Assessment Task 3 Manage project integration BSBPMG540 Student Declaration To be filled out and submitted with assessment responses ◻ I declare that this task and any attached document related to the task is all my own work and I have not cheated or plagiarised the work or colluded with any other student(s) ◻ I understand that if I am found to have plagiarised, cheated or colluded, action will be taken against me according to the process explained to me ◻ I have correctly referenced all resources and reference texts throughout these assessment tasks. ◻ I have read and understood the assessment requirements for this unit ◻ I understand the rights to re-assessment ◻ I understand the right to appeal the decisions made in the assessment Unit Title: Manage project integration Unit Code: BSBPMG540 Muhammad Talha Saleem Student name Student ID number Student signature Task Number 68911 Taljha Date 3 11/12/22 ------OFFICE USE ONLY----For Trainer and Assessor to complete: ◻ Student requested reasonable adjustment for the assessment BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Page 2 greenwichcollege.edu.au Marking Sheet Comments N DNS Did the student satisfactorily: The student has satisfactorily completed and submitted the following: Y Completed successfully ☐ ☐ ☐ ☐ ☐ ☐ Addressing of scenarios at execution phase for the 3 projects Risk assessment form - Project 1 Email to departmental manager Project 1 Change request form - Project 1 Email to the project sponsor – Project 1 Status report - Project 1 Issue log - Project 2 Status report – Project 2 Draft dialogue to resolve conflict – Project 2 Risk assessment form – Project 3 Status Report – Project 3 Reflection project 3 Project finalisation activities for the 3 projects Handover report -Project 1 Budget variation report – Project 1 and 3 Project review report for the 3 projects Demonstrated ability to: Implement and monitor project according to project scope, time and budget Resolve conflicts affecting attainment of project objectives with relevant stakeholders Confirm project records are updated against project deliverables at required intervals Analyse and submit status reports on project progress and identify issues with relevant stakeholders and project authorities Analyse and submit impact analysis of change requests for approval BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Page 3 greenwichcollege.edu.au Marking Sheet Comments DNS This is evidenced by: Addressing of scenarios at execution phase for the 3 projects Risk assessment form - Project 1 Email to departmental manager Project 1 Change request form - Project 1 Email to the project sponsor – Project 1 Status report - Project 1 Issue log - Project 2 Status report – Project 2 Draft dialogue to resolve conflict – Project 2 Risk assessment form – Project 3 Status Report – Project 3 Reflection project 3 Demonstrated ability to: Identify and allocate project finalisation activities Confirm project products and associated documentation are prepared for handover to client in a timely manner Finalise financial, legal and contractual obligations Seek feedback from relevant stakeholder and project authorities on project implementation, management and integration Document feedback received to improve future projects N Did the student satisfactorily: Maintain relevant project logs and registers for project audit Y Completed successfully ☐ ☐ ☐ This is evidenced by: Project finalisation activities for the 3 projects Handover report -Project 1 Budget variation report – Project 1 and 3 Project review report for the 3 projects BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Page 4 greenwichcollege.edu.au Marking Sheet Comments Task Outcome: N DNS Did the student satisfactorily: The student consulted and collaborated with the project team and the project sponsor to gather inputs and feedback to complete project monitoring and finalisation activities. Y Completed successfully ☐ ☐ ☐ Satisfactory ☐ Not Yet Satisfactory ☐ Student Name: Muhammad Talha Saleem Assessor Name: Assessor Signature: Date: Table of Content Student Declaration ........................................................................................................ 1 Task 3 – Execute, control and finalise the project ........................................................ 7 BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Page 5 greenwichcollege.edu.au Task 3.1 Execute and monitor project ........................................................................... 9 Task 3.2 Review project ............................................................................................... 33 BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Page 6 greenwichcollege.edu.au Task 3 – Execute, control and finalise the project Task summary and instructions What is this assessment task about? This task builds on Task 2, and you will build on the work performed for project 1, project 2 and project 3 in Task 2. This task comprises of the following assessment methods: o Product-based ☒ o Direct observation of Role-Play ☐ o Case Study ☒ o Other (specify) ☐ It has been designed to evaluate your ability to/competency in: Implement and monitor project according to project scope, time and budget Resolve conflicts affecting attainment of project objectives with relevant stakeholders Confirm project records are updated against project deliverables at required intervals Analyse and submit status reports on project progress and identify issues with relevant stakeholders and project authorities Analyse and submit impact analysis of change requests for approval Maintain relevant project logs and registers for project audit Identify and allocate project finalisation activities Confirm project products and associated documentation are prepared for handover to the client in a timely manner Finalise financial, legal and contractual obligations Seek feedback from relevant stakeholders and project authorities on project implementation, management and integration Document feedback received to improve future projects Please note that the performance evidence for this unit of competency requires you to demonstrate the ability to manage project integration on at least three occasions. This assessment has been designed to meet that requirement. You are required to address the following: Task 3.1 Execute and monitor project BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Page 7 greenwichcollege.edu.au Task summary and instructions o Task 3.2 Review project o What do I need to do to complete this task satisfactorily? Specifications Complete a series of tasks relevant to project execution and monitoring for three projects Complete a series of tasks relevant to project finalisation