Enbridge Pipelines Inc.
Line 3 Replacement Program
Application Submitted to the NEB
Appendix 7-8
List of Codes, Standards and Specifications
Table 1: Canadian Industry Standards and Specifications
NUMBER
DESCRIPTION
REVISION
-
Alberta Transportation, Oil and Gas InstallationsGeneral Procedures
February 2010
-
Government of Alberta, Ministry of Transportation:
Application Procedures for Placement of
Underground Oil and High Pressure Gas Pipelines in
the Vicinity of Transportation Facilities Under the
Jurisdiction of Alberta Transportation
February 2010
CAN/CSA Z245.11-13
Steel Fittings
October 2013
CAN/CSA Z245.12-13
Steel Flanges
October 2013
CAN/CSA Z245.15-13
Steel Valves
October 2013
CAN/CSA Z245.20
Series 10
Plant-applied External Coatings for Steel Pipe
March 2012
CAN/CSA-G40.21-13
Structural Quality Steel
May 2014
CNR-0510
Pipeline Crossing Specifications
Not applicable
CSA A23.1-09
Concrete Materials and Methods of Concrete
Construction
March 2011
CSA C22.3 No. 6-13
Principles and Practices of Electrical Coordination
Between Pipelines and Electric Supply Lines
June 2014
CSA Z245.1
Steel Pipe
March 2014
CSA Z662
Oil and Gas Pipeline Systems
Reprinted
January 2012
Page 1 of 14
Enbridge Pipelines Inc.
Line 3 Replacement Program
NUMBER
Application Submitted to the NEB
Appendix 7-8
DESCRIPTION
REVISION
DIN EN 12954
Cathodic Protection of Buried or Immersed Metallic
Structures – General Principles and Applications for
Pipelines.
April 2001
NACE SP0169-2007
Control of External Corrosion on Underground or
Submerged Metallic Piping Systems (NACE
International [NACE])
October 2013
OCC-1-2013
Recommended Practice for Control of External
Corrosion on Buried or Submerged Metallic Piping
Systems (Canadian Gas Association [CGA])
June 2013
OPR-99
Onshore Pipeline Regulations (National Energy
Board)
July 2013
TC E-10
Government of Canada, Transport Canada:
Standards Respecting Pipeline Crossings Under
Railways
March 2014
Page 2 of 14
Enbridge Pipelines Inc.
Line 3 Replacement Program
Application Submitted to the NEB
Appendix 7-8
Table 2: US Industry Standards and Specifications
NUMBER
DESCRIPTION
REVISION
API SPEC 6D
Specification for Pipeline Valves
01 April 2008
API RP 1102
Steel Pipelines Crossing Railroads and Highways
01 December
2007
ASME B16.49-2012
Factory-Made, Wrought Steel, Buttwelding
Induction Bends for Transportation and
Distribution Systems
11 February
2013
ASME BPVC Section IX
Welding, Brazing and Fusing Qualifications
01 July 2013
Page 3 of 14
Enbridge Pipelines Inc.
Line 3 Replacement Program
Application Submitted to the NEB
Appendix 7-8
Table 3: Enbridge Standards and Specifications
DOCUMENT TITLE
LATEST REVISION
Construction Specifications
CPCS-003-SPEC-NDT Specification for Pipeline Construction
(Canada): Non-Destructive Testing
November 21, 2013
CPCS-005-SPEC-HYDRO Specification for Pipeline
Construction (Canada): Pipeline Hydrostatic Testing
December 13, 2013
CPCS-006-SPEC-HDD Specification for Pipeline Construction
(Canada): Horizontal Directional Drilling
January 23, 2014
CPCS-SPEC-PCCT-007: Specification for Pipeline
Construction (Canada): Post Construction Caliper Tool
December 13, 2013
CPCS-SPEC-PIPELINE-001 Specification for Pipeline
Construction (Canada): Pipeline Construction
January 2, 2014
CPCS-SPEC-PLW-002 Specification for Pipeline Construction
(Canada): Pipeline Welding
November 21, 2013
CPCS-SPEC-PS-008 Specification for Pipeline Construction
(Canada): Pipeline Surveying
July 11, 2013
CPCS-004-SPEC-PFC Specification for Pipeline Construction
(Canada): Pipeline Field Coating
November 21, 2013
Other
ENB-ENG-PROC-009 Design Review Procedure
August 11, 2014
ENB-ENG-PROC-010 Material Requisition Development
Procedure
June 17, 2014
Drawing Specifications
DS-001 Enbridge Drawing Standards
April 1, 2014
DS-002 Functional Tag Number Standard
April 1, 2014
Design Standards
Administration
D01-101 Use of Engineering Standards
January 1, 2005
D01-102 Policy & Style for Engineering Standards
October 20, 2008
Page 4 of 14
Enbridge Pipelines Inc.
