Uploaded by Ho Pong Fung

ASME I 2015

advertisement
ASME Boiler and
Pressure Vessel Code
An International Code
2015
R ul e s for Const ruction
of Powe r Boi l e rs
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
SECTION I
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I -2015
No fu
2015 ASME Boiler &
Pressure Vessel Code
2015 Edition
July 1, 2015
RULES FOR CONSTRUCTION
OF POWER BOILERS
ASME Boiler and Pressure Vessel Committee
on Power Boilers
Two Park Avenue • New York, NY • 10016 USA
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
I
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
AN INTERNATIONAL CODE
No fu
This international code or standard was developed under procedures accredited as meeting the criteria for
American National Standards and it is an American National Standard. The Standards Committee that approved
the code or standard was balanced to assure that individuals from competent and concerned interests have
had an opportunity to participate. The proposed code or standard was made available for public review and comment that provides an opportunity for additional public input from industry, academia, regulatory agencies, and
the public-at-large.
ASME does not “approve,” “rate,” or “endorse” any item, construction, proprietary device, or activity.
ASME does not take any position with respect to the validity of any patent rights asserted in connection with any
items mentioned in this document, and does not undertake to insure anyone utilizing a standard against liability
for infringement of any applicable letters patent, nor assume any such liability. Users of a code or standard are
expressly advised that determination of the validity of any such patent rights, and the risk of infringement of such
rights, is entirely their own responsibility.
Participation by federal agency representative(s) or person(s) affiliated with industry is not to be interpreted as
government or industry endorsement of this code or standard.
ASME accepts responsibility for only those interpretations of this document issued in accordance with the established ASME procedures and policies, which precludes the issuance of interpretations by individuals.
The endnotes and preamble in this document (if any) are part of this American National Standard.
ASME collective membership mark
Certification Mark
“ASME” is the trademark of The American Society of Mechanical Engineers.
No part of this document may be reproduced in any form, in an electronic
retrieval system or otherwise, without the prior written permission of the
publisher.
Library of Congress Catalog Card Number: 56-3934
Printed in the United States of America
Adopted by the Council of The American Society of Mechanical Engineers, 1914; latest edition 2015.
The American Society of Mechanical Engineers
Two Park Avenue, New York, NY 10016-5990
Copyright © 2015 by
THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS
All rights reserved
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
The above ASME symbol is registered in the U.S. Patent Office.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
Date of Issuance: July 1, 2015
No fu
List of Sections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Foreword . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Statement of Policy on the Use of the Certification Mark and Code Authorization in Advertising
Statement of Policy on the Use of ASME Marking to Identify Manufactured Items . . . . . . . . . . . .
Submittal of Technical Inquiries to the Boiler and Pressure Vessel Standards Committees . . . . .
Personnel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Preamble . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Summary of Changes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
List of Changes in Record Number Order . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Cross-Referencing and Stylistic Changes in the Boiler and Pressure Vessel Code . . . . . . . . . . . . .
Part PG
PG-1
PG-2
PG-3
PG-4
PG-11
PG-12
PG-13
PG-14
PG-16
PG-17
PG-18
PG-19
PG-20
PG-21
PG-22
PG-23
PG-25
PG-26
PG-27
PG-28
PG-29
PG-30
PG-31
PG-32
PG-33
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
General Requirements for all Methods of Construction . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Service Limitations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Referenced Standards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Units . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Plate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Forgings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Castings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Pipes, Tubes, and Pressure‐Containing Parts . . . . . . . . . . . . . . . . . . . . . . . . . .
Material Identified With or Produced to a Specification Not Permitted by This
Section, and Material Not Fully Identified . . . . . . . . . . . . . . . . . . . . . . . . . .
Prefabricated or Preformed Pressure Parts Furnished Without a Certification
Mark . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Water Level Indicators and Connector Material . . . . . . . . . . . . . . . . . . . . . . .
Stays . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Rivets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Fabrication by a Combination of Methods . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Design Validation by Proof Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Cold Forming of Austenitic Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Cold Forming of Creep Strength Enhanced Ferritic Steels . . . . . . . . . . . . . . .
Maximum Allowable Working Pressure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Loadings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Stress Values for Calculation Formulas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Quality Factors for Steel Castings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Weld Joint Strength Reduction Factor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Cylindrical Components Under Internal Pressure . . . . . . . . . . . . . . . . . . . . . .
Components Under External Pressure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Dished Heads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Stayed Dished Heads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Unstayed Flat Heads and Covers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Openings and Compensation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Openings in Shells, Headers, and Dished Heads . . . . . . . . . . . . . . . . . . . . . . .
Compensation Required for Openings in Shells and Dished Heads . . . . . . .
iii
xv
xvii
xix
xix
xx
xxii
xxxix
xli
xlvi
xlix
1
1
1
1
1
1
2
2
3
3
3
3
6
7
10
10
10
11
11
11
11
11
13
13
14
14
15
16
16
21
24
25
25
29
29
30
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-5
PG-6
PG-7
PG-8
PG-9
PG-10
..
..
..
..
..
..
..
..
..
..
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
TABLE OF CONTENTS
No fu
PG-36
PG-37
PG-38
PG-39
PG-42
PG-43
PG-44
PG-46
PG-47
PG-48
PG-49
PG-52
PG-53
PG-55
PG-56
PG-58
PG-59
PG-60
PG-61
PG-75
PG-76
PG-77
PG-78
PG-79
PG-80
PG-81
PG-82
PG-90
PG-91
PG-93
PG-99
PG-101
PG-104
PG-105
PG-106
PG-107
PG-108
PG-109
PG-110
iv
32
32
32
34
35
35
36
39
39
40
40
41
41
41
44
44
44
48
48
51
55
55
58
59
59
62
64
71
72
72
73
77
77
77
77
77
77
78
78
78
78
78
79
80
80
80
80
81
81
82
85
85
86
86
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-67
PG-68
PG-69
PG-70
PG-71
PG-72
PG-73
Flanged‐in Openings in Formed Heads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Compensation Required for Openings in Flat Unstayed Heads and Flat Stayed
Plates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Limits of Metal Available for Compensation . . . . . . . . . . . . . . . . . . . . . . . . . .
Strength of Compensation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Compensation for Multiple Openings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Methods of Attachment of Pipe and Nozzle Necks to Vessel Walls . . . . . . . .
General Requirements for Flanges, Pipe Fittings, and Valves . . . . . . . . . . . .
Nozzle Neck Thickness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Inspection Openings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Stayed Surfaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Staybolts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Location of Staybolts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Dimensions of Staybolts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Ligaments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Ligaments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Supports and Attachment Lugs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Loading on Structural Attachments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Boiler External Piping and Boiler Proper Connections . . . . . . . . . . . . . . . . . .
Outlets and External Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Application Requirements for the Boiler Proper . . . . . . . . . . . . . . . . . . . . . . .
Design and Application . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Design and Application Requirements for Miscellaneous Pipe, Valves, and
Fittings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Feedwater Supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Overpressure Protection Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Superheater and Reheater . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Certification of Capacity of Pressure Relief Valves . . . . . . . . . . . . . . . . . . . . .
Capacity of Pressure Relief Valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Mounting of Pressure Relief Valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Operation of Pressure Relief Valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Minimum Requirements for Pressure Relief Valves . . . . . . . . . . . . . . . . . . . .
Fabrication . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Cutting Plates and Other Stock . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Plate Identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Repairs of Defects in Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Tube Holes and Ends . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Permissible Out‐of‐Roundness of Cylindrical Shells . . . . . . . . . . . . . . . . . . . .
Tolerance for Formed Heads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Holes for Stays . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Inspection and Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Qualification of Inspectors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Examination and Repair of Flat Plate in Corner Joints . . . . . . . . . . . . . . . . . .
Hydrostatic Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Certification by Stamping and Data Reports . . . . . . . . . . . . . . . . . . . . . . . . . .
Heating Surface Computation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Certification Marks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Stamping of Boilers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Field Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Stamping for Field‐Assembled Boilers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Stamping of Pressure Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Stamping of Boiler Pressure Relief Valves . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
PG-34
PG-35
No fu
Part PW
PW-1
PW-5
PW-8
PW-9
PW-10
PW-11
PW-13
PW-14
PW-15
PW-16
PW-19
PW-26
PW-27
PW-28
PW-29
PW-31
PW-33
PW-46
PW-47
PW-48
PW-49
PW-50
PW-51
PW-52
PW-53
PW-54
Part PR
PR-1
PR-2
PR-3
PR-4
PR-5
PR-6
87
87
89
Requirements for Boilers Fabricated by Welding . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Design of Welded Joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Heat Treatment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Volumetric Examination of Welded Butt Joints . . . . . . . . . . . . . . . . . . . . . . . .
Head‐to‐Flange Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Openings in or Adjacent to Welds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Welded Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Minimum Requirements for Attachment Welds . . . . . . . . . . . . . . . . . . . . . . .
Welded‐In Stays . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Fabrication . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Welding Processes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Welding Qualification and Weld Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Base Metal Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Alignment Tolerance, Shells and Vessels (Including Pipe or Tube Used as a
Shell) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Alignment, Tube and Pipe . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Finished Longitudinal and Circumferential Joints . . . . . . . . . . . . . . . . . . . . . .
Miscellaneous Welding Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Preheating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Requirements for Postweld Heat Treatment . . . . . . . . . . . . . . . . . . . . . . . . . .
Repair of Defects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Circumferential Joints in Pipes, Tubes, and Headers . . . . . . . . . . . . . . . . . . .
Joints in Valves and Other Boiler Appurtenances . . . . . . . . . . . . . . . . . . . . . .
Fabrication Rules for Bimetallic Tubes When the Clad Strength Is Included
Inspection and Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Check of Welding Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Check of Welder and Welding Operator Performance Qualifications . . . . . .
Check of Heat Treatment Practice . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Qualification of Nondestructive Examination Personnel . . . . . . . . . . . . . . . .
Radiographic Examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Ultrasonic Examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Test Plates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Hydrostatic Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
91
91
91
91
91
92
92
92
93
93
93
93
96
96
103
103
103
103
107
108
108
108
108
108
109
109
109
121
123
124
124
126
126
126
126
126
127
127
127
127
132
Requirements for Boilers Fabricated by Riveting
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Responsibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Strength of Plates . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Strength of Rivets . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
133
133
133
133
133
133
133
133
133
133
v
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PW-34
PW-35
PW-36
PW-38
PW-39
PW-40
PW-41
PW-42
PW-44
Location of Stampings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Manufacturer’s Data Report Forms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Master Data Report Form . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
PG-111
PG-112
PG-113
No fu
PR-18
PR-19
PR-20
PR-21
PR-22
PR-23
PR-24
PR-25
PR-26
PR-27
PR-28
Part PB
PB-1
PB-8
PB-9
PB-10
PB-14
PB-15
PB-16
PB-17
PB-18
PB-19
PB-26
PB-28
PB-29
PB-30
PB-31
PB-32
PB-33
PB-46
PB-47
PB-48
PB-49
PB-50
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
133
133
134
134
134
134
135
135
135
136
136
137
137
137
137
137
138
138
138
139
139
139
139
139
Requirements for Boilers Fabricated by Brazing
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Brazing Filler Metals . . . . . . . . . . . . . . . . . . . . . . . . . .
Fluxes and Atmospheres . . . . . . . . . . . . . . . . . . . . . .
Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Strength of Brazed Joints . . . . . . . . . . . . . . . . . . . . . .
Brazed Joint Efficiency . . . . . . . . . . . . . . . . . . . . . . . .
Application of Brazing Filler Metal . . . . . . . . . . . . . .
Permissible Types of Joints . . . . . . . . . . . . . . . . . . . .
Joint Clearance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Joint Brazing Procedure . . . . . . . . . . . . . . . . . . . . . . .
Openings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Brazed Connections . . . . . . . . . . . . . . . . . . . . . . . . . . .
Fabrication . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Qualification of Brazing Procedure . . . . . . . . . . . . . .
Qualification of Brazers and Brazing Operators . . .
Cleaning of Surfaces to Be Brazed . . . . . . . . . . . . . . .
Clearance Between Surfaces to Be Brazed . . . . . . . .
Postbrazing Operations . . . . . . . . . . . . . . . . . . . . . . .
Repair of Defective Brazing . . . . . . . . . . . . . . . . . . . .
Inspection and Tests . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Check of Brazing Procedure . . . . . . . . . . . . . . . . . . . .
Brazer and Brazing Operator . . . . . . . . . . . . . . . . . . .
Visual Examination . . . . . . . . . . . . . . . . . . . . . . . . . . .
Exemptions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
140
140
140
140
140
141
141
141
141
141
141
142
142
142
142
143
143
143
143
143
143
144
144
144
144
144
144
144
144
144
145
vi
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PB-5
PB-6
PB-7
Crushing/Compressive Strength of Plates . . . . . . . . . . .
Joint Efficiency and the Thickness of Shells and Drums
Thickness of Buttstraps . . . . . . . . . . . . . . . . . . . . . . . . . .
Longitudinal Joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Circumferential Joints . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Transverse Pitch (Back Pitch) of Rows of Rivets . . . . .
Preparation of Plate Edges for Calking . . . . . . . . . . . . . .
Edge Distance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Riveted Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Reinforcement of Openings . . . . . . . . . . . . . . . . . . . . . . .
Reinforcing Shells of Watertube Boilers . . . . . . . . . . . . .
Fabrication . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Welded Connections in Riveted Boilers . . . . . . . . . . . . .
Buttstraps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Rivet Holes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Assembly of Joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Riveting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Joint Tightness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Inspection, Tests, and Data Reports . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Hammer Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Hydrostatic Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Data Reports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
PR-7
PR-8
PR-9
PR-10
PR-11
PR-12
PR-13
PR-14
PR-15
PR-16
PR-17
No fu
Part PL
PL-1
PL-2
PL-3
PL-4
PL-5
PL-6
PL-7
PL-8
PL-9
PL-10
PL-11
PL-12
PL-13
PL-14
PL-15
PL-16
145
145
Requirements For Locomotive Boilers . . . . . . . . . . . . . . . . . . . . . . . .
Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Testing and Stamping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
In the Course of Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
In the Course of Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Allowable Stress Values for Materials . . . . . . . . . . . . . . . . . . . . . . . . . . .
In the Course of Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
In the Course of Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
In the Course of Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
In the Course of Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
In the Course of Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
In the Course of Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
In the Course of Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
In the Course of Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
In the Course of Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Cylindrical Boiler Shell . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
In the Course of Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Reinforcing and Doubling Plates on Unstayed Portions of the Boiler .
Requirements for Domes of Locomotive Boilers . . . . . . . . . . . . . . . . . .
In the Course of Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
In the Course of Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Flues . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
In the Course of Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
In the Course of Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Stayed Surfaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Mudring (Firebox Foundation Ring) . . . . . . . . . . . . . . . . . . . . . . . . . . . .
In the Course of Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Staybolts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
In the Course of Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
In the Course of Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Crown Bars . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
In the Course of Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
In the Course of Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Braces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
In the Course of Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
In the Course of Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Arch Tubes, Circulators, and Thermic Syphons . . . . . . . . . . . . . . . . . . .
In the Course of Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
In the Course of Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Water Gage Glasses and Water Columns . . . . . . . . . . . . . . . . . . . . . . . .
Boiler Blowoff Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
In the Course of Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Feedwater Supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
In the Course of Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
In the Course of Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Dry Pipe . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
146
146
146
146
146
146
146
146
146
146
149
149
149
149
149
149
149
149
149
149
149
149
149
149
150
154
154
154
156
156
156
158
159
159
160
160
160
160
160
160
166
166
166
169
169
169
170
170
170
170
170
170
vii
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PL-17
PL-18
PL-19
PL-20
PL-21
PL-22
PL-23
PL-24
PL-25
PL-26
PL-27
PL-28
PL-29
PL-30
PL-31
PL-32
PL-33
PL-34
PL-35
PL-36
PL-37
PL-38
PL-39
PL-40
PL-41
PL-42
PL-43
PL-44
PL-45
PL-46
PL-47
PL-48
Marking and Reports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
PB-51
No fu
PWT-1
PWT-5
PWT-8
PWT-9
PWT-11
PWT-12
PWT-13
PWT-14
PWT-15
Part PFT
PFT-1
PFT-5
PFT-8
PFT-9
PFT-10
PFT-11
PFT-12
PFT-22
PFT-23
PFT-24
PFT-25
PFT-26
PFT-27
PFT-28
PFT-29
PFT-30
PFT-31
PFT-32
PFT-40
PFT-41
PFT-42
PFT-43
PFT-44
PFT-45
PFT-46
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
171
171
171
171
171
171
171
171
171
173
173
173
173
Requirements for Firetube Boilers . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Thickness Requirements . . . . . . . . . . . . . . . . . . . . . .
Shell Joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Attachment of Heads and Tubesheets . . . . . . . . . . .
Tubes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Combustion Chambers . . . . . . . . . . . . . . . . . . . . . . . .
Combustion Chamber Tubesheet . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Plain Circular Furnaces . . . . . . . . . . . . . . . . . . . . . . . .
Ring‐Reinforced Type . . . . . . . . . . . . . . . . . . . . . . . . .
Corrugated Furnaces . . . . . . . . . . . . . . . . . . . . . . . . . .
Combined Plain Circular and Corrugated Type . . . .
Attachment of Furnaces . . . . . . . . . . . . . . . . . . . . . . .
Fireboxes and Waterlegs . . . . . . . . . . . . . . . . . . . . . .
Stayed Surfaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Working Pressure for Stayed Curved Surfaces . . . .
Staying Horizontal Return Tube Boilers . . . . . . . . . .
Staying Segments of Heads . . . . . . . . . . . . . . . . . . . .
Area Supported by Stay . . . . . . . . . . . . . . . . . . . . . . .
Maximum Spacing . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Staybolts and Stays . . . . . . . . . . . . . . . . . . . . . . . . . . .
Flexible Staybolts . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Crown Bars and Girder Stays . . . . . . . . . . . . . . . . . . .
Stay Tubes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Stresses in Diagonal Stays . . . . . . . . . . . . . . . . . . . . .
Doors and Openings . . . . . . . . . . . . . . . . . . . . . . . . . .
Welded Door Openings . . . . . . . . . . . . . . . . . . . . . . . .
Openings in Wrapper Sheets . . . . . . . . . . . . . . . . . . .
Fireside Access Openings . . . . . . . . . . . . . . . . . . . . . .
Requirements for Inspection Openings . . . . . . . . . .
Opening Between Boiler and Pressure Relief Valve
Domes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Requirements for Domes . . . . . . . . . . . . . . . . . . . . . .
Setting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Method of Support . . . . . . . . . . . . . . . . . . . . . . . . . . .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
174
174
174
174
174
174
174
174
174
174
175
176
176
177
177
177
178
178
178
179
180
180
180
182
182
182
182
183
184
184
185
185
186
186
186
186
186
186
186
186
187
187
viii
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PFT-13
PFT-14
PFT-15
PFT-17
PFT-18
PFT-19
PFT-20
PFT-21
Requirements for Watertube Boilers . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Tubes and Pipe . . . . . . . . . . . . . . . . . . . . . . . . .
Tube Connections . . . . . . . . . . . . . . . . . . . . . . .
Staybolting Box‐Type Headers and Waterlegs
Staying Segment of Heads . . . . . . . . . . . . . . . .
Firing Doors . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Access and Firing Doors . . . . . . . . . . . . . . . . . .
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
Part PWT
No fu
Part PFH
PFH-1
Part PMB
PMB-1
PMB-2
PMB-5
PMB-8
PMB-9
PMB-10
PMB-11
PMB-12
PMB-13
PMB-14
PMB-15
PMB-16
PMB-17
PMB-21
Part PEB
PEB-5
PEB-8
PEB-9
PEB-10
PEB-11
PEB-12
PEB-13
PEB-14
PEB-15
PEB-16
PEB-17
PEB-18
PEB-19
Part PVG
PVG-1
PVG-5
PVG-8
PVG-9
PVG-10
..
..
..
..
.
.
.
.
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
187
187
188
188
Optional Requirements for Feedwater Heater (When Located Within
Scope of Section I Rules) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
................................................................
189
189
Requirements for Miniature Boilers .
General . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . .
Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Materials . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . .
Design . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . .
Welding . . . . . . . . . . . . . . . . . . . . . . . . . .
Washout Openings . . . . . . . . . . . . . . . . .
Feedwater Supply . . . . . . . . . . . . . . . . . .
Blowoff . . . . . . . . . . . . . . . . . . . . . . . . . . .
Water Gages . . . . . . . . . . . . . . . . . . . . . . .
Fixtures and Fittings . . . . . . . . . . . . . . . .
Pressure Relief Valves . . . . . . . . . . . . . .
Steam Stop Valves . . . . . . . . . . . . . . . . . .
Automatic Devices . . . . . . . . . . . . . . . . . .
Hydrostatic Tests and Inspection . . . . .
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
.
.
.
.
..
..
..
..
.
.
.
.
..
..
..
..
..
..
..
..
.
.
.
.
..
..
..
..
.
.
.
.
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
190
190
190
190
190
190
190
190
190
190
191
191
191
191
191
191
191
191
Requirements for Electric Boilers . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Optional Requirements for the Boiler Pressure Vessel
Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Welding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Inspection Openings . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Feedwater Supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Blowoff . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Water Level Indicators . . . . . . . . . . . . . . . . . . . . . . . . . .
Pressure Gages . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Pressure Relief Valves . . . . . . . . . . . . . . . . . . . . . . . . . .
Automatic Devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Hydrostatic Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Inspection and Stamping of Boilers . . . . . . . . . . . . . . .
Manufacturer’s Data Report for Electric Boilers . . . . .
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
192
192
192
192
192
192
192
193
193
193
193
193
193
193
193
193
194
194
194
195
Requirements for Organic Fluid Vaporizers
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General Requirements . . . . . . . . . . . . . . . . . . . .
Gage Glasses . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
196
196
196
196
196
196
196
196
196
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
ix
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PEB-1
PEB-2
PEB-3
Piping, Fittings, and Appliances
Water Level Indicators . . . . . . .
Feed Piping . . . . . . . . . . . . . . . .
Blowoff Piping . . . . . . . . . . . . . .
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
PFT-47
PFT-48
PFT-49
No fu
Drain Valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Pressure Relief Valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
196
196
Part PFE
PFE-1
PFE-2
PFE-3
PFE-4
Requirements for Feedwater Economizers
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Pressure Relief . . . . . . . . . . . . . . . . . . . . . . . . . .
Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
.
.
.
.
.
198
198
198
198
198
Part PHRSG
PHRSG-1
PHRSG-2
PHRSG-3
199
199
199
PHRSG-4
PHRSG-5
Requirements for Heat Recovery Steam Generators . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Requirements for Superheater and Reheater Condensate Removal Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Desuperheater Drain Pots . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Certification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
199
199
200
Mandatory Appendix II
Standard Units for Use in Equations
..............................
203
Mandatory Appendix III
Criteria for Reapplication of a Certification Mark . . . . . . . . . . . . . . . . . . .
204
Mandatory Appendix IV
Local Thin Areas in Cylindrical Shells and in Spherical Segments of
Heads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
207
Mandatory Appendix V
Additional Rules for Boilers Fabricated by Riveting . . . . . . . . . . . . . . . .
211
Mandatory Appendix VI
Establishing Governing Code Editions, Addenda, and Cases for Boilers
and Replacement Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
215
Explanation of the Code Containing Matter Not Mandatory Unless Specifically Referred to in the Rules of the Code . . . . . . . . . . . . . . . . . . . . .
217
Positive Material Identification Practice . . . . . . . . . . . . . . . . . . . . . . . . . . .
317
Nonmandatory Appendix A
Nonmandatory Appendix B
PG-52.2
PG-52.3
PG-52.4
PG-52.5
PG-53.3
PG-56.1.2
PG-56.2
PG-58.3.1(a)
PG-58.3.1(b)
PG-58.3.1(c)
PG-58.3.2
.
.
.
.
.
..
..
..
..
..
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
..
..
..
..
..
.
.
.
.
.
..
..
..
..
..
.
.
.
.
.
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
..
..
..
..
..
Maximum Internal Projection of Welded Access or Inspection Openings . . . . . . . . . . . . . . . .
Some Acceptable Types of Unstayed Flat Heads and Covers . . . . . . . . . . . . . . . . . . . . . . . . . . .
Nomenclature and Equations for Reinforced Openings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Some Representative Configurations Describing the Dimensions t e , h, and d . . . . . . . . . . . . .
Chart for Determining Value of F . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Illustrations of the Rule Given in PG-38.4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Welding End Transitions Maximum Envelope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Acceptable Proportions for Ends of Through‐Stays . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Diagram for Determining the Efficiency of Longitudinal and Diagonal Ligaments Between
Openings in Cylindrical Shells . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Example of Tube Spacing With Pitch of Holes Equal in Every Row . . . . . . . . . . . . . . . . . . . . .
Example of Tube Spacing With Pitch of Holes Unequal in Every Second Row . . . . . . . . . . . .
Example of Tube Spacing With Pitch of Holes Varying in Every Second and Third Row . . . .
Example of Tube Spacing With Tube Holes on Diagonal Lines . . . . . . . . . . . . . . . . . . . . . . . . .
Diagram for Determining Equivalent Longitudinal Efficiency of Diagonal Ligaments Between
Openings in Cylindrical Shells . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Method of Computation of Attachments to Tubes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Chart for Determining Load Factor, L f . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Code Jurisdictional Limits for Piping — Drum‐Type Boilers . . . . . . . . . . . . . . . . . . . . . . . . . . .
Code Jurisdictional Limits for Piping — Isolable Economizers Located in Feedwater Piping and
Isolable Superheaters in Main Steam Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Code Jurisdictional Limits for Piping — Reheaters and Nonintegral Separately Fired Superheaters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Code Jurisdictional Limits for Piping — An Example of Forced‐Flow Steam Generators With No
Fixed Steam or Waterline . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
x
22
26
31
33
34
35
38
40
42
43
43
43
44
45
46
47
49
50
51
52
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
FIGURES
PG-28
PG-31
PG-33.1
PG-33.2
PG-33.3
PG-38
PG-42.1
PG-46.2
PG-52.1
..
..
..
..
..
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
PVG-11
PVG-12
No fu
PG-59.1
PG-60.3.7
PG-60.3.9
PG-67.4
PG-80
PG-105.1
PG-106
PW-9.3.1
PW-9.3.3
PW-9.4
PW-15
PW-16.1
PW-16.2
PW-16.8
xi
53
54
57
58
61
79
82
83
92
94
95
97
98
102
104
106
106
128
129
130
131
135
136
137
138
142
147
148
150
151
151
153
157
159
159
160
161
162
163
164
164
165
166
167
168
168
169
172
175
177
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PW-19.4(a)
PW-19.4(b)
PW-53.1
PW-53.2
PW-53.3(a)
PW-53.3(b)
PR-13-1
PR-15.4-1
PR-17.2-1
PR-20.2-1
PB-15
PL-2.2-1
PL-2.2-2
PL-20.4.1-1
PL-20.4.2-1
PL-20.5-1
PL-21.4.1-1
PL-27.5-1
PL-27.6.3-1
PL-27.6.3-2
PL-27.7-1
PL-28.2-1
PL-33-1
PL-36.2.1-1
PL-36.5-1
PL-36.7-1
PL-36.9-1
PL-36.9-2
PL-39.1-1
PL-39.2.1-1
PL-39.2.1-2
PL-39.3-1
PWT-11
PFT-12.1
PFT-17.2
Code Jurisdictional Limits for Piping — An Example of Steam Separator Type Forced-Flow
Steam Generators With No Fixed Steam or Waterline . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Typical Boiler Bushings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Y‐Type Globe Valve . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Typical Arrangement of Steam and Water Connections for a Water Column . . . . . . . . . . . . .
Requirements for Overpressure Protection Forced‐Flow Steam Generator . . . . . . . . . . . . . . .
Maximum Permissible Deviation From a Circular Form, e , for Cylindrical Parts Under External
Pressure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Official Certification Mark to Denote the American Society of Mechanical Engineers’ Standard
for Boilers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Form of Stamping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Butt Welding of Plates of Unequal Thickness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Heads Attached to Shells . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Prohibited Welded Joint . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Examples of Weld Strength Calculations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Some Acceptable Types of Welded Nozzles and Other Connections to Shells, Drums, and
Headers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Some Acceptable Forms of Welds for Lugs, Hangers, and Brackets on Shells, Drums, and
Headers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Some Acceptable Designs for Partial-Penetration-Weld-Type Attachments Designed for 900°F
(480°C) or Higher Service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Some Acceptable Types of Diagonal Braces for Installation by Welding . . . . . . . . . . . . . . . . .
Unacceptable Types of Diagonal Braces for Installation by Welding . . . . . . . . . . . . . . . . . . . .
Test Specimens From Longitudinal Welded Test Plates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Method of Forming Longitudinal Test Plates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Details of Tension Test Specimens . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Details of Bend Test Specimens . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Typical Plate Edge Beveled for Sealing by Calking in a Riveted Joint . . . . . . . . . . . . . . . . . . . .
Location of Seams in Inside and Outside Calking Boundaries . . . . . . . . . . . . . . . . . . . . . . . . . .
Boundary of Reinforcing Plate on Outside and Inside of Drum . . . . . . . . . . . . . . . . . . . . . . . . .
Allowable Welding of Plate Edges at Ends of Buttstraps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Some Acceptable Types of Brazed Joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Steam Locomotive Boiler With Dome Throttle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Steam Locomotive Boiler With Front-End Throttle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Round Riveted Plate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Diamond Riveted Plate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Manhole Frame . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Steam Dome Top Flange . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Examples of Doubler Attachment Methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Double-Riveted Lap Seam in Stayed Area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Double-Fillet-Welded Lap Seam in Stayed Area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Upper Corner of Firebox . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Some Examples of Acceptable Mudring Construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Example of Crown Bar Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Support Perimeters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Typical Forms of Diagonal Braces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Typical Forms of Gusset Braces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Tee Iron . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Tee-Iron Support Area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Arch Tubes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Circulators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Circulator Attachment Section Views . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Example of Thermic Syphon Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Examples of Acceptable Forms of Tube Attachment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Some Acceptable Forms of Tube Attachment on Firetube Boilers . . . . . . . . . . . . . . . . . . . . . .
Acceptable Type of Ring‐Reinforced Furnace . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
PG-58.3.3
No fu
xii
178
179
179
180
181
183
184
185
188
188
197
201
208
209
209
209
210
210
211
212
213
214
217
218
218
219
219
220
221
227
233
235
236
237
243
245
247
247
247
248
249
254
254
255
256
256
257
258
259
300
310
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PFT-46.2
PVG-12
PHRSG-4
IV-2-1
IV-3-1
IV-3-2
IV-3-3
IV-3-4
IV-3-5
V-2.2-1
V-2.2-2
V-4-1
V-5-1
A-2-1
A-3-1
A-4-1
A-5-1
A-6-1
A-6-2
A-8
A-19
A-66
A-67
A-68
A-69
A-70.1
A-70.2
A-71
A-72
A-73
A-74
A-75-1
A-250.3.4-1
A-250.3.4-2
A-250.3.6-1
A-250.3.6-2
A-250.3.6-3
A-250.3.6-4
A-250.3.6-5
A-250.3.6-6
A-357
A-370
Morison Furnace . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Connection Between Plain and Corrugated Furnace . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Welding Ogee Ring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Some Acceptable Methods of Forming Waterleg Joints by Welding . . . . . . . . . . . . . . . . . . . . .
Stayed Wrapper Sheet of Locomotive‐Type Boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Example of Staying of Heads Adjacent to Cylindrical Furnaces . . . . . . . . . . . . . . . . . . . . . . . . .
Pitch of Staybolts Adjacent to Upper Corners of Fireboxes . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Measurements for Determining Stresses in Diagonal Stays . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Spacing and Weld Details for Wall‐Support Lugs Set in Pairs on Horizontal‐Return Tubular
Boilers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Welded Bracket Connection for Horizontal‐Return Tubular Boilers . . . . . . . . . . . . . . . . . . . . .
Constant, C, for Vapor Related to Ratio of Specific Heats (k = c p /c v ) . . . . . . . . . . . . . . . . . . .
Some Acceptable Desuperheater Spraywater Protection Device Arrangements . . . . . . . . . . .
Symbols . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Blend Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
..............................................................................
..............................................................................
..............................................................................
..............................................................................
Riveted Circumferential Joint for Circular Furnace Plates Over 5/8 in. (16 mm) . . . . . . . . . . .
Proper Location of Staybolts Adjacent to Longitudinal Joint in Furnace Sheet . . . . . . . . . . . .
Staying of Head With Steel Angles in Tubular Boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Method of Riveting Manhole Frames to Shells or Drums With Two Rows of Rivets . . . . . . .
Single-Riveted Lap Joint, Longitudinal or Circumferential . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Double-Riveted Lap Joint, Longitudinal or Circumferential . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Double-Riveted Buttstrap and Double-Strap Joint . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Triple-Riveted Buttstrap and Double-Strap Joint . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Quadruple-Riveted Buttstrap and Double-Strap Joint . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Joints That May Be Used to Avoid Eccentric Stresses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Detail Illustrations Showing Application of PG-48 and PFT-27 to the Staying of Boilers . . .
Typical Forms of Fusible Plugs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Example for Typical Nozzle Computations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Example for Typical Nozzle Computations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Example for Typical Nozzle Computations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Example for Typical Nozzle Computations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Example for Typical Nozzle Computations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Example for Typical Nozzle Computations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Structural Attachment With Radial Load . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Structural Attachment With Eccentric Load . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Structural Attachment With Moment Load . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Structural Attachment on Tube Bend . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Example of Nozzle Attached by Riveting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Aligned Rounded Indications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Groups of Aligned Rounded Indications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Charts for t 1/8 in. (3 mm) to 1/4 in. (6 mm), Inclusive . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Charts for t Over 1/4 in. (6 mm) to 3/8 in. (10 mm), Inclusive . . . . . . . . . . . . . . . . . . . . . . . . . .
Charts for t Over 3/8 in. (10 mm) to 3/4 in. (19 mm), Inclusive . . . . . . . . . . . . . . . . . . . . . . . . .
Charts for t Over 3/4 in. (19 mm) to 2 in. (50 mm), Inclusive . . . . . . . . . . . . . . . . . . . . . . . . . .
Charts for t Over 2 in. (50 mm) to 4 in. (100 mm), Inclusive . . . . . . . . . . . . . . . . . . . . . . . . . .
Charts for t Over 4 in. (100 mm) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Guide to Data Report Forms Distribution . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Sample Certificate of Authorization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
PFT-18.1
PFT-19
PFT-20
PFT-21
PFT-23.1
PFT-25
PFT-27
PFT-32
PFT-46.1
No fu
PG-39
PG-56.2
PG-67.5
PG-67.5M
PG-68.7
PG-68.7M
PW-11
PW-33
PW-39-1
PW-39-2
PW-39-3
PW-39-4
PW-39-5
PW-39-6
PW-39-7
PW-39-8
PW-39-10
PW-39-11
PW-39-12
PW-39-13
PW-39-14
PW-39.1
PR-9-1
PR-15.3-1
PB-1
PB-16
PL-21.3.4-1
PL-24.1-1
PL-28.4-1
PHRSG-4
II-1
V-4-1
xiii
12
14
17
36
47
63
65
67
69
95
108
111
112
113
114
115
116
117
117
118
118
119
119
120
120
121
134
136
141
143
152
155
162
202
203
206
213
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PW-39-9
Post Cold‐Forming Strain Limits and Heat‐Treatment Requirements . . . . . . . . . . . . . . . . . . . .
Post Cold‐Forming Strain Limits and Heat‐Treatment Requirements . . . . . . . . . . . . . . . . . . . .
Weld Strength Reduction Factors to Be Applied When Calculating Maximum Allowable Working
Pressure or Minimum Required Thickness of Components Fabricated With a Longitudinal
Seam Weld . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Minimum Number of Threads Per Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Tube Attachment Angle Design Factor, K . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Supercritical Correction Factor, K s c . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Supercritical Correction Factor, K s c . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Superheat Correction Factor, K s h . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Superheat Correction Factor, K s h . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Required Volumetric Examination of Welded Butt Joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Alignment Tolerance of Sections to Be Butt Welded . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments
— P-No. 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments
— P-No. 3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments
— P-No. 4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments
— P-No. 5A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments
— P-No. 15E . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments
— P-No. 6 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments
— P-No. 7 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments
— P-No. 8 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments
— P-No. 10H . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments
— P-No. 10I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments
— P-No. 31 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments
— P-No. 43 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments
— P-No. 45 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments
— P-No. 51 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Alternate Postweld Heat Treatment Requirements for Carbon and Low Alloy Steels . . . . . . .
Minimum Thickness of Buttstraps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Allowable Stress on Rivets in Tension . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Maximum Design Temperatures for Brazing Filler Metal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Recommended Joint Clearance at Brazing Temperature . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Thickness of Riveted Reinforcing Rings for Dome Openings . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Maximum Allowable Working Pressure for Steel Flues for Firetube Locomotive Boilers . . . .
Radii for Firebox Mudrings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Minimum Drain Pot Size . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Standard Units for Use in Equations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Guide for Completing the Certificate of Conformance for Reapplication of the Certification
Mark . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Sizes of Angles Required for Staying Segments of Heads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
TABLES
PG-19
PG-20
PG-26
No fu
A-354
A-354.1
A-354.2
A-355
A-356
A-358
A-359
A-360
A-370
B-1
Certificate of Conformance for Reapplication of the Certification Mark . . . . . . . . . . . . . . . . . . . . . .
Manufacturer’s Data Report for All Types of Boilers Except Watertube and Electric . . . . . . . . . .
Manufacturer’s Data Report for All Types of Electric Boilers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Manufacturer’s Data Report for Electric Superheaters and Reheaters . . . . . . . . . . . . . . . . . . . . . . .
Manufacturer’s Data Report for Watertube Boilers, Superheaters, Waterwalls, and Economizers
Engineering-Contractor Data Report for a Complete Boiler Unit . . . . . . . . . . . . . . . . . . . . . . . . . . .
Manufacturer’s Partial Data Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Manufacturer’s Data Report for Fabricated Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Manufacturer’s Data Report for Field Installed Mechanically Assembled Piping . . . . . . . . . . . . . .
Summary Data Report for Process Steam Generators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Manufacturer’s Data Report Supplementary Sheet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Manufacturer’s Data Report for Pressure Relief Valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Manufacturer’s or Assembler’s Certificate of Conformance for Pressure Relief Valves . . . . . . . . .
Manufacturer’s Data Report for Locomotive Boilers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
285
288
291
293
295
299
302
307
308
309
319
.
.
.
.
.
.
.
.
.
.
.
.
.
.
205
265
269
274
278
283
286
289
292
294
296
297
301
303
ENDNOTES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
321
xiv
.
.
.
.
.
.
.
.
.
.
.
.
.
.
231
251
253
267
272
276
281
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
FORMS
III-1A
P-2
P-2A
P-2B
P-3
P-3A
P-4
P-4A
P-4B
P-5
P-6
P-7
P-8
PL-1
Guide for Estimating Steaming Capacity Based on Heating Surface . . . . . . . . . . . . . . . . . . . . . .
...............................................................................
Maximum Permissible Size of Rounded Indication . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Guide for Completing Manufacturer’s Data Report, Form P-2 . . . . . . . . . . . . . . . . . . . . . . . . . . .
Guide for Completing Manufacturer’s Data Report, Form P-2A . . . . . . . . . . . . . . . . . . . . . . . . . .
Guide for Completing Manufacturer’s Data Report, Form P-2B . . . . . . . . . . . . . . . . . . . . . . . . . .
Guide for Completing Manufacturer’s Data Report, Form P-3 . . . . . . . . . . . . . . . . . . . . . . . . . . .
Guide for Completing Engineering-Contractor Data Report for a Complete Boiler Unit, Form
P-3A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Guide for Completing Manufacturer’s Partial Data Report, Form P-4 . . . . . . . . . . . . . . . . . . . . .
Guide for Completing Manufacturer’s Data Report, Form P-4A . . . . . . . . . . . . . . . . . . . . . . . . . .
Guide for Completing Manufacturer’s Data Report, Form P-4B . . . . . . . . . . . . . . . . . . . . . . . . . .
Guide for Completing Summary Data Report for Process Steam Generators, Form P-5 . . . . .
Guide for Completing Manufacturer’s Data Report for Pressure Relief Valves, Form P-7 . . . .
Guide for the Preparation of Manufacturer’s or Assembler’s Certificate of Conformance, Form
P-8 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Guide for Completing Manufacturer’s Data Report for Locomotive Boilers, Form PL-1 . . . . . .
Codes, Standards, and Specifications Referenced in Text . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Guide to Information Appearing on Certificate of Authorization . . . . . . . . . . . . . . . . . . . . . . . .
Identification Elements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
A-44
A-75-1
A-250.3.2
A-351
A-351.1
A-351.2
A-352
A-353
No fu
Materials
• Part A — Ferrous Material Specifications
• Part B — Nonferrous Material Specifications
• Part C — Specifications for Welding Rods, Electrodes, and Filler Metals
• Part D — Properties (Customary)
• Part D — Properties (Metric)
III
Rules for Construction of Nuclear Facility Components
• Subsection NCA — General Requirements for Division 1 and Division 2
• Appendices
• Division 1
– Subsection NB — Class 1 Components
– Subsection NC — Class 2 Components
– Subsection ND — Class 3 Components
– Subsection NE — Class MC Components
– Subsection NF — Supports
– Subsection NG — Core Support Structures
– Subsection NH — Class 1 Components in Elevated Temperature Service*
• Division 2 — Code for Concrete Containments
• Division 3 — Containments for Transportation and Storage of Spent Nuclear Fuel and High Level Radioactive
Material and Waste
• Division 5 — High Temperature Reactors
IV
Rules for Construction of Heating Boilers
V
Nondestructive Examination
VI
Recommended Rules for the Care and Operation of Heating Boilers
VII
Recommended Guidelines for the Care of Power Boilers
VIII Rules for Construction of Pressure Vessels
• Division 1
• Division 2 — Alternative Rules
• Division 3 — Alternative Rules for Construction of High Pressure Vessels
IX
Welding, Brazing, and Fusing Qualifications
X
Fiber-Reinforced Plastic Pressure Vessels
XI
Rules for Inservice Inspection of Nuclear Power Plant Components
XII
Rules for Construction and Continued Service of Transport Tanks
*
The 2015 Edition of Section III is the last edition in which Section III, Division 1, Subsection NH, Class 1 Components in Elevated Temperature
Service, will be published. The requirements located within Subsection NH have been moved to Section III, Division 5, Subsection HB, Subpart B
for the elevated temperature construction of Class A components.
xv
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
II
ð15Þ
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
LIST OF SECTIONS
SECTIONS
I
Rules for Construction of Power Boilers
No fu
Interpretations of the Code have historically been posted in January and July at http://cstools.asme.org/interpretations.cfm. Interpretations issued during the previous two calendar years are included with the publication of the applicable Section of the Code in the 2015 Edition. Interpretations of Section III, Divisions 1 and 2 and Section III Appendices
are included with Subsection NCA.
Following the 2015 Edition, interpretations will not be included in editions; they will be issued in real time in ASME's
Interpretations Database at http://go.asme.org/Interpretations. Historical BPVC interpretations may also be found in
the Database.
CODE CASES
The Boiler and Pressure Vessel Code committees meet regularly to consider proposed additions and revisions to the
Code and to formulate Cases to clarify the intent of existing requirements or provide, when the need is urgent, rules for
materials or constructions not covered by existing Code rules. Those Cases that have been adopted will appear in the
appropriate 2015 Code Cases book: “Boilers and Pressure Vessels” or “Nuclear Components.” Supplements will be sent
or made available automatically to the purchasers of the Code Cases books up to the publication of the 2017 Code.
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
xvi
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
INTERPRETATIONS
No fu
*
The information contained in this Foreword is not part of this American National Standard (ANS) and has not been processed in accordance
with ANSI's requirements for an ANS. Therefore, this Foreword may contain material that has not been subjected to public review or a consensus process. In addition, it does not contain requirements necessary for conformance to the Code.
**
Construction, as used in this Foreword, is an all-inclusive term comprising materials, design, fabrication, examination, inspection, testing,
certification, and pressure relief.
xvii
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
In 1911, The American Society of Mechanical Engineers established the Boiler and Pressure Vessel Committee to formulate standard rules for the construction of steam boilers and other pressure vessels. In 2009, the Boiler and Pressure
Vessel Committee was superseded by the following committees:
(a) Committee on Power Boilers (I)
(b) Committee on Materials (II)
(c) Committee on Construction of Nuclear Facility Components (III)
(d) Committee on Heating Boilers (IV)
(e) Committee on Nondestructive Examination (V)
(f) Committee on Pressure Vessels (VIII)
(g) Committee on Welding, Brazing, and Fusing (IX)
(h) Committee on Fiber-Reinforced Plastic Pressure Vessels (X)
(i) Committee on Nuclear Inservice Inspection (XI)
(j) Committee on Transport Tanks (XII)
(k) Technical Oversight Management Committee (TOMC)
Where reference is made to “the Committee” in this Foreword, each of these committees is included individually and
collectively.
The Committee’s function is to establish rules of safety relating only to pressure integrity, which govern the
construction** of boilers, pressure vessels, transport tanks, and nuclear components, and the inservice inspection of nuclear components and transport tanks. The Committee also interprets these rules when questions arise regarding their
intent. The technical consistency of the Sections of the Code and coordination of standards development activities of the
Committees is supported and guided by the Technical Oversight Management Committee. This Code does not address
other safety issues relating to the construction of boilers, pressure vessels, transport tanks, or nuclear components, or
the inservice inspection of nuclear components or transport tanks. Users of the Code should refer to the pertinent codes,
standards, laws, regulations, or other relevant documents for safety issues other than those relating to pressure integrity. Except for Sections XI and XII, and with a few other exceptions, the rules do not, of practical necessity, reflect the
likelihood and consequences of deterioration in service related to specific service fluids or external operating environments. In formulating the rules, the Committee considers the needs of users, manufacturers, and inspectors of pressure
vessels. The objective of the rules is to afford reasonably certain protection of life and property, and to provide a margin
for deterioration in service to give a reasonably long, safe period of usefulness. Advancements in design and materials
and evidence of experience have been recognized.
This Code contains mandatory requirements, specific prohibitions, and nonmandatory guidance for construction activities and inservice inspection and testing activities. The Code does not address all aspects of these activities and those
aspects that are not specifically addressed should not be considered prohibited. The Code is not a handbook and cannot
replace education, experience, and the use of engineering judgment. The phrase engineering judgement refers to technical judgments made by knowledgeable engineers experienced in the application of the Code. Engineering judgments
must be consistent with Code philosophy, and such judgments must never be used to overrule mandatory requirements
or specific prohibitions of the Code.
The Committee recognizes that tools and techniques used for design and analysis change as technology progresses
and expects engineers to use good judgment in the application of these tools. The designer is responsible for complying
with Code rules and demonstrating compliance with Code equations when such equations are mandatory. The Code
neither requires nor prohibits the use of computers for the design or analysis of components constructed to the
ð15Þ
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
FOREWORD*
No fu
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
xviii
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
requirements of the Code. However, designers and engineers using computer programs for design or analysis are cautioned that they are responsible for all technical assumptions inherent in the programs they use and the application of
these programs to their design.
The rules established by the Committee are not to be interpreted as approving, recommending, or endorsing any proprietary or specific design, or as limiting in any way the manufacturer's freedom to choose any method of design or any
form of construction that conforms to the Code rules.
The Committee meets regularly to consider revisions of the rules, new rules as dictated by technological development,
Code Cases, and requests for interpretations. Only the Committee has the authority to provide official interpretations of
this Code. Requests for revisions, new rules, Code Cases, or interpretations shall be addressed to the Secretary in writing
and shall give full particulars in order to receive consideration and action (see Submittal of Technical Inquiries to the
Boiler and Pressure Vessel Standards Committees). Proposed revisions to the Code resulting from inquiries will be presented to the Committee for appropriate action. The action of the Committee becomes effective only after confirmation
by ballot of the Committee and approval by ASME. Proposed revisions to the Code approved by the Committee are submitted to the American National Standards Institute (ANSI) and published at http://go.asme.org/BPVCPublicReview to
invite comments from all interested persons. After public review and final approval by ASME, revisions are published at
regular intervals in Editions of the Code.
The Committee does not rule on whether a component shall or shall not be constructed to the provisions of the Code.
The scope of each Section has been established to identify the components and parameters considered by the Committee
in formulating the Code rules.
Questions or issues regarding compliance of a specific component with the Code rules are to be directed to the ASME
Certificate Holder (Manufacturer). Inquiries concerning the interpretation of the Code are to be directed to the Committee. ASME is to be notified should questions arise concerning improper use of an ASME Certification Mark.
When required by context in this Section, the singular shall be interpreted as the plural, and vice versa, and the feminine, masculine, or neuter gender shall be treated as such other gender as appropriate.
No fu
ASME has established procedures to authorize qualified organizations to perform various activities in accordance
with the requirements of the ASME Boiler and Pressure Vessel Code. It is the aim of the Society to provide recognition
of organizations so authorized. An organization holding authorization to perform various activities in accordance with
the requirements of the Code may state this capability in its advertising literature.
Organizations that are authorized to use the Certification Mark for marking items or constructions that have been
constructed and inspected in compliance with the ASME Boiler and Pressure Vessel Code are issued Certificates of
Authorization. It is the aim of the Society to maintain the standing of the Certification Mark for the benefit of the users,
the enforcement jurisdictions, and the holders of the Certification Mark who comply with all requirements.
Based on these objectives, the following policy has been established on the usage in advertising of facsimiles of the
Certification Mark, Certificates of Authorization, and reference to Code construction. The American Society of Mechanical
Engineers does not “approve,” “certify,” “rate,” or “endorse” any item, construction, or activity and there shall be no statements or implications that might so indicate. An organization holding the Certification Mark and/or a Certificate of
Authorization may state in advertising literature that items, constructions, or activities “are built (produced or performed) or activities conducted in accordance with the requirements of the ASME Boiler and Pressure Vessel Code,”
or “meet the requirements of the ASME Boiler and Pressure Vessel Code.” An ASME corporate logo shall not be used
by any organization other than ASME.
The Certification Mark shall be used only for stamping and nameplates as specifically provided in the Code. However,
facsimiles may be used for the purpose of fostering the use of such construction. Such usage may be by an association or
a society, or by a holder of the Certification Mark who may also use the facsimile in advertising to show that clearly specified items will carry the Certification Mark. General usage is permitted only when all of a manufacturer’s items are
constructed under the rules.
The ASME Boiler and Pressure Vessel Code provides rules for the construction of boilers, pressure vessels, and nuclear
components. This includes requirements for materials, design, fabrication, examination, inspection, and stamping. Items
constructed in accordance with all of the applicable rules of the Code are identified with the official Certification Mark
described in the governing Section of the Code.
Markings such as “ASME,” “ASME Standard,” or any other marking including “ASME” or the Certification Mark shall not
be used on any item that is not constructed in accordance with all of the applicable requirements of the Code.
Items shall not be described on ASME Data Report Forms nor on similar forms referring to ASME that tend to imply
that all Code requirements have been met when, in fact, they have not been. Data Report Forms covering items not fully
complying with ASME requirements should not refer to ASME or they should clearly identify all exceptions to the ASME
requirements.
xix
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
STATEMENT OF POLICY ON THE USE OF ASME MARKING TO
IDENTIFY MANUFACTURED ITEMS
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
STATEMENT OF POLICY ON THE USE OF THE CERTIFICATION
MARK AND CODE AUTHORIZATION IN ADVERTISING
No fu
SUBMITTAL OF TECHNICAL INQUIRIES TO THE BOILER AND
PRESSURE VESSEL STANDARDS COMMITTEES
1
INTRODUCTION
(a) The following information provides guidance to Code users for submitting technical inquiries to the committees.
See Guideline on the Approval of New Materials Under the ASME Boiler and Pressure Vessel Code in Section II, Parts C
and D for additional requirements for requests involving adding new materials to the Code. Technical inquiries include
requests for revisions or additions to the Code rules, requests for Code Cases, and requests for Code Interpretations, as
described below.
(1) Code Revisions. Code revisions are considered to accommodate technological developments, address administrative requirements, incorporate Code Cases, or to clarify Code intent.
(2) Code Cases. Code Cases represent alternatives or additions to existing Code rules. Code Cases are written as a
question and reply, and are usually intended to be incorporated into the Code at a later date. When used, Code Cases
prescribe mandatory requirements in the same sense as the text of the Code. However, users are cautioned that not
all jurisdictions or owners automatically accept Code Cases. The most common applications for Code Cases are:
(-a) to permit early implementation of an approved Code revision based on an urgent need
(-b) to permit the use of a new material for Code construction
(-c) to gain experience with new materials or alternative rules prior to incorporation directly into the Code
(3) Code Interpretations. Code Interpretations provide clarification of the meaning of existing rules in the Code, and
are also presented in question and reply format. Interpretations do not introduce new requirements. In cases where
existing Code text does not fully convey the meaning that was intended, and revision of the rules is required to support
an interpretation, an Intent Interpretation will be issued and the Code will be revised.
(c) Inquiries that do not comply with these provisions or that do not provide sufficient information for a committee’s
full understanding may result in the request being returned to the inquirer with no action.
2
INQUIRY FORMAT
Submittals to a committee shall include:
(a) Purpose. Specify one of the following:
(1) revision of present Code rules
(2) new or additional Code rules
(3) Code Case
(4) Code Interpretation
(b) Background. Provide the information needed for the committee’s understanding of the inquiry, being sure to include reference to the applicable Code Section, Division, edition, addenda (if applicable), paragraphs, figures, and tables.
Preferably, provide a copy of the specific referenced portions of the Code.
(c) Presentations. The inquirer may desire or be asked to attend a meeting of the committee to make a formal presentation or to answer questions from the committee members with regard to the inquiry. Attendance at a committee meeting shall be at the expense of the inquirer. The inquirer’s attendance or lack of attendance at a meeting shall not be a
basis for acceptance or rejection of the inquiry by the committee.
xx
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
(b) The Code rules, Code Cases, and Code Interpretations established by the committees are not to be considered as
approving, recommending, certifying, or endorsing any proprietary or specific design, or as limiting in any way the freedom of manufacturers, constructors, or owners to choose any method of design or any form of construction that conforms to the Code rules.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ð15Þ
No fu
CODE REVISIONS OR ADDITIONS
Requests for Code revisions or additions shall provide the following:
(a) Proposed Revisions or Additions. For revisions, identify the rules of the Code that require revision and submit a copy
of the appropriate rules as they appear in the Code, marked up with the proposed revision. For additions, provide the
recommended wording referenced to the existing Code rules.
(b) Statement of Need. Provide a brief explanation of the need for the revision or addition.
(c) Background Information. Provide background information to support the revision or addition, including any data
or changes in technology that form the basis for the request that will allow the committee to adequately evaluate the
proposed revision or addition. Sketches, tables, figures, and graphs should be submitted as appropriate. When applicable, identify any pertinent paragraph in the Code that would be affected by the revision or addition and identify paragraphs in the Code that reference the paragraphs that are to be revised or added.
4
CODE CASES
Requests for Code Cases shall provide a Statement of Need and Background Information similar to that defined in 3(b)
and 3(c), respectively, for Code revisions or additions. The urgency of the Code Case (e.g., project underway or imminent,
new procedure, etc.) must be defined and it must be confirmed that the request is in connection with equipment that will
bear the Certification Mark, with the exception of Section XI applications. The proposed Code Case should identify the
Code Section and Division, and be written as a Question and a Reply in the same format as existing Code Cases. Requests
for Code Cases should also indicate the applicable Code editions and addenda (if applicable) to which the proposed Code
Case applies.
5
CODE INTERPRETATIONS
6
SUBMITTALS
Submittals to and responses from the committees shall meet the following:
(a) Submittal. Inquiries from Code users shall be in English and preferably be submitted in typewritten form; however,
legible handwritten inquiries will also be considered. They shall include the name, address, telephone number, fax number, and e-mail address, if available, of the inquirer and be mailed to the following address:
Secretary
ASME Boiler and Pressure Vessel Committee
Two Park Avenue
New York, NY 10016-5990
As an alternative, inquiries may be submitted via e-mail to: SecretaryBPV@asme.org or via our online tool at
http://go.asme.org/InterpretationRequest.
(b) Response. The Secretary of the appropriate committee shall acknowledge receipt of each properly prepared inquiry and shall provide a written response to the inquirer upon completion of the requested action by the committee.
xxi
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
(a) Requests for Code Interpretations shall provide the following:
(1) Inquiry. Provide a condensed and precise question, omitting superfluous background information and, when
possible, composed in such a way that a “yes” or a “no” Reply, with brief provisos if needed, is acceptable. The question
should be technically and editorially correct.
(2) Reply. Provide a proposed Reply that will clearly and concisely answer the Inquiry question. Preferably, the Reply
should be “yes” or “no,” with brief provisos if needed.
(3) Background Information. Provide any background information that will assist the committee in understanding
the proposed Inquiry and Reply.
(b) Requests for Code Interpretations must be limited to an interpretation of a particular requirement in the Code or a
Code Case. The committee cannot consider consulting type requests such as the following:
(1) a review of calculations, design drawings, welding qualifications, or descriptions of equipment or parts to determine compliance with Code requirements;
(2) a request for assistance in performing any Code-prescribed functions relating to, but not limited to, material
selection, designs, calculations, fabrication, inspection, pressure testing, or installation;
(3) a request seeking the rationale for Code requirements.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
3
No fu
PERSONNEL
ASME Boiler and Pressure Vessel Standards Committees,
Subgroups, and Working Groups
January 1, 2015
MARINE CONFERENCE GROUP
TECHNICAL OVERSIGHT MANAGEMENT COMMITTEE (TOMC)
T. P. Pastor, Chair
R. W. Barnes, Vice Chair
J. S. Brzuszkiewicz, Staff Secretary
R. J. Basile
J. E. Batey
T. L. Bedeaux
D. L. Berger
D. A. Canonico
A. Chaudouet
D. B. DeMichael
R. P. Deubler
P. D. Edwards
J. G. Feldstein
R. E. Gimple
M. Gold
T. E. Hansen
G. W. Hembree
J. G. Hungerbuhler, Jr.
G. Nair
J. F. Henry
R. S. Hill III
G. G. Karcher
W. M. Lundy
J. R. MacKay
W. E. Norris
G. C. Park
M. D. Rana
R. F. Reedy, Sr.
B. W. Roberts
S. C. Roberts
F. J. Schaaf, Jr.
A. Selz
B. F. Shelley
W. J. Sperko
R. W. Swayne
C. Withers
CONFERENCE COMMITTEE
A. J. Justin
W. G. Knecht
J. LeCoff
T. G. McCarty
G. C. Millman
R. A. Moen
R. F. Reedy, Sr.
D. E. Mallory — New Hampshire
W. McGivney — New York
U. Merkle — Iowa
M. S. Moore — Michigan
S. V. Nelson — Colorado
C. C. Novak — Illinois
T. Oda — Washington
R. P. Pate — Alabama
M. K. Perdue — Oregon
M. Poehlmann — Alberta, Canada
J. F. Porcella — West Virginia
A. Pratt — Connecticut
C. F. Reyes — California
M. J. Ryan — Illinois
M. H. Sansone — New York
T. S. Scholl — British Columbia,
Canada
G. L. Schultz — Nevada
T. S. Seine — North Dakota
C. S. Selinger — Saskatchewan,
Canada
D. Slater — Manitoba, Canada
N. Smith — Pennsylvania
R. Spiker — North Carolina
R. K. Sturm — Utah
S. R. Townsend — Prince Edward
Island, Canada
R. D. Troutt — Texas
M. J. Verhagen — Wisconsin
M. Washington — New Jersey
K. L. Watson — Mississippi
C. J. Wilson III — Kansas
ADMINISTRATIVE COMMITTEE
T. P. Pastor, Chair
R. W. Barnes, Vice Chair
J. S. Brzuszkiewicz, Staff Secretary
R. J. Basile
J. E. Batey
T. L. Bedeaux
D. L. Berger
J. F. Henry
INTERNATIONAL INTEREST REVIEW GROUP
R. S. Hill III
V. Felix
Y.-G. Kim
S. H. Leong
W. Lin
O. F. Manafa
G. C. Park
M. D. Rana
B. F. Shelley
W. J. Sperko
xxii
C. Minu
T. S. G. Narayannen
Y.-W. Park
R. Reynaga
P. Williamson
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
D. A. Douin — Ohio, Secretary
M. J. Adams — Ontario, Canada
J. T. Amato — Minnesota
B. P. Anthony — Rhode Island
R. D. Austin — Arizona
R. J. Brockman — Missouri
M. A. Burns — Florida
J. H. Burpee — Maine
C. B. Cantrell — Nebraska
D. C. Cook — California
B. J. Crawford — Georgia
E. L. Creaser — New Brunswick,
Canada
J. J. Dacanay — Hawaii
C. Dautrich — North Dakota
P. L. Dodge — Nova Scotia, Canada
D. Eastman — Newfoundland and
Labrador, Canada
J. J. Esch — Delaware
C. Fulton — Alaska
R. J. Handy — Kentucky
D. R. Hannon — Arkansas
E. S. Kawa — Massachusetts
J. C. Klug — Wisconsin
M. Kotb — Quebec, Canada
T. C. Hellman — Oklahoma
E. G. Hilton — Virginia
D. T. Jagger — Ohio
K. J. Kraft — Maryland
L. C. Leet — Washington
A. M. Lorimor — South Dakota
M. Mailman — Northwest
Territories, Canada
HONORARY MEMBERS (MAIN COMMITTEE)
F. P. Barton
R. J. Cepluch
T. M. Cullen
W. D. Doty
G. E. Feigel
O. F. Hedden
M. H. Jawad
N. Prokopuk
J. D. Reynolds
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ð15Þ
No fu
Subgroup on Locomotive Boilers (BPV I)
L. Moedinger
P. A. Molvie
Y. Oishi
E. M. Ortman
J. T. Pillow
B. W. Roberts
J. M. Tanzosh
D. Tompkins
D. E. Tuttle
J. Vattappilly
R. V. Wielgoszinski
Y. Li, Delegate
H. Michael, Delegate
D. N. French, Honorary Member
T. C. McGough, Honorary Member
R. L. Williams, Honorary Member
L. Moedinger, Chair
S. M. Butler, Secretary
P. Boschan
J. Braun
R. C. Franzen, Jr.
D. W. Griner
S. D. Jackson
M. A. Janssen
Subgroup on Materials (BPV I)
G. W. Galanes, Chair
K. K. Coleman, Vice Chair
J. S. Hunter, Secretary
S. H. Bowes
D. A. Canonico
P. Fallouey
K. L. Hayes
J. F. Henry
Subgroup on Design (BPV I)
J. Vattappilly, Chair
D. I. Anderson, Secretary
D. Dewees
P. Dhorajia
H. A. Fonzi, Jr.
J. P. Glaspie
G. B. Komora
S. A. Lee
G. M. Ray
J. E. Rimmasch
R. B. Stone
M. W. Westland
R. Yuill
R. D. Reetz, Contributing Member
P. A. Molvie
D. A. Olson
S. V. Torkildson
M. Lewis
O. X. Li
F. Masuyama
D. W. Rahoi
B. W. Roberts
J. M. Tanzosh
J. Vattappilly
M. Wadkinson
C. F. Jeerings, Contributing Member
J. C. Light, Contributing Member
Subgroup on Solar Boilers (BPV I)
Subgroup on Fabrication and Examination (BPV I)
J. Hainsworth
T. E. Hansen
C. T. McDaris
R. E. McLaughlin
R. J. Newell
Y. Oishi
R. V. Wielgoszinski
D. J. Koza
F. Massi
E. M. Ortman
M. J. Slater
J. C. Light, Contributing Member
India International Working Group (BPV I)
H. Dalal
I. Kalyanasundaram
S. Mathur
A. J. Patil
A. R. Patil
G. V. S. Rao
Subgroup on General Requirements and Piping (BPV I)
T. E. Hansen, Chair
E. M. Ortman, Vice Chair
F. Massi, Secretary
P. Becker
D. L. Berger
P. D. Edwards
G. W. Galanes
W. L. Lowry
R. E. McLaughlin
B. Mollitor
J. T. Pillow
D. Tompkins
S. V. Torkildson
D. E. Tuttle
M. Wadkinson
R. V. Wielgoszinski
C. F. Jeerings, Contributing Member
R. Uebel, Contributing Member
U. Revisanakaran
N. Satheesan
G. U. Shanker
D. Shrivastava
S. Venkataramana
Task Group on Modernization of BPVC Section I
D. I. Anderson, Chair
U. D’Urso, Staff Secretary
J. L. Arnold
S. W. Cameron
D. Dewees
G. W. Galanes
J. P. Glaspie
T. E. Hansen
Subgroup on Heat Recovery Steam Generators (BPV I)
S. V. Torkildson, Chair
J. L. Arnold
J. P. Bell
B. G. Carson
J. Gertz
T. E. Hansen
G. B. Komora
C. T. McDaris
Y. Oishi
E. M. Ortman
D. Tompkins
B. C. Turczynski
xxiii
J. F. Henry
R. E. McLaughlin
P. A. Molvie
E. M. Ortman
J. T. Pillow
B. W. Roberts
D. E. Tuttle
J. Vattappilly
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
J. T. Pillow, Chair
J. L. Arnold, Secretary
P. Becker
D. L. Berger
S. W. Cameron
S. Fincher
G. W. Galanes
P. F. Gilston
J. S. Hunter, Chair
S. V. Torkildson, Secretary
G. W. Galanes
R. E. Hearne
P. Jennings
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
COMMITTEE ON POWER BOILERS (BPV I)
D. L. Berger, Chair
R. E. McLaughlin, Vice Chair
U. D'Urso, Staff Secretary
J. L. Arnold
S. W. Cameron
D. A. Canonico
K. K. Coleman
P. D. Edwards
P. Fallouey
J. G. Feldstein
G. W. Galanes
T. E. Hansen
J. F. Henry
J. S. Hunter
W. L. Lowry
F. Massi
No fu
Subgroup on International Material Specifications (BPV II)
E. Shapiro
M. J. Slater
R. C. Sutherlin
R. W. Swindeman
J. M. Tanzosh
D. Tyler
O. Oldani, Delegate
H. D. Bushfield, Contributing
Member
M. L. Nayyar, Contributing Member
E. G. Nisbett, Contributing Member
E. Upitis, Contributing Member
T. M. Cullen, Honorary Member
W. D. Doty, Honorary Member
W. D. Edsall, Honorary Member
G. C. Hsu, Honorary Member
R. A. Moen, Honorary Member
C. E. Spaeder, Jr., Honorary
Member
A. W. Zeuthen, Honorary Member
A. Chaudouet, Chair
O. X. Li, Vice Chair
T. F. Miskell, Secretary
S. W. Cameron
D. A. Canonico
H. Chen
P. Fallouey
A. F. Garbolevsky
D. O. Henry
M. Ishikawa
W. M. Lundy
A. R. Nywening
E. Upitis
F. Zeller
D. Kwon, Delegate
O. Oldani, Delegate
H. Lorenz, Contributing Member
Subgroup on Nonferrous Alloys (BPV II)
R. C. Sutherlin, Chair
M. H. Gilkey, Vice Chair
H. Anada
J. Calland
D. B. Denis
J. F. Grubb
A. Heino
M. Katcher
J. A. McMaster
L. Paul
D. W. Rahoi
W. Ren
E. Shapiro
M. H. Skillingberg
D. Tyler
J. Weritz
R. Wright
R. Zawierucha
W. R. Apblett, Jr., Contributing
Member
Subgroup on Physical Properties (BPV II)
Executive Committee (BPV II)
J. F. Henry, Chair
D. W. Rahoi, Vice Chair
N. Lobo, Staff Secretary
A. Appleton
A. Chaudouet
J. R. Foulds
M. Gold
J. F. Grubb, Chair
H. D. Bushfield
D. B. Denis
J. F. Grubb
R. W. Mikitka
B. W. Roberts
R. C. Sutherlin
Subgroup on Strength, Ferrous Alloys (BPV II)
R. W. Swindeman
J. M. Tanosh
J. R. Harris III
M. H. Jawad
C. R. Thomas
M. Wadkinson
M. Katcher, Contributing Member
C. H. Sturgeon, Contributing
Member
Subgroup on Strength of Weldments (BPV II & BPV IX)
W. F. Newell, Jr., Chair
S. H. Bowes
K. K. Coleman
P. D. Flenner
J. R. Foulds
D. W. Gandy
M. Gold
K. L. Hayes
Subgroup on Ferrous Specifications (BPV II)
A. Appleton, Chair
K. M. Hottle, Vice Chair
P. Wittenbach, Secretary
H. Chen
B. M. Dingman
M. J. Dosdourian
P. Fallouey
J. D. Fritz
T. Graham
J. M. Grocki
J. F. Grubb
C. Hyde
S. W. Knowles
F. Masuyama
C. Pearce
D. W. Rahoi
B. W. Roberts
M. S. Shelton
J. P. Shingledecker
R. W. Swindeman
W. R. Apblett, Jr., Contributing
Member
H. Murakami, Contributing
Member
D. S. Janikowski
L. J. Lavezzi
S. G. Lee
W. C. Mack
A. S. Melilli
K. E. Orie
J. Shick
E. Upitis
J. D. Wilson
R. Zawierucha
E. G. Nisbett, Contributing Member
J. F. Henry
J. Penso
D. W. Rahoi
B. W. Roberts
J. P. Shingledecker
W. J. Sperko
J. P. Swezy, Jr.
J. M. Tanzosh
Working Group on Materials Database (BPV II)
R. W. Swindeman, Chair
N. Lobo, Staff Secretary
F. Abe
J. R. Foulds
J. F. Henry
M. Katcher
B. W. Roberts
xxiv
R. C. Sutherlin
D. Andrei, Contributing Member
J. L. Arnold, Contributing Member
W. Hoffelner, Contributing Member
T. Lazar, Contributing Member
D. T. Peters, Contributing Member
W. Ren, Contributing Member
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
J. M. Tanzosh, Chair
M. J. Slater, Secretary
F. Abe
H. Anada
D. A. Canonico
A. Di Rienzo
P. Fallouey
J. R. Foulds
M. Gold
J. A. Hall
J. F. Henry
K. Kimura
Subgroup on External Pressure (BPV II)
R. W. Mikitka, Chair
D. L. Kurle, Vice Chair
J. A. A. Morrow, Secretary
L. F. Campbell
H. Chen
D. S. Griffin
J. F. Grubb
P. Fallouey
E. Shapiro
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
COMMITTEE ON MATERIALS (BPV II)
J. F. Henry, Chair
D. W. Rahoi, Vice Chair
N. Lobo, Staff Secretary
F. Abe
A. Appleton
J. Cameron
D. A. Canonico
A. Chaudouet
P. Fallouey
J. R. Foulds
D. W. Gandy
M. H. Gilkey
M. Gold
J. F. Grubb
J. A. Hall
K. M. Hottle
M. Katcher
O. X. Li
F. Masuyama
R. K. Nanstad
B. W. Roberts
No fu
J. F. Henry, Chair
F. Abe
S. H. Bowes
D. A. Canonico
K. K. Coleman
G. Cumino
P. D. Flenner
J. R. Foulds
D. W. Gandy
Subcommittee on Design (BPV III)
M. Gold
F. Masuyama
W. F. Newell, Jr.
B. W. Roberts
W. J. Sperko
R. W. Swindeman
J. M. Tanzosh
R. G. Young
R. P. Deubler, Chair
D. E. Matthews, Vice Chair
G. L. Hollinger, Secretary
T. M. Adams
G. A. Antaki
R. L. Bratton
C. W. Bruny
P. R. Donavin
R. S. Hill III
P. Hirschberg
M. H. Jawad
R. I. Jetter
R. B. Keating
R. A. Ladefian
K. A. Manoly
R. J. Masterson
M. N. Mitchell
W. J. O’Donnell, Sr.
E. L. Pleins
T.-L. Sham
J. P. Tucker
K. Wright
J. Yang
Working Group on Data Analysis (BPV II)
J. R. Foulds, Chair
F. Abe
M. Gold
J. F. Grubb
J. F. Henry
M. Katcher
F. Masuyama
W. Ren
B. W. Roberts
M. Subanovic
M. J. Swindeman
R. W. Swindeman
Subgroup on Component Design (SC-D) (BPV III)
T. M. Adams, Chair
R. B. Keating, Vice Chair
S. Pellet, Secretary
G. A. Antaki
S. Asada
J. F. Ball
J. R. Cole
R. P. Deubler
P. Hirschberg
H. Kobayashi
R. A. Ladefian
K. A. Manoly
R. J. Masterson
D. E. Matthews
J. C. Minichiello
D. K. Morton
China International Working Group (BPV II)
X. Wang
F. Yang
G. Yang
R. Ye
L. Yin
H. Zhang
X.-H. Zhang
Yingkai Zhang
Q. Zhao
S. Zhao
J. Zou
Working Group on Core Support Structures (SG-CD) (BPV III)
J. Yang, Chair
J. F. Kielb, Secretary
L. C. Hartless
D. Keck
T. Liszkai
H. S. Mehta
COMMITTEE ON CONSTRUCTION OF NUCLEAR FACILITY
COMPONENTS (BPV III)
R. S. Hill III, Chair
R. B. Keating, Vice Chair
J. C. Minichiello, Vice Chair
A. Byk, Staff Secretary
T. M. Adams
A. Appleton
R. W. Barnes
W. H. Borter
C. W. Bruny
T. D. Burchell
J. R. Cole
R. P. Deubler
A. C. Eberhardt
B. A. Erler
G. M. Foster
W. Hoffelner
R. M. Jessee
R. I. Jetter
C. C. Kim
G. H. Koo
V. Kostarev
K. A. Manoly
D. E. Matthews
R. P. McIntyre
M. N. Mitchell
M. Morishita
D. K. Morton
T. Nagata
R. F. Reedy, Sr.
I. Saito
C. T. Smith
W. K. Sowder, Jr.
W. J. Sperko
K. R. Wichman
C. S. Withers
Y. H. Choi, Delegate
T. Ius, Delegate
H.-T. Wang, Delegate
M. Zhou, Contributing Member
E. B. Branch, Honorary Member
G. D. Cooper, Honorary Member
W. D. Doty, Honorary Member
D. F. Landers, Honorary Member
R. A. Moen, Honorary Member
C. J. Pieper, Honorary Member
M. Nakajima
M. D. Snyder
A. Tsirigotis
R. Vollmer
J. T. Land, Contributing Member
Working Group on Design of Division 3 Containments
(SG-CD) (BPV III)
D. K. Morton, Chair
D. J. Ammerman
G. Bjorkman
G. Broz
S. Horowitz
D. W. Lewis
J. C. Minichiello
E. L. Pleins
C. J. Temus
I. D. McInnes, Contributing Member
R. E. Nickell, Contributing Member
H. P. Shrivastava, Contributing
Member
Working Group on HDPE Design of Components (SG-CD) (BPV III)
T. M. Musto, Chair
J. Ossmann, Secretary
T. M. Adams
T. A. Bacon
C. Basavaraju
D. Burwell
S. Choi
xxv
P. Krishnaswamy
M. Martin
J. C. Minichiello
D. P. Munson
F. J. Schaaf, Jr.
R. Stakenborghs
H. E. Svetlik
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
B. Shou, Chair
Yong Zhang, Vice Chair
X. Tong, Secretary
W. Fang
Q. C. Feng
S. Huo
H. Li
J. Li
S. Li
Z. Rongcan
S. Tan
C. Wang
T. M. Musto
T. Nagata
A. N. Nguyen
E. L. Pleins
I. Saito
G. C. Slagis
J. R. Stinson
G. Z. Tokarski
J. P. Tucker
P. Vock
K. R. Wichman
C. Wilson
J. Yang
C. W. Bruny, Contributing Member
A. A. Dermenjian, Contributing
Member
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
Working Group on Creep Strength Enhanced Ferritic Steels (BPV II)
No fu
Subgroup on Design Methods (SC-D) (BPV III)
R. B. Keating
V. Kostarev
Y. Liu
J. F. McCabe
J. C. Minichiello
I.-K. Nam
A. N. Nguyen
M. S. Sills
G. C. Slagis
N. C. Sutherland
E. A. Wais
C.-I. Wu
J. J. Martinez, Contributing Member
N. J. Shah, Contributing Member
E. C. Rodabaugh, Honorary
Member
C. W. Bruny, Chair
S. McKillop, Secretary
K. Avrithi
W. Culp
P. R. Donavin, Jr.
J. V. Gregg, Jr.
H. T. Harrison III
K. Hsu
M. Kassar
Working Group on Design Methodology (SG-DM) (BPV III)
S. D. Snow, Chair
M. R. Breach, Secretary
K. Avrithi
C. Basavaraju
R. D. Blevins
D. L. Caldwell
D. Dewees
C. M. Faidy
H. T. Harrison III
P. Hirschberg
M. Kassar
R. B. Keating
J. Kim
H. Kobayashi
Working Group on Pressure Relief (SG-CD) (BPV III)
J. F. Ball, Chair
A. L. Szeglin
D. G. Thibault
Working Group on Pumps (SG-CD) (BPV III)
R. A. Ladefian, Chair
P. W. Behnke
R. E. Cornman, Jr.
M. D. Eftychiou
A. Fraser
M. A. Gaydon
R. Ghanbari
M. Higuchi
R. A. Patrick
J. Sulley
Working Group on Environmental Effects (SG-DM) (BPV III)
R. Udo
S. Pellet
I. Saito
H. P. Shrivastava
C. Stirzel
T. G. Terryah
G. Z. Tokarski
P. Wiseman
C.-I. Wu
C. Jonker
J. E. Nestell
T. Schriefer
M. S. Shelton
Y. H. Choi, Delegate
Working Group on Environmental Fatigue Evaluation Methods
(SG-DM) (BPV III)
K. Wright, Chair
M. A. Gray, Vice Chair
W. F. Weitze, Secretary
T. M. Adams
S. Asada
K. Avrithi
R. C. Cipolla
J. R. Cole
T. M. Damiani
C. M. Faidy
C. A. Mizer
K. E. Reid II
H. R. Sonderegger
J. Sully
I. Tseng
J. P. Tucker
T. D. Gilman
S. R. Gosselin
Y. He
P. Hirschberg
H. S. Mehta
J.-S. Park
D. H. Roarty
I. Saito
D. Vlaicu
R. Z. Ziegler
Working Group on Fatigue Strength (SG-DM) (BPV III)
P. R. Donavin, Chair
T. M. Damiani
D. Dewees
C. M. Faidy
S. R. Gosselin
R. J. Gurdal
C. F. Heberling II
C. E. Hinnant
P. Hirschberg
K. Hsu
S. H. Kleinsmith
S. Majumdar
Working Group on Vessels (SG-CD) (BPV III)
D. E. Matthews, Chair
R. M. Wilson, Secretary
C. Basavaraju
J. V. Gregg, Jr.
W. J. Heilker
A. Kalnins
R. B. Keating
D. Keck
J. Kim
O.-S. Kim
K. Matsunaga
M. C. Scott
P. K. Shah
J. Shupert
C. Turylo
D. Vlaicu
W. F. Weitze
T. Yamazaki
R. Z. Ziegler
xxvi
S. N. Malik
D. H. Roarty
M. S. Shelton
G. Taxacher
A. Tsirigotis
K. Wright
H. H. Ziada
G. S. Chakrabarti, Contributing
Member
W. J. O'Donnell, Sr., Contributing
Member
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
W. Culp, Chair
B. D. Frew, Secretary
K. Avrithi
P. J. Dobson
W. J. Heilker
A. G. Washburn
Working Group on Valves (SG-CD) (BPV III)
P. Vock, Chair
J. O'Callaghan, Secretary
M. C. Buckley
G. A. Jolly
J. Klein
T. A. McMahon
T. Liszkai
J. F. McCabe
A. N. Nguyen
W. D. Reinhardt
D. H. Roarty
P. K. Shah
R. Vollmer
S. Wang
T. M. Wiger
K. Wright
J. Yang
M. K. Au-Yang, Contributing
Member
S. Mauvais
Working Group on Supports (SG-CD) (BPV III)
