Al Jazeera Hospital Facility Management and Safety Department Monthly Electrical Room Inspection Date: _______________ Location Panel No. Inspector: __________________________ Signature: ____________________ Rated Voltage (V) Main CB Rating (Amp) Actual Reading (Amp) Actual Voltage (V) L1 L2 L3 Thermograph Reading (ºC) N L1 L2 L3 STATUS Inspection Items REMARKS Satisfactory 1. Internal and external parts are free of damage 2. Panel is free from dust (internal and external) 3. Ammeter and voltmeter are accurate 4. Indicator lams are working, not busted. 5. A/C temperatures are in range (22 º C- 27ºC) 6. Cables are not frayed, not damaged and free from signs of burning Circuit breakers are free from damage and signs of burning, overheating 7. Unsatisfactory Other Comments: ________________________________________________________________________________________ ________________________________________________________________________________________ ________________________________________________________________________________________ ________________________________________________________________________________________ Prepared By: Checked and Approved By: Technician: _____________________ Engr. Ahmad Beshbishy – FMS Director: ___________________