COGEN ISSUED 09 MAY 2023 TTCL PUBLIC COMPANY LIMITED EGCO COGENERATION COMPANY LIMITED METHOD STATEMENT FOR INSTALLATION OF FM 200 SYSTEM PROJECT DOC. NO. D211-AS-PP-11 EGCO COGENERATION SPP REPLACEMENT PROJECT TTCL JOB NO. D-211 FOR APPROVAL Total (Including this Page): 13 sheets 1 26-Apr-23 For Approval 0 23-Mar-23 For Approval REV. DATE DESCRIPTION Udomkan R. Poramin C. Khwankaew C. Chamnarn A. --- ORIGINAL SIGNED --MADE CHECKED AUTH’D APPROVED For Project Use only Originator Piping Distribution No. of Copy ED PR MA ME PP EE IN CV QC Proj Site Owner Total 1 1 2 EGCO COGENERATION SPP REPLACEMENT PROJECT TTCL Job No. D-211 COGEN METHOD STATEMENT FOR INSTALLATION OF FM 200 SYSTEM 26-Apr-23 Rev. 1 Project Doc. No. D211-AS-PP-11 Revision History Sheet Rev. Date Description 0 23-Mar-23 For Approval 1 26-Apr-23 For Approval Revice per your comment Page 2 of 13 EGCO COGENERATION SPP REPLACEMENT PROJECT TTCL Job No. D-211 COGEN METHOD STATEMENT FOR INSTALLATION OF FM 200 SYSTEM 26-Apr-23 Rev. 1 Project Doc. No. D211-AS-PP-11 Page 3 of 13 CONTENTS 1. PURPOSE 2. METHOD STATEMENT AND REQUIREMENT ATTACHMENT 1: SURVEY BOUNDARY OF ELECTRICAL CONTROL BUILDING ATTACHMENT 2: PRE-COMMENCEMENT WORKS ATTACHMENT 3: COMMISSIONING 3. SAFETY AND SECURITY PROCEDURE 4. PROJECT SCHEDULE AND TIME&WORKING EGCO COGENERATION SPP REPLACEMENT PROJECT TTCL Job No. D-211 COGEN METHOD STATEMENT FOR INSTALLATION OF FM 200 SYSTEM 26-Apr-23 1. Rev. 1 Project Doc. No. D211-AS-PP-11 Page 4 of 13 PURPOSE The purpose of this method statement is to describe the sequence of activities, method and other for the efficiency and safety in operation of the existing equipment is required for the FM-200 at Electrilcal control building of EGCO Cogeneration SPP Replacement Project located in Rayong Industrial Park, Map Kha Sub-district, Thailand. 2. METHOD STATEMENT AND REQUIREMENT This method statement is FM-200 piping and pipe support installation for EGCO Cogeneration SPP Replacement Project working area ECB(Electrical Control Building) 2.1 Survey Boundary of Electrical Control Building 2.1.1 Due to the existing area has many equipment. We should be survey for definite’s boundary of equipment’s foundation. 2.2 Pre-Commencement works 2.2.1 Mobilize tool and equipment on site. Obtain necessary As-built records/Plan/Documents. 2.2.2 Carry out hazard identification and risk assessment 2.2.3 Before start works shall ensure that all gate passes, permits, tools, materials for safety precautions, manpower, equipment are available before the commencement of work, and all tool shall be inspected before using. 2.2.4 The Site Team shall make sure that access roads are always clear from any obstruction and site is always accessible. Provision of access and egress such as ladders, steps, ramps, or other safe means of egress and be with reasonable distance. 2.2.5 Prior to the commencement of work all persons involved will be given a pre-work briefing based on the Job Hazard Analysis relating to the risks and required control measures for the work. The assigned supervisor will be responsible for presenting and recording the briefing. 2.2.6 Prior to the commencement of work all materials and equipment will be checked to ensure that they are in good condition. 2.2.7 Perform to inspection of lifting gear before start lifting. 2.2.8 Route Line FM-200 Piping Electrical Control Building Area EGCO COGENERATION SPP REPLACEMENT PROJECT TTCL Job No. D-211 COGEN METHOD STATEMENT FOR INSTALLATION OF FM 200 SYSTEM 26-Apr-23 Rev. 1 Project Doc. No. D211-AS-PP-11 Pic.1 Layout Plan Pic.2 Layout Plan Page 5 of 13 EGCO COGENERATION SPP REPLACEMENT PROJECT TTCL Job No. D-211 COGEN METHOD STATEMENT FOR INSTALLATION OF FM 200 SYSTEM 26-Apr-23 Rev. 1 Project Doc. No. D211-AS-PP-11 Pic.3 Layout Plan Pic.4 Layout Plan Page 6 of 13 EGCO COGENERATION SPP REPLACEMENT PROJECT TTCL Job No. D-211 COGEN METHOD STATEMENT FOR INSTALLATION OF FM 200 SYSTEM 26-Apr-23 2.2.3 Project Doc. No. D211-AS-PP-11 Rev. 1 Page 7 of 13 Construction Method 2.2.3.1 Place the plywood sheet in the work area. 2.2.3.2 Place the blue sheet on the plywood below the work area. 2.2.3.3 Installation scaffolding at Control Building Area for installation pipe support and pipe and removing existing Co2 pipes. 