Line 3 Replacement Program
Application Submitted to the NEB
Appendix 7-8
DOCUMENT TITLE
LATEST REVISION
General
D02-109 Pipeline Transient Hydraulics
March 1, 2013
D02-110 Fatigue Design of New Pipelines
July 3, 2013
D02-101 Design Basis, Electrical, Instrumentation & Controls
August 27, 2014
D02-102 Design Basis, Mainline
October 30, 2013
D02-103 Design Basis, Station & Terminal
December 18, 2013
D02-104 Hazardous Area Classification
October 30, 2013
D02-105 Fire Protection, Extinguishment
January 6, 2000
D02-106 Noise & Acoustic Dampening
September 1, 1999
D02 -108 Terminal Transient Hydraulics
December 18, 2013
Quality Assurance
D03-101 Pipeline Corrosion Assessment
September 1, 1999
D03-104 Weld Inspection
June 3, 2010
Corrosion Protection
D04-101 Cathodic Protection
March 1, 2013
D04-102 Painting, Coating and Lining
July 28, 2006
Civil/Structural: Earthwork & Improvements
D05-101 Facility & Tank Containment Systems
December 18, 2013
D05-102 Site Preparation, Earthwork, Grading, Roads &
Pavement
November 29, 2013
D05-103 Trenches, Underground Lines
November 29, 2013
Civil/Structural: Foundations
D05-201 Foundation, Oil Storage Tank
October 30, 2013
D05-202 Foundation, Station & Terminal
November 29, 2013
Civil/Structural: Buildings
D05-301 Building, Station & Terminal
December 18, 2013
D05-302 Laboratory, Sample & Sample Storage Buildings
March 13, 2013
Civil/Structural: Platforms, Racks, and Supports
D05-401 Platforms, Stairs and Ladders
December 18, 2013
Piping
D06-101 Piping Design & Construction, Mainline
October 9, 2013
D06-102 Piping Design, Station & Terminal
July 30, 2014
D06-103 Crossing Design, Mainline
November 29, 2013
Page 5 of 14
Enbridge Pipelines Inc.
Line 3 Replacement Program
Application Submitted to the NEB
Appendix 7-8
DOCUMENT TITLE
LATEST REVISION
D06-104 Pipe and Fittings, Steel
December 18, 2013
D06-105 Valve, Steel
October 30, 2013
D06-106 Piping Design & Construction, Auxiliary
November 29, 2013
Mechanical Equipment & Systems: Pumps
D07-102 Pump, Booster
December 18, 2013
Mechanical Equipment & Systems: HVAC
D07-201 HVAC, Building, Station & Terminal
December 18, 2013
D07-202 Heat Tracing
December 18, 2013
D07-203 HVAC, Pipeline Maintenance Building
April 30, 2014
Mechanical Equipment & Systems: General
D07-301 Sump System Design
December 18, 2013
Tankage & Storage Facilities: Low Vapor Pressure, Above Ground
D08-101 Oil Storage Tank
December 18, 2013
D08-102 Oil Storage Tank, Roof
December 18, 2013
D08-103 Oil Storage Tank, Accessories
September 25, 2013
Oil Measurement
D09-104 Custody Transfer Metering Systems
April 30, 2014
Power & Supply Distribution: Power System Design
D10-101 Power System Design
February 10, 2012
D10-102 Substation Design
October 30, 2013
D10-103 Switchgear & Motor Control Center
July 31, 2013
D10-104 Auxiliary Power Supplies
September 25, 2013
D10-105 Power System Protective Relaying
March 1, 2013
D10-106 Substation Grounding
November 29, 2013
D10-107 Surge Protection & Insulation Coordination
December 18, 2013
Power & Supply Distribution: Wiring Design
D10-201 Wiring Methods
October 30, 2013
D10-202 Grounding Methods
December 18, 2013
Electric Equipment: Motor & Drive
D11-102 Variable Frequency Drive
April 24, 2013
D11-103 Motor Protection
March 1, 2013
Page 6 of 14
Enbridge Pipelines Inc.
