Uploaded by NANDA KISHORE BOSE

IBR,1950

advertisement
Reg. 375*
REGULATIONS FOR THE REGISTRATION OF BOILERS AND INSPECTION OF
BOILERS AND STEAM-PIPES
The procedure to be followed in connection with applications for the registration of a boiler and
with examinations of boilers under the Act shall be regulated in accordance with the provisions
of this Chapter read with the relevant Sections of the Act.
REG.376
Preparation for Inspection
a) At every examination of boiler or the grant of renewal of a certificate, the boiler shall be
empty and thoroughly clean in all its parts. Except as provided as for in sub-regulation (f) all
doors of manholes, handholes and sightholes and cleaning plugs and all caps in the leaders
and mud drums of water tube boilers, all firebars, bearers, front plates, bridge plates, fire
bridges brick arches, oil fuel burners and mechanical stoker fittings shall be removed. All
valves and cocks comprising the boiler mounting shall be opened up and taken apart and the
valves or cocks ground, when necessary, before the Inspectors’ visit.
b) Provision shall if, required by the Inspector, be made for the removal of lagging or brickwork or other concealing part and for the drilling of plates, and for verifying the pressure
gauge and safety valve dimensions and weights.
c) All smoke tubes, exterior of water tubes, smoke boxes, and external flues shall be swept
clean.
d) Provision shall be made for the effective disconnection of all steam and hot water
communication with another boiler under steam as required in Chapter IX-A of these
Regulations
e) No blank flange/plug shall be inserted between a safety valve chest and the boiler generally
and where it is permitted by the Inspector, the blank flange/plug shall be removed in his
presence.
f)
At alternative annual inspections and subject to a minimum of three bottom rows or all tubes
subject to the first pass of heat being opened up for inspection the Inspector may at his
discretion relax the preparation for inspection called for under (a) above in favour of boilers
having an evaporative capacity of 200,000 lbs. per hour and over, and fed either water
treated to the satisfaction of the Inspectors.
g) In the case of forced flow and forced circulation types of boilers, provisions shall be made
for checking that proper circulation is maintained through all sections of the circuit by the
flow of water.
* Note:- In accordance with section 7 and 8 of the Act, Inspectors are required to measure
and examine boilers for registration, to examine boilers for renewal certificates, to determine
subject to the approval of the Chief Inspector, the pressure at which they may be allowed to
work, to grant certificate therefor and generally to convey to the owners such orders as the
Chief Inspector may issue.
Reg. 377, Reg. 378
Hydraulic test of boilers for registration
Every boiler shall be hydraulically tested in the presence of an Inspector.
Reg. 378
Preparation for hydraulic tests
a) The chest of all mountings subject to the steam pressure shall be in place and shut tight or
blank flanged.
b) The safety valves should invariably be removed and the chest opening blank flanged.
c) The attachment for the Inspector’s pressure gauge shall be in order.
d) All doors shall be properly jointed and tightened up. The boiler shall be completely filled
with water, care being taken to allow all air to escape and, if possible, a preliminary test not
exceeding the working pressure of the boiler shall be taken before the Inspector’s visit, to
test the tightness of the joints.
e) When a boiler is hydraulically tested for the first time, it shall be entirely cleared of lagging
or brickwork; at subsequent tests the lagging or brickwork, or portions thereof, shall be
removed
if
required
by
the
Inspector.
Provided that the Inspector may, at his discretion, allow the lagging and brick work to
remain in situ, in case of boilers where the covered parts have been fabricated and tested
before erection in position.
Reg.379
Procedure of hydraulic tests
a)
(i)
Subject to the provisions of sub-regulation (e) of regulation 381, every boiler shall be
hydraulically tested after erection at site in presence of the Inspector to 1¼ times the
maximum working pressure as certified by the Inspecting Authority in Form II, to be
stamped on the boiler, as free from any indication of weakness or defects.
(ii) If all components of the boiler in the manufacturer’s premises have not been tested
hydraulically as per regulation 268, the test, on completion, shall be taken to 1½ times
the maximum working pressure.
(iii) The temperature of the water used as medium of pressure testing shall not be less than
20°C and greater than 50°C.
