee: 9,000 VND/m3 (~0.4 USD/m3) (Excluding VAT)
INFRASTRUCTURE AND FACILITY
Operating fee
Financial institution
Maritime Bank
Tax service, State finance
office
Customs Service
13 km from Tax department of Hai Duong province
14 km from State Treasury in Hai Duong
13 km from Hai Duong Customs
Logistics
Post office
14 km from the industrial zone
Nippon Express、Nippon Konpo、MOL Logistics、Sankyu
VNPT and Viettel Post Office inside the zone
Medicare
14 km to Hanam General Hospital
Police, public security
Dong Van II Industrial Park has established a police station near the IP to ensure order and
security.
3km to Thanh Dong University.
Universities, training
facilities, etc.
Recruitment
Worker dormitory
The labor forces from local and from neighboring provinces (Bac Ninh, Thai Binh, Hung Yen,
Hai Phong, Quang Ninh...). It is easy to find the workers whom you need in the vicinity.
Housing, villa for experts/ employees are working in Dai An IZ.
369
Worker's child education
facility
One-stop service
5 km from nearest University
Road Width
Main road: 40 m in width
Branch road: 22.5 m in width
Telecommunication: broadband ADSL service, telecommunication with IDD, fiber optic
capabilities, leased line
Telephone: number of line depend on investor’s demand.
Available
IT & Tele-communication
Facilities
Emergency Power
generator
Fire-fighting facility
NA
Available
Layout Plan
Location map
Actual View
370
LIST OF TENANTS
No
Company Name
Nationality
1
Ata Paint Company Limited
Vietnam
2
Sumi Vietnam wiring system Co., Ltd
Japan
3
Kalbas Vietnam Company Limited
Japan
4
SRE Vietnam Co., Ltd.
Japan
5
Pomme International Company Limited
Japan
6
Honda Lock VN Co., Ltd
Japan
7
Vietnam Electronics Co., Ltd. TACHIBANA
Japan
8
Branch of Hanoi Textile and Garment Corporation
Vietnam
9
Cargill VN Co., Ltd in Ha Nam
America
10
Thong Nhat Electrical Mechanical Joint Stock Company - Ha Nam Branch
Vietnam
11
Ha Nam Binh Duong Mechanical Company Limited
Vietnam
12
Eidai Vietnam Co., Ltd.
Japan
13
Honda Vietnam Branch in Ha Nam
Japan
14
Dong Van Clean Water Joint Stock Company
Vietnam
15
Ha Dong Hanosimex Textile Joint Stock Company
Vietnam
16
Shikoku Cable Vietnam Co., Ltd.
Japan
17
Yokowo Vietnam Co., Ltd.
Japan
18
Arai Vietnam Company Limited
Japan
19
M.O.TEC Vietnam Company Limited
Japan
20
Osawa Vietnam Co., Ltd.
Japan
21
Ueda Vietnam Company Limited
Japan
22
Fujigen Vietnam Co., Ltd.
Japan
23
Technomeiji Rubber Vietnam Co., Ltd.
Japan
24
Nippon Konpo Vietnam Real Estate Company Limited
Japan
25
Ishigaki Vietnam Co., Ltd.
Japan
26
Sumiriko Hose Vietnam Co., Ltd.
Japan
27
T.Rad Vietnam Company Limited
Japan
28
Mavin Foods Joint Venture Company Limited
Australia
29
Drilube Vietnam Co., Ltd.
Japan
30
Kuwayama Vietnam Co., Ltd.
Japan
31
Essa Hi-Tech Co., Ltd.
Korea
32
Nissho Vietnam Co., Ltd,
Japan
371
33
Nippon Thermostat Vietnam Co., Ltd.
Japan
34
Makuroh Paper Vietnam Co., Ltd.
Japan
35
Minato Rubber Vietnam Co., Ltd.
Japan
36
JCU Vietnam Co., Ltd.
Japan
37
Hashima Vietnam Co., Ltd.
Japan
38
Afix Vietnam Co., Ltd.
Japan
39
Vina Kailo Company Limited
Korea
40
Gentherm Vietnam Company Limited
Germany
41
Sam Kyoung Vina Co., Ltd.
Korea
42
Greenfeed Vietnam Joint Stock Company - Ha Nam Branch
Hong Kong
43
Marujyu Vietnam Company Limited
Japan
44
Dai Nguyen Textile Co., Ltd. (Vietnam)
Taiwan
45
Dai Nguyen Clean Water Co., Ltd. (Vietnam)
Taiwan
46
Hanoi Maruito Company Limited
Japan
47
NBK Vina Company Limited
Korea
48
Kanayama Kasei Vietnam Co., Ltd.
Japan
49
Ace Antenna Co. Ltd.
Korea
50
Meitoku Engineering Vietnam Co., Ltd.
Japan
51
Sinfonia Microtec (Vietnam) Ltd.
Japan
52
Kuwana Company Limited
Japan
53
Vietnam Textile Garment Import Export Co., Ltd - Ha Nam Branch
Japan
54
Green energy Co., Ltd - Ha Nam
Vietnam
55
Chien Bian Vietnam Company Limited
Hong Kong
56
CS Plastic Vietnam Co., Ltd.
Japan
57
Jaehyun Vietnam Co., Ltd.
Korea
58
NMS Vietnam Co., Ltd.
Japan
59
Gunze Hanoi Company Limited
Japan
60
Hachi Vietnam Cosmetics Co., Ltd.
Vietnam
61
CJ VINA AGRI COMPANY LIMITED - Ha Nam branch
Korea
62
Wooyoung Hi-Tech Vina Co., Ltd
Korea
63
TDS Vietnam Co., Ltd.
Japan
64
Wing Kwong Industrial Vietnam Co., Ltd
Hong Kong
65
Kos Hanoi Company Limited
Korea
66
Pacific Company of Vietnam Pacific
Vietnam
67
Osung Advanced Materials Vietnam Co., Ltd.
Korea
68
Ha Nam Safe Paint Company Limited
Vietnam
69
Quang Quan Company Limited
Vietnam
70
Ukai Vietnam Company Limited
Japan
71
Diamond French Pharmaceutical Pharmaceutical Joint Stock Company
Vietnam
72
Origin Vietnam Co., Ltd.
Japan
73
Tonghe Vina Science and Technology Co., Ltd.
China
74
Branch of Thuan Nhat Automation Electric Co., Ltd in Ha Nam
Vietnam
75
Ha Nam YFY Packaging Co., Ltd.
Taiwan
76
Aiwado Joint Stock Company
Vietnam
77
Wetop Pharmaceutical Joint Stock Company's branch in Ha Nam
Vietnam
78
Ishigaki Gomu Kougyo Vietnam Co., Ltd.
Japan
79
Kent Warm Vietnam Co., Ltd
Japan
372
80
PLK Chemical Co., Ltd
Korea
81
Sung Nam Electron Vina Co., Ltd
Korea
82
Sam Sung Climate Control Vietnam Co., Ltd.
Korea
83
I.J Tech Vina Manufacturing Co., Ltd
Korea
84
Gia Phuc Dong Van Company Limited
Vietnam
85
Gemtek Vietnam Company Limited
Taiwan
373
DONG VAN III INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Dong Van Commune, Duy Tien District, Ha Nam
Investor
▪ Dong Van III Industrial Zone Infrastructure Development Investment JSC
․ Address: No. 209 Le Hoan Road, Phu Ly City, Ha Nam Province
▪ Mr. Nguyen Van Luong – Chairman – (84) 913 320 349 - luongqhxd@gmail.com
▪ Ms. Hien – (84) 904333910▪ Land: 45 km from Hanoi, 1 km from Dong Van Railway Station. Near Cau Gie – Ninh Binh Highway,
National Road 38, North-South Railway
▪ Seaport: 125 km from Hai Phong port; 145 km from Cai Lan seaport
▪ Airport: 65 km from Noi Bai Aiprort
Priority Sectors for
Clean industry, light industry, and supporting industry.
Investment
Restricted Sectors
Restrict heavy industry, industries affecting the enviroment
for Investment
[Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Contact Person
Location
Investment Area
Minimum wage
Lease term
Minimum Lease
Area
Limit for
Construction
Height
Permitted
Construction Rate
Planned area
Factory Available
for Rent
Operation Status
Occupancy Rate
and Number of
Projects
Number of
Korean Projects
Lease fee
▪ Start date: 2017
▪ End date: 2067
10,000 m2
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning
regulation (QCXDVN 01: 2008/BXD)
▪ Total area: 523 ha
- Phase I: 300 ha; Vacant leasable area: 60ha
- Phase II: 223 ha
▪ NA
▪ Phase I: In operation
▪ Phase II: Under legal process
▪ Phase I
- Occupancy Rate: 75%
- Number of Projects: 56
None
▪ Land lease fee: N/A
▪ Management fee: 0.3 USD/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 11,500 VND (~0.5 USD)/m3
▪ Wastewater treatment fee: 9,000 VND - 12,000 VND (~0.4-0.53 USD)/m3
▪ Waste treatment fee: 9,000 VND/m3 (~0.4 USD/m3)
(Excluding VAT)
INFRASTRUCTURE AND FACILITY
Operating fee
Financial
institution
Tax service, State
finance office
Customs Service
Maritime Bank
Logistics
5 km from nearest Logistic compnay
Post office
12 km from Hanam Post office
Medicare
12 km from Hanam General Hospital
Police, public
security
Universities,
training facilities,
etc.
Recruitment
24/7 service inside the zone
12 km from Ha Nam Tax Office and Hanam Treasury office
16 km from Ha Nam Customs Service
7km from Ha Hoa Tien University
Supported by the IZ developer
374
Worker dormitory
NA
Worker's child
education facility
One-stop service
NA
Road Width
NA
IT & Telecommunication
Facilities
Emergency Power
generator
Fire-fighting
facility
Layout Plan
Telecommunication: broadband ADSL service, telecommunication with IDD, fiber optic capabilities,
leased line
Inside the zone
Available
Available
Location Map
Actual View
375
LIST OF SOME NOTABLE TENANTS
No
Company Name
Nationality
1
Northern Power Construction Consulting Joint Stock Company
Vietnam
2
Ducan Environment Technology Joint Stock Company
Vietnam
3
Ohtsuka Sangyo Vietnam Co., Ltd.
Japan
4
Osawa Vietnam Trading Co., Ltd.
Japan
5
Chubutsu Vietnam Co., Ltd.
Japan
6
Pronics Hanoi Company Limited
Japan
7
TDI Electronics Co., Ltd. Vietnam
Japan
8
Seiko Precision Parts Vietnam Co., Ltd.
Japan
9
Hojitsu Vietnam Limited
Japan
10
Vietnam Plastic Taniguchi Company Limited
Japan
11
YKK Vietnam Co., Ltd. - Ha Nam Branch
Japan
12
Fuji Electric Industry Vietnam Co., Ltd.
Japan
13
Fuji Star Roof Co., Ltd.
Japan
14
Ojitex Hai Phong Co., Ltd branch in Ha Nam
Japan
15
Tan Cang - Dong Van Ha Nam Joint Stock Company
Vietnam
16
Vina Ito Co., Ltd.
Japan
17
Hashimoto Cloth Vietnam Co., Ltd.
Japan
18
Kajitech Company Limited
Japan
19
Vietnam Japan Sawada precision Co., Ltd.
Japan
20
Shikoku Cable Vietnam Co., Ltd. - Dong Van III Branch
Japan
21
Kuwana Company Limited
Japan
22
Branch of Sugiko Vietnam Co., Ltd. in Ha Nam
Japan
23
Katolec Global Logistics Vietnam Co., Ltd.
Japan
24
Kyosha Vietnam Co., Ltd.
Japan
376
DONG VAN IV INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Dai Cuong Commune, Kim bang District, Ha Nam Province
Investor
Viglacera Corporation
(Glass and Ceramics for Construction Corporation)
▪ Address: Tien Son Industrial Park, Hoan Son Commune, Tien Du District, Bac Ninh Province.
Head Office: The 2nd Floor, Viglacera Tower, No.1 Thang Long Boulevard, Ha Noi, Vietnam.
▪ Tel: +84 24 35536688
Fax: +84 24 35537666
▪ Website: www.viglaceraip.com
▪ Mr. Dang The Nam - Deputy Manager of Business Department –
(84) 903 405 099 - namdt.vir@viglaceraland.vn
▪ Ms. Nguyen Ha Phuong – Senior Marketing Executive – (84) 97 344 8994 phuongnh.vir@viglaceraland.vn
▪ Land: 50 km from Hanoi, 1 km from Dong Van Railway Station. 7 km from Cau Gie – Ninh Binh
Highway, on National Road 38, 5 km from National Road 1A, 5km from North-South Railway
▪ Seaport: 114 km from Hai Phong port; 150 km from Cai Lan seaport
▪ Airport: 80 km from Noi Bai Aiprort
Priority Sectors for
Electronics, power industry, high techs, material for construction and
Investment
mechanics, pharmaceuticals, foodstuffs, light industry, consumer goods
Restricted Sectors for Polluted sectors
Investment
[Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Contact Person
Location
Investment Area
Minimum wage
Lease term
Minimum Lease Area
Limit for Construction
Height
Permitted Construction
Rate
Planned area
Factory Available for
Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean
Projects
Lease fee
▪ Start date: 2016
▪ End date: 2066
10,000 m2
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential
Planning regulation (QCXDVN 01: 2008/BXD)
Total area: 550 ha
▪ Phase 1: 300 ha
▪ Phase 2: 250 ha
N/A
▪ Phase I: In operation
▪ Phase II: Under construction
▪ Phase I
- Occupancy Rate: 100%
- Number of Projects: 48
16 projects
N/A
▪ Management fee: 0.7 USD/m2/year (excluded 10% VAT)
▪ Electricity fee:
(1) - Normal hours: 1,555 VND/Kwh (equivalent to 0.067 USD/Kwh)
(From Monday to Saturday: 4h - 9h30’, 11h30’ - 17h and 20h - 22h; Sunday: 4h - 22h)
(2) - Night hours: 1,007 VND/Kwh (equivalent to 0.04 USD/Kwh)
(Everyday: 22h - 4h)
(3) - Rush hours: 2,871 VND/Kwh (equivalent to 0.123 USD/Kwh)
(From Monday to Saturday: 9h30’ - 11h30’ and 17h - 20h/Not Sunday)
▪ Water fee: 11,500 VND/m3 (equivalent 0.506 USD/m3) excluded VAT - monthly payment.
▪ Wastewater treatment fee: 9,600 VND/m3 excluded VAT (equivalent 0.45 USD/m3) - monthly
payment. The quantity is defined by 80% the amount of water supply.
INFRASTRUCTURE AND FACILITY
Operating fee
Financial institution
Vietin Bank, Vietcombank, BIDV
Tax service, State
finance office
Customs Service
15 km from Hanam Tax Office.
16 km from Hanam Treasury Office
A customs office is planned to locate at the Administration Center of the Industrial Park in order to
deal with customs formalities promptly and properly for enterprises
Logistics services, including warehouse solution, shipping and custom clearance are provided
inside the industrial park
Logistics
377
Post office
Medicare
Police, public security
Ha Nam Post Office with modern informatics technology system for serving multi-service
communication such as data transfer, internet, IP telephone and video conference,
Bach Mai General Hospital (18 km), Viet Duc General Hospital (17 km), General Hospital of Ha
Nam (14.8 km)
Security Guard ensures security inside industrial park.
Recruitment
4 Universities (Hanoi pedagogical university – Ha Nam branch, Trade university – Ha Nam branch,
Hanoi industrial university – Ha Nam branch, Construction university – Ha Nam branch), 4
colleges, 7 secondary schools.
Viglacera will support in recruitment
Worker dormitory
Urban area with around 16.8ha always ensure houses, dormitory, apartment for workers in the IP
Worker's child
education facility
One-stop service
Many kindergartens near the industrial park
Universities, training
facilities, etc.
Road Width
IT & Telecommunication
Facilities
Emergency Power
generator
Fire-fighting facility
Land and factory lease, fast-track procedures and convenient services such as catering, security
service, accommodation, IT system, water-electrical system implemented and/or supported by our
industrial park
NA
The telecommunication system complies with international standards and is always available for
commnunication demand with high data transmission speed
Yes
Available. Water supply system for firefighting is located along each road.
Layout Plan
Location Map
378
Actual View
LIST OF SOME NOTABLE TENANTS
No
Company Name
Nationality
1
Park Electronics Vina Co., Ltd
Korea
2
JT Sensor Vina Co., Ltd
Korea
379
3
Sunjin F&F Co., Ltd.
Korea
4
Eco wiring system co.ltd
Vietnam
5
Henan MNS Meat Co., Ltd
Vietnam
6
Ha Hien Thanh Hien Co., Ltd
Vietnam
7
Saki Ha Nam Company Limited
Vietnam
8
Jeio Vina Co., Ltd.
Korea
9
Anam Electronics Vietnam Co., Ltd.
Korea
10
Vikohasan Joint Stock Company
Vietnam
11
Vu Gia International Co. Ltd.
Vietnam
12
S-Tec Vina Co., Ltd
Korea
13
Hico Vietnam Company Limited
Korea
14
Nanofrance High-tech Manufacturing DP Co., Ltd Ha Nam branch
Vietnam
15
Lisal Vina Co., Ltd.
Korea
16
Myungsung Hanoi Co., Ltd.
Korea
17
Partner Eng Vina Co. Ltd.
Korea
18
Dinh Huong Construction and Trading Co., Ltd
Vietnam
19
Dong Shin Hanoi Vina Joint Stock Company
Vietnam
20
Binh Thuan Development Co., Ltd
Vietnam
380
HOA MAC INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Highway 38, Hoa Mac town, Duy Tien district, Ha Nam province, Vietnam
Investor
Hoa Mac Industrial Park Development Management Co., Ltd (directly under Hoa Phat Urban
Development & Construction JSC. - HOA PHAT Group)
▪ Address: No. 39 Nguyen Dinh Chieu – Hai Ba Trung – Ha Noi – Viet Nam
▪ Tel: (84) 243 976 3889
▪ Fax: (84) 243 976 3890
▪ Website: www.yenmy2-ip.vn
▪ Ms. Hien - Marketing Manager - (84) 989 383 531
▪ Ms. Huyen - Marketing Dept - (84) 904 200 035
- 45 kilometers far from Ha Noi (40 minutes driving). There are public buses going from the Industrial
Park to Ha Noi every 20 minutes and vice versa.
- Located adherent to Highway 38, close to Highways 1A, 1B; and Highway 39 connected with Highway
5, Hanoi - Hai Phong Expressway (Highway 5B) and Highway 18
- Nearby Yen Lenh Red River port
- 100 kilometers far from Hai Phong Seaport
- 75 kilometers far from Noi Bai International Airport
- 8 kilometers far from Dong Van railway station (on North - South Railway) which is a transshipment
station inside the region.
Priority Sectors
- Mechanical assembly and Electronic Industry;
for Investment
- Food and Agricultural Product Processing;
- Garment and Footwear Industry;
- High-grade Consumer Goods Manufacturing;
- Environmental -friendly Building materials Manufacturing.
Restricted Sectors Garment, textile dyeing
for Investment
[Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Contact Person
Location
Investment Area
Minimum wage
Lease term
Minimum Lease
Area
Limit for
Construction
Height
Permitted
Construction Rate
Planned area
▪ Start date: 2008
▪ End date: 2058
16,784 m2
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning
regulation (QCXDVN 01: 2008/BXD)
▪ Total area: 131 ha
Factory Available
for Rent
Operation Status
▪ Total area: 3,712 m2
Occupancy Rate
and Number of
Projects
Number of
Korean Projects
Lease fee
▪ 100%
▪ 42 Projects
Operating fee
▪ In operation
16 projects
▪ Land lease fee: N/A
▪ Factory lease fee: 4 USD/m2/month
▪ Payment:
- Make a deposit of 20% of the infrastructure rental within 07 days as from the signing date of the MOU
- Pay 50% of the infrastructure rental within 07 days as from the signing date of the contract
- Pay 30% of the infrastructure rental within 07 days as from the land handover date
▪ Management fee: 0.5 USD/m2/year (Exclude VAT)
▪ Electricity fee:
(1) - Normal hour: VND 1,611 /Kwh (equivalent to USD 0.073 /Kwh)
Time period applied:
- From Monday to Saturday: 4:00 am - 9:30 am; 11:30 am - 5:00 pm; 8:00 pm -10:00 pm
- Sunday: 4:00 am - 10:00 pm
(2) - Night hour: VND 1,044 /Kwh (equivalent to USD 0.047 /Kwh)
Time period applied: Everyday from 10:00 pm to 4:00 am
(3) - Peak hour: VND 2,964 /Kwh (equivalent to USD 0.135 /Kwh)
381
Time period applied:
- From Mondays to Saturdays: 9:30 am - 11:30 am; 5:00 pm - 8:00 pm
- Sundays: no peak hour
▪ Water fee: VND 11,500/m3 (equivalent to USD 0.5/m3) - Monthly payment.
▪ Wastewater treatment fee: VND 11,000/m3 (equivalent to USD 0.48/m3) - Monthly payment. The
volume is defined as 80% of supply water volume.
INFRASTRUCTURE AND FACILITY
Financial
institution
Tax service, State
finance office
Customs Service
Vietin Bank, BIDV, Agribank, Techcombank
Logistics
NA
Post office
From an office of Ha Nam Post Office to the Industrial Park: about 700 meters to serve the demand of
enterprises on post and telecommunications services.
Duy Tien Health Care Center and Hung Yen General Hospital (4 kilometers far from the Industrial Park)
shall meet labor's demand for medical examination and treatment.
24/7 security service.
Medicare
Police, public
security
Universities,
training facilities,
etc.
20 km to Tax department of Ha Nam province
21 km to State Treasury in Ha Nam
Inside Industrial Park
Recruitment
There is a system of colleges and professional vocational schools in Ha Nam province including 2
Universities, 6 Colleges, 1 Vocational School, 3 Provincial Voactional Centers and some other Vocational
Centers, which could satisfy the demand of enterprises in the province for technical workmen. Outstanding
Training centers involve as follows:
- Ha Hoa Tien University;
- Hanoi University of Industry - Hanam branch;
- Ha Nam Vocational College;
- Ly Nhan Vocational Training and Job Introducing Centers.
- National
University of Civil Engineering - Hanam branch
- Vietnam University of
Commerce - Hanam branch
IZ developer will support recruitement
Worker dormitory
NA
Worker's child
education facility
One-stop service
NA
Road Width
37.5m /2 lanes
IT & Telecommunication
Facilities
Emergency Power
generator
Fire-fighting
facility
International-standard telecommunication system is available to satisfy demand for communication, highranking data transmission and international and domestic post service. An optical fiber system is installed
underground to every factory.
No
NA
Available
382
Layout Plan
Location Map
Actual View
383
384
LIST OF TENANTS
No
Company Name
Nationality
1
Novaref Refractories Company Ltd.
Vietnam
2
PVC-ME1 Mechanical Co., Ltd
Vietnam
3
Vinaglaze Joint Stock Company
Vietnam
4
Advanced Material Vietnam Co., Ltd.
Japan
5
GP Battery Company Limited (Vietnam)
Singapore
6
Vina - Ha Nam Animal Feed Joint Stock Company
Vietnam
7
Branch of OSG Vietnam Co., Ltd in Ha Nam
Japan
8
Finetek Vietnam Joint Stock Company
Korea
9
Keyrin Electronics Vietnam Co., Ltd.
Korea
10
Hanoi Elite Group Company Limited
Korea
11
Vietnam Byron Holdings Ltd.
Japan
12
Sebang Chain Vina Co., Ltd
Korea
13
DK Vietnam Company Limited
Korea
14
NPI Vietnam Co., Ltd.
Korea
15
Guymarc'h - VCN Limited Company in Ha Nam
France - VN
16
Dorco Vina Co., Ltd- Ha Nam Branch
Korea
17
Dynaox Vietnam Company Limited
Japan
18
Ha Nam Nasaco Animal Feed Co., Ltd.
Vietnam
19
Cu Tech Vietnam Co., Ltd.
Korea
20
Naxis Vietnam Company Limited - Ha Nam Branch
Japan
21
Noda Kogyo (Vietnam) Co., Ltd.
Japan
22
Dorco Living Vina Co., Ltd
Korea
23
Wish Tree Vina Co., Ltd
Korea
24
Vietnam Kyodo Seihan Printing Co., Ltd
Japan
25
Pretty Vina Co., Ltd
America
26
Minami Aso Nouen International Co., Ltd.
Japan
27
Ha Nam Kurosu Company Limited
Japan
28
Taesung Hitech Vina Co., Ltd
Korea
29
Komos Vina Co., Ltd
Korea
30
DMR Vina Co., Ltd
Korea
385
CHAU SON INDUSTRIAL ZONE
GENERAL INFORMATION
Address
▪ Chau Son ward, Phu Ly city, Ha Nam province
Investor
Ha Nam VPID One Member Company Limited (Branch of Vinh Phuc Infrastructure
Development Joint Stock Company)
▪ Address: Chau Son Industrial Park, Chau Son Ward, Phu Ly, Ha Nam
▪ Tel: (84-226) 6252 137/ (84-226) 6545556
▪ Email: kcnchauson@vpid.vn
▪ Nguyen Anh De - (84) 983 282 399
▪ Ms. Vy Lan - (84) 931 661 999
▪ Ms. Vu Bich Lien - (84) 976 821 877
▪ Land: 58 km from Hanoi, 3 km from Dong Van Railway Station, 1 km from National Road
1A
▪ Seaport: 100 km from Hai Phong port; 150 km from Cai Lan seaport, 500m far from Thinh
Chau port
▪ Airport: 80 km from Noi Bai Aiprort
▪ Railway: 3km far from Phu Ly station of the Vietnam railway from North to South
Priority Sectors
Light and high tech industries
for Investment
Restricted
Polluted industries
Sectors for
Investment
[Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Contact Person
Location
Investment Area
Minimum wage
Lease term
Minimum Lease Area
Limit for Construction Height
Permitted Construction Rate
▪ Chau Son Industrial Park: Until July 2056
▪ Expanded Chau Son Industrial Park: Until October 2068
1 ha
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Residential Planning regulation (QCXDVN 01: 2008/BXD)
Factory Available for Rent
▪ Total planned area: 377ha
▪ Vacant leasable area: 30ha
Total workshop area: 22,891.0 m2 (05 workshops)
Operation Status
In operation
Occupancy Rate and Number
of Projects
Number of Korean Projects
▪ Occupancy Rate: 92%
▪ Number of Projects: 133
31 projects
Planned area
▪ Land lease fee (including infrastructure): from 75 USD/m2
▪ Rental price for raw land: 9,000 VND/m2/year (equivalent to 0.39USD/m2/year). Unit price
is decided under the Ha Nam Province People’s Committee.
Investors in the expanded IP are now enjoying free land rental up to November 2029.
▪ Factory lease fee: 3.3 USD/m2/month
- Minimum rent: 05 years
- Deposit: 06 month’s rent at minimum
▪ Management fee: 0,35 USD/m2/year
Operating fee
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 11,500 VND (~0.5 USD)/m3
▪ Wastewater treatment fee: From B level: 9,600 VND (~0.43 USD) /m3
▪ Waste treatment fee: 9,000 VND/m3 (~0.4 USD/m3)(Excluding VAT)
INFRASTRUCTURE AND FACILITY
Lease fee
Financial institution
Vietinbank, Vietcombank, BIDV
Tax service, State finance
office
Customs Service
5.4 km from Hanam Tax Department
3.6 km from Hanam State Treasury
4 km from Hanam Customs Office
Logistics
NA
Post office
3 km from Ha Nam Post Office
Medicare
3.2 km from Hanam Hospital
Police, public security
1.4 km from Hanam Public Security
386
Universities, training
facilities, etc.
Recruitment
10.6 km from Ha Hoa Tien University
Worker dormitory
Under Construction
Worker's child education
facility
One-stop service
NA
Road Width
Emergency Power generator
Mai Road width: 32 m, number of lanes: 4)
Internal Road (width: 23 m, number of lanes: 2)
Viettel telecommunication corporation (Viettel Telecom) is ready to meet demands of 9 - 10
lines/ ha
Underground cable is set up to fence of the manufactories.
Available
Fire-fighting facility
Water supply system and extinguishing valves are also installed along all of roads
IT & Tele-communication
Facilities
Supported by the Management Board
Supported by Industrial Zone developer
Layout Plan
387
Location Map
Actual View
LIST OF TENANTS
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Company name
KangYin Electronic Technology Co., Ltd
Espoir Vietnam Co., Ltd
ARTPRESTO VIETNAM CO., LTD
Enex Vina Company Limited
Dream Plastic Company Limited
SET Vietnam Co., LTD
DongJun Art Craft Co., Ltd
Sunlin Vietnam Electronics Co., LTD
Daedong Vina Co., LTD
JY Plasteel Vina Co., LTD
SDS Vina Co., LTD
Dream Printing & Package Co., Ltd
Samsin Vina Co., Ltd
KAVA Vina Co., Ltd
ILLJIN COM VINA Co., Ltd
NUAS VINA CO., LTD
IPN VINA CO.,LTD
Business line
electronic components producing
garment producing
Manufacture bag producing
Interior and constructive material producing
Production of Child toy and plactic products
Electronic components producing
Jewelry producing
electronic components producing
Bag hold vegetables and fruits producing
Children's bicycles producing
electronic components producing
Manufacture of paper products
Electronic components producing
electronic components producing
Manufacture of wires and cables for automobiles
producing of paper packaging
manufacturing plastic products auto parts
388
Nationality
Australia
Japan
Japan
Korea
Korea
Korea
Korea
Korea
Korea
Korea
Korea
Korea
Korea
Korea
Korea
Korea
Korea
Manufacture of screws
Korea
electronic components producing
manufacturing automobile accessorios
Korea
Korea
21
22
VIET NAM SPECIAL FASTENERS
CO.,LTD
SONETECK TJ CO.,LTD
YURA HARNESS VIET NAM
CO.,LTD
HANSHIN VINA CO., LTD
Long Prosper International Co., Ltd
manufacturing antenna cables in car
electronic components producing
23
FAVOR UNION VINA CO., LTD
electronic components producing
24
25
Led production
electronic components producing
26
V POWER INDUSTRIAL CO., LTD
SIYOTO VINA ELECTRONIC CO.,
LTD
SI YUAN TECH CO., LTD
Korea
Taiwan/ HongKong/
China
Taiwan/ HongKong/
China
Taiwan
HongKong
27
BEST FOUR VIET NAM CO.,LTD
Production of paper packaging plastic packaging,
assembly charger preventive
stationery production
28
29
30
31
32
33
Saovang Rubber JSC
MTV Vinh Son Ha Nam Co., Ltd
Nam Vang Ha Nam JSC
Hoa Viet Pharmacy JSC
Chau Son Manufacture Co., Ltd
Thien Loc Lighting Co., Ltd
rubber products producing
Construction and workshop rental
Manufacture of plastic products
Traditional medicines producing
Manufacture of plywood panels
Led production
18
19
20
389
Taiwan/ HongKong/
China
Taiwan/ HongKong/
China
Vietnam
Vietnam
Vietnam
Vietnam
Vietnam
Vietnam
THANH LIEM INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Area
Minimum wage
Lease term
Minimum Lease Area
Limit for Construction
Height
Permitted Construction
Rate
Planned area
Factory Available for
Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean
Projects
Lease fee
▪ Thanh Liem Industrial Park, Thanh Phong Commune, Thanh Liem District, Ha Nam Province,
Viet Nam
CAPELLA LAND JOINT STOCK COMPANY
▪ Address: F26, Vinaconex 9 Tower, Pham Hung Street, Hanoi, Vietnam
▪ Tel: (84-220) 3 562718
Fax: (84-220) 3 727886
▪ Website: cpliz.com.vn
▪ Ms. Nguyen Thi Hong Chuyen– Sales Director – (84) 964 420 028 - chuyen.cpl@gmail.com
▪ Ms. Ha - Sales Deputy Director - (84) 983 670 928 - hadtt.cpl@gmail.com
▪ Ms Tue – Sales Officer – (84) 35 323 9989 –tueanh.cpl@gmail.com
- Located on National Road No 1A, 8km from Ha Noi – Ninh Binh Freeway
- 55 Km from Hanoi Capital Center
- 4 Km from Phu Ly City, Ha Nam Province
- 75 Km from Noi Bai International Airport
- 100 Km from Hai Phong International Seaport
- 25 Km from Huyndai – Ninh Binh Province
- 250 km from China Border Gate, Lang Son Province
Priority Sectors for
Multi-Industry
Investment
Restricted Sectors for
Restrict heavy industry, industries affecting the environment
Investment
[Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
▪ Start date: April 2019
▪ End date: April 2069
10,000 m2
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential
Planning regulation (QCXDVN 01: 2008/BXD)
Factory area: 60%
Operation area: 60%
▪ Total area: 293 ha
- Phase I: 150 ha (fully occupied)
- Phase II: 143 ha
▪ Vacant leasable area (Phase II): 70 ha
No
In operation
▪ Phase I: 100%
▪ Phase II
- Occupancy Rate: 50%
- Number of Projects: 9
01
▪ Land lease fee: From 75USD/m2/whole leasing term (50 years from 2019 to 2069)
▪ Payment:
- Method: One-time payment, divided into three installments
- Period: Deposit: 30%; Second payment: 30% after IRC/ERC; Third payment: 40% after
handover leveled land.
▪ Management fee: 10.000VND/m2/year, equivalent to 0.43 USD/m2/year
Operating fee
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: about 0.47USD/m3 - Monthly payment
▪ Wastewater treatment fee: about 10.500VND/m3, equivalent to 0.45USD/m3. Customers will sign
contract with a Service Environment Company.
INFRASTRUCTURE AND FACILITY
Financial institution
Viet A Bank, BIDV, Vietcombank, Agribank…
Tax service, State
finance office
Customs Service
- 7km to Ha Nam to Ha Nam state treasury
- 6km to Ha Nam Tax Department
7 km to Ha Nam Customs Agency
Logistics
5.5 km from SME Logistic (Le Cong Thanh Street, Phu Ly City)
Post office
6 km to Ha Nam Post Office
390
Medicare
Police, public security
- 8 km to Viet Duc Hospital (Thanh Liem District)
- 7 km to Ha Nam Hospital (Truong Trinh Street)
- 8 km to Bach Mai Hospital (Thanh Liem District)
6 km to Ha Nam Police (Ly Thuong Kiet Street, Phu Ly City)
Recruitment
- 13km to Ha Hoa Tien university
- 8km to Industrial University (Phu Van Street, Phu Ly City)
- 8km to Ha Nam vocational college (Le Hoan Street, Phu Ly City)
6.5km to Job Introduction Center of Ha Nam Province (Tran Quang Khai Street, Phu Ly City)
Worker dormitory
Near the residential area. No dormitory
Worker's child
education facility
One-stop service
A lot of Nursery school arround Thanh Liem district and Phu Ly City
Road Width
Main Road: 46m; Branch Road: 28m and 20.5m
IT & Telecommunication
Facilities
Emergency Power
generator
Fire-fighting facility
International-standard telecommunication system is available to satisfy demand for communication,
high-ranking data transmission and international and domestic post service. An optical fiber system
is installed underground to every factory.
No
Universities, training
facilities, etc.
10km (Quang Trung Street, Phu Ly City)
Set up along the roads of Industrial Park
Layout Plan
Location Map
Actual View
NA
391
THAI HA INDUSTRIAL ZONE
GENERAL INFORMATION
Minimum wage
▪ Thanh Liem Industrial Park, Thanh Phong Commune, Thanh Liem District, Ha Nam Province, Viet
Nam
Thai Ha Urban and Industrial Park Investment Joint Stock Company
▪ Address: PG1 – 01 Vincom, Bien Hoa, Phu Ly City, Ha Nam
▪ Tel: 0834188 189
▪ Website: khucongnghiepthaiha.com.vn
▪ Ms. Nguyen Van Quyen – Sales Executive– Mobile: (84) 834188189 Email: cpdtthaiha@gmail.com
▪ About 28 km from National Highway 1A and the North-South railway; 28km from Hanoi-Ninh Binh
expressway; adjacent to the planning road of 5 Belt Road - Hanoi capital; adjacent to Thai Ha bridge,
Hung Ha bridge (way to Hung Yen, Hai Duong, Thai Binh, Hai Phong); adjacent to the highway linking
axis: Hanoi - Ninh Binh and Hanoi - Hai Phong.
▪ 20km from Phu Ly City, 77 km from Hanoi center, 85 km from Noi Bai airport and 90 km from Hai
Phong port
Priority Sectors for
▪ Mechanical engineering, assembly, cars and motorcycles.
Investment
▪ Electricity, electronics, telecommunications, information technology.
▪ New auxiliary industries and materials.
▪ Processing and preserving agricultural products, food, beverages and
milk.
▪ Warehousing and transportation support activities
Restricted Sectors for
Polluted
Investment
[Area 4] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term
Until 2069
Minimum Lease
Area
Limit for
Construction
Height
Permitted
Construction Rate
Planned area
1ha
Address
Investor
Contact Person
Location
Investment Area
Factory Available
for Rent
Operation Status
1 – 3 floors
60%
▪ Total planned area: 200ha
- Phase I: 100ha; total vacant leasable area: 50 ha
- Phase II: 100ha
N/A
▪ Phase I: in operation
Occupancy Rate
and Number of
Projects
Number of Korean
Projects
Lease fee
▪ Phase I:
- Occupancy Rate: 50%
- Number of projects: 5
N/A
Financial
institution
Tax service, State
finance office
ArigBank, BIDV
▪ Land lease fee: 70 -75 USD/m2/50 years, depending on location, contract signing date
▪ Payment:
- Sign contract in principle: 30% deposit
- After obtaining investment certificate, business registration in Thai Ha Industrial Park / 60 days from
the date of payment deposit: 30%
- Receive handover of payment premises: 30%
- Sign official contract, notice of issuance of payment certificate: remaining 10%
▪ Management fee: 0.5 USD/m2/year
Operating fee
▪ Electricity fee: as regulated by the Government
▪ Water fee: as regulated by the Government
▪ Wastewater treatment fee: 0.5 USD/m3/month
▪ Waste treatment fee: Negotiable
INFRASTRUCTURE AND FACILITY
Tax Department of Ly Nhan district, State treasury of Ly Nhan district
392
Customs Service
15km from the nearest Customs Agency
30km from the nearest Inland Container Depot
Logistics
Post office
3km
Medicare
15km from Bach Mai Hospital and Viet Duc Hospital (Ha Nam branch)
Police, public
security
Universities,
training facilities,
etc.
Recruitment
1km from the nearest Police Station
Worker dormitory
9.63 ha – next to the IZ
Worker's child
education facility
One-stop service
Available
Road Width
68m, 54m, 36m, 12m
IT & Telecommunication
Facilities
Emergency Power
generator
Fire-fighting
facility
Layout Plan
Available
Within a radius of 10 km, there are 4 high schools and vocational training centers.
Support recruiment
Not available
Fire Police: 1km
393
Location Map
Actual View
N/A
394
[- This Page is intentionally left blank -]
395
HA TINH
396
INVESTMENT ENVIRONMENT IN HA TINH
USD/VND
23.510
GENERAL INFORMATION
Area
6026 km2
Population
1,3 million people (2022)
Geographical Location
▪ Ha Tinh is located in North Central region.
▪ Located in the North Central area
▪ 340 km (211 miles) to Hanoi Center. The topography is diverse, with mountainous, midland,
plain and sea areas. Ha Tinh has 14 large and small rivers and many lakes.
Adjacent provinces
▪ The province has Nghe An to the North, Quang Binh to the South, Laos to the West, the East
Sea to the east with a coastline of 137km.
2022 statistic:
GRDP
Industry growth
Import - Export
▪ Real GRDP (billion VND):
92.960
▪ GRDP growth:
3,98%
▪ GRDP per capita (million VND/year):
70,50
(3.96 billion USD)
(3.00 USD)
▪ Economic structure:
- Industry - Construction:
40,50%
- Agriculture. forestry and fishery:
31,50%
- Service:
15,00%
▪ Industry - Construction growth:
-3,23%
▪ Agriculture, forestry and fishery growth: 0,83%
▪ Service growth:
13,08%
Import turnover (billion USD):
3,40
(Growth rate: 0,03)
Export turnover (billion USD):
1,80
(Growth rate: -0,1)
PCI
▪ Steel and electricity manufacturing
▪ Besides steel and electricity production, the province also produces a number of other key
industrial products such as beer and commercial electricity
67.18
Ranking
18
Key Industry
SOCIAL INFRASTRUCTURE
Transportation
Electricity
Water
▪ Roadway: Ha Tinh has 130 km (82 miles) of Highway 1A stretching from Ben Thuy Bridge
(Vinh City) to Deo Ngang Pass linking Hà TInh and Quang Binh. The Ho Chi Minh Route is the
second most important route of the province. Ha Tinh also contains Road 8 which runs from
Hong Linh town to Laos and the Viet-Lao highway from Vung Ang Harbour (Ky Anh District) to
Laos.
▪ Railway: a railway link to Laos was proposed from Ha Tinh province in 2007
▪ Waterway: 167.5 km of national inland waterways and 87 km of local provincial waterways. In
particular, the national inland waterway route includes: Song La route (13 km), Ngan Sau river
(27 km), Song Nghen (38.5 km), Le canal (26 km).
▪ The province's electricity is supplied by Vung Anh thermal power plant
▪ Besides, Ngan Troi hydropower plant with a capacity of 25.5 MW after 5 years of construction
has been completed and connected to the national power grid.
▪ In Ha Tinh province, there are 43 facilities licensed to exploit surface water with a total capacity
of approximately 161,000 m3/day.
Education & Training
▪ 01 University, 238 primary schools, 157 junior high schools and 44 high schools
Medicare
▪ 18 public hospitals
INVESTMENT CONDITION
Human resource
68,9% of population are in the working age (2022)
Education level
Trained labor rate: 74% (2022)
397
▪ The minimum salary for the province is applied as follows:
- Area I (4,680,000 VND/month): N/A
- Area II (4,160,000 VND/month): N/A
- Area III (3,640,000 VND/month): Ha Tinh City anh Ky Anh Town
Salary
- Area IV (3,250,000 VND/month): Hong Linh Town and Cam Xuyen, Can Loc, Duc Tho,
Huong Khe, Huong Son, Ky Anh, Nghi Xuan, Thach Ha, Vu Quang, Loc Ha Districts
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum
wages paid to employees working under employment contracts)
Investment incentives
Fields Attracting
Investment
Investment attraction
situation
Industrial zones
▪ Incentives according to government regulations:
- Exemption and reduction for land and water rent fee
- Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
▪ Incentives from the province:
- Preferential credit policies
- Interest rate support
▪ Prioritized projects: steel manufacture, assembly, electronic products, agricultural products,
manufacturing electronic and other industrial fields.
Revenue of the FDI sector as of 9/2022 in Ha Tinh province reached 3 billion USD, equivalent to
70,270 billion VND, down 80% compared to the same period in 2021.
Ha Vang Industrial Park
Vung Ang Industrial Park
Dai Kim Industrial Park
Gia Lach Industrial Park
Phu Vinh Industrial Park
Formosa Industrial Park
Map
Ha Tinh Department of Planning and Investment
▪ Address: No 16, Xo Viet Nghe Tinh, Tran Phu, Ha Tinh
Contact
▪ Tel: 0239 3856 750
▪ Email: sokehoach@hatinh.gov.vn
▪ Contact person:
- Tran Viet Ha (Head of the Department).
Tel: 0906868468
LIST OF INDUSTRIAL ZONES IN HA TINH
398
No
Industrial zone Name
Total Area (ha)
Occupancy Rate
Status
1
Gia Lach Industrial Zone
350
22.7%
In Operation
2
Vung Ang Economic Zone
22,781
N/A
In Operation
3
Phu Vinh Industrial Zone
200
30%
In Operation
4
Vung Ang 1 Industrial Zone
200
92%
In Operation
5
56,685
N/A
In Operation
4
Cau Treo International Border Gate
Economic Zone (Cau Treo IBEZ)
Ha Vang Industrial Zone
250
0%
Under Construction
7
Hoanh Son Industrial Zone
41.76
0%
Under Construction
HA TINH’S LOCATION MAP OF INDUSTRIAL ZONES
399
GIA LACH INDUSTRIAL ZONE
GENERAL INFORMATION OF INDUSTRIAL ZONE
Address
Xuan An town, Nghi Xuan district, Ha Tinh
Investor
Ha Tinh Economic Zone Service Infrastructure Center
▪ Address: Vung Ang Industrial Zone, Ky Thinh Ward, Ky Anh Commune, Ha Tinh
▪ Tel: (84-239) 3 713 999
Fax : (84-239) 3 713 999
Contact Person
Location
Contact person:
▪ Mr. Pham Anh Tu- Director of Center for Investment Promotion and Human Resource Supply
of Ha Tinh Economic Zones- Mail: ipc.hatinhez@gmail.com
▪ Mr. Le Nguyen Kien Cuong - Director - (84) 985 346 168 - lenguyenkiencuong@gmail.com
▪ Mr. Dang Ba Giap - Head of Department - (84) 974 220 090 - dangbagiap@gmail.com
▪ 50 m to National Road 1A, 5 km to Vinh City, 45 km to Ha Tinh City
▪ 25 km to Cua Lo Port
▪ 15km to Vinh Airport, 06 km to Xuan Hai Port
Investment priorities Sectors
Production of household appliances, mechanical processing,
spare parts manufacturing, agro-forestry-fishery processing
industry
Investment Restricted Sectors
Heavy industries
Investment Area
Minimum wage
Lease term
[Area 4] According to Decree 90/2019/NĐ-CP dated 15th November 2019
50 years
Minimum Lease Area
1.5 ha
Limit for Construction
Height
1 - 5 floors
Permitted Construction
Rate
N/A
Planned area
Factory Available for Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean Projects
Lease fee
Operating fee
▪ Total area: 100ha
▪ Total vacant space for rent: 67.56 ha
▪ Total area with full infrastructure ready to build factories: 43.55 ha
▪ Currently, the IZ does not have factory available for rent
In Operation
▪ Rate of Occupancy: 25.7%
▪ Number of project: 05 projects
None
0.3 USD/m 2 /year
▪ Management fee: None
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 9,000 VND (~0.4 USD)/m3 for production activities
▪ Wastewater treatment fee: to be defined
INFORMATION OF INFRASTRUCTURE AND FACILITY
Financial institution
Tax service, State finance
office
Customs Service
Logistics
5 km to Agribank branch of Nghi Xuan district
1 km to Vietcombank branch of Xuan An Town
5 km to Tax Department and State Treasury of Nghi Xuan district
42 km to Customs Department of Ha Tinh province
N/A
400
Post office
5 km to Post Office of Nghi Xuan district
Medicare
6 km to Nghi Xuan General Hospital
Police, public security
5 km to Police station of Nghi Xuan district
Universities, training
facilities, etc.
42 km to Ha Tinh city, where has many universities and technical school located.
Recruitment
42 km to Ha Tinh Job Introduction center
Worker dormitory
N/A
Worker's child education
facility
N/A
One-stop service
Road Width
44 km to Ha Tinh Public Administration Center
N/A
Communication
Infrastructure of Industrial
Zone
Available
Emergency Power generator
N/A
Fire-fighting Facility
N/A
Layout Plan
Location map
401
Actual View
List of enterprises in the Industrial Park
No.
Name
Nationality
Business sector
1
Chau Tuan Export and Import Ltd.
Vietnamese
Manufacture of paper and packages
for export
2
Vinh Plastic & Bag JSC.
Vietnamese
Manufacture of packages
3
Nghe An LPG Ltd.
Vietnamese
Processing gas extraction, painting,
repairing and verifying gas tank shells
4
Hai Phong Gas Petrolimex Ltd. - Ha Tinh
Branch
Vietnamese
Extraction of LPG
402
VUNG ANG ECONOMIC ZONE
GENERAL INFORMATION OF INDUSTRIAL ZONE
Address
Ky Anh Town, Ha Tinh province
Investor
Ha Tinh Economic Zone Management Board
▪ Office 1:
- Address: Ky Loi, Ky Anh Town, Ha Tinh Province
- Tel: (84-239) 3 891 962
Fax : (84-239) 3 868 699
▪ Office 2: No. 86 Phan Dinh Phung, Ha Tinh City, Ha Tinh Province
- Address: Ky Loi, Ky Anh Town, Ha Tinh Province
- Tel: (84-239) 3 881 237
Fax: (84-239) 3 882 992
Contact Person
Mr Nguyen Van Khoa- Deputy Head of Management BoardMobile: (84) 98 387 6559- Email: nguyenvankhoa.kkt@hatinh.gov.vn
Location
▪ 100 km to Vinh City, 50 km to Ha Tinh City
▪ 9 km to Vung Ang port
▪ 65 km to Dong Hoi Airport, 115 km to Vinh Airport
Investment
priorities Sectors
▪ High-tech; processing technology, supporting industries; Post-steel
manufacturing industries.
▪ Eco- tourism - trade.
▪ Seaport; port services, loading, logistics, sea transport.
▪ Social Infrastructure Projects.
Investment
Restricted Sectors
N/A
Investment Area
Minimum wage
Lease term
[Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019
No more than 50 years
Minimum Lease Area
0.58 ha
Limit for Construction
Height
1 - 5 floors
Permitted Construction Rate
Planned area
Factory Available for Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean Projects
55 - 70%
▪ Total area: 113.8 ha
▪ Total vacant space for rent: 87.06 ha
▪ Total area with full infrastructure ready to build factories: 15.15 ha
Currently, the EZ does not have any factory for rent
▪ In Operation
▪ Occupancy rate: 82%
▪ Number of Project: 132 projects
None
Lease fee
▪ Land lease rate: 0.3 USD/m 2 /year
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 9,000 VND (~0.4 USD)/m3 for production
▪ Wastewater treatment fee: to be updated
Operating fee
▪ Management fee: None
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 9,000 VND (~0.4 USD)/m3 for production
▪ Wastewater treatment fee: to be updated
INFORMATION OF INFRASTRUCTURE AND FACILITY
Financial institution
▪ Agribank and Vietinbank branches are located in the EZ
▪ 12 km to Techcombank, Vietcombank, BIDV bank branches of Ky Anh town
403
Tax service, State finance
office
Customs Service
Logistics
About 10 km to Tax Department and State Treasury of Ky Anh town
6 km to Customs Office of Vung Ang Port Border Gate
Vung Ang Economic Zone has a wide logistical system: from Vung Ang deep seaport and its
supporting logistical providers,…
Post office
12 km to Ky Anh Post office
Medicare
10 km to Ky Anh General Hospital
Police, public security
10 km to Ky Anh police station
Universities, training
facilities, etc.
60-70 km to universities and technical colleges located in Ha Tinh city (of Ha Tinh province)
Recruitment
Worker dormitory
There is an on-site Employment transaction floor of Vung Ang - Ky Anh EZ
There are dormitories for individuals and family dormitories
Worker's child education
facility
N/A
One-stop service
N/A
Road Width
N/A
Communication
Infrastructure of Industrial
Zone
N/A
Emergency Power generator
N/A
Fire-fighting facility
Vung Ang Firefighting and Prevention Police Department is located in the EZ; firefighting
devices are equipped.
Layout Plan
404
Location Map
Actual View
List of enterprises in the Industrial Park
No.
1
Name
Rong Mei JSC.
Nationality
Taiwanese
405
Business sector
Paint production: 5,000 tons/year;
Mechanical processing, metal
processing and coating with a
capacity of 10,000 tons of
products/year.
2
Shian Yun JSC.
Taiwanese
3
Juan Yen Ltd.
Taiwanese
4
Morfortune JSC.
Taiwanese
Construction of factories for rent
5
Goodean Ltd.
Taiwanese
6
Huu Sinh Control and Mechanical
Construction Ltd.
Taiwanese
Processing, coating and handling all
kinds of steel with a capacity of
36,000 tons of products/year.
Production of metal structures
406
Industrial gas production and
extraction
General processing, including
mechanical processing, chemical
preparation used in wastewater
treatment; factories for rent.
PHU VINH INDUSTRIAL ZONE
GENERAL INFORMATION OF INDUSTRIAL ZONE
Address
Investor
Contact Person
Location
▪ Vung Ang Economic Zone, Ky Anh town, Ha Tinh province
Phu Vinh Infrastructure Construction Investment Co., Ltd.
▪ Address: Lien Phu Group, Ky Lien Ward, Ky Anh Commune, Ha Tinh
▪ Tel: (84-239) 3 722 578
Fax : (84-239) 3 722 378
▪ Email: pv@pvip.com.vn
▪ Ms. Tran Ngoc Linh – Assistant - Mobile: (84) 932 315 368Email: tran0568@gmail.com
▪ Mr. Chang Wei Lin – Sales Deputy Director – Mobile: (84) 932 315 028 –
Email: pvwilliam8899@gmail.com
▪ Ms. To Thi Kim Dung – Sales Executive – Mobile: (84) 932 315 848 – Email:
tothikimdung.ht@gmail.com
▪ 200 m to National road 1B
▪ 15 km to Vung Ang port
▪ 70 km to Dong Hoi Airport, 120 km to Vinh Airport
Investment
priorities
Sectors
▪ Production and processing of iron and steel products: Hot rolled steel coils,
stainless steel, steel bars, round steel, steel pipes, special metals.
▪ Mechanical and electrical industry: Electronics, electronics, industrial and
household electricity, information technology, communications and
telecommunications.
▪ Manufacture of mechanical industry: components, accessories for assembling
vehicles, motors, manufacturing and repairing agricultural mechanics, and
equipment used in mining exploitation.
▪ Building materials industry: Producing concrete, cement, fire-proof, heatresistant and ceiling materials.
▪ Other industries
Investment
Restricted
Sectors
N/A
Investment Area
Minimum wage
Lease term
[Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019
▪ Start date: 2010
▪ End date: 2060
Minimum Lease Area
5,000 m2
Limit for Construction
Height
N/A
Permitted Construction
Rate
N/A
Planned area
Factory Available for Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean Projects
Lease fee
Operating fee
200 ha
Currently, the IZ does not have factory available for rent
In Operation
▪ Rate of Occupancy: 30%
▪ Number of Project: 06 projects
None
▪ Land lease fee (including:
- 65 USD/m2/until 2060 for lease area from 0.5 ha – 2 ha
- 55 USD/m2/until 2060 for lease area from above 2 ha
▪ Management fee: 1,350 VND (~0.061 USD) /m2/month
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 11,000 VND (~0.4 USD)/m3 for production
407
▪ Wastewater treatment fee: 2,500 VND (~0.27 USD) /m3
INFORMATION OF INFRASTRUCTURE AND FACILITY
Financial institution
Tax service, State finance
office
Customs Service
Logistics
Agribank, Techcombank, BIDV bank branches of Ky Anh town are located nearby
17 km to Tax Department and State Trasury of Ky Anh town
17 km to Vung Ang Customs Office
Vung Ang Economic Zone has a wide logistical system: Vung Ang deep seaport and its
supporting logistical providers
Post office
17 km to Post Office of Ky Anh province
Medicare
14 km to Ky Anh General Hospital
Police, public security
15 km to Ky Anh Police
Universities, training
facilities, etc.
60-70 km to universities and technical colleges located in Ha Tinh city (of Ha Tinh province)
Recruitment
Worker dormitory
Worker's child education
facility
One-stop service
Road Width
Communication
Infrastructure of Industrial
Zone
Emergency Power
generator
Fire-fighting Facility
There is an on-site Employment transaction floor of Vung Ang - Ky Anh EZ
There are dormitories for individuals and family dormitories
N/A
Phu Vinh gives support to projects in proceeding one-stop service
▪ Main road: 45.5 m wide
▪ Branch road: 11.25 m wide
Available, installed to the fence of each factory
Self- equipped
Available
Layout Plan
408
Location map
Actual View
409
VUNG ANG I INDUSTRIAL ZONE
GENERAL INFORMATION OF INDUSTRIAL ZONE
Address
Investor
Contact Person
Location
Vung Ang Economic Zone, Ky Anh town, Ha Tinh province
Ha Tinh Economic Zone Service Infrastructure Center
▪ Address: Vung Ang Industrial Zone, Ky Thinh Ward, Ky Anh Commune, Ha Tinh
▪ Tel: (84-239) 3 713 999
Fax : (84-239) 3 713 999
▪ Mr Pham Anh Tu- Director of Center for Investment Promotion and Human Resource Supply
of Ha Tinh Economic ZonesMail: ipc.hatinhez@gmail.com
▪ Mr. Le Nguyen Kien Cuong - Director – (84) 985 346 168
Mail: lenguyenkiencuong@gmail.com
▪ Mr. Dang Ba Giap - Head of Department - (84) 974 220 090 –
Mail: dangbagiap@gmail.com
▪ 50 m to National Road 1A, 100 km to Vinh City, 50 km to Ha Tinh City
▪ 9 km to Vung Ang Port
▪ 70 km to Dong Hoi Airport, 115 km to Vinh Airport
Prioritized Area:
N/A
Restricted Area
N/A
Investment Area
Minimum wage
Lease term
[Area 3] According to Decree 157/2018/ND-CP dated 23rd December
50 years
Minimum Lease Area
N/A
Limit for Construction
Height
N/A
Permitted Construction
Rate
N/A
Planned area
Factory Available for Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean Projects
Lease fee
Operating fee
▪ Total Area: 200 ha
N/A
In Operation
▪ Rate of Occupancy: 92%
▪ Number of Project: 26
▪ None
▪ Land lease fee: 0.3 USD/m2/year
▪ Management fee: None
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 9,000 VND (~0.4 USD)/m3 for production
▪ Wastewater treatment fee: to be defined
INFORMATION OF INFRASTRUCTURE AND FACILITY
Financial institution
Agribank, Techcombank, BIDV bank branches of Ky Anh town are located nearby
Tax service, State finance
office
Ky Anh Town State Treasury and Tax Department is located nearby the ID (~2 km )
Customs Service
Logistics
15-20 km to Vung Ang Customs Office, located in Vung Ang EZ
Vung Ang Economic Zone has a wide logistical system: from Vung Ang deep seaport and its
supporting logistical providers.
410
Post office
Ky Anh Post Office is located in the ID
Medicare
600 m to Ky Anh General Hospital
Police, public security
500 m to Ky Anh Police station
Universities, training
facilities, etc.
50-60 km to Ha Tinh city, where has universities and technical schools located
Recruitment
Worker dormitory
There is an on-site Employment transaction floor of Vung Ang - Ky Anh EZ
There are dormitories for individuals and family dormitories
Worker's child education
facility
N/A
One-stop service
N/A
Road Width
N/A
Communication
Infrastructure of Industrial
Zone
Vung Ang Firefighting and Prevention Police Department is located in the EZ; firefighting
devices are equipped
Emergency Power
generator
N/A
Fire-fighting facility
N/A
Layout Plan
Location Map
N/A
Actual View
411
CAU TREO INTERNATIONAL BORDER GATE ECONOMIC ZONE
GENERAL INFORMATION OF INDUSTRIAL ZONE
Address
Investor
Contact Person
Location
▪ Son Kim 1-2 Town, Tay Son Town, Huong Son District, Ha Tinh Province
Ha Tinh Economic Zone Management Board
▪ Office 1:
- Address: Ky Loi, Ky Anh Town, Ha Tinh Province
- Tel: (84-239) 3 891 962
Fax : (84-239) 3 868 699
▪ Office 2: No. 86 Phan Dinh Phung, Ha Tinh City, Ha Tinh Province
- Address: Ky Loi, Ky Anh Town, Ha Tinh Province
- Tel: (84-239) 3 881 237
Fax : (84-239) 3 882 992
Mr. Pham Anh Tu- Director of Center for Investment Promotion and Human Resource Supply
of Ha Tinh Economic ZoneMobile: (84) 393 868 939/ (84) 989 353 968
▪ 65 km to Vinh City, 75 km to Ha Tinh City
▪ 80 km to Vung Ang port
▪ 75 km to Vinh Airport
Investment priorities
Sectors
▪ Production and processing of agro-forest products, fine art product,
cosmetics and pharmaceutical products, animal food
▪ Processing and assembling of electronic device, automobile and
motor accessories, packaging, mechanicals
▪ Trading and service: supermarkets, hotels, restaurants, eco – tourism
▪ Investment in infrastructural construction (urban infrastructure, water
supply and treatment, telecommunication,..)
Investment
Restricted Sectors
Polluted industries
Investment Area
Minimum wage
Lease term
[Area 4] According to Decree 90/2019/NĐ-CP dated 15th November 2019
50 years
Minimum Lease Area
N/A
Limit for Construction
Height
N/A
Permitted Construction Rate
N/A
Planned area
Factory Available for Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean Projects
Lease fee
Operating fee
56,685 ha
N/A
In operation
▪ Occupancy Rate: N/A
▪ Rate of Occupancy: 26 projects
None
▪ Land lease fee: Depending on location and projects
▪ Management fee: None
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 9,000 VND (~0.4 USD)/m3 for production
▪ Wastewater treatment fee: to be defined
INFORMATION OF INFRASTRUCTURE AND FACILITY
Financial institution
Tax service, State finance
office
Few bank branches located nearby
About 30 km to Huong Son Tax Department and State Treasury
412
Customs Service
Logistics
Vung Ang Customs Service is located far (more than 100 km) from the EZ. Previously, Cau
Treo International Border Gate Customs Office was closed.
N/A
Post office
Over 30 km to Huong Son Post Office
Medicare
Over 40 km to km to Huong Son General Hospital
Police, public security
Located in the EZ
Universities, training
facilities, etc.
Located in Ha Tinh city, over 110 km to the EZ
Recruitment
110 km to Job Introduction Center of Ha Tinh
Worker dormitory
N/A
Worker's child education
facility
N/A
One-stop service
About 110 km to Ha Tinh Public Administration Center
Road Width
N/A
Communication
Infrastructure of Industrial
Zone
N/A
Emergency Power generator
N/A
Fire-fighting facility
N/A
N/A
Layout Plan
Location Map
Actual View
413
414
[- This Page is intentionally left blank -]
415
HAI DUONG
416
INVESTMENT ENVIRONMENT IN HAI DUONG
GENERAL INFORMATION
Area, Population
▪ Area: 1,662 km2
▪ Population: about 1.9 million (2022 statistic)
Geographical Location
▪ One of Hanoi’s satellite cities, located in the Northern focal economic area and in regional planning
of Hanoi Capital City
▪ 57 km from Hanoi, 45 km from Hai Phong, 100 km from Quang Ninh.
Adjacent provinces
▪ The Province has Bac Giang Province to the north, Bac Ninh Province to the North West and Quang
Ninh Province to the North East, Hai Phong Province to the east, Hung Yen to the west, Thai Binh
Province to the south.
GRDP
Industry growth
PCI
2022 statistic:
▪ Real GRDP (billion VND): 169.179 (7,275 billion USD)
▪ GRDP growth: 9,0%
▪ GRDP per capita (million VND/year): 86,9
(3.746 USD)
▪ Economic structure:
- Industry - Construction:
60,2%
- Agriculture. forestry and fishery:
9,5%
- Service: 30,3%
2022 statistic:
▪ Industry - Construction growth: 11,8%
▪ Service growth: 6.8%
▪ Agriculture, forestry and fishery: 3,4%
▪ Score: 65,22– ranked 32th out of 63 cities and provinces in Vietnam (2022)
SOCIAL INFRASTRUCTURE
Transportation
▪ Roadway: National Road 5 from Hanoi to Hai Phong runs through the Province with total length of
44.8 km, National Road 18 from Bac Ninh, Huong Duong to Cai Lan Port - Quang Ninh runs through
the Province with total length of 20 km. Another national roads through the Province are National Road
37, 38, 38B, 10 and Hanoi – Hai Phong Expressway (new Highway 5).
▪ Railway: on the route of Hai Phong – Hai Duong – Hung Yen – Ha Noi – Lang Son – Lao Cai
railway, the route Kep – Bai Chay, the route Yen Vien- Cai Lan.
▪ Waterway: Hai Duong domestic port is in the centre of the key economic zone in the Northern delta
area. The port is 55 km away from Ha Noi, 90 km away from Noi Bai airport, 55 km away from Hai
Phong port, and 120 km away from Cai Lan port – Quang Ninh.
▪ Airway: 75 km to Noi Bai airport (1.5 h car travel); 70 km to Cat Bi Airport (1.5 hour car travel),
both through the new Highway 5.
Electricity
▪ The capacity satisfies the demands of manufacturing and people living.
Water
▪ The capacity satisfies the demands of manufacturing and people living.
Education
▪ 06 universities, 06 junior colleges, 02 technical colleges.
Medicare
▪ 22 provinical hospital, 5 local polyclinics and 265 clinics in towns.
INVESTMENT CONDITION
Human resource
Salary
Investment incentives
▪ About 60% of population in working age (2022)
▪ The minimum salary for the province is applied as follows (see appendix for detail amount):
- Area II: Hai Duong City
- Area III: Chi LinhTown and Cam Giang, Nam Sach, Kim Thanh, Kim Mon, Gia Loc, Binh Giang,
Tu Ky District in Hai Duong Province
- Area IV: Thanh Ha, Thanh Mien and Ninh Giang districts
▪ The lowest wage for trained labor (including those trained by the enterprises) must be at least 7%
higher than the above referenced basic salary
▪ Incentives according to government regulations:
- Exemption and reduction for land and water rent fee
- Preferential tax rates and exemption period, reduction for corporate income tax.
417
- Import tax exemption
Fields Attracting
Investment
▪ Prioritized projects:
- Building infrastructure in industrial zones, developing traditional villages, developing non-state
owned industries, rural industries and traditional villages
Investment attraction
situation
17 newly licensed projects with a total registered capital of 59.5 million USD (7 projects outside
industrial zones - IZs, total capital 13.7 million USD and 10 projects in industrial zones, total capital
45.7 million USD); 31 projects adjusted to increase capital with a total capital increase of 299.5 million
USD (7 projects outside the industrial zone, up 23.4 million USD; 24 projects in the industrial zone, up
276.1 million USD).
Map
Contact
Hai Duong Center for Investment Promotion and Development Consultancy
Address: 58 Quang Trung - Quang Trung Ward- Hai Duong City
Tel: (84-220) 3 852 344
Fax: (84-220) 3 850 814
418
LIST OF INDUSTRIAL ZONES IN HAI DUONG
No
Total Area
(ha)
135.96
Occupancy Rate
Status
95%
In Operation
Dai An Extended Industrial Zone – Stage I
189.02
85%
In Operation
Dai An Extended Industrial Zone – Stage II
278.02
0%
2
Lai Cach Industrial Zone
135.42
16.7%
To Be
Implemented In
2022
In Operation
3
An Phat Hi-Tech Industrial Zone
46.42
89%
In Operation
4
An Phat 1 Industrial Zone
180
3%
5
Cong Hoa Industrial Zone
201.23
58%
In Land
Clearance Process
In Operation
6
Cam Dien - Luong Dien (VSIP) Industrial Zone
149.31
100%
In Operation
7
Lai Vu Industrial Zone
212.89
90%
In Operation
8
Phu Thai Industrial Zone
56.7
100%
In Operation
9
Tan Truong Industrial Zone
198.06
100%
In Operation
Expanded Tan Truong Industrial Zone
112.6
0%
Licensed
10
Nam Sach Industrial Zone
62.42
100%
In Operation
11
Phuc Dien Industrial Zone
82.88
100%
In Operation
Expanded Phuc Dien Industrial Zone
214.57
0%
In Legal Process
1
Industrial zone Name
Dai An Industrial Zone
12
Binh Giang Industrial Zone
450
0%
In Legal Process
13
Kim Thanh Industrial Zone
164.98
0%
In Legal Process
14
Gia Loc Industrial Zone
198
0%
In Legal Process
419
HAI DUONG’S LOCATION MAP OF INDUSTRIAL ZONES
420
DAI AN INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Area
Minimum wage
Lease term
Minimum Lease Area
Limit for Construction
Height
Permitted Construction
Rate
Km 51, Highway No.5, Tu Minh Ward, Hai Duong City, Hai Duong Province, Vietnam
DAI AN JOINT STOCK COMPANY
▪ Address: Dai An Industrial Zone, Km 51, Highway No.5, Tu Minh Ward, Hai Duong City, Hai
Duong Province, Vietnam
▪ Tel: 02203.555.888
▪ Fax: 02203.786.703
▪ Website: http://daianvietnam.com/
▪ Mrs. Tuong Quynh Huong - Deputy General Director –
(84) 936 388 477 - huong.tuong@daianvietnam.com
▪ Mrs. Tran Huyen Thanh - Sales and Marketing Department –
(84) 906 856 899 - thanh.tran@daianvietnam.com
▪ Mr. Vuong Quoc Trung - Sales and Marketing Department –
(84) 945469358 - trung.vuong@daianvietnam.com
- 5 km to Hai Duong city center
- 50km far from Hanoi Central
- 50km far from Hai Phong domestic airport
- 80km far from Noi Bai International Airport
- 50km far from Hai Phong Sea Port
- 80km to Quang Ninh deep water sea port
- 7km far from the new Freeway No. 5A Hanoi – Hai Phong
- 2km far from Cao Xa Railway Station
Priority Sectors for
Investment
Investment on high-tech industry, clean industry, light industry, and
supporting industry.
Restricted Sectors for
Investment
Restrict heavy industry, industries affecting the environment.
[Area 1] According to Decree 90/2019/NĐ-CP dated 15th November 2019
▪ Start date: 2002
▪ End date: 2052
10,000 m2
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residental
Planning regulation (QCXDVN 01: 2008/BXD)
Planned area
Total area:135.96 ha
Factory Available for
Rent
Total area: 18,538 m2
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean
Projects
Lease fee
Operating fee
In operation
▪ Occupancy Rate: 95%
▪ Number of Projects: 42
11 companies
▪ Land lease fee: 100USD/m2
▪ Factory lease fee: 25,000 USD/month to 60,000 USD/month
▪ Payment: pay into 3 installments:
- 1st installment: 30% of total leasing fee within 5 days after signing MOU.
- 2nd installment: 65% of total leasing fee not over 30 days from the 1st installment.
- 3rd installment: 5% of total leasing fee before receiving the land use rights.
▪ Management fee: 0.3 USD/m2/year
421
▪ Infrastructure maintenance fee: 0.4 USD/m2/year
▪ Electricity fee: According to the price of the government EVN (see Appendix)
▪ Water fee: According to the price of Hai Duong clean water supply Co., Ltd
▪ Wastewater treatment fee:
FOR ENTERPRISE LEASING THE WORKSHOP
Waste water standard fee (VND/m3)
*Enterprise leases the workshop: 18,500 (~0.79 USD)
*For enterprise with metal index not over B 40%,
Fee will be plus 39,000 VND Over 40% not accept
*For enterprise with chloride index, mecury index
Fee will be plus 39,000 VND over B
FOR ENTERPRISE LEASING LAND
Waste water standard fee (VND/m3)
*QCVN40:2011 Level A: 12,500 (~0.54 USD)
*QCVN40:2011 Level B: 14,500 (~0.62 USD)
*QCVN40:2011 Over level B
- Having <=03 indexes over level B: 17,500 (~0.75 USD)
- Having 04 indexes over level B: 19,000 (~0.81 USD)
- Having 05 indexes over level B: 20,500 (~0.88 USD)
- Having 06 indexes over level B: 22,000 (~0.94 USD)
- Having 07 indexes over level B: 23,500 (~1 USD)
*QCVN40:2011: For enterprise with metal index
Fee will be plus 39,000 VND not over B 40%, over 40% not accept
*QCVN40:2011: For enterprise with chloride index, Fee will be plus 39,000 VND mecury index
over B
▪ Waste treatment fee: According to the price of the service supplier
INFRASTRUCTURE AND FACILITY
Financial institution
Tax service, State finance
office
Oceanbank, Vietcombank, BIDV, PG bank, Seabank, Vietinbank, Techcombank,…in the Hai
Duong city.
6km to Tax department of Hai Duong province
7km to State Treasury in Hai Duong
There is an On- site Customs Office insides Dai An IZ
Customs Service
Dai An IZ has Inland Container Depot
Logistics
4km to Trancy Logistics (Vietnam) in Hai Duong Co., Ltd
4km to BSL Networks Co., Ltd
Post office
TDT express, VNPT, DHL, FedEx, TNT...door-to-door delivery service
Medicare
5km to Hai Duong General Hospital
Police, public security
24/7 security service. The guards of Dai An IZ cooperate with the local polices supports to ensure
the security for the whole industrial zone.
Universities, training
facilities, etc.
3km to Thanh Dong University.
Recruitment
Worker dormitory
Worker's child education
facility
One-stop service
The labor forces from local and from neighboring provinces (Bac Ninh, Thai Binh, Hung Yen, Hai
Phong, Quang Ninh...). It is easy to find the workers whom you need in the vicinity.
Housing, villa for experts/ employees are working in Dai An IZ.
3km to Tu Minh preschool.
Dai An IZ has One-stop service.
Road Width
The internal roads system has the sections: 55m; 39m; 37m; 35.5m; 33m, 17.5m; 15.5m
IT & Telecommunication Facilities
Telecommunication: broadband ADSL service, telecommunication with IDD, fiber optic
capabilities, leased line
Telephone: number of line depend on investor’s demand.
422
Emergency Power
generator
Available
Fire-fighting facility
Available
Layout Plan
Location map
Actual View
423
LIST OF TENANTS
No
Company name
Nationality
Business line
1
Orisel Vietnam Co., Ltd
Korea
Manufactures and markets electrics application
2
Princeton Biomeditech Vietnam Co., Ltd
Korea
Medical equipment
3
Daeho Special Steel Vina Co., Ltd
Korea
Trade and manufactures st ainless steel
4
Silkroad Hanoi Joint Stock Company
Korea
Manufactures industrial admixtures
5
Shinheung Vina Electrics Co., Ltd
Korea
Specializes in electronic fields
6
Chemilens Vietnam Joint Stock Company
Korea
Manufactures chemicallens
7
Hana Motors Joint Stock Company
Korea
Produces Electric motorcycle
8
Prettl Viet Nam Co., Ltd
Korea
Manufacturing of electronic sensor parts
9
GD Technology Vina Co., Ltd
Korea
Manufactures electronic components
10
Eduen Vina Co., Ltd
Korea
Manufactures electronic components
11
Jinyong HNS Co., Ltd
Korea
Produces electronic appliances
12
Sumidenso Vietnam Co., Ltd
Japan
Manufactures and markets electric wire
13
Sumiden Automative Wire Co., Ltd
Japan
Manufactures electrical wires
14
Aureole Mitani Chemical & Environment Inc
Japan
15
Taishodo Vietnam Co., Ltd
Japan
Storing, diluting and distributing chemical
products
Produces electronic appliances
16
Tomoken Fire Viet Nam Co., Ltd
Japan
17
Trancy Logistic Co., Ltd
Japan
Manufacturing of fire fighting equipments and
other relating services.
Logistic distribution
18
PHI Co., Ltd
Taiwan
Trade and manufactures garment
19
Hulane Electronic Co., Ltd
Taiwan
Manufactures automotive connectors
20
Wonderful Vietnam Co.,Ltd
Taiwan
Manufactures electrical connectors
21
Vi Son Yarn Spining JSC
Vietnam
Manufactures and markets yarns
22
Masan One member Company Limited
Vietnam
Manufactures food (instant noodle)
23
Petrol Viet Nam Branch
Vietnam
Trade the services relating the petrol
24
Linh Anh School Equipment JSC
Vietnam
Produces school equipments
25
Minh Thai Co., LTd
Vietnam
Agency of wine, beer, beverage …
26
EDV Co., Ltd
Vietnam
workshop subleasing
27
Ngu Phuc Co., Ltd
Vietnam
workshop subleasing
28
Laurelton Diamonds Viet Nam Co.,Ltd
U.S.
Trades and manufactures rough diamonds
29
GCP Vietnam Co.,Ltd
U.S.
Produces admixtures
424
30
Ge-shen Co., Ltd
Malaysia
31
Hinsitsu Screen Vietnam Co., Ltd
Malaysia
32
Seiko Vietnam Co., Ltd
Malaysia
33
HongKong
34
Vietnam Luen Tai Electrical Equipment Co.,
Ltd
Taishodo Electronics Vietnam Co., Ltd
35
Bonsen Co., Ltd
HongKong
Manufactures household el ectrical Equipment
Co., Ltd equipments
Manufacturing and processing, assembling
electronic board
Manufacturing paper shredder
36
HongKong
Printing and embroidering on fabric
HongKong
Produces electronic appliances
38
DONG QUN ENTERPRISES (HK)
LIMITED
CHANG JIN CHENG ELECTRICAL (HK)
LIMITED
Tiens Vietnam Co., Ltd
China
Manufactures functional food
39
Yuantai Vietnam Co., Ltd
China
Printing and embroidering on fabric
40
Falcon Vietnam Co., Ltd
Singapore
Manufactures wooden furniture
41
Memtech Co., Ltd
Singapore
Producing plastic and metal molds
42
Jemmtec Vietnam Co., Ltd
UK
Refractory ceramic
37
HongKong
425
Designs and manufactures all kinds of plastic
molded products
Specializes in producing and printing the label
sticker for electrical and electric products, home
appliances…
Printing and other related services
DAI AN EXPANSION INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Area
Minimum wage
Lease term
Minimum Lease Area
Limit for Construction
Height
Permitted Construction
Rate
Planned area
Factory Available for
Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean
Projects
Lease fee
Km 51, Highway No.5, Tu Minh Ward, Hai Duong City, Hai Duong Province, Vietnam
DAI AN JOINT STOCK COMPANY
▪ Address: Dai An Industrial Zone, Km 51, Highway No.5, Tu Minh Ward, Hai Duong City, Hai
Duong Province, Vietnam
▪ Tel: 02203.555.888
▪ Fax: 02203.786.703
▪ Website: http://daianvietnam.com/
▪ Mrs. Tuong Quynh Huong - Deputy General Director – (84) 936 388 477 huong.tuong@daianvietnam.com
▪ Mrs. Tran Huyen Thanh - Sales and Marketing Department – (84) 906 856 899 thanh.tran@daianvietnam.com
- 5 km to Hai Duong city center
- 50km far from Hanoi Central
- 50km far from Hai Phong domestic airport
- 80km far from Noi Bai International Airport
- 50km far from Hai Phong Sea Port
- 80km to Quang Ninh deep water sea port
- 7km far from the new Freeway No. 5A Hanoi – Hai Phong
- 2km far from Cao Xa Railway Station
Priority Sectors for
Investment
Investment on high-tech industry, clean industry, light industry, and
supporting industry.
Restricted Sectors for
Investment
Restrict heavy industry, industries affecting the environment.
[Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019
▪ Start date: 2006