and monitoring for three projects Although the assessment requires group consultation and collaboration to simulate a work environment, the assessment submission is individual, and it will be marked as such. submit the completed assessment tasks, according to instructions, complete the tasks with sufficient detail and present them in a professional manner, use your own words and reference sources appropriately, meet the word count where required, use the scenario provided, use the templates provided where required, for your performance to be deemed satisfactory in this assessment task you must satisfactorily address all of the assessment criteria, if part of this task is not satisfactorily completed you will be asked to complete further assessment to demonstrate satisfactory performance. You must deliver/participate in: Consult and collaborate with the project team for inputs and feedback on project execution and finalisation Consult with the project sponsor as needed You must submit to GOALS Addressing of scenarios at execution phase for the 3 projects Risk assessment form - Project 1 Email to the departmental manager - Project 1 Change request form - Project 1 Email to the project sponsor – Project 1 Status report - Project 1 Issue log - Project 2 Status report – Project 2 Draft dialogue to resolve conflict – Project 2 Risk assessment form – Project 3 Status Report – Project 3 BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Page 8 greenwichcollege.edu.au Task summary and instructions Resources and equipment Re-submission opportunities • • • • • • • Reflection project 3 Project finalisation activities for the 3 projects Handover report -Project 1 Budget variation report – Project 1 and 3 Project review report for the 3 projects Computer with Internet access Access to Microsoft Office suites or similar software Learning material Scenario for assessment as provided Appendices as provided Relevant policies and procedures as provided Templates as provided You will be provided feedback on your performance by the Assessor. The feedback will indicate if you have satisfactorily addressed the requirements of each part of this task. If any parts of the task are not satisfactorily completed, the assessor will explain why, and provide you written feedback along with guidance on what you must undertake to demonstrate satisfactory performance. Re-assessment attempt(s) will be arranged at a later time and date. You have the right to appeal the outcome of assessment decisions if you feel that you have been dealt with unfairly or have other appropriate grounds for an appeal. You are encouraged to consult with the assessor prior to attempting this task if you do not understand any part of this task or if you have any learning issues or needs that may hinder you when attempting any part of the assessment. Complete the following activities: Task 3.1 Execute and monitor project This task is about the execution phase of the projects when monitoring is required during their execution. You will complete tasks relevant to each project to evidence your ability to: Implement and monitor the project according to project scope, time and budget Resolve conflicts affecting the attainment of project objectives with relevant stakeholders BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Page 9 greenwichcollege.edu.au Confirm the update of project documents Analyse and submit status reports on project progress and identify issues with relevant stakeholders and project authorities Analyse and submit impact analysis of change requests for approval Maintain relevant project logs and registers for project audit Work in collaboration with the project team and consult with the project sponsor (played by the trainer and assessor in simulated work conditions) to ensure the projects' progress towards successful completion. Ask for inputs and feedback in completing the tasks below in simulated work conditions. Project 1 – MMI Main Project' Sydney Campus' Assume that the following scenarios occurred: Scenarios A 25% project timeline The project team includes employees from MMI departments seconded for a couple of days/week to the project. One of the departmental managers at MMI cannot share one of their staff members with the project due to conflicting priorities. This will impact the project schedule. 50% project timeline MMI is planning to update their current website to include information about the new campus. The project sponsor asked to add this deliverable to the project. 75% timeline The project budget is cut by 5%; as a project manager, you have reviewed the expense items on your budget and decided to change the furniture supplier to a more affordable one compromising on the quality of the furniture for the new campus. B C 1. For each scenario: Detail what monitoring and control procedures/processes/techniques were applied to identify the issue/s. Identify the impact of the scenarios on project progress. Include the impact on project interdependencies and constraints. Outline how the issue/s is/are addressed to manage the impact of the scenarios on the project and to ensure project progress at each stage. Additionally, identify what changes/updates to project documentation is implemented (example: changes to project plan). BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Page 10 greenwichcollege.edu.au Scenario Monitoring and control (30-50 words/scenario) Impact (30-50 words/scenario) A The project manager should monitor and oversee staff employee utilisation by producing a project schedule with responsibilities connected to the stated activities and having it approved by the project sponsor to ensure no conflicts for staff members in the process. This will be performed by developing a timeline for the actions and material posted throughout the website upgrade. Reducing the number of people working on the project will be delayed. However, project productivity will suffer because it does not have enough people to execute it efficiently. A brainstorming session will be held, and research will be conducted to determine the project's budget and costs. This will notify the steering committee which expenses need to be reduced to save the project. Diminishing the spending plan for furniture will bring about more terrible quality for the new school grounds decorations. This suggests that there will be confusion in the furniture used on the two grounds, which may hurt the brand's standing. B C Upgrading the proposal to incorporate the new campus will increase brand awareness since Sydney locals and fans want to join the campus. This will show market expansion, resulting in a more substantial brand reputation than earlier. How the issue is addressed and