Overhead & Gantry Crane Operation 1.) Hoist operator must inspect equipment daily before use. 2.) Do not operate crane or hoist, if limits switch, steel ropes, chain or other components are worn or in disrepair. 3.) Replace nylon or web sling immediately if excessively worn. 4.) Associates in the direction of travel should be warned to move and remain clear of lifted load all the times. 5.) Loads should not be suspended over personal below. 6.) Under no circumstances anyone ride the hook or load. 7.) Directional movement should be made smoothly and deliberately. Avoid rapid movement in any direction. 8.) Do not exceed the rated load capacity of the crane hoist, chain, cable, slings, or other components. 9.) Slings, load chains and other lifting devices must be fully and securely seated in the hook before moving the load. Remove slack from the sling, chain or cable before lifting the load. 10.) Locate the hoist directly above the lifting point of the load before lifting 11.) Lower load directly to the hoist. 12.) Keeps hoists vertical. Do not pull or push the load. 13.) Maintain two full wraps of cable on the hoisting drum.