CHECK LIST FOR EXCAVATION AND BACKFILL CCCC CONTRACTOR:- Check List No: Date: Inspection Time Inspection Date TO:SUBJECT DRAWING REF LOCATION CIVIL WORKS X Mark where applicable Survey ( ) Dimension Wet Conditions ( ) Surface water controlled or diverted Bedding ( ) Approved Material in use for Pipe etc. Bedding ( ) Levels ( )Plumb ( ) water pump ( )Thickness and Dimension of Bedding Utilities ( )Marking (Warning Tape) ( )Alignment Means of Access ( ) Site preparation including site formation & site access ( ) Lateral Travel to edge of Excavation should be 1 m Checked By: Surveyor QC Engineer Site Engineer ( )Exact location of utilities marked Backfilling ( ) Approved Material in use Grading/Shaping ( ) Approved Material in use ( ) Filling Placed in required ( )Compacting Verified by Lab Layers ( )Level/Dimensions ( ) Compaction Verified by Lab DATE &TIME DATE &TIME DATE &TIME Approval /Remarks Engineer's Rep: RECEIVED BY Date : Date & Time: Date & Time Approved under a using test on site Yann REDOULOUX 14 01 2017 :