J. R. Stinson, Chair
U. S. Bandyopadhyay, Secretary
K. Avrithi
T. H. Baker
F. J. Birch
R. P. Deubler
N. M. Graham
R. J. Masterson
D. Keck
M. N. Mitchell
W. J. O’Donnell, Sr.
P. J. O’Regan
W. D. Reinhardt
P. Smith
S. D. Snow
W. F. Weitze
K. Wright
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
Working Group on Piping (SG-CD) (BPV III)
G. A. Antaki, Chair
G. Z. Tokarski, Secretary
T. M. Adams
T. A. Bacon
C. Basavaraju
J. Catalano
F. Claeys
J. R. Cole
C. M. Faidy
R. G. Gilada
N. M. Graham
M. A. Gray
R. W. Haupt
A. Hirano
P. Hirschberg
M. Kassar
J. Kawahata
No fu
M. N. Mitchell, Chair
M. W. Davies, Vice Chair
C. A. Sanna, Staff Secretary
T. D. Burchell, Secretary
A. Appleton
R. L. Bratton
S. Cadell
S.-H. Chi
A. Covac
S. W. Doms
S. F. Duffy
S. T. Gonczy
Y. Katoh
J. Ossmann
M. Roemmler
N. Salstrom
T. Shibata
S. Yu
G. L. Zeng
T. Asayama, Chair
M. Li, Secretary
F. W. Brust
P. Carter
R. I. Jetter
G. H. Koo
B.-L. Lyow
S. N. Malik
H. Qian
T.-I. Sham
Working Group on Elevated Temperature Construction (SG-ETD)
(BPV III)
Working Group on Probabilistic Methods in Design
(SG-DM) (BPV III)
P. J. O'Regan, Chair
M. Golliet, Secretary
T. Asayama
K. Avrithi
M. R. Graybeal
D. O. Henry
R. S. Hill III
M. Morishita
N. A. Palm
I. Saito
M. H. Jawad, Chair
B. Mollitor, Secretary
D. I. Anderson
R. G. Brown
D. Dewees
J. P. Glaspie
B. F. Hantz
Special Working Group on Computational Modeling for Explicit
Dynamics (SG-DM) (BPV III)
G. Bjorkman, Chair
D. J. Ammerman, Secretary
M. R. Breach
G. Broz
J. Jordan
D. Molitoris
J. Piotter
Working Group on High Temperature Flaw Evaluation (SG-ETD)
(BPV III)
W. D. Reinhardt
P. Y.-K. Shih
S. D. Snow
C.-F. Tso
M. C. Yaksh
U. Zencker
G. L. Hollinger
R. I. Jetter
S. Krishnamurthy
A. Mann
D. L. Marriott
M. N. Mitchell
C. Nadarajah
F. W. Brust, Chair
N. Broom
P. Carter
W. Hoffelner
S. N. Malik
D. L. Rudland
P. J. Rush
D.-J. Shim
S. X. Xu
T.-L. Sham, Chair
T. Asayama
C. Becht IV
F. W. Brust
P. Carter
J. F. Cervenka
B. F. Hantz
W. Hoffelner
A. B. Hull
M. H. Jawad
R. I. Jetter
G. H. Koo
M. Li
S. Majumdar
J. E. Nestell
W. J. O'Donnell, Sr.
R. W. Swindeman
D. S. Griffin, Contributing Member
W. J. Koves, Contributing Member
D. L. Marriott, Contributing
Member
Working Group on Allowable Stress Criteria (SG-ETD) (BPV III)
R. W. Swindeman, Chair
R. Wright, Secretary
J. R. Foulds
K. Kimura
M. Li
S. N. Malik
R. P. McIntyre, Chair
L. M. Plante, Secretary
V. Apostolescu
A. Appleton
S. Bell
J. R. Berry
B. K. Bobo
J. DeKleine
J. V. Gardiner
G. Gratti
J. W. Highlands
G. V. Imbro
K. A. Kavanagh
Y.-S. Kim
M. R. Minick
E. C. Renaud
D. J. Roszman
C. T. Smith
W. K. Sowder, Jr.
G. E. Szabatura
T. G. Terryah
D. M. Vickery
C. S. Withers
H. Michael, Delegate
G. L. Hollinger, Contributing
Member
J. E. Nestell
W. Ren
B. W. Roberts
M. Sengupta
Working Group on Duties and Responsibilities (SG-GR) (BPV III)
T.-I. Sham
Working Group on Analysis Methods (SG-ETD) (BPV III)
P. Carter, Chair
M. J. Swindeman, Secretary
M. Ando
M. R. Breach
Subgroup on General Requirements (BPV III)
R. I. Jetter
S. Krishnamurthy
T.-I. Sham
D. K. Williams
J. V. Gardiner, Chair
G. L. Hollinger, Secretary
S. Bell
J. R. Berry
J. DeKleine
N. DeSantis
Y. Diaz-Castillo
E. L. Farrow
xxvii
G. Gratti
B. N. Juarez
K. A. Kavanagh
J. M. Lyons
L. M. Plante
D. J. Roszman
T. G. Terryah
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Subgroup on Elevated Temperature Design (SC-D) (BPV III)
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
Working Group on Creep-Fatigue and Negligible Creep (SG-ETD)
(BPV III)
Working Group on Graphite and Composites Design
(SG-DM) (BPV III)
No fu
C. T. Smith, Chair
C. S. Withers, Secretary
V. Apostolescu
A. Appleton
B. K. Bobo
S. M. Goodwin
J. Grimm
J. W. Highlands
Y.-S. Kim
B. McGlone
R. P. McIntyre
M. R. Minick
R. B. Patel
E. C. Renaud
T. Rezk
J. Rogers
W. K. Sowder, Jr.
J. F. Strunk
G. E. Szabatura
D. M. Vickery
C. A. Spletter, Contributing Member
T. Rezk
J. Rogers
D. J. Roszman
B. S. Sandhu
G. J. Solovey
R. Spuhl
G. E. Szabatura
C. S. Withers
S. F. Harrison, Contributing
Member
E. W. McElroy
T. M. Musto
S. Patterson
S. Schuessler
R. Stakenborghs
T. Tipton
M. Troughton
Z. J. Zhou
Joint ACI-ASME Committee on Concrete Components for Nuclear
Service (BPV III)
A. C. Eberhardt, Chair
C. T. Smith, Vice Chair
A. Byk, Staff Secretary
J. F. Artuso
C. J. Bang
F. Farzam
P. S. Ghosal
B. D. Hovis
T. C. Inman
O. Jovall
N.-H. Lee
J. McLean
J. Munshi
N. Orbovic
J. F. Strunk
Special Working Group on General Requirements Consolidation
(SG-GR) (BPV III)
J. V. Gardiner, Chair
C. T. Smith, Vice Chair
S. Bell
M. Cusick
Y. Diaz-Castillo
J. Grimm
J. M. Lyons
M. McGlone
R. Patel
E. C. Renaud
M. Golliet, Chair
M. A. Martin, Secretary
W. H. Borter
M. C. Buckley
E. M. Focht
B. Hauger
J. Johnston, Jr.
P. Krishnaswamy
T. Tonyan
T. J. Ahl, Contributing Member
N. Alchaar, Contributing Member
B. A. Erler, Contributing Member
J. Gutierrez, Contributing Member
M. F. Hessheimer, Contributing
Member
T. E. Johnson, Contributing
Member
T. Muraki, Contributing Member
B. B. Scott, Contributing Member
M. R. Senecal, Contributing
Member
M. K. Thumm, Contributing
Member
Working Group on Design (BPV III-2)
Subgroup on Materials, Fabrication, and Examination (BPV III)
T. Melfi
H. Murakami
J. Ossmann
J. E. O’Sullivan
C. Pearce
N. M. Simpson
W. J. Sperko
J. R. Stinson
J. F. Strunk
K. B. Stuckey
R. Wright
S. Yee
H. Michael, Delegate
R. W. Barnes, Contributing Member
Working Group on Graphite and Composite Materials (SG-MFE)
(BPV III)
T. D. Burchell, Chair
A. Appleton
R. L. Bratton
S. Cadell
S.-H. Chi
A. Covac
M. W. Davies
S. W. Doms
S. F. Duffy
S. T. Gonzcy
M. G. Jenkins
Y. Katoh
M. N. Mitchell
J. Ossmann
M. Roemmler
N. Salstrom
T. Shibata
S. Yu
G. L. Zeng
M. Diaz, Contributing Member
S. Diaz, Contributing Member
M. F. Hessheimer, Contributing
Member
A. Istar, Contributing Member
T. E. Johnson, Contributing
Member
B. R. Laskewitz, Contributing
Member
Z. Shang, Contributing Member
M. Sircar, Contributing Member
Working Group on Materials, Fabrication, and Examination
(BPV III-2)
P. S. Ghosal, Chair
T. Tonyan, Vice Chair
M. Allam
J. F. Artuso
J.-B. Domage
A. C. Eberhardt
C. Jones
C. T. Smith
J. F. Strunk
D. Ufuk
J. Gutierrez, Contributing Member
B. B. Scott, Contributing Member
Z. Shang, Contributing Member
Special Working Group on Modernization (BPV III-2)
J. McLean, Chair
N. Orbovic, Vice Chair
A. Adediran
N. Alchaar
O. Jovall
C. T. Smith
xxviii
M. A. Ugalde
S. Wang
S. Diaz, Contributing Member
J.-B. Domage, Contributing Member
U. Ricklefs, Contributing Member
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
R. M. Jessee, Chair
B. D. Frew, Vice Chair
S. Hunter, Secretary
W. H. Borter
T. D. Burchell
G. R. Cannell
R. H. Davis
G. M. Foster
G. B. Georgiev
S. E. Gingrich
M. Golliet
J. Grimm
J. Johnston, Jr.
C. C. Kim
M. Lashley
J. Munshi, Chair
N. Alchaar
M. Allam
S. Bae
L. J. Colarusso
A. C. Eberhardt
F. Farzam
P. S. Ghosal
B. D. Hovis
T. C. Inman
O. Jovall
N.-H. Lee
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
Working Group on HDPE Materials (SG-MFE) (BPV III)
Working Group on Quality Assurance, Certification, and Stamping
(SG-GR) (BPV III)
No fu
D. K. Morton, Chair
G. M. Foster, Vice Chair
G. R. Cannell, Secretary
G. Abramczyk
D. J. Ammerman
G. Bjorkman
S. Horowitz
D. W. Lewis
P. E. McConnell
R. E. Nickell
E. L. Pleins
J. E. Nestell, Chair
M. Sengupta, Secretary
N. Broom
T. D. Burchell
R. S. Hill III
E. V. Imbro
R. I. Jetter
Y. W. Kim
R. H. Smith
G. J. Solovey
C. J. Temus
W. H. Borter, Contributing Member
R. S. Hill III, Contributing Member
A. B. Meichler, Contributing
Member
T. Saegusa, Contributing Member
N. M. Simpson, Contributing
Member
Working Group on High Temperature Liquid-Cooled Reactors
(BPV III-5)
Subgroup on Fusion Energy Devices (BPV III)
W. K. Sowder, Jr., Chair
D. Andrei, Staff Secretary
D. J. Roszman, Secretary
R. W. Barnes
B. R. Doshi
M. Higuchi
G. Holtmeier
M. Kalsey
K. A. Kavanagh
H. J. Kim
K. Kim
T. R. Lupold
S. N. Malik
D. L. Marriott
D. K. Morton
T.-L. Sham
X. Li, Contributing Member
L. Shi, Contributing Member
I. Kimihiro
S. Lee
G. Li
X. Li
P. Mokaria
T. R. Muldoon
M. Porton
Y. Song
M. Trosen
C. Waldon
I. J. Zatz
T.-L. Sham, Chair
T. Asayama, Secretary
M. Arcaro
R. W. Barnes
P. Carter
M. E. Cohen
A. B. Hull
R. I. Jetter
G. H. Koo
M. Li
S. Majumdar
M. Morishita
J. E. Nestell
X. Li, Contributing Member
G. Wu, Contributing Member
Executive Committee (BPV III)
Working Group on General Requirements (BPV III-4)
Working Group on In-Vessel Components (BPV III-4)
M. Kalsey, Chair
R. P. McIntyre
J. C. Minichiello
M. Morishita
D. K. Morton
C. A. Sanna
T.-L. Sham
W. K. Sowder, Jr.
Working Group on Magnets (BPV III-4)
K. Kim, Chair
China International Working Group (BPV III)
J. Yan, Chair
W. Tang, Vice Chair
C. A. Sanna, Staff Secretary
Y. He, Secretary
H. Ge
Z. Han
J. Jian
Y. Jing
F. Kai
D. Kang
X. Li
Y. Li
B. Liang
H. Lin
S. Lin
J. Liu
S. Liu
W. Liu
K. Mao
W. Pei
Working Group on Materials (BPV III-4)
M. Porton, Chair
Working Group on Vacuum Vessels (BPV III-4)
I. Kimihiro, Chair
B. R. Doshi
Subgroup on High Temperature Reactors (BPV III)
M. Morishita, Chair
R. I. Jetter, Vice Chair
T.-L. Sham, Secretary
N. Broom
T. D. Burchell
W. Hoffelner
G.-H. Koo
D. K. Morton
J. E. Nestell
N. N. Ray
X. Li, Contributing Member
L. Shi, Contributing Member
xxix
G. Sun
G. Tang
Y. Tu
Y. Wang
H. Wu
X. Wu
Z. Wu
S. Xue
Z. Yan
C. Ye
Z. Yin
S. Zaozhan
G. Zhang
K. Zhang
W. Zhang
G. Zhao
W. Zhao
Y. Zhong
Z. Zhong
G. Zhu
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
R. S. Hill III, Chair
A. Byk, Staff Secretary
T. M. Adams
C. W. Bruny
R. P. Deubler
A. C. Eberhardt
R. M. Jessee
R. B. Keating
W. K. Sowder, Jr., Chair
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
Working Group on High Temperature Gas-Cooled Reactors
(BPV III-5)
Subgroup on Containment Systems for Spent Fuel and High-Level
Waste Transport Packagings (BPV III)
No fu
D. Ostermann
G. Roos
J. Rudolph
C. A. Sanna
H. Schau
C. A. Spletter
R. Trieglaff
P. Völlmecke
J. Wendt
F. Wille
M. Winter
N. Wirtz
R. M. Jessee, Chair
A. Appleton
R. W. Barnes
Special Working Group on Industry Experience for New Plants
(BPV III & BPV XI)
G. M. Foster, Chair
J. T. Lindberg, Chair
H. L. Gustin, Secretary
J. Ossmann, Secretary
T. L. Chan
D. R. Graham
P. J. Hennessey
D. O. Henry
J. Honcharik
E. V. Imbro
C. G. Kim
O.-S. Kim
India International Working Group (BPV III)
B. Basu, Chair
G. Mathivanan, Vice Chair
C. A. Sanna, Staff Secretary
S. B. Parkash, Secretary
V. Bhasin
P. Chellapandi
S. Jalaldeen
D. Kulkarni
S. A. Kumar De
N. M. Nadaph
R. N. Sen
A. Sundararajan
Special Working Group on International Meetings (BPV III)
C. T. Smith, Chair
A. Byk, Staff Secretary
T. D. Burchell
S. W. Cameron
J. R. Cole
R. L. Crane
G. M. Foster
R. S. Hill III
M. N. Mitchell
R. F. Reedy, Sr.
C. A. Sanna
Special Working Group on New Advanced Light Water Reactor Plant
Construction Issues (BPV III)
E. L. Pleins, Chair
M. C. Scott, Secretary
A. Cardillo
P. J. Coco
B. Gilligan
J. Honcharik
G. V. Imbro
O.-S Kim
M. Kris
J. C. Minichiello
D. W. Sandusky
C. A. Sanna
R. R. Stevenson
R. Troficanto
M. L. Wilson
J. Yan
Special Working Group on Regulatory Interface (BPV III)
J. C. Minichiello
L. M. Plante
R. F. Reedy, Sr.
W. K. Sowder, Jr.
C. Wilson
G. V. Imbro, Chair
S. Bell, Secretary
A. Cardillo
A. A. Dermenjian
B. N. Juarez
K. Matsunaga
D. E. Matthews
A. T. Roberts III
R. R. Stevenson
D. Terao
M. L. Wilson
R. A. Yonekawa
Special Working Group on HDPE Stakeholders (BPV III)
D. Burwell, Chair
S. Patterson, Secretary
T. M. Adams
S. Bruce
S. Choi
C. M. Faidy
E. M. Focht
M. Golliet
J. Grimes
R. M. Jessee
J. Johnston, Jr.
D. Keller
M. Lashley
T. R. Lupold
K. A. Manoly
D. P. Munson
T. M. Musto
J. E. O’Sullivan
M. A. Richter
V. Rohatgi
F. J. Schaaf, Jr.
R. Stakenborghs
M. Troughton
Z. J. Zhou
COMMITTEE ON HEATING BOILERS (BPV IV)
T. L. Bedeaux, Chair
J. A. Hall, Vice Chair
G. Moino, Staff Secretary
B. Calderon
J. Calland
J. P. Chicoine
C. M. Dove
A. Heino
B. J. Iske
P. A. Molvie
xxx
R. E. Olson
M. Wadkinson
R. V. Wielgoszinski
H. Michael, Delegate
D. Picart, Delegate
S. V. Voorhees, Contributing
Member
J. L. Kleiss, Alternate
W. L. Haag, Jr., Honorary Member
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
D. Kwon
B. Lee
D. Lee
Sanghoon Lee
Sangil Lee
D. J. Lim
H. Lim
I.-K. Nam
B. Noh
C.-K. Oh
C. Park
J.-S. Park
T. Shin
S. Song
O. Yoo
Special Working Group on Editing and Review (BPV III)
D. K. Morton, Chair
R. L. Bratton
R. P. Deubler
A. C. Eberhardt
R. I. Jetter
Y.-S. Kim
K. Matsunaga
D. E. Matthews
R. E. McLaughlin
E. L. Pleins
D. W. Sandusky
D. M. Swann
T. Tsuruta
E. R. Willis
R. M. Wilson
S. M. Yee
M. Ponnusamy
Korea International Working Group (BPV III)
G. H. Koo, Chair
S. S. Hwang, Vice Chair
O.-S. Kim, Secretary
H. S. Byun
S. Choi
J.-Y. Hong
N.-S. Huh
J.-K. Hwang
C. Jang
I. I. Jeong
H. J. Kim
J. Kim
J.-S. Kim
K. Kim
Y.-B. Kim
Y.-S. Kim
J. R. Cole
D. E. Matthews
J. C. Minichiello
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
Special Working Group on Honors and Awards (BPV III)
Germany International Working Group (BPV III)
C. Huttner, Chair
H.-R. Bath, Secretary
B. Arndt
M. Bauer
G. Daum
L. Gerstner
G. Haenle
K.-H. Herter
U. Jendrich
G. Kramarz
C. Krumb
W. Mayinger
D. Moehring
No fu
J. A. Hall
P. A. Molvie
N. A. Finney, Chair
D. Adkins
J. Anderson
T. G. Bollhalter
C. T. Brown
N. Carter
Subgroup on Cast Iron Boilers (BPV IV)
J. P. Chicoine, Chair
T. L. Bedeaux, Vice Chair
C. M. Dove
J. M. Downs
J. A. Hall
J. L. Kleiss
M. Ghahremani
J. W. Mefford, Jr.
M. Sens
D. Van Allen
Subgroup on Surface Examination Methods (BPV V)
S. A. Johnson, Chair
J. Halley, Vice Chair
S. J. Akrin
J. E. Batey
A. S. Birks
P. L. Brown
B. Caccamise
N. Y. Faransso
N. Farenbaugh
N. A. Finney
Subgroup on Materials (BPV IV)
J. A. Hall, Chair
M. Wadkinson, Vice Chair
J. Calland
J. M. Downs
J. L. Garner
A. Heino
B. J. Iske
J. L. Kleiss
E. Rightmier
G. W. Hembree
R. W. Kruzic
B. D. Laite
C. May
L. E. Mullins
A. B. Nagel
F. J. Sattler
P. Shaw
G. M. Gatti, Delegate
Subgroup on Water Heaters (BPV IV)
J. Calland, Chair
J. P. Chicoine
B. J. Iske
Subgroup on Volumetric Methods (BPV V)
R. E. Olson
T. E. Trant
A. B. Nagel, Chair
N. A. Finney, Vice Chair
S. J. Akrin
J. E. Batey
P. L. Brown
B. Caccamise
N. Y. Faransso
A. F. Garbolevsky
J. F. Halley
R. W. Hardy
Subgroup on Welded Boilers (BPV IV)
J. Calland, Chair
T. L. Bedeaux
B. Calderon
J. L. Kleiss
P. A. Molvie
R. E. Olson
M. Wadkinson
R. V. Wielgoszinski
N. Y. Faransso, Chair
J. E. Batey, Vice Chair
J. W. Houf
S. A. Johnson
R. W. Kruzic
C. May
A. B. Nagel
T. L. Plasek
F. J. Sattler
G. M. Gatti, Delegate
X. Guiping, Delegate
B. D. Laite, Alternate
H. C. Graber, Honorary Member
O. F. Hedden, Honorary Member
J. R. MacKay, Honorary Member
T. G. McCarty, Honorary Member
Working Group on Radiography (SG-VM) (BPV V)
B. Caccamise, Chair
F. B. Kovacs, Vice Chair
S. J. Akrin
J. E. Batey
P. L. Brown
C. Emslander
N. Y. Faransso
A. F. Garbolevsky
R. W. Hardy
G. W. Hembree
Subgroup on General Requirements/Personnel Qualifications and
Inquiries (BPV V)
F. B. Kovacs, Chair
J. W. Houf, Vice Chair
S. J. Akrin
C. A. Anderson
J. E. Batey
A. S. Birks
C. Emslander
N. Y. Faransso
S. R. Doctor
R. K. Miller
S. A. Johnson
R. W. Kruzic
B. D. Laite
S. Mango
C. May
R. J. Mills
A. B. Nagel
T. L. Plasek
M. Torok
Working Group on Ultrasonics (SG-VM) (BPV V)
N. A. Finney
N. A. Finney, Chair
J. F. Halley, Vice Chair
B. Caccamise
K. J. Chizen
J. M. Davis
N. Y. Faransso
P. T. Hayes
S. A. Johnson
G. W. Hembree
S. A. Johnson
D. I. Morris
A. B. Nagel
J. P. Swezy, Jr., Contributing
Member
xxxi
R. W. Kruzic
B. D. Laite
C. May
L. E. Mullins
A. B. Nagel
F. J. Sattler
M. Torok
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Working Group on Acoustic Emissions (SG-VM) (BPV V)
COMMITTEE ON NONDESTRUCTIVE EXAMINATION (BPV V)
G. W. Hembree, Chair
F. B. Kovacs, Vice Chair
J. S. Brzuszkiewicz, Staff Secretary
S. J. Akrin
C. A. Anderson
J. E. Batey
A. S. Birks
P. L. Brown
M. A. Burns
B. Caccamise
N. Y. Faransso
N. A. Finney
A. F. Garbolevsky
J. F. Halley
G. W. Hembree
S. A. Johnson
F. B. Kovacs
R. W. Kruzic
C. May
L. E. Mullins
T. L. Plasek
F. J. Sattler
M. Torok
G. M. Gatti, Delegate
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
Special Working Group on NDE Resource Support (SG-GR/PQ & I)
(BPV V)
Subgroup on Care and Operation of Heating Boilers (BPV IV)
M. Wadkinson, Chair
T. L. Bedeaux
J. Calland
No fu
N. Y. Faransso, Chair
J. E. Batey, Vice Chair
D. Alleyne
N. Amir
J. F. Halley
C. D. Rodery, Chair
J. P. Swezy, Jr., Vice Chair
B. R. Morelock, Secretary
L. F. Campbell
D. I. Morris
O. Mulet
M. J. Pischke
M. J. Rice
B. F. Shelley
S. A. Johnson
G. M. Light
P. Mudge
M. J. Quarry
J. Vanvelsor
COMMITTEE ON PRESSURE VESSELS (VIII)
R. J. Basile, Chair
S. C. Roberts, Vice Chair
S. J. Rossi, Staff Secretary
T. Schellens, Staff Secretary
G. Aurioles, Sr.
V. Bogosian
J. Cameron
A. Chaudouet
D. B. DeMichael
J. P. Glaspie
J. F. Grubb
L. E. Hayden, Jr.
G. G. Karcher
D. L. Kurle
K. T. Lau
M. D. Lower
R. Mahadeen
R. W. Mikitka
U. R. Miller
T. W. Norton
T. P. Pastor
D. T. Peters
M. J. Pischke
M. D. Rana
G. B. Rawls, Jr.
F. L. Richter
C. D. Rodery
E. Soltow
D. A. Swanson
J. P. Swezy, Jr.
S. Terada
E. Upitis
P. A. McGowan, Delegate
H. Michael, Delegate
K. Oyamada, Delegate
M. E. Papponetti, Delegate
D. Rui, Delegate
T. Tahara, Delegate
M. Gold, Contributing Member
W. S. Jacobs, Contributing Member
K. Mokhtarian, Contributing
Member
C. C. Neely, Contributing Member
A. Selz, Contributing Member
K. K. Tam, Contributing Member
Subgroup on General Requirements (BPV VIII)
M. D. Lower, Chair
J. P. Glaspie, Vice Chair
F. L. Richter, Secretary
R. J. Basile
V. Bogosian
D. T. Davis
D. B. DeMichael
M. Faulkener
L. E. Hayden, Jr.
K. T. Lau
A. S. Olivares
T. P. Pastor
S. C. Roberts
J. C. Sowinski
P. Speranza
D. B. Stewart
D. A. Swanson
R. Uebel
K. Oyamada, Delegate
C. C. Neely, Contributing Member
Task Group on U-2(g) (BPV VIII)
T. P. Pastor
M. D. Rana
G. B. Rawls, Jr.
S. C. Roberts
C. D. Rodery
D. Srnic
J. Vattappilly
R. A. Whipple
K. Xu
K. Oyamada, Delegate
M. E. Papponetti, Delegate
W. S. Jacobs, Contributing Member
P. K. Lam, Contributing Member
K. Mokhtarian, Contributing
Member
A. Selz, Contributing Member
S. C. Shah, Contributing Member
K. K. Tam, Contributing Member
R. F. Reedy, Sr.
S. C. Roberts
M. A. Shah, Jr.
D. Srnic
D. A. Swanson
R. Uebel
K. K. Tam, Contributing Member
Subgroup on Heat Transfer Equipment (BPV VIII)
G. Aurioles, Sr., Chair
P. Matkovics, Secretary
D. Angstadt
S. R. Babka
M. Bahadori
J. H. Barbee
O. A. Barsky
I. G. Campbell
A. Chaudouet
M. D. Clark
S. Jeyakumar
G. G. Karcher
D. L. Kurle
B. J. Lerch
R. Mahadeen
S. Mayeux
U. R. Miller
T. W. Norton
K. Oyamada
D. Srnic
A. M. Voytko
R. P. Wiberg
F. E. Jehrio, Contributing Member
J. Mauritz, Contributing Member
F. Osweiller, Contributing Member
R. Tiwari, Contributing Member
S. Yokell, Contributing Member
S. M. Caldwell, Honorary Member
Working Group on Design-By-Analysis (BPV III)
B. F. Hantz, Chair
T. W. Norton, Secretary
R. G. Brown
D. Dewees
R. D. Dixon
Z. Gu
C. E. Hinnant
R. Jain
M. H. Jawad
S. Krishnamurthy
A. Mann
G. A. Miller
C. Nadarajah
M. D. Rana
T. G. Seipp
M. A. Shah
S. Terada
D. Arnett, Contributing Member
Task Group on Plate Heat Exchangers (BPV VIII)
M. J. Pischke, Chair
S. R. Babka
S. Flynn
J. F. Grubb
F. Hamtak
J. E. Lane
xxxii
R. Mahadeen
P. Metkovics
D. I. Morris
C. M. Romero
E. Soltow
D. Srnic
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
S. R. Babka
R. J. Basile
D. K. Chandiramani
R. Mahadeen
U. R. Miller
T. W. Norton
T. P. Pastor
Subgroup on Design (BPV VIII)
D. A. Swanson, Chair
J. C. Sowinski, Vice Chair
M. Faulkner, Secretary
G. Aurioles, Sr.
S. R. Babka
O. A. Barsky
R. J. Basile
M. R. Breach
F. L. Brown
D. Chandiramani
B. F. Hantz
C. E. Hinnant
C. S. Hinson
M. H. Jawad
D. L. Kurle
M. D. Lower
R. W. Mikitka
U. R. Miller
P. L. Sturgill
E. A. Whittle
K. Oyamada, Delegate
W. J. Bees, Contributing Member
W. S. Jacobs, Contributing Member
J. Lee, Contributing Member
R. Uebel, Contributing Member
E. Upitis, Contributing Member
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
Subgroup on Fabrication and Inspection (BPV VIII)
Working Group on Guided Wave Ultrasonic Testing (SG-VM) (BPV V)
No fu
Special Working Group on Bolted Flanged Joints (BPV VIII)
G. T. Nelson
E. A. Rodriguez
E. D. Roll
K. C. Simpson, Jr.
D. L. Stang
F. W. Tatar
S. Terada
J. L. Traud
R. Wink
K.-J. Young
K. Oyamada, Delegate
R. M. Hoshman, Contributing
Member
G. J. Mraz, Contributing Member
D. J. Burns, Honorary Member
E. H. Perez, Honorary Member
R. W. Mikitka, Chair
G. D. Bibel
W. Brown
H. Chen
W. J. Koves
Working Group on Design (BPV VIII Div. 3)
Subgroup on Materials (BPV VIII)
J. F. Grubb, Chair
J. Cameron, Vice Chair
P. G. Wittenbach, Secretary
A. Di Rienzo
J. D. Fritz
M. Katcher
M. Kowalczyk
W. M. Lundy
J. Penso
D. W. Rahoi
M. Morishita
J. R. Payne
G. B. Rawls, Jr.
M. S. Shelton
R. C. Sutherlin
E. Upitis
K. Xu
K. Oyamada, Delegate
G. S. Dixit, Contributing Member
M. Gold, Contributing Member
J. A. McMaster, Contributing
Member
E. G. Nisbett, Contributing Member
J. Keltjens, Chair
C. Becht V
R. C. Biel
R. Cordes
R. D. Dixon
L. Fridlund
R. T. Hallman
G. M. Mital
S. C. Mordre
G. T. Nelson
D. T. Peters
E. D. Roll
K. C. Simpson
D. L. Stang
K. Subramanian
S. Terada
J. L. Traud
R. Wink
Y. Xu
F. Kirkemo, Contributing Member
D. J. Burns, Honorary Member
D. M. Fryer, Honorary Member
G. J. Mraz, Honorary Member
E. H. Perez, Honorary Member
Working Group on Materials (BPV VIII Div. 3)
F. W. Tatar, Chair
L. P. Antalffy
P. N. Chaku
J. A. Kapp
A. K. Khare
Subgroup on Toughness (BPV II & BPV VIII)
J. P. Swezy, Jr.
E. Upitis
K. Oyamada, Delegate
K. Mokhtarian, Contributing
Member
C. C. Neely, Contributing Member
Subgroup on Graphite Pressure Equipment (BPV VIII)
E. Soltow, Chair
G. C. Becherer
T. F. Bonn
F. L. Brown
Task Group on Impulsively Loaded Vessels (BPV VIII)
J. Vattappilly
M. R. Minick
A. A. Stupica
A. Viet
E. A. Rodriguez, Chair
P. O. Leslie, Secretary
G. A. Antaki
J. K. Asahina
D. D. Barker
A. M. Clayton
J. E. Didlake, Jr.
T. A. Duffey
B. L. Haroldsen
K. Hayashi
D. Hilding
K. W. King
R. Kitamura
R. A. Leishear
R. E. Nickell
F. Ohlson
C. Romero
N. Rushton
J. H. Stofleth
Q. Dong, Contributing Member
H.-P. Schildberg, Contributing
Member
J. E. Shepherd, Contributing
Member
M. Yip, Contributing Member
Italy International Working Group (BPV VIII)
G. Pontiggia, Chair
A. Veroni, Secretary
B. G. Alborali
P. Angelini
R. Boatti
A. Camanni
P. Conti
P. L. Dinelli
F. Finco
L. Gaetani
A. Ghidini
M. Guglielmetti
P. Mantovani
M. Maroni
M. Massobrio
L. Moracchioli
L. Possenti
C. Sangaletti
A. Teli
I. Venier
G. Gobbi, Contributing Member
Subgroup on Interpretations (BPV VIII)
U. R. Miller, Chair
T. Schellens, Staff Secretary
G. Aurioles, Sr.
R. J. Basile
J. Cameron
R. D. Dixon
J. F. Grubb
D. L. Kurle
M. D. Lower
R. Mahadeen
xxxiii
D. T. Peters
S. C. Roberts
C. D. Rodery
D. B. Stewart
P. L. Sturgill
D. A. Swanson
J. P. Swezy, Jr.
J. Vattappilly
T. P. Pastor, Contributing Member
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
D. L. Kurle, Chair
K. Xu, Vice Chair
R. J. Basile
W. S. Jacobs
M. D. Rana
F. L. Richter
K. Subramanian
D. A. Swanson
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
Subgroup on High Pressure Vessels (BPV VIII)
D. T. Peters, Chair
R. D. Dixon, Vice Chair
R. T. Hallman, Vice Chair
A. P. Maslowski, Staff Secretary
L. P. Antalffy
R. C. Biel
P. N. Chaku
R. Cordes
L. Fridlund
D. M. Fryer
A. H. Honza
J. A. Kapp
J. Keltjens
A. K. Khare
N. McKie
S. C. Mordre
No fu
M. B. Sims
M. J. Stanko
P. L. Sturgill
J. P. Swezy, Jr.
P. L. Van Fosson
R. R. Young
A. Roza, Delegate
R. K. Brown, Jr., Contributing
Member
M. Consonni, Contributing Member
S. A. Jones, Contributing Member
S. Raghunathan, Contributing
Member
W. D. Doty, Honorary Member
B. R. Newmark, Honorary Member
S. D. Reynolds, Jr., Honorary
Member
Subgroup on Brazing (BPV IX)
M. J. Pischke, Chair
E. W. Beckman
L. F. Campbell
M. L. Carpenter
A. F. Garbolevsky
A. R. Nywening
J. P. Swezy, Jr.
S. Schuessler
P. L. Sturgill
J. P. Swezy, Jr.
M. Troughton
E. W. Woelfel
J. Wright
J. C. Minichiello, Contributing
Member
C. W. Rowley, Contributing
Member
Subgroup on Procedure Qualification (BPV IX)
D. A. Bowers, Chair
M. J. Rice, Secretary
M. Bernasek
M. A. Boring
L. Harbison
W. M. Lundy
W. F. Newell, Jr.
S. Raghunathan
M. B. Sims
W. J. Sperko
S. A. Sprague
J. P. Swezy, Jr.
P. L. Van Fosson
T. C. Wiesner
D. Chandiramani, Contributing
Member
COMMITTEE ON FIBER-REINFORCED PLASTIC PRESSURE VESSELS
(BPV X)
Subgroup on General Requirements (BPV IX)
D. Eisberg, Chair
B. F. Shelley, Vice Chair
P. D. Stumpf, Staff Secretary
F. L. Brown
J. L. Bustillos
T. W. Cowley
I. L. Dinovo
T. J. Fowler
M. R. Gorman
B. Hebb
D. H. Hodgkinson
L. E. Hunt
D. L. Keeler
B. M. Linnemann
N. L. Newhouse
D. J. Painter
G. Ramirez
J. R. Richter
F. W. Van Name
D. O. Yancey, Jr.
P. H. Ziehl
COMMITTEE ON NUCLEAR INSERVICE INSPECTION (BPV XI)
Subgroup on Materials (BPV IX)
M. Bernasek, Chair
T. Anderson
J. L. Arnold
M. L. Carpenter
E. Cutlip
S. S. Fiore
S. E. Gingrich
L. Harbison
R. M. Jessee
C. C. Kim
T. Melfi
M. J. Pischke
C. E. Sainz
W. J. Sperko
M. J. Stanko
P. L. Sturgill
R. R. Young
V. G. V. Giunto, Delegate
Subgroup on Performance Qualification (BPV IX)
D. A. Bowers, Chair
M. J. Rice, Secretary
M. A. Boring
R. B. Corbit
P. D. Flenner
K. L. Hayes
J. S. Lee
W. M. Lundy
T. Melfi
E. G. Reichelt
M. B. Sims
G. C. Park, Chair
R. W. Swayne, Vice Chair
R. A. Yonekawa, Vice Chair
R. L. Crane, Staff Secretary
J. M. Agold
V. L. Armentrout
J. F. Ball
W. H. Bamford
T. L. Chan
R. C. Cipolla
D. D. Davis
G. H. DeBoo
R. L. Dyle
E. V. Farrell, Jr.
E. L. Farrow
E. B. Gerlach
R. E. Gimple
T. J. Griesbach
D. O. Henry
R. D. Kerr
S. D. Kulat
D. W. Lamond
D. R. Lee
xxxiv
G. A. Lofthus
E. J. Maloney
J. E. O’Sullivan
R. K. Rhyne
D. A. Scarth
F. J. Schaaf, Jr.
J. C. Spanner, Jr.
G. L. Stevens
D. E. Waskey
J. G. Weicks
T. Yuhara
H. D. Chung, Delegate
C. Ye, Delegate
B. R. Newton, Contributing Member
R. A. West, Contributing Member
J. Hakii, Alternate
J. T. Lindberg, Alternate
C. J. Wirtz, Alternate
C. D. Cowfer, Honorary Member
F. E. Gregor, Honorary Member
O. F. Hedden, Honorary Member
P. C. Riccardella, Honorary Member
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
A. S. Olivares
D. K. Peetz
H. B. Porter
K. R. Willens
E. W. Woelfel
E. Molina, Delegate
B. R. Newmark, Honorary Member
P. L. Sturgill, Chair
E. W. Beckman
J. P. Bell
G. Chandler
P. R. Evans
A. Howard
R. M. Jessee
M. L. Carpenter, Chair
D. Burwell
J. M. Craig
M. Ghahremani
K. L. Hayes
R. M. Jessee
J. Johnston, Jr.
E. W. McElroy
J. E. O’Sullivan
E. G. Reichelt
M. J. Rice
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
Subgroup on Plastic Fusing (BPV IX)
COMMITTEE ON WELDING, BRAZING, AND FUSING (BPV IX)
W. J. Sperko, Chair
D. A. Bowers, Vice Chair
S. J. Rossi, Staff Secretary
M. Bernasek
M. L. Carpenter
J. G. Feldstein
P. D. Flenner
S. E. Gingrich
R. M. Jessee
J. S. Lee
W. M. Lundy
T. Melfi
W. F. Newell, Jr.
A. S. Olivares
D. K. Peetz
M. J. Pischke
M. J. Rice
No fu
Working Group on Flaw Evaluation (SG-ES) (BPV XI)
S. D. Kulat
J. T. Lindberg
W. E. Norris
R. K. Rhyne
J. C. Spanner, Jr.
G. L. Stevens
R. W. Swayne
R. C. Cipolla, Chair
W. H. Bamford
M. L. Benson
B. Bezensek
H. D. Chung
G. H. DeBoo
C. M. Faidy
B. R. Ganta
R. G. Gilada
H. L. Gustin
F. D. Hayes
P. H. Hoang
K. Hojo
D. N. Hopkins
Y. Kim
K. Koyama
V. Lacroix
D. R. Lee
China International Working Group (BPV XI)
J. H. Liu, Chair
Y. Nie, Vice Chair
C. Ye, Vice Chair
M. W. Zhou, Secretary
J. Cai
D. X. Chen
H. Chen
H. D. Chen
Y. B. Guo
Y. Hou
P. F. Hu
D. M. Kang
X. Y. Liang
Z. X. Liang
S. X. Lin
L. Q. Liu
Y. Liu
W. N. Pei
C. L. Peng
G. X. Tang
Q. Wang
Q. W. Wang
Z. S. Wang
F. Xu
Z. Y. Xu
Q. Yin
K. Zhang
Y. Zhang
Z. M. Zhong
L. L. Zou
Task Group on Evaluation Procedures for Degraded Buried Pipe
(WG-PFE) (BPV XI)
R. O. McGill, Chair
S. X. Xu, Secretary
G. Antaki
R. C. Cipolla
G. H. DeBoo
K. Hasegawa
K. M. Hoffman
Germany International Working Group (BPV XI)
T. J. Griesbach, Chair
V. Marthandam, Secretary
K. R. Baker
W. H. Bamford
H. Behnke
T. L. Dickson
R. L. Dyle
A. E. Freed
S. R. Gosselin
M. Hayashi
S. A. Kleinsmith
H. S. Mehta
A. D. Odell
D. R. Lee
Y. Li
R. O. McGill
H. S. Mehta
K. Miyazaki
R. Pace
J. C. Poehler
S. Ranganath
D. A. Scarth
T. V. Vo
K. R. Wichman
S. X. Xu
D. P. Munson
R. Pace
P. J. Rush
D. A. Scarth
R. Pace
N. A. Palm
J. C. Poehler
S. Ranganath
W. L. Server
D. V. Sommerville
C. A. Tomes
A. Udyawar
T. V. Vo
D. P. Weakland
K. E. Woods
T. Hardin, Alternate
Working Group on Pipe Flaw Evaluation (SG-ES) (BPV XI)
D. A. Scarth, Chair
G. M. Wilkowski, Secretary
W. H. Bamford
H. D. Chung
R. C. Cipolla
N. G. Cofie
J. M. Davis
G. H. DeBoo
C. M. Faidy
B. R. Ganta
S. R. Gosselin
L. F. Goyette
C. E. Guzman-Leong
K. Hasegawa
P. H. Hoang
K. Hojo
D. N. Hopkins
E. J. Houston
Task Group on Evaluation of Beyond Design Basis Events (SG-ES)
(BPV XI)
R. Pace, Chair
K. E. Woods, Secretary
G. Antaki
P. R. Donavin
R. G. Gilada
T. J. Griesbach
H. L. Gustin
M. Hayashi
M. Moenssens
Working Group on Operating Plant Criteria (SG-ES) (BPV XI)
H. Schau
X. Schuler
J. Wendt
Subgroup on Evaluation Standards (SG-ES) (BPV XI)
W. H. Bamford, Chair
G. L. Stevens, Secretary
H. D. Chung
R. C. Cipolla
G. H. DeBoo
R. L. Dyle
B. R. Ganta
T. J. Griesbach
K. Hasegawa
K. Hojo
D. N. Hopkins
K. Koyama
G. A. A. Miessi
K. Hojo
S. A. Kleinsmith
H. S. Mehta
D. V. Sommerville
T. V. Vo
K. R. Wichman
G. M. Wilkowski
T. Weaver, Contributing Member
xxxv
K. Kashima
Y. Li
R. O. McGill
H. S. Mehta
G. A. A. Miessi
K. Miyazaki
S. H. Pellet
H. Rathbun
D. L. Rudland
P. J. Rush
D.-J. Shim
A. Udyawar
T. V. Vo
B. Wasiluk
S. X. Xu
A. Alleshwaram, Alternate
M. L. Benson, Alternate
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
C. A. Spletter, Secretary
H.-R. Bath
B. Hoffmann
U. Jendrich
Y. Li
H. S. Mehta
G. A. A. Miessi
K. Miyazaki
R. K. Qashu
S. Ranganath
H. Rathbun
P. J. Rush
D. A. Scarth
W. L. Server
D.-J. Shim
A. Udyawar
T. V. Vo
B. Wasiluk
K. R. Wichman
G. M. Wilkowski
D. L. Rudland, Alternate
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
Executive Committee (BPV XI)
R. A. Yonekawa, Chair
G. C. Park, Vice Chair
R. L. Crane, Staff Secretary
W. H. Bamford
R. L. Dyle
M. J. Ferlisi
E. B. Gerlach
R. E. Gimple
No fu
J. T. Lindberg
G. A. Lofthus
G. R. Perkins
S. A. Sabo
F. J. Schaaf, Jr.
R. V. Swain
C. J. Wirtz
J. E. O'Sullivan, Chair
S. Schuessler, Secretary
M. T. Audrain
J. Johnston, Jr.
T. M. Musto
S. Patterson
B. B. Raji
F. J. Schaaf, Jr.
Z. J. Zhou
Task Group on Repair by Carbon Fiber Composites
(WGN-MRR) (BPV XI)
J. E. O'Sullivan, Chair
J. W. Collins
M. Golliet
L. S. Gordon
T. Jimenez
G. M. Lupia
M. P. Marohl
Working Group on Personnel Qualification and Surface Visual and
Eddy Current Examination (SG-NDE) (BPV XI)
J. T. Lindberg, Chair
J. E. Aycock, Secretary
S. E. Cumblidge
A. Diaz
N. Farenbaugh
D. O. Henry
J. W. Houf
J. C. Spanner, Jr.
J. T. Timm
M. C. Weatherly
M. L. Whytsell
C. J. Wirtz
R. P. Ojdrovic
D. Peguero
A. Pridmore
B. B. Raji
C. W. Rowley
V. Roy
J. Wen
Working Group on Design and Programs (SG-RRA) (BPV XI)
R. Clow, Chair
A. B. Meichler, Secretary
O. Bhatty
S. B. Brown
J. W. Collins
L. R. Corr
R. R. Croft
E. V. Farrell, Jr.
E. B. Gerlach
Working Group on Procedure Qualification and Volumetric
Examination (SG-NDE) (BPV XI)
G. A. Lofthus, Chair
G. R. Perkins, Secretary
M. T. Anderson
M. Briley
C. B. Cheezem
A. D. Chockie
D. R. Cordes
M. Dennis
S. R. Doctor
F. E. Dohmen
K. J. Hacker
D. B. King
D. A. Kull
C. A. Nove
S. A. Sabo
R. V. Swain
S. J. Todd
D. K. Zimmerman
Subgroup on Water-Cooled Systems (SG-WCS) (BPV XI)
S. L. McCracken
B. R. Newton
J. E. O'Sullivan
S. Schuessler
R. R. Stevenson
R. W. Swayne
D. L. Tilly
D. E. Waskey
J. G. Weicks
R. A. Yonekawa
E. G. Reichelt, Alternate
M. J. Ferlisi
P. J. Hennessey
D. W. Lamond
A. McNeill III
T. Nomura
G. C. Park
J. E. Staffiera
H. M. Stephens, Jr.
R. Turner
Task Group on High Strength Nickel Alloys Issues (SG-WCS) (BPV XI)
R. L. Dyle, Chair
B. L. Montgomery, Secretary
W. H. Bamford
P. R. Donavin
R. E. Gimple
R. Hardies
K. Koyama
M. Lashley
H. Malikowski
S. E. Marlette
G. C. Park
J. M. Shuping
J. C. Spanner, Jr.
K. B. Stuckey
E. J. Sullivan, Jr.
B. C. Thomas
D. P. Weakland
Working Group on Welding and Special Repair Processes (SG-RRA)
(BPV XI)
D. E. Waskey, Chair
D. J. Tilly, Secretary
R. E. Cantrell
S. J. Findlan
P. D. Fisher
M. L. Hall
R. A. Hermann
K. J. Karwoski
C. C. Kim
S. L. McCracken
D. B. Meredith
B. R. Newton
J. E. O'Sullivan
R. E. Smith
J. G. Weicks
Working Group on Containment (SG-WCS) (BPV XI)
J. E. Staffiera, Chair
H. M. Stephens, Jr., Secretary
P. S. Ghosal
H. T. Hill
R. D. Hough
B. Lehman
J. A. Munshi
xxxvi
D. J. Naus
A. A. Reyes-Cruz
E. A. Rodriguez
M. Sircar
S. G. Brown, Alternate
T. J. Herrity, Alternate
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
S. D. Kulat, Chair
N. A. Palm, Secretary
J. M. Agold
V. L. Armentrout
J. M. Boughman
S. T. Chesworth
A. D. Cinson
D. D. Davis
H. Q. Do
E. L. Farrow
Subgroup on Repair/Replacement Activities (SG-RRA) (BPV XI)
E. B. Gerlach, Chair
E. V. Farrell, Jr., Secretary
J. F. Ball
S. B. Brown
R. E. Cantrell
R. Clow
P. D. Fisher
R. E. Gimple
D. R. Graham
R. A. Hermann
K. J. Karwoski
R. D. Kerr
D. R. Graham
G. F. Harttraft
T. E. Hiss
H. Malikowski
M. A. Pyne
R. R. Stevenson
R. W. Swayne
R. A. Yonekawa
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
Working Group on Nonmetals Repair/Replacement Activities
(SG-RRA) (BPV XI)
Subgroup on Nondestructive Examination (SG-NDE) (BPV XI)
J. C. Spanner, Jr., Chair
D. R. Cordes, Secretary
D. Alley
T. L. Chan
C. B. Cheezem
F. E. Dohmen
D. O. Henry
No fu
J. M. Agold, Chair
N. Granback, Secretary
R. W. Blyde
C. Cueto-Felgueroso
R. E. Day
H. Q. Do
M. J. Ferlisi
K. W. Hall
B. R. Snyder, Chair
A. B. Meichler, Secretary
T. M. Anselmi
S. Asada
D. V. Burgess
Y.-K. Chung
D. D. Davis
R. L. Dyle
K. M. Hoffman
S. D. Kulat
A. Lee
T. Nomura
J. C. Nygaard
R. Rishel
G. J. Navratil, Alternate
A. L. Hiser, Jr.
R. E. Nickell
K. Sakamoto
W. L. Server
R. L. Turner
G. G. Young
Z. Zhong
M. Srinivasan, Alternate
Working Group on General Requirements (BPV XI)
Task Group on Optimization of Ultrasonic Evaluation Requirements
(WG-ISC) (BPV XI)
M. J. Ferlisi, Chair
K. W. Hall
D. O. Henry
K. M. Hoffman
B. L. Montgomery
G. J. Navratil
M. Orihuela
J. C. Poehler
R. K. Rhyne, Chair
E. J. Maloney, Secretary
J. F. Ball
T. L. Chan
E. L. Farrow
P. J. Hennessey
K. M. Herman
R. K. Mattu
C. E. Moyer
R. L. Williams
Special Working Group on Reliability and Integrity Management
Program (BPV XI)
Working Group on Pressure Testing (SG-WCS) (BPV XI)
D. W. Lamond, Chair
J. M. Boughman, Secretary
D. Alley
Y.-K. Chung
J. A. Doughty
R. E. Hall
A. E. Keyser
J. K. McClanahan
B. L. Montgomery
S. A. Norman
F. J. Schaaf, Jr., Chair
A. T. Roberts III, Secretary
N. Broom
S. R. Doctor
J. Fletcher
S. R. Gosselin
N. Granback
J. Grimm
A. B. Hull
Task Group on Buried Components Inspection and Testing
(WG-PT) (BPV XI)
JSME/ASME Joint Task Group for System-Based Code (SWG-RIM)
(BPV XI)
T. Ivy
A. Lee
G. M. Lupia
J. Ossmann
M. A. Richter
D. Smith
T. Asayama, Chair
K. Dozaki
M. R. Graybeal
M. Hayashi
Y. Kamishima
H. Machida
M. Morishita
F. J. Schaaf, Jr.
S. Takaya
D. Watanabe
COMMITTEE ON TRANSPORT TANKS (BPV XII)
Working Group on Risk-Informed Activities (SG-WCS) (BPV XI)
M. A. Pyne, Chair
S. T. Chesworth, Secretary
J. M. Agold
C. Cueto-Felgueroso
H. Q. Do
R. Fougerousse
M. R. Graybeal
R. Haessler
J. Hakii
K. W. Hall
K. M. Hoffman
S. D. Kulat
D. W. Lamond
R. K. Mattu
A. McNeill III
P. J. O’Regan
N. A. Palm
D. Vetter
J. C. Younger
Special Working Group on Editing and Review (BPV XI)
R. W. Swayne, Chair
C. E. Moyer
K. R. Rao
J. E. Staffiera
D. J. Tilly
C. J. Wirtz
M. D. Rana, Chair
N. J. Paulick, Vice Chair
T. Schellens, Staff Secretary
A. N. Antoniou
P. Chilukuri
W. L. Garfield
G. G. Karcher
M. Pitts
T. A. Rogers
S. Staniszewski
A. P. Varghese
M. R. Ward
J. A. Byers, Contributing Member
R. Meyers, Contributing Member
M. D. Pham, Contributing Member
A. Selz, Contributing Member
Subgroup on Design and Materials (BPV XII)
A. P. Varghese, Chair
R. C. Sallash, Secretary
D. K. Chandiramani
P. Chilukuri
G. G. Karcher
S. L. McWilliams
N. J. Paulick
M. D. Rana
xxxvii
T. A. Rogers
A. Selz
M. R. Ward
K. Xu
J. Zheng, Corresponding Member
T. Hitchcock, Contributing Member
M. D. Pham, Contributing Member
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
D. W. Lamond, Chair
J. M. Boughman, Secretary
M. Moenssens, Secretary
C. Blackwelder
G. C. Coker
R. E. Day
R. Hardies
D. M. Jones
A. L. Krinzman
D. R. Lee
R. K. Miller
M. N. Mitchell
R. Morrill
T. Roney
R. W. Swayne
S. Takaya
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
Special Working Group on Nuclear Plant Aging Management
(BPV XI)
Working Group on Inspection of Systems and Components
(SG-WCS) (BPV XI)
No fu
M. Pitts, Chair
P. Chilukuri, Secretary
W. L. Garfield
D. Hayworth
K. Mansker
G. McRae
O. Mulet
T. A. Rogers
M. Rudek
R. C. Sallash
S. Staniszewski
S. E. Benet, Contributing Member
J. A. Byers, Contributing Member
A. S. Olivares, Contributing
Member
L. H. Strouse, Contributing Member
S. V. Voorhees, Contributing
Member
Subgroup on General Requirements (BPV XII)
S. Staniszewski, Chair
A. N. Antoniou
J. L. Freiler
W. L. Garfield
O. Mulet
B. Pittel
S. Yang
S. F. Harrison, Contributing
Member
S. Andrews, Alternate
V. Bogosian, Alternate
P. J. Coco, Alternate
P. D. Edwards, Alternate
D. P. Gobbi, Alternate
K. M. Hottle, Alternate
K. A. Kavanagh, Alternate
B. G. Kovarik, Alternate
M. A. Martin, Alternate
M. Paris, Alternate
A. Torosyan, Alternate
E. A. Whittle, Alternate
H. L. Wiger, Alternate
M. Pitts
T. Rummel
Subcommittee on Safety Valve Requirements (SC-SVR)
R. C. Sallash
K. L. Gilmore, Contributing Member
L. H. Strouse, Contributing Member
Subgroup on Nonmandatory Appendices (BPV XII)
M. R. Ward
S. E. Benet, Contributing Member
D. D. Brusewitz, Contributing
Member
J. L. Conley, Contributing Member
T. Eubanks, Contributing Member
T. Hitchcock, Contributing Member
A. Selz, Contributing Member
A. P. Varghese, Contributing
Member
D. B. DeMichael, Chair
J. F. Ball, Vice Chair
C. E. O’Brien, Staff Secretary
J. Burgess
S. Cammeresi
J. A. Cox
R. J. Doelling
J. P. Glaspie
S. F. Harrison, Jr.
W. F. Hart
D. Miller
B. K. Nutter
T. Patel
Z. Wang
J. A. West
R. D. Danzy, Contributing Member
Subgroup on Design (SC-SVR)
D. Miller, Chair
C. E. Beair
J. A. Conley
R. J. Doelling
T. Patel
J. A. West
R. D. Danzy, Contributing Member
Subgroup on General Requirements (SC-SVR)
S. T. French
J. P. Glaspie
B. Pittel
D. E. Tuttle
J. F. Ball, Chair
G. Brazier
J. Burgess
D. B. DeMichael
COMMITTEE ON BOILER AND PRESSURE VESSEL CONFORMITY
ASSESSMENT (CBPVCA)
P. D. Edwards, Chair
L. E. McDonald, Vice Chair
K. I. Baron, Staff Secretary
M. Vazquez, Staff Secretary
S. W. Cameron
J. P. Chicoine
D. C. Cook
M. A. DeVries
T. E. Hansen
K. T. Lau
D. Miller
B. R. Morelock
J. D. O'Leary
G. Scribner
B. C. Turczynski
D. E. Tuttle
E. A. Whittle
R. V. Wielgoszinski
P. Williams
D. Cheetham, Contributing Member
V. Bogosian, Alternate
J. B. Carr, Alternate
J. W. Dickson, Alternate
M. B. Doherty, Alternate
J. M. Downs, Alternate
B. J. Hackett, Alternate
B. L. Krasiun, Alternate
P. F. Martin, Alternate
K. McPhie, Alternate
M. R. Minick, Alternate
I. Powell, Alternate
R. Pulliam, Alternate
R. Rockwood, Alternate
R. D. Troutt, Alternate
R. Uebel, Alternate
J. A. West, Alternate
D. A. Wright, Alternate
A. J. Spencer, Honorary Member
Subgroup on Testing (SC-SVR)
J. A. Cox, Chair
T. Beirne
J. E. Britt
S. Cammeresi
J. W. Dickson
G. D. Goodson
W. F. Hart
B. K. Nutter
C. Sharpe
Z. Wang
A. Wilson
U.S. Technical Advisory Group ISO/TC 185 Safety Relief Valves
T. J. Bevilacqua, Chair
C. E. O’Brien, Staff Secretary
J. F. Ball
G. Brazier
xxxviii
D. B. DeMichael
D. Miller
B. K. Nutter
J. A. West
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
N. J. Paulick, Chair
S. Staniszewski, Secretary
P. Chilukuri
D. Hayworth
K. Mansker
S. L. McWilliams
M. Pitts
T. A. Rogers
R. C. Sallash
D. G. Shelton
R. R. Stevenson, Chair
J. DeKleine, Vice Chair
E. Suarez, Staff Secretary
G. Gobbi
S. M. Goodwin
J. W. Highlands
K. A. Huber
J. C. Krane
M. A. Lockwood
R. P. McIntyre
M. R. Minick
L. M. Plante
H. B. Prasse
T. E. Quaka
C. T. Smith
D. M. Vickery
C. S. Withers
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
COMMITTEE ON NUCLEAR CERTIFICATION (CNC)
Subgroup on Fabrication, Inspection, and Continued Service
(BPV XII)
No fu
Power boiler — a boiler in which steam or other vapor is generated at a pressure of more than 15 psi (100 kPa) for use external to itself.
Electric boiler — a power boiler or a high-temperature water boiler in which the source of heat is electricity.
3
Miniature boiler — a power boiler or a high-temperature water boiler in which the limits specified in PMB-2 are not exceeded.
4
High-temperature water boiler — a water boiler intended for operation at pressures in excess of 160 psi (1.1 MPa) and/or temperatures in
excess of 250°F (120°C).
5
Heat recovery steam generator (HRSG) — a boiler that has as its principal source of thermal energy a hot gas stream having high-ramp
rates and temperatures such as the exhaust of a gas turbine.
6
Solar receiver steam generator — a boiler system in which water is converted to steam using solar energy as the principal source of thermal energy. The solar energy is typically concentrated onto the solar receiver through the use of an array of mirrors that focuses solar radiation
on the heat transfer surface.
7
Fired pressure vessel — reheaters, isolable superheaters, economizers located outside the limits of boiler external piping, and nonintegral
separately fired superheaters.
8
Certification Designator (Designator) — the symbol used in conjunction with the Certification Mark for the scope of activity described in a
Manufacturer’s Certificate of Authorization.
9
Certification Mark — an ASME symbol identifying a product as meeting Code requirements.
1
2
xxxix
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
This Code covers rules for construction of power boilers,1 electric boilers,2 miniature boilers, 3 high-temperature
water boilers,4 heat recovery steam generators,5 solar receiver steam generators,6 and certain fired pressure vessels7
to be used in stationary service and includes those power boilers used in locomotive, portable, and traction service. Reference to a paragraph includes all the subparagraphs and subdivisions under that paragraph.
The Code does not contain rules to cover all details of design and construction. Where complete details are not given, it
is intended that the manufacturer, subject to the acceptance of the Authorized Inspector, shall provide details of design
and construction which will be as safe as otherwise provided by the rules in the Code.
The scope of jurisdiction of Section I applies to the boiler proper and to the boiler external piping.
Superheaters, economizers, and other pressure parts connected directly to the boiler without intervening valves shall
be considered as parts of the boiler proper, and their construction shall conform to Section I rules.
Boiler external piping shall be considered as that piping which begins where the boiler proper or isolable superheater
or isolable economizer terminates at:
(a) the first circumferential joint for welding end connections; or
(b) the face of the first flange in bolted flanged connections; or
(c) the first threaded joint in that type of connection; and which extends up to and including the valve or valves required by this Code.
ASME Code Certification (including Data Forms and stamping the Certification Mark with appropriate Designator8),
and/or inspection by the Authorized Inspector, when required by this Code, is required for the boiler proper and the
boiler external piping.
Construction rules for materials, design, fabrication, installation, and testing of the boiler external piping are contained in ASME B31.1, Power Piping. Piping beyond the valve or valves required by Section I is not within the scope
of Section I, and it is not the intent that the Certification Mark9 be applied to such piping or any other piping.
The material for forced-circulation boilers, boilers with no fixed steam and water line, and high-temperature water
boilers shall conform to the requirements of the Code. All other requirements shall also be met except where they relate
to special features of construction made necessary in boilers of these types, and to accessories that are manifestly not
needed or used in connection with such boilers, such as water gages and water columns.
Reheaters receiving steam which has passed through part of a turbine or other prime mover and separately fired
steam superheaters which are not integral with the boiler are considered fired pressure vessels and their construction
shall comply with Code requirements for superheaters, including safety devices. Piping between the reheater connections and the turbine or other prime mover is not within the scope of the Code. Steam piping to the inlet connections
and from the outlet connections of nonintegral separately fired superheaters is not within the scope of this Code.
Economizers that are located outside the limits of boiler external piping are considered fired pressure vessels. Piping
to and from the connections to such economizers is not within the scope of this Code.
A pressure vessel in which steam is generated by the application of heat resulting from the combustion of fuel (solid,
liquid, or gaseous) or from solar radiation shall be classed as a fired steam boiler.
ð15Þ
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
PREAMBLE
No fu
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
xl
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
Unfired pressure vessels in which steam is generated shall be classed as unfired steam boilers with the following
exceptions:
(a) vessels known as evaporators or heat exchangers
(b) vessels in which steam is generated by the use of heat resulting from operation of a processing system containing a
number of pressure vessels such as used in the manufacture of chemical and petroleum products
Unfired steam boilers shall be constructed under the provisions of Section I or Section VIII.
Expansion tanks connected to high-temperature water boilers without intervening valves shall be constructed to the
requirements of Section I or Section VIII.
A pressure vessel in which an organic fluid is vaporized by the application of heat resulting from the combustion of
fuel (solid, liquid, or gaseous) or from solar radiation shall be constructed under the provisions of Section I. Vessels in
which vapor is generated incidental to the operation of a processing system, containing a number of pressure vessels
such as used in chemical and petroleum manufacture, are not covered by the rules of Section I.
No fu
After publication of the 2015 Edition, Errata to the BPV Code may be posted on the ASME Web site to provide corrections
to incorrectly published items, or to correct typographical or grammatical errors in the BPV Code. Such Errata shall be
used on the date posted.
Information regarding Special Notices and Errata is published by ASME at http://go.asme.org/BPVCerrata.
Changes given below are identified on the pages by a margin note, (15), placed next to the affected area.
The Record Numbers listed below are explained in more detail in “List of Changes in Record Number Order” following
this Summary of Changes.
Page
Location
Change (Record Number)
List of Sections
Revised
xvii
Foreword
(1) Revised
(2) New footnote added by errata (13-860)
xx
Submittal of Technical
Inquiries to the Boiler
and Pressure Vessel
Standards Committees
In last line of 6(a), URL revised
xxii
Personnel
Updated
xxxix
Preamble
Revised (12-1445, 14-337)
2
PG-5.5
In second sentence, cross-reference to PFE-4 added (12-1445)
3
PG-6.1
Reference to SA-202 deleted (13-318)
5
PG-9.3
Second sentence revised (14-1019)
7
PG-11
Revised in its entirety (10-1780)
11
PG-19
In Endnote 3 (formerly Endnote 8), cross-reference to A-370 revised
to A-205 (14-606)
12
Table PG-19
(1) Entries for UNS Nos. S30432 and N08811 added (13-120,
13-1039)
(2) Note (2) revised (13-708)
14
PG-22.2
Cross-reference to PW-43 revised to PG-56 (12-1572)
15
PG-25.2.1.1
Revised (12-1117)
15
PG-25.2.1.2.1
Last sentence revised (12-1117)
16
PG-25.2.2.2
First paragraph revised (12-1117)
17
Table PG-26
Revised (12-2087, 13-1474)
19
PG-27.2.3
Cross-reference to A-125 revised to A-317 (14-1295)
21
PG-27.4.6
In in-text table, entry for N06025 added (13-1475)
22
PG-28.3.1
Last two sentences added (14-1269)
24
PG-29.7
In first sentence, cross-reference to PG-27.2.2 revised to “PG-27 or
A-317” (14-1296)
xli
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
xv
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
SUMMARY OF CHANGES
No fu
Location
Change (Record Number)
Figure PG-31
Revised editorially
25
PG-31.2
In definition of S, units of measure deleted (13-1568)
27
PG-31.3.2
In eq. (2), h g revised to h G (13-1676)
27
PG-31.3.3
In eq. (5), h g revised to h G (13-1676)
27
PG-31.4
In twelfth paragraph, in equations, h g revised to h G (13-1676)
30
PG-32.3.3
Third sentence revised (13-1409)
31
Figure PG-33.1
On left side of Figure, equations for A 1 corrected by errata (14-2465)
30
PG-33.3
Definitions of t and t n revised (13-850)
36
PG-42
Title and PG-42.1 revised (10-1780)
41
PG-48.1
Added (14-1179)
41
PG-52.1
Revised (12-1573)
41
PG-52.3
Cross-reference to A-125 deleted (14-1295)
44
PG-52.6
Deleted (12-1573)
44
PG-56
(1) Former PW-43 revised and redesignated as PG-56 (12-1572)
(2) PG-56.2 (formerly PW-43.2) corrected by errata to renumber
Steps (14-424)
50
Figure PG-58.3.1(b)
Revised (12-1445)
56
PG-60.1.2
In first and second paragraphs, first sentence revised (14-323)
62
PG-67.5
First paragraph revised (10-1776)
63
Table PG-67.5
Former Table PG-69.2.3 redesignated as Table PG-67.5 (10-1776)
65
Table PG-67.5M
Former Table PG-69.2.3M redesignated as Table PG-67.5M
(10-1776)
64
PG-68.7
Cross-reference to Table PG-68.7M added (10-1776)
66
PG-69.2
Revised (10-1776)
68
PG-69.2.3
In subpara. (b), last two paragraphs deleted (10-1776)
71
PG-69.3
Revised in its entirety (10-1776)
71
PG-69.4
First sentence revised (10-1776)
81
PG-105
Revised in its entirety (12-1617, 12-1796)
82
Figure PG-105.1
Revised (12-1617)
84
PG-106.8.3
New PG-106.8.3 added and former PG-106.8.3 redesignated as
PG-106.8.4 (12-1617)
86
PG-110
Subparagraph (e)(2) revised (10-1776, 11-1459)
87
PG-112.1
Revised (12-1194, 13-1964, 14-1074)
87
PG-112.2
(1) PG-112.2, PG-112.2.1, PG-112.2.2, PG-112.2.4, and PG-112.2.8
revised (13-1964, 14-1074)
(2) PG-112.2.9 added (13-1964, 14-1074)
89
PG-112.3
In second paragraph, first and last sentences revised (13-1964,
14-1074)
xlii
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
26
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
Page
No fu
Location
Change (Record Number)
PG-112.6
First sentence revised (14-1074)
89
PG-113.1
In first sentence, reference to Form PL-1 added (13-1964)
90
PG-113.3
In first sentence, reference to Form PL-1 added (13-1964)
92
PW-9.3
(1) Second paragraph of PW-9.3 and first paragraph of PW-9.3.1
revised (13-287)
(2) PW-9.3.3 added (13-287)
92
Figure PW-9.3.1
Former Figure PW-9.1 revised and redesignated as Figure PW-9.3.1
(13-287)
94
Figure PW-9.3.3
Added (13-287)
93
PW-9.4
Revised (13-287)
95
Figure PW-9.4
Former Figure PW-9.2 redesignated as Figure PW-9.4 (13-287)
95
Table PW-11
(1) General Notes (k) and (l) revised (13-103)
(2) General Note (n) added (13-103)
98
Figure PW-16.1
(1) Illustration (z-2) corrected by errata (13-1199)
(2) Revised editorially
103
PW-16.8
Added (11-1180)
104
Figure PW-16.8
Added (11-1180)
109
PW-36.3
Added (11-1208)
111
Table PW-39-1
(1) In General Note (a)(1), last sentence added (13-675)
(2) General Note (a)(2)(a) revised (13-316)
118
Table PW-39-9
Heading of second column revised (13-682)
119
Table PW-39-12
Minimum Holding Temperature entry for UNS No. N06617 revised
(13-1039)
120
Table PW-39-13
Revised (13-1039)
124
PW-43
Revised and redesignated as PG-56 (12-1572)
124
PW-44.1
In second paragraph, last sentence, cross-reference to A-360 revised
to A-207 (14-606)
146
Part PL
Added (12-459)
173
PWT-12
Revised in its entirety (13-103)
173
Figure PWT-12.1
Deleted (13-103)
173
Figure PWT-12.2
Deleted (13-103)
175
PFT-12.1.1
Last sentence added (14-1019)
177
PFT-17.4
Revised (14-1269)
179
PFT-20.3
Revised (12-2279)
193
PEB-8.3
Revised (13-1962)
198
Part PFE
Added (12-1445)
199
PHRSG-3.3
Second sentence revised (13-1563)
xliii
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
89
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
Page
No fu
Location
Change (Record Number)
Figure A-8
(1) Illustration (g) replaced by illustrations (g-1) and (g-2)
(14-1179)
(2) Revised editorially
242
A-70
Revised in its entirety (12-1052)
243
Figure A-70.1
Former Figure A-70 revised and redesignated as Figure A-70.1
(12-1052)
245
Figure A-70.2
Added (12-1052)
246
A-71
Cross-references to former PW-43 revised to PG-56 (12-1572)
247
A-73.1
Cross-references to former PW-43 revised to PG-56 (12-1572)
248
A-74
Cross-references to former PW-43 revised to PG-56 (12-1572)
252
A-125
Deleted (14-1295)
253
A-250.2.3
Revised (12-2086)
255
Figure A-250.3.6-1
Revised editorially
256
Figure A-250.3.6-2
Revised editorially
256
Figure A-250.3.6-3
Revised editorially
257
Figure A-250.3.6-4
Revised editorially
258
Figure A-250.3.6-5
Revised editorially
259
Figure A-250.3.6-6
Revised editorially
255
A-260.1
Last sentence revised (14-1071)
257
A-270.1
Last sentence revised (14-1071)
260
A-302.3
Second paragraph added (12-1617)
263
A-350
(1) In first paragraph, first sentence, reference to Form PL-1 added
(14-1074)
(2) A-350.1 added (12-1194)
265
Form P-2
Revised (12-1194)
269
Form P-2A
Revised (12-1194)
274
Form P-2B
Revised (12-1194)
278
Form P-3
Revised (12-1194)
283
Form P-3A
Revised (12-1194)
286
Form P-4
Revised (12-1194, 12-1617)
288
Table A-354
In item (33), last sentence added (12-1617)
289
Form P-4A
Revised (12-1194)
292
Form P-4B
Revised (12-1194)
294
Form P-5
Revised (12-1194)
297
Form P-7
Revised (12-1194)
299
Table A-356
Items (17) and (19) revised (10-1776, 14-1223)
301
Form P-8
Revised (12-1194)
303
Form PL-1
Added (13-1964)
xliv
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
221
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
Page
No fu
Location
Change (Record Number)
307
Table A-359
Added (13-1964)
308
Table A-360
References updated (12-1117, 12-1796, 13-972, 13-973, 13-974,
14-415, 14-416, 14-417, 14-418, 14-419, 14-422, 14-423)
309
Table A-370
Revised (12-1617)
xlv
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
NOTE: Volume 63 of the Interpretations to Section I of the ASME Boiler and Pressure Vessel Code follows the last page of
Section I.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
Page
No fu
Record Number
10-1776
10-1780
11-1180
11-1208
11-1459
12-459
12-1052
12-1117
12-1194
12-1445
12-1572
12-1573
12-1617
12-1796
13-120
13-287
13-316
13-318
13-675
13-682
13-708
13-850
13-860
In PG-67.5, PG-68.7, PG-69.2, PG-69.2.3, PG-69.3, and PG-69.4, standardized the application of
the supercritical correction factor, the Napier correction factor, and capacity certification methods and marking for both pressure relief valves and power-actuated pressure-relieving valves.
Also moved the supercritical correction factor to PG-67.
Replaced and reorganized PG-11 and PG-42.1.
Added PW-16.8 and Figure PW-16.8.
Added PW-36.3.
Revised PG-110(e)(2) by adding “for power-actuated pressure-relieving valves per PG-69.4, or
for pressure relief valves” prior to “for superheated.”
Added Part PL, Requirements for Locomotive Boilers.
Revised example problem A-70 into two example problems, as follows:
(a) A-70.1, in which the opening is exempted from compensation calculations
(b) A-70.2, in which the opening is not exempted from compensation calculations
Updated Table A-360 to reference ASTM NDE standards E125-63 (R2013), E186-10, E280-10,
and E446-10. In the titles of ASTM E186-10 and ASTM E446-10, changed “51 mm” to
“50.8 mm,” matching revisions ASTM made to titles of the standards. Revised PG-25 to delete
the title of the ASTM standards and refer to them only by number.
Revised PG-112.1.
Added Part PFE, Requirements for Feedwater Heaters.
Redesignated PW-43 as new PG-56. Added alternate design procedures to new PG-56.
Combined the text formerly in PG-52.6 with the text in PG-52.1.
Revised PG-105.1, PG-105.3, PG-105.4, A-302.3, Form P-4, and Tables A-354 and A-370, and
added new PG-106.8.3 to address a new Certificate of Authorization for organizations fabricating parts without design responsibility.
Revised PG-105 and Table A-360 to adopt the ASME CA-1 Standard to establish uniform requirements for conformity assessment.
Revised A-250.2.3.
Added weld strength reduction factors for nickel base alloys to Table PG-26.
Revised PFT-20.3 to describe alternate weld joint geometry.
Added to Table PW-11 an exemption from volumetric examination in PWT-12 and PFT-21 for
watertube boilers. In PWT-12, added the term waterleg and added a cross-reference to PFT-21
for permitted construction of box-type headers and waterlegs. Deleted PWT-12.1 and
PWT-12.2.
Revised Table PG-19 to include UNS No. S30432, applying the rules for TP347H.
Added PW-9.3.3 and Figure PW-9.3.3. Revised PW-9.3 and PW-9.3.1 accordingly, and replaced
existing Figure PW-9.1 with new Figure PW-9.3.1. (The dashed head lines in the existing Figure
PW-9.1 were removed in the new Figure PW-9.3.1, since head attachment details are shown in
the new Figure PW-9.3.3.) Redesignated existing Figure PW-9.2 as Figure PW-9.4, to correlate
with PW-9.4.
Revised Table PW-39-1, General Note (a)(2)(a).
Deleted reference to SA-202 material specification from PG-6.
Revised Table PW-39-1, General Note (a)(1) to exclude the diameter of welded stays from establishing the requirement for preheat.
Editorially revised Table PW-39-9.
Amended Table PG-19, Note (2) to include 310HCbN. Note (2) reads as follows: “While minimum heat-treatment temperatures are specified, it is recommended that the heat-treatment
temperature range be limited to 150°F (85°C) above that minimum, and 250°F (140°C) for
310HCbN, 347, 347H, 348, and 348H.”
Revised the definitions of t and t n in PG-33.3.
In the Foreword, the subtitle has been deleted and replaced with an ANSI disclaimer as a footnote.
xlvi
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
12-2086
12-2087
12-2279
13-103
Change
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
LIST OF CHANGES IN RECORD NUMBER ORDER
No fu
13-972
13-973
13-974
13-1039
13-1199
13-1409
13-1474
13-1475
13-1563
13-1568
13-1676
13-1962
13-1964
14-323
14-337
14-415
14-416
14-418
14-419
14-422
Revised Table A-360 to reference ASME B16.5-2013.
Revised Table A-360 to reference ASME B16.34-2013.
Revised Table A-360 to reference ASME B16.9-2012.
Revised Table PG-19 to list alloy 800HT. Revised the minimum holding temperature provided
in Table PW-39-12. Added PWHT requirements for alloys 800H (UNS No. N08810) and 800HT
(UNS No. N08811) to Table PW-39-13.
Errata correction. See Summary for Changes for details.
Modified PG-32.3.3 to clarify the parenthetical sentence regarding suggested compensation
limits.
In Table PG-26, added reference to Note (11) to entry for CSEF (subcrit.).
In PG-27.4.6, inserted y value line in the in-text table.
In PHRSG-3.3, changed the wording at the beginning of second sentence from “The MAWP of
the piping” to “The design pressure of the piping.”
In PG-31.2, removed the units of measure for the term S.
In PG-31.3.2, PG-31.3.3, and PG-31.4, changed h g to h G .
Modified PEB-8.3 to allow electric element support plates to be constructed by “U” Certificate
Holders or as miscellaneous pressure parts.
Adopted new Form PL-1 and Table A-359, and revised PG-112 and PG-113 to explain the use of
the form.
Revised PG-60.1.2 to clarify that the requirement for isolation and drain valves applies to all
externally mounted level-sensing devices.
Added solar as a fuel source and the definition of solar receiver steam generators to the Preamble.
Revised Table A-360 to reference ASME B1.20.1-2013. The referenced standard had a major
update. The entire standard was changed significantly and substantively from the 1983 edition.
The changes are highlighted in the Foreword of the standard. No changes were noted that
would affect Section I.
Revised Table A-360 to reference ASME B16.5-2013. In this 2013 edition, section 7 was revised
and now requires threads and gaging practices to be as per and identical with those of ASME
B1.20.1 and other ASME B16 standards.
Revised Table A-360 to reference ASME B16.20-2012. The changes to ASME B16.20 are as follows:
(a) A number of illustrations were removed from tables and added as figures earlier in the
document. There has been no change in the content of the figures.
(b) A new type of gasket has been added, “grooved metal gasket with covering layers.” This
resulted in a new section 5 covering the gasket, and the additions of Figures 3 and 4, Tables 26
through 30, and Tables I-15 through I-17.
(c) Table 19, “Color Coding and Abbreviations for Spiral-Wound Gasket Materials,” has added
alloy 800 under “Metallic Winding Materials,” and added vermiculite and phlogpite under “Nonmetallic Filler Materials.” Asbestos and mica-graphite have been removed from the filler materials list. All of the other changes are editorial in nature.
Revised Table A-360 to reference ASME B16.25-2012.
Revised Table A-360 to reference the latest edition of ASME QAI-1.
Revised Table A-360 to reference ASME B18.1.2-1972 (R2011).
xlvii
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
14-417
Change
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
Record Number
No fu
14-423
14-424
14-606
14-1019
14-1071
14-1074
14-1179
14-1223
14-1269
14-1295
Revised Table A-360 to reference ASTM E8/E8M-13a. The following are changes in relation to
ASTM E8/E8M-11:
(a) replaced 3.1 Definitions with Definitions and Discussions
(b) added 3.1.2 common terms from Terminology E6
(c) reformatted 3.1.3 by adding Discussions
(d) reformatted 3.1.4 elongation after fracture
(e) added the following definitions: 3.1.7 reduction of area, 3.1.8 tensile strength, and 3.1.12
yield strength
(f) reformatted 3.1.11 yield point elongation
(g) added 3.2.1 referee test
(h) added Note 32 in summary; it describes if the straight line portion of the stress strain
curve does not go through the origin, offsets and extension will be from the portion of the curve
that intersects the strain axis.
Errata correction. See Summary of Changes for details.
Revised PW-44.1 to reference A-207 instead of A-360. Revised Endnote 8 to reference A-205
instead of A-370.
Added exception to PFT-12.1.1 to the requirement in PG-9.3 that copper pipe or tube be a minimum of ASME Schedule 40. Revised PG-9.3 to refer to the exception added in PFT-12.1.1.
Revised A-260.1 and A-270.1 to clarify the requirement for demonstration of NDE procedures,
by adding “demonstrated to the satisfaction of the Inspector,” and adding a cross-reference to
Section V, Subsection A, Article 1, T-150(a) or T-150(b).
Revised PG-112.1, PG-112.2, PG-112.3, PG-112.6, and A-350 to clarify guidance for use of Data
Report Forms.
Reinstated PG-48.1. Replaced Figure A-8, illustration (g) with new illustrations (g-1) and (g-2).
In Table A-356, added a metric equivalent value missing in line (19).
Revised PG-28.3.1 to clarify that Section I contains rules for stiffener rings for furnaces only.
Revised PFT-17.4 description of required weld attaching stiffening rings to furnaces.
In PG-27.2.3, replaced cross-reference to A-125 with reference to A-317. In PG-52.3, deleted
cross-reference to A-125. Deleted A-125 in its entirety.
In PG-29.7, replaced cross-reference to PG-27.2.2 with “PG-27 or A-317.”
Errata correction. See Summary of Changes for details.
xlviii
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
14-1296
14-2465
Change
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
Record Number
No fu
There have been structural and stylistic changes to BPVC, starting with the 2011 Addenda, that should be noted to aid
navigating the contents. The following is an overview of the changes:
Subparagraph Breakdowns/Nested Lists Hierarchy
•
•
•
•
•
•
First-level breakdowns are designated as (a), (b), (c), etc., as in the past.
Second-level breakdowns are designated as (1), (2), (3), etc., as in the past.
Third-level breakdowns are now designated as (-a), (-b), (-c), etc.
Fourth-level breakdowns are now designated as (-1), (-2), (-3), etc.
Fifth-level breakdowns are now designated as (+a), (+b), (+c), etc.
Sixth-level breakdowns are now designated as (+1), (+2), etc.
Footnotes
With the exception of those included in the front matter (roman-numbered pages), all footnotes are treated as endnotes. The endnotes are referenced in numeric order and appear at the end of each BPVC section/subsection.
Submittal of Technical Inquiries to the Boiler and Pressure Vessel Standards Committees
Submittal of Technical Inquiries to the Boiler and Pressure Vessel Standards Committees has been moved to the front
matter. This information now appears in all Boiler Code Sections (except for Code Case books).