(iv) The test pressure shall be raised gradually under proper control at all times so that it
never exceeds by more than 6% of the required pressure and maintained for 30
minutes whereupon the pressure shall be reduced to maximum allowable working
pressure and maintained for sufficient time to permit close visual inspection for
leakage of pressure parts.
b) The boiler shall satisfactorily withstand such pressure without appreciable leakage or undue
deflection or distortion of its parts for at least ten consecutive minutes. If the test is not
satisfactory, the working pressure allowable by calculation shall be suitably reduced, unless
the owner desires to make such alterations as will enable the boiler to withstand satisfactorily
the hydraulic test, in which case the boiler shall again be examined after the alterations have
been made, the pressure recalculated, if necessary, and the boiler tested to the satisfaction of
the Inspector.
c) * At the first hydraulic test of a boiler prior to the issue of an original certificate deflection
measurements shall be made before, during and after test of each furnace length, fire-box and
flat end or other plates.
d) After the application of the hydraulic test the Inspector shall carefully examine the boiler
inside and outside and satisfy himself that it has satisfactorily withstood the test.
e) In any case in which the safe working pressure to be allowed for a boiler cannot, owing to
peculiar construction of any of its parts, be determined by calculation in the ordinary way,
the Inspector shall, under the direction of the Chief Inspector, subject the boiler to hydraulic
test for the purpose of determining the fitness of such parts. The amount of the test pressure
to be applied in such a case shall not exceed the test pressure prescribed for the least working
pressure found by calculation for other parts of the boiler or the intended working pressure
whichever is less.
f) Should any part of the boiler show undue deflection or indication of permanent set during the
progress of the test, the pressure shall be released immediately such indications are observed.
The working pressure for the part shall be 40 per cent of the test pressure applied when the
point of permanent set was reached. This procedure shall apply to any boiler at any test.
g) Hydraulic tests of boilers at subsequent examination shall, except when the Inspector
expressly requires otherwise, be made after the inspection. The test pressure to be applied to
boilers at such subsequent examinations shall be from one and a quarter to one and a half
times the working pressure of the boiler.
h) When the internal construction of size of a boiler does not permit of the Inspector getting
inside it or of examining closely all its parts, he shall see it tested by hydraulic pressure to
one and a half times the working pressure at each inspection or the grant or renewal of a
certificate.
i) Water tube locomotive type and all tubular boilers shall be hydraulically tested at each
inspection for the grant or renewal of a certificate, unless such test is waived under the order
of the Chief Inspector.
j) The Inspector may if the considers it necessary, apply a hydraulic test to any boiler at any
inspection.
k) Except in the case of vertical boilers, heating surface of which is less than 18.58 sq.m. (200
sq. ft.), portable and vehicular boilers, which do not require re-erection or building in
brickwork, the hydraulic test of all boiler shall be conducted only after the erection of the
boiler in situ and all boilers shall after re-erection in a position different from that in which
they were last examined be hydraulically tested.
* NOTE:-These deflection measurements should be entered in the Memorandum of Inspection
Book before its submission to the Chief Inspector.
l) A hydraulic test shall also be taken before granting an increased pressure certificate and after
repairing a boiler. However, in the case of minor repairs to the Water Tube boilers where
NDT has been carried out, hydraulic testing may be dispensed with provided NDT is carried
out by an approved method.
m) When carrying out hydraulic test, Inspectors shall use pressure gauges supplied by the Chief
Inspector.
Reg. 380*
Steam tests
a) Every newly registered boiler and every other boiler of which the working pressure has been
altered shall, before the issue of an original or renewal certificate for such boiler, be tested
under steam to the satisfaction of the Inspector.
b) at the time of test the safety valves shall be left free and capable of being adjusted to the
approved working pressure.
c) After adjustment of the valves to the correct blowing pressure the boiler shall be tried under
full steam and firing with the feed water shut off and the stop-valve closed, during which time
the Inspector shall note the accumulation of pressure and other details of the test as well as
the
loading
and
adjustment
of
the
safety
valves.
In the case of water tube boiler or boilers fitted with super heaters, the feed water connection
and stop valve need not be shut off and if the total safety valve are is lifted and found to be
adequate by calculations, the requirement of the accumulation test may be assumed to have
been satisfied if the valves are or have been found so adjusted that at least one safety valve on
each boiler shall lift at or below the designed working pressure of the boiler and all valves
shall lift so that all steam which can be generated by the boiler can be discharged with a
pressure rise not exceeding 10% of the designed working pressure.
d) Before the safety valve test, the Inspector shall satisfy himself that the water gauges are in
working order and that the feed apparatus is capable of supplying the boiler with sufficient
water.
e) Where the State Government does not require a person-in-charge of a boiler to hold a
certificate of competency, the Inspector may, when he thinks fit, satisfy himself by
questioning or by practical test whether the person-in-charge of the boiler understands the use
and purpose of the water gauges, the pressure gauge, the safety valves, the feed water-supply
and blow down.
f) When witnessing safety valve test, Inspectors shall use the standard pressure gauges supplied
by the Chief Inspector unless the boiler pressure gauge has, since the time of inspection, been
tested
and
found
correct
with
an
authorized
testing
machine.
NOTE:- A steam test is primarily intended for the purpose of ascertaining by actual test
whether the safety valves are sufficient to reliever boilers effectively of excess steam and
whether they operate at the time when the maximum working pressure is reached. Inspectors
should always send to the owner due notice of the date fixed for the steam test.