▪ End date: 2056
10,000 m2
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residental
Planning regulation (QCXDVN 01: 2008/BXD)
▪ Total area: 467.04 ha
- Stage 1: 189.02 ha
- Stage 2: 278.02 ha (Expected 2021)
▪ Vacant leasable area: 11.751 ha
▪ Total area with full infrastructure ready to build factory: 189.02 ha
Total area: 1.537 m2
In Operation
▪ Occupancy Rate of Stage 1: 85%
▪ Number of Projects: 41
26 companies
▪ Land lease fee: 100 USD/m2
▪ Factory lease fee: 90.000 VND/m2/month
▪ Payment: pay into 3 installments:
- 1st installment: 30% of total leasing fee within 5 days after signing contract.
- 2nd installment: 65% of total leasing fee not over 30 days from the 1st installment.
- 3rd installment: 5% of total leasing fee before receiving the land use rights.
426
Operating fee
▪ Management fee: 0.3 USD/m2/year
▪ Infrastructure maintenance fee: 0.4 USD/m2/year
▪ Electricity fee: According to the price of the government EVN (see Appendix)
▪ Water fee: According to the price of Hai Duong clean water supply Co., Ltd
▪ Wastewater treatment fee:
FOR ENTERPRISE LEASING THE WORKSHOP
Waste water standard fee (VND/m3)
*Enterprise leases the workshop: 18,500 (~0.79 USD)
*For enterprise with metal index not over B 40%,
Fee will be plus 39,000 VND Over 40% not accept
*For enterprise with chloride index, mecury index
Fee will be plus 39,000 VND over B
FOR ENTERPRISE LEASING LAND
Waste water standard fee (VND/m3)
*QCVN40:2011 Level A: 12,500 (~0.54 USD)
*QCVN40:2011 Level B: 14,500 (~0.62 USD)
*QCVN40:2011 Over level B
- Having <=03 indexes over level B: 17,500 (~0.75 USD)
- Having 04 indexes over level B: 19,000 (~0.81 USD)
- Having 05 indexes over level B: 20,500 (~0.88 USD)
- Having 06 indexes over level B: 22,000 (~0.94 USD)
- Having 07 indexes over level B: 23,500 (~1 USD)
*QCVN40:2011: For enterprise with metal index
Fee will be plus 39,000 VND not over B 40%, over 40% not accept
*QCVN40:2011: For enterprise with chloride index, Fee will be plus 39,000 VND mecury index
over B
▪ Waste treatment fee: According to the price of the service supplier
INFRASTRUCTURE AND FACILITY
Financial institution
Tax service, State finance
office
Oceanbank, Vietcombank, BIDV, PG bank, Seabank, Vietinbank, Techcombank, in the Hai
Duong city.
6km to Tax department of Hai Duong province
7km to State Treasury in Hai Duong
There is an On- site Customs Office insides Dai An Expansion IZ
Customs Service
Dai An Expansion IZ has Inland Container Depot
Logistics
4km to Trancy Logistics (Vietnam) in Hai Duong Co., Ltd
4km to BSL Networks Co., Ltd
Post office
TDT express, VNPT, DHL, FedEx, TNT...door-to-door delivery service
Medicare
5km to Hai Duong General Hospital
Police, public security
24/7 security service. The guards of Dai An IZ cooperate with the local polices supports to ensure
the security for the whole industrial zone.
Universities, training
facilities, etc.
3km to Thanh Dong University.
Recruitment
Worker dormitory
Worker's child education
facility
One-stop service
The labor forces from local and from neighboring provinces (Bac Ninh, Thai Binh, Hung Yen, Hai
Phong, Quang Ninh...). It is easy to find the workers whom you need in the vicinity.
Housing, villa for experts/ employees are working in Dai An IZ.
3km to Tu Minh preschool.
Dai An IZ has One-stop service.
Road Width
The internal roads system has the sections: 55m; 39m; 37m; 35.5m; 33m, 17.5m; 15.5m
IT & Tele-communication
Facilities
Telecommunication: broadband ADSL service, telecommunication with IDD, fiber optic
capabilities, leased line
Telephone: number of line depend on investor’s demand.
427
Emergency Power
generator
Available
Fire-fighting facility
Available
Layout Plan
Location map
Actual View
428
429
LIST OF TENANTS
No
1
2
3
4
5
6
7
Company name
Kefico Vietnam Co., Ltd
During Vietnam Co., Ltd
Namyang Delta Co., Ltd
KPF Vietnam Co., Ltd
SD Global Viet Nam Co., Ltd
DS INV Co., Ltd
LB Label Tracing Co., Ltd
Nationality
Korea
Korea
Korea
Korea
Korea
Korea
Korea
8
Korea
19
ShinYang Metal Viet Nam
Co., Ltd
Yuhan Precision Vina Co.,
Ltd
Orgel VietNam Co., ltd
Fashion Pin Up Vina Co., Ltd
Myong Shin Tech Vina Co.,
Ltd
Suntel Vina Co., Ltd
DS Global Vina
Sangshin Vina Co., Ltd
Sepyung ENC Co., Ltd
Doosan Electro - Material
Vietnam Co., LTd
Vina Ilshin Tech Vina Co.,
Ltd
LMS Vina Co., Ltd
20
21
22
23
24
25
26
27
28
SY Global Co., Ltd
DY Elecen Vina Co., Ltd
Poongsan system Co., Ltd
Samsong Industry Co., Ltd
HST Networks Vina Co., Ltd
GIC Vina Co., Ltd
Vina Solar CO., LTD
Fuluhashi Viet Nam Co., Ltd
Fujikura Kasei Co., Ltd
Korea
Korea
Korea
Korea
Korea
Korea
Korea
Japan
Japan
29
30
Koyo Viet Nam Co., Ltd
NISSEI ECO VIETNAM
CO., LTD
Pan-Continental Metal
Materials Viet Nam
Company Limited
Jin Shan Hardware Vietnam
Co., Ltd
SK FACADE (VN) Co., Ltd
Dolexphar International
Pharmaceutical Joint Stock
Company
Burwitz Joint Stock Company
Vescom Co., Ltd
Thien An An Co., Ltd
CTKF Co., Ltd
Taiwoo Technology VN Co.,
Ltd
Hai Duong HaiD Co., Ltd
Twins Hai Duong Vietnam
Co., Ltd
Japan
Japan
9
10
11
12
13
14
15
16
17
18
31
32
33
34
35
36
37
38
39
40
41
Korea
Business line
Produces automobile components and automatic control system
Produces automobile components and automatic control system
Manufactures garment
Manufactures screws
The production and inspection of cell phone cover glass
manufacturing waste water treatment equipements
Production, processing and export of woven labels and printed labels
for clothing, hats, shoes. Processing and trading of garment materials
and accessories. Manufacturing carton, all types of paper boxes
Manufacturing and processing of metal components, aluminum
products
Manufactures electronic components
Korea
Korea
Korea
Music box manufacturing
Processing plastic and manufacturing garment accessories
Manufactures transmission parts and engine parts
Korea
Korea
Korea
Korea
Korea
Manufactures electronic components
Assembly and processing electronic products
Manufactures electronic components
Assembly and processing electronic products
Manufactures electronic components
Korea
Manufactures electronic components
Korea
Manufacturing and processing of metal components, aluminum
products
Manufactures electronic components (tape)
Manufactures electronic components
Manufactures part for automotive (ETC)
Manufactures automatic components for engine equipment
Manufactures belt bucker
Manufactures part for automotive components
Manufactures Solar Aluminum Structure and Parts
Wood Palet
Coating materials for interior and exterior of two-wheel, four-wheel
vehicle.
Precision mechanical
Manufacturing plastic products
Taiwan
Manufactures the copper oxide powder, copper cacbonate powder
Taiwan
Manufactures screwdrives
Taiwan
Vietnam
Manufactures curtain wall
Manufacturing functional food
Vietnam
Vietnam
Vietnam
Vietnam
HongKong
Manufacturing fireproof concrete
workshop subleasing
workshop subleasing
Singapore
Singapore
Manufactures animal feed
Manufactures animal feed
The Production of Mobil-Phone parts & Precise Electric Goods
430
LAI CACH INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Area
Minimum wage
Lease term
Km 49, Highway No.5, Lai Cach Town, Cam Giang District, Hai Duong City, Hai Duong Province,
Vietnam
Dai Duong Co., Ltd
▪ Address: Lai Cach IZ Km 49, Highway No.5, Lai Cach Town, Cam Giang District, Hai Duong
City, Hai Duong Province, Vietnam
▪ Tel: (84-220) 3 555 868
▪ Fax: (84-220) 3 555 916
▪ Mrs. Tuong Quynh Huong - Deputy General Director – (84) 936 388 477 huong.tuong@daianvietnam.com
- 5 km to Hai Duong city center
- 50km far from Hanoi Central
- 50km far from Hai Phong domestic airport
- 80km far from Noi Bai International Airport
- 50km far from Hai Phong Sea Port
- 82km to Quang Ninh deep water sea port
- 7km far from the new Freeway No. 5A Hanoi – Hai Phong
- 2km far from Cao Xa Railway Station
Priority Sectors for
Investment
High-tech industry, clean industry, light industry, and supporting industry.
Restricted Sectors for
Investment
Restrict heavy industry, industries affecting the enviroment
[Area 2] According to Decree 90/2019/NĐ-CP dated 15th November 2019
End date: January 1st, 2057
Minimum Lease Area
15,000 m2
Limit for Construction
Height
Factory height may not exceed two floors and may not exceed 14m.
Permitted Construction
Rate
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residental
Planning regulation (QCXDVN 01: 2008/BXD)
Planned area
Factory Available for
Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean
Projects
Lease fee
Operating fee
▪ Total area: 135.42 ha
▪ Vacant leasable area: 75.17ha
▪ Total area with full infrastructure ready to build factory: 75.17ha
Total area: 1.500 m2
In operation
▪ Occupancy Rate: 16.7%
▪ Number of Projects: 9
03 projects
▪ Land lease fee: 72 USD/m2 to 90 USD/m2
▪ Payment: pay into 3 installments:
- 1st installment: 30% of total leasing fee within 5 days after signing contract.
- 2nd installment: 65% of total leasing fee not over 30 days from the 1st installment.
- 3rd installment: 5% of total leasing fee before receiving the land use rights.
▪ Management & infrastructure maintenance fee: 20,000 VND/m2/year
From 2022: Prices will change according to the Board of Director’s decision, but not more than 15%
compared to the previous year.
▪ Electricity fee: According to the price of the government EVN (see Appendix)
▪ Water fee: According to the price of Hai Duong clean water supply Co., Ltd
▪ Wastewater treatment fee:
431
FOR ENTERPRISE LEASING THE WORKSHOP
Waste water standard fee (VND/m3)
*Enterprise leases the workshop: 18,500 (~0.79 USD)
*For enterprise with metal index not over B 40%,
Fee will be plus 39,000 VND Over 40% not accept
*For enterprise with chloride index, mecury index
Fee will be plus 39,000 VND over B
FOR ENTERPRISE LEASING LAND
Waste water standard fee (VND/m3)
*QCVN40:2011 Level A: 12,500 (~0.54 USD)
*QCVN40:2011 Level B: 14,500 (~0.62 USD)
*QCVN40:2011 Over level B
- Having <=03 indexes over level B: 17,500 (~0.75 USD)
- Having 04 indexes over level B: 19,000 (~0.81 USD)
- Having 05 indexes over level B: 20,500 (~0.88 USD)
- Having 06 indexes over level B: 22,000 (~0.94 USD)
- Having 07 indexes over level B: 23,500 (~1 USD)
*QCVN40:2011: For enterprise with metal index
Fee will be plus 39,000 VND not over B 40%, over 40% not accept
*QCVN40:2011: For enterprise with chloride index, Fee will be plus 39,000 VND mecury index over
B
▪ Waste treatment fee: According to the price of the service supplier
INFRASTRUCTURE AND FACILITY
Financial institution
Tax service, State
finance office
Oceanbank, Vietcombank, BIDV, PG bank, Seabank, Vietinbank, Techcombank,…in the Hai
Duong city.
6km to Tax department of Hai Duong province
7km to State Treasury in Hai Duong
There is an On- site Customs Office insides Lai Cach IZ
Customs Service
Lai Cach IZ has Inland Container Depot
Logistics
4km to Trancy Logistics (Vietnam) in Hai Duong Co., Ltd
4km to BSL Networks Co., Ltd
Post office
TDT express, VNPT, DHL, FedEx, TNT...door-to-door delivery service
Medicare
5km to Hai Duong General Hospital
Police, public security
24/7 security service. The guards of Lai Cach IZ cooperate with the local polices supports to ensure
the security for the whole industrial zone.
Universities, training
facilities, etc.
4km to Thanh Dong University.
Recruitment
Worker dormitory
The labor forces from local and from neighboring provinces (Bac Ninh, Thai Binh, Hung Yen, Hai
Phong, Quang Ninh...). It is easy to find the workers whom you need in the vicinity.
Housing, villa for experts/ employees are working in Lai Cach IZ
Worker's child
education facility
4km to Tu Minh preschool.
One-stop service
Lai Cach IZ has One-stop service
Road Width
IT & Telecommunication Facilities
The main internal roads system has the sections: 30m - 33m
Telecommunication: broadband ADSL service, telecommunication with IDD, fiber optic
capabilities, leased line
Telephone: number of line depend on investor’s demand.
Emergency Power
generator
Available
Fire-fighting facility
Available
432
Layout Plan
Location Map
Actual View
433
434
AN PHAT HIGH-TECHNOLOGY INDUSTRIAL PARK
GENERAL INFORMATION
Address
Km 47, Highway 5, Viet Hoa and Tu Minh ward, Hai Duong city, Hai Duong province
Investor
An Phat High-Technology Industrial Park Company Limited
▪ Address: Km 47, Highway 5, Viet Hoa and Tu Minh ward, Hai Duong city, Hai Duong province
▪ Tel: (84) 986 888 868
▪ Website: anphatcomplex.com
Contact Person
▪ Pham Van Tuan - General Director - Mobile: (84) 986 888 868 - Email:
tuanpv@anphatcomplex.com
▪ Mr. Duc Kien Vuong/Kevin - Deputy Business Development Manager - Mobile: (84) 965666899
– Email: kienvd@anphatholdings.com
Location
- 2.7 km from Hai Duong City Center, 60 km from Hanoi Center
- 85 km from Noi Bai International Airport and 55 km from Cat Bi Airport (Hai Phong city)
- 50 km from Hai Phong Port and 55 km from Dinh Vu Port
- 0.1 km from Highway 5
Priority
Sectors for
Investment
- Producing plastic bag, industrial packaging, high-tech building material
- Producing plastic products, accessories and household appliances
- Electronic components - Precision engineering, molding manufacturing
- Plastic parts for cars and motorbikes
- Manufacturing industries of new and high-tech materials
- High-end garment, shoes and textile (not including dyeing and tanning)
- Processing wood and high-end furniture - Producing products from paper, carton
- Producing building materials
- Mechanical processing, steel components
- Assembling bicycles, motorbike, cars, specialized transport vehicles
Restricted
Sectors for
Investment
- Producing basic chemicals (accruing industrial wastewater)
- Steel refining from iron and steel scrap using non-continuous furnace
- Non-attracting/restricted-attracting-investment industries in Hai Duong province
Investment Area
Minimum wage
Lease term
Minimum Lease Area
Limit for Construction
Height
Permitted Construction
Rate
Planned area
Factory Available for
Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean
Projects
Lease fee
[Area 2] According to Decree 90/2019/NĐ-CP dated 15th November 2019
End date: November 30, 2056
Negotiation
Factory area: up to 21m
Factory area: 60 percent of land area
▪ Total area: 46 ha
▪ Total vacant leasable area: 2.9 ha for commercial/ service land
▪ Total area with full infrastructure ready to build factory: around 2 ha
Total area: about 40,000 m2
In operation
▪ Occupancy Rate: 89%
▪ Number of Projects:10
None
▪ Land lease fee: 85 USD/m2 plus factory unit construction cost of $200 - $250/m2
▪ Factory lease fee: 3.2 USD/ m2 (VAT excluded)
▪ Payment:
- Method: Bank transfer
- Period: Factory lease: on quarterly basis, on the 10th day of the first month of the next period.
435
- Land lease: Payment due is 30 days after the date of contracting at the latest.
Operating fee
▪ Management fee: 0.6 USD/m2/year
▪ Electricity fee: According to Government Regulation (See Appendix)
INFRASTRUCTURE AND FACILITY
Financial institution
Tax service, State finance
office
3.1 km from BIDV - Thanh Dong Branch
4.0 km from Vietcombank – Hai Duong Branch
3.3 km from Vietinbank – Industrial Park Branch
3.0 km from VPBank – Nguyen Luong Bang Transaction Office
3.9 km from Hai Duong Tax Department
4.4 km from Hai Duong State Treasury
500m from Hai Duong Custom Department
Customs Service
5.9 km from Hai Duong Inland Container Depot
Logistics
Logistics services, including warehouse solution, shipping and custom clearance are provided
inside the industrial park
Post office
5.0 km from Hai Duong Post Office
Medicare
2.8 km from Hai Duong General Hospital
Police, public security
1.6 km from Viet Hoa ward Police Station
Universities, training
facilities, etc.
2.0 km from Hai Duong University
28.0 km from Sao Do University
Recruitment
Worker dormitory
Worker's child education
facility
One-stop service
Road Width
IT & Telecommunication Facilities
Yes
2.0 km from the dormitory in Hai Duong University
Many kindergartens near the industrial park
Land and factory lease, fast-track procedures and convenient services such as catering, security
service, accommodation, IT system, water-electrical system implemented and/or supported by our
industrial park
Main road: 50m, 4 lanes
Loops: 34m, 2 lanes
High-speed internet, international telecommunication, on-demand telephone installation
Emergency Power
generator
Yes
Fire-fighting facility
Yes
436
Layout Plan
437
Actual View
438
AN PHAT 1 INDUSTRIAL ZONE
(Previously: Quoc Tuan – An Binh Industrial Zone)
GENERAL INFORMATION
Address
Quoc Tuan, An Binh, An Lam Commune, Nam Sach District, Hai Duong Province
Investor
An Phat High-Technology Industrial Park Company Limited
▪ Address: Km 47, Highway 5, Viet Hoa and Tu Minh ward, Hai Duong city, Hai Duong province
▪ Tel: (84) 986 888 868
▪ Website: anphatcomplex.com
Contact Person
▪ Pham Van Tuan - General Director - Mobile: (84) 986 888 868 - Email:
tuanpv@anphatcomplex.com
▪ Mr. Duc Kien Vuong/Kevin - Deputy Business Development Manager - Mobile: (84) 965666899
– Email: kienvd@anphatholdings.com
Location
▪ 12 km from Hai Duong City Center, 70 km from Hanoi Center
▪ 79 km from Noi Bai International Airport and 54 km from Cat Bi Airport (Hai Phong city)
▪ 50 km from Hai Phong Port and 55 km from Dinh Vu Port
▪ 0 km to Highway 37 - 10 km from Highway 5
Priority Sectors for
Investment
▪ Producing plastic bag, industrial packaging, high-tech building
material
▪ Producing plastic products, accessories and household appliances
▪ Electronic components - Precision engineering, molding
manufacturing
▪ Plastic parts for cars and motorbikes
▪ Manufacturing industries of new and high-tech materials
▪ High-end garment, shoes and textile (not including dyeing and
tanning)
▪ Processing wood and high-end furniture
▪ Producing products from paper, carton
▪ Producing building materials
▪ Mechanical processing, steel components
▪ Assembling bicycles, motorbike, cars, specialized transport vehicles
Restricted Sectors for
Investment
▪ Producing basic chemicals (accruing industrial wastewater)
▪ Steel refining from iron and steel scrap using non-continuous furnace
▪ Non-attracting/restricted-attracting-investment industries in Hai
Duong province
Investment Area
Minimum wage
Lease term
[Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019
End date: 2070
Minimum Lease Area
1 ha
Limit for Construction
Height
up to 21m
Permitted Construction
Rate
60%
Planned area
Factory Available for
Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean
Projects
Lease fee
▪ Total area: 180 ha
▪ Total vacant leasable area: 140 ha
No RBF
Obtained the investment approval from prime Minister and IRC
Land handover in Quarter IV, 2021
▪ Occupancy Rate: 3%
▪ Number of Projects: 1
None
▪ Land lease fee: 75 USD/m2 plus factory unit construction cost of $200 - $250/m2
439
▪ Payment:
- Method: Bank transfer
- Period: Factory lease: on quarterly basis, on the 10th day of the first month of the next period.
- Land lease: Payment due is 30 days after the date of contracting at the latest.
Operating fee
▪ Management fee: 0.6 USD/m2/year
▪ Electricity fee: According to Government Regulation (See Appendix)
INFRASTRUCTURE AND FACILITY
Financial institution
Tax service, State finance
office
Agribank Vietnam- 500 m
BIDV Nam Sach – 500m
State Treasury- Nam Sach District- 500m
Customs Service
Logistics
Logistics services, including warehouse solution, shipping and custom clearance are provided
inside the industrial park
Post office
Nam Sach Post office – 1km
Medicare
Quoc Tuan Mediacal Centre – 200m
Nam Sach Hospital – 2km
Police, public security
Nam Sach District Police station – 2 km
Universities, training
facilities, etc.
Nam Sach High School: 2 km
Hai Duong University: 12 km
Recruitment
Available
Worker dormitory
Worker's child education
facility
One-stop service
Road Width
IT & Telecommunication Facilities
Many kindergartens near the industrial park
Land and factory lease, fast-track procedures and convenient services such as catering, security
service, accommodation, IT system, water-electrical system implemented and/or supported by our
industrial park
Main road: 50m, 4 lanes
Loops: 34m, 2 lanes
High-speed internet, international telecommunication, on-demand telephone installation
Emergency Power
generator
Available
Fire-fighting facility
Available
Layout Plan
440
Location Map
Actual View
441
CONG HOA INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Area
Minimum wage
Lease term
Minimum Lease Area
Limit for Construction
Height
Permitted Construction
Rate
Planned area
Factory Available for
Rent
Operation Status
Cong Hoa Ward, Chi Linh Commune, Hai Duong city
Cao Su Viet Nam Industrial Zone & Urban Development JSC
▪ Address: No. 12, Nguyen An Street, Hai Tan Ward, Hai Duong City
▪ Tel: (84-220) 3 838 025
Fax: (84-220) 3 838 024
▪ Email: info@vinaruco.com.vn
▪ Mr. Nguyen Dinh Dang - Head of Planning and Investment Department - (84-220) 3 838 029
▪ Mr. Phuong – (84) 913215420 - ntphuong2002@gmail.com
- Land: Located on National Road 5, No.18 and No.37
- Seaport: 50 km Hai Phong Sea Port and 80 km from Quang Ninh Deep Water sea port
- Airport: 80 km from Noi Bai International Airport
Priority Sectors for
Investment
Manufacturing and assembling electric, electronic product,
mechanical, automobile and motorbike; textile
Restricted Sectors for
Investment
Polluted Sector
[Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019
▪ Start date: 2008
▪ End date: 2058
10,000 m2
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residental
Planning regulation (QCXDVN 01: 2008/BXD)
▪ Total area: 201.23 ha
▪ Total Industrial Land area: 145.54 ha
▪ Total area: NA
▪ In operation
Occupancy Rate and
Number of Projects
58%
Number of Korean
Projects
None
Lease fee
Operating fee
Land lease fee: 65 -75 USD/m2
▪ Maintainance fee: 0.35 USD/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 0.65 USD/m3
▪ Wastewater treatment fee: 0.7 USD/m3
INFRASTRUCTURE AND FACILITY
Financial institution
Tax service, State finance
office
Customs Service
Agribank, Vietin Bank, BIDV
30 km to Tax department of Hai Duong province
29 km to State Treasury in Hai Duong
31 km from Hai Duong Customs Department
442
Logistics
N/A
Post office
TDT express, VNPT, DHL, FedEx, TNT...door-to-door delivery service
Medicare
29 km to Hai Duong General Hospital
Police, public security
24/7 security service. The guards of Lai Cach IZ cooperate with the local polices supports to ensure
the security for the whole industrial zone.
Universities, training
facilities, etc.
32.4 km to Thanh Dong University.
Recruitment
The labor forces from local and from neighboring provinces (Bac Ninh, Thai Binh, Hung Yen, Hai
Phong, Quang Ninh...). It is easy to find the workers whom you need in the vicinity.
Worker dormitory
N/A
Worker's child education
facility
N/A
One-stop service
N/A
Road Width
IT & Telecommunication Facilities
The main internal roads system has the sections: 30m - 33m
Telecommunication: broadband ADSL service, telecommunication with IDD, fiber optic
capabilities, leased line
Telephone: number of line depend on investor’s demand.
Emergency Power
generator
Available
Fire-fighting facility
Available
Layout Plan
443
Location Map
Actual View
444
LIST OF SOME NOTABLE TENANTS
No.
Company name
Nationality
Business line
1
Vietnam Rubber Industry and Urban
Development Joint Stock Company
Vietnam
2
Nice Ceramic Company Limited
Vietnam
3
Kim Duong Vietnam Consumer Goods
Company Limited
Poyun Electronics (HD) Vietnam
Company Limited
China
Investing in construction and trading of technical
infrastructure system of Republic Industrial Zone,
Chi Linh district, province HD in accordance with
detailed planning of Cong Hoa Industrial Zone
approved by People's Committee of HD
Producing and trading in import and export of tiles
and other sizes
Manufacturing, processing and trading high
quality plastic products
Manufacturing, processing, trading in speaker
components and components and devices related
to speakers and sound
Manufacturing and processing components of
speakers, Amplifier and Amplifier components
Manufacturing and processing speaker tubers and
components related to speaker roots; speakers and
headphones
Manufacturing and processing tubers of speakers,
frequency, finished products
4
5
6
7
Seychelles
Dainty & Gemmy Technology Co., Ltd
Vietnam
Dong A Vietnam Science and
Technology Co., Ltd
Hong Kong
Sun Acoustis Company Limited
Virgin Islands
Hong Kong
445
CAM DIEN – LUONG DIEN INDUSTRIAL ZONE (VSIP HAI DUONG)
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Area
Minimum wage
Lease term
Minimum Lease Area
Limit for Construction
Height
▪ Cam Dien Commune, Cam Giang District, Hai Duong, Vietnam
VSIP Hai Duong Co., Ltd
▪ Address: Cam Dien Commune, Cam Giang District, Hai Duong, Vietnam
▪ Tel: +84 220 378 9668
▪ Fax: +84 220 378 6868
▪ Website: vsip.com.vn
▪ Le Quoc Han (Robin) - (84) 943 836 839 - han.lq@vsip.com.vn
- 40 Km from Hanoi Capital
- 60 Km from Hanoi International Airport
- 65 Km from Hai Phong Seaport
- 25 Km from Highway 5B
- Face to National Highway 5A
Priority Sectors for Investment
Light and high tech industries
Restricted Sectors for
Investment
Polluted industries
[Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019
▪ Start date: When tenants are ready
▪ End date: 5th August 2058
1 ha
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residental
Planning regulation (QCXDVN 01: 2008/BXD)
Permitted Construction
Rate
Planned area
Factory Available for
Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean
Projects
Lease fee
Operating fee
▪ Total area: 149.31 ha
▪ Total vacant leasable area: 110 ha (Phase 1)
▪ Total area: NA
▪ In operation
100%
N/A
▪ Land lease fee: 85 USD/m2/over project life
▪ Management fee: 1,577 VND (~0.07 USD)/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 13,700 VND (~0.5 USD)/m3
▪ Wastewater treatment fee: 5,633 VND (~0.25 USD)/m3
INFRASTRUCTURE AND FACILITY
Financial institution
Tax service, State finance
office
Vietcombank, VietinBank
15km from the nearest State Tax and Finance Agency
15km from the nearest Customs Agency
Customs Service
15km from the nearest Inland Container Depot
446
Logistics
5km from the nearest Logistic Center
Post office
3km from the nearest Mailing Post Office
Medicare
3km from the nearest local clinic
Police, public security
2km from the nearest Police Station
Universities, training
facilities, etc.
15km from the nearest Universites and Training Center + University of Economic and Technology,
University of Medical/ Hai Duong vocational School
Recruitment
Recruitment support service available
Worker dormitory
Worker dormitory available within IP
Worker's child education
facility
One-stop service
Road Width
IT & Telecommunication Facilities
Emergency Power
generator
Fire-fighting facility
2km from the nearest Facility
15km from the nearest Hai Duong provincial Facility
Main Road: 56-meter-wide, four lanes
Branch Road: 26-Meter-wide, two lanes
Telecommunication: broadband ADSL service, telecommunication with IDD, fiber optic
capabilities, leased line
Telephone: number of line depend on investor’s demand.
NA
Available
Layout Plan
Location Map
447
Actual View
448
LIST OF SOME NOTABLE TENANTS
No.
Company name
Nationality
Business line
1
Best Pacific Company Limited
(Vietnam)
Hong Kong
2
Long Star Engineering Co., Ltd.
(Vietnam)
Seychelles
3
Ehwa Global Company Limited
South Korea
4
BW Hai Duong Industrial
Construction Company Limited
Ta Ting Plastic Co., Ltd. (Hai Duong)
Netherlands Vietnam
Samoa
Jointak Labels (VN) Company
Limited
BW Hai Duong Industry PT
Company Limited - Project 02
Leo (Vietnam) Paper Products Co.,
Ltd
Vietnam Union Materials Company
Limited
BW Hai Duong Industrial
Construction Company Limited - HD
03
Superior EMS Limited (Vietnam)
Hong Kong
Netherlands Vietnam
Hong Kong
Producing and trading in knitted fabric, knitting fabric,
woven fabric and other non-woven fabrics belonging to
industry code 1321
Manufacturing and trading raw materials used for
manufacturing shoe soles, shoes from rubber plastic and
Eva plastic; Producing and trading catalysts, flocculants
and additives
Producing and processing grinding stone products with
diamonds; manufacturing and processing all kinds of saw
blades and drills with diamonds used in industrial
production; Performing commercial rights
Warehousing and storage services, business and real
estate consulting; building offices and workshops for rent
Production and trading of l
PE and PP plastic bags
Manufacturing and trading textile labels, labels, paper
hangers, labels, hand-locking silicon
Warehousing and storage services, business and real
estate consulting; building offices and workshops for rent
Producing paper bags, paper cards
South Korea
Producing Ferrite magnets
Netherlands Vietnam
Warehousing and storage services, business and real
estate consulting; building offices and workshops for rent
Hong Kong
Producing postcards; making machines
Cotton candy; animal music player
Production of electric wires and cables of all kinds
5
6
7
8
9
10
11
12
13
14
Tran Phu Electrical Mechanical Joint
Stock Company
Vina Foam Vietnam Co., Ltd.
Vietnam
Vietnam
Producing fire foam products
The Long Airtech Joint Stock
Company
Vietnam
Production of air blowing chamber; production and
assembly of equipment and machines used for laboratories
and medical; Production of air filter accessories
449
LAI VU INDUSTRIAL ZONE
GENERAL INFORMATION
Address
▪ Lai Vu commune, Kim Thanh district, Hai Duong province
Investor
Lai Vu industry Park Company limited
▪ Address: Lai Vu commune, Kim Thanh district, Hai Duong province, Viet Nam
▪ Tel: (84-220) 3 562718
Fax: (84-220) 3 727886
Contact Person
▪ Mrs. Tuong Quynh Huong - Deputy General Director – (84) 936 388 477 huong.tuong@daianvietnam.com
▪ Mrs. Tran Huyen Thanh - Sales and Marketing Department – (84) 906 856 899 thanh.tran@daianvietnam.com
Location
Investment Area
Minimum wage
Lease term
Minimum Lease Area
Limit for Construction
Height
Permitted Construction
Rate
Planned area
Factory Available for
Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean
Projects
Lease fee
Operating fee
- Land: Next to National Road 5A, 1 km from Tien Trung
- Seaport: 40 km from Hai Phong Port
- Airport: 40 km from Cat Bi (Hai Phong) airport
Priority Sectors for
Investment
High-tech industry, clean industry, light industry, and supporting
industry.
Restricted Sectors for
Investment
Restrict heavy industry, industries affecting the enviroment
[Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019
▪ Start date: 2007
▪ End date: 2057
10,000 m2
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residental
Planning regulation (QCXDVN 01: 2008/BXD)
▪ Total area: 212.89 ha
▪ Vacant leasable area: 152.5ha
▪ Currently, Lai Vu IZ does not have factory available for rent
▪ In operation
▪ Occupancy Rate: 90%
▪ Number of Projects: 11 project
None
▪ Land lease fee: 60 USD/m2
▪ Management fee: 0.5 USD/m2/year - Annual payment from 5th to 15th January
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 0.61 USD/m3 - Monthly payment
▪ Wastewater treatment fee: Sewage treatment system is Under contruction
INFRASTRUCTURE AND FACILITY
Financial institution
5 km from nearest ATM of BIDV, VietinBank
Tax service, State
finance office
12 km to Tax department of Hai Duong province
11 km to State Treasury in Hai Duong
Customs Service
13 km to Hai Duong Customs Office
450
Logistics
Trancy Logistics (Vietnam) in Hai Duong Co., Ltd, BSL Networks Co., Ltd
Post office
TDT express, VNPT, DHL, FedEx, TNT...door-to-door delivery service
Medicare
7 km from Nam Sach District Medical Center
Police, public security
24/7 security service.
Universities, training
facilities, etc.
10 km to Hai Duong University.
Recruitment
Worker dormitory
The labor forces from local and from neighboring provinces (Bac Ninh, Thai Binh, Hung Yen, Hai
Phong, Quang Ninh...). It is easy to find the workers whom you need in the vicinity.
NA
Worker's child
education facility
3 km to Lai Vu preschool.
One-stop service
NA
Road Width
IT & Telecommunication Facilities
The main internal roads system has the sections: 30m - 33m
Telecommunication: broadband ADSL service, telecommunication with IDD, fiber optic
capabilities, leased line
Telephone: number of line depend on investor’s demand.
Emergency Power
generator
Available
Fire-fighting facility
Available
Layout Plan
Location Map
451
Actual View
LIST OF TENANTS
No.
Company name
Nationality
Business line
1
Vinashin Precision Mechanical Joint
Stock Company
Vietnam
Manufacturing
Lai Vu Industrial Park Company
Limited
Shipbuilding Electric-Electronic Joint
Stock Company
Vietnam
Vinashin Industrial Development
Company Limited
Thinh Hung Transport and Construction
Material Trading Joint Stock Company
Vietnam
6
Enbest Joint Stock Company
Vietnam
7
Binh Duong Mechanical and Trading
Company Limited
Vietnam
8
CAS International Container Joint Stock
Company
United StatesBritish Virgin
Islands-Vietnam
9
Tinh Loi Garment Company Limited
Hong Kong
10
Pacific Crystal Textile Co., Ltd.
Hong Kong
11
Misawa Engineering Co., Ltd.
Japan
2
3
4
5
Vietnam
Vietnam
non-standard mechanical equipment and hydraulic
equipment, hydraulic units; production and
manufacture of steel structures; production of grinding
nuts
Constructing and trading technical infrastructure
system of Lai Vu Industrial Park
Manufacturing measuring modules and protecting
diesel parameters; transmitter protection devices;
universal
Fabrication of wind pipe systems and accessories
Installing transmission lines for commercial concrete
stations, supplying commercial concrete for
construction projects (mainly supplied to Pacific
Textile Project and expanding Tinh Loi Garment
Project in Lai Vu Industrial Park)
Trading in petrol, oil, liquefied petroleum gas;
warehouse business; restaurants, mini supermarkets
Manufacturing metal components; producing,
processing and trading mechanical products; excess
factory rental as prescribed
Manufacturing all kinds of international standard
container products, manufacturing and assembling
mechanical products; Manufacturing and assembling all
kinds of components for container production;
Manufacturing specialized machinery, equipment and
tools for the container industry
Manufacturing and trading garment products; Washing,
printing, embroidery and performing other processing
steps
Manufacturing and trading knitted products and raw
materials
Manufacturing, manufacturing, processing
and assembling parts, components, components of
angle and motor measuring sensors
452
PHU THAI (NAM TAI) INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Area
Minimum wage
Lease term
Minimum Lease Area
Limit for Construction
Height
Permitted Construction
Rate
Planned area
Factory Available for
Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean
Projects
Lease fee
Operating fee
▪ Phu Thai Town, Kim Thanh Distric, Hai Duong Province
Nam Tai International Co., Ltd. (Phu Thai IZ West area)
▪ Address: Phu Thai Industrial Park, Phu Thai Town, Kim Thanh District, Hai Duong Province
▪ Tel: (84-220) 3 722 990/1
▪ Fax: (84-220) 3 722 960
▪ Email: sales@namtai.vn
▪ Mr. Hoang Vinh Tuan - Sales & Service Manager – (84) 982 594 866 (leaved)
- Land: Next to National Road 5A, 1 km from Tien Trung
- Seaport: 40 km from Hai Phong Port
- Airport: 40 km from Cat Bi (Hai Phong) airport
Priority Sectors for
Investment
High-tech industry, clean industry, light industry, and supporting
industry.
Restricted Sectors for
Investment
Restrict heavy industry, industries affecting the enviroment
[Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019
▪ Phu Thai Industrial Park – West area 2003-2050.
▪ Phu Thai Industrial Park – East area 2015-2065.
10,000 m2
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residental
Planning regulation (QCXDVN 01: 2008/BXD)
▪ Total area: 56.7 ha
▪ Ready built factory for lease with the area ranging from 2,520 to 20,000 m2
In operation
▪ Occupancy Rate: 100%
▪ Number of Projects: 42
09 projects
▪ Land lease fee: Depending on location
▪ Management fee: 0.35 USD/m2/month (Pay at the 1st day of the 1st month of each quarter)
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 14,385 VND (~0.65 USD)/m3 (Monthly Payment)
▪ Wastewater treatment fee: 7,350 VND (~0.33 USD)/m3 - Monthly payment with chargeable
volume is counted at 70% of supplied water volume
INFRASTRUCTURE AND FACILITY
Financial institution
Tax service, State finance
office
Customs Service
Logistics
BIDV, VietinBank, Vietcombank, Sacombank ATM within 5 km
25 km to Tax department of Hai Duong province
24 km to State Treasury in Hai Duong
25 km to Hai Duong Customs Office
Trancy Logistics (Vietnam) in Hai Duong Co., Ltd, BSL Networks Co., Ltd
453
Post office
4 km to Kim Luong Post Office
Medicare
1.6 km from Phuc Thanh District Medical Center
Police, public security
24/7 security service.
Universities, training
facilities, etc.
24 km to Hai Duong University.
Recruitment
Worker dormitory
Worker's child education
facility
One-stop service
Road Width
IT & Telecommunication Facilities
The labor forces from local and from neighboring provinces (Bac Ninh, Thai Binh, Hung Yen, Hai
Phong, Quang Ninh...). It is easy to find the workers whom you need in the vicinity.
NA
6.5 km to Kinh Mon preschool.
NA
The main internal roads system has the sections: 30m - 33m
Telecommunication: broadband ADSL service, telecommunication with IDD, fiber optic
capabilities, leased line
Telephone: number of line depend on investor’s demand.
Emergency Power
generator
Available
Fire-fighting facility
Available
Layout Plan
Location Map
454
Actual View
455
LIST OF TENANTS
No.
Company name
Nationality
Business line
1
Poyun Electronic Co., Ltd.
Brunei
2
Vietnam Ripe Lawn
Company Limited
Hakken Technology Co., Ltd.
Japan
Production and trading of speaker coils;
production and trading of parts related to speakers;
audio equipment
Production of plastic materials for export
3
British Virgin Islands
Hong Kong
6
Vietnam Shop Vac Company
Limited
Nam Lee International Co.,
Ltd.
Cixing VN Company Limited
7
Nam Ninh Company Limited
Vietnam
8
Merrimack River Precision
Industry Co., Ltd. (HD)
Taiwan
9
Injae Vina Company Limited
China
10
Dong Tai VN International
Company Limited
British Virgin Islands
11
Believe Zone Company
Limited
Korea - Vietnam
12
Global Resources Group
Company Limited Vietnam
Nam & Co Co., Ltd.
China
4
5
13
14
15
16
17
18
Blue Tec Vina Company
Limited
Nam Tai International
Company Limited
Global Wrapper Industrial
Co., Ltd Vietnam
Nam Tai International
Company Limited
Fantastic International Ltd.
Vietnam
Hong Kong
Vietnam
Manufacturing motor boats; export sports
clothing; business motels, food, drink,
refreshments, karaoke services
Manufacture all kinds of plastic support frames
inside and outside of speaker components; detailed
plastic accessories of travel products such as
suitcases, bags, backpacks;
Producing garments made of exported wool;
manufacturing and processing toys, paper,
notebooks and cards; execute commercial rights
Producing garment machinery and equipment;
production and trading of garment accessories;
delivery, transportation of garments and consumer
goods
Producing and trading Polyethelene membranes,
bags and plastic beads; Trade promotion between
Vietnam and foreign countries
Manufacturing industrial protective clothing (worn
once)
Making clothes (except for fur); producing
knitting and knitting clothes; trading fabrics,
ready-made garments, footwear and other related
goods
Manufacturing and processing plastic molds for
mobile phones and other electronic devices
Building factories for rent
Hong Kong
Production of plastic products
Vietnam
Building factories for rent
Hong Kong
Producing all kinds of children's toys
Vietnam
South Korea
20
Nam Tai International
Company Limited
Daeil Tech Vietnam Co., Ltd.
South Korea
21
Em Vina Company Limited
South Korea
22
May Mayfair Company
Limited
Hai Duong Branch - KTC
Electronics VN Co., Ltd.
Hong Kong
19
23
Processing, assembling, manufacturing and selling
speaker components and related accessories;
hardware, equipment and speakers
Production of vacuum cleaners, engines, filter
bags and vacuum cleaner parts and accessories
Manufacturing and processing all kinds of
garments
Sublease machinery
Building factories for rent
South Korea
456
Storage and Inspection of electronic component
products (Phms for mobile phones)
Manufacturing and processing film and adhesive
tapes for mobile phones and other electronic
devices; Performing import and export rights and
distribution rights of wholesale and retail
distribution (No wholesale or retail establishment
is established)
Making garments (except for fur)
Store, check and assemble all kinds of rubber,
silicone mobile phone components (mobile phone
keyboard, back plate to protect the phone, stand,
HMT Vina Company Limited
South Korea
25
LLP Company Limited
United Kingdom - Russia
26
Eno Interlining Vietnam
Company Limited
Hyon Jin Vietnam Co., Ltd.
Singapore
24
pads, mobile keyboard pad, mobile phone key
adjustment)
Store, check and assemble all kinds of rubber,
silicone mobile phone components (mobile phone
keyboard, back plate to protect the phone, stand,
pads, mobile keyboard pad, mobile phone key
adjustment); Commercial rights
Trade
South Korea
Manufacturing and processing fabric fabrication;
Performing commercial rights
Producing plastic products;
China
Producing other products from rubber;
Manufacturing electronic components;
Management consulting activities; Implementation
of export rights, import rights and distribution
rights
Manufacturing and processing products
South Korea
Outdoor travel, including: canvas tents, sleeping
bags, sack bags, suitcases.
Manufacturing and processing: wire
Hong Kong
connection, set of electrical conductors,
containers, terminals for electrical and electronic
devices
Producing toy clothes
Kintex Elastic Company
Limited
Nam Tai International
Company Limited
Binh Thanh Production and
Trading Company Limited
Akiflex Vina Company
Limited
Nam Tai International
Company Limited
Nam Tai International
Company Limited
Innovation Group Company
Limited (Vietnam)
Hae Sung Chemical Vina Co.,
Ltd.
Seychelles Republic
and accessories of toys; Production of toys and
dolls made of cotton and polyester; Production of
backpacks, children's bags, school bags
Producing woven wire
39
Wanda Textile Co., Ltd.
India - China
Manufacturing, processing, pressing plastic
products for electronic products from pure silicone
resins
Production of pillowcases and bed sheets
40
Vietnam Bigfun Leisure
Company Limited
Nam Tai International
Company Limited
Ducar Company Limited
China
Production of plastic products; Commercial rights
Vietnam
Building warehouses - factories and auxiliary
works for rent
Production of water pumps,
27
28
29
30
31
32
33
34
35
36
37
38
41
42
TianYe Outdoor Company
Limited (Vietnam)
Yura Vietnam Company
Limited
Pamson Industry Vietnam
Co., Ltd.
Vietnam
Vietnam
Factory Project - Warehouse G3, G4, G5 belong to
batch CN11, CN12 - Eastern subdivision
Producing and processing garments
South Korea
Manufacturing Panel construction
Vietnam
Construction of factories - warehouses and
auxiliary works for lease
Construction of factories - warehouses and
auxiliary works for lease
Production of rubber products
Vietnam
Thailand
South Korea
China
Pressure washers, generators, portable generators.
457
TAN TRUONG INDUSTRIAL ZONE
GENERAL INFORMATION
Address
▪ Tan Truong Town, Cam Giang District, Hai Duong city
Investor
Nam Quang Invesment and Development JSC
▪ Address: Nam Sach IZ, Ai Quoc Ward, Hai Duong
▪ Tel: (84-220) 3 570 666
▪ Email: namquanghd@gmail.com/ namquang@vidgroup.com.vn
Contact Person
Location
Investment Area
Minimum wage
Lease term
Minimum Lease Area
Limit for Construction
Height
Permitted Construction
Rate
Planned area
Factory Available for Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean Projects
Lease fee
Operating fee
▪ Mr. Huan – Sales Department – (84) 989 768 586 – huannm2@tniholdings.vn
/huan792003@gmail.com
- Land: 45 km from Hanoi, 55 km from Hai Phong
- Seaport: 55 km Hai Phong Sea Port, 60 km from Cai Lan – Quang Ninh port
- Airport: 70 km from Noi Bai International Airport; 50 km from Cat Bi – Hai Phong
Priority Sectors for
Investment
High-tech industry, clean industry, light industry, and supporting
industry.
Restricted Sectors for
Investment
Restrict heavy industry, industries affecting the enviroment
[Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019
▪ Start date: 2008
▪ End date: 2058
10,000 m2
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residental
Planning regulation (QCXDVN 01: 2008/BXD)
▪ Total area: 198.06 ha
▪ Total Industrial land: 129.45 ha
NA
In operation
▪ Occupancy Rate: 100%
▪ Number of Projects: Over 40
01 project
▪ Land lease fee: 80 USD/m2
▪ Management fee: 0.35 USD/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 11,500 VND (~0.5 USD)/m3
▪ Wastewater treatment fee: USD 0.6/m3 for C level; USD 0.45/m3 for B level; USD 0.18/m3
for A level (Excluding VAT)
INFRASTRUCTURE AND FACILITY
Financial institution
Tax service, State finance
office
Customs Service
Maritime Bank, Vietcombank, ACB, Agribank, Techcombank...
13 km to Tax department of Hai Duong province
11 km to State Treasury in Hai Duong
There is an On- site Customs Office insides Tan Truong IZ
Tan Truong IZ has Inland Container Depot
458
Logistics
Nippon Express、Nippon Konpo、MOL Logistics、Sankyu、Konoike、Yusen
Post office
TDT express, VNPT, DHL, FedEx, TNT...door-to-door delivery service
Medicare
5km to Hai Duong General Hospital
Police, public security
24/7 security service. The guards of Lai Cach IZ cooperate with the local polices supports to
ensure the security for the whole industrial zone.
Universities, training
facilities, etc.
4km to Thanh Dong University.
Recruitment
Worker dormitory
Worker's child education
facility
One-stop service
Road Width
IT & Tele-communication
Facilities
The labor forces from local and from neighboring provinces (Bac Ninh, Thai Binh, Hung Yen,
Hai Phong, Quang Ninh...). It is easy to find the workers whom you need in the vicinity.
Housing, villa for experts/ employees are working in the IZ
8km to Tu Minh preschool.
Tan Truong IZ has One-stop service
Road system of centre is 36m wide. Branch road syste, is 24m wide. Street lighting system was
installed along the route.
Telecommunication: broadband ADSL service, telecommunication with IDD, fiber optic
capabilities, leased line
Telephone: number of line depend on investor’s demand.
Emergency Power
generator
Available
Fire-fighting facility
Available
Layout Plan
Location Map
459
Actual View
LIST OF TENANTS
No.
Company name
Nationality
Business line
1
UMC VN Electronic Company Limited
Japan
2
Iriso VN Electronic Co., Ltd
Japan
3
Jaguar International Co., Ltd Hanoi
Japan
4
Evergreen Vietnam Screw Industry Co., Ltd
Taiwan
5
Japan VSM Production Co., Ltd.
Japan
Manufacturing, manufacturing and assembling all
kinds of electronic machinery, equipment, parts and
components
Manufacturing connected parts; connecting parts
with needle tip; connecting parts for cars; Accurate
mechanical and electrical equipment parts
Manufacturing and trading in designing,
manufacturing and assembling sewing machines and
spare parts; execute commercial rights
Producing iron shells; stainless steel snail
production; copper snail production; mechanical
Producing garment products
6
Uniden VN Company Limited
Japan
7
Hong Tri Precision Company Limited
Taiwan
8
Branch of Sankyu VN Co., Ltd.
Japan
9
Pegasus sewing machine company limited
Japan
10
YAS Real Estate Company Limited
Hong Kong
11
Hitachi Cable VN Company Limited
Japan
12
Valqua VN Company Limited
Japan
13
Chi Hua VN Company Limited
Samoa
460
Producing all kinds of cordless phones and
accessories; types of radio transceivers and parts
Manufacture of connecting machines; Coaxial Cable;
antenna; sublease office
Service of leasing and managing factories,
warehouses, rental machines and equipment
Production of nose overlock industrial sewing
machines; 5-stitch stitch machine; type of sewing
table; sewing table shaft; Commercial rights
Investing in creating offices, factories, warehouses
and other facilities; providing machinery rental and
supporting equipment for offices, factories and
warehouses
Manufacturing, processing and assembling all kinds
of wires and related semi-finished products; plastic
beads for wire sheath; sub-lease of offices and
factories; antennas for PC computers
Producing twisted pads; synthetic plastic pads
Manufacturing motors; generator; total clock;
automobile motors, chucks; automotive generator;
flywheel sports machine; sports machines;
14
Nishoku Technology VN Company Limited
Taiwan
15
IKKA VN Technology Co., Ltd
Japan
16
C.P VN Livestock Joint Stock Company (02 Branches in Hai Duong)
Japan Toko Mimtech Co., Ltd.
Thailand
18
Sankyu Logistics (Vietnam) Co., Ltd. - in
Hai Duong
Japan
19
Mascot VN Co., Ltd.
Denmark
20
Ajinomoto Vietnam Company
Japan
21
ICS VN Company Limited
Japan
22
Brother Vietnam machine limited company
Japan
23
Sansei VN Co., Ltd.
Hong Kong
24
Showa Valve Vietnam Co., Ltd.
Japan
25
ChangHong Vietnam Engineering Co., Ltd.
Seychelles
Republic
26
Leong Hup Vietnam Company Limited
Malayasia
27
Vietnam Zunow Engineering Co., Ltd.
Hong Kong
28
Nam Quang Investment and Construction
Joint Stock Company
Vietnam
29
Vietnam
30
SBC Vietnam Steel House Joint Stock
Company
Vifon Joint Stock Company
31
Minh Phu Steel Joint Stock Company - HD
Vietnam
32
USFEED CO., LTD
America
33
ManGo Vietnam Company Limited
Japan
34
Fuji Seiko Innovation Vietnam Company
Limited
Japan
35
ABSFIL Vina Company Limited
South Korea
17
Japan
Poland Vietnam
461
manufacturing, processing and assembling plastic
parts
Manufacturing plastic components of mobile phones;
plastic components of computers; consumer plastic
products; other plastic products
Manufacturing and processing plastic components
for cars and motorcycles; Plastic components for
office equipment
Production of feed for cattle and poultry
Production and manufacture of precision metal parts
for automatic, automotive, orthodontic systems,
medical and dental instruments, hardware and key
parts, computers
Transport agency services, freight forwarding,
customs clearance, warehouse management,
warehousing and storage services
Producing and processing clothes; building
warehouses and yards; commercial rights
Building Ajinomoto's products storage and
distribution center manufactured and traded in
Vietnam
Manufacture, process and process metal parts for
cars and electronic devices
Processing, assembling, manufacturing and selling
sewing machines, accessories; repair and resell used
sewing machines; carry out business activities
according to the above areas
Manufacturing and assembling all kinds of parts and
details; types of molds; restore, repair and maintain
molds; factory lease
Manufacturing, processing and assembling valves,
sieves and other pipeline materials
Processing, mold making, plastic and metal
component assemblies; manufacturing and
assembling components or finished products; Printed
and processed plastic product surface
Producing food, poultry and aquatic products;
production of raw materials used to produce animal
feed, poultry and aquatic products; Production of
vitamin and mineral mixtures to supplement feed
ingredients
Manufacturing, processing and assembling plastic
components, parts and products
Embellish the ground for construction of traffic
infrastructure system, power supply, water supply,
communication, wastewater treatment ... to attract
investors to build and trade in industrial zones.
Production of steel structures; corrugated iron
Producing products from rice, starch and starch
products; processing food, meat, vegetables;
Production of seasoning powder
Production of rolled steel coils (P / O steel coils),
cold rolled steel coils, galvanized steel coils and steel
box tubes (input materials are produced and
processed from hot rolled coils).
Production of animal feed, poultry and aquatic
products: 330,000 tons / year
Manufacturing, processing and assembling molds for
plastic products and plastic products
Manufacturing, processing, manufacturing all kinds
of metal parts and products for automatic office
equipment, automobile industry and other industries
Manufacturing filter parts; environmental materials;
consulting and installing waste water treatment
36
Sansei Vina Company Limited
Japan
37
Jupiter Vietnam Supply Chain Joint Stock
Company in Hai Duong
Vietnam
38
Super Foam Enterprise INC
Anguilla
39
Sambound Vietnam Company Limited
Hong Kong
40
Three-Color Stone Stationery (Vietnam) Co.,
Ltd.
China
462
systems; research and market development of filters,
waste water treatment materials, waste water
treatment systems; Commercial rights
Manufacturing, processing and assembling plastic
components and products; types of molds and seals,
accessories; print letters and pictures on plastic
products; restore, maintain and repair molds; Support
businesses to find customers
Warehousing and storage of goods; other support
services related to transport; freight transport by
road; goods support, packaging, loading and
unloading services
Manufacturing and processing plastic products from
plastic particles
Production and processing of plastic packaging
products for cosmetic industry (makeup powder,
lotion, eyelash, lipstick, ...); Manufacturing and
processing toys for children (models of plastic toys,
robots, animals, ...).
Manufacturing and processing: notebooks,
envelopes, stationery from paper; file clamps, file
folders and school supplies; pen, pencil of all kinds,
pencil core
NAM SACH INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Area
Minimum wage
Lease term
Minimum Lease Area
Limit for Construction
Height
▪ Nam Sach District, Hai Duong Province
Nam Quang Invesment and Development JSC
▪ Address: Nam Sach IZ, Ai Quoc Ward, Hai Duong
▪ Tel: (84-220) 3 570 666
▪ Email: namquanghd@gmail.com/ namquang@vidgroup.com.vn
▪ Mr. Huan – Sales Department – (84) 989 768 586 – huannm2@tniholdings.vn
/huan792003@gmail.com
- Land: 57 km from Hanoi,
- Seaport:56 km Hai Phong Sea Port, 67 km from Cai Lan – Quang Ninh port
- Airport: 65 km from Noi Bai International Airport
Priority Sectors for
Investment
High-tech industry, clean industry, light industry, and supporting
industry.
Restricted Sectors for
Investment
Restricted heavy industry, industries affecting the enviroment
[Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019
▪ Start date: 2003
▪ End date: 2053
10,000 m2
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Residental Planning regulation (QCXDVN 01: 2008/BXD)
Permitted Construction Rate
Planned area
Factory Available for Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean Projects
Lease fee
Operating fee
▪ Total area: 62.42 ha
▪ Total Industrial land: 48.08 ha
▪ NA
▪ In operation
▪ Occupancy Rate: 100%
▪ Number of Projects: 18
02 projects
▪ Land lease fee: 45 - 66 USD/m2
▪ Management fee: 0.35 USD/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 11,500 VND (~0.5 USD)/m3
▪ Wastewater treatment fee: USD 0.6/m3 for C level; USD 0.45/m3 for B level; USD 0.18/m3
for A level (Excluding VAT)
INFRASTRUCTURE AND FACILITY
Financial institution
Tax service, State finance
office
Customs Service
Logistics
Maritime Bank, Vietcombank, ACB, Agribank, Techcombank...
6 km to Tax department of Hai Duong province andState Treasury in Hai Duong
13km from Hai Duong Customs Department
Nippon Express、Nippon Konpo、MOL Logistics、Sankyu、Konoike、Yusen
463
Post office
TDT express, VNPT, DHL, FedEx, TNT...door-to-door delivery service
Medicare
10 km to Hai Duong General Hospital
Police, public security
24/7 security service. The guards of Lai Cach IZ cooperate with the local polices supports to
ensure the security for the whole industrial zone.
Universities, training
facilities, etc.
8 km to Hai Duong University.
Recruitment
Worker dormitory
Worker's child education
facility
One-stop service
Road Width
IT & Tele-communication
Facilities
The labor forces from local and from neighboring provinces (Bac Ninh, Thai Binh, Hung Yen,
Hai Phong, Quang Ninh...). It is easy to find the workers whom you need in the vicinity.
Housing, villa for experts/ employees are working in the IZ
8 km to preschool.
Nam Sach IZ has One-stop service
Main road: 16.5 m, other road: 13.5 m
Telecommunication: broadband ADSL service, telecommunication with IDD, fiber optic
capabilities, leased line
Telephone: number of line depend on investor’s demand.
Emergency Power generator
Available
Fire-fighting facility
Available
Layout Plan
Location Map
464
Actual View
LIST OF TENANTS
No.
Company name
Nationality
Business line
1
Co., Ltd. Chyun Jaan
Taiwan
2
Haivina Company Limited
South Korea
3
Baifar Hai Duong Wood Co., Ltd Vietnam
China
4
AP Packaging Co., Ltd (Hanoi)
Thailand
5
Tinh Loi Garment Company Limited
Hong Kong
6
May Ever-Glory Company Limited
China
Producing and trading in products made of
plastic and rubber
Production of sports gloves, industrial
gloves, sports clothes, all kinds of shirts and
sports apparel
Manufacturing and processing plywood
products. Performing the right to export,
import, and wholesale distribution of goods.
Manufacture, print all kinds of cartons,
corrugated carton sheets and hard forms
Manufacturing and trading all kinds of
garment products from textile, knitted, wool
and raw materials for textile industry
Production of scale clothing
7
VN Toyodenso Company Limited
Japan
8
Viet Tuong Company Limited
Samoa
9
Aiden VN Company Limited
Japan-Hong
Kong
10
Vina Okamoto Company Limited
Hong Kong
11
LFV Metal VN Company Limited
Taiwan
12
First Company - Hai Duong Plastic Chemical
Company Limited
Dusco vina steel yarn processing company
Taiwan
13
14
South Korea
Nam Quang Infrastructure Development and
Investment Joint Stock Company
Vietnam
465
Manufacture parts for cars; multi-purpose
parts; Production of ignition coils
Producing carpet type 4m / m; Flame
retardant preparations
Manufacturing circuit boards in PCB,
electrical and electronic products; electrical
and electronic components; design, drawing
drawings and CAD and CAM data for molds
of plastic and metal products;
Producing all kinds of shoes, boots and
gloves; raincoats and wind jackets;
Performing commercial rights
Producing all kinds of glass products;
aluminum door; aluminum windows; door
push; aluminum tiles
Production of plastic pipes and PVC, HDPE,
PPR connectors
Producing steel fibers
Embellish the ground for construction of
traffic infrastructure system, power supply,
water supply, communication, wastewater
15
Green Environment Trading Service Co., Ltd
Vietnam
16
Hong Gia Joint Stock Company
Vietnam
17
Vina Feed Joint Stock Company
Vietnam
18
An Phat Plastic and Green Environment Joint
Stock Company
Vietnam
466
treatment ... to attract investors to build and
trade in industrial zones.
Industrial waste treatment plant
Fabrication of weaving, dyeing, stretching,
sewing into tulle curtain products
Producing and processing animal feed pellets
Investing production lines according to
modern Japanese technology and equipment
to produce high quality plastic packaging
PHUC DIEN INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Area
Minimum wage
Lease term
Minimum Lease Area
Limit for Construction
Height
▪ Cam Phuc Town, Cam Giang District, Hai Duong city
Nam Quang Invesment and Development JSC
▪ Address: Nam Sach IZ, Ai Quoc Ward, Hai Duong
▪ Tel: (84-220) 3 570 666
▪ Email: namquanghd@gmail.com/ namquang@vidgroup.com.vn
▪ Mr. Huan – Sales Department – (84) 989 768 586 – huannm2@tniholdings.vn
/huan792003@gmail.com
- 40 Km from Hanoi Capital
- 75 Km from Noi Bai International Airport
- 68 Km from Hai Phong Seaport, 127 km from Cai Lan Quang Ninh Sea Port
Priority Sectors for
Investment
High-tech industry, clean industry, light industry, and supporting
industry.
Restricted Sectors
for Investment
Restricted heavy industry, industries affecting the enviroment
[Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019
▪ Start date: 2003
▪ End date: 2053
1 ha
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residental
Planning regulation (QCXDVN 01: 2008/BXD)
Permitted Construction
Rate
Planned area
Factory Available for Rent
▪ Total area: 82.88 ha
▪ Total area: NA
Operation Status
▪ In operation
Occupancy Rate and
Number of Projects
▪ 100%
▪ 28 projects
Number of Korean Projects
Lease fee
Operating fee
None
▪ Land lease fee: Depending on location
▪ Management fee: 0.35/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 15,000 VND (~0.64 USD)/m3
▪ Wastewater treatment fee: 5,633 VND (~0.25 USD)/m3
INFRASTRUCTURE AND FACILITY
Financial institution
Tax service, State finance
office
Vietcombank, VietinBank
15km from the nearest State Tax and Finance Agency
15km from the nearest Customs Agency
Customs Service
15km from the nearest Inland Container Depot
Logistics
Post office
5km from the nearest Logistic Center
3km from the nearest Mailing Post Office
467
Medicare
3km from the nearest local clinic
Police, public security
2km from the nearest Police Station
Universities, training
facilities, etc.
15km from the nearest Universites and Training Center + University of Economic and
Technology, University of Medical/ Hai Duong vocational School
Recruitment
Recruitment support service available
Worker dormitory
Worker dormitory available within IP
Worker's child education
facility
One-stop service
Road Width
IT & Tele-communication
Facilities
Emergency Power
generator
Fire-fighting facility
2km from the nearest Facility
15km from the nearest Hai Duong provincial Facility
Widths of main road system of the IZ are 30m and 23.25m. Branch road’s width is 17.5m. The
road system in the industrial park is completely asphalted with concrete and is illuminated by
modern high pressure lamps.
The internal telecommunication network is connected from the industrial zone’s switchboard to
factories through the underground cable system to ensure high-speed, uninterrupted transmission
of information. Other services such as the Internet, mail, newspapers are provided by the postal
service network of Hai Duong province.
The water supply network for firefighting is designed in conjunction with the potable water
supply network, which is located along the roads. The distance among fire hydrants is 120m 150m with a diameter of D125mm.
Available
None
Layout Plan
Location Map
Actual View
468
469
LIST OF TENANTS
No.
Company name
1
Towada VN Electronic Co., Ltd
2
Brother Vietnam Industrial Company
Limited
3
Nissei VN Technology Company
Limited
Taisei Hanoi Electronic Company
Limited
4
Nationality
Business line
Hong Kong
Manufacturing and trading in manufacturing and
assembling electric and electronic components and
equipment; high-tech digital equipment and
products; machinery, equipment, tools and fixtures
for production, business, manufacture and assembly;
outsource processing of materials, components and
products for the above business activities
Manufacture all kinds of printers, fax machines,
electronic devices and multi-functions; types of
accessories and spare parts; research and
development activities; repairing and re-exporting
these products to foreign markets
Manufacturing plastic lenses; metal parts; molds;
Machining components and mold details
Producing electric wires, sheathed wires and electric
wire sheaths; electric and electronic machinery,
equipment, components; producing all kinds of raw
materials for production of the above-mentioned
products; Commercial rights
Production and assembly of springs, stroke switches
and technical axes
Production of textile products
Japan
Singapore
Japan-Hong Kong
5
Matex VN Company Limited
6
Kim Thuy Phuc Company Limited
China
7
Atarih Precision Vietnam Co., Ltd.
Japan
8
Mizuho Precision Vietnam Co., Ltd.
Japan-Hong Kong
9
Siam Steel VN Company Limited
10
Kuroda Kagaku VN Company
Limited
11
Vinh Han Precision Technology
Vietnam Co., Ltd.
12
Viet Nhat Transport Company
Limited - Hai Duong Branch
13
Posco Vietnam Holdings Company
Limited
Japan-Korea
14
Branch of Aureole BCD Company
Limited
Leo VN Electronics Company
Limited
Japan
15
16
Meijitsu Tongda VN Company
Limited
Hong Kong
Thailand-Japan
Japan
Taiwan
Japan - Vietnam
Hong Kong
Japan
470
Manufacture precision mechanical stamping parts;
production of molds and mold details; exercise the
right to import and export, wholesale distribution and
retail of registered goods
Manufacturing, trading and assembling all kinds of
injection molds and molds, metal springs, precision
shaft springs for automatic office equipment and
other machinery and electronic equipment; stamping
parts, spare parts and components for other types of
automatic office equipment.
Producing, manufacturing and assembling products
from rolled steel; perform stamping, punching,
shaping, bending, cutting, and cutting products of
steel products
Manufacturing, processing, assembling and selling
parts, details, plastic components for automatic
office equipment and other electrical and electronic
equipment; plastic components used for transport
vehicles; Precision molds and parts for molds.
Mold manufacturing; mold machining and repair;
manufacturing, processing and repairing plastic
components; mold parts
Building warehouses with a scale of 4,370m2;
import and export goods delivery and transport
services, and goods loading and unloading charges
Producing and processing steel products; Sublease
excess factory built; Carrying out activities of buying
and selling goods
Manufacturing plastic components used in cars and
in electronic components
Manufacture of high-tech metal parts, parts and
components; pressed metal parts; molds; mechanical
and electronic products
Manufacturing and processing all kinds of labels and
decals; perform import and export rights and
distribution
17
SSK VN Company Limited
18
20
Sanyu Seimitsu Vietnam Company
Limited
Fuji Seiko Vietnam Company
Limited
Teikoku VN Company Limited
21
Honwu VN Co., Ltd.
22
Jupiter VN Logistics Joint Stock
Company
Japan - Vietnam
23
Arion Electric Company Limited
Japan
24
Fit VN Company Limited
25
Fuji Chemi Vietnam Company
Limited
26
Nam Quang Investment and
Construction Joint Stock Company
Vietnam
27
Vietnam Lifting Equipment Joint
Stock Company
Vietnam
28
Truong Phu Joint Stock Company
Vietnam
19
Japan
Japan-Taiwan
Hong Kong
Japan
Taiwan
Hong Kong
Japan
Manufacture electrostatic brushes; producing decals,
adhesive tapes of all kinds; sponge production;
factory lease
Production of electrical and electronic components,
plastic parts and products
Manufacture all kinds of shaft, shaft, spring and
screw parts; Other parts, details, components
Manufacturing all kinds of components in
photocopiers, fax machines; machining of office
machine parts; Other surface treatment
Manufacturing, processing and processing shoe
boxes; packing box; cans; packing paper, paper
sacks, paper plates, hangers, shoe covers, cartons,
paperboard, lining, foil, gift wrap, paper tray;
products made of paper pulp or paperboard,
sandpaper, paper bags, lock bags and paper.
Producing and trading in plastic products. Produce
and trade user manuals for the above products.
Trading and providing warehousing and storage
services; providing and trading transportation
services
Production of control equipment, components and
parts
Manufacturing and trading plastic parts and
components for electronic products, office machines,
household appliances and others. Excessive office
and factory leasing. Implementing the right to export
and import and distribute components according to
HS code registered
Execute import and export rights and distribution
rights for new chemical and materials products and
synthetic plastics for industrial use
Embellish the ground for construction of traffic
infrastructure system, power supply, water supply,
communication, wastewater treatment ... to attract
investors to build and trade in industrial zones.
Constructing workshops to manufacture, sell, install
lifting and lowering equipment, conveying
machinery and equipment for industrial, agricultural,
transportation, mechanical and automation industries
to meet domestic market
Production of telecommunication cables of all kinds
[- This Page is intentionally left blank -]
471
HAI PHONG
472
INVESTMENT ENVIRONMENT IN HAI PHONG
GENERAL INFORMATION
Area, Population
▪ Area: 1,526 km2
▪ Population: 2.09million (2022 statistic)
Geographical Location
▪ Located in the Northeastern region of Vietnam.
▪ Located105 km from Ha Noi.
Adjacent provinces
▪ To the north: Quang Ninh province
▪ To the west: Hai Duong province
▪ To the east: Bac Bo bay
▪ To the south: Thai Binh province
GRDP
Industry growth
PCI
2022 statistic:
▪ GRDP: 365,000 billion VND
(14.6 billion USD)
▪ GRDP growth: 12.32%
▪ GRDP per capita: 7,517 USD/year
▪ Economic structure:
- Industry - Construction: 53.68%;
- Agriculture. forestry and fishery: 3.61%;
- Service: 36.98%;
- Tax on Goods: 5.73%
2022 statistic:
▪ Industry - Construction growth: 15.56%
▪ Agriculture, forestry and fishery growth: 1.21%
▪ Service growth: 9.06%
▪ Score: 70.76 – ranked 03 out of 63 cities and provinces in Vietnam. (2022)
▪ Score: 70.61 – ranked 02 out of 63 cities and provinces in Vietnam. (2021)
SOCIAL INFRASTRUCTURE
Transportation
▪ Roadway:

