Green has been appointed by client for a period of three (3) to render Boiler Service for various institutions. A service level agreement (SLA) has been signed and the works are being carried out to suit this agreement. The aim of this report is to present a contextual of how the project will be unfold and ensure mutal understanding by the client of Green plant of action and timelines the deliverable years Mechanical Framework Contract. This contract is based on Upgrade and Maintaining Laundry Mechanical Assets (Washing Machine, Sluice Machine, Ironing Machine and Machine Dryer at the different institutions that have been allocated for the period of 3 Years. All this equipment must be maintained of supplied under the IUSS standard and complied under South African National Standard (SANS) 10146 and 1044. Laundry Condition Assessment Report (LCAR) Client is of the Three (3) Hospital that are situated under District but it falls under town. It is one of the district hospitals that have been supporting the Mines Industrial in surrounded area and the community. The laundry condition assessment report had been conducted through visual inspection, condition monitoring / preventive maintenance, reactive maintenance, emergency breakdowns and turnaround time of availability of mechanical and electrical spares in the market. Assets Ratings Condition The below colours below represents an asset condition and as well as a performance. GOOD AVERAGE POOR INDUSTRIAL WASHING / SLUICE MACHINE Mechanical Specification: MOD REF VOLTAGE POWER SN : MAQ B-25 HW TC2 : 18002150 : 230V : 3KW : 8101953557/ 02/20 ELECTRICAL DISTRIBUTION BORD (DB) RCA Washing Machine & DB Board Visual inspection the machine still good for operation for past 5 year, if it was maintained regular. Dosing pump were not installed on the day that was commission and handover, this may course the hospital Staff to overload soap since feed manual. Electrical distribution board is not compliant, it requires new wiring and issued new Certificate of Compliance (COC). The hospital require more machine to fully functional and compliant Scope of Work The work consists design asset or system, supply, delivery onsite, commissioning, training staff, refurbishment plant room and decommission existing assets and leave onsite before leave all mechanical assets operate at the full capacity. The contractor Green) will be liable to provide maintenance of new equipment at the period of 12 month before handed over to the institution. The scope are as follows: Supply One Industrial (1) New Washing Machines, incorporating Dosing pumps. Supply One Industrial (1) New Sluice Washing Machine, incorporating Dosing pumps Supply One Industrial (1) New Ironing Machine Supply One Industrial (1) New Air Dryer Machine Supply Once Off Consumable Washing Liquid Soup 10 x 25L (25 liter) Mechanical Standards and Specification for Laundry Equipment Other than Central Laundries, equipment shall be kept to a standard size at all Health Institutions to suit the application and shall comply with the following sizes for which technical specifications are available. Rev 1 Sluice Machine (9 to 25kg). Roll Ironer single roll (1.9 to 2.0 metres) Washer Extractor (23 to 34kg) Side Loading Washing Machine (67kg) Electrically heated Tumble Drier (23 to 34kg) Single Garment Press IUSS Laundry Standard Compliance Requirement Annexure (A) Basic Floor Layout Drawing