With an extensive track record of Nine years in the Cathodic Protection and Corrosion Prevention field, I have
had the privilege to contribute to various impactful projects catering to numerous clients. My expertise lies in
the seamless execution of Cathodic Protection Systems and the efficient management of corrosion prevention
processes.
With a comprehensive understanding of Cathodic protection principles and corrosion mitigation techniques, I
have played a pivotal role in implementing, and maintaining effective corrosion prevention systems for diverse
clients and industries. My proficiency extends to material procurement, bid preparation, cost analysis, and
adherence to stringent health, safety, and environmental.
EDUCATION
2014 – 2016:
M.Sc. Metallurgy & Material Engineering
University of the Punjab, Lahore, Pakistan
2009 – 2013:
B.Sc. Metallurgy & Material Engineering
University of the Punjab, Lahore, Pakistan
NACE MEMBERSHIP
Holds NACE Membership # 10983444
PROFESSIONAL EXPERIENCE
 August 7, 2014 – To Date
MAS associates (Pvt) Limited, Pakistan
Responsibility/ Jobs Description:



Conduct comprehensive Technical Audits of Cathodic Protection (CP) systems, encompassing both ICCP
(Impressed Current Cathodic Protection) and Sacrificial Anode systems, to assess their performance and
compliance with industry standards.
Plan and execute Pre-design Site Surveys for CP system installations, including Soil Resistivity Surveys
and Groundbed Location Surveys, to ensure optimal system design and performance.
Installation CP Grid Systems for Tank Bottoms, ensuring the protection of critical infrastructure.
Page 1 of 6