National way: QL5, QL10, QL37

Highway: Ha Noi – Hai Phong, Ha Noi – Quang Ninh

Highway at the seaside: Quang Ninh – Hai Phong – Ninh Binh
▪ Railway: Ha Noi – Hai Phong
▪ Inland waterway:2,700 km, account for 40% national inland waterway; connect to
almost provinces in the North of Vietnam
▪ Seaway:

125km long coastline

Port city with 35 seaports

Lach Huyen international deep-water port; have sea freights direct routes
to Europe (33 days), Eastern US (45 days), Western US (25 days), India
(18 days)...
▪ Airway:

Cat Bi international airport

Domestic flights to: Da Nang, Pleiku, Buon Ma Thuot, Nha Trang, Phu
Quoc, Ho Chi Minh City.

International flights to: Incheon (Korea), Osaka (Japan), Bangkok
(Thailand), Singapore.
Hai Phong 1 & 2 Thermal Power Plant located in Tam Hung commune, Thuy
Nguyen district, Hai Phong city:
Electricity



Capacity of 4x300MW
Total investment of more than 1.2 billion USD equivalent to about
24,000MW
Producing 7.2 billion kWh electricity each year, providing a large amount
of electricity for the national grid.
473

The power production cycle of the plant includes 2 main equipments:
boiler and turbine, generator with power transmission system including 2
distribution 220kv and 110kv.
Water
8 water treatment plants in Hai Phong with a total capacity of 380,000 m3/day can
serve all kinds of needs with water quality up to WHO standards. Furthermore, in
each rural district, there are small water treatment plants that meet all local needs.
Education
▪ 05 universities and academies, 02 research institutes, 16 colleges, 26 junior colleges
and nearly 60 vocational schools in the city
Medicare
▪12 hospitals and 04 institutes
INVESTMENT CONDITION
Human resource
▪ 50.2% of population are in the working age (2022)
Education level
▪ Trained labor rate: 35% (2022)
Salary
▪ The minimum salary for the city is applied as follows:
- Area I: 4.680.000 VND
▪ The lowest wage for trained labor (including those trained by the enterprises) must
be at least 7% higher than the above referenced basic salary
Investment incentives
a. Offers in Economic Zones
- 10% corporate income tax rate for 15 years; Tax exemption for 4 years, 50%
reduction of payable tax for the next 9 years;
- Exemption from land rental to serve investment projects during capital construction
under projects approved by competent authorities, but not exceeding 03 years from
the date of issuance of land lease decisions.
- Tax exemption for goods imported to create fixed assets, raw materials, supplies
and components imported for production of the project.
b. Incentives in industrial zones outside economic zones
- Corporate income tax rate of 17% for 10 years; Tax exemption for 2 years, 50%
reduction of tax payable for the next 4 years;
- Exemption from land rent in accordance with current law
- Tax exemption for goods imported to create fixed assets, raw materials, supplies
and components imported for production of the project.
c. Incentives for Export Processing Enterprise (EPE)
Apply incentives to goods of export processing enterprises, exempt from export tax,
import tax and value added.
- Conditions of preferential treatment:
+ Production projects specialized for export;
+ Register for operation as an export processing enterprise according to the
provisions of law.
Fields Attracting Investment
Hi-tech industry, seaport - logistics, tourism - trade; focusing on attracting large and
high-tech projects that play a leading role and make great contributions to the city.
Contact
Hai Phong Economic Zone Authority
▪ Address: 24 Cu Chinh Lan street, Hong Bang district, Hai Phong city.
▪Tel:(+84) 02253.569.170
▪ Fax :
▪ Email: banquanlykkt@haiphong.gov.vn
▪ Contact person: Mr. Le Trung Kien – Chairman
LIST OF INDUSTRIAL ZONES
No
Industrial zone Name
Total Area (ha)
Occupancy Rate
Status
1
Trang Due industrial zone
394.27
97.97%
In operation
2
Japan – Hai Phong industrial zone
153
100%
In operation
3
MP Dinh Vu industrial zone
234.1
96.97%
In operation
474
4
Dinh Vu industrial zone
541.46
96.73%
In operation
5
Do Son Hai Phong industrial zone
155.2
96.91%
In operation
6
An Duong industrial zone
196.1
83.26%
In operation
7
VSIP urban, industrial and trading zone
507.6
76.07%
In operation
8
Industrial zone and marine services
132.7
92.6%
In operation
9
Nam Cau Kien industrial zone
263.47
54.4%
In operation
10
Nam Dinh Vu non-tariff and industrial
zone (zone 1)
Nam Dinh Vu industrial zone (zone 2)
1,329.11
29.27%
In operation
513.4
20.57%
In operation
526.81
2.44%
In operation
13
Hai Phong international gateway port
industrial zone
Xuan Cau non-tariff and industrial zone
751.95
0%
Under legal
14
Tien Thanh industrial zone
410.46
0%
Under legal
11
12
475
LIST OF PLANNING INDUSTRIAL ZONE TO 2030
No
Industrial zone Name
No
Industrial zone Name
1
Trang Due 3 industrial zone
7
Tien Lang 1 & 2 industrial zone
2
Cau Cuu industrial zone
8
Nam Trang Cat industrial zone
3
Giang Bien industrial zone
9
Cai Trap Island industrial zone
4
An Hoa industrial zone
10
Thuy Nguyen industrial zone
5
Vinh Quang industrial zone
11
An Hung – Dai Ban industrial zone
6
Kien Thuy industrial zone
12
Nam Cau Kien 2 industrial zone
LOCATION MAP OF INDUSTRIAL ZONES AND ECONOMIC ZONE
476
DEEP C INDUSTRIAL ZONES
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Sectors
Minimum wage
Lease term
Minimum Lease Area
Dong Hai 2 Ward, Hai An District, Hai Phong city
Name of Investor: DEEP C Industrial Zones
▪ Address: Harbourview Office Tower, 12 Tran Phu, Hai Phong city, Vietnam
▪ Tel: +84 2253836169
▪ Email: info@deepc.vn
▪ Website:www.deepc.vn
Koo Hyeji – Head of Korea Desk - +82 10 9792 3302 – hyeji.koo@deepc.vn
Adjacent location
- 07 km from city center;
- 05 km from Cat Bi internationalairport;
- Directly connected to Hai Phong Port; 15km to Lach Huyen Deep Sea Port (100,000 DWT
vessel)
- Directly connected to Hanoi – Hai Phong – Quang Ninh – China Border expressway
Priority Sectors for
Renewable Energy, Electronic, Mechanical, Petrochemical.
Investment
Investment Restricted
Follow restricted industry list of Hai Phong city
Sectors
Area 01According to Decree 38/2022/ND-CP
▪ Start date: 06/05/2009
▪ End date: 06/05/2059
10,000 m2
Limit for Construction
Height
Following regulation of Airport Height Safety Limit
Permitted Construction
Rate
Planned area
60%
Factory Available for Rent
▪ Total area: 1,500
▪ Total vacant leasable area: 750
▪ Total area with full infrastructure ready to build factory:400
▪ 200,000 m2 Ready built Factory from Sub-Developers (BW, KCN, Core5)
Operation Status
Ready for lease
Occupancy Rate and
Number of Projects
140+ Projects
50% occupancy
Number of Korean projects
21
Lease fee
▪ Land lease fee: Depend on location, size
▪ Factory lease fee: Depend on location, size
Operating fee
▪ Management fee: to be discussed
▪ Electricity fee: follow EVN rate
▪ Water fee: 20,200 VND/m3
▪ Wastewater treatment fee: to be discussed
▪ Waste treatment fee: to be discussed
477
Layout plan
INFRASTRUCTURE AND FACILITY
Banking service inside Industrial Zone
2km to Custom Agency
Logistic Center within Industrial Zone
Petrochemical Zone within Industrial Zone
Strong cooperation with Local Universities& Vocational school
List of Korean Projects in DEEP C Industrial Zones
No.
Name of Company
Business line
1
Daesun Vina Co., Ltd
Portable Butane gas
2
Dong Nam Petrovina Co., Ltd
Insulating oil
3
YTG Vina Co.,Ltd
Bobbin Manufacturing
4
INNOREX Vina Co., Ltd
Automotive parts
5
Pantra Vina Co., Ltd
Rubber parts for automotive
6
Suhil Vina Co., Ltd
Optical cable components
7
KFS Vina Co., Ltd
Casting & Molding facilities
8
Haewon Vina Co., Ltd
Automotive parts
9
PHA VIETNAM Co., Ltd
Automotive parts
10
YMP PLUS COMPANY LIMITED
Automotive parts
11
Dong Yang Vina Industry Co., Ltd
Automotive parts
12
Mi Chang Vietnam Company Limited
Automotive parts
13
SEM DIAMOND CO., LTD
Diamond precision Tools
14
SEM MICRO CO., LTD
Precison tool for semiconductor
15
Ecoluxveko Co., Ltd
Lighting Assembly
478
16
G Food Co., Ltd
Sesame Oil
17
LS Metal VINA
Copper Pipe
479
TRANG DUE INDUSTRIAL PARK
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Sectors
Minimum wage
Lease term
Minimum Lease Area
Limit for Construction
Height
Permitted Construction
Rate
Planned area
Factory Available for Rent
Operation Status
Occupancy Rate and
Number of Projects
Le Loi Commune, An Duong District, Hai Phong City
Sai Gon – Hai Phong Industrial Park Corporation
▪ Address:Le Loi Commune, An Duong District, Hai Phong City
▪ Tel: (+84.225) 324-2668
▪ Email: info@trangdue-ip.com.vn
▪ Website:trangdue-ip.com.vn
Contact Name: Nguyen Thi Hong Hanh
Position: Sales and Marketing Director
Mobile: (+84) 982-990-505
Email: hanh.nguyen@trangdue-ip.com.vn
+ Distance to Ha Noi Capital: 102km
+ Distance to Hai Phong City Center: 15km
+ Distance to Cat Bi International Airport: 15km
+ Distance to the Ha Noi – Hai Phong Railway station: 15km
+ Distance to Thuong Ly river port: 15km
+ Distance to the Hai Phong seaport: 15km
Priority Sectors for
Investment
High-tech fields, Supporting industries, Industries producing
environmentally friendly products, etc.
Investment Restricted
Sectors
Textile Dyeing
The minimum wageapplying toRegion 1in accordance with Decree No. 38/2022/ND-CP
issued on 01/07/2022 is VND 4,680,000/person/month
50 years:
- Trang Due IP phase I: 2006-2056
- Trang Due IP phase II: 2014-2064
- Trang Due 3 IP: Expected 2023-2073
- Minimum rental area (m2):
+ Land lease: 20,000m2
+ Warehouse for rent: 6,000m2
+ 4.0m +/- 0,1m
70% total subleased land area
- The total area (m2 or hectare): 1,088ha in which:
- Trang Due Industrial Park Phase 1: 187ha
- Trang Due Industrial Park Phase 2: 214ha
- Trang Due 3 Industrial Park: 687ha
- The area available for rent (m2 or hectare): 687ha
+ Trang Due Industrial Park Phase 1&2: 100% occupied.
+ Trang Due Industrial Park 3: 687ha
+ Warehouse: 12,000m2
- Operation status (as of end of 2020):
+ Trang Due Industrial Park Phase 1&2: 401ha (100% active)
+ Trang Due Industrial Park 3: 687ha (Under legal procedures)
- The rate of occupancy % (as of end of 2020):
+ Trang Due Industrial Park Phase 1&2: 100% occupied.
+ Trang Due Industrial Park 3: 0% (under legal procedures)
-Number of projects: 112 projects
480
Number of Korean
projects
Lease fee
Operating fee
▪ ~70 projects
▪ Land lease fee:
▪ Factory lease fee: 5 USD/m2/month (not including VAT)
▪ Management fee: 0.5 USD/m2/year
▪ Electricity fee:
+ Peak hours: 2,871 VND/Kwh
+ Normal hours: 1,555 VND/Kwh
+ Idle hours: 1,007 VND/Kwh
▪ Water fee: 21,500 VND/m3 (not including VAT)
▪ Wastewater treatment fee: 13.000 VND/m3
▪ Waste treatment fee:
Layout plan
INFRASTRUCTURE AND FACILITY
Financial institution
Tax service, State finance
office
Customs Service
Distance from the nearest Banking: SHINHAN BANK, WORRIBANK inside the IP (0.5km)
Distance from the nearast State Tax and Finance Agency: 5km
Distance from the nearest Customs Agency: 18km
Distance from the nearest Inland Container Depot: 27km
Logistics
Distance from the nearest Logistic Center: 35km
Post office
Distance from the nearest Mailing Post Office: 5km
Medicare
Distance from the nearest Hospital: 4km
Police, public security
Distance from the nearest Police Station: 1.5km
Universities, training
facilities, etc.
6km
Recruitment
Worker dormitory
Support recruitment
Distance from the nearest Facility: inside the IP (0.5km)
Worker's child education
facility
Distance from the nearest Facility: 4km
One-stop service
Distance from the nearest Facility: 3km
481
Road Width
Communication
Infrastructure of
industrial park
+ Main road: 40m (6 car lanes)
+ Branch road: 23m
Available
Emergency Power
generator
Available
Fire-fighting facility
Available
List of enterprises in Trang Due Industrial Zone
No.
Name of Company
Business line
Nationality
1
Tan Huy Hoang
Manufactory of foam, foam helmet liner
Viet Nam
2
HP 2 Painting Co.,Ltd
Producing powder coating, water paint
Viet Nam
3
VLC packaging JSC
Producing PP woven fertilizer
Viet Nam
4
SIVICO JSC
Viet Nam
5
Asia plastic JSC
Manufactory of high-end packaging and reflective
road marking paint
Producing plastic pipe
6
Manufactory of shoes and leather products
7
Hai Phong International Fashion
company
EH Hai Phong Viet Nam Co.,Ltd
8
Hoang Nam Co.,Ltd
Manufactory of wood chipboard
Viet Nam
9
Bucheon Viet Nam Co.,Ltd
Manufactory of electrical cable
Korea
10
Dongjin Techwin Vina Co,Ltd
Korea
11
Crystal Sweater Viet Nam Co.,Ltd
Manufactory of plastic components, electronic
components, household electronic products and preprocessed plastic beads
Project on manufacturing shirt products
12
LG Electronic Viet nam Hai Phong
Co.,Ltd
13
Kansai Felt VN Co.,Ltd
14
Steelflex Co.,Ltd
15
16
Dong Yang Hai Phong Electronics
Co.,Ltd
Bluecom Vina Co.,Ltd
17
Dong Do Electronics Hai Phong Co.,Ltd
18
Samnec International JSC
19
Meiko Viet Nam Co.,Ltd
20
Aichi Tokei Denki Viet Nam Co.,Ltd
Manufactory of animal feed
Project of high-tech electronic products, automotive
electronic components, energy-saving household
goods production…
Manufactory of components for automotive &
computer drives and other devices, components in
electrical devices
Manufacture and assembly of combined frames,
transmission equipment and electrical components for
interior products
Project on manufacturing electronic products' details,
spare parts and plastic components
Manufactory of TV speakers, vibration motor (for
phone), bluetooth headsets
Project of electronic factory DongDo produces
printed circuit boards for mobile phone, battery
charger for mobile phone and other products
Manufacture and assembly of electric fans, steam fans
Manufactory of plastic components, assembly plastic
sheet and plastic molding for office machinery
equipments
Factory of processing and assembling components,
semi-finished products and finished products of gas
meters, electronic water meters, mechanical water
meters.
482
Viet Nam
Japan
UK
Hong Kong
Korea
Japan
Italia
Korea
Korea
Korea
Viet Nam
Japan
Japan
21
Trang Due transportation JSC
Construction and business operation of factories and
warehouses
Producing labels and packages, antibacterial and antimildew agents.
22
Baoshen Viet Nam Printing Co.Ltd
23
Insung Hivina Co.,Ltd
24
Kyowa Plastic Industry VN Co.,Ltd
25
26
Steel Flower HP Electronics &
Machinery Co.,Ltd
Heang sung Electronics Co.,Ltd
27
Heesung Electronics Viet Nam Co.,Ltd
28
Halla Electronics Vina Co.,Ltd
29
Comet Viet Nam Co.,Ltd
30
Hoang Hai Viet Nam packaging JSC
Factory of manufacturing and assembling electronic
circuit boards, electronic boards for electronic
products, telephones, IVI and home appliances
Factory manufacturing and assembling components
for automatic positioning liquid crystal modules,
manufacturing induction plates, and automatic
positioning light guide plates
Manufacturing components for cell phones and
accessories for cars
Projects on manufacturing electrical, electronic
components, mechanical and mold
Manufactory of carton packaging
31
Sungwoo Tech Vina Co.,Ltd
Manufacturing electronic components
Korea
32
Ohsung vina Co.,Ltd
Manufacturing accessories for LED screens and
OLED TVs
Korea
33
Công Ty TNHH Hansung PTC Vina
34
LG Display Vietnam Haiphong Co.,Ltd
35
HT solar Viet Nam Co.,Ltd
36
WooSung Electronics VN Co.,Ltd
37
HKT Electronics Viet Nam Co.,Ltd
38
HKTM Vina Company
39
Thien Bao Hai Phong Co.,Ltd
40
HS Color Co.,Ltd
41
Ilshintech Việt Nam Co.,Ltd
42
SL Electronics Co.,Ltd
43
DongA-Hwasung Co.,Ltd
44
LG Innotek VNHP Co.,Lyd
45
Seongho Tech vina Co.,Ltd
46
EST Vina Co.,Ltd
47
Products plastics Jingguang Co.,Ltd
Manufactory of plastic products, molds, plasticmechanical jigs for electronics, automobiles and other
industrial products.
Project for steel product production
Viet Nam
Hong Kong
Japan
Korea
Korea
Korea
Korea
Korea
Viet Nam
Korea
Manufacturing and processing plastic OLED screens
for mobile devices, smart watches, tablets, OLED TV
screens
Projects on manufacturing batteries and solar panels
Korea
Manufacturing electronic components for mobile
phones and motor vehicles
Manufacturing components for mobile phones,
components for infotainment systems on vehicles.
Manufacturing conveyor belts and factory automatic
machines and providing maintenance services by
conveyors and automatic machines used in factories.
Manufacturing safety fence, automation system, ...
Construction and business operation of factories
Korea
China
Korea
Korea
Viet Nam
Manufacturing components for mobile phones,
components for infotainment systems on vehicles.
Manufacturing accessories for mobile phones,
printing on adhesive tape products, nylon, board used
for phone screens, printing on electronic components
Projects on manufacturing washing machine
accessories, refrigerators, motor vehicles
Project on manufacturing plastic products, processing
plastic molds, processing rubber products, processing
metal molds
Manufactory of camera module
Korea
Assembling and processing heat presses used in the
manufacture of electronic products. Assembling and
processing automatic assembly machines for
telephone components and other products
Manufacturing, processing racks, legs, shells ... used
in television and other electronic devices,
manufacturing nail, screws, metal sheet presses
products
Manufacturing and processing plastic components for
electronic products
Korea
483
Korea
Korea
Korea
Korea
Korea
China
48
Serveone (Viet Nam) Co.,Ltd
Warehousing
Korea
49
0Kr Ems Viet Nam Co.,Ltd
Electronic production
Korea
50
LG Chem Engineering Plastics Co.,Ltd
Plastic beads production
Korea
51
K&P Electronics Việt Nam Co.,ltd
Circuit boards for camera modules production
Korea
52
Chin Hung Việt Nam Co.,Ltd
Manufacturing products from silicon
China
53
Seiyo Hai phong Co.,Ltd
Plastic components production
China
54
Re-tech Hai Phong Co.,Ltd
Recycling, processing electronic components
55
Bao Nam investment development
services JSC
YoungHo Eng Vina Co.,Ltd
Renting office
Viet Nam
Renting office
Korea
Renting office
Viet Nam
58
Thuan Thien Service International
Co.,Ltd
J2 Engineering Co,Ltd
Renting office
Viet Nam
59
Bach Thao Duoc Co.,Ltd
Pharmaceutical production
Viet Nam
60
Groll Plywood Viet Nam Co.<ltd
Plywood production
China
61
Công ty TNHH SM Tech Việt Nam
High technology, metal components
Korea
62
Taesung Engineering vina Co.,Ltd
Camera components
Korea
63
JCV Corp co.,Ltd
Fake nails production
Korea
64
Tuong Vien Grandpark Co.,Ltd
Construction and business operation of factories
Viet Nam
65
Central pharmaceuticals No.3 company
Pharmaceutical
Viet Nam
66
AP-Tech Viet Nam Co.,Ltd
Electronic components
Korea
67
Yesun Tech Viet Nam Co.,Ltd
Gaskets and adhesives production
Korea
68
Primzen electronics Co.,Ltd
China
69
Power seven Tech JSC
Manufacturing connecting equipment in electronic
components
Electronic components production
70
Van Long Co.,Ltd
Technical plastic production
71
Dunam Chemistry Vina Co.,Ltd
Plastic beads production
Korea
72
Goda Intenational Co.,Ltd
Electronic components production
Taiwan
73
Ourhome Co.,Ltd
Food production
Korea
56
57
484
US
China
Viet Nam
485
NAM DINH VU INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Sectors
Dinh Vu-Cat Hai Economic Zone, Dong Hai 2 Ward, Hai An District, Hai Phong City,
Vietnam
Sao Do Investment Group JSC
▪ Address: No. 768B Ngo GiaTu Street, Thanh To Ward, Hai An District, Hai Phong City,
Vietnam
▪ Tel: (+84) 965 469 469
▪ Email: sales@saodogroup.com
▪ Website: Namdinhvu.com/saodogroup.com
Name - Position - Mobile: - Email:
[Mrs. Tran Thi To Loan–Deputy Director–(+84) 945226868 – loantt@saodogroup.com]
Adjacent location [Cáckhuvựcxungquanh]
- 10 km from Hai Phong city/ 100km from Hanoi the capital;
- 15 km from Cat Bi International airport;
- 0 km from Nam Dinh Vu port which is located inside the industrial park;
- 7km km from Hanoi – Hai Phonghighway/..
Priority Sectors for
Investment
Investment Restricted
Sectors
Minimum wage
Lease term
Minimum Lease Area
Limit for Construction
Height
Permitted Construction
Rate
Planned area
Factory Available for Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean projects
Lease fee
- Logistics, warehousing
- Car parts
- Electronics, electrical parts, high technology products,
industrial products supporting high-tech industry
- Mechanism
- Plastic& packaging products
- Oil & gas
- Light industry
Follow the list of restricted project of Hai Phong city
Region 1: VND 4,680,000/monthAccording to Decree 38/2022/ND-CP
▪ Start date: 06 May 2009
▪ End date: 06 May 2059
10,000sqm
-
Factory: 2-3 floors
Office, Commercial & service area: up to 9 floors
70%
▪ Total area: 1329ha
▪ Total vacant leasable area: 300ha
▪ Total area with full infrastructure ready to build factory:50ha++
▪ Totalarea 10,600sqm.
Many tenants inside the industrial park providing a large number of factory for rent
▪ Active/Under Construction/Under Construction and to be completed by {year}/In Land
Clearance Process
Active
▪ Phase 1 (370ha): 100% occupied
 Phase 2 (960ha): Phase 2.1 (220ha) 80% occupied. Phase 2.2 (280ha) under infrastructure
construction. Remaining one develop in the future
▪6
▪ Land lease fee: USD105/sqm
▪ Factory lease fee: USD4.5-5/sqm/month
486
▪ Management fee: VND 1,400/sqm/month
▪ Electricity fee: Follow EVN price + 1-3% operation fee
▪ Water fee: VND 16,300/m3 + 3% operation fee (~VND 500/m3)
▪ Wastewater treatment fee: VND 12,000/m3
▪ Waste treatment fee: Collected and calculated by Urban Environment Company
Operating fee
Layout plan
INFRASTRUCTURE AND FACILITY [CƠ SỞ HẠ TẦNG]
Distance from the nearest Banking, nearest State Tax and Finance Agency, nearest Logistic Center, Universities,
training facilities, etc., Road Width,…
Distance from the nearest banking: 4km
Nearest State Tax & Finance Agency: 15km
Logistics Center: There are many companies doing different kind of logistics inside the Industrial Park such as warehouse for
lease, cold storage, depot, CFS warehouse, parking area, etc.
Distance to nearest Universities: 15km
Road Width: 23 – 34 – 46m
Nam Dinh Vu International Seaport & Liquid Jetties located inside the industrial park saving logistics cost
List of Projects in Industrial Zone
No.
Name of Company
Nationality
Business line
1
Nam Dinh Vu Port
Vietnam
Seaport Operation
2
Hai Phong Port Services
Vietnam
Cold Storage & Container yard
3
Pan Hai An
Vietnam & Korea
Container yard
4
Polyfill
Vietnam
Plastic Bead (PE, PP)
5
Bac Viet
Vietnam
Metal processing
6
GLC
Taiwan
Air purifier system
7
VICO
Vietnam
Homecare, Bodycare
8
SIVICO
Vietnam
Traffic Paint
9
Wiseland
Hong Kong
Packaging
10
Tapetco
Vietnam
Jet Fuel storage
11
Iteco
Vietnam
LNG storage
12
Tam Cang
Vietnam
Container yard
13
PVOil
Vietnam
Petrol station
14
Thien Luong
Vietnam
Car parking
15
Hisun
China
Terrain vehicle assembling
16
Yunjia
China
PVC film
17
PolyStyrene
Taiwan
Plastic Bead (EPS, PP, PS)
487
18
Arnova
Korea
Paint for construction
19
Yoshino
Japan
Gypsum board
20
JTS
Korea
Electronics parts
21
BW Industrial
Vietnam
RBF
22
An Phat
Vietnam
Plastic Bead (PBAT)
23
TuongVien Group (TVG)
Vietnam
RBF & BTS Factory
24
Sea Logistics (SLP)
Singapore
Warehouse for lease
25
Build Up
Hong Kong
Clothes hanger
26
Greenworks
China
Gardening tools
27
Allan Logistics
Vietnam
Warehouse for lease
28
TTC
Vietnam
Warehouse for sugar
29
Gaw NP
Hong Kong
RBF
30
JD Property
China
Warehouse for lease
31
Dong Li
China
Packaging
32
Viet Phap Steel
Vietnam
Steel sheet, pipe
33
ESR
Singapore
RBF
34
Jeil
Korea
Cold Warehouse, Container Yard
35
Samsung Engineering AMECC
Vietnam & Korea
Steel Structure
36
Doosan
Korea
Steel Structure
37
GFA
Vietnam
Warehouse, Container Yard
38
Fengmang
China
Sandpaper
39
Hai Phong Paint
Vietnam
Paint
40
Mitsubishi Estate
Japan
Warehouse for lease
41
Fine Tech
China
Metal hand tools
42
Magnetec
Germany
Magnetic metal coil in automobile
43
RRC
Germany
High tech battery
44
Robot Grand Pro
China
Vacuum Cleaner robot
45
Growatt
China
Electric car charger
46
Vietwood
Russia
Wood processing
488
TIEN THANH INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Sectors
Minimum wage
Lease term
Minimum Lease Area
Limit for Construction
Height
Permitted Construction
Rate
Planned area
Factory Available for Rent
Operation Status
Tien Thanh and Cap Tien Commune, Tien Lang District, Hai Phong City
Tien Thanh Investment Industrial Zone JSC
▪ Address: Tien Lang District, Hai Phong City
▪ Tel: +84(225)3588819
▪ Email: info@tienthanhiz.com
▪ Website: tienthanhiz.com.vn
Dang Thai Son–Chief Of Industrial Zone Management Board- Mobile Number: 0982388831 –
tienthanhiz.com.vn
Adjacent location
- 25 km from Hai Phong center city;95 km from Ha Noi city/ the capital;
- 25 km from Cat Bi airport;
- 45 km from LachHuyendeepwater port;
- 2 km from No.10 Highway; 11km from Ha Noi – Hai Phong Expressway
Priority Sectors for
Investment
Investment Restricted
Sectors
[Mechanicals; Consume Production; Light Industry; Electronic;
Agricultural Processing;Production of construction materials]
[Chemical, Battery and Accumulator, Metallurgical, Plating,
Dying, Paper Production etc. compliance with Decision
No.1338/QD-UBND issued by Hai Phong People Committee]
[4,680,000 VND] According to Decree 38/2022/ND-CP
▪ Start date: 27/5/2022
▪ End date:27/5/2072
1.5 ha
Please refer to QVCVN 01:2021/BXD based on land plot area, we only regulate the maximum
of floor number as follows:
Industry area: max. of 5 floors
Administrator area: max.of 5 floors
Total Industry and administrator area: max. of 70% land plot area
▪ Total area: 410.46 ha
▪ Total vacant leasable area: 289.11 ha
▪ Total area with full infrastructure ready to build factory: 0
▪ Totalarea: 0
▪ Active/Under Construction/Under Construction and to be completed by {year}/In Land
Clearance Process
[In Land Clearance Process, to be commenced in Q4/2023 ]
Occupancy Rate and
Number of Projects
Number of Korean projects
Lease fee
▪ Land lease fee:
▪ Factory lease fee:
489
Operating fee
▪ Management fee:
▪ Electricity fee:
▪ Water fee:
▪ Wastewater treatment fee:
▪ Waste treatment fee:
INFRASTRUCTURE AND FACILITY
Distance from the nearest Banking, nearest State Tax and Finance Agency, nearest Logistic Center, Universities, training
facilities, etc., Road Width,…
Bank List:
Agribank- 3.7km
Lienviet Post Bank: 4.1km
VIETNAM PROSPERITY BANK: 4.3 km
Tien Lang State Tax Agency:3.7km
Logistic Center: 28km
Education Facilities:
Viet Nam Maritime University25.7 km
Hai Phong University16km
Vocational College≈12km
490
[- This Page is intentionally left blank -]
491
HA NOI
492
INVESTMENT ENVIRONMENT IN HANOI
USD/VND 23.510
GENERAL INFORMATION
Area
Population
Geographical
Location
3360 km2
8,435 million people (2022)
▪ Hanoi is located in Red River Delta region.
▪ Bac Giang, Bac Ninh Province to the East; Hung Yen Province to the South East; Vinh Phuc Province to
the North, Ha Nam Province to the South; Phu Tho and Hoa Binh Province to the West.
Adjacent provinces
2022 statistic:
▪ Nominal GRDP (billion VND):
1.196.000 (50,93 billion USD)
▪ Real GRDP (billion VND):
GRDP
▪ GRDP growth:
8,89%
▪ GRDP per capita (million VND/year):
141,80
( USD)
▪ Economic structure:
Industry growth
Import - Export
PCI
Ranking
- Industry - Construction:
24,04%
- Agriculture. forestry and fishery:
2,08%
- Service:
63,22%
▪ Industry - Construction growth:
7,74%
▪ Agriculture, forestry and fishery growth:
2,58%
▪ Service growth:
10,06%
Import turnover (billion USD):
40,93
Export turnover (billion USD):
17,10
(Growth rate: 0,103)
66.74
20
SOCIAL INFRASTRUCTURE
Transportation
Electricity
Water
Education &
Training
Medicare
▪ Roadway: National Road 1A from North To South, National Road 2 to Ha Giang, National Road 3 to Bac
Kan, Cao Bang, National Road 5 to Hai Phong, the new Hanoi-Hai Phong Expressway; National Road 18 to
Quang Ninh, National Road 6 and 32 to Southwest run through the City; Highway Hoa Lac- Hoa Binh
(newly completed); Highway Phap Van- Cau Gie (Ha Nam)
▪ Railway: Hanoi is the arrival and departure point for many Vietnam Railways and one trans-national
railway to Beijing, China and to Kunming, China. It also has Cat Linh- Ha Dong elevated railway
constructed and under testament.
▪ Waterway: A large system of river passes through the City, including Hong, Day, Duong To Lich, Kim
Nguu, Lu, Ca Lo, Nhue River. 2 hours from Hai Phong Seaport and Cai Lan – Quang Ninh Seaport by car
▪ Airway: Noi Bai International Airport 45 km to the North
▪ 7 transformer stations and power lines of 200kW and 500kW, 32 transformer stations of 110kV and other
lower-voltage wires…
▪ 18 water supply plants with capacity of 4,000 to 98,000 m3 per day
▪ 80 universities, colleges; 182 high schools; 320 vocational centers; 113 scientific research departments
▪ 94 hospitals and medical centers; 577 clinics in villages, districts; 18 Health & Medicine research
Institutions.
INVESTMENT CONDITION
Human resource
68,5% of population are in the working age (2022)
Education level
Trained labor rate: 72,23% (2022)
Salary
▪ The minimum salary for the province is applied as follows:
493
- Area I (4,680,000 VND/month): Ba Dinh, Bac Tu Liem, Cau Giay, Dong Da, Ha Dong, Hai Ba Trung,
Hoan Kiem, Hoang Mai, Long Bien, Nam Tu Liem, Tay Ho, Thanh Xuan, Gia Lam, Dong Anh, Soc Son,
Thanh Tri, Thuong Tin, Hoai Duc, Thach That, Quoc Oai, Thanh Oai, Me Linh, Chuong My Districts and
Son Tay Town
- Area II (4,160,000 VND/month): Ba Vi,, Dan Phuong, Phu Xuyen, Phuc Tho, Ung Hoa and My Duc
Districts
- Area III (3,640,000 VND/month): N/A
- Area IV (3,250,000 VND/month): N/A
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages
paid to employees working under employment contracts)
▪ Incentives according to government regulations:
- Exemption and reduction for land and water rent fee
- Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
Investment
▪ Incentives from the province:
incentives
▪ Incentives according to government regulations:
- Exemption and reduction for land and water rent fee
- Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
▪ Prioritized projects:
- Developing selectively some industries, which are highly beneficial and use high-technologies; eco-civic
Fields Attracting agriculture and new villages; high quality human resources and science-technology strength for the needs of
Hanoi and nation’s development
Investment
- Developing Hanoi to become high quality center of services of the Northern Vietnam, national and
international area
Hanoi attracts 1,692 million USD of FDI in 2022.
Of which, 365 new projects were registered with a capital of 233 million USD; there were 202 additional
Investment
attraction situation projects to increase investment capital with an increase of 834 million USD; Foreign investors contributed
capital and bought shares 388 times with a capital of 625 million USD, up 83.8%.
Map
494
Hanoi Investment Promotion Center
Contact
▪ Address: No. 16, Cat Linh Street, Hanoi, Viet Nam
▪ Tel: (84-24) 926 3455/926 3479
495
LIST OF INDUSTRIAL ZONES IN HANOI
No
1
2
3
4
5
6
7
8
9
10
11
Industrial zone Name
Hoa Lac Hi-Tech Park
Quang Minh I Industrial Zone
Quang Minh II Industrial Zone
Hanoi Southern Supporting Industrial
Park
Phu Nghia Industrial Zone
Thach That- Quoc Oai Industrial Zone
Nam Thang Long Industrial Zone
Thang Long Industrial Zone
Sai Dong B Industrial Zone
Noi Bai Industrial Zone
Hanoi- Dai Tu Industrial Zone
12
13
Cong vien cong nghe industrial park
Sach Soc Son Industrial Zone
Total Area (ha)
1,586
407
344
76.92
Occupancy Rate
40%
100%
40%
30%
Status
In Operation
In Operation
In Operation
In Operation
170
155
260.87
302
47.3
114.1
40
100%
100%
80%
100%
100%
100%
N/A
36
203,8
37%
1%
In Operation
In Operation
In Operation
In Operation
In Operation
In Operation
Transferred into Urban
Zone
Clearing Ground
Clearing Ground
HANOI’S LOCATION MAP OF INDUSTRIAL ZONES
496
HOA LAC HI- TECH PARK
GENERAL INFORMATION OF INDUSTRIAL ZONE
Address
29Km, Thang Long Highway, Thach That District, Hanoi
Investor
Hoa Lac Hi-tech Park Management Board, Ministry of Science and Technology (MOST
▪ Address: Km29, Thang Long Highway, Thach That, Hanoi, Viet Nam
▪ Tel: (84-246) 3 269 295
▪ Fax: (84-246) 3 269 290
▪ Website: www.hhtp.gov.vn
▪ Email: info@hhtp.gov.vn
Contact Person
Location
Investment Area
Minimum wage
Lease term
Minimum Lease
Area
Limit for
Construction Height
Permitted
Construction Rate
Planned area
Mr. Nguyen Hieu - Vice Director, International Relations and Investment Promotion Department
Mobile: (84) 912 682 766
Email: hieunt@hhtp.gov.vn; hieuhhtp@gmail.com
▪ 30 km to Hanoi
▪ 47 km to Noi Bai International Airport
▪ 156 km to Hai Phong Port; 193 km to Cai Lan Port
▪ Km29, Thang Long Highway, Thach That, Hanoi, Viet Nam
Investment
prioritized
Sectors
Biotechnology, Information technology, New material technology and Automation
technology, regulated in Decision 66/QĐ-TTg dated November 25, 2014 and
Decision 13/2017/QĐ-TTg dated April 28, 2017
Investment
Restricted
Sectors
N/A
[Area 2] According to Decree 90/2019/NĐ-CP dated 15th November 2019
▪ 70 years for projects on prioritized sectors; 50 years for other projects
3000m2
1-7 Floor (s)
40%-60%
▪ Total area: 1586 ha
▪ Total vacant leasable area: 673 ha [1065 ha, trong đó đã cho thuê 392 ha (chiếm 36,8% diện tích)]
Factory Available
for Rent
Currently, the Park has no factory available for rent. The Management Board has plan to build factory
for rent soon
Operation Status
In Operation
Occupancy Rate
and Number of
Projects
Occupancy Rate: 40%
Number of project: about 94
Number of Korean
Projects
Lease fee
Operating fee
04 companies
▪ Land lease fee: 70-90USD depending on location
▪ Infrastructure lease: 50-60 USD/m2/up to 2060 (not including 10% VAT)
▪ Factory lease fee: N/A
▪ Management and Infrastructural Maintenance fee: 0.8 USD/m2//year
▪ Electricity fee: as regulated by the Government (see Appendix)
▪ Water fee: 11,615VND/m3 (~0.5 USD/m3)
▪ Wastewater treatment: Water treatment factory is already constructed recently, and the fee is issued
in 2020.
INFORMATION OF INFRASTRUCTURE AND FACILITY
497
Financial institution
7-8 km to local bank branch of Agribank, BIDV...
Tax service, State
finance office
11 km to Tax Department and State Treasury of Thach That district
The Management Board is working with
Customs Service
Hoa Lac Customs Office is located in the High Tech Park
Logistics
There are some logistics serivce provider operating inside the High Tech Park such as Yusen Logistics,
Nippon Express,...
Post office
11 km to Thach That Post office
Medicare
9 km to Thach That General Hospital; a new hospital will be built in the General Service Area for
workers, experts,..
Police, public
security
Hoa Lac High-tech Police Station is located within the High Tech Park
Universities,
training facilities,
etc.
Many new universities and technology institute are built/relocated in the Park, such as FPT University,
Vietnam-Japan University (of Vietnam National University), University of Science and Technology
of Hanoi,… in order to supply high-quality human resource on Science/Technology
Recruitment
Available and plentiful, as Hanoi is the education hub of Northern Vietnam and many top institutes of
technology are located nearby the Park.
Worker dormitory
There is a general service area for workers, experts and administrative staffs of the Park
Worker's child
education facility
Available in the General Service Area
One-stop service
According to Decree No. 74/2017 / ND-CP, The Management Board is allowed to apply the one-stop
mechanism in handling administrative procedures under the authority of the Management Board. The
"one-stop-shop" mechanism is applied in handling administrative procedures under the authority of
other state management agencies and other specialized agencies in the fields of investment and
registration of business, land use, construction, labor use and other fields.
The Management Board is the leading and coordinating agency with state management agencies and
relevant professional agencies in handling administrative procedures under the "one-stop" and "onestop shop" mechanism. information
Road Width
Lang- Hoa Lac Highway: 6 lanes, 140m wide
Communication
Infrastructure of
Industrial Zone
Communication system (telecommunication, internet,..) is provided by VNPT Group with a capacity
of 300,000 head numbers.
Emergency Power
generator
Available
Fire-fighting facility
Available
498
Layout Plan
Location Map
Actual View
499
LIST OF PROJECTS IN HOA LAC HI-TECH PARK
No.
Company Name
1.
Vietnam Joint Stock Commercial Bank
For Industry And Trade (Vietinbank)
National Institute Of Information And
Communications Strategy- Ministry Of
Information And Communications.
Directorate For Standard, Metrology
And Quality
Hti- Science Union Of High Tech
Telecommunications
2.
3.
4.
Functional
Area
R&D
Nationality
Business line
Vietnam
R&D
Vietnam
Bank information technology
development training center
High-tech information and
communication center.
R&D
Vietnam
Center of measurement
R&D
Vietnam
Research, development and testing of
new space equipment, materials and
satellite image processing.
Research on automotive engine
5.
Nissan Techno Vietnam Co., Ltd.
R&D
Japan
6.
National Satellite Center
R&D
Vietnam
7.
Hanoi Department Of Science And
Technology
Institute Of Functional Foods
R&D
Vietnam
R&D
Vietnam
Vietnam Institute Of Science And
Technology
Government Cipher Committee
R&D
Vietnam
R&D
Vietnam
11.
Institute Of Technology Application,
Ministry Of Science And Technology
R&D
Vietnam
12.
Dt&C Vina Jsc.
R&D
South Korea
8.
9.
10.
500
Building material facilities for the
development of space satellite
technology
Technology transfer and research center
Research on the application and
implementation of advanced science and
technology in biotechnology, food,
functional foods, biomedical, cosmetics
and medicinal materials.
Building CNC infrastructure for
National Network Monitoring Center,
National CA Center and CHIP
Technology Development Research
- Providing a system of core transfer
centers and open-transfer research
centers in a number of potential
technological fields such as electronics,
automation, new materials,
biomedical, ...
- Supporting commercialization of
products after research;
- Studying electromagnetic
compatibility and electrical safety for
products, electrical and electronic
equipment and other testing methods.
- Providing testing services on
electromagnetic field compatibility and
electrical safety for electrical and
electron
Vietnam - Korea Institute Of Science
And Technology
Viettel Military Telecommunications
Group
Vietnam Diamond Media Jsc.
Center Area
Vietnam,
Korea
Vietnam
Center Area
Vietnam
16.
Viettel - Cht Co., Ltd
Center Area
Vietnam
Data center and customer service
(project leasing area at the General
Service Center)
Data storage
17.
Vietnam Internet Center
Center Area
Vietnam
Internet center
18.
Vietnam Post And Telecommunications
Group
Center Area
Vietnam
19.
Viettel Military Telecommunications
Group
Hoa Lac Nasia Jsc.
Center Area
Vietnam
Supporting the needs of
telecommunications - information
technology services at Hoa Lac Hi-Tech
Park
Controlling the entire
telecommunication-information
technology network in the west of
Hanoi capital
Office
Center Area
Vietnam
21.
Vietcombank
Center Area
Vietnam
Production of intelligent warning and
monitoring devices
Banking services
22.
Center Area
Vietnam
CNC center
Center Area
Vietnam
Hotel services
24.
Southeast Asia Commercial Joint Stock
Bank
Financial And Enterprise Development
Jsc.
Ministry Of Finance
Center Area
Vietnam
Office
25.
Fpt Software Hanoi Co., Ltd.
Software Park
Vietnam
Manufacturing and trading in software
26.
C.E.O Investment Jsc.
Software Park
Vietnam
27.
Tinh Van Technology Jsc.
Software Park
Vietnam
Building offices for software
enterprises.
Manufacturing and trading software
28.
Vietnam Diamond Media Jsc.
Software Park
Vietnam
Outsourcing and customer service
29.
Bkav Jsc.
Software Park
Vietnam
30.
Hoa Lac High-Tech Park Development
Co., Ltd
Misa Jsc.
Software Park
Vietnam
Mixed Zone
N/A
Togi Real Estate Financial Investment
Jsc.
Financial And Enterprise Development
Jsc.
Hoa Lac Xanh Jsc.
Mixed Zone
Vietnam
Manufacturing network security
software
Investment and trading in technical
infrastructure
Researching and developing computer
software and manufacturing
information-telecommunications
products.
Educations
Mixed Zone
Vietnam
Mixed Zone
Vietnam
Establishment of trade and service
center area
Restaurant
Mixed Zone
Vietnam
Education Department
36.
International Education Investment
Management Jsc.
Embedded System Development Jsc.
Mixed Zone
Vietnam
Embedded system
37.
Twitter Beans Coffee Jsc.
Mixed Zone
Vietnam
38.
Mixed Zone
Vietnam
39.
Hoa Lac High-Tech Park Development
Co., Ltd
Fpt University
Education
Vietnam
Restaurants, convenience stores, fast
food and coffee shops
Introducing and trading furniture with
high applicability.
University
40.
C.E.O Investment Jsc.
Education
Vietnam
Training center
41.
Education
Vietnam
University
Education
Vietnam
Training center
43.
Vietnam Institute Of Science And
Technology
Hanoi Department Of Industry And
Trade
Van Lang University
Education
Vietnam
University
44.
H.P.T Foam Crete Joint Stock Company
Hi-Tech
Industrial Park
Vietnam
Researching new materials technology,
producing HPT-2001 chemicals,
13.
14.
15.
20.
23.
31.
32.
33.
34.
35.
42.
R&D
501
Viettel Hi-tech center
Italy
installing lightweight concrete
aggregate gas production line,..
Electronic components and devices,
integrated control circuits, industrial
robots.
Manufacturing and assembling optical
cable connector.
Infrastructure construction and trading
(34.5ha)
Manufacture phones and electronic
boards.
Manufacturing medical equipment;
research and development center for
technology transfer
Manufacturing precision mechanical
products and high-class heat treatment.
Producing antibiotics
Vietnam
Producing probiotics
Vietnam
Infrastructure business investment
(225.5ha)
45.
Noble Vietnam Electronic Co., Ltd.
Hi-Tech
Industrial Park
Japan
46.
Vietnam Oe Tek Group Co., Ltd
Taiwan
47.
Vietnam Export And Construction
Corporation
Thuan Phat Imoso Jsc.
Hi-Tech
Industrial Park
Hi-Tech
Industrial Park
Hi-Tech
Industrial Park
Hi-Tech
Industrial Park
48.
49.
Viet Nam - Korea Medical
Corporation (Vikomed)
50.
Fc Hoa Lac Technology Co., Ltd
51.
Medlac Pharma Pharmaceutical
Manufacturing Co., Ltd Italy
Thanh Ha Jsc.
52.
53.
54.
55.
Fpt Hoa Lac High-Tech Park
Development Co., Ltd
Mobile Telecom Infrastructure And
Technical Services Corpartion
Vnpt Technology
57.
Eco Energy Jsc. (Vietnam Green Energy
Co., Ltd)
Viettel Military Telecom Group
58.
Vinalines Logistics Vietnam Jsc.
59.
Felix Vietnam Jsc.
60.
Viettel Military Telecom Group
61.
Biospring Hoa Lac.,Jsc
62.
Evn Hanoi
63.
Sao Viet Jsc.
64.
Sds Industrial Co., Ltd
65.
Viet Chuan Jsc.
66.
Htmp Vietnam Mechanical Co., Ltd
67.
Hanoi Customs Department
68.
Cvi Cosmetic Pharmaceutical Jsc.
69.
Hanwha Techwin Co., Ltd
56.
Vietnam
Vietnam, South
Korea
Hi-Tech
Industrial Park
Hi-Tech
Industrial Park
Hi-Tech
Industrial Park
Hi-Tech
Industrial Park
Hi-Tech
Industrial Park
Hi-Tech
Industrial Park
Hi-Tech
Industrial Park
Hi-Tech
Industrial Park
Hi-Tech
Industrial Park
Hi-Tech
Industrial Park
Vietnam
Hi-Tech
Industrial Park
Hi-Tech
Industrial Park
Vietnam
Hi-Tech
Industrial Park
Hi-Tech
Industrial Park
Hi-Tech
Industrial Park
Hi-Tech
Industrial Park
Vietnam
N/A
Vietnam
Vietnam
Manufacture of telecommunication
equipment
Producing telecommunication products,
field cables; Producing solar batteries
Produce smart card
Vietnam
Bonded
Vietnam
Manufacturing precision mechanical
products and high-class heat treatment.
(Phase 2 of the FC Company Project)
Manufacturing telecom equipment, IT
and Viettel CNC products
Building Probiotics Biotechnology
Research Functional Area for
applications in animal husbandry,
agriculture, food and pharmaceuticals
Electrical engineering services, manage
and grid operation
Producing solar panels
N/A
Vietnam
Vietnam
South Korea
Vietnam
Hi-Tech
Industrial Park
Hi-Tech
Industrial Park
Hi-Tech
Industrial Park
Vietnam
Hi-Tech
Industrial Park
South Korea
502
Vietnam
Vietnam
Manufacture piezoelectric pump and
graphite sheet for electronic products
Researching and applying CAD / CAM
/ CNC technology to produce highprecision mold products
Mold manufacturing factory with
advanced technology and high accuracy
Headquarters of Ha Tay Customs
Department
-Technology transfer; development and
production of nano-technological
products, extraction and transformation
technologies to enhance traditional
herbal values
- Producing medicinal products and
functional foods and cosmetics of high
economic value
Manufacturing parts and components of
aircraft engines and industrial turbine
gas engines
71.
Kannametal Singapore Pte Ltd And
Shinki Special Tool Co., Ltd
Nidec Corporation
72.
Nidec Corporation
73.
Kova Paint Co., Ltd
74.
Asia Industrial Technology Jsc.
75.
77.
Vinsmart Research And Manufacture
Jsc.
Vinaconex Advanced Compound Stone
Jsc. (Vicostone)
Style Stone Jsc.
78.
Vietnam Stone Processing Jsc.
79.
Vinaconex Glass Fiber Reinforced Pipe
Jsc.
Hit High Technology Development Jsc.
70.
76.
80.
Hi-Tech
Industrial Park
Hi-Tech
Industrial Park
Hi-Tech
Industrial Park
Hi-Tech
Industrial Park
Hi-Tech
Industrial Park
Hi-Tech
Industrial Park
Hi-Tech
Industrial Park
Hi-Tech
Industrial Park
Hi-Tech
Industrial Park
Hi-Tech
Industrial Park
Hi-Tech
Industrial Park
Singapore
Vietnam
Development and production of cutting
tools
Developing, manufacturing and trading
brushless DC motors
Developing, manufacturing and trading
small-sized reducers with high accuracy
Research and produce high-class,
environmentally friendly nano paint
Producing high-quality electrical
equipment
Constructing a smart electronics factory
Vietnam
Producing high-class paving stone.
Vietnam
Vietnam
Production of artificial high quality
paving stones
Producing interior stone
Vietnam
Producing glass fiber reinforced pipe
Vietnam
Software technology, electronics and
telecommunications, information
technology.
Software technology, electronics and
telecommunications, information
technology.
Manufacture of fireproof doors
Japan
Japan
Vietnam
Vietnam
81.
Hti High-Tech Production Science And
Technology Union
Hi-Tech
Industrial Park
Vietnam
82.
Vina-Sanwa Co., Ltd (Joint Venture
Between Vinaconex And SannwaHoldings Corp Japan)
State Bank Of Vietnam
Hi-Tech
Industrial Park
Vietnam,
Japan
Hi-Tech
Industrial Park
Hi-Tech
Industrial Park
Vietnam
Office
Vietnam
Infrastructure business (277ha)
Hi-Tech
Industrial Park
N/A
Manufacturing large-scale quartz slabs
using polymer-squeezed organic
adhesive in vacuum environment, with
thermal phase with the most advanced
technology today producing CNC
products
Producing and trading smart electronics,
capable of transmitting data with
UART, RS232 / 485 interfaces
83.
85.
Vietnam Construction And Import Export Joint Stock Corporation
(Vinaconex)
A&A Green Phoenix Jsc.
86.
Smart Energy Management Jsc.
Hi-Tech
Industrial Park
N/A
87.
Gia Phat Hoa Lac Entertainment Service
Jsc.
Recreation
And Sport
Zone
Vietnam
84.
503
QUANG MINH I INDUSTRIAL ZONE
GENERAL INFORMATION OF INDUSTRIAL ZONE
Address
▪ Me Linh district, Hanoi
Investor
Nam Duc Investment and Development Infrastructure Co.,Ltd
▪ Address: Quang Minh Industrial Zone, Quang Minh Town, Me Linh Dist., Hanoi City
▪ Tel: (84-24) 3 248 4282 Fax: (84-24) 3 813 4514
Contact Person
Location
Investment Area
Minimum wage
N/A
▪ 18km to Hanoi Center
▪ 10 km to Phuc Yen Station
▪ 110 km to Hai Phong port
▪ 4 km from Noi Bai Airport
Investment priorities
Sectors
▪ Electronics, high technology industry
▪ Eco-friendly industry
Investment Restricted
Sectors
Polluted Industries
[Area 1] According to Decree 90/2019/NĐ-CP dated 15th November 2019
Lease term
N/A
Minimum Lease Area
N/A
Limit for Construction
Height
N/A
Permitted Construction
Rate
N/A
Planned area
Factory Available for Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean Projects
Lease fee
Operating fee
▪Total area: 407 ha
▪ Total vacant leasable area: 20 ha
▪ Currently, the IZ does not have factory available for rent
▪ In operation
▪ Occupancy Rate: 100%
▪ Number of Projects: 98
32 companies
▪ Land lease fee: 120 USD/m2
▪ Building lease fee: 2.0 – 2.5 USD/m2/month
▪ Management fee: 0.3 USD/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: ~ 0.6 USD/m3
INFORMATION OF INFRASTRUCTURE AND FACILITY
Financial institution
Tax service, State finance
office
Customs Service
Logistics
Vietcombank, Maritime Bank, ACB, Agribank, Techcombank have their branches near the ID
10 km to Tax Department and State Treasury of Me Linh District
9 km to Bac Thang Long Industrial Zone Customs Office
Various fast and convenient means:
▪ Road (many national roads across for domestic transportation);
▪ Sea (Haiphong Seaport (via Hai Phong- Hanoi Expressway), Cai Lan Port, Cua Ong Seaport of
Quang Ninh (via Hanoi- Ha Long High Express way);
▪ Air: Noi Bai Airport
504
Post office
8.5 km to Me Linh Post Office
Medicare
17 km to Me Linh General Hospital, also, there are many central, national hospitals in Hanoi
Urban Area.
Police, public security
10 km to Me Linh Police Station
Universities, training
facilities, etc.
There are many universities, colleges and intermediate vocational training in various fields.
Recruitment
Worker dormitory
Worker's child education
facility
One-stop service
Road Width
Communication
Infrastructure of Industrial
Zone
Emergency Power
generator
Fire-fighting facility
Hanoi has a redundant source of well-trained labor with many universities, colleges, vocational
schools of all sectors.
Available dorms for workers and administrative staffs.
Available
10 km to Me Linh People’s Committee, which provides one-stop service
▪ Central/main road: 36 m wide
▪ Local/ branch road: 24 m wide
Reach international standards, adapt well with communication needs. Underground optical cable
system is directly connected to the fence of each enterprise.
Available
The system reaches national standard, as one fire hydrant is installed every 120m
Layout Plan
Location Map
505
Actual View
506
QUANG MINH II INDUSTRIAL ZONE
GENERAL INFORMATION OF INDUSTRIAL ZONE
Address
▪ Me Linh district, Hanoi
Investor
Hop Quan Investment Company-Taiwan
▪ Address: Quang Minh II Industrial Zone, Me Linh District, Hanoi
▪ Tel: (84-24) 6260 5786/(84-24) 6260 5788
▪ Fax: (84-24) 6260 5788
Contact Person
Location
N/A
▪ 18 km to Hanoi Center; 10 km to Phuc Yen Station
▪ 110 km to Hai Phong Port; 120 km to Cai Lan Dêp Port
▪ 03 km to Noi Bai Airport
▪ To the North of North Thang Long- Noi Bai Expressway and Hanoi- Lao Cai Railway, at the
head of National Road 18 to Hai Phong Port and Quang Ninh- Cai Lan Deep Port, which creates
favorable condition for transportation
Investment Area
N/A
Minimum wage
[Area 1] According to Decree 90/2019/NĐ-CP dated 15th November 2019
Lease term
N/A
Minimum Lease Area
N/A
Limit for Construction
Height
N/A
Permitted Construction
Rate
Planned area
Factory Available for Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean Projects
Lease fee
Operating fee
▪ Total area: 344ha
Currently, the IZ does not have factory available for rent
▪ Management fee: 0.4 USD/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: ~0.6 USD/m3
▪ Rate of Occupancy: 40%
▪ Number of projects: 35
01
▪ Land lease fee: 120 USD/m2
▪ Buidling lease: 2.0 – 2.5 USD/m2/month
▪ Management fee: 0.4 USD/m2/year
▪ Electricity fee: as regulated by the Government
▪ Water fee: ~0.6 USD/m3
INFORMATION OF INFRASTRUCTURE AND FACILITY
Financial institution
Tax service, State finance
office
Customs Service
Logistics
Local bank branches of Vietcombank, Maritime Bank, ACB, Agribank, Techcombank are located
nearby the IZ
10 km to Tax Office and State Treasury of Me Linh District
9 km to Bac Thang Long Industrial Zone Customs Office
Various fast and convenient means:
▪ Road (many national roads across for domestic transportation);
▪ Sea (Haiphong Seaport (via Hai Phong- Hanoi Expressway), Cai Lan Port, Cua Ong Seaport of
Quang Ninh (via Hanoi- Ha Long High Express way);
▪ Air: Noi Bai Airport
507
Post office
5km to Me Linh District Post Office, 2 km to Quang Minh Post Office
Medicare
13 km to North Thang Long Hospital, Dong Anh District, 15 km to Hanoi E Hospital
Police, public security
10 km to Me Linh Police Station
Universities, training
facilities, etc.
There are many universities, colleges and intermediate vocational training in various fields.
Recruitment
Worker dormitory
Worker's child education
facility
One-stop service
Road Width
Communication
Infrastructure of Industrial
Zone
Emergency Power
generator
Fire-fighting facility
Hanoi has a redundant source of well-trained labor with many universities, colleges, vocational
schools of all sectors.
A dorm of 27.8 ha for over 10,000 workers and specialists with park and social services.
Available
Provided by Me Linh People’s Committee.
Main road: 36 m wide
Branch road: 24 m wide
Modern and standardized telecommunication system to meet the needs of investors
N/A
The system reaches national standard, fire hydrants are installed in domestic road of the IZ
Layout Plan
Location map
Actual View
508
509
HANOI SOUTHERN SUPPORTING INDUSTRIAL PARK
GENERAL INFORMATION OF INDUSTRIAL ZONE
Address
▪ Phu Xuyen district, Hanoi
Investor
N&G Development and Investment Corporation
▪ Address: No. 20, Mai Anh Tuan St., Dong Da Dist., Hanoi City
▪ Tel: (84-24) 3 784 6045
Fax: (84-24) 3 784 6043
▪ Email: sales@ngcorp.com.vn
Contact Person
Location
Investment Area
Minimum wage
Lease term
Contact person: Mr. Tran Phuong Lam – Sales Department – (84) 90 456 8688
▪ Land: 30 km to Hanoi Center; 04 km to Phuc Yen Station
▪ Seaport: 85 km to Hai Phong Port
▪ Airport: 60 km to Noi Bai Airporrt
Investment prioritized
Sectors
Electronic supporting industry; mechanical precision industry;
Automobile supporting industry; high tech industry, leather
shoe supporting industry, textile supporting industry
Investment Restricted Sectors
N/A
[Area 2] According to Decree 90/2019/NĐ-CP dated 15th November 2019
▪ 70 years for projects on prioritized sector; 50 years for other projects
Minimum Lease Area
N/A
Limit for Construction
Height
N/A
Permitted Construction
Rate
N/A
Planned area
Factory Available for Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean
Projects
Lease fee
Operating fee
▪ Total area: 76.92 ha
▪ Total industrial land area: 52 ha
▪ Total vacant leasable area: 50 ha
Currently, the IZ has no factory available for rent
In Operation
Occupancy Rate: 30%
2 projects
None
▪ Land lease fee: 140 – 180 USD/m2/50 years to 70 years
▪ Factory lease fee: 2 – 3 USD/m2/month
▪ Management fee: 0.3 – 0.7 USD/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: ~0.6 USD/m3
INFORMATION OF INFRASTRUCTURE AND FACILITY
Financial institution
Tax service, State finance
office
Customs Service
Logistics
Post office
Bank branches of VDB, AgriBank are located nearby.
3.5 km to Phu Xuyen Tax department; 5 km to Phu Xuyen State Treasury
42 km to Ha Tay Customs Office
Strategically located at the gateway to the south of Hanoi capital, between two arterial road: Phap
Van - Cau Gie highway and National Highway 1A.
4 km to Phu Xuyen Post Office
510
Medicare
4 km to Phu Xuyen Hospital.
Police, public security
4.5 km to Phu Xuyen Police station
Universities, training
facilities, etc.
There are many universities, colleges and intermediate vocational training of various fields.
Recruitment
Worker dormitory
Worker's child education
facility
One-stop service
Road Width
Communication
Infrastructure of Industrial
Zone
Hanoi has a redundant source of well-trained labor with many universities, colleges, vocational
schools of all sectors.
A population neighborhood is located near the ID.
Available
Provided by Phu Xuyen People’s Committee
N/A
Reach international standards, adapt well with communication needs. Underground optical cable
system is directly connected to the fence of each enterprise. Fiber optic cable systems can be
connected to telecommunication applications and leased line systems. There are IDD, VoIP,
ADSL telephone switchboard.
Emergency Power
generator
Available
Fire-fighting facility
Available
Layout Plan
Location Map
511
List of Tenant
No.
1
2
Name of project
Investment project on production and
trading of high-tech supporting
industrial products
Project of investment in building a
factory to produce supporting industry
products
Nationality
Business field
Japan
Manufacturing mechanical
components
Vietnam
Producing mechanical components,….
512
PHU NGHIA INDUSTRIAL ZONE
GENERAL INFORMATION OF INDUSTRIAL ZONE
Address
▪ Km25, National Road 6, Phu Nghia, Chuong My District, Hanoi
Investor
Phu My Group JSC.
▪ Address: No 24, Ngo Quyen, Van Phuc Ha Dong, Hanoi.
▪ Tel: 0919 18 18 18
▪ Fax: (+8424) 3311 9807
▪ Website: http://phumygroup.com.vn/
Contact Person
Location
Investment Area
Minimum wage
Lease term
Nguyen Thi Thanh Xuan, Director – (84) 9 1918 1818 - Email: sales@phumygroup.com.vn/
thanhxuan@phumygroup.com.vn
▪ 23 km from Hanoi City.
▪ 40 km from Noi Bai Airport.
▪ 120 km from Hai Phong Port.
▪ 10km from National Road 21A.
Investment
priorities Sectors
Technology, industrial manufacturing, supporting industries
Investment
Restricted
Sectors
Polluted industries
[Area 1] According to Decree 90/2019/NĐ-CP dated 15th November 2019
Lease term : 50 years
▪ Start date : 2008
▪ End date : 2057
Minimum Lease Area
700m2
Limit for Construction
Height
▪ Unlimited
Permitted Construction Rate
Planned area
Factory Available for Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean Projects
Lease fee
Operating fee
▪ 60%
▪ Total area : 170 ha
▪ Total vacant leasable area : N/A
▪ Total area with full infrastructure ready to build factory: 145 Ha
▪ Currently, the IZ does not have factory available for rent
▪ In operation
▪ Occupancy rate: 100%
N/A
▪ Land lease fee: 100 USD/m2
▪ Factory lease fee: to be negotiated
▪ Management fee: 0.5 USD/m2/year
▪ Electricity fee: as regulated by the Government
▪ Water fee: 0.4USD/m3
▪ Wastewater treatment fee: 0.4USD/m3
▪ Waste treatment fee: to be negotiated
INFORMATION OF INFRASTRUCTURE AND FACILITY
Financial institution
Internal Sevice
Tax service, State finance
office
Internal Service
513
Internal Service
Customs Service
Internal Service
Logistics
Internal Service
Post office
Internal Sevice
Medicare
7km to Chuong My Hospital
Police, public security
6km to the nearest police station
Universities, training
facilities, etc.
There are many universities, colleges and intermediate vocational training in various fields.
Recruitment
Worker dormitory
Worker's child education
facility
One-stop service
Road Width
Hanoi has a redundant source of well-trained labor with many universities, colleges, vocational
schools of all sectors.
Available dorms for workers and administrative staffs.
Available
4 km to Chuong My People’s Committee, which provides one-stop service
▪ Main road : 30m and 25m width
▪ Internal transport system accounted for 15% of the total area of the industrial zone
Communication
Infrastructure of Industrial
Zone
Good
Emergency Power generator
Available
Fire-fighting facility
Internal Service (general system for the IZ and each factory’s installation)
Layout Plan
Location Map
514
Actual View
515
THACH THAT- QUOC OAI INDUSTRIAL ZONE
GENERAL INFORMATION OF INDUSTRIAL ZONE
Address
▪ Thach That District, Hanoi
Investor
Ha Tay Investment Development JSC
▪ Address: Thach That – Quoc Oai Industrial Zone, Thach That Dist., Hanoi
▪ Tel: (84-24) 2324 4881
Fax: (84-24) 3394 3204
Contact Person
Location
▪ N/A
▪ 20 km to Hanoi Center; 20 km to Hanoi Gas Station
▪ 130 km to Hai Phong port; 150 km to Quang Ninh- Cai Lan Deep Port
▪ 30 km to Noi Bai Airport
Investment
Sectors
priorities
Investment Area
Investment Restricted
Sectors
Minimum wage
Lease term
▪ Starting date: 2007
▪ End date: 2057
1 ha
Limit for Construction
Height
N/A
Permitted Construction
Rate
N/A
Factory Available for Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean Projects
Lease fee
Operating fee
Polluted Industry
[Area 1] According to Decree 90/2019/NĐ-CP dated 15th November 2019
Minimum Lease Area
Planned area
Mechanical industry, electronic industry, processing food, consumers
goods, jewelry, parts of motorbike, automobiles and electrical
appliances
▪ Total area: 155 ha
▪ Vacant leasable area: N/A
▪ Currently, the IZ does not have factory available for rent
▪ In operation
▪ Occupancy Rate: 100%
▪ Number of Projects: N/A
06
▪ Land lease fee: 100 USD/m2
▪ Management fee: 0.5 USD/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: ~0.6 USD/m3
▪ Waste treatment fee: N/A
INFORMATION OF INFRASTRUCTURE AND FACILITY
Financial institution
Tax service, State finance
office
Customs Service
Logistics
There are many bank branches near the IZ
8.5 km to Thach That Tax Department and State Treasury
10 km to Ha Tay Customs Office
Various fast and convenient means:
▪ Road (many national roads across for domestic transportation);
▪ Sea (Haiphong Seaport (via Hai Phong- Hanoi Expressway), Cai Lan Port, Cua Ong Seaport of
Quang Ninh (via Hanoi- Ha Long High Express way)
516
▪ Air: Noi Bai Airport
Post office
8.5 km to Thach That post office
Medicare
4.6 km to Quoc Oai Hospital
Police, public security
7.5 km from Thach That Police Station
Universities, training
facilities, etc.
Some civil national universities (such as Posts and Telecommunications Institute of Technology,
Hanoi Architecture University,..) and vocational schools are located in Ha Dong city, 20 km from
the ID.
Recruitment
Hanoi has a redundant source of well-trained labor with many universities, colleges, vocational
schools of all sectors.
Worker dormitory
Worker's child education
facility
One-stop service
Road Width
Communication
Infrastructure of Industrial
Zone
Available dorms for workers and administrative staffs.
N/A
8.5 km to Thach That People’s Committee, which provides one-stop service
Main road: 36 m wide
Branch road: 24m wide
Reach international standards, adapt well with communication needs. Underground optical cable
system is directly connected to the fence of each enterprise.
Emergency Power
generator
Available
Fire-fighting facility
Available
Layout Plan
Location Map
Actual View
517
518
THANG LONG INDUSTRIAL ZONE
GENERAL INFORMATION OF INDUSTRIAL ZONE
Address
▪ Dong Anh district, Hanoi capital
Investor
Thang Long Industrial Park Corporation
▪ Address: Thang Long Industrial park, Dong Anh District, Hanoi, Vietnam
▪ Tel: (84-24) 3 881 0620
Fax: (84-24) 3 881 0624
Contact Person
Location
Investment Area
Minimum wage
Lease term
▪ N/A
▪ Land: 11 km to Hanoi Center; 10 km to Phu Dien Station, 15 km to Hanoi Railway Station
▪ Seaport: 100 km to Hai Phong port, 115 km to Cai Lan Port
▪ Airport: 11 km to Noi Bai Airporrt
Investment priorities
Sectors
Mechanical Industry, Electronic industry, Precision industry,
Light industry, IT, High-tech industry
Investment Restricted
Sectors
Restrict Industries affecting the environment.
[Area 1] According to Decree 90/2019/NĐ-CP dated 15th November 2019
▪ 50 years
Minimum Lease Area
1 ha
Limit for Construction
Height
N/A
Permitted Construction
Rate
N/A
Planned area
Factory Available for Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean Projects
Lease fee
Operating fee
▪ Total area: 302ha
▪ Total leasable area:
▪ Currently, the IZ does not have factory available for rent
▪ In operation
▪ Occupancy Rate: 100%
▪ Number of Projects: 106 projects
None
▪ Land lease fee: from 100 USD/m2
▪ Building lease fee: 7.0 USD/m2/month
▪ Management fee: 1.0 USD/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: ~0.6 USD/m3
INFORMATION OF INFRASTRUCTURE AND FACILITY
Financial institution
Tax service, State finance
office
Many bank branches are near the ID
11 km to Tax department and State Treasury of Dong Anh District.
There is an On- site Customs Office in the IZ
Customs Service
Located in the Customs Office
Logistics
Post office
Various fast and convenient means:
▪ Road (many national roads across for domestic transportation);
▪ Sea (Haiphong Seaport (via Hai Phong- Hanoi Expressway), Cai Lan Port, Cua Ong Seaport of
Quang Ninh (via Hanoi- Ha Long High Express way);
▪ Air: Noi Bai Airport
11 km to Dong Anh post office
519
Medicare
12 km to Dong Anh General Hospital, >20 km to many national hospital in Hanoi urban area.
Police, public security
12 km to Police station of Dong Anh District
Universities, training
facilities, etc.
Many universities, colleges and vocational schools are located in Hanoi
Recruitment
Worker dormitory
Worker's child education
facility
One-stop service
Road Width
Communication
Infrastructure of Industrial
Zone
Emergency Power
generator
Firefighting Facility
Hanoi has a redundant source of well-trained labor with many universities, colleges, vocational
schools of all sectors.
Available dorms for workers, specialists and administrative staffs.
There are 3 public preschools, 5 private preschools and 10 baby-sitting homes around the ID
13 km to Dong Anh People’s Committee, which provides one-stop service.
Main road: 40m wide, 6-lane
Local/branch road: 26m, 2-lane
Be able to support domestic and international communication via telecommunication, Fax,
Internet.
Available
Available and well-equipped
Layout Plan
Location map
520
Actual View
521
NAM THANG LONG INDUSTRIAL ZONE
GENERAL INFORMATION OF INDUSTRIAL ZONE
Address
▪ Thuy Phuong Town, Bac Tu Liem district, Hanoi
Investor
Hanoi Huaic Industrial Park Development Corporation
▪ Address: Nam Thang Long Industrial Zone, Thuy Phuong, Tu Liem Dist., Hanoi
▪ Tel: (84-24) 3 7523 444/ 3 7523 453
Fax: (84-24) 3 7521 896
Contact Person
Location
Investment Area
Minimum wage
▪ N/A
▪ 15 km to Hanoi Urban area
▪ 6 km to Hanoi Center; 10 km to Phu Dien Station
▪ 115 km to Hai Phong port
▪ 15 km to Noi Bai Airport
Investment priorities Sectors
Developed towards a green industrial Zone with High tech industry,
light industry and civil mechanical industry
Investment Restricted
Sectors
Polluted Industries
[Area 1] According to Decree 90/2019/NĐ-CP dated 15th November 2019
Lease term
N/A
Minimum Lease Area
1 ha
Limit for Construction
Height
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential
Planning regulation (QCXDVN 01: 2008/BXD)
Permitted Construction Rate
Planned area
Factory Available for Rent
Operation Status
Occupancy Rate and
Number of Projects
▪ Total area: 260.87 ha
▪ Vacant leasable area: 10 ha
▪ Currently, the IZ does not have factory available for rent
In Operation
▪ Occupancy Rate: 80%
▪ Number of Projects: 87
Number of Korean Projects N/A
Lease fee
Operating fee
▪ Land lease fee: 120 - 130 USD/m2
▪ Building lease fee: 3.0 – 4.0 USD/m2/month
▪ Management fee: 1.0 USD/m2/year
▪ Electricity fee: as regulated by the Government
▪ Water fee: ~0.6 USD/m3
INFORMATION OF INFRASTRUCTURE AND FACILITY
Financial institution
Tax service, State finance
office
Customs Service
Logistics
There are many bank branches near IZ.
9 km to Bac Tu Liem Tax Department; 8 km to Bac Tu Liem State Treasury
▪ 10 km to North Hanoi Customs Office
▪ ICD My Dinh is located in North Hanoi Customs Department
Various fast and convenient means:
▪ Road (many national roads across for domestic transportation);
▪ Sea (Haiphong Seaport (via Hai Phong- Hanoi Expressway), Cai Lan Port, Cua Ong Seaport
of Quang Ninh (via Hanoi- Ha Long High Express way);
▪ Air: Noi Bai Airport
522
Post office
4 km to Tan Xuan VnPost of Tu Liem District.
Medicare
7 km to Nguyen Xa Hospital; many national Hospital in Hanoi Urban area.
Police, public security
10 km to Bac Tu Liem Police station
Universities, training
facilities, etc.
There are many universities, colleges and intermediate vocational training in various fields.
Recruitment
Worker dormitory
Worker's child education
facility
One-stop service
Road Width
Hanoi has a redundant source of well-trained labor with many universities, colleges, vocational
schools of all sectors.
Available dorms for workers, specialists and administrative staffs.
N/A
10 km to Bac Tu Liem People’s Committee, where provides one-stop service
▪ External transport system: 40- 60m
▪ Internal transport system: ranging from 18, 21, 30 m
Communication
Infrastructure of Industrial
Zone
Full communication system ensures national and international contact easily, include telephone,
mobile phone, Fax, Internet.
Emergency Power generator
Available
Fire-fighting facility
Available
Layout Plan
Location map
523
Actual View
524
SAI DONG B INDUSTRIAL ZONE
GENERAL INFORMATION OF INDUSTRIAL ZONE
Address
▪ Long Bien district, Hanoi
Investor
Hanoi Electronic Corp. (HANEL)
▪ Address: No. 2, Chua Boc St., Dong Da Dist., Hanoi City
▪ Tel: (84-24) 3 852 2102 / 3 852 4555
Fax: (84-24) 3 852 5770
▪ Email: info@hanel.com.vn
Contact Person
Location
Investment Area
Minimum wage
Lease term
▪ N/A
▪ 8 km to Hanoi Center; 03 km to Gia Lam Station
▪ 87 km to Hai Phong Port; 100 km to Cai Lan Port
▪ 33 km to Noi Bai Airport
Investment priorities
Sectors
Production of food, animal feed; Electronic industry
Investment Restricted
Sectors
Restrict industries affecting the environment
[Area 1] According to Decree 90/2019/NĐ-CP dated 15th November 2019
50-70 years
Minimum Lease Area
N/A
Limit for Construction
Height
N/A
Permitted Construction Rate
N/A
Planned area
Factory Available for Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean Projects
Lease fee
Operating fee
▪ Total area: 47.3 ha
▪ Currently, the IZ does not have factory available for rent
▪ In operation
▪ Occupancy Rate: 100%
▪ Number of Projects: 24
8 companies
▪ Land lease fee: 150 –200 USD/m2/50 years
▪ Management fee: 0.6 USD/m2/year
▪ Infrastructure maintenance fee: 1.5 USD/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: About 0.6 USD/m3
INFORMATION OF INFRASTRUCTURE AND FACILITY
Financial institution
Tax service, State finance
office
Customs Service
Logistics
Post office
There are many bank branches near IZ.
Long Bien Tax department and State Treasury is located in the ID
▪ 3 km to Gia Thuy Customs Office
▪ ICD Gia Thuy í located in Gia Thuy Customs Office
Various fast and convenient means: road (many national roads across for domestic
transportation); Haiphong Seaport (via Hai Phong- Hanoi Expressway), Cai Lan Seaport, Cua
Ong Seaport of Quang Ninh (via Hanoi- Ha Long High Express way); Noi Bai Airport (27 km
away from the ID)
5 km to Long Bien Post office
525
Medicare
10 km to Bach Mai Hospital and Hanoi Medical University Hospital, and many central,
national hospitals in Hanoi
Police, public security
4 km to Long Bien Post office
Universities, training
facilities, etc.
There are many universities, colleges and intermediate vocational training in various fields.
Recruitment
Worker dormitory
Worker's child education
facility
One-stop service
Road Width
Hanoi has a redundant source of well-trained labor with many universities, colleges, vocational
schools of all sectors.
Available dorms for workers, specialists and administrative staffs.
Available
5 km to Long Bien People’s Committee, where provides one-stop service
Main road: 26 m wide
Local/ Branch Road: 20.5 m wide
Communication
Infrastructure of Industrial
Zone
Full service
Emergency Power generator
Available
Fire-fighting facility
Available
Layout Plan
Location Map
526
Actual View
527
NOI BAI INDUSTRIAL ZONE
GENERAL INFORMATION OF INDUSTRIAL ZONE
Address
▪ Mai Dinh Town, Quang Tien Commune, Soc Son district, Hanoi
Investor
Noi Bai Development Co., Ltd
▪ Address: Quang Tien Commune, Soc Son District, Hanoi
▪ Tel: (84-24) 3 582 0332
Fax: (84-24) 3 582 0330
Contact Person
Location
Investment Area
Minimum wage
Ms. Tuyen – Client Relationship Manager - (84) 963 741 780 - tuyen.nguyen@nbiz.com.vn
▪ 25 km to Hanoi Center; 10 km to Phuc Yen Station
▪ 120 km to Hai Phong port; 125 km to Cai Lan Airport.
▪ 3 km to Noi Bai Airport
Investment priorities Sectors
Mechanical Industry, Electronic Industry, Precision Industry,
Light Industry, IT,..
Investment
Sectors
Polluted Sector
Restricted
[Area 1] According to Decree 90/2019/NĐ-CP dated 15th November 2019
Lease term
N/A
Minimum Lease Area
N/A
Limit for Construction
Height
N/A
Permitted Construction Rate
N/A
Planned area
▪ Total area: 114.1 ha. (Phase I: 100 ha ; Phase II: 14.1 ha )
Factory Available for Rent
▪ Currently, the IZ does not have factory available for rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean Projects
Lease fee
Operating fee
▪ In operation
▪ Occupancy rate: 100%
▪ Number of project: N/A
None
135 USD/m2
▪ Management fee: 1 USD/m2/year
▪ Electricity fee: as regulated by the Government
▪ Water fee: ~0.75 USD/m3
INFORMATION OF INFRASTRUCTURE AND FACILITY
Financial institution
Tax service, State finance
office
Customs Service
Logistics
Vietcombank, Agribank near the ID
6.5 km to Soc Son’s State Treasury and Tax Department
10km to Express Delivery Customs Office (Soc Son, Hanoi)
Various fast and convenient means:
▪ Road (many national roads across for domestic transportation);
▪ Sea (Haiphong Seaport (via Hai Phong- Hanoi Expressway), Cai Lan Port, Cua Ong Seaport of
Quang Ninh (via Hanoi- Ha Long High Express way);
▪ Air: Noi Bai Airport
Post office
6.5 km to Soc Son Post Office
Medicare
7 km to Soc Son Hospital. There are many national, central hospitals in Hanoi
528
Police, public security
6km to Soc Son Police Station
Universities, training
facilities, etc.
There are many universities, colleges and intermediate vocational training in various fields.
Recruitment
Worker dormitory
Worker's child education
facility
One-stop service
Road Width
Hanoi has a redundant source of well-trained labor with many universities, colleges, vocational
schools of all sectors.
Available dorms for workers and administrative staffs.
Available
6.5 km to Soc Son People’s Committee, which provides one-stop service
N/A
Communication
Infrastructure of Industrial
Zone
Be able to support domestic and international communication via telecommunication, Fax,
Internet.
Emergency Power generator
Available
Fire-fighting facility
Available
Layout Plan
Location Map
Actual View
529
530
CONG VIEN CONG NGHE THONG TIN INDUSTRIAL PARK
GENERAL INFORMATION
Address
Investors
Tan Dan and Minh Tri communes, Soc Son district, Hanoi city
HIM LAM JOINT STOCK COMPANY
▪ Address: 234 Ngo Tat To Street, Ward 22, Binh Thanh, Ho Chi Minh City, Vietnam
Tel: 02835144348
Geographical features
- The East is adjacent to Sai Dong Be Industrial Park
- The West is adjacent to Dam Quang Trung Street
- The South borders Aeon Long Bien
- The North borders on National Highway 5.
- 15 minutes from Hanoi city center by car, easy to move to neighboring districts as well as to the
northern provinces.
Investment sector
Technology
Minimum wage
Lease term
[Minimum regional salary according to 38/2022/ND-CP]
50 years
Minimum rental area
N/A
Building height limit
N/A
Permissible building rate
N/A
Planned area
Total planned area: 36 (ha)
Area available for rent: 25.9 (ha)
Status
Clearing ground
Occupancy rate and
number of projects in the
area
Number of Korean projects
in the area
37 %
Lease fee
N,/A
Management fee
N/A
N/A
INFRASTRUCTURE
Transportation System: The traffic route N1 has a cross section of 18m wide and a total length of 95.95m. The N2 traffic route
has a cross section of 25m wide, the total length of the route is 391.55m. Traffic route N3 has a cross section of 17.5m wide, total
length of route 302.50m. The traffic route N4 has a cross section of 15m wide, the total length of the route is 84.94m. Traffic
route N5 has a cross section of 15m wide, total length of route 137.56(m) Traffic route D1 has a cross section of 25m wide, total
length of route 756.54m. Traffic route D2 has a cross section
Electricity: National power system (110KV, 220KV...): Underground 22KV power line along industrial road 3, belonging to Sai
Dong B Industrial Park. 22/0.4KV transformer station: 6 stations, total capacity: 11100KVA
Water: Volume of water (m3/day) from Sai Dong B water supply station to supply water to the area with a flow rate of 3500
m3/day
Wastewater treatment: Maximum treatment capacity (m3/day): 3,200 m3/day Factory standard: The centralized wastewater
treatment station is built in accordance with the general planning of the Park, with an isolated green space to meet comply with
QCVN 01/2008.
531
SACH SOC SON INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Investors
Tan Dan and Minh Tri communes, Soc Son district, Hanoi city
Geographical features
Distance from Noi Bai International Airport: 3.7km
Distance from Hanoi city center: 20km
Distance from National Highway 5 to Hai Phong: 24.5km
Distance from Hai Phong port: 120km, Cai Lan port: 125km
Investment sector
Information technology, communication, computer software technology,
biotechnology, microelectronics technology, precision mechanics,
mechatronics, optoelectronics, automation, new materials technology ,
nanotechnology, environmental technology, clean energy technology.
Minimum wage
Lease term
Minimum rental area
Building height limit
[Minimum regional salary according to 38/2022/ND-CP]
50 years
01 ha
N/A
Permissible building
rate
N/A
Planned area
▪ Total area: 302.8ha
Status
Occupancy rate and
number of projects in
the area
Number of Korean
projects in the area
Lease cost
Clearing Ground
1%
DDK Construction Investment Group Joint Stock Company
▪ Address: No. 5, alley 629/15 - Kim Ma Street - Ngoc Khanh Ward - Ba Dinh
District - Hanoi City
▪ Tel: 0243.7830464 - 0243.7830465
None
Land fee: 260 USD/m2
Fee for using infrastructure: 220 USD - 260 USD/m2/50 years for the
manufacturing sector; 250 USD/m2/50 years for logistic projects
Management and maintenance fee for industrial park infrastructure: 0.8
USD/m2/year
Annual land rent: Applied according to regulations of Hanoi People's
Committee
Waste water treatment fee: 4,500 VND/m3
Electricity supply price: Applied according to the electricity supply tariff of
EVN
532
Water supply price: 8,000 VND/m3
Note: The above prices do not include VAT and are subject to change without
prior notice
533
[- This Page is intentionally left blank -]
534
HAU GIANG
535
INVESTMENT ENVIRONMENT IN HAU GIANG
USD/VND 23.510
GENERAL INFORMATION
Area
Population
Geographical
Location
Adjacent provinces
1621 km2
0,729 million people (2022)
▪ Hau Giang is located in Mekong Delta River region.
▪ Belongs to Mekong Delta
It borders with Can Tho City, Vinh Long Province on the north, Bac Lieu Province on the south, Soc
Trang Province on the east, and Kien Giang Province on the west.
2022 statistic:
GRDP
Industry growth
Import - Export
Key Industry
PCI
Ranking
▪ Real GRDP (billion VND):
48.062
▪ GRDP growth:
13,94%
▪ GRDP per capita (million VND/year):
65,89
(2,03 billion USD)
(2657 USD)
▪ Economic structure:
- Industry - Construction:
29,95%
- Agriculture. forestry and fishery:
24,06%,
- Service:
36,86%
▪ Industry - Construction growth:
6,63%
▪ Agriculture, forestry and fishery growth:
-3,00%
▪ Service growth:
-2,97%
Import turnover (billion USD):
0,35
(Growth rate: -0,02)
Export turnover (billion USD):
0,77
(Growth rate: 0,257)
Processing, manufacturing, electricity generation and distribution, water supply, waste management and
treatment activities, seafood and aquatic product processing, livestock and livestock feed production
poultry and aquatic products, manufacturing products from prefabricated metal
68.12
12
SOCIAL INFRASTRUCTURE
Transportation
Electricity
Water
▪ Roadway: The province has 6 national highways with a total length of more than 158 km
▪ Railway: Hau Giang will focus on directing the completion of the project DT926B connecting Can Tho Ca Mau expressway and Soc Trang province, DT925B connecting Vi Thanh city with Can Tho city and
connecting to the Can Tho - Ca Mau expressway intersection with Chau Doc - Soc Trang; DT931 to
connect with Hong Dan district, Bac Lieu province... to create motivation for local socio-economic
development.
▪ Waterway: some main canal routes such as Xa No canal, Quan Lo - Phung Hiep canal, dredging KH9
canal, Lai Hieu canal, 8,000 canal
Solar and wind power projects are being approached by investors, the Provincial People's Committee is
asking the Ministry of Industry and Trade to submit to the Prime Minister to supplement solar power
projects with a total capacity of 900MW and power projects. wind with a total capacity of 350MW in Hau
Giang province in the Power Plan VIII in the period of 2021 - 2025.
The rate of urban population using clean water 97%, the rate of rural population using clean water
88.95%. This group of targets exceeded the plan.
(16) Rate of domestic waste in urban and rural areas is collected and treated 90%, reaching the plan.
Education &
Training
N/A
Medicare
N/A
INVESTMENT CONDITION
Human resource
of population are in the working age (2022)
Education level
Trained labor rate: 65,37% (2022)
Salary
▪ The minimum salary for the province is applied as follows:
536
- Area I (4,680,000 VND/month): N/A
- Area II (4,160,000 VND/month): N/A
- Area III (3,640,000 VND/month): Vi Thanh, Nga Bay City and Chau Thanh, Chau Thanh A Districts
- Area IV (3,250,000 VND/month): Long My Town, Vi Thuy, Long My, Phung Hiep Districts
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages
paid to employees working under employment contracts)
▪ Incentives according to government regulations:
- Exemption and reduction for land and water rent fee
Investment incentives
- Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
▪ Prioritized projects:
- For Industrial manufacturing: mechanical manufacture, assembly,
- For the investment projects in infrastructures in economic zones, rural area; commerce and services:
Fields Attracting
infrastructures in industrial zones, rural areas, commercial and services centers.
Investment
- For the environmental fields: Water supply for the industrial zones, rural areas; Solid waste treatment,
water waste centralized treatment.
Investment attraction No new FDI projects are granted in the year; Accumulated so far, there are 24 FDI projects, with a total
registered capital of nearly 607.4 million USD
situation
Industrial zones
2 industrial zones (Song Hau, Tan Phu Thanh), 8 industrial clusters (CCNs) with a total area of 744 ha.
Map
Hau Giang Department Of Planning And Investment
▪ Address: No 7, Xo Viet Nghe Tinh Street, Ward 5, Vi Thanh City, Hau Giang Province
Contact
▪ Tel: 2933870214
▪ Email: maunt.skhdt@haugiang.gov.vn
▪ Contact person:
- Ms. Nguyen Thi Mau- Deputy Director of Department of Planning and Investment of Hau Giang
province
LIST OF INDUSTRIAL ZONE
537
No.
1
3
4
Name of industrial zone
Song Hau Industrial Park - Phase 1
Central area for operating IT zones
Tan Phu Thanh Industrial Park
Total area
290,79 ha
12,75 ha
201 ha
538
Occupancy Rate
83%
SONG HAU INDUSTRIAL PARK
GENERAL INFORMATION
Address
Investors
Dong Phu Commune, Chau Thanh District, Hau Giang Province
HIM LAM JOINT STOCK COMPANY
▪ Address: 234 Ngo Tat To Street, Ward 22, Binh Thanh, Ho Chi Minh City, Vietnam
Tel: 02835144348
Geographical features
- The East is adjacent to Sai Dong Be Industrial Park
- The West is adjacent to Dam Quang Trung Street
- The South borders Aeon Long Bien
- The North borders on National Highway 5.
- 15 minutes from Hanoi city center by car, easy to move to neighboring districts as well as to the
northern provinces.
Investment sector
Lease term
Agro-fishery processing, production.
Machine manufacturing.
Production of consumer goods.
Producing food, foodstuffs, spare parts for production, daily life,....
[Minimum regional salary according to 38/2022/ND-CP]
Since 2009
Minimum rental area
N/A
Building height limit
N/A
Permissible building rate
N/A
Planned area
Total planned area: 290.79ha
Status
In operation
Occupancy rate and
number of projects in the
area
Number of Korean projects
in the area
83%
Lease fee
68 USD/m2
Management fee
0,5USD/m2/year
Minimum wage
N/A
539
[- This Page is intentionally left blank -]
540
HO CHI MINH
541
INVESTMENT ENVIRONMENT IN HO CHI MINH
GENERAL INFORMATION
Area, Population
▪ Area: 2,095 km2
▪ Population: 9,3 million (2022 statistics)
Geographical Location
▪ Located in the South region of Vietnam.
▪ Located 1760 km from Hanoi capital
Adjacent provinces
The city is adjacent to Binh Duong province to the north, with Tay Ninh province to
the northwest, with Dong Nai province to the east and northeast, with Ba Ria - Vung
Tau province to the southeast, and with Long An and Tien Giang to the west and
southwest.
GRDP
Industry growth
PCI
2022 statistics:
▪ GRDP: 1.479.227 billion VND (# 64 billion USD)
▪ GRDP growth: 9,03%
▪ GRDP per capita: 6.770 USD/year
▪ Economic structure:
- Industry - Construction: 22,1%;
- Agriculture. forestry and fishery: 0,6%;
- Service: 64%;
- Tax on Goods: 13,3%
2022 statistics:
▪ Industry - Construction growth: 11,95%
▪ Agriculture, forestry and fishery growth: 3,74%
▪ Service growth: 8,37%
▪ Score: 65.86 – ranked 27 out of 63 cities and provinces in Vietnam. (2022)
SOCIAL INFRASTRUCTURE
Transportation
▪ Roadway: Ho Chi Minh City is 1,760km from Hanoi, 99km from Tay Ninh, 30km
from Bien Hoa (Dong Nai), 70km from My Tho, 125km from Vung Tau, 168km
from Can Tho, 308km from Dalat, and 375km from Buon Ma Thuot. The City has
National Highway 13 which connects Vietnam with the rest of Indochina.
▪ Railway: Thong Nhat express train connects Ho Chi Minh City to Hanoi, through
many provinces in Vietnam
▪ Waterway:
- Having 110 river & canal routes with the total length of nearly 1,000 km, along
with a system of seaports and inland waterways;
- Saigon Port as the largest seaport system in Vietnam, having an important
strategic position in economic development, acting as an international gateway for
foreign trade activities of the whole country
▪ Airway: Tan Son Nhat International Airport, 7km from the city hub to the north,
being one of the biggest international airports in Vietnam with the current designed
handling capacity of 28 million passengers per year, actual capacity of over 30
million passengers per year & future expansion to 50 million (T3 terminal under
construction); operating over 250,000 domestic and international flights yearly with
domestic flights to & fro Hanoi, Da Nang City and numerous cities and provinces in
all regions across Vietnam as well as international flights to over 30 foreign countries
and territories across the world
▪ Other: The ongoing Hochiminh City Metro project – a combination of metro,
tramway and monorail with a total length of 225.5km, consisting of 8 urban
railway lines with the total length of 169km, 1 tram line of 12.8km and 2 monorail
lines of 43.7 km, 175 stations; Line 1 Ben Thanh-Suoi Tien (19.7km long, 14
stations), construction start in 2007 & operation expected in 2024
Electricity
Power from the national grid of 500/220/110KV power stations supplies power to Ho
Chi Minh City with a capacity of 12,454.2 MW.
542
Water
Currently, raw water sources are mainly exploited (up to 94%) from surface water
including The Dong Nai river basin and Saigon river basin, and a small part (6%)
from groundwater. The total design water supply capacity of current water plants is
2,400,000 m3/day, and the average actual water generation capacity of 2019: is
1,928,000 m3/day. Some of the main parameters of the City's current water supply
system are as follows:
- Percentage of population with water supply: 100%.
- Average consumption of clean water through the city's water supply system: 1.93
million m3/day.
- Total design capacity of water plants: 2.40 million m3/day.
- Average total capacity of water generation from water plants: 1.53 million
m3/day.
- Total number of customer connections: 2.14 million.
- Total length of clean water transmission and distribution network: 8,200 km.
- Rate of loss of clean water loss: 20.85%.
Education
Ho Chi Minh City has abundant human resources with high technical
skills,advanced education system with 75 universities and colleges and 700,000
students
Medicare
▪ 128 hospitals and some hundreds of medical examination & treatment facilities
INVESTMENT CONDITION
Human resource
▪ 8,8% of population (50.557.000 people) are in the working age, about 4.3 million
workers (2022)
Education level
▪ Trained labor rate: 87,56% (2022)
Salary
▪ The minimum salary for the province is applied as follows:
- Area I: In Ho Chi Minh City, all districts, Thu Duc city and 4 districts (Nha Be,
Binh Chanh, Hoc Mon, Cu Chi) apply the region I minimum wage (minimum wage
is 4.68 million VND/month) and 22,500 VND/hour).
- Area II: Can Gio district applies the minimum wage in Region II (minimum is
4.16 million VND/month and 20,000 VND/hour).
▪ The lowest wage for trained labor (including those trained by the enterprises)
must be at least 7% higher than the above referenced basic salary
Investment incentives
▪ Incentives according to government regulations:
Corporate Income tax incentives, Exemption of Import Duty and Export Tax, Land
rent incentives, Incentives on accelerated depreciation
Fields Attracting Investment
▪ Prioritized projects:
Prior to attracting the leading technology corporations that are at the top of
production chains, have high technology usage, and have strengths in the field of
R&D.
Prior to investors who are financially strong, have new technologies with high
intellectual properties, and are environmentally friendly.
Prior to attracting of service industries with high added value and high scientific and
technological content; digital economy and application of artificial.
Prioritize the information technology industries towards automation, using clean
energy, renewable energy
543
Map
Contact
Department of Planning and Investment
▪ Address: 32 Le Thanh Ton Street, Ben Nghe Ward, Distric 1, Ho Chi Minh City,
Viet Nam
▪ Tel: (028).38.293.179 - (028).38.227.495 - (028).38.293.174
▪ Fax : (84.8) 38295008 – 38290817
▪ Email: skhdt@tphcm.gov.vn
▪ Website: http://www.dpi.hochiminhcity.gov.vn/
LIST OF INDUSTRIAL ZONES
Industrial zone Name
Total Area (ha)
Occupancy Rate
Status
Dong Nam Industrial Park
342 ha
95%
In operation
Hiep Phuoc Industrial Park
597 ha
30%
In operation
Le Minh Xuan 3 Industrial
Park
311 ha
60%
In operation
Le Minh Xuan Industrial
Park
100 ha
100%
In operation
544
Tan Phu Trung Industrial
Park
542.64 ha
80%
In operation
Tan Thuan Export
Processing Park
300 ha
83%
In operation
Tay Bac Cu Chi Economic
Zone
381,24 ha
98%
In operation
Vinh Loc Industrial Park
207 ha
94%
In operation
545
DONG NAM INDUSTRIAL ZONE
GENERAL INFORMATION
ADDRESS
INVESTOR
Provincial Road No.8, Binh My – Hoa Phu Commune, Cu Chi District, Ho Chi Minh City,
Vietnam
Sai Gon VRG Investmet Corporation
CONTACT PERSON
Mobile: (+84) 948 859 999
Email: info@saigonvrg.com.vn
LOCATION