On completion of the test the Inspector should enter all details in the Memorandum of
Inspection Books.
g) No steam gauge shall be used without a syphon filled with water between it and the boiler.
h) When the accumulation of the maximum working pressure, the area of the safety valves shall
be considered insufficient, and a certificate shall be refused until the safety valve area is
increased.
i) An Inspector may, when visiting a factory for any purpose, verify the correctness of the safety
valves and pressure gauge of any boiler under steam by comparison with him standard
pressure gauge.
Reg. 381
Procedure for registration
a) On receipt of an application for registration under Section 7(1) of the Act, the Inspector shall,
when the boiler has been properly prepared for examination proceed to measure in complete
detail all its parts, ascertain the working pressure allowed by the Regulations by making a
series of calculations of the strength of the various parts, such calculations being based on his
measurement and if he is satisfied with the correctness of the maker’s certificate, on the
dimensions and other particulars relating to the material and construction as stated therein
[vide Section 14(1)(c) of the Act and Regulation]. In making his calculations he shall after
examination of the material, take due account of the workmanship and details of the
construction of each part. In his examination the Inspector may, if he deems necessary bore
the plates or other parts to ascertain their thickness and in making his calculations he shall be
guided by the requirements of the Regulations.
b) If no formulae or co-efficient applicable to any part is contained in the Regulations, the Chief
Inspector shall in his discretion determine the fitness of such part.
c) The strength of the weakest part so calculated or determined, subject to any discretionary
power exercised by the Chief Inspector, shall determine the permissible working pressure of
the boiler. After inspecting the boiler and ascertaining by the prescribed calculations the
maximum pressure at which the boiler may be worked, the Inspector shall hydraulically test
and steam-test it in accordance with requirements of Regulations 379 and 380 and a
provisional order under Section 9 of the Act in Form V may be issued after the hydraulic test.
d) The Inspector shall enter the above particulars and dimensions of the boiler and calculations
of strength of the various parts, together with details of the hydraulic and of the steam tests, in
a “Memorandum of Inspection” Book (vide Regulation 386) which, together with all the
maker’s papers for the boiler, shall be submitted to the Chief Inspector with the Inspector’s
report under sub-section (3) of Section 7 of the Act in Form I.
e) Where a certificate in Form II and a Memorandum of Inspection Book in Form I are furnished
by an Inspecting Authority in accordance with sub-regulation (c) of Regulation 4, the
Inspector shall, on receipt of an application for registration under sub-section (1) of Section 7
of the Act, proceed to make such examination and measurement of boiler as will satisfy him
that the boiler is the one certified by the Inspecting Authority and carry out a thorough
examination and check the measurements to ensure the correctness of the Inspecting
Authority’s certificate and that no damage has been caused in transit.
The Inspector shall, if he is satisfied with the condition of the boiler, the correctness of the
particulars and approved working pressure entered in Form I by the Inspecting authority,
subject the boiler to hydraulic test in accordance with Regulation 379.
When the Inspector is satisfied that the boiler has satisfactorily withstood the test, he shall
issue a provisional order to enable the boilers to the worked.
Reg. 383
Measurement of heating surface
a) For the purpose of regulating the area of the safety valves and the amount of registration and
inspection fees the “heating surface” of a boiler shall be the total surface of all plates and
tubes exposed to heat on one side and in contact with water on the other measured on the
water side or the fire side, whichever is larger.
b) For Lancashire and Cornish boilers the total heating surface shall include the wetted surface
of the furnaces between the end plates, the fire surface of cross tube where fitted, and the part
of the external shell below the side flue covers. In estimating the areas furnaces shall be
considered as plain cylinders the area of their wetted surface shall be taken as their mean
external circumference x the length of the boiler between end plates. For the shell the width
of that part of the circumference below the flue covers shall be taken as = 2 D, and this width
+ the length between end plates shall be taken as the area of shell heating surface. The part of
the surface of the back-end plate exposed to heat shall be omitted from the calculation.
Example.- The formula for the total heating surface of a Lancashire boiler having plain
furnaces
without
cross
tubes
is
as
follows:H.S. in square feet = 2L(3.14 d + D). L is the length of the boiler between end plates in feet
and D is the internal diameter of the largest belt of shell in feet.
c) For steam and water drums of water tube boilers the heating surface of the drum shall be
taken as half the external mean circumference multiplied by the clear length of drum between
the outer brick walls or centres of cross boxes, as the case may be. The heating surface of the
tubes shall be taken as the external surface of the tubes between the tube plates or heaters.