updates (40-80 words/scenario) The project manager should ensure mutual agreement on staff sharing before starting the project. This will assist in reducing the danger to human resources posed by departmental bickering. Before presenting a draught text to management for review and approval, the marketing team will collect and compile data about the new campus. Developers will upload the files. The venture guiding gathering will meet to rethink project quality and arrange furniture estimating with providers to obtain excellent quality while remaining under the financial plan. 2. Develop the following project documentation to meet the project record-keeping system requirements: a) A risk assessment form to the attention of the project sponsor for a risk identified at 25% timeframe scenario. (Template 1) Template 1 - Risk Assessment Form - at 25% timeframe Project details BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Page 11 greenwichcollege.edu.au Project Name New Sydney Campus Project Manager: Manikantha Sivaraja Risk details Raised by: Muhammad Talha Saleem Date raised: 25/11/22 Description of risk: Briefly describe the identified risk and its possible impact on the project (e.g. scope, resources, deliverables, timelines and/or budgets). (30-50 words) The inevitable risk is resource peril. Nonetheless, there will be a shortfall of enough human resources for managing the endeavour practices as one of the line chiefs isn't willing to share his associates. Likelihood of risk: Describe and rank the likelihood of the risk occurring (i.e. low, medium or high). Impact of risk: Describe and rank the impact on the project if the risk occurs (i.e. low, medium or high). High High Risk mitigation BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Page 12 greenwichcollege.edu.au Preventative actions recommended: Briefly describe any action to treat the risk (risk treatment option). (30-50 words) The leaders should utilize more staff to ensure the endeavour has adequate personnel to hand the industry works out. However, the task of commitments ought to be conceivable at the beginning stages with the endeavour partners so risks won't happen. Approval details Signature: ___Taylor Warin____________________ /_22___ Date: __25_ /_11__ PLEASE FORWARD THIS FORM TO THE PROJECT SPONSOR Record Complete the filing record below so that the project documentation can be saved in the project management record system Project Title: New Sydney Campus Project Client: MMI Project Sponsor: Taylor Varin File Name: Risk Form Project Manager: Date: 25/11/22 Version:1.0 Muhammad Talha Saleem b) Write an email (Template 2) to the departmental manager (scenario A) to resolve the resource conflict described in the scenario The email text should be in grammatically correct English, written in an appropriate (polite, business-like) style. (50-100 words) Template 2 -Email Email to Departmental Manager To: Department Manager Cc: Taylor Varin BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Page 13 greenwichcollege.edu.au Bcc: Subject: Risk Assessment Form Date email is sent: 25/11/22 Attachments: Dear Sir, I trust this email imagines that you are well. During our endeavour meeting, it has agreed that the New MMI Sydney Campus will utilize a part of the delegates from MMI workplaces. I fathom that you are not prepared to convey one of your partners due to, by a similar token unavoidable conditions, or maybe you don't be aware of something almost identical. Thoughtfully see associated the affixed gathering notes for your confirmation. Permit us to work all together to see the endeavour being a victory. Looking forward to your coordinated effort. Regards Manikantha Sivaraja c) Develop a change request form (Template 3) to request the changes needed as part of the issue resolution strategy for the scenario at 75% timeframe. Template 3 - Change Request Form - at 75% timeframe This form is used to assist with recording and management of changes in scope, time, quality, resources, processes or budget needed to manage the issue/s. Min. one change must be requested. Change Request – Project Issued by Project Mnanger Change/s Requested Five per cent budget was reduced in the furniture. Reason for change/s To get a good deal on the endeavour to spend through getting more sensible furnishings Impact on the project The quality of the furniture is bad. Change authorised: Yes/No Signed: Project Manager Talyor Varin Sponsor BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Page 14 greenwichcollege.edu.au Change Request – Project Date 25/11/22 Record Complete the filing record below to save the project documentation in the project management record system. Project Title: New Sydney Campus Project Client: MMI Project Sponsor: Talyor Varin File Name: Change Form Project Manager: Muhammad Talha Saleem Date: 25/11/22 Version: 1.0 d) Write a brief email (Template 2) to the project sponsor and request approval for the change/s listed in the change request form. Summarise the content of the change request form and attach the form by writing its title in the 'attachment' section of the email template. The email text should be in grammatically correct English, written in an appropriate (polite, business-like) style. (50-100 words) Template 2 -Email Email to Project Sponsor To: Talyor Varin Cc: Steering Committee Bcc: Subject: Change Form Request Date email is sent: 25/11/22 Attachments: Dear Sir, I trust this email imagines that you are well. I'm writing to enlighten you that we should diminish the furniture monetary arrangement by 5% by acquiring the more sensible merchant. This will help us get a good deal on the undertaking spent. Kind see attached the change request structure (As above) for your review and underwriting. Looking forward to your response. BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Page 15 greenwichcollege.edu.au Regards Manikantha Sivaraja Project Manager e) Develop a status report at 75% timeframe (Template 4) As per organisational project management record-keeping system requirements, your project sponsor requires regular status reports to record: ● financial management and budget control, ● project milestones, for example: ○ quality review completion, ○ outcomes, and deliverables. Consider the quality standards for the project documentation: ● clearly communicate legal obligations, ● no grammar or spelling errors, ● professional but friendly language, ● fair and flexible delivery for the intended audience, ● meet audience requirements and are sensitive to information needs. Additional information to complete the report at 75% timeline: ● Two project team members are ill and will be on sick leave for one week ● A glitch in the CRM (Customer