Line 3 Replacement Program
Application Submitted to the NEB
Appendix 7-8
DOCUMENT TITLE
LATEST REVISION
Electric Equipment: Lighting
D11-201 Lighting, Indoor
November 29, 2013
Electric Equipment: General
D11-301 Valve Actuation & Control
October 30, 2013
Instrumentation & Control: Pipeline Control
D12-102 Control, Injection & Delivery Facility
July 20, 2006
D12-104 Pressure Relief
May 28, 2014
D12-105 Mainline Leak Detection Equipment
October 30, 2013
Instrumentation & Control: Instrumentation & Control Equipment
D12-201 Instrumentation, General
May 28, 2014
D12-202 Gas Detection
May 28, 2014
D12-203 Fire Detection
December 1, 1999
D12-204 Vibration Monitoring
December 1, 1999
D12-205 Programmable Logic Controllers
January 4, 2008
D12-208 Pressure Control System
April 30, 2014
Engineering Equipment Specifications
General
EES000 Specification Guidelines
August 8, 2000
Electrical: 5 kV
EES010 Electric Valve Actuator Specification
October 30, 2013
EES023 Steel Fittings and Flanges
October 30, 2013
EES032 Medium Voltage Pad-mounted Switchgear
April 18, 2012
EES037 5 kV Power Factor Correction Capacitor Bank
November 29, 2013
EES049 5 kV Air Disconnect Switch – Outdoor Mounted
October 30, 2013
EES052 5 kV Load Break Disconnect Switch
November 29, 2013
EES054 5 kV Motor Starters
February 18, 2005
Electrical: Other
EES033 Low Voltage MCC
November 29, 2013
EES051 Instrument Cabinets & Control Panels
November 12, 2009
Page 7 of 14
Enbridge Pipelines Inc.
Line 3 Replacement Program
Application Submitted to the NEB
Appendix 7-8
DOCUMENT TITLE
LATEST REVISION
EES71 Steel Pipe Induction Bends Specification
November 29, 2013
EES074 Medium Voltage Variable Frequency Drive
September 25, 2013
EES108 Medium Voltage Distribution Circuit Breaker
November 29, 2013
EES115 Medium Voltage Solid State Reduced Voltage
Starters
November 29, 2013
Electrical: Power
EES013 Emergency Generator Set
December 18, 2013
EES030 Uninterruptible Power Supply
September 25, 2013
EES043 48 VDC Power Supply
November 29, 2013
Electrical: Transformers
EES045 Dry-Type Distribution Transformers
November 29, 2013
EES048 Pad-mounted Distribution Transformers
December 18, 2013
Mechanical
EES007 Sump Tanks
November 29, 2013
EES023 Steel Fittings & Flanges
October 30, 2013
EES061 Pipe Type Sleeves
March 28, 1999
EES068 Oil Tanks
December 18, 2013
EES071 Steel Pipe Induction Bends (Supplement to ASME
B16.49)
November 29, 2013
EES100 Electric-Welded Steel Pipe (Supplement to CSA
Z245.1)
May 1, 2008
EES101 Electric-Welded Steel Pipe (Supplement to API 5L)
December 21, 2012
EES102 Submerged-Arc Welded Steel Pipe (Supplement to
CSA Z245.1-07)
November 29, 2013
EES103 Submerged-Arc Welded Steel Pipe (Supplement to
API 5L)
November 29, 2013
EES129 Auxiliary Valves
December 18, 2013
Mechanical/Electrical: HVAC
EES031 Heating, Ventilation & Air Conditioning Unit
Page 8 of 14
November 29, 2013
Enbridge Pipelines Inc.