It is our intention to establish cross-reference link functionality in the current edition and moving forward. To facilitate this, cross-reference style has changed. Cross-references within a subsection or subarticle will not include the designator/identifier of that subsection/subarticle. Examples follow:
• (Sub-)Paragraph Cross-References. The cross-references to subparagraph breakdowns will follow the hierarchy of
the designators under which the breakdown appears.
– If subparagraph (-a) appears in X.1(c)(1) and is referenced in X.1(c)(1), it will be referenced as (-a).
– If subparagraph (-a) appears in X.1(c)(1) but is referenced in X.1(c)(2), it will be referenced as (1)(-a).
– If subparagraph (-a) appears in X.1(c)(1) but is referenced in X.1(e)(1), it will be referenced as (c)(1)(-a).
– If subparagraph (-a) appears in X.1(c)(1) but is referenced in X.2(c)(2), it will be referenced as X.1(c)(1)(-a).
• Equation Cross-References. The cross-references to equations will follow the same logic. For example, if eq. (1) appears in X.1(a)(1) but is referenced in X.1(b), it will be referenced as eq. (a)(1)(1). If eq. (1) appears in X.1(a)(1) but
is referenced in a different subsection/subarticle/paragraph, it will be referenced as eq. X.1(a)(1)(1).
xlix
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Cross-References
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
CROSS-REFERENCING AND STYLISTIC CHANGES IN THE BOILER
AND PRESSURE VESSEL CODE
No fu
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
INTENTIONALLY LEFT BLANK
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
No fu
PART PG
GENERAL REQUIREMENTS FOR ALL METHODS OF
CONSTRUCTION
GENERAL
PG-1
such thermal fluid heaters may be constructed and
stamped in accordance with this Section, provided all applicable requirements are met.
SCOPE
The requirements of Part PG apply to power boilers
and high pressure, high‐temperature water boilers and
to parts and appurtenances thereto and shall be used in
conjunction with the specific requirements in the applicable Parts of this Section that pertain to the methods of
construction used.
PG-2
PG-3
REFERENCED STANDARDS
The Manufacturer shall establish the effective Code Edition, Addenda, and Code Cases for boilers and replacement parts in accordance with Mandatory Appendix VI.
Specific editions of standards referenced in this Section
are shown in Table A-360.
SERVICE LIMITATIONS
PG-2.1 The rules of this Section are applicable to the
following services:
(a) boilers in which steam or other vapor is generated
at a pressure of more than 15 psig (100 kPa) for use external to itself
(b) high‐temperature water boilers intended for operation at pressures exceeding 160 psig (1.1 MPa) and/or
temperatures exceeding 250°F (120°C)
PG-4
UNITS
PG-2.2 For services below those specified in PG-2.1
it is intended that rules of Section IV apply; however, boilers for such services may be constructed and stamped in
accordance with this Section provided all applicable requirements are met.
PG-2.3 Coil‐type hot water boilers where the water
can flash into steam when released directly to the atmosphere through a manually operated nozzle may be exempted from the rules of this Section provided the
following conditions are met:
(a) There is no drum, header, or other steam space.
(b) No steam is generated within the coil.
(c) Tubing outside diameter does not exceed 1 in.
(25 mm).
(d) Pipe size does not exceed NPS 3/4 (DN 20).
(e) Nominal water capacity does not exceed 6 gal
(23 L).
(f) Water temperature does not exceed 350°F (175°C).
(g) Adequate pressure relief valves and controls are
provided.
PG-2.4 The rules of this Section are not intended to
apply to thermal fluid heaters in which a fluid other than
water is heated by the application of heat resulting from
the combustion of solid, liquid, or gaseous fuel but in
which no vaporization of the fluid takes place; however,
1
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Either U.S. Customary, SI, or any local customary units
may be used to demonstrate compliance with all requirements of this edition (e.g., materials, design, fabrication,
examination, inspection, testing, certification, and overpressure protection).
In general, it is expected that a single system of units
shall be used for all aspects of design except where unfeasible or impractical. When components are manufactured
at different locations where local customary units are different than those used for the general design, the local
units may be used for the design and documentation of
that component. Similarly, for proprietary components
or those uniquely associated with a system of units different than that used for the general design, the alternate
units may be used for the design and documentation of
that component.
For any single equation, all variables shall be expressed
in a single system of units. When separate equations are
provided for U.S. Customary and SI units, those equations
must be executed using variables in the units associated
with the specific equation. Data expressed in other units
shall be converted to U.S. Customary or SI units for use
in these equations. The result obtained from execution
of these equations may be converted to other units.
Production, measurement and test equipment, drawings, welding procedure specifications, welding procedure and performance qualifications, and other
fabrication documents may be in U.S. Customary, SI, or local customary units in accordance with the fabricator’s
practice. When values shown in calculations and analysis,
fabrication documents or measurement and test equipment are in different units, any conversions necessary
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Material not completely identified with any approved
Code specifications may be used in the construction of
boilers under the conditions outlined in PG-10.
for verification of Code compliance, and to ensure that dimensional consistency is maintained, shall be in accordance with the following:
(a) Conversion factors shall be accurate to at least four
significant figures.
(b) The results of conversions of units shall be expressed to a minimum of three significant figures.
Conversion of units, using the precision specified above
shall be performed to ensure that dimensional consistency is maintained. Conversion factors between U.S. Customary and SI units may be found in A-391 through
A-393 of Nonmandatory Appendix A. Whenever local customary units are used, the Manufacturer shall provide the
source of the conversion factors which shall be subject to
verification and acceptance by the Authorized Inspector
or Certified Individual.
Material that has been manufactured and certified to
either the U.S. Customary or SI material specification
(e.g., SA-516M) may be used regardless of the unit system
used in design. Standard fittings (e.g., flanges, elbows,
etc.) that have been certified to either U.S. Customary or
SI units may be used regardless of the units system used
in design.
All entries on a Manufacturer’s Data Report and data
for Code‐required nameplate marking shall be in units
consistent with the fabrication drawings for the component using U.S. Customary, SI, or local customary units.
It is acceptable to show alternate units parenthetically.
Users of this Code are cautioned that the receiving jurisdiction should be contacted to ensure the units are
acceptable.
PG-5.4 Size Limits and Tolerances.
PG-5.4.1 Materials outside the limits of size or
thickness given in the title or scope clause of any specification in Section II may be used if the material is in compliance with the other requirements of the specification,
and no similar limitation is given in the rules for
construction.
PG-5.4.2 Pipe having a tolerance of ±1% on either
the O.D. or the I.D., rather than the tolerance specified in
the material specification, may be used, provided the material complies with all other requirements of the specifications. When used under external pressure, such pipe
shall be limited to a maximum of 24 in. (600 mm) in diameter. The pipe shall include the designation 1% O.D. or
1% I.D., as appropriate, in any required documentation
and marking of the material.
PG-5.5 The use of austenitic alloy steel is permitted ð15Þ
for boiler pressure parts that are steam touched in normal operation. Except as specifically provided in
PG-9.1.1, PG-12, PEB-5.3, and PFE-4, the use of such austenitic alloys for boiler pressure parts that are water
wetted in normal service is prohibited.1
PG-5.3 If, in the development of the art of boiler construction, it is desired to use materials other than those
herein described, data should be submitted to the Boiler
and Pressure Vessel Committee in accordance with the requirements of Section II, Part D, Mandatory Appendix 5.
PG-5.6.2 If during any phase of manufacturing or
erection of the component, any portion that does contain
a weld is heated above 1,445°F (785°C), then the requirements of Notes (3) and (4) of Table PW-39-5 for P-No.
15E, Group 1 Materials, shall apply for reheat treatment.
MATERIALS
PG-5
GENERAL
PG-5.1 Except as otherwise permitted in PG-8.2,
PG-8.3, PG-10, and PG-11, material subject to stress due
to pressure shall conform to one of the specifications given in Section II and shall be limited to those that are
listed in the Tables of Section II, Part D. The Manufacturer
shall ensure that the correct material has been received
and is properly identified before proceeding with construction (see A-302.4). Materials shall not be used at
temperatures above those for which stress values are limited, for Section I construction, in the Tables of Section II,
Part D. Specific additional requirements described in
PG-5 through PG-13 shall be met as applicable.
2
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-5.2 Material covered by specifications in Section
II is not restricted as to the method of production unless
so stated in the specification, and as long as the product
complies with the requirements of the specification.
PG-5.6 P-No. 15E, Group 1 Materials.
PG-5.6.1 If during any phase of manufacturing or
erection any portion of the component that does not contain a weld is heated to a temperature greater than
1,470°F (800°C), one of the following actions shall be
performed:
(a) The component shall be reaustenitized and retempered in its entirety in accordance with the specification
requirements.
(b) That portion of the component heated above
1,470°F (800°C), including the heat‐affected zone created
by the local heating, must be replaced or must be removed, reaustenitized, and retempered in accordance
with the specification requirements and then replaced
in the component.
(c) If the allowable stress values to be used are less
than or equal to those provided in Table 1A of Section
II, Part D for Grade 9 (e.g., SA-213 T9, SA-335 P9, or
equivalent product specifications) at the design temperature, then the requirements stated above may be waived,
provided that the portion of the component heated above
1,470°F (800°C) is retempered in accordance with the
specification requirements. The use of this provision shall
be noted on the Manufacturer’s Data Report.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PG-6
ð15Þ
PLATE
When cast iron is used as allowed in PG-11.1 for standard pressure parts, it shall conform to one of these
standards
ASME B16.1, Gray Iron Pipe Flanges and Flanged
Fittings
ASME B16.4, Cast Iron Threaded Fittings
Material conforming to ASTM A126 may be used subject to all requirements of the particular standard. Such
usage is subject also to all the requirements for the use
of cast iron given in PG-8.2 and other paragraphs of this
Section.
PG-6.1 Steel plates for any part of a boiler subject to
pressure, whether or not exposed to the fire or products
of combustion, shall be of pressure vessel quality in accordance with one of the following specifications:
SA-204, Pressure Vessel Plates, Alloy Steel,
Molybdenum
SA-240, (Type 405 only) Pressure Vessel Plates, Alloy
Steel (Ferritic Stainless), Chromium
SA-285, Pressure Vessel Plates, Carbon Steel, Low‐and
Intermediate‐Tensile Strength
SA-299, Pressur e Vessel Plates, Carbon Steel,
Manganese‐Silicon
SA-302, Pressure Vessel Plates, Alloy Steel, Manganese‐
Molybdenum and Manganese‐Molybdenum‐Nickel
SA-387, Pressure Vessel Plates, Alloy Steel,
Chromium‐Molybdenum
SA-515, Pressure Vessel Plates, Carbon Steel, for
Intermediate‐ and Higher‐Temperature Service
SA-516, Pressure Vessel Plates, Carbon Steel, for
Moderate‐ and Lower‐Temperature Service
SA/AS 1548, Fine Grained, Weldable Steel Plates for
Pressure Equipment
SA/EN‐10028‐2, Flat Products Made of Steels for Pressure Purposes
SA/GB 713, Steel Plates for Boilers and Pressure
Vessels
SA/JIS G3118, Carbon Steel Plates for Pressure Vessels
for Intermediate and Moderate Temperature Service
PG-8.2.2 Cast iron as designated in SA-278 may be
used for boiler and superheater connections under pressure, such as pipe fittings, water columns, valves and their
bonnets, for pressures up to 250 psi (1.7 MPa), provided
the steam temperature does not exceed 450°F (230°C).
PG-8.3 Cast Nodular Iron. Cast nodular iron as designated in SA-395 may be used for boiler and superheater connections under pressure, such as pipe fittings,
water columns, and valves and their bonnets, for pressures not to exceed 350 psi (2.5 MPa), provided the steam
temperature does not exceed 450°F (230°C).
PG-8.4 Nonferrous. Bronze castings shall conform to
SB-61, SB-62, and SB-148, and may be used only for the
following:
PG-8.4.1 For flanges and flanged or threaded fittings complying with the pressure and temperature requirements of ASME B16.15 or B16.24, except that such
fittings shall not be used where steel or other material
is specifically required. Threaded fittings shall not be
used where flanged types are specified.
FORGINGS
PG-7.1 Seamless steel drum forgings made in accordance with SA-266 for Carbon‐Steel and SA-336 for Alloy
Steel may be used for any part of a boiler for which pressure vessel quality is specified or permitted.
PG-8.4.1.1 For valves at allowable stress values
not to exceed those given in Section II, Part D, Subpart 1,
Table 1B, with maximum allowable temperatures of
550°F (290°C) for SB-61 and SB-148, and 406°F (208°C)
for SB-62.
PG-7.2 Forged flanges, fittings, nozzles, valves, and
other pressure parts of the boiler shall be of material that
conforms to one of the forging specifications as listed in
PG-9.
PG-7.3 Drums, shells, or domes may be of seamless
drawn construction, with or without integral heads, provided the material conforms to the requirements of the
Code for shell material.
PG-8
PG-8.4.1.2 For parts of pressure relief valves
subject to limitations of PG-73.3.4.
PG-9
CASTINGS
PIPES, TUBES, AND
PRESSURE-CONTAINING PARTS
Pipes, tubes, and pressure‐containing parts used in
boilers shall conform to one of the specifications listed
in this paragraph for which maximum allowable stresses
are given in Section II, Part D, Subpart 1, Tables 1A and
1B. The stress values given in these tables include the applicable joint efficiency factor for welded pipes and tubes.
Open‐hearth, electric furnace, or basic oxygen steel
shall be used for boiler pressure parts exposed to the fire
or products of combustion. When used for internal
PG-8.1 Except for the limited usage permitted by
PG-8.2 and PG-8.3, cast material used in the construction
of vessels and vessel parts shall conform to one of the specifications listed in PG-9 for which maximum allowable
stress values are given in Section II, Part D, Subpart 1,
Tables 1A and 1B. The allowable stress values shall be
multiplied by the applicable casting quality factor given
in PG-25 for all cast materials except cast iron.
3
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-7
PG-8.2 Cast Iron.
PG-8.2.1 Cast iron shall not be used for nozzles or
flanges attached directly to the boiler for any pressure or
temperature.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
pressure, the material stress and dimensions shall meet
the appropriate requirements of PG-27 and Part PW
and be in accordance with the following:
SA/EN 10216-2, Seamless Steel Tubes for Pressure
Purposes — Part 2: Technical Delivery Conditions for
Non-Alloy and Alloy Steel Tubes With Specified Elevated
Temperature Properties
SA/EN 10222-2, Steel Forgings for Pressure Purposes
— Part 2: Ferritic and Martensitic Steels With Specified
Elevated Temperature Properties
PG-9.1.1 Boiler parts on once‐through boilers shall
be any of the specifications listed in PG-9.1 or any of the
following:2
SB-407, Nickel‐Iron‐Chromium Alloy Seamless Pipe
and Tube
SB-408, Nickel‐Iron‐Chromium Alloy Rod and Bar
SB-409, Nickel‐Iron‐Chromium Alloy Plate, Sheet, and
Strip
SB-423, Nickel‐Iron‐Chromium-Molybdenum-Copper
Alloy Seamless Pipe and Tube
SB-424, Nickel‐Iron‐Chromium‐Molybdenum‐Copper
Alloy Plate, Sheet, and Strip
SB-425, Nickel‐Iron‐Chromium‐Molybdenum‐Copper
Alloy Rod and Bar
SB-515, Welded Nickel‐Iron‐Chromium Alloy Tubes
SB-564, Nickel Alloy Forgings
PG-9.1.2 Materials for use in connector piping or
tubing and the pressure chamber for remote water level‐
sensing devices, as referenced in PG-12.2, shall be one of
the specifications listed in PG-9.1 or one of the following:
SA-213, Seamless Ferritic and Austenitic Alloy-Steel
Boiler, Superheater, and Heat-Exchanger Tubes
SA-312, Seamless and Welded Austenitic Stainless Steel
Pipes
SB-163, Seamless Nickel and Nickel Alloy Condenser
and Heat-Exchanger Tubes
SB-167, Nickel‐Chromium‐Iron Alloys and Nickel–
Chromium–Cobalt Molybdenum Alloy Seamless Pipe and
Tube
SB-407, Nickel-Iron-Chromium Alloy Seamless Pipe
and Tube
SB-423, Nickel‐Iron‐Chromium-Molybdenum-Copper
Alloy Seamless Pipe and Tube
SB-515, Welded Nickel‐Iron‐Chromium Alloy Tubes
SB-516, Welded Nickel‐Chromium‐Iron Alloy Tubes
SB-517, Welded Nickel‐Chromium‐Iron Alloy Pipe
SB-619, Welded Nickel and Nickel‐Cobalt Alloy Pipe
SB-622, Seamless Nickel and Nickel‐Cobalt Alloy Pipe
and Tube
SB-626, Welded Nickel and Nickel‐Cobalt Alloy Tube
PG-9.2 Superheater parts shall be of any one of the
specifications listed in PG-9.1, PG-9.1.1, or one of the
following:
SA-182, Forged or Rolled Alloy and Stainless Steel Pipe
Flanges, Forged Fittings, and Valves and Parts for High‐
Temperature Service
SA-213, Seamless Ferritic and Austenitic Alloy-Steel
Boiler, Superheater, and Heat-Exchanger Tubes
4
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-9.1 Boiler parts shall be of the following specifications only:
SA-53, Pipe, Steel, Black and Hot-Dipped, Zinc-Coated,
Welded and Seamless (excluding galvanized)
SA-105, Carbon Steel Forgings for Piping Applications
SA-106, Seamless Carbon Steel Pipe for High‐
Temperature Service
SA-178, Electric‐Resistance‐Welded Carbon Steel and
Carbon-Manganese Steel Boiler and Superheater Tubes
SA-181, Carbon Steel Forgings, for General-Purpose
Piping
SA-182, Forged or Rolled Alloy‐Steel Pipe Flanges,
Forged Fittings, and Valves and Parts for High‐
Temperature Service (ferritic only)
SA-192, Seamless Carbon Steel Boiler Tubes for High
Pressure Service
SA-209, Seamless Carbon‐Molybdenum Alloy‐Steel
Boiler and Superheater Tubes
SA-210, Seamless Medium-Carbon Steel Boiler and Superheater Tubes
SA-213, Seamless Ferritic and Austenitic Alloy‐Steel
Boiler, Superheater, and Heat Exchanger Tubes (ferritic
only)
SA-216, Steel Castings, Carbon, Suitable for Fusion
Welding for High‐Temperature Service
SA-217, Steel Castings, Martensitic Stainless and Alloy,
for Pressure‐Containing Parts, Suitable for High‐
Temperature Service
SA-234, Pipe Fittings of Wrought Carbon Steel and Alloy Steel for Moderate and High-Temperature Service
SA-250, Electric‐Resistance‐Welded Ferritic Alloy‐Steel
Boiler and Superheater Tubes
SA-266, Carbon Steel Forgings for Pressure Vessel
Components
SA-268, Seamless and Welded Ferritic and Martensitic
Stainless Steel Tubing for General Service
SA-333, Seamless and Welded Steel Pipe for Low‐
Temperature Service
SA-335, Seamless Ferritic Alloy Steel Pipe for High‐
Temperature Service
SA-336, Alloy Steel Forgings for Pressure and HighTemperature Parts
SA-350, Carbon and Low-Alloy Steel Forgings Requiring
Notch Toughness Testing for Piping Components
SA-423, Seamless and Electric-Welded Low Alloy Steel
Tubes
SA-660, Centrifugally Cast Carbon Steel Pipe for High‐
Temperature Service
SA-731, Seamless, Welded Ferritic, and Martensitic
Stainless Steel Pipe
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
SB-575, Low‐Carbon Nickel‐Molybdenum‐Chromium,
Low‐Carbon Nickel‐Chromium‐Molybdenum, Low‐
Carbon Nickel‐Chromium‐Molybdenum‐Copper, Low‐
Carbon Nickel‐Chromium‐Molybdenum‐Tantalum, and
Low‐Carbon Nickel‐Chromium‐Molybdenum‐Tungsten
Alloy Plate, Sheet, and Strip
SB-619, Welded Nickel and Nickel‐Cobalt Alloy Pipe
SB-622, Seamless Nickel and Nickel‐Cobalt Alloy Pipe
and Tube
SB-626, Welded Nickel and Nickel‐Cobalt Alloy Tube
PG-9.3 Copper or copper alloy pipe or tubes shall not ð15Þ
be used in the boiler proper for any service where the
temperature exceeds 406°F (208°C). Except as provided
in PFT-12.1.1, copper and copper alloys shall be seamless,
having a thickness not less than ASME Schedule 40 standard pipe, and shall comply to one of the following specifications: SB-42, Seamless Copper Pipe, Standard Sizes;
SB-43, Seamless Red Brass Pipe, Standard Sizes; SB-75,
Seamless Copper Tube; or SB-111, Copper and Copper‐
Alloy Seamless Condenser Tubes and Ferrule Stock.
PG-9.4 Bimetallic tubes, having a core of an acceptable boiler and superheater material, and having an external cladding of another metal alloy, may be used provided
the requirements of PG-27.2.1.5 are met. In applying the
rules of PG-27.2.1, tubes that are diffusion coated shall
not be permitted to include the strength of the clad. The
permissible variation in wall thickness tolerance of
SA-450 or SB-163, as applicable, shall apply to the total
wall thickness. The thickness and over and undertolerances of the cladding shall be included in the ordering information. Marking of the bimetallic tubular product shall
meet the specification requirements of the core material,
but shall also suitably identify the cladding alloy.
PG-9.5 ERW products shall be limited to a maximum
thickness of 1/2 in. (13 mm) for internal pressure applications. For external pressure applications, ERW products
shall be limited to a maximum thickness of 1/2 in.
(13 mm) and a maximum size of NPS 24 (DN 600). The
thickness and diameter limitations noted above shall be
within tolerances stated by the product material
specification.
PG-9.6 In addition to other materials permitted by
this Section, instrument wells may be fabricated from
one of the following titanium alloys:
(a) SB-265, titanium and titanium alloy strip, sheet, and
plate
(b) SB-338, seamless and welded titanium and titanium
alloy tubes for condensers and heat exchangers
(c) SB-348, titanium and titanium alloy bars and billets
(d) SB-861, titanium and titanium alloy seamless pipe
(e) SB-862, titanium and titanium alloy welded pipe
5
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
SA-240, Chromium and Chromium-Nickel Stainless
Steel Plate, Sheet, and Strip for Pressure Vessels and for
General Applications
SA-249, Welded Austenitic Steel Boiler, Superheater,
Heat-Exchanger, and Condenser Tubes
SA-312, Seamless and Welded Austenitic Stainless Steel
Pipes
SA-351, Castings, Austenitic, Austenitic-Ferritic (Duplex) for Pressure-Containing Parts (Duplex excluded)
SA-369, Carbon and Ferritic Alloy Steel Forged and
Bored Pipe for High‐Temperature Service
SA-376, Seamless Austenitic Steel Pipe for High‐
Temperature Central‐Station Service
SA-479, Stainless Steel Bars and Shapes for Use in Boilers and Other Pressure Vessels
SA-965, Steel Forgings, Austenitic, for Pressure and
High Temperature Parts
SA/JIS G 4303, Specification for Stainless Steel Bars
SB-163, Seamless Nickel and Nickel Alloy Condenser
and Heat Exchanger Tubes
SB-166, Nickel‐Chromium Iron Alloys and Nickel‐
Chromium‐Cobalt‐Molybdenum Alloy Rod, Bar, and Wire
SB-167, Nickel‐Chromium Iron Alloys and NickelChromium-Cobalt-Molybdenum Alloy Seamless Pipe and
Tube
SB-168, Nickel‐Chromium Iron Alloys and Nickel‐
Chromium‐Cobalt‐Molybdenum Alloy Plate, Sheet, and
Strip
SB-366, Factory‐Made Wrought Nickel and Nickel Alloy
Fittings
SB-435, N06230 Plate, Sheet, and Strip
SB-443, Nickel-Chromium-Molybdenum-Columbium
Alloy Plate, Sheet, and Strip
SB-444, Nickel-Chromium-Molybdenum-Columbium
Alloy Pipe and Tube
SB-446, Nickel-Chromium-Molybdenum-Columbium
Alloy Rod and Bar
SB-462, Forged or Rolled Nickel Alloy Pipe Flanges,
Forged Fittings, and Valves and Parts for Corrosive, High‐
Temperature Service
SB-511, Nickel-Iron-Chromium-Silicon Alloy Bars and
Shapes
SB-516, Welded Nickel‐Chromium‐Iron Alloy Tubes
SB-517, Welded Nickel‐Chromium‐Iron Alloy Pipe
SB-535, Nickel-Iron-Chromium-Silicon Alloys Seamless
Pipe and Tube
SB-536, Nickel-Iron-Chromium-Silicon Alloys Plate,
Sheet, and Strip
SB-572, Nickel‐Molybdenum‐Chromium‐Iron Alloy Rod
SB-574, Low‐Carbon Nickel‐Molybdenum‐Chromium,
Low‐Carbon Nickel‐Chromium‐Molybdenum, Low‐
Carbon Nickel‐Molybdenum‐Chromium‐Tantalum, Low‐
Carbon Nickel‐Chromium‐Molybdenum‐Copper, and
Low‐Carbon Nickel‐Chromium‐Molybdenum‐Tungsten
Alloy Rod
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PG-10.1.1.4 The material, and the Certificate of
Compliance or the Material Test Report have been identified with the designation of the specification to which the
material is recertified and with the notation “Certified per
PG-10.”
PG-9.7 In addition to other materials permitted by
this Section, the following materials are permitted only
for use in economizers or feedwater heaters and associated piping:
(a) SA-182, Forged or Rolled Alloy‐Steel Pipe Flanges,
Forged Fittings, and Valves and Parts for High‐
Temperature Pressure Service (S31803 only)
(b) SA-240, Pressure Vessel Plate, Alloy Steel (Ferritic
Stainless), Chromium (S31803 only)
(c) SA-479, Stainless Steel Bars and Shapes (S31803
only)
(d) SA-789, Seamless and Welded Ferritic Austenitic
Stainless Steel Tubing (S31803 only)
(e) SA-790, Seamless and Welded Ferritic Austenitic
Stainless Steel Pipe (S31803 only)
(f) SA-815, Wrought Ferritic, Ferritic Austenitic, and
Martensitic Stainless Steel Piping Fittings (S31803 only)
PG-10
PG-10.1.2
manufacturer.
Recertification by the boiler or part
PG-10.1.2.1 A copy of the certification by the
material manufacturer of the chemical analysis required
by the permitted specification, with documentation showing the requirements to which the material was produced
and purchased, which demonstrates that there is no conflict with the requirements of the permitted specification,
is available to the Inspector.
PG-10.1.2.2 For applications in which the maximum allowable stresses are subject to a note of Section II,
Part D, Subpart 1, Table 1A, requiring the use of killed
steel, documentation is available to the Inspector that establishes that the material is a killed steel.
MATERIAL IDENTIFIED WITH OR
PRODUCED TO A SPECIFICATION NOT
PERMITTED BY THIS SECTION, AND
MATERIAL NOT FULLY IDENTIFIED
PG-10.1.2.3 Documentation is available to the
Inspector that demonstrates that the metallurgical structure, mechanical property, and hardness requirements of
the permitted specification have been met.
PG-10.1.2.4 For material recertified to a permitted specification that requires a fine austenitic grain
size or that requires that a fine grain practice be used during melting, documentation is available to the Inspector
that demonstrates that the heat treatment requirements
of the permitted specification have been met, or will be
met during fabrication.
PG-10.1.1 Recertification by an organization other
than the boiler or part manufacturer:
PG-10.1.2.5 The material has marking, acceptable to the Inspector, for identification to the
documentation.
PG-10.1.1.1 All requirements, including but not
limited to, melting method, melting practice, deoxidation,
quality, and heat treatment, of the specification permitted
by this Section, to which the material is to be recertified,
have been demonstrated to have been met.
PG-10.1.2.6 When the conformance of the material with the permitted specification has been established,
the material has been marked as required by the permitted specification.
PG-10.1.1.2 A copy of the certification by the
material manufacturer of the chemical analysis required
by the permitted specification, with documentation showing the requirements to which the material was produced
and purchased, and which demonstrates that there is no
conflict with the requirements of the permitted specification, has been furnished to the boiler or part
manufacturer.
PG-10.2 Material Identified to a Particular Production Lot as Required by a Specification Permitted by This
Section but That Cannot Be Qualified Under PG-10.1.
Any material identified to a particular production lot as
required by a specification permitted by this Section,
but for which the documentation required in PG-10.1 is
not available, may be accepted as satisfying the requirements of the specification permitted by this Section provided that the conditions set forth below are satisfied.
PG-10.1.1.3 A certification that the material was
manufactured and tested in accordance with the requirements of the specification to which the material is recertified, excluding the specific marking requirements, has
been furnished to the boiler or part manufacturer, together with copies of all documents and test reports pertinent to the demonstration of conformance to the
requirements of the permitted specification.
PG-10.2.1 Recertification by an organization other
than the boiler or part manufacturer — not permitted.
PG-10.2.2
manufacturer.
Recertification by the boiler or part
PG-10.2.2.1 Chemical analyses are made on different pieces from the lot to establish a mean analysis
which is to be accepted as representative of the lot. The
6
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-10.1 Identified With Complete Certification
From the Material Manufacturer. Material identified
with a specification not permitted by this Section, or material procured to chemical composition requirements
and identified to a single production lot as required by
a permitted specification may be accepted as satisfying
the requirements of a specification permitted by this Section provided the conditions set forth in PG-10.1.1 or
PG-10.1.2 are satisfied.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
is not known, both a transverse and a longitudinal tension
test specimen shall be taken from each sampling location
designated in the permitted specification. The results of
both tests shall conform to the minimum requirements
of the specification, but the tensile strength of only one
of the two specimens need conform to the maximum
requirement.
pieces chosen for analyses shall be selected at random
from the lot. The number of pieces selected shall be at
least 10% of the number of pieces in the lot, but not less
than three. For lots of three pieces or less, each piece shall
be analyzed. Each individual analysis in the permitted
specification and the mean for each element shall conform to the heat analysis limits of that specification. Analyses need to be made for only those elements required by
the permitted specification. However, consideration
should be given to making analyses for elements not specified in the specification but which would be deleterious
if present in excessive amounts.
PG-10.3.2.2 The provisions of PG-10.2.2.3,
PG-10.2.2.4, and PG-10.2.2.5 are met.
PG-10.3.2.3 When the identity of the material
with the permitted specification has been established in
accordance with PG-10.3.2.1 and PG-10.3.2.2, each piece
(or bundle, etc., if permitted in the specification) is
marked with a marking giving the permitted specification
number and grade, type, or class as applicable and a serial
number identifying the particular lot of material. A suitable report, clearly marked as being a “Report on Tests of
Nonidentified Material,” shall be completed and certified
by the boiler or part manufacturer. This report, when accepted by the Inspector, shall constitute authority to use
the material in lieu of material procured to the requirements of the permitted specification.
PG-10.2.2.2 Mechanical property tests are made
in accordance with the requirements of the permitted
specification and the results of the tests conform to the
specified requirements.
PG-10.2.2.3 For applications in which the maximum allowable stresses are subject to a note of Section II,
Part D, Subpart 1, Table 1A, requiring the use of killed
steel, documentation is available to the Inspector which
establishes that the material is a killed steel.
PG-10.2.2.4 When the requirements of the permitted specification include metallurgical structure requirements (i.e., fine austenitic grain size), tests are
made and the results are sufficient to establish that those
requirements of the specification have been met.
PG-11
PG-10.2.2.6 When the conformance of the material with the permitted specification has been established,
the material has been marked as required by the permitted specification.
PG-10.3 Material Not Fully Identified. Material
which cannot be qualified under the provisions of either
PG-10.1 or PG-10.2, such as material not fully identified
as required by the permitted specification or as unidentified material, may be accepted as satisfying the requirements of a specification permitted by this Section
provided that the conditions set forth below are satisfied.
PG-10.3.1 Qualification by an organization other
than the boiler or part manufacturer — not permitted.
Qualification by the boiler or part
PG-10.3.2.1 Each piece is tested to show that it
meets the chemical composition for product analysis
and the mechanical properties requirements of the permitted specification. Chemical analyses need only be
made for those elements required by the permitted specification. However, consideration shall be given to making
analyses for elements not specified in the specification
but which would be deleterious if present in excessive
amounts. For plates, when the direction of final rolling
PG-11.2 Cast, Forged, Rolled, or Die-Formed Nonstandard Pressure Parts. Pressure parts such as shells,
heads, and removable and access-opening cover plates
7
ð15Þ
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-11.1 General. In general, all prefabricated or preformed pressure parts shall be certified as meeting the
rules of this Section via ASME Data Reports and conformity marking requirements included elsewhere in this
Section. Where stamping directly on the material is prohibited and a nameplate is used for those required markings, if the nameplate interferes with further fabrication,
installation, or service, it may be removed by the Manufacturer of the completed boiler with the concurrence of
the Authorized Inspector. Such removal of the nameplate
shall be noted in the “Remarks” section of the boiler Manufacturer’s Data Report, and the nameplate shall be
destroyed.
Prefabricated or preformed pressure parts supplied
under the provisions of PG-11.1 through PG-11.4 are exempt from the requirements for ASME Data Reports and
conformity markings included elsewhere in this Section.
The rules of PG-11.1 through PG-11.4 shall not be applied
to welded shells or heads in headers and drums. A part
furnished under the requirements of PG-11.2, PG-11.3,
and PG-11.4 need not be manufactured by a Certificate
Holder. The Manufacturer of the completed boiler or of
the part stamped with the Certification Mark into which
the preformed or prefabricated part is incorporated shall
first ensure the parts meet all applicable Code requirements. Prefabricated or preformed pressure parts may
be supplied as indicated in PG-11.2 through PG-11.4.
PG-10.2.2.5 When the requirements of the permitted specification include heat treatment, the material
is heat treated in accordance with those requirements,
either prior to or during fabrication.
PG-10.3.2
manufacturer.
PREFABRICATED OR PREFORMED
PRESSURE PARTS FURNISHED WITHOUT
A CERTIFICATION MARK
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PG-11.3.7 The Manufacturer of the completed boiler shall have the following responsibilities when using
standard pressure parts that comply with an ASME product standard:
(a) Ensure all standard pressure parts comply with applicable rules of this Section.
(b) Ensure all standard pressure parts are suitable for
the design conditions of the completed boiler.
(c) When volumetric examination is required by the
rules of this Section, obtain the completed radiographs
or duplicate thereof, properly identified, with a radiographic examination report, or any other applicable volumetric examination report.
that are wholly formed by casting, forging, rolling, or die
forming may be supplied basically as materials. All such
parts shall be made of materials permitted under this Section, and the manufacturer of the part shall furnish identification in accordance with PG-5. Such parts shall be
marked with the name or trademark of the parts manufacturer and with such other markings as will serve to
identify the particular parts with accompanying material
identification. The Manufacturer of the completed vessel
shall be satisfied the part is suitable for the design conditions specified for the completed vessel in accordance
with the rules of this Section.
PG-11.3 Cast, Forged, Rolled, or Die-Formed Standard Pressure Parts, Either Welded or Nonwelded, That
Comply With an ASME Product Standard.
PG-11.3.1 PG-11.3 applies to pressure parts such
as pipe fittings, valves, flanges, nozzles, welding caps,
manhole frames and covers, and pump casings that are
a part of the boiler circulating system, that comply with
an ASME product standard accepted by reference in
PG-42 and are so marked. The ASME product standard establishes the basis for the pressure–temperature rating
and marking unless modified in PG-42.
PG-11.3.8 The Manufacturer shall fulfill the responsibilities of PG-11.3.7 by obtaining, when necessary,
documentation as provided below, providing for retention of this documentation until the final boiler stamping
has been completed, and having such documentation
available for review by the Authorized Inspector when requested. The documentation shall contain at a minimum
(a) material used
(b) the pressure–temperature rating of the part
(c) the basis for establishing the pressure–temperature
rating
PG-11.3.2 Materials for standard pressure parts
shall be either as permitted by this Section or as specifically listed in the ASME product standard.
PG-11.3.3 When welding is performed, in addition
to meeting all requirements of the ASME product standard, the welding shall meet either the requirements of
Part PW of this Code or the welding requirements of
ASME specification SA-234 for parts conforming to ASME
B16.9 and ASME B16.11 only.
PG-11.3.4 If heat treatment [including postweld
heat treatment (PWHT), postforming heat treatment, or
any heat treatment needed to achieve material properties
or mitigate material degradation mechanisms] is required, it may be performed either in the location of the
parts manufacturer or in the location of the Manufacturer
of the vessel to be marked with the Certification Mark. If
heat treatment is performed by other than the Manufacturer of the completed boiler, the heat treatment procedure, including mitigation heat treatment procedures
for alloys that may be affected by the environment (e.g.,
those subject to stress corrosion cracking) between the
time they are welded and the time PWHT is performed,
shall be specified by the Manufacturer. These activities
shall be documented and provided to the Manufacturer.
PG-11.4.2 Parts of small size falling within this category for which it is impossible to obtain identified material or which may be stocked and for which
identification cannot be obtained and is not customarily
furnished may be used as non-pressure-bearing attachments and need not conform to the specifications for
the material to which they are attached or to a material
specification permitted in this Section. If attached to the
boiler by welding, such parts shall be of weldable quality.
PG-11.4.3 Materials for these parts shall be as permitted by this Section only.
PG-11.3.5 If radiography or other volumetric examination is required by the rules of this Section, it may
be performed at the location of the Manufacturer of the
completed boiler or the location of the pressure parts
manufacturer.
PG-11.4.4 When welding is performed, it shall
meet the requirements of Part PW of this Section.
PG-11.4.5 Pressure parts such as welded standard
pipe fittings, welding caps, and flanges that are fabricated
by one of the welding processes recognized by this Section do not require Authorized Inspection or Partial Data
Reports, provided the requirements of PG-11.4 are met.
PG-11.3.6 Pressure parts meeting the requirements of PG-11.3 do not require inspection, mill test reports, or Manufacturer’s Partial Data Reports.
8
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-11.4 Cast, Forged, Rolled, or Die-Formed Standard Pressure Parts, Either Welded or Nonwelded, That
Comply With a Standard Other Than an ASME Product
Standard.
PG-11.4.1 Standard pressure parts, such as pipe fittings, valves, flanges, nozzles, welding caps, manhole
frames and covers, and pump casings, that are a part of
the boiler circulating system, that are either welded or
nonwelded and comply with a manufacturer’s proprietary standard, a standard other than an ASME product
standard, or an ASME product standard not adopted by
this Section may be supplied by a Certificate Holder or a
pressure parts manufacturer.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PG-11.4.6 If postweld heat treatment is required
by the rules of this Section, it may be performed either
in the location of the parts manufacturer or in the location
of the Manufacturer of the completed boiler. If postweld
heat treatment is performed by other than the Manufacturer of the completed boiler, the heat treatment procedure shall be documented and provided to the
Manufacturer.
PG-11.4.11 The documentation shall contain at a
minimum
(a) material used
(b) the pressure–temperature rating of the part
(c) the basis for establishing the pressure–temperature
rating
(d) written certification by the pressure parts manufacturer that all welding complies with Code requirements
PG-11.4.7 If volumetric examination is required, it
may be performed at the location of the Manufacturer of
the completed boiler, the location of the parts Manufacturer, or the location of the pressure parts manufacturer.
PG-11.5 A Manufacturer holding an ASME Certificate
of Authorization may provide standard pressure parts in
accordance with PG-11.4. In lieu of the requirements of
PG-11.4.4, such organizations may subcontract for welding services to an individual or an organization that does
not hold an ASME Certificate of Authorization, provided
the conditions of PG-11.5.1 through PG-11.5.10 are met.
PG-11.4.8 Marking for these parts shall be as
follows:
(a) the name or trademark of the Certificate Holder or
the pressure part manufacturer and any other markings
as required by the proprietary standard or other standard
used for the pressure part
(b) a permanent or temporary marking that will serve
to identify the part with the Certificate Holder’s or the
pressure part manufacturer’s written documentation of
the particular items, and which defines the pressure–
temperature rating of the part
PG-11.5.1 The activities to be performed by the
subcontractor shall be included within the Certificate
Holder’s quality control system.
PG-11.5.2 The Certificate Holder’s quality control
system shall provide for the following activities associated with subcontracting of welding operations, and
these provisions shall be acceptable to the Manufacturer’s
Authorized Inspection Agency:
(a) the welding processes permitted by this Section
that are permitted to be subcontracted
(b) welding operations
(c) Authorized Inspection activities
(d) placement of the Certificate Holder’s marking in accordance with PG-11.4.8
PG-11.5.3 The Certificate Holder’s quality control
system shall provide for the Manufacturer of the boiler
to arrange for the Authorized Inspector to have free access to such parts of all plants as are concerned with
the supply or manufacture of materials for the boiler,
when so requested. The Authorized Inspector shall be
permitted free access, at all times while work on the boiler is being performed, to all parts of the Manufacturer’s
shop that concern the construction of the vessel and to
the site of field-erected vessels during the period of assembly and testing of the vessel. The Manufacturer shall
keep the Authorized Inspector informed of the progress
of the work and shall notify him reasonably in advance
for any required tests or inspections.
PG-11.4.10 The Manufacturer of the completed
boiler shall fulfill the responsibilities of PG-11.4.9 by
one of the following methods:
(a) Obtain, when necessary, documentation as provided in PG-11.4.11, provide for retention of this documentation until the final boiler stamping has been
completed, and have such documentation available for review by the Authorized Inspector when requested.
(b) Perform an analysis of the pressure part in accordance with the rules of this Section subject to the acceptance of the Authorized Inspector, while being mindful
this Section does not contain rules to cover all details of
design and construction. It is intended the Manufacturer
shall provide details of design and construction that will
be as safe as those provided by the rules of this Section.
This analysis shall be included in the documentation
and shall be made available for inspection by the Authorized Inspector when requested.
PG-11.5.4 The Certificate Holder shall be responsible for reviewing and accepting the quality control programs of the subcontractor.
PG-11.5.5 The Certificate Holder shall ensure that
the subcontractor uses written procedures and welding
operations that have been qualified as required by this
Section.
PG-11.5.6 The Certificate Holder shall ensure that
the subcontractor uses personnel that have been qualified
as required by this Section.
9
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-11.4.9 The Manufacturer of the completed boiler shall have the following responsibilities when using
standard pressure parts:
(a) Ensure all standard pressure parts comply with applicable rules of this Section.
(b) Ensure all standard pressure parts are suitable for
the design conditions of the completed boiler.
(c) When volumetric examination is required by the
rules of this Section, obtain the completed radiographs
or duplicate thereof, properly identified, with a radiographic examination report, or any other applicable volumetric examination report for retention until the final
boiler stamping has been completed.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PG-11.5.7 The Certificate Holder and the subcontractor shall describe in the quality control system the operational control of procedure and personnel
qualifications of the subcontracted welding operations.
Table continued
Grade
PG-11.5.8 The Certificate Holder shall be responsible for controlling the quality and ensuring that all materials and parts that are welded by subcontractors and
submitted to the Authorized Inspector for acceptance
conform to all applicable requirements of this Section.
PG-11.5.10 The Certificate Holder shall receive approval for subcontracting from the Authorized Inspection
Agency prior to commencing of activities.
PG-13
WATER LEVEL INDICATORS AND
CONNECTOR MATERIAL
N06625
600
N06600
STAYS
PG-14
RIVETS
PG-14.1 Rivets shall conform to SA-31, Specification
for Steel Rivets and Bars for Rivets, Pressure Vessels.
PG-14.1.1 In lieu of SA-31, it is permissible to substitute bar which is converted to rivets from SA-36, Specification for Carbon Structure Steel, under the conditions
specified in PG-14.1.1.1 and PG-14.1.1.2.
PG-14.1.1.1 In addition to compliance with
SA-36, the bar shall comply with
(a) the “rivet bend tests” for SA-31 Grade B, para. 6.1.2
(b) the “rivet flattening tests” for SA-31 Grades A and B,
para. 6.2
(c) the “bar bend tests” for SA-31 Grade B, para. 6.4.2
PG-12.3 Connector material and the pressure chamber material of the remote water level indicator or water
level‐sensing devices, except for water columns, may include austenitic stainless steels and nickel‐based alloys.
The material shall be in the solution‐annealed heat treatment condition. If filler metals are used in welding of the
austenitic stainless steels, they shall be limited to low‐
carbon content.
The material shall be one of the grades from the following list:
PG-14.1.1.2 The following paragraphs of SA-31
shall be applicable to the additional mechanical properties tests:
(a) paragraph 9, Number of Tests and Retests
(b) paragraph 10, Specimen Preparation
(c) paragraph 11, Test Methods
(d) paragraph 12, Inspection
(e) paragraph 13, Rejection and Reheating
PG-14.1.2 When rivets made from SA-36 bar are
substituted for those made from SA-31, the design stresses for SA-31 Grade B shall apply.
UNS Number
S30403
S31603
N08800
N08020
N08825
N10276
N06022
PG-14.2 In computing the ultimate strength of rivets
in shear, the following shear stresses in ksi (MPa) of the
cross‐sectional area of the rivet shank shall be used:
(a) Steel rivets, SA-31 Grade A, in single shear, 44.0
(305)
10
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-12.2 Boilers having a maximum allowable working pressure not exceeding 900 psi (6 MPa) may use alternative methods for independent remote water level
indicators or water level‐sensing devices (see PG-60 for
requirements for water level indicators and water columns). The sensing devices may include a magnetically
coupled float inside a nonmagnetic cylindrical pressure
chamber to utilize through‐the‐wall sensing of float position. The pressure chamber stresses and dimensions shall
meet the appropriate requirements of PG-27 and Part
PW, shall comply with one of the specifications in
PG-9.1.2, and shall be restricted to the material grades
listed in PG-12.3.
304L
316L
800
…
825
C‐276
…
N06059
625
Threaded stays shall be of steel complying with SA-36,
SA/CSA-G40.21, or SA-675.
Seamless steel tubes for threaded stays shall comply
with SA-192 or SA-210.
Staybolts, stays, through‐rods, or stays with ends for attachment by fusion welding shall comply with SA-36,
SA/CSA-G40.21, or SA-675.
PG-12.1 Gage glass body and connector materials
shall comply with a Manufacturer’s standard that defines
the pressure–temperature rating marked on the unit. The
materials used may include austenitic stainless steels and
nickel‐based alloys.1
Grade
N06690
59
The allowable stresses shall be those listed in Section II,
Part D, Subpart 1, Table 1A or Table 1B for Section I. If allowable stresses are not listed for Section I but are listed
for Section VIII, Division 1, the allowable stresses for Section VIII, Division 1 may be utilized. When two lines of
stresses are listed in Section II, Part D, the design shall
be based on the lower allowable stresses.
PG-11.5.9 The Certificate Holder shall describe in
the quality control system the operational control for
maintaining traceability of materials received from the
subcontractor.
PG-12
UNS Number
690
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
(b) Steel rivets, SA-31 Grade A, in double shear, 88.0
(605)
(c) Steel rivets, SA-31 Grade B, in single shear, 52.0
(360)
(d) Steel rivets, SA-31 Grade B, in double shear, 104.0
(715)
The cross‐sectional area used in the computations shall
be that of the rivet after driving.
which stays may be applied in other than cylindrical outer
shell plates shall be 5/16 in. (8 mm). When pipe larger than
NPS 5 (DN 125) is used in lieu of plate for the shell of cylindrical components under pressure, its minimum wall
shall not be less than the smaller of 1/4 in. (6 mm) or the
minimum wall thickness of Standard wall pipe listed in
ASME B36.10M, Table 1.
PG-16.4 Undertolerance on Plates. Plate material
that is not more than 0.01 in. (0.3 mm) thinner than that
calculated from the formula may be used in Code constructions provided the material specification permits
such plate to be furnished not more than 0.01 in.
(0.3 mm) thinner than ordered.
DESIGN
PG-16
GENERAL
PG-16.1 The design of power boilers, high‐
temperature water boilers, and other pressure parts included within the scope of these rules shall conform to
the general design requirements in the following paragraphs and in addition to the specific requirements for
design given in the applicable Parts of this Section that
pertain to the methods of construction used. This Section
does not contain rules to cover all possible details of design. When detailed rules are not given, it is intended that
the Manufacturer, subject to the acceptance of the Inspector, shall provide details of design that will be as safe as
those provided by the rules of this Section. This may be
done by appropriate analytical methods, the appropriate
use of rules from other design codes or, as permitted by
PG-18, by proof test.
PG-16.5 Undertolerance on Pipe and Tubes. Pipe or
tube material shall not be ordered thinner than that calculated from the applicable formula of this Section. The ordered material shall include provision for the allowed
manufacturing undertolerance as given in Section II in
the applicable pipe or tube specification.
PG-16.6 The Code does not fully address tolerances.
When dimensions, sizes, or other parameters are not specified with tolerances, the values of these parameters
shall be considered nominal, and allowable tolerances
or local variances should be considered acceptable when
based on engineering judgment and standard practices as
determined by the designer.
PG-17
FABRICATION BY A COMBINATION OF
METHODS
A boiler and parts thereof may be designed and fabricated by a combination of the methods of fabrication given in this Section, provided the rules applying to the
respective methods of fabrication are followed and the
boiler is limited to the service permitted by the method
of fabrication having the most restrictive requirements.
PG-16.2.1 The relative location of the various pressure parts within the scope of Section I, with respect to
the path of water‐steam flow.
PG-18
DESIGN VALIDATION BY PROOF TEST
Where no rules are given for calculating the strength of
a boiler or any part thereof, the Manufacturer may establish MAWP by testing a full‐size sample in accordance
with A-22, Proof Tests to Establish Maximum Allowable
Working Pressure.
PG-16.2.2 A line showing the expected maximum
sustained pressure as described in PG-21.3, indicating
the expected variation in pressure along the path of
water‐steam flow.
PG-16.2.3 The maximum allowable working pressure of the various pressure parts.
PG-19
PG-16.2.4 The location and set pressure of the
overpressure protection devices.
Copy of this diagram shall be attached to the Master
Data Report per PG-113.
COLD FORMING OF AUSTENITIC
MATERIALS3
The cold‐formed areas of pressure‐retaining components manufactured of austenitic alloys shall be heat
treated for 20 min per inch of thickness or for 10 min,
whichever is greater, at the temperatures given in Table
PG-19 under the following conditions:
(a) the finishing‐forming temperature is below the
minimum heat‐treating temperature given in Table PG-19
PG-16.3 Minimum Thicknesses. The minimum thickness of any boiler plate under pressure shall be 1/4 in.
(6 mm) except for electric boilers constructed under the
rules of Part PEB. The minimum thickness of plates to
11
ð15Þ
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-16.2 When the pressure parts of a forced‐flow
steam generator with no fixed steam and waterline are
designed for different pressure levels as permitted in
PG-21.3, the owner shall provide or cause to be provided
a boiler pressure system design diagram, certified by a
Professional Engineer experienced in the mechanical design of power plants, which supplies the following
information.
No fu
ð15Þ
Table PG-19
Post Cold-Forming Strain Limits and Heat-Treatment Requirements
Limitations in Lower Temperature Range
For Design Temperature
304
304H
…
304N
309S
310H
310S
310HCbN
316
316H
316N
321
321H
347
347H
347HFG
348
348H
…
600
601
617
690
800
800H
…
…
…
S30400
S30409
S30432
S30451
S30908
S31009
S31008
S31042
S31600
S31609
S31651
S32100
S32109
S34700
S34709
S34710
S34800
S34809
N06230
N06600
N06601
N06617
N06690
N08800
N08810
N08811
S30815
N06022
Exceeding
°F
1,075
1,075
1,000
1,075
1,075
1,075
1,075
1,000
1,075
1,075
1,075
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,100
1,075
1,075
1,200
1,075
1,100
1,100
1,100
1,075
1,075
°C
(580)
(580)
(540)
(580)
(580)
(580)
(580)
(540)
(580)
(580)
(580)
(540)
(540)
(540)
(540)
(540)
(540)
(540)
(595)
(580)
(580)
(650)
(580)
(595)
(595)
(595)
(580)
(580)
But Less Than And Forming
or Equal to
Strains
°F
°C
Exceeding
1,250
1,250
1,250
1,250
1,250
1,250
1,250
1,250
1,250
1,250
1,250
1,250
1,250
1,250
1,250
1,250
1,250
1,250
1,400
1,200
1,200
1,400
1,200
1,250
1,250
1,250
1,250
1,250
(675)
(675)
(675)
(675)
(675)
(675)
(675)
(675)
(675)
(675)
(675)
(675)
(675)
(675)
(675)
(675)
(675)
(675)
(760)
(650)
(650)
(760)
(650)
(675)
(675)
(675)
(675)
(675)
Minimum Heat‐Treatment
For Design
Temperature When Design
And
Temperature Forming Temperature and Forming Strain Limits
Exceeding
Are Exceeded [Note (1)] and [Note (2)]
Strains
°F
°C
Exceeding
°F
°C
20%
1,250 (675)
20%
1,250 (675)
15%
1,250 (675)
15%
1,250 (675)
20%
1,250 (675)
20%
1,250 (675)
20%
1,250 (675)
15%
1,250 (675)
20%
1,250 (675)
20%
1,250 (675)
15%
1,250 (675)
15% [Note (3)] 1,250 (675)
15% [Note (3)] 1,250 (675)
15%
1,250 (675)
15%
1,250 (675)
15%
1,250 (675)
15%
1,250 (675)
15%
1,250 (675)
15%
1,400 (760)
20%
1,200 (650)
20%
1,200 (650)
15%
1,400 (760)
20%
1,200 (650)
15%
1,250 (675)
15%
1,250 (675)
15%
1,250 (675)
15%
1,250 (675)
15%
…
…
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
10%
…
1,900
1,900
2,000
1,900
2,000
2,000
2,000
2,000
1,900
1,900
1,900
1,900
2,000
1,900
2,000
2,150
1,900
2,000
2,200
1,900
1,900
2,100
1,900
1,800
2,050
2,100
1,920
2,050
(1 040)
(1 040)
(1 095)
(1 040)
(1 095)
(1 095)
(1 095)
(1 095)
(1 040)
(1 040)
(1 040)
(1 040)
(1 095)
(1 040)
(1 095)
(1 175)
(1 040)
(1 095)
(1 205)
(1 040)
(1 040)
(1 150)
(1 040)
(980)
(1 120)
(1 150)
(1 050)
(1 120)
GENERAL NOTE: The limits shown are for cylinders formed from plates, spherical or dished heads formed from plate, and tube and
pipe bends. When the forming strains cannot be calculated as shown in PG-19, the forming strain limits shall be half those tabulated in
this Table (see PG-19.1).
NOTES:
(1) Rate of cooling from heat‐treatment temperature not subject to specific control limits.
(2) While minimum heat‐treatment temperatures are specified, it is recommended that the heat‐treatment temperature range be limited to 150°F (85°C) above that minimum, and 250°F (140°C) for 310HCbN, 347, 347H, 348, and 348H.
(3) For simple bends of tubes or pipes whose outside diameter is less than 3.5 in. (89 mm), this limit is 20%.
12
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Grade
UNS
Number
Limitations in Higher
Temperature Range
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PG-21.1 No boiler, except a forced‐flow steam generator with no fixed steam and water line that meets
the special provisions of PG-67, shall be operated at a
pressure higher than the maximum allowable working
pressure except when the pressure relief valve or valves
are discharging, at which time the maximum allowable
working pressure shall not be exceeded by more than 6%.
(b) the design metal temperature and the forming
strains exceed the limits shown in Table PG-19. Forming
strains shall be calculated as follows:
Forming strains shall be calculated as follows:
(1) Cylinders formed from plate
PG-21.2 Expected maximum sustained conditions of
pressure and temperature are intended to be selected sufficiently in excess of any expected operating conditions
(not necessarily continuous) to permit satisfactory boiler
operation without operation of the overpressure protection devices.
(2) Spherical or dished heads formed from plate
(3) Tube and pipe bends
PG-21.3 In a forced‐flow steam generator with no
fixed steam and waterline it is permissible to design the
pressure parts for different pressure levels along the path
of water‐steam flow. The maximum allowable working
pressure of any part shall be not less than that required
by the rules of Part PG for the expected maximum sustained conditions of pressure and temperature to which
that part is subjected except when one or more of the
overpressure protection devices covered by PG-67.4 is
in operation.
where
R = nominal bending radius to centerline of pipe or
tube
r = nominal outside radius of pipe or tube
R f = mean radius after forming
R o = original mean radius (equal to infinity for a flat
plate)
t = nominal thickness of the plate, pipe, or tube before
forming
PG-19.1 When the forming strains cannot be calculated as shown in PG-19, the manufacturer shall have
the responsibility to determine the maximum forming
strain.
PG-21.4.1.1 The component shall be designed
for the most severe condition of coincident pressure
and temperature expected to be sustained during operation that results in the greatest calculated thickness for
the pressure part and that will not exceed the maximum
temperature or the maximum allowable stress permitted
in Section II, Part D for the material.
PG-19.2 For flares, swages, or upsets, heat treatment
in accordance with Table PG-19 shall apply, regardless of
the amount of strain.
PG-20
COLD FORMING OF CREEP STRENGTH
ENHANCED FERRITIC STEELS
The cold-formed areas of pressure-retaining components manufactured of creep strength enhanced ferritic
alloys shall be heat treated as listed in Table PG-20. Cold
forming is defined as any method that is performed at a
temperature below 1,300°F (705°C) and produces strain
in the material. The calculations of cold strains shall be
made in accordance with PG-19.
PG-21
PG-21.4.1.2 The design requirements of this
Section shall be met for each design condition (coincident
pressure and temperature).
PG-21.4.1.3 The maximum allowable working
pressure (MAWP) selected for the part shall be sufficiently in excess of the highest pressure of the multiple
design conditions to permit satisfactory boiler operation
without operation of the overpressure protection device
(s). Each design condition (coincident pressure and temperature) shall be reported on the Manufacturer’s Data
Report.
MAXIMUM ALLOWABLE WORKING
PRESSURE
The maximum allowable working pressure is the pressure determined by employing the allowable stress values, design rules, and dimensions designated in this
Section.
Whenever the term maximum allowable working pressure is used in this Section of the Code, it refers to gage
pressure, or the pressure above atmosphere.
PG-21.4.2
Definitions.
coincident pressure and temperature: a specific combination of pressure and temperature that is coincident with
a specific normal operating condition.
13
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-21.4 Components With Multiple Design Conditions.
PG-21.4.1 Components with multiple design conditions may be designed considering the coincident pressures and temperatures if all of the conditions specified
in PG-21.4.1.1 through PG-21.4.2 are met.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Table PG-20
Post Cold-Forming Strain Limits and Heat-Treatment Requirements
Limitations in Higher
Temperature Range
Limitations in Lower Temperature Range
For Design Temperature
Grade
UNS
Number
91
K90901
Exceeding
But Less
Than or
Equal to
°F
°C
°F
°C
And Forming
Strains
1,000
1,000
(540)
(540)
1,115
1,115
(600)
(600)
> 25%
> 5 to ≤ 25%
For Design
Temperature
Exceeding
°F
°C
1,115
1,115
(600)
(600)
And
Forming
Strains
> 20%
> 5 to
≤ 20%
Required Heat Treatment When
Design Temperature and Forming
Strain Limits Are Exceeded
Normalize and temper [Note (1)]
Postbend heat treatment [Note (2)],
[Note (3)], [Note (4)]
GENERAL NOTE: The limits shown are for cylinders formed from plates, spherical or dished heads formed from plate, and tube and
pipe bends. The forming strain limits tabulated in the table shall be divided by two if PG-19.1 is applied. For any material formed at
1,300°F (705°C) or above, and for cold swages, flares, or upsets, normalizing and tempering is required regardless of the amount of
strain.
PG-22.2
to PG-56.
normal operating condition: a sustained (or steady-state)
condition that is a stable mode of operation of the boiler
(not a transient condition).
start-up and shutdown: transient condition of the boiler to
bring it from a cold condition or low-load condition to a
normal operating condition or to a shutdown condition.
PG-23
sustained condition: a steady-state normal operating condition whose duration in time is significant and long
running.
STRESS VALUES FOR CALCULATION
FORMULAS
PG-23.1 The maximum allowable stress values in
Section II, Part D, Subpart 1, Tables 1A and 1B, are the
unit stresses to be used in the equations of this Section
to calculate the minimum required thickness or the maximum allowable working pressure of the pressure part
(see Section II, Part D, Mandatory Appendix 1).
transient condition: a controlled transitional mode of operating the boiler to bring it from one steady-state condition of temperature and pressure to another steady-state
condition of temperature and pressure.
PG-22
Loading on structural attachments — refer ð15Þ
PG-23.2 The yield strength values for use in PG-28.3
may be found in Section II, Part D, Subpart 1, Table Y-1.
LOADINGS
PG-23.3 With the publication of the 2004 Edition,
Section II, Part D is published as two separate publications. One publication contains values only in U.S. Customary units and the other contains values only in SI
units. The selection of the version to use is dependent
on the set of units selected for analysis.
PG-22.1 Stresses due to hydrostatic head shall be taken into account in determining the minimum thickness
required unless noted otherwise. This Section does not
fully address additional loadings other than those from
working pressure or static head. Consideration shall be
given to such additional loadings (see PG-16.1).
14
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
NOTES:
(1) Normalization and tempering shall be performed in accordance with the requirements in the base material specification, and shall
not be performed locally. The material shall either be heat treated in its entirety, or the cold strained area (including the transition
to the unstrained portion) shall be cut away from the balance of the tube or component and heat treated separately or replaced.
(2) Postbend heat treatments shall be performed at 1,350°F to 1,445°F (730°C to 785°C) for 1 hr/in. (1 h/25 mm) or 30 min minimum. Alternatively, a normalization and temper in accordance with the requirements in the base material specification may be
performed.
(3) For materials with greater than 5% strain but less than or equal to 25% strain with design temperatures less than or equal to
1,115°F (600°C), if a portion of the component is heated above the heat treatment temperature allowed above, one of the following actions shall be performed:
(a) The component in its entirety must be renormalized and tempered.
(b) The allowable stress shall be that for Grade 9 material (i.e., SA-213 T9, SA-335 P9, or equivalent product specification) at the
design temperature, provided that portion of the component that was heated to a temperature exceeding the maximum holding
temperature is subjected to a final heat treatment within the temperature range and for the time required in Note (2) above. The
use of this provision shall be noted on the Manufacturer’s Data Report.
(4) If a longitudinal weld is made to a portion of the material that is cold strained, that portion shall be normalized and tempered,
prior to or following welding. This normalizing and tempering shall not be performed locally.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PG-25
QUALITY FACTORS FOR STEEL CASTINGS
indications exceeding degree 1 of Type I, degree 2 of Type
II, and degree 3 of Type III, and exceeding degree 1 of
Types IV and V of ASTM E125 are unacceptable.
A quality factor as specified below shall be applied to
the allowable stresses for steel casting materials given
in Section II, Part D, Subpart 1, Table 1A.
PG-25.2.1.2.2 The technique for liquid penetrant examination shall be in accordance with Section V,
Article 6. Surface indications determined by liquid penetrant examination are unacceptable if they exceed the
following:
(a) all cracks and hot tears
(b) any group of more than six linear indications other
than those in (a) in any rectangular area of 11/2 in. × 6 in.
(38 mm × 150 mm) or less, or any circular area having a
diameter of 31/2 in. (89 mm) or less, these areas being taken in the most unfavorable location relative to the indications being evaluated
(c) other linear indications more than 1/4 in. (6 mm)
long for thicknesses up to 3/4 in. (19 mm) inclusive, more
than one‐third of the thickness in length for thicknesses
from 3/4 in. to 21/4 in. (19 mm to 57 mm), and more than
3
/4 in. (19 mm) long for thicknesses over 2 1/4 in.
(57 mm) (Aligned acceptable indications separated from
one another by a distance equal to the length of the longer
indication are acceptable.)
(d) all indications of nonlinear imperfections that have
any dimension exceeding 3/16 in. (5 mm)
PG-25.1 A factor not to exceed 80% shall be applied
when a casting is inspected only in accordance with the
minimum requirements of the specification for the material, except when the special methods of examination prescribed by the selected specification are followed, thus
permitting the use of the applicable higher factor in this
paragraph.
PG-25.2 A factor not to exceed 100% shall be applied
when the casting meets the requirements of PG-25.2.1
through PG-25.2.4.
PG-25.2.1 All steel castings 41/2 in. (114 mm) nominal body thickness or less, other than steel flanges and
fittings complying with ASME B16.5, and valves complying with ASME B16.34, shall be examined as specified in
PG-25.2.1.1 through PG-25.2.1.5.
ð15Þ
PG-25.2.1.1 All critical areas, including the junctions of all gates, risers, and abrupt changes in section or
direction and weld‐end preparations, shall be radiographed in accordance with Section V, Article 2, and the
radiographs shall conform to the requirements of ASTM
E446 or ASTM E186, depending upon the section thickness. The maximum acceptable severity level for 100%
quality factor shall be
For ASTM E446
Severity Level
Greater
Than 1 in.
(25 mm)
Thick
Up to and Including
Imperfection Category 1 in. (25 mm) Thick
A
1
2
B
2
3
C Types 1, 2, 3, and 4
D, E, F, and G
1
PG-25.2.1.4 Any indications in excess of the
maximum permitted in PG-25.2.1.1 and PG-25.2.1.2 shall
be cause for rejection unless the casting is repaired by
welding after the base metal has been examined to ensure
that the imperfection has been removed or reduced to an
acceptable size. The completed repair shall be subject to
reexamination by the same method as was used in the original examination and the repaired casting shall be postweld heat treated.
3
None acceptable
None
acceptable
For ASTM E186
Imperfection Category
ð15Þ
Severity Level
A and B, Types 1 and 2 of C
2
Type 3 of C
3
D, E, and F
None acceptable
PG-25.2.1.2 All surfaces of each casting, including machined gasket seating surfaces, shall be examined
after heat treatment by the magnetic particle method in
accordance with PG-25.2.1.2.1 or by the liquid penetrant
method in accordance with PG-25.2.1.2.2.
PG-25.2.1.5 All welding shall be performed
using welding procedures qualified in accordance with
Section IX. The procedure qualification shall be performed on test specimens of cast material of the same
specification and subjected to the same heat treatment
before and after welding as will be applied to the work.
All welders and operators performing this welding shall
also be qualified in accordance with Section IX.
PG-25.2.1.2.1 The technique for magnetic
particle examination shall be in accordance with Section
V, Article 7. Imperfections causing magnetic particle
PG-25.2.2 All steel castings having a body greater
than 41/2 in. (114 mm) nominal thickness shall be examined as specified in PG-25.2.2.1 through PG-25.2.2.6.
15
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-25.2.1.3 Where more than one casting of a
particular design is produced, each of the first five castings shall be examined as above. Where more than five
castings are being produced, the examination shall be
performed on the first five plus one additional casting
to represent each five additional castings. If this additional casting proves to be unacceptable, each of the remaining castings in the group shall be examined.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PG-25.2.4 Personnel performing radiographic,
magnetic particle, or liquid penetrant examinations under
this paragraph shall be qualified in accordance with their
employer’s written practice. SNT‐TC‐1A4 or CP‐189 shall
be used as a guideline for employers to establish their
written practice for qualification and certification of their
personnel.
When personnel have been certified according to their
employer’s written practice based upon an edition of
SNT‐TC‐1A or CP‐189 earlier than that referenced in
A-360, their certification shall be valid for performing
nondestructive examination required by this Section until
their next scheduled recertification. Any recertifications,
reexaminations, or new examinations shall be performed
to the employer’s written practice based on the edition of
SNT‐TC‐1A or CP‐189 referenced in A-360.
PG-25.2.2.1 All surfaces of each casting, including machined gasket seating surfaces, shall be examined
after heat treatment by the magnetic particle method in
accordance with PG-25.2.1.2.1 or liquid penetrant method
in accordance with PG-25.2.1.2.2.
ð15Þ
PG-25.2.2.2 All parts of castings shall be subjected to complete radiographic examination in accordance with Section V, Article 2, and the radiographs
shall conform to the requirements of ASTM E280.
The maximum acceptable severity level for a 100%
quality factor shall be
Imperfection Category
A, B, and Types 1, 2, and 3 of C
D, E, and F
Severity Level
2
None acceptable
PG-26
PG-25.2.2.3 Any indications in excess of the
maximum permitted in PG-25.2.2.1 and PG-25.2.2.2 are
unacceptable. The casting may be repaired by welding
after the base metal has been magnetic particle or liquid
penetrant examined to ensure that the imperfection has
been removed or reduced to an acceptable size.
WELD JOINT STRENGTH REDUCTION
FACTOR
PG-25.2.2.4 All weld repairs of depth exceeding
1 in. (25 mm) or 20% of the section thickness, whichever
is less, shall be examined by radiography in accordance
with PG-25.2.2.2 and by magnetic particle or liquid penetrant examination of the finished weld surface. All weld
repairs of depth less than 20% of the section thickness,
or 1 in. (25 mm), whichever is less, and all weld repairs
of sections which cannot be effectively radiographed shall
be examined by magnetic particle or liquid penetrant examination of the first layer, of each 1/4 in. (6 mm) thickness of deposited weld metal and of the finished weld
surface. Magnetic particle or liquid penetrant examination of the finished weld surface shall be performed after
postweld heat treatment.
PG-25.2.2.5 When repair welding is done after
heat treatment of the casting, the casting shall be postweld heat treated.
PG-27
PG-25.2.2.6 All welding shall be performed
using welding procedures qualified in accordance with
Section IX. The procedure qualification shall be performed on test specimens of cast material of the same
specification and subjected to the same heat treatment
before and after welding as will be applied to the work.
All welders and operators performing this welding shall
also be qualified in accordance with Section IX.
CYLINDRICAL COMPONENTS UNDER
INTERNAL PRESSURE
PG-27.1 General. Unless the requirements of A-317
of Nonmandatory Appendix A are selected, the equations
under this paragraph shall be used to determine the minimum required thickness or the maximum allowable
working pressure of piping, tubes, drums, Shells, and
headers in accordance with the appropriate dimensional
categories as given in PG-27.2.1, PG-27.2.2, and
PG-27.2.3 for temperatures not exceeding those given
for the various materials listed in Section II, Part D, Subpart 1, Tables 1A and 1B.
The calculated and ordered thickness of material must
include the requirements of PG-16.3, PG-16.4, and
PG-16.5. Stress calculations must include the loadings as
defined in PG-22 unless the formula is noted otherwise.
PG-25.2.3 Identification and Marking. Each casting to which a quality factor greater than 80% is applied
shall be marked with the name, trademark, or other traceable identification of the manufacturer and the casting
identification, including the casting quality factor and material designation.
16
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
At elevated temperatures, the long‐term strength of
weld joints can be lower than the long‐term strength of
the base material. Table PG-26 specifies a weld joint
strength reduction factor, w , to be used to account for this
lower long‐term strength in determining the required
thickness of components operating in the creep range.
This factor shall be applied in the design of cylinders containing longitudinal butt welds and to hemispherical
heads or any other spherical sections that comprise segments joined by welding. As defined in PW-11.2, longitudinal butt welds shall be interpreted to include spiral
(helical) welds. Weld strength reduction factors apply to
such seams made by any welding process, with or without
filler metal added, regardless whether the welding is performed as part of material manufacture or by the Certificate Holder as part of Section I fabrication. The designer is
responsible for determining the applicability of weld joint
strength reduction factors to other (e.g., circumferential)
welds. The weld joint strength reduction factor is not required when evaluating occasional loads, such as wind
and earthquake.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Table PG-26
Weld Strength Reduction Factors to Be Applied When Calculating Maximum Allowable Working Pressure or Minimum Required
Thickness of Components Fabricated With a Longitudinal Seam Weld
Temperature,°F
Temperature,°C
700
371
750
399
800
427
850
454
900
482
950
510
1,000 1,050 1,100 1,150 1,200 1,250 1,300 1,350 1,400 1,450 1,500 1,550 1,600 1,650
538
566
593
621
649
677
704
732
760
788
816
843
871
899
Steel Group
Weld Strength Reduction Factor [Note (1)]–[Note (6)]
…
…
…
…
1.00
1.00
NP
0.95
NP
0.91
NP
0.86
NP
0.82
NP
0.77
NP
0.73
NP
0.68
NP
0.64
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
CSEF (N + T) [Note (9)], [Note (10)],
[Note (11)]
CSEF (subcrit.) [Note (9)], [Note (11)],
[Note (12)]
…
…
…
…
…
1.00
0.95
0.91
0.86
0.82
0.77
NP
NP
NP
NP
NP
NP
NP
NP
NP
…
…
…
…
1.00
0.50
0.50
0.50
0.50
0.50
0.50
NP
NP
NP
NP
NP
NP
NP
NP
NP
Austenitic stainless steels and alloys 800H …
(N08810 and N08811) [Note (13)],
[Note (14)]
…
…
…
…
1.00
0.95
0.91
0.86
0.82
0.77
0.73
0.68
0.64
0.59
0.55
0.50
NP
NP
NP
…
…
…
…
…
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
NP
NP
NP
N06045
…
…
1.00
0.95
0.91
0.86
0.82
0.77
0.73
0.68
0.64
0.59
0.55
0.50
0.50
0.50
0.50
NP
NP
NP
N06600
…
…
1.00
0.95
0.91
0.86
0.82
0.77
0.73
0.68
0.64
NP
NP
NP
NP
NP
NP
NP
NP
NP
N06690
…
…
…
1.00
0.95
0.91
0.86
0.82
0.77
0.73
0.68
NP
NP
NP
NP
NP
NP
NP
NP
NP
N06601
…
…
…
…
1.00
0.95
0.91
0.86
0.82
0.77
0.73
0.68
0.64
0.59
0.55
0.50
0.50
0.50
0.50
0.50
0.50
Autogenously welded austenitic stainless
[Note (15)]
Nickel base alloys
17
N06025
…
…
…
…
…
1.00
0.95
0.91
0.86
0.82
0.77
0.73
0.68
0.64
0.59
0.55
0.50
0.50
0.50
N10276
…
…
…
…
…
1.00
0.95
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
N06022
…
…
…
…
…
…
1.00
0.95
0.91
0.86
0.82
0.77
NP
NP
NP
NP
NP
NP
NP
NP
…
…
…
…
…
…
1.00
0.95
0.91
0.86
0.82
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
…
…
…
…
…
…
…
…
1.00
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
N06617 (except SAW) [Note (16)]
…
…
…
…
…
…
…
…
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
N06617 (SAW) [Note (17)]
…
…
…
…
…
…
…
…
1.00
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
N07740
…
…
…
…
…
…
…
…
1.00
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
NP
NP
NP
…
…
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Autogenously welded nickel base alloys
[Note (15)]
GENERAL NOTE: Nothing in this table shall be construed to permit materials that are not permitted by PG-5 through PG-9 of this Section or to permit use of materials at temperatures
beyond limitations established by this Section. Several materials covered by this table are currently permitted for Section I application only via code case.
NOTES:
(1) Cautionary Note: There are many factors that may affect the life of a welded joint at elevated temperature, and all of those factors cannot be addressed in a table of weld strength
reduction factors. For example, fabrication issues such as the deviation from a true circular form in pipe (e.g., “peaking” at longitudinal weld seams) or offset at the weld joint can cause
an increase in stress that may result in reduced service life, and control of these deviations is recommended.
(2) NP = not permitted.
(3) Components made from carbon steel are exempt from the requirements of PG-26 and Table PG-26.
This copy downloaded on 2015-07-31 23:27:17 -0
N06230
N06625
ASME BPVC.I-2015
C‐Mo [Note (7)]
Cr‐Mo [Note (8)], [Note (9)]
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ð15Þ
Temperature,°F
Temperature,°C
950
510
Materials
Type 304 stainless steel welded with SFA-5.22
EXXXT‐G (16‐8‐2 chemistry), SFA 5.4E 16‐8‐2,
and SFA-5.9 ER 16‐8‐2
Type 316 stainless steel welded with SFA-5.22
EXXXT‐G (16‐8‐2 chemistry), SFA 5.4 E
16‐8‐2, and SFA-5.9 ER 16‐8‐2
1,000
538
1,050
566
1,100
593
1,150
621
1,200
649
Weld Strength Reduction Factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.85
0.90
0.97
0.99
1.00
This copy downloaded on 2015-07-31 23:27:17 -0
(15) Autogenous welds (made without weld filler metal) have been assigned a WSRF of 1.0 for austenitic SS materials up to 1,500°F (816°C) and for nickel base alloys up to 1,650°F
(899°C), provided that the product is solution annealed after welding and receives nondestructive electric examination, in accordance with the material specification.
(16) Includes autogenous and SMAW, GTAW, and GMAW filler metal welds.
(17) SAW filler metal welds.
ASME BPVC.I-2015
18
NOTES (CONT'D):
(4) Longitudinal seam welds in components made from materials not covered in this table operating in the creep regime are not permitted. For the purposes of this table, the creep regime
temperature range is defined to begin at a temperature 50°F (25°C) below the T‐note temperature listed in Section II, Part D design property tables for the base material involved.
(5) All weld filler metal shall have a minimum carbon content of 0.05% for the Cr‐Mo and CSEF materials and a minimum carbon content of 0.04% for the austenitic stainless steels.
(6) At temperatures below those where WSRFs are tabulated, a value of 1.0 shall be used for the factor w where required by the rules of this Section; however, the additional rules of this
table and notes do not apply.
(7) Longitudinal seam fusion welded construction is not permitted for C‐1/2 Mo steel above 850°F (454°C).
(8) The Cr‐Mo steels include 1/2Cr–1/2Mo, 1Cr–1/2Mo, 11/4Cr–1/2Mo–Si, 21/4Cr–1Mo, 3Cr–1Mo, and 5Cr–1/2Mo. Longitudinal welds shall either be normalized, normalized and tempered, or
subjected to proper subcritical PWHT for the alloy.
(9) Basicity index of SAW flux ≥ 1.0.
(10) N + T = normalizing + tempering PWHT.
(11) The CSEF (creep strength enhanced ferritic) steels include Grades 91, 92, 911, 122, and 23.
(12) subcrit. = subcritical PWHT is required. No exemptions from PWHT are permitted. The PWHT time and temperature shall meet the requirements of Tables PW-39-1 through
PW-39-14; the alternative PWHT requirements of Table PW-39.1 are not permitted.
(13) Certain heats of the austenitic stainless steels, particularly for those grades whose creep strength is enhanced by the precipitation of temper‐resistant carbides and carbo‐nitrides, can
suffer from an embrittlement condition in the weld heat‐affected zone that can lead to premature failure of welded components operating at elevated temperatures. A solution annealing heat treatment of the weld area mitigates this susceptibility.
(14) Alternatively, the following factors may be used as the weld joint strength reduction factor for the materials and welding consumables specified, provided the weldment is solution
annealed after welding.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
Table PG-26
Weld Strength Reduction Factors to Be Applied When Calculating Maximum Allowable Working Pressure or Minimum Required
Thickness of Components Fabricated With a Longitudinal Seam Weld (Cont'd)
including the maximum plus tolerance of the core tube.
The minimum required thickness, t , shall apply only to
the core material.
When required by the provisions of this Code, allowance must be provided in material thickness for threading
and minimum structural stability (see PG-27.4.3,
PG-27.4.5, and PWT-9.2).
If local thin areas are present in cylindrical shells, the
required thickness may be less than the thickness determined in PG-27 provided the requirements of Mandatory
Appendix IV are met.
Tubes for which the strength of the clad is included and
meeting the requirements of PG-9.4 shall use an outside
diameter, D , in the appropriate equation in PG-27.2.1
equal to the outside diameter of the bimetallic tube, including the maximum plus tolerance for both the core
tube diameter and clad thickness.
PG-27.2 Equations for Calculation.
PG-27.2.1 Tubing — Up to and Including 5 in.
(125 mm) Outside Diameter. For bare tubes or bimetallic
tubes when the strength of the clad is not included,5 use
the following equations:
PG-27.2.2 Piping, Drums, Shells, and Headers.
Based on strength of weakest course.
See PG-27.4.1, PG-27.4.3, and PG-27.4.5 through
PG-27.4.8.
See PG-27.4.2, PG-27.4.4, PG-27.4.8, and PG-27.4.9.
For bimetallic tubes when the strength of the clad is
included,5 use the following equations:
PG-27.2.3 Thickness Greater Than One-Half the ð15Þ
Inside Radius of the Component. The maximum allowable working pressure for parts of boilers of cylindrical
cross section, designed for temperatures up to that of saturated steam at critical pressure [705.4°F (374.1°C)],
shall be determined by the equations in A-317.
PG-27.3 Symbols. Symbols used in the preceding
equations are defined as follows:
See PG-27.4.4, PG-27.4.8, PG-27.4.9, and PG-27.4.10.
PG-27.2.1.2 The wall thickness of the ends of
tubes strength‐welded to headers or drums need not be
made greater than the run of the tube as determined by
these equations.
PG-27.2.1.3 The wall thickness of the ends of
tubes permitted to be attached by threading under the
limitations of PWT-9.2 shall be not less than t as determined by this formula, plus 0.8/n (20/n), where n equals
the number of threads per inch (per mm).
PG-27.2.1.4 A tube in which a fusible plug is to
be installed shall be not less than 0.22 in. (5.6 mm) in
thickness at the plug in order to secure four full threads
for the plug (see also A-20).
PG-27.2.1.5 Bimetallic tubes for which the
strength of the clad is not included and meeting the requirements of PG-9.4 shall use an outside diameter, D ,
in the appropriate equation in PG-27.2.1 no less than
the calculated outside diameter of the core material.
