Engr. Jahangir Hussain Nationality: Pakistani engg.jahangir@live.com Mobile No. +92 323 477 8923 Passport No. ZW6896982 Current Position: Asst. Manager With an extensive track record of Nine years in the Cathodic Protection and Corrosion Prevention field, I have had the privilege to contribute to various impactful projects catering to numerous clients. My expertise lies in the seamless execution of Cathodic Protection Systems and the efficient management of corrosion prevention processes. With a comprehensive understanding of Cathodic protection principles and corrosion mitigation techniques, I have played a pivotal role in implementing, and maintaining effective corrosion prevention systems for diverse clients and industries. My proficiency extends to material procurement, bid preparation, cost analysis, and adherence to stringent health, safety, and environmental. EDUCATION 2014 – 2016: M.Sc. Metallurgy & Material Engineering University of the Punjab, Lahore, Pakistan 2009 – 2013: B.Sc. Metallurgy & Material Engineering University of the Punjab, Lahore, Pakistan NACE MEMBERSHIP Holds NACE Membership # 10983444 PROFESSIONAL EXPERIENCE August 7, 2014 – To Date MAS associates (Pvt) Limited, Pakistan Responsibility/ Jobs Description: Conduct comprehensive Technical Audits of Cathodic Protection (CP) systems, encompassing both ICCP (Impressed Current Cathodic Protection) and Sacrificial Anode systems, to assess their performance and compliance with industry standards. Plan and execute Pre-design Site Surveys for CP system installations, including Soil Resistivity Surveys and Groundbed Location Surveys, to ensure optimal system design and performance. Installation CP Grid Systems for Tank Bottoms, ensuring the protection of critical infrastructure. Page 1 of 6 Handle end-to-end project management responsibilities, from planning and feasibility studies to execution and completion, while adhering to project standards and ensuring client satisfaction. Conduct Coordination Meetings with clients to provide updates on work progress and establish a clear project plan. Mobilize teams and coordinate construction activities at project sites, prioritizing quality and safety throughout the execution process. Oversee the Operation and Maintenance of Remote Monitoring Systems, enabling proactive management of CP systems and timely intervention when required. Utilize NACE criteria for CP systems to make adjustments and ensure compliance with industry standards. Manage material procurement and costing, including import processes and customs clearance, to ensure timely delivery of required materials for projects. Prepare detailed documentation, including techno-commercial proposals and survey commissioning reports, to support project bids and tender requirements. Consult with clients, vendors, and personnel to formulate accurate estimates and resolve project-related issues efficiently. Develop detailed Tender Documents and prepare both Technical and Commercial Proposals for submission to clients. Enforce a strong safety culture among workers by conducting Hazard Identification, Risk Assessments, and adherence to HSE rules and safe work procedures. Establish Emergency Response Procedures and Environmental Protection Requirements to mitigate potential risks and ensure a safe working environment. Update and maintain HSE documents to reflect current best practices and regulatory standards. Proficient in the installation of Flange Insulating Kits, Splicing Kits, Cadweld Joints, and Pin Brazing techniques, contributing to comprehensive CP system construction. Competent in preparing As-Built Drawings and CP Survey Reports to document system installations accurately. Familiarity with Cathodic Protection