Line 3 Replacement Program
Application Submitted to the NEB
Appendix 7-8
DOCUMENT TITLE
LATEST REVISION
Mechanical/Electrical: Measurement
EES003 Meter Bi-Directional Provers
July 20, 2011
EES016 Positive Displacement Meters for Custody Transfer
May 28, 2014
EES041 Turbine Meters for Custody Transfer
May 9, 2008
EES055 Segmental Wedge Type Flow Meters
February 15, 2001
EES119 Ultrasonic Flow Meters
November 23, 2011
EES130 Flow Computer System
September 25, 2013
EES131 Densitometers
November 16, 2012
EES132 Viscometers
July 23, 2012
Mechanical/Electrical: Other
EES001 Tank Mixers
November 29, 2013
Mechanical/Electrical: Pumps & Motors
EES004 Vertical Centrifugal Primer Sump Pumps & Motors
November 29, 2013
EES021 Densitometer Pumps & Motors
December 18, 2013
EES027 Booster Pumps & Booster Pump Motors
December 18, 2013
Mechanical/Electrical: Valves & Actuators
EES006A Control Valve & Electro-Hydraulic Actuator
February 24, 2006
EES010 Electric Valve Actuator Specification
October 30, 2013
EES110 Triple Offset Valves
October 30, 2013
EES120 Check Valves
January 8, 2013
EES122 Plug Valves
April 10, 2013
EES124 Slab & Expanding Gate Valves
May 28, 2014
EES136 Ball Valves
November 29, 2013
Buildings
EES009 Overhead Cranes
November 29, 2013
EES011 Pre-Engineered Rigid Frame Building
November 29, 2013
Page 9 of 14
Enbridge Pipelines Inc.
Line 3 Replacement Program
Application Submitted to the NEB
Appendix 7-8
DOCUMENT TITLE
LATEST REVISION
EES014 Self Framing Metal Shelters
November 29, 2013
EES017 Skid Mounted Self Framing Metal Shelters
November 29, 2013
EES053 Skid Mounted Self Framing Hazardous Waste
Storage Building
November 29, 2013
EES125 Power & Controls Building
November 29, 2013
Painting Specifications
Coating
C-010 External Fusion Bonded Epoxy Coating for Mainline
Pipe
December 1, 2007
C-020 Fusion Bonded Epoxy Coating Overcoated with Powder
Coating
December 1, 2007
C-110 Coating of Buried Steel with Plural Component Spray
Applied Coatings
November 2007
C-210 Coating of Buried Steel with Rollable or Brushable
Coatings
August 1, 2007
C-310 Coating of Girth Welds with Fusion Bond Epoxy
November 2007
C-420 Coating of Buried Steel with Wax Tape Systems
October 2001
C-610 Transition Coating
April 2001
Lining
L-110 Fiberglass Lining of Tanks
May 2007
L-210 Lining of Tanks with Spray Applied Coatings
June 25, 2012
L-310 Lining of Tank Lines with Spray Applied of Fusion
Bonded Coatings
May 2008
Painting
P-110 Painting of Above Ground Tanks
January 2001
P-210 Shop & Field Painting: Construction
September 26, 2012
P-410 Painting Concrete Floors
February 2001
P-Prod List Approved Product Materials
March 8, 2013
Page 10 of 14
Enbridge Pipelines Inc.