The outside diameter of the core material shall be determined by subtracting twice the minimum thickness of the
cladding from the outside diameter of the bimetallic tube,
19
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
C = minimum allowance for threading and structural
stability (see PG-27.4.3)
D = outside diameter of cylinder
E = efficiency (see PG-27.4.1)
e = thickness factor for expanded tube ends (see
PG-27.4.4)
P = maximum allowable working pressure (see PG-21)
R = inside radius of cylinder; for pipe, the inside radius
is determined by the nominal outside radius minus
the nominal wall thickness
S = maximum allowable stress value at the design temperature of the metal, as listed in the tables specified in PG-23 (see PG-27.4.2)
Sb = maximum allowable stress value at the design temperature of the base metal, as listed in the tables
specified in PG-23, for a bimetallic tube in which
the clad strength is to be included (see PG-27.4.10)
Sc = maximum allowable stress value at the design temperature of the clad metal, as listed in Section II,
Part D, Tables 1A or 1B, for a bimetallic tube in
which the clad strength is to be included (see
PG-27.4.10)
t = minimum required thickness (see PG-27.4.7)
tb = minimum required thickness of the base metal for a
bimetallic tube in which the clad strength is to be
included (see PG-27.4.10)
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
t c = minimum required thickness of the clad for a bimetallic tube in which the clad strength is to be included (see PG-27.4.10)
tc′ = minimum effective clad thickness for strength purposes for a bimetallic tube in which the clad
strength is to be included (see PG-27.4.10)
w = weld joint strength reduction factor per PG-26
y = temperature coefficient (see PG-27.4.6)
Threaded Pipe [Note (1)]
D ≤ 3/4 in. (19 mm) nominal
D > 3/4 in. (19 mm) nominal
Value of C [Note (2)],
in. (mm)
0.065 (1.65)
Depth of thread h[Note (3)]
NOTES:
(1) Steel or nonferrous pipe lighter than Schedule 40 of
ASME B36.10M, Welded and Seamless Wrought Steel
Pipe, shall not be threaded.
(2) The values of C stipulated above are such that the actual stress due to internal pressure in the wall of the
pipe is no greater than the values of S given in Table
1A of Section II, Part D, as applicable in the
equations.
(3) The depth of thread h in in. (mm) may be determined from the formula h =0.8/n (h = 20/n ), where
n is the number of threads per inch (25 mm) or from
the following:
PG-27.4 The following paragraphs apply to PG-27
equations as referenced.
PG-27.4.1
E = 1.0 for seamless cylinders without openings spaced
to form ligaments
= the ligament efficiency per PG-52 or PG-53 for seamless cylinders with ligaments
= w , the weld joint strength reduction factor per
PG-26, for longitudinally welded cylinders without
ligaments
n
8
111/2
For longitudinally welded cylinders with ligaments located such that no part of the longitudinal weld seam is
penetrated by the openings forming the ligament, E shall
be taken as the lesser of w or the ligament efficiency from
PG-52 or PG-53. If any part of the longitudinal seam weld
is penetrated by the openings that form the ligaments, E
shall be taken as the product of w times the ligament
efficiency.
h
0.100 (2.5)
0.0696 (1.77)
PG-27.4.4
PG-27.4.3 Any additive thickness represented by
the general term C may be considered to be applied on
the outside, the inside, or both. It is the responsibility of
the designer using these equations to make the appropriate selection of diameter or radius to correspond to the
intended location and magnitude of this added thickness.
The pressure‐ or stress‐related terms in the formula
should be evaluated using the diameter (or radius) and
the remaining thickness which would exist if the “additive” thickness had not been applied or is imagined to
have been entirely removed.
PG-27.4.5 While the thickness given by the formula is theoretically ample to take care of both bursting
pressure and material removed in threading, when steel
pipe is threaded and used for steam pressures of
250 psi (1.7 MPa) and over, it shall be seamless and of
a weight at least equal to Schedule 80 in order to furnish
added mechanical strength.
The values of C below do not include any allowance for
corrosion and/or erosion, and additional thickness
should be provided where they are expected. Likewise,
this allowance for threading and minimum structural stability is not intended to provide for conditions of misapplied external loads or for mechanical abuse.
20
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
e = 0.04 (1.0) over a length at least equal to the length of
the seat plus 1 in. (25 mm) for tubes expanded into
tube seats, except
= 0 for tubes expanded into tube seats provided the
thickness of the tube ends over a length of the seat
plus 1 in. (25 mm) is not less than the following:
(a) 0.095 in. (2.41 mm) for tubes 11/4 in. (32 mm)
O.D. and smaller
(b) 0.105 in. (2.67 mm) for tubes above 11/4 in.
(32 mm) O.D. and up to 2 in. (50 mm) O.D., incl.
(c) 0.120 in. (3.05 mm) for tubes above 2 in.
(50 mm) O.D. and up to 3 in. (75 mm) O.D., incl.
(d) 0.135 in. (3.43 mm) for tubes above 3 in.
(76 mm) O.D. and up to 4 in. (100 mm) O.D., incl.
(e) 0.150 in. (3.81 mm) for tubes above 4 in.
(100 mm) O.D. and up to 5 in. (125 mm) O.D., incl.
= 0 for tubes strength‐welded to tubesheets, headers,
and drums. Strength-welded tubes shall comply with
the minimum weld sizes of PW-16.
PG-27.4.2 The temperature of the metal to be used
in selecting the S value for tubes shall not be less than the
maximum expected mean wall temperature, i.e., the sum
of the outside and inside tube surface temperatures divided by 2. For tubes that do not absorb heat, the metal
temperature may be taken as the temperature of the fluid
within the tube but not less than the saturation
temperature.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
ð15Þ
PG-27.4.6
The temperature of the metal to be used in selecting the
S b value for core tubes shall not be less than the maximum expected mean wall temperature calculated using
the base metal thermal properties for a tube with the
same outside diameter and total wall thickness as the clad
tube, i.e., the sum of the outside and inside tube surface
temperature of an equivalent core tube, divided by 2.
The temperature of the metal to be used in selecting the
Sc value for the clad shall not be less than the maximum
expected mean wall temperature of the clad, i.e., the sum
of the outside surface temperature and the base metal‐
clad interface temperature, divided by 2.
The value of S c shall be taken as that for an annealed
wrought material with nominally equivalent strength
and composition as the clad. Values applicable to either
Section I or Section VIII, Division 1 may be used. If two
stress values are listed for a material, the higher value
may be used.
The sizing equation is subject to the following
constraints:
• t b ≥ t c (excludes clads thicker than core tube)
• t < D/4 (excludes thick-walled tubes)
y = a coefficient having values as follows:
Temperature, °F (°C)
900
1,250
(480)
(675)
and
950 1,000 1,050 1,100 1,150 1,200 and
Below (510) (540) (565) (595) (620) (650) Above
Ferritic
Austenitic
Alloy 800,
801
800H,
N08811
825
N06230
N06022
N06025
N06045
N06600
N06601
N06625
N06690
Alloy 617
S31803
0.4
0.4
0.4
0.5
0.4
0.4
0.7
0.4
0.4
0.7
0.4
0.4
0.7
0.5
0.4
0.7
0.7
0.4
0.7
0.7
0.5
0.7
0.7
0.7
0.4
0.4
0.4
0.4
0.4
0.4
0.5
0.7
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
…
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
…
…
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
…
…
0.4
0.5
0.5
0.5
0.5
0.5
0.4
0.5
0.4
…
…
0.4
0.7
0.7
0.7
0.7
0.7
…
0.7
0.4
…
…
0.5
0.7
0.7
0.7
0.7
0.7
…
0.7
0.5
…
…
0.7
0.7
0.7
0.7
…
…
…
…
0.7
…
• If
, the ratio is set to 1 in the calculation
• If
Values of y between temperatures listed may be determined by interpolation. For nonferrous materials not
listed, y = 0.4.
, the actual ratio is used in the
calculation
PG-28
COMPONENTS UNDER EXTERNAL
PRESSURE
PG-28.1 Thickness of Cylindrical Components Under External Pressure.
PG-28.1.1 Design Temperature shall be not less
than the mean expected wall temperature.
PG-28.1.1.1 Temperatures in excess of the maximum temperature listed for each material given in Section II, Part D, Subpart 1, Tables 1A and 1B, are not
permitted.
PG-28.1.1.2 Temperatures in excess of the maximum temperature given on the external pressure charts
are not permitted.
PG-27.4.8 When computing the allowable pressure for a pipe of a definite minimum wall thickness,
the value obtained by the equations may be rounded up
to the next higher unit of 10 psi (0.1 MPa).
PG-28.1.1.3 Rounding off equation results to the
next higher unit of 10 is permitted (see PG-27.4.8).
PG-28.2 Welded Access or Inspection Openings Under External Pressure. The maximum allowable working
pressure for welded access or inspection openings, with
inward projections subjected to external pressure (such
as manhole or handhole rings with internal covers),
may be determined in accordance with the rules of
PG-27 when the following requirements are met. The
length of the internal projection of the ring extending past
the toe of the attachment weld on the ring, shall not exceed the thickness of the ring. The length past the toe of
the weld is measured at the location of the shortest ring
projection into the vessel (see Figure PG-28). For elliptical
PG-27.4.9 The maximum allowable working pressure P need not include the hydrostatic head loading,
PG-22, when used in this equation.
PG-27.4.10 The following requirements apply to
bimetallic tubes when the strength of the clad is included.
For additional fabrication requirements, see PW-44. For
such bimetallic tubes, the thermal conductivity of the base
metal shall be equal to or greater than the thermal conductivity of the clad material. The cladding process shall
achieve a metallurgical bond between the clad and the
base metal (core tube).
21
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-27.4.7 If pipe is ordered by its nominal wall
thickness, as is customary in trade practice, the manufacturing tolerance on wall thickness must be taken into account. After the minimum pipe wall thickness t is
determined by the formula, this minimum thickness shall
be increased by an amount sufficient to provide the manufacturing tolerance allowed in the applicable pipe specification. The next heavier commercial wall thickness may
then be selected from Standard thickness schedules as
contained in ASME B36.10M. The manufacturing tolerances are given in the several pipe specifications listed
in PG-9.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
rings the value of D to be used in the procedures of PG-27
shall be determined in accordance with the following
equation for elliptical rings:
where
a = outside major axis of the ellipse
b = outside minor axis of the ellipse
This provision does not apply to flanged in manholes
covered by PG-29.3, PG-29.7, and PG-29.12.
PG-28.3 Maximum Allowable External Working
Pressure for Cylindrical Components.
PG-28.3.1 The maximum allowable working presð15Þ
sure of cylindrical components under external pressure
shall be as determined by the following rules. External
pressure charts for use in determination of minimum requirements are given in Section II, Part D, Subpart 3.
Figure numbers shown in this Article are contained in
that Subpart. Section I includes design rules for stiffening
rings for external pressure design for furnaces only (see
PFT-17.11). For stiffening rings for other cylindrical components under external pressure, see PG-16.1.
PG-28.3.1.1 The following symbols are used in
the procedures of this Article:
A = factor determined from Section II, Part D, Subpart
3, Figure G and used to enter the applicable material chart in Section II, Part D. For the case of cylinders having D o / t va lues less than 10, see
PG-28.3.1.2(a).
A S = cross‐sectional area of stiffening ring
Figure PG-28
Maximum Internal Projection of Welded Access or Inspection Openings
Length past the toe
GENERAL NOTE: For other acceptable weld configurations, see Figure PW-16.1.
22
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
B = factor determined from the applicable material
chart in Section II, Part D, for maximum design metal temperature
D o = outside diameter of cylindrical component
E = modulus of elasticity of material at design temperature. (For this value see the applicable materials
chart in Section II, Part D. Interpolation may be
made between the lines for intermediate
temperatures.)
I S = required moment of inertia of stiffening ring about
its neutral axis parallel to the axis of the furnace
L = total length, of a cylindrical component between
lines of support, or design length of a furnace taken
as the largest of the following:
(a) the greatest center‐to‐center distance between any two adjacent stiffening rings
(b) the distance between the tubesheet and the
center of the first stiffening (ring reinforced)
(c) the distance from the center of the first stiffening ring to a circumferential line on a formed
head at one‐third the depth from the head tangent
line
L s = one‐half of the distance from the center line of the
stiffening ring to the next line of support on one
side, plus one‐half of the center line distance to
the next line of support on the other side of the stiffening ring, both measured parallel to the axis of
the cylinder. (See PFT-17.11 for design of stiffening
rings.) A line of support is
(a) a stiffening ring that meets the requirements
of PFT-17.11
(b) a circumferential connection to a tubesheet
or jacket for a jacketed section of a cylindrical shell
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
P =
Pa =
S =
t =
tS =
(c) a circumferential line on a formed head at
one‐third the depth of the head from the head tangent line
external design pressure
calculated value of allowable external working
pressure for the assumed value of t
the maximum allowable stress value at design metal temperature
minimum required thickness of cylindrical
components
nominal thickness of cylindrical components
Step 8. Compare the calculated value of P a obtained in
Step 6 or Step 7 with P . If P a is smaller than P , select a
larger value for t and repeat the design procedure until
a value of P a is obtained that is equal to or greater than P .
(b) cylinders having D o /t values of less than 10
Step 1. Using the same procedure as given in (a) above,
obtain the value of B . For values of D o /t less than 4, the
value of A shall be calculated using the following
equation:
For values of A greater than 0.10, use a value of 0.10.
Step 2. Using the value of B obtained in Step 1, calculate
a value of P a 1 using the following equation:
Step 3. Calculate a value of P a 2 using the following
equation:
where S B is the lesser of 2 times the maximum allowable
stress values at design metal temperature from Section II,
Part D, Subpart 1, Tables 1A and 1B; or, 1.8 times the yield
strength of the material at Design Metal Temperature
from Section II, Part D, Subpart 1, Table Y-1.
Step 4. The smaller of the values of P a 1 calculated in
Step 2, or P a 2 calculated in Step 3 shall be used for the
maximum allowable external pressure P a . If P a is smaller
than P , select a larger value for t and repeat the design
procedure until a value for P a is obtained that is equal
to or greater than P .
PG-28.3.1.3 The design pressure or maximum
allowable working pressure shall be not less than the
maximum expected difference in operating pressure that
may exist between the outside and the inside of the cylindrical component at any time.
PG-28.3.1.4 When necessary, furnaces shall be
provided with stiffeners or other additional means of support to prevent overstress or large distortions under the
external loadings listed in PG-22 other than pressure and
temperature.
Step 7. For values of A falling to the left of the applicable material/temperature line, the value of P a shall be
calculated using the following equation:
23
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-28.3.1.2 Cylindrical Components. The required minimum thickness of a cylindrical component und e r e x t e r na l p r es s u r e , ei t he r s ea m le s s o r w it h
longitudinal butt joints, shall be determined by the following procedure:
(a) cylinder having D o /t values equal to or greater than
10
Step 1. Assume a value of t and determine the ratios
L/D o and D o /t.
Step 2. Enter Section II, Part D, Subpart 3, Figure G at
the value of L /D o determined in Step 1. For values of
L /D o greater than 50, enter the chart at a value of
L /D o = 50. For values of L /D o less than 0.05, enter the
chart at a value of L/D o = 0.05.
Step 3. Move horizontally to the line for the value of
D o /t determined in Step 1. Interpolation may be made
for intermediate values of D o /t . From this point of intersection, move vertically downward to determine the value of Factor A .
Step 4. Using the value of A calculated in Step 3, enter
the applicable material chart in Section II, Part D, for
the material under consideration. Move vertically to an
intersection with the material/temperature line for the
design temperature. Interpolation may be made between
lines for intermediate temperatures. In cases where the A
value falls to the right of the end of the material temperature line, assume an intersection with the horizontal projection of the upper end of the material/temperature line.
For values of A falling to the left of the material/temperature line, see Step 7.
Step 5. From the intersection obtained in Step 4, move
horizontally to the right and read the value of Factor B .
Step 6. Using the value of B , calculate the value of the
maximum allowable external pressure, P a , using the following equation:
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PG-29
DISHED HEADS
be the minimum thickness of a head with a flanged‐in
manhole opening for any form of head and the maximum
allowable working stress shall not exceed the values given in Section II, Part D, Subpart 1, Table 1A.
PG-29.1 The thickness of a blank unstayed dished
head with the pressure on the concave side, when it is a
segment of a sphere, shall be calculated by the following
equation:
PG-29.6 No head, except a full‐hemispherical head,
shall be of a lesser thickness than that required for a
seamless shell of the same diameter.
PG-29.7 A blank head of a semiellipsoidal form in ð15Þ
which half the minor axis or the depth of the head is at
least equal to one‐quarter of the inside diameter of the
head shall be made at least as thick as the required thickness of a seamless shell of the same diameter as provided
in PG-27 or A-317. If a flanged‐in manhole that meets the
Code requirements is placed in an ellipsoidal head, the
thickness of the head shall be the same as for a head
dished to a segment of a sphere (see PG-29.1 and
PG-29.5) with a dish radius equal to eight‐tenths the outside diameter of the head and with the added thickness
for the manhole as specified in PG-29.3.
where
L = radius to which the head is dished, measured on
the concave side of the head
P = maximum allowable working pressure (hydrostatic
head loading need not be included)
S = maximum allowable working stress, using values
given in Section II, Part D, Subpart 1, Table 1A
t = minimum thickness of head
w = weld joint strength reduction factor per PG-26
PG-29.1.1 If local thin areas are present in the
spherical portion of the dished head, the required thickness may be less than the thickness determined in
PG-29.1 provided the requirements of Mandatory Appendix IV are met.
PG-29.8 When heads are made to an approximate ellipsoidal shape, the inner surface of such heads must lie
outside and not inside of a true ellipse drawn with the
major axis equal to the inside diameter of the head and
one‐half the minor axis equal to the depth of the head.
The maximum variation from this true ellipse shall not exceed 0.0125 times the inside diameter of the head.
PG-29.2 The radius to which a head is dished shall be
not greater than the outside diameter of flanged portion
of the head. Where two radii are used the longer shall
be taken as the value of L in the equation.
PG-29.11 The thickness of a blank unstayed full‐
hemispherical head with the pressure on the concave side
shall be calculated by the following equation:
PG-29.4 Except as otherwise provided for in
PG-29.3, PG-29.7, and PG-29.12, all openings which require reinforcement, placed in a head dished to a segment
of a sphere, or in an ellipsoidal head, or in a full‐
hemispherical head, including all types of manholes except those of the integral flanged‐in type, shall be reinforced in accordance with the rules in PG-33.
When so reinforced, the thickness of such a head may
be the same as for a blank unstayed head.
where
L = radius to which the head was formed, measured on
the concave side of the head
P = maximum allowable working pressure
S = maximum allowable working stress, using values
given in Section II, Part D, Subpart 1, Table 1A
t = minimum thickness of head
w = weld joint strength reduction factor per PG-26
PG-29.5 Where the radius L to which the head is
dished is less than 80% of the outside diameter of the
head, the thickness of a head with a flanged‐in manhole
opening shall be at least that found by making L equal
to 80% of the outside diameter of the head and with
the added thickness for the manhole. This thickness shall
24
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-29.9 Unstayed dished heads with the pressure on
the convex side shall have a maximum allowable working
pressure equal to 60% of that for heads of the same dimensions with the pressure on the concave side.
Head thicknesses obtained by using the equations in
PG-29.11 for hemispherical heads and PG-29.7 for blank
semiellipsoidal heads do not apply to heads with pressure
on the convex side.
PG-29.3 When a head dished to a segment of a
sphere has a flanged‐in manhole or access opening that
exceeds 6 in. (150 mm) in any dimension, the thickness
shall be increased by not less than 15% of the required
thickness for a blank head computed by the above formula, but in no case less than 1/8 in. (3 mm) additional thickness over a blank head. Where such a dished head has a
flanged opening supported by an attached flue, an increase in thickness over that for a blank head is not required. If more than one manhole is inserted in a head,
the thickness of which is calculated by this rule, the minimum distance between the openings shall be not less than
one‐fourth of the outside diameter of the head.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PG-30.1.3 That through‐stays be used attached to
the dished head by outside and inside nuts.
The above equation shall not be used when the required thickness of the head given by this formula exceeds 35.6% of the inside radius, and instead, the
following equation shall be used:
PG-30.1.4 That the maximum allowable working
pressure shall not exceed that calculated by the rules
for an unstayed dished head plus the pressure corresponding to the strength of the stays or braces secured
by the formula for braced or stayed surfaces given in
PG-46, using 1.3 for the value of C.
where
PG-30.2 If a stayed dished head concave to pressure
is formed with a flattened spot or surface, the diameter of
the flat spot shall not exceed that allowable for flat heads
as given by the formula in PG-31, using C = 0.25.
Joints in full‐hemispherical heads including the joint to
the shell shall be governed by and meet all the requirements for longitudinal joints in cylindrical shells, except
that in a buttwelded joint attaching a head to a shell the
middle lines of the plate thicknesses need not be in
alignment.
If local thin areas are present in the full-hemispherical
head, the required thickness may be less than the thickness determined above provided the requirements of
Mandatory Appendix IV are met.
PG-31
PG-31.1 The minimum thickness of unstayed flat
heads, cover plates, and blind flanges shall conform to
the requirements given in this paragraph. These requirements apply to both circular and noncircular6 heads and
covers. Some acceptable types of flat heads and covers are
shown in Figure PG-31. In this figure, the dimensions of
the welds are exclusive of extra metal required for corrosion allowance.
PG-29.12 If a flanged‐in manhole that meets the Code
requirements is placed in a full‐hemispherical head, the
thickness of the head shall be the same as for a head
dished to a segment of a sphere (see PG-29.1 and
PG-29.5), with a dish radius equal to eight‐tenths the outside diameter of the head and with the added thickness
for the manhole as specified in PG-29.3.
PG-31.2 The notations used in this paragraph and in ð15Þ
Figure PG-31 are defined as follows:
PG-29.14 If a dished head concave to pressure is
formed with a flattened spot or surface, the diameter of
the flat spot shall not exceed that allowable for flat heads
as given by the equation in PG-31, using C = 0.25.
STAYED DISHED HEADS
PG-30.1 When dished heads are of a thickness less
than called for by PG-29, they shall be stayed as flat surfaces, no allowance being made in such staying for the
holding power due to the spherical form unless all of
the following conditions are met:
PG-30.1.1 That they be at least two‐thirds as thick
as called for by the rules for unstayed dished heads.
PG-30.1.2
thickness.
That they be at least 7/8 in. (22 mm) in
25
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
C = a factor depending on the method of attachment of
head and on the shell, pipe, or header dimensions,
and other items as listed in PG-31.4 below, dimensionless. The factors for welded covers also include
a factor of 0.667 that effectively increases the allowable stress for such constructions to 1.5S.
D = long span of noncircular heads or covers measured
perpendicular to short span
d = diameter, or short span, measured as indicated in
Figure PG-31
h G = gasket moment arm, equal to the radial distance
from the center line of the bolts to the line of the
gasket reaction, as shown in Figure PG-31, illustrations (j) and (k)
L = perimeter of noncircular bolted head measured
along the centers of the bolt holes
l = length of flange of flanged heads, measured from
the tangent line of knuckle, as indicated in Figure
PG-31, illustrations (a) and (c)
m = the ratio t r /t s , dimensionless
P = maximum allowable working pressure
r = inside corner radius on a head formed by flanging
or forging
S = maximum allowable stress value, using values given in Section II, Part D, Subpart 1, Table 1A
t = minimum required thickness of flat head or cover
t 1 = throat dimension of the closure weld, as indicated
in Figure PG-31, illustration (r)
t f = nominal thickness of the flange on a forged head, at
the large end, as indicated in Figure PG-31, illustration (b)
PG-29.13 The corner radius of an unstayed dished
head measured on the concave side of the head shall be
not less than three times the thickness of the material
in the head; but in no case less than 6% of the outside diameter of the head. In no case shall the thinning‐down due
to the process of forming, of the knuckle portion of any
dished head consisting of a segment of a sphere encircled
by a part of a torus constituting the knuckle portion (torispherical), exceed 10% of the thickness required by the
formula in PG-29.1. Other types of heads shall have a
thickness after forming of not less than that required by
the applicable equation.
PG-30
UNSTAYED FLAT HEADS AND COVERS
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
ð15Þ
Figure PG-31
Some Acceptable Types of Unstayed Flat Heads and Covers
Center of lap
Center of weld
ts
Tangent line
t
ts
tf min. = 2ts
ts
tf
r = 3t min.
d
Taper
r = 3tf min.
t
d
t
t
C = 0.17
C = 0.30
(b)
(a)
t
(c)
0.7ts
ts
t
0.7ts
ts
t
d
C = 0.13
See Note (1)
(d)
(e)
See Note (1)
(g-1)
Min. included angle
30 deg with a min. of
15 deg on the head
Min. 1/8 in. (3 mm)
0.7ts
Min. 0 in. (0 mm)
d
C = 0.33 m
C = 0.33
(g-2)
t
C min. = 0.20
d
C = 0.33
(i-1)
hG
hG
d
d
t
C = 0.3 [see Note (2)]
d
(j)
(i-2)
Retaining
ring
t
C = 0.30 [see Note (2)]
d
t
C = 0.30
(m)
(n)
ts
t1
30 deg min.
45 deg max.
d
Threaded
ring
C = 0.30
(k)
d
1.25tr
min.
Seal weld
t
C = 0.30
(o)
3/ t
4
min.
0.8ts min.
t
d
t
t
d
t
Min. t1 = t or ts
whichever
is greater
or
d
C = 0.25
C = 0.75
[see Note (3)]
C = 0.33
C = 0.33
(p)
(q)
(r)
(s)
ts
GENERAL NOTE: The above illustrations are diagrammatic only. Other designs that meet the requirements of PG-31 will be acceptable.
NOTES:
(1) For illustrations (e), (f), and (g‐1) circular covers, C = 0.33m, C min. = 0.20; noncircular covers, C = 0.33.
(2) Use PG-31.3.2 eq. (2) or PG-31.3.3 eq. (5).
(3) When pipe threads are used, see Table PG-39.
26
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
t
t
45 deg max.
ts
45 deg max.
t
t
d
Not less than the smaller
of ts or 1/4 in. (6 mm)
Min. gap 1/8 in. (3 mm)
Min. included angle 30 deg with
a min. of 15 deg on the head
Bevel optional
t
d
Bevel optional
ts
Continuation
of shell
optional
See Note (1)
t
d
(f)
tw = 2tr min. not less than 1.25ts
but need not be greater than t
Projection beyond
weld is optional
ts
tw = 2 tr min. not less than 1.25ts
but need not be greater than t
Projection beyond
weld is optional
0.7ts
r = 1/4 t min.
d
r = 3t min.
t
d
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
t h = nominal thickness of flat head or cover
t r = thickness required for pressure of seamless shell,
pipe, or header
t s = minimum specified thickness of shell, pipe, or
header
t w = thickness through the weld joining the edge of a
head to the inside of a drum, pipe, or header, as indicated in Figure PG-31, illustrations (g-1) and
(g-2)
W = total bolt load, as further defined in PG-31.3.2
Z = a factor for noncircular heads and covers that depends on the ratio of short span to long span, as given in PG-31.3, dimensionless
where
ð4Þ
with the limitation that Z need not be greater than 21/2.
Equation (3) does not apply to noncircular heads, covers, or blind flanges attached by bolts causing a bolt edge
moment [Figure PG-31, illustrations (j) and (k)]. For noncircular heads of this type, the required thickness shall be
calculated by the following equation:
ð5Þ
PG-31.3 The thickness of flat unstayed heads, covers,
and blind flanges shall conform to one of the following
three requirements.7
When using eq. (5), the thickness t shall be calculated
in the same way as specified above for eq. PG-31.3.2(2).
PG-31.4 For the types of construction shown in ð15Þ
Figure PG-31, the minimum values of C to be used in
eqs. PG-31.3.2(1), PG-31.3.2(2), PG-31.3.3(3), and
PG-31.3.3(5) are:9
Figure PG-31, illustration (a): C = 0.17 for flanged circular and noncircular heads forged integral with or buttwelded to the shell, pipe, or header, with an inside
corner radius not less than three times the required head
thickness, with no special requirement with regard to
length of flange, and where the welding meets all the requirements for circumferential joints given in Part PW.
C = 0.10 for circular heads, where the flange length for
heads of the above design is not less than
PG-31.3.1 Circular blind flanges of ferrous materials conforming to ASME B16.5 shall be acceptable for the
diameters and pressure–temperature ratings in Table 2 of
that Standard when of the types shown in Figure PG-31,
illustrations (j) and (k).
ð15Þ
PG-31.3.2 The minimum required thickness of flat
unstayed circular heads, covers, and blind flanges shall be
calculated by the following equation:
ð1Þ
ð6Þ
When C = 0.10 is used, the slope of the tapered sections
shall be no greater than 1:3.
Figure PG-31, illustration (b): C = 0.17 for circular and
noncircular heads forged integral with or buttwelded to
the shell, pipe, or header, where the corner radius on
the inside is not less than three times the thickness of
the flange and where the welding meets all the requirements for circumferential joints given in Part PW.
Figure PG-31, illustration (c): C = 0.30 for circular
flanged plates screwed over the end of the shell, pipe,
or header, with inside corner radius not less than 3t , in
which the design of the threaded joint against failure by
shear, tension, or compression, resulting from the end
force due to pressure, is based on a factor of safety of at
least 4, and the threaded parts are at least as strong as
the threads for standard piping of the same diameter. Seal
welding may be used, if desired.
Figure PG-31, illustration (d): C = 0.13 for integral flat
circular heads when the dimension d does not exceed
24 in. (600 mm); the ratio of thickness of the head to
the dimension d is not less than 0.05 nor greater than
0.25; the head thickness t h is not less than the shell thickness t s , the inside corner radius is not less than 0.25t ; and
ð2Þ
When using eq. (2) the thickness t shall be calculated
for both design conditions and gasket seating, and the
greater of the two values shall be used. For design conditions, the value of P shall be the maximum allowable
working pressure, the value of S at design temperature
shall be used, and W shall be the sum of the bolt loads required to resist the end pressure load and to maintain
tightness of the gasket.8 For gasket seating, P equals zero,
the value of S at atmospheric temperature shall be used,
and W shall be the average of the required bolt load and
the load available from the bolt area actually used.
ð15Þ
PG-31.3.3 Flat unstayed heads, covers, or blind
flanges may be square, rectangular, elliptical, obround,
segmental, or otherwise noncircular. Their required
thickness shall be calculated by the following equation:
ð3Þ
27
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
except when the head, cover, or blind flange is attached by
bolts causing an edge moment [Figure PG-31, illustrations
(j) and (k)] in which case the thickness shall be calculated
by the following equation:
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
of the extra moment applied to the cover by the bolting.
When the cover plate is grooved for a peripheral gasket,
as shown in illustration (k), the net cover plate thickness
under the groove or between the groove and the outer
edge of the cover plate shall be not less than
for circular heads and covers, and not less than
for noncircular heads and covers.
Figure PG-31, illustrations (m), (n), and (o): C = 0.3 for
a circular plate inserted into the end of a shell, pipe, or
header and held in place by a positive mechanical locking
arrangement, and when all possible means of failure
either by shear, tension, compression, or radial deformation, including flaring, resulting from pressure and differential thermal expansion, are resisted with a factor of
safety of at least 4. Seal welding may be used, if desired.
Figure PG-31, illustration (p): C = 0.25 for circular and
noncircular covers bolted with a full‐face gasket to shell,
flanges, or side plates.
Figure PG-31, illustration (q): C = 0.75 for circular
plates screwed into the end of a shell, pipe, or header having an inside diameter d not exceeding 12 in. (300 mm);
or for heads having an integral flange screwed over the
end of a shell, pipe, or header having an inside diameter
d not exceeding 12 in. (300 mm); and when the design
of the threaded joint against failure by shear, tension,
compression, or radial deformation, including flaring, resulting from pressure and differential thermal expansion,
is based on a factor of safety of at least 4. If a tapered pipe
thread is used, the requirements of Table PG-39 shall be
met. Seal welding may be used, if desired.
Figure PG-31, illustration (r): C = 0.33 for circular
plates having a dimension d not exceeding 18 in.
(450 mm) inserted into the shell, pipe, or header and
welded as shown, and otherwise meeting the requirements for welded boiler drums including postweld heat
treatment but omitting volumetric examination. The end
of the shell, pipe, or header shall be crimped over at least
30 deg, but not more than 45 deg. The crimping may be
done cold only when this operation will not injure the metal. The throat of the weld shall be not less than the thickness of the flat head or the shell, pipe, or header,
whichever is greater.
Figure PG-31, illustration (s): C = 0.33 for circular beveled plates having a diameter, d , not exceeding 18 in.
(450 mm) inserted into a shell, pipe, or header, the end
of which is crimped over at least 30 deg, but not more
than 45 deg, and when the undercutting for seating leaves
at least 80% of the shell thickness. The beveling shall be
not less than 75% of the head thickness. The crimping
shall be done when the entire circumference of the cylinder is uniformly heated to the proper forging temperature
28
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
the construction is obtained by special techniques of upsetting and spinning the end of the shell, pipe, or header,
such as are employed in closing header ends.
Figure PG-31, illustrations (e), (f), and (g‐1): C = 0.33m
but not less than 0.20 for circular plates and C = 0.33 for
noncircular plates welded to the inside of a drum, pipe, or
header, and otherwise meeting the requirements for the
respective types of welded boiler drums, including post‐
weld heat treatment when required for the drum, but
omitting volumetric examination. If a value of m less than
1 is used in calculating t , the shell thickness, t s , shall be
maintained along a distance inwardly from the inside face
of the head equal to at least
. The throat thickness of
the fillet welds in illustrations (e) and (f) shall be at least
0.7t s . The size of the weld t w in illustration (g‐1) shall be
not less than 2 times the required thickness of a seamless
shell nor less than 1.25 times the nominal shell thickness
but need not be greater than the head thickness; the weld
shall be deposited in a welding groove with the root of the
weld at the inner face of the head as shown in the figure.
Figure PG-31, illustration (g‐2): C = 0.33 for circular
plates, welded to the inside of a drum, pipe, or header,
and otherwise meeting the requirements for the respective types of welded boiler drums, including postweld
heat treatment when required for the drum, but omitting
volumetric examination. When the weld is not deposited
at the inner face of the header, the thickness of the head
that remains unwelded shall be in addition to the thickness of the head calculated per PG-31.3.2. The drum or
header shall be limited to NPS 4 or less.
C = 0.33 for noncircular plates, welded to the inside of a
drum, pipe, or header, and otherwise meeting the requirements for the respective types of welded boiler
drums, including postweld heat treatment when required
for the drum, but omitting volumetric examination. The
throat thickness of the fillet welds in Figure PG-31, illustrations (e) and (f) shall be at least 0.7t s . The size of the
weld t w in illustration (g‐1) shall be not less than 2 times
the required thickness of a seamless shell nor less than
1.25 times the nominal shell thickness but need not be
greater than the head thickness; the weld shall be deposited in a welding groove with the root of the weld at the
inner face of the head as shown in the figure.
Figure PG-31, illustration (i): C = 0.33m but not less
than 0.20 for circular plates welded to the end of the
drum, pipe, or header, when an inside weld with minimum throat thickness of 0.7t s is used. The width at the
bottom of the welding groove shall be not less than
1
/8 in. (3 mm) and the exposed edge not less than t s or
1
/4 in. (6 mm), whichever is smaller. The inside fillet weld
may be omitted, providing t s is not less than 1.25t r and
the factor C is taken as 0.33.
Figure PG-31, illustrations (j) and (k): C = 0.3 for circular and noncircular heads and covers bolted to the shell,
flange, or side plate as indicated in the figures. Note that
eq. PG-31.3.2(2) or eq. PG-31.3.3(5) shall be used because
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
for the material used. For this construction, the ratio t s /d
shall be not less than the ratio P /S nor less than 0.05. The
maximum allowable working pressure for this construction shall not exceed P =5S/d (P = 125S/d ).
PG-38, PG-52, or PG-53, in shells or headers when the diameter of the finished opening, d , as defined in PG-33.3
does not exceed the larger of (a) or (b) below.
(a) the value of d m a x as follows:
(U.S. Customary Units)
OPENINGS AND COMPENSATION10
PG-32
OPENINGS IN SHELLS, HEADERS, AND
DISHED HEADS
PG-32.1 The rules for openings and compensation in
PG-32 through PG-39 shall apply to all openings in shells,
headers, and dished heads except as otherwise provided
in PG-29.3, PG-29.7, PG-29.12, PG-32.1.2, PG-32.1.4,
PG-32.1.5, and PFT-40.
(SI Units)
(b) the smaller of one-fourth the inside diameter of the
shell or header or 23/8 in. (60 mm)
PG-32.1.1 The notations used throughout PG-32.1
are defined as follows:
PG-32.1.5 Openings in Dished Heads. No calculation need be made to determine the availability of compensation for a single opening in dished heads under
the same conditions stipulated for openings in shells
and headers in PG-32.1.4, provided the following additional requirements are met.
PG-32.1.5.1 The openings shall be located completely within the center portion of a dished head
bounded by the tangent line between the spherically
dished portion and the knuckle radius, but not closer than
the thickness of the head to the edge of this circle or to a
flanged‐in manway. For a 2:1 ellipsoidal head, the opening shall be located completely within the center portion
of the head bounded by a circle equal to 80% of the inside
diameter, but not closer than the thickness of the head to
the edge of this circle.
PG-32.1.5.2 For dished heads other than fullhemispherical heads, the maximum allowable opening
diameter shall not exceed that permitted in PG-32.1.4
for an equivalent shell constructed of the same material,
having the same outside diameter as the flange of the
head, and the same maximum allowable working pressure as the head.
PG-32.1.2 Multiple Openings. Groups of openings
may be designed in accordance with the rules for ligaments in PG-52 or PG-53. Multiple openings that are not
designed as ligaments shall comply with PG-38.
PG-32.1.5.3 For full-hemispherical heads, the
maximum allowable opening diameter shall not exceed
that permitted in PG-32.1.4 for an equivalent shell constructed of the same material, having the same outside
diameter as the flange of the head, and the same maximum allowable working pressure as the head; where
the value of K used in the calculations of PG-32.1.4 shall
be one-half the value calculated by the equation in
PG-32.1.1.
PG-32.1.3 Single Openings. Single openings are
defined as openings that have a minimum center‐to‐
center distance between adjacent openings not less than
L h or L s , where
PG-32.2
PG-32.1.4 Openings in Shells and Headers. No
calculation need be made to determine the availability
of compensation for a single opening, not covered by
Shape of Openings.11
PG-32.2.1 Openings in cylindrical portions of vessels or in formed heads shall preferably be circular, elliptical, or obround.12
29
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
A, B = the finished opening diameters of any two finished openings under consideration, in. (mm)
(see d below)
D = the outside diameter of the shell, header, or
dished head containing the opening, in. (mm)
d = diameter of a finished opening, in. (mm)(see
PG-33.3)
d m a x . = the maximum permissible finished opening diameter for an uncompensated opening, in. (mm)
(see PG-32.1.2)
K = P D/1.82St (where K shall not exceed 0.990)
L h = the distance between centers of the two openings measured on the surface of the dished head
L s = the distance between centers of the two openings measured on the surface of the shell or
header
P = the maximum allowable working pressure
S = the maximum allowable stress value, taken from
Tables 1A and 1B of Section II, Part D
t = the nominal thickness of the head, shell, or header, in. (mm)
X = the limits of compensation parallel to the vessel
wall (see PG-36.2)
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
When the long dimension of an elliptical or obround
opening exceeds twice the short dimension, the compensation across the short dimension shall be increased as
necessary to provide against excessive distortion due to
twisting moment.
PG-29.12; openings in flat heads covered by PG-35; and
openings covered within PG-32.1.2, PG-32.1.4, and
PG-32.1.5.
When required, compensation shall be provided in such
amount and distribution that the requirements for area of
compensation are satisfied for all planes through the center of the opening and normal to the vessel surface. For a
circular opening in a cylindrical shell, the plane containing the axis of the shell is the plane of greatest loading
due to pressure.
PG-32.2.2 Openings may be of other shapes than
those given in PG-32.2.1, and all corners shall be provided
with a suitable radius. When the openings are of such proportions that their strength cannot be computed with assurance of accuracy, or when doubt exists as to the safety
of a vessel with such openings, the part of the vessel affected shall be subjected to a proof hydrostatic test as prescribed in PG-18.
PG-33.2 Area Required. The total cross‐sectional
area of compensation required in any given plane for a
vessel under internal pressure shall be not less than A ,
as defined in Figure PG-33.1.
PG-32.3 Size of Openings.
PG-32.3.1 Properly reinforced openings in cylindrical and spherical shells are not limited as to size and
shall comply with the provisions that follow, and with
the additional provisions given under PG-32.3.2.
PG-33.3 The notation used in this paragraph is de- ð15Þ
fined as follows:
PG-32.3.2 The rules given herein for compensation apply to openings not exceeding the following
dimensions:
(a) for vessels 60 in. (1 500 mm) inside diameter and
less, one-half the vessel inside diameter but not over
20 in. (500 mm)
(b) for vessels over 60 in. (1 500 mm) inside diameter,
one-third the vessel inside diameter but not over 40 in.
(1 000 mm)
ð15Þ
PG-32.3.3 Larger openings should be given special
attention and may be provided with compensation in any
suitable manner that complies with the intent of the Code
rules. It is recommended that the compensation provided
be distributed close to the opening. (A provision of about
two‐thirds of the required compensation within a distance of three-fourths times the limit established in
PG-36.2 on each side of the opening as measured from
the center of the opening is suggested.) Special consideration should be given to the fabrication details used and
the inspection employed on critical openings; compensation often may be advantageously obtained by use of a
thicker shell plate for a vessel course or inserted locally
around the opening; welds may be ground to concave
contour and the inside corners of the opening rounded
to a generous radius to reduce stress concentrations. Appropriate proof testing may be advisable in extreme cases
of large openings approaching full vessel diameter, openings of unusual shape, etc.
PG-33
COMPENSATION REQUIRED FOR
OPENINGS IN SHELLS AND DISHED
HEADS
PG-33.1 General. The rules in this subparagraph apply to all openings other than flanged‐in openings in
dished heads covered by PG-29.3, PG-29.7, and
30
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
d = diameter in the plane under consideration of the
finished opening (see Figure PG-33.2)
= the maximum diameter of the threads, in the plane
under consideration, in the finished opening, for inside tapped NPT fittings
D p = outside diameter of reinforcing element (The actual size of reinforcing element may exceed the limits of reinforcement established by PG-36;
however, credit cannot be taken for any material
outside these limits.)
F = factor from PG-33 and Figure PG-33.3, which compensates for the variation in pressure stresses on
different planes with respect to the longitudinal
axis of a cylindrical shell. F = 1.0 for formed or flat
heads.
f r = strength reduction factor, not greater than 1.0 (see
Figure PG-33.1)
f r 1 = S n /S v
f r 2 = (lesser of S n or S p )/S v
f r 3 = S P /S v
h = distance nozzle projects inward from the outer surface of the vessel wall (Extension of the nozzle beyond the inside surface of the vessel wall is not
limited; however, for reinforcement calculations,
credit shall not be taken for material outside the
limits of reinforcement established by PG-36.)
R n = inside radius of the nozzle under consideration
S = allowable stress value in tension (from Section II,
Part D, Subpart 1, Tables 1A and 1B)
S n = allowable stress in nozzle (see S )
S P = allowable stress in reinforcing element (plate)
(see S )
S v = allowable stress in vessel (see S)
t = specified vessel wall thickness 13 (not including
forming allowances). For pipe, it is the nominal
thickness less manufacturing undertolerance allowed in the pipe specification.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
ð15Þ
Figure PG-33.1
Nomenclature and Equations for Reinforced Openings
Dp
tn
2.5t or 2.5tn + te
Use smaller value
trn
Rn
WL1
te
WL2
tr
t
See PG-36
for limits of
reinforcement
h
2.5t or 2.5tn
Use smaller value
WL3
d
d or Rn + tn + t
d or Rn + tn + t
Use larger value
Use larger value
For nozzle wall inserted through the vessel wall
For nozzle wall abutting the vessel wall
Notes for set through nozzles, A
extends to the nozzle O.D. [Note (1)]
= A = (d + 2tn)trF
Area required
A = dtrF
= (d – 2tn)(t – Ftr) – 2wd (t – Ftr)(1 – fr1)
= d(t – Ftr)
= A1
Area available in nozzle
projecting outward; use
smaller value
= A2
Area available in nozzle
projecting inward
= A3 = 2tnfr1h
A3 = 0
Area available in outward
nozzle weld
= A41 = (WL1)2fr2
A41 = (WL1)2fr2
Area available in inward
nozzle weld
= A43 = (WL3)2fr1
A43 = 0
A1
= 2t (t – Ftr) – 2wd (t – Ftr)(1 – fr1)
= 2(tn – trn)(21/2tfr1)
A2
= 2(tn – trn)(21/2tn + te)fr1
= 2(t + tn)(t – Ftr)
= 2(tn – trn)(21/2tfr1)
= 2(tn – trn)(21/2tn + te)fr1
If A1 +A2 + A3 + A41 + A43
A
Opening is adequately reinforced
If A1 +A2 + A3 + A41 + A43
A
Opening is not adequately reinforced so
reinforcing elements must be added
and /or thickness must be increased
With reinforcing element added:
Area available in
outer element weld
= A42 = (WL2)2fr3
A42 = (WL2)2fr3
Area available in
element [Note (2)]
= A5 = (Dp – d – 2tn)tefr3
A5 = (Dp – d – 2tn)tefr3
If A1 +A2 + A3 + A41 + A42 + A43 + A5
A
Opening is adequately reinforced
GENERAL NOTES:
(a) This figure illustrates common nozzle configurations and is not intended to prohibit other configurations permitted by the Code.
(b) See PG-33.3 and PG-36 for definitions of nomenclature.
NOTES:
(1) For the left-hand side of the illustration, w d = 0.
(2) This formula is applicable for a rectangular cross‐sectional element that falls within the limits of reinforcement.
31
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Area available in shell:
use larger value
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PG-35
PG-34
COMPENSATION REQUIRED FOR
OPENINGS IN FLAT UNSTAYED HEADS
AND FLAT STAYED PLATES
PG-35.1 General. The rules in this paragraph apply
to all openings other than small openings covered by
PG-32.1.4(b).
PG-35.2 Flat unstayed heads that have an opening
with a diameter that does not exceed one‐half of the head
diameter or shortest span, as defined in PG-31, shall have
a total cross‐sectional area of compensation not less than
0.5 times the required area specified in PG-33.2.
As an alternative, the thickness may be increased to
provide the necessary openings compensation as specified in PG-35.2.1 and PG-35.2.2
PG-35.2.1 By using 2C or 0.75 in place of C, whichever is less, in eq. PG-31.3.2(1) or eq. PG-31.3.3(3) for calculating head thickness in PG-31.3 or
PG-35.2.2 In eq. PG-31.3.2(2) or eq. PG-31.3.3(5)
by doubling the quantity under the square root sign.
PG-35.3 Flat unstayed heads that have an opening
with a diameter that exceeds one‐half of the head diameter or shortest span, as defined in PG-31.3, shall be designed as provided in PG-16.1.
PG-35.4 Openings in flat stayed plates such as waterlegs and tubesheets of firetube boilers shall have a total
cross‐sectional area of compensation not less than
0.5d t , where
d = for circular openings, the diameter of the finished
opening; for elliptical openings, the major axis of
the finished opening; or for other shapes, the maximum span
t = the required thickness for the stayed surface calculated in accordance with PG-46 using the maximum
distance between stays, tubes, or other support in
the area where the opening resides
FLANGED-IN OPENINGS IN FORMED
HEADS
PG-36
PG-34.1 All openings in torispherical, ellipsoidal, and
hemispherical heads shall be provided with reinforcement in accordance with PG-33, except for heads that
meet the requirements in PG-34.2 and PG-29.3, PG-29.7,
and PG-29.12.
LIMITS OF METAL AVAILABLE FOR
COMPENSATION
PG-36.1 The boundaries of the cross‐sectional area
in any plane normal to the vessel wall and passing
through the center of the opening within which area metal must be located in order to have value as compensation are designated as the limits of compensation for
that plane (see Figure PG-33.1).
PG-34.2 A flanged‐in manhole opening in a dished
head shall be flanged to a depth of not less than three
times the required thickness of the head for plate up to
11/2 in. (38 mm) in thickness. For plate exceeding 11/2 in.
(38 mm) in thickness, the depth shall be the thickness
of the plate plus 3 in. (75 mm). The depth of flange shall
be determined by placing a straight edge across the outside opening along the major axis and measuring from
the straight edge to the edge of the flanged opening. A
manhole opening may be compensated by a manhole ring
or other attachment in place of flanging in accordance
with PG-33.
PG-36.2 The limits of compensation, measured parallel to the vessel wall, shall be at a distance, on each side
of the axis of the opening, equal to the greater of the
following:
PG-36.2.1
The diameter of the finished opening.
PG-36.2.2 The radius of the finished opening plus
the thickness of the vessel wall, plus the thickness of the
nozzle wall.
32
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
t e = thickness of attached reinforcing pad or height of
the largest 60 deg right triangle supported by the
vessel and nozzle outside diameter projected surfaces and lying completely within the area of integral reinforcement (see Figure PG-33.2)
t n = nozzle wall thickness.13 Except for pipe, this is the
wall thickness not including forming allowances.
For pipe, use the nominal thickness.
t r = required thickness of a seamless shell or head computed by the rules of the Code for the designated
pressure, except when
(a) the opening and its compensation are in a
torispherical head and are entirely within the spherical portion; t r is the thickness required for a
seamless hemispherical head of the same radius
as that of the spherical portion
(b) the opening and its compensation are in an
ellipsoidal head in which one‐half of the minor axis
is equal to one‐fourth of the inside diameter, and
are located entirely within a circle the center of
which coincides with the center of the head and
the diameter of which is equal to 80% of the shell
inside diameter, t r is the thickness required for a
seamless hemispherical head of radius equal to
90% of the inside diameter of the shell
t r n = required thickness of seamless nozzle wall; found
by the formula used for t r for the shell, omitting
the C factor (the value of S used in determining
t r n shall be based on the nozzle material). The value of t r n shall be taken as zero for the entire wall of
manhole and handhole rings projecting internally
with the cover on the inside.
w d = width of the nozzle inserted into the vessel wall beyond t n , not greater than the larger of d/2 – t n or t
(see Figure PG-33.2)
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PG-33.2
Some Representative Configurations Describing the Dimensions t e , h , and d
tn
tn
tn
d
30 deg min.
te
te
t
h
te
t
d
t
h
tn = 0
h=0
t
d
d
wd = 0
wd = 0
(a)
(b)
60 deg
wd
(c)
(d)
tn
30 deg min.
d
tn
d
d
tn
30 deg
L
3
te = 0
te
d
1
t
t
t
te
t
wd
tx
(e)
wd
(e–1)
(e–2)
tn
(f)
tn
tn
d
3/
4
45 deg max.
te
in. (19 mm)
R min.
te
te
t
t
t
30
deg max.
d
60 deg
60 deg
wd
(g)
(h)
GENERAL NOTE: Use illustration (e) to determine whether illustration (e‐1) or (e‐2) applies:
(1) If L < 2.5t x i , use illustration (e‐1).
(2) If L ≥ 2.5t x i , use illustration (e‐2).
(3) The 30 deg min. transition shown at illustration (e) is typical for illustrations (e‐1) and (e‐2).
33
d
te = 0.732R
wd
wd
(i)
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
wd = 0
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
nozzle wall available as compensation is the smaller of the
values of A 2 given by the equations shown in Figure
PG-33.1.
All metal in the nozzle wall extending inside the vessel
wall may be included. No allowance shall be taken for the
fact that a differential pressure on an inwardly extending
nozzle may cause opposing stress to that of the stress in
the shell around the opening.
Figure PG-33.3
Chart for Determining Value of F
1.00
0.95
PG-36.4.3 Metal added as compensation (continuously about the nozzle) when welded to both the vessel
and nozzle, and metal provided in attachment welds.
0.90
0.85
PG-36.5 Typical examples of the application of the
above rules are presented in A-65 through A-69.
Value of F
0.80
PG-37
0.70
0.65
0.60
0.55
0
10
20
30
40
50
60
70
80
90
Angle With Plane With Longitudinal Axis, deg
GENERAL NOTE:
PG-37.2 The welds that attach elements of compensation that are not an integral part of the vessel wall shall
have a strength, W , not less than the load carried by those
elements defined as follows:
PG-36.3 The limits of compensation, measured normal to the vessel wall, shall conform to the contour of
the surface at a distance from each surface equal to the
smaller of the following:
PG-36.3.1
21/2 times the nominal shell thickness.
where A, A1, and S v are defined in PG-33.3 and Figure
PG-33.1.
1
PG-36.3.2 2 /2 times the nozzle‐wall thickness plus
the thickness of any added compensation, exclusive of
weld metal on the side of the shell under consideration.
PG-37.3 When a reinforcing pad is required by the
rules of PG-33, the welds attaching the nozzle to the
pad and shell shall be checked independently to assure
that the loads carried by the individual elements can be
transmitted by the attaching welds. For detailed requirements and examples of calculating the strength of welds,
see PW-15.
PG-36.4 Metal within the limits of reinforcement that
may be considered to have reinforcing value shall include
the following:
PG-36.4.1 Metal in the vessel wall over and above
the thickness required to resist pressure. The area of the
vessel wall available as compensation is the larger of the
values of A 1 given by the equations shown in Figure
PG-33.1.
PG-37.4 Welds attaching elements of compensation
need not satisfy the weld strength requirements of
PG-37.2 under the following circumstances:
(a) openings that are exempt in PG-32 from compensation calculations
(b) openings designed by ligaments rules of PG-52 and
PG-53 and/or
PG-36.4.2 Metal over and above the thickness required to resist pressure in that part of a nozzle wall extending outside the vessel wall. The maximum area in the
34
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-37.1 Material used for compensation shall have
an allowable stress value equal to or greater than that
of the material in the vessel wall, except that material of
lower strength may be used provided the area of compensation is increased in inverse proportion to the ratio of
the allowable stress values of the two materials to compensate for the lower allowable stress value of the compensation. No credit may be taken for the additional
strength of any compensation having a higher allowable
stress value than that of the vessel wall. Deposited weld
metal outside of either the vessel wall or any reinforcing
pad used as reinforcement shall be credited with an allowable stress value equivalent to the weaker of the materials connected by the weld. Vessel‐to‐nozzle or pad‐
to‐nozzle attachment weld metal within the vessel wall
or within the pad may be credited with a stress value
equal to that of the vessel wall or pad, respectively.
0.75
0.50
STRENGTH OF COMPENSATION
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
(c) openings with elements of compensation attached
by full penetration welds as listed in PW-15.1.6
Figure PG-38
Illustrations of the Rule Given in PG-38.4
PG-37.5 The minimum weld sizes shall not be smaller than the minimum required by PW-16.
5
PG-38
t
COMPENSATION FOR MULTIPLE
OPENINGS
PG-38.1 When any two adjacent openings that require compensation are spaced at less than two times
the distance defined in PG-36.2 so that their limits of compensation overlap, the two openings (or similarly for any
larger group of openings) shall be compensated in accordance with PG-33 with a compensation that has an area
equal to the combined area of the compensation required
for the separate openings. No portion of the cross section
shall be considered as applying to more than one opening,
or be evaluated more than once in a combined area.
tr
3
5
tr
PG-38.2 Two adjacent openings shall have a distance
between centers not less than 11/3 times their average
diameter.
t
tr
7
6
2
1
4
3
8
7
5
PG-38.3 When a group of openings is provided with
compensation by a thicker section buttwelded into the
shell or head, the edges of the inserted section shall be tapered as prescribed in PW-9.3.
6
2
1
4
3
8
7
GENERAL NOTE: The cross‐sectional area represented by 5, 6, 7,
and 8 shall be at least equal to the area of the rectangle represented
by 1, 2, 3, and 4 multiplied by 0.7F, in which F is a value from Figure
PG-33.3 and t r is the required thickness of a seamless shell.
provided for studs, the threads shall be full and clean
and shall engage the stud for a length not less than the
larger of d s or
METHODS OF ATTACHMENT OF PIPE AND
NOZZLE NECKS TO VESSEL WALLS
in which d s is the diameter of the stud, except that the
thread engagement need not exceed 11/2d s . Studded connections shall meet the requirements for compensation.
No credit for compensation shall be allowed for any areas
attached by studs only.
PG-39.1 General. Except as limited in PG-32, nozzles
may be attached to the shell or head of a vessel by any of
the methods of attachment given in this paragraph.
PG-39.2 Welded Connections. Attachment by welding shall be in accordance with the requirements of
PW-15 and PW-16.
PG-39.5 Threaded Connections.
PG-39.5.1 Where a threaded connection is to be
made to a boiler component it shall be into a threaded
hole. The threads shall conform to the requirements of
ASME B1.20.1 and provide for the pipe to engage the
minimum number of threads specified in Table PG-39
after allowance has been made for curvature of the vessel
wall. A built‐up pad or properly attached plate or fitting
may be used to provide the metal thickness and number
of threads required in Table PG-39, or to furnish compensation when required.
PG-39.4 Studded Connections. Connections may be
made by means of bolt studs. The vessel shall have a flat
surface machined on the shell, or on a built‐up pad, or on
a properly attached plate or fitting. Drilled holes to be
tapped for straight threads shall not penetrate within
one‐fourth of the wall thickness from the inside surface
of the vessel, unless at least the minimum thickness required as above is maintained by adding metal to the inside surface of the vessel. Where tapped holes are
35
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-38.4 When a shell or drum has a series of holes in
a definite pattern, the net cross‐sectional area between
any two finished openings within the limits of the actual
shell wall, excluding the portion of the compensation
not fused to the shell wall, shall equal at least 0.7F of
the cross‐sectional area obtained by multiplying the
center‐to‐center distance of the openings by the required
thickness of a seamless shell, where the factor F is taken
from Figure PG-33.3 for the plane under consideration
(see Figure PG-38).
PG-39
2
1
4
8
t
6
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Table PG-39
Minimum Number of Threads Per Connection
U.S. Customary Units
Pressure up to and including 300 psi
Size of pipe connection (NPS)
Threads engaged
Min. plate thickness required, in.
Pressures above 300 psi
Size of pipe connection, (NPS)
Threads engaged
Min. plate thickness, required, in.
…
…
…
1 and 11/4
4
0.348
11/2 and 2
5
0.435
21/2 to 4
7
0.875
5 and 6
8
1.0
8
10
1.25
10
12
1.5
12
13
1.625
/2 and 3/4
6
0.43
1 to 11/2
7
0.61
2
8
0.70
21/2 and 3
8
1.0
4 to 6
10
1.25
8
12
1.5
10
13
1.62
12
14
1.75
1
SI Units
Pressure up to and including 2 MPa
Size of pipe connection (DN)
Threads engaged
Min. plate thickness required (mm)
…
…
…
25 and 32
4
9
40 and 50
5
11
65 to 100
7
22
125 and 150
8
25
200
10
32
250
12
38
300
13
41
Pressures above 2 MPa
Size of pipe connection (DN)
Threads engaged
Min. plate thickness, required (mm)
15 and 20
6
11
25 to 40
7
16
50
8
18
65 and 80
8
25
100 to 150
10
32
200
12
38
250
13
41
300
14
44
PG-42
PG-39.5.2 Threaded joints for boiler connections
for external piping shall be in accordance with the following size and pressure limitations and shall not be used
where the temperature exceeds 925°F (495°C).
Maximum Size, NPS (DN)
(80)
(65)
(50)
(40)
(32)
(25)
(20) and smaller
PG-42.1 The following standards covering flanges
and pipe fittings are acceptable for use under this Section
in accordance with the requirements of PG-11. Pressure–
temperature ratings shall be in accordance with the appropriate standard except that the pressure–temperature
ratings for ASME B16.9 and ASME B16.11 fittings shall be
calculated as for straight seamless pipe in accordance
with the rules of this Section, including the maximum allowable stress for the material. The thickness tolerance of
the ASME standards shall apply.
ASME B16.1, Gray Iron Pipe Flanges and Flanged Fittings, Classes 25, 125, and 25014
ASME B16.3, Malleable Iron Threaded Fittings, Classes
150 and 300
ASME B16.4, Gray Iron Threaded Fittings, Classes 125
and 250
ASME B16.5, Pipe Flanges and Flanged Fittings, NPS 1/2
Through NPS 24 Metric/Inch Standard (see PG-11.3)
• Pressure–temperature ratings per Table 2-1.1
through 2-3.19
• Facing dimensions (other than ring‐joint) per Table 4
• Facing dimensions for ring‐joint flanges per Table 5
• Dimensions of flanges for pressure rating classes per
Tables 8 through 22
ASME B16.9, Factory-Made Wrought Buttwelding
Fittings
Maximum Pressure,
psi (MPa)
400 (3)
500 (3.5)
600 (4)
900 (6)
1,000 (7)
1,200 (8)
1,500 (10)
PG-39.5.3 Threaded connections for plug closures
used for inspection openings, end closures, and similar
purposes may be used within the size and pressure limitations of Table PG-39.
PG-39.6 Expanded Connections. Provided the requirements for compensation are met, a pipe, tube, or forging not exceeding 6 in. (150 mm) in outside diameter
may be attached to shells, heads, headers, or fittings by inserting through an opening and expanding in accordance
with the rules for tube attachment in Parts PWT and PFT,
whichever is applicable.
The sharp edges left in drilling tube holes shall be removed on both sides of the plate with a file or other tool.
The inner surface of the tube hole in any form of attachment may be grooved or chamfered.
NOTE: When pressure ratings are established under the provisions
of ASME B16.9, para. 2.1, they shall be calculated as for straight
seamless pipe in accordance with ASME B31.1. Parts such as lap‐
joint stub ends fabricated by welding with filler metal added may
not be used in Code construction, unless they are fabricated in accordance with PG-11.
PG-39.7 All welded connections shall be postweld
heat treated after attachment unless specifically allowed
otherwise.
36
ð15Þ
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
3
21/2
2
11/2
11/4
1
3
/4
GENERAL REQUIREMENTS FOR FLANGES,
PIPE FITTINGS, AND VALVES
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PG-42.3 Flange Materials. Flanges shall be made of
materials permitted by this Section or of materials specifically listed in the applicable product standards listed in
PG-42.1, but not of materials specifically prohibited or beyond the use limitations listed in this Section. Rolled or
forged flanges may be made from material conforming
to any forging specification among these permitted materials, except that SA-181 shall not be used for flanges
whose pressure rating is higher than Class 300 (PN 50).
Hub‐type flanges shall not be cut or machined from plate
material.
ASME B16.11, Forged Fittings, Socket-Welding and
Threaded (see PG-11.3)
ASME B16.15, Cast Copper Alloy Threaded Fittings,
Classes 125 and 250 (see PG-8.4 and PG-42.4.11)
ASME B16.20, Metallic Gaskets for Pipe Flanges, RingJoint, Spiral-Wound, and Jacketed
ASME B16.24, Cast Copper Alloy Pipe Flanges and
Flanged Fittings, Classes 150, 300, 600, 900, 1500, and
2500 (see PG-8.4)
ASME B16.25, Buttwelding Ends
ASME B16.34, Valves — Flanged, Threaded, and Welding End (see PG-11.3 and PG-42.4.3)
ASME B16.42, Ductile Iron Pipe Flanges and Flanged
Fittings, Classes 150 and 300 (see PG-8.3)
PG-42.4 Additional Requirements. Flanges made of
other materials permitted under this Section shall be at
least equal to the strength requirements, and the facing
dimensions and bolt circles shall agree with the Standard
otherwise required.
PG-42.4.1 The thickness of all fitting and valve
bodies subject to pressure shall be not less than that required by the applicable ASME Standard listed in
PG-42.1 for the corresponding maximum allowable working pressure and temperature for the material used. The
cylindrical ends of cast steel welding end valves and fittings conforming to ASME B16.5 or ASME B16.34 may
be proportioned with a casting quality factor of 100%
provided these areas are finish‐machined both inside
and outside, are carefully inspected, and that the contour
of the welding end transition complies with PG-42.4.2.
PG-42.4.2 The welding ends of component bodies
such as fittings and valves, whether constructed of cast
products, wrought products, or any other fabrication process acceptable under the Code, shall provide a gradual
change in thickness from that of the adjoining pipe to that
of the component body. Any configuration of weld end
transition that lies entirely within the envelope shown
in Figure PG-42.1 is acceptable, provided that
(a) the wall thickness in the transition region is not less
than the smaller of the fitting or valve thickness required
by PG-42.4.1 or the minimum value of the pipe thickness
t m i n defined under Figure PG-42.1.
(b) the transition region including the weld joint shall
avoid sharp reentrant angles and abrupt changes in slope.
When the included angle between any two adjoining surfaces of a taper transition is less than 150 deg, the intersection or corner (except for the weld reinforcement)
shall be provided with a radius of at least 0.05t m i n .
The configurations and tolerances suggested by such
weld end standards as ASME B16.9 and ASME B16.25
are acceptable only to the extent that the resulting product and weld joint will comply with these requirements
of PG-42.4.2. In Figure PG-42.1 the thickness in the plane
at the end of the fitting or valve shall not be less than t m i n
and shall not exceed a maximum of either: the greater of
[t m i n + 0.15 in. (4 mm)] or 1.15t m i n when ordered on a
minimum wall basis, or the greater of [t m i n + 0.15 in.
(4 mm)] or 1.10t n o m when ordered on a nominal wall
basis.
PG-42.2 Marking. All valves and fittings shall be
marked with the name, trademark, or other identification
of the manufacturer and the primary service pressure rating except that the pressure-rating marking may be
omitted from:
PG-42.2.1 Cast iron threaded fittings for Class 125
(PN 20) working pressure
PG-42.2.2 Malleable iron threaded fittings for
Class 150 (PN 20) working pressure
PG-42.2.3 Nonferrous threaded fittings for Classes
125 (PN 20) and 250 (PN 50) working pressure
PG-42.2.4
flanges
Cast iron and nonferrous companion
PG-42.2.5 Additional markings for buttwelding fittings, as called for by several Code Standards for all valves
and fittings, are recommended if the size and shape of the
valve or fitting permit.
37
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-42.1.1 A forged nozzle flange may use the
ASME B16.5 and ASME B16.47 pressure–temperature ratings for the flange material being used, provided all of the
following are met:
(a) For ASME B16.5 applications, the forged nozzle
flange shall meet all dimensional requirements of a
flanged fitting given in ASME B16.5 with the exception
of the inside diameter. The inside diameter of the forged
nozzle flange shall not exceed the inside diameter of the
same size lap-joint flange given in ASME B16.5. For ASME
B16.47 applications, the inside diameter shall not exceed
the weld hub diameter, A , given in the ASME B16.47
tables.
(b) For ASME B16.5 applications, the outside diameter
of the forged nozzle neck shall be at least equal to the
hub diameter of the same size and class ASME B16.5 lapjoint flange. For ASME B16.47 applications, the outside
diameter of the hub shall at least equal the X diameter given in the ASME B16.47 tables. Larger hub diameters
shall be limited to nut stop diameter dimensions. See Section VIII, Division 1, Figure 2-4, illustrations (12) and
(12a).
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PG-42.1
Welding End Transitions Maximum Envelope
tmin
2
11/2tmin
Outside
Radius of at least 0.05tmin
Radius not mandatory
45 deg maximum
30 deg maximum
Component or fitting
Maximum–See Note (2)
tnom
tmin
Minimum–1.0tmin
30 deg maximum
See Note (1)
Radius of at least 0.05tmin
2tmin
Transition region
GENERAL NOTES:
(a) Weld bevel is shown for illustration only.
(b) The weld reinforcement permitted by PW-35 may be outside the maximum envelope.
NOTES:
(1) The value of t m i n is whichever of the following is applicable:
(a) the minimum ordered wall thickness of the pipe; or
(b) the minimum ordered wall thickness of the tube; or
(c) 0.875 times the nominal wall thickness of pipe ordered to a pipe schedule wall thickness that has an undertolerance of 12.5%; or
(d) the minimum ordered wall thickness of the cylindrical welding end of a component or fitting (or the thinner of the two) when the joint
is between two components
(2) The maximum thickness at the end of the component is
(a) the greater of [t m i n + 0.15 in. (4 mm)] or 1.15t m i n when ordered on a minimum wall basis
(b) the greater of [t m i n + 0.15 in. (4 mm)] or 1.10t n o m when ordered on a nominal wall basis
38
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Maximum slope
1:3
Inside
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PG-42.4.3 Fittings in which there are minor
changes in the center‐to‐face dimensions or in which
the angles of elbows differ from those given in an ASME
Standard in PG-42.1 may be considered to fall within
the scope of the standard provided the other requirements for materials, dimensions, and thickness are met.
otherwise be required. Bronze threaded fittings may be
used if they comply with ASME B16.15. The material shall
comply with PG-8.4 and the allowable working stresses
are not to exceed the values given in Section II, Part D,
Subpart 1, Table 1B, except as provided in PG-73.3.4.
Bronze shall not be used where steel or other material
is specifically required. Threaded-type fittings shall not
be used where flanged types are specified.
PG-42.4.4 Flanges and flanged fittings meeting the
requirements of ASME B16.5 or valves meeting the requirements of ASME B16.34 may be used at the pressure–
temperature ratings established by those standards. Standard Class, Special Class, or Limited Class valves may be
used, provided that all parts of the valves are suitable
for the pressure–temperature conditions at which they
are to be used. Valves of intermediate rating or class, as
described in ASME B16.34, are permitted.
PG-43
NOZZLE NECK THICKNESS
The minimum thickness of a nozzle neck (including access openings and openings for inspection) shall not be
less than the thickness required for the applicable loadings. Additionally, the minimum thickness of a nozzle
neck (except for access openings and openings for inspection) shall be not less than the smaller of the following:
PG-42.4.5 When the service requirements exceed
the permissible values given in ASME B16.5 or ASME
B16.34, the requirements of the Code will be met if the
bolting material, flange thickness, and/or body thickness
are increased so that the deflection limits are no greater
and the factor of safety is no less than that of the nearest
Pressure Rating Class in ASME B16.5 or ASME B16.34.
PG-43.1 The minimum required thickness of a seamless shell or head to which it is attached.
PG-43.2 The minimum wall thickness of standard‐
wall pipe listed in ASME B36.10M.
PG-44
INSPECTION OPENINGS
PG-42.4.7 ASME Standard slip‐on flanges shall not
exceed NPS 4 (DN 100). Attachment of slip‐on flanges
shall be by double fillet welds. The throats of the fillet
welds shall not be less than 0.7 times the thickness of
the part to which the flange is attached.
PG-42.4.8 ASME Standard socket welded flanges
may be used in piping or boiler nozzles provided the dimensions do not exceed NPS 3 (DN 80) for Class 600
(PN 110) and lower, and NPS 2 1/2 (DN 65) in Classes
900 (PN 150) and 1,500 (PN 260).
PG-42.4.9 Threaded fittings of cast iron or malleable iron conforming to the requirements of the ASME
Standards for Classes 125 (PN 20), 150 (PN 20), 250
(PN 50), and 300 (PN 50) pressure may be used except
where otherwise specifically prohibited or where flanged
fittings are specifically required. They shall not be used
for temperatures over 450°F (230°C).
PG-42.4.10 Cast‐ or forged‐steel threaded fittings
or valves that are at least equal to the strength requirements of the ASME Standard fittings that would otherwise
be required may be used in all cases except where flanged
fittings are specifically required.
PG-44.2 Manhole and handhole cover plates and
yokes shall be of rolled, forged, or cast steel except that
for pressures not exceeding 250 psi (1.7 MPa), and/or
temperatures not exceeding 450°F (230°C), either handhole cover plates or yokes may be made of cast iron complying with SA-278.
The strength of all such parts together with the bolts
and yokes, if any, shall be proportioned for the service
for which they are used.
PG-42.4.11 The casting quality factors given in
PG-25 do not apply to ASME Standard cast steel fittings
whose dimensions and ratings are incorporated in the
Code.
Bronze threaded or flanged type fittings or valves may
be used provided they are at least equal to the strength
requirements of ASME B16.1 gray iron fittings that would
39
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-44.1 All boilers or parts thereof shall be provided
with suitable manhole, handhole, or other inspection
openings for examination or cleaning, except for special
types of boilers where such openings are manifestly not
needed or used.
Specific requirements for access openings in certain
types of boilers appear in other paragraphs.
An elliptical manhole opening shall be not less than
12 in. × 16 in. (300 mm × 400 mm) in size.
A circular manhole opening shall be not less than 15 in.
(380 mm) in diameter.
A handhole opening in a boiler drum or shell shall be
not less than 23/4 in. × 31/2 in. (70 mm × 89 mm), but it
is recommended that, where possible, larger sizes be
used.
Manhole, handhole, inspection, and washout openings
in a shell or unstayed head shall be designed in accordance with the rules of PG-32 to PG-42.
When a threaded opening is to be used for inspection or
washout purposes, it shall be not less than 1 in. (25 mm)
pipe size. The closing plug or cap shall be of nonferrous
material except for pressures of over 250 psi (1.7 MPa).
The thread shall be a standard tapered pipe thread, except that a straight thread of equal strength may be used
if other sealing surfaces to prevent leakage are provided.
PG-42.4.6 Steel buttwelding fittings may be used
provided they are at least equal to the requirements of
ASME B16.9.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PG-44.3 The minimum width of bearing surface for a
gasket on a manhole opening shall be 11/16 in. (17 mm).
No gasket for use on a manhole or handhole of any boiler
shall have a thickness greater than 1/4 in. (6 mm), when
compressed.
PG-46
PG-46.4 Acceptable proportions for the ends of
through‐stays with washers are indicated in Figure
PG-46.2.
PG-46.5 The maximum pitch shall be 8 1/2 in.
(215 mm) except that for welded‐in staybolts the pitch
may be greater provided it does not exceed 15 times
the diameter of the staybolt.
For the application of PG-48 and PFT-26, see Figure
A-8.
STAYED SURFACES
PG-46.1 The minimum thickness and maximum allowable working pressure for stayed flat plates and those
parts that, by these rules, require staying as flat plates
with stays or staybolts of uniform diameter symmetrically
spaced, shall be calculated by the following equations:
PG-46.6 Where the staybolting of shells is unsymmetrical by reason of interference with butt straps or other
construction, it is permissible to consider the load carried
by each staybolt as the area calculated by taking the distance from the center of the spacing on one side of the
bolt to the center of the spacing on the other side.
ð1Þ
PG-46.7 The ends of stays fitted with nuts shall not
be exposed to the direct radiant heat of the fire.
ð2Þ
PG-46.8 Stays exceeding 120 diameters in length
shall be supported at intervals not exceeding 120 diameters, or the cross‐sectional area of the stay shall be increased by not less than 15% of its required area.
where
PG-47
STAYBOLTS
PG-47.1 The ends of staybolts or stays screwed
through the plate shall extend beyond the plate not fewer
than two threads when installed, after which they shall be
riveted over or upset by an equivalent process without
excessive scoring of the plates; or they shall be fitted with
threaded nuts through which the bolt or stay shall extend.
The thread lead of both ends and both plates being stayed
shall be synchronized to permit the bolt to be installed
without stripping the threads. The outside ends of solid
staybolts 8 in. (200 mm) and less in length, if of uniform
diameter throughout their length, shall be drilled with
telltale holes at least 3/16 in. (5 mm) in diameter to a depth
extending at least 1/2 in. (13 mm) beyond the inside of the
plate. If such staybolts are reduced in section between
their ends below their diameter at the root of the thread,
the telltale holes shall extend at least 1/2 in. (13 mm)
Figure PG-46.2
Acceptable Proportions for Ends of
Through-Stays
1.0
PG-46.2 The minimum thickness of plates to which
stays may be applied, in other than cylindrical or spherical outer shell plates, shall be 5/16 in. (8 mm), except for
welded construction covered by PW-19.
Not less than 21/2 diameters of
bolt as measured on the outside of
the threaded portion, but must be
0.4 pitch of stays if C = 3.2
PG-46.3 When two plates are connected by stays and
only one of these plates requires staying, the value of C
shall be governed by the thickness of the plate requiring
staying.
Not less than 1/2t if C = 2.8 or less,
and not less than t if C = 3.2
40
t
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
C = 2.1 for welded stays or stays screwed through
plates not over 7/16 in. (11 mm) in thickness with
ends riveted over
= 2.2 for welded stays or stays screwed through
plates over 7/16 in. (11 mm) in thickness with ends
riveted over
= 2.5 for stays screwed through plates and fitted with
single nuts outside of plate, or with inside and outside nuts, omitting washers
= 2.8 for stays with heads not less than 1.3 times the
diameter of the stays screwed through plates or
made a taper fit and having the heads formed on
the stay before installing them, and not riveted
over, said heads being made to have a true bearing
on the plate
= 3.2 for stays fitted with inside and outside nuts and
outside washers where the diameter of washers is
not less than 0.4p and thickness not less than t
P = maximum allowable working pressure, psi (MPa)
p = maximum pitch measured between straight lines
passing through the centers of the staybolts in the
different rows, which lines may be horizontal and
vertical, or radial and circumferential, in. (mm)
S = maximum allowable stress given in Section II, Part
D, Subpart 1, Table 1A, psi (MPa)
t = minimum thickness of plate, in. (mm)
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
beyond the point where the reduction in section commences. Hollow staybolts may be used in place of solid
staybolts with drilled ends. Solid staybolts over 8 in.
(200 mm) long and flexible staybolts of either the jointed
or ball‐and‐socket type need not be drilled. Staybolts used
in waterlegs of watertube boilers shall be hollow or
drilled at both ends, in accordance with the requirements
above stated, irrespective of their length. All threaded
staybolts not normal to the stayed surface shall have
not less than three engaging threads of which at least
one shall be a full thread, but if the thickness of the material in the boiler is not sufficient to give one full engaging
thread, the plates shall be sufficiently reinforced on the
inside by a steel plate welded thereto. Telltale holes are
not required in staybolts attached by welding.
n
p
p′
p1
=
=
=
=
number of openings in length p 1
longitudinal pitch of adjacent openings, in. (mm)
diagonal pitch of adjacent openings, in. (mm)
pitch between corresponding openings in a series
of symmetrical groups of openings, in. (mm)
p c = circumferential pitch of adjacent openings, in. (mm)
The pitch shall be determined at the mean radius of the
cylinder.
The efficiency of the ligament between the tube holes
shall be determined as indicated in PG-52.2 through
PG-52.5 (see Figure PG-52.1).
PG-52.2 Openings Parallel to Vessel Axis.
PG-52.2.1 When the pitch of the tubes on every
tube row is equal (as in Figure PG-52.2), the equation is
PG-47.2 The ends of steel stays upset for threading
shall be fully annealed after upsetting.
PG-47.3 Requirements for welded‐in staybolts are given in PW-19.
PG-48
ð15Þ
Example: Pitch of tube holes in the drum as shown in
Figure PG-52.2 = 51/4 in. Diameter of tube = 31/4 in. Diameter of tube holes = 39/32 in.
LOCATION OF STAYBOLTS
PG-48.1 For staybolts adjacent to the riveted edges
bounding a stayed surface, the value of p in PG-46 eqs.
(1) and (2) may be taken as the distance from the edge
of a staybolt hole to a straight line tangent to the edges
of the rivet holes [see Figure A-8, illustrations (g-1) and
(g-2)].
PG-52.2.2 When the pitch of the tube holes on any
one row is unequal (as in Figure PG-52.3 or Figure
PG-52.4), the equation is
PG-49
Example: Spacing shown in Figure PG-52.3. Diameter of
tube holes = 39/32 in.
DIMENSIONS OF STAYBOLTS
PG-49.1 The required area of a staybolt at its minimum cross section shall be obtained by dividing the load
on the staybolt, computed in accordance with PFT-26, by
the allowable stress value in accordance with Section II,
Part D, Subpart 1, Table 1A, and multiplying the results
by 1.10. For steam locomotives only, the allowable stress
shall be limited to 7,500 psi (51.7 MPa).
Example: Spacing shown in Figure PG-52.4. Diameter of
tube holes = 39/32 in.
PG-49.2 The diameter of a screw stay shall be taken
at the bottom of the thread or wherever it is of the least
diameter.
PG-52
ð15Þ
LIGAMENTS
PG-52.1 The rules of PG-52 apply to groups of openings that form a definite pattern in pressure parts. (For
patterns not definite, see PG-53.)
The symbols defined below are used in the equations of
PG-52.
PG-52.3 Openings Transverse to Vessel Axis. The ð15Þ
equivalent longitudinal efficiency of circumferential ligaments if used in the equations of PG-27.2.2 or A-317 shall
be
d = diameter of openings, in. (mm)
E = efficiency of ligament
41
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-48.2 When the edge of a flat stayed plate is
flanged, the distance from the center of the outermost
stays to the inside of the supporting flange shall not be
greater than the pitch of the stays plus the inside radius
of the flange.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
60
Figure PG-52.1
Diagram for Determining the Efficiency of Longitudinal and Diagonal Ligaments Between Openings in
Cylindrical Shells
ng
d
Drum
axis
d
l
na
65
70
itu
p
0.
Circumferential pitch
n
di
lo
an
go
y
0.
75
ia
d
of
lig
am
en
ts
nc
ie
c
ffi
al
nti
ti
di
mf
p = longitudinal pitch
p' = diagonal pitch
o
ere
on
0.
60
80
p'
le
ua
q
fe
cir
nd
la
en
cy
so
eff
Point A
Cu
rve
of
co
0.
