CARB Certification Program Working Plan

advertisement
CARB Certification Program Work Plan For New-applied Factory
Work Items
Co
.,
Lt
d.
Time Schedule
(Working Days)
NO.
Factory Need To Do
1
TPC Need To Do
Sign Contracts, mail out the samples and hard copy
contracts.
TBD
Sign, scan and sent back electronic contract.
Initial payments according to 11.1 of the signed
contract, sent the payments receipts to TPC.
1.Received the hard copy contract, sign and return to factory.
2. Recived samples and payments, start to qualifying testing.
3. Assign Engineer to contact factory, send QCM questionare form to factory.
4. Supply QC testing lab equipment list, if applicable.
4
7
Travel to factory for training, initial inspection and select samples from
production line for testing.
Condcut comparsion testing(Correlation test) with
TPC lab to set up new QCL value based on same
panels of each group.
Condcut comparsion testing(Correlation test) with
TPC lab to set up new QCL value based on same
panels of each group.
8
Finished the final payments
an
g
On-going production
Sh
11
5
5
2
3
Issue the electronic certificate to factory
1
Mail out hard copy certificate
7
Application Stage finished. 20 ~ 40 working days
On-going Works
Quarterly Inspection and testing Quarterly
Note: This working plan is released on April 2017, by Shanghai Hongjun Science & Technology Co.,Ltd.
QC Staff, CARB-certified products sales and key
persons need attend the training meeting.(About
2~3 hours)
Half day training for lab operation training, if
applicable.
Within 10 days after
samples received by If not use TPC lab.
TPC.
Establish new QCL value for factory, final approved QCM and evaluation the
certification program.
ha
i
10
Ho
ng
9
2
&
en
ce
Preparation for training and inspection.
Sc
i
6
Factory fill the QCM questionare, confirm QC testing lab
information.
Purchase QC testing lab equipments, if applicable.
ju
n
5
1
Te
ch
no
lo
gy
2
3
Note
Quarterly
Download