Relationship Management System) used in the organisation (which is also used to gather data for project reporting) has caused the data to be inputted incorrectly for three days. The data needs to be double-checked for accuracy and correctness. Template 4 - Status Report - at 75% timeframe Project Name: Project Status G: Status Y: R: Overall Timeline Budget Resources Scope Quality Risk Y Y G R G G Y BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Page 16 greenwichcollege.edu.au List of Project Plan Updates: Changed schedule to cover the lost time Changing the monetary errand plan Checked and update the risk register Status Report Project Name: New MMI Campus Prepared by: Muhammad Talha Saleem Date: 25/11/22 Attention to: Talyor Varin Executive This document is a status report at 75% time of the task. It summary passes on the movements that have been made to the endeavour plan and report a monetary arrangement similar to the risks recognized from the start of the Use this section for summary information about the status of the project. endeavour. (30-50 words) Change The monetary assignment plan ought to be hacked someplace close to 5% on the request spend for the referenced furniture to get a good deal on the endeavour to spend. Summarise This will consider the endeavour quality decline because the table will be of awful any change quality. needs and include impact analysis of the required change/s. BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Page 17 greenwichcollege.edu.au Status Report Deliverable At 25 %, there were issues with less staff because of one of the line status status overseers keeping the endeavour boss one from getting the arranged Use this endeavour partners as needs be diminishing the workforce. At a 50 % completion section for rate, the endeavour will invigorate the ground site to feature the new grounds. At summarising a 75% finish rate, the commission desires to diminish the endeavour information monetary arrangement by 5% to get a good deal on the errand costs by looking about the for less extravagant decorations. status of the deliverables of the project. Schedule The endeavour plan is behind by around fourteen days, something that has been status by status the line boss for one of the workplaces keeping the endeavour from Use this getting his partners. section for summarising the status of the project schedule Budget The furniture monetary arrangement has been diminished by 5% to save costs by status looking for a more sensible furniture supplier. The financial undertaking plan is Use this 75% used by the endeavour plan. section for summarising the status of the project budget Quality The idea of the endeavour is sabotaged by the diminishing of the status status furniture spending plan by 5% like the idea of the endeavour furniture will Use this be cut down. section for a BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Page 18 greenwichcollege.edu.au Status Report summary of the status of the project's quality. Project 2 – 'Virtual Event' Assume that the following scenarios occurred: Scenarios A 50% project timeline As a Project Manager, you assigned a task (review all project reports completed so far to identify errors) to one of your project team members. The project team member identified several issues with the communication between the project team and the marketing team involved in the project. The marketing officers did not communicate some changes to the event schedule and content that may cause scope creep. 75% timeline The project sponsor would like to add a workshop about student engagement to the event schedule (1-hour workshop). B 1. For each scenario: Detail what monitoring and control procedures/processes/techniques were applied to identify the issue/s. Identify the impact of the scenarios on project progress. Include the impact on project interdependencies and constraints. Outline how the issue/s is/are addressed to manage the impact of the scenarios on the project and to ensure project progress at each stage. Additionally, identify what changes/updates to project documentation is implemented (example: changes to project plan). Scenario Monitoring and control (30-50 words/scenario) Impact (30-50 words/scenario) A Nonappearance of authentic correspondence among the partners in the episode will see delays in the endeavour practices likewise Using the event reports there is a correspondence breakdown between the publicizing and adventure gatherings. This has made BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K How the issue is addressed and updates (40-80 words/scenario) A proper endeavour correspondence the course of action should be figured and settled upon by the project bunch Page 19 greenwichcollege.edu.au Scenario Monitoring and control (30-50 words/scenario) B Impact (30-50 words/scenario) the publicizing bunch misfire to pass on some of the endeavour works out compelling some unnecessary project creep as changes will be made to the endeavour without support Using the endeavour organizing plan and the event reports, the bunch need to consolidate a studio about understudy obligation to the event plan. Supports ought to be done using the endeavour underwriting documentation after the change has been added to the project plan The endeavour courses of occasions will be somewhat long as one more hour will be added to the event's day plan. Seriously spending plan ought to be added to cook for costs for the studio. How the issue is addressed and updates (40-80 words/scenario) people to ensure all of the activities are driven by the assignment plan and project necessities. This will ensure that all the gatherings are invigorated on the next project move. The endeavour bunch reviewed the project plan besides, opened a 1hour studio opening for the endeavour elevating gathering to attract the inevitable understudies. The project monetary arrangement was dispersed to cover the virtual event stage costs. 