The heating surface of the heaters shall be omitted from the calculation.
d) For marine boilers of the fire-tube type, the heating surface shall include the wetted surface of
the furnaces between the tube plates (considered in the same way as for Lancashire boilers),
the wetted surface of the combustion chambers (less the area of the tube holes) and the wetted
surface of the tubes between tube plates. The parts of the front tube plate exposed to heat shall
be omitted from the calculation.
e) For locomotive type boilers, the heating surface shall include the wetted surface of the firebox above the foundation ring (less the area of the tube holes and the firehole and ring) and
the wetted surface of the tubes between the tube plates. The smoke box tube-plate shall be
omitted from the calculation.
f) For vertical boilers of ordinary type the heating surface shall include the wetted surface of the
fire-box above the foundation ring (less the area of fire hole and ring and tube holes if any)
and the surface of any cross or other tubes and uptake below the lowest water level shown in
the gauge glass.
g) For Electrode boilers the heating surface shall be calculated as follows:
Heating surface =
E
6
where E = the equivalent evaporation at 212°F under normal load, which x K.W.
K.W. the kilowatts absorbed at the stated voltage when the water in the boiler has a specific
resistance of not less than 200 ohms per inch tube at 150oF and while the boiler is delivering
its normal output of steam at its working pressure with the feed water temperature of 60°F,
h) No deduction shall be made for stays, etc., in calculating the heating surface.
i) For any other heating surface not provided for in the foregoing instructions the same general
procedure shall be observed.
Reg. 384
Boiler rating
The boiler rating shall be the number of square metres (to the nearest whole number) in the
heating surface of the boiler as determined under Regulation 383.
Reg. 386
* Memorandum of Inspection Book
a) A Memorandum of Inspection Book shall be prepared for each boiler in Form I. In this book
the Inspector shall enter in ink all particulars and dimensions of the boilers with the
calculations for the various parts in details, particulars of hydraulic test and steam test and his
inspection notes.
b) At subsequent inspections Inspectors shall enter the dates of the inspections hydraulic tests
and steam tests, when such are made with their notes thereon.
c) Inspectors should also enter in the Memorandum of Inspection Book the general condition of
the boiler and of repairs, to what extent boiler have been cleared of brick work, etc., a report
of all casual visits for inspection of repairs, for inspection of main-steam-pipes, and reports on
accidents, etc., in this way the Memorandum of Inspection Book will provide a useful record
of the boiler’s history for the information and guidance of Inspectors at subsequent
inspections.
d) On submission of the Memorandum Book to the Chief Inspector he will in the case of newly
registered boilers, check all particulars and calculations and approve of the working pressure
that is to be permitted. In the case of old boilers, the Chief Inspectors will examine the
Inspector’s notes of inspection and proposals made for repairs or reduction of pressure. A
pressure once approved for the boiler should not be altered without the written authority of
the Chief Inspector.
* The Memorandum of Inspection Book should always be kept clean and up-to date
Inspection Books except when actually required by Inspector, should be filled in the office of
the Chief Inspector.
Reg. 387,
Registration Book
a) A Registration Book or copy of Memorandum of Inspection Book containing all the
particulars required for registration shall be maintained in the office of the Chief Inspector in
Form I and any order passed by him regarding the boiler shall be entered in the Registration
Book under his initials.
b) The Chief Inspector should also see that the note of subsequent inspections entered in the
Memorandum of Inspection Book are copied in the Registration Book.
Reg. 388, Reg. 389
Transfer of Memorandum of Inspection Book and Registration Book
On a boiler passing from one State to another, the Memorandum of Inspection Book and the
Registration Book shall, on the request of the Chief Inspector of the State to which the boiler has
been transferred, be forwarded to that officer who shall take over their custody and maintain
them as herein before prescribed.
Reg. 389
Grant of certificate
A certificate for the use of a boiler shall be granted in Form VI. In the certificate shall be entered
the maximum pressure at which the boiler shall be worked, the load to be placed on the safety
valves or the thickness of washers or ferrules required as safeguard against overloading and the
date and pressure of the last hydraulic test of the boiler.
The Inspector's remarks should be as brief as possible.
Reg. 390
Procedure for inspection of installed boilers
General Instruction
a)
It is essential to have every part of the boiler, that is accessible, open and properly prepared
for examination, internally and externally. All boilers have openings through which an
examination may be made and which for operation are closed; all such parts shall be
opened whether for access to water surfaces, or heater surfaces. In cooling a boiler down
for inspection or repairs, the water should not be withdrawn until the setting is sufficiently
cooled to avoid damage to the boiler and when possible allowed to cool down naturally. It
is not necessary, in order to comply with ordinary prudence, to remove insulation material,
masonry, or fixed parts of the boiler, unless defects or deterioration peculiar to certain types
or inaccessible parts of boilers are suspected and where there is moisture or vapor showing
through the covering should be removed at once and a complete investigation made.