2.2.3.4 Obtain scaffolding inspection before use. Scaffolding Scaffolding Plywood Blue sheet Pic.4 Layout section Support installation with concrete 2.2.3.5 Layout location support for installation 2.2.3.6 Drill concrete as sizing anchor bolt by drilling machine 2.2.3.7 Cleaning concrete dust 2.2.3.8 Put Anchor bolt into hole 2.2.3.9 Installation anchor bolt 2.2.3.10 Set leveling support and gouging concrete Installation pipe support and Tighten anchor bolt EGCO COGENERATION SPP REPLACEMENT PROJECT TTCL Job No. D-211 COGEN METHOD STATEMENT FOR INSTALLATION OF FM 200 SYSTEM 26-Apr-23 Rev. 1 Project Doc. No. D211-AS-PP-11 Page 8 of 13 Support FM-200 pipe Pic.5 Layout Plan Support FM-200 pipe Pic.6 Layout section Support FM-200 Cylinder & Header pipe Pic.7 Isomatic view EGCO COGENERATION SPP REPLACEMENT PROJECT TTCL Job No. D-211 COGEN METHOD STATEMENT FOR INSTALLATION OF FM 200 SYSTEM 26-Apr-23 Rev. 1 Project Doc. No. D211-AS-PP-11 2.2.3.11 Lifting pipe spools to pipe support 2.2.3.12 Assembly and fit-up pipe spools 2.2.3.13 Check alignment and dimension 2.2.3.14 Check the tightening of flange bolts and gaskets. 2.2.3.15 Visual inspection pipe spools 2.2.3.16 Installation bolt, nut, gasket and Tighten flange joint 2.2.3.17 Installation U-Bolt 2.2.3.18 Issue RFI for Line Check Pic.8 Isomatic view & section Page 9 of 13 EGCO COGENERATION SPP REPLACEMENT PROJECT TTCL Job No. D-211 COGEN METHOD STATEMENT FOR INSTALLATION OF FM 200 SYSTEM 26-Apr-23 Rev. 1 Project Doc. No. D211-AS-PP-11 Page 10 of 13 Painting specification 2.2.3.19 2.2.3.20 2.2.3.21 2.2.3.22 2.2.3.22 2.2.3.22 2.2.3.23 Prepare a tray to organize the color Place the blue sheet below in the work area. Store the color in the right area. Put on gloves and goggles before you start painting. Check the paint on the installation area for scratches or not. Repair and prepare the surface before painting. Color measurement to meet specifications. Pic.9 Isomatic view 2.2.4 Pressure Test 2.2.4.1 Installation blind flange, bolt, nut and gasket 2.2.4.2 Fill medium by Nitrogen gas 600 PSI at Branch pipe, Holding time 10 min. 2.2.4.3 During test will record pressure with pressure loss not over 10%. 2.2.4.4 Issue RFI for Inspection 2.2.4.5 Witness together with QC for check joint field weld each joint EGCO COGENERATION SPP REPLACEMENT PROJECT TTCL Job No. D-211 COGEN METHOD STATEMENT FOR INSTALLATION OF FM 200 SYSTEM 26-Apr-23 Rev. 1 Project Doc. No. D211-AS-PP-11 Page 11 of 13 2.3 Commissioning 2.3.1 2.3.2 2.3.3 2.3.4 2.3.5 Restatement Install valve, bolt, nut and gasket permeance Information area owner for startup and commissioning service test Issue RFI for Inspection Witness together with area owner for check leak Handover and release area to area owner 3 Safety and Security Procedure 3.1 General Base philosophy is that good working conditions, proper instruction and audits at appropriate timing, and well-trained people who work in the job site will prevent the accident. To prevent accident, the following "Safety Check Point" shall be secured as General Safety Plan by all people who work in the job site 3.2 Safety Control 3.2.1 3.2.2 3.2.3 3.2.4 3.2.5 3.2.6 3.2.7 All workers shall provide with PPE (Personal Protective Equipment) and shall be worn every time they are entering the site. Safety induction to be conducted to all new workers that involved to this activity and safety tool box meeting shall be conducted every day to remind the workers about concerning the safety. Safety Officer shall ensure that the activity shall carry out in a safe manager All workers shall fully support and actively participate in all safety related activities and comply with all practicable safety measures. All workers shall be advised report any accident or injury to supervisor and proper treatment to be obtained. The site shall be kept clear or unnecessary obstruction. First aid kid boxes will be provided at site off. EGCO COGENERATION SPP REPLACEMENT PROJECT TTCL Job No. D-211 COGEN METHOD STATEMENT FOR INSTALLATION OF FM 200 SYSTEM 26-Apr-23 Project Doc. No. D211-AS-PP-11 Rev. 1 Page 12 of 13 Manpower S/N 1 2 4 5 6 7 Description Number Required 1 1 1 10 1 1 Total 15 Engineer Supervisor Safety Officer Fitter Welder Painter Remark PERSONNEL PROTECTIVE EQUIPMENT (PPE) Safety Shoes Safety Gloves Hearing Protection Eyes Protection Respiratory Protection Coveralls Welding Helmet Safety Harness YES Where required No Yes Yes Yes Yes Yes EGCO COGENERATION SPP REPLACEMENT PROJECT TTCL Job No. D-211 COGEN METHOD STATEMENT FOR INSTALLATION OF FM 200 SYSTEM 26-Apr-23 Rev. 1 Project Doc. No. D211-AS-PP-11 4. PROJECT SCHEDULE AND TIME&WORKING Pic.9 Overall manufacturing schedule Page 13 of 13