2. Develop the following project documentation to meet the project record-keeping system requirements: a) Complete the issue log (Template 5) to include 50% and 75% project timeframe issues. Add additional rows if needed. Template 5 - Issues Log - at 50% and 75% timeframe Issues should be recorded when they arise, assigned a number and responsibility, a recovery strategy or alternate path agreed, acted upon and recorded when closed. A minimum of 2 issues must be identified to complete this form. Note: include an indicative date for the issue resolution. BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Page 20 greenwichcollege.edu.au Issue Strategy to manage the issue Date logged Date resolved Update the current site Make the 25/11/22 30/11/22 to fuse information about content for the the new grounds. new school, search for supports besides, share with the association engineers for joining in the site. Reduce the project furniture budget by 5% Focal point for 25/11/22 30/11/22 sensible furniture suppliers who will give the things at a more affordable cost like this, reducing the undertaking cost BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Page 21 greenwichcollege.edu.au Strategy to manage the issue Issue Date logged Date resolved Record Complete the filing record below to save the project documentation in the project management record system. Project Title: New Sydney Campus Project Client: MMI Date: 25/11/22 Version: 1.0 b) Develop a status report at 75% timeframe (Template 4). Include an accompanying email to submit the report to the project sponsor. As per organisational project management record-keeping system requirements, your project sponsor requires regular status reports to record: ● financial management and budget control, ● project milestones, for example: ○ quality review completion, ○ outcomes, and deliverables. Consider the quality standards for the project documentation: ● clearly communicate legal obligations, ● no grammar or spelling errors, ● professional but friendly language, ● fair and flexible delivery for the intended audience, ● meet audience requirements and are sensitive to information needs. Additional information to complete the report: ● The team has been required to work additional hours due to the flu forcing several team members to ask for sick days at different times ● An error in estimating an item in the budget has caused an increase in budget by 8%, ● The schedule is now one week behind BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Page 22 greenwichcollege.edu.au Template 4 - Status Report - at 75% timeframe Accompanying email to project sponsor. (50-100 words) Email to Project Sponsor To: Talyor varin Cc: Project Steering Committee Bcc: Subject: 75% Time Frame form Date email is sent: 25/11/22 Attachments: Status Report Dear Sir, I trust this email imagine that you are well. I'm creating this email to respond to your request for a status report. Associated is the data that contains financial organization and spending plan control, project accomplishments, and quality standards for the undertaking documentation. Empathetically review and give your comments. Regards Muhammad Talha Saleem Project Manager Project Name: Project Status G: Status Y: R: Overall Timeline Budget Resources Scope Quality Risk Y Y R GG G Y Y List of Project Plan Updates: The endeavour spending plan should be investigated downwards The endeavour schedules to be invigorated to feature the new activity to cover the week float. Status Report Project Name: New MMI Sydney Campus Prepared by: Muhammad Talha Saleem BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Page 23 greenwichcollege.edu.au Status Report Date: 25/11/22 Attention to: Talyor Varin Executive This report tends to be a status report for the assignment at 75% of the errand summary progress. However, the organization of the review has revealed changing the report assignment spending plan, which has made a goof requiring the spending intend Use this section for summary information about the status of the project. to be extended by 8%. (30-50 words) Change The endeavour ally should add an understudy request obligation to the event plan request (1-hour studio). The spending plan ought to be changed to lessen the event Summarise costs. any change needs and include impact analysis of the required change/s. Deliverable status The studio request has been associated with the endeavour schedule to incorporate the studio for an hour. Use this section for summarising information about the status of the BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Page 24 greenwichcollege.edu.au Status Report deliverables of the project. Schedule It's one week behind the schedule status Use this section for summarising the status of the project schedule Budget Diminishing the monetary arrangement has caused a bungle that regarded 8 % status extension in the endeavour financial arrangement. Use this section for summarising the status of the project budget Quality Lessening the money related game plan has caused a bungle that respected 8 % status advancement in the monetary course of action. Reducing the spending plan has Use this affected the endeavour assumptions, diminishing the idea of the endeavour section for a assumptions due to the shortfall of enough resources for work with the errand summary of orchestrating all through to execution. the status of the project's quality. c) Draft the content of a dialogue that you would have with the Marketing Manager to address and resolve the issues identified in Scenario A. Document the dialogue in the space provided below: BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Page 25 greenwichcollege.edu.au 'We have recognized a couple of missteps in the endeavour correspondence as there is no joint exertion between your gathering and the undertaking bunch. This has been brought by the review of all the undertaking reports has informed me that the publicizing authorities didn't confer a couple of changes to the event schedule and content That may cause project-related undertakings to run wild. We need to stop this and work all in all to see the undertaking win for all. Do you have any comments over this?' Project 3 – 'Staff Event' Assume that the following scenarios occurred: Scenarios 75% project timeline The cost of the accommodation for Melbourne personnel in Sydney was not included in the project budget. This cost estimation error will add $ 9,000 to the budget. 75% project timeline The catering company informs you that they cannot deliver the service you booked with them to cater for the event. You have contacted a different catering company that does not seem to have the same quality standards and does not deliver gluten-free options. Still, they will provide the catering 5% cheaper than the first supplier. 