Particular attention should be paid to the external parts of boilers in the way of seating
blocks, especially when the situation is damp. Saddle tanks and engine fittings of
locomotive type boilers should be removed to facilitate the inspection of the parts
underneath at the first inspection, and at any reasonable period afterwards if the Inspector
cannot otherwise satisfy himself as to the condition of those parts. Upon sufficient visible
evidence or suspicion due to age or other causes, every effort shall be made to discover the
true condition, even to the removal of insulating material, masonry or fixed parts of a
boiler. Sometimes drilling or cutting away of parts is justifiable and necessary to positively
determine this condition.
The Inspector should, whenever the size permits, go inside it and make a thorough
inspection of all its internal parts. Before doing so, he should of course, satisfy himself that
proper provision has been made for disconnecting the boiler from any other boiler under
steam. Should he find that proper provision for disconnection has not been made or that the
boiler has not been properly cleaned or scaled, or that is unreasonably hot, he should
decline to proceed with the inspection and should report the facts to the Chief Inspector for
orders. When a boiler is of such a size or its construction is such that the Inspector cannot
go inside it, there should be sufficient sight holes or hand-holes provided to enable him to
see the principal internal parts; if any important part of a boiler is so constructed that the
Inspector cannot examine it, he should report the facts to the Chief Inspector for orders.
In the case of forced circulation and forced flow boilers which are not accessible to close
visual inspection, the Inspector should, besides thorough examination, ensure by the flow of
water that proper circulation is maintained through all sections of the water circuits.
Reg. 391 A
Aging of boilers
a) Shell Type Boilers:(i)
(ii)
In order to take the aging effect on boilers, the working pressure of the parts of them
as calculated from the formulae in these regulations shall be reduced as per the table
given below:Age of boiler exceeding
(in years)
25 35 45 50 60 70 80 90 100
Maximum permitted working
pressure percent.
95 90 85 80 70 60 50 40 30
For those boilers the plates of which have already been cut and tested shall be given a
further lease of life of fifty years from the date of the test of the boilers. The working
pressure that shall be allowed after the testing shall be reduced as per the table given
below:Period after date of test
(in years)
10 20 30
40
50
Maximum working pressure
allowed (percentage)
90 80 70
50
30
b) Water Tube Boilers: (i)
The boilers which are operating at a temperature of 400°C and above including utility
or industrial boilers and all boiler parts operating in the creep range of the boiler shall
be non-destructively tested as per the table 1 given below after they are in operation for
1,00,000 hours for assessment of the remnant life of the parts;
(ii) The parts of a boiler when it completes a life of twenty five years are to be tested as per
table 2 for assessment of the remnant life of such parts. If results are acceptable as per
the standards laid down by the Central Boilers Board, a certificate shall be issued by the
Chief Inspector of Boilers for extending the life of the boiler for a further period of ten
years or such less period as recommended by the Remnant Life Assessment
Organisation. This assessment of remnant life shall be carried out thereafter every five
years by the organisations working in the field of boilers and remnant life and extension
thereof after such organisation is approved by the Central Boilers Board. Such
organisation shall work in close coordination with the office of the Chief Inspector of
Boilers in the field of remnant life assessment and extension. The working pressure of
such boilers may be reduced on the recommendations of such approved organisation.
Notwithstanding anything contained in this regulation, for boilers working at a pressure less than 50
kg/cm2, such elaborate remnant life assessment is not mandatory. However, in such cases, drums and
headers of such boilers shall be inspected by Ultrasonic testing, Magnetic particle testing and Dye
penetrant test.
Reg. 392, Reg. 392 a, Reg.392 b
Repairs to boilers and steam pipes
(1) Major repairs such as fusion welded or riveted patches to shells, fire boxes and end plates of
boilers and extensive building up of wasted parts of boilers permitted under these regulations, the
renewal of furnaces and end plates, parts of shell, fire boxes, girders and steam-pipes, etc. shall
only be entrusted to a firm who is recognized as a repairer under these regulations.
(2) Any firm seeking recognition shall apply to Chief Inspector of Boilers of the State in which the
recognition is sought.
(3) A firm seeking recognition as a repairer shall meet the following requirements depending upon
the class of boilers, namely:(i)
Class I boiler repairer- The owner of the firm himself shall have a degree in
mechanical or electrical engineering or the firm shall have on its rolls a
permanently employed engineer having a degree in mechanical or electrical
engineering with the firm having at least five years' experience in fabrication,
erection, repair or maintenance and quality control of boilers, and qualified and
permanently employed welders as per the provisions of these regulations;
(ii)
(iii)
(iv)
Class II boiler repairer- The owner of the firm himself shall have a diploma in
mechanical or electrical engineering or the firm shall have on its rolls a
permanently employed engineer having a diploma in mechanical or electrical
engineering with the firm having at least three years' experience in fabrication,
repair and maintenance of boilers;
Class III boiler repairer - The firm shall have the experience of five years in repair,
maintenance, operation, erection or inspection of boiler.