Distance to Ho Chi Minh City Center: 24 km
Distance to Thu Dau Mot, Binh Duong: 05 km
Distance to Cat Lai Port: 44 km
Distance to Cai Mep – Thi Vai deep seaport: 90 km
Distance to Tan Son Nhat Airport: 24 km
Priority Sectors
for Investment
Electronics industry, high-tech industry and supporting industries,
medical equipment and medicine, food processing, mechanics.
Restricted Sectors
for Investment
Production of iron, steel, construction materials, paper, chemicals,
textiles and garment products, v.v
INVESTMENT AREA
MINIMUM WAGE
[Area 1] According to Decree 38/2022/ND-CP dated June 12th, 2022
LEASE TERM
 Start date: 2008
 End date: 2058
MINIMUM LEASE AREA
Not available
LIMIT FOR CONSTRUCTION
HEIGHT
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Residential Planning Regulation (QCXDVN 01:2008/BXD)
PERMITTED CONSTRUCTION
RATE
PLANNED AREA
 Total area: 342 ha
 Total vacant leasable area: 95% occupied

FACTORY AVAILABLE FOR
RENT

OPERATION STATUS
OCCUPANCY RATE AND
NUMBER OF PROJECTS
NUMBER OF KOREAN
PROJECTS
LEASE FEE
Factory for rent:
Minimum area for rent: 1,000 m2
Rent contract term: minimum 3 years.
Deposit: 3-6 months
Land for lease: 2 ha (minimum area)
In operation
Occupancy rate: 95%
03
For information of land and factory for lease, contact:
 Mobile: (+84) 948 859 999 (Ms. Janice)
 Email: info@saigonvrg.com.vn

OPERATING FEE (NOT
INCLUDING VAT)

Management fee:
- Land: 0.63 USD/m2/year;
- Factory for rent: 0.8 USD/m2/year;
Electricity fee: as regulated by the Government
546
 Water fee: 0.59 USD/m3/month
 Wastewater treatment fee: 0.405 USD/m3/month
INFRASTRUCTURE AND FACILITY
Vietcombank
FINANCIAL INSTITUTION
TAX SERVICE, STATE FINANCE
15 km to Cu Chi Tax Department
OFFICE
27 km to Linh Trung Export Processing Zone Customs Department
CUSTOMS SERVICE
Not Available
LOGISTICS
15 km to Cu Chi Post Office
POST OFFICE
20 km to Cu Chi General Hospital
MEDICARE
24/7 security service
POLICE, PUBLIC SECURITY
UNIVERSITIES, TRAINING
FACILITIES, ETC.
 15 km to Ho Chi Minh City University of Foreign Languages – Information
Technology
 21 km to Industrial University of Ho Chi Minh City
 8 km to Thu Dau Mot University of Binh Duong Province
RECRUITMENT
Supported by Industrial zone developer
WORKER DORMITORY
Worker Dormitory project available and demanding from tenants
WORKER’S CHILD EDUCATION
FACILITY
ONE-STOP SERVICE
ROAD WIDTH
IT & TELE-COMMUNICATION
FACILITIES
EMERGENCY POWER
GENERATOR
FIRE-FIGHTING FACILITY
Not available
Inside the zone
Main road: 29 m – 40 m; Branch road: 15 m – 22 m
Telecommunication systems are ready to meet the communication needs.
Available in the zone
The water supply network for firefighting is designed in conjunction with the potable
water supply network, which is located along the roads.
LAYOUT PLAN
547
LOCATION MAP
ACTUAL VIEW
548
LIST OF TENANTS IN DONG NAM IP
No.
Company name
1
USA
Solar panels
Austria
Pakistan
Vietnam
Package
Medicine
Food Flavor
Japan
Vietnam
Package
Sanitary equipment
Vietnam
British Virgin Isl.
Taiwan
Vietnam
Vietnam
Vietnam
Gas
Garment
Garment
Veterinary medicine
Dairy products
Electrical equipment
Vietnam
Vietnam
Vietnam
South Korea
Vietnam
Vietnam
Candle
Package
Medicine
Rubber spare parts
Furniture
Furniture
19
20
21
FIRST SOLAR VIETNAM MANUFACTURING COMPANY
LTD
ALPLA PACKAGING (VIETNAM) COMPANY LIMITED
AM VI PHARMACEUTICAL JOINT STOCK COMPANY
WESTERN FLAVORS FRAGRANCES PRODUCTION
JOINT STOCK COMPANY
JAPAN PLUS VIETNAM CO.,LTD
NAM DO PRODUCTION TRADING JOINT STOCK
COMPANY
INDUSTRIAL GAS T.H.T CO., LTD
WORLDON (VIET NAM) COMPANY LIMITED
SHEICO (VIET NAM) CO., LTD
MINH NGAN VETERINARY MEDICINE CO., LTD
VIETNAM DAIRY PRODUCTS JOINT STOCK COMPANY
TRUONG GIANG ELECTRICAL TRADING PRODUCTION CO., LTD
ZHONG SHENG CANDLE COMPANY LIMITED
HOANG NAM PRODUCTION COMPANY LIMITED
IVC JOINT STOCK COMPANY
BANSUK VIETNAM CO.,LTD
NHAN HOANG FURNITURE CORPORATION
NGOC HOANG GIA MANUFACTURING TRADING CO.,
LTD
SAGOPHAR CO., LTD
ANPHACHEM COMPANY LIMITED
GCP VIETNAM COMPANY LIMITED
Vietnam
Vietnam
Singapore
22
23
24
25
26
27
28
29
30
31
SHEICO WATERSPORTS (VIETNAM) CO., LTD.
TAN HOANG GIA TRADING COMPANY LIMITED
MODO LIVING COMPANY LIMITED
CJ VINA AGRI CO., LTD.
AT&N COMPANY LIMITED
HAZEL COSMETIC JOINT STOCK COMPANY
BMO INT CO., LTD
VINA MOLYMER COMPANY LIMITED
GOTIME ECO SCIENCE JOINT STOCK COMPANY
GLOBAL SAFEWEAR VIETNAM CO., LTD.
Taiwan
Vietnam
Vietnam
South Korea
Vietnam
Vietnam
Korea
Japan
Vietnam
New Zealand
Veterinary medicine
Food Flavor
Construction
additives
Garment
Furniture
Furniture
Meat processing
Cosmetics
Cosmetics
Machinery
Sanitary equipment
Cosmetics
Safe wear
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Nationality
549
Business line
HIEP PHUOC INDUSTRIAL PARK
GENERAL INFORMATION
Name of industrial
park (IP)
HIEP PHUOC INDUSTRIAL PARK (Phase 2)
Location of IP (city,
province and district)
Nha Be District
Period of operation
UP TO SEPTEMBER 23, 2058
Type of IP
Total land size of IP
(ha)
Size of industrial lot/
factory outlet inside
the IP) (m2)
Total leasable area
(ha)
Rate of occupancy of
IP
Nearest ring road
light, clean and un-polluted industry, non labor intensive, logistics.
597 ha
Total area of Hiep Phuoc Industrial Park Phase 2 is at 597 ha of land with 64 current enterprises
350 Ha
30%
Nguyen Van Linh street
Distance (km)
13km
The nearest national
railway
Sai Gon station
Distance (km)
20
The nearest airport
Tan Son Nhat Airport
Distance (km)
25km
Hiep Phuoc Port: 1km
Cat Lai Port : 23 km
The nearest port
INFRASTRUCTURE
Main road system width and number of
lanes
Internal road system
- width and number
of lanes
Power supply
Water supply
Sewage treament
system
INVESTMENT COST
Land
Road 60m wide
Road 25m, 35m wide
National grid
45,000 (m3/day)
18,000
597ha
Leasing term - year
Up to September 23, 2058
Rental price
Not available
Electricity Price (USD/Kwh)
550
Peak time
VND 2,871
Regular time
VND 1,555
Peak off time
VND 1,007
Price of water supply
(USD/m3)
Average income per
worker (USD/month)
VND 10.800/m3
~ 6.000.000 VND -~ 8.000.000 VND/ tháng
INVESTOR INFORMATION
Other
competitiveness:
Focused type of
industry/ investment
:
Name of IP
developer
ideal location closed to the downtown, convenient for labor recruitment, inside ports, comprehensive
infrastructure.
light, clean and un-polluted industry, non-labor intensive, logistics.
Hiep Phuoc Industrial Park Joint Stock Company.
Address:
Headquarter: Division B, Road No. 1, Hiep Phuoc Industrial Park, Hiep Phuoc Commune, Nha Be
District, HCMC
Contact person
Mr Tan - Sale & Marketing Deputy Director: (+84) 984865516 email: tan.huong@hiepphuoc.com
Sale & Marketing Department: (+84) 964 11 88 33 email: marketing@hiepphuoc.com
Location map
551
Layout plan
552
LE MINH XUAN 3 INDUSTRIAL ZONE
GENERAL INFORMATION
ADDRESS
Provincial Road No.10, Le Minh Xuan Commune, Binh Chanh District, Ho Chi Minh
City, Vietnam
INVESTOR
Sai Gon VRG Investmet Corporation
CONTACT PERSON
Mobile: (+84) 948 859 999 (Ms. Janice)
Email: info@saigonvrg.com.vn
LOCATION






INVESTMENT AREA
Priority Sectors
for Investment
Electronics industry, high-tech industry and supporting industries,
medical equipment and medicine, food processing, mechanics.
Restricted
Sectors for
Investment
Production of iron, steel, construction materials, paper, chemicals,
textiles and garment products, v.v
Distance to Outer Ring Road No.3: Directly connected
Distance to Ho Chi Minh – Trung Luong Highway: 11 km
Distance to Tan Tao Industrial Park: 04 km
Distance to Cat Lai Port: 35 km
Distance to Cai Mep – Thi Vai deep seaport: 85 km
Distance to Tan Son Nhat Airport: 18 km
MINIMUM WAGE
[Area 1] According to Decree 38/2022/ND-CP dated June 12th, 2022
LEASE TERM
 Start date: 2014
 End date: 2064
MINIMUM LEASE AREA
Not available
LIMIT FOR CONSTRUCTION
HEIGHT
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Residential Planning Regulation (QCXDVN 01:2008/BXD)
PERMITTED CONSTRUCTION
RATE
PLANNED AREA
 Total area: 311 ha
 Total vacant leasable area: not available for lease
FACTORY AVAILABLE FOR
RENT


Factory for rent:
Minimum area for rent: 680 m2
Rent contract term: minimum 3 years.
Deposit: 3-6 months
Land for lease: 1.2 ha (minimum area)
OPERATION STATUS
In operation
OCCUPANCY RATE AND
NUMBER OF PROJECTS
Occupancy rate: 60%
NUMBER OF KOREAN
PROJECTS
Not available
LEASE FEE
For further information of land and factory for lease, contact:
 Mobile: (+84) 948 859 999 (Ms. Janice)
 Email: info@saigonvrg.com.vn
553
OPERATING FEE (NOT
INCLUDING VAT)




Management fee:
- Land: 0.65 USD/m2/year;
- Factory for rent: 0.8 USD/m2/year;
Electricity fee: as regulated by the Government
Water fee: 0.54 USD/m3/month
Wastewater treatment fee: 0.4 USD/m3/month
INFRASTRUCTURE AND FACILITY
FINANCIAL INSTITUTION
Vietcombank, Agribank
TAX SERVICE, STATE FINANCE
OFFICE
CUSTOMS SERVICE
13 km to Binh Chanh Tax Department
LOGISTICS
Not Available
POST OFFICE
 06 km to Ba Hom Post Office (Binh Tan, Ho Chi Minh)
 15 km to Tan Kien Post Office (Binh Tan, Ho Chi Minh)
 12 km to Binh Chanh Post Office (Binh Chanh, Ho Chi Minh)
MEDICARE
 14 km to Binh Chanh General Hospital
 07 km to Quoc Anh General Hospital
 09 km to Trieu An General Hospital
POLICE, PUBLIC SECURITY
UNIVERSITIES, TRAINING
FACILITIES, ETC.
24/7 security service
 08 km to Ho Chi Minh International College
 09 km to South Vietnam Agriculture and Forestry College
RECRUITMENT
Supported by Industrial zone management board
WORKER DORMITORY
Not available
WORKER’S CHILD EDUCATION
FACILITY
ONE-STOP SERVICE
Not available
ROAD WIDTH
Zone B: Main road: 18m – 22m; Branch road: 16,5 m
Zone A: Main road: 25m – 30m; Branch road: 18 m
Telecommunication systems meet the communication needs.
IT & TELE-COMMUNICATION
FACILITIES
EMERGENCY POWER
GENERATOR
FIRE-FIGHTING FACILITY
34 km to Linh Trung Export Processing Zone Customs Department
Not available
Available in the zone
The water supply network for firefighting is designed in conjunction with the potable
water supply network, which is located along the roads.
LAYOUT PLAN
554
LOCATION MAP
ACTUAL VIEW
LIST OF TENANTS IN LE MINH XUAN 3 IP
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
Company name
VOLGA VN CORPORATION
SIEU THANH MANUFACTURING TRADING INVESTMENT CO.,
LTD.
VI GIA SHOES COMPANY LIMITED
BLUE SKY PACKAGING JOINT STOCK COMPANY
TAN TIEN SENKO MANUFACTURING COMPANY LIMITED
VINH NAM IMPORT EXPORT MANUFACTURING TRADING
CO., LTD.
CDT PRODUCTION CO., LTD
CP PAPER CORPORATION
ROEDERS VIETNAM COMPANY LIMITED
VIETNAM PAIHO., LTD
BEN THANH - HIEU UYEN COMPANY LIMITED
ANHNGA MOTOR MANUFACTURING COMPANY LIMITED
SONG THANH TEXTILE DYEING COMPANY LIMITED
KIEN DANG TEXTILE DYEING COMPANY LIMITED
DANG THANH SERVICE TRADING MANUFACTURING CO.,
LTD.
DUC PHU MINH COMPANY LIMITED
TAN GIA ANH TEXTILE AND DYEING CO., LTD.
THANH PHAT TEXTILE DYEING COMPANY LIMITED
TRANG KIEM PRODUCTION TRADING COMPANY LIMITED
DUC PHUC TEXTILE DYEING COMPANY LIMITED
HOANG LONG TEXTILE DYEING FABRIC YARN CO., LTD
THAI BINH DUONG TEXTILE SERVICE TRADING
MANUFACTURING CO., LTD.
THIEN PHU THINH TRADING MANUFACTURING CO., LTD.
VIET PHAT TEXTILE AND DYEING CO., LTD.
PHUOC THINH DYEING COMPANY LIMITED
DUNG TAM TEXTILE SERVICE TRADING MANUFACTURING
CO., LTD.
MINH DUC TEXTILE DYEING COMPANY LIMITED
ECPVN SAIGON 1 LIMITED LIABILITY COMPANY
CHANG YUAN MATERIAL CO., LTD
555
Nationality
Vietnam
Vietnam
Business line
Package
Plastic equipment
Vietnam
Vietnam
Vietnam
Vietnam
Shoes
Package
Machinery
Package
Vietnam
Vietnam
Germany
Taiwan
Vietnam
Vietnam
Vietnam
Vietnam
Vietnam
Machinery
Package
Mechanical equipment
Garment
Machinery
Machinery
Textile & Dyeing
Textile & Dyeing
Textile & Dyeing
Vietnam
Vietnam
Vietnam
Vietnam
Vietnam
Vietnam
Vietnam
Textile & Dyeing
Textile & Dyeing
Textile & Dyeing
Textile & Dyeing
Textile & Dyeing
Textile & Dyeing
Textile & Dyeing
Vietnam
Vietnam
Vietnam
Vietnam
Textile & Dyeing
Textile & Dyeing
Textile & Dyeing
Textile & Dyeing
Vietnam
Canada
Taiwan
Textile & Dyeing
Cold storage
Molding
30
31
32
33
34
35
36
VINH KIEN THINH MACHINERY - CONSTRUCTION - TRADE SERVICE CO., LTD.
KONOHANA VIET NAM PACKAGING PAPER CO., LTD
THIEN LONG GLOBAL TRADING AND SERVICE CO., LTD.
TAM MINH FOOD COMPANY LIMITED
ANAMET VIETNAM COMPANY LIMITED
LAM AN PACKAGING SX CO.,LTD
SOCIAL BELLA RETAIL VIETNAM COMPANY LIMITED
556
Vietnam
Chemicals
Japan
Vietnam
Vietnam
Netherland
Vietnam
Indonesia
Package
Stationery
Food
Mechanical equipment
Package
Cosmetics
LE MINH XUAN INDUSTRIAL ZONE
GENERAL INFORMATION
ADDRESS
INVESTOR
CONTACT PERSON
LOCATION
INVESTMENT AREA
MINIMUM WAGE
LEASE TERM
MINIMUM LEASE AREA
LIMIT FOR CONSTRUCTION
HEIGHT/ PERMITTED
CONSTRUCTION RATE
PLANNED AREA
FACTORY
AVAILABLE FOR
RENT
OPERATION
STATUS
OCCUPANCY RATE AND
NUMBER OF PROJECTS
NUMBER OF KOREAN
PROJECTS
LEASE FEE
OPERATING FEE
Lot B, Street No. 04, Central Park B, Le Minh Xuan Industrial Zone, Le Minh Xuan
ward, Binh Chanh district, Ho Chi Minh city, Vietnam
Khang Phuc House Trading Investment Company Limited
Address: 550 Kinh Duong Vuong Street, An Lac A ward, Binh Tan district, Ho Chi
Minh city, Vietnam.
Tel: (84-28) 3875 3021 – 3876 6172
Website: https://www.khangphuchouse.com.vn/
Mr. Trieu - Sales & Marketing Deputy Manager - Mobile: (84) 919490224 - Email:
trieu.truong@khangphuchouse.com.vn
18 Km from Ho Chi Minh City Center
18 Km from Tan Son Nhat International Airport
18 Km from Sai Gon Seaport
06 Km from National Highway No. 01A and 06 Km from Provincial Highway No. 10
Priority sectors for investment: Multi – Industry
Restricted sectors for investment: Industries that are polluting.
[Region 1] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum
salaries
1997 – 2047
2.000 m2
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Residential Planning regulation (QCXDVN 01: 2008/BXD)
Total area: 100 ha
Total vacant leasable area: Unavailable
Unavailable
In operation
Occupancy Rate: 100%
Number Of Projects: 169 projects
0 project
Land and factory lease fee: Unavailable
Management fee: 1,400 VND/m2/month (excluded VAT)
Electricity fee: According to the Circular by Ministry of Industry and Trade, valid from
March 16th, 2015 (excluded VAT) for voltage from 22KV-110KV
Water fee: 13,000 VND/m3 (excluded VAT)
Wastewater treatment fee: From 9.829 VND and more depending on the level pollution
of the waste water (excluded VAT)
INFRASTRUCTURE AND FACILITY
FINANCIAL INSTITUTION
TAX SERVICE, STATE FINANCE
OFFICE
CUSTOMS SERVICE
LOGISTICS
POST OFFICE
MEDICARE
POLICE, PUBLIC SECURITY
UNIVERSITIES, TRAINING
FACILITIES, ETC.
RECRUITMENT
WORKER DORMITORY
WORKER'S CHILD EDUCATION
FACILITY
ONE-STOP SERVICE
ROAD WIDTH
IT&TELECOMUNICATION
FFACILITIES
EMERGENCY POWER
18 km from Ho Chi Minh Tax Office
Inside Le Minh Xuan Industrial Zone
Inside Le Minh Xuan Industrial Zone
1 km from Vietnam Post Office
Inside Le Minh Xuan Industrial Zone
24/7 security service
No planning of universities near Le Minh Xuan Industrial Zone
Khang Phuc House Trading Investment Company Limited will support in recruitment
Many rental houses and hotels within a radius of 2km
2 Km from the zone
Hepza – 35 Nguyen Binh Khiem Street, District 1, HCM City
Main roads: road limit: 8 m, 2 lanes
By roads: road limit: 5 - 8 m, 2 lanes
Inside Le Minh Xuan Industrial Zone
5km from Le Minh Xuan Industrial Zone
557
GENERATOR
FIRE- FIGHTING FACILITY
LAYOUT PLAN
Inside Le Minh Xuan Industrial Zone
LOCATION MAP
https://goo.gl/maps/kScT5BRBAdbMxGmo8
558
ACTUAL VIEW
559
TAN PHU TRUNG INDUSTRIAL ZONE
GENERRAL INFORMATION
ADDRESS
Northwest Saigon City Development Corporation (SCD)
Headquarter: National Highway No.22 (Asian Highway 1), Tram Bom Hamlet, Tan Phu Trung
Commune, Cu Chi District, Ho Chi Minh City, VN
Tel: (+84.28) 3796 5862 – 37963379
Hotline: (+84) 0934910919
Email: scd@tanphutrung-iz.com
Website: www.tanphutrung-iz.com
INVESTOR
Key shareholders:
 Kinh Bac City Development Holding Corporation (KBC) under Saigon Invest Group (SGI)
 Ho Chi Minh City Finance and Investment State-owned company (HFIC)
CONTACT PERSON
LOCATION
 Ms. Lan - Sale & Marketing Deputy Director: (+84) 934910919 – (+84) 903370302
lantanphutrung.iz@gmail.com
 Sale & Marketing Department: (+84.28) 37965862 ttkd.scd.iz@gmail.com
Located in the northwest of Ho Chi Minh City, Tan Phu Trung Industrial Zone is on the facade of
National Highway No.22, Tan Phu Trung Commune, Cu Chi District. Bordering Tay Ninh
Province to the North, Binh Duong Province to the East, Long An Province to the West and Hoc
Mon District, Ho Chi Minh City to the South, it belongs to the Northwest City’s urban planning
with an area of 6,000 hectares.
Details about Tan Phu Trung Industrial Park (IP)’s position (in favor of land transport)
Road:
 25 km away from Ho Chi Minh City center
 55 km away from Moc Bai International Border Gate
 National Highway No.22: Spanning HCMC center, Tan Binh District, District 12, Hoc Mon
District and Cu Chi District (HCMC). This is the route that connects Cu Chi (HCMC) and
Moc Bai and Xa Mat international border gates (Tay Ninh province) that border Cambodia.
It is one of the roads under the Asian Highway project implemented between HCM City and
Cambodia.
 National Highway No.1A: It is a route running throughout Vietnam which starts from Huu
Nghi (Friendship) border gate on the border with China and ends in Nam Can Town, Ca Mau
province. Considered as the most important route in Vietnam, Highway No.1A passes through
centers of half of the provinces in Vietnam and connects four big cities in Vietnam: Ha Noi,
Da Nang, Ho Chi Minh City and Can Tho.
 Provincial Road No. 8: It connects the key economic triangle area of Long An, Binh Duong
provinces and HCMC.
 Ring Road 3: Starting at Ben Luc - Long Thanh expressway ending at Ho Chi Minh City Trung Luong expressway, will pass through 6 important intersections, including the Ho Chi
Minh City - Moc Bai Expressway Interchange belt 3 Cu Chi (HCMC). Ring road 3 intersects
National Highway 22 (Hoc Mon) at the route Km 8 + 800 along the route of National Highway
22, parallel to An Ha canal.
 Ring Road 4: Starting at the intersection with Bien Hoa - Vung Tau Expressway at Km 40 +
000 (Phu My area), towards Long Thanh international airport, intersecting with HCMC Long expressway Thanh - Dau Giay, intersects with National Highway 1A, intersects with
National Highway 22 in Cu Chi, crosses Ben Luc town, intersects with Ho Chi Minh City Trung Luong highway, the end point connects to the North-South trunk road in the urban area.
Hiep Phuoc port town, HCMC.
 Ho Chi Minh City-Moc Bai Expressway: the expressway will run side-by-side with
National Highway No. 22, starting from an intersection with Ring Road No. 3 and cross the
Ring Road 4 in Ho Chi Minh City and ending at the Moc Bai border gate economic zone in
Tay Ninh.
Ports:
 27 km from Saigon Port
 35 km from Cat Lai Port
560
 30 km away from VICT Port
 37 km from Lotus Port
Dock load:
Saigon Port:
* Container depot: 570,000m2
* Wharves: 2,300m
* Being able to handle vessels with a maximum load of 50,000 DWT (approximately 50,000 tons)
Cat Lai Port:
* Container depot: 62,000m2
* Wharves: 296m
* Being able to handle vessels with a maximum load of 30,000 DWT (approximately 30,000 tons)
VICT Port
* Container depot: 99,840m2
* Wharves: 678m
* Being able to handle vessels with a maximum load of 40,000 DWT (approximately 40,000 tons)
Lotus Port
* Container depot: 150,000m2
* Wharves: 300m
* Being able to handle vessels of up to 45,000 DWT (equivalent to 45,000 tons)
The route from Tan Phu Trung Industrial Zone to Ports:
Highway 22 (the Asian Highway)  An Suong Flyover  Ha Noi Highway or Vo Van Kiet
Avenue  Cat Lai Port (under Saigon Port) or VICT Port  60 minutes
Airports:
 60 km away from Long Thanh International Airport (Long Thanh Airport is expected to be a
major air transshipment point in Vietnam and the world and is planned to be put into operation
in 2023)
 Capacity: 100 million passengers/year
 The terminal and cargo capacity is 5 million tons/year
 15 km from Tan Son Nhat Domestic & International Airport
 Capacity: 25 million passengers per year and 400 flights per day
The route from Tan Phu Trung Industrial Zone to Tan Son Nhat Airport:
Highway 22 (the Asian Highway)  An Suong Intersection  Truong Chinh Street  Hoang
Van Thu Street  Phan Dinh Giot Street  Truong Son Street  Tan Son Nhat International
Airport  30 minutes
INVESTMENT AREA
MINIMUM WAGE
LEASE TERM
MINIMUM LEASE
AREA
LIMIT FOR
CONSTRUCTION
HEIGHT
PLANNED AREA
FACTORY
AVAILABLE FOR
RENT
OPERATION STATUS
OCCUPANCY RATE
AND NUMBER OF
PROJECTS
NUMBER OF KOREAN
PROJECTS
LEASE FEE
OPERATING FEE
Priority sectors for investment: Multi – Industry
Restricted sectors for investment: Industries that are polluting and labor intensive
[Region I] According to Decree 38/2022/ND-CP date 12th June 2022 on minimum salaries
 Start date: 16/12/2004
 End date: 16/12/2054
15,000 m2
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential
Planning regulation QCXDVN 01:2008/BXD
Total area: 542.64 ha
2,600 m2
In operation
 Occupancy Rate: 80%
 Number Of Projects: 112
1
 Land lease: The unit price applicable from January 01st, 2015 to December 31, 2019 is
2,310VND/ m2/year (According to the Circular No 3214/TB-CT dated March 25, 2016).
 Infrastructure lease fee: Please contact sales for details (Hotline: 0934.910.919)
 Unit price: 12,500 VND/ m2/year
 Water price: 9,600 VND/m3
561
 Wastewater treatment fee: 7,820 VND/m3
 Power price: (from 6 KV): according to the price set by the HCMC Power Company,
excluding VAT.
Normal hours: 1,685 VND/Kwh
Off-peak hours: 1,100 VND/Kwh
Peak hours:
FINACIAL
INSTITUTION
TAX SERVICE, STATE
FINANCE OFFICE
CUSTOMS SERVICE
LOGISTICS
POST OFFICE
MEDICARE
POLICE, PUBLIC
SECURITY
UNIVERSITIES,
TRAINING
FACILITIES, ETC
RECRUITMENT
WORKER
DORMITORY
WORKER’S CHILD
EDUCATION
FACILITY
ONE- STOP SERVICE
ROAD WIDTH
IT&TELECOMUNICAT
ION FFACILITIES
EMERGENCY POWER
GENERATOR
FIRE- FIGHTING
FACILITY
3,076 VND/Kwh
INFRASTRUCTURE AND FACILITY
Vietcombank, MB bank, Vietinbank, Agibank
10 km from Tan Phu Trung Zone
25 km from Tan Phu Trung Zone
Inside Tan Phu Trung zone
1km from Tan Phu Trung Zone
In front of Tan Phu Trung Zone
24/7 security service
Universities center planning nearby Tan Phu Trung Zone
Support from
Near by Tan Phu Trung Zone
1km from Tan Phu Trung Zone
Hepza – 35 Nguyen Binh Khiem St, Dist 1, HCM City
Roads are synchronously planned under the national standard No. 22 TCVN 276-01 with a load
capacity of H.30
Main roads: road limit: 35 - 40m
Byroads: road limit: 20 - 25 m
Inside Tan Phu Trung Zone
5km from Tan Phu Trung Zone
Inside Tan Phu Trung Zone
LAYOUT PLAN
562
LOCATION MAP
ACTUAL VIEW
563
TAN THUAN EXPORT PROCESSING ZONE
GENERAL INFORMATION
ADDRESS
INVESTOR
CONTACT PERSON
Tan Thuan Export Processing Zone, Tan Thuan Dong Ward, District 7, Ho Chi Minh City, Viet
Nam
Tel: 84-28-3770 1777 / 1888 ; 0901 821 669
Mail: marketing@tanthuan.com.vn
Web: www.tanthuan.com.vn
Key shareholders:
 Industrial Promotion Company (IPC)
 Phu My Hung Holdings Group (CT&D)
Sale & Marketing Department: 0901 821 669
marketing@tanthuan.com.vn
Ideal location closed to the downtown, convenient for labor recruitment, right next to the biggest
container port of Vietnam, completed infrastructure, best services, EPZ management experience
of foreign experts.
Details about Tan Thuan Export Processing Zone (TTZ)’s position (in favor of land
transport)
Roads:
 4 km from Ho Chi Minh City center.
 2 km from Phu My Hung New City Center.
 The nearest national highway (about 0.5 km) - Nguyen Van Linh: has a total length of
17.8 km, connecting from Huynh Tan Phat Street, District 7 to National Highway 1 (the
section passing through Binh Chanh), connecting with the highway Ho Chi Minh City Trung Luong; It is considered a significant lifeline for economic development for the
southern region of Ho Chi Minh City, connecting with key projects such as Tan Thuan
Export Processing Zone, Phu My Hung Urban Area, Hiep Phuoc Power Plant, Hiep Phuoc
Industrial Park, Hiep Phuoc Port Urban Area, Hiep Phuoc Port, Phu My Bridge and Thu
Thiem New Urban Area.
 National Highway No.1A: It is a route running throughout Vietnam which starts from Huu
Nghi (Friendship) border gate on the border with China and ends in Nam Can Town, Ca Mau
province. Considered as the most important route in Vietnam, Highway No.1A passes
through centers of half of the provinces in Vietnam and connects four big cities in Vietnam:
Ha Noi, Da Nang, Ho Chi Minh City and Can Tho.
Ports:
 8 km from Cat Lai Port
 Next to VICT Port
LOCATION
Dock load:
Cat Lai Port:
* Container depot: 62,000m2
* Wharves: 296m
* Being able to handle 7 container ships at once with a load from 30,000 – 40,000 DWT (over
2.000TEUs).
* Loading and unloading capacity: 60 moves/h/vessel
VICT Port
* Container depot: 99,840m2
* Wharves: 678m
* Being able to handle vessels with a maximum load of 25,000 DWT (approximately 25,000
tons).
The route from TTZ to Ports:
From Huynh Tan Phat St.  Vo Chi Cong St.  Eastern Ring Road  Nguyen Thi Dinh 
Cat Lai Port (under Saigon Port) (around 30 minutes) or From Huynh Tan Phat St.  Ben
Nghe St.  VICT Port (5-10 minutes).
Airports:
48 km away from Long Thanh International Airport (Long Thanh Airport is expected to be a
major air transshipment point in Vietnam and the world and is planned to be put into operation
in 2023). Capacity: 100 million passengers/year. The terminal and cargo capacity is 5 million
tons/year
564
13 km from Tan Son Nhat Domestic & International Airport. Capacity: 25 million passengers
per year and 400 flights per day
The route from Tan Thuan Export Processing Zone to Tan Son Nhat Airport:
Huynh Tan Phat St.  Nguyen Tat Thanh St.  Ton Duc Thang St.  Vo Thi Sau St. 
Nguyen Van Troi St.  Truong Son St.  Tan Son Nhat International Airport (30 minutes).
National railway – Sai Gon station:
10 km away from the station.
INVESTMENT AREA
MINIMUM WAGE
LEASE TERM
MINIMUM LEASE
AREA
LIMIT FOR
CONSTRUCTION
HEIGHT
PLANNED AREA
FACTORY
AVAILABLE FOR
RENT & OCCUPANCY
RATE
OPERATION STATUS
OCCUPANCY RATE
AND NUMBER OF
PROJECTS
NUMBER OF KOREAN
PROJECTS
LEASE FEE
Priority sectors for investment: light, clean and un-polluted industry, high value added
industries, bio-tech industry, trading and services.
Restricted sectors for investment: Industries that are polluting and labor intensive
[Region I] According to Decree 38/2022/ND-CP date 12th June 2022 on minimum salaries
 Start date: 23/09/1991
 End date: 23/09/2041
1000 m2 for factory leasing
100 m2 for office leasing
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential
Planning regulation QCXDVN 01:2008/BXD
Total area: 300 ha
Area: ~ 30,000 sqm
Rate: ~ 10%
In operation
250
11

Please contact sales for details (Hotline: 0901 821 669)
 Management fee: 0.5 USD/m2/month
 Water price: 12,100VND/m3
 Power price: according to the price set by the HCMC Power Company, excluding VAT.
OPERATING FEE
Normal hours: 2,666 VND/Kwh (4:00~9:30; 11:30~17:00; 20:00~22:00)
Off-peak hours: 1,622 VND/Kwh (22:00 ~ 04:00)
Peak hours:
4,587 VND/Kwh (9:30 ~ 11:30; 17:00 ~ 20:00)
INFRASTRUCTURE AND FACILITY
FINANCIAL
INSTITUTION
TAX SERVICE, STATE
FINANCE OFFICE
CUSTOMS SERVICE
LOGISTICS
POST OFFICE
MEDICAL FACILITIES
POLICE, PUBLIC
SECURITY
UNIVERSITIES,
TRAINING
FACILITIES, ETC
RECRUITMENT
WORKER
DORMITORY
WORKERS’ CHILD
EDUCATION
FACILITY
Vietcombank
Please search District 7 Tax Department
Inside Tan Thuan zone
Inside Tan Thuan zone
Inside Tan Thuan zone
Inside Tan Thuan zone
24/7 security service
Universities center planning nearby Tan Thuan Zone
Support from HEPZA
Inside Tan Thuan Zone
Inside Tan Thuan Zone
565
ONE- STOP SERVICE
ROAD WIDTH
IT&TELECOMUNICAT
ION FACILITIES
EMERGENCY POWER
GENERATOR
FIRE- FIGHTING
FACILITY
Hepza – 35 Nguyen Binh Khiem St, Dist 1, HCM City
Main roads: 30 m
Byroads: 12 – 20 m
Inside Tan Thuan Zone
Inside Tan Thuan Zone
Inside Tan Thuan Zone
LAYOUT PLAN
566
LOCATION MAP
ACTUAL VIEW
567
TAY BAC CU CHI INDUSTRIAL ZONE
GENERAL INFORMATION
ADDRESS
INVESTOR
CONTACT PERSON
LOCATION
CU CHI COMMERICAL AND INDUSTRIAL DEVELOPING INVESTMENT JOINT STOCK COMPANY (CIDICO)
HO: Road D3, Cu Chi Tay Bac Cu Chi Industrial Zone, Tan An Hoi, Cu Chi District, Ho
Chi Minh City, VN.
Tel: (84.8) 38920587 – 38921737
Fax: (84.8) 38921008
Email: cuchiiz@cidico.com.vn
Website: www.cidico.com.vn
Key shareholders:
 Cuchi Commercial and Industrial Developing Investment - Joint Stock Company
(Cidico)
 Ho Chi Minh City Finance and Investment State-Owned Company (HFIC)
 Planning and Investment Department:
 Mr. Loi +(84) 0989.048.335
 Gmail: doanducloi139@gmail.com
Tay Bac Cu Chi Industrial Zone is located on Highway 22 in Ho Chi Minh City, so it is
convenient to carry out all procedures quickly. The city's traffic routes have been expanded
and built to create favorable conditions for the best transportation of goods to the port, airport
and neighboring provinces.
Details about Tay Bac Industrial Park (IP)’s position (in favor of land transport)
Road:
 National Highway No.22: Spanning HCMC center, Tan Binh District, District 12, Hoc
Mon District and Cu Chi District (HCMC). This is the route that connects Cu Chi (HCMC)
and Moc Bai and Xa Mat international border gates (Tay Ninh province) that border
Cambodia. It is one of the roads under the Asian Highway project implemented between
HCM City and Cambodia.
 National Highway No.1A: It is a route running throughout Vietnam which starts from
Huu Nghi (Friendship) border gate on the border with China and ends in Nam Can Town,
Ca Mau province. Considered as the most important route in Vietnam, Highway No.1A
passes through centers of half of the provinces in Vietnam and connects four big cities in
Vietnam: Ha Noi, Da Nang, Ho Chi Minh City and Can Tho.
 Provincial Road No. 8: It connects the key economic triangle area of Long An, Binh
Duong provinces and HCMC.
 Ring Road 3: Starting at Ben Luc - Long Thanh expressway ending at Ho Chi Minh City
- Trung Luong expressway, will pass through 6 important intersections, including the Ho
Chi Minh City - Moc Bai Expressway Interchange belt 3 Cu Chi (HCMC). Ring road 3
intersects National Highway 22 (Hoc Mon) at the route Km 8 + 800 along the route of
National Highway 22, parallel to An Ha canal.
 Ring Road 4: Starting at the intersection with Bien Hoa - Vung Tau Expressway at Km
40 + 000 (Phu My area), towards Long Thanh international airport, intersecting with
HCMC - Long expressway Thanh - Dau Giay, intersects with National Highway 1A,
intersects with National Highway 22 in Cu Chi, crosses Ben Luc town, intersects with Ho
Chi Minh City - Trung Luong highway, the end point connects to the North-South trunk
road in the urban area. Hiep Phuoc port town, HCMC.
 Ho Chi Minh City-Moc Bai Expressway: the expressway will run side-by-side with
National Highway No. 22, starting from an intersection with Ring Road No. 3 and cross
the Ring Road 4 in Ho Chi Minh City and ending at the Moc Bai border gate economic
zone in Tay Ninh.
Ports:
 35 km from the center of Ho Chi Minh City
 40 km from Saigon port, 57 km from Cat Lai port
 35 km from Saigon Station
 29 km from Tan Son Nhat airport
Dock load:
Saigon Port:
* Container depot: 570,000m2
* Wharves: 2,300m
* Being able to handle vessels with a maximum load of 50,000 DWT (approximately 50,000
tons)
Cat Lai Port:
* Container depot: 62,000m2
568
* Wharves: 296m
* Being able to handle vessels with a maximum load of 30,000 DWT (approximately 30,000
tons)
VICT Port
* Container depot: 99,840m2
* Wharves: 678m
* Being able to handle vessels with a maximum load of 40,000 DWT (approximately 40,000
tons)
Lotus Port
* Container depot: 150,000m2
* Wharves: 300m
* Being able to handle vessels of up to 45,000 DWT (equivalent to 45,000 tons)
The route from Tay Bac Industrial Zone to Ports:
Highway 22 (the Asian Highway)  An Suong Flyover  Ha Noi Highway or Vo Van Kiet
Avenue  Cat Lai Port (under Saigon Port) or VICT Port  90 minutes.
Airports:
82 km away from Long Thanh International Airport (Long Thanh Airport is expected to be
a major air transshipment point in Vietnam and the world and is planned to be put into
operation in 2023). Capacity: 100 million passengers/year. The terminal and cargo capacity
is 5 million tons/year
29 km from Tan Son Nhat Domestic & International Airport . Capacity: 25 million
passengers per year and 400 flights per day
The route from Tay Bac Industrial Zone to Tan Son Nhat Airport:
Highway 22 (the Asian Highway)  An Suong Intersection  Truong Chinh Street 
Hoang Van Thu Street  Phan Dinh Giot Street  Truong Son Street  Tan Son Nhat
International Airport  50 minutes
INVESTMENT AREA
MINIMUM WAGE
LEASE TERM
LIMIT FOR
CONSTRUCTION
HEIGHT
PERMITTED
CONSTRUCTION RATE
PLANNED AREA
OPERATION STATUS
OCCUPANCY RATE
AND NUMBER OF
PROJECTS
NUMBER OF KOREAN
PROJECTS
LEASE FEE
OPERATING FEE
Priority sectors for investment: Multi – Industry
Restricted sectors for investment: Industries that are polluting and labor intensive
[Region I] According to Decree 38/2022/ND-CP date 12th June 2022 on minimum salaries