Handle end-to-end project management responsibilities, from planning and feasibility studies to
execution and completion, while adhering to project standards and ensuring client satisfaction.
Conduct Coordination Meetings with clients to provide updates on work progress and establish a clear
project plan.
Mobilize teams and coordinate construction activities at project sites, prioritizing quality and safety
throughout the execution process.
Oversee the Operation and Maintenance of Remote Monitoring Systems, enabling proactive
management of CP systems and timely intervention when required.
Utilize NACE criteria for CP systems to make adjustments and ensure compliance with industry
standards.
Manage material procurement and costing, including import processes and customs clearance, to ensure
timely delivery of required materials for projects.
Prepare detailed documentation, including techno-commercial proposals and survey commissioning
reports, to support project bids and tender requirements.
Consult with clients, vendors, and personnel to formulate accurate estimates and resolve project-related
issues efficiently.
Develop detailed Tender Documents and prepare both Technical and Commercial Proposals for
submission to clients.
Enforce a strong safety culture among workers by conducting Hazard Identification, Risk Assessments,
and adherence to HSE rules and safe work procedures.
Establish Emergency Response Procedures and Environmental Protection Requirements to mitigate
potential risks and ensure a safe working environment.
Update and maintain HSE documents to reflect current best practices and regulatory standards.
Proficient in the installation of Flange Insulating Kits, Splicing Kits, Cadweld Joints, and Pin Brazing
techniques, contributing to comprehensive CP system construction.
Competent in preparing As-Built Drawings and CP Survey Reports to document system installations
accurately.
Familiarity with Cathodic Protection systems for onshore Pipelines, tank bottoms, and Condensers,
enabling diverse project capabilities.
Over 9 Years’ experience in Corrosion Control Department, the following projects:
PAKISTAN STATE OIL
o Rehabilitation of CP System at ZOT, BOT, PMY & SIHALA Terminals
SUI SOUTHERN GAS COMPANY LIMITED
o Installation of Remote Monitoring System at different locations of SSGC in Karachi
Page 2 of 6
FATIMA POWER (FATIMA POWER PLANT SANAWAN-PUNJAB)
o Audit/ Inspection of SCP system for plant piping at Fatima Power Plant, Sanawan, Punjab
SHELL PAKISTAN (SHELL KEAMARI TERMINAL)
o Installation, Testing & Commissioning of Cathodic Protection system 8” Dia. & 16” Dia TDL Pipelines at
shell Keamari Terminal
SNGPL (SUI NORTHERN GAS PIPELINES LIMITED)
o Installation of Deep Well Groundbed Anode System at different 17 Nos. sites of SNGPL at Lahore region
TPPL (TPPL (TOTAL PARCO PAKISTAN LIMITED SHIKARPUR TERMINAL)
o Rehabilitation of CP system for Pipeline and Storage tanks at TPPL Shikarpur Terminal
APL (ATTOCK PETROLEUM LIMITED SAHIWAL & MEHMOOD KOT TERMINAL)
o Inspection of CP system for Pipelines & Storage Tanks at TPPL Shikarpur Terminal
QATPL (QUAID-E-AZAM THERMAL POWER (PRIVATE) LIMITED BHIKKI-PUNJAB)
o Rehabilitation of SCP system for plant piping at QATPL, Bhikki Sheikupura
TPPL (TOTAL PARCO PAKISTAN LIMITED SHIKARPUR TERMINAL)
o Inspection of CP system for pipelines, storage tanks at TPPL Shikarpur Terminal
APL (ISLAMABAD INTERNATIONAL AIRPORT)
o Audit/ inspection of existing cathodic protection system for fuel hydrant pipeline at Islamabad
international airport
SHELL (SHELL SHIKARPUR TERMINAL, SINDH)
o Rehabilitation ICCP system for tanks and fuel transporting pipeline at Shell Shikarpur Terminal
SHELL (SHELL MACHIKE TERMINAL, MACHIKE SHEIKHUPURA)
o Installation of remote monitoring units for CP system for 12 dia. HSD pipeline at shell Machike terminal
TPPL (TOTAL PARCO PAKISTAN LIMITED SHEIKHUPURA-PUNJAB)
o Installation of ICCP system for 12”dia. 450 m long Mogas pipeline at TPPL Machike terminal T1
TPPL (TOTAL PARCO PAKISTAN LIMITED SHEIKHUPURA-PUNJAB)
o Installation of ICCP system for 12”dia. 450 m long Mogas pipeline at TPPL Machike terminal T2
PSO LAHORE AIRPORT
o AUDIT/ INSPECTION OF EXISTING CATHODIC PROETECTION SYSTEM FOR FUEL HYDRANT PIPELINE AND
BURRIED TANKS AT PSO AVIATION SERVICES ALLAMA IQBAL INTERNATIONAL AIR PORT LAHORE
Page 3 of 6
AL-TARIQ CONSTRUCTORS
o AUDIT/ INSPECTION OF EXISTING CATHODIC PROETECTION SYSTEM FOR GAS PIPELINES AT GUDDU
POWER STATION
PARCO (SITE: PARCO MACHIKE TERMINAL, MACHIKE, PUNJAB)
o Installation of ICCP System for 02 Nos. 18.1 M Dia. Mogas storage Tanks at PARCO Machike terminal
PARCO (SITE: FAISALABAD TERMINAL, FAISALABAD, PUNJAB)
o Installation of ICCP System for 12” Mogas, FW pipelines at PARCO Faisalabad terminal
PARCO (SITE: MID COUNTRY REFINERY MAHMOOD KOT, PUNJAB)
o Installation of ICCP System for plant piping at PARCO Mahmood Kot
SAIF POWER PLANT
o Installation, testing & Commissioning of CP System for plant pipelines
HALMORE POWER PLANT
o Installation, Testing & Commissioning of ICCP System for Plant pipelines
SHELL PAKISTAN LIMITED
o Installation, Testing & Commissioning of deep well ground bed for Shell Chaklala Installations
SAPPHIRE ELECTRIC COMPANY LIMITED
o Installation, Testing & Commissioning of ICCP System for Gas Pipeline
o Inspection of CP system 6" Dia. 7.5km Fuel Pipeline Shell Chaklala to ARL, and 1.5km Fuel Pipeline Shell
Chaklala to Airport
SHELL (SITE: SHELL QUETTA AIRPORT, QUETTA-BALUCHISTAN)
o Audit of existing ICCP system for Fuel Storage tanks at Quetta Airport
BE (SITE: BAKARI ENERGY, SHEIKHUPURA-PUNJAB)
o Audit/ Inspection of SCP system for 12” Dia. 1.5 KM Long Fuel Transportation Pipeline at BE Machike
Terminal
FATIMA POWER (SITE: FATIMA POWER PLANT SANAWAN-PUNJAB)
o Audit/ Inspection of SCP system for plant piping at Fatima Power Plant, Sanawan, Punjab
ELECTROWAYS (GO SARAI NAURANG DEPOT)
o Installation, Testing & Commissioning of Cathodic Protection System for 2 nos. Tanks at Go Sarai Naurang
Depot
Page 4 of 6
ELECTROWAYS (HTL SAHIWAL DEPOT)
o Installation, Testing & Commissioning of cathodic protection system for 4 nos. Sami buried tanks at HTL
Sahiwal depot
SHELL (SITE: SHELL SHILARPUR)
o Audit of existing ICCP system at SHELL SHILARPUR Installations
SHELL (SITE: SHELL MACHIKE)
o Audit of existing CP system at SHELL MACHIKE Installations
SHELL (SITE: SHELL CHAKLALA)
o Audit of existing ICCP system at SHELL CHAKLALA Installations
AGRI TECH (AGRI TECH FERTILIZER, MIANWALI)
o Rehabilitation/up-gradation of existing ICCP system
PSO (PAKISTAN STATE OILFURNACE OIL DEPOTE LALPIR MUZAFERGARH MULTAN)
o Complete Inspection of installed CP System for 8” Dia. 2.5 KM PSO to PAKGEN, 10” Dia. 4.5 KM PSO to
PARCO and 6” Dia. 32 KM PSO to KAPCO Furnace oil distribution Pipelines
UPL (UCH POWER LIMITED, 485 MW POWER STATION, DARA MURAD JAMALI)
o Installation of ICCP on 20”Dia 4.5KM Raw water Pipeline
TPPL (TOTAL PARCO PAKISTAN LIMITED SHEIKHUPURA)
o Installation of Sacrificial Cathodic Protection System for 10”Dia 450M Pipeline
EPRF-II (ENAR PETROLEUM REFING FACILITY KORANGI KARACHI)
o Installation of Sacrificial Cathodic Protection System for 8”Dia 4.5 Km Pipeline
ATL (NATIONAL BENAZIR BHUTTO INTERNATIONAL AIRPORT, ISLAMABAD)
o Installation of Impress current remote monitoring control on 14” dia.14 KM long hydrant refueling
pipeline
FRIENDS ENGINEERING (MANGLA DAM RAISING PROJECT MDR-32, MIRPUR, AJK)
o Installation of ICCP system for 28” Dia. 9 Km Length Water Supply Pipeline
 July 4, 2012 – July 28
Worked as Internee in Pakistan Ordnance Factories
Wah cantt Islamabad
 July 4, 2011 – July 29, 2011
Worked as Internee in Excel Engineering (PVT.) Limited
Lahore
Page 5 of 6
PROJECTS