(a) Where the power stations, fertilizer plants, chemical and petrochemical plants
or refineries apply for repair of their own boilers, they shall have all the facilities
in-house and may apply to the Chief Inspector of Boilers of the State for permission
to repair their own boilers in accordance with these regulations.
(b) On receipt of the application for permission to repair to a boiler, the Chief
Inspector of Boilers of the State shall reply to the request within a period of fifteen
days of the receipt of the application.
(4) On receipt of the application under sub-regulation (3), the Chief Inspector shall send a
questionnaire in ‘Form XVIII’ to the applicant.
(5) The Chief Inspector will scrutinize and evaluate the application along with the replies to the
questionnaire and after satisfying himself that the following requirements are fulfilled, shall
recognise the firm as a repairer in the category applied for, namely:(i)
(ii)
that the firm possesses rectifier or generator, grinder, general tools and tackles,
dye-penetrant kit, expander and measuring instruments;
that the electric arc or oxy-acetylene welding sets and all other tools and plant in
his possession for carrying out repairs are suitable for the work undertaken;
(iii)
that the quality of material used conforms to the specifications prescribed in these
regulations;
(iv)
that the supervisory and operational staff employed by the firm possesses the
necessary training and experience for the work undertaken;
(v)
that all welders employed by the firm possess certificates issued as required under
Chapter XIII of these regulations;
(vi)
standard of work should be of high order and comply with all the requirements and
test that may be prescribed by the Chief Inspector.
(6) The recognition of the firm as a repairer shall be for a period of two years. Thereafter they
shall apply for renewal of their recognition at least two months before the expiry of said period.
(7) In case the repairer is found indulging in violating the provisions of the Act/Regulations
knowingly or unknowingly, the firm shall be blacklisted under intimation to Chief Inspector or
Director of Boilers of all the States/Union territories and renewal shall not be done in any case.
(a) Procedure for repairs
(1) The repair work shall be carried out under the supervision of Inspector, and when the
fireboxes and smoke tubes of locomotive tube boilers are withdrawn, the internal parts, which are
otherwise inaccessible to close inspection, shall be inspected by the Inspector.
(2) Repair to boiler shells shall be carried out by patching or by removing a strip of worn or
damaged plate and inserting the new strip with covering straps over the longitudinal butt ends, the
strength of the riveted joints to be not less than that of the longitudinal joints of the shell.
(3) (a) Patches for fire exposed plates shall be fitted metal to metal without joint of any
description.
(b) The affected part shall be cut out, leaving the corners of the hole well-rounded.
(c) Patches shall be secured, wherever possible, properly spaced rivets with a width of plate
at least equal to the diameter of rivet between the edge of the rivet hole and the edge of the plate.
(d) Where riveting is impracticable, the plate shall be secured by welt fitting countersunk
headed screw pins.
(4) The thickness of a patch plate shall not be less than the original thickness of the plate
which it is used to patch.
(5) Bulged or distorted furnaces or circular section may, if the bulge or distortion is not
too great, be pressed back to shape.
(6) Circular furnaces of horizontal boilers that have become distorted may be suitably
reinforced.
(7) (a) Anti-collapse rings shall be of substantial section either of single or double angles
bolted back to back with screw stays not less than 22mm in diameter and about 178mm in pitch
passed through flat of angle and screwed into the furnace, the ends being either rounded or riveted
over on the fire side and fitted with nuts at the other.
(b) The stay bolts shall be fitted with ferrules not less than 1 inch in depth between furnace
and angle ring.
(8) Welding shall not be accepted for the repair of any part of a boiler for which welding is
forbidden for a new boiler under these regulations and boiler shells shall not be repaired by
welding beyond the filling up of a small isolated corroded or pitted part or the making up of
wasted edges of openings.
(9) Cracks or grooving in dished or flat end plates of cylindrical shells or in the bends of
furnace flanges in a circumferential direction may be weed out and welded.
(10) Wasted parts of circular furnaces and fire-boxes and fire exposed flat plates as in
rectangular fire-boxes and combustion chambers may be cut out and be replaced by new pieces
welded in or they may be built up by welding.
(11) Longitudinal cracks in circular furnaces and fireboxes and cracks in rectangular
fireboxes and combustion chambers may be welded.
(12) No stay bar shall be welded.
(13) Smoke tubes may be butt welded either by fusion welding, flush welding or oxyacetylene welding, and these may be tested hydraulically at the discretion of the Chief Inspector.
(b) Welding
The Repairer shall satisfy the Chief Inspector,(i)
that the electric arc or oxy-acetylene welding sets and all other tools and plant in his
possession for carrying out repairs are suitable for the work undertaken.