75% project timeline A project team member is experiencing some personal problems and feels under pressure at work. This morning the project team member was rude towards you due to the stress they are experiencing. A B C 1. For each scenario: Detail what monitoring and control procedures/processes/techniques were applied to identify the issue/s. Identify the impact of the scenarios on project progress. Include the impact on project interdependencies and constraints. Outline how the issue/s is/are addressed to manage the impact of the scenarios on the project and to ensure project progress at each stage. Additionally, identify what changes/updates to project documentation is implemented (example: changes to project plan). BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Page 26 greenwichcollege.edu.au Scenario Monitoring and control (30-50 words/scenario) A Using the endeavour plan likewise project plan, we will need to screen again, control any endeavour activity that ought to be associated with the plan to ensure there is no the missing thing. B Through escalated due tirelessness to the giving food association, the undertaking the chiefs will be prepared to learn if the food suppliers will need to pass on the project. C The Human Resource head to eagerly screen labourers through searching for their contribution about their progress at work. The the task executive can as well, use the WHS documentation to analyze the thriving of his gathering. Impact (30-50 words/scenario) How the issue is addressed and updates (40-80 words/scenario) Missing to fuse This will be handled accommodation the errand through doing the monetary arrangement will research on the infer that the financial comfort procedure ought to be changed, spaces available in and the underwriting of the Sydney, separate association repeated to ensure they then underwrite the extra-economic objective is the spending plan for upheld. This will cost the organizing cycle to project sometime in this continue. Booking manner will then be done delays to ensure the space is saved. This will make difficulties as Due tirelessness the cycle for looking for another reports and shipper needs to start likewise agreements will help. following the association On picking the acquisition technique. organization, a The idea of the event will the agreement ought furthermore, be affected to be endorsed between the provider and the organization to submit them conveying as guaranteed. The endeavour gathering will There should be a be missing work, thus WHS framework in they have pressure and can't a spot to ensure the pass on any more extended as strength of they have shown up at their delegates are taken devouring point due to working halfway. More for extra hours. representatives should be appropriated to the dare to ensure delegates are working for fewer hours. 2. Develop the following project documentation to meet the project record-keeping system requirements: BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Page 27 greenwichcollege.edu.au a) A risk assessment form to the attention of the project sponsor for a risk identified at 75% timeframe scenario. (Template 1) Template 1 - Risk Assessment Form - at 75% timeframe Project details Project Name New MMI Sydney Campus Project Manager: Muhammad Talha Saleem Risk details Raised by: Muhammad Talha Saleem Date raised: 25/11/22 Description of risk: Briefly describe the identified risk and its possible impact on the project (e.g. scope, resources, deliverables, timelines and/or budgets). (30-50 words) There are human resource perils as one of the labourers experiences individual issues and feels under resistance work, which comes down on him. Likewise, there is a display peril as the cook pulls from the agreement to supply the event with late food organization. Likelihood of risk: Describe and rank the likelihood of the risk occurring (i.e. low, medium or high). Impact of risk: Describe and rank the impact on the project if the risk occurs (i.e. low, medium or high). High High Risk mitigation BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Page 28 greenwichcollege.edu.au Preventative actions recommended: Briefly describe any action to treat the risk (risk treatment option). (30-50 words) For the agent, the human resource boss, alongside the endeavour chief, makes a WHS plan that will target recognizing what delegates are going through helpful social affairs to get to their conditions and analysis when they are at the workplace. Approval details Signature: ___Muhammad Talha Saleem______ Date: __25_ /11___ /22____ PLEASE FORWARD THIS FORM TO THE PROJECT SPONSOR Record Complete the filing record below so that the project documentation can be saved in the project management record system Project Title: New Sydney Campus Project Client: MMI CLIENT Project Sponsor: Talyor Varin File Name: Risk Assessment form Project Manager: Muhammad Talha Saleem Date: 25/11/22 Version:1.0 b) Develop a status report at 75% timeframe (Template 4). Include an accompanying email to submit the report to the project sponsor. As per organisational project management record-keeping system requirements, your project sponsor requires regular status reports to record: ● financial management and budget control, ● project milestones, for example: ○ quality review completion, BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Page 29 greenwichcollege.edu.au ○ outcomes, and deliverables. Consider the quality standards for the project documentation: ● clearly communicate legal obligations, ● no grammar or spelling errors, ● professional but friendly language, ● fair and flexible delivery for the intended audience, ● meet audience requirements and are sensitive to information needs. Additional information to complete the report: ● A new external project team member has been appointed ● The project manager has decided to conduct additional training on WHS for the team; the project sponsor has agreed. The training will increase the budget by $500.00 ● A public holiday was not reported in the project schedule, and this will affect two workdays Template 4 - Status Report - at 75% timeframe Accompanying email to project sponsor. (50-100 words) Email to Project Sponsor To: Talyor Varin Cc: Steering Committee Bcc: Subject: Status Report- 75% timeframe Date email is sent: 25/11/22 Attachments: Status Report Dear Sir, I trust this email believe that you are well. I'm writing this email to respond to your request for a status report. Joined is the data that contains money related organization and monetary arrangement control, project accomplishments, showing quality rules for the undertaking documentation, among various things. Liberally review and give your comments. Regards Manikantha Sivaraja Project manager Project Name: New Sydney Campus BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Page 30 greenwichcollege.edu.au Project Status G: Status Y: R: Overall Timeline Budget Resources Scope Quality Risk Y Y G R Y Y Y List of Project Plan Updates: Change in project plan due to deferments The course of action of another endeavour associate Change of a cooking supplier decreasing the spending plan by 5% Status Report Project Name: New Sydney Campus Prepared by: Muhammad Talha Saleem Date: 25/11/22 Attention to: Talyor Varin Executive This report tends to be a status report for the endeavour at a time of a blueprint summary 75% of the