Start date: 30/12/1998

End date: 30/12/2048
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Residential Planning regulation QCXDVN 01:2008/BXD
Total area: 381,24 ha
Step 1- Existing project: 208 ha
Step 2- wide grease project: 173,24 ha (not active yet)
In operation
 Occupancy Rate: 98%
 Number Of Projects: 43
05
 Land lease:
 Infrastructure lease fee:
Please contact sales for details (Hotline: (84.8) 38920587)
 Unit price: 0,5 USD/ m2/year
 Water price: according to the price set by the water supply service units such as: Saigon
Water Corporation (Sawaco), Ho Chi Minh City Irrigation Service Exploit Management
Company Limited (Hcm.Imc Co., Ltd) excluding VAT.
 Wastewater treatment fee: 8.500 VND/m3
 Power price: (from 22 KV): according to the price set by the HCMC Power Company,
569
excluding VAT.
Normal hours: 1,685 VND/Kwh
Off-peak hours: 1,100 VND/Kwh
Peak hours:
3,076 VND/Kwh
INFRASTRUCTURE AND FACILITY
FINACIAL
INSTITUTION
TAX SERVICE, STATE
FINANCE OFFICE
CUSTOMS SERVICE
LOGISTICS
POST OFFICE
MEDICARE
POLICE, PUBLIC
SECURITY
UNIVERSITIES,
TRAINING FACILITIES,
ETC
RECRUITMENT
WORKER DORMITORY
WORKER’S CHILD
EDUCATION FACILITY
ONE- STOP SERVICE
ROAD WIDTH
TELECOMMUNICATIO
N FACILITIES
EMERGENCY POWER
GENERATOR
FIRE- FIGHTING
FACILITY
LAYOUT PLAN
Vietcombank, ACB Bank, Agibank, BIDV Bank, ...
<2 km from Tay Bac Zone
< 40 km from Tay Bac Zone
Inside Tay Bac zone
Inside Tay Bac Zone
Such as: VN post, J&T express, Viettel post, DHL,...
Beside of Cu Chi Hopital
24/7 security service
< 1km from Tay Bac Zone - Sai Gon Polytechnic College
Support from Tay Bac Zone
Near by Tay Bac Zone
< 1km from Tay Bac Zone
Hepza – 35 Nguyen Binh Khiem St, Dist 1, HCM City
Roads are synchronously planned under the national standard No. 22 TCVN 276-01 with a
load capacity of H.30
Main roads: road limit: 35 - 40m
Byroads: road limit: 20 - 25 m
< 2km from Tay Bac zone
< 2km from Tay Bac Zone
Inside Tay Bac Zone
570
LOCATION MAP
ACTUAL VIEW
571
VINH LOC INDUSTRIAL PARK
GENERAL INFORMATION
ADDRESS
INVESTOR
CONTACT PERSON
LOCATION
INVESTMENT AREA
MINIMUM WAGE
LEASE TERM
MINIMUM LEASE AREA
LIMIT FOR
CONSTRUCTION
HEIGHT/ PERMITTED
CONSTRUCTION RATE
PLANNED AREA
FACTORY AVAILABLE
FOR RENT
OPERATION
STATUS
OCCUPANCY RATE AND
NUMBER OF PROJECTS
NUMBER OF KOREAN
PROJECTS
LEASE FEE
OPERATING FEE
FINANCIAL INSTITUTION
TAX SERVICE, STATE
FINANCE OFFICE
POST OFFICE
MEDICARE
POLICE, PUBLIC
SECURITY
UNIVERSITIES, TRAINING
FACILITIES, ETC.
RECRUITMENT
WORKER DORMITORY
WORKER'S CHILD
EDUCATION FACILITY
ONE-STOP SERVICE
ROAD WIDTH
IT&TELECOMUNICATION
FFACILITIES
EMERGENCY POWER
GENERATOR
FIRE- FIGHTING
FACILITY
Lot A59/I, Street No. 07, Vinh Loc industrial Park, Binh Hung Hoa B ward, Binh Tan district,
Ho Chi Minh city, Vietnam
Vinh Loc Industrial Park Limited Company
Address: Lot A59/I, Street No. 07, Vinh Loc industrial Park, Binh Hung Hoa B ward, Binh
Tan district, Ho Chi Minh city, Vietnam
Tel: (84-28) 3765 0946
Website: https://www.kcnvinhloc.vn/
Ms. Lan Anh - Sales & Service Manager - Mobile: (84) 0902997690 - Email:
ntlananh211@yahoo.com
15 Km from Ho Chi Minh City Center
8 Km from Tan Son Nhat International Airport
17 km away from Sai Gon Port
Close to the National Highway 1A
Priority sectors for investment: Multi – Industry
Restricted sectors for investment: Industries that are polluting.
[Region 1] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
1997 – 2053
878 m2
According to Decision 226/QD-SQHKT dated 11/12/2018 of the Department of Planning and
Architecture of Ho Chi Minh City
Total area: 207 ha
Total vacant leasable area: 10.000m2
3.000m2
In operation
Occupancy Rate: 94%
Number Of Projects: 147 projects
0 project
Land and factory lease fee: Unavailable
Infrastructure maintenance and reconstruction costs: 0,6 USD/m2/year (excluded VAT)
Electricity fee: 4.200VND/khw (excluded VAT)
Water fee: 12,100 VND/m3 (excluded VAT)
Wastewater treatment fee: From 5.766 VND and more depending on the level pollution of the
waste water (excluded VAT)
INFRASTRUCTURE AND FACILITY
Joint Stock Commercial Bank for Foreign Trade of Vietnam – Saigon North Branch
16 km from Ho Chi Minh Tax Office
1 km from Viettel Post
Tan Binh General Clinic
24/7 security service
4,5 km from Ho Chi Minh City University of Food Industry. Ho Chi Minh City
Inside Vinh Loc Industrial Park
Workers' accommodation Industrial Park
Inside Vinh Loc Industrial Park
Hepza – 35 Nguyen Binh Khiem Street, District 1, HCM City
Main roads: road limit: 8 m, 2 lanes
By roads: road limit: 5 - 8 m, 2 lanes
Inside Vinh Loc Industrial Park
Inside Vinh Loc Industrial Park
Inside Vinh Loc Industrial Park
572
LAYOUT PLAN
LOCATION MAP
573
ACTUAL VIEW
574
[- This Page is intentionally left blank -]
575
HOA BINH
576
INVESTMENT ENVIRONMENT IN HOA BINH
GENERAL INFORMATION
Area, Population
▪ Area: 4.596,4 km2
▪ Population: 875.379 with 30 ethnics (2022 statistic)
Geographical Location
▪ Hoa Binh province is located at the gateway to the Northwest region of Vietnam. It is
about 74 km far from the center of Hanoi Capital in the direction of National Highway
6 and is a counterbalance area to the West of Hanoi Capital.
Adjacent provinces
▪ Adjacent Hanoi Capital to the East, borders Phu Tho province to the North, borders
Son La province and Thanh Hoa province to the West and borders Ha Nam province and
Ninh Binh province to the Southeast..
GRDP
Industry growth
PCI
2022 statistic:
▪ GRDP: 32,680 billion VND
(1,39 billion USD)
▪ GRDP growth: 9.03%
▪ GRDP per capita: 2.799,83 USD/year
▪ Economic structure:
- Industry - Construction: 38, 97%;
- Agriculture, forestry and fishery: 22,71%;
- Service: 33,18%;
- Tax on Goods: 5,14%
2022 statistic:
▪ Industry - Construction growth: 11,44%
▪ Agriculture, forestry and fishery growth: 4,57%
▪ Service growth: 11,08%
▪ Score: 62,81 – ranked 53 out of 63 cities and provinces in Vietnam. (2022)
SOCIAL INFRASTRUCTURE
Transportation
▪ Roadway: There are important national highways running through the area such as:
Ho Chi Minh Road, National Highway 6, National Highwayh 12B, National Highway
21, especially Hoa Lac – Hoa Binh city road has been invested and operated which
shortens the traveling time from Hoa Binh city to Hanoi Capital’s center from 120
minutes to less than 60 minutes on average. In addition, the route from Hoa Binh City
to Moc Chau district (Son La province) is currently approved by the Prime Minister,
when completed, it will reduce the traveling time from Hanoi Capital to Son La province
by about 2-3 hours.
▪ Railway: None.
▪ Waterway: None.
▪ Airway: None.
Electricity
▪ Supplied from the national power network
Water
▪ Supplied by Hoa Binh Clear Water JSC
Education
Medicare
▪ 05 colleges, 03 technical schools, 10 district-level centers of vocational education and
training, 02 vocational education centers and 02 other institutions participating in
vocational training at elementary level. Among those, there are 16 public establishments,
06 private establishments in which 03 establishments are managed by the central
government and 19 others are managed by the local authority.
▪ 02 provincial hospitals; 9 district hospitals
INVESTMENT CONDITION
577
Human resource
▪ 68,5% of population are in the working age (2022)
Education level
▪ Trained labor rate: 26,2% (2022)
Salary
▪ The minimum salary for the province is applied as follows:
- Area III: including: Hoa Binh city, Luong Son, Tan Lac, Kim Boi, Mai Chau, Cao
Phong, Yen Thuy, Lac Thuy, Lac Son, Da Bac district.
▪ The lowest wage for trained labor (including those trained by the enterprises) must be
at least 7% higher than the above referenced basic salary
▪ Incentives according to government regulations:
The project is entitled to incentives in accordance with the Investment Law of Vietnam
and other relevant regulations, including:
(1) Corporate income tax incentives;
Investment incentives
(2) Exemption from import tax on goods imported to create fixed assets; raw materials,
supplies and components imported for production in accordance with the law on
import and export tax;
(3) Exemption or reduction of land use levy, land rent, and land use tax;
(4) Rapid depreciation, increasing the amount of expenses deductible when calculating
taxable income.
And other available incentives are regulated by Vietnam Government.
Fields Attracting Investment
▪ Prioritized projects:
- High technology, industrial electronics, mechanical engineering products;
- Supporting industry;
- Development of trade, service and tourism;
- Construction and development of infrastructure and key projects.
Map
Contact
Hoa Binh Department of Planning and Investment
▪ Address: No 672 Tran Hung Dao, Hoa Binh city
▪ Tel: (84-218) 3 852 111
▪ Fax: (84-218) 3 853 152
▪ Email: sokehoach@hoabinh.gov.vn
LIST OF INDUSTRIAL PARKS
578
NO.
INDUSTRIAL ZONE NAME
OCCUPANCY
RATE
Fully occupied
STATUS
Luong Son Industrial Park
TOTAL AREA
(HA)
83.08
1
2
Da River Left-bank Industrial Park
68.37
89.78
Active, the cleared land area left is
for auction
3
Yen Quang Industrial Park
200.11
0
Under construction, with available
land for rent
4
Binh Phu Industrial Park
214.29
31
In Land clearance process
5
Nhuan Trach Industrial Park
213.68
0
In Land clearance process
6
Lac Thinh Industrial Park
220
0
Currently applying for Investment
Policy Decision
7
South Luong Son Industrial Park
204.2
55.69
Currently unavailable
8
Thanh Ha Industrial Park (for DDI
projects only)
282.14
0.54
Currently unavailable
579
Active
LUONG SON INDUSTRIAL PARK
GENERAL INFORMATION
Address
Hoa Son commune, Luong Son district, Hoa Binh province, next to Ha Noi
Investor
An Thinh Hoa Binh Real Estate JSC
- Address: Luong Son Industrial Park, Km 36 Highway 6, Hoa Son commune, Luong Son district, Hoa
Binh province
- Tel: 0218 38 23488
- Email: luongsonpark@yahoo.com
Contact person
Location
Investment sectors
Mr. Nguyen Tue Vinh
- Position: Chief Executive Officer
- Tel: 0932.262.789
- Email: luongsonpark@yahoo.com
36 km from Ha Noi center
65 km from Noi Bai International Airport
120 km from Hai Phong deep-water port
22 km from Hoa Lac-Hoa Binh highway
- Priority Sectors: Electronic components, garment
- Restricted Sectors: Dyeing; billet, aluminum cast iron… production
Mininum Wage
According to Decree
38/2022/NĐ-CP
4.160.000 VND/month
Lease term
- Start date: 02/02/2007
- End date: 02/02/2057
Minimum Lease Area
1.600 m2
Limit for Construction
Height
- Factory construction area: 2 to 3 floors
- Operating area: 3 to 5 floors
Permitted
Construction Rate
Planned area
Factory available for
Rent
Operation Status
- Factory construction area: 60%
- Operating area: 35% - 60%
- Total area: 83,082 ha
- Total vacant leasable area: 60,46 ha
- Total area with full infrastructure ready to build factory: 60,46 ha
- Total area: About 3,09ha with 70% already occupied
Well-established
Occupancy rate and
number of projects
fully occupied
44 projects
Number of Korean
projects
9
Lease fee
Operating fee
- Land lease fee: 60 USD/m2 - 85 USD/m2
- Management fee: 0,3 USD/m2 (7.000VND/m2)
- Electricity fee: as regulated by EVN
- Water fee: 9.298 VND/m3
- Wastewater treament fee: 9.000 VND/m3
580
LIST OF SOME NOTABLE TENANTS
No.
Company name
Countries
Business fields
1
Garment Export manufacturing factory
Korea
Manufacturing garment for export
2
Investment in building factory of
manufacturing and processing incenses,
bamboo, joss powder and related products to
export at Luong Son industrial park
India
Processing incenses, bamboo, joss powder
3
Dongah Elecom Co.,LTD establishment
project
Korea
Manufacturing and assembling battery power equipment
4
Almine Viet Nam Co.,LTD establishment
project
Japan
Aluminum alloy product manufacturing and processing
5
Construction of Tessellation Viet Nam - Hoa
Binh exporting garment products factory
Korea
- Finishing of textile products
Details: Finishing (printing, washing, embroidering,…)
garment; Finishing of textile products;
- Remaining other business support activities
Details: Import and export of raw materials, equipment
and finished products for garment processing.
Exercising the right to import and export goods.
- Manufacturing ready-made textiles
- Manufacturing carpets, blankets and cushions.
- Manufacturing knitted and crocheted garments.
- Manufacturing other textiles etc.
Details: Producing garment products and garment
accessories
6
Manufacture personal working uniform
factory
Japan
Manufacturing personal working uniform
7
Project of establishment Transon Vietnam
Co.,Ltd
Korea
8
Nissin Manufacturing Viet Nam
Japan
9
Doosung Tech Viet Nam Factory
Korea
Production of electronic components:
Producing, processing, assembling transformers,
resistance rolls and other electronic components,
manufacturing, processing, assembling PCB circuit
board
Manufacturing parts and accessories for automobiles
and other motor vehicles
Manufacturing and assembling Mobile Phone
Components
10
Investment project to produce Led, camera
for mobile phones, finger print recognition
module and CCTV camera Coasia CM Vina
Korea
11
Tongwei Hoa Binh animal feed factory
Taiwan
12
The project of manufacturing connector
equipment associated with the establishment
of CN PLUS VINA Co., Ltd
Korea
Manufacturing precision connectors for high-definition
displays, network equipment and solar power converters
13
The project of manufacturing electronic
components
Korea
Manufacturing electronic components
14
Cap Global Manufacturing Company
Korea
Manufacture parts and accessories for motor vehicles
and other motor vehicles
581
- Manufacturing electronic components
Production of cameras for mobile phones (Camera
module), LED, fingerprint identification module.
Production of components and accessories to produce
camera modules;
Production of observation cameras;
- Repair electronic and optical equipment
Details: Repair Camera of mobile phones (camera
module)
Animal and poultry feed production
Detail: Manufacturing, processing, assembling wipers
for automobile
15
Melamine paper and furniture factory
16
Viet Nam Etch Home Technology
China
Taiwan
582
Manufacturing melamine paper
- Manufacture of electronic components such as:
Conductive frame, ultra-thin thermocouple module,
rotary encoder, ultra-thin VCM voice coil drive;
- Manufacture of other metal products ;
- Manufacture of peripherals.
DA RIVER LEFT-BANK INDUSTRIAL PARK
GENERAL INFORMATION
Address
Huu Nghi ward, Hoa Binh city
Investor
Da Hop Trade JSC
- Address: 1st floor, DH12 social housing building, Le Thanh Tong street, group 5, Tan Thinh
ward, Hoa Binh city, Hoa Binh province
- Tel: 02183 854 926
- Email: dahop@dahop.vn
- Website: www.dahop.vn
Contact person
Location
Investment sectors
- Name: Vu Thi Hop
- Position: Chairman of Directors, General Director
- Tel: 036 6477777
- Email: dahop@dahop.vn
Adjencent location
64km from Hanoi Capital city, in the center of Hoa Binh city
93 km from Noi Bai Aiprort
150 km from Hai Phong Port
22 km from Hoa Lac-Hoa Binh highway
- Priority Sectors: high-tech, low pollution, large-capital industries
- Investment: Electronic components, garment, food processing, pharmacy, medical
- Restricted Sector: High risk of pollution
Mininum Wage According to
Decree 38/2022/NĐ-CP
4.160.000 VND/month
Lease term
- Start date: 30/6/2014
- End date: 30/6/2064
Minimum Lease Area
0,5 ha
Limit for Construction Height
- Factory construction area: not exceeding 3 floors
- Operating area: 1 to 2 floors
Permitted Construction Rate
- Factory construction area: not exceeding 55%
- Operating area: not exceed 60%
Planned area
Factory available for Rent
Operation Status
- Total area: 68,37 ha
- Total vacant leasable area: 66,39 ha (6ha for auction)
- Total area: Approximately 50%
Infrastructure completed (110KV substation next to IP; clean water treatment plant,
wastewater treatment plant and social housing)
Occupancy rate and number
of projects
89,78%
32 projects
Number of Korean projects
2
Lease fee
Operating fee
- Land lease fee: 65-100 USD/m2 (based on the land lot)
- Management fee: 0.3 USD/m2/year
- Electricity fee: As regulated by EVN
- Water fee: 10,950 VND/m3
- Wastewater treament fee: 0,3 USD/m3
583
LIST OF SOME NOTABLE TENANTS
No
1
Project
Trading, Export and Import of
Materials; Manufacture of temperature
measurement components, including
Finished Thermistor and Lead Wire;
Manufacture of Machinery Instrument
and Tools. Assembly of Machinery
Instrument and Tools.
Countries
Japan
Business Fields
Manufacture of temperature measurement components.
Manufacture of Machinery Instrument and Tools. Assembly of
Machinery Instrument and Tools. Products for export and
domestic consumption. Trading, Export and Import of
Materials for Thermistor and Wire Sensors.
2
High-quality Optical lens factory
Japan
Manufacturing high quality lenses
3
4
Garment Export manufacturing factory
Manufacturing of electronic circuits
Korea
Japan
Manufacturing garment for export
- Manufacturing of electronic circuits used for creating
equipment: Peripheral equipment,
computers, electronic appliances, audiovisual equipment, solar
cells; microprocessors; controllers (programmable logic
controllers PLC , CNC, ... (Prioritized supporting products, hitech industry);
- Collection, treatment of wastewater, exhaust, solid wastes;
recycling or wastes;
- Leasing unused factory premises.
5
Hoa Binh Koyuseni Knitting Factory
Korea
6
Long Binh Electronics Co., LTD
Korea
7
Bandai Viet Nam Co.,LTD
Japan
- Manufacture of knitted and crocheted garments;
- Finishing of textile products;
- Yarn making;
- Production of woven fabrics;
- Manufacturing other textiles.
- Wholesale of other machinery, equipment and spare parts;
- Wholesale of fabrics, ready-made goods, shoes.
Manufacturing and processing electromagnetic interference
filters, Emi filters and auxiliary accessories
Processing and assembling electrical and electronic conductor
for export
584
BINH PHU INDUSTRIAL PARK
GENERAL INFORMATION
Address
No CC01 Binh Phu Industrial Park, Mong Hoa commune, Hoa Binh city, Hoa Binh province
Name of investor: Binh Phu Invest
- Address: No CC01 Binh Phu Industrial Park, Mong Hoa commune, Hoa Binh city, Hoa
Binh province
Investor
- Tel: 091 918 1818
- Email: hoaphu.hb@phumygroup.com.vn
- Website: binhphuip.com
- Name: Chu Duc Phuong
Contact person
- Position: General Manager
- Tel: 091 918 1818
- Email: hoaphu.hb@phumygroup.com.vn
Adjencent location
Location
18km from Hoa Binh City; 55km from Ha Noi city
80km from Noi Bai airport
160km from Hai Phong port
13 km from Hoa Lac - Hoa Binh highway
- Priority Sectors: Enviromentally friendly projects
Investment sectors
- Restricted Sectors (Lĩnh vực hạn chế đầu tư)
Mininum Wage
Lease term
Minimum Lease Area
4.160.000 VND/ month
50 years
Not applicable
- Khu xây dựng nhà máy: 5 (projected)
Limit for Construction Height
- Khu điều hành: 5 (projected)
- Khu xây dựng nhà máy: 70%
Permitted Construction Rate
- Khu điều hành: 40%
- Total area: 214,29 ha
Planned area
Operation Status
Occupancy rate and number of
projects
- Total vacant leasable area: 80 ha (projected)
In Land clearance process
50%
585
LIST OF FDI PROJECTS
No
Project
Countries
Business Fields
1
Forestry manufacturing
factory
China
Manufacture of plywood, veneers and thin boards
NHUAN TRACH INDUSTRIAL PARK
GENERAL INFORMATION
Address
Nhuan Trach and Cu Yen communes, Luong Son district, Hoa Binh province
Name of investor: Hoa Phu - Hoa Binh Co.,LTD
- Address: Nhuan Trach Industrial park, Luong Son Town, Luong Son district, Hoa Binh
province
Investor
- Tel: 091 918 1818
- Email: hoaphu.hb@phumygroup.com.vn
- Website: Nhuantrachip.com
- Name: Chu Duc Phuong
- Position: General Manager
Contact person
- Tel: 091 918 1818
- Email: hoaphu.hb@phumygroup.com.vn
Adjencent location
35km from Hoa Binh City; 40km from Ha Noi centre
Location
60km from Noi Bai airport
150km from Hai Phong port
20km from Hoa Lac-Hoa Binh expressway
- Priority Sectors: Enviromentally friendly projects
Investment sectors
- Restricted Sectors: sectors with high risk of pollution
Mininum Wage
Minimum Lease Area
4.160.000 VND/month
2010 (m2)
- Khu xây dựng nhà máy: 5
Limit for Construction Height
- Khu điều hành: 5
- Khu xây dựng nhà máy: 70%
Permitted Construction Rate
- Khu điều hành: 40%
- Total area: 213,68%
Planned area
- Total vacant leasable area: 149 ha
586
- Total area with full infrastructure ready to build factory: 0%
Factory available for Rent
Operation Status
Occupancy rate and number of
projects
Lease fee
- Total area (tổng diện tích nhà xưởng có thể cho thuê):
In Land Clearance Process
0%
50-60 USD/m2 not include VAT
Layout map
587
LAC THINH INDUSTRIAL PARK
GENERAL INFORMATION
Address
Lac Thinh Commune, Hang Tram town, Yen Thuy district
Investor
Name of investor: GREENTEX VINA
Contact
Tel: 02183 897052
Adjencent location
To Hanoi City: 90km, To Hoa Binh city: 70km
Location
To Noi Bai International airport: 90km; To Cat Bi - Hai Phong: 190km
Hai Phong port: 190km
Investment sectors
Mininum Wage
Minimum Lease Area
Lease term
Manufactures electrical and electronic equipment, information technology, technology
incubator. High-tech industry, software technology, electricity, electronics
3.250.000 VND/month
1ha
50 years
- Total area: 220ha
Planned area
- Total area with full infrastructure ready to build factory: 60%
Operation Status
Occupancy rate and number of
projects
Lease fee
Operating fee
Completed land clearance of 113 ha
N/A
- Land lease fee: 15-35 USD
- Factory lease fee: $3
- Management fee: 0,3 USD/m2
- Electricity fee: 0.05 USD
- Water fee: 0.4 USD/m3
- Wastewater treament fee: 0.22 USD/m3
Layout map
588
YEN QUANG INDUSTRIA1:E41AL PARK
GENERAL INFORMATION
Address
Yen Quang Village, Ky Son District, Hoa Binh Province
Name of investor: An Viet Hoa Binh JSC.
- Address: Yen Quang Industrial Park, Quang Tien District, Hoa Binh city, Hoa Binh Province
Investor
- Tel: 088 988 6068
- Email: info@amberasset.vn
- Website: https://yenquangip.com.vn/
- Name: Tran Phuong Lan
- Position: Head of Sales & Marketing Department
Contact person
- Tel: 090 428 1006
- Email:
Adjencent location [Các môi trường xung quanh]
43 km from Hanoi City
66 km from Noi Bai International Airport
Location
30 km from Son Tay Port (Hanoi)
174 km from Hai Phong deep-water port
200 km from Cai Lan deep-water port (Quang Ninh)
50 km from Hanoi Station
Investment sectors
- Priority Sectors :
Food production & processing;
Garment & Leather Footwear;
Manufacture of drugs, pharmaceutical chemicals and medicinal herbs;
Other processing and manufacturing industries;
Telecommunication;
Producing products from wood, bamboo, products from straws and plaiting materials;
Manufacture of metals and other non-metalic mineral products;
Manufacture of automobiles and motor vehicles, means of transport;
Production and distributio of steam, hot water, air conditioning and ice production
- Restricted Sectors: Environmental polluted industries
Mininum Wage
4.160.000 VND
- Start date: 2015
Lease term
- End date: 2065
Minimum Lease Area
Limit for Construction
Height
Permitted Construction
Rate
1 ha
- Khu xây dựng nhà máy: 5 floors
- Khu điều hành:
- Khu xây dựng nhà máy: 70%
- Khu điều hành:
- Total area: 200.11 ha
Planned area
- Total vacant leasable area: 130.9 ha
589
Operation Status
Occupancy rate and
number of projects
Infrastructure under construction and to be completed by the first quarter of 2024
3 projects (occupancy rate: 5%)
Number of Korean projects
Lease fee
- Land lease fee: 90-95 USD
- Management fee: 0,3 USD/m2/year
- Electricity fee:
As regulated by EVN
Peak hours: 2,759 VND/kW (voltage level 110 kV or more)
Normal hours: 970 VND/kW (with voltage level 110 kV or more)
Off-peak hours: 1,536 VND/kW (with voltage level 110 KV or more)
Operating fee
- Water fee: 9.298 VND/m3 for Manufacturing enterprises; 12.387 VND/m3 for services
activities
- Wastewater treament fee: 9.000 VND/m3/month
- Waste treament fee: According to the prescribed price of the unit responsible for handling
domestic and hazardous waste
590
[- This Page is intentionally left blank -]
591
HUNG YEN
592
INVESTMENT ENVIRONMENT IN HUNG YEN
GENERAL INFORMATION
Area, Population
Geographical Location
Adjacent provinces
GRDP
Industry growth
▪ Area: 930,2 km2
▪ Population: 1.284 million (2022 statistic)
▪ Hung Yen province is located in the Red River Delta, in the Northern Key Economic
Zone.




