Uploaded by Principal poly Roever

106 OCTOBER 2018

advertisement
-6-
106
Register \io.:
October 2018
Sketch 'Q' to accom pany OP Code: 106
Fi:ne - Th_ree hours
(Maximum Marks: 75)
Hon NO NOU.:>3S
I
(Sketch 'P' and 'Q' to accompany)
[N.B: (1) a.No. 8 in PART - A and a.No. 16 in PART - B are compulsory.
Answer any FOUR questions from the remaining in each PART - A
and PAR T - B
5' l l'O 11.WOSN"ln
Cl> l 'COi"909
(2) Answer division (a) or division (b) of each question in PART - C.
r'Z' 1·n<aa
(3) Each question carries 2 marks in PART - A, 3 marks in Part - B and
10 marks in PART - C. J
Iii
t:
t:
..
0
+
+
+
+
T :n1
r---·,
Q
M
1
t
PART - A
,t
t',i :!
I
l
1.
State any two necessities of specification.
2.
List the types of report.
3.
List any two factors affecting the value of the property.
4.
Define standard rent and market rent.
5.
Name the steel sections used in window grils.
6.
List the materials used in soak pit.
z
7.
.
i
8.
A tipper operate at the rate of
covey 160t for 20 km.
f
t··§8
..i§!i;
2
...
t.J I.bl
T
.+
.--+-.
-------
" ,.
..
..
g.+--1
1
l
L...+.rl.... ":;1-_:·
z
1-o--
-
--t
- i. --;:;
T
'
I
'
I
!
!!!
List any two items of work in water bound macadam road works .
- 2 5.00/Km/t, Calculate the cost to
PART - 8
185/12-6
9.
Write the specification for cement.
10.
Mention any three points to be considered while writing report.
11.
Calculate the annual instalment of sinking fund at 9% rate of
interest to accumulate a total amount of .25,00,000.
12.
. Explain in detailabout any three factors influencing the rent of
a bui ding.
13.
What is meant by standard data book and schedu e of rates?
14.
List the items of work involved in the construction of septic tank.
185/12-1
[Turn over.....
-2 -
-5-
Sketch 'P' to accompany QP Code: 106
15 . State the unit of measurement for (i)Rough stone dry packing
(ii)Surface dressing '(iii)Preparation of sub grade.
16. Write short notes on purpose of valuation.
I
osr'
..,
ooc
""001"'
no
Mw
z
e;
PART - C
-
1(1 l:l -
17.
(a)
I &!
l c.
Write detai ed specification for providing AC sheet roofing.
.,
(Or)
(b)
Write a report to accompany an estimate of 6 water supply
project proposed for a vil age.
v:lii
.....
,..
·.. :
18.
(a)
Find the capitalised value of the property from the fol owing
particulars:
·
Replacement value of the building
= .3 0,00,000
Estimated Life of the building
= 70 years
The rent of the building
= . 12,000/month
Taxes payable
= 16% of gross rent
Insurance premium
= 0.5% of gross rent
Repairs and management charges = 18% of gross rent
Interest on capital
= 9%
Interest on sinking fund = 6%
(Or)
(a)
i
{!.)
J.
=
----·----- ... •
I
I
!
·...
·..
... .
v
-
1_::_
...
I
!
...
··'
.."
.C:"•. !it
;;;
,."" ·
.» ·.·
- 1No
I
...•
:;!
§
II
..
i
Cl
Analyse and determine the rate for manufacturing and
supplying Ferro cement circular ring of 1.2 m diameter, 1.0 m
height and SO mm thick for wellsinking - 1No.
I
I
I .
l,u
q
I
IZ
z
s
:
I
I
<II
)
•
I
Ii;
I
. ..
..
I
.I
.:·.
I
I
I
I
I
l
I
I
I
·..·....•:
I
t
I
I
I
'I
I
I
I
I
6 mm size chips
Sand
Cement
6 mm MS bars
Binding wire
Chicken mesh
t:
00
ft
(i) Wr ite short notes on fixing rent of a private building used by
government.
(ii) Write short notes on rent control.
Materials required
0.......
I
.•:..::..'=......
19
z
E3
..
(b)
M
- 0.2 m3
- 0.13 m3
- 100 Kg
- 8 Kg
- 0.1 Kg
- 4 m2
.
L __
I
,...,.,.,
,--1
.f ;
185/12-2
185/12-5
I
I