endeavour progress. It tends to the movements made on the report report project plan, project spending plan and extension of human resources. Another Use this section for summary information about the status of the project. food supplier is likewise familiar with the dare to offer cooking organizations. (30-50 words) Change Change the cooking supplier to displace the principal who has said they won't request make it in giving organizations to the staff event. Summarise any change needs and BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Page 31 greenwichcollege.edu.au Status Report include impact analysis of the required change/s. Deliverable One more supplier has been searched for and is more affordable than the one, status reducing the spending plan by 5%. Similarly, one extra specialist has been Use this developed to the endeavour bunch. section for summarising information about the status of the deliverables of the project. Schedule The schedule is behind one of the employees has been stressed, thus affecting the status project team's delivery. Use this section for summarising the status of the project schedule Budget After the dropping of the main supplier, the catering spending plan was status diminished by 5%, inferring that the endeavour will get a good deal on that Use this space. section for summarising the status of the project budget BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Page 32 greenwichcollege.edu.au Status Report Quality The new supplier can't fulfil the previous dealer's rules status status on quality as they can't supply sans gluten decisions for the event subject Use this matter experts. This infers that the endeavour quality will be section for a compromised. summary of the status of the project's quality. c) Reflect on the conflict described in Scenario C and address the following: How would you address the situation? What conflict resolution strategy would you use, why? What could you do to support the project team member? Document your reflection in the space provided below. (50-100 words) The new supplier can't satisfy the previous vendor's rules status on quality as they can't supply without gluten decisions. Use this fragment to diagram the circumstance with the undertaking's quality. Event orderlies. This suggests that the endeavour quality will be compromised. Task 3.2 Review project This task is about the project finalisation phase, and it will provide evidence of your ability to: Identify and allocate project finalisation activities Confirm project products and associated documentation are prepared for handover to the client in a timely manner Finalise financial, legal and contractual obligations Seek feedback from relevant stakeholders and project authorities on project implementation, management and integration BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Page 33 greenwichcollege.edu.au Document feedback received to improve future projects The projects are now completed. Reflect on and review your work during project initiation, planning, execution and monitoring and control. Reflect on the work completed in this assessment and ask for feedback and inputs from the project team and the project sponsor to complete the tasks below. Address the following: 1. Identify and allocate project finalisation activities for each project Project Project 1 Project 2 Project 3 Finalisation Activities (3-4/project) Fixing the furniture Issuing the project certificate to the architect Project closure Responsibility assigned to Invitation reminders to educational agents Testing virtual links Event organisation Marketing Muhammad Talha Saleem , IT personnel Muhammad Talha Saleem Invitations to staff members Event location Performing the event Marketing team Muhammad Talha Saleem Muhammad Talha Saleem The architect Project sponsor Project sponsor and project manager 2. Complete a handover report (Template 6) – for Project 1 Template 6 - Handover Report for MMI Main Project' Sydney Campus' This report summarises the actions to be completed post-project by the sponsoring organisation or by another project team. Customise the template and add additional rows as needed. Handover report Project Name New MMI Sydney Campus Handed over by Talyor Varin Handed over to Educational agents BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Page 34 greenwichcollege.edu.au Handover report Actions post-project Actions to be completed: What actions must be completed once the project is finalised (example: evaluation survey) Driving of post-project evaluations Holding model learned social occasions Project dispatch Record all fundamental endeavour documents Directing information review from the errand bunch and the tutoring subject matter experts Access to support and information: How to reach project staff to obtain further information or support to implement actions (example: email project manager) Envelopes of the endeavour processes Envelopes of the endeavour reports and related records Knowledge of assignment related accomplices and task labourers Email address of assignment boss and associates Staff transition Summarise staff transition arrangements to new roles or re-assigned to previous roles. (50-80 words) After the underwriting for the project end, an event for the celebration of the compelling wrapping. The undertaking will be held with the staff who will join the new grounds invited. Planning will be coordinated with the extraordinary grounds staff people. New delegates will moreover be enrolled to fill the left opening on HR. Notice will be imparted to the evolving BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Page 35 greenwichcollege.edu.au Handover report agents to proceed and relocate to the new worksite. Record Complete the filing record below so that the project documentation can be saved in the project management record system Project Title: New Sydney Campus Project Client: MMI CLIENT Project Sponsor: File Name: Handover Report Talyor Varin Project Manager: Muhammad Talha Saleem Date: 25/11/22 Version:1.0 3. Complete a budget variation report as part of finalising project financial obligations (Template 7) for Project 1 and 3 Template 7 - Budget Variation Report for MMI Main Project' Sydney Campus' The project budget is a prediction of the costs associated with a particular project. These costs include labour, materials, and other resources required to complete the project. At the end of the project, review budget variations and how the project performed concerning the budget. Consider how the budget was impacted by the scenarios you worked on in Task 3.1. Customise the template and add additional rows as needed. Budget Variation Report Expense Budget Actual % Variation Furniture 