(ii)
that the quality of material used conforms to the specifications that are prescribed.
(iii)
that the supervisory and operational staff employed by him possess the necessary training
and experience for the work undertaken.
(iv)
that all welders employed by him possess certificates issued as required under Chapter
XIII of these Regulations.
(v)
Standard of work should be of high order and comply with all the requirements and test
that may be prescribed by the Chief Inspector.
Reg. 393
Submission of manufacturing drawings and the particulars of boilers in advance:(a)
In the case of land boilers made in India for use in the States, the manufacturing drawings
and the particulars of materials, design and construction of boilers shall be submitted by
the Makers of the boilers to the Inspecting Authority of the State, where the principal
parts of the boilers will be manufactured, for examination and approval before
commencement of the manufacture of boilers.
b)
In the case of boilers made outside India for use in the State, the manufacturing drawings
and particulars of the material, design and construction, of boilers shall be submitted
initially to the Inspecting Authority in the country of manufacture for examination and
approval.
The manufacturing drawings and the particulars of materials, design and construction in
the case of fired boilers of steam generating capacity 100 tons/hour and above and that of
Waste heat boiler of 20 tons/hour and above shall then be submitted to the Technical
Adviser (Boilers) for selection of latest materials with high strengths and use in high
temperature and pressure, energy conservation and increased thermal efficiency and
remote control and instrumentation for the safety of the boilers. Thereafter, the
manufacturing drawings and the particulars of materials, design and construction shall be
sent to the Chief Inspector of Boilers of the State where the boiler will be installed and
used, for final examination and approval before commencement of manufacture so as to
avoid questions arising at the time of erection and registration of the boiler.
c)
The Inspecting Authority or the Chief inspector or both, as the case may be, shall, after
examination of the manufacturing drawings and the particulars intimate to the proposer
whether they are satisfied with the materials, design, construction and fitness of the parts
for the intended pressure and, if not, what modification is necessary therein. When the
manufacturing drawings and the particulars of boilers have been approved, the Inspector
in making his examination shall see that the design and the particulars of construction as
approved have been carefully followed and that the material corresponds with the
approved particulars.
(d)
The fee for the scrutiny of the manufacturing drawings and the particulars of the
materials, design and construction of boilers under sub-regulations (a) or (b) shall be on
the scale prescribed in regulation 385 subject to a maximum of Rs.20,000/. When the
manufacturing drawings have been scrutinised and in respect of them alterations have
been suggested and the same are resubmitted for scrutiny, separate fee at the rate of 10%
of the fee for the first scrutiny of the drawings shall be payable if the manufacturing
drawings contain alterations other than those previously suggested.
(e)
The arrangement drawings showing the broad details of modifications or conversions of
the existing boiler shall be subject to the approval of the Chief Inspector of Boilers of the
State where the boiler is intended for modification or conversion is registered.
(f)
If the detailed manufacturing drawings are got approved by the Inspecting Authority of
the State where parts will be manufactured and inspected, no separate compliance of subregulation (e) is required.
Reg. 394
STEAM PIPES
Inspections of Steam Pipes
a) Steam pipes shall be inspected and hydraulically tested before erection in place, the test
pressure to be that prescribed in the standard conditions for steam pipes. A certificate from
the Inspecting Authority in Form III-A, stating that this has been done by him may be
accepted. If the Inspector is satisfied with the test, the pipes may be erected in position. The
Chief Inspector shall intimate his approval to the owner regarding the suitability of the pipe
line for use at the pressure and temperature to be specified.
b) At subsequent inspections of the boiler or at any other time, the Inspector may make an
external inspection of the steam-pipes and for this purpose may require a part of the lagging at
the flanges to be removed, and the pipe made bare. If as a result of this inspection the
Inspector is of opinion that the pipes or any portions of them are in an unsatisfactory
condition, he shall report the matter to the Chief Inspector, who may require the whole of the
lagging to be removed and may require any pipe or pipes to be hydraulically tested. The test
pressure at such hydraulic test shall be not less than one and a half times the working pressure
of the boiler or the intended working pressure of the pipe, as the case may be.
c) A memorandum of Inspection Book shall be prepared in respect of steam-pipes and fittings in
Form No. XIV. In this book, the Inspector shall enter in ink all particulars and dimensions of
the steam pipes and fittings with calculations for the various parts in detail, particulars of
hydraulic
test
and
his
inspection
notes.
At subsequent inspection, the Inspector shall enter the date of the inspection and hydraulic
test
together
with
notes
thereon.
The Inspector shall also enter in the Memorandum of Inspection Book remarks regarding the
general condition of the steam-pipes and fittings, and repairs, replacements or alterations, if
any, and the extent to which the steam-pipes have been cleaned of lagging and covering, so
that the book provides a useful record of the steam-pipes and fittings for the information and
guidance
of
Inspectors
at
subsequent
inspection.