30
nd
95
itio
no
fe
qu
al
Ra
ici
tio
90
0.
40
of
fp
' ÷
dia
p
go
na
50
0.
Cu
85
e
rv
Point B
cu
n
co
of
20
30
40
0.60
0.65
0.70
0.75
0.80
0.85
0.90
0.95
20
50
60
70
80
90
Longitudinal Efficiency, %
p−d
× 100
p
GENERAL NOTES:
(a) Equations are provided for the user’s option in Notes (b), (c), and (d) below. The use of these equations is permitted for values beyond
those provided by Figure PG-52.1.
(b)
(c)
Curve of condition of equal efficiency of diagonal and circumferential ligaments,
(d)
42
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Equivalent Longitudinal Efficiency of Diagonal Ligament, %
70
li
al
80
0.
ts
en
m
ga
0.
55
0.
90
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PG-52.2
Example of Tube Spacing With Pitch of Holes
Equal in Every Row
Figure PG-52.4
Example of Tube Spacing With Pitch of Holes
Varying in Every Second and Third Row
51/4
in.
51/4
in.
51/4
in.
51/4
in.
51/4
in.
51/4
in.
51/4
in.
51/4
in.
(133
mm)
(133
mm)
(133
mm)
(133
mm)
(133
mm)
(133
mm)
(133
mm)
(133 (171 (133 (133 (171 (133 (171 (133 (133
mm) mm) mm) mm) mm) mm) mm) mm) mm)
63/4
in.
51/4 51/4
in. in.
63/4
in.
51/4
in.
63/4
in.
51/4 51/4
in. in.
291/4 in. (743 mm)
Longitudinal Line
Longitudinal Line
PG-52.4 Holes Along a Diagonal. When a shell or
drum is drilled for tube holes as shown in Figure
PG-52.5, the efficiency of these ligaments shall be that given by the diagram in Figure PG-52.1. The abscissa
(p – d)/p and the ratio p ′ /p shall be computed. With
these values the efficiency may be read off the ordinate.
Should the point fall above the curve of equal efficiency
for the diagonal and longitudinal ligaments, the longitudinal ligaments will be the weaker, in which case the efficiency is computed from the following equation:
ð3Þ
The point corresponding to these values is shown at A on
the diagram in Figure PG-52.1, and the corresponding efficiency is 37.0%. As the point falls below the curve of
equal efficiency for the diagonal and longitudinal ligaments, the diagonal ligament is the weaker.
(2) Diagonal pitch of tube holes in drum = 635/64 in. Diameter of tube holes = 41/64 in. Longitudinal pitch of tube
holes = 7 in.
ð1Þ
ð4Þ
(1) Diagonal pitch of tube holes in drum as shown in
Figure PG-52.5 = 6.42 in. Diameter of holes = 41/32 in.
Longitudinal pitch of tube holes = 111/2 in.
The point corresponding to these values is shown at B on
the diagram in Figure PG-52.1, and it will be seen that it
falls above the line of equal efficiency for the diagonal
and longitudinal ligaments, in which case the efficiency
is computed from eq. (1). Applying eq. (1), we have
ð2Þ
Figure PG-52.3
Example of Tube Spacing With Pitch of Holes
Unequal in Every Second Row
51/4
in.
63/4
in.
51/4
in.
63/4
in.
51/4
in.
63/4
in.
51/4
in.
(133
mm)
(171
mm)
(133
mm)
(171
mm)
(133
mm)
(171
mm)
(133
mm)
PG-52.5 When tubes or holes are arranged in a drum
or shell in symmetrical groups along lines parallel to the
axis and the same spacing is used for each group, the efficiency for one of the groups shall be not less than the efficiency on which the maximum allowable working
pressure is based. For all tube-hole pattern arrangements,
the equivalent longitudinal ligament efficiency for any diagonal and circumferential ligaments shall be calculated
and compared to the longitudinal ligament efficiency.
The lesser value of the longitudinal ligament efficiency
or the equivalent longitudinal ligament efficiencies shall
be used to calculate the minimum required thickness
and maximum allowable working pressure for the associated cylindrical section.
12 in. (305 mm)
Longitudinal Line
43
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Example:
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
based. When the radius of the drum exceeds 30 in.
(750 mm), the length shall be taken as 30 in. (750 mm)
in applying this rule.
Figure PG-52.5
Example of Tube Spacing With Tube Holes on
Diagonal Lines
PG-53.3 For holes placed longitudinally along a drum
but that do not come in a straight line, the above rules for
calculating efficiency shall hold except that the equivalent
longitudinal width of a diagonal ligament shall be used. To
obtain the equivalent width the longitudinal pitch of the
two holes having a diagonal ligament shall be multiplied
by the efficiency of the diagonal ligament. The efficiency
to be used for the diagonal ligaments is given in Figure
PG-53.3.
PG-55
53/4 in.
(146 mm)
PG-55.1 Lugs or hangers when used to support a
boiler of any type shall be properly fitted to the surfaces
to which they are attached.
6.42 in. (163 mm)
Longitudinal Line
ð15Þ
DELETED
LIGAMENTS
PG-53.1 The rules in this paragraph apply to groups
of openings that do not form a definite pattern in pressure
parts. (For definite patterns, see PG-52.) The efficiency of
the ligament between tube holes shall be determined as
follows:
PG-53.2 When tubes or holes are unsymmetrically
spaced, the average ligament efficiency shall be not less
than that given by the following rules, which apply to ligaments between tube holes, and not to single openings.
This procedure may give lower efficiencies in some cases
than those for symmetrical groups which extend a distance greater than the inside diameter of the shell as covered under PG-52. When this occurs, the efficiencies
computed by the rules under PG-52 shall be used.
PG-56
LOADING ON STRUCTURAL
ATTACHMENTS
PG-56.1 Loads imposed on steel tube walls by
welded or mechanical attachments, which produce bending stresses that are additive to bursting stresses, shall
conform to PG-56.1.1 and PG-56.1.2. Alternatively, stresses at structural attachments may be evaluated using
one of the following methods:
(a) Welding Research Council (WRC) Bulletin Number
537, Precision Equations and Enhanced Diagrams for Local Stresses in Spherical and Cylindrical Shells Due to External Loadings for Implementation of WRC Bulletin 107
(b) WRC Bulletin 198, Part 1: Secondary Stress Indices
for Integral Structural Attachments to Straight Pipe, and
Part 2: Stress Indices at Lug Supports on Piping Systems
(c) other analytical methods as permitted by PG-16.1
PG-53.2.1 For a length equal to the inside diameter
of the drum for the position that gives the minimum efficiency, the efficiency shall be not less than that on which
the maximum allowable working pressure is based. When
the diameter of the drum exceeds 60 in. (1 500 mm), the
length shall be taken as 60 in. (1 500 mm) in applying this
rule.
PG-53.2.2 For a length equal to the inside radius of
the drum for the position that gives the minimum efficiency, the efficiency shall be not less than 80% of that
on which the maximum allowable working pressure is
44
ð15Þ
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-55.2 Lugs, hangers, or brackets may be attached
by fusion welding provided the welding meets the requirements of Part PW, including stress relieving but
omitting volumetric examination and provided they are
attached by full penetration welds, combination groove
and fillet welds, or by fillet welds along the entire periphery or contact edges. Some acceptable forms of welds for
lugs, hangers, or brackets are shown in Figure PW-16.2.
The materials for lugs, hangers, or brackets are not limited to those listed in Section II, Part D, Subpart 1, Tables
1A and 1B, but shall be of weldable quality. The allowable
load on the fillet welds shall equal the product of the weld
area based on minimum leg dimension, the allowable
stress value in tension of the material being welded,
and the factor 0.55. When using welded pipe, the stress
values given in Section II, Part D, Subpart 1, Table 1A,
may be increased to that of the basic material by eliminating the stated weld efficiencies.
PG-52.6
PG-53
SUPPORTS AND ATTACHMENT LUGS
No fu
Figure PG-53.3
Diagram for Determining Equivalent Longitudinal Efficiency of Diagonal Ligaments Between Openings in
Cylindrical Shells
100
20.0
10.0
90
5.0
4.0
3.0
70
2.5
60
2.0
50
1.8
1.7
40
1.6
1.5
30
1.4
1.3
20
Drum
axis
p
p
= 1.2
d
d
s
10
p = diagonal pitch
d = diameter of tube hole
s = p cos 0
0
10
20
30
40
50
60
Angle of Diagonal With Longitudinal, , deg
70
80
90
GENERAL NOTES:
(a) The equation in (b) below is provided for the user’s option. The use of the equation is prohibited beyond the range of the abscissa and
ordinate shown.
(b)
45
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Equivalent Longitudinal Efficiency of Diagonal Ligament, %
80
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PG-56.1.1
The following inequality:
(a) Compression Loading
where
(b) Tension Loading
L = actual unit load calculated from PG-56.1.2, lb/in.
(N/mm)
L a = maximum allowable unit load, lb/in. (N/mm) of attachment from PG-56.2
PG-56.1.2
The following equation:
Step 3. Determine available stress, S t .
where
e
ℓ
W
Wr
=
=
=
=
Step 4. Using values obtained in Steps 1 through 3, determine maximum allowable unit load, L a .
eccentricity of W (see Figure PG-56.1.2), in. (mm)
length of attachment of tube, in. (mm)
eccentric load applied to lug, lb (N)
load component normal to tube axis, lb (N)
where
D = outside diameter of tube, in. (mm)
K = tube attachment width design factor from Table
PG-56.2, dimensionless
Lf = a c o m p r e s s i o n o r t e n s i o n l o a d f a c t o r ,
dimensionless
log = logarithm to base 10
S = pressure stress in tube determined by the equation
in PG-27.2.1, psi (MPa)
S a = allowable stress value from Section II, Part D, Subpart 1, Table 1A, psi (MPa)
S t = portion of allowable stress available for attachment
loading, from Step 3, psi (MPa)
t = tube wall thickness, in. (mm)
X = b D /t 2, a parameter used to determine L f , dimensionless, where
PG-56.2 Procedure for determining L a in the equation in PG-56.1.1.
Step 1. Determine K from Table PG-56.2.
Step 2. Determine load factor, L f , for compression or
tension loading on lug from Figure PG-56.2, or from (a)
or (b), when the range of the curves in Figure PG-56.2
does not extend far enough to cover specific cases.
b = unit width = 1.0 in. (25.4 mm)
Figure PG-56.1.2
Method of Computation of Attachments to Tubes
Wr
Lug
Tube
W
e
46
/2
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
In determining the allowable loading per unit length of
attachment on a tube bend, the allowable unit load determined by using the outside diameter of the tube shall be
increased by the amount of allowable compression or tension unit load, as applicable, for a tube having an outside
diameter equivalent to the outside diameter of the bend
and having a wall thickness the same as that of the tube
bend (see Figure A-74). For an alternative method of determining the maximum allowable loading on structural
attachments to tubes, see A-73.2 for conducting tests on
full‐size sections of tubes.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Table PG-56.2
Tube Attachment Angle Design Factor, K
Attachment angle
Angle of attachment, deg
Design factor, K
0
1.000
5
1.049
10
1.108
15
1.162
20
1.224
25
1.290
30
1.364
35
1.451
40
1.545
Angle of attachment, deg
Design factor, K
50
1.730
55
1.836
60
1.949
65
2.076
70
2.221
75
2.341
80
2.513
85
2.653
90
2.876
Figure PG-56.2
Chart for Determining Load Factor, L f
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
47
45
1.615
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
BOILER EXTERNAL PIPING AND BOILER
PROPER CONNECTIONS
PG-58
(2) the face of the first flange in bolted flange connections or
(3) the first threaded joint in that type of connection
OUTLETS AND EXTERNAL PIPING
PG-58.3.2 When two or more boilers are connected to a common steam header, or when a single boiler
is connected to a header having another steam source
(e.g., a turbine extraction line), the connection from each
boiler having a manhole opening shall be fitted with two
stop valves having an ample free‐blow drain between
them. The boiler external piping includes all piping from
the boiler proper up to and including the second stop
valve and the free‐blow drain valve.
PG-58.1 General. The rules of this subparagraph apply to the boiler external piping as defined in the
Preamble.
PG-58.2 Boiler External Piping Connections to Boilers. All boiler external piping connected to a boiler for
any purpose shall be attached to one of the types of joints
listed in PG-59.1.1.1, PG-59.1.1.2, and PG-59.1.1.3.
PG-58.3 Boiler External Piping. The following defines the Code Jurisdictional Limits of the boiler external
piping systems, including general requirements, valves,
and inspection. The limits are also shown in Figures
PG-58.3.1(a), PG-58.3.1(b), PG-58.3.1(c), PG-58.3.2, and
PG-58.3.3. The materials, design, fabrication, installation,
and testing shall be in accordance with ASME B31.1,
Power Piping.
PG-58.3.3 The feedwater piping for all boilers, except high‐temperature water boilers and forced‐flow
steam generators complying with PG-58.3.5, shall extend
through the required stop valve and up to and including
the check valve except as required by PG-58.3.4. On a single boiler‐turbine unit installation the boiler feed shutoff
valve may be located upstream from the boiler feed check
valve.
If a feedwater heater or heaters meeting the requirements of Part PFH are installed between the required stop
valve and the boiler, and are fitted with isolation and bypass valves, provisions must be made to prevent the feedwater pressure from exceeding the maximum allowable
working pressure of the piping or feedwater heater,
whichever is less. Control and interlock systems are permitted in order to prevent overpressure.
PG-58.3.4 When two or more boilers are fed from
a common source, the piping shall be up to and including
a globe or regulating valve located between the check
valve required in PG-58.3.3 and the source of supply. If
the regulating valve is equipped with an isolation valve
and a bypass valve, the piping shall be up to and including
both the isolation valve downstream from the regulating
valve and the shutoff valve in the bypass.
PG-58.3.5 The feedwater piping for a forced‐flow
steam generator with no fixed steam and waterline may
terminate up to and including the stop valve near the boiler and omitting the check valve near the boiler, provided
that a check valve having a pressure rating no less than
the boiler inlet design pressure is installed at the discharge of the boiler feed pump or elsewhere in the feedline between the feed pump and the feed stop valve. If the
feedwater heater(s) is fitted with isolation and bypass
valves, the applicable requirements of PG-58.3.3 must
be met.
PG-58.3.6 The blowoff piping for all boilers, except
forced‐flow steam generators with no fixed steam and
waterline, high‐temperature water boilers, and those
used for traction and/or portable purposes, when the
maximum allowable working pressure exceeds 100 psi
(700 kPa) shall extend through and include the second
valve. The blowoff piping for all traction and/or portable
48
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-58.3.1 The steam piping connected to the boiler drum or to the superheater outlet header shall extend
up to and including the first stop valve in each connection,
except as required by PG-58.3.2. In the case of a single
boiler and prime mover installation, the stop valve required herein may be omitted provided the prime mover
throttle valve is equipped with an indicator to show
whether the valve is open or closed and is designed to
withstand the required hydrostatic pressure test of the
boiler.
For an isolable or separately fired superheater which
discharges steam directly to a process stream, the stop
valve required by this paragraph and the safety valve(s)
required by PG-68 may be omitted provided the following
conditions are satisfied:
(a) The boiler is a drum‐type boiler in a single‐boiler
installation.
(b) The steam discharge passes through the process
stream to the atmosphere with no intervening valves.
(c) The system shall be designed so that the process
stream through which the steam discharge passes cannot
be obstructed in such a way as to cause the pressure in
the superheater to exceed that permitted by PG-67.2, with
maximum steam flow from the boiler to the superheater.
Flow and pressure calculations demonstrating that the
superheater will not be overpressurized under any steam
flow conditions shall be documented and made available
to the Inspector. These calculations shall be certified by a
Professional Engineer experienced in the mechanical design of power plants.
(d) There is no valve on the discharge side of the
superheater.
(e) Section I jurisdiction shall include the pressure
parts between the superheater inlet and the outlet at
(1) the first circumferential joint for welding end
connections
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PG-58.3.1(a)
Code Jurisdictional Limits for Piping — Drum-Type Boilers
Vents and
instrumentation
PG-58.3.7
Single installation
PG-71
PG-58.3.1
PG-58.3.2
Multiple installation
Common
header
Drain
PG-58.3.7
Level indicators PG-60
Steam drum
Control device
PG-60
PG-58.3.7
Inlet header
(if used)
Vent
Drain
t
Integral
superheater
(if used)
PG-68.1
n
Ve
Soot blowers PG-68.5
Single installation
PG-68.2
Main steam
PG-58.3.1
PG-58.3.7
PG-58.3.2
Drain
Integral
economizer
(if used)
Soot blowers PG-68.5
Multiple installation
Common
Drain
header
t
n
Ve
Feedwater systems
PG-58.3.3
Blow-off
single and multiple
installations
Boiler no. 2
Boiler no. 1
Two or more
boilers fed from
a common source
Regulating valves
Boiler no. 2
Two or more
boilers fed from
a common source
Drain
PG-58.3.7
Administrative Jurisdiction and Technical Responsibility
Boiler Proper — The ASME Boiler and Pressure Vessel Code (ASME BPVC) has total
administrative jurisdiction and technical responsibility (refer to Section I Preamble)
Boiler External Piping and Joint — The ASME BPVC has total administrative jurisdiction
(mandatory certification by stamping the Certification Mark with appropriate Designator,
ASME Data Forms, and Authorized Inspection) of Boiler External Piping and Joint. The
ASME Section Committee B31.1 has been assigned technical responsibility.
Non-Boiler External Piping and Joint — Not Section I jurisdiction (see applicable ASME
B31 Code).
GENERAL NOTE: This figure provides references to other paragraphs of the Code for information only.
49
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Water drum
Single boiler
Single boiler
Part PFH
Boiler no. 1
PG-58.3.6
Surface blow
Continuous
blow
Chemical feed
Drum sample
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PG-58.3.1(b)
Code Jurisdictional Limits for Piping — Isolable Economizers Located in Feedwater Piping and Isolable Superheaters in Main Steam Piping
(Boiler Pressure Relief Valves, Blowoff, and Miscellaneous Piping for Boiler Proper Not Shown for Clarity)
PG-67.2.1.6
Vent
Vent
PG-68.3
Isolable
Vent
Vent
economizer
Main steam
refer to Fig.
PG-58.3.1(a)
Isolable
superheater
Drain
PG-58.3.7
Inlet header
(if used)
Drain
PG-58.3.7
Feedwater
systems
PG-58.3.3
Intervening
valve PG-59.5.1
Drain
PG-58.3.7
Boiler proper
[See Fig.
PG-58.3.1 (a)]
Intervening
valve
Drain
PG-58.3.7
(1) Economizer Within the Limits of BEP
PG-67.2.1.6
Note (1)
Vent
50
Boiler Proper — The ASME Boiler and Pressure Vessel Code (ASME BPVC) has total
administrative jurisdiction and technical responsibility (refer to Section I Preamble).
Boiler External Piping and Joint — The ASME BPVC has total administrative jurisdiction
(mandatory certification by stamping the Certification Mark with appropriate
Designator, ASME Data Forms, and Authorized Inspection) of Boiler External Piping and
Joint. The ASME Section Committee B31.1 has been assigned technical responsibilty.
Non-Boiler External Piping and Joint — Not Section I jurisdiction (see applicable ASME
B31 Code).
Vent
economizer
Feedwater
Drain
PG-58.3.7
Drain
PG-58.3.7
(2) Economizer Within the Limits of BEP
PG-67.2.1.6
Vent
Isolable
Vent
economizer
ASME BPVC.I-2015
Isolable
Administrative Jurisdiction and Technical Responsibility
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ð15Þ
Feedwater
Drain
(3) Economizer Outside the Limits of BEP
GENERAL NOTE: This figure provides references to other paragraphs of the Code for information only.
NOTE:
(1) With feedwater regulator located between the boiler and economizer, the economizer may be constructed utilizing austenitic stainless steel (see Part PFE).
This copy downloaded on 2015-07-31 23:27:17 -0
Drain
Figure PG-58.3.1(c)
Code Jurisdictional Limits for Piping — Reheaters and Nonintegral Separately Fired Superheaters
Vent
PG-68.4
Vent
Hot reheat
PG-59.5.1.1
Vent
Drain
PG-58.3.7
Vent
PG-68.3
Reheater
Nonintegral
separately fired
Steam out
superheater
Steam in
PG-68.4
Drain
PG-58.3.7
Cold reheat
Inlet header
(if used)
Drain
PG-58.3.7
Drain
PG-58.3.7
Administrative Jurisdiction and Technical Responsibility
Boiler Proper — The ASME Boiler and Pressure Vessel Code (ASME BPVC) has total
administrative jurisdiction and technical responsibility (refer to Section I Preamble)
ASME Data Forms, and Authorized Inspection) of Boiler External Piping and Joint. The
ASME Section Committee B31.1 has been assigned technical responsibilty.
Non-Boiler External Piping and Joint — Not Section I jurisdiction (see applicable ASME
B31 Code).
GENERAL NOTE: This figure provides references to other paragraphs of the Code for information only.
boilers and for forced circulation and electric boilers having a normal water content not exceeding 100 gal (380 L)
are required to extend through only one valve.
supply and return piping systems shall meet the requirements of PG-58.3.2, including the requirement for a freeblown drain.
PG-58.3.7 The miscellaneous piping shall include
the piping for such items as drains, vents, surface‐blowoff,
steam and water piping for water columns, gage glasses
and pressure gages. When a drain is not intended for
blowoff purposes (when the boiler is under pressure) a
single valve is acceptable, otherwise two valves in series
are required except as permitted by PG-58.3.6.
PG-58.3.9 Welded piping in PG-58.3.1, PG-58.3.2,
PG-58.3.3, PG-58.3.4, PG-58.3.5, PG-58.3.6, PG-58.3.7,
and PG-58.3.8 is also subject to the requirements of
PG-104 for proper Code certification.
PG-58.3.8 Boiler external piping for single high‐
temperature water boilers shall extend from the connections to the boiler up to and including the first stop valve
and shall be classified as miscellaneous piping.
When multiple high-temperature water boilers are connected to common supply and return piping, and contain
openings of a size that permit entry into the vessel, the
PG-59.1 Common to Steam, Feedwater, Blowoff,
and Drain Systems.
PG-59.1.1 Outlets of a boiler to which piping is to
be attached for any purpose, and which piping comes
within the Code requirements, shall meet the requirements of PG-39 and shall be
PG-59
APPLICATION REQUIREMENTS FOR THE
BOILER PROPER
PG-59.1.1.1
51
A tapped opening.
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Boiler External Piping and Joint — The ASME BPVC has total administrative jurisdiction
(mandatory certification by stamping the Certification Mark with appropriate Designator,
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PG-58.3.2
Code Jurisdictional Limits for Piping — An Example of Forced-Flow Steam Generators With No Fixed
Steam or Waterline
Turbine valve or
code stop valve
PG-58.3.1
Superheater
Turbine
To equipment
Reheater
Convection
and radiant
section
Start-up system
may vary to suit
boiler manufacturer
Condenser
Economizer
Alternates PG-58.3.5
Administrative Jurisdiction and Technical Responsibility
Boiler Proper — The ASME Boiler and Pressure Vessel Code (ASME BPVC) has total
administrative jurisdiction and technical responsibility (refer to Section I Preamble)
Boiler External Piping and Joint — The ASME BPVC has total administrative jurisdiction
(mandatory certification by stamping the Certification Mark with appropriate Designator,
ASME Data Forms, and Authorized Inspection) of Boiler External Piping and Joint.
The ASME Section Committee B31.1 has been assigned technical responsibilty.
Non-Boiler External Piping and Joint — Not Section I jurisdiction (see applicable ASME
B31 Code).
52
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Boiler feed pump
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PG-58.3.3
Code Jurisdictional Limits for Piping — An Example of Steam Separator Type Forced-Flow Steam
Generators With No Fixed Steam or Waterline
Turbine valve or
Code stop valve
PG-58.3.1
Superheater
Turbine
To equipment
Steam
separator
Convection
and radiant
section
Reheater
Water
collector
Start-up system
may vary to suit
boiler manufacturer
(if used)
Economizer
(if used)
(if used)
(if used)
Boiler feed pump
Alternates PG-58.3.5
Administrative Jurisdiction and Technical Responsibility
Boiler Proper – The ASME Boiler and Pressure Vessel Code (ASME BPVC) has total
administrative jurisdiction and technical responsibility (refer to Section I Preamble).
Boiler External Piping and Joint – The ASME BPVC has total administrative jurisdiction
(mandatory certification by stamping the Certification Mark with appropriate Designator,
ASME Data Forms, and Authorized Inspection) of Boiler External Piping and Joint. The
ASME Section Committee B31.1 has been assigned technical responsibility.
Non-Boiler External Piping and Joint – Not Section I jurisdiction (see applicable ASME
B31 Code).
53
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Recirculation pump
(if used)
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PG-59.2 Requirements for Feedwater Connections.
The feedwater shall be introduced into a boiler in such
a manner that the water will not be discharged directly
against surfaces exposed to gases of high temperature
or to direct radiation from the fire. For pressures of
400 psi (3 MPa) or over, the feedwater inlet through
the drum shall be fitted with shields, sleeves, or other suitable means to reduce the effects of temperature differentials in the shell or head. Feedwater, other than
condensate returns as provided for in PG-59.3.6, shall
not be introduced through the blowoff.
PG-59.1.1.2 Bolted flanged joints including
those of the Van Stone type.
PG-59.1.1.3
welding type.
Welding ends of the butt or socket
PG-59.1.1.4 Piping within the boiler proper may
be expanded into grooved holes, seal welded if desired.
Blowoff piping of firetube boilers shall be attached by
threading into a tapped opening with a threaded fitting
or valve at the other end if exposed to products of combustion, or by PG-59.1.1.1 or PG-59.1.1.2 if not so exposed
(see PFT-49).
PG-59.3 Requirements for Blowoffs.
PG-59.3.1 A blowoff as required herein is defined
as a pipe connection provided with valves located in the
external piping through which the water in the boiler
may be blown out under pressure, excepting drains such
as are used on water columns, gage glasses, or piping to
feedwater regulators, etc., used for the purpose of determining the operating condition of such equipment. Piping
connections used primarily for continuous operation,
such as deconcentrators on continuous blowdown systems, are not classed as blowoffs but the pipe connections
and all fittings up to and including the first shutoff valve
shall be equal at least to the pressure requirements for
the lowest set pressure of any pressure relief valve on
the boiler drum and with the corresponding saturated‐
steam temperature.
PG-59.1.2 Steam Mains. Provisions shall be made
for the expansion and contraction of steam mains connected to boilers, by providing substantial anchorage at
suitable points, so that there shall be no undue strain
transmitted to the boiler. Steam reservoirs shall be used
on steam mains when heavy pulsations of the steam currents cause vibration of the boiler shell plates.
PG-59.1.3 Figure PG-59.1 illustrates a typical form
of connection for use on boiler shells for passing through
piping such as feed, surface blowoff connections, etc., and
which permits the pipes’ being threaded in solid from
both sides in addition to the reinforcing of the opening
of the shell. The pipes shall be attached as provided in
PG-59.1.1.
In these and other types of boilers where both internal
and external pipes making a continuous passage are employed, the boiler bushing or its equivalent shall be used.
54
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Figure PG-59.1
Typical Boiler Bushings
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PG-59.4.1.2 Each high‐temperature water boiler
shall have a bottom drain connection of at least NPS 1
(DN 25) in direct connection with the lowest water space
practical for external piping conforming to PG-58.3.8.
PG-59.3.2 A surface blowoff connection shall not
exceed NPS 21/2 (DN 65), and the internal pipe and the
terminal connection for the external pipe, when used,
shall form a continuous passage, but with clearance between their ends and arranged so that the removal of
either will not disturb the other. A properly designed steel
bushing, similar to or the equivalent of those shown in
Figure PG-59.1, or a flanged connection shall be used.
PG-59.5 Requirements for Valves and Fittings. The
following requirements apply to the use of valves and fittings in the boiler proper.
PG-59.5.1 Steam Stop Valves.
PG-59.5.1.1 If a shutoff valve is used between
the boiler and its superheater, the pressure relief valve
capacity on the boiler shall comply with the requirements
of PG-67.2 and PG-70, except as provided for in
PG-59.5.1.2, no credit being taken for the pressure relief
valve on the superheater, and the superheater must be
equipped with pressure relief valve capacity as required
by PG-68. A stop valve is not required at the inlet or the
outlet of a reheater or separately fired superheater.
PG-59.3.3 Each boiler except forced‐flow steam
generators with no fixed steam and waterline and high‐
temperature water boilers shall have a bottom blowoff
outlet in direct connection with the lowest water space
practicable for external piping conforming to PG-58.3.6.
PG-59.3.4 All waterwalls and water screens that
do not drain back into the boiler, and all integral economizers, shall be equipped with outlet connections for a
blowoff or drain line and conform to the requirements
of PG-58.3.6 or PG-58.3.7.
PG-59.5.1.2 When stop valves are installed in
the water‐steam flow path between any two sections of
a forced‐flow steam generator with no fixed steam and
waterline, the pressure relief valves shall satisfy the requirements of PG-67.4.4.
PG-59.3.5 Except as permitted for miniature boilers in Part PMB and for boilers with 100 ft2 (9.3 m2) of
heating surface or less, the minimum size of blowoff connections shall be NPS 1 (DN 25) and the maximum size
shall be NPS 21/2 (DN 65). Boilers with 100 ft2 (9.3 m2)
or less but more than 20 ft2 (1.9 m2) of heating surface
may have a minimum size blowoff connection of NPS 3/4
(DN 20). Boilers with 20 ft2 (1.9 m2) or less of heating surface may have a minimum size blowoff connection of
NPS 1/2 (DN 15).
DESIGN AND APPLICATION
PG-60
DESIGN AND APPLICATION
REQUIREMENTS FOR MISCELLANEOUS
PIPE, VALVES, AND FITTINGS
PG-59.3.6 Condensate return connections of the
same size or larger than the size herein specified may
be used, and the blowoff may be connected to them. In
such case the blowoff shall be so located that the connection may be completely drained.
PG-60.1 Water Level Indicators. All boilers having a
fixed water level (steam and water interface) shall have at
least one gage glass (a transparent device that permits visual determination of the water level). Gage glass designs
that utilize transverse structural members (cross webbing) as a means to strengthen the body of the gage,
which are not continuous over the entire vertical length
of the gage glass, are not permitted.15 The lowest visible
water level in a gage glass shall be at least 2 in.
(50 mm) above the lowest permissible water level, as determined by the boiler Manufacturer.
Gage glass assemblies having multiple sections,
whether of tubular or other construction, shall be designed in such a manner that will ensure a minimum of
1 in. (25 mm) overlap of all adjoining sections in which
the water level may be visible, except that ported gages
or reflex gages that use refraction of light to aid ready determination of the liquid level, may omit the requirement
for overlapping sections.
PG-59.3.7 A bottom blowoff pipe when exposed to
direct furnace heat shall be protected by firebrick or other
heat resisting material that is so arranged that the pipe
may be inspected.
PG-59.3.8 An opening in the boiler setting for a
blowoff pipe shall be arranged to provide free expansion
and contraction.
PG-59.4 Requirements for Drains.
PG-59.4.1 Ample drain connections shall be provided where required to permit complete drainage of all
piping, superheaters, waterwalls, water screens, economizers, and all other boiler components in which water
may collect. Piping shall conform to the requirements of
PG-58.3.6 or PG-58.3.7.
PG-60.1.1 Boilers having a maximum allowable
working pressure of 400 psi (3 MPa) or less shall have
at least one gage glass in service at all times. Boilers having a maximum allowable working pressure exceeding
400 psi (3 MPa) shall have two gage glasses. Instead of
PG-59.4.1.1 Each superheater shall be equipped
with at least one drain connection so located as to most
effectively provide for the proper operation of the
apparatus.
55
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Piping referred to in this paragraph shall be designed in
accordance with the applicable requirements of ASME
B31.1.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
rating of valves, fittings, and piping shall be at least equal
to the boiler MAWP and the corresponding saturated‐
steam temperature.
Straight‐run globe valves shall not be used on such connections. Automatic shutoff valves as referenced here, are
valves intended to automatically restrict flow in the event
of a gage glass failure without human intervention, and
shall conform to the requirements given in A-18.
one of the two required gage glasses, two independent remote water level indicators (two discrete systems that
continuously measure, transmit, and display water level)
may be provided and the required gage glass may be shut
off, but shall be maintained in serviceable condition.
Electrode‐type electric boilers are required to have
only one gage glass, regardless of MAWP.
Boilers not having a fixed water level, such as forced‐
flow steam generators and high‐temperature water boilers of the forced circulation type, are not required to have
a gage glass.
PG-60.1.3 As used in this section, “automated isolation valve” shall be taken to mean a device that is actuated electrically, pneumatically, or hydraulically to
temporarily isolate a gage glass. It is required that the
closing and opening sequences of such a device be manually initiated by the operator.
Automated isolation valves may be used, provided that
(a) all piping and fittings between the sight glass and
the boiler, or sight glass and water column, are designed
for internal inspection and cleaning, or are designed to allow passage internally of a rotary cleaning tool. The
valves shall be of such through‐flow construction as to
prevent stoppage by deposits of sediment.
(b) the valves are equipped with opened and closed indicators that can readily be seen from the valve operating
floor or platform. The design of the valves shall be such as
to prevent indicating a false opened or closed condition.
(c) a means of manually opening and closing the valves
from the valve operating floor or platform is provided.
(d) automated isolation valves are designed to fail‐safe
in the as‐is condition.
PG-60.1.1.1 When the water level in at least one
gage glass is not readily visible to the operator in the area
where control actions are initiated, either a fiber optic
cable (with no electrical modification of the optical signal)
or mirrors shall be provided to transfer the optical image
of the water level to the control area. Alternatively, any
combination of two of the following shall be provided:
(a) an independent remote water level indicator
(b) an independent continuous transmission and display of an image of the water level in a gage glass
PG-60.1.1.2 The display of a remote water level
indicator shall have a clearly marked minimum water level reference at least 2 in. (50 mm) above the lowest permissible water level, as determined by the Manufacturer.
ð15Þ
PG-60.2 Water Columns.
PG-60.2.1 A water column shall be so mounted
that it will be correctly positioned, relative to the normal
water level under operating conditions.
PG-60.2.3 Each water column shall be furnished
with a connection of at least NPS 3/4 (DN 20) to install a
valved drain to a safe point of discharge.
PG-60.1.2 Each gage glass or externally mounted
water-level-sensing or water-level-controlling device
shall be fitted with a drain cock or valve having an unrestricted drain opening of not less than 1/4 in. (6 mm) diameter to facilitate cleaning. When the boiler MAWP
exceeds 100 psi (700 kPa), the gage glass shall be furnished with a connection to install a valved drain to a point
of safe discharge.
Each gage glass or externally mounted water-levelsensing or water-level-controlling device shall be
equipped with a top and a bottom shutoff valve of such
through‐flow construction as to prevent stoppage by deposits of sediments. See PG-60.3.7(a) through
PG-60.3.7(e) for examples of acceptable valve construction. If the bottom valve is more than 7 ft (2 m) above
the floor or platform from which it is operated, the operating mechanism shall indicate by its position whether
the valve is open or closed. A means of manually opening
and closing the valves from the valve operating floor or
platform shall be provided. The pressure–temperature
PG-60.2.4 The design and material of a water column shall comply with the requirements of PG-8.2,
PG-8.3, and PG-42.
PG-60.3 Connections.
PG-60.3.1 Gage glasses that are required by
PG-60.1 shall be connected directly to the shell or drum
of the boiler or to an intervening water column. When
two gage glasses are required, both may be connected
to a single water column.
PG-60.3.2 The lower edge of the steam connection
between a water column, gage glass, or austenitic stainless steel or nickel‐based alloy water level‐sensing device
in the boiler shall not be below the highest visible water
level in the gage glass. There shall be no sag or offset in
the piping that will permit the accumulation of water.
PG-60.3.3 The upper edge of the water connection
between a water column, gage glass, or austenitic stainless steel or nickel‐based alloy water level‐sensing device
56
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-60.1.1.3 Independent remote level indicators that contain sensing devices that include a magnetically coupled float inside a nonmagnetic cylindrical
pressure chamber to utilize through‐the‐wall sensing of
float position shall be restricted to the requirements of
PG-12.2.16 The design and construction of such devices
shall include provisions for ease of cleaning and maintenance. Attachment of any control devices for use other
than indicating water level is prohibited.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
(e) Y‐type globe valve with rising stem so constructed
that the lowest edge of the seat is at least 25% of the inside diameter below the centerline of the valve as shown
in Figure PG-60.3.7.
Such valves shall be locked or sealed open except under
the following additional conditions:
(1) The boiler MAWP shall not exceed 250 psig
(1.7 MPa).
(2) The boiler shall not be hand fired or fired with solid fuel not in suspension.
(3) Interlocks between the valve and the burner control system shall stop fuel supply and prevent firing
whenever the valve between the drum and the water column is not in the fully open position.
(4) The minimum valve size shall be NPS 1 (DN 25).
and the boiler shall not be above the lowest visible water
level in the gage glass. No part of this pipe connection
shall be above the point of connection at the water
column.
PG-60.3.4 Connections from the boiler to the
water column shall be at least NPS 1 (DN 25). Connections
for gage glasses connected directly to the boiler or to an
intervening water column shall be at least NPS 1/2
(DN 15). Connections from the boiler to the remote level
indicator shall be at least NPS 3/4 (DN 20) to and including
the isolation valve and from there to the remote level indicator at least 1/2 in. (13 mm) O.D. tubing.
PG-60.3.5 When the boiler MAWP exceeds 400 psi
(3 MPa), lower connections to drums for water columns
and remote level indicators shall be provided with
shields, sleeves, or other suitable means to reduce the effect of temperature differentials in the shells or heads.
PG-60.3.7.1 Automated isolation valves (as described in PG-60.1.3) need not be locked or sealed open
as noted above.
PG-60.3.8 Except for control devices such as damper regulators and feedwater regulators, drains, steam
pressure gages, or apparatus of such form as does not
permit the escape of an appreciable amount of steam or
water therefrom, no outlet connections shall be placed
on the piping connecting a water column or gage glass
to a boiler. No outlet connections shall be placed on the
piping connecting a remote level indicator to the boiler
or to a water column for any function other than water
level indication.
PG-60.3.9 An acceptable arrangement is shown in
Figure PG-60.3.9.
PG-60.4
Gage Cocks. Not required.
PG-60.5 Water Fronts. Each boiler fitted with a
water jacketed boiler‐furnace mouth protector, or similar
appliance having valves on the pipes connecting them to
the boiler shall have these valves locked or sealed open.
Such valves, when used, shall be of the straightway type.
PG-60.3.7 Shutoff valves, including automated
valves as described in PG-60.1.3, if provided in the pipe
connections between a boiler and a water column or between a boiler and the shutoff valves required for the
gage glass, or austenitic stainless steel or nickel‐based alloy water level‐sensing device (PG-60.1.2), shall be of
such through‐flow construction as to prevent stoppage
by deposits of sediment and shall indicate whether they
are in open or closed position of the operating
mechanism.
Some examples of acceptable valves are:
(a) outside‐screw‐and‐yoke-type gate valve
(b) lever‐lifting‐type gate valve with permanently fastened lever
(c) stopcock with the plug held in place by a guard or
gland
(d) ball valve
Figure PG-60.3.7
Y-Type Globe Valve
D
57
1/
4D
min.
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-60.3.6 The steam and water connections to a
water column, gage glass, or austenitic stainless steel or
nickel‐based alloy water level‐sensing device shall be
readily accessible for internal inspection and cleaning.
Some acceptable methods of meeting this requirement
are by providing a cross or fitting with a back outlet at
each right‐angle turn to permit inspection and cleaning
in both directions, or by using pipe bends or fittings of
a type that does not leave an internal shoulder or pocket
in the pipe connection and with a radius of curvature that
will permit the passage of a rotary cleaner. Screwed plug
closures using threaded connections as allowed by
PG-39.5.3 are acceptable means of access for this inspection and cleaning. When the boiler MAWP exceeds
400 psig (3 MPa), socket‐welded plugs may be used for
this purpose in lieu of screwed plugs. If the water connection to the water column has a rising bend or pocket that
cannot be drained by means of the water‐column drain,
an additional drain shall be placed on this connection so
that it may be blown off to clear any sediment from the
pipe.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PG-60.6.2 Each forced‐flow steam generator with
no fixed steam and waterline shall be equipped with pressure gages or other pressure measuring devices located
as specified in PG-60.6.2.1 through PG-60.6.2.3.
Figure PG-60.3.9
Typical Arrangement of Steam and Water
Connections for a Water Column
PG-60.6.2.1 at the boiler or superheater outlet
(following the last section, which involves absorption of
heat)
Steam
Steam
A
B
PG-60.6.2.2 at the boiler or economizer inlet
(preceding any section that involves absorption of heat),
and
B
Glass
A
C
D
A — not lower
than B
PG-60.6.2.3 upstream of any shutoff valve that
may be used between any two sections of the heatabsorbing surface
C — not higher
than D
C
PG-60.6.3 Each boiler shall be provided with a
valve connection at least NPS 1/4 (DN 8) for the exclusive
purpose of attaching a test gage when the boiler is in service, so that the accuracy of the boiler pressure gage can
be ascertained.
D
Water
Water
PG-60.6.4 Each high‐temperature water boiler
shall have a temperature gage so located and connected
that it shall be easily readable. The temperature gage shall
be installed so that it at all times indicates the temperature in degrees Fahrenheit (Celsius) of the water in the
boiler, at or near the outlet connection.
PG-61
FEEDWATER SUPPLY
PG-61.1 Except as provided for in PG-61.2 and
PG-61.4, boilers having more than 500 ft 2 (47 m 2) of
water‐heating surface shall have at least two means of
feeding water. Except as provided for in PG-61.3,
PG-61.4, and PG-61.5, each source of feeding shall be capable of supplying water to the boiler at a pressure of 3%
higher than the highest setting of any pressure relief valve
on the boiler proper. For boilers that are fired with solid
fuel not in suspension, and for boilers whose setting or
heat source can continue to supply sufficient heat to cause
damage to the boiler if the feed supply is interrupted, one
such means of feeding shall not be susceptible to the same
interruption as the other, and each shall provide sufficient
water to prevent damage to the boiler.
PG-61.2 Except as provided for in PG-61.1, a boiler
fired by gaseous, liquid, or solid fuel in suspension, or
heated by combustion turbine engine exhaust, may be
equipped with a single means of feeding water, provided
means are furnished for the shutting off of its heat input
prior to the water level reaching the lowest permissible
level established by PG-60.
PG-61.3 For boilers having a water‐heating surface of
more than 100 ft2 (9.3 m2), the feed water connection to
the boiler shall be not less than NPS 3/4 (DN 20).
For boilers having a water‐heating surface of 100 ft2
(9.3 m2) or less, the feed water connection to the boiler
shall be not less than NPS 1/2 (DN 15).
58
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-60.6 Pressure Gages.
PG-60.6.1 Each boiler shall have a pressure gage
so located that it is easily readable. The pressure gage
shall be installed so that it shall at all times indicate the
pressure in the boiler. Each steam boiler shall have the
pressure gage connected to the steam space or to the
water column or its steam connection. A valve or cock
shall be placed in the gage connection adjacent to the
gage. An additional valve or cock may be located near
the boiler providing it is locked or sealed in the open position. No other shutoff valves shall be located between
the gage and the boiler. The pipe connection shall be of
ample size and arranged so that it may be cleared by
blowing out. For a steam boiler the gage or connection
shall contain a syphon or equivalent device that will develop and maintain a water seal that will prevent steam
from entering the gage tube. Pressure gage connections
shall be suitable for the maximum allowable working
pressure and temperature, but if the temperature exceeds
406°F (208°C), brass or copper pipe or tubing shall not be
used. The connections to the boiler, except the syphon, if
used, shall not be less than NPS 1/4 (DN 8) but where steel
or wrought iron pipe or tubing is used, they shall not be
less than 1/2 in. (13 mm) inside diameter. The minimum
size of a syphon, if used, shall be 1/4 in. (6 mm) inside diameter. The dial of the pressure gage shall be graduated to
approximately double the pressure at which the safety
valve is set, but in no case to less than 11/2 times this
pressure.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Boilers with 20 ft2 (1.9 m2) or less of water heating surface may have the feed water delivered through the blowoff opening.
relief valves relieving at full lift. For boilers that use auxiliary firing in combination with the primary heat source,
the Manufacturer shall include the effect of such firing in
the total required capacity.
PG-61.4 High‐temperature water boilers shall be
provided with means of adding water to the boiler or system while under pressure.
PG-67.2.1.1.2 The minimum required relieving capacity of the pressure relief valves shall not be less
than the maximum designed steaming capacity at the
MAWP of the boiler, and the boiler shall be provided with
controls responsive to steam pressure, which include not
less than the following:
PG-61.5 A forced‐flow steam generator with no fixed
steam and waterline shall be provided with a source of
feeding capable of supplying water to the boiler at a pressure not less than the expected maximum sustained pressure at the boiler inlet, as determined by the boiler
Manufacturer, corresponding to operation at maximum
designed steaming capacity with maximum allowable
working pressure at the superheater outlet.
(a) a control that reduces that total heat input to the
boiler such that the steam generated does not exceed
the maximum designed steaming capacity at the MAWP
of the boiler
(b) a control that trips the heat input to the boiler if the
pressure reaches 106% of the MAWP of the boiler
OVERPRESSURE PROTECTION
REQUIREMENTS
PG-67
PG-67.2.1.2 The minimum required relieving capacity for a waste heat boiler shall be determined by the
Manufacturer. When auxiliary firing is to be used in combination with waste heat recovery, the maximum output
as determined by the boiler Manufacturer shall include
the effect of such firing in the total required capacity.
When auxiliary firing is to be used in place of waste heat
recovery, the minimum required relieving capacity shall
be based on auxiliary firing or waste heat recovery,
whichever is higher.
BOILER
PG-67.2.1.3 The minimum required relieving capacity for electric boilers shall be in accordance with
PEB-15.
PG-67.2 The pressure relief valve capacity for each
boiler (except as noted in PG-67.4) shall be such that
the pressure relief valve, or valves will discharge all the
steam that can be generated by the boiler without allowing the pressure to rise more than 6% above the highest
pressure at which any valve is set and in no case to more
than 6% above the maximum allowable working
pressure.
PG-67.2.1.4 The minimum required relieving
capacity in lb/hr (kg/hr) for a high‐temperature water
boiler shall be determined by dividing the maximum output in Btu/hr (W) at the boiler nozzle, produced by the
highest heating value fuel for which the boiler is designed,
by 1,000 (646).
PG-67.2.1.5 The minimum required relieving
capacity for organic fluid vaporizers shall be in accordance with PVG-12. The minimum required relieving capacity for miniature boilers shall be in accordance with
PMB-15.
PG-67.2.1 The minimum required relieving capacity of the pressure relief valves for all types of boilers shall
be not less than the maximum designed steaming capacity
at the MAWP of the boiler, as determined by the Manufacturer and shall be based on the capacity of all the fuel
burning equipment as limited by other boiler functions.
PG-67.2.1.6 Any economizer that may be shut
off from the boiler, thereby permitting the economizer
to become a fired pressure vessel, shall have one or more
pressure relief valves with a total discharge capacity, in
lb/hr (kg/hr), calculated from the maximum expected
heat absorption in Btu/hr (W), as determined by the Manufacturer, divided by 1,000 (646). This absorption shall
be stated in the stamping (PG-106.4). For overpressure
conditions where the fluid relieved is water, the discharge
capacity of the pressure relief valve, or valves shall be sufficient to prevent the pressure from exceeding the limits
of PG-67.2.
PG-67.2.1.1 The steam generated when all pressure relief valves are relieving at full lift on a boiler that
has a steam-generating surface located downstream (in
the gas stream of) a superheater and/or reheater surface
may exceed the maximum designed steaming capacity at
the MAWP of the boiler. The Manufacturer shall address
this by one of the following methods:
PG-67.2.1.1.1 The minimum required relieving capacity of the pressure relief valves shall not be less
than the steam that may be generated with all pressure
59
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-67.1 Each boiler shall have at least one pressure
relief valve and if it has more than 500 ft2 (47 m2) of bare
tube water‐heating surface, or if an electric boiler has a
power input more than 1,100 kW, it shall have two or
more pressure relief valves. For a boiler with combined
bare tube and extended water‐heating surface exceeding
500 ft2 (47 m2), two or more pressure relief valves are required only if the design steam generating capacity of the
boiler exceeds 4,000 lb/hr (1 800 kg/hr). Organic fluid
vaporizer generators require special consideration as given in Part PVG.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PG-67.3 One or more pressure relief valves on the
boiler proper shall be set at or below the maximum allowable working pressure (except as noted in PG-67.4). If additional valves are used the highest pressure setting shall
not exceed the maximum allowable working pressure by
more than 3%. The complete range of pressure settings of
all the saturated‐steam pressure relief valves on a boiler
shall not exceed 10% of the highest pressure to which
any valve is set. Pressure setting of pressure relief valves
on high‐temperature water boilers 17 may exceed this
10% range. Economizer pressure relief devices required
by PG-67.2.1.6 shall be set as above using the MAWP of
the economizer.
This capacity certification shall be conducted in accordance with the provisions of PG-69.3. The valves shall
be marked in accordance with the provisions of PG-69.4.
PG-67.4.2 Pressure relief valves shall be provided,
having a total combined relieving capacity, including that
of the power‐actuated pressure-relieving capacity installed under PG-67.4.1, of not less than 100% of the maximum designed steaming capacity of the boiler, as
determined by the Manufacturer, except the alternate
provisions of PG-67.4.3 are satisfied. In this total, no credit in excess of 30% of the total required relieving capacity
shall be allowed for the power‐actuated pressurerelieving valves actually installed. Any or all of the pressure relief valves may be set above the maximum allowable working pressure of the parts to which they are
connected, but the set pressures shall be such that when
all of these valves (together with the power‐actuated
pressure-relieving valves) are in operation the pressure
will not rise more than 20% above the maximum allowable working pressure of any part of the boiler, except
for the steam piping between the boiler and the prime
mover.
PG-67.4 For a forced‐flow steam generator with no
fixed steam and waterline (Figure PG-67.4), equipped
with automatic controls and protective interlocks responsive to steam pressure, pressure relief valves may be provided in accordance with the above paragraphs or the
following protection against overpressure shall be
provided:
PG-67.4.3 The total installed capacity of pressure
relief valves may be less than the requirements of
PG-67.4.2 provided all of the following conditions are met.
PG-67.4.3.1 The boiler shall be of no less steaming capacity than 1,000,000 lb/hr (450 000 kg/hr) and installed in a unit system for power generation (i.e., a single
boiler supplying a single turbine‐generator unit).
PG-67.4.3.2 The boiler shall be provided with
automatic devices, responsive to variations in steam pressure, which include not less than all the following:
PG-67.4.3.2.1 A control capable of maintaining steam pressure at the desired operating level and of
modulating firing rates and feedwater flow in proportion
to a variable steam output.
PG-67.4.3.2.2 A control that overrides
PG-67.4.3.2.1 by reducing the fuel rate and feedwater flow
when the steam pressure exceeds the maximum allowable working pressure as shown in the master stamping
(PG-106.3) by 10%, and
PG-67.4.3.2.3 A direct‐acting overpressure‐
trip‐actuating mechanism, using an independent
pressure-sensing device, that will stop the flow of fuel
and feedwater to the boiler, at a pressure higher than
the set pressure of PG-67.4.3.2.2, but less than 20% above
the maximum allowable working pressure as shown in
the master stamping (PG-106.3).
PG-67.4.3.3 There shall be not less than two
pressure relief valves and the total rated relieving capacity of the pressure relief valves shall be not less than 10%
of the maximum designed steaming capacity of the boiler
as determined by the Manufacturer. These pressure relief
valves may be set above the maximum allowable working
60
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-67.4.1 One or more power‐actuated
pressure-relieving valves 18 shall be provided in direct
communication with the boiler when the boiler is under
pressure and shall receive a control impulse to open
when the maximum allowable working pressure at the
superheater outlet, as shown in the master stamping
(PG-106.3), is exceeded. The total combined relieving capacity of the power‐actuated relieving valves shall be not
less than 10% of the maximum design steaming capacity
of the boiler under any operating condition as determined
by the Manufacturer. The valve or valves shall be located
in the pressure part system where they will relieve the
overpressure.
An isolating stop valve of the outside‐screw‐and‐yoke
or ball type may be installed between the power‐actuated
pressure-relieving valve and the boiler to permit repairs
provided an alternate power‐actuated pressure-relieving
valve of the same capacity is so installed as to be in direct
communication with the boiler in accordance with the requirements of this paragraph.
The isolating stop valve port area shall at least equal
the area of the inlet of the power‐actuated
pressure-relieving valve. If the isolating stop valve is of
the ball type, the valve shall include a means to clearly
identify whether the valve is in the open or closed position. If the isolating stop valve is power actuated (air, motor, hydraulic, etc.), a manual override mechanism shall
be provided.
Power‐actuated pressure-relieving valves discharging
to intermediate pressure and incorporated into bypass
and/or startup circuits by the boiler Manufacturer need
not be capacity certified. Instead, they shall be marked
by the valve manufacturer with a capacity rating at a
set of specified inlet pressure and temperature conditions. Power‐actuated pressure-relieving valves discharging directly to atmosphere shall be capacity certified.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PG-67.4
Requirements for Overpressure Protection Forced-Flow Steam Generator
Maximum set pressure
pressure relief valves
(PG-67.4.2)
Maximum overpressure
(PG-67.4.2 and PG-67.4.3)
3%
Actual design pressure
Pressure, psi (MPa)
Opening pressure
power-actuated valves
Minimum design pressure
17%
Master stamping
pressure
Operating pressure
Steam-water flow direction
Check
valve
(1)
Economizer
Water
walls
Superheater
(A)
(C)
Throttle
inlet
(2)
Superheater
Turbine
Alternate Requirements for Pressure Relief Valves
Pressure
(A) = master stamping (PG-106.3)
(B) = component design at inlet to stop valve (5) (PG-67.4.4.1)
(C) = turbine throttle inlet (ASME B31.1, para. 122.1.2, A.4)
Pressure Relief Valve Flow Capacity (minimum, based on
rated capacity of boiler)
(1) = 10% – 30% (PG-67.4.1)
(2) = one valve minimum (PG-68.1)
(2) + (3) when downstream to stop valve (5) = that
required for independently fired superheaters
(PG-68.3)
(4) = 10% total with minimum of two valves when there
is a stop valve (5) (PG-67.5.3.3)
(2) + (4) = 10% with minimum of two valves when there
is no stop valve (5) (PG-67.4.3.3)
Pressure Relief and Power-Actuated Valves
(1) = power actuated (PG-67.4.1)
(2), (3), and (4) = pressure relief valve (PG-67.4.2)
(5) = superheater stop (PG-67.4.4)
Pressure Relief Valve Flow Capacity (minimum, based on rated
capacity of boiler)
(1) = 10% – 30% (PG-67.4.1)
(2) = minimum of one valve (PG-68.1)
(2) + (3) when downstream to stop valve (5) =
that required for independently fired superheaters
(PG-68.3)
(2) + (3) + (4) = 100% – (1) (PG-67.4.2)
Pressure Relief Valve Opening Pressure (maximum)
(1) = (A), and (B) when there is stop valve (5)
(PG-67.4.1)
(2), (3), and (4) = (A) + 20% (PG-67.4.3.3)
(5) = (A) (PG-67.4.1)
Pressure Relief Valve Opening Pressure (maximum)
(1) = (A), and (B) when there is stop valve (5) (PG-67.4.1)
(2), (3), and (4) = (A) + 17% (PG-67.4.2)
(5) = (A) (PG-67.4.1)
Automatic Pressure Controls (PG-67.4.3)
(a) at (C) for normal operation under load (PG-67.4.3.2.1)
(b) at (A) + 10% to overide control (a) (PG-67.4.3.2.2)
(c) at (A) + 20% to shut off flow of fuel and feedwater
(PG-67.4.3.2.3)
(d) pressure relief valves at (4) to shut off flow of
fuel and feedwater by “fail-safe” power circuit
(PG-67.4.3.4)
61
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Boiler feed
pump
(B)
(4) (5) (3)
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
rated relieving capacity, W , shall be multiplied by the appropriate supercritical correction factor, K s c , from Table
PG-67.5 or Table PG-67.5M.
Pressure relief valves may be used that give any opening up to the full discharge capacity of the area of the
opening of the inlet of the valve, provided the movement
of a steam pressure relief valve is such as not to induce
lifting of water in the boiler.
For high‐temperature water boilers pressure relief
valves shall be used. Such valves shall have a closed bonnet. In addition the pressure relief valves shall be capable
of satisfactory operation when relieving water at the saturation temperature corresponding to the pressure at
which the valve is set to blow.
pressure of the parts to which they are connected but
shall be set such that the valves will lift at a pressure no
higher than 20% above the maximum allowable working
pressure as shown in the master stamping (PG-106.3).
PG-67.4.3.4 At least two of these pressure relief
valves shall be equipped with a device that directly transmits the valve stem lift action to controls that will stop the
flow of fuel and feedwater to the boiler. The control circuitry to accomplish this shall be arranged in a “fail‐safe”
manner (see Note).
NOTE: “Fail‐safe” shall mean a circuitry arranged as either of the
following:
(a) Energize to Trip. There shall be at least two separate and independent trip circuits served by two power sources, to initiate and
perform the trip action. One power source shall be a continuously
charged DC battery. The second source shall be an AC‐to‐DC converter connected to the DC system to charge the battery and capable of
performing the trip action. The trip circuits shall be continuously
monitored for availability.
It is not mandatory to duplicate the mechanism that actually stops
the flow of fuel and feedwater.
(b) De‐energize to Trip. If the circuits are arranged in such a way
that a continuous supply of power is required to keep the circuits
closed and operating and such that any interruption of power supply
will actuate the trip mechanism, then a single trip circuit and single
power supply will be enough to meet the requirements of this
subparagraph.
PG-68
PG-68.2 The discharge capacity of the pressure relief
valve, or valves, on an attached superheater may be included in determining the number and size of the pressure relief valves for the boiler, provided there are no
intervening valves between the superheater pressure relief valve and the boiler, and provided the discharge capacity of the pressure relief valve, or valves, on the
boiler, as distinct from the superheater is at least 75%
of the aggregate valve capacity required.
PG-67.4.4 When stop valves are installed in the
water‐steam flow path between any two sections of a
forced‐flow steam generator with no fixed steam and
waterline,
PG-67.4.4.1 The power‐actuated pressurerelieving valve(s) required by PG-67.4.1 shall also receive
a control impulse to open when the maximum allowable
working pressure of the component, having the lowest
pressure level upstream to the stop valve, is exceeded,
and
PG-68.3 Every isolable superheater that may be shut
off from the boiler and permit the superheater to become
a fired pressure vessel and all nonintegral separately fired
superheaters shall have one or more pressure relief
valves having a discharge capacity equal to 6 lb/ft 2
(29 kg/m2) of steam per hour, using the superheater surface measured on the side exposed to the hot gases. As an
alternative the Manufacturer may also calculate the minimum pressure relief valve discharge capacity in lb (kg) of
steam per hour from the maximum expected heat absorption (as determined by the Manufacturer) in Btu/hr (W),
divided by 1,000 (646). In the case of electrically heated
superheaters, the pressure relief valve capacity shall be
based upon 31/2 lb (1.6 kg)/hr/kW input. The number of
pressure relief valves installed shall be such that the total
capacity is at least equal to that required. Pressure relief
PG-67.4.4.2 The pressure relief valves shall be
located to provide the pressure protection requirements
in PG-67.4.2 or PG-67.4.3.
PG-67.4.5 A reliable pressure‐recording device
shall always be in service and records kept to provide evidence of conformity to the above requirements.
PG-67.5 Pressure relief valves or power-actuated
pressure-relieving valves shall be tested in accordance
with the requirements of PG-69, and shall be credited
with capacities as determined by the provisions of
PG-69.2. For pressures over 3,200 psig (22.1 MPa), the
62
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-67.4.3.5 The power supply for all controls
and devices required by PG-67.4.3 shall include at least
one source contained within the same plant as the boiler
and which is arranged to actuate the controls and devices
continuously in the event of failure or interruption of any
other power sources.
ð15Þ
SUPERHEATER AND REHEATER
PG-68.1 Except as permitted in PG-58.3.1, every attached superheater shall have one or more pressure relief
valves in the steam flow path between the superheater
outlet and the first stop valve. The location shall be suitable for the service intended and shall provide the overpressure protection required. The pressure drop
upstream of each pressure relief valve shall be considered
in the determination of set pressure and relieving capacity of that valve. If the superheater outlet header has a full,
free steam passage from end to end and is so constructed
that steam is supplied to it at practically equal intervals
throughout its length so that there is a uniform flow of
steam through the superheater tubes and the header,
the pressure relief valve, or valves, may be located anywhere in the length of the header.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
ð15Þ
Table PG-67.5
Supercritical Correction Factor, K s c
Total Temperature, °F, of Supercritical Steam
750
800
850
900
950
1,000
1,050
1,100
1,150
1,200
3,208.2
1.059
0.971
0.913
0.872
0.839
0.811
0.788
0.767
0.748
0.731
3,250
3,300
3,350
3,400
1.064
1.070
1.077
1.084
0.975
0.980
0.985
0.990
0.916
0.919
0.922
0.925
0.874
0.876
0.878
0.881
0.841
0.842
0.844
0.846
0.813
0.814
0.815
0.817
0.788
0.790
0.791
0.792
0.767
0.768
0.769
0.770
0.748
0.749
0.750
0.750
0.731
0.732
0.732
0.733
3,450
3,500
3,550
3,600
1.091
1.100
1.109
1.118
0.996
1.002
1.008
1.014
0.929
0.932
0.935
0.939
0.883
0.885
0.888
0.890
0.848
0.849
0.851
0.853
0.818
0.819
0.821
0.822
0.793
0.794
0.795
0.796
0.771
0.772
0.773
0.774
0.751
0.752
0.753
0.754
0.734
0.734
0.735
0.735
3,650
3,700
3,750
3,800
1.129
1.141
1.153
1.168
1.020
1.027
1.034
1.041
0.943
0.946
0.950
0.954
0.893
0.895
0.898
0.900
0.855
0.857
0.859
0.861
0.824
0.825
0.827
0.828
0.797
0.799
0.800
0.801
0.775
0.775
0.776
0.777
0.754
0.755
0.756
0.757
0.736
0.737
0.737
0.738
3,850
3,900
3,950
4,000
1.186
1.205
1.227
1.251
1.048
1.056
1.064
1.072
0.958
0.962
0.966
0.970
0.903
0.906
0.908
0.911
0.862
0.864
0.866
0.868
0.830
0.831
0.833
0.834
0.802
0.803
0.804
0.806
0.778
0.779
0.780
0.781
0.757
0.758
0.759
0.760
0.739
0.739
0.740
0.741
4,050
4,100
4,150
4,200
1.279
1.310
1.343
1.395
1.080
1.089
1.098
1.107
0.974
0.978
0.983
0.987
0.914
0.916
0.919
0.922
0.870
0.872
0.874
0.876
0.836
0.837
0.839
0.840
0.807
0.808
0.809
0.810
0.782
0.783
0.784
0.785
0.760
0.761
0.762
0.763
0.741
0.742
0.743
0.743
4,250
4,300
4,350
4,400
1.444
1.491
1.538
…
1.116
1.125
1.135
1.146
0.992
0.997
1.002
1.007
0.925
0.928
0.931
0.934
0.878
0.881
0.883
0.885
0.842
0.844
0.845
0.847
0.812
0.813
0.814
0.815
0.786
0.787
0.788
0.789
0.764
0.765
0.765
0.766
0.744
0.745
0.745
0.746
4,450
4,500
4,550
4,600
…
…
…
…
1.157
1.169
1.181
1.194
1.012
1.017
1.022
1.027
0.937
0.940
0.943
0.947
0.887
0.889
0.892
0.894
0.848
0.850
0.852
0.853
0.817
0.818
0.819
0.820
0.790
0.791
0.792
0.793
0.767
0.768
0.768
0.769
0.746
0.747
0.748
0.749
4,650
4,700
4,750
4,800
…
…
…
…
1.207
1.220
1.234
1.248
1.033
1.038
1.044
1.050
0.950
0.953
0.957
0.960
0.896
0.898
0.900
0.903
0.855
0.857
0.858
0.860
0.822
0.823
0.824
0.826
0.794
0.795
0.796
0.797
0.770
0.771
0.772
0.773
0.749
0.750
0.751
0.751
4,850
4,900
4,950
5,000
…
…
…
…
1.263
1.278
1.294
1.310
1.056
1.062
1.069
1.075
0.963
0.967
0.970
0.974
0.905
0.908
0.910
0.912
0.862
0.863
0.865
0.867
0.827
0.828
0.830
0.831
0.798
0.799
0.800
0.801
0.774
0.774
0.775
0.776
0.752
0.753
0.753
0.754
5,050
5,100
5,150
5,200
…
…
…
…
1.326
1.343
1.360
1.377
1.082
1.088
1.095
1.102
0.978
0.981
0.985
0.989
0.915
0.917
0.920
0.922
0.869
0.871
0.872
0.874
0.832
0.834
0.835
0.837
0.803
0.804
0.805
0.806
0.777
0.778
0.779
0.780
0.755
0.755
0.756
0.757
5,250
5,300
5,350
5,400
…
…
…
…
1.393
1.411
1.427
1.443
1.109
1.116
1.123
1.131
0.993
0.997
1.001
1.004
0.925
0.927
0.930
0.933
0.876
0.878
0.880
0.882
0.838
0.839
0.841
0.842
0.807
0.808
0.809
0.810
0.780
0.781
0.782
0.783
0.758
0.758
0.759
0.760
5,450
5,500
5,550
5,600
…
…
…
…
1.460
1.476
1.491
1.507
1.139
1.146
1.154
1.162
1.009
1.013
1.017
1.021
0.935
0.938
0.941
0.943
0.884
0.886
0.887
0.889
0.844
0.845
0.846
0.848
0.811
0.812
0.813
0.815
0.784
0.785
0.786
0.787
0.760
0.761
0.762
0.763
5,650
5,700
…
…
1.522
1.536
1.171
1.179
1.025
1.030
0.946
0.949
0.891
0.893
0.849
0.851
0.816
0.817
0.788
0.788
0.763
0.764
63
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Flowing
Pressure,
psia
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Table PG-67.5
Supercritical Correction Factor, K s c (Cont'd)
Flowing
Pressure,
psia
Total Temperature, °F, of Supercritical Steam
800
850
900
950
1,000
1,050
1,100
1,150
1,200
5,750
5,800
…
…
750
1.551
1.565
1.187
1.195
1.034
1.038
0.952
0.955
0.895
0.897
0.852
0.854
0.818
0.819
0.789
0.790
0.765
0.765
5,850
5,900
5,950
6,000
…
…
…
…
1.578
1.591
1.603
1.615
1.204
1.212
1.221
1.229
1.043
1.047
1.052
1.057
0.957
0.960
0.963
0.966
0.899
0.901
0.903
0.906
0.855
0.857
0.858
0.860
0.820
0.821
0.823
0.824
0.791
0.792
0.793
0.794
0.766
0.767
0.768
0.768
PG-69
valves for separately fired superheaters shall be located
in accordance with the rules of PG-68.1 and the mounting
rules of PG-71.
PG-69.1 Before the Certification Mark is applied to
any pressure relief valve or power-actuated pressurerelieving valve, the valve manufacturer shall have the relieving capacity of his pressure relief valves certified in
accordance with the provisions of this paragraph.
PG-69.1.1 Capacity certification tests shall be conducted using dry saturated steam. The limits for test purposes shall be 98% minimum quality and 20°F (10°C)
maximum superheat. Correction from within these limits
may be made to the dry saturated condition.
PG-69.1.2 Tests shall be conducted at a place that
meets the requirements of A-312.
PG-69.1.3 Capacity test data reports for each pressure relief valve design and size, signed by the manufacturer and Authorized Observer witnessing the tests,
together with drawings showing the valve construction,
shall be submitted to the ASME designee for review and
acceptance.19
PG-68.5 A soot blower connection may be attached
to the same outlet from the superheater or reheater that
is used for the pressure relief valve connection.
PG-68.6 Every pressure relief valve used on a superheater or reheater discharging superheated steam at a
temperature over 450°F (230°C) shall have a casing, including the base, body, and, if applicable, bonnet and spindle, of steel, steel alloy, or equivalent heat‐resisting
material.
The pressure relief valve shall have a flanged inlet connection, or a weld‐end inlet connection. It shall have the
seat and disk of suitable heat erosive and corrosive resisting material, and the spring of direct spring-loaded safety
valves shall be fully exposed outside of the valve casing so
that it shall be protected from contact with the escaping
steam.
PG-69.1.4 Capacity certification tests shall be conducted at a pressure that does not exceed the set pressure
by 3% or 2 psi (15 kPa), whichever is greater. Pressure
relief valves shall be adjusted so that the blowdown does
not exceed 4% of the set pressure. For pressure relief
valves set at or below 100 psi (700 kPa), the blowdown
shall be adjusted so as not to exceed 4 psi (30 kPa). Pressure relief valves used on forced‐flow steam generators
with no fixed steam and waterline, and pressure relief
valves used on high‐temperature water boilers shall be
adjusted so that the blowdown does not exceed 10% of
the set pressure. The reseating pressure shall be noted
and recorded.
PG-68.7 The capacity of a pressure relief valve on
superheated steam shall be calculated by multiplying
the capacity determined in accordance with PG-69.2 by
the appropriate superheat correction factor K s h , from
Table PG-68.7 or Table PG-68.7M.
PG-69.1.5 Capacity certification of pilot-operated
pressure relief valves may be based on tests without the
pilot valves installed, provided prior to capacity tests it
has been demonstrated by test to the satisfaction of the
Authorized Observer that the pilot valve will cause the
main valve to open fully at a pressure which does not
64
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-68.4 Every reheater shall have one or more pressure relief valves, such that the total relieving capacity is
at least equal to the maximum steam flow for which the
heater is designed. The capacity of the reheater pressure
relief valves shall not be included in the required relieving
capacity for the boiler and superheater.
One or more pressure relief valves with a combined relieving capacity not less than 15% of the required total
shall be located along the steam flow path between the reheater outlet and the first stop valve. The pressure drop
upstream of the pressure relief valves on the outlet side
of the reheater shall be considered in determining their
set pressure.
ð15Þ
CERTIFICATION OF CAPACITY OF
PRESSURE RELIEF VALVES
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
ð15Þ
Table PG-67.5M
Supercritical Correction Factor, K s c
Total Temperature, °C, of Supercritical Steam
400
425
450
475
500
525
550
575
600
625
650
22.12
1.056
0.976
0.922
0.883
0.851
0.824
0.801
0.781
0.762
0.745
0.730
22.25
22.50
22.75
23.00
1.058
1.063
1.067
1.072
0.978
0.982
0.985
0.989
0.924
0.926
0.929
0.931
0.884
0.886
0.887
0.889
0.852
0.853
0.855
0.856
0.825
0.826
0.827
0.828
0.802
0.803
0.803
0.804
0.781
0.782
0.783
0.783
0.763
0.763
0.764
0.764
0.746
0.746
0.747
0.747
0.730
0.731
0.731
0.732
23.25
23.50
23.75
24.00
1.077
1.082
1.087
1.093
0.993
0.997
1.001
1.006
0.934
0.937
0.939
0.942
0.891
0.893
0.895
0.897
0.858
0.859
0.860
0.862
0.830
0.831
0.832
0.833
0.805
0.806
0.807
0.808
0.784
0.785
0.785
0.786
0.765
0.766
0.766
0.767
0.748
0.748
0.749
0.749
0.732
0.732
0.733
0.733
24.25
24.50
24.75
25.00
1.099
1.106
1.112
1.120
1.010
1.014
1.019
1.024
0.945
0.948
0.950
0.953
0.899
0.901
0.903
0.905
0.863
0.865
0.866
0.868
0.834
0.835
0.836
0.837
0.809
0.810
0.811
0.812
0.787
0.788
0.789
0.789
0.768
0.768
0.769
0.769
0.750
0.751
0.751
0.752
0.734
0.734
0.735
0.735
25.25
25.50
25.75
26.00
1.128
1.136
1.145
1.155
1.029
1.034
1.039
1.045
0.956
0.959
0.962
0.966
0.907
0.909
0.911
0.913
0.869
0.871
0.872
0.874
0.839
0.840
0.841
0.842
0.813
0.814
0.815
0.816
0.790
0.791
0.792
0.792
0.770
0.771
0.771
0.772
0.752
0.753
0.753
0.754
0.736
0.736
0.737
0.737
26.25
26.50
26.75
27.00
1.166
1.178
1.192
1.206
1.050
1.056
1.062
1.068
0.969
0.972
0.975
0.979
0.915
0.917
0.919
0.921
0.875
0.877
0.879
0.880
0.843
0.845
0.846
0.847
0.817
0.818
0.819
0.820
0.793
0.794
0.795
0.796
0.773
0.773
0.774
0.775
0.754
0.755
0.755
0.756
0.737
0.738
0.738
0.739
27.25
27.50
27.75
28.00
1.222
1.239
1.258
1.278
1.074
1.081
1.088
1.095
0.982
0.985
0.989
0.992
0.924
0.926
0.928
0.930
0.882
0.883
0.885
0.887
0.848
0.850
0.851
0.852
0.820
0.821
0.822
0.824
0.796
0.797
0.798
0.799
0.775
0.776
0.777
0.777
0.756
0.757
0.758
0.758
0.739
0.740
0.740
0.741
28.25
28.50
28.75
29.00
1.300
1.323
1.354
1.390
1.102
1.109
1.117
1.126
0.996
1.000
1.004
1.007
0.933
0.935
0.937
0.940
0.888
0.890
0.892
0.893
0.854
0.855
0.856
0.857
0.825
0.826
0.827
0.828
0.800
0.801
0.801
0.802
0.778
0.779
0.779
0.780
0.759
0.759
0.760
0.760
0.741
0.742
0.742
0.743
29.25
29.50
29.75
30.00
1.424
1.457
1.490
…
1.134
1.143
1.151
1.158
1.011
1.015
1.019
1.023
0.942
0.945
0.947
0.950
0.895
0.897
0.899
0.900
0.859
0.860
0.861
0.863
0.829
0.830
0.831
0.832
0.803
0.804
0.805
0.806
0.781
0.781
0.782
0.783
0.761
0.762
0.762
0.763
0.743
0.744
0.744
0.745
30.25
30.50
30.75
31.00
…
…
…
…
1.098
1.083
1.090
1.099
1.028
1.032
1.036
1.041
0.952
0.955
0.957
0.960
0.902
0.904
0.906
0.908
0.864
0.865
0.867
0.868
0.833
0.834
0.835
0.836
0.806
0.807
0.808
0.809
0.784
0.784
0.785
0.786
0.763
0.764
0.764
0.765
0.745
0.746
0.746
0.746
31.25
31.50
31.75
32.00
…
…
…
…
1.107
1.115
1.124
1.133
1.046
1.050
1.055
1.060
0.963
0.966
0.968
0.971
0.910
0.911
0.913
0.915
0.870
0.871
0.872
0.874
0.837
0.838
0.839
0.840
0.810
0.811
0.812
0.812
0.786
0.787
0.788
0.788
0.766
0.766
0.767
0.767
0.747
0.748
0.748
0.748
32.25
32.50
32.75
33.00
…
…
…
…
1.142
1.151
1.160
1.170
1.065
1.070
1.075
1.080
0.974
0.977
0.980
0.983
0.917
0.919
0.921
0.923
0.875
0.877
0.878
0.879
0.841
0.843
0.844
0.845
0.813
0.814
0.815
0.816
0.789
0.790
0.791
0.791
0.768
0.769
0.769
0.770
0.749
0.750
0.750
0.750
33.25
33.50
33.75
34.00
…
…
…
…
1.180
1.190
1.201
1.211
1.085
1.091
1.096
1.102
0.986
0.988
0.992
0.995
0.925
0.927
0.929
0.931
0.881
0.882
0.884
0.885
0.846
0.847
0.848
0.849
0.817
0.818
0.819
0.820
0.792
0.793
0.793
0.794
0.770
0.771
0.772
0.772
0.751
0.751
0.752
0.752
34.25
34.50
…
…
1.222
1.233
1.108
1.114
0.998
1.001
0.933
0.935
0.887
0.888
0.850
0.852
0.820
0.821
0.795
0.796
0.773
0.773
0.753
0.753
65
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Flowing
Pressure,
MPa
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Table PG-67.5M
Supercritical Correction Factor, K s c (Cont'd)
Flowing
Pressure,
MPa
Total Temperature, °C, of Supercritical Steam
450
475
500
525
550
575
600
625
650
…
…
400
1.244
1.255
1.119
1.125
1.004
1.007
0.937
0.939
0.890
0.891
0.853
0.854
0.822
0.823
0.796
0.797
0.774
0.775
0.754
0.754
35.25
35.50
35.75
36.00
…
…
…
…
1.267
1.278
1.290
1.301
1.131
1.137
1.144
1.150
1.011
1.014
1.017
1.021
0.941
0.944
0.946
0.948
0.893
0.894
0.896
0.898
0.855
0.856
0.858
0.859
0.824
0.825
0.826
0.827
0.798
0.799
0.799
0.800
0.775
0.776
0.776
0.777
0.755
0.755
0.756
0.757
36.25
36.50
36.75
37.00
…
…
…
…
1.313
1.324
1.336
1.347
1.156
1.162
1.169
1.175
1.024
1.027
1.031
1.034
0.950
0.952
0.955
0.957
0.899
0.901
0.902
0.904
0.860
0.861
0.862
0.864
0.828
0.829
0.830
0.831
0.801
0.802
0.802
0.803
0.778
0.778
0.779
0.779
0.757
0.758
0.758
0.759
37.25
37.50
37.75
38.00
…
…
…
…
1.358
1.369
1.380
1.391
1.182
1.188
1.195
1.201
1.038
1.042
1.045
1.049
0.959
0.961
0.964
0.966
0.906
0.907
0.909
0.910
0.865
0.866
0.867
0.868
0.832
0.833
0.834
0.834
0.804
0.805
0.805
0.806
0.780
0.781
0.781
0.782
0.759
0.760
0.760
0.761
38.25
38.50
38.75
39.00
…
…
…
…
1.402
1.412
1.422
1.433
1.208
1.215
1.222
1.228
1.053
1.056
1.060
1.064
0.968
0.971
0.973
0.975
0.912
0.914
0.915
0.917
0.870
0.871
0.872
0.873
0.835
0.836
0.837
0.838
0.807
0.808
0.809
0.809
0.783
0.783
0.784
0.784
0.761
0.762
0.762
0.763
39.25
39.50
39.75
40.00
…
…
…
…
1.443
1.453
1.463
1.472
1.235
1.242
1.248
1.255
1.068
1.072
1.076
1.080
0.978
0.980
0.983
0.985
0.919
0.921
0.922
0.924
0.875
0.876
0.877
0.879
0.839
0.840
0.841
0.842
0.810
0.811
0.812
0.812
0.785
0.786
0.786
0.787
0.763
0.764
0.764
0.765
40.25
40.50
40.75
41.00
…
…
…
…
1.481
1.490
1.499
1.507
1.262
1.268
1.275
1.282
1.084
1.088
1.092
1.096
0.988
0.990
0.993
0.995
0.926
0.928
0.929
0.931
0.880
0.881
0.882
0.884
0.843
0.844
0.845
0.846
0.813
0.814
0.815
0.816
0.788
0.788
0.789
0.790
0.765
0.766
0.766
0.767
41.25
…
1.515
1.288
1.100
0.998
0.933
0.885
0.847
0.816
0.790
0.767
exceed the set pressure by more than 3% or 2 psi
(15 kPa), whichever is greater, and that the pilot valve
in combination with the main valve will meet all of the requirements of this Section.
(SI Units)
PG-69.1.6 Pilot-operated pressure relief valves for
economizer service shall also be capacity certified using
water at a temperature between 40°F and 125°F (4°C
and 50°C). The valves shall be tested without change to
the adjustments established in PG-69.1.1 to PG-69.1.4.
ð15Þ
PG-69.2.1 Three Valve Method. A capacity certification test is required on a set of three pressure relief
valves for each combination of size, design, and pressure
setting. The capacity of each valve of the set shall fall
within a range of ±5% of the average capacity. If one of
the three pressure relief valves tested falls outside this
range, it shall be replaced by two valves, and a new average shall be calculated based on all four valves, excluding
the replaced valve. Failure of any of the four capacities to
fall within a range of ±5% of the new average shall be
cause to refuse certification of that particular valve
design.
PG-69.2 Relieving capacities shall be determined
using one of the methods in PG-69.2.1 through
PG-69.2.3, and for pressures over 1,500 psig (10.3 MPa)
and up to 3,200 psig (22.1 MPa), the value of W shall be
multiplied by the correction factor.
(U.S. Customary Units)
The rated relieving capacity for each combination of design, size, and test pressure shall be 90% of the average
capacity.