systems for onshore Pipelines, tank bottoms, and Condensers, enabling diverse project capabilities. Over 9 Years’ experience in Corrosion Control Department, the following projects: PAKISTAN STATE OIL o Rehabilitation of CP System at ZOT, BOT, PMY & SIHALA Terminals SUI SOUTHERN GAS COMPANY LIMITED o Installation of Remote Monitoring System at different locations of SSGC in Karachi Page 2 of 6 FATIMA POWER (FATIMA POWER PLANT SANAWAN-PUNJAB) o Audit/ Inspection of SCP system for plant piping at Fatima Power Plant, Sanawan, Punjab SHELL PAKISTAN (SHELL KEAMARI TERMINAL) o Installation, Testing & Commissioning of Cathodic Protection system 8” Dia. & 16” Dia TDL Pipelines at shell Keamari Terminal SNGPL (SUI NORTHERN GAS PIPELINES LIMITED) o Installation of Deep Well Groundbed Anode System at different 17 Nos. sites of SNGPL at Lahore region TPPL (TPPL (TOTAL PARCO PAKISTAN LIMITED SHIKARPUR TERMINAL) o Rehabilitation of CP system for Pipeline and Storage tanks at TPPL Shikarpur Terminal APL (ATTOCK PETROLEUM LIMITED SAHIWAL & MEHMOOD KOT TERMINAL) o Inspection of CP system for Pipelines & Storage Tanks at TPPL Shikarpur Terminal QATPL (QUAID-E-AZAM THERMAL POWER (PRIVATE) LIMITED BHIKKI-PUNJAB) o Rehabilitation of SCP system for plant piping at QATPL, Bhikki Sheikupura TPPL (TOTAL PARCO PAKISTAN LIMITED SHIKARPUR TERMINAL) o Inspection of CP system for pipelines, storage tanks at TPPL Shikarpur Terminal APL (ISLAMABAD INTERNATIONAL AIRPORT) o Audit/ inspection of existing cathodic protection system for fuel hydrant pipeline at Islamabad international airport SHELL (SHELL SHIKARPUR TERMINAL, SINDH) o Rehabilitation ICCP system for tanks and fuel transporting pipeline at Shell Shikarpur Terminal SHELL (SHELL MACHIKE TERMINAL, MACHIKE SHEIKHUPURA) o Installation of remote monitoring units for CP system for 12 dia. HSD pipeline at shell Machike terminal TPPL (TOTAL PARCO PAKISTAN LIMITED SHEIKHUPURA-PUNJAB) o Installation of ICCP system for 12”dia. 450 m long Mogas pipeline at TPPL Machike terminal T1 TPPL (TOTAL PARCO PAKISTAN LIMITED SHEIKHUPURA-PUNJAB) o Installation of ICCP system for 12”dia. 450 m long Mogas pipeline at TPPL Machike terminal T2 PSO LAHORE AIRPORT o AUDIT/ INSPECTION OF EXISTING CATHODIC PROETECTION SYSTEM FOR FUEL HYDRANT PIPELINE AND BURRIED TANKS AT PSO AVIATION SERVICES ALLAMA IQBAL INTERNATIONAL AIR PORT LAHORE Page 3 of 6 AL-TARIQ CONSTRUCTORS o AUDIT/ INSPECTION OF EXISTING CATHODIC PROETECTION SYSTEM FOR GAS PIPELINES AT GUDDU POWER STATION PARCO (SITE: PARCO MACHIKE TERMINAL, MACHIKE, PUNJAB) o Installation of ICCP System for 02 Nos. 18.1 M Dia. Mogas storage Tanks at PARCO Machike terminal PARCO (SITE: FAISALABAD TERMINAL, FAISALABAD, PUNJAB) o Installation of ICCP System for 12” Mogas, FW pipelines at PARCO Faisalabad terminal PARCO (SITE: MID COUNTRY REFINERY MAHMOOD KOT, PUNJAB) o Installation of ICCP System for plant piping at PARCO Mahmood Kot SAIF POWER PLANT o Installation, testing & Commissioning of CP System for plant pipelines HALMORE POWER PLANT o Installation, Testing & Commissioning of ICCP System for Plant pipelines SHELL PAKISTAN LIMITED o Installation, Testing & Commissioning of deep well ground bed for Shell Chaklala Installations SAPPHIRE ELECTRIC COMPANY LIMITED o Installation, Testing & Commissioning of ICCP System for Gas Pipeline o Inspection of CP system 6" Dia. 7.5km Fuel Pipeline Shell Chaklala to ARL, and 1.5km Fuel Pipeline Shell Chaklala to Airport SHELL (SITE: SHELL QUETTA AIRPORT, QUETTA-BALUCHISTAN) o Audit of existing ICCP system for Fuel Storage tanks at Quetta Airport BE (SITE: BAKARI ENERGY, SHEIKHUPURA-PUNJAB) o Audit/ Inspection of SCP system for 12” Dia. 1.5 KM Long Fuel Transportation Pipeline at BE Machike