In the event of an accident to a pipe line or its fittings, necessary remarks shall also be entered
in
the
book.
The Memorandum Book shall be submitted to the Chief Inspector, who will check all
particulars and calculations and approve the working pressure and temperatures that are to be
permitted for the various parts of the pipe line and fittings. The pressure and temperature once
approved for the particular steam pipe line shall not be altered except on a written authority
from the Chief Inspector.
Reg. 395, Reg. 395 A
Submission of plans of steam-pipes
a) Plans of steam pipes shall be submitted with the prescribed fee to the Chief Inspector before
construction or at the time of registration of the boiler for his decision whether the pipes and
their arrangement comply with the Regulations.
b) (i)
The fees for examination of plans and the particulars of materials, design and
construction of steam pipes before the commencement of manufacture of the steam
pipes shall be at the rate of Rs. 30/- for 30 meters of piping or part thereof, subject to a
minimum of Rs.50/-, inclusive of all fittings excepting the fittings like desuperheaters, steam receivers, feed heaters and separately fired superheaters. For any
fittings like de-superheaters, steam receivers, separators and flanges, the fee shall be
Rs.150.00 for each category of such identical fittings.
ii)
The fees for examination of lay out plans of steam pipes shall be Rs.20/- per 30 metres
of piping or part thereof, subject to a minimum of Rs.50/-, inclusive of all fittings,
except fittings like de-superheaters steam receivers, feed heaters and separately fired
superheaters. For any fittings like de-superheaters, steam receivers and separators, the
fee shall be Rs.150.00 for each such fittings.
Reg. 395 A
Inspection fee for boilers and parts thereof constructed in India
1) The inspection fee for boilers shall be calculated on the following basis:
(i)
at four times the registration fee for a boiler of riveted construction.
ii)
at four times the registration fee for a boiler of welded construction.
2) Fees for inspections of boiler scantlings shall be charged as under:(i)
upto 10 square feet (0.929 sq. meter) of outside surface - nil.
ii)
above 10 square feet (0.929 sq. meter) of outside surface – one half of the registration
fee of the boiler for which the part is intended.
3) For inspection of tubes and pipes, the fees shall be charged at the rate of Rs.150/- per metric
tonne or a fraction thereof.
4) Fees for inspection of boiler at the site of construction shall be charged at the rate of four
times the registration fee.”.
5) For inspection of forged pipe fittings, the fees shall be charged at the rate specified for forged
and cast flanges under clause (1), of sub-regulation (2) of regulation 395 C.
6) For inspection of pipe fittings other than forged pipe fittings, the fees shall be charged as
under:(a) Upto and including 50mm, for 100 kg. or a fraction thereof
Rs. 50/-
(b) Over 50 mm and upto and including 100 mm for 450 kg. or fraction
Rs. 250/thereof.
c) Over 100 mm for 900 kg. or a fraction thereof.
Rs. 500/-
Reg. 395 B, Reg. 395 C
Fees for inspection of Pipes
a) For the pipes of nominal bore not exceeding 100 mm inclusive of all fittings, excepting
fittings like de-superheaters, steam receivers, feed heaters and separately fired superheaters
Rs.200/- for 30 meters of pipe or part thereof.
b) For pipes of nominal bore exceeding 100 mm inclusive of all fittings excepting fittings like
de-superheaters, steam receivers, feed heaters and separately fired superheaters Rs.500/-for 30
meters of pipe or part thereof.
c) Fee for inspection of fittings like feed water heater, desuperheater, steam receivers,
separators and separately fired superheaters-Rs.500/-for each such fittings.
Reg. 395 g
Fee for inspection of spares and scantlings
(i)
Spares – For all types of coils, namely, economiser coils, superheater coils, reheater
coils, the fee for inspection shall be charged on the basis of surface area as provided in
Regulation 385.
(ii)
Scantlings – The fee for inspection of scantlings shall be charged as under:(a)
for outside surface area not exceeding 1 sq. metre
Rs.500/-
(b)
for outside surface area exceeding 1 sq. metre but not exceeding
Rs.600/3 sq. metres
(c)
for OSA exceeding 3 sq. metres but not exceeding 5 sq. metres
Rs.700/-
(d) for OSA exceeding 5 sq. metres but not exceeding 7 sq. metres
Rs.800/-
(e)
for OSA exceeding 7 sq. metres but not exceeding 9 sq. metres
Rs.900/-
(f)
for OSA exceeding 9 sq. metres but not exceeding 11 sq. metres
Rs.1000/-
For outside surface area exceeding 11 sq. metres a fee of Rs.50/- shall be charged for every 2 sq.
metres or part thereof subject to a maximum of Rs.5000/-
Download