66
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
425
34.75
35.00
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Table PG-68.7
Superheat Correction Factor, K s h
Flowing
Pressure,
psia
Total Temperature, °F, of Superheated Steam
450
500
550
600
650
700
750
800
850
900
0.987
0.998
0.984
0.979
…
0.957
0.963
0.970
0.977
0.972
0.930
0.935
0.940
0.945
0.951
0.905
0.909
0.913
0.917
0.921
0.882
0.885
0.888
0.892
0.895
0.861
0.864
0.866
0.869
0.871
0.841
0.843
0.846
0.848
0.850
0.823
0.825
0.826
0.828
0.830
0.805
0.807
0.808
0.810
0.812
0.789
0.790
0.792
0.793
0.794
0.774
0.775
0.776
0.777
0.778
0.759
0.760
0.761
0.762
0.763
0.745
0.746
0.747
0.748
0.749
0.732
0.733
0.733
0.734
0.735
0.719
0.720
0.721
0.721
0.722
0.708
0.708
0.709
0.709
0.710
0.696
0.697
0.697
0.698
0.698
300
350
400
450
500
…
…
…
…
…
0.968
0.968
…
…
…
0.957
0.963
0.963
0.961
0.961
0.926
0.930
0.935
0.940
0.946
0.898
0.902
0.906
0.909
0.914
0.874
0.877
0.880
0.883
0.886
0.852
0.854
0.857
0.859
0.862
0.832
0.834
0.836
0.838
0.840
0.813
0.815
0.816
0.818
0.820
0.796
0.797
0.798
0.800
0.801
0.780
0.781
0.782
0.783
0.784
0.764
0.765
0.766
0.767
0.768
0.750
0.750
0.751
0.752
0.753
0.736
0.736
0.737
0.738
0.739
0.723
0.723
0.724
0.725
0.725
0.710
0.711
0.712
0.712
0.713
0.699
0.699
0.700
0.700
0.701
550
600
650
700
750
…
…
…
…
…
…
…
…
…
…
0.962
0.964
0.968
…
…
0.952
0.958
0.958
0.958
0.958
0.918
0.922
0.927
0.931
0.936
0.889
0.892
0.896
0.899
0.903
0.864
0.867
0.869
0.872
0.875
0.842
0.844
0.846
0.848
0.850
0.822
0.823
0.825
0.827
0.828
0.803
0.804
0.806
0.807
0.809
0.785
0.787
0.788
0.789
0.790
0.769
0.770
0.771
0.772
0.774
0.754
0.755
0.756
0.757
0.758
0.740
0.740
0.741
0.742
0.743
0.726
0.727
0.728
0.728
0.729
0.713
0.714
0.715
0.715
0.716
0.701
0.702
0.702
0.703
0.703
800
850
900
950
1000
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
0.960
0.962
0.965
0.969
0.974
0.942
0.947
0.953
0.958
0.959
0.906
0.910
0.914
0.918
0.923
0.878
0.880
0.883
0.886
0.890
0.852
0.855
0.857
0.860
0.862
0.830
0.832
0.834
0.836
0.838
0.810
0.812
0.813
0.815
0.816
0.792
0.793
0.794
0.796
0.797
0.774
0.776
0.777
0.778
0.779
0.759
0.760
0.760
0.761
0.762
0.744
0.744
0.745
0.746
0.747
0.730
0.730
0.731
0.732
0.732
0.716
0.717
0.718
0.718
0.719
0.704
0.704
0.705
0.705
0.706
1050
1100
1150
1200
1250
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
0.960
0.962
0.964
0.966
0.969
0.927
0.931
0.936
0.941
0.946
0.893
0.896
0.899
0.903
0.906
0.864
0.867
0.870
0.872
0.875
0.840
0.842
0.844
0.846
0.848
0.818
0.820
0.821
0.823
0.825
0.798
0.800
0.801
0.802
0.804
0.780
0.781
0.782
0.784
0.785
0.763
0.764
0.765
0.766
0.767
0.748
0.749
0.749
0.750
0.751
0.733
0.734
0.735
0.735
0.736
0.719
0.720
0.721
0.721
0.722
0.707
0.707
0.708
0.708
0.709
1300
1350
1400
1450
1500
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
0.973
0.977
0.982
0.987
0.993
0.952
0.958
0.963
0.968
0.970
0.910
0.914
0.918
0.922
0.926
0.878
0.880
0.883
0.886
0.889
0.850
0.852
0.854
0.857
0.859
0.826
0.828
0.830
0.832
0.833
0.805
0.807
0.808
0.809
0.811
0.786
0.787
0.788
0.790
0.791
0.768
0.769
0.770
0.771
0.772
0.752
0.753
0.754
0.754
0.755
0.737
0.737
0.738
0.739
0.740
0.723
0.723
0.724
0.724
0.725
0.709
0.710
0.710
0.711
0.711
1550
1600
1650
1700
1750
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
0.972
0.973
0.973
0.973
0.974
0.930
0.934
0.936
0.938
0.940
0.892
0.894
0.895
0.895
0.896
0.861
0.863
0.863
0.863
0.862
0.835
0.836
0.836
0.835
0.835
0.812
0.813
0.812
0.811
0.810
0.792
0.792
0.791
0.790
0.789
0.773
0.774
0.772
0.771
0.770
0.756
0.756
0.755
0.754
0.752
0.740
0.740
0.739
0.738
0.736
0.726
0.726
0.724
0.723
0.721
0.712
0.712
0.710
0.709
0.707
1800
1850
1900
1950
2000
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
0.975
0.976
0.977
0.979
0.982
0.942
0.944
0.946
0.949
0.952
0.897
0.897
0.898
0.898
0.899
0.862
0.862
0.862
0.861
0.861
0.834
0.833
0.832
0.832
0.831
0.810
0.809
0.807
0.806
0.805
0.788
0.787
0.785
0.784
0.782
0.768
0.767
0.766
0.764
0.762
0.751
0.749
0.748
0.746
0.744
0.735
0.733
0.731
0.729
0.728
0.720
0.718
0.716
0.714
0.712
0.705
0.704
0.702
0.700
0.698
2050
2100
2150
2200
2250
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
0.985
0.988
…
…
…
0.954
0.956
0.956
0.955
0.954
0.899
0.900
0.900
0.901
0.901
0.860
0.860
0.859
0.859
0.858
0.830
0.828
0.827
0.826
0.825
0.804
0.802
0.801
0.799
0.797
0.781
0.779
0.778
0.776
0.774
0.761
0.759
0.757
0.755
0.753
0.742
0.740
0.738
0.736
0.734
0.726
0.724
0.722
0.720
0.717
0.710
0.708
0.706
0.704
0.702
0.696
0.694
0.692
0.690
0.687
2300
2350
2400
2450
2500
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
0.953
0.952
0.952
0.951
0.951
0.901
0.902
0.902
0.902
0.902
0.857
0.856
0.855
0.854
0.852
0.823
0.822
0.820
0.818
0.816
0.795
0.794
0.791
0.789
0.787
0.772
0.769
0.767
0.765
0.762
0.751
0.748
0.746
0.743
0.740
0.732
0.729
0.727
0.724
0.721
0.715
0.712
0.710
0.707
0.704
0.699
0.697
0.694
0.691
0.688
0.685
0.682
0.679
0.677
0.674
2550
2600
2650
2700
2750
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
0.951
0.951
0.952
0.952
0.953
0.902
0.903
0.903
0.903
0.903
0.851
0.849
0.848
0.846
0.844
0.814
0.812
0.809
0.807
0.804
0.784
0.782
0.779
0.776
0.773
0.759
0.756
0.754
0.750
0.747
0.738
0.735
0.731
0.728
0.724
0.718
0.715
0.712
0.708
0.705
0.701
0.698
0.695
0.691
0.687
0.685
0.682
0.679
0.675
0.671
0.671
0.664
0.664
0.661
0.657
2800
…
…
…
…
…
…
0.956 0.903 0.842 0.801 0.769 0.743 0.721 0.701 0.684 0.668 0.653
67
950 1000 1050 1100 1150 1200
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
400
50
100
150
200
250
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Table PG-68.7
Superheat Correction Factor, K s h (Cont'd)
Flowing
Pressure,
psia
Total Temperature, °F, of Superheated Steam
400
450
500
550
600
650
700
750
800
850
900
2850
2900
2950
3000
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
0.959
0.963
…
…
0.902
0.902
0.902
0.901
0.839
0.836
0.834
0.831
0.798
0.794
0.790
0.786
0.766
0.762
0.758
0.753
0.739
0.735
0.731
0.726
0.717
0.713
0.708
0.704
0.697
0.693
0.688
0.684
0.679
0.675
0.671
0.666
0.663
0.659
0.655
0.650
0.649
0.645
0.640
0.635
3050
3100
3150
3200
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
0.899
0.896
0.894
0.889
0.827
0.823
0.819
0.815
0.782
0.777
0.772
0.767
0.749
0.744
0.738
0.733
0.722
0.716
0.711
0.705
0.699
0.693
0.688
0.682
0.679
0.673
0.668
0.662
0.661
0.656
0.650
0.644
0.645
0.640
0.634
0.628
0.630
0.625
0.620
0.614
PG-69.2.2 Slope Method. If a Manufacturer wishes
to apply the Certification Mark to a design of pressure relief valves, four valves of each combination of pipe size
and orifice size shall be tested. These four valves shall
be set at pressures that cover the approximate range of
pressures for which the valve will be used or covering
the range available at the certified test facility that shall
conduct the tests. The capacities based on these four tests
shall be as follows:
950 1000 1050 1100 1150 1200
For water applications the relieving capacity shall not
exceed 90% of the average slope multiplied by the square
root of the difference between the flow rating pressure
and the valve discharge pressure.
(a) The slope W/P of the actual measured capacity versus the flow pressure for each test point shall be calculated and averaged
For steam
PG-69.2.3 Coefficient of Discharge Method. A ð15Þ
coefficient of discharge for the design, K , may be established for a specific valve design according to the following procedure:
(a) For each design, the pressure relief valve manufacturer shall submit for test at least three valves for each of
three different sizes (a total of nine valves). Each valve of
a given size shall be set at a different pressure, covering
the range of pressures for which the valve will be used
or the range available at the facility where the tests are
conducted.
For each valve design where the coefficient of discharge
has been determined that is intended to be restricted in
lift, the Manufacturer shall have capacity tests conducted
on three valves of different sizes. Each size valve shall be
tested for capacity at the minimum lift for which certification is required, and at two intermediate lift points between the full rated lift and minimum lift certification
points. Each of the three test valves shall be set at a different pressure.
For each valve tested, it shall be verified that actual
measured capacity at restricted lift will equal or exceed
the rated capacity at full rated lift multiplied by the ratio
of measured restricted lift to full rated lift.
For water
All values derived from the testing must fall within ±5%
of the average value
If the values derived from the testing do not fall between the minimum and maximum slope values, the
Authorized Observer shall require that additional valves
be tested at the rate of two for each valve beyond the
maximum and minimum values with a limit of four additional valves.
For steam applications the relieving capacity to be
stamped on the valve shall not exceed 90% of the average
slope times the absolute accumulation pressure
68
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
(U.S. Customary Units)
stamped capacity ≤ rated slope (1.03 × set pressure + 14.7) or (set pressure + 2 psi + 14.7), whichever
is greater
(SI Units)
stamped capacity ≤ rated slope (1.03 × set pressure + 0.101) or (set pressure + 0.015 MPa + 0.101),
whichever is greater
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Table PG-68.7M
Superheat Correction Factor, K s h
Flowing
Pressure,
MPa
205
Total Temperature, °C, of Superheated Steam
250
275
300
325
350
375
400
425
450
475
500
525
550
575
600
625
0.991
0.995
0.985
0.981
…
0.968
0.972
0.973
0.976
…
0.942
0.946
0.95
0.954
0.957
0.919
0.922
0.925
0.928
0.932
0.896
0.899
0.902
0.905
0.907
0.876
0.878
0.88
0.883
0.885
0.857
0.859
0.861
0.863
0.865
0.839
0.841
0.843
0.844
0.846
0.823
0.824
0.825
0.827
0.828
0.807
0.808
0.809
0.81
0.812
0.792
0.793
0.794
0.795
0.796
0.778
0.779
0.78
0.781
0.782
0.765
0.766
0.766
0.767
0.768
0.752
0.753
0.753
0.754
0.755
0.74
0.74
0.741
0.741
0.742
0.728
0.729
0.729
0.729
0.73
0.717
0.717
0.718
0.718
0.718
0.706
0.707
0.707
0.707
0.708
1.75
2.00
2.25
2.50
2.75
…
…
…
…
…
…
…
…
…
…
0.959
0.96
0.963
…
…
0.935
0.939
0.943
0.946
0.948
0.91
0.913
0.916
0.919
0.922
0.887
0.889
0.892
0.894
0.897
0.866
0.868
0.87
0.872
0.874
0.847
0.849
0.85
0.852
0.854
0.829
0.831
0.832
0.834
0.835
0.813
0.814
0.815
0.816
0.817
0.797
0.798
0.799
0.8
0.801
0.782
0.784
0.785
0.785
0.786
0.769
0.769
0.77
0.771
0.772
0.756
0.756
0.757
0.757
0.758
0.743
0.744
0.744
0.744
0.745
0.731
0.731
0.732
0.732
0.733
0.719
0.72
0.72
0.72
0.721
0.708
0.708
0.709
0.71
0.71
3.00
3.25
3.50
3.75
4.00
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
0.949
0.951
0.953
0.956
0.959
0.925
0.929
0.933
0.936
0.94
0.899
0.902
0.905
0.908
0.91
0.876
0.879
0.881
0.883
0.885
0.855
0.857
0.859
0.861
0.863
0.837
0.838
0.84
0.841
0.842
0.819
0.82
0.822
0.823
0.824
0.802
0.803
0.804
0.806
0.807
0.787
0.788
0.789
0.79
0.791
0.772
0.773
0.774
0.775
0.776
0.759
0.759
0.76
0.761
0.762
0.746
0.746
0.747
0.748
0.748
0.733
0.734
0.734
0.735
0.735
0.722
0.722
0.722
0.723
0.723
0.71
0.711
0.711
0.711
0.712
4.25
4.50
4.75
5.00
5.25
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
0.961
…
…
…
…
0.943
0.944
0.946
0.947
0.949
0.913
0.917
0.919
0.922
0.926
0.887
0.89
0.892
0.894
0.897
0.864
0.866
0.868
0.87
0.872
0.844
0.845
0.847
0.848
0.85
0.825
0.826
0.828
0.829
0.83
0.808
0.809
0.81
0.811
0.812
0.792
0.793
0.793
0.794
0.795
0.776
0.777
0.778
0.779
0.78
0.762
0.763
0.764
0.765
0.765
0.749
0.749
0.75
0.751
0.752
0.736
0.737
0.737
0.738
0.738
0.724
0.725
0.725
0.725
0.726
0.713
0.713
0.713
0.714
0.714
5.50
5.75
6.00
6.25
6.50
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
0.952
0.954
0.957
0.96
0.964
0.93
0.933
0.937
0.94
0.944
0.899
0.902
0.904
0.907
0.91
0.874
0.876
0.878
0.88
0.882
0.851
0.853
0.855
0.856
0.859
0.831
0.833
0.834
0.836
0.837
0.813
0.815
0.816
0.817
0.818
0.797
0.798
0.798
0.799
0.801
0.78
0.782
0.783
0.783
0.784
0.766
0.767
0.768
0.768
0.769
0.752
0.753
0.753
0.754
0.754
0.739
0.739
0.74
0.74
0.741
0.727
0.727
0.727
0.728
0.729
0.714
0.715
0.716
0.716
0.716
6.75
7.00
7.25
7.50
7.75
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
0.966
…
…
…
…
0.946
0.947
0.949
0.951
0.953
0.913
0.916
0.919
0.922
0.925
0.885
0.887
0.889
0.891
0.893
0.86
0.862
0.863
0.865
0.867
0.839
0.84
0.842
0.843
0.844
0.819
0.82
0.822
0.823
0.824
0.802
0.802
0.803
0.805
0.806
0.785
0.786
0.787
0.788
0.788
0.769
0.77
0.771
0.772
0.772
0.755
0.756
0.756
0.757
0.758
0.742
0.742
0.743
0.744
0.744
0.729
0.729
0.73
0.73
0.731
0.717
0.717
0.717
0.718
0.719
8.00
8.25
8.50
8.75
9.00
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
0.955
0.957
0.96
0.963
0.966
0.928
0.932
0.935
0.939
0.943
0.896
0.898
0.901
0.903
0.906
0.869
0.871
0.873
0.875
0.877
0.846
0.847
0.849
0.85
0.852
0.825
0.827
0.828
0.829
0.83
0.806
0.807
0.809
0.81
0.811
0.789
0.79
0.791
0.792
0.793
0.773
0.774
0.775
0.776
0.776
0.758
0.759
0.76
0.76
0.761
0.744
0.745
0.746
0.746
0.747
0.732
0.732
0.732
0.733
0.734
0.719
0.719
0.72
0.721
0.721
9.25
9.50
9.75
10.00
10.25
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
0.97
0.973
0.977
0.981
0.984
0.947
0.95
0.954
0.957
0.959
0.909
0.911
0.914
0.917
0.92
0.879
0.881
0.883
0.885
0.887
0.853
0.855
0.857
0.859
0.86
0.832
0.833
0.834
0.836
0.837
0.812
0.813
0.814
0.815
0.816
0.794
0.795
0.796
0.797
0.798
0.777
0.778
0.779
0.78
0.78
0.762
0.763
0.763
0.764
0.764
0.747
0.748
0.749
0.749
0.75
0.734
0.734
0.735
0.735
0.736
0.721
0.722
0.722
0.722
0.723
10.50
10.75
11.00
11.25
11.50
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
0.961
0.962
0.963
0.964
0.964
0.923
0.925
0.928
0.93
0.931
0.889
0.891
0.893
0.893
0.894
0.862
0.863
0.865
0.865
0.865
0.838
0.839
0.84
0.84
0.84
0.817
0.818
0.819
0.819
0.818
0.799
0.799
0.8
0.799
0.798
0.781
0.782
0.782
0.781
0.78
0.765
0.766
0.766
0.765
0.764
0.75
0.751
0.751
0.75
0.749
0.737
0.737
0.737
0.736
0.735
0.723
0.724
0.724
0.723
0.722
11.75
12.00
12.25
12.50
12.75
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
0.965
0.966
0.967
0.967
0.968
0.932
0.933
0.935
0.936
0.937
0.894
0.894
0.895
0.896
0.896
0.865
0.864
0.864
0.864
0.864
0.839
0.839
0.839
0.838
0.838
0.817
0.817
0.816
0.816
0.815
0.797
0.797
0.796
0.796
0.795
0.78
0.779
0.778
0.777
0.776
0.763
0.762
0.761
0.76
0.759
0.748
0.747
0.746
0.745
0.744
0.734
0.733
0.732
0.731
0.729
0.721
0.719
0.718
0.717
0.716
13.00
13.25
13.50
14.00
14.25
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
0.969
0.971
0.972
0.976
0.978
0.939
0.94
0.942
0.946
0.947
0.896
0.897
0.897
0.897
0.898
0.864
0.864
0.863
0.863
0.862
0.837
0.837
0.837
0.835
0.834
0.814
0.813
0.813
0.811
0.81
0.794
0.792
0.792
0.79
0.789
0.775
0.774
0.773
0.771
0.77
0.758
0.757
0.756
0.753
0.752
0.743
0.741
0.74
0.737
0.736
0.728
0.727
0.725
0.723
0.721
0.715
0.713
0.712
0.709
0.707
14.50
…
…
…
…
…
…
…
0.948 0.898 0.862 0.833 0.809 0.787 0.768 0.751 0.734 0.72 0.706
69
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
225
0.50
0.75
1.00
1.25
1.50
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Table PG-68.7M
Superheat Correction Factor, K s h (Cont'd)
Flowing
Pressure,
MPa
205
Total Temperature, °C, of Superheated Steam
250
275
300
325
350
375
400
425
450
475
500
525
550
575
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
0.948
0.948
0.947
0.947
0.898
0.899
0.899
0.899
0.862
0.861
0.861
0.861
0.832
0.832
0.831
0.83
0.808
0.807
0.806
0.804
0.786
0.785
0.784
0.782
0.767
0.766
0.764
0.763
0.749
0.748
0.746
0.745
0.733
0.732
0.73
0.728
15.75
16.00
16.25
16.50
16.75
17.00
17.25
17.50
17.75
18.00
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
0.946 0.899 0.86 0.829 0.803 0.781 0.761 0.743 0.727 0.712 0.698
0.945 0.9 0.859 0.828 0.802 0.779 0.759 0.741 0.725 0.71 0.696
0.945 0.9 0.859 0.827 0.801 0.778 0.757 0.739 0.723 0.708 0.694
0.945 0.9 0.858 0.826 0.799 0.776 0.756 0.738 0.721 0.706 0.692
0.944 0.9 0.857 0.825 0.797 0.774 0.754 0.736 0.719 0.704 0.69
0.944 0.9 0.856 0.823 0.796 0.773 0.752 0.734 0.717 0.702 0.688
0.944 0.9 0.855 0.822 0.794 0.771 0.75 0.732 0.715 0.7 0.686
0.944 0.9 0.854 0.82 0.792 0.769 0.748 0.73 0.713 0.698 0.684
0.944 0.9 0.853 0.819 0.791 0.767 0.746 0.728 0.711 0.696 0.681
0.944 0.901 0.852 0.817 0.789 0.765 0.744 0.725 0.709 0.694 0.679
18.25
18.50
18.75
19.00
19.25
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
0.945
0.945
0.945
0.946
0.948
0.901
0.901
0.901
0.901
0.901
0.851
0.85
0.849
0.847
0.846
0.815
0.814
0.812
0.81
0.808
0.787
0.785
0.783
0.781
0.778
0.763
0.761
0.758
0.756
0.753
0.742
0.739
0.737
0.734
0.732
0.723
0.72
0.718
0.715
0.713
0.706
0.704
0.701
0.698
0.696
0.691
0.689
0.686
0.683
0.681
0.677
0.674
0.671
0.669
0.666
19.50
19.75
20.00
20.25
20.50
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
0.95
0.952
…
…
…
0.9
0.899
0.899
0.899
0.899
0.844
0.842
0.84
0.839
0.837
0.806
0.803
0.801
0.798
0.795
0.776
0.773
0.77
0.767
0.764
0.75
0.748
0.745
0.742
0.738
0.729
0.726
0.723
0.72
0.717
0.71
0.707
0.704
0.701
0.697
0.693
0.69
0.687
0.683
0.68
0.677
0.674
0.671
0.668
0.665
0.663
0.66
0.657
0.654
0.651
20.75
21.00
21.25
21.50
21.75
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
0.898
0.896
0.894
0.892
0.891
0.834
0.832
0.829
0.826
0.823
0.792
0.79
0.786
0.783
0.779
0.761
0.758
0.754
0.75
0.746
0.735
0.732
0.728
0.724
0.72
0.713
0.71
0.706
0.702
0.698
0.694
0.691
0.686
0.682
0.679
0.677
0.673
0.669
0.665
0.661
0.661
0.658
0.654
0.65
0.646
0.647
0.643
0.64
0.636
0.631
22.00
…
…
…
…
…
…
…
…
0.887 0.82 0.776 0.743 0.716 0.694 0.674 0.657 0.641 0.627
(b) Tests shall be made on each pressure relief valve to
determine its lift at capacity, popping, and blowdown
pressures, and actual relieving capacity. An individual
coefficient, K D , shall be established for each valve as
follows:
For flat seat
(U.S. Customary Units)
(SI Units)
Where actual flow is determined by test and theoretical
flow, W T is calculated by one of the following equations:
For tests with dry saturated steam
For 45 deg seat
For nozzle
(U.S. Customary Units)
(U.S. Customary Units)
(SI Units)
(SI Units)
70
600
625
0.719 0.704
0.717 0.703
0.716 0.702
0.714 0.7
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
225
14.75
15.00
15.25
15.50
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
For tests with water
For 45 deg seat
the new average value, excluding the replaced valve(s),
shall be cause to refuse certification of that particular
valve design.
The rated relieving capacity of all sizes and set pressures of a given design, for which K has been established
under the provision of this paragraph, shall be determined by the following equation:
(U.S. Customary Units)
(SI Units)
where
For flat seat
K = coefficient of discharge for the design
W = rated relieving capacity, lb/hr (kg/hr)
W T = theoretical flow, defined by the same equation
used to determine K D , lb/hr (kg/hr)
(U.S. Customary Units)
The coefficient of discharge for the design shall be not
greater than 0.878 (the product of 0.9 × 0.975). The coefficient shall not be applied to valves whose beta ratio (ratio of valve throat to inlet diameter) lies outside the range
of 0.15 to 0.75, unless tests have demonstrated that the
individual coefficient of discharge, K D , for valves at the
extreme ends of a larger range, is within ±5% of the average coefficient, K D .
For designs where the lift is used to determine the flow
area, all valves shall have the same nominal lift to seat
diameter ratio (L/D).
(SI Units)
For nozzle
(U.S. Customary Units)
(SI Units)
where
nozzle throat area, in.2 (mm2)
seat diameter, in. (mm)
lift at pressure P , in. (mm)
(1.03 × set pressure + 14.7), psia, or
(set pressure + 2 + 14.7), psia, whichever is greater
(1.03 × set pressure + 0.101), MPa, or
(set pressure + 0.014 + 0.101), MPa, whichever is
greater
P d = pressure at discharge of the valve, psia (MPa)
W T = theoretical flow, lb/hr (kg/hr)
w = specific weight of water at inlet conditions, lb/ft3
(kg/m3)
A
D
L
P
=
=
=
=
=
=
=
PG-69.4 Power‐actuated pressure-relieving valves, ð15Þ
having capacities certified in accordance with the provision of PG-69.3, shall be marked as required by PG-110
with the computed capacity, corresponding to 3% above
the full load operating pressure and temperature conditions at the valve inlet when the valve is operated by
the controller, and they shall also be stamped with the
set pressure of the controller. When the valve is marked
as required by this paragraph, it shall be the guarantee
by the manufacturer that the valve also conforms to the
details of construction herein specified.
PG-69.6 When changes are made in the design of a
pressure relief valve or power-actuated pressurerelieving valve in such a manner as to affect the flow path,
lift, or performance characteristics of the valve, new tests
in accordance with this Section shall be performed.
To convert lb/hr of water to gal/min of water, multiply
the capacity in lb/hr by 1/500. To convert kg/hr of water to
liter/min of water, multiply the capacity in kg/hr by 1/60.
The average of the coefficients K D of the nine tests required shall be multiplied by 0.90, and this product shall
be taken as the coefficient K of that design. All individual
coefficients of discharge, K D , shall fall within a range
of ±5% of the average coefficient found. If a valve fails
to meet this requirement, the Authorized Observer shall
require two additional valves to be tested as replacements for each valve having an individual coefficient,
K D , outside the ±5% range, with a limit of four additional
valves. Failure of a coefficient, K D , to fall within ±5% of
PG-70
CAPACITY OF PRESSURE RELIEF VALVES
PG-70.1 Subject to the minimum number required by
PG-67.1, the number of pressure relief valves required
shall be determined on the basis of the maximum designed steaming capacity, as determined by the boiler
Manufacturer, and the relieving capacity marked on the
valves by the manufacturer.
71
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-69.3 If a manufacturer wishes to apply the Certi- ð15Þ
fication Mark to a power‐actuated pressure-relieving
valve under PG-67.4.1, the power-actuated pressurerelieving valve or valves shall be certified in accordance
with PG-69.2.2 or PG-69.2.3.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PG-71
MOUNTING OF PRESSURE RELIEF VALVES
PG-71.4 If a muffler is used on a pressure relief valve,
it shall have sufficient outlet area to prevent back pressure from interfering with the proper operation and discharge capacity of the valve. The muffler plates or other
devices shall be so constructed as to avoid a possibility
of restriction of the steam passages due to deposit. Mufflers shall not be used on high‐temperature water boiler
pressure relief valves.
PG-71.1 When two or more pressure relief valves are
used on a boiler, they may be mounted either separately
or as twin valves made by placing individual valves on
Y‐bases, or duplex valves having two valves in the same
body casing. Twin valves made by placing individual
valves on Y‐bases, or duplex valves having two valves in
the same body, shall be of approximately equal capacity.
When a pressure relief valve is exposed to outdoor elements that may affect operation of the valve, it is permissible to shield the valve with a satisfactory cover. The
shield or cover shall be properly vented and arranged
to permit servicing and normal operation of the valve.
When not more than two valves of different sizes are
mounted singly on the same component (e.g., drum, economizer, superheater, etc.) the relieving capacity of the
smaller valve shall be not less than 50% of that of the
larger valve.
PG-71.5 When a boiler is fitted with two or more
pressure relief valves on one connection, this connection
to the boiler shall have a cross‐sectional area not less than
the combined areas of inlet connections of all the pressure relief valves with which it connects and shall also
meet the requirements of PG-71.3.
PG-71.2 The pressure relief valve or valves shall be
connected to the boiler independent of any other connection, and attached as close as possible to the boiler or the
normal steam flow path, without any unnecessary intervening pipe or fitting. Such intervening pipe or fitting
shall be not longer than the face‐to‐face dimension of
the corresponding tee fitting of the same diameter and
pressure under the applicable ASME Standard listed in
PG-42 and shall also comply with PG-8 and PG-39. Every
pressure relief valve shall be connected so as to stand in
an upright position, with spindle vertical. On high‐
temperature water boilers of the watertube forced‐
circulation type, the valve shall be located at the boiler
outlet.
PG-71.6 Pressure relief valves may be attached to
drums or headers by welding provided the welding is
done in accordance with Code requirements.
PG-71.3 The opening or connection between the boiler and the pressure relief valve shall have at least the area
of the valve inlet. No valve of any description shall be
placed between the required pressure relief valve or
valves and the boiler, nor on the discharge pipe between
the pressure relief valve and the atmosphere. When a discharge pipe is used, the cross‐sectional area shall be not
less than the full area of the valve outlet or of the total
of the areas of the valve outlets, discharging thereinto.
It shall be as short and straight as possible and so arranged as to avoid undue stresses on the valve or valves.
Such dimensional limitations to operation for steam
need not apply to steam scrubbers or driers provided
the net free steam inlet area of the scrubber or drier is
at least 10 times the total area of the boiler outlets for
the pressure relief valves.
All pressure relief valve discharges shall be so located
or piped as to be carried clear from running boards or
platforms. Ample provision for gravity drain shall be
made in the discharge pipe at or near each pressure relief
valve, and where water of condensation may collect. Each
valve shall have an open gravity drain through the casing
below the level of the valve seat. For iron‐ and steel‐
bodied valves exceeding NPS 21/2 (DN 65), the drain hole
shall be tapped not less than NPS 3/8 (DN 10).
PG-71.8 If pressure relief valves are attached to a separate steam drum or dome, the opening between the
boiler proper and the steam drum or dome shall be not
less than required by PG-71.7.
PG-72
Discharge piping from pressure relief valves on high‐
temperature water boilers shall be provided with adequate provisions for water drainage as well as the steam
venting.
OPERATION OF PRESSURE RELIEF
VALVES
PG-72.1 Pressure relief valves shall be designed and
constructed to operate without chattering, with a minimum blowdown of 2 psi (15 kPa) or 2% of the set pressure, whichever is greater, and to attain full lift at a
pressure not greater than 3% above their set pressure.
The installation of cast iron bodied pressure relief
valves for high‐temperature water boilers is prohibited.
72
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-71.7 Every boiler shall have proper outlet connections for the required pressure relief valve, or valves, independent of any other outside steam connection, the
area of opening to be at least equal to the aggregate areas
of inlet connections of all of the pressure relief valves to
be attached thereto. An internal collecting pipe, splash
plate, or pan may be used, provided the total area for inlet
of steam thereto is not less than twice the aggregate areas
of the inlet connections of the attached pressure relief
valves. The holes in such collecting pipes shall be at least
1
/4 in. (6 mm) in diameter and the least dimension in any
other form of opening for inlet of steam shall be 1/4 in.
(6 mm).
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Pressure relief valves shall have the seat inclined at any
angle between 45 deg and 90 deg, inclusive, to the centerline of the disk.
Pressure relief valves used on forced‐flow steam generators with no fixed steam and waterline, and pressure
relief valves used on high‐temperature water boilers
must be marked for these special services by the valve
Manufacturer or Assembler.
PG-73.2.2 The design shall incorporate guiding arrangements necessary to insure consistent operation and
tightness.
PG-72.2 The set pressure tolerance plus or minus
shall not exceed that specified in the following table:
Set Pressure, psi (MPa)
≤ 70 (0.5)
PG-73.2.3 The spring shall be designed so that the
full lift spring compression shall be no greater than 80%
of the nominal solid deflection. The permanent set of the
spring (defined as the difference between the free height
and height measured 10 min after the spring has been
compressed solid three additional times after presetting
at room temperature) shall not exceed 0.5% of the free
height.
Tolerance, Plus or Minus
From Set Pressure
2 psi (15 kPa)
> 70 (0.5) and ≤ 300 (2.1)
3% of set pressure
> 300 (2.1) and ≤ 1,000 (7.0)
10 psi (70 kPa)
> 1,000 (7.0)
1% of set pressure
PG-72.4 If the set pressure of a valve is changed so as
to require a new spring, the spring shall be acceptable to
the manufacturer. The spring installation and valve adjustment shall be performed by the manufacturer, his
authorized representative, or an assembler. A new nameplate as described in PG-110 shall be furnished and installed, and the valve shall be resealed.
PG-73
PG-73.2.5 The seat of a pressure relief valve shall
be fastened to the body of the valve in such a way that
there is no possibility of the seat lifting.
MINIMUM REQUIREMENTS FOR
PRESSURE RELIEF VALVES
PG-73.1 Permissible Pressure Relief Valves.
PG-73.1.1 Pressure relief valves shall be either direct spring-loaded safety valves, direct spring-loaded
safety relief valves, or pilot-operated pressure relief
valves.
PG-73.2.6 A body drain below seat level shall be
provided in the valve and this drain shall not be plugged
during or after field installation. For valves exceeding
NPS 21/2 (DN 65), the drain hole or holes shall be tapped
not less than NPS 3/8 (DN 10). For valves of NPS 2 1/2
(DN 65) or smaller, the drain hole shall not be less than
1
/4 in. (6 mm) in diameter.
PG-73.1.2 Power-actuated pressure-relieving
valves shall only be used for applications specified in
PG-67.4.1.
PG-73.2.7 In the design of the body of the valve,
consideration shall be given to minimizing the effects of
water deposits.
PG-73.1.3 Deadweight or weighted lever safety
valves or safety relief valves shall not be used.
PG-73.2.8 Valves having screwed inlet or outlet
connections shall be provided with wrenching surfaces
to allow for normal installation without damaging operating parts.
PG-73.1.4 Unless otherwise defined, the definitions relating to pressure relief devices in ASME PTC 25
shall apply.
PG-73.2 Minimum Requirements.
PG-73.2.1 All pressure relief valves shall be so constructed that the failure of any part cannot obstruct the
free and full discharge of steam and water from the valve.
PG-73.2.9 Means shall be provided in the design of
all valves for use under this Section, for sealing all external adjustments. Seals shall be installed by the
73
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-73.2.4 To provide a means for verifying
whether it is free, each safety valve or safety relief valve
shall have a substantial lifting device, which when activated will release the seating force on the disk when
the valve is subjected to pressure of at least 75% of the
set pressure. The lifting device shall be such that it cannot
lock or hold the valve disk in lifted position when the exterior lifting force is released. Disks of pressure relief
valves used on high‐temperature water boilers shall not
be lifted while the temperature of the water exceeds
200°F (93°C). If it is desired to lift the valve disk to assure
that it is free, this shall be done when the valve is subjected to a pressure of at least 75% of the set pressure.
Pilot-operated pressure relief valves shall be provided
with either a lifting device as described above or means
for connecting and applying pressure to the pilot adequate to verify that the moving parts critical to proper operations are free to move. For high‐temperature water
boilers, the lifting mechanism shall be sealed against
leakage.
PG-72.3 The spring in a pressure relief valve shall not
be reset for any pressure more than 5% above or below
that for which the valve is marked unless the new setting
is within the spring design range established by the manufacturer or is determined to be acceptable to the
manufacturer.
If the set pressure is to be adjusted within the limits
specified above, the adjustment shall be performed by
the manufacturer, his authorized representative, or an assembler. An additional valve data tag identifying the new
set pressure, capacity, and date shall be furnished and installed, and the valve shall be resealed.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PG-73.3.3 Materials used in bodies and bonnets or
yokes shall be listed in Section II, Parts A and B, and identified in Tables 1A and 1B of Section II Part D, as permitted for Section I construction. Materials used in body
to bonnet or body to yoke bolting shall be listed in ASME
B16.34. Materials used in all other parts required for the
pressure-relieving or pressure-retaining function shall be
(a) listed in ASME Section II
(b) listed in ASTM Specifications (see Note below) or
(c) controlled by the manufacturer of the pressure relief valve by a specification ensuring control of chemical
and physical properties and quality at least equivalent
to ASTM Standards (see Note in PG-73.3.4)
manufacturer, his authorized representative, or an assembler at the time of the initial adjustment. After spring
replacement and/or subsequent adjustment, the valve
shall be resealed. Seals shall be installed in such a manner
as to prevent changing the adjustment without breaking
the seal and, in addition, shall serve as a means of identifying the manufacturer, his authorized representative, or
the assembler making the adjustment.
PG-73.2.10 Valve capacity may be restricted by restricting the lift of a valve provided the following requirements are met:
(a) The valve size shall be NPS 3/4 (DN 20) or larger.
(b) No changes shall be made in the design of the valve
except to change the valve lift by use of a lift restraining
device described in (c) below.
(c) The restriction of valve capacity shall be permitted
only by the use of a lift restraining device which shall limit
valve lift and shall not otherwise interfere with flow
through the valve. The design of the lift restraining device
shall be subject to review by an ASME designee.
(d) The lift restraining device shall be designed so that,
if adjustable, the adjustable feature can be sealed. Seals
shall be installed by the valve Manufacturer or Assembler
at the time of initial adjustment.
(e) Valves shall not have their lifts restricted to a value
less than 30% of full rated lift, or 0.080 in. (2 mm).
(f) When sizing and selecting valves, the restricted lift
nameplate capacity shall be determined by multiplying
the capacity at full rated lift by the ratio of the restricted
lift to the full rated lift.
PG-73.3.4 Pressure relief valves may have bronze
parts complying with either SB-61, SB-62, or SB-148, provided the maximum allowable stresses and temperatures
do not exceed the values given in Section II, Part D, Subpart 1, Table 1B, and shall be marked to indicate the class
of material used. Such valves shall not be used on superheaters delivering steam at a temperature over 450°F
(230°C) for SB-61 and SB-148, and 306°F (150°C) for
SB-62, and shall not be used for high-temperature water
boilers.
NOTE: It shall be the manufacturer’s responsibility to ensure that the
allowable stresses at temperature meet the requirements of Section
II, Part D, Mandatory Appendix 1, Basis for Establishing Stress Values
in Tables 1A and 1B.
PG-73.2.12 The pilot sensing line of pilot-operated
pressure relief valves shall be adequately protected from
freezing.
PG-73.4.2 Manufacturing, assembly, inspection,
and test operations including capacity, are subject to inspections at any time by an ASME designee.
PG-73.3 Material Selections.
PG-73.3.1 Cast iron seats and disks are not
permitted.
PG-73.4.3 A Manufacturer or Assembler may be
granted permission to apply the Certification Mark with
“V” Designator to production pressure relief valves
capacity‐certified in accordance with PG-69, provided
the following tests are successfully completed. This permission shall expire on the sixth anniversary of the date
it is initially granted. This permission may be extended
for 6‐yr periods if the following tests are successfully repeated within the 6‐mo period before expiration.
(a) Two sample production pressure relief valves of a
size and capacity within the capability of an
ASME‐accepted laboratory shall be selected by an ASME
PG-73.3.2 Adjacent sliding surfaces such as guides
and disks or disk holders shall both be of corrosion‐
resistant material. Springs of corrosion‐resistant material
or having a corrosion‐resistant coating are required. The
seats and disks of pressure relief valves shall be of suitable material to resist corrosion by the lading fluid.
NOTE: The degree of corrosion resistance, appropriate to the intended service, shall be a matter of agreement between the manufacturer and the purchaser.
74
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-73.2.11 A pressure relief valve over NPS 3
(DN 80), used for pressure greater than 15 psig
(100 kPa), shall have a flanged inlet connection or a
welded inlet connection. The dimensions of the flanges
subjected to boiler pressure shall conform to the applicable ASME standards as given in PG-42. The facing shall
be similar to those illustrated in the standard.
PG-73.4 Inspection of Manufacturing and/or Assembly.
PG-73.4.1 A manufacturer shall demonstrate to the
satisfaction of an ASME designee that his manufacturing,
production, and test facilities and quality control procedures will ensure close agreement between the
performance of random production samples and the performance of those valves submitted for capacity
certification.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Set Pressure, psi (kPa)
< 67 (500)
Maximum Blowdown
4 psi (30 kPa)
≥ 67 (500) and ≤ 250 (1 700)
6% of set pressure
> 250 (1 700) and < 375 (2 500)
15 psi (100 kPa)
≥ 375 (2 500)
4% of set pressure
The blowdown for sample valves designed for use on
forced flow steam generators with no fixed steam and
waterline or high‐temperature water boilers shall not exceed 10% of the set pressure.
(b) Operational and capacity tests shall be conducted in
the presence of an ASME designee at an ASME‐accepted
laboratory. The valve manufacturer or assembler shall
be notified of the time of the test and may have representatives present to witness the test.
(c) Should any valve fail to relieve at or above its certified capacity or should it fail to meet performance requirements in PG-72, the test shall be repeated at the
rate of two replacement valves, selected in accordance
with (a), for each valve that failed.
(d) Failure of any of the replacement valves to meet capacity or the performance requirements of this Section
shall be cause for revocation within 60 days of the authorization to use the Certification Mark on that particular
type of valve. During this period, the Manufacturer or assembler shall demonstrate the cause of such deficiency
and the action taken to guard against future occurrence.
PG-73.4.4 Use of the Certification Mark by an assembler indicates the use of original unmodified parts
in strict accordance with the instructions of the manufacturer of the valve.
(a) An assembler may transfer original and unmodified
pressure relief parts produced by the Manufacturer to
other Assemblers, provided the following conditions are
met:
(1) both Assemblers have been granted permission
to apply the Certification Mark with the “V” or “UV” Designator to the specific valve type in which the parts are to
be used
(2) the Quality Control System of the Assembler receiving the pressure relief valve parts shall define the
controls for the procurement and acceptance of those
parts
(3) the pressure relief valve parts are appropriately
packaged, marked, or sealed by the Manufacturer to ensure that the parts are
(-a) produced by the Manufacturer
(-b) the parts are original and unmodified
(b) However, an assembler may convert original finished parts by either machining to another finished part
NOTE: Within the requirements of PG-73.4 and PG-73.5, a manufacturer is defined as a person or organization who is completely responsible for design, material selection, capacity certification,
manufacture of all component parts, assembly, testing, sealing, and
shipping of pressure relief valves certified under this Section.
An assembler is defined as a person or organization who purchases or receives from a manufacturer the necessary component
parts or valves and assembles, adjusts, tests, seals, and ships pressure relief valves certified under this Section at a geographical location other than and using facilities other than those used by the
manufacturer.
PG-73.5 Testing by Manufacturers or Assemblers.
PG-73.5.1 Pressure Testing. Each pressure relief
valve to which the Certification Mark is to be applied shall
be subjected to the following tests by the Manufacturer or
Assembler:
(a) The pressure‐containing parts of each valve shall be
hydrostatically tested at a pressure at least 1.5 times the
design pressure of the parts. Parts meeting the following
criteria shall be exempt from pressure testing:
(1) the applied stress under hydrostatic test conditions does not exceed 50% of the allowable stress; and
(2) the part is not cast or welded.
75
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
or applying a corrosion‐resistant coating to valve springs
for a specific application under the following conditions:
(1) Conversions shall be specified by the Manufacturer. Drawings and/or written instructions used for part
conversion shall be obtained from the Manufacturer and
shall include a drawing or description of the converted
part before and after the conversion.
(2) The Assembler’s quality control system, as accepted by a representative from an ASME‐designated organization, must describe in detail the conversion of
original parts, provisions for inspection and acceptance,
personnel training, and control of current Manufacturer’s
drawings and/or written instructions.
(3) The Assembler must document each use of a converted part.
(4) The Assembler must demonstrate to the Manufacturer the ability to perform each type of conversion.
The Manufacturer shall document all authorizations
granted to perform part conversions. The Manufacturer
and Assembler shall maintain a file of such authorizations.
(5) For an Assembler to offer restricted lift valves,
the Assembler must demonstrate to the satisfaction of
the Manufacturer the ability to perform valve lift restrictions. The Manufacturer shall document all authorizations
granted to restrict the lift of the valves, and shall maintain
records of the lift restrictions made by the Assembler. The
Assembler shall maintain a file of such authorizations.
(6) At least annually a review shall be performed by
the Manufacturer of an Assembler’s system and conversion capabilities. The Manufacturer shall document the
results of these reviews. A copy of this documentation
shall be kept on file by the Assembler. The review results
shall be made available to a representative from an ASME
designated organization.
designee. The maximum blowdown for these samples
shall not exceed the value specified in the following table:
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PG-73.5.3 Leak Test.
(a) A seat tightness test shall be conducted at maximum
expected operating pressure but at a pressure not exceeding the reseating pressure of the valve. When being
tested, a valve exhibiting no sign of leakage shall be considered adequately tight.
(b) Closed bonnet pressure relief valves designed for
discharge to a closed system shall be tested with a minimum of 30 psig (200 kPa) air or other gas in the secondary pressure zone. There shall be no sign of leakage.20
(b) Alternatively, testing may be performed pneumatically at a pressure 1.25 times the design pressure of the
part. Pneumatic testing can be hazardous; it is therefore
recommended that special precautions be taken when
conducting a pneumatic test.
(c) Testing may be done in the component or assembled condition.
(d) When the valve is designed for discharging directly
to atmosphere, the valve components downstream of the
valve disk are exempt from pressure testing.
PG-73.5.4 A manufacturer or assembler shall have
a documented program for the application, calibration,
and maintenance of test gages.
(e) Valve components are exempt from pressure testing when fully contained within pressure-containing
parts that have been either pressure tested or exempted
from pressure testing by (a)(1) and (a)(2).
PG-73.5.5 Testing time on steam valves shall be
sufficient to assure that test results are repeatable and representative of field performance.
(f) These tests shall be conducted after all machining
and welding operations on the parts have been
completed.
PG-73.5.6 Test fixtures and test drums, where applicable, shall be of adequate size and capacity to assure
that the observed set pressure is consistent with the
stamped set pressure within the tolerance required by
PG-72.2.
(g) There shall be no sign of leakage.
PG-73.5.2 Every valve shall be tested with steam
by the manufacturer or assembler to demonstrate its
set point and pressure‐containing integrity. The blowdown control elements of the pressure relief valve shall
be set to the Manufacturer’s specifications.
PG-73.6 Design Requirements. At the time of submission of valves for capacity certification or testing in accordance with PG-69, the ASME designee has the
authority to review design for conformity with the requirements of this Section and to reject or require modification of designs that do not conform, prior to capacity
testing.
PG-73.5.2.1 Tests shall be conducted either on
equipment that meets the requirements of PG-73.5.6, or
on the boiler, by raising the pressure to demonstrate
the set pressure.
(a) testing the valve at full pressure may cause damage
to the valve, or testing of the valve is impractical due to
boiler system operational safety considerations
(b) the valve lift has been mechanically verified to meet
or exceed the required lift
(c) the blowdown control elements of the safety valve
are set to the valve manufacturer’s specification
(d) the valve design is compatible with the alternative
test method selected
PG-73.7.1 Requirements for the Certified Individual (CI). The CI shall
(a) be an employee of the manufacturer or assembler
(b) be qualified and certified by the manufacturer or assembler. Qualifications shall include as a minimum
(1) knowledge of the requirements of this Section for
the application of the Certification Mark with the “V”
Designator
(2) knowledge of the manufacturer’s or assembler’s
quality program
(3) training commensurate with the scope, complexity, or special nature of the activities to which oversight is
to be provided
PG-73.5.2.2.1 The valve, with its lift temporarily restricted during the test, if required to prevent valve
damage, shall be tested on steam to demonstrate set
pressure.
PG-73.5.2.2.2 The valve may be fitted with a
hydraulic or pneumatic lift assist device and tested on
steam at a pressure less than the valve set pressure.
The lift assist device and test procedure shall be calibrated to provide the set pressure setting within the tolerance of PG-72.2.
76
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-73.7 Certification Mark With the “V” Designator.
Each pressure relief valve to which the Certification Mark
with the “V” Designator will be applied shall have been
fabricated or assembled by a manufacturer or assembler
holding a valid Certificate of Authorization21 (PG-105.2)
and capacity certified in accordance with the requirements of this Section. A Certified Individual (CI) shall provide oversight to assure that each use of the Certification
Mark with the “V” Designator on a pressure relief valve is
in accordance with the requirements of this Section, and
that each use of the Certification Mark with the “V” Designator is documented on a Certificate of Conformance,
Form P-8.
PG-73.5.2.2 When the valve is beyond the production test equipment capabilities, an alternative test
method presented in PG-73.5.2.2.1 or PG-73.5.2.2.2 may
be used, provided all of the following conditions are met:
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
(c) have a record, maintained and certified by the manufacturer or assembler, containing objective evidence of
the qualifications of the CI and the training program
provided
as appropriate, except that heads containing tube holes
and buttstraps shall have visible at least a sufficient portion of such stamps for identification.
PG-77.2 It is permissible for an authorized representative of the boiler Manufacturer to transfer the markings
on the plate provided a record is made of such transfer. In
lieu of the above and PG-77.1, identification may be by applying a coded marking traceable to the original required
markings or by recording the required markings using
methods such as material tabulations or as built illustration which ensure identification of each piece of material
during fabrication and subsequent identification in the
completed boiler. Such transfers of markings shall be
made prior to cutting, except that the Manufacturer may
transfer markings immediately after cutting, provided
the control of these transfers is described in his written
Quality Control System (A-301 and A-302). The procedure for making such transfer shall be acceptable to the
Authorized Inspector.
PG-73.7.2 Duties of the Certified Individual (CI).
The CI shall
(a) verify that each item to which the Certification Mark
with the “V” Designator is applied has a current capacity
certification and meets all applicable requirements of this
Section
(b) review documentation for each lot of items to be
stamped to verify, for the lot, that requirements of this
Section have been completed
(c) sign the Certificate of Conformance, Form P-8, prior
to release of control of the pressure relief valves
PG-73.7.3 Certificate of Conformance, Form P-8.
(a) The Certificate of Conformance, Form P-8, shall be
filled out by the manufacturer or assembler and signed
by the Certified Individual. Multiple duplicate pressure
relief valves may be recorded as a single entry, provided
the valves are identical and are produced in the same lot.
(b) The manufacturer’s or assembler’s written quality
control program shall include requirements for completion of Certificates of Conformance, Form P-8, and retention, by the manufacturer or assembler, for a minimum of
5 years.
PG-77.3 An authorized representative of the plate
manufacturer may duplicate the required stamping on
any material wherever located.
FABRICATION
PG-75
GENERAL
The fabrication of boilers and parts thereof shall conform to the general fabrication requirements in the following paragraphs and in addition to the specific
requirements for fabrication in the Parts of this Section
that pertain to the methods of construction used.
PG-78
PG-76
PG-79
Defects in material may be repaired by the boiler Manufacturer provided acceptance by the Inspector is first obtained for the method and extent of repairs. Material that
cannot be satisfactorily repaired shall be rejected.
CUTTING PLATES AND OTHER STOCK
PG-76.1 Plates may be cut by machining, punching,
shearing, or cutting by the electric arc or gas process, providing enough metal is left at any unfinished edges to
meet the requirements of PG-79.
TUBE HOLES AND ENDS
Tube holes shall be drilled full size from the solid plate,
or they may be punched at least 1/2 in. (13 mm) smaller in
diameter than full size, and then drilled, reamed, or finished full size with a rotating cutter. The thermal‐ or
plasma‐arc cut holes, when made, shall be sufficiently
smaller in diameter than full size, such that subsequent
machining to full size shall completely remove all metal
whose mechanical and metallurgical properties have
been affected as a result of the thermal‐ or plasma‐arc
cutting. Tube holes may be counterbored where the metal
is thicker than that required to get a proper bearing by expanding, so as to form narrow seats into which the tube
ends can be properly expanded, provided there is space
available to permit a proper amount of flare of the tube
end.
The sharp edges of tube holes shall be taken off on both
sides of the plate with a file or other tool.
PG-76.2 When end faces of nozzle or manhole necks
are to remain unwelded in the completed vessel, these
end faces shall not be cut by shearing unless at least
1
/8 in. (3 mm) of additional metal is removed by any method that will produce a smooth finish.
PG-77
REPAIRS OF DEFECTS IN MATERIALS
PLATE IDENTIFICATION
PG-77.1 When the boiler is completed, there shall remain visible on shell plates, furnace sheets, and heads,
one group of the plate manufacturer’s stamps, consisting
of the manufacturer’s name, plate identification number,
material specification number with grade, class, and type
77
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-77.4 When plate specification heat treatments
are not performed by the mill, they shall be performed
by or under the control of the fabricator, who shall then
place the letter “T” following the letter “G” in the mill plate
marking (see SA-20) to indicate that the material specification heat treatments have been performed. The fabricator shall also show by a supplement to the appropriate
Mill Test Report that the specified heat treatment has
been performed.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PG-80
PERMISSIBLE OUT-OF-ROUNDNESS OF
CYLINDRICAL SHELLS
Assembler is required to arrange for the services of
Authorized Inspectors (see Foreword and PG-91) to perform inspections on all of his work within the scope of
this Section, whether performed in the shop or in the
field. Duties of the AI are described elsewhere in this Section and include the following:
PG-80.1 Internal Pressure. Finished cylindrical sections of headers, shells, drums, and similar components
shall be circular at any section within a limit of 1% of
the mean diameter, based on the differences between
the maximum and minimum mean diameters at any section. To determine the difference in diameters, measurements may be made on the inside or the outside, and
when the component is made of plates of unequal thicknesses, the measurements shall be corrected for the plate
thicknesses as they may apply, to determine the diameters at the middle line of the plate thickness.
PG-90.1.1 Verifying that the Manufacturer or Assembler has a valid ASME Certificate of Authorization covering the scope of his Code activities ( PG-104.2.1,
PG-105.5).
PG-90.1.2 Monitoring compliance with the accepted Quality Control Program and verifying that any
ch a n g e s m e e t t h e r e q u i r e m e n t s o f t h i s S e c t i o n
(PG-105.4, PEB-18, A-301 and A-302).
PG-80.2 External Pressure. Welded cylindrical furnaces and other cylindrical parts subjected to external
pressure shall be rolled to practically a true circle with
a maximum plus or minus deviation not to exceed the
following:
(a) For components greater than 24 in. (600 mm) O.D.,
the maximum permissible deviation, e, shall be obtained
from Figure PG-80. The symbols L, DO, and t S are as defined in PG-28.3.1.1.
(b) For components equal to or less than 24 in.
(600 mm) O.D., the maximum deviation shall not exceed
1% of the O.D.
PG-81
PG-90.1.3 Verifying that the Certificate Holder has
the necessary Code books, Addenda, and Code Cases to
cover the work being performed.
PG-90.1.4 Reviewing a selected number of the
Manufacturer’s design calculations to verify compliance
with Section I (PG-90.3).
PG-90.1.5 Witnessing and approving proof tests to
establish Maximum Allowable Working Pressure (MAWP)
(A-22).
TOLERANCE FOR FORMED HEADS
PG-90.1.6 Verifying that the Certificate Holder has
sufficient material control to assure that material used for
construction complies with the applicable requirements
of this Section (PG-10, PG-11, PG-105.4, A-302.4).
PG-82
PG-90.1.7 When cutting plate material into two or
more pieces is necessary, verifying that the Certificate
Holder’s controls provide a positive means of identification to maintain traceability of materials ( PG-77.2,
A-302.4).
HOLES FOR STAYS
PG-82.1 Holes for threaded stays shall be drilled full
size or punched and subsequently drilled or reamed.
Punched holes shall not exceed 1/4 in. (6 mm) less than full
diameter for plates over 5/16 in. (8 mm) or 1/8 in. (3.2 mm)
less than full diameter for plates not exceeding 5/16 in.
(8 mm) thickness prior to finished drilling or reaming.
Threaded holes shall be tapped fair and true with a full
thread.
PG-90.1.8 Verifying that the Certificate Holder’s
personnel are examining cut edges before welding
(PW-29.3).
PG-90.1.9 Verifying that all welding procedure
specifications, procedure qualification records, welder
and welding operator qualification records conform to
the requirements of this Section ( PW-1.2, PW-28,
PW-40.2, PW-44.3, PW-47, PW-48, PW-53, PB-47,
PB-48).
PG-82.2 Holes for welded stays shall be cut and prepared in accordance with PW-29.
PG-90.1.10 If welded repairs are necessary, accepting the method and extent of repairs and verifying
that only qualified welding procedures, welders, and
welding operators are used (PG-78, PG-93.2, PW-40,
PW-44.9, PW-54.2, PB-33).
INSPECTION AND TESTS
PG-90
GENERAL
PG-90.1 Each boiler, superheater, waterwall, or
economizer shall be inspected during construction and
after completion by an Authorized Inspector (AI). The
AI may perform inspections at other stages of the work
as he may designate (PW-46.2). Each Manufacturer or
PG-90.1.11 Verifying that all required heat treatments have been performed and are properly documented (PG-19, PG-20, PG-11.3.4, PW-39, PW-44.4, PW-44.6,
PW-49).
78
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
When heads are made to an approximate ellipsoidal
shape, the inner surface of such heads must lie outside
and not inside of a true ellipse drawn with the major axis
equal to the inside diameter of the head and one‐half the
minor axis equal to the depth of the head. The maximum
variation from this true ellipse shall not exceed 0.0125
times the inside diameter of the head.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PG-80
Maximum Permissible Deviation From a Circular Form, e , for Cylindrical Parts Under External Pressure
1,000
900
800
700
600
500
Outside Diameter ÷ Thickness, Do /t
400
e=
300
e=
200
e=
150
e=
100
90
80
70
e=
60
e=
50
e=
40
e=
30
25
0.05
0.10
0.2
1.0
t
0.8
t
0.6
t
0.5
t
0.4
t
0.3
t
0.2
5t
0.2
0t
0.3
0.4 0.5 0.6
0.8 1.0
Design Length ÷ Outside Diameter, L /Do
2
3
4
5
6
7 8 9 10
PG-90.3 The Manufacturer is responsible for the preparation of design calculations to show compliance with
the rules of Section I and his signature on the Manufacturers’ Data Report Form shall be considered to include
certification that has been done. The Manufacturer shall
make available such design calculations as the Authorized
Inspector may request. The Authorized Inspector has the
duty to review a selected number of the Manufacturer’s
design calculations to verify compliance with Section I.
PG-90.1.12 Verifying that required nondestructive
examinations and tests have been performed by qualified
personnel and that the results are properly documented
(PG-25.2, PG-93.1, PW-11, PW-44.7, PW-44.8, PW-51,
PW-52).
PG-90.1.13 Performing the required inspections
and witnessing hydrostatic tests (PG-99, PW-54, PB-49,
PMB-21, PEB-17, PEB-18).
PG-90.1.14 Verifying that the responsible representative of the Certificate Holder has signed the Data Report and that it is correct before being signed (PG-104,
PG-112, PG-113, PW-1.2.5, PB-1.4.5).
PG-91
QUALIFICATION OF INSPECTORS
The inspection required by this Section shall be by an
Inspector employed by an ASME accredited Authorized
Inspection Agency,22 that is, the inspection organization
of a state or municipality of the United States, a Canadian
province, or of an insurance company authorized to write
boiler and pressure vessel insurance. These Inspectors
shall have been qualified by written examination under
the rules of any state of the United States or province of
Canada which has adopted the Code.
PG-90.1.15 Prior to stamping, verifying that the
item is in compliance with the requirements of this Section. After stamping, verifying that the stamping is correct
and that the nameplate, if used, has been properly attached (PG-106, PG-108, PG-109, PW-1.2.5, PB-1.4.5).
79
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
GENERAL NOTES:
(a) The above chart applies to cylinders over 24 in. (600 mm) O.D.
(b) Use the curves e = 1.0t s or e = 0.2t s , respectively, for points falling above or below those curves.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PG-93
EXAMINATION AND REPAIR OF FLAT
PLATE IN CORNER JOINTS
to which boiler components are subjected during hydrostatic test shall be taken into account when designing
the components. Close visual examination for leakage is
not required during this stage.
PG-93.1 When flat plate greater than 1/2 in. (13 mm)
thickness is welded to other pressure parts to form a corner joint, such as in flat heads [Figure PG-31, illustrations
(g-1), (g-2), (i‐1), and (i‐2)], waterlegs of firebox boilers
or combustion chambers of wetback boilers [Figure A-8,
illustrations (l) through (n) and (p)], and the exposed
edges of the plate are closer to the edge of the weld than
a distance equal to the thickness of the plate, the peripheral plate edges and any remaining exposed surface of the
weld joint preparation shall be examined after welding by
either the magnetic particle or liquid penetrant method.
When the plate is nonmagnetic, only the liquid penetrant
method shall be used. The requirements of this paragraph
shall not apply to those joints when 80% or more of the
pressure load is carried by tubes, stays, or braces, or
when the exposed edges of the plate are farther from
the edge of the weld than a distance equal to the thickness
of the plate.
PG-99.2 The hydrostatic test pressure may then be
reduced to the maximum allowable working pressure,
as shown on the Data Report, to be stamped on the boiler
and maintained at this pressure while the boiler is carefully examined. The metal temperature shall not exceed
120°F (50°C) during the close visual examination.
PG-99.3 A completed forced‐flow steam generator
with no fixed steam and waterline, having pressure parts
designed for different pressure levels along the path of
water‐steam flow, shall be subjected to a hydrostatic
pressure test by the above procedure (PG-99.1 and
PG-99.2) based upon
PG-99.3.1 For the first stage test (PG-99.1) a hydrostatic test pressure of not less than 11/2 times the maximum allowable working pressure at the superheater
outlet as shown in the master stamping (PG-106.3) but
no less than 11/4 times the maximum allowable working
pressure of any part of the boiler, excluding the boiler external piping.
PG-93.2 Laminations, cracks, or other imperfections
found during the examination required by PG-93.1 that
would affect the safety of the vessel shall be repaired in
accordance with PG-78. The imperfection(s) may be pursued by any suitable method (grinding, chipping, etc.).
The repaired area shall be subjected to the same examination that first revealed the imperfection.
PG-99.3.2 For the second stage test (PG-99.2) the
hydrostatic test pressure may be reduced to not less than
the maximum allowable working pressure at the superheater outlet.
PG-93.3 Methods and acceptance criteria for magnetic particle and liquid penetrant examination shall be
in accordance with A-260 or A-270, respectively.
HYDROSTATIC TEST
Hydrostatic testing of the completed boiler unit shall be
conducted in accordance with the following
requirements:
After a boiler has been completed (see PG-104), it shall
be subjected to pressure tests using water at not less than
ambient temperature, but in no case less than 70°F
(20°C). Where required test pressures are specified in
this paragraph, whether minimum or maximum pressures, they apply to the highest point of the boiler system.
When the boiler is completed in the Manufacturer’s shop
without boiler external piping, subsequent hydrostatic
testing of the boiler external piping shall be the responsibility of any holder of a valid Certification Mark with the
“S,” “A,” or “PP” Designator. The pressure relief valves
need not be included in the hydrostatic test. The tests
shall be made in two stages in the following sequence:
PG-99.4.2 Dial pressure gages used in testing shall
preferably have dials graduated over their entire range of
about double the intended maximum test pressure, but in
no case shall the range be less than 11/2 times that pressure. The spacing between graduations shall be such that
the inspector and the operator controlling the test shall
be able to determine when the required test pressure
has been applied. Digital pressure gages having a wider
range of pressure readings may be used provided the
readings give the same or greater degree of accuracy as
obtained with dial pressure gages.
CERTIFICATION BY STAMPING AND DATA
REPORTS
PG-99.1 Hydrostatic pressure tests shall be applied
by raising the pressure gradually to not less than 1 1/2
times the maximum allowable working pressure as
shown on the data report to be stamped on the boiler.
No part of the boiler shall be subjected to a general membrane stress greater than 90% of its yield strength (0.2%
offset) at test temperature. The primary membrane stress
PG-101
HEATING SURFACE COMPUTATION
PG-101.1 For the stamping required by PG-106, the
heating surface shall be computed as specified in
PG-101.1.1 through PG-101.1.3.
80
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-99
PG-99.4 Test Gages.
PG-99.4.1 An indicating gage, visible to the operator controlling the pressure applied, shall be connected to
the pressure parts. Hydrostatic head on the gage shall be
considered such that the required test pressure is
achieved at the top of the boiler.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PG-101.1.1 Heating surface, as part of a circulating
system in contact on one side with water or wet steam
being heated and on the other side with gas or refractory
being cooled, shall be measured on the side receiving
heat.
NOTES (CONT'D):
fabricated parts in the field with authorization from the Society
to use the Certification Mark with the “S” Designator in accordance with the Code provisions in PG-105.3.
(2) When boiler external piping within the scope of Section I is furnished by other than the boiler Manufacturer, the boiler Manufacturer is not responsible for the Code certification of such piping.
The organizations that furnish and that install such external piping by welding shall furnish proper Code certification (PG-104.2)
for such piping including Manufacturers’ Data Report Form P-4A
as required by PG-112.2.4 and PG-112.3.
PG-101.1.2 Boiler heating surface and other
equivalent surface outside the furnace shall be measured
circumferentially plus any extended surface.
PG-101.1.3 Waterwall heating surface and other
equivalent surface within the furnace shall be measured
as the projected tube area (diameter × length) plus any
extended surface on the furnace side. In computing the
heating surface for this purpose, only the tubes, fireboxes,
shells, tubesheets, and the projected area of headers need
to be considered, except that for vertical firetube steam
boilers only that portion of the tube surface up to the middle of the gage glass is to be computed.
PG-104
PG-104.2 Proper Code certification refers to the furnishing of stamping and Data Reports as evidence to establish the following:
PG-104.2.1 The organization that performed that
portion of the work held an appropriate Certificate of
Authorization.
PG-104.2.2 By signing and furnishing the appropriate data report, that organization certified compliance
with Code rules for that portion of the work.
GENERAL
PG-104.2.3 By proper use of the Certification
Mark, that organization identified the portions of the
work covered by its Data Report Form.
PG-104.2.4 By countersignature on the same Data
Report a qualified Inspector confirmed that portion of the
work complied with applicable Code rules.
PG-105
CERTIFICATION MARKS
PG-105.1 Authorization. Except as permitted in
PG-105.5, no organization may assume responsibility for
Code construction without having first received from
the ASME a Certificate of Authorization to use the Certification Mark (see Figure PG-105.1) and Designators. The
Designators used with the Certification Mark are defined
as follows:
(a) S — power boiler Designator
(b) M — miniature boiler Designator
(c) E — electric boiler Designator
(d) A — boiler assembly Designator
(e) PP — pressure piping Designator
(f) V — boiler pressure relief valve Designator
(g) PRT — fabricated parts Designator
Each boiler, superheater, waterwall, economizer, or
boiler part to which a Certification Mark is to be applied
shall be fabricated by a Manufacturer who is in possession of a Certificate of Authorization to use the Certification Mark with appropriate Designator.
NOTES:
(1) Boiler Manufacturer or Manufacturer as used in PG-104 or other
paragraphs referenced to this Note may also be an Engineering‐
Contractor organization with or without fabricating facilities,
but having the capability of providing a design specification that
establishes the pressure and temperature conditions for each
component of a complete boiler unit and of assembling the
PG-105.2 Application for Certificate of Authorization. Any organization desiring a Certificate of Authorization shall apply to the ASME in accordance with the
certification process of ASME CA-1. Authorization to use
Certification Marks may be granted, renewed, suspended,
or withdrawn as specified in ASME CA-1.
81
ð15Þ
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-104.1 The completed boiler unit includes all piping and piping components as defined in the Preamble.
The Manufacturer [see Note (1) below] of any complete
boiler unit to be stamped with the Certification Mark has
the responsibility of assuring through proper Code certification that all work performed by him or others responsible to him complies with all requirements of the Code,
including design, construction, materials, and workmanship. With the exception of field installed boiler external
piping, when some portions of a complete boiler unit
are supplied by, or Code work is performed by others
not responsible to the Manufacturer, the Manufacturer
has the duty of obtaining from these other organizations
their proper Code certification, covering such portions of
work.
When the Manufacturer furnishes a shop assembled
boiler that is complete except for boiler external piping,
and the boiler has been hydrostatically tested in the shop
and properly stamped with the Certification Mark with
the “S” Designator, the subsequent installation in the field
of the external piping within the scope of Section I is not
by itself considered “field assembly of the boiler” [see
Note (2) below].
No Manufacturer or assembler may accept Code responsibility for work that falls within the scope of the
Code, that is performed by workmen employed by any
other organization, except through proper Code certification. The responsibilities set forth herein relate only to
Code compliance and are not to be construed as involving
contractual relations or legal liabilities.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
ð15Þ
Figure PG-105.1
Official Certification Mark to Denote the American Society of Mechanical Engineers’ Standard for Boilers
S
M
E
A
(a)
(b)
(c)
(d)
PP
V
PRT
(e)
(f)
(g)
as it deems appropriate, and all such regulations shall become binding upon the holders of any valid Certificates of
Authorization.
PG-105.4 Quality Control System. Any Manufacturer or Assembler holding or applying for a Certificate
of Authorization shall demonstrate a quality program that
meets the requirements of ASME CA-1 and establishes
that all Code requirements including material, design, fabrication, examination (by the Manufacturer), and inspection for boilers and boiler parts (by the Authorized
Inspector) will be met. The quality control system shall
be in accordance with the requirements of A-301 and
A-302.
Certificates of Authorization will be endorsed to indicate the scope of activity authorized.
The Manufacturer may at any time make changes in the
quality program concerning the methods of achieving results subject to acceptance by the Authorized Inspector.
For manufacturers or assemblers of pressure relief valves
bearing the “V” Designator, such acceptance shall be by
the ASME designee.
PG-106.1 The Manufacturer shall stamp each boiler,
superheater, waterwall, or economizer constructed in
compliance with this Section in the presence of the
Authorized Inspector, after the hydrostatic test, in the
shop of the Manufacturer, except that in cases where boilers, superheaters, waterwalls, or economizers are not
completed and hydrostatically tested before shipment,
proper stamping shall be applied at the shop and the data
reports required in PG-112 and PG-113 shall be signed by
the same or different Inspectors who shall indicate the
portions of the inspections made at the shop and the field.
The stamping shall consist of the appropriate Certification Mark shown in Figure PG-105.1, which shall be put
on each piece of equipment listed above in the locations
specified in PG-111, except as provided in PG-106.2.
PG-106
STAMPING OF BOILERS
PG-106.2 When the watertube boiler is arranged integrally with its economizer, superheater and/or waterwalls, the stamping required in PG-106.1 for such parts
as are fabricated by the Manufacturer of the boiler may
be combined into a single stamping located as specified
in PG-111.5. Identifying marks shall be placed on all headers as required in PG-111.10, PG-111.11, and PG-111.12.
PG-105.5 Code Construction Before Receipt of Certificate of Authorization. When used to demonstrate his
quality control system, a Manufacturer may start fabricating Code items before receipt of a Certificate of Authorization to use a Certification Mark under the conditions
specified in ASME CA-1.
PG-106.3 For forced‐flow steam generators with no
fixed steam and waterline, consisting of groups of pressure parts or components designed at several different
levels of maximum allowable working pressures
(PG-21), the stamping, required in PG-106.1 for such
parts as are fabricated by the Manufacturer of the boiler,
PG-105.6 Regulations on Use of Certification
Marks. ASME may at any time revise the requirements
concerning the issuance and use of Certification Marks
82
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-105.3 Designated Oversight. The Manufacturer
or Assembler shall comply with the requirements of
ASME CA-1 for Designated Oversight by use of an Authorized Inspection Agency or Certified Individual, as
applicable.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
(e) for isolable or nonintegral separately fired superheaters, heating surface or the minimum pressure relief
valve discharge capacity calculated from the maximum
expected heat absorption (as determined by the
Manufacturer)
shall be combined into a single stamping. In addition,
whichever Manufacturer [see PG-104.1, Note (1)] has
the responsibility for assurance of Code certification for
a completed boiler unit, that Manufacturer shall provide
a master stamping for the complete unit which shall show
the maximum allowable working (minimum design) pressure at the superheater outlet as determined by the Manufacturer as item PG-106.4.1(c). In no case shall the
master stamping pressure be more than the maximum allowable working pressure of any part of the unit, excluding the steam piping between the boiler and the prime
mover. The master stamping shall be located as required
in PG-111.5.2.
PG-106.5 For boilers with no pressure-retaining part
larger than 16 in. (400 mm) O.D., or for equipment operating at temperatures above 800°F (425°C), a cast, etched,
or stamped metallic nameplate may be used to provide
the data required by PG-106 instead of stamping directly
on the pressure-retaining material. This plate shall be securely attached to the item it describes. If the attachment
is by welding, the welding shall meet the requirements of
this Section. The Authorized Inspector shall witness the
stamping of the Certification Mark and verify that the
nameplate has been attached.
PG-106.4 In addition to the Certification Mark, the
following items shall also be stamped with letters and
figures at least 5/16 in. (8 mm) high [5/32 in. (4 mm) on miniature boilers if necessary], arranged as shown in Figure
PG-106.
PG-106.4.1
PG-106.6 Each Manufacturer shall furnish, in addition, a metallic plate or plates on which the above data
are reproduced for all the items manufactured by him, except when the original stampings are so located on the
completed (or assembled) boiler unit that all will be readily visible from one place on the operating floor or platform. These plates, if used, shall be located as specified
in PG-111.13. All data on such additional plates, including
the Certification Mark, shall be cast, etched, or stamped
and this marking need not be witnessed by an Authorized
Inspector. The letters and figures on these nameplates
shall be not less than 5/32 in. (4 mm) high.
Items on Boilers.
(a) Manufacturer’s serial number
(b) certified by (name of Manufacturer)
(c) maximum allowable working pressure when built
(d) heating surface (or power input for electric boilers)
(e) year built
(f) maximum designed steaming capacity (or, for high‐
temperature water boilers, maximum designed output)
PG-106.7 When the Manufacturer is an Engineering
Contractor [see PG-104.1, Note (1)], either of the sequences specified in PG-106.7.1 and PG-106.7.2 may be
selected for the certification and stamping of the completed boiler.
Items on Waterwalls, Superheaters,
(a) Manufacturer’s serial number
(b) certified by (name of Manufacturer)
PG-106.7.1 Certification of Field Assembly Prior
to Certification of Engineering Contractor.
(a) The Engineering Contractor shall prepare a Form
P-3A Master Data Report with the Certification of Engineering Contractor portion remaining blank. This Master
Data Report, including all associated Partial Data Reports
shall be forwarded to the Assembler.
(b) After the required inspections and the hydrostatic
test have been performed, the Assembler and his Authorized Inspector shall certify the field assembly portion of
Form P-3A. The Assembler shall then forward the completed Form P-3A, including all associated Partial Data
Reports, to the Engineering Contractor.
(c) The Engineering Contractor shall provide a metallic
master stamping plate or plates. The letters and figures
on this plate shall be not less than 5/32 in. (4 mm) high.
This plate shall include, in addition to the Certification
Mark, all the data required by PG-106.4. Such data, except
the Certification Mark, may be cast, etched, or stamped on
this plate. The Certification Mark shall be stamped. The
stamping of the master stamping plate shall be in the
presence of the Engineering Contractor’s Authorized
(c) maximum allowable working pressure when built
(d) heating surface (not required for integral superheaters) (rated absorption for an isolable economizer)
Figure PG-106
Form of Stamping
Certified by
(Name of Manufacturer)
S
(Max. allow. working pressure when built)
(Heating surface, boiler, and waterwalls)
(Maximum designed steaming capacity)
Manufacturer’s
serial number
Year built
83
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-106.4.2
or Economizers.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Parts may be stamped with the Certification Mark without being pressure tested prior to shipment (see PG-112
for requirements for documentation and stamping of
pressure parts that do not contain pressure-retaining
welds).
Inspector after the Inspector has examined the Design
Specification for the complete boiler unit, verified the
plate data, and is satisfied that the Engineering Contractor
has provided for the construction of the complete boiler
unit. The Engineering Contractor and his Authorized Inspector shall then sign the Certification of Engineering
Contractor portion of Form P-3A.
PG-106.8.2 In lieu of such stamping, small parts
[5 in. (125 mm) O.D. and under] may be marked with
an identification acceptable to the Inspector (e.g., bar coding, etching, paint stencil, etc.) and traceable to the Form
P-4, Manufacturer’s Partial Data Report. Such marking
shall be of a type that will remain visible until the part
is installed. The Certification Mark is not required.
(d) The Engineering Contractor shall provide the Assembler with the master stamping plate who shall affix
it to a location on the boiler as specified in PG-111.13.
PG-106.7.2 Certification of Engineering Contractor Prior to Certification of Field Assembly.
PG-106.8.3 Manufacturers of parts who do not ð15Þ
perform or assume any design responsibility for the parts
they manufacture shall identify on Form P-4, Manufacturer’s Partial Data Report (see PG-112.2.4), the Certificate Holder assuming responsibility for the design of
the part. The Manufacturer shall document the Edition
and Addenda used to manufacture the part in the “Remarks” section of Form P-4.
(a) The Engineering Contractor shall provide a metallic
master stamping plate or plates. The letters and figures
on this plate shall be not less than 5/32 in. (4 mm) high.
This plate shall include, in addition to the Certification
Mark, all the data required by PG-106.4. Such data, except
the Certification Mark, may be cast, etched, or stamped on
this plate. The Certification Mark shall be stamped. The
stamping of the master stamping plate shall be in the
presence of the Engineering Contractor’s Authorized Inspector after the inspector has examined the Design Specification for the complete boiler unit, verified the plate
data, and is satisfied that the Engineering Contractor
has provided for the construction of the complete boiler
unit. The Engineering Contractor and his Authorized Inspector shall then sign the Certification of Engineering
Contractor portion of Form P-3A in the presence of and
when authorized by the Authorized Inspector.
PG-106.8.4 Manufacturers with multiple locations,
each with its own Certificate of Authorization, may transfer boiler parts from one location to another without Partial Data Reports, provided the Quality Control System
describes the method of identification, transfer, and receipt of the parts.
(b) The Engineering Contractor shall provide the Assembler with the master stamping plate and Form P-3A
Master Data Report, including all associated Partial Data
Reports.
PG-106.10 Shell plates, furnace sheets, and heads
shall have identification stamping in conformance with
PG-77.
(c) After the required inspections and the hydrostatic
test have been performed, the Assembler shall affix the
master stamping plate to the boiler at a location as specified in PG-111.13 in the presence of and when authorized
by his Authorized Inspector.
PG-106.11 The American Society of Mechanical Engineers’ Certification Marks and the boiler builder’s stamps
shall not be covered permanently by insulating or other
material.
(d) The Assembler and his Authorized Inspector shall
then sign the Certificate of Field Assembly portion of
Form P-3A. The Assembler shall then forward the completed Form P-3A, including all associated Partial Data
Reports, to the Engineering Contractor.
PG-106.12 Multiple Pressure Steam Generators consisting of several sections of heat exchange surface designed for different pressure levels may be considered
as a single boiler and the Manufacturer’s stamping required by PG-106.1 combined into a single stamping
provided
PG-106.8
Stamping and Marking of Parts.
PG-106.12.1 The different circuits of the boiler are
not intended to be operated separately or independently.
PG-106.8.1 When only a part of the boiler is supplied and the data are recorded on Form P-4, Manufacturer’s Partial Data Report (see PG-112.2.4), the part
shall be stamped with
PG-106.12.2 The extent and design of the boiler
external piping for each circuit shall be established in accordance with PG-58.3.
(a) Certification Mark above the word “part”
PG-106.12.3 The various circuits shall be separated from each other by providing a stop valve and a
check valve in the feedwater piping leading to each circuit, in accordance with PG-58.3.3.
(b) certified by (name of Manufacturer)
(c) Manufacturer’s serial number of the part
(d) year built
84
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-106.9 No accessory or part of a boiler may be
marked “ASME” or “ASME Std.” unless so specified in the
Code.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PG-106.12.4 Each circuit shall be given a hydrostatic test corresponding to its MAWP, as required by
PG-99.
(b) Code certification of work performed by an organization responsible for partial field assembly of a boiler
shall be provided as follows:
(1) The work performed shall be described on a
Form P-3. The form shall be marked as not being the Master Data Report. Lines 1 through 5 of the form shall be
completed by the assembler responsible for partial field
assembly of the boiler, except that the words “partial field
assembly” are to be inserted on Line 4 instead of the unit
identification and ID numbers. The portion of partial field
assembly completed by the assembler and the location of
the stamping required by (3) shall be described on Line
15, Remarks.
(2) The Certificate of Field Assembly Compliance on
the form shall be completed and signed by the assembler.
The Certificate of Field Assembly Inspection on the form
shall be completed and signed by the assembler’s Authorized Inspector.
(3) When authorized by the Authorized Inspector,
the assembler’s Certification Mark together with the assembler’s name, or an acceptable abbreviation, and the
words “partial field assembly” shall be stamped by the assembler on a major pressure part assembled as part of the
work covered by the Code certification. If limited space
prevents this, the stamping shall be applied near the Manufacturer’s stamping required by PG-106.