The Northwest borders with Hanoi city.
The East borders with Hai Duong province.
The South borders with Thai Binh province.
The Southwest borders with Ha Nam province.
2022 statistic:
▪ Real GRDP: 5.570 billion USD
▪ GRDP growth: 13,41%.
▪ GRDP per capita: 4771 USD/year
▪ Economic structure:
- Industry - Construction: 63,91%;
- Agriculture. forestry and fishery: 7,49%;
- Service: 28,60 %;
- Tax on Goods: 6,28%
2022 statistic:
▪ Industry - Construction growth: 12,71 %
▪ Agriculture, forestry and fishery growth: 2,48%
▪ Service growth: 21,91%
Import turnover (billion USD):
Import - Export
Export turnover (billion USD): 0.63 billion USD
PCI
▪ Score: 67.91– ranked 14 out of 63 cities and provinces in Vietnam. (2021)
SOCIAL INFRASTRUCTURE
Transportation
▪ Roadway: Hanoi - Hai Phong Expressway
(3 km/5 minute drive); Huu Nghi Border Gate
(200 km/3h45 minute drive). The province adjacent National Highway 5, adjacent to
road 39A, 73km from Hai Phong port, 90km from Cai Lan port...
▪ Railway: Hanoi - Hai Phong railway, connecting the provinces including Hanoi,
Hung Yen, Hai Duong, Hai Phong and the northern and southern border provinces, to
international border gates.
▪ Waterway: The inland waterway transport route on the Red River and Luoc River is
capable of connecting the Northwest provinces to international seaports in Hai Phong
and Quang Ninh
▪ Airway: Easy access to Noi Bai international airport by highway with a time of about
45 minutes.
Electricity
Hung Yen has Waste-to-energy plant, electromechanical power plants
Water
▪ The total reserve of underground water (groundwater) that can be exploited in the
province is currently over 1.1 million m3/day, of which over 81% of the groundwater
reserve is located in the deep aquifer (the aquifer) pleistocene water).
Education
▪ Hung Yen has over 400 schools meeting national standards
Medicare
▪ About 16 hospitals
593
INVESTMENT CONDITION
Human resource
▪ 46,3% of population are in the working age (2022)
Education level
▪ Trained labor rate: 65% (2022)
Salary
▪ The minimum salary for the province is applied as follows:
- Area I, II, III, IV:
▪ The lowest wage for trained labor (including those trained by the enterprises) must be
at least 7% higher than the above referenced basic salary
Investment incentives
▪ Tax incentives, subsidies, low rent.
Fields Attracting Investment
▪ Producing components, electrical and electronic
products; Energy; Garment
▪ Prioritizing in industries with high added value,
high science and technology content,
environmentally friendly, energy, logistics,
production and business projects that can participate
in the global value chain, especially electronics
industry, telecommunications industry, mechanical
industry
Investment Attraction Situation
▪ 516 projects with total investment capital of 6.313.000.000 USD
Map
Contact
Department of Planning and Investment
 Address: 8 Chua Chuong Street, Hung Yen City, Hung
 Yen Province
 Tel: +84 (221).3.863.456
 Email: sokhdt@hungyen.gov.vn
 Website: https://sokhdt.hungyen.gov.vn/
594
LIST OF INDUSTRIAL ZONES IN HUNG YEN PROVINCE
NO
INDUSTRIAL ZONE NAME
TOTAL AREA
(HA)
688.94
525.7
198
150
280
313.5
143.08
159.71
192.64
100
1
2
3
4
5
6
7
8
9
10
Pho Noi A Industrial Zone
Thang Long II Industrial Zone
Minh Duc Industrial Zone
Minh Quang Industrial Zone
Yen My Industrial Zone
Yen My II Industrial Zone
Clean Industrial Zone
No.3 Industrial Zone
No.5 Industrial Zone
Kim Dong Industrial Zone
11
12
13
Tan Dan Industrial Zone
Ly Thuong Kiet –
VIDIFI Industrial Zone
No. 4 Industrial Zone
14
No. 6 Industrial Zone
308.2
15
No. 7 Industrial Zone
198.56
200
300
390
OCCUPANCY
RATE (%)
84%
64.6%
34.2%
40.4%
53%
28.1%
13%
0%
0%
STATUS
In operation
In operation
In operation
In operation
In operation
In operation
In operation
In operation
In operation
Expand
in the period 2021-2030 by 100 ha
Under construction
Under construction
New planned industrial parks by
2030
New planned industrial parks by
2030
New planned industrial parks by
2030
595
LOCATION MAP OF INDUSTRIAL ZONES
596
PHO NOI A INDUSTRIAL PARK
GENERAL INFORMATION
Address
Located in Yen My district, Van Lam district and My Hao town, Hung Yen province
Hoa Phat Hung Yen Industrial Park Infrastructure Development Company Limited.
- Address: 39 Nguyen Dinh Chieu, Le Dai Hanh Ward, Hai Ba Trung District, Hanoi City.
Industrial investor
- Tel: 024.39763889
- Fax: 024.39763890
- Contact person: Mr. Cuong- 0918.507.886
Km19, National Highway 5, Hung Yen:
Geographical location
-
24 km from Hanoi center,
43 km from Noi Bai airport,
101 km from Dinh Vu port (Hai Phong),
130 km from Quang Ninh deep sea port.
▪ Manufacturing and assembling components and equipment of electricity, electronics,
refrigeration, optics, telecommunications, products from new technologies and high techniques;
▪ Mechanical engineering; manufacturing and assembling automobiles, motorcycles, medical
devices, and other machinery and motor equipment; production of products from prefabricated
metal, jewelry; production of corrugated iron, aluminum, steel;
▪ Food production and processing (excluding production of tapioca, vermicelli, MSG, sugar from
sugarcane; aquatic and seafood processing; slaughter of cattle and poultry), beverages;
Fields of investment
attraction
▪ Production of products from paper, wood (excluding wood processing, wood chips from
natural wood), plastic (excluding recycling of plastic scrap), rubber, plastics, leather;
▪ Production of pharmaceuticals, cosmetics, packaging, labels; production of building materials
(excluding cement, clinker, brick, tile), composite materials, artificial flooring, flexible, superdurable, ultra-light materials; production of industrial gases;
▪ Logistics services, factories for rent.
The reception of investment projects in industrial parks must ensure compliance with the
investment attraction orientation of Hung Yen province from time to time.
Minimum regional wage
Area II, minimum wage 4,160,000 VND (USD 177.22)
Minimum rental area
According to the agreement with the Industrial Park Infrastructure Investor.
Limit for Construction
Height
According to the planning approved by the competent authority.
Permitted Construction
Rate
According to the planning approved by the competent authority.
▪ Scale: 688.94 ha. In which, the area of industrial land for lease is 492.1 ha.
▪ Area of industrial land leased: 412 ha, occupancy rate reached 84%.
Planning Area
▪ The remaining industrial land area not leased: About 80 ha.
597
Operation Status
Active
The industrial park has received 211 investment projects (92 FDI projects and 119 DDI projects),
Number of Projects
with a total registered investment capital of about 1,169 million USD and 23,387 billion VND. In
which, there are 30 projects of Korean investors with registered investment capital of about 468
million USD.
▪ Land sublease price associated with industrial park infrastructure: 125 - 140 USD/m2
▪ Management cost: USD 0.7/m2/year
Lease fee & Operating
fee
▪ Electricity costs: According to the general regulations of the Government
▪ Water cost: 13,500 VND/m3
▪ Wastewater treatment fee: 12,000 VND/m3
INFRASTRUCTURE
▪ Construction site: The land plots have been processed, ready for the construction of the
Factory.
▪ Power supply: Power is supplied continuously and stably through 3 110/22KV substations.
▪ Water supply: Industrial park water plant was built with a capacity of 15,000 m3/day.
▪ Waste water and waste treatment: The wastewater treatment plant was built with a total
capacity of 6,000 m3/day.
Infrastructure
▪ Telephone & Internet: The telecommunications system meets international standards and is
always available to meet the needs of communication, high-speed data transmission and
domestic and international postal services. The underground fiber optic cable system is directly
connected to the fence of each enterprise.
▪ Internal traffic: The system of internal roads is built with a reasonable cross-section, ensuring
easy and convenient means of transportation to each factory. Lighting systems are installed
along the roads.
▪ Fire prevention: Water supply system with fire hydrants is arranged along the roads of the
Industrial Park.
▪ Customs: Hung Yen Customs is currently headquartered about 4 km from the Industrial Park.
All sealing and lead clamping procedures are carried out right at the factories in the Industrial
Park.
Social infrastructure
and services
▪ Banking: The system of banks (Vietcombank, Techcombank, ACB, Sacombank, Agribank,
Bank for Investment and Development of Vietnam...) has a branch in Pho Noi, 1-2 km from the
Industrial Park. . Currently, some banks have set up ATM stations in the Industrial Park, quickly
serving all requirements of businesses and employees in the Industrial Park.
▪ Housing for workers: The area near the industrial park has been planned to invest in the
construction and development of urban areas and housing areas, ensuring housing needs for
598
industrial park workers.
▪ Hospital: Pho Noi General Hospital (2km away from the Industrial Park) is modernly planned
and built to meet the needs of treatment and medical examination and treatment for workers in the
Industrial Park.
Location/ Map
LIST OF TENANTS
No
Name of Projects
Nation
Business line
1
Factory producing stainless steel
cutlery and fork
KOREA
2
KIDO Garment Factory
KOREA
3
ALPEC Elevator FACTORY
Japan
Producing stainless steel knives, spoons, forks and
tableware; production of core products, metal
polishing wax; and build factories for rent
Producing fabric pants and shirts; pants, swimwear;
pants, leather jacket; Manufacturing sports shoes
and sandals; Producing all kinds of labels for
products of pants, shirts, shoes and sandals.
Manufacturing and assembling elevators; escalators
and hydraulic ladders; Manufacture of electrical
panels, medium and low voltage electrical
599
4
Factory for the production of workwear
and protective clothing
KOREA
5
Factory manufacturing and assembling
toys and electrical and electronic
mechanical products
KOREA
6
Factory manufacturing bearings,
mechanical products
Japan
7
Factory for processing livestock,
poultry and aquatic food
Animal and poultry feed processing
factory
PALFINGER MARINE VIETNAM
FACTORY - DAVIT
KOREA
8
9
10
KOREA
NETHERLANDS
The factory produces PE cover material
and other plastic products.
Mold and spare parts factory
KOREA
12
Aluminum factory Hyundai Aluminum
Vina
KOREA
13
tissue paper factory
Japan
14
Relocating the factory producing
plastic products and printing plastic
packaging labels of all kinds
Moving ViKom auto parts
manufacturing factory
KOREA
16
General Industrial Project IDE
Japan
17
Japan
18
Shinjo Pho Noi mechanical factory
manufactures and manufactures black
long screws.
Wassenburg Medical Vietnam Factory
NETHERLANDS
19
Vinax Porcelain Factory
Japan
20
Japan
21
The factory produces labels and export
labels.
Tatsumi Seiko Vietnam Factory
22
Dorco Hung Yen razor factory
KOREA
23
Factory producing transmission
components using inductors
China (HK)
11
15
KOREA
KOREA
Japan
600
equipment; mechanical products; Manufacturing
and assembling elevators, escalators and hydraulic
ladders;
Producing workwear and protective clothing such
as: Clothes, gloves, socks... used for cleaning in
clean rooms, laboratories
Manufacture and assemble children's toys;
Manufacture of molds; Manufacture and assemble
electrical and electronic equipment accessories;
manufacturing Urethame Foam products,
manufacturing and assembling products on stamping
machine lines, paint spraying machines such as cold
storage tanks, auto parts, etc.
Manufacture of bearings and mechanical products;
Manufacturing and assembling other electrical
products
Producing animal, poultry and aquatic feed
Producing and processing feed for livestock, poultry
and other livestock.
Manufacture of life-saving systems and equipment
mounted on rigs and ships for the shipbuilding and
offshore industries
Producing PE cover materials and other plastic
products.
Manufacture of molds and mold spare parts. Factory
for rent.
Producing aluminum ingots and aluminum products,
decorating the surface with heat press technology
for aluminum profile products, renting a part of the
factory on the premises
Producing high-grade tissue paper products from
wood pulp and recycled paper to supply domestic
and export markets
Manufacturing plastic products and printing plastic
packaging labels of all kinds
Manufacture and assemble motors, motor spare
parts, control cables, door moving equipment used
in automobiles and industry; Producing and
assembling blowers and accessories of blowers;
Manufacture of plastic components for automotive
equipment. Manufacturing and assembling molds
for product production
Building factories for rent; provides services related
to construction and finishing of factories,
installation of industrial production equipment lines
Manufacture of steel molds and steel mold details.
Manufacture of bolts, screws and tools for the
production of bolts and screws
Manufacture of WD 440 sterilizer assembly parts,
WD 440 sterilizer electronic box and WD 440
sterilizer lift bar;
Producing high-grade sanitary ware,
Producing image caption labels (Head set label),
language annotation labels (Panel sticker) and
product labels (Fine label.
Producing metal punching products and other
mechanical products
Manufacture of razor blades, manufacture of razors,
eyebrows, manufacture of razor handles,
manufacture of molds for the manufacture of
cutlery, hand tools, and common metal utensils.
24
DSM Vietnam Factory
KOREA
25
Factory that manufactures and
assembles all kinds of image
processing machines and related parts,
components and electrical equipment
by high technology
Daido DMS Vietnam Factory
Japan
27
DSM Vietnam factory expansion
project
KOREA
28
Branch of CARGIll Vietnam Co., Ltd
in Hung Yen
America
29
INOX PRODUCTS FACTORY
KOREA
30
31
Project to produce Korean products
Project of manufacturing plastic
products
Japan
Japan
32
Drossapharm Asia Factory (Vietnam)
China (HK)
33
Project of manufacturing precision
mechanical products
Japan
34
Icam Vietnam factory project.
Japan
35
Vietnam Factory MIE
Japan
36
Paint and putty factory
Japan
37
Greenfeed Vietnam Factory- Hung Yen
Branch
THAILAND
38
The project of establishing Watanabe
Pipe Vietnam Co., Ltd. in Vietnam
Japan
39
PALFINGER MARINE VIETNAM
FACTORY - BOAT
DORCO VINA II FACTORY
NETHERLANDS
Expanded export label and plate
factory
Vietnam yamato rubber products
factory
Japan
Factory producing loose parts related
to sanitary ware products
Japan
26
40
41
42
43
Japan
KOREA
Japan
601
Manufacture of components for optical game
players (PSPs), DVD-RW players; transmission
components for car doors.
Manufacture of plastic phone cases.
Manufacture and assemble document scanners and
related parts, components and equipment;
manufacturing and assembling printer parts,
components and equipment; manufactures and
assembles camera parts, components and equipment.
Producing and processing steel products of all kinds,
by production processes: stamping, cutting, bending,
coiling, rolling, riveting, machining, grinding, heat
treatment, surface treatment.
Manufacturing and assembling components, spare
parts and accessories for phones and plastic
products.
Producing and processing feed for livestock, poultry
and aquatic products.
Producing stainless steel products
Producing welding materials such as: welding rod,
welding wire, solder paste, solder powder, solder
pellets; Producing products from turpentine as
welding materials and serving other manufacturing
industries
Producing plastic products such as household
plastic, auto parts, office machinery
Processing pig's small intestine; separation of
extracts and chemical essences from the mucous
membrane of the small intestine of pigs;
classification and processing of sausage casings
Design, manufacture and assemble precision plastic
components and products such as: electrical wiring
harnesses, covers, etc. used for cameras,
automobiles, electronics, electrical and other
industrial products; Design capacity of 950 tons of
products/year
Invest in building a factory to produce metal molds;
manufacturing plastic parts and metal parts used for
cars and motorcycles; manufactures water meters
and components in water meters. Include:
Move Vietnam MIE factory project from land lot
No. D-9, Thang Long II Industrial Park, Hung Yen
province to Zone A Pho Noi A Industrial Park;
Invest in additional machinery and equipment to
increase the capacity of the old project and
supplement the production of water meters and
details in water meters.
Vietnam MIE One Member Limited Liability
Company is allowed to apply regulations on export
processing enterprises.
Production of water-based paints, oil-based paints
and putty;
Producing high quality animal, poultry and seafood
feed
Manufacturing, assembling, installing and finishing
greenhouses for agricultural cultivation
Manufacture of boats, lifeboats, life rafts and rescue
boats for the marine and offshore market. Design
capacity scale:
Invest in building factories and offices for lease.
44
45
Ming Hao Vietnam Electronic
Components Factory
Factory producing all kinds of cutlery
KOREA
46
PLASTIC BENE PRODUCTION
KOREA
47
FANCY VIETNAM INDUSTRIAL
FACTORY
VIETNAM HAPAM CAPACITOR
MANUFACTURING FACTORY
MANUFACTURING ALUMINUM
LCD/OLED TV FRAME
ANNEX VIETNAM ELECTRONIC
FACTORY
China (HK)
48
49
50
CHINA
Netherlands
Korea
51
MINGHUI VIETNAM FACTORY
Singapore
52
Sanitary ware factory
China (HK)
53
54
PHAM NGUYEN CAKE FACTORY
SUN KANG VIETNAM FACTORY
Japan
Singapore
55
KOPAC CONCERT FACTORY
KOREA
56
PROJECT MANUFACTURING
ALUMINUM PHONE CASE - CNC
MOBILE
PROJECT MANUFACTURING
CONCRETE ADDITIVES
EXPANDING INOX PRODUCTS
FACTORY
IDEAL INDUSTRIAL PROJECT 2
KOREA
57
58
59
60
61
62
FACTORY MANUFACTURING,
PROCESSING WOODEN FLOORS,
MULTIPLE PLANTS
FACTORY MANUFACTURING
TEMPERATURE LABEL
PRODUCTS
MOLITEC MANUFACTURING
FACTORY PROJECT IN HUNG YEN
PROVINCE
Production of concrete admixtures
China (HK)
Producing stainless steel products
KOREA
Japan
Invest in building factories for lease; and provide
services related to construction and finishing of
factories, offices, installation of industrial
production equipment lines, investment
consulting....
Invest in building a factory to produce laminated
laminate flooring
China
Producing all kinds of product labels
Japan
Forging, pressing and rolling metal; mechanical
processing and metal coating (excluding plating);
manufacturing and manufacturing auto parts,
motorcycle parts, agricultural machinery parts and
metal household electronic components
Invest in building a factory to produce PE film,
packaging, shrink film, PE-PET . protective film
Producing electronic price list products, laptop
battery chargers, plastic TVs
PLASTIC PRODUCTS FACTORY
Japan
64
FACTORY MANUFACTURING
ELECTRONIC PRICE LIST AND
BATTERY CHARGER.
DSM VIETNAM FACTORY
EXPANDING PROJECT for the 2nd
time.
TSUKUBA VIETNAM'S MOLD
MANUFACTURING FACTORY IN
PHONOI A INDUSTRIAL PARK
KOREA
66
Manufacture of electronic switches for phones,
computers, home appliances and other electronic
products
Manufacture and processing of earphone shells,
molds and other parts of headphones for mobile
phones and tablets; Producing electronic devices
and components for earphones, mobile phones,
tablets
Producing high-grade sanitary ware; manufacturing
water heaters, aluminum profiles and related loose
parts for export and domestic consumption; Import
of related products for the production of the above
mentioned products
Production of soft chocolate covered cakes
Production of printing ink, silkscreen printing of
clothing
Producing all kinds of cardboard packaging from
roll paper; Factory and warehouse for rent
Invest in more machines to produce aluminum
phone cases from CNC technology
Korea
63
65
Invest in machinery and equipment to produce razor
blades.
Invest in additional machinery and equipment to
increase the capacity of the project "Factory
manufacturing labels and export labels
Producing rubber products used for electronic
devices and motor engines
Invest in equipment and production lines for plastic
parts related to sanitary ware products
Manufacturing and assembling transformers and
circuits for phone chargers
Manufacturing aluminum LCD/OLED TV frames
KOREA
KOREA
602
Invest in additional machinery and equipment from
undistributed profits to expand the production of
plastic products
Invest in building factories to manufacture, produce
casting molds, and process all kinds of cast products
made of aluminum, zinc, magnesium and other
67
68
69
70
71
72
73
SG PRECISION FACTORY
ESTABLISHMENT PROJECT
HARNESS CABLE PRODUCTION
PROJECT AND APPLICATION
DEVICES
PROJECT FACTORY PRODUCING,
PROCESSING HANDLING HAND,
HANDLING MATERIAL WITH
PLASTIC
CONSTRUCTION LIXIL VIETNAM
WAREHOUSE
PROJECT OF PRODUCTION OF
USEFUL PRODUCTS
FOR PRINTING CIRCUIT
PRODUCTION EQUIPMENT
JINXIANDA VIETNAM FACTORY
metals; painting and plating of aluminum, zinc,
magnesium, other metals and plastic products
Research, development, production and processing
of precision mechanical components
Production of wire harnesses and application
equipment
Japan
Japan
Japan
Producing and processing hanging baskets, metal
hangers covered with plastic.
China
Invest in building a warehouse to store
manufactured products of Lixil Vietnam Co., Ltd
Production of plastic solution tanks, frames, racks,
metal hangers
Producing cables and signal transmission lines for
machines
Manufacturing and assembling paper shredders of
all kinds, plastic laminators
Invest in building factories for lease; and provide
services related to construction and finishing of
factories, offices, installation of industrial
production equipment lines, investment
consulting....
Invest in building a factory to manufacture molds
and plastic products for the electrical, electronic,
and household appliances industries
Japan
Japan
China (HK)
74
YOULL ELECTRONIC FACTORY
VIETNAM
China (HK)
75
IDEAL INDUSTRIAL PROJECT 3
Japan
76
MINGHUI TECHNOLOGY
VIETNAM FACTORY
China (HK)
Producing phone battery charging case, electronic
price list cover, laptop battery charging case, TV
case, desk phone case, phone earphone case.
Producing pins, steel contacts of all kinds.
77
DSM VINA FACTORY
Korea
78
BX SHINSEI VIETNAM COMPANY
LIMITED PROJECT
HAI HAN NEW MATERIAL CO.,
LTD
MARUSHIN SEISAKUSHO
VIETNAM PROJECT
Japan
79
80
81
AJ TOTAL CONNECTOR
Producing and assembling rolling door opening and
closing motors, flanges and accessories, rolling door
equipment
Producing all kinds of PVC flooring
China
Producing, processing spare parts and auxiliary parts
for cars
Invest in building and providing cold and dry
storage services; storage of frozen and dry goods
(CPC 742).
Japan
KOREA
- Manufacture of automobile water pumps: 450
tons/year;
- Producing flywheel moving parts for motor
vehicles: 50 tons/year;
- Manufacture of equipment for changing disc
brakes and brake pads for motor vehicles: 15
tons/year
82
HZL GROUP VIETNAM PROJECT
China
Producing and processing vending machines: 300
products/year (equivalent to 150 tons/year).
Provide consulting services on operation and
management of vending machines.
Provide vending machine repair and maintenance
service.
83
84
FACTORY ESTABLISHMENT GRN
VIETNAM CO., LTD HANOI
BRANCH
FACTORY, OFFICE FOR LEASE
Japan
Factory lease
China (HK)
603
Producing, processing and assembling parts and
accessories for printers, copiers, fax machines,
scanners, multi-function office equipment (walkietalkies), automatic teller machines (ATMs) , money
85
China (HK)
86
FANCY VIETNAM INDUSTRIAL
FACTORY 2
PLASTIC FLOORING FACTORY
87
HAIXIN FACTORY NO. 2
China
88
89
Aj total Hanoi – cold storage project
PLASTIC PRODUCTS AND MOLD
FACTORY
KOREA
Japan
90
SG PRECISION 2 FACTORY
ESTABLISHMENT PROJECT
FACTORY PRODUCING FILM
FROM PVC AND FILM FROM
PAPER
Japan
91
China
China
604
counters, household electrical appliances, medical
equipment, vehicles, industrial machinery
equipment
Factory producing plastic flooring products
Invest in building a factory producing all kinds of
PVC flooring
Invest in building and providing cold and dry
storage services;
storage of frozen and dry goods (CPC 742)
Invest in building a factory producing plastic trays
and plastic films; Manufacture of metal molds and
metal jigs; Factory lease
Manufacturing and processing precision mechanical
components
Producing film from PVC and film from paper
THANG LONG II INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Located in Yen My district and My Hao town, Hung Yen province.
Industrial investor
Thang Long II Industrial Park Company Limited
- Address: Thang Long II Industrial Park, Yen My district, Hung Yen province.
- Tel: (+84-321) 3974620; Fax: (+84-321) 3974624;
Geographical
location
Fields of investment
attraction
- Contact person: Mr. Nguyen Duc Thang – 0912.173.518; Position: Director.
Adjacent to National Highway 5; 30km from Hanoi, about 70km from Hai Phong port, 115km from Quang
Ninh deep sea port; adjacent to Pho Noi Textile and Garment Industrial Park
Manufacturing precision electronic and mechanical products; mechanical and electronic industries, traffic
machinery, production of rubber products for the automobile industry; light industry, industrial gas;
manufacture of drugs, vaccines and biological products; optical glass production and high-tech
manufacturing industries are encouraged to develop according to the provisions of law; packaging
production (excluding paper and board recycling, pulp and paper production).
Minimum regional
wage
Minimum rental
area
Limit for
Construction Height
Permitted
Construction Rate
Planning Area
Area II, minimum wage 4,160,000 VND (USD 177.22).
According to the agreement with the Industrial Park Infrastructure Investor.
According to the planning approved by the competent authority.
According to the planning approved by the competent authority.
▪ Scale: 525.7 ha. In which, the area of industrial land for lease is 401.42 ha.
▪ Industrial land area for lease: 259 ha, occupancy rate is 64.6%.
▪ The remaining industrial land area not yet leased: Approximately 142 ha.
Operation Status
Active
Number of Projects
In the industrial park, there are 104 foreign investment projects, with a total registered investment capital of
about 3,130 million USD. Foreign investors investing in industrial zones are mainly Japanese investors,
including a number of large economic groups such as Kyocera, Hoya, Nippon, Daikin, Toto, Panasonic, ..
Lease fee &
Operating fee
▪ Land lease fee associated with industrial park infrastructure: 130 - 150 USD/m2
▪ Factory rent: From 126,940 VND/m2 to 163,800 VND/m2
▪ Management cost: 23,400 VND/m2/month
▪ Electricity cost: According to the general regulations of the Government
▪ Water cost: 13,104 VND/m3
▪ Waste water treatment fee: 5,850 VND/m3
INFRASTRUCTURE
Infrastructure
▪ Construction site: The land plots have been processed, ready for the construction of the Factory.
▪ Power supply: The power supply is stable with a capacity of 216 MVA.
▪ Water supply: The Industrial Park water plant was built with a capacity of 24,000 m3/day.
▪ Waste water and waste treatment: The wastewater treatment plant was built with a total capacity of
15,000 m3/day.
▪ Telephone & Internet: The telecommunications system meets international standards and is always
available to meet the needs of communication, high-speed data transmission and domestic and international
605
postal services. The underground fiber optic cable system is directly connected to the fence of each
enterprise.
▪ Internal traffic: The system of internal roads is built with a reasonable cross-section, ensuring easy and
convenient means of transportation to each factory. Lighting systems are installed along the roads.
▪ Fire prevention: Water supply system with fire hydrants is arranged along the roads of the Industrial
Park. In the industrial park, a team of fire prevention and fighting police of Hung Yen Provincial Police has
been arranged.
Social infrastructure
and services
▪ Customs: Hung Yen Customs is currently headquartered about 1 km from the Industrial Park. All sealing
and lead clamping procedures are carried out right at the factories in the Industrial Park.
▪ Banking: The system of banks (Vietcombank, Techcombank, ACB, Sacombank, Agribank, Bank for
Investment and Development of Vietnam...) has a branch in Pho Noi, 1-2 km from the Industrial Park. .
Currently, some banks have set up ATM stations in the Industrial Park, quickly serving all requirements of
businesses and employees in the Industrial Park.
▪ Housing for workers: The area near the industrial park has been planned to invest in the construction and
development of urban areas and housing areas, ensuring housing needs for industrial park workers.
▪ Hospital: Pho Noi General Hospital (2km away from the Industrial Park) is modernly planned and built
to meet the needs of treatment and medical examination and treatment for workers in the Industrial Park.
Location/ Map
606
607
LIST OF TENANTS
No
1
Name of Projects
Hamaden Vietnam Factory
Nationality
Japan
2
Corona Vietnam Factory
Japan
3
Takagi Vietnam Factory
Japan
4
Japan
5
Akiyama cold-drawn bar
production project SC(Vietnam)
BUNKA Factory- Vietnam
6
Factory NIKKISO Vietnam
Japan
7
Hoya Glass Disk Vietnam II
Japan
8
Japan
9
10
HUNG YEN INDUSTRIAL
GAS AND MEDICAL GAS
PRODUCTION FACTORY
DENYO Vietnam Factory
Shindengen Vietnam Factory
11
Ochai Vietnam Factory
Japan
12
Mikasa Vietnam Factory
Japan
13
Sews-Components Vietnam
Factory
Musashi Auto Parts Vietnam
Factory
Mizuno Precision Parts
Vietnam Factory
Japan
14
15
Japan
Japan
Japan
Japan
Japan
Business line
Manufacture of components for cars and motorcycles;
Processing, assembling and packing components and spare parts
of cars and motorcycles.
Manufacture of plastic and metal accessories and product details
(brake pedals, accelerator pedals, steps up and down, logos,
logos, etc.) for motor vehicles: Scale: 800,000 units/year
(equivalent to 800,000 units/year) equivalent to 8 tons/year);
Mechanical processing, surface treatment and surface coating of
metal and plastic products for the Company's manufactured
products. Scale: 5 tons/year; Precision mold making. Scale: 120
tons/year
Manufacture of parts for water purifiers; Producing molds, water
fountains, tap products 60 tons of products/year; Expansion
project of manufacturing water purifiers; machine parts and
sprinklers; Manufacture of molds and faucets. Design capacity
scale: 90 tons of products.
Producing cold drawn steel bars;
Producing all kinds of rolling doors, storm-proof doors, doors;
partitions, sliding glass frames; awnings, tents, screens; interior
and exterior products; disaster prevention equipment, security
equipment, fire prevention equipment.
Producing accessories for blowback parts for commercial
aircraft, such as: Blocker Door, Bullnose.
2.1. Manufacturing, assembling and processing computers,
internet and telecommunications equipment and products,
information, spare parts and components for products, such as
magnetic disks, computer hard drives and used glass substrates
for magnetic memory disk (for hard drive production).
2.2. Research, explore and create solutions for application in the
field of computer technology and information technology; and
develop technology to create and perfect new technology or new
products in computers, internet/telecommunications/information
equipment and spare parts and components related to the abovementioned fields and trade in products generated from research
and development
2.3. Manufacture of plastic trays to store glass discs in the
polishing process.
Hoya Glass Disk Vietnam II Co., Ltd. is allowed to apply
regulations on export processing enterprises.
Producing and filling high quality industrial and medical gas
products
Manufacture of generators and generator spare parts
Manufacture of electronic products for cars, motorcycles and
others
Manufacture of industrial mechanical accessories such as locks,
hooks, rings, latches, clamps, corrugated washers, leaf springs,
washers
* Producing, researching and developing light construction
equipment such as table compactor, vibrating roller compactor,
compactor hammer, concrete mixer, reverse roller, submersible
pump and power supply
* Producing components and spare parts for the abovementioned machinery and equipment
Manufacture of electrical and electronic components for cars
and motorcycles
Producing parts such as camshaft, manual shift lever, automatic
control lever, pedal shift lever
Manufacturing and processing electronic components and auto
parts
608
16
Factory for the production of
electrical cables used in the
automotive industry
Factory Vietnam
Japan
Manufacture of electrical cables used in the automotive industry
Japan
18
Toyota Vietnam Industrial
Equipment Factory
Japan
19
HITACHI ATEMO HUNG
YEN FACTORY
THAILAND
20
Established Kyoto Biken
Hanoi Laboratories Co., Ltd. Building a factory to produce
veterinary drugs
SMM VIETNAM FACTORY
Japan
Manufacture of rubber parts for automobiles, motorcycles,
office equipment and other products such as: wire rings,
protective devices, covers, seals and washers, rubber gaskets
Manufacture of electrical equipment and spare parts for motor
vehicles such as: Engines for material handling equipment,
axles.
Manufacture of transport equipment such as: Motorized
forklifts, stackers, trailers.
Manufacture of carburetors, throttle valves, air ducts, fuel pump
modules, electronic controls for motorcycles, cars and multipurpose engines
Production and distribution of veterinary drugs, biological
products, microorganisms, chemicals used in veterinary
medicine.
22
Construction project of
Kyocera high-tech product
production complex
Japan
23
Panasonic Vietnam – Hung
Yen Branch.
Japan
24
Topy Fasteners Vietnam
factory project
Japan
25
Japan
26
Akebono Brake Astra Vietnam
Factory
Shin-Etsu Vietnam Factory
27
Bando factory (Vietnam)
Japan
28
Kawakin Core-tech Vietnam
Factory Project
Japan
29
Panasonic Appliances
Vietnam factory in Hung Yen
Japan
30
Kosaka Vietnam Factory
Japan
17
21
Japan
Japan
Manufacture of Lithium iron phosphate used as electrodes for
lithium batteries; Crushing Lithium iron phosphate products
produced by the Company
Construction of high-standard factories, warehouses,
infrastructure, offices and other ancillary works for lease by
Kyocera's affiliates; provide management consulting services;
provides general office administrative management services for
investment projects to rent factories and offices in the Complex.
Support financial activities for subsidiaries in Vietnam of
Panasonic corporation to carry out projects of manufacturing
electrical appliances, components, and household electrical
products, through activities including but not limited to: the
provision of factories, warehouses, operators, technical
infrastructure...
Producing steel accessories for cars and motorcycles, including:
washers, clamps, nut clamps, clamps, counterweights, VTC
versions... and other similar products.
Manufacture of master cylinders, brake controllers
Production of adhesive materials; Manufacture of reflectors for
LED light emitting diodes and other semiconductor applications
Manufacture of plastic parts for motorcycles such as: Fuel tank
cap; water barrier; Fenders; handbrake and throttle protection
device; turn signal lights….
Manufacture of conveyor belts. (belt) for motorcycles.
Manufactures parts and equipment made of metal and rubber,
including anti-seismic equipment, vibration control and
reinforcement equipment for bridges and buildings.
2.1. Invest in machinery and equipment for manufacturing,
assembling and installing household electrical appliances and
household products, including: washing machines of all kinds,
refrigerators of all kinds, dryers of all kinds, microwave ovens,
etc. types, vacuum cleaners of all kinds, rice cookers of all
kinds, presses and grinders of all kinds, irons of all kinds and
details, components, semi-finished products used for the above
equipment and products. Design capacity: 1,000,000
products/year.
2.2. Design, research and develop household electrical
appliances, household products, details, components, semifinished products, materials for equipment and products
specified in Section 2.1 of this Article .
2.3. Provide market research services (CPC 86401).
2.4. Provide management consulting services (CPC 865).
2.5. Providing customer care services such as: surveying
opinions, recording customer feedback, offering solutions to
improve products, quality and services ... for household
electrical appliances; household products.
Manufacture of motor shafts for industrial trucks
609
31
INVESTMENT PROJECT
PRODUCING SMD
SURFACE COMPONENTS.
Azuma Safety Factory
Japan
33
Sanwa vietnam industrial
factory project.
Japan
34
Seiko Vietnam Industrial
Factory
Japan
35
Electronic connector
manufacturing project
Japan
36
Hamatetsu Vietnam Factory
Project
Tanaka Precision Vietnam
Factory
Fuji Bakelite Vietnam Factory
Japan
Project to expand the factory
to produce electric cables used
in the automotive industry
Musashi Auto Parts Vietnam
factory expansion project
Japan
41
Research and develop
technology Hoya Memory
Disk
NETHERLANDS
42
Tokyo Keiso Vietnam Factory
Project
Denka Vietnam New
Materials Factory
Generator production project
Factory Ochiai II
Project for the production of
parts for commercial aircraft
wings
Matsuda Sangyo Scrap
Recycling Factory (Vietnam)
Project of Yotsugi Vietnam
factory
Rotor and Stator production
project
Japan
32
37
38
39
40
43
44
45
46
47
48
49
Japan
Japan
Japan
Japan
Singapore
Japan
Japan
Japan
Japan
Japan
Japan
Manufacture of SMD surface-glued components for crystal
oscillators; Manufacture, repair and maintenance of molds and
accessories for molds
Manufacture of lights (reflective) and related parts, reflective
signs and related steel poles, reflective nails, rubber traffic poles
used in road traffic safety.
2.1. Manufacture of interior parts, plastic seats for automobiles;
Design capacity scale: 51.2 tons of products/year.
2.2. Manufacture of molds used for molding plastic products;
Design capacity scale: 05 sets/year (equivalent to 5.5 tons of
products/year).
2.3. Manufacture of inspection jigs used to inspect plastic
interior parts for automobiles; capacity scale 20 sets/year
(equivalent to 1.2 tons/year).
Sanwa Vietnam Industry Co., Ltd. is allowed to apply
regulations on export processing enterprises.
Producing stainless steel, aluminum, iron, plastic parts for
machinery and equipment such as stepper motors, Ion implants,
automatic testing equipment, etc. in semiconductor production
lines
Producing all kinds of connectors for laptops, printers, copiers,
mobile phones. Scale of design capacity; 300 tons of
products/year. Producing plastic connectors for laptops, printers,
copiers, mobile phones. Design capacity: 200 tons of
products/year
Manufacture of metal washers, clutches, levers and gearboxes
for motorcycles and cars
Manufacture of pins, bearings, discs, metal clamps for
motorcycles.
* Manufacturing and assembling electrical equipment, control
equipment for power distribution such as: Circuit breakers,
leakage current circuit breakers, circuit breakers parts, cable
terminals of electric meters.
* Design and manufacture stamping dies used in heat casting
and stamping technology.
Manufacture of electrical cables used in the automotive industry
Invest in additional machinery and equipment to increase the
capacity of the production project Camshaft, manual shift lever,
automatic control gear lever, gear lever for cars, motorcycles,
ships from 3,214,000 products/year (equivalent to 1,240 tons of
products/year) to 10,230,000 products/year (equivalent to 3,580
tons of products/year)
Research, explore and create solutions for application in the
field of computer technology and information technology; and
develop technology to create and perfect new technologies or
new products in computers,
internet/telecommunications/information equipment and spare
parts and components related to the above fields to provide the
Company Hoya Glass Disk Vietnam II
Manufacture of flow meters; Manufacture of water level
measuring equipment
Manufacture of PVC adhesive tapes for automotive electronics
and others
Manufacture of generators
Manufacture of washers
Manufacture of commercial aircraft wing parts such as the
Sharklet and the product that joins the gap between the J Panel
(Gap cover) and the J Panel (J Panel).
Recycling scrap from electrical, electronic, mechanical and
semiconductor components
Producing products from insulating materials such as jackets,
pants, insulating plastic sheets
Manufacture of stators and rotor cores for lifting equipment
engines and motor vehicles
610
50
51
MICROTECHNO VIETNAM
FACTORY
JEWELRY PROJECT WITH
PREMIUM METAL, GEM
Japan
Japan
52
TOEI VIETNAM FACTORY
PROJECT
53
SECOND TOTO VIETNAM
FACTORY PROJECT
EIKODO VIETNAM
FACTORY PROJECT
Tamagawa Electronics
Vietnam Factory
Japan
56
MITSUBA VIETNAM
FACTORY PROJECT IN
THANG LONG II
INDUSTRIAL PARK
Japan
57
ELECTRONIC
COMPATIBILITY LAB
PROJECT
RODAX VIETNAM
FACTORY PROJECT
Japan
54
55
58
Japan
Japan
Virtue
59
Project to expand investment
in manufacturing SMD
surface-glued components
Japan
60
PROJECT
MANUFACTURING THE
DOORS OF BAGGAGE
BOXES, BACKWARDS
AND COMMERCIAL
AIRLINES
SUZURAN VIETNAM
PRODUCTION FACTORY
PROJECT
FLOWER FACTORY
Japan
TOPY FASTENERS
VIETNAM FACTORY
EXPANDING PROJECT
NIPPON MEKTRON
FACTORY PROJECT
FOOD MANUFACTURING,
PROCESSING AND
PROCESSING FACTORY.
NITTAN VIETNAM
FACTORY PROJECT
PRODUCTION OF SMD
SURFACE SURFACED
COMPONENTS
Switzerland
61
62
63
64
65
66
67
Manufacture of spare parts and accessories for automobiles,
including: oil damper, oil booster valve, stopper and core coil
Products from gold, silver and platinum (Platinum): 393,600
products/year (equivalent to 1,200 kg of products/year);
Products from Cobarion (Co-Cr alloy): 24,000 products/year
(equivalent to 72 kg of products/year);
Products from brass (Cu-zn alloy): 24,000 products/year
(equivalent to 72 kg of products/year).
Producing components for office equipment and
telecommunications equipment such as: roller brush, cotton
coated roller brush, metal frame and others
Manufacture of sanitary ware and sanitary ware-related
accessories
Candy production
Manufacture of electrical components for mobile
telecommunications of base stations, broadcasting,
telecommunications satellites and public broadcasting, such as:
coaxial attenuators, dividers, coaxial splitters, circuit breakers,
coaxial filters, duplexers and other components
Manufacture of starter motors, generators, horns, electrical
relays, electrical conductors, pulse generators and some other
electronic products of motorcycles; Manufacture of electrical
relays and electrical conductors for automobiles; Manufacture of
windshield wipers for cars. Producing all kinds of horns
(trumpets) for cars. Manufacture of fuel pumps and auto power
generation integrators. Producing cooling fan motors for
automobiles; Producing all kinds of motors for motorcycles and
cars
Provide technical testing and electromagnetic compatibility
certification services for electrical and electronic products.
Manufacture of components for transmission of industrial
machines such as housings, shafts, rims and manufacture of
metal precision machinery products.
Invest in additional investment in machinery and equipment at
the stages of gluing, punching, glazing and printing circuits,
cutting edges and cleaning products under the investment
project of manufacturing SMD surface-glued components,
increasing the production process. Project capacity scale from
2.4 billion products/year (equivalent to 300 tons) to 3.6 billion
products/year (305 tons)
Manufacture of luggage compartment doors and manufacture of
rear flaps and blades in commercial aircraft
Japan
Invest in building a cotton factory for medical, sanitary and
cosmetic use
Japan
Invest in building a factory to produce, process and pack
nutritional drinks.
Invest in additional machinery and equipment to increase the
capacity of the Topy Fasteners Vietnam Factory project
Japan
Japan
Invest in building a factory to produce printed circuit boards for
electronic devices.
Invest in building a food production, processing and processing
factory.
Japan
Manufacture of fire alarm system equipment
Japan
Additional investment in machinery and equipment, increasing
the capacity of investment projects to produce SMD surfaceglued components from 6.84 billion products/year (equivalent to
611
68
69
70
71
72
73
74
75
76
77
78
79
80
PRODUCTION EXPANSION
PROJECT (2nd time).
DAIKIN VIETNAM
FACTORY
DAINICHI VIETNAM
FACTORY PROJECT
KOYO VIETNAM
FACTORY PROJECT
AMAGASAKI PIPE
VIETNAM FACTORY
PROJECT
MARUESU VIETNAM
FACTORY PROJECT
ITO VIETNAM FACTORY
PROJECT
CERAMIC PACKAGE
PRODUCTION PROJECT
FOR OPTICAL CABLE
NETWORK
HONEYCOMB J-PANEL
PRODUCTION PROJECT
FOR COMMERCIAL
AIRLINES
NIKKISO VIETNAM
FACTORY II
CHAIN
MANUFACTURING,
PROCESSING AND
Assembling FACTORY
KAGA ELECTRONICS
VIETNAM FACTORY
PROJECT
ORGANO FACTORY
(VIETNAM) IN HUNG YEN
PROVINCE
Japan
Japan
Japan
Japan
Japan
Manufacture of metal equipment.
Japan
Medical device manufacturing
Japan
Processing and assembling technical ceramic products (Ceramic
Package) and connectors for fiber optic networks
Japan
Manufacture of honeycomb core (Honeycomb J-panel) for the
production of J-panel products for commercial aircraft
Japan
Manufacture of products, parts and equipment from composite
materials for commercial aircraft
Chain production, processing and assembly
Japan
Japan
THAILAND
JEWELRY KHANH
MANUFACTURING AND
PROCESSING FACTORY
PROJECT
VIETINAK FACTORY 2
Japan
THE SECOND TOTO
VIETNAM FACTORY
EXPANDING PROJECT.
THANG LONG SERVICE
STATION II
SANWA FELT VIETNAM
PROJECT
SWCC SHOWA VIETNAM
Japan
86
87
88
IPTVN FACTORY PROJECT
NFK VIETNAM PROJECT
FUJI BAKELITE VIETNAM
FACTORY EXPAND
Japan
Singapore
Japan
89
PROCESS LAB PROJECT.
MICRON VIETNAM
SEWS-COMPONENTS
VIETNAM FACTORY
PROJECT II
PRODUCTION PROJECT
OF INDUSTRIAL CUTTING
TOOLS
ASAHI KASEI ADVANCE
VIETNAM PROJECT
Japan
81
82
83
84
85
90
91
92
652 tons of products/year) to 7.44 billion products/year
(equivalent to 727 tons of products/year)
Manufacturing, processing and assembling air conditioners and
related spare parts and components of air conditioners
Manufacturing and assembling electronic components and
products
Invest in building a factory to manufacture metal equipment for
furniture such as sofa hinges, turntables of all kinds
Invest in building a factory for the production of copper fittings
for connecting pipes for air conditioners
Japan
Japan
Japan
Japan
Japan
Manufacturing, processing and assembling electrical and
electronic equipment for air conditioners and automobiles
Manufacturing and assembling wastewater treatment systems;
providing maintenance services, maintenance of wastewater
treatment systems; chemical preparation Polytetsu used in
wastewater treatment system
Invest in building a factory to manufacture and process jewelry,
imitation jewelry and related details
Manufacture of rubber parts for automobiles, motorcycles,
office equipment and other products
Lease more land, invest in building factories and add machinery
and equipment to increase the capacity of the second Toto
Vietnam factory project.
Invest in building distribution and trading stores for petroleum
and petrochemical products
Manufacture of components used for copiers and laser printers.
Producing connecting wires used for electrical, electronic,
household, industrial equipment and means of transport
Manufacture of components and spare parts for molds
Invest in building a factory producing all kinds of flexible pipes
Invest in building factories and supplementing machinery and
equipment to increase the capacity of the project of Fuji Bakelite
Vietnam Factory
Producing metal molds for circuit board production
Japan
Invest in building a factory to produce electronic components
for cars and motorcycles; manufactures electrical wiring for cars
and motorcycles
Producing industrial cutting tools
Japan
Manufacture of airbags for cars
612
93
Zipper STEEL FACTORY
Japan
94
COLD AKIYAMA-SC
(VIETNAM)
FUKOKU BUSSAN
VIETNAM PROJECT
GLASS PRINTING LINE
INVESTMENT PROJECT
LEAD FOR SURFACE
PARTS SMD
THIRD TOTO VIETNAM
FACTORY PROJECT
NAGAOKA VIETNAM
PROJECT
THE FOURTH TOTO
VIETNAM FACTORY
PROJECT
FACTORY FOR LEASE
INVESTMENT PROJECT IN
LOT G3-G6
CRYSTAL-OPTECH
FACTORY
CMOS COMPONENTS
PRODUCTION
INVESTMENT PROJECT
Japan
95
96
97
98
99
100
101
102
103
Japan
Japan
Japan
Japan
Japan
Japan
Producing and processing cold drawn wire (rolled steel) from
high-grade alloy steel and stainless steel
Manufacture of cables and conductors
Investment and installation of lead glass printing line (lead glass
frit) for SMD surface-glued components
Invest in building a factory for the production of protective
equipment
Invest in building a factory to produce wire mesh pipes to
collect water
Invest in building a factory to manufacture sanitary ware and
related accessories
Invest, build factories and technical infrastructure works for
lease
Producing glass for smartphone cameras and smart watches.
Japan
Producing ceramic packages of components used for CMOS
sensors
Japan
Manufacture of crystal oscillators for the automotive industry
Japan
Manufacture of contactors (probes) for testing electrical
contacts.
613
MINH DUC INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Located in My Hao town, Hung Yen province.
Industrial investor
VNT Infrastructure Investment and Development Joint Stock Company
- Address: Minh Duc Industrial Park, My Hao Town, Hung Yen Province.
Geographical
location
Fields of investment
attraction
- Contact person: Ms. Tuong Quynh Huong – Deputy Director; Phone: 0936.388.477.
Km32 National Highway 5 (Hanoi - Hai Phong); 35 km from Hanoi center, 58 km from Noi Bai airport,
65 km from Hai Phong port, 105 km from Quang Ninh deep sea port.
▪ Producing and assembling electrical and electronic components and equipment, refrigeration,
telecommunications, products from new and high-tech technologies;
▪ Mechanical engineering; manufacturing and assembling machinery, equipment, automobiles,
motorcycles, prefabricated metal products; jewelry;
▪ Producing and processing agricultural and forestry products, food, beverages, animal feed (excluding
cattle and poultry slaughter);
▪ Producing products from paper, wood, plastic, rubber, plastic;
▪ Manufacture of pharmaceuticals, cosmetics, paints, packaging, printing, embroidery, labels, building
materials, ceramics, glass, textiles (excluding dyeing), leather and footwear (excluding tanning) , furniture,
kitchen equipment, concrete admixtures, environmental chemicals, coating materials, detergents;
▪ Logistics services, petrol shops
Minimum regional
wage
Region 2, minimum salary 4,160,000 VND.
Minimum rental area
According to the agreement with the investor of the industrial park infrastructure.
Limit for
Construction Height
According to the planning approved by the competent authority.
Permitted
Construction Rate
According to the planning approved by the competent authority.
Planning Area
▪ Scale: 198 hectares. In which, the area of industrial land for lease is 155 hectares.
▪ Industrial land area for lease: 53 ha, occupancy rate is 34.2%.
▪ The remaining industrial land area not yet leased: Approximately 102 ha.
Operation Status
Active
Number of Projects
In the industrial park, there are 31 investment projects (7 FDI projects and 24 DDI projects), with a total
registered investment capital of about 1,087 billion VND and 43 million USD. In which, there are 03
projects with Korean investment capital with a total registered investment capital of about 7.9 million
USD.
Lease fee &
Operating fee
▪ Sublease fee of land associated with industrial park infrastructure: 145 - 150 USD/m2
▪ Management cost: 17,000 VND/m2/year
▪ Electricity cost: According to the general regulations of the Government
▪ Water cost: 15,500 VND/m3
▪ Waste water treatment fee: 14,500 VND/m3
INFRASTRUCTURE
614
Infrastructure
▪ Construction site: The land plots have been processed, ready for the construction of the Factory.
▪ Power supply: The power supply is stable.
▪ Water supply: The water source is taken from the clean water supply station of Hai Duong Clean Water
Trading Joint Stock Company.
▪ Waste water and waste treatment: The wastewater treatment plant was built with a total capacity of
2,500 m3/day.
▪ Telephone & Internet: The telecommunications system meets international standards and is always
available to meet the needs of communication, high-speed data transmission and domestic and international
postal services. The underground fiber optic cable system is directly connected to the fence of each
enterprise.
▪ Internal traffic: The system of internal roads is built with a reasonable cross-section, ensuring easy and
convenient means of transportation to each factory. Lighting systems are installed along the roads.
▪ Fire prevention: Water supply system with fire hydrants is arranged along the roads of the Industrial
Park.
Social infrastructure
and services
▪ Customs: Hung Yen Customs is currently headquartered about 6 km from the Industrial Park. All sealing
and lead clamping procedures are carried out right at the factories in the Industrial Park.
▪ Banking: The system of banks (Vietcombank, Techcombank, ACB, Sacombank, Agribank, Bank for
Investment and Development of Vietnam ...) is located near the industrial park.
▪ Hospital: Pho Noi General Hospital (10 km away from the Industrial Park) is modernly planned and built
to meet the needs of treatment and medical examination and treatment for workers in the Industrial Park.
Location/ Map
615
616
LIST OF TENANTS
No
Name of projects
Nationality
1
Vegetable and seafood processing factory
by vacuum drying technology
Factory manufacturing steel structure and
lifting equipment
Tam Hoang Son Industrial Service
Complex
Factory Manufacturing mechanical and
plastic foam
Factory producing composite film,
printing on film material and producing
artificial wood board
Steel structure factory
Vietnam
Phu Du Garment Factory
SPRAY MANUFACTURING
FACTORY
Factory producing high-class bedding
Hiep Hoa specialized car mechanic
factory
Vietnam
Vietnam
Factory manufacturing steel structure and
lifting equipment
Specialized vehicle assembly plant
Packaging factory and factory for rent
Mechanical factory and factory for rent
Vietnam
FACTORY MANUFACTURING,
ASSEMBLY ELECTRIC BIKE AND
CONSTRUCTION FACTORY FOR
LEASE
TOTAL SERVICES MESA
Vietnam
FACTORY, OFFICE FOR LEASE
PLASTIC ADDITIONAL
PRODUCTION PROJECT
HUNG YEN VQB TIN
MANUFACTURING FACTORY.
Vietnam
Vietnam
Vietnam
24
FACTORY MANUFACTURING,
MANUFACTURING GARMENTS,
GARMENT ACCESSORIES AND
FACTORY FOR LEASE
PRODUCTION OF WOMEN
SURFACES
TIEN GIA CUTTING TOOLS
FACTORY
ASIA STAR BUILDING MATERIALS
FACTORY
EXPAND STEEL Structural FACTORY
25
Kerry Integrated Logistics(Hung Yen)
CANADA
26
Garment factory for export
KOREA
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
Business line
Vietnam
Processing vegetables, fruits and seafood by vacuum
drying technology
Manufacture of steel structures and lifting equipment
Vietnam
Factory lease
Vietnam
Producing gasoline engine water pumps, steel billets
and EPS foam products.
Production of composite films used to package
products, print on films and manufacture wooden
boards.
Manufacturing all kinds of steel structures, nonstandard goods with steel structures
Manufacture of garments for export
Producing all kinds of foam
Vietnam
Vietnam
Vietnam
Vietnam
Vietnam
Vietnam
Vietnam
Vietnam
Vietnam
Producing auxiliary equipment for the automotive
mechanical industry, products for environmental
sanitation, labor protection equipment, including: Thin
shell products, frame structures, non-standard
components , specialized accessories, workwear.
Manufacture of steel structures and lifting equipment
Manufacturing and assembling special-use vehicles.
Production of plastic packaging;
1. Mechanical processing, production of steel products
2. Invest in building factories for rent
Manufacturing and assembling electric bicycles. Scale
of design capacity: 24,000 units/year. Construction of
factory for rent. Scale of area: 22,400m2.
Invest in building a service center for warehouse
leasing and storing goods.
Factory and office for rent
Production of plastic additives
Producing, electrolysing and refining tin with 99.95%
content from tin ingots with 99.75% content; and
produce tin wire, tin bar, tin range from 99.75% to
99.95%.
Invest in building factories for manufacturing,
processing garments, accessories for the garment
industry, and leasing factories
Vietnam
PRODUCTION OF WOMEN SURFACES
Vietnam
Invest in building a scissor factory of all kinds
Vietnam
Invest in building a factory to produce all kinds of
materials for the construction industry
Producing steel frame structure and non-standard steel
structure
Warehousing, transportation, delivery and distribution
services; Import-Export freight forwarding services
and Logistics services: Store and preserve records.
Capacity 1,500,000 tons of goods/year
Producing and processing garments for export and
domestic consumption
Vietnam
617
27
Investment project to expand garment
factory for export
KOREA
28
Project to manufacture walls, partitions,
and roofing sheets used in Sypanel Vina
construction
KIM THANH VIETNAM CLEAN
ROOM EQUIPMENT FACTORY
KOREA
30
GIA HUNG RUBBER SHOOT
FACTORY
China
31
BUILDING PROJECT FACTORY FOR
LEASE - CORE5 HUNG YEN I CO.,
LTD
UK
29
China
618
Additional investment, replacement of machinery and
equipment to improve the production capacity of the
project of garment factory for export
Manufacture of walls, partitions, and roofing sheets
used in construction; Production of plastic windows
and doors with panels
Manufacture of metal equipment for clean rooms.
- Producing soundproof, heat-insulating,
soundproofing and fire-resistant roofing sheets,
partitions and walls with color coated corrugated iron
and non-metallic minerals.
- Manufacture of metal doors, windows and frames,
shutters, gates, room dividers.
Producing labor protection boots from synthetic resin
Invest in building ready-built factories and auxiliary
offices for lease
Producing labor protection boots from synthetic resin
Invest in building ready-built factories and auxiliary
offices for lease
MINH QUANH INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Industrial investor
Geographical
location
Fields of investment
attraction
Located in My Hao town, Hung Yen province.
VID Hung Yen Joint Stock Company.
- Address: Minh Duc Industrial Park, My Hao Town, Hung Yen Province.
- Contact person: Mr. Nguyen Minh Huan; Phone: 0989.768.586.
Km32 National Highway 5 (Hanoi - Hai Phong); 35 km from Hanoi center, 58 km from Noi Bai airport,
65 km from Hai Phong port, 105 km from Quang Ninh deep sea port.
Electrical, electronic, refrigeration, mechanical, agro-forestry product processing industry, food, highgrade building materials, packaging industry, consumer goods production, light industry and other
industries. other clean industry.
Minimum regional
wage
Region 2, minimum salary 4,160,000 VND.
Minimum rental area
According to the agreement with the investor of the industrial park infrastructure.
Limit for
Construction Height
According to the planning approved by the competent authority.
Permitted
Construction Rate
According to the planning approved by the competent authority.
Planning Area
▪ Scale: 150 ha. In which, the area of industrial land for lease is 111.35 ha.
▪ Industrial land area for lease: 46.5 ha, occupancy rate is 40.4%.
▪ The remaining industrial land area not yet leased: Approximately 64 ha.
Operation Status
Active
Number of Projects
The IP has received 27 investment projects (10 FDI projects and 17 DDI projects), with a total registered
investment capital of about 2,225 billion VND and 98 million USD. Including 01 project of Korean investor
with registered investment capital of 280.00 USD.
Lease fee &
Operating fee
▪ Land sublease price associated with industrial park infrastructure: 125 - 140 USD/m2
▪ Management cost: 14,000 VND/m2/year
▪ Electricity cost: According to the general regulations of the Government
▪ Water cost: Ngoc Tuan Nagaoka Clean Water Co., Ltd provides directly to investors.
INFRASTRUCTURE
Infrastructure
▪ Construction site: The land plots have been processed, ready for the construction of the Factory.
▪ Power supply: The power supply is stable.
▪ Water supply: The clean water supply plant was built with a total capacity of 5,500 m3/day.
▪ Waste water and waste treatment: The wastewater treatment plant was built with a capacity of 2,000
m3/day.
▪ Telephone & Internet: The telecommunications system meets international standards and is always
available to meet the needs of communication, high-speed data transmission and domestic and international
postal services. The underground fiber optic cable system is directly connected to the fence of each
enterprise.
▪ Internal traffic: The system of internal roads is built with a reasonable cross-section, ensuring easy and
convenient means of transportation to each factory. Lighting systems are installed along the roads.
▪ Fire prevention: Water supply system with fire hydrants is arranged along the roads of the Industrial
619
Social infrastructure
and services
Park.
▪ Customs: Hung Yen Customs is currently headquartered about 6 km from the Industrial Park. All sealing
and lead clamping procedures are carried out right at the factories in the Industrial Park.
▪ Banking: The system of banks (Vietcombank, Techcombank, ACB, Sacombank, Agribank, Bank for
Investment and Development of Vietnam ...) is located near the industrial park.
▪ Hospital: Pho Noi General Hospital (10 km away from the Industrial Park) is modernly planned and built
to meet the needs of treatment and medical examination and treatment for workers in the Industrial Park.
Location/ Map
620
LIST OF TENANTS
No
1
Name of Projects
NEW BEST WIRE VIETNAM
INDUSTRIAL FACTORY PROJECT
Nationality
Taiwan
2
PROJECT BY JAPANESE SAFETY
STANDARDS
NAKANO INDUSTRIES VIETNAM
Japan
4
PROJECT OF FACTORY,
WAREHOUSE, OFFICE FOR LEASE
VIETLOG
Singapore
5
FACTORY AND WAREHOUSE FOR
LEASE DH LOGISTICS PROPERTY
MINH QUANG VIETNAM
GENERATOR MANUFACTURING
FACTORY - ELECTRIC ENGINE SENCI
VIETNAM
PRODUCTION OF CONCRETE
ADDITIONAL MATERIALS
SUPERLON HUNG YEN FACTORY
Singapore
9
HIGHEND KITCHEN PRODUCTION
PROJECT
China
10
BURMAY VIETNAM INVESTMENT
PROJECT
MECHANICAL MANUFACTURING
FACTORY, THANG LONG HUNG YEN
MECHANICAL JOINT STOCK
COMPANY
INVESTMENT IN CONSTRUCTION
FACTORY, OFFICE FOR LEASE
CONTAINER FACTORY
MANUFACTURING FACTORY
China (HK)
INVESTMENT IN CONSTRUCTION
FACTORY, OFFICE FOR LEASE
PRODUCTION OF PLASTIC
HOUSEHOLDS AND FACTORY LEASE
3A
PLASTIC ADDITIONAL FACTORY
Vietnam
18
STORAGE AND MATERIALS
TRADING OF KIEN VUONG
COMPANY IN HUNG YEN
Vietnam
19
PROJECT FACTORY, OFFICE FOR
LEASE TTC
Vietnam
3
6
7
8
11
12
13
14
15
16
17
Japan
China
KOREA
Singapore
Vietnam
Vietnam
Vietnam
Vietnam
Vietnam
Vietnam
621
Business line
Producing high-grade carbon steel wire, alloy steel
wire, stainless steel wire by steel wire tensioning
technology
Invest in building warehouses to store goods
2.1. Producing drums from metal.
2.2. Exercising the right to export, import, and
distribute wholesale (without establishing a
wholesale establishment) of goods with HS codes:
4016, 7326, 8309.
2.3. Services related to production (CPC 884, 885).
Details: Repairing drums
2.1. Invest in building factories, warehouses,
offices and some ancillary works for lease.
2.2. Management consulting and investment
consulting services for businesses (CPC 865).
Invest in building factories and offices for rent
Manufacture of generating sets and generator
engines; High pressure car washing machine, water
pump of all kinds; 4 stroke gasoline engine
Producing raw materials for concrete admixtures,
concrete admixtures
Manufacture of rubber-based products, such as:
Insulation rolls, sheet insulation, exercise mats,
foam insulation tapes, insulating tapes,
soundproofing materials, foam pads for use in the
car
Production and processing of kitchen cabinets,
kitchen drawers, edge braces and wooden kitchen
cabinet partitions
Producing hand tools and electric machinery
Invest in the construction of a factory to
manufacture and process mechanical products for
the automotive, motorcycle, household appliances,
and furniture industries.
Invest in building factories and offices for rent
Producing container houses and containers
Invest in the construction of a factory to
manufacture and construct prefab houses with
industrial wood and metal
Invest in building factories and offices for rent
Investing in building a factory to produce
household plastic products and leasing factories and
offices
Invest in building a factory to produce plastic
additives.
2.1. Warehouse and trading of production materials
for the food, pharmaceutical, food and industrial
additives, animal feed, veterinary medicine, aquatic
medicine, aquaculture medicine.
2.2. Dispensing Dextrose from powder to liquid
form
Invest in building factories and offices for rent
20
DULICO MECHANICAL
MANUFACTURING FACTORY AND
FACTORY LEASE
Vietnam
21
VAN HO LOGISTICS
Vietnam
22
23
MINH THU LOGISTICS CENTER
AN HUNG THINH PACKAGING
FACTORY
PROJECT HUNG YEN
FACTORY, OFFICE FOR LEASE
Vietnam
Vietnam
26
JASTAR FURNITURE AND EXTERIOR
PRODUCTION FACTORY
Vietnam
27
CARTON PACKAGING FACTORY IN
HUNG YEN
Vietnam
24
25
Vietnam
Vietnam
622
Invest in building a factory for the production of
lock details and components; mold production;
production of copper trees, copper sheet rolls; and
for rent factories and offices
Investing in construction, providing dry and cold
storage services
LOGISTICSMINH THU CENTER
Invest in building a factory to produce plastic and
paper packaging
Building factories and offices for rent
Invest in building factories, offices and ancillary
works for lease.
Invest in building a factory to manufacture interior
and exterior products made of wood and plastic and
lease factories and offices
Producing carton packaging from paper
YEN MY INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Industrial investor
Located in Yen My district, Hung Yen province.
Viglacera Industrial Park Development Joint Stock Company Yen My - Hung Yen.
- Address: Km 33, new road 39A, Lieu Xa commune, Yen My district, Hung Yen province.
Geographical location
Fields of investment
attraction
- Contact person: Mr. Nguyen Anh Tuan – Director; Phone: 0932.309.8888.
Adjacent to the new National Highway 39 A; 32 km from Hanoi, about 75 km from Hai Phong port,
118 km from Quang Ninh deep sea port
High-tech application; Manufacture of electrical equipment, electronics, computers and optical
products; Manufacture of automobiles, motorcycles, machinery, equipment and products from
prefabricated metal; Processing and preserving meat, vegetable and fruit products; Beverage
production; manufacture of wood products; pharmaceuticals, cosmetics, paints, packaging; Services
of Logistics.
Minimum regional wage
Region 2, minimum salary 4,160,000 VND
Minimum rental area
According to the agreement with the investor of the industrial park infrastructure
Limit for Construction
Height
According to the planning approved by the competent authority
Permitted Construction
Rate
According to the planning approved by the competent authority
Planning Area
▪ Scale: 280 hectares. In which, the area of industrial land for lease is 204 ha.
▪ Industrial land area for lease: 108.3 ha, occupancy rate is 53%.
▪ The remaining industrial land area not yet leased: Approximately 95 ha.
Operation Status
Active
Number of Projects
The IP has received 30 investment projects (16 FDI projects and 14 DDI projects), with a total
registered investment capital of about 2,020 billion VND and 298 million USD. In which, there are
03 projects of Korean investors with registered investment capital of 36 million USD.
Lease fee & Operating fee
▪ Land sub-lease price associated with industrial park infrastructure: 120 - 135 USD/m2
▪ Management cost: 0.7 USD/m2/year
▪ Electricity cost: According to the general regulations of the Government
▪ Water cost: 13,000 VND/m3
▪ Waste water treatment fee: 12,000 VND/m3
INFRASTRUCTURE
Infrastructure
▪ Construction site: The land plots have been processed, ready for the construction of the Factory.
▪ Power supply: The power supply is stable.
▪ Water supply: Provided by a clean water supply plant outside the IP.
▪ Waste water and waste treatment: The wastewater treatment plant was built with a capacity of
2,000 m3/day.
▪ Telephone & Internet: The telecommunications system meets international standards and is
always available to meet the needs of communication, high-speed data transmission and domestic
and international postal services. The underground fiber optic cable system is directly connected to
623
Social infrastructure and
services
the fence of each enterprise.
▪ Internal traffic: The system of internal roads is built with a reasonable cross-section, ensuring
easy and convenient means of transportation to each factory. Lighting systems are installed along
the roads.
▪ Fire prevention: Water supply system with fire hydrants is arranged along the roads of the
Industrial Park.
▪ Customs: Hung Yen Customs is currently headquartered about 3 km from the Industrial Park. All
sealing and lead clamping procedures are carried out right at the factories in the Industrial Park.
▪ Banking: The system of banks (Vietcombank, Techcombank, ACB, Sacombank, Agribank, Bank
for Investment and Development of Vietnam ...) is located near the industrial park.
▪ Hospital: Pho Noi General Hospital (4 km from the Industrial Park) is modernly planned and built
to meet the needs of treatment and medical examination and treatment for workers in the Industrial
Park.
Location/ Map
624
LIST OF TENANTS
No
Name of Projects
1
HUNG YEN LOGISTICS PARK
I
Singapore
2
HUNG YEN LOGISTICS PARK
II
Singapore
3
HUNG YEN LOGISTICS PARK
III
Singapore
4
YUSUNG ELECTRONICS
VINA
JIA YANG PACKAGING
FACTORY
SANG-A VINA PROJECT
Korea
Invest in the construction of a logistics center to develop,
operate and lease the completed logistics facilities and
related technical infrastructures and works; real estate
business; providing management services (CPC 742);
provides real estate management services (CPC 82202).
Invest in the construction of a logistics center to develop,
operate and lease the completed logistics facilities and
related technical infrastructures and works; real estate
business; providing management services (CPC 742);
provides real estate management services (CPC 82202).
Invest in the construction of a logistics center to develop,
operate and lease the completed logistics facilities and
related technical infrastructures and works; real estate
business; providing management services (CPC 742);
provides real estate management services (CPC 82202).
Manufacture of engine control devices, sensors and LEDs
Samoa
Paper packaging production
KOREA
POLYMERIC PRODUCTS VGH
CO., LTD (VIETNAM)
FACTORY FUSION GROUP
China (DL)
YEE WOO VIETNAM WATER
FACTORY YEE WOO
VIETNAM
FACTORY MANUFACTURING
CONSTRUCTION SURFACES
AND ADDITIONS
HUNG YEN TITAN
INDUSTRIAL PROJECT
China (HK)
- Producing all kinds of pneumatic accessories such as:
wiper valves, safety valves, connectors, connecting pipes,
steam valves, couplings...: 2,000,000 products/year
(equivalent to 480 tons/year);
- Producing all kinds of plastic pipes, plastic pneumatic
pipes (for industrial robots and pneumatic pipes): 1,000,000
meters/year (equivalent to 360 tons/year)
Producing synthetic rubber of all kinds and products from
synthetic rubber; Producing products from synthetic plastic
2.1. Production, processing and packaging of animal feed.
2.2. Exercising the right to export, import, and distribute
wholesale (without establishing a wholesale establishment)
of goods with the following file codes: 1902, 1905,
2309.10, 2309.90.20, 3920, 3926, 4201.00.00 , 4203, 4415,
6115, 7323, 7326.20, 8214, 8424.10, 8531, 8703, 9603.
2.3. Providing warehousing and storage services (CPC 742)
(only operating since April 2025).
Invest in building a factory to produce packaging from
cardboard, corrugated paper from cardboard
12
GOODS STORAGE AND AIG
MANUFACTURING FACTORY
IN HUNG YEN
China (HK)
13
PAPER PRODUCTION
FACTORY
FACTORY MANUFACTURING
COMPONENTS FOR
ELECTRIC VEHICLES,
MOTORCYCLES, GARDEN
MACHINERY AND
MECHANICAL PRODUCTION
China (HK)
5
6
7
8
9
10
11
14
Nationality
Business line
KOREA
Germany
Invest in building a factory to produce additives for the
construction industry.
Singapore
2.1 Invest in building factories, warehouses and ancillary
works for lease.
2.2. Warehousing and storage of goods (CPC 742).
2.3. Brokerage services, real estate consulting, real estate
management.
2.4. Technical consulting service (CPC 8672).
2.5. Management consulting services (CPC 865).
- Centers, warehouses for storing goods and leasing
warehouses: 50,000 tons of products;
- Production and mixing of food ingredients and food
additives: 1,200 tons of products/year
Producing paper bags, paper boxes from paper
China
2.1. Manufacturing and assembling components,
accessories and spare parts: automobiles, motorcycles,
mopeds, electric bicycles, electric motorcycles, electric
vehicles, generators; agricultural machinery, forestry,
gardening machines, mechanical processing.
2.2. Manufacture of metal furniture accessories.
625
15
16
ACEWELL FACTORY
(VIETNAM)
ECHO PLASTIC FLOOR
FACTORY
2.3. Office and factory for rent
Manufacture of mechanical components for the automotive
and petroleum industry
Producing plastic floor panels and PVC films of all kinds.
Samoa
America
626
YEN MY II INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Industrial investor
Located in Yen My district, Hung Yen province
Hoa Phat Hung Yen Industrial Park Infrastructure Development Company Limited.
- Address: 39 Nguyen Dinh Chieu, Le Dai Hanh ward, Hai Ba Trung district, City. Hanoi.
- Tel: 024.39763889 Fax: 024.39763890 ;
Geographical
location
- Contact person: Mr. Cuong- 0918.507.886.
Adjacent to Highway 39; about 5km from National Highway 5A, about 3km from Hanoi-Hai Phong
highway intersection, about 30km from Hanoi center, 55km from Noi Bai airport, 75km from Hai Phong
port, 120km from Quang Ninh deep sea port.
Fields of investment
attraction
Manufacturing and assembling data transmission equipment and components, mobile phones, computers
and peripheral devices; software and digital content production; manufacturing and assembling electrical,
electronic, refrigeration, optical, telecommunications, automobile, motorbike, and other motorized vehicles,
machines and equipment; manufacturing mechanical products, machinery and equipment, manufacturing
molds, jewelry, jewelry; metal production (excluding the production of cast iron and steel billets);
production of sports equipment, toys, production of building materials (excluding production of cement,
clinker, bricks and tiles); manufacturing composite materials, flexible, super-durable, ultra-lightweight
materials; industrial gas production; production and processing of agricultural products, food (excluding
production of cassava flour, vermicelli, monosodium glutamate, sugar from sugar cane; processing aquatic
products, seafood; slaughtering livestock and poultry), beverages, food breed; manufacture of paper
products (excluding pulp and paper production), wood (excluding wood processing, wood chips from
natural wood), plastic (excluding recycling of plastic scraps), high rubber, plastics, non-metallic minerals
and from steel, aluminum and alloys; manufacturing pharmaceuticals, cosmetics, packaging and labels;
manufacture of medical equipment; manufacture of chemical products (excluding basic chemicals,
detergents, additives, chemical fertilizers, plant protection chemicals); logistics services, warehouses,
factories for rent, petrol stations; manufacture of supporting industry products (excluding textiles, garments,
leather and shoes) on the list of priority development as prescribed by law and other industries producing
Minimum regional
wage
Minimum rental area
Limit for
Construction Height
Permitted
Construction Rate
Planning Area
products from new and high-tech technologies.
Region 2, minimum salary 4,160,000 VND
According to the agreement with the investor of the industrial park infrastructure
According to the planning approved by the competent authority
According to the planning approved by the competent authority
▪ Scale: 313.5 ha. In which, the area of industrial land for lease is 221.83 ha.
▪ Industrial land area for lease: 62.4 hectares, occupancy rate is 28.1%.
▪ The remaining industrial land area not yet leased: Approximately 159 ha.
Operation Status
Active
Number of Projects
The IP has received 43 projects (26 DDI projects and 17 FDI projects), with a total registered investment capital
of about 2,736 billion VND and 200 million USD. In which, there are 02 projects with investment capital of
foreign investors with a registered investment capital of about 15 million USD.
627
Lease fee &
Operating fee
▪ Land sub-lease price associated with industrial park infrastructure: 120 - 135 USD/m2
▪ Management cost: 0.7 USD/m2/year
▪ Electricity cost: According to the general regulations of the Government
▪ Water cost: 13,500 VND/m3
▪ Waste water treatment fee: 12,000 VND/m3
INFRASTRUCTURE
Infrastructure
▪ Construction site: The land plots have been processed, ready for the construction of the Factory.
▪ Power supply: Power is supplied stably with a 110/22KV transformer station with a capacity of 63 MVA.
▪ Water supply: The clean water supply plant was built with a total capacity of 6,000 m3/day.
▪ Waste water and waste treatment: The wastewater treatment plant was built with a total capacity of
3,000 m3/day.
▪ Telephone & Internet: The telecommunications system meets international standards and is always
available to meet the needs of communication, high-speed data transmission and domestic and international
postal services. The underground fiber optic cable system is directly connected to the fence of each
enterprise.
▪ Internal traffic: The system of internal roads is built with a reasonable cross-section, ensuring easy and
convenient means of transportation to each factory. Lighting systems are installed along the roads.
▪ Fire prevention: Water supply system with fire hydrants is arranged along the roads of the Industrial
Park.
Social infrastructure
and services
▪ Customs: Hung Yen Customs is currently headquartered about 6 km from the Industrial Park. All sealing
and lead clamping procedures are carried out right at the factories in the Industrial Park.
▪ Banking: The system of banks (Vietcombank, Techcombank, ACB, Sacombank, Agribank, Bank for
Investment and Development of Vietnam ...) is located near the industrial park.
▪ Hospital: Pho Noi General Hospital (7 km from the Industrial Park) is modernly planned and built to meet
the needs of treatment and medical examination and treatment for workers in the Industrial Park.
Location/ Map
628
629
LIST OF TENANTS
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Name of Projects
Tri-Wall Vina Packaging
Factory
YAMCO PRECISION
VIETNAM FACTORY
Nationality
China (HK)
MING SHIN VIETNAM
FACTORY
PROJECT
MANUFACTURING FOOD
CONTAINERS SHINMEI
VIETNAM
YOUNGMIN HI-TECH
VINA
INTECH COLOR VIETNAM
FACTORY
PROJECT KIV
BEVERAGE
MANUFACTURING
FACTORY
THE NORTH TRIBECO.
China (HK)
LAYMAC VIETNAM
FACTORY
PROJECT OF FACTORY,
OFFICE, HOUSE FOR
LEASE
ENGINE PRODUCTS
ASSEMBLY FACTORY
VIETNAM RAIDON
MECHANICAL
GENERATOR ASSEMBLY
FACTORY
JIANGHUAI GENERATOR
ASSEMBLY FACTORY
VAKSINDO VIETNAM
VETERINARY PROJECT
SIMON ELECTRICAL
EQUIPMENT FACTORY
Japan
Japan
KOREA
China
Korea
ENGLISH
(Cayman)
Japan
China
Business line
* Producing packaging from cardboard materials
* Producing wooden pallets
Manufacturing and processing precision mechanical products, auto
parts and components used for electronic equipment.
Economic organizations established to implement this investment
project may apply regulations on export processing enterprises.
Production of paper packaging, production of plastic packaging and
printing
Producing food containers with aluminum foil, paper, plastic film
Producing and processing car steering wheel heating pads, electric
car seat pads and related accessories
Producing all kinds of colored plastic beads
Invest in building a factory to produce auto components
Invest in building a factory to produce soy milk, pure drinking
water, fruit juice, and carbonated soft drinks
Invest in building a factory to manufacture and process mechanical
products for washing machines, electric trains, ships, and machine
shelves.
Invest in building factories, offices and warehouses for rent.
China
Assembling pressure pumps, 4-stroke gasoline engines, gasoline
generators
China
Generator assembly
China
Manufacturing and assembling gasoline-powered generators: 27,000
tons/year
Manufacturing and assembling gasoline generator components such
as: cylinder shield, electric motor, control screen, mounting frame,
fuel tank: 110 tons/year
Production of veterinary drugs
Indonesia
Spain
China
China
Invest in the construction of a mold factory; manufacturing and
processing plastic products, civil and industrial plastic
specifications; assembling civil and industrial electrical equipment
Assembling snow removal machines, cultivators, washers, lawn
mowers, engines
Assembling pressure pumps, generators, 4-stroke gasoline engines,
snow removal machines, cultivators, washing machines, lawn
mowers
630
CLEAN INDUSTRIAL PARK
GENERAL INFORMATION
Address
Industrial investor
Located in Khoai Chau and An Thi districts, Hung Yen province.
VTK Hung Yen Industrial Park Investment and Development Company Limited.
- Address: Executive office building, Ecopark urban area, Xuan Quan commune, Van Giang district,
Hung Yen province, Vietnam.
Geographical location
Fields of investment
attraction
- Contact person: Mr. Sun Byung Soo; Position: General Director.
Adjacent to the road connecting Hanoi - Hai Phong Expressway and Cau Gie - Ninh Binh Expressway;
about 2 km from the intersection to Hanoi - Hai Phong highway, about 35 km from Hanoi center, 50
km from Noi Bai airport, 75 km from Hai Phong port, 120 km from Quang Ninh deep sea port.
Manufacture of data transmission equipment and components, mobile phones, computers and
peripheral devices; software production, digital content; manufacturing and assembling electrical and
electronic equipment and components; manufacturing and assembling automobiles, motorcycles and
auto and motorcycle parts; manufacturing machinery and equipment for industry, agriculture and
energy; manufacturing precision mechanical products, molds, high-grade steel and components and
spare parts for mechanical processing machines; manufacturing composite materials, flexible, superdurable, ultra-lightweight materials; manufacturing supporting technology products according to the
Government's regulations; manufacturing in the field of cosmetics and pharmaceuticals with
intelligent and automated production processes; produce energy-saving products; warehousing, goods
storage, logistics operations
Minimum regional wage
Region 2, minimum salary 4,160,000 VND
Minimum rental area
Limit for Construction
Height
Permitted Construction
Rate
Planning Area
According to the agreement with the Investor
According to the planning approved by the competent authority
According to the planning approved by the competent authority
▪ Scale: 143.08 ha. In which, the area of industrial land for lease is 100 ha.
▪ Industrial land area for lease: 13 hectares, occupancy rate is 13%.
▪ The remaining industrial land area not yet leased: About 87 ha.
Operation Status
In operation, the investor is building the infrastructure of the industrial park
Number of Projects
The IP has received 7 FDI projects of Korean investors, with a total registered investment capital of
about 36 million USD.
Lease fee & Operating fee
▪ Sub-lease fee of land associated with industrial park infrastructure: 96 - 130 USD/m2
▪ Management cost: 13,800 VND/m2/year
▪ Electricity cost: According to the general regulations of the Government
▪ Water cost: IP infrastructure investor has not decided yet
▪ Waste water treatment fee: IP infrastructure investor has not decided yet
INFRASTRUCTURE
Infrastructure
The investor is building the infrastructure of the industrial park
631
Social infrastructure and
services
▪ Banking: The system of banks is located near the IP.
▪ Hospitals: Some provincial hospitals are near the industrial park, meeting the needs of treatment and
medical examination and treatment for industrial park workers.
Location/ Map
632
INDUSTRIAL PARK NO.3
GENERAL INFORMATION
Address
Industrial investor
Located in Yen My, Khoai Chau and An Thi districts, Hung Yen province
Ecoland Industrial Park Management Joint Stock Company.
- Address: C78 Pho Truc, Ecopark Urban Area, Xuan Quan Commune, Van Giang District, Hung Yen Province,
Vietnam.
- Contact person: Mr. Ho Nam – 0987.803.699; Position: Deputy General Director
Geographical
location
Adjacent to the road connecting Hanoi - Hai Phong Expressway and Cau Gie - Ninh Binh Expressway; about 1
km from the intersection to Hanoi - Hai Phong highway, about 35 km from Hanoi center, 50 km from Noi Bai
airport, 75 km from Hai Phong port, 120 km from Quang Ninh deep sea port.
Fields of
investment
attraction
Manufacturing electrical equipment, data transmission accessories, mobile phones, computers and peripheral
devices; production of communication equipment; manufacture of civil electrical products, manufacture of civil
electrical appliances, manufacture of hand tools powered by motor or compressed air; producing shoes;
manufacture of electric motors, generators, transformers, electrical distribution and control equipment;
production of plastics and synthetic rubber in primary form; manufacture of office machinery and equipment
(except for computers and computer peripherals); manufacture beds, cabinets, tables and chairs; manufacture of
gymnastics and sports equipment; manufacture toys and games; manufacture of refractory products; manufacture
of electric lighting equipment; manufacture of electric lighting equipment; manufacture of metal tanks, tanks
and containers; software production, digital content; manufacturing and assembling electrical and electronic
equipment and components; manufacturing and assembling automobiles, motorcycles and auto and motorcycle
parts; manufacturing machinery and equipment for industry, agriculture and energy; manufacturing precision
mechanical products, molds, high-grade steel and components and spare parts for mechanical processing
machines; manufacturing composite materials, super-plastic, super-durable, ultra-lightweight materials;
manufacturing supporting industry products according to the Government's regulations; manufacturing in the
field of cosmetics and pharmaceuticals with intelligent and automated production processes; produce energysaving products; production, business and distribution of clean energy, renewable energy; warehouse, storage of
Minimum regional
wage
Minimum rental
area
Limit for
Construction
Height
Permitted
Construction Rate
Planning Area
goods; logistics activities and other industries encouraging investment
Region 2, minimum salary 4,160,000 VND
According to the agreement with the Investor who is building the infrastructure of the Industrial Park
According to the planning approved by the competent authority
According to the planning approved by the competent authority
▪ Scale: 159.71 ha. In which, the area of industrial land for lease is 115 hectares.
▪ Industrial land area for lease: 0 ha, occupancy rate is 0%.
▪ The remaining industrial land area not yet leased: 115 ha.
Operation Status
Number of Projects
Lease fee &
Operating fee
The investor is compensating for site clearance and applying for land lease
Calling for investment attraction and in the industrial park
Calling for investment attraction and in the industrial park
633
INFRASTRUCTURE
Infrastructure
The investor is building the infrastructure of the industrial park
Social
infrastructure and
services
▪ Banking: The system of banks is located near the IP.
▪ Hospitals: Some provincial hospitals are near the industrial park, meeting the needs of treatment and medical
examination and treatment for industrial park workers.
Location/ Map
634
INDUSTRIAL PARK NO.4
GENERAL INFORMATION
Address
Industrial investor
Located in An Thi and Kim Dong districts, Hung Yen province
Yen My Industrial Park Investment Joint Stock Company.
- Address: No. 63 Tran Duy Hung, Trung Hoa, Cau Giay, Hanoi, Vietnam.
Geographical location
- Contact person: Mr. Nguyen Tuan – 0977.865.455; Position: Director.
Adjacent to the road connecting Hanoi - Hai Phong Expressway and Cau Gie - Ninh Binh Expressway;
about 3 km from the intersection to Hanoi - Hai Phong highway, about 35 km from Hanoi center, 50 km
from Noi Bai airport, 75 km from Hai Phong port, 120 km from Quang Ninh deep sea port
Fields of investment
attraction
Electronics, precision mechanics; light industry, other production and business industries in accordance with
the industrial development planning of Hung Yen province
Minimum regional wage
Region 2, minimum salary 4,160,000 VND
Minimum rental area
Limit for Construction
Height
Permitted Construction
Rate
Planning Area
According to the agreement with the investor
According to the planning approved by the competent authority
According to the planning approved by the competent authority
▪ Scale: 192.64 ha, industrial land for lease is 143 ha..
▪ Industrial land area for lease: 0 ha, occupancy rate is 0%.
▪ The remaining industrial land area not yet leased: Approximately 143 ha.
Operation Status
Number of Projects
Lease fee & Operating
fee
The investor is building the infrastructure of the industrial park.
Calling for investment attraction and in the industrial park
▪ Land sub-lease price associated with industrial park infrastructure: 115 - 120 USD/m2
▪ Management cost: 13,800 VND/m2/year
▪ Electricity cost: According to the general regulations of the Government
▪ Water cost: IP infrastructure investor has not decided yet
▪ Waste water treatment fee: IP infrastructure investor has not decided yet
INFRASTRUCTURE
Infrastructure
The investor is building the infrastructure of the industrial park
Social infrastructure and
services
▪ Banking: The system of banks is located near the IP.
▪ Hospitals: Some provincial hospitals are near the industrial park, meeting the needs of treatment and
medical examination and treatment for industrial park workers.
Location/ Map
635
636
[- This Page is intentionally left blank -]
637
KHANH HOA
638
INVESTMENT ENVIRONMENT IN KHANH HOA
GENERAL INFORMATION
Area, Population
Geographical Location
Adjacent provinces
GRDP
Growth
PCI
▪ Area: 5,199.5 km2
▪ Population: 1.254 million (2022 statistic)
▪ Located in the South-Central Coast region of Vietnam.
▪ Located 450 km from Ho Chi Minh city and 1.270 km from Hanoi city
▪ Phu Yen province to the north, DakLak and Lam Dong to the west, the sea to the
east, and Ninh Thuan province to the south.
2022 statistic:
▪ GRDP: 54,505.2 billion VND
(2,32 billion USD)
▪ GRDP growth: 20,7%
▪ GRDP per capita: 3,257 USD/year
▪ Economic structure:
- Industry - Construction: 32.39 %;
- Agriculture. forestry and fishery: 11.2 %;
- Service: 46.54 %;
- Tax on Goods: 9.88 %
2022 statistic compared to 2021:
▪ Industry - Construction growth: 24.61 %
▪ Agriculture, forestry and fishery growth: 2.49 %
▪ Service growth: 25.46 %
▪ Score: 67.74 – ranked 16 out of 63 cities and provinces in Vietnam. (2022)
SOCIAL INFRASTRUCTURE
Transportation
▪ Roadway: Road traffic is smooth to the neighboring provinces and the Central Central Highlands through National Highways 1A, 26, 27C and Deo Ca Tunnel. T
▪ Railway: The North-South railway runs along Khanh Hoa province, with Nha Trang
Station as one of the major stations to ensure the transit of passengers and goods to
localities in the country.
▪ Waterway: Khanh Hoa province has the orientation to plan 04 inland waterway
wharf areas: Van Phong Bay, Nha Phu lagoon, Nha Trang Bay and Cam Ranh Bay to
meet the demand of freight and passengers serving the socio - economic development
of the province with ship sizes: Container vessels up to 24,000 TEU (Northern Van
Phong); General and bulk cargo vessels from 100,000 to 300,000 tons (North/- South
Van Phong, Cam Ranh) and passenger ships up to 225,000 GT in all 04 areas.
▪ Airway: Cam Ranh International Airport is the port with the 4th largest passenger
transport port in Viet Nam and with the 3rd international passenger traffic ranked in
the country. Cam Ranh International Airport is capable in receiving Airbus 320, 321,
300-600, Boeing 767, 777, 747 and equivalent aircraſt
* Capacity: 85 flights/day
* International flights to: Russia, China, Hong Kong, Korea, Malaysia, Singapore,
Uzbekistan
* Distance: 35 km south of Nha Trang city center and 10 km north of Cam Ranh.
▪ Marina: to serve tourism. The bay areas of Nha Trang, Cam Ranh, Van Phong are
oriented to study the berth, anchor buoys serving cruise ships, yachts to use the above
tourism services and study the construction of airports for seaplanes in service of
tourism associated with the tourist port.
639
Electricity
Khanh Hoa province's electricity grid system is located in the national power grid
system with a fairly strong power grid. The province's commercial electricity reached
2,136 billion kWh in 2021, reaching 95.16% compared to 2020, Pmax = 395MW. The
main power is supplied by 2 hydroelectric power plants and 01 transformer station
220/110/22KV- 250MVA Nha Trang with capacity (125+250)MVA, Pmax = 278MW
that meets the power demand for operation, production and business of investors.
Water
Khanh Hoa province has 9 factories with a total capacity of 173,500m3/day and night.
There are 05 water supply plants outside the Van Phong Economic Zone with a
capacity of 91,000m3/day-night. Van Phong economic zone has 04 reservoirs
including Dong Dien Lake (100 million m3), Da Ban Lake (75 million m3), Hoa Son
Lake (19 million m3), and Tien Du Lake (09 million m3).
Education
▪ 06 Special research institution, 09 universities and institutes, 04 junior colleges and
over 30 vocational schools in the province and Singapore Vietnam International
School.
Medicare
▪ Hospital system: Khanh Hoa Provincial General Hospital, Vinmec International
Hospital, Saigon - Nha Trang Eye Hospital, 22/12 Hospital, 87 Hospital, Tam Tri
Hospital, Saigon General Hospital – Nha Trang, Khanh Hoa Provincial Cancer
Hospital, Yersin Nha Trang General Hospital.
▪ Private polyclinics: Tin Duc, Phuc Sinh, Medic, Olympia Polyclinic and family
doctor...
INVESTMENT CONDITION
Human resource
▪ 63,8% of population are in the working age (2022)
Education level
▪ Trained labor rate: 83% (2022)
Salary
▪ The minimum salary for the province is applied as follows:
- Area I: 4,680 million/month
- Area II: 4,160 million/month
- Area III: 3,640 million/month
- Area IV: 3,250 million/month
Investment incentives
▪ Incentives according to government regulations:
According to the rules of law.
▪ Incentives from the province:
Resolution No. 55/2022/QH15 dated June 16, 2022 of the National Assembly on piloting
some preferential mechanisms, policies and peculiarities of Khanh Hoa
provincedevelopment includes 05 groups of policies with 11 specific policies
Fields Attracting Investment
▪ Prioritized projects:
On April 13, 2022, the Prime Minister issued Decision 451/QD-TTg approving the
task of adjusting the master planning on Van Phong economic zone, Khanh Hoa
province until 2040, vision to 2050 with the following important points: * As a multisector integrated economic zone, it plays a leading role in attracting investment. It is an
economic development’s main force for the regions and the whole country. The green
economy is the foundation with an international container transshipment port and
logistics, the urban, services, tourism and industry. All play an important role
combining with the development of other economic sectors
* As a center of high-class general tourism and entertainment services, which is
unique, distinct and modern tourism products and services with high quality, branded
and international competitiveness
* As an area for sustainable smart urban development with a modern and
synchronously developed social infrastructure system full stop
640
Map
Contact
Department of Planning and Investment
▪ Address: 01 Tran Phu street, Nha Trang city, Khanh Hoa Province
▪ Tel: 0258.3822.906
▪ Fax : 0258.3822.906
▪ Email:
▪ Contact person: 0913839438
LIST OF INDUSTRIAL ZONES
Industrial Park
Location
Scale
Occupancy rate
Status
Suoi Dau Industrial Park
Suoi Tan commune
136,73 ha
97% occupancy rate
In operation
www.sudazi.com.vn
Cam Lam district
Ninh Thuy Industrial Park
Ninh Thuy ward Ninh
207,9 ha
35% occupancy rate
In operation
www.ninhthuyip.com
Hoa Town
641
Khatoco Ninh Ich industrial
and livestock cluster
Ninh Ich commune
35,58 ha
Completed
In operation
infrastructure,
Ninh Hoa town
occupancy rate
reaches 69%
Ninh Xuan Cluster
Ninh Xuan commune
50 ha
The first construction
Under contruction
procedures are
Ninh Hoa town
underway
Dac Loc Cluster
Vinh Phuong commune
34,52 ha
100% occupancy rate
In operation
49,77 ha
100% occupancy rate
In operation
25,23 ha
Completed
In operation
Nha Trang city
Dien Phu Cluster
Dien Phu commune
Dien Khanh district
Dien Phu VCN Cluster
Dien Phu commune
infrastructure, phase 3
Dien Khanh district
expansion investment
is underway
Dien Phu VCN Cluster
Dien Tho commune
50 ha
The first construction
Under contruction
procedures are
Dien Khanh district
underway
Trang E 1 Cluster
Suoi Tan commune and
35,2 ha
Suoi Cat commune
Completed
In opertation
infrastructure, calling
for secondary
Cam Lam district
investors; occupancy
rate reaches 91%
Trang E 2 Cluster
Suoi Tan commune and
44,68 ha
Suoi Cat commune
Infrastructure is being
completed
Cam Lam district
642
Under contruction
Song Cau Cluster
Song Cau commune
40 ha
Completed
infrastructure, calling
Khanh Vinh district
for investors
643
In operation
LOCATION MAP OF INDUSTRIAL ZONES
644
SUOI DAU INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Sectors
Minimum wage
Lease term
Minimum Lease Area
Suoi Dau Industrial Zone, Suoi Tan Commune, Cam Lam District, Khanh Hoa Provine
Name of Investor:
Suoi Dau Industrial Zone Join Stock Comany
▪ Address: Suoi Dau Industrial Zone, Suoi Tan Commune, Cam Lam District, Khanh Hoa
Provine
▪ Tel: 0583743249
▪ Email: info@sudazi.com.vn
▪ Website:www.sudazi.com.vn
Mr Tran Dinh Tan
Position: General Director
Tel: 0944192130
- Located on National Highway 1A
- 20km to Nha Trang City
- 35km to Cam Ranh Port, Cam Ranh Internation Airport.
Priority Sectors for
Investment
Seafood processing; vegetables, caned food processing;
garment; electronics, mechanical engineering…
Investment Restricted
Sectors
Acording to Investment Restricted Sectors
3,640,000 VND/month
▪ Start date:
▪ End date: 21/8/2048
5,000 m2
Limit for Construction
Height
5 floors
Permitted Construction
Rate
70% for 1 floor construction, 60% for 2 floors construction, 50% for 3-5 floors construction
Planned area
Factory Available for Rent
▪ Total area: 136.73 ha
▪ Total vacant leasable area: 92.05 ha
▪ Total area with full infrastructure ready to build factory: 92.05 ha
▪ Total area: None
Operation Status
▪ Active
Occupancy Rate and
Number of Projects
▪ 97%
Number of Korean projects
Lease fee
▪ 04 projects
▪ Land lease fee: 8.5 USD/m2/ 5 years
▪ Factory lease fee: None
645
Operating fee
▪ Management fee: None
▪ Electricity fee: Acording to electricity fee of Khanh Hoa Power Company
▪ Water fee: 8,500 VND/m3
▪ Wastewater treatment fee: 3,000 – 38,300 VND/m3
Layout plan
INFRASTRUCTURE AND FACILITY
Distance from the nearest Banking, nearest State Tax and Finance Agency, nearest Logistic Center, Universities,
training facilities, etc., Road Width,…
List of Projects in Industrial Zone
No.
Name of Company
Nationality
Business line
1
Seafood processing factory
Japan
Production of aquatic products
2
Seafood frozen factory for
export
British Virgin Islands
3
Marine and petroleum precision
mechanical equipment factory;
shipbuilding and composite
components
Norway
4
Sports gloves factory
Korea
5
Animal feed factory
Taiwan
Processing, preserving and trading
aquatic products and aquatic
products
Manufacture of marine and
petroleum precision mechanical
equipment (excluding goods and
services when exercising border
rights)
Producing, trading, processing
sports gloves, garment products
and exporting all kinds of skating
shoes
Producing animal feeds,
veterinary drugs, probiotics,
aquatic veterinary drugs, pond
improvers, fertilizers, processing
646
6
Factory producing aquaculture
feed and veterinary medicine
7
Factory for manufacturing,
processing and installing
complete assemblies, pipes and
steel structures
8
Seafood processing plants
9
Production of furniture, rattan
exports Rapexco - Dai Nam Suoi
Dau Branch
America
10
Sewing swimwear
Hong Kong- China
11
Processing flower paste, packing
finished products of household
ceramics (excluding sanitary
ceramics), fine art ceramics
Factory manufacturing
mechanical equipment and
electrical and electronic
equipment
Taiwan
Seafood processing and
preservation factory
Sodex Toseco Co., Ltd
Malaysia
An Phuoc Sunpo Co., Ltd
Vietnam - Hong Kong
12
13
14
15
British Virgin Islands
Korea
Hong Kong- China
Norway
France
647
agricultural products and
functional foods.
Producing and trading all kinds of
feed, additives, feed ingredients,
equipment and supplies for
aquaculture; Processing aquatic
products for export; Production of
veterinary drugs
Production, processing and
installation of engine
compartments, modules,
complete assemblies, pipes and
steel structures of ships for new
construction
Processing and preserving
seafood and aquatic products
Producing products from wood,
bamboo (except furniture);
manufactures products from
bamboo, sedge, straw, twine and
furniture
Producing and trading in
swimwear, beachwear,
sportswear and other apparel
products, auxiliary materials for
the garment industry; Perform
machining, re-machining
Processing flower paste and
packing household ceramic
products
Invest in building a factory
specializing in the production of
electrical, electronic and
mechanical equipment for the
marine, aquaculture, oil and gas
industries and shipbuilding.
Processing and preserving
seafood and aquatic products
-Manufacture, export and
domestic sales of sports products
for professional training and
competition; Supply and install
professional sports equipment
and tools; Construction of civil
sports works.
Producing bra cup products
16
17
18
Project of processing seafood
products and freezing packaging
of foods and agricultural
products for export
Shin Woo Tech Mechanical
Factory
Japan
Il Shin . Food Processing Factory
Korea
Korea
648
Processing and packaging
seafood, agricultural products and
fruits; produce solar power for
the project's production activities.
Producing and manufacturing
details and components for
mechanical products of all kinds.
Processing and preserving aquatic
products and aquatic products.
NINH THUY INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Investor
Location
Investment Sectors
Minimum wage
Ninh Thuy Industrial Zone, Ninh Thuy ward, Ninh Hoa town, Khanh Hoa province
Name of Investor:
Hoan Cau Van Phong Co,Ltd
▪ Address: 20 Tran Phu, Nha Trang ciy, Khanh Hoa Provine
▪ Tel: (84.58) 6260 222
▪ Email: marketingip@thanhyen.com
▪ Website:www.ninhthuyip.com
This coastal industrial zone is in the south of Van Phong EZ, in Ninh Thuy Ward, Ninh Hoa town. It
is 8 km away from National Highway 1A; 18 km to Hoa Huynh station; 10 km to Hon Khoi port;
adjacent to South Van Phong general port; and 75 km to Cam Ranh international airport
Priority Sectors for
Investment
Mechanical manufacturing and assembly, refrigeration – electronic,
producing home appliances, handicrafts, packing, processing of
agriculture and forestry products, producing building materials
Investment Restricted
Sectors
Acording to Investment Restricted Sectors
3,640,000 VND/month
Minimum Lease Area
▪ Start date:
▪ End date: 06/2063
5,000 m2
Limit for Construction
Height
5 floors
Lease term
Permitted Construction
Rate
Planned area
Factory Available for Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean projects
Lease fee
Operating fee
70% for 1 floor construction, 60% for 2 floors construction, 50% for 3-5 floors construction
▪ Total area: 207.9 ha
▪ Total vacant leasable area: 152.82 ha
▪ Total area with full infrastructure ready to build factory: 152.82 ha
▪ Total area None
▪ Active phase 1
▪ Under construction phase 2
▪ 35%
▪ 05 projects
▪ Land lease fee:
▪ Factory lease fee: None
▪ Management fee: 0.1 USD/m2/year
▪ Electricity fee: acording to electricity fee of Khanh Hoa Power Company
▪ Water fee: 4,750 – 11,700 VND/m3
▪ Wastewater treatment fee: 0.3 USD/m3
649
Layout plan
INFRASTRUCTURE AND FACILITY
Distance from the nearest Banking, nearest State Tax and Finance Agency, nearest Logistic Center, Universities, training
facilities, etc., Road Width,…
List of Projects in Ninh Thuy Industrial Zone
No.
1
Name of Company
Nationality
Business line
Japan
Cement distribution station
2
Ninh Thuy Cement Distribution
Station
Seyoung Factory - Hoa Hiep
Korea
3
Gyeongnam Insu Warehouse
Korea
4
Daeehyup Vietnam Factory
Korea
5
Jeil VinaNT . Factory
Korea
6
Ninh Hoa export wood chip
processing factory
Singapore
7
Hankook Factory
Korea
Production, processing and
installation of machine
compartment assemblies,
modules, tool parts, pipes and
steel structures
warehouse (capacity: 12,700 m3)
containing materials and
insulation for repair of machinery
and equipment
Mechanical processing,
construction of insulation by
spray method, construction of
deck finishing, interior
construction of houses on ships
for new construction
Producing, processing and
assembling steel structures for
shipbuilding
Purchasing and processing paper
materials into wood chips for
export
Producing, processing and
assembling steel structures for
shipbuilding
650
8
Seafood processing plants
Australia
651
Processing and preserving
seafood and aquatic products
[- This Page is intentionally left blank -]
652
KIEN GIANG
653
INVESTMENT ENVIRONMENT IN KIEN GIANG
USD/VND 23.510
GENERAL INFORMATION
Area
Population
Geographical
Location
Adjacent
provinces
6348 km2
1,81 million people (2022)
▪ Kien Giang is located in Mekong Delta River region.
Located in the Mekong Delta.
It is bounded by An Giang, Hau Giang provinces, Can Tho City in the east and the south - east, Ca Mau
Province in the south, and Cambodia in the north.
2022 statistic:
▪ Nominal GRDP (billion VND):
GRDP
▪ Real GRDP (billion VND):
68.436
▪ GRDP growth:
7,70%
▪ GRDP per capita (million VND/year):
66,24
(2,92 billion USD)
(2822 USD)
▪ Economic structure:
Import - Export
Key Industry
PCI
Ranking
- Industry - Construction:
26,26%
- Agriculture. forestry and fishery:
41,09%
- Service:
30,06%
Import turnover (billion USD):
0,16
(Growth rate: 0,24)
Export turnover (billion USD):
0,80
(Growth rate: 0,0971)
Food processing, supporting industries
62.24
56
SOCIAL INFRASTRUCTURE
Transportation
Electricity
Water
▪ Roadway: National highway system through Kien Giang province, including: 04 national highways 61, 63, 80,
road N1 with a length of 292km
▪ Waterway: 2,700 km of rivers, canals and canals being exploited for water transport with 123 routes. In which,
the longest route has a distance of 160 km from Rach Gia city to Ca Mau city and the shortest route has a
distance of 9.3 km from An Thoi port to Hon Thom commune (Phu Quoc).
▪ Power supply from the National Power station network
The inter-district intra-provincial water source belongs to 02 rivers and canals (Cai Be River, Rach Gia - Ha
Tien Canal); Independent provincial water source belongs to 2,927 rivers. In addition, Kien Giang waters cover
an area of more than 63,000 square kilometers, with a coastline of nearly 200 kilometers and 143 islands, of
which 41 are inhabited.
INVESTMENT CONDITION
Human resource
Labor in economic sectors, including agriculture - forestry - fishery accounted for the largest proportion, over
45%, followed by labor in the service sector accounting for more than 39%, labor in industry - construction
accounting for more than 39%. of population are in the working age (2022)
Education level
Trained labor rate: 50% (2022)
▪ The minimum salary for the province is applied as follows:
- Area I (4,680,000 VND/month): N/A
Salary
- Area II (4,160,000 VND/month): Rach Gia, Ha Tien, Phu Quoc City
- Area III (3,640,000 VND/month): Kien Luong, Kien Hai, Chau Thanh Districts
- Area IV (3,250,000 VND/month): An Bien, An Minh, Rong Rieng, Go Quao, Hon Dat, U Minh Thuong, Tan
Hiep, Vinh Thuan, Giang Thanh Districts
654
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages paid to
employees working under employment contracts)
Investment
incentives
Fields Attracting
Investment
Investment
attraction
situation
Industrial zones
▪ Incentives according to government regulations:
- Exemption and reduction for land and water rent fee
- Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
▪ Incentives from the province:
-Land rental exemption: The 1-year land rental unit price is calculated at 0.5% of the land price according to the
purpose of using the leased land and the unit price is stable for 5 years. Exemption from paying land rent for 315 years, depending on the investment location and investment industry.
Some policies allowed by the Prime Minister to be applied in Phu Quoc island are as follows:
- Investment projects in tourism business in Phu Quoc are investment projects in the list A.
- All investment projects of domestic and foreign organizations and individuals are entitled to the corporate
income tax rate of 10% for 15 years.
- 50% income tax reduction for high-income earners.
- Policies on entry and exit in Phu Quoc.
- Policies on residence in Phu Quoc.
Eco-tourism and luxury resort; well-qualified workforce training; infrastructure development for IPs, tourism
sites and urban areas;
By the end of 2022, the province has withdrawn 294 projects, with a total area of more than 11,866 hectares.
Total 5 industrial zones. Currently, Thuan Yen Industrial Park (134 ha) is basically full, Thanh Loc Industrial
Park (250 ha) is 46% full. Xeo Ro Industrial Park, Tac Cau Industrial Park, Kien Luong Industrial Park are
calling for investment in infrastructure.
Map
Kien Giang Department of Planning & Investment
▪ Address: No 29, Bach Dang street, Vinh Thanh Van ward, Rach Gia city, Kien Giang province
Contact
▪ Tel: 2973862037
▪ Email: skhdt@kiengiang.gov.vn
▪ Contact person:
- Mr. Giang Thanh Khoa - Director of the Department of Planning and Investment of Kien Giang province
655
XEO RO INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Hung Yen commune, An Bien district, Kien Giang province
Economic Zone Management Board of Kien Giang Province
Investor
Location
Investment Sectors
Minimum wage
Lease term
7km from An Bien district center, 15km from Rach Gia airport and 22km from Rach Gia city. This
industrial park complex is located on National Highway 63 and the river is adjacent to Cai Lon river,
convenient for transporting goods by road and waterway.
Priority Sectors for
Investment
3,640,000 VND/month
▪ 50 years
Minimum Lease Area
10000 (m2)
Limit for Construction
Height
N/A
Planned area
▪ Total area: 210.5 (ha)
The planning associated with the IZ is the residential - resettlement area with an area of 30.03 ha
and the service - commercial area with an area of 71.28 ha.
Operation Status
▪ Active
Occupancy Rate and
Number of Projects
▪ 90%
Lease fee
Operating fee
+ Investment and business in technical infrastructure of Xeo Ro
Industrial Park Complex (including: Industrial Park, Service Commercial Zone, Residential - Resettlement Area).
+ Investment in industrial production with such industries as: Processing
seafood; food and food processing; mechanical industry; shipbuilding
industry; production of building materials and some other industries.
▪ Land lease fee: 15 USD
▪ Factory lease fee: 2 USD
▪ Management fee: 0,5USD/m2/years
656
Layout plan
INFRASTRUCTURE AND FACILITY
Distance from the nearest Banking, nearest State Tax and Finance Agency, nearest Logistic Center, Universities, training
facilities, etc., Road Width,…
657
TAC CAU INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Hoa Phu commune, Chau Thanh district, Kien Giang province
Investor
N/A
Location
About 17 km from Rach Gia city center; It is about 5 km from the center of Chau Thanh district
Distance to the nearest airport: About 12 km from Rach Gia Airport
Distance to the nearest seaport: About 17 km from Rach Gia city center; It is about 5 km from the
center of Chau Thanh district
Investment Sectors
Minimum wage
Lease term
Minimum Lease Area
Priority Sectors for
Investment
Processing agricultural products, aquatic products, food, manufacturing
consumer goods and garments, leather shoes, plastic products, animal
feed, livestock and poultry, mechanical and electronic assembly....
3,640,000 VND/month
▪ 50 years
10000 (m2)
Limit for Construction
Height
N/A
Planned area
▪ Total area: 68ha
Operation Status
Occupancy Rate and
Number of Projects
Lease fee
Operating fee
▪ Active
50%
▪ Land lease fee: 30 USD/m2
▪ Factory lease fee: 2 USD
▪ Management fee: 0,5USD/m2/years
Electricity price: - Normal hours: 1,452 VND/kWh. - Off-peak hours: 918 VND/kWh. - Peak hours:
2,673 VND/kWh. (Note: Price does not include value added tax)
Water price: 8,500 VND/m3.
658
Layout plan
INFRASTRUCTURE AND FACILITY
Distance from the nearest Banking, nearest State Tax and Finance Agency, nearest Logistic Center, Universities, training
facilities, etc., Road Width,…
659
[- This Page is intentionally left blank -]
660
KON TUM
661
INVESTMENT ENVIRONMENT IN KON TUM
USD/VND 23.510
GENERAL INFORMATION
Area
Population
Geographical Location
Adjacent provinces
9676 km2
0,569 million people (2022)
▪ Kon Tum is located in Central Highlands region.
Kon Tum is located on the East-West Economic Corridor (sea and continent) and the Central
Coast economic arc;
Kon Tum has a particularly important geographical position, belonging to the Vietnam - Laos Cambodia Development Triangle area, where there is "the three-border landmark of Vietnam Laos - Cambodia".
2022 statistic:
GRDP
Industry growth
Import - Export
Key Industry
PCI
Ranking
▪ Real GRDP (billion VND):
17.626
▪ GRDP growth:
9,50%
▪ GRDP per capita (million VND/year):
52,44
(0,757918 billion USD)
(2234 USD)
▪ Economic structure:
- Industry - Construction:
26,83%
- Agriculture. forestry and fishery:
19,75%
- Service:
44,80%
▪ Industry - Construction growth:
14,88%
▪ Agriculture, forestry and fishery growth:
6,19%
▪ Service growth:
8,03%
Import turnover (billion USD):
0,01
Export turnover (billion USD):
0,32
(Growth rate: 0,1)
Producing coffee, rubber, macadamia, sugar cane, cold vegetables - flowers, red ginseng and other
rare and precious materials; afforestation associated with forestry economic development; develop
beef cattle, dairy cows, goats, freshwater aquatic products and cold sturgeon...; production of
renewable energy such as wind power, solar power,...
64.89
37
SOCIAL INFRASTRUCTURE
Transportation
Electricity
Water
▪ Roadway: National Highway 14, National Highway 40, National Highway 24 ... convenient
connection to Central provinces, Central Highlands and the whole country.
▪ Power sources based on renewable energy sources besides hydroelectricity that Kon Tum
province has potential, especially wind power, solar power....
The water source of 80 irrigation reservoirs in Kon Tum province has a storage capacity of 86%
or more of the design capacity, basically ensuring irrigation for the Winter-Spring crop in 20222023.
Education & Training
N/A
Medicare
N/A
INVESTMENT CONDITION
Human resource
49,32% of population are in the working age (2022)
Education level
Trained labor rate: ()
Salary
▪ The minimum salary for the province is applied as follows:
662
- Area I (4,680,000 VND/month): N/A
- Area II (4,160,000 VND/month): N/A
- Area III (3,640,000 VND/month): Kon Tum City, Dak Ha District
- Area IV (3,250,000 VND/month): Dak To, Dak Glei, Ia H'Drai, Kon Long, Kon Ray, Ngoc Hoi,
Sa Thay, Tu Mo Rong Districts
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum
wages paid to employees working under employment contracts)
Investment incentives
Fields Attracting Investment
Investment attraction situation
▪ Incentives according to government regulations:
- Exemption and reduction for land and water rent fee
- Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
Production of renewable energy such as wind power, solar power,...
Total registered capital of nearly 172.6 billion VND, 9 projects outside industrial parks and
economic zones with total registered capital of 1,483 billion VND; In addition, a number of
potential investors and corporations such as: Sun Group, Hung Nhon, Him Lam Joint Stock
Company, Nutifood, ... have come to survey and look for investment opportunities in the
province.
Map
Kon Tum Department of Planning & Investment
Contact
▪ Address: 12 - Nguyen Viet Xuan - Kon Tum City, Kon Tum Province.
663
▪ Tel: 2603862710
▪ Email: skhdt@kontum.gov.vnsokehoachdautu
kontum@chinhphu.vn
▪ Contact person:
- Mr. Ngo Viet Thanh - Director of Department of Planning and Investment of Kon Tum province
664
[- This Page is intentionally left blank -]
665
LAI CHAU
666
INVESTMENT ENVIRONMENT IN LAI CHAU
USD/VND
23.510
GENERAL INFORMATION
Area
Population
Geographical
Location
Adjacent
provinces
9059 km2
0,484146 million people (2022)
▪ Lai Chau is located in Northwest region.
It is located 450 km from Hanoi.
Lai Chau is located in the northwest of Vietnam. The province shares its borders with Yunnan province (China) to
the North, with other provinces of Lao Cai, Yen Bai, and Son La to the East and with Dien Bien to the West and
Southwest. The province has a common border with China of 273 km in length.
2022 statistic:
GRDP
▪ Nominal GRDP (billion VND):
23.943
(1,029555364 billion USD)
▪ Real GRDP (billion VND):
14.146
(0,608297221 billion USD)
▪ GRDP growth:
9,00%
▪ GRDP per capita (million
VND/year):
29,22
(1256,43343330318 USD)
▪ Economic structure:
Industry growth
Import - Export
Key Industry
PCI
Ranking
- Industry - Construction:
39,57%
- Agriculture. forestry and fishery:
14,49%
- Service:
39,41%
▪ Industry - Construction growth:
14,78%
▪ Agriculture, forestry and fishery
growth:
4,77%
▪ Service growth:
5,05%
Import turnover (billion USD):
0,03
(Growth rate: 0,057)
Export turnover (billion USD):
0,01
(Growth rate: -0,537)
Hydropower industry, processing industry
62. 05
57
SOCIAL INFRASTRUCTURE
Transportation
Electricity
Water
Education &
Training
Medicare
Transportation is Lai Chau is rather challenging due to its difficult topography. Roadway is the major means in the
province. There are 5 national highways running through the province (National highways No. 12, 32, 4D, 279,
100 with the total length of 216 km). National highway no. 12 connects Dien Bien Phu city with China (through
Ma Lu Thang border gate). National 4D connects to Sapa town of Lao Cai province.
Electricity grid was combined of different lines including 110, 35, 22, 10 and 0.4 KV and transformer systems. The
110KV line is 87 km long; the 35KV line: 688 km; the 22KV line: 0.16km; the 10KV line: 5.9km; the 0.4KV line:
408 km. There are two 110 KV substations with the total capacity of 16,000KV; a 35/6KV substation with
capacity of 48.429 KVA; a 22/0.4 KV substation with capacity of 10KVA; 6 10/0.4 KV substations with the total
capacity of 920KVA; a 04/10 KV substation with capacity of 1,120K
Water supply works mainly meet a water demand in urban areas.
There are 390 schools, reaching 64.78% (increasing 14 schools, increasing 2.28% compared to 2021).
N/A
INVESTMENT CONDITION
Human resource
52% of population are in the working age (2022)
Education level
Trained labor rate: 58.28% (2022)
667
▪ The minimum salary for the province is applied as follows:
- Area I (4,680,000 VND/month): N/A
- Area II (4,160,000 VND/month): N/A
Salary
- Area III (3,640,000 VND/month): Lai Chau City
- Area IV (3,250,000 VND/month): The districts of Muong Te, Phong Tho, Sin Ho, Tam Duong, Than Uyen, Tan
Uyen, Nam Nhun
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages paid to
employees working under employment contracts)
Investment
incentives
Fields Attracting
Investment
Investment
attraction
situation
Industrial zones
▪ Incentives according to government regulations:
- Exemption and reduction for land and water rent fee
- Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
▪ Incentives from the province:
- The preferential tax rate of 10% for a period of 15 years applies to: Newly established enterprises from
investment projects in the province.
- Tax exemption for 4 years, 50% reduction of tax payable in the next 9 years for newly established enterprises
from investment projects in the province.
- For employees with household registration in Lai Chau province: The level of support for labor training is from
02 to 03 million VND/person/course.
Agricultural production to develop local specialties; application of high technology in agriculture, connectivity
between businesses and farmers, sustainable forestry development, renewable energy, mining, building materials
production, agricultural and forestry product processing, economic activities at border gates, and tourism.
Up to now, Lai Chau has 1 FDI projects with the total investment capital is about 1.5 million US dollars.
There are 2 industrial zones which are Muong So IZ (Phong Tho district) covering 200 hectares and Tam Duong IZ
(Tam Duong district) covering 200 hectares.
Map
Department of Planning and Investment Lai Chau
▪ Address: The 7th Floor B Zone administrative center - Lai Chau politics
Contact
▪ Tel: (84-213) 3876 501
▪ Email: so.kh&dt-laichau@chinhphu.vn
668
▪ Contact person:
- Mr. Dang Tran Thang - Director
- Tel: 84-913 253 23
669
[- This Page is intentionally left blank -]
670
LAM DONG
671
INVESTMENT ENVIRONMENT IN LAM DONG
GENERAL INFORMATION
▪ Area: 9.773 km2
Area, Population
Geographical Location
▪ Population: 1,322 million
▪ Located in the subtropical mosoon area with average annual temperature ranging from 18-25o
Celcius, at the altitude of 800-1500m above sea level.
▪ Located near Liên Khương International Airport, 30km from Đà Lạt city to the south
Adjacent provinces
▪ Lâm Đồng borders Bình Thuận province to the south east, Khánh Hòa anh Ninh Thuậ provinces to
the east, Đăk Lăk – Đăk Nông provinces to the north, Đồng Nai – Bình Phước provinces to the west,
south west.
2021 statistic:
▪ Nominal GRDP: 81,157 billion VND (3.53 billion USD)
▪ GRDP growth: 2.58%
▪ Nominal GRDP per capita: 65.93 million VND/year
GRDP
▪ Economic Structure:
- Industry and Construction: 20.03%
- Service: 38.88%
- Agriculture, Forestry and Fishery: 41.09%
2021 statistic:
▪ Industry - Construction growth: 6.28%
Industry growth
▪ Agriculture, forestry and fishery growth: 4.8%
▪ Service growth: -1.84%
PCI
▪ Score: 67.26 – ranked 17th out of 63 cities and provinces in Vietnam (2022)
SOCIAL INFRASTRUCTURE
Transportation
▪ Roadway: National Roads: 20, 27, 28, 55; Provincial roads: 722, 723, 724, 725 connecting south
central, southeast anh central highland provineces.
▪ Airway: Liên Khương International Airport, 30km from Đà Lạt city to the south.
Electricity
▪ Supplied from the national power network
▪ Quality underground water is mainly used in water supply system
Water
▪ In area: 08 water stations in operation with total capacity of 61,000 m3/day
672
▪ In industrial zones, industrial clusters: 04 water stations in operation with total capacity of 24,400
m3/day
Education
▪ 02 universities, 04 colleges, 01 technical schools and 53 vocational training schools in the province.
Medicare
▪ 06 provincial hospitals, 12 district hospitals and 01 private hospitals
INVESTMENT CONDITION
Human resource
▪ Around 60% of population in working age (2021)
Education level
▪ Trained labor rate: 18.8% (2021)
▪ The minimum salary for the province is applied as follows (see appendix for detail amount):
Salary
- Area II: including: Bảo Lộc City
- Area III: including: Đức Trọng district
▪ Incentives according to government regulations:
Exemption and reduction for land and water rent fee
Investment incentives
- Preferential tax rates and exemption period, reduction for corporate income tax.
Import tax exemption
▪ Prioritized Projects:
- High technology, industrial electronics, information technology; mechanical engineering products;
- Supporting industry;
Fields Attracting
Investment
- Projects using high technology, modern techniques; ecological environment preservation; research,
development and high-technology incubators;
- Development of trade, service and tourism;
- Construction and development of infrastructure and key projects;
- Development of education, training, health, fitness and sports.
Map
673
Office of Lam Dong Industrial Zones Authority
Address: No 36 Tran Phu, 4 Ward, Dalat City, Lam Dong Province
Contact
Tel: (84-263) 3 549 106
Fax: (84-263) 3 549 104
E-mail: bqlkcn@lam dong.gov.vn
LIST OF INDUSTRIAL ZONES IN LAM DONG
No
Industrial zone Name
Total Area (ha)
Occupancy Rate
Status
1
Phú Hội Industrial Zone
109
97,9%
In operation
2
Lộc Sơn Industrial Zone
183
85,8%
In operation
3
Phú Bình Industrial Zone
246
LÂM ĐỒNG’S LOCATION MAP OF INDUSTRIAL ZONES
674
Planning
PHU HOI INDUSTRIAL ZONE
GENERAL INFORMATION
Phú Hội commune, Đức Trọng district, Lâm Đồng Province, Vietnam
Address
Investor
Contact Person
Lộc Sơn – Phú Hội Infrastructure Development Company
▪ Address: No 371, Thống Nhất Street, Đức Trọng district, Lâm Đồng province, Vietnam.
▪ Tel: (84-263) 3678 515
▪ Website: http://liza.lamdong.gov.vn
▪ Võ Văn Hậu - Director - Mobile: +84 - 989-200 272 - Email: hauvv@lamdong.gov.vn
Minimum wage
- From HCMC: 270 km
- From Da Lat: 30 km
- From Lien Khuong airport: 03 km
- Close to major communications network
- Advantages of geographical location: Ho Chi Minh City seaport, Dong Nai, Binh Thuan, Khanh
Hoa, main industrial parks in the south.
- The labor abundant, stable from local and neighboring provinces.
Priority Sectors for
processing of manufacturing products for tourism, processing vegetables,
Investment
seafood, wine, jams, sweets, industrial production of building materials,
high quality bricks, processing forestry, wood products, agricultural
products, electronics and other industrial sectors
[Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term
2005 - 2055
Limit for Construction
Height
Permitted Construction Rate
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential
Planning regulation (QCXDVN 01: 2008/BXD)
Construction area is 50%-70% of the total leased land lot
Planned area
▪ Total area: 109 ha
Operation Status
▪ In operation
Occupancy Rate and
Number of Projects
Number of Korean Projects
▪ 97.9%
▪ 33 Projects
▪ 03 projects
Lease fee
▪ Land lease fee: 5.200VND/m2 /year
▪ Payment:
- Method: Bank Transfer in VND
- Annual payment
▪ Management fee: 0.16 USD/m2/year
▪ Electricity fee: According to the Circular by Ministry of Industry and Trade,
Location
Investment Area
Operating fee
675
Layout Plan
676
LOC SON INDUSTRIAL ZONE
GENERAL INFORMATION
Lộc Sơn ward, Bảo Lộc City, Lâm Đồng Province, Vietnam
Address
Investor
Contact Person
Location
Investment Area
Minimum wage
Lease term
Limit for Construction
Height
Permitted Construction
Rate
Planned area
Lộc Sơn – Phú Hội Infrastructure Development Company
▪ Address: No 371, Thống Nhất Street, Đức Trọng district, Lâm Đồng province, Vietnam.
▪ Tel: (84-263) 3678 515
▪ Website: http://liza.lamdong.gov.vn
▪ Võ Văn Hậu - Director - Mobile: +84 - 989-200 272 - Email: hauvv@lamdong.gov.vn
Close to major communications network
From HCMC : 190km
From Da Lat : 110km
Advantages of geographical location: Ho Chi Minh City seaport, Dong Nai, Binh Thuan, main
industrial parks in the south, Lien Khuong airport 80 km from the north.
The labor abundant, stable from local and neighboring provinces
Priority Sectors
processing of coffee, tea, silk, building materials, aluminum production,
for Investment
paving stones, electronic assembly, processing woods, shoes, clothing
industry ...
[Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
▪ Start date: 2004
▪ End date: 2054
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential
Planning regulation (QCXDVN 01: 2008/BXD)
▪ 183 ha
Factory Available for Rent
None
Operation Status
In operation
Occupancy Rate and
Number of Projects
Number of Korean Projects
▪ 85.8%
▪ 51 projects
02 projects
Lease fee
▪ Land lease fee: 10.800VND/m2 /year
▪ Management fee: 0.16 USD/m2/year
▪ Electricity fee: According to the Circular by Ministry of Industry and Trade
▪ Waste treatment fee: According to contract
INFRASTRUCTURE AND FACILITY
Operating fee
677
Layout Plan
678
[- This Page is intentionally left blank -]
679
LANG SON
680
INVESTMENT ENVIRONMENT IN LANG SON
GENERAL INFORMATION
Area and population
▪ Area: 8,310 km2
▪ Population: 802,090 Million (Data 2022)
Geographical location
▪ Lang Son is a mountainous province, located in the Northeast of Vietnam
▪ Lang Son is 154 km from Hanoi by road and 165 km by railway.
▪ Having a border line over 231 km long, there are 02 international border gates, 01
main border gate and 09 auxiliary border gates, openings.
Adjacent provinces
▪ The North borders Cao Bang province
▪ The East borders Quang Ninh province and Sung Ta city (Guangxi, China).
▪ The South borders Bac Giang province
▪ The West borders Bac Kan province and Thai Nguyen province.
GRDP
Figures for 2022:
▪ GRDP Index: 22,683 Billion VND
▪ GRDP Growth: 7.22%
▪ GRDP per capita: 51.72 million VND/person
▪ Economic structure:
- Industry - Construction: 24.40%;
- Agriculture: 21.10%;
- Service: 49.98%;
- Product tax: 4.53%
Industry growth
Figures for 2022:
▪ Processing and manufacturing industry: 10.25%
▪ Total turnover of import and export goods through Lang Son province reached
23,849 million USD
▪ Service increase: 12.49%
PCI
▪ According to the announcement of VCCI, with a composite score of 67.88 points,
Lang Son province ranked 15th out of 63 provinces and cities in the country, up 21
places compared to 2021; ranked 5th out of 14 provinces in the Northern mountainous
region (2022).
SOCIAL INFRASTRUCTURE
Transportation
▪ Main roads: The arterial traffic routes running through the province such as National
Highway 1A (Huu Nghi - Hanoi: 150km), National Highway 4A (Dong Dang - Cao
Bang: 118km), National Highway 4B (Lang Son - Mui Port: 118km), National
Highway 4B (Lang Son - Mui Port) Pagoda, Quang Ninh: 114km), National Highway
1B (Lang Son - Thai Nguyen: 160km).
▪ Railway: Intermodal railway Hanoi - Lang Son - China.
▪ Waterway: 114km from Mui Chua port - Quang Ninh, 220km from Dinh Vu port Hai Phong.
▪ By air: 152km from Noi Bai International Airport, 135.2km from Van Don Airport.
Electricity
The whole province has 4 110kV transformer stations, a relatively complete power
transmission line system that can supply enough for consumption and production.
Currently, 100% of communes are using electricity from the national grid.
Water
The whole province has a clean water supply system with a total capacity of
50,020m3/day, which can basically fully meet the clean water source for residential
areas and a part of the clean water demand for production and business of enterprises.
located in the city and surrounding areas.
Education & Training
▪ Kindergarten: 232
▪ Elementary School: 180
681
▪ Middle School: 141
▪ Elementary and Middle School: 72
▪ High School: 26
▪ Vocational Education Center - GDTX: 09
▪ Education Center: 01
▪ Center for Informatics and Foreign Language Education: 01
▪ Professional school: 01
▪ College: 04
INVESTMENT CONDITION
Human resource
▪ 515,324 people of working age (2022)
Education level
▪ Proportion of people with professional training: 50% (2022)
Salary
▪ Region III: Minimum monthly salary is 3,640,000 VND, minimum hourly wage is
17,500 VND. Apply to: Lang Son City.
▪ Region IV: Minimum monthly salary is 3,250,000 VND, minimum hourly wage is
15,600 VND. Apply to: Bac Son, Binh Gia, Cao Loc, Chi Lang, Dinh Lap, Huu Lung,
Loc Binh, Trang Dinh, Van Lang, Van Quan districts.
▪ The salary paid to employees who have undergone vocational training or vocational
training is at least 7% higher than the corresponding regional minimum wage.
Investment incentives
▪ Incentives decided by the government
- Exemption and reduction of land and water surface rents
- Incentives on tax rates and duration of corporate income tax exemption and reduction.
- Import duty free
▪ Incentives according to the decision of the province
Investment support policy in Lang Son province according to Resolution No.
16/2022/NQ-HDND dated 07/07/2022 (Attached file).
Fields Attracting Investment
- Agriculture and Forestry
- Industry Development
- Development of tourism - services
- Developing border economy
Map
Contact
Investment Promotion Center - Department of Planning and Investment
▪ Address: No. 2 Hoang Van Thu - Chi Lang Ward, Lang Son City
Tel: 025.3816.815
▪ Email: ttxtdtls@gmail.com
682
683
LIST OF INDUSTRIAL PARKS
NO.
INDUSTRIAL ZONE NAME
OCCUPANCY RATE
STATUS
Dong Banh Industrial Park
TOTAL AREA
(HA)
162,13
1
90%
In operation
2
Huu Lung Industrial Park
599,76 ha
-
In operation
DONG BANH INDUSTRIAL PARK MAP
684
DONG BANH INDUSTRIAL PARK
GENERAL INFORMATION
Address
Investor
Hoa Lac commune, Huu Lung district and Chi Lang town, Chi Lang district, Lang Son province
Management Board of Dong Dang - Lang Son Border Gate Economic Zone
▪ Address: Ly Thai To Street, Dong Kinh, Lang Son City, Lang Son
▪ Tel: 0205 3875 708
▪ Email: banqlktck@langson.gov.vn
▪ Website: https://banqlktck.langson.gov.vn/
Location
- Distance from province: 180 km from Hanoi city, 34 km from Lang Son city
- Distance from airport: Noi Bai airport 186 km
- Distance from port: Cai Lan port 142 km
Investment sectors
Areas of investment
promotion:
Areas of investment
restriction:
Mininum Wage
Lease term
+ Group of industries of mechanical assembly, manufacturing of spare
parts;
+ The industry group produces high-quality plastic parts;
+ Group of industries producing and assembling electronic components
and electronic circuits;
+ Group of industries producing and processing molds with high
technical standards;
+ Other industrial service industries.
none
Region IV: Minimum regional salary according to Decree No. 38/2022/ND-CP
50 years
Minimum Lease Area
not required
Limit for Construction
Height
In accordance with the National Technical Regulation on construction planning
(QCVN 01:2021/BXD)
Permitted Construction
Rate
Planned area
Factory available for Rent
Operation Status
Occupancy rate and
number of projects
Number of Korean projects
Lease fee
▪ Total area: 162.13 ha
▪ Area for building factories and warehouses: 110.97 ha
Not available yet
Infrastructure is being built
▪ Occupancy rate: 33.61 ha (equivalent to 20.73%)
▪ Number of projects in the area: 2 projects
None
▪ Land rental cost: 20-30 USD
▪ Factory rental cost: 2 USD
685
Operating fee
▪ Management cost: 0.2USD/m2
▪ Electricity cost:
Rush hour: 0.1 USD
Normal: 0.05 USD
Off-peak hours: 0.03 USD
▪ Water cost: 0.4 USD/m3
▪ Waste water treatment fee: 0.3 USD/m3
INFRASTRUCTURE
- Industrial production land includes:
+ Construction of factories and production enterprises;
+ Building warehouses and yards;
- Industrial zone administrative and service land area includes:
+ Operators and managers of industrial parks;
+ Banking and financial transaction office;
+ Product introduction center;
+ Police station;
+ Specialized fire prevention and fighting teams in industrial parks;
- Technical infrastructure works include:
+ Water supply station;
+ Waste water treatment station;
+ 110KV power station;
+ Parking lot;
- Green land and water surface area, including:
+ Landscape land;
+ Isolate green land;
+ Water surface in the industrial park;
LIST OF SOME NOTABLE TENANTS
No.
Company name
Countries
Business fields
1
DONG BANH Cement Factory
Vietnam
Cement production
2
LANG SON CONSTRUCTION JOINT
STOCK COMPANY
Vietnam
Producing concrete and products from
cement - cement and gypsum
686
HUU LUNG INDUSTRIAL PARK
GENERAL INFORMATION
Address
Location
Investment sectors
Ho Son commune and Hoa Thang commune, Huu Lung district
The North borders Na Vi village and Dong Gia village, Ho Son commune; The South borders on
Suoi Ngang 1 village, Hoa Thang commune; The East borders Hanoi - Lang Son railway; West
borders Bac Giang - Lang Son highway.
Areas of investment
promotion:
Areas of investment
restriction:
Mininum Wage
Lease term
+ Group of industries of mechanical assembly, manufacturing of spare
parts;
+ The industry group produces high-quality plastic parts;
+ Group of industries producing and assembling electronic components
and electronic circuits;
+ Group of industries producing and processing molds with high
technical standards;
+ Other industrial service industries.
none
Region IV: Minimum regional salary according to Decree No. 38/2022/ND-CP
50 years
Minimum Lease Area
not required
Limit for Construction
Height
In accordance with the National Technical Regulation on construction planning
(QCVN 01:2021/BXD)
Permitted Construction
Rate
Planned area
Factory available for Rent
Operation Status
▪ Total area: 599,76 ha
Not available yet
Infrastructure is being built
Occupancy rate and
number of projects
N/A
Number of Korean projects
None
Lease fee
▪ N/A
Operating fee
Management fee: 0.2 USD/m2
Electricity price: 0.03 - 0.1 USD / KWh
Water price: 0.4 USD/m3
Wastewater treatment: $0.28/m3
INFRASTRUCTURE
687
- Industrial production land includes:
+ Construction of factories and production enterprises;
+ Building warehouses and yards;
- Industrial zone administrative and service land area includes:
+ Operators and managers of industrial parks;
+ Banking and financial transaction office;
+ Product introduction center;
+ Police station;
+ Specialized fire prevention and fighting teams in industrial parks;
- Technical infrastructure works include:
+ Water supply station;
+ Waste water treatment station;
+ 110KV power station;
+ Parking lot;
- Green land and water surface area, including:
+ Landscape land;
+ Isolate green land;
+ Water surface in the industrial park;
[- This Page is intentionally left blank -]
688
LAO CAI
689
INVESTMENT ENVIRONMENT IN LAO CAI
GENERAL INFORMATION
Area, Population
 Area: 6,364.03 km2
 Population: 770.60 thousand people (2022)
Geographical Location
 Lao Cai is a highland province, located in the North of Vietnam
245km from Hanoi by road, 296km by railway
It borders Ha Giang province to the East, Yen Bai province to the South, Lai Chau
province to the West, and Yunnan province (China) to the North.
Adjacent provinces
2022 statistic:
GRDP




