Uploaded by hoanghai.sce

B01-50-SCJV-MC-5000090032-003 AA

advertisement
TOC_EQ: 9-Aug-23
Vendor to delete Korean language. Only show English on drawing
Apply the Company General comments applicable form G.A. drawing for 50-E-5102 (B01-50-SCJV-MC-5000090032-002)
TOC_EQ: 9-Aug-23 G eneral Com m ent
1 , Vendor to add c ov er p age for this doc um ent
2, D elete c loud and hold item
SCJV
24-Jul-23
20
RECEIVED
TOC_EQ: 9-Aug-23
Vendor to add P ad for lifting lug on head
TOC_EQ: 9-Aug-23
1 /8 " p er A2.0 1 3
Please
spec ify E L
Please Update 3D model
after comfirmation
Please spec ify u n it.
Is it k g or k N ?
Please prov ide b u n dle
forc e for main ten an c e c ase
Please select one unit
kg or kN
Please c h ec k forc e, th ey
are same in 3 direc tion
N
Please modify north mark
-plot plan comment-
TOC_EQ: 9-Aug-23
Vendor to add 2 note for S /T heat ex c hanger:
21 , EX TER N AL P AIN TIN G : EQU IP M EN T P AIN TIN G S H AL L B E
AP P L IED AS P ER R L P P -CH ES -0 0 0 0 1 , R L P P -CH ES -0 0 0 0 3, and
1 0 5 0 -CH ES -0 0 0 0 3
22, All shell and head attac hm ents, inc luding noz z le nec k s, reinforc ing
p ads and struc tural attac hm ents hall c lear weld seam s b y a m inim um
5 0 m m . W hen unav oidab le, the seam shall b e ground flush and 1 0 0 %
radiograp hed to a m inim um of 5 0 m m b eyond eac h side of interfered
sec tion.
TOC_EQ: 9-Aug-23
Vendor to add Im p ac t Test req uirem ent
A2
M EAN
TOC_EQ: 9-Aug-23
M aterial need to c hec k again
M D M T is 1 0 deg C, so norm aliz e m aterial will b e not ap p lied
Download