PG-106.12.5 Each circuit shall be stamped with the
information required by PG-106.4. The stamping shall be
located in accordance with PG-111.
PG-106.12.6 The Manufacturer shall furnish, in addition, a single metallic plate on which the above data are
reproduced for all of the circuits. This plate shall be located in accordance with PG-111.13. All data on such
plates shall be cast, etched or stamped. The Certification
Mark shall be stamped on this plate and shall be witnessed by an Authorized Inspector. The letter and figures
on these nameplates shall be not less than 5/32 in. (4 mm)
high.
PG-107
FIELD ASSEMBLY
Code responsibility for a completed boiler unit that is
field assembled [excluding the shop assembled boiler
with field installed piping, see PG-104.1, Note (2)] may
be assumed only under the following conditions.
PG-107.1 By the boiler Manufacturer [see PG-104.1,
Note (1)], provided
PG-107.1.1 Assembly work is performed by workmen employed by the boiler Manufacturer.
PG-107.2.4 The completed boiler unit is properly
stamped with the Manufacturer’s Certification Mark with
the “S” Designator and the assembler’s Certification Mark
in accordance with PG-108.2.
PG-107.1.2 Any work performed by others, such as
erection of piping, that falls within the scope of the Code,
is handled by proper Code certification.
PG-107.2.5 Data Reports are prepared in accordance with PG-113.2 and such Data Reports clearly define
the work completed by the Manufacturer and the
assembler.
PG-107.1.4 Data Reports are prepared in accordance with PG-113.1.
PG-108
PG-107.2 Jointly by the boiler Manufacturer and the
assembler responsible for performing the hydrostatic test
of the completed boiler, signing of the Certificate of Field
Assembly Compliance on the Master Data Report, and for
providing the supplemental stamping in accordance with
PG-108.2, provided
STAMPING FOR FIELD-ASSEMBLED
BOILERS
Field assembly of a completed boiler unit may be made
by anyone possessing a valid Certificate of Authorization
for a power boiler stamp or an assembly stamp provided
responsibility is assumed in accordance with the requirements of PG-107. Stamping for field assembled boiler
units shall be completed as specified in PG-108.1 and
PG-108.2.
PG-107.2.1 Assembly work is performed by workmen employed by the assembler.
PG-108.1 When responsibility for the completed boiler unit is assumed under PG-107.1, no additional stamping beyond that required by PG-106 is necessary.
PG-107.2.2 The assembler uses his own properly
qualified welding procedures, welders and/or welding
operators.
PG-108.2 When responsibility for the completed
boiler unit is assumed under PG-107.2, the Manufacturer’s [see PG-104.1, Note (1)] stamping shall be supplemented with the assembler’s stamp, together with the
name of the assembler or an acceptable abbreviation. This
supplementary stamping shall be applied in the field on
the boiler near the stamping called for by PG-106 when
authorized by the field Inspector after the required
PG-107.2.3 Any work performed in the field by
others, such as erection of boiler external piping or partial
assembly of the boiler proper, that falls within the scope
of the Code, is handled by proper Code certification.
(a) Code certification of boiler external piping installed
by an organization other than the boiler Manufacturer or
assembler shall be provided in accordance with PG-109.
85
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-107.1.3 The completed boiler unit is properly
stamped with the Manufacturer’s Certification Mark with
the “S” Designator in accordance with PG-108.1.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
shall be stamped or marked as required by PG-106.8
and reported on a Form P-4, Manufacturer’s Partial Data
Report, as called for in PG-112.2.4.
inspections and the hydrostatic test of the completed boiler unit. This supplementary stamping shall also be reproduced on a nameplate as required by PG-106.6 or
PG-106.7 and attached in a location immediately adjacent
to the master stamping plate, as required in PG-111.13.
PG-109
PG-109.4 Mechanically assembled boiler external
piping which contains no pressure boundary welds does
not require stamping, and as such may be assembled by
a nonstamp holder. Note that the responsibility for documentation and hydrostatic testing of a mechanically assembled boiler external piping must be assumed by a
holder of a valid Certification Mark with the “S,” “A,” or
“PP” Designator (see PG-112.2.4).
STAMPING OF PRESSURE PIPING
PG-109.1 Boiler external piping, as defined in the
Preamble, may be fabricated by a manufacturer other
than the Manufacturer of the boiler, provided that the
manufacturer has been issued a Certificate of Authorization to use the Certification Mark with the “S” or “PP” Designator. Boiler external piping may be installed by
welding by a manufacturer or contractor other than the
Manufacturer of the boiler, provided such an organization
has been issued a Certificate of Authorization to use the
Certification Mark with the “S,” “PP,” or “A” Designator.
When boiler external piping is installed by welding, the
welding, including the qualification of welding procedures, welders, and welding operators, shall be done in
accordance with the applicable rules of ASME B31.1.
The welding shall be inspected by an Authorized Inspector at such stages of the work as he may elect. The organizations which fabricate or install such piping shall
furnish proper code certification (PG-104.2) for it including a Manufacturer’s Data Report Form P-4A as required
by PG-112.2.4 and PG-112.3.
PG-110
STAMPING OF BOILER PRESSURE RELIEF
VALVES
PG-109.2 Welded boiler external piping included
within the scope of this Code, over NPS 2 (DN 50), shall
be stamped with a Certification Mark, together with the
manufacturer’s or contractor’s name and serial number.
Such stamping shall be on the pipe, valve, or fitting adjacent to the welded joint farthest from the boiler. For piping operating at temperatures above 800°F (425°C) the
Certification Mark may be stamped on a nameplate that
is irremovably attached by welding, provided such welding is postweld heat treated, or on a circular metal band at
least 1/4 in. (6 mm) thick. This band around the pipe shall
be secured in such a manner as to prevent it from slipping
off during handling and installation.
Welded piping NPS 2 (DN 50) or less included within
the scope of this Code shall be marked with an identification acceptable to the Inspector and traceable to the required Data Report. Such marking shall be of a type that
will remain visible until the piping has been installed.
PG-109.3 A manufacturer in possession of the pressure piping Certification Mark may
(a) design and fabricate welded piping. Such fabrications shall be stamped and reported on a Form P-4A, Manufacturer’s Data Report for Fabricated Piping, as called for
in PG-112.2.4.
(b) fabricate other parts of boilers, such as superheater,
waterwall, or economizer headers, where complete design requirements are provided by others. Such parts
86
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Each pressure relief valve shall be plainly marked with
the required data by the Manufacturer or Assembler (see
PG-73.4.4) in such a way that the marking will not be obliterated in service. The marking shall be placed on the
valve or on a metal nameplate securely fastened to the
valve. The other required data may be stamped, etched,
impressed, cast, or applied by other means acceptable
to the ASME designated organization on the valve or
nameplate. For units other than those included below,
see PG-4. The marking shall include the following:
(a) the name (or an acceptable abbreviation) of the
Manufacturer and Assembler, as applicable
(b) Manufacturer’s design or type number
(c) NPS (DN) (the nominal pipe size of the valve inlet)
(d) set pressure
psi (MPa)
(e) Capacity
(1) capacity
lb/hr (kg/hr) (for saturated
steam service in accordance with PG-69.2) or
(2) capacity
lb/hr (kg/hr) at
°F (°C)
(for power-actuated pressure-relieving valves in accordance with PG-69.4, or for pressure relief valves for
superheated steam service in accordance with PG-68.7
or supercritical steam service in accordance with
PG-67.5) or
(3) capacity
gal/min (l/min) at 70°F (20°C)
and
lb/hr (kg/hr) steam (for economizer service
in accordance with PG-69.2) or
(4) capacity
lb/hr (kg/hr) a t
°F
(°C)
(fluid identification) (for organic fluid vaporizers in accordance with PVG-12.4)
(f) year built, or alternatively, a coding may be marked
on the valve such that the valve Manufacturer or Assembler can identify the year the valve was assembled and
tested
(g) Certification Mark as shown in Figure PG-105.1
with a “V” Designator placed under the Certification Mark.
A marking method other than the stamp issued by the Society may be used, provided that it is acceptable to the
ASME designated organization.
(h) The pilot of a pilot-operated pressure relief valve
shall be plainly marked by the Manufacturer or Assembler
showing the name of the Manufacturer, the
ð15Þ
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PG-111.12 Waterwalls — on one end of a lower header. Other headers shall carry identifying marks.
Manufacturer’s design or type number, the set pressure in
pounds per square inch (MPa), and the year built, or alternatively, a coding that the Manufacturer can use to identify the year built.
PG-111
PG-111.13 When required by PG-106.6 and PG-106.7,
the Manufacturer [see PG-104.1, Note (1)] shall furnish a
nameplate or plates on which the appropriate Certification Mark and design data for the scope of his responsibility are permanently imprinted. The nameplate shall be
securely attached to the front of the boiler, its setting or
casing, at a place readily visible from the operating floor
or platform.
LOCATION OF STAMPINGS
The location of the required stampings shall be as listed
below. These stampings shall be left uncovered or an easily removable marked cover may be provided over the
stamping when a boiler is covered with insulation, or
jacketed. No piping, boiler appliance, or other obstructions shall interfere with reading of the stamping.
PG-112
PG-111.2 Horizontal‐flue boilers — on the front head
above the flues.
PG-112.1 Twelve types of Manufacturer’s Data Re- ð15Þ
port Forms are shown in A-350 under the heading “Data
Report Forms and Guides” at the end of this Section.
These forms shall be used by the Manufacturer [see
PG-104.1, Note (1)] to record all the items constructed
in accordance with this Section, as defined in the provisions of PG-112.2. When the certification of the complete
boiler unit is accomplished by more than one Data Report,
the principal Data Report (Form P-2, P-2A, P-3, P-3A, or
PL-1) shall be designated as the Master Data Report
(see PG-113).
Supporting Data Reports, such as Form P-4 and, when
used as a Partial Data Report, Form P-3, shall be attached
to and referenced in the Master Data Report. Requirements for completing multiple pages of Data Report
Forms are shown in A-350.1.
For forced‐flow steam generators with no fixed steam
and waterline consisting of groups of pressure parts or
components designed at several different pressure levels,
a separate Manufacturer’s Data Report, Form P-3 or Form
P-4, shall clearly identify the pressure parts at each pressure level and show the maximum allowable working
pressure. These several Data Reports shall be attached
to and referenced in a Master Data Report (PG-113) that
shall clearly identify each component as part of the complete unit.
PG-111.3 Traction, portable, or stationary boilers of
the locomotive type or Star watertube boilers — on the
furnace end above the handhole. Or on traction boilers
of the locomotive type — on the left wrapper sheet forward of the driving wheel.
PG-111.4 Vertical firetube and vertical submerged
tube boilers — on the shell above the firedoor and handhole opening.
PG-111.5 Watertube Boilers.
PG-111.5.1 Drum type — on a head of the steam
outlet drum near and above the manhole.
PG-111.5.2 Forced‐flow steam generator with no
fixed steam and waterline — the master stamping
(PG-106.3) shall be located on a major pressure part, located near the main operating floor where readily visible.
The Data Report Form shall record the location of the
master stamping.
PG-111.6 Scotch marine boilers — on either side of
the shell near the normal water level line and as near as
practical to the front tubesheet.
PG-111.7 Economic boilers — on the front head,
above the center row of tubes.
PG-111.8 Miniature and electric boilers — on some
conspicuous and accessible place on the boiler proper,
or on a stamping plate at least 3/64 in. (1.2 mm) thick, permanently fastened (adhesives prohibited) to the boiler.
MANUFACTURER’S DATA REPORT
FORMS
PG-112.2 Types of Data Report Forms. The types of ð15Þ
Data Report Forms and the purposes for which they are to
be used are specified in PG-112.2.1 through PG-112.2.9.
PG-112.2.1 Form P-2, Manufacturer’s Data Report
for All Types of Boilers Except Watertube and Electric,
shall be used to record all types of boilers that are not
watertube, electric, or locomotive.
PG-111.9 On any of the above types where there is
not sufficient space in the place designated, and for other
types and new designs — in a conspicuous place on the
boiler proper. The Data Report Form shall record the location of the required stamping.
PG-112.2.1.1 Form P-2A, Manufacturer’s Data
Report for All Types of Electric Boilers, shall be used to
record all types of electric boilers.
PG-111.10 Superheaters — on superheater header
near the outlet. Other headers shall carry identifying
marks.
PG-112.2.1.2 Form P-2B, Manufacturer’s Data
Report for Electric Superheaters and Reheaters, shall be
used to record electric superheaters and reheaters installed external to the boiler setting.
PG-111.11 Economizers — at a handy location on
water inlet header or drums. Other headers shall carry
identifying marks.
87
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-111.1 Horizontal‐return tubular boilers — on the
front head above the central rows of tubes.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Except as provided in (b), Form P-4 shall be used only
to provide supporting data for the information given on
the Master Data Report (see PG-113) or on a Form P-3
that is used to record a superheater, waterwall, or
economizer.
(b) Form P-4 shall be used to record boiler parts requiring inspection and stamping under this Section that are
furnished by other than the Manufacturer responsible
for the completed boiler.
(1) Form P-4 shall be used only to provide supporting data for the information given on the Master Data Report for the completed boiler.
(2) When used to record parts furnished to the user
of an existing boiler as replacement or repair parts, Form
P-4 is sufficient and need not support a Master Data Report Form. A copy of the parts Manufacturer’s Form P-4
shall be forwarded to the purchaser. The parts shall be
stamped with the Certification Mark with the “S” Designator and the additional information, as applicable, shown
in PG-106.4.2.
(3) The parts Manufacturer shall indicate under “Remarks” the extent to which he has performed the design
functions. When the parts Manufacturer performed only
a portion of the design, he shall state which portion of
the design he has performed.
PG-112.2.5 Form P-4A, Manufacturer’s Data Report for Fabricated Piping, shall be used to record all shop
or field‐welded boiler external piping that falls within the
scope of this Section but is not furnished by the boiler
Manufacturer. Form P-4B, Manufacturer’s Data Report
for Field‐Installed Mechanically Assembled Piping, shall
be used to record all field‐installed mechanically assembled boiler external piping. Form P-4B shall be used
only for piping that contains no joints brazed or welded
by the field installer.
PG-112.2.3 Form P-3A, Engineering‐Contractor
Data Report for a Complete Boiler Unit, shall be used
when such an organization assumes the Manufacturer’s
Code responsibility as provided for by PG-104.1, Note
(1). This form shall be used to certify Code responsibility
for the design specification of the complete boiler unit, of
which the components are individually certified by their
individual manufacturers in accordance with the Code
rules. This form also provides for field assembly
certification.
Form P-3A shall not be used by a Manufacturer to provide Code certification for only a portion of the complete
boiler unit.
PG-112.2.6 Form P-5, Summary Data Report for
Process Steam Generators, may be used by the Manufacturer [see PG-104.1, Note (1)] to record all items of
field‐assembled process steam generators of the waste
heat or heat recovery type, comprising one or more
drums and one or more arrays of heat exchange surface
designed for different pressure levels. All such component
items shall be constructed to the applicable rules of the
Code and shall be certified by individual Data Report
Forms executed by the component manufacturer and
the Authorized Inspector. When used, the Summary Data
Report Form P-5 shall list all the properly executed data
report forms for components comprising the complete
process steam generator and shall be attached to the
Manufacturer’s Data Report.
PG-112.2.4 See below.
(a) Form P-4, Manufacturer’s Partial Data Report, shall
be used to record boiler parts requiring inspection and
stamping under this Section which are furnished by other
than the Manufacturer responsible for the completed
boiler, superheater, waterwall, or economizer.
PG-112.2.7 When using a print version of a Data
Report Form, Form P-6, Manufacturer’s Data Report Supplementary Sheet, shall be used to record additional data
where space was insufficient on a Data Report Form. This
Manufacturer’s Data Report Supplementary Sheet will be
attached to the Manufacturer’s Data Report Form where
88
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-112.2.2 See below.
(a) Form P-3, Manufacturer’s Data Report for Watertube Boilers, Superheaters (except electric), Waterwalls,
and Economizers, shall be used to record all of the items
comprising a complete watertube boiler. When Form P-3
is used as a Master Data Report, the box at the top of the
first page of the form shall be checked to indicate it is the
Master Data Report.
Item 10 on Form P-3 shall be used to record other parts
connected at the openings listed in Item 11 if such parts
are fabricated of materials or by processes that require
Code inspection. If such parts have not been connected
prior to the hydrostatic test, a notation shall be made under Item 10 reading: “No parts connected to the openings
listed in Item 11 except as noted.”
(b) When Form P-3 is used as a Partial Data Report, it
shall be used to record boiler parts requiring inspection
and stamping under this Section that are furnished by
other than the Manufacturer responsible for the completed boiler.
(1) Form P-3, when used as a Partial Data Report,
shall be used only to provide supporting data for the information given on the Master Data Report for the completed boiler.
(2) When used to record parts furnished to the user
of an existing boiler as replacement or repair parts, Form
P-3, Partial Data Report, is sufficient and need not support
a Master Data Report. A copy of the parts Manufacturer’s
Form P-3, Partial Data Report, shall be forwarded to the
purchaser. The parts shall be stamped with the Certification Mark with the “S” Designator and the additional information, as applicable, shown in PG-106.4.2.
(3) The parts Manufacturer shall indicate under “Remarks” the extent to which he has performed the design
functions. When the parts Manufacturer performed only
a portion of the design, he shall state which portion of
the design he has performed.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Partial Data Reports, together with his own inspection,
shall be the final Inspector’s authority to witness the application of the Certification Mark to the boiler or the superheater, waterwall, or economizer. The Partial Data
Reports shall be attached to the associated Form P-2,
P-2A, P-3, P-3A, P-5, or PL-1 by the Manufacturer having
Code responsibility for the boiler or the superheater,
waterwall, or economizer.
used. When using an electronic version of a Data Report
Form, it may be expanded to include all additional data,
or Form P-6 may be used in accordance with PG-112.5.2.
PG-112.2.8 Form P-7, Manufacturer’s Data Report
for Pressure Relief Valves, shall be used to record required pressure relief valves. Form P-7 shall be used as
supporting data for Form P-2, P-3, P-3A, or PL-1. Form
P-7 is not required for boilers certified on Form P-2A,
or for boilers with a single pressure relief valve when
the pressure relief valve size, set pressure, and capacity
[lb/hr (kg/hr)] are included in the remarks section of
Form P-2 or P-3.
PG-112.4 A-350 includes nonmandatory guides to
aid in the completion and certification of the Manufacturer’s Data Report Forms.
PG-112.5 Multiple Pressure Steam Generators shall
b e d o c u m e n t e d a s i n d i c at e d i n P G - 1 1 2 . 5 . 1 a n d
PG-112.5.2.
ð15Þ
PG-112.5.1 Data Report Form P-3 or P-3A shall be
used by the Manufacturer as the Master Data Report to record all items comprising a multiple pressure steam generator of the waste heat or heat recovery type. The Master
Data Report shall list all of the properly executed data report forms for the items comprising the complete steam
generator unit.
PG-112.5.2 Other forms such as Forms P-3, P-4,
P-5, P-6, and P-7 shall be used as necessary to provide
and summarize supporting information for the Master
Data Report.
PG-112.6 Manufacturer’s Partial Data Report Form ð15Þ
P-3, P-4, or PL-1 and stamping in accordance with
PG-106 are neither required nor prohibited for pressure
parts that do not contain pressure-retaining welds (e.g.,
boiler furnace walls, floor panel assemblies, tubes with
support or hanger lugs). However, the Manufacturer shall
certify that the material and construction are in accordance with the requirements of this Section.
PG-112.6.1 Certification may be supplied in the
form of bills of material and drawings with a statement
of compliance or Certificate of Compliance from the
Manufacturer.
PG-112.6.2 The Certification shall state what materials were used including size (O.D. and wall thickness)
and which edition and addenda of the Code were used
to construct the parts.
PG-112.3 Manufacturer’s Data Reports and all associated Partial Data Reports shall be furnished to the purchaser, the inspection agency, and the state, municipal, or
provincial authority at the place of installation. Partial
Data Reports for pressure parts requiring inspection under this Section, and which are furnished by other than
the Manufacturer having Code responsibility for the boiler or the superheater, waterwall, or economizer, shall be
executed by the parts Manufacturer and the Inspector in
accordance with the requirements of this Section.
Except as provided in PG-112.2.2(b), PG-112.2.4(b), or
PG-112.2.9(b), the Partial Data Reports shall be forwarded, in duplicate, to the Manufacturer of the boiler
or the superheater, waterwall, or economizer. These
PG-112.6.3 The parts shall be clearly identified
with markings traceable to the certification. The markings
may be in the form of labels, tags, stamping, paint, or
coded identification.
PG-113
MASTER DATA REPORT FORM
PG-113.1 The Master Data Report (using Manufac- ð15Þ
turer’s Data Report Form P-2, P-2A, P-3, P-3A, or PL-1,
as applicable) shall be used by the boiler Manufacturer
[see PG-104.1, Note (1)] to fully document all parts of a
complete boiler unit [excluding boiler external piping;
89
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PG-112.2.9 See below.
(a) Form PL-1, Manufacturer’s Data Report for Locomotive Boilers, shall be used to record all of the items comprising a complete locomotive boiler. The box at the top of
the form shall be checked to indicate it is a Master Data
Report. The item shall be stamped with the Certification
Mark with the “S” Designator and the additional information, as applicable, shown in PG-106.4.1.
(b) When Form PL-1 is used as a Partial Data Report, it
shall be used to record locomotive boiler parts requiring
inspection and stamping under this Section that are furnished by other than the Manufacturer responsible for the
completed locomotive boiler.
(1) Form PL-1, when checked as a Partial Data Report, shall be used only to provide supporting data for
the information given on the Master Data Report Form
PL-1 for the completed locomotive boiler.
(2) When used to record parts furnished to the user
of an existing boiler as replacement or repair parts, Form
PL-1, Partial Data Report, is sufficient and need not support a Master Data Report Form PL-1. A copy of the parts
Manufacturer’s Form PL-1 shall be forwarded to the purchaser. The parts shall be stamped with the Certification
Mark with the “S” Designator and the additional information, as applicable, shown in PG-106.4.2.
(3) The parts Manufacturer shall indicate under “Remarks” the extent to which he has performed the design
functions. When the parts Manufacturer performed only
a portion of the design, he shall state which portion of
the design he has performed.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
see PG-104.1, Note (2)] as having Code certification in accordance with the Code requirements for design, construction, and workmanship.
accept the components fabricated by the other manufacturers and included in the construction of the complete
boiler unit.
PG-113.2 When a field‐assembled boiler unit is documented by Data Forms from manufacturers other than
the Manufacturer [see PG-104.1, Note (1)] responsible
for the complete boiler unit, the boiler Manufacturer shall
complete the applicable Master Data Report Form by recording the required data from all supporting Data Report
Forms that are required for the complete boiler unit. All
Data Forms shall be securely attached to the Master Data
Report. The Data Reports shall clearly separate shop fabrication from field assembly and in the case of large units,
supplemental sheets may be used to record the information. The certificate of shop inspection block and the certificate of field assembly block shall clearly designate the
items to be certified by the Inspector in the shop and
those to be certified by the Inspector in the field. The certified Data Reports furnished by the several manufacturers shall be the shop or field Inspector’s authority to
PG-113.3 The boiler Manufacturer [see PG-104.1, ð15Þ
Note (1)] shall have the responsibility for distributing copies of the complete Master Data Report Form (Form P-2,
P-2A, P-3, P-3A, or PL-1, as applicable) to the inspection
agency and the required number of proper authorities.
The Manufacturer’s written quality control system shall
include requirements for completion of Manufacturer’s
Data Reports. The Manufacturer shall retain the Manufacturer’s Data Reports for a minimum of 5 years.
PG-113.4 When boiler external piping is furnished by
an organization not contractually responsible to the Manufacturer [see PG-104.1, Note (1)], the organization responsible for the fabrication and installation of this
piping shall have the responsibility for distributing copies
of Form P-4A to the inspection agency and proper
authorities.
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
90
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PART PW
REQUIREMENTS FOR BOILERS FABRICATED BY WELDING
GENERAL
PW-1
PW-1.2.3 All welders shall be qualified by the Manufacturer in accordance with the requirements of Section
IX.
GENERAL
PW-1.1 Scope. The rules in Part PW are applicable to
boilers and component parts thereof, including piping
constructed under the provisions of this Section, that
are fabricated by welding and shall be used in conjunction
with the general requirements in Part PG as well as with
the specific requirements in the applicable Parts of this
Section that pertain to the type of boiler under
consideration.
PW-1.2.4 The Manufacturer’s quality control system shall include as a minimum
PW-1.2.4.1 A requirement for complete and exclusive administrative and technical supervision of all
welders by the Manufacturer.
PW-1.2.4.2 Evidence of the Manufacturer’s
authority to assign and remove welders at his discretion
without involvement of any other organization.
PW-1.2.4.3 A requirement for Assignment of
Welder identification symbols.
PW-1.2.4.4 Evidence that this program has been
accepted by the Manufacturer’s Authorized Inspection
Agency which provides the inspection service.
PW-1.2.5 The Manufacturer shall be responsible
for Code compliance of the weldment including stamping
the Certification Mark with appropriate Designator and
providing Data Report Forms properly executed and
countersigned by the Authorized Inspector.
PW-1.3 Welding Definitions. For some of the more
common terms related to welding, refer to Section IX,
QG-109.2.
MATERIALS
PW-5
GENERAL
PW-5.1 Materials used in welded construction of
pressure parts shall conform to one of the specifications
given in Section II and shall be limited to those specifically
permitted in Parts PG, PWT, and PFT and for which allowable stress values are given in Section II, Part D, Subpart 1,
Tables 1A and 1B, for Section I construction and for which
weld Group P‐Numbers are assigned in Section IX.
PW-1.2.1 All Code construction shall be the responsibility of the Manufacturer.
PW-5.2 Carbon or alloy steel having a carbon content
of more than 0.35% shall not be used in welded construction or be shaped by oxygen cutting or other thermal cutting processes.
PW-1.2.2 All welding shall be performed in accordance with Manufacturer’s Welding Procedure Specifications that have been qualified by the Manufacturer in
accordance with the requirements of Section IX.
PW-5.3 Austenitic stainless steel materials joined by
electroslag welding shall be limited to SA-240 Grades 304
and 316, SA-182 Grades F304 and F316, and SA-351
Grade CF 8.
91
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PW-1.2 Responsibility. Each Manufacturer23 (Certificate of Authorization holder) is responsible for the welding done by his organization and shall establish the
procedures and conduct the tests required in Section IX
to qualify the welding procedures he uses in the construction of the weldments built under Section I and the performance tests of welders 24 who apply these
procedures. Alternatively, AWS Standard Welding Procedure Specifications that have been accepted by Section
IX may be used for Section I construction, provided the
welding meets the requirements of this Section. A particular AWS Standard Welding Procedure may contain a
range for a welding variable where only part of the range
meets the requirements of this Section. This could apply
to one or more welding variables. The Section I requirements always take precedence. Manufacturers intending
to use AWS Standard Welding Procedures shall describe
in their Quality Control System (A-302.7) control measures used to assure that the welding meets the requirements of this Section and Section IX. Other occurrences of
the phrase qualified in accordance with Section IX in this
Part shall be construed to permit use of AWS Standard
Welding Procedures accepted by Section IX and controlled as described above. Such welding will ordinarily
be done by employees of the Manufacturer who accepts
the responsibility for Code construction of the boiler or
part being welded. Alternatively, the Manufacturer may
perform Code welding using the services of individual
welders who are not in his employ provided all the following conditions are met.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PW-5.4 Welding electrodes and filler metal shall be
selected to provide deposited weld metal of chemical
composition and mechanical properties compatible with
the materials to be joined and the service conditions
anticipated.
When Grade 91 filler metal (e.g., AWS B9, EN CrMo91,
etc.) is used to make pressure-retaining welds in P-No.
15E Gr. 1 materials, the nickel plus manganese (Ni +
Mn) content of the filler metal shall not exceed 1.2%.
Figure PW-9.3.1
Butt Welding of Plates of Unequal Thickness
PW-5.5 Rimmed and semi‐killed steels shall not be
joined by the inertia and continuous drive friction welding processes.
3
1
PW-5.6 For pressure-retaining welds in 21/4Cr–1Mo
materials, other than circumferential buttwelds less than
or equal to 31/2 in. (89 mm) in outside diameter, when design metal temperatures exceed 850°F (455°C), the weld
metal shall have a carbon content greater than 0.05%.
GENERAL
The rules in the following paragraphs apply specifically
to the design of boilers and parts thereof that are fabricated by welding and shall be used in conjunction with
the general requirements for design in Part PG, as well
as with the specific requirements for design in the applicable Parts of this Section that pertain to the type of boiler
under consideration.
1
Tapered one
side only
(inside or
outside)
(b) Permissible
(Circumferential
Joints Only)
(c) Not
Permissible
is greater than one-fourth the thickness of the thinner
material or 1/8 in. (3 mm), whichever is less. Any process
that will provide a uniform taper may be used to form the
transition section. The weld may be partly or entirely in
the tapered section or adjacent to it as indicated in Figure
PW-9.3.1. The tapered transition shall have a length not
less than 3 times the offset between the adjoining surfaces, as shown in Figure PW-9.3.1. Provisions for tapers
at circumferential butt-welded joints connecting formed
heads to main shells are contained in PW-9.3.3.
For longitudinal joints, the middle lines of the adjoining
materials shall be in alignment with the fabricating tolerances specified in PW-33. Alternatively, the middle lines
of the adjoining materials may be offset so that the inside
or outside diameters form a continuous surface, provided
the following conditions are met:
(a) The ratio of plate thicknesses shall not exceed 2:1.
(b) The maximum design temperature shall not exceed
750°F (400°C).
DESIGN OF WELDED JOINTS
PW-9.1 Longitudinal, circumferential, and other
joints, uniting the material used for drums, shells, or other
pressure parts, except as otherwise provided in PG-31,
PG-39, PW-41, PWT-11, and Part PFT shall be full penetration butt welds. The welds should preferably be of
the double‐welded butt type, but may also be of the
single‐welded butt type with the filler metal added from
one side only when made to be the equivalent of the
double‐welded butt joint by providing means for accomplishing complete penetration.
PW-9.2 Welding Grooves. The dimensions and shape
of the edges to be joined by butt welds shall be such as to
permit complete fusion and complete joint penetration.
ð15Þ
3
PW-9.3 Transitions at Butt Joints Between Materials of Unequal Thickness. This paragraph is not intended
to apply to joint designs specifically provided for elsewhere in this Code.
The requirements of PW-9.3.1 through PW-9.3.3, as applicable to the specific type of pressure part, shall be met.
PW-9.3.2 Pipes and Tubes. When tube and pipe
components of different diameters or thicknesses are
welded circumferentially, the transition shall not exceed
a slope of 30 deg from the smaller to the larger diameter.
Any process that will provide a uniform taper may be
used to form the transition section. The weld may be
partly or entirely in the tapered section or adjacent. Alignment shall meet the provisions of PW-34.
PW-9.3.1 Shells, Drums, and Vessels (Including
Those Fabricated From Materials Complying With Piping or Tubing Material Specifications). When materials
of unequal thickness are joined via a butt joint, a tapered
transition shall be provided if the difference in thickness
PW-9.3.3 Heads Attached to Shells. A tapered
transition having a length not less than 3 times the offset
between the adjacent surfaces of abutting sections as
shown in Figure PW-9.3.3, illustrations (a) and (b) shall
be provided at joints between formed heads and shells
92
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PW-9
1
(a) Preferred Method
(Centerlines
Coincide)
DESIGN
PW-8
3
ð15Þ
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
longitudinal butt weld: includes longitudinal and spiral
welded butt joints in drums, shells, headers, pipes, and
tubes; any welded butt joint within a sphere or within a
formed or flat head or tubesheet; and welded butt joints
attaching insert‐nozzles of the type shown in Figure
PW-16.1, illustrations (q‐1) through (q‐4).
that differ in thickness by more than one-fourth the thickness of the thinner section or by more than 1/8 in. (3 mm),
whichever is less. When a taper is required on any formed
head thicker than the shell and intended for butt-welded
attachment [see Figure PW-9.3.3, illustrations (c) and
(d)], the length of the skirt as measured from the tangent
line shall meet the requirements in Figure PW-9.3.3 and
the taper shall be entirely within the skirt. When the transition is formed by removing material from the thicker
section, the minimum thickness of that section, after the
material is removed, shall not be less than that required
by Part PG. The centerline misalignment between shell
and head shall be no greater than one-half the difference
between the actual shell and head thickness, as illustrated
in Figure PW-9.3.3, illustrations (a) through (d).
ð15Þ
nondestructive examination (NDE): examination methods
used to verify the integrity of materials and welds in a
component without damaging its structure or altering
its mechanical properties. NDE may involve surface, subsurface, and volumetric examination.
NPS: nominal pipe size.
volumetric NDE: a method capable of detecting imperfections that may be located anywhere within the examined
volume. For Section I construction, volumetric NDE is limited to radiographic (RT) and ultrasonic (UT) examination
methods.
PW-9.4 Prohibited Welded Joints. Corner joints as
depicted in Figure PW-9.4 are prohibited.
PW-10
HEAT TREATMENT
Vessels and vessel parts shall be preheated and postweld heat treated in accordance with the requirements
in PW-38 and PW-39.
PW-11
PW-11.3 For use with Table PW-11, the size and
thickness of welded butt joints is defined as the larger
and thicker of the two abutting edges after edge
preparation.
VOLUMETRIC EXAMINATION OF WELDED
BUTT JOINTS
The geometric unsharpness U g is defined by the
equation
where
D = distance from source of radiation to the weld
d = distance from the source side of the weld to the film
F = source size; the maximum projected dimension of
the radiating source (or effective focal spot) in
the plane perpendicular to the distance D from
the weld
U g = geometric unsharpness
PW-13
HEAD-TO-FLANGE REQUIREMENTS
Dished heads, other than hemispherical, concave to
pressure to be attached by butt welding, and flanged
heads or flanged furnace connections to be fillet welded,
shall have a length of flange not less than 1 in. (25 mm)
for heads or furnace openings not over 24 in. (600 mm)
in external diameter and not less than 11/2 in. (38 mm)
for heads or furnace openings over 24 in. (600 mm) in
diameter.
PW-11.2 Definitions. For use with Table PW-11 and
elsewhere in this Section, the following definitions apply:
butt joint: a joint between two members aligned approximately in the same plane.
PW-14
circumferential butt weld: includes circumferential
welded butt joints in drums, headers, pipes, and tubes,
and welded butt joints attaching formed heads to drums,
shells, and headers.
OPENINGS IN OR ADJACENT TO WELDS
Any type of opening that meets the requirements for
compensation given in PG-32 through PG-44 may be located in a welded joint.
93
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PW-11.1 Welded butt joints requiring volumetric examination are specified in Table PW-11. Unless Table
PW-11 restricts volumetric examination to one method,
either the radiographic or the ultrasonic method may be
used. Acceptance of the weld shall be determined by the
method selected for the initial examination of the completed weld. If repairs are required, the repairs shall be
examined using the same method by which the unacceptable imperfections were detected. Subsequent examination of the weld following acceptance is beyond the
requirements of this Section and shall be a matter of
agreement between the Manufacturer and the User.
Experience has demonstrated that welded butt joints
not requiring volumetric examination by these rules have
given safe and reliable service even if they contain imperfections that may be disclosed upon further examination.
Any examination and acceptance standards beyond the
requirements of this Section are beyond the scope of this
Code and shall be a matter of agreement between the
Manufacturer and the User.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
ð15Þ
Figure PW-9.3.3
Heads Attached to Shells
th
3y
Thinner part
Thinner part
th
3y
Tangent line
y
1/ (t – t )
2 s
h
1/ (t – t )
2 s
h
y
ts
ts
(b) [See Notes (1) and (2)]
(a) [See Notes (1) and (2)]
th
th
Tangent line
1/ (t – t )
2 h
s
3y
Minimum 3:1
taper inside
and outside
Thinner part
Tapered one
side only
(inside or
outside)
Thinner part
3y
y
1/ (t – t )
2 h
s
ts
ts
(c) [See Notes (2) and (3)]
(d) [See Notes (2) and (3)]
GENERAL NOTE:
t h = nominal thickness of head
t s = nominal thickness of shell
NOTES:
(1) In all cases, the projected length of taper, ℓ , shall be not less than 3y .
(2) Length of required taper, ℓ, may include the width of the weld. The shell plate centerline may be on either side of the head plate centerline.
(3) In all cases, ℓ shall be not less than 3y when t h exceeds t s . Minimum length of skirt is 3t h but need not exceed 11/2 in. (38 mm) except when
necessary to provide required length of taper. When t h is equal to or less than 1.25t s , length of skirt shall be sufficient for any required
taper.
94
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
y
No fu
Figure PW-9.4
Prohibited Welded Joint
ð15Þ
ð15Þ
Table PW-11
Required Volumetric Examination of Welded Butt Joints
Pressure Part Service Conditions [Note (1)]
Subject to Furnace Radiant Heat
[Note (2)]
Not Subject to Furnace Radiant Heat [Note (2)]
Butt Weld Type
Longitudinal
Contains Steam and/or Water
All sizes and thicknesses
Contains Water
Contains Steam
All sizes and thicknesses
All sizes and thicknesses
Circumferential welds in
drums and shells
> NPS 10 (DN 250) or
> 11/8 in. (29 mm) thick
> NPS 10 (DN 250) or
> 11/8 in. (29 mm)
thick
> NPS 10 (DN 250) or
> 11/8 in. (29 mm) thick
Circumferential welds in
pipes, tubes, and
headers
> NPS 4 (DN 100) or
> 1/2 in. (13 mm) thick
> NPS 10 (DN 250) or
> 11/8 in. (29 mm)
thick
> NPS 16 (DN 400) or
> 15/8 in. (41 mm) thick
NOTES:
(1) Service conditions and pressure part contents are as determined by the designer.
(2) A weld will not be considered subject to radiant heat from the furnace when in a portion of a pressure part that has five or
more rows of tubes between it and the furnace.
95
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
GENERAL NOTES:
(a) Unless exempted by this table, all longitudinal and circumferential welded butt joints are to be volumetrically examined
throughout their entire length.
(b) Volumetric examination is required when either the size or wall thickness limit is exceeded (i.e., the diameter and thickness
limitations apply independently).
(c) Radiographic examination shall be performed in accordance with PW-51.
(d) Ultrasonic examination shall be carried out in accordance with PW-52.
(e) Personnel performing the volumetric examination required by this table shall be qualified and certified in accordance with
PW-50.
(f) When any combination of radiographic parameters produces a geometric unsharpness exceeding 0.07 in. (1.8 mm) then UT
shall be used.
(g) Where the thickness is below 1/2 in. (13 mm) then RT shall be used.
(h) Both RT and UT examination are required for welds in ferritic materials using the electoslag process. If a grain refining (austenizing) heat treatment is used, the UT examination shall be performed after the heat treatment is completed. If an austenizing heat treatment is not used, the UT examination shall be done after an intermediate postweld heat treatment or after the
final postweld heat treatment is completed.
(i) Both RT and UT examination are required for welds in any material using the inertia or continuous drive friction welding
process.
(j) For electric boilers volumetric examination is not required when the maximum allowable working pressure is ≤100 psig (700
kPa) and the shell I.D. is. ≤ 16 in. (400 mm) (see PEB-9).
(k) For firetube boilers, volumetric examination is not required for
(1) longitudinal welded butt joints in furnaces made with the addition of filler metal, provided a bend test of a sample of the
welded joint for each section of the furnace meets the requirements of PW-53
(2) circumferential welded butt joints in furnaces (see PFT-14)
(3) butt welds and corner joints meeting the requirements of PFT-21.1 through PFT-21.3 for waterlegs, furnaces, and
fireboxes
(l) For miniature boilers, volumetric examination is not required (see PMB-9).
(m) Volumetric examination is not required for the longitudinal weld in ERW products that comply with an acceptable material
specification when used for construction within the limitations of PG-9.5.
(n) For watertube boilers, volumetric examination is not required for butt welds and corner joints meeting the requirements of
PWT-12 and PFT-21.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PW-15
WELDED CONNECTIONS
PW-16
PW-15.1 Nozzles, other connections, and their compensation may be attached to vessels by arc or gas welding. Sufficient weld and compensation shall be provided
on either side of the plane through the center of the opening, parallel to the longitudinal axis of the vessel, to develop the required strength, as prescribed in PG-37, in shear
or tension, whichever is applicable (see Figure PW-15 for
example calculations, where, if a fillet weld has unequal
legs, the value of W L 1 or W L 2 shall be taken as the length
of the shorter leg).
PW-16.1 General. Except as permitted in PW-16.5,
PW-16.6, and PW-16.7 nozzles and other connections to
shells, drums, and headers shall be attached by full penetration welds applied from one or both sides, partial penetration welds applied from both sides, fillet welds
applied from both sides, or fillet and partial penetration
welds on opposite sides. In addition to the strength calculations required in PG-37, the location and minimum size
of attachment welds for nozzles and other connections
shall conform to the requirements in this paragraph.
PW-15.1.1 The stress correction factors in
PW-15.2 shall apply to all welds.
PW-16.2 Nomenclature. The symbols used in this
paragraph and in Figures PW-16.1 and PW-16.2 are defined as follows:
PW-15.1.2 The strength of fillet welds shall be
based on one‐half the area subjected to shear, computed
on the average diameter of the weld.
t = thickness of vessel shell or head
t c = not less than the smaller of 1/4 in. (6 mm) or
0.7t m i n (inside corner welds may be further limited by a lesser length of projection of the nozzle
wall beyond the inside face of the vessel wall)
t l = thickness of lug, hanger, or bracket, as shown in
Figure PW-16.2
t min = the smaller of 3/4 in. (19 mm) or the thickness of
either of the weld parts joined by a fillet, single
bevel, or single J‐weld
t n = thickness of nozzle wall
t w = dimension of partial penetration attachment
welds (fillet, single bevel, or single J), measured
as shown in Figure PW-16.1
PW-15.1.3 The strength of groove welds shall be
based on one‐half the area subjected to shear or tension,
as applicable, computed using the minimum weld depth
dimension in the direction under consideration.
PW-15.1.6 The strength calculations for nozzle attachment welds are not required for the weld configurations shown in Figure PW-16.1, illustrations (a) through
(c), (g), (h), (o), (q‐1) through (q‐4), (u‐1), (v‐1), (w‐1),
(y), and (z).
PW-15.2 Stress Values for Weld Metal. The allowable stress values for groove and fillet welds in percentages of stress values for the vessel material are as
follows:
t 1 + t 2 ≥ 11/4t m i n measured as shown in Figure PW-16.1,
in., both t 1 and t 2 shall each be not less than the smaller
of 1/4 in. (6 mm) or 0.7t m i n
Percentage
Groove‐weld tension
74%
Groove‐weld shear
60%
Fillet‐weld shear
49%
PW-16.3 All welding shall be equivalent to that required under the rules within this Section. Volumetric examination of attachment welds may be omitted except as
specifically required in other paragraphs of this Code, and
except for inserted‐type nozzles similar to those illustrated in Figure PW-16.1, illustrations (q‐1) through
(q‐4).
NOTE: These values are obtained by combining the following factors:
871/2% for combined end and side loading, 80% for shear strength,
and the applicable joint efficiency factors.
PW-16.4 Fittings shown in Figure PW-16.1, illustrations (u‐2), (v‐2), (w‐2), and (x) not exceeding NPS 3
(DN 80) may be attached by welds that are exempt from
size requirements other than those specified in PW-15.1.
PW-15.3 Compensation plates and saddles of nozzles
attached to the outside of a vessel shall be provided with
at least one telltale hole [maximum size 1/4 in. (6 mm) pipe
tap] that may be tapped for a preliminary compressed‐air
and soapsuds test for tightness of welds that seal off the
inside of the vessel. These telltale holes shall be left open
when the vessel is in service.
PW-16.5 Internally threaded fittings not exceeding
NPS 3 (DN 80) may be attached by a fillet groove weld
from the outside only as shown in Figure PW-16.1, illustration (w‐3). The groove weld t w shall be not less than
the thickness of Schedule 160 pipe (ASME B36.10M).
The external fillet weld throat shall be not less than t c .
PW-15.4 Figure PW-16.1 illustrates some types of fusion welded connections which are acceptable.
When end faces of nozzle or manhole necks are to remain unwelded in the completed vessel, these end faces
shall not be cut by shearing unless at least 1/8 in.
(3 mm) of additional metal is removed by any method
that will produce a smooth finish.
PW-16.6 Necks and Tubes Up to and Including
NPS 6 (DN 150) Attached From One Side Only. Necks
and tubes not exceeding NPS 6 (DN 150) may be attached
96
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Material
MINIMUM REQUIREMENTS FOR
ATTACHMENT WELDS
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PW-15
Examples of Weld Strength Calculations
For illustration (a):
tn
Required weld strength (PG-37.2):
WL1
d
W = (A – A1)Sv
Weld strength = WL1 in shear + WL2 in shear
= 0.49 (1/2) WL1 (d + 2tn + WL1) Sv fr1 +
0.49 (1/2) WL2 (d + 2tn + WL2) Sv fr1
WL2
(a)
For illustration (b):
tn
d
WL1
Required weld strength (PG-37.2):
W = (A – A1)Sv
Weld strength = WL1 in shear + t2 in tension
= 0.49 (1/2) WL1 (d + 2tn + WL1) Sv fr1 +
0.74 (1/2) t2 (d + 2tn) Sv fr1
(b)
For illustration (c):
tn
(1) Required weld strength (PG-37.2):
d
WL1
W = (A – A1)Sv
Weld strength = WL2 in shear + t2 in tension
= 0.49 (1/2) WL2 (Dp + WL2) Sv fr 3 +
0.74 (1/2) t2 (d + 2tn) Sv fr1
WL2
t2
(2) Check nozzle to pad and shell (PG-37.3):
W = (A – A1 – A42 – A5)Sv
(c)
Weld strength = WL1 in shear + t2 in tension
= 0.49 (1/2) WL1 (d + 2tn + WL1) Sv fr1 +
0.74 (1/2) t2 (d + 2tn) Sv fr1
97
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
t2
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
ð15Þ
Figure PW-16.1
Some Acceptable Types of Welded Nozzles and Other Connections to Shells, Drums, and Headers
Backing strip if used may be removed after welding
tc
tc
tc
(a)
(b)
tn
(c)
tn
tn
tn
t1
t1
t1
t1
t
t
t2
t
t
t2
t2
t2
tc
(d)
(e-1)
(e-2)
(f)
For illustrations (d) through (f):
t1 + t2 11/4t min
t1 and t2 shall each be not less than the smaller of 1/4 in. (6 mm) or 0.7t min
tc
tc
1/
2t min
t
tw = 0.7t min
(g) Typical Flush-Type Nozzle
(h) Typical Flush-Type Nozzle
(k)
tn
tn
1/
tc
2t min
tw = 0.7t min
1/ t
2 min
1/
Weld to pad
t
Weld to shell
tw = 0.7t min
(l)
tc
2t min
t
t
tw = 0.7t min
tc
(m)
98
(n)
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
tn
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PW-16.1
Some Acceptable Types of Welded Nozzles and Other Connections to Shells, Drums, and Headers (Cont'd)
tn
1/ t
2 min
tc
t
(o)
tn
tn
45 deg max.
3
1
30 deg max.
t
Min. of 11/2 t
(q-1)
(q-2)
tn
30 deg min.
tn
1/
2 in. (13 mm) min.
1/ in. (6 mm) R min.
4
3/
4 in. (19 mm) R min.
t
t3
t
t4
t1 + t4 0.2t but not greater than 1/4 in. (6 mm)
(q-4)
(q-3)
99
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
t
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PW-16.1
Some Acceptable Types of Welded Nozzles and Other Connections to Shells, Drums, and Headers (Cont'd)
Either method of attachment
is satisfactory
tn
tc
tw = 0.7tmin
t1
1/ t
2 min
t
1/ in.
4
t2
(6 mm)
(u-1)
(u-2)
(r)
Either method of attachment
is satisfactory
tc
tn
t1
tw = 0.7tmin
tc
t2
t
(v-1)
(v-2)
tw = 0.7tmin
For illustrations (u) and (v):
t 1 + t 2 11/4tmin
(s)
t 1 and t 2 shall each be not less than
the smaller of 1/4 in. (6 mm) or 0.7tmin
tw = 0.7tmin
For illustrations (u-2) and (v-2):
For 3 in. (75 mm) pipe and smaller,
see exemption in PW-16.4.
t
1/ t
2 min
(t)
100
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
1/ t
2 min
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PW-16.1
Some Acceptable Types of Welded Nozzles and Other Connections to Shells, Drums, and Headers (Cont'd)
Either method of attachment
is satisfactory
3 in. (DN 80) IPS max.
tc
1/ t
2 min
t1
tw (see PW-16.5)
(w-1)
tw = 0.7tmin
tc
t2
(w-2)
(x)
(w-3)
For illustrations (w-2) and (x):
For 3 in. (DN 80) pipe and smaller, see exemption in PW-16.4.
tn
tc
tn
tc
tw
tw
1/ in.
16
1/
(1.5 mm)
t but not less
Recommended n
than 1/4 in. (6 mm)
16 in.
(1.5 mm)
t but not less
Recommended n
than 1/4 in. (6 mm)
(y-1)
(y-2)
1
tn
t
tn but not less c
1
than /4 in. (6 mm)
tc
16 in.
(1.5 mm)
Recommended
Section 1 – 1
(z-1)
2
tn
t
tn but not less c
1
than /4 in. (6 mm)
tc
1/
2
(z-2)
16 in.
(1.5 mm)
Recommended
Section 2 – 2
G
For illustration (aa):
(a) For applications where
there are no external
loads: G = 1/8 in. (3 mm) max.
(b) With external loads:
G = 0.005 for Do < 1 in. (25 mm)
G = 0.010 for 1 in. < Do < 4 in. (100 mm)
G = 0.015 for 4 in. < Do < 65/8 in. (170 mm)
G
Do
Do
11/4tmin
11/4tmin
(aa)
101
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
1/
1
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PW-16.1
Some Acceptable Types of Welded Nozzles and Other Connections to Shells, Drums, and Headers (Cont'd)
tn
1/
8
in. (3 mm) min.
tn min.
tc
(bb) [Note (1)]
NOTE:
(1) NPS 2 (DN 50) max., t n ≤ 1/4 in. (6 mm)
Figure PW-16.1, illustration (aa). Such attachments shall
satisfy the rules for reinforcement of opening except that
no material in the nozzle neck shall be counted as
reinforcement.
(c) Watertubes may be welded into a tubesheet or
header in accordance with the following provisions,
where tw, tc, and t m i n are as defined in PW-16.2 and illustrated in Figure PW-16.1, illustration (bb):
(1) The size shall not exceed NPS 2 (DN 50).
(2) The thickness shall not exceed 1/4 in. (6 mm).
(3) The groove depth t w shall be not less than 1/8 in.
(3 mm) and t c shall be not less than 1/4 in. (6 mm) or
0.7t m i n , whichever is smaller.
(4) The tube shall be welded from the waterside of
the boiler.
(5) The application shall be limited to 650°F (345°C)
maximum.
Figure PW-16.2
Some Acceptable Forms of Welds for Lugs, Hangers, and Brackets on Shells, Drums, and Headers
(See PG-55)
tl
tl
tl
t
0.7t min but not less than
1/ in. (6 mm)
4
(a)
t
t
0.7t min but not less than
1/ in. (6 mm)
4
0.7t min but not less than
1/ in. (6 mm)
4
(b)
(c)
102
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
by partial penetration or fillet welds from one side only
on either the outside or inside of the vessel in accordance
with the provisions given below
(a) When the neck or tube is attached from the outside
only, a welding groove shall be cut into the surface to a
depth of not less than t n on the longitudinal axis of the
opening. It is recommended that the neck or tube extend
a minimum of 1/16 in. (1.5 mm) past the bottom of the
weld groove to aid in centering the neck or tube. The dimension t w of the attachment weld shall be not less than
t n nor less than 1/4 in. (6 mm). See Figure PW-16.1, illustrations (y-1), (y-2), (z-1), and (z-2).
(b) When the neck or tube is attached from the inside
only, the depth of welding groove or throat of fillet weld
shall be at least equal to 11/4t m i n . Radial clearance between the vessel hole and nozzle outside diameter at
the unwelded side shall not exceed tolerances given in
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
ð15Þ
extending through the sheet shall be not less than 1.25
times the required cross‐sectional area of the stay, but
in no case shall the size of the weld be less than 3/8 in.
(10 mm).
PW-19.2 The ends of the stays shall not be covered
by weld metal and the face of the welds shall not be below
the outside surface of the plates.
PW-19.3 The ends of stays inserted through the sheet
shall not project more than 3/8 in. (10 mm) beyond surfaces exposed to products of combustion.
PW-19.4 Diagonal stays shall be attached to the inner
surface of the shell, but not the head, by fillet welds only,
as described in PW-19.4.1 and PW-19.4.3. [See Figures
PW-19.4(a) and PW-19.4(b).]
PW-19.4.1 The fillet welds shall be not less than
/8 in. (10 mm) size and shall continue the full length of
each side of the portion of the stay in contact with the
shell. The product of the aggregate length of these fillet
welds times their throat shall be not less than 1.25 times
the required cross‐sectional area of the stay. A fillet weld
across the end of the stay is optional but shall not be credited in calculating the required area of fillet welds.
3
PW-19.4.3 The longitudinal center line of the stay,
projected if necessary, shall intersect the inner surface of
the plate to which the stay is attached within the outer
boundaries of the attaching welds, also projected if
necessary.
PW-19.5 The pitch of stays attached by welding to
flat surfaces shall comply with the requirements of
PFT-27.
PW-19.6 The welding shall be done in such a manner
that excessive weld deposits do not project through the
surface of the plate at the root of the weld.
PW-16.8 Partial-penetration-weld-type tube-toheader attachments such as shown in Figure PW-16.1, illustrations (y-1) and (z-1), constructed with ferritic materials and designed for 900°F (480°C) or higher service,
shall be designed to avoid an accumulation of oxide between the nozzle end and the seat. Designs that could satisfy this include, but are not limited to, a weld joint
design establishing a 1/16 in. (1.5 mm) minimum gap between the nozzle end and the seat, or a design that tapers
either the nozzle end or seat such that any oxide formed
between the tube and shell, drum, or header can spall
from the gap, as shown in Figure PW-16.8.
PW-19
PW-19.7 The welding shall be postweld heat treated
in accordance with PW-39.
PW-19.8 Telltale holes are not required in staybolts
attached by welding.
FABRICATION
PW-26
GENERAL
The rules in the following paragraphs apply specifically
to the fabrication of boilers and parts thereof that are fabricated by welding and shall be used in conjunction with
the general requirements for fabrication in Part PG, as
well as with the specific requirements for fabrication in
the applicable Parts of this Section that pertain to the type
of boiler under consideration.
WELDED-IN STAYS
Welded‐in stays may be used in lieu of threading and
shall meet the requirements of PW-19.1 through
PW-19.8.
PW-27
PW-19.1 The stays shall be inserted into countersunk
holes through the sheet, except as provided in PW-19.4,
and attached by full penetration welds. The area of the
weld in shear measured parallel to that portion of the stay
WELDING PROCESSES
The welding processes that may be used under this Part
shall meet all the test requirements of Section IX and are
restricted to PW-27.1 through PW-27.4.
103
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PW-16.7 The minimum throat dimensions of fillet
welds defined in PW-16.2 shall be maintained around
the circumference of the attachment, except as provided
below:
(a) For a radial nozzle attachment on a cylindrical shell
(or header) as shown in Figure PW-16.1 where the nozzle
meets the size limitations in PG-32.3.2, the fillet weld leg
dimensions that meet the minimum throat dimensions
shall be determined at the plane through the longitudinal
axis of the cylindrical shell (other planes need not be considered), and these fillet weld leg dimensions shall be
used around the circumference of the attachment.
(b) For a radial nozzle attachment on a cylindrical shell
(or header) as shown in Figure PW-16.1, illustrations (a)
through (c), (g), (h), and (o), where the nozzle exceeds the
size limitations in PG-32.3.2, the fillet weld leg dimensions that meet the minimum throat dimensions shall
be determined at the plane through the longitudinal axis
of the cylindrical shell (other planes need not be considered), and these fillet weld leg dimensions shall be used
around the circumference of the attachment.
(c) For a radial nozzle attachment on a cylindrical shell
(or header) as shown in Figure PW-16.1, illustrations (a)
through (c), (g), and (h), where the outside diameter of
the nozzle is the same as the outside diameter of the cylindrical shell or when the outside diameter of the nozzle
is too large to make a fillet weld, the fillet weld leg dimensions that meet the minimum throat dimensions shall be
determined at the plane through the longitudinal axis of
the cylindrical shell (other planes need not be considered), and these fillet weld leg dimensions shall be used
around the circumference of the attachment to the maximum extent possible, and from that point, the fillet weld
may be transitioned into a butt weld or full-penetration
weld, developing the required strength.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
ð15Þ
Figure PW-16.8
Some Acceptable Designs for Partial-Penetration-Weld-Type Attachments Designed for 900°F (480°C) or
Higher Service
(a)
10 deg min.
(b)
10 deg min.
Not greater than
in. (1.5 mm)
(c)
104
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
10 deg min.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PW-16.8
Some Acceptable Designs for Partial-Penetration-Weld-Type Attachments Designed for 900°F (480°C) or
Higher Service (Cont'd)
10 deg min.
Not greater than
in. (1.5 mm)
(d)
(e)
(f)
Not less than
in. (1.5 mm)
105
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Not greater than
in. (1.5 mm)
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PW-19.4(a)
Some Acceptable Types of Diagonal Braces for Installation by Welding
GENERAL NOTE: A round bar or a round bar with a forged palm.
PW-27.2 Arc stud welding and resistance stud welding may be used for nonpressure‐bearing attachments
having a load‐ or nonload‐carrying function. Stud size
shall be limited to 1 in. (25 mm) diameter maximum for
round studs or an equivalent cross‐sectional area for
studs with other shapes. For load‐carrying attachments,
the requirements of PW-28.6 shall be met prior to the
start of production welding, and the postweld heat treatment requirements of PW-39 shall also be complied with.
PW-27.1 The following welding processes may be
used for any Section I construction: shielded metal arc,
submerged arc, gas metal arc, hybrid plasma-gas metal
arc, flux cored arc, gas tungsten arc, plasma arc, atomic
hydrogen arc, oxyhydrogen, oxyacetylene, laser beam,
electron beam, flash, induction, pressure thermit, pressure gas, and inertia and continuous drive friction
welding.
Resistance welding is permitted within the thickness
and diameter limitations given in PG-9.5, except that circumferential butt welds and pressure‐bearing attachment
welds are not restricted. Resistance welding of
nonpressure‐bearing attachments is not restricted, except
as provided in PW-27.2.
PW-27.3 The electroslag welding process may be
used for butt welds only in austenitic stainless steels of
types listed in PW-5.3 and ferritic steels. Electroslag
106
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Figure PW-19.4(b)
Unacceptable Types of Diagonal Braces for Installation by Welding
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
qualification by volumetric NDE, in conformance with
Section IX, QW‐304 for welders or QW‐305 for welding
operators, may be performed within the first 3 ft (1 m)
of the first production weld.
welds in ferritic steels require special NDE [Table PW-11,
General Notes (a) and (b)] and special heat treatment
(PW-39.7).
PW-27.4 Definitions are given in Section IX, which include variations of these processes.
PW-28.4 The Manufacturer shall maintain qualification records of the welding procedures, welders, and
welding operators employed, showing the date, results
of the tests, and the identification mark assigned to each
welder. These records shall be certified by the Manufacturer by signature or some other method of control in accordance with the Manufacturer’s Quality Control System
and be accessible to the Authorized Inspector.
PW-27.5 When welding UNS N06230 with filler metal of the same nominal composition as the base metal,
only GMAW or GTAW processes are allowed.
PW-28
WELDING QUALIFICATION AND WELD
RECORDS
PW-28.1 Requirements for Qualification of Welding
Procedures, Welders, and Welding Operators.
PW-28.1.1 The Welding Procedure Specifications,
the welders, and the welding operators used in welding
pressure parts and in joining load‐carrying nonpressure
parts, such as all permanent or temporary clips and lugs,
to pressure parts shall be qualified in accordance with
Section IX.
PW-28.4.1 The Manufacturer shall also establish a
procedure whereby all welded joints, except as permitted
in PW-28.4.2 and PW-28.4.3, can be identified as to the
welder or welding operator who made them. This procedure shall use one or more of the following methods and
be acceptable to the Authorized Inspector. The welder or
welding operator may stamp his identification mark on or
adjacent to all welded joints made by him, or he may
stamp on or adjacent to a continuous weld or a series of
similar joints made by him at intervals of not greater than
3 ft (1 m), or, in lieu of stamping, the Manufacturer may
keep a record of welded joints and the welders or welding
operators used in making the joints.
PW-28.4.2 When making multiple load‐carrying or
nonload‐carrying structural attachment welds on pressure parts, the Manufacturer need not identify the welder
or welding operator that welded each individual joint,
provided
(a) the Manufacturer’s Quality Control System includes
a procedure whereby the identity of the welders or welding operators that made such welds on each pressure part
will be maintained so that the Inspector can verify that
the welders or welding operators were all properly
qualified
(b) the welds are all the same type and configuration
and are welded with the same welding procedure
specification
PW-28.4.3 Identification of welders or welding operators making tack welds that become part of a final
pressure‐retaining weld or structural attachment weld
is not required provided the Quality Control System of
the Manufacturer includes a procedure to permit the Inspector to verify that such tack welds were made by qualified welders or welding operators.
PW-28.1.3 Welding of all test coupons shall be conducted by the Manufacturer. Testing of all test coupons
shall be the responsibility of the Manufacturer. Qualification of a welding procedure, a welder, or a welding operator by one Manufacturer shall not qualify that procedure,
welder, or the welding operator for any other Manufacturer except as provided in Section IX, QG-106.1(c) and
QG-106.2(g).
PW-28.6 In the case where stud welding is used to attach load‐carrying studs, a production stud weld test of
the procedure and welding operator shall be performed
on a separate test plate or tube prior to the start of production welding on the first work piece. This weld test
shall consist of five studs, welded and subjected to either
the bend or torque stud weld testing described in Section
IX.
PW-28.2 No production work shall be undertaken
until the procedures, the welders, and the welding operators have been qualified, except that performance
107
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PW-28.1.2 Except as provided in (a) and (b), the
Welding Procedure Specification, the welders and the
welding operators used in welding nonpressure‐bearing
attachments which have essentially no load‐carrying
function (such as extended heat transfer surfaces, insulation support pins, etc.) to pressure parts shall be qualified
in accordance with Section IX.
(a) When the welding process is automatic, welding
procedure and performance qualification testing is not
required.
(b) When the material used for the nonpressure part
makes the mechanical test requirements for procedure
qualification and performance qualifications impracticable (i.e., insufficient material ductility), a weld test coupon may be evaluated using the macro‐examination
method for both groove and fillet welds. The test coupon
may be of production configuration and shall be of sufficient length to contain a specimen for macro‐
examination. Heat treatment shall be considered a nonessential variable. The weldable quality of the nonpressure
part materials shall be verified by the macro‐examination
of a single cross‐section of the weld. Visual examination of
the weld metal and heat‐affected zone of both the pressure part and nonpressure part material shall show complete fusion and freedom from cracks.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PW-31.4 When joining two parts by the inertia and
continuous drive friction welding processes, one of the
two parts must be held in a fixed position and the other
part rotated. The two faces to be joined must be essentially symmetrical with respect to the axis of rotation.
Some of the basic types of applicable joints are solid
round‐to‐solid round, tube‐to‐tube, solid round‐to‐tube,
solid round‐to‐plate, and tube‐to‐plate.
PW-28.7 If tube butt welds are made using the flash
welding process, production testing shall be performed in
accordance with Section IX, QW‐199.1.3 as follows:
(a) one sample shall be tested at the start of production
(b) one sample shall be tested at the beginning, midpoint, and end of each work shift
(c) when production shifts are consecutive, a test at the
end of the shift may serve as the test for the beginning of
the next shift
(d) when a welding operator is replaced during
production
(e) if any machine settings are changed
When any production run weld fails to pass the required tests, the welding parameters shall be adjusted until two consecutive welds pass the bend test. In addition,
all welds that were made subsequent to the previous successful test shall be either cut out and rewelded or cut out
and tested in reverse sequence of welding until two successive welds pass the tests.
PW-29
PW-33
PW-33.1 Alignment of sections at edges to be butt
welded shall be such that the maximum offset is not greater than the applicable amount as listed in Table PW-33,
where t is the nominal thickness of the thinner section
at the joint.
PW-33.2 Joints in spherical vessels and within heads
and joints between cylindrical shells and hemispherical
heads shall meet the requirements in PW-33.1 above for
longitudinal joints in cylindrical shells.
BASE METAL PREPARATION
PW-29.1 The preparation of joints prior to welding
may involve any of the conventional methods in use such
as machining, thermal cutting, chipping, grinding, or combinations of these.
PW-33.3 Any offset within the allowable tolerance
provided above shall be faired at a 3 to 1 taper over the
width of the finished weld, or if necessary, by adding additional weld metal beyond what would otherwise be the
edge of the weld.
PW-29.2 Where thermal cutting is used, the effect on
the mechanical and metallurgical properties of the base
metal shall be taken into consideration.
PW-34
ALIGNMENT, TUBE AND PIPE
PW-34.1 When tubes or pipes are welded together,
the alignment shall be such that the inside surfaces provide for complete weld penetration. The weld shall meet
the reinforcement requirements of PW-35.
PW-29.4 Cast surfaces to be welded shall be machined, chipped, or ground where necessary to remove
foundry scale and to expose sound metal.
PW-35
FINISHED LONGITUDINAL AND
CIRCUMFERENTIAL JOINTS
PW-35.1 Butt welds shall have complete joint penetration. To assure that the weld grooves are completely
filled so that the surface of the weld metal at any point
is not below the surface of the adjoining base materials,
ASSEMBLY
PW-31.1 Parts that are being welded shall be fitted,
aligned, and retained in position during the welding operation within the tolerance specified in PW-33.
PW-31.2 Bars, jacks, clamps, tack welds, or other appropriate means may be used to hold the edges of the
parts to be welded in alignment.
Table PW-33
Alignment Tolerance of Sections to Be Butt
Welded
PW-31.3 Tack welds used to secure alignment shall
either be removed completely when they have served
their purpose or their stopping and starting ends shall
be properly prepared by grinding or other suitable means
so that they may be satisfactorily incorporated into the final weld. Tack welds, whether removed or left in place,
shall be made using a fillet weld or butt weld procedure
qualified in accordance with Section IX. Tack welds to
be left in place shall be made by welders qualified in accordance with Section IX and shall be examined visually
for defects and, if found to be defective, shall be removed.
Direction of Joints in Cylindrical
Shells
Section Thickness, in. (mm)
Up to 1/2 (13), incl.
Over 1/2 (13) to 3/4 (19), incl.
Over 3/4 (19) to 11/2 (38), incl.
Over 11/2 (38) to 2 (50), incl.
Over 2 (50)
108
Longitudinal
in. (mm)
Circumferential in. (mm)
1
1
1
1
/4t
/8 (3.0)
1
/8 (3.0)
1
/8 (3.0)
Lesser of 1/16t
or 3/8 (10)
/4t
/4t
3
/16 (5)
1
/8t
Lesser of 1/8t or
3
/4 (19)
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PW-29.3 The method of base metal preparation used
shall leave the welding groove with reasonably smooth
surfaces and free from deep notches, striations, or irregularities. The surfaces for welding shall be free of all scale,
rust, oil, grease, or other foreign materials.
PW-31
ALIGNMENT TOLERANCE, SHELLS AND
VESSELS (INCLUDING PIPE OR TUBE
USED AS A SHELL)
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
weld metal may be added as reinforcement on each face
of the weld. The thickness of the weld reinforcement on
each face shall not exceed the following:
except for those processes of welding by which proper fusion and penetration are otherwise obtained and by
which the root of the weld remains free from impurities.
PW-36.2 Fillet Welds. In making fillet welds, the
weld metal shall be deposited in such a way as to secure
adequate penetration into the base metal at the root of
the weld. Undercuts on pressure‐retaining boundaries
shall not exceed the lesser of 1/32 in. (0.8 mm) or 10% of
the nominal thickness of the adjoining surface and shall
not encroach upon the required section thickness. The
surface of the welds shall be free from coarse ripples or
grooves, and shall merge smoothly with the surfaces
being joined. Concavity of the face of the weld is permissible, provided it does not encroach on the required weld
thickness.
Maximum Reinforcement,
in. (mm)
Circumferential
Joints in Pipe
Nominal Thickness, in. (mm)
and Tubing
Up to 1/8 (3)
Over 1/8 (3) to 3/16 (5), incl.
Over 3/16 (5) to 1/2 (13), incl.
Over 1/2 (13) to 1 (25), incl.
Over 1 (25) to 2 (50), incl.
Over 2 (50) to 3 (75), incl.
Over 3 (75) to 4 (100), incl.
Over 4 (100) to 5 (125), incl.
Over 5 (125)
Other
Welds
3
3
1
3
/32 (2.5)
/8 (3.0)
5
/32 (4.0)
3
/16 (5.0)
1
/4 (6.0)
[Note (1)]
[Note (1)]
[Note (1)]
[Note (1)]
/32 (2.5)
/32 (2.5)
3
/32 (2.5)
3
/32 (2.5)
1
/8 (3.0)
5
/32 (4.0)
7
/32 (5.5)
1
/4 (6.0)
5
/16 (8.0)
PW-36.3 When attachment welds are made to the ð15Þ
clad portion of pressure parts constructed from P-No.
5B, P-No. 6, or P-No. 15E and other creep-strengthenhanced ferritic steels having weld metal buildup or
corrosion-resistant weld metal overlay, the rules of
PW-44.2(a) and PW-44.2(b) shall be followed.
NOTE:
(1) The greater of 1/4 in. (6 mm) or 1/8 times the width of
the weld in inches (mm).
PW-38
PW-35.2 The weld reinforcement need not be removed except to the extent necessary to meet the thickness requirements in PW-35.1.
PW-35.3 Backing strips used at longitudinal welded
joints shall be removed and the weld surface prepared
for volumetric examination as required. Inside backing
rings may remain at circumferential joints of cylinders,
provided they meet the requirements of PW-41.
PW-38.2 Preheat for welding or thermal cutting may
be applied by any method that does not harm the base
material or any weld metal already applied, or that does
not introduce into the welding area foreign material that
is harmful to the weld.
PW-35.4 The welded joint between two members
joined by the inertia and continuous drive friction welding processes shall be full penetration weld. Visual examination of the as‐welded flash roll of each weld shall be
made as an in‐process check. The weld upset shall meet
the specified amount with ±10%. The flash shall be removed to sound metal.
PW-36
PREHEATING
PW-38.1 The need for and the temperature of preheat are dependent upon a number of factors such as
chemical analysis, degree of restraint of the parts being
joined, elevated temperature mechanical properties, and
material thicknesses. Some practices used for preheating
are described in A-100 as a general guide for the materials listed by P‐Numbers of Section IX. It is cautioned that
the preheating suggested in A-100 does not necessarily
ensure satisfactory completion of the welded joint and
that the requirements for individual materials within
the P‐Number listing may have preheating more or less
restrictive than this general guide. The welding procedure
specification for the material being welded shall specify
the minimum preheating requirements described in the
welding procedure qualification requirements of Section
IX.
PW-39
REQUIREMENTS FOR POSTWELD HEAT
TREATMENT
The rules in the following paragraphs apply specifically
to the fabrication of the boiler proper and parts thereof
and do not apply to the external piping as defined in
the Preamble.
MISCELLANEOUS WELDING
REQUIREMENTS
PW-36.1 Before applying weld metal on the second
side to be welded, the root of double‐welded butt joints
shall be prepared by suitable methods such as chipping,
grinding, or thermal gouging, so as to secure sound metal
at the base of weld metal deposited on the face side,
PW-39.1 Before applying the detailed requirements
and exemptions in these paragraphs, satisfactory weld
procedure qualifications of the procedures to be used
shall be performed in accordance with all the essential
109
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
As‐welded surfaces are permitted; however, the surface of the welds shall be sufficiently free from coarse ripples, grooves, overlaps, abrupt ridges, and valleys to avoid
stress raisers. Undercuts shall not exceed 1/32 in. (0.8 mm)
or 10% of the wall thickness, whichever is less, and shall
not encroach on the required section thickness. The surfaces of the finished weld shall be suitable to permit proper interpretation of the nondestructive examinations. If
there is a question regarding the surface condition of
the weld when interpreting radiographic film, the film
shall be compared to the actual weld surface for determination of acceptability.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PW-39.2 When pressure parts of two different
P‐Number groups are joined by welding, the postweld
heat treatment shall be that specified in Tables PW-39-1
through PW-39-14 and applicable notes for the material
requiring the higher postweld heat treatment temperature, except as noted in PW-39.2.1. When nonpressure
parts are welded to pressure parts, the postweld heat
treatment temperature of the pressure parts shall control.
Pressure part welds and attachment welds using ferritic filler metals that have a specified chromium content of
more than 3% shall receive a postweld heat treatment.
The postweld heat treatment time and temperature used
shall be not less than that shown in Tables PW-39-1
through PW-39-14 for a base metal of equivalent analysis.
PW-39.2.1 Fillet welds, partial penetration welds,
and full penetration welds through the tube or pipe thickness, attaching P-No. 4 or P-No. 5A tubes and pipe to
headers of lower P‐Number material, may be postweld
heat treated at the temperature specified in Tables
PW-39-1 through PW-39-14 for the lower P‐Number material provided the tubes or pipe comply with all the following conditions:
(a) a maximum specified chromium content of 3.0%
(b) a maximum size of NPS 4 (DN 100)
(c) a maximum thickness of 1/2 in. (13 mm)
(d) a maximum specified carbon content of not more
than 0.15%
PW-39.3 In the procedures that follow, the volume of
metal required to be heated, to meet or exceed the minimum postweld heat treatment temperatures listed in
Tables PW-39-1 through PW-39-14, is defined as the soak
band. As a minimum, the soak band shall contain the weld
and a portion of the base metal on each side of the weld
being heat treated, including the weld heat-affected
zones. The width of each portion of base metal to be included in the soak band shall be equal to the lesser of
the vessel or shell thickness, or 2 in. (50 mm). A greater
amount of base material, on either or both sides of the
weld, may also be heated to permit temperature gradient
control.
The weldment shall be heated slowly to the temperature specified in Tables PW-39-1 through PW-39-14 and
held for the specified time, and shall be allowed to cool
PW-39.4 The weldments shall be postweld heat
treated by any of the following methods.
PW-39.4.1
Heating the complete assembly as a
PW-39.4.2
Heating sections of assemblies.
unit.
PW-39.4.3 In cases where the vessel is postweld
heat treated in sections, the heat treatment of the final
joints may be performed by one of the following methods.
PW-39.4.3.1 By uniformly heating a circumferential band around the vessel, to the temperature and
for the time specified in Tables PW-39-1 through
PW-39-14 for postweld heat treatment.
110
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
slowly in a still atmosphere to a temperature not exceeding 800°F (425°C). Suggested heating and cooling rates
for postweld heat treatment are shown in A-101. The
heating and cooling rates for postweld heat treatment described in A-101 are provided as a general guide; the requirements for individual materials within the P-Number
listing may have rates more or less restrictive than this
general guide. Several weldments of varied thickness
may be postweld heat treated in the same furnace at
the same time.
The term “nominal thickness” as used in Tables
PW-39-1 through PW-39-14 is defined as follows:
(a) For full penetration butt welds, the nominal thickness is the thinner of the parts being joined.
(b) For full penetration corner welds, the nominal
thickness is the depth of the weld.
(c) For partial penetration groove and material repair
welds, the nominal thickness is the depth of the weld.
The total depth of partial or full penetration groove welds
made from both sides shall be taken as the sum of the
depth of both sides at a given location.
(d) For fillet welds, the nominal thickness is the weld
throat. When a fillet weld is used in conjunction with a
groove weld, the nominal thickness is either the depth
of the groove weld or the fillet throat dimension, whichever is greater.
(e) For Figure PW-16.1, except as stipulated in (f) below, the nominal thickness is the depth of the groove, if
present, through the shell or nozzle or reinforcing pad,
or the throat of any fillet weld, whichever is greater.
(f) When multiple openings depicted in Figure
PW-16.1 form a ligament where the spacing between centers is less than twice the average diameter, the nominal
thickness of a combination groove and fillet weld shall be
the sum of the groove depth and fillet weld throat.
The holding time at temperature as specified in Tables
PW-39-1 through PW-39-14 need not be continuous. It
may be an accumulation of time of multiple postweld heat
treat cycles.
variables of Section IX including conditions of postweld
heat treatment or lack of postweld heat treatment and including other restrictions listed below. Except as otherwise specifically provided in PFT-29, PMB-9, PW-39.8,
PW-40.2, PW-40.3, and in the notes within Tables
PW-39-1 through PW-39-14, all welded pressure parts
of power boilers shall be given a postweld heat treatment
at a temperature not less than that specified in Tables
PW-39-1 through PW-39-14. The materials in Tables
PW-39-1 through PW-39-14 are listed in accordance with
the materials P‐Number grouping of Section IX, QW-420.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Table PW-39-1
Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments
— P-No. 1
Minimum Holding Time at Normal Temperature for Weld Thickness (Nominal)
Material
Minimum Holding
Temperature, °F (°C)
P‐No. 1 Group No. 1, 2, 3
1,100 (595)
Up to 2 in. (50 mm)
Over 2 in. (50 mm) to 5 in.
(125 mm)
Over 5 in. (125 mm)
1 hr/in. (1 hr/25 mm), 15 min 2 hr plus 15 min for each
2 hr plus 15 min for each
minimum
additional inch (25 mm) over
additional inch (25 mm)
2 in. (50 mm)
over 2 in. (50 mm)
GENERAL NOTES:
(a) Postweld heat treatment is not mandatory for P‐No. 1 materials under the following conditions:
(1) when the nominal thickness of a weld as defined in PW-39.3 does not exceed 3/4 in. (19 mm), and a minimum preheat of 200°F
(95°C) is applied when the nominal material thickness of any of the base metals in the weld joint exceeds 1 in. (25 mm). For stays welded
in accordance with PW-19, the diameter of the stay is not used to determine preheat requirements.
(2) when the nominal thickness of a weld as defined in PW-39.3 is greater than 3/4 in. (19 mm) but does not exceed 11/2 in. (38 mm),
and:
(a) the calculated carbon equivalent, CE, of each of the base metals in the weld joint is less than or equal to 0.45, using the formula
Note: The maximum chemical composition limit from the material specification or the actual values from a chemical analysis or material test report shall be used in computing CE. If the chemistry values required for the last two terms are not available, 0.15% shall be
substituted for those two terms as follows:
111
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
(b) a minimum preheat of 250°F (120°C) is applied
(c) no individual weld pass thickness exceeds 1/4 in. (6 mm)
(3) for welds used to attach extended heat-absorbing surface to tubes and insulation attachment pins to pressure parts
(4) for studs welded to pressure parts, provided preheat to a minimum temperature of 200°F (95°C) is applied when the thickness of
the pressure part exceeds 1 in. (25 mm)
(5) for corrosion‐resistant weld metal overlay cladding of pipe or tube materials, provided that all of the following conditions are met:
(a) the thickness of the overlay cladding is 1/4 in. (6 mm) or less
(b) preheat to a minimum temperature of 200°F (95°C) is applied when the thickness of the pressure part exceeds 3/4 in. (19 mm)
(c) the pipe or tube material
(-1) does not exceed NPS 5 (DN 125) outside diameter
(-2) is not used as a drum or shell
(6) for welds attaching nonload‐carrying studs not exceeding 1/2 in. (13 mm) in diameter when using an automatic arc stud welding or
automatic resistance stud welding process
(7) for attaching bare wire thermocouples by capacitor discharge welding or electric resistance welding, provided the following requirements are met:
(a) the requirements of PW-39.8
(b) the minimum wall thickness shall be 0.200 in. (5.0 mm) or greater
(b) When it is impractical to postweld heat treat at the temperature specified in this Table, it is permissible to carry out the postweld heat
treatment at lower temperatures for longer periods of time in accordance with Table PW-39.1.
ð15Þ
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Table PW-39-2
Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments
— P-No. 3
Minimum Holding Time at Normal Temperature for Weld Thickness (Nominal)
Material
Minimum Holding
Temperature, °F (°C)
P‐No. 3 Group No. 1, 2, 3
1,100 (595)
Up to 2 in. (50 mm)
1 hr/in. (1 hr/25 mm),
15 min minimum
Over 2 in. (50 mm) to 5 in.