Line 3 Replacement Program
Application Submitted to the NEB
Appendix 7-8
DOCUMENT TITLE
LATEST REVISION
Facility Construction Specifications
FCS001 Site Preparation & Earthwork
August 27, 2014
FCS002 Installation of Underground Piping & Electrical
Services
July 30, 2012
FCS003 Sewers & Drains
December 6, 2012
FCS004 Roads
December 12, 2012
FCS005 Grouting
December 12, 2012
FCS006 Concrete Including Reinforcement & Formwork
December 15, 2012
FCS007 Cast-In-Place Concrete Piles
December 12, 2012
FCS008 Steel Piles
December 13, 2012
FCS009 Precast Concrete Piles
August 27, 2014
FCS010 Electrical
December 6, 2012
FCS011 Instrumentation
December 6, 2012
FCS012 Facility Piping Construction
December 18, 2013
FCS013 Piping Classes
August 31, 2012
FCS014 Pressure Testing – Facility Piping
October 9, 2013
FCS015 Mechanical Equipment Installation
December 17, 2012
FCS016 PE & PVC Pressure Piping
August 31, 2012
FCS017 Coatings
July 30, 2012
FCS018 Structural Steel
December 14, 2012
FCS019 Painting
December 14, 2012
FCS020 Preservation of Mechanical Equipment
December 10, 2012
GS-001 Geospatial Data Deliverable
April 1, 2014
MPCR Mainline Painting Coating Requirements
July 1, 2002
MP-QMS-GUID-017 Inspection and Test Plan (ITP)
Preparation Guideline
December 17, 2013
MP-QMS-GUID-018 Inspection and Test Plan (ITP) Review
Guideline
December 17, 2013
Page 11 of 14
Enbridge Pipelines Inc.
Line 3 Replacement Program
Application Submitted to the NEB
Appendix 7-8
DOCUMENT TITLE
LATEST REVISION
TIR01-101 Technical Records Turnover
May 28, 2014
Industry Standard
API 650 Welded Steel Tanks for Oil Storage
API 610 Centrifugal Pumps for Petroleum, Petrochemical and
Natural Gas Industries
NFPA 11 Low, Medium and High Expansion Foam
NFPA 30 Flammable and Combustible Liquids Code
Page 12 of 14
Enbridge Pipelines Inc.
Line 3 Replacement Program
Application Submitted to the NEB
Appendix 7-8
Other Applicable Documents
Alberta Energy Regulator (AER). Directive 50, Drilling Waste Management.
Canadian Association of Petroleum Producers (CAPP), Canadian Energy Pipeline Association
(CEPA) and Canadian Gas Association (CGA). Pipeline Associated Watercourse Crossings,
Third Edition. October 2005.
Canadian Association of Petroleum Producers (CAPP), Canadian Energy Pipeline Association
(CEPA). Hydrostatic Test Water Management Guidelines. September 1996.
Canadian Association of Petroleum Producers (CAPP). Planning Horizontal Directional Drilling
for Pipeline Construction. September 2004.
Canadian Pipeline Water and Crossing Committee. Watercourse Crossings, Second Edition.
Fisheries and Oceans Canada (DFO). Fisheries Act. June 2012
Fisheries and Oceans Canada (DFO). Fresh Water Intake End-of-Pipe Fish Screen Guideline.
March 1995.
Fisheries and Oceans Canada (DFO). Species at Risk Act (SARA).
Government of Alberta. Alberta Environment. Water Act, Code of Practice for Pipelines and
Telecommunication Lines Crossing a Water Body.
Government of Alberta. Environmental Protection and Enhancement Act: Code of Practice for
the Release of Hydrostatic Test Water from Hydrostatic Testing of Petroleum Liquid and Gas
Pipelines. January 1999.
Government of Alberta. Water Act: Code of Practice for the Temporary Diversion of Water for
Hydrostatic Testing of Pipelines. January 1999.
Government of Canada. Environment Canada. Canada Water Act. R.S.C. 1985, c. C-11.
Government of Canada. Transport Canada, Navigable Waters Protection Act. R.S. 1985, c. N22.
Government of Manitoba. Manitoba Water Stewardship, Discharge of hydrostatic test water.
Water Quality Management section.
Government of Manitoba. Water Rights Act, Manitoba Water Stewardship, Water withdrawal for
hydrostatic testing as pre “water use licensing form and guidelines.”
http://www.gov.mb.ca/waterstewardship/licensing/wlb/water_use.html
Page 13 of 14
Enbridge Pipelines Inc.
Line 3 Replacement Program
Application Submitted to the NEB
Appendix 7-8
Government of Saskatchewan, Water Security Agency. Temporary Water Rights Licence for
Industrial Water Use, https://www.wsask.ca/Permits-and-Approvals/Regulatory-Info/TemporaryWater-Rights-Licence-for-Industrial-Water-Use/.
Government of Saskatchewan. Saskatchewan Environment Code, Enacted pursuant to the
Environmental Management and Protection Act, 2010.
Page 14 of 14