250000 230000 0.5 less Rent for one year 800000 800000 Nil Staff wages 460000 460000 Nil Hardware and software 300000 350000 6% +ve BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Page 36 greenwichcollege.edu.au Budget Variation Report Architect and building company 120000 130000 Subtotal 1930000 1970000 TOTAL 1930000 1.2 +ve Record Complete the filing record below so that the project documentation can be saved in the project management record system Project Title: New Sydney Campus Project Client: MMI Project Sponsor: Talyor Varin File Name: Budget Variaotion report Project Manager: Muhammad Talha Saleem Date: 25/11/22 Version:1.0 Template 7 - Budget Variation Report for 'Staff Event' The project budget is a prediction of the costs associated with a particular project. These costs include labour, materials, and other resources required to complete the project. At the end of the project, review budget variations and how the project performed concerning the budget. Consider how the budget was impacted by the scenarios you worked on in Task 3.1. Customise the template and add additional rows as needed. Budget Variation Report Expense BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Budget Actual % Variation Page 37 greenwichcollege.edu.au Budget Variation Report Furniture 25000 23000 0.5 less Rent for one year 80000 80000 Nil Staff wages 46000 46000 Nil Hardware and software 30000 35000 6% +ve Architect and building company 12000 13000 1.2 +ve Subtotal 193000 197000 TOTAL 193000 Record Complete the filing record below so that the project documentation can be saved in the project management record system Project Title: New Sydney Campus Project Client: MMI Project Sponsor: Talyor Varin File Name: Budget Variaotion report Project Manager: Muhammad Talha Saleem Date: 25/11/22 Version:1.0 4. Complete a project review report (Template 8) for each project Template 8 - Project Review Report for MMI Main Project' Sydney Campus' This template is used to guide you through the process of conducting a project review. BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Page 38 greenwichcollege.edu.au Project Review Report Name of project: Overview A brief summary of highlights and achievements, etc. (50-100 words) The accomplishment of this endeavour should manage the lack of adventure part by continuing with the additional season of the rest people and redistributing the extra given out tasks to follow the assignment plan postponement, and something different is adjusting the project spending plan in light of appraisal bumble by changing the entire assignment monetary arrangement and saving the spending plan. Worked well Could have gone better Bunch execution Individual work for the endeavour Support from the errand support Evaluation of the endeavour spending plan Adjusting the errand spending plan Unsatisfied task is finished from the building association Lessons learned and suggested improvements (40-80 words): To improve for the accompanying endeavour, the endeavour bunch should design better errand the evaluation cycle, considered flu season to hinder the partners' prosperity thought to set up the extra endeavour part or staff. Record Complete the filing record below to save the project documentation in the project management record system. Project Title: New Sydney MMI Campus BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Project Client:MMI Date: 25/11/22 Version:1.0 Page 39 greenwichcollege.edu.au Project Review Report Project Sponsor: Talyor Varin Project Manager: Muhammad Talha Saleem File Name: Review Report Template 8 - Project Review Report for 'Virtual Event' This template is used to guide you through the process of conducting a project review. Project Review Report Name of project: Overview A brief summary of highlights and achievements, etc. (50-100 words) The accomplishment of this endeavour should manage the lack of adventure part by continuing with the additional season of the rest people and redistributing the extra given out tasks to follow the assignment plan postponement, and something different is adjusting the project spending plan in light of appraisal bumble by changing the entire assignment monetary arrangement and saving the spending plan. Worked well Could have gone better Bunch execution Individual work for the endeavour Support from the errand support Evaluation of the endeavour spending plan Lessons learned and suggested improvements (40-80 words): To improve for the accompanying endeavour, the endeavour bunch should design better errand the evaluation cycle, considered flu season to hinder the partners' BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Page 40 greenwichcollege.edu.au Project Review Report prosperity thought to set up the extra endeavour part or staff. Record Complete the filing record below to save the project documentation in the project management record system. Project Title: New Sydney MMI Campus Project Client:MMI Project Sponsor: Talyor Varin File Name: Review Report Project Manager: Muhammad Talha Saleem Date: 25/11/22 Version:1.0 Template 8 - Project Review Report for 'StaffEvent' This template is used to guide you through the process of conducting a project review. Project Review Report Name of project: Overview A brief summary of highlights and achievements, etc. (50-100 words) The accomplishment of this endeavour should manage the lack of adventure part by continuing with the additional season of the rest people and redistributing the extra given out tasks to follow the assignment plan postponement, and something different is adjusting the project spending plan in light of appraisal bumble by changing the entire assignment monetary arrangement and saving the spending plan. Worked well BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Could have gone better Page 41 greenwichcollege.edu.au Project Review Report Support from the errand support Individual work for the endeavour Adjusting the errand spending plan Evaluation of the endeavour spending plan with other staff members Lessons learned and suggested improvements (40-80 words): To improve for the accompanying endeavour, the endeavour bunch should design better errand the evaluation cycle, considered flu season to hinder the partners' prosperity thought to set up the extra endeavour part or staff. Record Complete the filing record below to save the project documentation in the project management record system. Project Title: New Sydney MMI Campus Project Client:MMI Project Sponsor: Talyor Varin File Name: Review Report Project Manager: Muhammad Talha Saleem BSBPMG540 - Manage project integration V3 2021 RTO Provider: 91153 - CRICOS Code: 02672K Date: 25/11/22 Version:1.0 Page 42 greenwichcollege.edu.au