To investigate the welding & corrosion behavior of API X-56 steel pipe under sweet environment
To investigate the fatigue behavior of welded and Unwelded AA6061 rod for failure investigation in
frames of Bicycle
Development of liquid cleaner which will also render a fabric fire proof
CERTIFICATION





Certified in IOSH MS under Institution of Occupational Safety and Health
Certified in Energy Audit Tools & Techniques under Pakistan Engineering Council
Certified in HABC level II Award in Health & Safety in the Workplace under High field Awarding Body
for Compliance
Participated in training of Fire Prevention & Management Training under HSE Culture Developers
Participated in training of Introduction to Welding Metallurgy, Procedure & Performance
PROFESSIONAL AFFILIATIONS



Member of American Society for Testing and Materials (ASTM) with membership # 1613153
Member of American Oil Chemists Society with membership # 543940
Member of International Association of Engineers with membership # 139140
ACHIEVEMENTS/HONORS







Participated in seminar “World Environment Day 2015” under PEC at PC Lahore
Participated as organizer in LCCI Job Fair 2013 at Expo Centre Lahore
Participated in Metallographic Competition 2012 organized under the College of Engineering &
Emerging Technology University of The Punjab Lahore
Participated in First Education Competition 2000 organized under the Phool club Vehari
Senior Coordinator for the Sports Mela 2012 of the C.E.E.T. University of The Punjab Lahore
Awarded as active Citizen of the Awaz Foundation Pakistan Center For Development Services
Awarded Certificate of Appreciation by MAS Group
SKILLS