Terminal FATIMA POWER (SITE: FATIMA POWER PLANT SANAWAN-PUNJAB) o Audit/ Inspection of SCP system for plant piping at Fatima Power Plant, Sanawan, Punjab ELECTROWAYS (GO SARAI NAURANG DEPOT) o Installation, Testing & Commissioning of Cathodic Protection System for 2 nos. Tanks at Go Sarai Naurang Depot Page 4 of 6 ELECTROWAYS (HTL SAHIWAL DEPOT) o Installation, Testing & Commissioning of cathodic protection system for 4 nos. Sami buried tanks at HTL Sahiwal depot SHELL (SITE: SHELL SHILARPUR) o Audit of existing ICCP system at SHELL SHILARPUR Installations SHELL (SITE: SHELL MACHIKE) o Audit of existing CP system at SHELL MACHIKE Installations SHELL (SITE: SHELL CHAKLALA) o Audit of existing ICCP system at SHELL CHAKLALA Installations AGRI TECH (AGRI TECH FERTILIZER, MIANWALI) o Rehabilitation/up-gradation of existing ICCP system PSO (PAKISTAN STATE OILFURNACE OIL DEPOTE LALPIR MUZAFERGARH MULTAN) o Complete Inspection of installed CP System for 8” Dia. 2.5 KM PSO to PAKGEN, 10” Dia. 4.5 KM PSO to PARCO and 6” Dia. 32 KM PSO to KAPCO Furnace oil distribution Pipelines UPL (UCH POWER LIMITED, 485 MW POWER STATION, DARA MURAD JAMALI) o Installation of ICCP on 20”Dia 4.5KM Raw water Pipeline TPPL (TOTAL PARCO PAKISTAN LIMITED SHEIKHUPURA) o Installation of Sacrificial Cathodic Protection System for 10”Dia 450M Pipeline EPRF-II (ENAR PETROLEUM REFING FACILITY KORANGI KARACHI) o Installation of Sacrificial Cathodic Protection System for 8”Dia 4.5 Km Pipeline ATL (NATIONAL BENAZIR BHUTTO INTERNATIONAL AIRPORT, ISLAMABAD) o Installation of Impress current remote monitoring control on 14” dia.14 KM long hydrant refueling pipeline FRIENDS ENGINEERING (MANGLA DAM RAISING PROJECT MDR-32, MIRPUR, AJK) o Installation of ICCP system for 28” Dia. 9 Km Length Water Supply Pipeline July 4, 2012 – July 28 Worked as Internee in Pakistan Ordnance Factories Wah cantt Islamabad July 4, 2011 – July 29, 2011 Worked as Internee in Excel Engineering (PVT.) Limited Lahore Page 5 of 6 PROJECTS To investigate the welding & corrosion behavior of API X-56 steel pipe under sweet environment To investigate the fatigue behavior of welded and Unwelded AA6061 rod for failure investigation in frames of Bicycle Development of liquid cleaner which will also render a fabric fire proof CERTIFICATION Certified in IOSH MS under Institution of Occupational Safety and Health Certified in Energy Audit Tools & Techniques under Pakistan Engineering Council Certified in HABC level II Award in Health & Safety in the Workplace under High field Awarding Body for Compliance Participated in training of Fire Prevention & Management Training under HSE Culture Developers Participated in training of Introduction to Welding Metallurgy, Procedure & Performance PROFESSIONAL AFFILIATIONS Member of American Society for Testing and Materials (ASTM) with membership # 1613153 Member of American Oil Chemists Society with membership # 543940 Member of International Association of Engineers with membership # 139140 ACHIEVEMENTS/HONORS Participated in seminar “World Environment Day 2015” under PEC at PC Lahore Participated as organizer in LCCI Job Fair 2013 at Expo Centre Lahore Participated in Metallographic Competition 2012 organized under the College of Engineering & Emerging Technology University of The Punjab Lahore Participated in First Education Competition 2000 organized under the Phool club Vehari Senior Coordinator for the Sports Mela 2012 of the C.E.E.T. University of The Punjab Lahore Awarded as active Citizen of the Awaz Foundation Pakistan Center For Development Services Awarded Certificate of Appreciation by MAS Group SKILLS Autodesk AutoCAD Leadership C & C++ Language Presentations Microsoft Office Project Management Page 6 of 6