-
GRDP scale: 68,000 billion VND (2.89 billion USD)
GRDP growth rate: 9.02%
GRDP per capita: 90 million VND/year
Economic structure:
Industry - Construction: 44.85%
Agriculture, Forestry and Fishery: 13.97%
Tourism and Services: 41.18%
Goods taxes: 10.16 %
2022 statistic:
Industry growth
 Industry – Construction growth: 8.62 %
 Agriculture, Forestry and Fishery growth: 4.47 %
 Services growth: 10.76 %
PCI
ranked 11th out of 63 cities and provinces in Vietnam (2022)
SOCIAL INFRASTRUCTURE
Transportation
 Roadway: Five national highways with a total length of 456km and Noi Bai Lao Cai highway with a length of 72km through the province; 16 provincial
roads with a length of 969km and more than 9,500km of rural roads
 Waterway: The inland waterway system through Lao Cai province has great
potential for transportation with 2 major river routes flowing through are the
Red River and Chay River with a total length of about 230km.
 Railway: The province has about 120 km of railways, of which the 62 km section
through Lao Cai territory belongs to the railway line maintaining international
transport operations Hai Phong - Hanoi - Lao Cai (Vietnam) - Kunming (China).
 Airway: Sa Pa airport – airport standards of grade 4C, capacity of 1.5 million
passengers/year is being invested to soon put into operation.
Electricity
 231 km of 220KV lines (two 220KV substations) and 450km of 110KV lines (five
110KV substations)
Water
 Water supply system with a total capacity of 109.6 thousand m3/day and night
Education
 Lao Cai province has 01 branch of Thai Nguyen University - Lao Cai campus, 15
vocational education centers (01 college, 01 secondary school, 12 vocational education
centers and 01 enterprise with vocational education activities). On average, every year,
vocational training institutions recruit and train more than 13,359 people
Medicare
 5 provincial hospitals, 9 district hospitals and 01 private hospitals
690
INVESTMENT CONDITION
Human resource
60% of population in working age (2022)
Education level
Trained labor rate: 66.7% (2022)
Salary




The regional minimum wages are applied as follows:
Region II: Lao Cai city (minimum salary 4,160,000 VND/month)
Region III: Sa Pa town, Bao Thang district (minimum salary 3,640,000 VND/month)
Region IV: Districts: Bao Yen, Bat Xat, Muong Khuong, Si Ma Cai, Van Ban
(minimum salary 3,250,000 VND/month)
 Average salary of workers in industrial zones: Foreign-owned enterprises: 6,000,000
VND/person/month; Domestic capital enterprises: 9,500,000 VND/person/month
Investment incentives
 Lao Cai province is always committed to improving the investment and business
environment in the direction of transparency and openness, creating the most favorable
conditions for investors and businesses. Apply the regulations on preferential policies
of the Central Government in relevant legal documents such as land, corporate income
tax, import and export tax, investment incentive industries and professions.
Fields Attracting Investment
 Large scale commodity agriculture, application of modern science and technology in the
chain of production, processing and consumption of products.
 Develop processing, manufacturing, mineral processing, agricultural products,
processing and assembly in the direction of high technology, clean technology, deep
processing, raising the localization rate, quality product quality, environmentally
friendly, low energy consumption, creating jobs for many workers. Attract investment
in the construction of logistics zones, inland ports, commercial infrastructure, technical
infrastructure serving the border gate economy, industrial parks and industrial clusters.
The fields of digital economy, digital technology.
 Strongly attract and develop high-quality and modern tourist service, cultural-spiritual
tourism and entertainment service areas, especially advantageous services, green, smart
and attractive tourism products, highly competitive lead.
Map
691
Lao Cai Department of Planning and Investment
Address: Block 2, Nam Cuong ward, Lao Cai citry, Lao Cai province
Contact
Phone: 02143.840 810 or 02143.840 034
Fax: 02143.823466
Email: skhdt@laocai.gov.vn
692
LIST OF INDUSTRIAL ZONES
Industrial zone Name
Total Area (ha)
Occupancy Rate
Status
Bac Duyen Hai Industrial
zone
85ha
98.2%
Currently filled, operating stably, so there is no
need to call for investment attraction
Dong Pho Moi Industrial
zone
100h
86,58%
In operation
Tang Loong Industrial zone
1,100ha
81,69%;
In operation
693
DONG PHO MOI INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Stay in economic zone of Lao Cai border, belonging to Pho Moi Ward, Lao Cai City, closely to Lao Cai
international railway station
Investor
Invest with state budget capital
Location
Mechanical assembly workshop; electronic production and assembly; processing agricultural and forestry
products; storages
Minimum wage
Lease term
Minimum Lease
Area
Limit for
Construction
Height
Permitted
Construction Rate
Planned area
Operating fee
4.16 million VND/person/month
N/A
100ha
The average building height of each land lot is 1-2 floors.
The average construction density for each specific land lot is 50-55%
Total area: 100h
Area available for rent: 65ha
+ Electricity cost: According to the price set by the Ministry of Industry and Trade
+ Cost of production water: Average 12,000VND/m3
+ Cost of wastewater treatment: Average 12,000VND/m3
Operation Status
In operation
Occupancy Rate
and Number of
Projects
86,58%; 42 projects (The remaining land fund to expand the Hoa Truong station to serve the development
of railway infrastructure when upgrading to 1,435m gauge)
Lease fee
Land rental cost: 4,000,000VND/m2
694
Map
695
TANG LOONG INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Investor
Location
Minimum wage
Lease term
Minimum Lease
Area
Limit for
Construction
Height
Permitted
Construction Rate
Phu Nhuan commune and Tang Loong town, Bao Thang district, Lao Cai province.
Invest with state budget capital
Metallurgy, chemical, mineral extraction and other supporting industries.
3.64 million VND/person/month
N/A
587.8ha
The average building height of each land lot is 1.5-3 floors.
The average construction density for each specific land lot is 40-60%.
Planned area
Total area: 1,100ha
Area available for rent: 587.8ha
Operating fee
+ Electricity cost: According to the price set by the Ministry of Industry and Trade
+ Cost of production water: 9,000VND/m3
+ Cost of household water: 11,000VND/m3
+ Cost of wastewater treatment: 16,238.2VND/m3
Operation Status
In operation
Occupancy Rate
and Number of
Projects
81,69%;
29 projects
(The remaining land fund is limited, mainly high hills and no clear ground, still inhabited interspersed. The
purpose of attracting investment projects to produce the following products is Gold, Silver, Copper,
Phosphorus….)
Lease fee
2,000,000VND/m2
696
Map
697
[- This Page is intentionally left blank -]
698
LONG AN
699
INVESTMENT ENVIRONMENT IN LONG AN
GENERAL INFORMATION
Area, Population
 Area: 4,494.93 km2
 Population: 1,738,000 people.
 Long An has 15 administrative units, including 1 city, 01 town, 13 districts; The
administrative center is Tan An city.
Geographical Location
 Long An is a province in the Mekong Delta region - has a special position as the
gateway between two regions: the Mekong Delta and the Southeast region, bordering
the Kingdom of Cambodia and Ho Chi Minh City. Ho Chi Minh City - enjoy the
spread of industrial and urban development of the city. Ho Chi Minh.
 From Ho Chi Minh City, it is easy to move to Long An in about 40-50 minutes, and
in Long An there is almost no traffic jam.
Adjacent provinces
 Long An is adjacent to Ho Chi Minh City and Tay Ninh province to the east, to
Cambodia to the north, to Dong Thap province to the west and Tien Giang province
to the south.
GRDP
2022 statistic:
 GRDP growth: 8.46%
 GRDP per capita: 90.2 million VND/year (3846 USD/year)
 Economic structure:
- Industry - Construction: 52.33%;
- Agriculture, forestry and fishery: 14.72%;
- Services: 26.66%;
Industry growth
2022 statistic:
 Industry – Construction increased: 11.15%
 Agriculture increased: 0.71%
 Service increase: 21%
 Import and export:
-Export turnover: 6.7 billion USD
- Import turnover: 5.1 billion USD
PCI
▪ Điểm PCI: 68,45 – Xếp thứ 10 trên 63 tỉnh Việt Nam. (2022)
SOCIAL INFRASTRUCTURE
Transportation
Electricity
 Roadway: Expressways passing through the province include: Ho Chi Minh City Trung Luong road: connecting Ho Chi Minh City with provinces in the Mekong Delta,
Ben Luc - Long Thanh Expressway connecting to Dong Nai and Eastern provinces
Southern. National Highway System: 1A, 50, 62, N1, N2 (Ho Chi Minh Road).
 Waterway: The waterway system managed by the province includes the HCMC
route. Ho Chi Minh - Kien Luong, City. Ho Chi Minh City-Moc Hoa, Moc Hoa-Ha
Tien, City. Ho Chi Minh - Ha Tien.
 The whole province has more than 5,261 km of medium voltage lines, 4,929 km of
low voltage lines; 20,480 substations with a total capacity of 5,096,023 kVA;
310,108km of 110KV transmission line, 20 110 kV stations with a capacity of 2,032
MVA; 02 220 kV stations with a capacity of 928 MVA. 100% of communes, wards
and townships have electricity from the national grid.
 In addition, in 2021, Long An has granted investment certificates for 2 projects of
Long An LNG 1 & 2 thermal power plants, with an expected capacity of 3,000 MW,
700
total investment capital of over 3 billion USD, which will meet the demand for use.
electricity for daily life and production and business activities in the province.
Water
Education
Medicare
 Number of factories/clean water treatment stations at present: there are 36 factories,
1413 rural water supply stations (> 30 households).
 Total capacity of existing factories and water supply stations: 345,700 m³/day
(updated in 2021 is 445,112 m³/day and night, 2022 is 515,112 m³/day). In which:
urban wells is 205,700m³/day (updated in 2021 is 220,700m³/day, in 2022 it
increases by 290,700 m/day), wells in rural areas are 140,000m³/day (updated in
2021 is 224,412 m³/day).
 Demand for water according to the approved planning: by 2025 is 511,989m³/day;
by 2030 is 627,457 m³/day and night.
 Long An currently has 2 universities, 1 Pedagogical College, and 39 vocational
training institutions. (25 public institutions, accounting for 64%; 14 non-public
establishments, accounting for 36%), of which: 3 Vocational Colleges, 6 Vocational
Intermediate Schools, 7 Vocational Training Centers, 18 units public institutions, 4
enterprises and 1 cooperative engaged in vocational training...
 Public health centers including: 29 affiliated units; 15 medical centers at district, town
and city level; 5 regional polyclinics and private medical facilities.
INVESTMENT CONDITION
Human resource
 According to the statistical yearbook, in 2021, the labor force aged 15 and over
will reach 992.7 thousand people.
Education level
 Rate of trained workers: 73.35 (2022)
 Including degrees and certificates: 32.07%
Salary
 Long An currently has: Area II, III and IV:
 Area II: VND 4,160,000/month and VND 20,000/hour, applicable to enterprises
operating in the area of Region II, including: Tan An city and districts of Ben Luc,
Can Duoc, Can Giuoc, Germany Hoa and Thu Thua.
 Area III: 3,640,000 VND/month and 17,500 VND/hour, applicable to enterprises
operating in the area of Region III, including: Kien Tuong town and Chau Thanh,
Duc Hue, Tan Tru and Thanh districts. Chemistry.
 Area IV: 3,250,000 VND/month and 15,600 VND/hour, applicable to enterprises
operating in the area of Region IV, including: the remaining districts of the
province: Moc Hoa, Tan Hung, Tan Thanh and Vinh Hung.
Investment incentives
 Incentives according to the Government's regulations: Exemption and reduction of
land and water rents; Preferential tax rates and duration of corporate income tax
exemption and reduction. Import duty free
Fields Attracting Investment
 Agriculture: high quality organic agriculture associated with key products such as
rice, vegetables, dragon fruit, lemon, beef,...; high-tech agricultural model
combining eco-tourism…
 Industry: Supporting industry, processing and manufacturing, automation,
manufacturing components - electronic equipment and software, microchips,
semiconductor industry, artificial intelligence; recycled energy.
 Developing urban complexes, commerce, entertainment services, combining resort
villas and world-class golf courses, etc.
 Marine economy, maritime services, logistics, finance, import and export.
701
Map
Contact
Tên cơ quan liên hệ: Sở Kế hoạch và Đầu tư tỉnh Long An
▪ Address / địa chỉ: No. 61, Truong Dinh, Tan An city, tỉnh Long An
▪ Tel: 0272.3886009
▪ Fax :
▪ Email: skhdt@longan.gov.vn
▪ Contact person: Mr. Nguyen Vu Dat, : Investment Promotion Specialist - Tel:
0394039659 – Email: nguyenvudat@longan.gov.vn
702
LIST OF INDUSTRIAL ZONES
No
Industrial zone Name
Total Area (ha)
Occupancy Rate
1
KCN Đức Hòa 1
(Duc Hoa 1 Industrial Park)
KCN Xuyên Á
(Xuyen A Industrial Park)
KCN Tân Đức
(Tan Duc Industrial Park)
KCN Đức Hòa III
(Duc Hoa III Industrial Park)
KCN Tân Đô
(Tan Do Industrial Park)
KCN Hải Sơn
(Hai Son Industrial Park)
KCN Vĩnh Lộc 2
(Vinh Loc 2 Industrial Park)
KCN Nhựt Chánh
(Nhut Chanh Industrial Park)
KCN Phúc Long
(Phuc Long Industrial Park)
KCN Phú An Thạnh
257.49
70.64%
In operation
302.45
89.80%
In operation
545.69
79.06%
In operation
330.46
82.01%
In operation
209.10
100%
In operation
443.29
100%
In operation
223.22
93.5%
In operation
122.75
97.7%
In operation
78.96
100%
In operation
352.75
76.07%
In operation
KCN Thịnh Phát
(Thinh Phat Industrial Park)
KCN Thuận Đạo
(Thuan Dao Industrial Park)
KCN Cầu Tràm
(Cau Tram Industrial Park)
KCN Cầu Cảng Phước Đông
(Cau Cang Phuoc Dong IP)
KCN Long Hậu
(Long Hau Industrial Park)
KCN Long Hậu 3
(Long Hau 3 Industrial Park)
KCN Tân Kim
(Tan Kim Industrial Park)
KCN Hoa Binh
(Hoa Binh Industrial Park)
SUB-TOTAL: 18 IPs
73.47
100%
In operation
303.16
100%
In operation
61.09
100%
In operation
128.88
34.15%
In operation
245.50
100%
In operation
123.98
56.71%
In operation
156.31
94.69%
In operation
117.67
85.83%
In operation
4,076.23
86.79%
105.48
34.09%
In operation
308.39
9.79%
In operation
524.14
23.02%
In operation
396.00
19.64%
In operation
119.20
0.00%
In operation
In operation
2
3
4
5
6
7
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
Status
KCN Trần Anh – Tân Phú
(Tran Anh – Tan Phu IP)
KCN Nam Thuận
(Nam Thuan Industrial Park)
KCN Hựu Thạnh
(Huu Thanh Industrial Park)
KCN Đông Nam Á
(Dong Nam A IP)
KCN An Nhựt Tân
(An Nhut Tan IP)
KCN Suntec
(Suntec Industrial Park)
SUB-TOTAL: 06 IPs
295.43
17.41%
1,748.64
18.07%
TOTAL: 24 IPs in operation
5,982.14
65.19%
KCN Thế Kỷ
(The Ky Industrial Park)
KCN Lộc Giang
(Loc Giang Industrial Park)
119.19
-
Land clearance
466.00
-
Land clearance
703
In operation
27.
KCN Prodezi
(Prodezi Industrial Park)
KCN Tandoland
(Tandoland Industrial Park)
KCN Nam Tân Tập
(Nam Tan Tap Industrial Park)
KCN Tân Tập
(Tan Tap Industrial Park)
KCN Quốc Tế Trường Hải
400.00
-
Land clearance
250.00
-
Land clearance
244.74
-
Land clearance
654.00
-
Land clearance
162.19
-
Land auction
32.
KCN Thủ Thừa
(Thu Thua Industrial Park)
SUB-TOTAL: 08 IPs
188.88
-
Land clearance
2,485
-
Land clearance
33.
152.21
-
131.19
-
200.00
-
36.
KCN Hoàng Lộc
(Hoang Loc Industrial Park)
KCN Anh Hồng 2
(Anh Hong 2 Industrial Park)
KCN Saigon-Mekong
(Saigon-Mekong IP)
KCN Cửa khẩu Bình Hiệp – Giai đoạn 1
168.50
-
37.
KCN Đông Sông Rồ
172.00
-
SUB-TOTAL: 05 IPs
823.9
-
TOTAL: 13 IPs
3,308.9
Waiting for Prime
Minister’s approval
Waiting for Prime
Minister’s approval
Waiting for Prime
Minister’s approval
- Waiting for Prime
Minister’s approval
- Inside Long An Bordergate Economic Zone
Waiting for Prime
Minister’s approval
Waiting for Prime
Minister’s approval
28.
29.
30.
31.
34.
35.
704
DUC HO III-HONG DAT IZ INDUSTRIAL PARK
GENERAL INFORMATION
Investor
Contact Person
Location
Investment Sectors
Hong Dat – Long An Company
▪ Address: Duc Lap Ha Commune, Duc Hoa District, Long An Province.
▪ Tel: 093 153 9292 – press 4
▪ Email: congtycophanhongdatlongan@gmail.com
Duong Huyen- Admin KCN – 093 153 9292
Adjacent location
Distance from Ho Chi Minh City: 05km;
Distance from Tan Son Nhat airport: 20 km
Distance from Hiep Phuoc port: 40 km
Distance from Long An international port: 60 km
From Ben Luc - Long Thanh port: 40 km
Distance from station/national road/1A: 20 km
Priority Sectors for
- Group of agricultural product processing projects;
Investment
- Group of textile and garment projects (not tanning);
- Group of electrical, electronic and telecommunications projects;
- Group of stationery projects;
- Group of projects for processing livestock, poultry and aqua feed (not
processing fishmeal, aquatic by-products from fresh aquatic byproducts);
- Group of other projects:
+ Manufacture of children's toys;
+ Producing technological products;
+ Support services for the operation of the industrial zone such as office
leasing, banking, postal and telecommunications; warehousing services
(including cold storage); transportation, delivery, food supply; industrial
hygiene; services of collecting and transporting solid waste and
hazardous waste to a place for thorough treatment outside the industrial
park.
Investment Restricted
Sectors
Minimum wage
Lease term
Minimum Lease Area
Limit for Construction
Height
Producing iron, steel, cast iron, metallurgy; production (mixing of raw
materials), processing, bottling and packaging of plant protection drugs;
fertilizer production.
4.160.000 VND
▪ Phase 1: From October 1, 2009 onward
▪ Stage 2: not done yet
5.000m2
2 floors
705
Permitted Construction
Rate
Land area
Factory Available for Rent
Operation Status
Occupancy Rate and
Number of Projects
- Factory construction area: 77.39%
- Operating area] 1.20%
▪
▪
▪
▪
Total area: 27,3989 ha
Total leasable area: 27,3989 ha
Total vacant leasable area: 0 ha
Total area with full infrastructure ready to build factory: 27,3989 ha
▪ Total area: 0 ha
▪ Active
▪ 100%
▪ 15 projects
No. of Korean projects
None
Lease fee
N/A
Operating fee
[Chi phí vận hành]
▪ Management fee: None
▪ Electricity fee: According to the tariff of Duc Hoa Electricity
▪ Water fee: 10,046 VND/m3
▪ Wastewater treatment fee: VND 10,454/m3
▪ Waste treatment fee: VND 6,600,000/wide area
LIST OF PROJECTS IN INDUSTRIAL ZONE
No.
Name of Company
Nationality
1
Duc Thi Technology Manufacturing Trading Service Co., Ltd
Vietnam
2
Vietnam Lien Nong Joint Stock Company
Vietnam
3
World Vision (VN) Co., Ltd.
4
Omega Plant Protection Products Joint Stock Company
Vietnam
5
A Chau Hoa Sinh Co., Ltd
Vietnam
6
Futai . Joint Stock Company
7
Dat Viet Research - Production Co., Ltd
Vietnam
8
Hoang Chau Long An Plastic Trading Co., Ltd
Vietnam
9
To Nam Biotech One Member Company Limited
Vietnam
10
Golden Lion Fertilizer Co., Ltd
Vietnam
11
Golden Agro-Chemical Fertilizer Co., Ltd
Vietnam
12
Asia Agros Co., Ltd
Vietnam
13
Gap Agro . Co., Ltd
Vietnam
14
Global Farm Joint Stock Company
Vietnam
China
China
706
15
C.N.D Aluminum Glass Door Manufacturing and Assembling Co., Ltd
707
Vietnam
HUU THANH IDICO INDUSTRIAL ZONE
GENERAL INFORMATION / THÔNG TIN TỔNG QUÁT
Address
Developer
Contact Person
Location
Investment Sectors
Minimum wage
Huu Thanh ward, Duc Hoa district, Long An province, Vietnam
IDICO Corporation - JSC/ Tổng công ty IDICO-CTCP
▪ Tel: +84 39312660
▪ Email: dautu@idico.com.vn
▪ Website: https://idico.com.vn
Vu Anh Luan - Deputy Sales Manager - Mobile: +84 985 614 678 - Email:
luan.va@idico.com.vn
Adjacent location
- Adjacent to border Ho Chi Minh city;
- 40km far from center of Ho Chi Minh city
- 35 km far from Tan An city of Long An province
- 15km far from HCM - Trung Luong expressway
- 20km far from National highway No.1A
- 52km far from Long An international port
- 32km far from Tan Son Nhat international airport
- 55km far from Cat Lai port
Priority Sectors for Investment:
Industrial zone is arranged with the following production types:
- Industrial electric machinery, industrial electricity and household electricity; Producing
electrical, electronic equipment and electronic components (including production stages in
the closed production technology of the Project such as painting, spraying, plating,
cleaning metal surfaces with chemicals, etc.);
-Manufacturing furniture, interior decoration; wood processing, wood chips from natural
wood; construction materials (no cement production, no clinker production, no lime
production); construction painting;
-Ceramic, Glass, Crystal;
-Producing and distributing gas, industrial gas, medical gas; hot water, steam,
Vùng II: 4.160.000VND/month
Lease term
06/8/2069
Minimum Lease Area
10.000m2
Limit for Construction Height
According to the regulations of the Ministry of Construction not in QCVN 01: 2021/BXD
Permitted Construction Rate
[Tỷ lệ xây dựng]
According to the regulations of the Ministry of Construction not in QCVN 01: 2021/BXD
Land area
Factory Available for Rent
Operation Status
▪
▪
▪
▪
Total area: 524,14ha
Total leasable area: 395,41ha
Total vacant leasable area: 300ha
Total area with full infrastructure ready to build factory: 200ha
▪ Total area of planning land: 28ha
▪ Total vacant leasable area: 10.000m2
▪ Active
Đang hoạt động
708
Occupancy Rate and Number of
Projects
No. of Korean projects
Lease fee
▪ 23%
▪ 35
▪0
▪0
▪ Land lease fee: 150$/m2/duration
▪ Factory lease fee: 4.5$/m2/month
Operating fee
▪ Management fee: 0.15$/m2/month
▪ Factory Roof rental price: 30,000VND/m2/year
▪ Electricity fee: accordance with regulation of government
▪ Water fee: 12.100VND/m3
▪ Wastewater treatment fee: ~0,5$/m3
▪ Waste treatment fee: accordance with regulation of suppliers
INFRASTRUCTURE AND FACILITY
Distance from the nearest Banking, nearest State Tax and Finance Agency, nearest Logistic Center, Universities, Training
facilities, etc., Road width, …
Layout plan
709
TAN DUC INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Sectors
Các lĩnh vực đầu tư
Lot 8, Duc Hoa Ha Road, Tan Duc Industrial Park, Duc Hoa District, Long An Province, Vietnam
Name of Investor:
TAN DUC INVESTMENT CORPORATION
▪ Address / Địa chỉ: Lot 8, Duc Hoa Ha Road, Tan Duc Industrial Park, Duc Hoa District, Long An
Province, Vietnam
▪ Tel: (+84.272)3761821
▪ Email: nhtduong@itagroup-vn.com
▪ Website: www.kcntanduc.vn
Name - Position - Mobile: - Email: Duong Nguyen Hoang Thuy – Deputy Sales Director- (+84)
899318986- nhtduong@itagroup-vn.com
Adjacent location
- 28 km from Hochiminh city/ the capital
- 23 km from Tan Son Nhat airport
- 20 km from Bourbon port
- 22 km from Trung Luong highway
Priority Sectors for
Investment













Electrical industry, industrial electricity and household electricity.
Electronic industry, informatics, media, telecommunications.
Motorcycle, automobile, tractor manufacturing industry.
Mechanical industry, precision mechanics, medical instruments.
Industry serving oil and gas exploitation and processing.
Manufacturing industry of construction steel, steel pipe, plating.
Furniture manufacturing industry, interior decoration, building
materials.
Industry of ceramics, glass, crystal.
Plastic and rubber technology (no latex processing).
Packaging, prepress, printing, paper industry (no pulp processing).
Garment and footwear industry.
Food and victuals processing industry.
Pharmaceutical and cosmetic manufacturing industry.
Minimum wage
4,160,000 VND/month
Lease term
Minimum Lease Area
▪ Stage 1: From…. Until October 28, 2055
▪ Stage 2: From…. Until 03/06/2058
3,000 m2
Limit for Construction
Height
No limit
Permitted Construction
Rate
60-70% land size
Land area
Factory Available for Rent
▪
▪
▪
▪
Total area: 545ha
Total leasable area: 388.5262 ha
Total vacant leasable area: 82ha
Total vacent area with full infrastructure ready to build factory: 70ha
▪ Total area: 199.093,22 m2
▪ Total vacant leasable area: 46.857m2
710
Operation Status
Occupancy Rate and
Number of Projects
No. of Korean projects
Lease fee
Operating fee
▪ In operation
▪ Stage 1: 94%, Stage 2: 63.15%
▪ 220 projects
▪ 10
▪ Land lease fee: 185-200 USD/m2 (VAT not included)
▪ Factory lease fee: 2.6-2.8 USD/m2/month
▪ Management fee: 10,018 VND/m2/year
▪ Electricity fee: according to the price of Vienam Electricity Company
3
▪ Water fee: 14,277 VND/m
▪ Wastewater treatment fee:
3
“Class A” Standard according to “Letter: 394/CV-TADICO 22”: 4,968 VND/m
3
“Class B” Standard according to “Letter: 393/CV-TADICO 22”: 12,790 VND/m
▪ Waste treatment fee: tenants will sign the contract directly with the service suppliers
INFRASTRUCTURE AND FACILITY
Tan Duc E-city is planned and designed on an area of 387 hectares, which includes homes, villas, apartments and flats. It features lovely
green landscaping and it guarantees to satisfy the strictest criterion of a green urban and an ideal living environment. The contemporary
urban and residential infrastructure system offers tree-lined roads; street lights; a central park with a beautiful 10ha lake surrounded by
green trees; an underground electricity system; a modern information technology infrastructure to supply cable TV and high speed
internet; and a water supply and treatment facility.
Additionally, there is a modern public service infrastructure, which includes schools, a sports complex, a commercial center,
supermarkets, an entertainment area, and medical clinics and hospitals.
Regarding safety and security, TTG employs a Security Team of 100 trained and well-equipped individuals who are
dedicated, responsible, polite and enthusiastic.
711
Layout plan
712
LONG HAU INDUSTRIAL PARK
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Sectors
Ấp 3, xã Long Hậu, huyện Cần Giuộc, tỉnh Long An
Name of Investor: Long Hau Company
▪ Address: Long Hau Commune, Can Giuoc District, Long An Province
▪ Tel: (+84) 906 938 599
▪ Email : sales@longhau.com.vn
▪ Website: https://longhau.com.vn/
Name - Position - Mobile: - Email:
Ms Phuong Anh – Korea Desk : (+84) 989 098 288 ;
Email: anh.tp@longhau.com.vn
Adjacent location
- Distance from the center of District 1, HCMC: 19 km
- Distance from Tan Son Nhat airport: 25 km
- Distance from Saigon Hiep Phuoc port: 03 km
- Long An International Port: 22 km
- Distance from Ben Luc - Long Thanh Expressway: 05 km
Priority Sectors for
Investment
Investment Restricted
Sectors
Minimum wage
Lease term
Thời hạn cho thuê
Minimum Lease Area
Limit for Construction
Height
Permitted Construction
Rate
Land area
[Diện tích đất]
Factory Available for Rent
Group of industries that cause less environmental pollution:
Mechanical engineering, metallurgy, food processing, beverage,
supporting industries; Projects on garment production, chemical,
pharmaceutical and cosmetic manufacturing industries; Instruments
manufacturing, medical equipment, packaging, electrical-electronic
assembly...
Group of industries causing environmental pollution.
4.160.000 VND/ month
▪ June 17, 2057
▪ Extended Long Hau Industrial Park: Land use term until December 21, 2059
▪ Long Hau 3 Industrial Park: Land use term until June 21, 2066
Ready-built factory: From 160 m2
- Industrial land: From 5,000 m2
Long Hau Industrial Park:
- Factory and warehouse area: Average number of floors: From 02-05 floors.
- Area of administrative and service works: Average number of floors: From 02-05 floors.
Extended Long Hau Industrial Park:
- Factory and warehouse area: Building height: From 02-05 floors.
- Area of administrative and service works: Building height: From 09 to 12 floors.
Long Hau Industrial Park 3-phase 1:
- Factory and warehouse area: Maximum building height: 05 floors.
- Area of administrative and service works: Maximum building height: 09 floors.
- Factory and warehouse area: ≤70%
- Area of administrative and service works: ≤45%
- Percentage of trees in the factory premises: ≥20%
- Percentage of trees in the premises of administrative and service works: ≥30%
▪ Total area: 411,31 ha.
▪ Total leasable area: 36,4 ha
▪ Total vacant leasable area: 36,4 ha
▪ Total area with full infrastructure ready to build factory: 36,4 ha
▪ Total area:
Ready-built factory: 73,700 m2
High-rise factory: 40,000 m2
▪ Total vacant leasable area:
Ready-built factory: 21,000 m2
713
High-rise factory: Phase1: 6,900 m2, Phase 2: 20,000 m2
Operation Status
Occupancy Rate and
Number of Projects
No. of Korean projects
Lease fee
Operating fee
In operation: Long Hau Industrial Park + Long Hau Industrial Park expansion: 249.33 ha; Long Hau
3 Industrial Park: 26.5 ha. KCN Long Hậu 3: đã giải phóng mặt bằng 117,7836,8 ha/ 123,9825 ha,
đạt 95%.
- Long Hau Industrial Park: 100%.
- Expanded Long Hau Industrial Park: 100%.
- Long Hau 3 Industrial Park: 55%.
▪ Total 192 projects include:
143 Enterprises lease land, 49 Enterprises rent factories.
▪ 23 projects
▪ Land lease fee : 260 USD/ m2
▪ Factory lease fee: 5 USD/ m2
▪ Management fee: Infrastructure fee: 0.042 USD/m2/month
▪ Electricity fee: According to the price of EVN Can Giuoc
▪ Water fee: 9,020 VND/m3
▪ Wastewater treatment fee: 8,040 VND/m3
▪ Waste treatment fee: N/A
INFRASTRUCTURE AND FACILITY
-
-
In Long Hau Industrial Park, there are HD Bank, Vietin Bank, BIDV, Shinhan Bank...; Ben Luc Customs Branch –
Customs Department of Long Hau Industrial Park; Large logistics units such as SLP, Logos, Cobi; The accommodation
area is 6.1ha wide with full facilities; supermarket; child school; clinic; gridiron; Police; Fire and Rescue Team; Post and
telecommunications infrastructure; power supply; adequate water supply to the enterprise's land plot and factory.
Near Long Hau Industrial Park, there are schools from primary to high school in Can Giuoc district, Nha Be district,
Hiep Phuoc vocational training school...
714
AN THANH INDUSTRIAL ZONE
GENERAL INFORMATION
Investor
Contact Person
Location
Investment Sectors
Minimum wage
Lease term
Minimum Lease Area
Permitted Construction
Rate
Land area
Factory Available for Rent
Operation Status
Phu An Thanh - Long An Company Limited
▪ Address / Address: Phu An Thanh Industrial Park, TL 830, An Thanh Commune, Ben Luc District,
Long An Province.
Tel: 02723655747
▪ Email: businessanhpat@pat-ip.com
▪ Website: pat-ip.com
Nguyen Thanh Quang – Deputy Director - 0903808385 – quan.nguyen@pat-ip.com
Adjacent location
- Distance from the city. Ho Chi Minh City: 35 km
- 40 km from the airport
- 40 km from the sand port
- Distance from station/national road/ 06 km
Priority Sectors for
Investment
Investment Restricted
Sectors
▪ Giai đoạn 1: From 2007 to 2057
2500m2
70%
▪
▪
▪
▪
Total area: 307ha
Total leasable area: 211,74ha
Total vacant leasable area: 22,47ha
Total area with full infrastructure ready to build factory: 211.74 ha
▪ Total area: None
▪ Total vacant leasable area: None
▪ Active
▪ 85,46%
▪ 57 Projects
No. of Korean projects
▪ 7 Projects
Operating fee
Pollution industry.
Area II: 4.160.000 VND/Month
Occupancy Rate and
Number of Projects
Lease fee
Clean industry, Advanced technology
▪ Land lease fee: 185 USD – 198 USD.
▪ Management fee: 1300VND/m2/month
▪ Electricity fee: According EVN
▪ Water fee: 13.210VND/m3
▪ Wastewater treatment fee: 11.300 – 17.535 VND/m3
715
Layout plan
716
TAN KIM INDUSTRIAL PARK
GENERAL INFORMATION / THÔNG TIN TỔNG QUÁT
JMP5+8RX, QL50, Tan Kim, Can Giuoc, Long An
Address
TAN KIM INDUSTRIAL AND RESIDENTIAL AREA INFRASTRUCTURE
DEVELOPMENT CO., LTD
▪ Address / Address: Tan Phuoc KP, Can Giuoc TT, Can Giuoc District, Long An Province
Tel: 0272 3875814
▪ Email: bql.kcn@tankim.com.vn
▪ Website: https://www.tankim.com.vn/
Investor
Vo Thi Kim Chi - Assistant Director- 0909801518-Chi.vo@haithanh.com.
Contact Person
Location
-
Investment Sectors
Minimum wage
Adjacent location
15 km from Ho Chi Minh city
- 20 km from Tan Son Nht airport
- 15 km from Long An International port
- 12 km from Hiep Phuoc port
- 16 km from Sai Gon port
Priority Sectors for
Industry causes less environmental pollution
Investment
Investment Restricted
Industry pollutes the environment
Sectors
[Mức lưong tối thiểu vùng] Area II: VND 4,160,000/month
Lease term
Thời hạn cho thuê
Minimum Lease Area
To 25/7/2058
Limit for Construction
Height
- Factory construction area: Max 19m
- Operating area: Up to 19m
Permitted Construction
Rate
Allowed Building Rate
- Factory construction area: 60%
- Operating area: 40%
Land area
Factory Available for Rent
Operation Status
Occupancy Rate and
Number of Projects
No. of Korean projects
Lease fee
It has been filled, there is no more land for rent
▪
▪
▪
▪
Total area: 104.1 ha
Total leasable area: 69,87 ha
Total vacant leasable area: full
Total area with full infrastructure ready to build factory:full
▪ Total area 11.577m2
▪ Total vacant leasable area: full
▪ Active
▪ 96.1 %
▪ 27 projects
None
▪ Land lease fee: Currently, the Industrial Park has no industrial land for lease
▪ Factory lease fee: 66,000 VND - 92,000 VND depending on the rental location
717
Operating fee
▪ Management fee: 10,000 VND/m2 excluding VAT [Management fee]
▪ Electricity fee: [Electricity fee]
+ Normal price bracket: 1,555 (VND/ Kwh)
+ Peak price bracket: 2,871 (VND/Kwh)
+ Low price bracket: 1,007 (VND/ Kwh
▪ Water fee: [Water fee]: 13,500 VND/m3
▪ Wastewater treatment fee: [Wastewater treatment fee] without VAT
+ Standard treatment: 9,000 VND/m3
+ Direct waste connection (< 5m3/day.night): 11,000 VND/m3
+ Wastewater exceeding standard (Cod < 200mg/l): 17,000 VND/m3
+ Wastewater exceeding standard (Cod > 200mg/l): 50,000 VND/m3
▪ Waste treatment fee:[Waste treatment fee] according to the contract with the supplier
718
[- This Page is intentionally left blank -]
719
NAM DINH
720
INVESTMENT ENVIRONMENT IN NAM DINH
GENERAL INFORMATION
Area, Population
▪ Area: 1,668 km2
▪ Population: 1.877 million (2022 statistic)
Geographical Location
▪ Nam Dinh is located in the southern center of the Red River Delta at coordinates 19 054’ to
20040’ North latitude and from 105055’ to 106045 East latitude.
▪ Distance from Hanoi: 90km, from Hai Phong: 75km, from Minh City: 1,058km, from Da
Nang: 515km.
Adjacent provinces
▪ The North is adjacent to Thai Binh province, the South is Ninh Binh province, the
northwest is adjacent to Ha Nam province, The East is adjacent to the sea (the Gulf of
Tonkin).
GRDP
Industry growth
PCI
2022 statistic:
▪ Real GRDP: 91,966 billion VND
(3.96 billion USD)
▪ GRDP growth: 9.07%
▪ GRDP per capita: 2,150 USD/year
▪ Economic structure:
- Industry - Construction: 42,56%;
- Agriculture. forestry and fishery: 19,39%
- Service: 34.78%;
- Tax on Goods: 3.8%
2022 statistic:
▪ Industry - Construction growth: 13.11%
▪ Agriculture, forestry and fishery growth: 3.9%
▪ Service growth: 7.47%
▪ Score: 64.99 – ranked 24 out of 63 cities and provinces in Vietnam. (2021)
SOCIAL INFRASTRUCTURE
▪ Roadway:
- Main highways: Cau Gie-Ninh Binh Expressway through Nam Dinh province is about 35
minutes by car from Nam Dinh city.
- National highway routes such as: National Highway 10, National Highway 37B, National
Highway 38B, National Highway 21, National Highway 21B have been built to ensure traffic
connection with the Northern Delta provinces and the center of Hanoi City.
- The trunk road connects the marine economic zone with the Cau Gie - Ninh Binh expressway
(Provincial road 490B); coastal road through Nam Dinh province are under construction, when
completed, have greatly contributed to promoting socio-economic development, ensuring
national security, international integration of the province.
Transportation
▪ Railway:
- The North-South railway through Nam Dinh province is 41.2km long, single track, 1,000mm
wide, mainly serving passengers going to/from Nam Dinh station from central and southern
provinces.
- The North-South high-speed railway route has been planned to pass through the area of
Nam Dinh province about 36km.
▪ Waterway:
- The central river system passes through the province with a total length of 257km including:
Red river, Dao river, Ninh Co river, Day river, Quan Lieu canal with many national important
inland waterway transport routes passing through the province such as Ba Lat - Hanoi route
(through Red River system); Lach Giang - Hanoi route (through the Red river and Ninh Co
721
river system); Quang Ninh - Ninh Binh route (through the Red River, Dao River and Day river
system) and Cua Day - Ninh Binh route (through the Day river system);
- The local river system is 278km long: Most of the rivers managed by the locality pass through
the saltwater sluices under the dike so limit static, only allowing ships <100T to pass through,
these rivers are mainly for transportation with short distances in each district, the main routes
are of low technical grade IV and grade V. The system of transport routes mainly serves the
demand of transporting agricultural products, construction materials between the inner
districts, connecting with the waterway system managed by the central government to form a
smooth and continuous waterway system.
▪ Other:
- Main airport: None.
- Routes to the airport:
+ National Highway 10 to Cat Bi airport;
+ National Highway 21, National Highway 21B to Noi Bai airport.
Electricity
Supplied from the national power network
Water
- Water price: According to general regulations.
+ Water price for production activities: 13,500 VND/m3
+ Domestic water for residential households: 8,200 VND/m3.
Education
- In Nam Dinh province, there are 16 vocational intermediate schools, colleges and
universities, in the school year 2021-2022 there are 34,331 pupils and students, accounting for
9.62% of the total number of students.
- Nam Dinh city has a vocational training and job introduction center.
Medicare
▪ 08 provincial hospitals, 10 district hospitals and 01 private hospitals
INVESTMENT CONDITION
Human resource
▪ 57.9% of population are in the working age (2022)
Education level
▪ Trained labor rate: 75,5% (2022)
Salary
▪ The minimum salary for the province is applied as follows:
- Area II: including: Nam Dinh city;
- Area III: including: Giao Thuy; Hai Hau, Nghia Hung, Xuan Truong, Nghia Hung, Nam
Truc, Truc Ninh, Vu Ban, Y Yen, My Loc District
▪ The lowest wage for trained labor (including those trained by the enterprises) must be at
least 7% higher than the above referenced basic salary
Investment incentives
▪ Investment procedures shall be settled at a focal agency; the time is greatly shortened
compared to general regulations; Investors do not have to pay any service fees except for the
prescribed fees.
▪ Investment incentives as prescribed by the Vietnamese Government apply.
▪ In addition to the general regulations, large-scale and important projects are researched by
the provincial government in collaboration with investors and submitted to the Government
for specific policies to be applied.
Fields Attracting Investment
▪ Prioritized projects: Infrastructure of industrial zones and clusters; high-tech industries;
spare part manufacturing industry, automobile assembly, electrical and electronic;
pharmaceutical production; other industries; High-tech agriculture; trade, service, high-class
entertainment; logistics services; education and training services; health care and medical
services...
722
Map
Contact
Department of Planning and Investment
▪ Address No. 172, Han Thuyen Street, Nam Dinh City, Nam Dinh Province City
▪ Tel: (84) 228.3.645.227
Website:http://sokhdt.namdinh.gov.vn
▪ Email: sokhdt@namdinh.chinhphu.vn
723
LIST OF INDUSTRIAL ZONES IN NAM DINH
No
Total Area (ha)
Occupancy Rate
Status
1
My Trung Industrial Zone
Industrial zone Name
150
30%
In operation
2
Hoa Xa Industrial Zone
300
100%
In operation
3
Bao Minh Industrial Zone
215
100%
In operation
4
Phase I: 520
11.5%
5
Rang Dong Textile Industrial Zone
(Aurora IP)
Hong Tien Industrial Zone
198.03
Under Land Clearance
Process
Finding Developers
6
My Thuan Industrial Zone
113.72
Finding Developers
7
Trung Thanh Industrial Zone
Finding Developers
8
Xuan Kien Industrial Zone
Finding Developers
9
Viet Hai Industrial Zone
Finding Developers
NAM DINH’S LOCATION MAP OF INDUSTRIAL ZONES
724
MY TRUNG INDUSTRIAL ZONE
GENERAL INFORMATION OF INDUSTRIAL ZONE
Nam Dinh City, Nam Dinh Province
Address
Investor
Contact Person
Location
Investment Area
Bac Giang FuJi Development JSC
▪ Add: Song Khe-Noi Hoang Industrial Park (the Northern area), Bac Giang
▪ Tel: (84-204) 652 9 010/ (84) 918 273 656
▪ Website: http://fujiip.com/ko/
Mr. Giang – (84) 913 275 656 - giangnguyen@fujiip.com
- Land: 90 km from Ha Noi City Center to the South East, 90 km from Hai phong to the Southwest
- Seaport: 90 km from Hai Phong Sea Port to the North East
- Airport: 130 km from Noi Bai Airport and 100 km from Cat Bi Airport
Investment priorities Sectors
Manufacturing and assembling electric, electronic
product, mechanical, automobile and motorbike; textile
Polluted Sector
Investment Restricted Sectors
Minimum wage
Lease term
Minimum Lease Area
Limit for Construction
Height
Permitted Construction Rate
Planned area
Factory Available for Rent
[Area 2] According to Decree 90/2019/NĐ-CP dated 15th November 2019
▪ Start date: 2006
▪ End date: 2056
10,000 m2
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential
Planning regulation (QCXDVN 01: 2008/BXD)
▪ Total area: 150 ha
▪ Total Industrial land area: 103 ha
▪ Total area: NA
Operation Status
▪ In operation
Occupancy Rate and
Number of Projects
Number of Korean Projects
▪ 30%
▪ 14 projects
01 project
Lease fee
▪ Land lease fee: 60 USD/m2
▪ Management fee: 6,000 VND (~0.26 USD)/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: About 11,000 VND (~0.5 USD)/m3
▪ Wastewater treatment fee: Not constructed
▪ Waste Collection: 350,000 - 400,000 VND (~15- 18 USD)/m3
INFORMATION OF INFRASTRUCTURE AND FACILITY
Operating fee
Financial institution
Tax service, State finance
office
Customs Service
Agribank, Vietin Bank, BIDV
5 km from Nam Dinh Tax Office
Nam Dinh Customs Office within 4 km
108 km from Hai Phong Bonded Warehouse
Logistics
NA
Post office
4.3 km from Nam Dinh Post Office
Medicare
Nam Dinh General Hospital within 4 km
Police, public security
Inside Industrial Zones
Universities, training
facilities, etc.
Recruitment
Luong The Vinh University
Nam Dinh Technical Pedagogy University
Supported by Nam Dinh Management Board Industrial Zone
Worker dormitory
NA
Worker's child education
facility
NA
725
One-stop service
NA
Road Width
NA
Communication
Infrastructure of Industrial
Zone
Emergency Power generator
Fire-fighting facility
Telephone network and high speed internet by VNPT
None
Set up across industrial zones. The distance between fire hydrants is 150m.
Layout Plan
726
LIST OF PROJECTS IN INDUSTRIAL ZONE
No
Company Name
Nationality
Business line
1
Vietnam Headwork Co., Ltd
JAPAN
Manufacture motor vehicles
2
YSS Garment Company Limited
HONGKONG
Manufacture of costumes
3
Nam Phuong Hong Joint Stock Company
Vietnam
Food Service
4
Vietnam
Producing products from prefabricated metal (except
machinery and equipment)
5
Hoang Anh Steel Structure and Lifting
Equipment Joint Stock Company
Cuu Long Investment Joint Stock Company
6
Trung Duc Trading and Trading Co., Ltd
Vietnam
7
Phu My Hai private enterprise
Vietnam
Producing and distributing electricity, gas, hot water,
steam and air-conditioning
Manufacture motor vehicles
8
Dai Doan Ket Import Export Joint Stock
Company
Vietnam
9
Phat Cuong Joint Stock Company
Vietnam
10
Tan Dan Phu Steel Joint Stock Company
Vietnam
11
Song Hong Garment Joint Stock Company
Vietnam
Processing wood and producing products from wood,
bamboo of various species (except beds, wardrobes,
tables, chairs); Producing products from straw,
plaiting materials and plaiting materials
Producing products from prefabricated metal (except
machinery and equipment)
Producing products from prefabricated metal (except
machinery and equipment)
Weaving
12
An Khanh Limited Company
Vietnam
Warehousing and support activities for transportation
13
Nam Lien Joint Stock Company
Vietnam
Producing packaging and anti-counterfeit stamps
14
PIM Vina Co., Ltd.
Korea
Instrumentation and control; engines and turbines;
pressure equipment and accessories; spare parts for
motor vehicles and vehicle engines, including
727
HOA XA INDUSTRIAL ZONE
GENERAL INFORMATION OF INDUSTRIAL ZONE
My Xa and Loc Hoa Commune, Nam Dinh City, Nam Dinh province
Address
Investor
▪ Nam Dinh IZ Development and Exploitation Infrastructure Company
․ Address: Pham Ngu Lao Road - Hoa Xa Industrial Zone - Nam Dinh province
․ Tel: (84-228) 3 682 539
Ms. Do Thi Huong - (84-228) 3682 539 - huongdt81.bql@gmail.com
Contact Person
Location
- National Road 10 connecting provinces from Quang Ninh to Ninh Binh links with national road 1
- the main traffic line at the border of Nam Dinh and Ninh Binh
- 90 km from Hai Phong Sea Port to the North East
- 130 km from Noi Bai Airport and 100 km from Cat Bi Airport
Investment Area
Investment priorities
Manufacturing and assembling electric, electronic product, mechanical,
Sectors
automobile and motorbike; textile
Investment Restricted
Polluted Sector
Sectors
[Area 2] According to Decree 90/2019/NĐ-CP dated 15th November 2019
Minimum wage
▪ Start date: 2003
▪ End date: 2053
10,000 m2
Lease term
Minimum Lease Area
Limit for Construction
Height
Permitted Construction Rate
Planned area
Factory Available for Rent
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential
Planning regulation (QCXDVN 01: 2008/BXD)
▪ Total area:
- Total Industrial land area: 285.27 ha
- Total leasable area: 204.34 ha - currently 100% industrial land is leased. Instead, factory lease and
transfer is available.
▪ Total area: 300 ha
Operation Status
▪ In operation
Occupancy Rate and
Number of Projects
Number of Korean Projects
▪ 100%
▪ 126 projects
09 companies
▪ Land lease fee: 65 USD/m2▪ Factory lease fee: 4 USD/m2/month
▪ Payment:
- Make a deposit of 20% of the infrastructure rental within 07 days as
from the signing date of
the MOU
- Pay 50% of the infrastructure rental within 07 days as from the signing date of the contract
- Pay 30% of the infrastructure rental within 07 days as from the land handover date
▪ Management fee: 2,500 VND (~0.11 USD)/m2/year
Operating fee
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 11,500 VND (~0.5 USD)/m3
▪ Wastewater treatment fee: 6,500 VND (~0.29 USD)/m3 (Excluding environment protection fee)
▪ Waste treatment fee: 200,000 VND (~9 USD)/m3 with regular solid waste
INFORMATION OF INFRASTRUCTURE AND FACILITY
Lease fee
Financial institution
Tax service, State
finance office
Customs Service
Agribank, Vietin Bank, BIDV
5 km from Nam Dinh Tax Office
Nam Dinh Customs Office within 4 km
108 km from Hai Phong Bonded Warehouse
Logistics
NA
Post office
4.3 km from Nam Dinh Post Office
Medicare
Nam Dinh General Hospital within 4 km
728
Police, public security
Inside Industrial Zones
Universities, training
facilities, etc.
Recruitment
Luong The Vinh University
Nam Dinh Technical Pedagogy University
Supported by Nam Dinh Management Board Industrial Zone
Worker dormitory
NA
Worker's child
education facility
One-stop service
NA
Road Width
NA
Communication
Infrastructure of
Industrial Zone
Emergency Power
generator
Fire-fighting facility
NA
Telephone network and high speed internet by VNPT
None
Set up across industrial zones. The distance between fire hydrants is 150m.
Layout Plan
729
Location Map
Actual View
730
LIST OF PROJECTS IN INDUSTRIAL ZONE
No
Company Name
Nationality
Business line
1
Nam Dinh Industrial Zone Infrastructure
Development and Development Company
Mai Van Dang Company Limited
Vietnam
Real estate business, infrastructure construction
Vietnam
Manufacture motor vehicles
3
Phu Hai Company Ltd.
Vietnam
Manufacture of electrical equipment
4
Phu Thinh private enterprise
Vietnam
5
Dong Thanh partnership
Vietnam
Producing machines and equipment not classified in
any category
Manufacture motor vehicles
6
Thai Quan Company Ltd.
Vietnam
Manufacture motor vehicles
7
Quang Toan Company Limited
Vietnam
Producing products from rubber and plastic
8
Thanh Nguyen Company Limited
Vietnam
Producing products from rubber and plastic
9
Minh Hong Company Limited
Vietnam
Producing products from rubber and plastic
10
Najimex Joint Stock Company
Vietnam
11
Nam Dinh Water Trading Co., Ltd
Vietnam
Processing wood and producing products from wood,
bamboo of various species (except beds, wardrobes,
tables, chairs); Producing products from straw,
plaiting materials and plaiting materials
Exploiting, treating and supplying water
12
Vietnam
Manufacture motor vehicles
13
Nam Dinh Industrial Goods Trading Joint
Stock Company
Hainan Company Limited
Vietnam
Manufacture motor vehicles
14
Doan Ket Company Limited
Vietnam
Producing beds, wardrobes, tables, chairs
15
Nam Dinh Electrical Construction Company
Ltd.
Vinh Ky Company Ltd.
Vietnam
Manufacture of electrical equipment
Vietnam
Producing products from rubber and plastic
17
Xuan Tung Company Limited
Vietnam
Producing products from rubber and plastic
18
Duy Khanh Transport Joint Stock Company
Vietnam
19
CP Thuy Dat
Vietnam
Producing products from prefabricated metal (except
machinery and equipment)
Manufacturing and processing food; textile
20
Thong Thong Company Limited
Vietnam
Manufacture of electrical equipment
21
Korea
Manufacture of costumes
Vietnam
Producing beds, wardrobes, tables, chairs
23
Garnet Nam Dinh Garment Company
Limited
Nam Dinh Forest Products Joint Stock
Company
Truong Phat Company Limited
Vietnam
Manufacture motor vehicles
24
Viet Han Electrical Technology Co., Ltd
Vietnam
Manufacture of electrical equipment
25
Phu Duc Company Limited
Vietnam
26
Dai Tan Company Limited
Vietnam
27
Nam Dinh Food Industry Joint Stock
Company (NADA Beer Joint Stock
Company)
CP Tasco Company
Vietnam
Producing machines and equipment not classified in
any category
Producing products from prefabricated metal (except
machinery and equipment)
Producing beverages
Vietnam
Producing products from other non-metallic minerals
Vietnam
30
Nam Dinh Investment and Development
Bank Branch
Tan Truong Phat Company Limited
Vietnam
Financial service activities (excluding insurance and
social insurance)
Manufacture of electrical equipment
31
Nam Tan Plastic Joint Stock Company
Vietnam
Producing products from rubber and plastic
32
Mai Huong Commercial Joint Stock
Company
Vietnam
2
16
22
28
29
731
Son Nam Textile and Garment Joint Stock
Company
ARKSUN - Phu Thanh Limited Company
Vietnam
Vietnam
Manufacture of costumes
Vietnam
36
Truong Tho Pharmaceutical Joint Stock
Company
Vinh Truong Joint Stock Company
Vietnam
Producing medicine, pharmaceutical chemicals and
pharmaceutical materials
Producing paper and paper products
37
Thanh Hai Company Limited
Vietnam
Manufacturing and processing food
38
CP Hung Vuong Company
Vietnam
39
Hang Quyen Company Limited
Vietnam
40
Nam Dinh Garment Joint Stock Company
Vietnam
Producing products from prefabricated metal (except
machinery and equipment)
Producing products from prefabricated metal (except
machinery and equipment)
Manufacture of costumes
41
Hai Hoa Company Limited
Vietnam
Manufacturing and processing food
42
Duc Phuong Company Limited
Vietnam
Manufacture motor vehicles
43
Minh Dan Pharmaceutical Joint Stock
Company
Viet Anh Company Limited
Vietnam
Vietnam
Producing medicine, pharmaceutical chemicals and
pharmaceutical materials
Producing beds, wardrobes, tables, chairs
UNIVERSAL CANDLE VIETNAM CO.,
LTD
Nam Duoc Company Limited
China
Other manufacturing and processing industries
Vietnam
Producing medicine, pharmaceutical chemicals and
pharmaceutical materials
Weaving
33
34
35
44
45
46
47
Hoang Dung Textile and Garment Company
Limited
Hong Phat Company Limited
Vietnam
Vietnam
50
Nam Dinh Silk Weaving Joint Stock
Company
Nam Dinh Textile and Garment Corporation
Producing products from prefabricated metal (except
machinery and equipment)
Producing medicine, pharmaceutical chemicals and
pharmaceutical materials
Weaving
Vietnam
Weaving
51
Dinh Cong Company Limited
Vietnam
Weaving
52
Vietnam
Financial service activities (excluding insurance and
social insurance)
53
Bank for Agriculture and Rural
Development of Nam Dinh, North of Nam
Dinh Branch
Tran Hong Quan Trade Co., Ltd
Vietnam
54
Chau Thanh private enterprise
Vietnam
Producing and distributing electricity, gas, hot water,
steam and air-conditioning
Producing products from rubber and plastic
48
Vietnam
Weaving
Vietnam
49
55
DHTEX textile and garment co.ltd
Italy
Weaving
56
ARKSUN Vietnam Joint Stock Company
China
Manufacture of costumes
57
CP Thuy Binh Company
Vietnam
Weaving
58
Vietnam
59
Viet Trieu Construction Mechanical Joint
Stock Company
Minh Quang Company Limited
60
CP Duc Thang
Vietnam
61
X20 Nam Dinh Company Limited
Vietnam
Producing machines and equipment not classified in
any category
Manufacture electronic products, computers and
optical products
Producing products from prefabricated metal (except
machinery and equipment)
Weaving
62
Vietnam
Producing beverages
63
Tuyet Thanh Production and Trading
Service Co., Ltd
TCE VINA DENIM Joint Stock Company
Korea
Weaving
64
DongYang ST Vina Co., Ltd
Korea
65
Northern Gas Trading Joint Stock Company
- Duyen Hai Branch
Bao Minh Company Limited
Vietnam
66
Vietnam
732
Metal production
67
Dan Phu commercial private enterprise
Vietnam
68
Nam Ninh Packaging Joint Stock Company
Vietnam
Producing products from prefabricated metal (except
machinery and equipment)
Packaging manufacturer
69
D.F Zin Company Limited
Korea
Manufacture of costumes
70
Thanh Binh Company Limited
Vietnam
Producing products from rubber and plastic
71
Vietnam Industrial Gas Co., Ltd
Vietnam
Other manufacturing and processing industries
72
Nam Dinh Granite Joint Stock Company
Vietnam
Producing products from other non-metallic minerals
73
Nam Dinh YoungOne Company Limited
Korea
Textile
74
Thuy Binh Wool Joint Stock Company
Vietnam
Lodging
75
TRITON LTD
Korea
Manufacture of costumes
76
Anh Phat Company Limited
Vietnam
Weaving
77
Vietnam
Producing solar cells, products using solar energy
Vietnam
Manufacturing and processing food
Vietnam
80
Thanh Thuy Green Energy Joint Stock
Company
Huong Giang Commercial Joint Stock
Company
Nam Dinh Enterprise Development Support
Joint Stock Company
Private enterprise Tam Huy Hoang
81
Honlei Duc Ha Joint Stock Company
Vietnam
Wholesale (excluding automobiles, motors,
motorcycles and other motor vehicles)
Producing products from prefabricated metal (except
machinery and equipment)
Manufacture motor vehicles
82
Vietnam
83
Nam Dinh Steel Wire Rope Joint Stock
Company
Dong Nam Woolen Textile Co., Ltd
China
Producing products from prefabricated metal (except
machinery and equipment
Weaving
84
Nam Dinh KATOH Company Limited
JAPAN
Producing products from rubber and plastic
85
Vietnam
86
Vietnam Joint Stock Commercial Bank for
Industry and Trade - ND Branch
Cheonghak Gloves Vina Co., Ltd
Korea
Financial service activities (excluding insurance and
social insurance)
Manufacture of costumes
87
DNA Investment Joint Stock Company
Vietnam
Manufacture of costumes
88
Designer Textile Vietnam Co., Ltd.
Weaving
89
Nam Ha Pharmaceutical Joint Stock
Company
Hoang Long Company Limited
NEW
ZEALAND
Vietnam
78
79
90
91
92
93
94
95
96
97
98
99
Vietnam
Vietnam
Producing medicine, pharmaceutical chemicals and
pharmaceutical materials
Producing products from prefabricated metal (except
machinery and equipment)
Producing products from other non-metallic minerals
Unburnt Brick Material Joint Stock
Company 567
Hoang Lien Pharmaceutical Co., Ltd
Vietnam
Phuong Thuy Import Export Trading Joint
Stock Company
International Auto Parts Co., Ltd
Vietnam
Anh Duc Commercial Wood Joint Stock
Company
Dai Loc Nam Dinh steel wire mesh Co., Ltd
Vietnam
Luc Bao Fiber and Synthetic Plastic Joint
Stock Company
Tan Phu prestressed concrete one member
limited company
Vietnam Textile Corporation
China
Producing products from prefabricated metal (except
machinery and equipment)
Producing chemicals and chemical products
Vietnam
Producing products from other non-metallic minerals
Vietnam
Weaving
Vietnam
Vietnam
Vietnam
Producing medicine, pharmaceutical chemicals and
pharmaceutical materials
Weaving
Sale and repair of automobiles, motors, motorbikes
and other motor vehicles
Vietnam
101
Phong Linh Transportation and Trading Co.,
Ltd
ETC Investment and Technology JSC
Vietnam
Environmental technology
102
Tran Tin Production and Trading Co., Ltd
Vietnam
Mechanical
100
733
103
Aelim Vina Co., Ltd
Korea
104
Vietnam
105
Thuan Phat Production and Trading Service
Co., Ltd
Viet Thuan Joint Stock Company
China-Vietnam
Manufacture of costumes
106
Hong Phu Gia Textile Co., Ltd
Vietnam
Textile
107
Phuc Vinh Transportation Co., Ltd
Vietnam
Producing products from other non-metallic minerals
108
Duc Chuong Company Limited
Vietnam
Laundry, cleaning textile and fur products
109
Denmark
Manufacture of costumes
110
Specter Vietnam Garment Technology Co.,
Ltd
Santerlon Travel Goods Co., Ltd
China
Producing suitcases, bags
111
Thanh Bach Shoes Co., Ltd Vietnam
China
Producing shoes
112
Nam Dinh Fertilizer Joint Stock Company
Vietnam
Fertilizer
113
Won Young Vina Co., Ltd
Korea
114
Hoa Son Company Ltd.
Vietnam
115
Viet Nam Nam Dinh Company Limited
116
Viet Thai Joint Stock Company
Vietnam
117
Tan Long Steel Pipe Limited Company
Vietnam
118
Vietnam
119
Bao Loc Trade and Production Joint Stock
Company
Giang Nam Cat Joint Stock Company
120
Hanh Thuy Trade & Production Co., Ltd.
Vietnam
124
Nox Vina Co., Ltd
125
Forelink Limited
126
Sing Yick One Member Company Limited
Vietnam
734
Manufacture motor vehicles
BAO MINH INDUSTRIAL ZONE
GENERAL INFORMATION OF INDUSTRIAL ZONE
Vu Ban district, Nam Dinh province
Address
Investor
Contact Person
▪ Nam Dinh IZ Development and Exploitation Infrastructure Company
․ Address: Pham Ngu Lao Road - Hoa Xa Industrial Zone - Nam Dinh province
․ Tel: (84-228) 3 682 539
Ms. Do Thi Huong - (84-228) 3682 539 - huongdt81.bql@gmail.com
Location
- National Road 10 connecting provinces from Quang Ninh to Ninh Binh links with national road 1
- the main traffic line at the border of Nam Dinh and Ninh Binh
- 90 km from Hai Phong Sea Port to the North East
- 130 km from Noi Bai Airport and 100 km from Cat Bi Airport
Investment Area
Investment priorities
Manufacturing and assembling electric, electronic product, mechanical,
Sectors
automobile and motorbike; textile
Investment Restricted
Polluted Sector
Sectors
[Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019
Minimum wage
Lease term
Minimum Lease Area
Limit for Construction
Height
Permitted Construction Rate
Planned area
Factory Available for Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean Projects
Lease fee
▪ Start date: 2007
▪ End date: 2057
10,000 m2
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential
Planning regulation (QCXDVN 01: 2008/BXD)
▪ Total area: 215ha
▪ Total Industrial Land area: 104.37 ha
▪ Total area: NA
▪ In operation
▪ 100%
None
Land lease fee: 90 USD/m2
▪ Management fee: 0.3 USD/m2/year (fixed for 5 years)
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 11,400 VND (~0.5 USD)/m3 (household); 8,800 VND (~0.39 USD)/m3 (production)
▪ Wastewater treatment fee: Approximately 0.45 - 0.6 USD/m3 (excluding textile wastewater)
▪ Waste treatment fee: Approximately 0.36 USD/m3 (excluding textile wastewater)
▪ Waste Collection: 30 USD/ton
INFORMATION OF INFRASTRUCTURE AND FACILITY
Operating fee
Financial institution
Tax service, State finance
office
Customs Service
Logistics
Agribank, Vietin Bank, BIDV
14 km from Nam Dinh Tax Office
Nam Dinh Customs Office within 14 km
NA
Post office
11 km from Nam Dinh Post Office
Medicare
Nam Dinh General Hospital within 10 km
Police, public security
Inside Industrial Zones
Universities, training
facilities, etc.
Recruitment
Luong The Vinh University
Nam Dinh Technical Pedagogy University
Supported by Nam Dinh Management Board Industrial Zone
Worker dormitory
NA
735
Worker's child education
facility
One-stop service
NA
Road Width
NA
Communication
Infrastructure of Industrial
Zone
Emergency Power generator
Fire-fighting facility
NA
Telephone network and high speed internet by VNPT
None
Set up across industrial zones. The distance between fire hydrants is 150m.
Layout Plan
Location Map
Actual View
736
737
LIST OF PROJECTS IN INDUSTRIAL ZONE
No
Company Name
Nationality
Business line
1
Bao Minh Industrial Zone Infrastructure
Investment JSC
Nam Dinh Forest Products Joint Stock
Company
Sunrise spinning (Vietnam) Co., Ltd.
Vietnam
Vietnam
Construction and trading of infrastructure, waste water
treatment
Producing beds, wardrobes, tables, chairs
HONGKONG
Weaving
Japan
Manufacture of electrical equipment
2
3
China
Weaving
6
Branch of Sumi Vietnam wiring system Co.,
Ltd. in Nam Dinh province
Sunrise Luen Thai Textile and Dyeing Joint
Stock Company
Smart Shirts Vietnam Co., Ltd.
HONGKONG
Manufacture of costumes
7
Yulun Textile Weaving Co., Ltd (Vietnam)
China
Weaving
8
Padmac Vietnam Co., Ltd.
4
5
Manufacture of costumes
9
Smart Shirts Co., Ltd Bao Minh
USA
Manufacture of costumes
10
Junzhen Garment Co.Ltd
China
Manufacture of costumes
11
Sunrise Fabric (Vietnam) Co., Ltd.
China
Textile fibers
12
KAM HING PIECE WORKS CO., LTD
HONGKONG
Textile
13
Bao Minh Textile Joint Stock Company
Vietnam
Textile
14
Chentai Weaving Company Limited of
Northern Vietnam
Herberton private limited company
Seychelles
Apparel manufacturers
15
Textile
738
RANG DONG TEXTILE INDUSTRIAL ZONE
GENERAL INFORMATION OF INDUSTRIAL ZONE
▪ Rang Dong Town, Nghia Hung, Nam Dinh Province, Vietnam
Address
Investor
Rang Dong Infrastructure Investment and Development JSC.,
HEAD OFFICE
▪ Address: Lot HC3, Rang Dong Textile Industrial Park, Rang Dong Town, Nghia Hung, Nam Dinh
Province, Vietnam
▪ Tel: 02288856886
▪ Website: www.auroraip.vn
NORTHERN REGIONAL OFFICE
▪ Address: HCO Building 5th Floor, 44B Ly Thuong Kiet, Hoan Kiem, Hanoi, Vietnam
▪ Tel: 0247305468
Contact Person
Location
Investment Area
Minimum wage
Lease term
Minimum Lease Area
Limit for Construction
Height
Permitted Construction Rate
Planned area
Factory Available for Rent
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean Projects
Lease fee
SOUTHERN REGIONAL OFFICE
▪ Address: VTP Building, 2nd Floor, 8 Nguyen Hue Blv., Ben Nghe Ward, District 1, HCMC,
Vietnam
▪ Tel: 02839110981
▪ Ms. Nguyen Thi Quynh Trang – Sale Director cum. CEO’s assistant –
Mobile: (84) 8 3989 9988 - Email: trang.nguyenthiquynh@auroraip.vn
- Located within Ninh Co Economic Zone
- 50km from Nam Dinh City Center; 40 km from Ninh Binh City Center, 75 km from Thai Binh
City Center, 130 km from Hanoi City Center;
- 150km from Noi Bai International Airport (Hanoi); 145km from Cat Bi Airport (Hai Phong);
- 200km from Cai Lan Deep Seaport, 140km from Hai Phong Port, 10Km from Hai Thinh
Intermediary Port;
- 30km from Cao Bo intersector connecting to the Highway.
Investment priorities
Fabric manufacturing, Dying, Supporting industry
Sectors
Investment Restricted
No restriction
Sectors
[Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019
▪ Start date: 2015
▪ End date: 30 June 2065
5 ha
(Lease area below this threshold is subject to approval on case by case basis)
For administrative and service area: 3 – 5 floors
For factory area: below 5 floors
For administrative and service area: 30% - 40% (various among area)
For factory area: 45% (at max of 5 floors and adjusted with construction height in compliance with
national standard)
▪ Total area: 2,100 ha
- Phase I: 520 ha (2017 -2020: to make 1 billion meters of fabric in the area)
- Phase II: 850 ha (2023-2030: increase fabric production to 1.5 billion meters and complete full
supply chain in the area)
- Phase III: 657 ha (2031-2035: build modern city of trading and service for textile and fashion)
▪ Total vacant leasable area: 350 ha (Phase 1)
▪ Total area with full infrastructure ready to build factory: 520ha (Phase 1)
▪ Total area: Na
▪ In operation
1 project ~ Occupancy rate of 11.5%
None
▪ Land lease fee: 70 USD/m2/over project life
▪ Factory lease fee: Not applicable
▪ Payment:
739
- Method: One-time payment for full leasing term
- Period:
Deposit: 20% of full amount at the time of principle contract
1st period: 20% of full amount at the time of official contract
2nd period: 50% of full amount upon investment certificate
4th period: 10% of full amount upon land use right certificate
▪ Management fee: 0.3 USD/m2/year
Operating fee
▪ Electricity fee: At EVN’s list price
▪ Water fee: 0.4 USD/m3 for industrial purpose, 0.5 USD/m3 for living purpose
▪ Wastewater treatment fee: Upon feature of wastewater (average 1 USD/m3)
▪ Waste treatment fee: Upon feature of waste
INFORMATION OF INFRASTRUCTURE AND FACILITY
Financial institution
Tax service, State finance
office
Customs Service
JSC Bank for Foreign Trade of Vietnam (Vietcombank)
Vietnam Technological and Commercial JSC Bank (Techcombank)
Vietnam Bank for Agriculture and Rural Development(Agribank)
Vietnam Bank for Industry and Trade (VietinBank)
Bank for Investment and Development of Vietnam (BIDV)
30Km from District Tax Authorities and Treasury office
55Km from Province Tax Authorities and Treasury office
60Km from nearest Customs Agency
ICD is available within Logistic Area of IP
Logistics
Available within IP
Post office
Available within IP
Medicare
2Km from Rang Dong Town Medicare Center
14Km from Nghia Binh Town General Hospital
35Km from Nghia Hung District General Hospital
34Km from Nghia Hung District Police Station
A public security unit will be available within IP.
Training center is available within IP
Police, public security
Universities, training
facilities, etc.
Recruitment
Recruitment support service available
Worker dormitory
Worker dormitory available within IP
Worker's child education
facility
One-stop service
2Km from Rang Dong Kindergarten
Road Width
Communication
Infrastructure of Industrial
Zone
Emergency Power generator
Fire-fighting facility
Available
24m with six lanes
Optical cable, IDD network available
Not available
Available
Layout Plan
740
Location Map
Actual View
[- This Page is intentionally left blank -]
741
NGHE AN
742
INVESTMENT ENVIRONMENT IN NGHE AN
GENERAL INFORMATION
Area, Population
▪ Area: 16.486,49 km2
▪ Population: 3,4 million (2022 statistic)
Geographical Location
Nghe An is a located at latitude 18033' to 20001' North latitude, longitude 103052' to
105048' East longitude, in the center of North Central region of Vietnam; The East borders
the sea, the South borders Ha Tinh province, the North borders Thanh Hoa province, the
West borders the Lao People's Democratic Republic with 468 km of land border, the east
coast is 82 km long.
Adjacent provinces
▪ The East borders the sea, the South borders Ha Tinh province, the North borders Thanh
Hoa province, the West borders the Lao People's Democratic Republic.
GRDP
Industry growth
PCI
2022 statistic:
▪ GRDP: 176.000 billion VND (7.5 billion USD)
▪ GRDP growth: 9,08%
▪ GRDP per capita: 51,34 million VND (2.1 thousand USD)
▪ Economic structure:
- Industry - Construction: 33,8%;
- Agriculture. forestry and fishery: 22,7%;
- Service: 43,5 %.
2022 statistic:
▪ Industry - Construction growth: 10,96% %;
▪ Agriculture, forestry and fishery growth: 4,78%;
▪ Service growth: 10,77%;
▪ Score in 2022:
Ranked 23 out of 63 cities and provinces in Vietnam (Up 7 steps compared to 2021).
SOCIAL INFRASTRUCTURE
Transportation
▪ Roadway:
There are 8 national highways passing through the province. In which, there are 3 routes
along the North-South direction, 5 transverse routes in the East-West direction connecting
with Laos; There is a trans-Asia route from Laos through Thanh Thuy border gate to Cua
Lo and Dong Hoi ports. The North-South Expressway passing through the territory of
Nghe An province is 134 km long, with a scale of 6 lanes, expected to be completed and
put into use in mid-2024.
▪ Railway:
With 94 km, stretching from North to South. In which, Vinh Railway Station is rated as the
first class station, the third largest passenger and transportation station in the country.
▪ Waterway:
The existing Cua Lo port is a large-scale commercial port, with 06 main berths, 3 cargo
yards with an area of 9ha, loading and unloading capacity of over 10 million tons/year,
receiving ships of 30,000 DWT.
Cua Lo deep-water port is planned with 12 berths (ship size 30, 50, 100 thousand DWT),
of which 1 berth for ships of 30,000 DWT and 1 berth for ships of 50,000 DWT put into
operation by the end of 2025.
▪ Airlineway:
Vinh International Airport is less than 15 minutes drive from the city center. The airport
has the fastest growth rate in the country and is the main airport of the North Central
region; currently investing in more cargo terminals and establishing more domestic and
international routes.
743
Electricity
The national electricity grid has covered all 21 districts, cities and towns in the province.
Many hydropower projects have been completed and will be put into operation such as:
Ban Ve, Khe Bo, Hua Na, Ban Coc, Nhan Hac and dozens of other small and medium
hydropower plants to ensure stable power supply for production and living.
Water
The water supply can meet the production, service and daily activities of Nghe An
province. Particularly, Vinh city and surrounding areas have a water supply capacity of
90,000m3/day and is expected to increase to 100,000m3/day in the future.
Education
Nghe An is a province with a multi-disciplinary and multi-field vocational training system
with 06 universities, 11 colleges and nearly 70 professional and vocational training schools
in the fields of economics, engineering, vocational training, pedagogy, health, culture and
art ... fully meet the human resource needs of investors with the rate of trained workers
reaching over 65%.
Medicare
▪ Nghe An has a synchronous hospital network with modern equipment from the provincial
and district levels, regional general clinics and a relatively good commune and ward health
network. In which, there are 12 provincial hospitals to fully meet the medical examination
and treatment needs of the people and investors such as Nghe An General Hospital with a
scale of 1000 beds. High-tech hospitals as satellites for the North Central region such as:
Oncology, Cardiology, Obstetrics and Gynecology, Eye, Vinh International,...
INVESTMENT CONDITION
Human resource
▪ In 2022, the province's labor force aged 15 and over is 1,556 million people, of which
those being employed in the economy accounted for 98.7% of the provincial population.
The labor structure of Nghe An has shifted in the right direction, increasing the proportion
of employees in the industries - construction and services (accounting for 63.4%); The
number of employees working in the formal economic sector is increasing rapidly. Every
year, new jobs are created for 40-45 thousand people.
Education level
▪ In the period of 2021-2022, 129,028 people will be recruited and trained, including 9,581
people at college degrees; intermediate level 18,265 people; primary education, training for
less than 3 months 101,182 people; The average employment rate after graduation is over
80.7%; The rate of trained workers in 2022 will reach 67.7%, of which diplomas and
certificates will reach 27.4%; The rate of students graduating from middle and high
schools entering vocational training is 57 percent.
Salary
Investment incentives
The minimum salary for the province is applied as follows:
- Areas in regions where the region II minimum wage is applied: VND 4,160,000/month,
including: Vinh city, Cua Lo town and Nghi Loc and Hung Nguyen districts.
- Areas in regions where the region III minimum wage is applied: 3,640,000 VND/month,
including: Quynh Luu District, Yen Thanh, Dien Chau, Do Luong, Nam Dan, Nghia Dan
and Thai Hoa towns , Hoang Mai.
- The rest of Nghe An province applies the region IV minimum wage: 3,250,000
VND/month.
▪ Incentives according to government regulations:
The project is entitled to investment incentives according to the regulations of the
Government of Vietnam for industrial zones in the Southeast Economic Zone (applicable
to areas with extremely difficult socio-economic conditions), including:
- Corporate income tax: The tax rate of 10% is applied for the first 15 years; in which, tax
exemption for 04 years and 50% tax reduction for the next 9 years.
- Import and export tax: Exemption from import tax on goods to create fixed assets; Tax
exemption for 5 years for raw materials, supplies and components that cannot be produced
domestically.
▪ Incentives from the province:
Resolution No. 05/2021/NQ-HDND dated August 13, 2021 of the People's Council of
Nghe An province promulgates a number of policies to support investment in Nghe An
province, period 2021-2025, including:
744
- Support training costs 01 (one) time with the level of 2 million VND / 1 employee for the
project with a total investment of 2,300 billion VND and employing more than 2,000
employees;
- The provincial budget will support 50% of the cost of implementing investment
procedures in the investment preparation step, but not exceeding VND 200 million per
project since the project comes into operation.
Map
Contact
South-East Nghe An Economic zone Management Auhtority
▪ Address: No 362- Le Nin street, Hung Phuc Ward, Vinh City, Nghe An Province.
▪ Tel: (0238) 3 835 146
▪ Fax :
▪ Email: dongnameza@gmail.com
▪ Contact person:
745
LIST OF INDUSTRIAL ZONES IN NGHE AN PROVINCE
No
Industrial zone Name
Total Area (ha)
Occupancy Rate
Status
1
WHA Industrial Zone 1
Hoang Mai Industrial Park
▪ Phase 1: 75%
▪ Phase 2: 22%
N/A
In Operation
2
3,200
(Phase 1: 498)
264.77
3
VSIP Industrial Zone
200 ha (Phase 1)
89% (Phase 1)
4
Nam Cam Industrial Zone
Zone A: 416.3
Zone B: 122.7
Zone C: 154.7
Zone D: 1,220.9
A: 97.91%
B: 87.58%
C:100%
D: 1%
Phase 1: In Operation
Phase 2: Under Construction
In Operation
In Operation
NGHE AN’S LOCATION MAP OF INDUSTRIAL ZONES
746
WHA INDUSTRIAL ZONE 1 - NGHE AN
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Area
Minimum wage
WHA Industrial Zone 1 - Nghe An, Nghi Long Commune, Nghi Loc District, Nghe An Province,
Vietnam
WHA Industrial Zone Nghe An JSC
▪ Address: Lot AC1-1, WHA Industrial Zone 1 - Nghe An, Nghi Long Commune, Nghi Loc
District, Nghe An Province, Vietnam.
▪ Tel: (84-222) 3634 034
▪ Website: https://www.whavietnam.com/
▪ Ms. Anchalee Prasertchand - Vice President - Mobile: +66 81 8432253 - Email: anchaleep@whaindustrialestate.com
▪ Ms. Nguyen Thi Ngoc – Senior Manager-Customer Development _ Mobile: +84975457459 _
Email: ngoc.thi.nguyen@whavietnam.com

16km from Cua Lo International Seaport Cluster

17km from Vinh Railway Station

18km from Vinh City / Airport

80km from Nghi Son Deep Sea Port

288km from Hanoi city

306km from Noi Bai airport

360 km from Hai Phong Sea port

1,318km Ho Chi Minh city/ Tan Son Nhat International Airport
Priority Sectors for
- Industrial: Automotive, Plastics, Light Metals, Textiles/Garments
Investment
(exclude dyeing), Building Materials
- Consumer Goods: Food Processing, Beverages, Value-added
Agriculture, Fast Moving Consumer Goods (FMCG), Electrical
Appliances
- Technology: Electronics, Medical Assembly, Software, Smart Phones,
Communications
- Logistics: Cold Storage, Inland Container Depot, Modern, Warehouse
Logistics, Shipping and Freight
Restricted Sectors for
Dyeing, tanning
Investment
[Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Minimum Lease Area
▪ Phase 1: 2017 - 2067
▪ Phase 2: 2017 - 2067
5,000 m2
Limit for Construction
Height
Permitted Construction Rate
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential
Planning regulation (QCVN 01:2021/BXD), The construction area is not more than 70% of the
total leased land lot
Planned area
Factory Available for Rent
▪ Total reserved area: 2,100 ha
▪ Total leasable area: 498 ha
▪ Total area: Available upon further Discussion
Operation Status
▪ In operation
Occupancy Rate and
Number of Projects
▪ Phase 1: 75%
▪ Phase 2: 22%
▪ 22 Projects
▪ 1 project
Lease term
Number of Korean Projects
Lease fee
▪ Development Fee: 65 USD/m2 (This Rate is valid until December 2023)
▪ Factory lease fee: Available upon further Discussion
▪ Payment:
- Method: Bank Transfer in VND
- Payment structure:

10% of Total Lease Fee, payable upon signing of MOU

40% of Total Lease Fee, payable upon signing of Land Sublease Agreement (within 2
months from MOU Date)
747

50% of Total Lease Fee, payable before Land Hand-over date (within 1 months from
LSA date)
▪ Management fee: VND1,506/m2/month (excluded VAT)
Operating fee
▪ Electricity fee: According to the Circular by Ministry of Industry and Trade, valid from March
16th, 2015 (excluded VAT) for voltage from 22KV-110KV.
▪ Treated Water Supply: 11,800 VND/ m3 (excluded VAT)
▪ Wastewater treatment fee: 6,300 VND/ m3 (excluded VAT)
Note: Wastewater Test Fee, Wastewater Surcharge Fee (in case of inorganic/heavy metal
parameters discharged) : To be provided upon discussion
INFRASTRUCTURE AND FACILITY
Financial institution
BIDV, Vietin Bank, Vietcombank, Agribank, etc
Tax service, State finance
office
Customs Service
17 km from Tax Department of Nghe An province
16 km from Nghe An State Treasury
17.5 Km from Nghe An Provincial Customs Department
Post office
2.7 km from Quan Hanh Post Office
Medicare
6 Km from Nghi Loc District Hospital
14 Km Nghe An General Hospital
5 km from Nghi Loc District Police Station
Police, public security
Universities, training
facilities, etc.
Recruitment
Worker dormitory
19 Km from Vinh University
Nghi Loc District, Nghe An Province, Labor-Invalids & Social Affairs Department, etc will support
in recruitment
Opposite the zone (300m)
Worker's child education
facility
One-stop service
2 Km from the zone
Road Width
Main road: 67m, 4 lanes; By Road: 30m, 2 lanes
IT & Tele-communication
Facilities
Emergency Power generator
The telecommunication system complies with international standards and is always available for
communication demand with high data transmissions
Available
Fire-fighting facility
Available.
- Fire Fighting Station: 24/7 operation with Emergency Team stand by, locating inside Industrial
Zone
- firefighting hydrant is located along internal roads.
18 Km from the nearest Facility
Layout Plan
748
Location Map
Actual View
749
LIST OF SOME NOTABLE TENANTS
No.
Company Name
Nationality
Location
1
GOERTEK Precision Industry Vietnam Co., Ltd
Hong Kong
Plot A1-1; A1-2; A1-3; A1-4;
A2-1; A2-2; A2-3
2
NAKANO Apparel Co., Ltd
Japan
Plot A5-7
3
KYUNGSHIN Nghe An Co., Ltd
Korea
Plot A5-8
4
VINA SUN Energy Investment JSC
Vietnam
Plot A3-1A
5
TALI International Transport and Trade JSC
Vietnam
Plot A3-1A
750
HOANG MAI I INDUSTRIAL PARK
GENERAL INFORMATION
Address
Quynh Thien Ward, Hoang Mai Town, Nghe An Province, Vietnam
Investor
▪ Address:.9th floor, VEAM Tay Ho Building, Lot D, Zone D1, Phu Thuong Ward, Tay Ho District,
Ha Noi
▪ Tel: 024.6269.3838
▪ Website: htdcorp.vn
▪ Hoang Minh Duc – PR Manager; Tel: 0868003789
Contact Person
Location
▪ 12km from Nghi Son deep water Port – Thanh Hoa
▪ 8km from Dong Hoi Port-Nghe An
▪ Adjacent to National Highway No 1A
▪ Near Hanoi – Vinh Highway
▪ 200km from Hanoi
▪ 60km from Vinh International Airport
Investment Area
Priority Sectors for
Investment
Minimum wage
Lease term
Minimum Lease Area
Manufacture and assembly of electrical, electronic and
telecommunication equipment; Manufacture of chemicals and chemical
products; Fine engineering Industry; Footwear manufacturing Industry;
Steel manufacturing Industry; Manufacture and assembly of automobile
and aircraft components; Agricultural goods and mineral processing –
forestry Industry; Construction materials, producing semi-finished
building products; Industrial service equipment manufacturing Industry
Restricted Sectors for
All occupations are unprohibited by Vietnamese law
Investment
[Area III] 3.640.000 VND
▪ Start date: from the date of signing the contract
▪ End date: February 26th 2071
30,000 m2
Factory Available for Rent
Building height limit
Factory construction area: 8-40m
Operating area: 8-20m
Permissible building rate
Factory construction area: 70%
Operating area: 60%
▪ Total area: 264.77 ha
▪ Total vacant leasable area: 174 ha
▪ Total area with full infrastructure ready to build factory: 174ha
▪ Total area: N/A
Operation Status
▪ In operation
Occupancy Rate and
Number of Projects
Number of Korean Projects
▪ 07 Projects
N/A
Limit for Construction
Height
Permitted Construction Rate
Planned area
Lease fee
▪ Land lease fee: 0.06 USD/m2
▪ Industrial infrastructure fee: 55 USD/m2
▪ Factory lease fee: N/A
▪ Payment:
- After signing Land Sublease Agreement : 10%
-
After signing Land Sublease Contract: 50%
After handing over land: 30%
751
-
After handing over the Certificate of Land Use Rights and the value-added invoice: 10%
▪ Management fee: 0.05USD/m2/month
▪ Electricity fee: Peak hour: 0.13 USD/KWh
Normal hour: 0.08 USD/KWh
Off-peak hour: 0.05 USD/KWh
▪ Water fee: 0.45USD/m3 (According to regulations of the Provincial People’s Committee on clean
water price)
▪ Wastewater treatment fee: 0.25 – 0.85 USD/m3
▪ Waste treatment fee: According to the regulations of the service provider
INFRASTRUCTURE AND FACILITY
Operating fee
Financial institution
BIDV, Vietin Bank, Vietcombank, Agribank
Tax service, State finance
office
Logistics
7.8 km from Nghe An Tax Office
30 km from Nghe An State Treasury Office
20 Km from Logistic Center: Nghi Son Logistics
Post office
6.3 km from Vietnam Post Office
Medicare
6 Km from Quang Khoi General Hospital
Universities, training
facilities, etc.
Road Width
4 Universities, 9 colleges, 14 vocational schools
The central road’s axis is of 36 meters in width
The main road’s axis is of 22,25 meters in width
IT & Tele-communication
Facilities
Emergency Power generator
The telecommunication system complies with international standards and is always available for
communication demand with high data transmission s
Available
Fire-fighting facility
Available. Water supply system for firefighting is located along each road.
Layout Plan
Location Map
Actual View
.
LIST OF SOME NOTABLE TENANTS
No.
Company Name
1
JUTENG ELECTRONIC TECHNOLOGY
(VIETNAM) LIMITED
2
DUC TIN HANOI PRODUCTION TRADING
SERVICES BUILDING LIMITED COMPANY
NHUA HOANG MAI CORPORATION
3
4
ENVROY VIETNAM JOINT STOCK
COMPANY
5
Nationality
Location
Taiwan
B1, B2, CN01 Hoang Mai I Industrial
Park
Viet Nam
DVHC02, Hoang Mai I Industrial
Park
KHA02, Hoang Mai I Industrial Park
Viet Nam
Japan
A01, Hoang Mai I Industrial Park
DONGXU JUTENG ELECTRONIC MATERIAL
(VIETNAM) LIMITED
Taiwan
A08, Hoang Mai I Industrial Park
6
GOOD MAY PAINT INDUSTRY CO., LTD
Taiwan
A09, Hoang Mai I Industrial Park
7
RUNERGY PV TECHNOLOGY (THAILAND)
CO.,LTD
Thailand
A10, Hoang Mai I Industrial Park
752
VSIP NGHE AN I INDUSTRIAL PARK
GENERAL INFORMATION
Minimum wage
No.8 Dai Lo Huu Nghi, Hung Tay Commune, Hung Nguyen District, Nghe An Province, Viet
Nam.
VSIP NGHE AN Ltd., Co.
▪ Address: No.8 Dai Lo Huu Nghi, Hung Tay Commune, Hung Nguyen District, Nghe An
Province, Viet Nam.
▪ Tel: (84.238) 3763 555
Website: https://www.vsip.com.vn
▪ Ms Hong Anh - Marketing Assistant Manager
- Mobile: ++ 84 93 2345 188
- Email: anh.nth@vsip.com.vn
- 2 Km from Vinh Center
- 4 Km from Vinh Airport
- 15 Km from Cua Lo Seaport
- 90 Km from Nghi Son Seaport
- 290 Km from Ha Noi
- 330 Km from Hai Phong Seaport
Priority Sectors for
Light, Clean & High-tech Industries such as: E&E, F&B, FMCG,
Investment
Packaging, Pharmaceutical, Automotive components, etc.
Restricted Sectors for
Heavy Industries which produce high pollution to environment such as:
Investment
dyeing, rubber, concrete, etc.
Region 2 (Pursuant to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries)
Lease term
▪ 50 years: 2015 - 2065
Minimum Lease Area
10,000 m2
Limit for Construction
Height
Permitted Construction Rate
Pursuant to Master Plan Amendment Approval of VSIP Nghe An dated 06 Nov
2020:
Address
Investor
Contact Person
Location
Investment Area

For Industrial Land, the maximum building coverage is 70%. The
maximum of 03 – 05 storeys is allowed.

For Mixed Use Land, e.g. dormitory land, the maximum building coverage
is 50%. The maximum of 10 storeys is allowed.
Factory Available for Rent
▪ Total IP area: 370 ha
▪ Total vacant leasable area: ~20 ha
▪ Available & supplied by BWID, SIS Nghe An
Operation Status
▪ In operation
Occupancy Rate and
Number of Projects
Number of Korean Projects
▪ 89 %
▪ 40 Projects
▪ 03 projects
Planned area
▪ Land lease fee: Upon Request
▪ Payment: 10% after signing Letter of Offer + 30 % after having Investment Registration
Certificate, Enterprise Registration Certificate + 30% after signing Land Sublease Agreement +
30% after Land Hand-over
- Method: Bank Transfer in VND.
▪ Management fee: 1,595 VND/m2/month (excluding VAT)
Operating fee
▪ Electricity fee: By EVN
▪ Water fee: 11,958 VND/m3 (excluding VAT)
▪ Wastewater treatment fee: 5,707 VND/m3/ (based on 80% of water consumption) (excluding
VAT)
INFRASTRUCTURE AND FACILITY
Lease fee
Financial institution
Vietcombank, BIDV, Seabank, Maritimebank, Agribank, etc
Tax service, State finance
office
Customs Service
9 km from Nghe An Tax Office
8 km from Nghe An State Treasury Office
3 Km from Vinh Customs Agency
753
Logistics
VN Post, Vietsun, SME, Avina, etc.
Post office
1 km from Vietnam Post Office
Medicare
6 Km from Nghe An General Hospital
Police, public security
2 Km from Hung Nguyen Police Station
Universities, training
facilities, etc.
Recruitment
8 Km from Vinh University
Worker dormitory
Worker's child education
facility
One-stop service
Road Width
VSIP Nghe An support investors in recruitment
(job fairs, advertisement, connect universities & investors, etc.)
Available for building on VSIP NA’s service land
Available from surrounding residential areas.
VSIP NA Customer Service coordinates with Dong Nam SEZ to support investors in doing
application for licenses.
Carriageway with reserve width of 27, 31 & 38m (02 lanes)
IT & Tele-communication
Facilities
Emergency Power generator
Supplied by Vietnam Technology & Telecommunication JSC (VNTT)
Fire-fighting facility
24/7 VSIP Nghe An Fire Fighting Station, Nghe An Fire Fighting Station
Available & supplied by EVN
Layout Plan
Location Map
Actual View
754
Sangwoo’s factory (Korean Garment maker)
Luxshare’s dormitory (Hong Kong E&E maker)
755
LIST OF SOME NOTABLE TENANTS
No.
Company Name
Nationality
Location
1
Biomass Fuel Vietnam Co., Ltd
Japan
18,19
2
An Nam Matsuoka Garment Co., Ltd.
Japan
C1-01
3
Innovative Manufacturing Solutions Vietnam Co.,
Ltd.
South Korea
24,25
4
SangWoo Vietnam Co., Ltd
South Korea
30
5
UMW Equipment Systems (VietNam) Ltd., Co.
Malaysia
28B
6
Gift Story Industrial Ltd., Co.
Hong Kong
17
7
Luxshare – ICT Nghe An Ltd., Co.
Hong Kong
20,21,22,23,27
8
Construction Material of Centre Region JSC
Vietnam
28
9
Dat Tien Ltd., Co.
Vietnam
26B
10
Hoang Gia Viet Service & Trading Ltd., Co.
Vietnam
29
11
Hoang Gia Warehouse Ltd., Co.
Vietnam
81
12
ICEM Material & Construction JSC
Vietnam
05B
13
Kien Moc Design JSC
Vietnam
26
14
Nanoco Vinh Ltd., Co.
Vietnam
36
15
Nghe An Industrial Gas JSC
Vietnam
12
16
TDV Vietnam Manufacturing & Trading
Corporation Ltd.
Vietnam
11
17
Viet Duc Glass Commercial JSC
Vietnam
05C
18
Vietnam Post
Vietnam
13,14,15
19
Vietnam Technology & Telecommunication JSC
Vietnam
H-05-3,1
20
Great LongView Industrial Co., Ltd.
Taiwan
06,16
21
Beckers Nghe An Branch
Sweden
07,08
756
22
BCI JSC
Vietnam
E2-02
23
INDICO Industrial Development Co., Ltd
Vietnam
E2-02, 82,83
24
Phuong Truc Investment JSC
Vietnam
04B
25
Haohui Technology Vietnam Ltd. Co.
Vietnam
04A
26
Everwin Precision Vietnam Technology Ltd., Co.
Hong Kong
D1-1, D1-2
27
Merry- Luxshare (Vietnam) Co., Ltd.
Hong Kong
01
28
Woosin Vina Co., Ltd.
Korea
32,33
29
SIS Infrastructure Service Co.,ltd
Singapore
96,97,98
30
Food 1.6 JSC
Vietnam
05A
31
Ngoc Ha Co.,ltd
Vietnam
04D
32
Taihing Plastic Metal (Vietnam)
Hong Kong
85
33
TOA Electric
Japan
92
34
TCS Industrial JSC
Vietnam
C2
35
Telstar Viet Nam Co.,ltd
Vietnam
86
36
Paper Works Printing Ltd
Hong Kong
31
37
Gaiwatch
Hong Kong
E2-02
38
Current Power
Hong Kong
05E
757
VSIP NGHE AN II INDUSTRIAL PARK
GENERAL INFORMATION
Tho Loc commune, Dien Chau District, Nghe An Province, Vietnam
Address
Investor
Minimum wage
VSIP Nghe An Co., Ltd
▪ Address: No. 8 Dai lo Huu Nghi, VSIP Nghe An, Hung Tay Town, Hung Nguyen Dist., Nghe
An, Vietnam
▪ Tel: (84) 917 31 1818
▪ Website: www.vsip.com.vn
▪ Ms Hong Anh - Marketing Assistant Manager
- Mobile: ++ 84 93 2345 188
- Email: anh.nth@vsip.com.vn
- 35 km from VSIP Nghe An I
- 37 km from Vinh City Center
- 30 km from Vinh International Airport
- 23 km from Cua Lo Seaport
- 310 km from Hai Phong Seaport
- 2.5 km from Highway No.01
Priority Sectors for
Light, Clean & High-tech Industries such as: E&E, F&B, FMCG,
Investment
Packaging, Pharmaceutical, Automotive components, etc.
Restricted Sectors
Heavy Industries which produce high pollution to environment such as:
for Investment
rubber, concrete, etc.
Region 3 (Pursuant to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries)
Lease term
2023-2073 (50 years)
Minimum Lease Area
10,000 m2
Limit for Construction Height
For Industrial Land, the maximum building coverage permitted is 70% of total area. The
maximum number of storey allowed is 05 storeys.
Contact Person
Location
Investment
Area
Permitted Construction Rate
Factory Available for Rent
▪ Total area: 500ha (Phase 1)
▪ Total vacant leasable area: 350ha (Phase 1)
▪ N/A
Operation Status
▪ Under development
Occupancy Rate and Number
of Projects
▪ Under construction
Planned area
Number of Korean Projects
▪ Land lease fee: Upon Request
▪ Payment: 10% after signing Letter of Offer + 30 % after having Investment Registration
Certificate, Enterprise Registration Certificate + 30% after signing Land Sublease Agreement +
30% after Land Hand-over
- Method: Bank Transfer in VND.
▪ Management fee: 1,595 VND/m2/month (excluding VAT)
Operating fee
▪ Electricity fee: By EVN
▪ Water fee: 11,958 VND/m3 (excluding VAT)
▪ Wastewater treatment fee: 5,707 VND/m3/ (based on 80% of water consumption) (excluding
VAT)
INFRASTRUCTURE AND FACILITY
Lease fee
Financial institution
Vietcombank, BIDV, Seabank, Maritimebank, Agribank, etc.
Tax service, State finance
office
Customs Service
34 km from Nghe An Tax Office
33 km from Nghe An State Treasury Office
34 km from Nghe An Custom Office
Logistics
9 km from the nearest Logistic Center: Nhat Tin Logistics
Post office
9 km from Dien Chau Post Office
Medicare
12 km from Dien Chau District Medical Center
758
Police, public security
11km from Dien Chau Police Station
Universities, training facilities,
etc.
Recruitment
Vinh University, Vinh Industrial University, Vietnam – Korea Vocational College, Vinh
Technical University, Vietnam – Germany Vocational College, etc.
VSIP Nghe An support investors in recruitment
(job fairs, advertisement, connect universities & investors, etc.)
Available for building on VSIP NA’s service land
Worker dormitory
Worker's child education
facility
One-stop service
3.4 km from the zone
Road Width
VSIP NA Customer Service coordinates with Dong Nam SEZ to support investors in doing
application for licenses
Width 7.5m, 11.25m, 22.5m
IT & Tele-communication
Facilities
Emergency Power generator
The telecommunication system complies with international standards and is always available for
communication demand with high data transmission
Available & supplied by EVN
Fire-fighting facility
24/7 VSIP Nghe An Fire Fighting Station, Nghe An Fire Fighting Station.
Layout Plan
Location Map
Actual View
Under Development
Land is available for handover in Q2/2024
759
760
NAM CAM INDUSTRIAL ZONE
GENERAL INFORMATION
Address
▪ Area A: On the border of Nghi Long, Nghi Thuan ward, Nghi Loc district, Nghe An
▪ Area B: On the border of Nghi Xa and Nghi Long ward, Nghi Loc district, Nghe An
▪ Area C: On the border of Nghi Xa and Nghi Quang ward, Nghi Loc district, Nghe An
▪ Area D: On the border of Nghi Thuan and Nghi Long ward, Nghi Loc district, Nghe An
Area A, B, C
Nghe An Industrial Zone Development Company
▪ Address: No. 16, Le Hoan Street, Hung Phuc Ward, Vinh City, Nghe An province
▪ Tel: (84-238) 860 0299
Fax: (84-238) 3597 985
Investor
Area D
Tuan Loc Construction Investment JSC.
▪ Address: 362/14 Ung Van Khiem, Ward 25, Binh Thanh District, Ho Chi Minh City
▪ Tel: (84-28) 6258 5039
Contact Person
▪ Area A,B,C: Mr Sy – Dong Nam Economic Zone Management Board - (84) 913 357 897 tvsykktdn@gmail.com
▪ Area D: Mr Son - (84) 966 66837 - info@xaydungtuanloc.com
Location
▪ 18 km to Vinh cỉty
▪ 8 km to Cua Lo Port
▪ 12 km to Vinh airport
▪ 17 km to Vinh station and 2 km to Quan Hanh station
Priority Sectors for
Investment
▪ Zone A: Steel rolling, metallurgy; Mechanical manufacture; Automobile
assembly; Processing of Agricultural and Forrest Product; Processing
consumer goods and products for export.
▪ Zone B: Brewery Manufacture
▪ Zone C: heavy industry with high pollutant level such as: Fertilizer
processing and chemical industry; Processing products to wood, leather;
Mechanical manufacture ; Mineral processing; Building material
manufacture,..
Restricted Sectors for
Investment
N/A
Investment Area
Minimum wage
[Area 4] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term
50 years
Minimum Lease Area
N/A
Limit for Construction
Height
N/A
Permitted Construction Rate
N/A
Planned area
▪ Area A: 416.3 ha (industrial land area: 288 ha, vacant leasable area: 6 ha)
▪ Area B: 122.7 ha (industrial land area: 101.6 ha, vacant leasable area: 0 ha)
▪ Area C: 154.7 ha (industrial land area: 110.37 ha, vacant leasable area: 0 ha)
▪ Area D: 1220.9 ha (industrial land area: 932.1 ha, vacant leasable area: 928.34 ha)
Factory Available for Rent
▪ Total area: N/A
Operation Status
▪ In operation
Occupancy Rate and
Number of Projects
▪ Rate of Occupancy:
- Area A: 97.91% (15 projects)
- Area B: 87.58% (15 projects)
- Area C: 100% (38 projects)
- Area D: 1% (1 project)
761
Number of Korean Projects
02 projects
Lease fee
▪ Land lease fee with infrastructure: 0.45USD/m2/year (for all area)
▪ Land lease fee without infrastructure:
- For 1,667 VND /m2/year (for A, C,D area); 3,996 VND (~0.176 USD)/m2/year (for B area)
▪ Factory lease fee:
- For Area A, B, C: 41,000 VND /m2/year (~ 1.82 USD/ m2/year)
(All statistics of 2017)
Operating fee
▪ Infrastructure maintenance fee: 2,071 VND (~ 0.09 USD) /m2/year (for Area C)
▪ Electricity fee: as regulated by the Government
▪ Water fee: 11,400 VND (~0.51 USD)/m3 (for all area)
▪ Wastewater treatment fee: 9,568 VND (~0.45 USD)/m3 (for all area)
INFRASTRUCTURE AND FACILITY
Financial institution
8-10 km to bank branches of Vietcombank, Vietinbank, Agri Bank, LienViet Post Bank
Tax service, State finance
office
9 km to Tax Department and State Treasury of Nghi Loc
Customs Service
6 km to Cua Lo Port Customs Office
Logistics
8 km to Cua Lo Port with transport service available there.
Post office
Nam Cam Post Office is next to the IZ
Medicare
7.6 km to Nghi Loc General Hospital; 9.4 km to Cua Lo Town General Hospital
Police, public security
9.4 km to Nghi Loc Post Office
Universities, training
facilities, etc.
10- 25 km to Nghe An’s universities and vocational schools
Recruitment
23 km to Nghe An Recruitment Center
Worker dormitory
N/A
Worker's child education
facility
Nghi Xa Preschool. Nghi Long Preschool, Nghi Quang Preschool are located in the area of the IZ
One-stop service
23 km to Nghe An Public Administration Center
Road Width
▪ The central roads system: 43m wide
▪ The interior road systems: 22.25m – 43m wide
IT & Tele-communication
Facilities
Systems of optical cable and wired lines Nam Cam Post Office is next to Industrial Park
Emergency Power generator
Available
Fire-fighting facility
Available
Layout Plan
762
Location Map
Actual View
763
LIST OF TENANTS
No.
Company name
Nationality
Business line
Zone
1
Chau Tien Co., Ltd
Vietnam
Wall baits manufacture
Zone A
2
Huong Lieu Co., Ltd
Vietnam
Stone manufacture
Zone A
3
Hanoi Beer JSC. - Nghe An
Vietnam
Beer manufacture
Zone A
4
Mechanical JSC. No. 9.1
Vietnam
Mechanical manufacture
Zone A
5
Vietnam
Sawn stone and limestone manufacture
Zone A
6
Japan-Viet Nghe An Warehouse
JSC.
Thien Phu Co., Ltd
Vietnam
Krap paper manufacture
Zone A
7
Masan MB Co., Ltd
Vietnam
Food manufacture
Zone A
8
Trung Do JSC.
Vietnam
High quality construction materials
Zone A
9
Vietnam
Building material
Zone A
10
Construction Investment JSC. and
TM 379
Thinh Loc JSC.
Vietnam
Warehouse service center
Zone A
11
Viet Vinh JSC.
Vietnam
Asbestos cement sheet
Zone A
12
Tin Thanh JSC.
Vietnam
Car service
Zone A
13
Tan An Construction JSC.
Vietnam
Mechanical Factory Project
Zone A
14
Dong Tien JSC.
Vietnam
Garment manufacture
Zone A
15
PetroVietnam Nghe An Mineral
Corporation
Tan A Co., Ltd
Vietnam
Construction materials production
Zone A
Vietnam
Solar water heater manufacture
Zone B
Vietnam
Alcohol - Beverage manufacture
Zone B
18
Hanoi Beer - Alcohol - Beverage
Joint Stock Corporation
Son Nam JSC.
Vietnam
CACO3 limestone manufacture
Zone B
19
1 TV Son Ha Nghe An Co., Ltd
Vietnam
Stainless steel products
Zone B
20
Choa Viet JSC.
Vietnam
Food processing
Zone B
21
Vietnam PJ Mercury JSC.
Vietnam
Animal feed
Zone B
22
Vietnam
Industrial freight forwarding center
Zone B
Vietnam
Storage and factory for rent
Zone B
24
Dai Minh Quang Construction Co.,
Ltd
Central Construction Consultant and
Investment JSC.
Royal Foods Nghe An Co., Ltd
Thailand
Seafood processing
Zone B
25
FRESCOL
Thailand
Sea products and meat, non-alcoholic beverages
Zone B
26
Royal Beverage Co., Ltd
Thailand
Zone B
27
Thailand
Animal feeding production
Zone B
29
Royal can Industries Co., Ltd, Nghe
An branch
Austfeed Nghe An Joint Venture
Company
Royal Capital Co., Ltd
Non-alcoholic beverages, ice, processing milk
and dairy products
Metal food boxes
Thailand
Showroom and service center
Zone B
30
Viet Duc Trading JSC.
Vietnam
Tempered glass manufacture
Zone B
31
Nghe An super-fine white limestone
JSC.
Ha An Phat Co., Ltd
Vietnam
Ultrafine limestone manufacture
Zone C
Vietnam
Stone Processing
Zone C
Vietnam
Unburnt bricks
Zone C
34
An Viet Investment and
Development JSC.
Vinh Mechanical JSC.
Vietnam
Supporting Industry
Zone C
35
Cao Thang Import Export JSC.
Vietnam
Food processing
Zone C
36
Lien Hiep- Nghe An Co., Ltd
Vietnam
CACO3 limestone manufacture
Zone C
37
VIC Trading JSC.
Vietnam
Animal feed manufacture
Zone C
16
17
23
28
32
33
764
Zone B
Vietnam
Seafood Processing
Zone C
39
Hai An Seafood Import Export &
Trading Co., Ltd
Nghe An Paper Material Co., Ltd
Vietnam
Paper manufacture
Zone C
40
Asia Mineral JSC.
Vietnam
Ultrafine limestone manufacture
Zone C
41
Vietnam
White stone processing factory
Zone C
42
Consulting and Construction of the
Central JSC.
Chemical Industry JSC.
Vietnam
Manufacturing and processing artificial wood
Zone C
43
Vietnam Tung Huong JSC.
Vietnam
Export wood processing enterprises for export
Zone C
44
Minh Thai Son JSC.
Vietnam
Fishmeal manufacture
Zone C
45
Tan Ky JSC.
Vietnam
White limestone fine art stone manufacture
Zone C
46
Phihico JSC.
Vietnam
Wood product manufacture
Zone C
47
European Plastic JSC.
Vietnam
Calcium carbonate resin manufacture
Zone C
48
Vietnam
Zone C
Vietnam
Ultra fine limestone and coating enamel
manufacture
Ultra fine limestone and porcelain enamel
50
VNT Construction Commercial
Joint Stock Corporation
Construction Trading Joint Stock
Corporation. - Ministry of Transport
Nghe An Mineral JSC.
Vietnam
Ultra fine limestone processing
Zone C
51
Tien Phong Plastic JSC.
Vietnam
Plastic products manufacture
Zone C
52
Thien Phu Co., Ltd
Vietnam
Krap paper manufacture
Zone C
53
Thien Phu JSC.
Vietnam
Paper manufacture
Zone C
54
Vietnam
Steel sheet manufacture
Zone C
55
Hoa Sen Nam Cam Nghe An Co.,
Ltd
Tri Viet Energy Co., Ltd
Vietnam
Northern Massan project
Zone C
56
Quy Long general service complex
57
OMYA company
58
60
TAN VIET TRUNG ARTIFICIAL
PLANK JSC.
Hope Nghe An Animal Feed Co.,
Ltd. Vietnam
BSE Vietnam Electronic Co., Ltd
61
Cargill Vietnam Co., Ltd.
62
Wood World Vietnam Joint Venture
Co., Ltd.
Agro Nutrition International JSC
38
49
Zone C
Vietnam
Seafood processing
Zone C
Switzerland
Ultrafine limestone
Zone C
China
Artificial plywood
Zone C
China
Animal feed manufacture
Zone C
Components and electrical testing equipment
Zone C
Feed production
Zone C
Nghe An plywood processing
Zone C
Malaysia
Animal feeding production
Zone C
Malaysia
66
CP Vietnam Livestock JSC.
Thailand
Factory producing animal feed for cattle, poultry
and handicrafts
Home appliance manufacturing electronic
components
C.P Nghe An animal feed factory
Zone C
65
ANT Co., Ltd (HN) - Nghe An
Branch
Vietnam Gia Nhat Plastic Co., Ltd
67
Nagoya Giken Industrial Co.Ltd
Car parts manufacturing project
Zone C
68
Becker Industrial Coatings Vietnam
Co., Ltd.
Tuan Loc Investment Construction
JSC.
Becker Vietnam paint factory
Zone C
Infrastructure construction
Zone D
59
63
64
69
South Korea
The U.S
India
China
Japan
Switzerland
Vietnam
765
Zone C
Zone C
[- This Page is intentionally left blank -]
766
NINH BINH
767
INVESTMENT ENVIRONMENT IN NINH BINH
USD/VND
23.510
GENERAL INFORMATION
Area, Population
 Area: 1,387.1 Km2
 Population: 1.007,6 million (2022 statistic)
Geographical Location
 Ninh Binh has a is the southernmost gateway province in the Northern Delta region,
located at the boundary of three geographical areas: the Northwest, the Red River Delta and
the North Central Region. Ninh Binh is located at the intersection of three economic
regions: the Hanoi region, the Northern Coastal region and the central coastal region.
 Distance from Hanoi: 95 Km, from Ho Chi Minh City: 1626 km, from Da Nang: 670 km
Adjacent provinces




GRDP
Industry growth
PCI
To the north, it borders Ha Nam province
To the east and northeast, it borders Nam Dinh province across the Day River
To the northwest, it borders Hoa Binh province
To the south, it borders Thanh Hoa province and the East Sea.
2022 statistic:
 GRDP: 81.000 billion VND
(3.45 billion USD)
 GRDP growth: 8,62%
 GRDP per capita: 3500 USD/year
 Economic structure:
- Industry - Construction: 37,81%;
- Agriculture. forestry and fishery: 8,85 %;
- Service: 36,95%;
- Tax on Goods: 16,39%
2022 statistic:
 Industry - Construction growth: 5,67%
 Agriculture, forestry and fishery growth: 3,04%
 Service growth:15,45%
 Score: 64.22 - ranked 44 out of 63 cities and provinces in Vietnam. (2022)
SOCIAL INFRASTRUCTURE
Transportation
Electricity
Water
 Roadway: The road system contains 01 expressway rout - 24.5 km, 08 national highway
routs - 240.79 km; 20 provincial road routs - 272.3 km; district roads - 349.5 km, urban
roads - 355.26 km, commune roads - 2,375.26 km and rural roads - 4,386 km.
 Railway: The North-South railway route is 21.6 km through the province with 4 stations
(Ninh Binh station, Cau Yen station, Ghenh station and Dong Giao station), and 10 faraway
stations that are convenient for transporting passengers and goods.
 Waterway: The waterway traffic includes 16 routes of the inland waterway with a total
length of nearly 298.8 km. There are 24 inland waterway ports: Ninh Binh port, Ninh Phuc
port, and ICD port, 103 cargo wharves, 4 petroleum wharves, and 30 river-cross passenger
wharves distributed throughout the province.
 The electricity network is built relatively evenly throughout the province: Ninh Binh Power
Plant with a capacity of 4x25MW; 01 500kV transformer station, 03 220kV transformer
stations; 13 110kV substations…
 Water resources including surface water and underground water. In which, the surface water
is the main water resource due to high rainfall, the sea and the river system is quite dense
along with many lakes and lowland areas.
 The large rivers include: Day river, Hoang Long river, Boi river and some other small rivers
such as Lang river, Vac river, An river, etc., but Day river is the largest river flowing
through Ninh Binh province from Gia Thanh and into the sea at the Cua Day (Day gate).
768
 Besides, there are 21 large reservoirs in the province such as Dap Troi, Da Lai, Yen Quang,
Yen Thang reservoirs, with a total area of 1,270ha with a storage capacity of about 30
million m3.
Education
 Up to now, the whole province has had 1 university, 4 colleges and 4 vocational and
professional intermediate schools training many professions with many types of training.
Medicare
 The province had 421 medical facilities
INVESTMENT CONDITION
Human resource
 48,4% of population are in the working age (2022)
Education level
 Trained labor rate: 14,5% (2022)
 The minimum salary for the province is applied as follows:
- Area II: Ninh Binh city: 4.160.000 VND
- Area III: Tam Diep city, Gia Vien district, Yen Khanh district, Hoa Lu district: 3.640.000
VND
- Area IV: Nho Quan district, Kim Son district, Yen Mo district: 3.250.000 VNĐ
 The lowest wage for trained labor: 5.000.000 VND (including those trained by the
enterprises) must be at least 7% higher than the above referenced basic salary
Salary
Investment incentives
 Investment incentives in Ninh Binh province shall be implemented according to
government regulations
Fields Attracting Investment
 Prioritized projects: high technology, modern technology, clean technology, smart
manufacturing, manufacturing, assembly and supporting industries for the automobile
industry, manufacturing products for agricultural production.
 Agriculture Sector: high-tech, green, clean, organic, endemic agriculture towards serving
the tourism industry; research projects for application and transfer of technology to breed
plant and animal breeds; scientific and technological application of aquaculture; develop
key and specialty products (OCOP) in an organic direction associated with sustainable
tourism development.
 Cultivation: project of research, transfer and production of high quality plant varieties;
projects on research and application of science and technology in farming, preservation,
processing and organic farming;
 Livestock production: livestock breeding project; livestock project towards the organic
direction, digital transformation.
 Fishery sector: project of producing high-tech aquatic breeds; organic aquaculture project;
projects on seafood exploitation in coastal waters (clams, oysters, shrimp, crabs...) and
offshore fishing.
 Attracting projects in the field of logistics; projects to build sports training and training
centers and establishments; vocational training projects; wastewater treatment in districts,
cities and urban areas.
Map
(Add Province map)
Contact
Department of Planning and Investment
 Address: 8 Le Hong Phong Street, Van Giang Ward, Ninh Binh City
 Tel: 0229.3871.156
 Fax : 0229.3873.381
 Email: skhdt@ninhbinh.gov.vn
 Contact person: Dinh Thi Thuy Ngan
LIST OF INDUSTRIAL ZONES
No
Industrial zone Name
Total Area (ha)
769
Occupancy Rate
Status
1
Gian Khau Industrial Zone
212
100%
In Operation
2
Phuc Sơn Industrial Zone
142
93,47%
In Operation
3
Khanh Phu Industrial Zone
351
100%
In Operation
4
Tam Diep I Industrial Zone
64
100%
In Operation
5
Kanh Cu Industrial Zone
In Operation
6
Tam Diep II Industrial Zone
planning
7
Kim Son Industrial Zone
planning
770
GIAN KHAU INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Contact Person
Location
Investment Sectors
Minimum wage
Located on the territory of 3 communes Gia Tan, Gia Xuan and Gia Tran, Gia Vien district, Ninh
Binh province
Mr. Thắng – Position: Head of Investment Management - Mobile: 0913055983 - Email:
hoangmanhthang0509@gmail.com
Adjacent location:
+ It is bordered by route ĐT477 to the South.
+ It is bordered by Gia Tan commune to the North.
+ It is bordered by Gia Lap commune to the West.
+ It is bordered by National Highway 1A to the East.
Priority Sectors for
Mechanical engineering, cement, light industry, food, garment…
Investment:
Lease term
200-500 USD/person/month.
50 years
Minimum Lease Area
[Diện tích cho thuê tối thiểu]
Limit for Construction
Height
[Giới hạn chiều cao xây dựng
Khu xây dựng nhà máy
Khu điều hành]
Permitted Construction
Rate
[Tỷ lệ xây dựng cho phép
Khu xây dựng nhà máy
Khu điều hành]
Planned area
Operation Status
Occupancy Rate and
Number of Projects
Lease fee
- Planning area: 262 ha
- The actual area was established: 162 ha
- The remaining area: 100 ha
- Planning area 2020: 262 ha
- The area of the project is the establishment of new and expanded 2020: 100 ha
▪ Active
▪ 100%
▪ 40 USD/m2
Layout plan
771
INFRASTRUCTURE AND FACILITY
- Water: Water is taken from clean water supply station of Hoa Lu district with a capacity of 3,000 m3/day, Ninh Binh Clean Water
Supply Company Limited, providing enough clean water for production and daily life.
- Power: The power is taken from 110KV power station in the industrial zone. It assures to provide sufficient and stable power supply
for production.
- Traffic system: The Industrial Zone is located in Gia Vien district which is crossed by National Highway 1A and Route ĐT477.
This industrial zone is near Day and Hoang Long river crossing which is convenient for water transportation to Hai Phong, Quang
Ninh and Thanh Hoa
772
TAM DIEP I INDUSTRIAL ZONE
GENERAL INFORMATION
Address
Investor
Contact Person
Location
Investment Sectors
Minimum wage
Lease term
Minimum Lease Area
Planned area
Operation Status
Occupancy Rate and
Number of Projects
Number of Korean projects
Lease fee
201 Le Hong Phong, Dong Thanh ward, Ninh Binh city, Ninh Binh province
Industrial Park Infrastructure Development Company
▪ Address: 201 Le Hong Phong, Dong Thanh ward, Ninh Binh city, Ninh Binh province
▪ Tel: 0904150979
▪ Email
▪ Website:
Mr. Thắng – Position: Head of Investment Management - Mobile: 0913055983 - Email:
hoangmanhthang0509@gmail.com
[Tên - Chức vụ - Số điện thoại – Email của người phụ trách]
Adjacent location: Tam Diep 1 Industrial Park is located in Quang Son commune (Tam Diep city),
about 15 km from Ninh Binh city center, about 3 km from Tam Diep city center.
Priority Sectors for
Cement Production; footwear and garment production; manufactures
Investment:
medical equipment…
200-500 USD/person/month.
50 years
[Diện tích cho thuê tối thiểu]
▪ Total area: 142 ha
▪ Total vacant leasable area: 9 ha
▪ Active
▪ 93,47% - 18 projects
▪ N/A
▪ Land lease fee: 50 USD/m2
Layout plan
INFRASTRUCTURE AND FACILITY
Electricity supply, clean water supply, wastewater treatment system... are invested synchronously and modernly, fully meeting the
needs of investors participating in production investment in the industrial park.
In addition to bui