(125 mm)
Over 5 in. (125 mm)
2 hr plus 15 min for each
2 hr plus 15 min for each
additional inch (25 mm) over
additional inch (25 mm)
2 in. (50 mm)
over 2 in. (50 mm)
112
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
GENERAL NOTES:
(a) Except for P‐No. 3 Group No. 3, postweld heat treatment of P‐No. 3 materials is not mandatory under the following conditions (postweld
heat treatment is mandatory for P‐No. 3 Group No. 3 materials for all thicknesses):
(1) for circumferential butt welds in pressure parts with both a nominal wall thickness of 5/8 in. (16 mm) or less, and a specified maximum carbon content (SA material specification carbon content, except when further limited by the Purchaser to a value within the specification limits) of not more than 0.25%
(2) for fillet welds used on socket welding fittings conforming to the rules of PW-41, when the following conditions are met:
(a) a fillet weld throat thickness of 1/2 in. (13 mm) or less, regardless of base metal thickness
(b) a maximum specified carbon content (SA material specification carbon content, except when further limited by the Purchaser to a
value within the specification limits) of not more than 0.25%
(c) a minimum preheat of 200°F (95°C) when the thickness of a pressure part at the weld exceeds 5/8 in. (16 mm)
(3) for fillet welds with a throat thickness of 1/2 in. (13 mm) or less and combination groove and fillet welds with a weld thickness of
1
/2 in. (13 mm) or less attaching nonpressure parts to pressure parts that have a specified maximum carbon content (SA material specification carbon content, except when further limited by the Purchaser to a value within the specification limits) of not more than 0.25%
provided preheat to a minimum temperature of 200°F (95°C) is applied when the thickness of the pressure part at the weld exceeds 5/8 in.
(16 mm)
(4) for welds used to attach extended heat‐absorbing surface to tubes and insulation attachment pins to pressure parts
(5) for tubes or pressure-retaining handhole and inspection plugs or fittings that are secured by physical means (rolling, shoulder construction, machine threads, etc.) and seal welded, provided the seal weld has a throat thickness of 3/8 in. (10 mm) or less, and preheat to a
minimum temperature of 200°F (95°C) is applied when the thickness of either part exceeds 5/8 in. (16 mm)
(6) postweld heat treatment is not mandatory for studs welded to pressure parts for purposes not included in (4) above and which
have a specified maximum carbon content of not more than 0.25% (SA material specification carbon content, except when further limited
by Purchaser to a value within the specification limits), provided a preheat to a minimum temperature of 200°F (95°C) is applied when
the thickness of the pressure part exceeds 5/8 in. (16 mm)
(7) for fillet welds attaching connections to a vessel, provided that all of the following conditions are met:
(a) the diameter of the finished opening (diameter d in Figures PG-33.1, PG-33.2, and PW-15) does not exceed that allowed in
PG-32.1.2 or 2 in. (50 mm), whichever is less
(b) the throat thickness does not exceed 3/8 in. (10 mm)
(c) preheat to a minimum temperature of 200°F (95°C) is applied when the thickness of either part exceeds 5/8 in. (16 mm)
(d) the connections are not placed in the vessel such as to form ligaments, the efficiency of which would affect the vessel thickness
(e) a maximum specified carbon content (SA material specification carbon content, except when further limited by the Purchaser to a
value within the specification limits) of not more than 0.25%
(8) for corrosion‐resistant weld metal overlay cladding of pipe or tube materials, provided that all of the following conditions are met:
(a) the thickness of the overlay cladding is 1/4 in. (6 mm) or less
(b) preheat to a minimum temperature of 200°F (95°C) is applied when the thickness of the pressure part exceeds 5/8 in. (16 mm)
(c) the pipe or tube material
(-1) does not exceed NPS 5 (DN 125) outside diameter
(-2) is not used as a drum or shell
(9) for welds attaching nonload‐carrying studs not exceeding 1/2 in. (13 mm) in diameter when using an automatic arc stud welding or
automatic resistance stud welding process
(10) for attaching bare wire thermocouples by capacitor discharge welding or electric resistance welding, provided the following requirements are met:
(a) the requirements of PW-39.8
(b) the minimum wall thickness shall be 0.200 in. (5.0 mm) or greater
(b) When it is impractical to postweld heat treat at the temperature specified in this table, it is permissible to carry out the postweld heat
treatment at lower temperatures for longer periods of time in accordance with Table PW-39.1.
(c) General Note (a) does not apply to welds using the inertia and continuous drive friction welding processes. Postweld heat treatment is
mandatory for all thicknesses of materials welded using inertia and continuous drive friction welding.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Table PW-39-3
Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments
— P-No. 4
Minimum Holding Time at Normal Temperature for Weld Thickness (Nominal)
Material
P‐No. 4 Group No. 1, 2
Minimum Holding
Temperature, °F (°C)
1,200 (650)
Up to 2 in. (50 mm)
1 hr/in. (1 hr/25 mm),
15 min minimum
Over 2 in. (50 mm) to 5 in.
(125 mm)
1 hr/in. (1 hr/25 mm)
Over 5 in. (125 mm)
5 hr plus 15 min for each
additional inch (25 mm)
over 5 in. (125 mm)
113
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
GENERAL NOTES:
(a) Postweld heat treatment is not mandatory for P‐No. 4 materials under the following conditions:
(1) for circumferential butt welds in pressure parts with all the following conditions:
(a) a nominal base metal thickness of 5/8 in. (16 mm) or less at the weld
(b) a maximum specified carbon content (SA material specification carbon content, except when further limited by the Purchaser to a
value within the specification limits) of not more than 0.15%
(c) a minimum preheat of 250°F (120°C). This minimum preheat is not required for SA-213 Grade T11 tube materials with a maximum outside diameter of 1.5 in. (38 mm) and a maximum thickness of 0.165 in. (4.2 mm) when buttwelded using a multipass GTAW
process
(2) for fillet welds used on socket welding fittings conforming to the rules of PW-41, when the following conditions are met:
(a) a fillet weld throat thickness of 1/2 in. (13 mm) or less, regardless of base metal thickness
(b) a maximum specified carbon content (SA material specification carbon content, except when further limited by the Purchaser to a
value within the specification limits) of not more than 0.15%
(c) a minimum preheat of 250°F (120°C)
(3) for pipe and tube materials meeting the requirements of (1)(a) and (1)(b) above and having fillet welds attaching nonpressure
parts to them, provided the fillet weld has a throat thickness of 1/2 in. (13 mm) or less and the material is preheated to 250°F (120°C)
minimum; or combination groove and fillet welds attaching nonpressure parts to pressure parts, with a weld thickness of 1/2 in.
(13 mm) or less, provided the material is preheated to a minimum of 250°F (120°C); or heat‐absorbing surfaces and non‐load‐carrying
studs attached to them, provided the material is preheated to 250°F (120°C) minimum. A lower preheating temperature may be used,
provided specifically controlled procedures necessary to produce sound joints are used. Such procedures shall include but shall not
be limited to the following:
(a) the throat thickness of fillet welds shall be 1/2 in. (13 mm) or less
(b) the maximum continuous length of fillet welds shall be not over 4 in. (100 mm)
(c) electrodes or filler metal shall be dry and shall provide a low-hydrogen weld deposit. Chromium-molybdenum filler metals shall
have a maximum specified chromium content of not more than 2.50% and a maximum specified carbon content of not more than 0.05%
(d) the thickness of the test plate used in making the welding procedure qualification of Section IX shall not be less than that of the
material to be welded
(4) for tubes or pressure-retaining handhole and inspection plugs or fittings that are secured by physical means (rolling, shoulder construction, machine threads, etc.) and seal welded, provided the seal weld has a throat thickness of 3/8 in. (10 mm) or less, and preheat to a
minimum temperature of 250°F (120°C) is applied when the thickness of either part exceeds 5/8 in. (16 mm)
(5) for corrosion‐resistant weld metal overlay cladding of pipe or tube materials, provided that all of the following conditions are met:
(a) the thickness of the overlay cladding is 1/4 in. (6 mm) or less
(b) preheat to a minimum temperature of 250°F (120°C) is applied when the thickness of the pressure part exceeds 1/2 in. (13 mm)
(c) the pipe or tube material
(-1) does not exceed NPS 5 (DN 125) outside diameter
(-2) is not used as a drum or shell
(6) for electric resistance welds used to attach extended heat‐absorbing fins to pipe and tube materials, provided the following requirements are met:
(a) a maximum pipe or tube size of NPS 4 (DN 100)
(b) a maximum specified carbon content (SA material specification carbon content, except when further limited by the Purchaser to a
value within specification limits) of not more than 0.15%.
(c) a maximum fin thickness of 1/8 in. (3 mm)
(d) prior to using the welding procedure, the Manufacturer shall demonstrate that the heat‐affected zone does not encroach upon the
minimum wall thickness
(7) for welds attaching nonload‐carrying studs or insulation attachment pins not exceeding 1/2 in. (13 mm) in diameter when using an
automatic arc stud welding or automatic resistance stud welding process
(8) postweld heat treatment is not mandatory for attaching bare wire thermocouples by capacitor discharge welding or electric resistance welding, provided the following requirements are met:
(a) The requirements of PW-39.8.
(b) The maximum carbon content of the base material is restricted to 0.15%.
(c) The minimum wall thickness shall be 0.20 in. (5.0 mm) or greater.
(b) General Note (a) does not apply to welds using the inertia and continuous drive friction welding processes. Postweld heat treatment is
mandatory for all thicknesses of materials welded using inertia and continuous drive friction welding.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Table PW-39-4
Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments
— P-No. 5A
Minimum Holding Time at Normal Temperature for Weld Thickness (Nominal)
Material
P‐No. 5A Group No. 1
and P‐No. 5B Group
No. 1
Minimum Holding
Temperature, °F (°C)
1,250 (675)
Up to 2 in. (50 mm)
1 hr/in. (1 hr/25 mm),
15 min minimum
Over 2 in. (50 mm) to 5 in.
(125 mm)
1 hr/in. (1 hr/25 mm)
Over 5 in. (125 mm)
5 hr plus 15 min for each
additional inch (25 mm)
over 5 in. (125 mm)
114
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
GENERAL NOTES:
(a) Postweld heat treatment is not mandatory under the following conditions:
(1) for circumferential butt welds in pressure parts with all of the following conditions:
(a) a maximum specified chromium content of 3.0%
(b) a nominal base metal thickness of 5/8 in. (16 mm) or less at the weld
(c) a maximum specified carbon content (SA material specification carbon content, except when further limited by the Purchaser to a
value within the specification limits) of not more than 0.15%
(d) a minimum preheat of 300°F (150°C)
(2) for fillet welds used on socket welding fittings conforming to the rules of PW-41, when the following conditions are met:
(a) a maximum specified chromium content of 3.0%
(b) a fillet weld throat thickness of 1/2 in. (13 mm) or less, regardless of base metal thickness
(c) a maximum specified carbon content (SA material specification carbon content, except when further limited by the Purchaser to a
value within the specification limits) of not more than 0.15%
(d) a minimum preheat of 300°F (150°C)
(3) for pipe and tube materials meeting the requirements of (1)(a) through (1)(c) above having fillet welds attaching nonpressure
parts to them, provided the fillet weld has a throat thickness of 1/2 in. (13 mm) or less and the material is preheated to 300°F (150°C)
minimum; or combination groove and fillet welds attaching nonpressure parts to pressure parts, with a weld thickness of 1/2 in.
(13 mm) or less, and the material is preheated to a minimum of 300°F (150°C); or heat‐absorbing surfaces and non‐load‐carrying studs
attached to them, provided the material is preheated to 300°F (150°C) minimum. A lower preheating temperature may be used, provided
specifically controlled procedures necessary to produce sound joints are used. Such procedures shall include but shall not be limited to
the following:
(a) the maximum throat thickness of fillet welds shall be 1/2 in. (13 mm)
(b) the maximum continuous length of fillet welds shall be not over 4 in. (100 mm)
(c) electrodes or filler metal shall be dry and shall provide a low‐hydrogen weld deposit. Chromium‐molybdenum filler metals shall
have a maximum specified chromium content of not more than 2.50% and a maximum specified carbon content of not more than 0.05%
(d) the thickness of the test plate used in making the welding procedure qualification of Section IX shall not be less than that of the
material to be welded
(4) for tubes or pressure-retaining handhole and inspection plugs or fittings with a specified maximum chromium content of 6% that
are secured by physical means (rolling, shoulder construction, machine threads, etc.) and seal welded, provided the seal weld has a throat
thickness of 3/8 in. (10 mm) or less, and preheat to a minimum temperature of 300°F (150°C) is applied when the thickness of either part
exceeds 5/8 in. (16 mm)
(5) for welds attaching nonload‐carrying studs or insulation attachment pins not exceeding 1/2 in. (13 mm) in diameter when using an
automatic arc stud welding or automatic resistance stud welding process
(6) for corrosion‐resistant weld metal overlay of P‐No. 5A pipe or tube, provided the following conditions are met:
(a) a minimum preheat of 300°F (150°C) is applied when the thickness exceeds 1/2 in. (13 mm)
(b) overlay is applied using GTAW or GMAW with a 360 deg spiral deposition technique
(c) overlay cladding thickness does not exceed 1/8 in. (3 mm)
(d) the tube or pipe material does not exceed NPS 5 (DN 125) and is not used as a drum or shell
(b) Postweld heat treatment is not mandatory for electric resistance welds used to attach extended heat‐absorbing fins to pipe and tube
materials, provided the following requirements are met:
(1) a maximum pipe or tube size of NPS 4 (DN 100)
(2) a maximum specified carbon content (SA material specification carbon content, except when further limited by the Purchaser to a
value within the specification limits) of not more than 0.15%
(3) a maximum fin thickness of 1/8 in. (3 mm)
(4) prior to using the welding procedure, the Manufacturer shall demonstrate that the heat‐affected zone does not encroach upon the
minimum wall thickness
(c) General Note (a) does not apply to welds using the inertia and continuous drive friction welding processes. Postweld heat treatment is
mandatory for all thicknesses of materials welded using inertia and continuous drive friction welding.
(d) Postweld heat treatment is not mandatory for attaching bare wire thermocouples by capacitor discharge welding or electric resistance
welding provided the following requirements are met:
(1) The requirements of PW-39.8.
(2) The maximum carbon content of the base material is restricted to 0.15%.
(3) The minimum wall thickness shall be 0.20 in. (5.0 mm).
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Table PW-39-5
Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments
— P-No. 15E
Material
P‐No. 15E Group No. 1
Minimum Holding
Temperature, °F (°C)
[Note (1)] and [Note (2)]
1,350 (730)
Maximum Holding
Temperature, °F (°C)
[Note (3)] and [Note (4)]
1,445 (785)
Minimum Holding Time at Normal Temperature for
Weld Thickness (Nominal)
Up to 5 in. (125 mm)
1 hr/in. (1 hr/25 mm),
30 min minimum
Over 5 in. (125 mm)
5 hr plus 15 min for each
additional inch
(25 mm) over 5 in.
(125 mm)
GENERAL NOTES:
(a) Postweld heat treatment is not mandatory for electric resistance welds used to attach extended heat‐absorbing fins to pipe and tube
materials, provided the following requirements are met:
(1) a maximum pipe or tube size of NPS 4 (DN 100)
(2) a maximum specified carbon content (SA material specification carbon content, except when further limited by the Purchaser to
a value within the specification limits) of not more than 0.15%
(3) a maximum fin thickness of 1/8 in. (3 mm)
(4) prior to using the welding procedure, the Manufacturer shall demonstrate that the heat‐affected zone does not encroach upon
the minimum wall thickness
(b) Postweld heat treatment is not mandatory for attaching bare wire thermocouples by capacitor discharge welding or electric resistance
welding, provided the following requirements are met:
(1) The requirements of PW-39.8.
(2) The maximum carbon content of the base material is restricted to 0.15%.
(3) The minimum wall thickness shall be 0.20 in. (5.0 mm).
115
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
NOTES:
(1) If the nominal weld thickness is ≤ 0.5 in. (13 mm), the minimum holding temperature is 1,325°F (720°C).
(2) For dissimilar metal welds (i.e., welds made between a P‐No. 15E Group 1 and another lower chromium ferritic, austenitic, or nickel‐
based steel), if filler metal chromium content is less than 3.0% or if the filler metal is nickel‐based or austenitic, the minimum holding
temperature shall be 1,300°F (705°C).
(3) For welds made with nickel-based filler metals, or with Grade 91 filler metal (e.g., AWS B9, EN CrMo91, etc.) that has Ni + Mn content
less than or equal to 1.0%, the maximum holding temperature can be increased to 1,470°F (800°C). However, if the PWHT encompasses
multiple welds and any one of those welds was made with Grade 91 filler metal that has a Ni + Mn content greater than 1.0%, but not
greater than 1.2%, or if the Ni + Mn content of the filler metal is unknown, the maximum PWHT temperature shall be 1,445°F (785°C).
Explanatory Note to (3) Above: The lower transformation temperature for matching filler material is affected by alloy content, primarily
the total of Ni + Mn. The maximum holding temperature has been set to avoid heat treatment in the intercritical zone.
(4) If a portion of the component is heated above the heat treatment temperature allowed above, one of the following actions shall be
performed:
(a) The component in its entirety must be renormalized and tempered.
(b) If the maximum holding temperature in the table or [Note (3)] above is exceeded, but does not exceed 1,470°F (800°C), the weld
metal shall be removed and replaced.
(c) The portion of the component heated above 1,470°F (800°C) and at least 3 in. (75 mm) on either side of the overheated zone must
be removed and be renormalized and tempered or replaced.
(d) The allowable stress shall be that for Grade 9 material (i.e., SA-213‐T9, SA-335‐P9, or equivalent product specification) at the design temperature, provided that the portion of the component that was heated to a temperature exceeding the maximum holding temperature is subjected to a final heat treatment within the temperature range and for the time required above. In order to apply the
provisions of this paragraph, the Manufacturer must have qualified a WPS with representative test specimens that accurately simulate
the thermal history of the production part. Specifically, the qualification specimens first must be heat treated at a similar temperature
for a similar time that violated the maximum holding temperature limit and then must receive a final heat treatment for the required
time within the temperature range specified by this table. The use of this provision shall be noted in the Manufacturer’s Data Report.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Table PW-39-6
Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments
— P-No. 6
Minimum Holding Time at Normal Temperature for Weld Thickness (Nominal)
Material
Minimum Holding
Temperature, °F (°C)
P‐No. 6 Group No. 1, 2, 3 1,400 (760)
Up to 2 in. (50 mm)
1 hr/in. (1 hr/25 mm),
15 min minimum
Over 2 in. (50 mm) to 5 in.
(125 mm)
1 hr/in. (1 hr/25 mm)
Over 5 in. (125 mm)
5 hr plus 15 min for each
additional inch
(25 mm) over 5 in.
(125 mm)
GENERAL NOTES:
(a) Postweld heat treatment is not mandatory for P‐No. 6 materials under the following conditions:
(1) for Type 410 material where the material and construction shall comply with the following conditions:
(a) a maximum specified carbon content (SA material specification carbon content, except when further limited by the Purchaser to a value within the specification limits) of not more than 0.08%
(b) the electrodes used shall produce an austenitic chromium‐nickel weld deposit, or a non‐air‐hardening nickel‐chromium‐iron
weld deposit, and provided the following additional requirements are met:
(-1) the material thickness at the welded joint does not exceed 3/8 in. (10 mm)
(-2) or material thickness over 3/8 in. (10 mm) through 11/2 in. (38 mm), the following additional conditions shall be required:
(-a) a preheat of 450°F (230°C) shall be maintained during welding
(-b) the welded joints shall be fully volumetrically examined
(2) for electric resistance welds used to attach extended heat‐absorbing fins to pipe and tube materials, provided the following
requirements are met:
(a) a maximum pipe or tube size of NPS 4 (DN 100)
(b) a maximum specified carbon content (SA material specification carbon content, except when further limited by the Purchaser to a value within specification limits) of not more than 0.15%
(c) a maximum fin thickness of 1/8 in. (3 mm)
(d) prior to using the welding procedure, the Manufacturer shall demonstrate that the heat‐affected zone does not encroach
upon the minimum wall thickness
(b) General [Note (a)] does not apply to welds using the inertia and continuous drive friction welding processes. Postweld heat treatment
is mandatory for all thicknesses of materials welded using inertia and continuous drive friction welding.
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
116
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Table PW-39-7
Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments
— P-No. 7
Minimum Holding Time at Normal Temperature for Weld Thickness (Nominal)
Minimum Holding
Temperature, °F (°C)
Material
P‐No. 7 Group No. 1, 2
1,350 (730)
Up to 2 in. (50 mm)
1 hr/in. (1 hr/25 mm),
15 min minimum
Over 2 in. (50 mm) to 5 in.
(125 mm)
1 hr/in. (1 hr/25 mm)
Over 5 in. (125 mm)
5 hr plus 15 min for each
additional inch
(25 mm) over 5 in.
(125 mm)
GENERAL NOTES:
(a) Postweld heat treatment for P‐No. 7 material shall be performed as described in PW-39.3, except that the cooling rate shall be a
maximum of 100°F/hr (55°C/hr) in the range above 1,200°F (650°C) after which the cooling rate shall be sufficiently rapid to prevent embrittlement.
(b) Postweld heat treatment is not mandatory for P‐No. 7 materials under the following conditions:
(1) for Type 405 material where the material and construction shall comply with the following conditions:
(a) a maximum specified carbon content (SA material specification carbon content, except when further limited by the Purchaser to a value within the specification) of not more than 0.08%
(b) the electrodes used shall produce an austenitic chromium‐nickel weld deposit, or a non‐air‐hardening nickel‐chromium‐iron
weld deposit, and provided the following additional requirements are met:
(-1) the material thickness at the welded joint does not exceed 3/8 in. (10 mm)
(-2) for material thickness over 3/8 in. (10 mm) through 11/2 in. (38 mm), the following additional requirements are met:
(-a) a preheat of 450°F (230°C) shall be maintained during welding
(-b) the welded joints shall be fully volumetrically examined
(2) for electric resistance welds used to attach extended heat‐absorbing fins to pipe and tube materials, provided the following
requirements are met:
(a) a maximum pipe or tube size of NPS 4 (DN 100)
(b) a maximum specified carbon content (SA material specification carbon content, except when further limited by the Purchaser to a value within the specification limits) of not more than 0.15%
(c) a maximum fin thickness of 1/8 in. (3 mm)
(d) prior to using the welding procedure, the Manufacturer shall demonstrate that the heat‐affected zone does not encroach
upon the minimum wall thickness
Minimum Holding Time at Normal Temperature for Weld Thickness (Nominal)
Material
P‐No. 8
Minimum Holding
Temperature, °F (°C)
None
Up to 2 in. (50 mm)
None
Over 2 in. (50 mm) to 5 in.
(125 mm)
None
Over 5 in. (125 mm)
None
GENERAL NOTE: Postweld heat treatment is neither required nor prohibited for joints between austenitic stainless steels of the P‐No. 8
group.
117
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Table PW-39-8
Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments
— P-No. 8
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
ð15Þ
Table PW-39-9
Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments
— P-No. 10H
Minimum Holding Time at Normal Temperature for Weld Thickness
Material
P‐No. 10H Group No. 1
Minimum Holding
Temperature, °F (°C)
Up to 2 in. (50 mm)
Over 2 in. (50 mm) to 5 in.
(125 mm)
Over 5 in. (125 mm)
None
None
None
None
GENERAL NOTE: For the austenitic‐ferritic wrought duplex stainless steels listed below, postweld heat treatment is neither required nor
prohibited, but any heat treatment applied shall be performed as listed below and followed by liquid quenching or rapid cooling by other
means.
Alloy
Postweld Heat Treatment, Temperature, °F (°C)
S31803
1,870–2,010 (1 020–1 100)
Minimum Holding Time at Normal Temperature for Weld Thickness (Nominal)
Material
P‐No. 10I Group No. 1
Minimum Holding
Temperature, °F (°C)
1,250 (675)
Up to 2 in. (50 mm)
1 hr/in. (1 hr/25 mm), 15 min
minimum
Over 2 in. (50 mm) to 5 in.
(125 mm)
Over 5 in. (125 mm)
1 hr/in. (1 hr/25 mm)
1 hr/in. (1 hr/25 mm)
GENERAL NOTE: Postweld heat treatment for P‐No. 10I (SA-268 TP446 material only) shall be performed as described in PW-39.3, except
that the cooling rate shall be a maximum of 100°F/hr (55°C/hr) above 1,200°F (650°C) after which the cooling rate shall be sufficiently
rapid to prevent embrittlement.
118
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Table PW-39-10
Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments
— P-No. 10I
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
Table PW-39-11
Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments
— P-No. 31
Minimum Holding Time at Normal Temperature for Weld Thickness (Nominal)
Material
P‐No. 31
Minimum Holding
Temperature, °F (°C)
None
Up to 2 in. (50 mm)
None
Over 2 in. (50 mm) to 5 in.
(125 mm)
None
Over 5 in. (125 mm)
None
GENERAL NOTE: Postweld heat treatment is neither required nor prohibited for joints between materials of the P‐No. 31 group.
Material
UNS No. N06617
All other P-No. 43
Alloys
Minimum Holding
Temperature, °F (°C)
Minimum Holding Time at Normal Temperature for Weld Thickness (Nominal)
Up to 1 in. (25 mm)
Over 1 in. (25 mm)
1,740 (950)
1 hr
1 hr plus 1 hr/in. (1 hr/25 mm)
None
None
None
GENERAL NOTES:
(a) Postweld heat treatment is not mandatory for UNS No. N06617 (Alloy 617) materials under any one of the following conditions:
(1) for design temperatures less than 1,000°F (540°C)
(2) for circumferential butt welds in pressure parts with a nominal base metal thickness of 1/2 in. (13 mm) or less at the weld
(3) for attaching bare wire thermocouples by capacitor discharge welding or electric resistance welding, provided all the following
requirements are met:
(a) the requirements of PW-39.8
(b) the minimum wall thickness shall be 0.2 in. (5.0 mm)
(b) As an alternative, solution annealing Alloy 617 in accordance with its material specification is acceptable.
(c) Except for Alloy 617, postweld heat treatment is neither required nor prohibited for joints between all other materials of the P-No. 43
group.
119
ð15Þ
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Table PW-39-12
Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments
— P-No. 43
No fu
ð15Þ
Table PW-39-13
Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments
— P-No. 45
Material
UNS Nos. N08800,
N08810, and N08811
All other P-No. 45 Alloys
Minimum Holding
Temperature, °F (°C)
Minimum Holding Time at Normal Temperature for Weld Thickness (Nominal)
Up to 1 in. (25 mm)
Over 1 in. (25 mm)
1,625 (885)
11/2 hr
11/2 hr plus 1 hr/in. (1 h/25 mm)
None
None
None
GENERAL NOTES:
(a) For UNS Nos. N08800 (Alloy 800), N08810 (Alloy 800H), and N08811 materials, the minimum holding temperature above is to be used
if the filler metal other than SFA-5.14 ERNiCrCoMo-1 is used. When SFA-5.14 ERNiCrCoMo-1 filler metal is used, the minimum holding
temperature shall be 1,740°F (950°C).
(b) Postweld heat treatment is not mandatory for UNS Nos. N08800 (Alloy 800), N08810 (Alloy 800H), and N08811 materials under any
one of the following conditions:
(1) for design temperatures less than 1,000°F (540°C)
(2) for circumferential butt welds in pressure parts with a nominal base metal thickness of 1/2 in. (13 mm) or less at the weld
(3) for attaching bare wire thermocouples by capacitor discharge welding or electric resistance welding, provided all the following
requirements are met:
(a) the requirements of PW-39.8
(b) the minimum wall thickness shall be 0.20 in. (5.0 mm)
(c) As an alternative, solution annealing for UNS Nos. N08800 (Alloy 800), N08810 (Alloy 800H), and N08811 materials in accordance
with their material specification is acceptable.
(d) Except for UNS Nos. N08800 (Alloy 800), N08810 (Alloy 800H), and N08811 materials, postweld heat treatment is neither required
nor prohibited for joints between all other materials of the P-No. 45 group.
PW-39.5.1 By heating a circumferential band
around the entire vessel with the welded connection located at the middle of the band. Except as modified below,
the soak band shall extend around the entire vessel, and
shall include the nozzle of welded attachment.
PW-39.5.1.1 By heating a circumferential band
around the entire vessel with the welded connection located at the middle of the band. Provided the required
soak band around the nozzle or attachment weld, as defined in PW-39.3, is heated to the required temperature
and held for the required time, as specified in Tables
PW-39-1 through PW-39-14, the remainder of the
circumferentially‐heated band may be varied in width
around the circumference of the vessel. The temperature
within the heated band shall be controlled to prevent
harmful gradients.
PW-39.4.3.2.1 Where the cross section of the
vessel that projects from the furnace contains a nozzle,
consideration shall be given to controlling the temperature in the nozzle, so that the temperature gradient is
not harmful.
PW-39.5 Nozzles or other welded attachments for
which postweld heat treatment is required may be locally
postweld heat treated by one of the following methods.
Table PW-39-14
Mandatory Requirements for Postweld Heat Treatment of Pressure Parts and Attachments
— P-No. 51
Minimum Holding Time at Normal Temperature for Weld Thickness (Nominal)
Material
Minimum Holding
Temperature, °F (°C)
Up to 2 in. (50 mm)
Over 2 in. (50 mm) to 5 in.
(125 mm)
Over 5 in. (125 mm)
P‐No. 51
None
None
None
None
GENERAL NOTE: Postweld heat treatment is neither required nor prohibited for joints between materials of the P‐No. 51 group.
120
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PW-39.4.3.2 Alternatively, the postweld heat
treatment of the final joints may be performed by heating
in the furnace, provided the overlap of the heated sections
of the vessel is at least 5 ft (1.5 m). When this procedure
is used, the portion outside of the furnace shall be thermally shielded (using blankets, brick, etc.) so that the
temperature gradient is not harmful.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
heat treated by heating a full circumferential band around
the entire vessel or shell, which shall include the nozzle in
the center of the band.
Table PW-39.1
Alternate Postweld Heat Treatment
Requirements for Carbon and Low Alloy
Steels
Decrease in Temperature
Below Minimum Specified
Temperature, °F (°C)
Minimum Holding Time
[Note (1)] at Decreased
Temperature, hr
Notes
50 (28)
100 (56)
150 (83)
200 (111)
2
4
10
20
…
…
(2)
(2)
PW-39.6 In the case of local postweld heat treatment
of welded joints in pipes, tubes, and headers, the soak
band shall extend around the entire pipe tube or header.
PW-39.7 Electroslag welds in ferritic materials over
11/2 in. (38 mm). in thickness at the joint shall be given
a grain refining (austenitizing) heat treatment.
PW-39.8 Capacitor discharge or electric resistance
welding may be used for attaching bare wire thermocouples, without subsequent postweld heat treatment, provided the energy output for welding is limited to a
maximum 125 W-sec and any requirements specified in
the applicable notes as found in Tables PW-39-1 through
PW-39-14 shall apply. A welding procedure specification
shall be prepared and the content shall describe as a minimum the capacitor discharge equipment, the combination
of materials to be joined, and the technique of application.
Qualification of the welding procedure is not required.
GENERAL NOTE: Applicable only when permitted in Tables
PW-39-1 through PW-39-14.
NOTES:
(1) Minimum holding time per inch (25 mm) for thickness up to
and including 2 in. (50 mm). Add 15 min per inch (25 mm) of
thickness for thickness greater than 2 in. (50 mm).
(2) These lower postweld heat treatment temperatures permitted only for P‐No. 1, Group 1 and 2 materials.
PW-40
REPAIR OF DEFECTS
PW-40.1 Weld imperfections, such as cracks, pinholes, and incomplete fusion, detected visually or by leakage tests or by the examinations described in PW-11 and
found to be rejectable, shall be removed by mechanical
means or by thermal grooving processes, after which
the joint shall be rewelded and reexamined.
PW-40.2 When tube‐to‐header or tube‐to‐drum
welded joints have already received the postweld heat
treatment required by PWT-11 and PW-39, minor local
additional welding for rework of the joint or to improve
the fillet weld contour may be performed on the materials
listed in (b) without repeating the postweld heat treatment, subject to all the following limitations:
(a) The depth of any rework welding below the surface
shall not exceed the smaller of 10% of the thickness of the
drum or header, or 50% of the wall thickness of the tube.
(b) The area to be rework welded shall be preheated to
at least the minimum temperatures as indicated below for
the material.
PW-39.5.2 Local areas around nozzles or welded
attachments in the larger radius sections of double curvature heads, or spherical shells or heads, may be postweld
heat treated by heating a circular region around the nozzle. This region, or soak band, shall include the nozzle or
welded attachment and shall be measured from the center of the nozzle or attachment. The soak band shall be
a circle whose radius is equal to the radius at the widest
width of the width of the weld attaching the nozzle or attachment to the shell, plus the thickness of the shell or
head, or 2 in. (50 mm), whichever is less. The portion of
the vessel outside of the circular region shall be thermally
shielded using blankets, brick, or other suitable insulation
material so that the temperature gradient is not harmful.
A greater amount of base material may also be heated to
permit temperature gradient control.
Material Welding
P‐Number Group
PW-39.5.3 Nozzles that contain circumferential
welds in close proximity to a vessel or shell have additional thermal restraint imposed by this close proximity.
Adequate length between the weld on the nozzle and
the shell shall be provided so that the postweld heat treatment does not introduce harmful stresses at the nozzle attachment weld. Alternatively, the weld may be postweld
Minimum Preheat, °F (°C),
for Rework Welding
P‐No. 3, Groups 1 and 2
200 (95)
P‐No. 4
250 (120)
P‐No. 5A
300 (150)
(c) The tubes shall not exceed 4 in. (100 mm) O.D., except for P‐No. 1 material, which shall not exceed 65/8 in.
(170 mm) O.D.
(d) The welding procedure used for the rework welding
shall have been qualified to the requirements of Section IX
for the thickness of rework welding to be performed and
for the omission of postweld heat treatment.
121
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PW-39.5.1.2 By heating a circumferential band
around the entire vessel with the welded connection located at the middle of the band. Provided the required
soak band around the nozzle or attachment weld, as defined in PW-39.3, is heated to the required temperature
and held for the required time, as specified in Tables
PW-39-1 through PW-39-14, the remainder of the
circumferentially‐heated band need not reach the required postweld heat treatment temperature. The temperature within the heated band shall be controlled to
prevent harmful gradients.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PW-40.3 Defects in P-No. 1, all groups (if not otherwise exempted by Table PW-39-1), and P‐No. 3 Group
Nos. 1 and 2 materials, and in the welds joining these materials, may be weld repaired after the final PWHT but
prior to the final hydrostatic test. The welded repairs
shall meet the requirements below.
PW-40.3.1 Defect Removal for Base Materials.
The defect shall be removed or reduced to an acceptable
size. Before repair welding, the groove shall be examined
to verify that the defect has been reduced to an acceptable
size, using either the magnetic particle or the liquid penetrant examination methods. When the material is nonmagnetic, only the liquid penetrant method shall be
used. Methods for magnetic particle examination and liquid penetrant examination shall be in accordance with
A-260 and A-270, respectively; however, the acceptance
standards for the examination shall be in accordance with
th e r eq u ir e me n ts o f t h e o r i g in al b as e m a te r i al
specification.
PW-40.3.2 Defect Removal for Welds and Welded
Repairs. The defect shall be removed, and the groove examined to verify defect removal, using either the magnetic particle or the liquid penetrant examination
methods. When the material is nonmagnetic, only the liquid penetrant method shall be used. Methods and acceptance standards for magnetic particle examination and
liquid penetrant examination shall be in accordance with
A-260 or A-270, respectively.
PW-40.3.3 The total repair depth shall not exceed
10% of the base material thickness. The total depth of a
weld repair shall be taken as the sum of the depths for repairs made from both sides of a weld at a given location.
The total area of such repairs shall not exceed 100 in.2
(0.065 m2).
PW-40.3.4 In addition to the requirements of Section IX for qualification of welding procedure specifications for groove welds, the following requirements shall
apply:
(a) The weld procedure qualification shall have been
made using material of the same P‐No. and Group No.
as the material to be repaired. The specific welding technique or combination of welding techniques used shall
have been developed and tested to assure adequate tempering of the underlying weld bead heat‐affected zones.
(b) The weld metal shall be deposited by the manual
shielded metal‐arc process. Only low hydrogen welding
electrodes shall be used. The electrodes shall be properly
conditioned in accordance with Section II, Part C, SFA-5.5,
Annex A, A6.12.
PW-40.3.5 For materials greater than 1 in.
(25 mm) thick, after completing all welding, the repair
area shall be heated to and maintained at a temperature
of 450°F to 550°F (230°C to 290°C) for a minimum period
of 4 hr.
(c) The maximum heat input for each weld layer shall
not exceed that used in the procedure qualification test.
PW-40.3.6 Any final temper bead reinforcement
shall then be removed substantially flush with the surface
of the base material.
(d) The maximum deposited weld bead width for any
electrode shall be four times the electrode core diameter.
122
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
(e) The repair area, including a band equal in width to
4 in. (100 mm) or four times the thickness of the weld repair, whichever is greater, on either side of the groove,
shall be preheated and maintained at a minimum temperature of 350°F (175°C) during welding. The maximum
interpass temperature shall be 450°F (230°C).
(f) The repair weld method shall be limited to either
the half bead or temper bead weld repair technique as
follows:
(1) For the half bead technique, the initial layer of
weld metal shall be deposited over the entire area using
1
/8 in. (3.2 mm) max. diameter electrodes. Approximately
one-half of the thickness of this layer shall then be removed by grinding before depositing subsequent layers.
Subsequent weld metal layers shall be deposited using
either 1/8 in. (3.2 mm) or 5/32 in. (4 mm) max. diameter
electrodes.
(2) For the temper bead technique, the initial layer of
weld metal shall be deposited over the entire area using
either 3/32 in. (2.4 mm) or 1/8 in. (3.2 mm) diameter
electrodes.
The subsequent weld layers for either weld repair
method shall be deposited in such a manner as to ensure
tempering of the prior weld beads.
Surface temper beads for either weld repair method
shall be applied to a level above the surface being repaired without contacting the base material, but close
enough to the edge of the underlying weld metal to ensure tempering of the base material heat-affected zone
(suggested temper bead layer placement is shown in Section IX, Figure QW-462.12). The half bead or temper bead
weld procedure specification shall be qualified in accordance with the requirements given in Section IX,
QW-290, using welding electrodes or filler metals that
are identified with a supplemental diffusible hydrogen
designator of H-4.
(g) Hardness testing for qualification of either the half
bead or temper bead repair weld procedure specifications
shall be in accordance with Section IX, QW-290.5(c). The
acceptance criteria for hardness testing for either weld
repair method shall be as follows:
(1) For P-No. 1 material, all groups, the maximum
peak hardness of the weld and base metal heat-affected
zone shall not exceed 300HV10.
(2) For P-No. 3 Groups 1 and 2 materials, the maximum peak hardness of the weld and base metal
heat-affected zone shall not exceed 315HV10.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PW-40.3.7 After the finished repair weld has
reached ambient temperature, it shall be examined to
the requirements of PW-40.3.2, using the same nondestructive examination technique that was used to examine
the weld groove.
PW-41.2.3 When the wall is recessed for a backing
ring or to assure a uniform inside diameter of the weld
preparation, the depth of such recess shall be so limited
that the remaining net section of the wall is not less than
the minimum required thickness. For boiler and superheater tubes where the diameter does not exceed 4 in.
(100 mm), the recess may reduce the required thickness
by not more than 1/32 in. (0.8 mm), provided the reduced
net section is replaced by weld metal in the outside reinforcement such that the resulting thickness of the weld,
including reinforcement, is at least equal to the minimum
required thickness.
PW-40.3.8 The vessel shall be hydrostatically
tested in accordance with PW-54.
PW-40.3.9 The Manufacturer shall obtain the approval of the Authorized Inspector, prior to making the
repair.
PW-41
CIRCUMFERENTIAL JOINTS IN PIPES,
TUBES, AND HEADERS
PW-41.2.4 Backing rings may be of any size or
shape suitable for the welding process and may be left
in place or removed as desired. Materials for backing
rings shall be compatible with the weld metal and base
material and shall not cause harmful alloying or contamination. If left in place they must be properly secured to
prevent dislodgment and shall have a contour on the inside to minimize the restriction to flow, if needed, and
be of such inside diameter as to permit the passage of a
tube cleaner where such cleaner is to be used.
The rules in the following paragraphs apply specifically
to the boiler proper and parts thereof.
PW-41.1 Circumferential welded butt joints in pipe,
tubes, and headers shall meet the radiographic and ultrasonic examination requirements of Table PW-11.
PW-41.2 All circumferential arc or gas welded joints
of parts covered by this paragraph and welded in accordance therewith shall have a double‐welded butt joint
or a single‐welded butt joint made the equivalent of a
double‐welded butt joint, except as otherwise provided
in PW-41.4 and PW-41.5.
PW-41.2.5 When welded joints in tubes or pipes
are not postweld heat treated, the procedure qualification
test shall be made under the same conditions, but the performance qualification test may be made on either postweld heat treated or nonpostweld heat treated samples.
PW-41.3 Pipe connections not exceeding NPS 1/2
(DN 15) may be welded to pipe or headers under the provisions of this paragraph without the inspection required
by this Section.
PW-41.4 For attachment of nozzles to boiler drums
or headers see PW-15.
PW-41.2.2 In welding single‐welded butt joints,
complete penetration at the root is required. This shall
be demonstrated by the qualification of the procedure
to be used. If complete penetration cannot otherwise be
secured, the procedure shall include a backing ring or
equivalent. The depth of weld measured between the inside surface of the weld preparation and the outside surface of the pipe or tube shall be not less than the
minimum thickness permitted by the applicable material
specifications for the particular size and thickness of pipe
or tubing used. Where backing rings are not used, concavity of the root surface is permitted if the depth of the concavity of the weld metal does not exceed the lesser of
3
/32 in. (2.5 mm) or 20% of the thinner of the two sections
being joined. The contour of the concavity shall be smooth
and the resulting thickness of the weld, including reinforcement, shall be at least equal to the required thickness of the thinner section. Concavity depth allowed
under the rules of this paragraph shall be reduced by an
amount equal to any net section replacement used, as permitted in PW-41.2.3.
PW-41.5 Welded socket-type joints or sleeve type
joints may be used to connect pipe or tubes to valves or
fittings, or to each other, provided the conditions specified in PW-41.5.1 through PW-41.5.6 are met.
PW-41.5.1 Pipe shall not exceed NPS 3 (DN 80) and
tubing shall not exceed 31/2 in. (89 mm) nominal outside
d i a m e te r ( se e P G - 4 2 , f o r A S M E s o c k e t w e l d i n g
components).
PW-41.5.2 The depth of insertion of a pipe or tube
into a socket shall be at least 1/4 in. (6 mm). There shall be
at least 1/16 in. (1.5 mm) clearance between the end of the
pipe or tube and the internal shoulder of the socket, before welding.
PW-41.5.3 The fit between the socket or sleeve
and the pipe or tube shall conform to applicable standards for socket weld fittings, and in no case shall the inside diameter of the socket or sleeve exceed the outside
diameter of the pipe or tube by more than 0.080 in.
(2.03 mm).
123
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PW-41.2.1 The strength of the weld shall be sufficient to develop the full strength of the part in the longitudinal direction. There shall be no valley or groove along
the edge or in the center of the weld except as permitted
by PW-35.1. Weld reinforcement may be removed if so
desired. The design of the joint and the method of welding
shall be such that there will be no appreciable projection
of weld metal past the inside surface.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PW-41.5.4 The average outside diameter of the
hub or sleeve (collar or end portion of socket welding fittings) shall be sufficient to make the average hub or
sleeve thickness not less than 1.09 times the nominal
thickness of the pipe or tube.
Table continued
Generic Identity
Wrought/Weld
PW-41.5.5 The throat dimension of the fillet weld
shall be not less than 0.77 times the nominal thickness of
the pipe or tube.
PW-41.5.6 The depth of the insertion of a pipe or
tube into a sleeve shall be at least 1/4 in. (6 mm). There
shall be at least 1/16 in. (1.5 mm) clearance between the
butting ends of the pipe or tube, before welding.
PW-42
DELETED
FABRICATION RULES FOR BIMETALLIC
TUBES WHEN THE CLAD STRENGTH IS
INCLUDED
PW-44.1 The strengths for annealed wrought products are listed in Section II, Part D, Subpart 1, Tables
1A and 1B. Values applicable to either Section I or Section
VIII, Division 1 may be used. The strength of deposited
clad metal (welded or laser fused) shall be inferred from
an annealed wrought material with nominally equivalent
strength and composition as the clad (see PG-27.2.1.5 and
PG-27.4.10). The in‐text table below contains wrought alloys and weld wires that may be considered as nominally
equivalent for this purpose. For powders used in laser‐
fused cladding, the deposit chemistry shall nominally conform to that for weld wire for welded cladding. For clad
alloys that are not included in the table below, the
strength may be established by performing tests in conformance with Section II, Part D, Mandatory Appendix 5
and submitting the data to ASME for analysis.
Generic Identity
Wrought/Weld
309 or 309S/309
None/309L
None/312
Wrought UNS No.
S30908
None — use S30403
None — use S30403
N06600
N06022
N06625
N06690
None — use N06600
N08825
PW-44.3 The rules of Section IX applicable to
corrosion‐resistant weld metal overlays (CRO) shall apply
for welding procedure qualifications and for welding performance qualifications. In addition, qualification as a
groove weld in accordance with Section IX shall be satisfied to demonstrate strength and ductility of the
weldment.
PW-44.4 Exemptions to postweld heat treatment
(PWHT) in PW-39 that are specific to corrosion‐resistant
weld metal overlay cladding of pipe or tube materials
shall apply. When there are no such exemptions, PWHT
is mandatory and shall be based on the core material in
accordance with PW-39.
PW-44.5 A stress relief to relax residual stresses and
improve ductility may be desirable before making cold
bends on bimetallic tubing.
PW-44.6 Bimetallic tubes that are cold formed after
cladding may require post‐forming heat treatments.
AWS Classifications
ER309
ER309L
ER312
PW-44.6.1 For bimetallic tubes in which the core
tube and clad are both austenitic materials (either steel
or nickel‐based alloy), the cold forming rules of PG-19
124
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
ð15Þ
600/82
622/622
625/625
690/52
671/72
825/None
AWS Classifications
None — matches
wrought chemistry
ERNiCr‐3
ERNiCrMo‐10
ERNiCrMo‐3
ERNiCrFe‐7
ERNiCr‐4
None
PW-44.2 Rules governing the P‐No. of the bimetallic
tube to which an attachment is welded are as follows:
(a) If the attachment is welded to the clad portion, the
P‐No. shall be that associated with the clad except when
the combination of heat input and clad thickness create
a new heat‐affected zone in the core tube, in which case
the P‐No. having the more conservative rules shall be applicable. Macroetching and microhardness measured
from a representative sample may be used to determine
whether a new heat‐affected zone is created in the core
tube by the attachment welding.
(b) If the attachment is welded to the core, the P‐No.
shall be that associated with the core tube.
PW-43
PW-44
R20033
Some of the clad alloys are subject to embrittlement
during long‐term service over specific temperature
ranges. In particular, Alloy 625 embrittles in the temperature range of 1,000°F to 1,400°F (540°C to 760°C), and
the ferrite phase of 312 stainless steels embrittles above
500°F (260°C) with the shortest embrittlement time occurring at 885°F (475°C) (see Section II, Part D, Nonmandatory Appendix A, A-207).
JOINTS IN VALVES AND OTHER BOILER
APPURTENANCES
Valves, other boiler appurtenances such as water columns, and casings of pumps that are part of a boiler circulation system, may have fusion‐welded joints other
than longitudinal, complying with the requirements of
this Part except that inspection of these joints is not required. The Manufacturer shall furnish, if requested, a
statement certifying that these requirements have been
met.
ð15Þ
Wrought UNS No.
33/33
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
shall apply with the minimum heat treatment temperature being the highest applicable to the two alloys. For
weld- or laser‐fused cladding, the nominal wrought
equivalents in PW-44.1 may be used.
(a) through (c) below. The basis for rejection of indications on any of the four examined surfaces shall be as
follows:
(a) Any linear indication (length more than or equal to
three times the width) with a length of 1/16 in. (1.6 mm) or
greater. Rejectable linear indications on two or more surfaces shall constitute rejection of the cladding process.
(b) More than two isolated rounded indications on any
single examined surface with a size of ≥ 50% of clad thickness or 1/16 in. (1.6 mm), whichever is less. Rounded indications that are initially classified as nonrejectable shall
be further explored by either incremental sectioning or
supplemental NDE. Any such rounded indication that is
determined to extend 1/8 in. (3.2 mm) or more below
the surface shall be reclassified as a rejectable indication.
Rejectable indications on two or more of the four examined surfaces shall constitute rejection of the cladding
process.
(c) Four or more rounded indications with a size
of ≥ 75% of clad thickness or 1/16 in (1.6 mm), whichever
is less, in a line separated by 1/16 in. (1.6 mm) or less, edge
to edge. Rejectable indications on one or more of the four
examined surfaces shall constitute rejection of the cladding process.
PW-44.6.2 For bimetallic tubes in which the core
is ferritic and the clad austenitic (either steel- or nickel‐
based alloy), the forming limits in Table PG-19 that would
initiate a required solution heat treatment shall not be exceeded. For weld- or laser‐fused cladding, the nominal
wrought equivalents in PW-44.1 may be used.
PW-44.7 Demonstration of the cladding process to
achieve a metallurgical bond and a clad that is free from
rejectable defects shall be by examination of a workmanship bimetallic tube sample using cladding parameters
that are to be used in production. The bimetallic tube
sample shall have a minimum length of 7 in. (175 mm).
This sample shall be evaluated prior to the start of fabrication and repeated for a new sample anytime an essential variable is changed, using the methods described in
paras. PW-44.7.1 through PW-44.7.4.
PW-44.7.1 Two 0.5 in. (13 mm)-long rings shall be
removed, one from each end, and the four available cross
sections (the ends of the two rings) shall be examined
using the liquid penetrant technique in accordance with
A-270 except for revisions to the acceptance criteria in
(a) through (c) below. The basis for rejection of indications on any of the examined surfaces shall be as follows:
(a) Any linear indication (length more than or equal to
three times the width) with a length of 1/16 in. (1.6 mm) or
greater. Rejectable linear indications on two or more surfaces shall constitute rejection of the cladding process.
(b) More than two isolated rounded indications on any
single examined surface with a size of ≥ 50% of clad thickness or 1/16 in. (1.6 mm), whichever is less. Rounded indications that are initially classified as nonrejectable shall
be further explored by either incremental sectioning or
supplemental NDE. Any such rounded indication that is
determined to extend 1/8 in. (3.2 mm) or more below
the ring surface shall be reclassified as a rejectable indication. Rejectable indications on more than two of the four
examined surfaces shall constitute rejection of the cladding process.
PW-44.7.4 In the event the cladding process is rejected based on PW-44.7.1, PW-44.7.2, or PW-44.7.3, two
recovery paths are available as follows:
(a) The amount of sampling shall be doubled from the
previous examination and a retest performed using the
same methods. Rejection of any grouping shall constitute
rejection of the process. In the event of a rejection of the
process on the second attempt, the retest protocol may be
repeated a third and final time.
(b) The cladding process parameters shall be changed
to produce a new workmanship sample and the examination process repeated from the beginning.
(c) Four or more rounded indications with a size
of ≥ 75% of clad thickness or 1/16 in (1.6 mm), whichever
is less, in a line separated by 1/16 in. (1.6 mm) or less, edge
to edge. Rejectable indications on two or more of the four
examined surfaces shall constitute rejection of the cladding process.
PW-44.7.2 After removal of the two rings, the remaining portion of the tube shall be split longitudinally,
and the four available cross sections shall be examined
using the liquid penetrant technique in accordance with
A-270, except for revisions to the acceptance criteria in
125
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PW-44.7.3 Ultrasonic examination (UT) may be
substituted for the examinations described in PW-44.7.1
and PW-44.7.2, provided the following conditions are
satisfied:
(a) The examination shall be done in accordance with
Section V, Article 4, with specific emphasis on the portions relating to cladding (T‐432.2, T‐434.1.4, T‐434.4,
and T‐473).
(b) The procedures shall have sensitivity to identify
and size rejectable defects of the sizes identified in
PW-44.7.1(a) through PW-44.7.1(c) and PW-44.7.2(a)
through PW-44.7.2(c).
(c) Four areas shall be selected, each containing a 7 in.
(175 mm) length of bimetallic tubing. These four lengths
shall be given a full clad volumetric and core‐to‐clad
bond-line examination, and the acceptance or rejection
of a single length or the group of four lengths collectively
shall be based on the criteria in PW-44.7.2(a) through
PW-44.7.2(c).
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PW-44.8 The rules in this paragraph and its subparagraphs are applicable to laser‐fused cladding and welded
cladding but not to coextruded tubing. During production
of bimetallic tubes, the Manufacturer responsible for certifying the boiler unit shall establish a nondestructive examination program, to be implemented by the cladding
organization, consisting of the elements described in
PW-44.8.1 through PW-44.8.4 as a minimum.
thickness or the minimum total wall thickness shall be
weld repaired in accordance with the applicable portions
of PW-41. All repaired areas shall subsequently be examined to the requirements of PW-44.8 and subparagraphs
and shown to conform to the acceptance standards in
A-270.
INSPECTION AND TESTS
PW-44.8.1 Visual examination (VT) shall be performed on 100% of the clad surface in accordance with
Section V, Article 9. Any indication open to the surface
shall additionally be subjected to liquid penetrant examination (PT) in accordance with A-270 and acceptance or
rejection based on A-270.4. The portion of bimetallic tubing containing rejectable defects shall either be removed
or the defects repaired in accordance with PW-44.9.
PW-46
GENERAL
PW-46.1 The rules in the following paragraphs apply
specifically to the inspection and testing of power boilers
and power boiler parts that are fabricated by welding and
shall be used in conjunction with the general requirements for inspection and tests in Part PG as well as the
specific requirements for inspection and tests in the applicable Parts of this Section that pertain to the type of
boiler under consideration.
PW-44.8.2 A minimum of 5% of the clad portion of
bimetallic tubing shall be subjected to liquid penetrant
examination (PT) in accordance with A-270 and acceptance or rejection based on A-270.4. The portion of bimetallic tubing containing rejectable defects shall either be
removed or the defects repaired in accordance with
PW-44.9.
PW-46.2 Inspection During Fabrication. The Manufacturer shall submit the vessel or other pressure part
for inspection at such stages of the work as may be designated by the Inspector.
PW-47
CHECK OF WELDING PROCEDURE
PW-47.1 It is the duty of the Inspector to assure himself that the welding procedures employed in construction have been qualified under the provisions of Section
IX. The Manufacturer shall submit evidence to the Inspector that those requirements have been met.
PW-47.2 The Inspector has the right at any time to
call for and witness the test welding and testing although
it is not mandatory that he witness the test welding and
the testing unless he so desires.
PW-44.8.4 Other elements that may be considered
for inclusions in the production examination program include the following:
(a) validation of chemical composition of the clad, particularly chromium
(b) documentation of dimensional characteristics of the
completed component
(c) records of clad areas for each weld consumable
used
(d) hardness testing
(e) examining the clad surface with copper sulfate to
identify bare areas
(f) macroscopic and microscopic metallographic
sampling
PW-48
CHECK OF WELDER AND WELDING
OPERATOR PERFORMANCE
QUALIFICATIONS
PW-48.1 It is the duty of the Inspector to assure himself that all welding is done by welders or welding operators qualified under the provisions of Section IX. The
Manufacturer shall make available to the Inspector a certified copy of the record of performance qualification
tests of each welder and welding operator as evidence
that these requirements have been met.
PW-48.2 The Inspector has the right at any time to
call for and witness the test welding and testing although
it is not mandatory that he witness the test welding and
the testing unless he so desires.
PW-44.9 Defects confined to the clad, revealed by the
examinations in PW-44.8 or found otherwise, that do not
encroach on the minimum clad thickness or the minimum
total wall thickness shall be removed locally by mechanical means and the area smoothly blended to the adjacent
contour. Defects that encroach on the minimum clad
PW-49
CHECK OF HEAT TREATMENT PRACTICE
The Inspector shall satisfy himself that all heat treating
operations required by the Code have been correctly
performed.
126
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PW-44.8.3 In the vicinity of all the areas identified
for PT in PW-44.8.2, clad thickness shall be measured at a
location (or locations) identified by the Manufacturer responsible for certifying the boiler unit. The means for
measuring the clad thickness shall be established by the
Manufacturer responsible for certifying the boiler unit
using calibration standards typical of the clad process.
All violations of minimum clad thickness shall initiate a
more extensive thickness survey to establish the extent
of the affected area, and an engineering evaluation for disposition shall be performed by the Manufacturer responsible for certifying the boiler unit.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PW-50
QUALIFICATION OF NONDESTRUCTIVE
EXAMINATION PERSONNEL
PW-51.3.1 Any indication characterized as a crack,
or zone of incomplete fusion or penetration.
PW-50.1 The Manufacturer shall be responsible for
assuring that nondestructive examination (NDE) personnel have been qualified and certified in accordance with
their employer’s written practice prior to performing or
evaluating radiographic or ultrasonic examinations required by this Section. SNT‐TC‐1A25 or CP‐189 shall be
used as a guideline for employers to establish their written practice. National or international Central Certification Programs, such as the ASNT Central Certification
Program (ACCP), may be used to fulfill the examination
and demonstration requirements of the employer’s written practice. Provisions for training, experience, qualification, and certification of NDE personnel shall be described
in the Manufacturer’s quality control system (see
PG-105.4).
PW-51.3.2 Any other elongated indication on the
radiograph that has a length greater than
(a) 1/4 in. (6 mm) for t up to 3/4 in. (19 mm)
(b) 1/3t for t from 3/4 in. (19 mm) to 21/4 in. (57 mm)
(c) 3/4 in. (19 mm) for t over 21/4 in. (57 mm)
where t is the thickness of the weld
PW-51.3.3 Any group of aligned indications that
have an aggregate length greater than t in a length of
12t, except when the distance between the successive imperfections exceeds 6L where L is the length of the longest imperfection in the group.
PW-51.3.4 Rounded indications in excess of those
shown in A-250.
PW-51.4 A complete set of radiographs for each job
shall be retained by the Manufacturer and kept on file
for a period of at least 5 years.
PW-50.2 NDE personnel shall be qualified by examination. Qualification of NDE Level III personnel certified
prior to the 2004 Edition of Section I may be based on demonstrated ability, achievement, education, and experience. Such qualification shall be specifically addressed
in the written practice. When NDE personnel have been
certified in accordance with a written practice based on
an edition of SNT‐TC‐1A or CP‐189 earlier than that referenced in A-360, their certification shall be valid until their
next scheduled recertification.
PW-52
PW-52.1 When the ultrasonic examination method is
used for a weld requiring volumetric examination by
PW-11, the weld shall be examined throughout its entire
length using the techniques and standards for ultrasonic
examination as defined in Section V, Article 4, Mandatory
Appendix VII, Ultrasonic Examination Requirements for a
Workmanship Based Acceptance Criteria.
PW-52.2 The Manufacturer’s report, as required by
Section V, Article 4, T-490, shall be retained by the Manufacturer for a minimum of 5 yr.
PW-52.3 Acceptance–Rejection Standards. Imperfections that cause an indication to exceed the evaluation
levels specified in Section V shall be investigated to the
extent that the ultrasonic examination personnel can determine their shape, identity, and location, and evaluate
them in terms of PW-52.3.1 and PW-52.3.2.
RADIOGRAPHIC EXAMINATION
PW-51.1 When the radiographic examination method
is used for a weld requiring volumetric examination by
PW-11, the weld shall be examined throughout its entire
length by the X-ray or gamma-ray method in accordance
with Section V, Article 2. The requirements of T-274 are to
be used as a guide but not for the rejection of radiographs
unless the geometrical unsharpness exceeds 0.07 in.
(1.8 mm).
PW-52.3.1 Cracks, lack of fusion, or incomplete penetration are unacceptable regardless of length.
PW-52.3.2 Other imperfections are unacceptable if
the indication exceeds the reference level and their length
exceeds the following:
(a) 1/4 in. (6 mm) for t up to 3/4 in. (19 mm)
(b) 1/3t for t from 3/4 in. (19 mm) to 21/4 in. (57 mm)
(c) 3/4 in. (19 mm) for t over 21/4 in. (57 mm)
PW-51.2 A single‐welded circumferential butt joint
with backing strip may be radiographed without removing the backing strip, provided it is not to be removed
subsequently and provided the image of the backing strip
does not interfere with the interpretation of the resultant
radiographs.
where t is the thickness of the weld being examined. If the
weld joins two members having different thicknesses at
the weld, t is the thinner of these two thicknesses.
PW-51.3 Indications shown on the radiographs of
welds and characterized as imperfections are unacceptable under the following conditions, and shall be repaired
as provided in PW-40 and the repair radiographed to
PW-51:
PW-53
TEST PLATES
PW-53.1 Vessel Test Plates. Cylindrical pressure
parts such as drums and shells and all noncylindrical
pressure parts that are subject to internal pressure and
127
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PW-50.3 Recertification shall be in accordance with
the employer’s written practice based on the edition of
SNT‐TC‐1A or CP‐189 referenced in A-360. Recertification
may be based on evidence of continued satisfactory performance or by reexamination(s) deemed necessary by
the employer.
PW-51
ULTRASONIC EXAMINATION
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
case the weld metal shall be deposited in the weld joint
of the test plate continuously with that deposited in the
shell joint.
are fabricated by fusion welding, shall meet the test requirements in PW-53.2 through PW-53.9. The following
are exempt from these requirements:
(a) cylindrical pipe, tubes, and headers subject to internal pressure
(b) all cylindrical pressure parts constructed of P-No. 1
materials
(c) all attachment welds
PW-53.2.2 For circumferential and other welded
joint configurations not described in PW-53.2.1, for which
attachment of a test plate as shown in Figure PW-53.2 is
not possible, weld the joint in the test plate without attaching it as a continuation of a joint in the vessel plate.
If the essential variables of the welding procedure specification used to weld all joint configurations in the vessel
plate remain unchanged, one test plate may be used to satisfy the requirements for all welded joint configurations
in the same vessel plate.
PW-53.2 Welded Test Plates. A welded test plate
having the dimensions shown in Figure PW-53.1 shall
be prepared from plate of the same material
specification,26 the same or greater thickness as the weld
at the joint and using the same welding procedure as used
for the parts that it represents. The plate shall be welded
by one of the following methods.
PW-53.3 Where there are several pressure parts of
any one design being welded in succession, and in which
the plates are of the same material that is covered by the
welding procedure, a test plate shall be furnished for each
PW-53.2.1 Attach the test plate as shown in Figure
PW-53.2 to one end of one longitudinal joint of each vessel so that the edges to be welded are a continuation of
the corresponding edges of the longitudinal joint. In this
Weld
Gage lines
Discard
Tension specimen (transverse)
Tension specimen
(all weld metal)
Bend test
specimen
Full-Size Specimen
1.5T
Tension
specimen
Small-Size
Specimen
Weld
Gage lines
Sufficient length to
accommodate all specimens
T
128
Plate
Thickness
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Discard
Edges of widest
face of weld
6 in. (150 mm) + 6t
but not less than 10 in. (250 mm)
Figure PW-53.1
Test Specimens From Longitudinal Welded Test Plates
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PW-53.2
Method of Forming Longitudinal Test Plates
Reinforcing bars clamped or welded to back of
test plates. Test plates to be tack welded to
the shell or otherwise supported in postion.
Test
plates
Drum shell
Test plate
Test plate
Reinforcing bars
Shell
Shell
surfaces of the weld have been machined to a plane surface flush with the surface of the plate. When the capacity
of the available testing machine does not permit testing a
specimen of the full thickness of the welded plate, the specimen may be cut with a thin saw into as many portions of
the thickness as necessary, each of which shall be tested
and shall meet the requirements.
200 ft (60 m), or fraction thereof, of the main welded
joints. The thickness of the thinnest plate and of the thickest plate shall not differ by more than 1/4 in. (6 mm).
PW-53.4 Where more than one welder or welding
operator is used on a vessel, the inspector may designate
the welder or welding operator who shall make the required test plate.
PW-53.6 Test Specimens. The coupons for tension
and bend test shall be removed as shown in Figure
PW-53.1 and shall be of the dimensions shown in Figures
PW-53.3(a) and PW-53.3(b). If the dimensions of the weld
groove are such that a full size tension specimen cannot
be obtained, then a small size specimen as shown in
Figure 4 of SA-370 may be used. The specimen removed
shall be the largest specimen that contains only all‐weld
metal in the reduced section.
PW-53.7.4 The tension test specimen of the weld
metal shall be taken such that the reduced portion of
the specimen shall consist entirely of deposited weld metal and shall meet the following requirements:
Tensile strength = at least that of the minimum of the
range of the plate which is welded
PW-53.7 Tension Tests.
PW-53.7.1 Except as provided in PW-53.7.5 two
types of tension test specimen are required, one of the
joint and the other of the weld metal.
PW-53.7.2 The tension specimen of the joint shall
be transverse to the welded joint and shall be the full
thickness of the welded plate after the outer and inner
129
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PW-53.7.3 If the transverse tension test specimen
breaks in the weld, its tensile strength shall be not less
than the minimum of the specified tensile range of the
base material (The tension test of the joint specimen as
specified herein is intended as test of the welded joint
and not of the plate.). When the specimen breaks outside
the weld at not less than 95% of the minimum of the specified tensile range of the base material and the weld
shows no sign of weakness, the test shall be accepted as
meeting the requirements. When the specimen or a portion thereof breaks in the base material below this
strength tolerance because of a local defect, one additional specimen shall be tested and shall meet the
requirements.
PW-53.5 The test plate shall be so supported that the
welding does not warp the plate out of line by an angle
greater than 5 deg. The plate shall be straightened before
postweld heat treatment to remove any warping that has
occurred. The test plate shall be given the same preheat
treatment and the same postweld heat treatment as the
vessel that it represents. In no case shall the temperature
of preheat or postweld heat treatment be higher than that
used for the vessel.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PW-53.3(a)
Details of Tension Test Specimens
T
T
A
[Note (1)]
Note (3)
Note (4)
Note (5)
B
[Note (2)]
10 in. (250 mm) approx.
2 in. (50 mm)r
1/
4
1/
4
Transverse Tension Specimen
in.
(6 mm)
Note (6)
in.
(6 mm)
3/
in.
(19 mm)
4
21/2 in. (64 mm)
21/
4
3/
4
in. (19 mm)
in. (57 mm)
T
1/
in. (13 mm)
Not less than 1/8 in. (3.0 mm)
±0.01 (0.2 mm)
2
1/
4
in. (6 mm)
Note (3)
W
Full Size All Weld Metal Tension Specimen
[Note (8)]
t
Note (6)
Transverse Tension Specimen
Small Size All Weld Metal Tension Specimen
[Note (9)]
NOTES:
(1) A — Cross section through tension specimen.
(2) B — Cross section through tension specimens on very thick plate.
(3) Weld reinforcement shall be machined flush with base metal.
(4) Edge of widest face of weld.
(5) This section machined preferably by milling.
(6) “f” indicates light finish cut.
(7) These edges may be flame cut.
(8) W = 11/2 in. (38 mm) ±0.01 in. (0.2 mm) if t does not exceed 1 in. (25 mm); W = 1 in. (25 mm) ±0.01 in. (0.2 mm) if t exceeds 1 in. (25 mm).
(9) Specimen sizes in accordance with Figure 4 of SA-370.
130
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Note (7)
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PW-53.3(b)
Details of Bend Test Specimens
R = not over 0.1T
Note (1)
f
f
Edge of widest
face of weld
f
1/ in. (3 mm) min.
8
T
Cross Section of
Bend Test Specimen
1/ in.
16
1/
16 in.
(1.5 mm)
f
[Note (2)]
f
t
f
f
R = not over
0.1t
1/ in. (3 mm)
8
min.
Tension
surface
T or t, as applicable
f
f
(1.5 mm)
f
T
f
f
f
Cross Section of
Bend Test Specimens
From Very Thick Plate
Elongation, minimum, %, in 2 in. (50 mm) = 20,
the available testing machines does not permit testing a
specimen of the full thickness of the welded plate, the specimen may be cut with a thin saw into as many portions of
the thickness as necessary, each of which shall be tested
and shall meet the requirements. The inside and outside
surfaces of the weld shall be machined to a plane surface
flush with the surface of the specimen. The edges of this
surface shall be rounded to a radius not over 10% of
the thickness of the test specimen. The specimen shall
be bent cold under free bending conditions until the least
elongation measured within or across approximately the
entire weld on the outside fibers of the bend test specimen is 30%, or 700/U (4 820/U ) + 20%, whichever is less
where
where
U = minimum specified tensile strength of the material
to be welded, ksi (MPa), as given in the applicable
stress table.
If small size tensile specimens are used, measurement
of elongation may be omitted.
PW-53.7.5 For plate thicknesses less than 5/8 in.
(16 mm), the all‐weld metal tension test may be omitted.
U = minimum specified tensile strength of the material
to be welded, psi, as given in the applicable stress
table.
PW-53.8 Bend Tests.
PW-53.8.1 The bend test specimen shall be transverse to the welded joint of the full thickness of the plate
and shall be of rectangular cross section with a width 11/2
times the thickness of the specimen. When the capacity of
PW-53.8.2 When a crack is observed in the tensile
strained surface of the specimen between the edges before the elongation required in PW-53.8.1 is attained,
the specimen shall be considered to have failed and the
131
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
NOTES:
(1) If coupons have been cut apart by a fusion process, the flame cut surfaces are to be machined off as indicated.
(2) This surface to be reasonably smooth. Any tool marks remaining must be lengthwise of specimen. “f” indicates light finish cut. Weld reinforcement to be removed.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PW-54.2 When repairs are made, the part shall again
be tested in the regular way, and if it passes the test the
Inspector shall accept it. If it does not pass the test the Inspector may permit supplementary repairs, or if in his
judgment the pressure part is not suitable for service,
he may permanently reject it.
test shall be stopped. Cracks at the corners of the specimen shall not be considered as a failure. The appearance
of small imperfections in the convex surface shall not be
considered as a failure if the greatest dimension does
not exceed 1/8 in. (3 mm).
PW-53.9 Retests.
PW-53.9.1 Should any of the specimens fail to meet
the requirements by more than 10%, no retest shall be allowed except that in the case of failure of the free‐bend
test specimen due to permissible types of imperfections,
free‐bend specimen retests may be allowed at the discretion of the Inspector.
PW-54.3 Welding of nonpressure parts to pressure
parts and seal welding of pressure-retaining handhole
and inspection plugs or fittings secured by physical
means may be performed after the hydrostatic test without requiring another hydrostatic test provided the following criteria are met.
PW-53.9.2 Should any of the specimens fail to
meet the requirements by 10% or less, retests shall be allowed. A second test plate shall be welded by the same
operator who welded the plate which did not meet the
test requirements. The retest shall be made on specimens
cut from the second plate.
PW-54.3.1 Welding is done in conformance with
this Part and the completed weld is inspected by the
Authorized Inspector. The Manufacturers’ Data Report
Form shall be signed only after completion of the welding.
PW-54.3.2 For nonpressure parts welded to pressure parts, the following additional conditions shall be
met:
(a) The pressure part material is limited to P‐No. 1
materials.
(b) The nonpressure attachment material is limited to
carbon steel with a carbon content not exceeding 0.2%
or any P‐No. 1 material.
(c) The welding is done by stud welding or by fillet
welding having a throat not exceeding the lesser of 0.70
times the thickness of the pressure part or 1/4 in. (6 mm).
(d) A minimum 200°F (95°C) preheat shall be applied
when the pressure part thickness exceeds 3/4 in. (19 mm).
PW-53.9.3 The retests shall comply with the requirements. For either of the tension retests, two specimens shall be cut from the second test plate, and both
of these shall meet the requirements.
PW-53.9.4 When there is more than one specimen
of the same type and one or more of the specimens fail to
meet the requirements by 10% or less, a retest may be
made for each specimen required for the weld under consideration. Each such specimen shall meet the
requirements.
PW-54
PW-54.3.3 For seal welding of pressure-retaining
handhole and inspection plugs or fittings secured by physical means, the following additional conditions shall be
met:
(a) The seal welds must be exempted from postweld
heat treatment by rules elsewhere in this section.
(b) The completed weld is examined using either the
magnetic particle or liquid penetrant examination method in accordance with A-260 or A-270, respectively. When
the base materials or welds are nonmagnetic, only the liquid penetrant method shall be used.
HYDROSTATIC TEST
PW-54.1 Except as modified in PG-99.3, PG-106.8,
and PW-54.3, all welded drums and other welded pressure parts shall be subjected to a hydrostatic test pressure of not less than 1.5 times the maximum allowable
working pressure. The hydrostatic test may be made
either in the Manufacturer’s shop or in the field.
132
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PW-53.9.5 If the percentage of elongation of all‐
weld metal tension specimen is less than that specified
and any part of the fracture is more than 3/4 in. (19 mm)
from the center of the 2 in. (50 mm) gage length of the
specimen, a retest shall be allowed.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PART PR
REQUIREMENTS FOR BOILERS FABRICATED BY RIVETING
GENERAL
PR-1
permitted in Parts PG, PWT, and PFT and for which allowable stress values are given in Section II, Part D, Subpart 1,
Tables 1A and 1B, for Section I construction.
SCOPE
The rules in this Part are applicable to boilers and component parts thereof that are fabricated by riveting. These
rules shall be used in conjunction with the general requirements in the applicable Parts of this Section and
Mandatory Appendix V that pertain to the type of boiler
under consideration.
PR-2
DESIGN
PR-4
RESPONSIBILITY
PR-2.1 Each Manufacturer (Certificate of Authorization holder) is responsible for the riveting done by its organization. Such riveting will ordinarily be done by
employees of the Manufacturer, who accepts the responsibility for Code construction of the boiler or part being
riveted. Alternatively, the Manufacturer may perform
Code riveting using the services of individual riveters
who are not in its employ provided all the conditions in
PR-2.1.1 through PR-2.1.3 are met.
PR-5
STRENGTH OF PLATES
In determining the efficiency of a riveted joint, the nominal tensile strength of the material under consideration
shall be used.
PR-6
STRENGTH OF RIVETS
In computing the ultimate strength of rivets in shear,
the values given in PG-14 shall be used.
PR-2.1.2 The Manufacturer shall include in its
quality control system, as a minimum, the following:
(a) a requirement for complete and exclusive administrative and technical supervision of all riveters by the
Manufacturer
(b) evidence that the addition to the Manufacturer’s
quality control system required in (a) has been accepted
by the Manufacturer’s Authorized Inspection Agency,
which provides inspection services
PR-7
CRUSHING/COMPRESSIVE STRENGTH OF
PLATES
The resistance to crushing (compressive strength) of
material may be determined by testing in accordance
with ASTM E9 of the actual material under consideration.
Alternatively, the following values in pounds per square
inch (MPa) may be used:
(a) SA-202 Grades A and B: 120,000 (827)
(b) SA-204 all grades: 95,000 (655)
(c) SA-285, SA-515 all grades: 95,000 (655)
(d) SA-516 all grades: 95,000 (655)
PR-2.1.3 The Manufacturer shall be responsible for
Code compliance of the riveted boiler or component part,
including stamping the Certification Mark with the appropriate designator and providing Data Report Forms properly executed and countersigned by the Authorized
Inspector.
PR-8
JOINT EFFICIENCY AND THE THICKNESS
OF SHELLS AND DRUMS
PR-8.1 The efficiency of a joint is the ratio of the
strength of the joint to the strength of the solid plate.
For a riveted joint, this is determined by calculating the
breaking strength of a unit section of the joint, considering each possible mode of failure separately, and dividing
the lowest result by the breaking strength of the solid
plate of equal length of the unit section of the joint. The
efficiency of the joint shall be calculated by the general
method described in A-1 through A-6.
MATERIALS
GENERAL
Materials used in riveted construction of pressure parts
shall conform to one of the specifications given in Section
II. Such materials shall be limited to those specifically
133
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PR-2.1.1 All Code construction shall be the responsibility of the Manufacturer.
PR-3
GENERAL
The rules in PR-5 through PR-18 apply specifically to
the design of boilers and parts thereof that are fabricated
by riveting. These rules shall be used in conjunction with
the general requirements for design in Part PG and with
the specific requirements for design in the applicable
Parts of this Section that pertain to the type of boiler under consideration.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PR-8.2 The minimum thickness or maximum allowable working pressure of cylindrical shells and drums of
riveted construction shall be the greater thickness or lesser pressure considering both longitudinal and circumferential stress.
Table PR-9-1
Minimum Thickness of Buttstraps
Required Thickness of Shell
Plate, in. (mm)
1
/4
/32
5
/16
11
/32
3
/8
13
/32
7
/16
15
/32
1
/2
17
/32
9
/16
5
/8
3
/4
7
/8
1
11/8
11/4
11/2
PR-8.2.1 Circumferential Stress (Longitudinal
Joints). The minimum thickness or maximum allowable
working pressure of shells and drums shall be determined using the rules given in PG-27 or A-317 using a value of E that equals the lesser of the efficiency of the
buttstrap longitudinal joint or the ligament efficiency
per PG-52 or PG-53. The value of S shall be multiplied
by 0.7.
9
PR-8.2.2 Longitudinal Stress (Circumferential
Joints). The minimum thickness or maximum allowable
working pressure shall be determined using the following
equations:
PR-12
(6)
(6)
(6)
(6)
(8)
(8)
(10)
(10)
(11)
(11)
(11)
(13)
(13)
(16)
(17)
(19)
(22)
(25)
TRANSVERSE PITCH (BACK PITCH) OF
ROWS OF RIVETS
PR-12.1 For longitudinal joints, the distance between
the centerlines of any two adjacent rows of rivets, or the
“back pitch” measured at right angles to the direction of
the joint shall have the following minimum values:
THICKNESS OF BUTTSTRAPS
The minimum thickness of buttstraps for double-strap
joints are shown in Table PR-9-1. Intermediate values
shall be determined by interpolation.
PR-12.1.1
If p /d ≤ 4, the minimum value shall be
PR-12.1.2
If p /d > 4, the minimum value shall be
2d .
LONGITUDINAL JOINTS
where
The riveted longitudinal joints of a shell or drum shall
be of butt- and double-strap construction. PR-10 does
not apply to domes [see V-6(b)] or the portion of a boiler
shell that is staybolted to the firebox sheet.
PR-11
/4
/4
1
/4
1
/4
5
/16
5
/16
3
/8
3
/8
7
/16
7
/16
7
/16
1
/2
1
/2
5
/8
11
/16
3
/4
7
/8
1
1
d = diameter of the rivet holes, in. (mm)
p = pitch of rivets in outer row where a rivet in the inner row comes midway between two rivets in the
outer row, in. (mm)
= pitch of rivets in the outer row less pitch of rivets in
the inner row where two rivets in the inner row
come between two rivets in the outer row, in.
(mm) (It is here assumed that the joints are the
usual construction where rivets are symmetrically
spaced.)
CIRCUMFERENTIAL JOINTS
PR-11.1 The riveted circumferential joints of a shell
or drum may be single- or double-riveted lap construction
or butt- and double-strap construction.
PR-11.2 The total force on a circumferential joint is
the cross-sectional area of the inside diameter of the shell
or drum multiplied by the maximum allowable working
pressure. When 50% or more of the total force is
PR-12.2 The back pitch of rivets in circumferential
joints may be less than that required in PR-12.1 provided
the ligaments between the rivet holes in the direction of
134
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
E = joint efficiency (see A-1 through A-6)
P = maximum allowable working pressure, psi (MPa)
R = inside radius of the shell at the point of connection
to the adjacent shell course or head, in. (mm)
S = maximum allowable stress value at the design temperature of the metal, as listed in the tables specified in PG-23, psi (MPa)
t = minimum required thickness of shell, in. (mm)
PR-10
1
supported by the affect of tubes or through stays, the
strength of the circumferential joints shall be at least
70% of that required by PR-8.2.2.
where
PR-9
(6)
(7)
(8)
(9)
(10)
(10.5)
(11)
(12)
(13)
(13.5)
(14)
(16)
(19)
(22)
(25)
(29)
(32)
(38)
Minimum Thickness of
Buttstraps, in. (mm)
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PR-15
the joint and those rivets in the diagonal direction, as determined by the rules in PG-52 and PG-53, are sufficient
to withstand all of the following:
(a) the stress due to pressure
(b) any stress due to the weight of components in support of the boiler structure
Attachment by riveting shall be in accordance with the
requirements in PR-15.1 through PR-15.5.
PR-15.1 Openings for nozzles and other connections
shall be far enough away from any riveted shell or drum
joint so that the joint and the opening connection flange
and/or reinforcement plates do not interfere with one
another.
PR-12.3 The back pitch of rivets shall be measured
either on the flat plate before rolling or on the median line
after rolling. The location of rivet holes in the plate shall
govern the locations of rivet holes in the buttstraps.
PR-15.2 For nozzle fittings having a bolting flange
and an integral flange for riveting, the thickness of the
flange attached to the boiler shall not be less than the
thickness of the neck of the fitting.
PR-12.4 The distance between any two rows of rivets
in a circumferential joint or back pitch shall be not less
than 1.75d .
PR-13
PR-15.3 The allowable stress on a rivet in tension
used to attach a flanged frame or ring to the outside of
a shell or drum shall be as shown in Table PR-15.3-1.
PREPARATION OF PLATE EDGES FOR
CALKING
The plate edges to be sealed by calking shall be beveled
to an angle not less than 65 deg and not more than 75 deg
to the plane of the plate. Refer to Figure PR-13-1.
PR-14
RIVETED CONNECTIONS
PR-15.4 The total load in tension on the rivets used
to attach a flanged frame or ring to a shell or drum shall
be determined by the following:
EDGE DISTANCE
The total cross-sectional area of rivets required for the
load on the rivets shall be determined by the following:
PR-14.2 On longitudinal joints of all types and on circumferential joints of drums having heads that are not
supported by tubes or through-stays, the distance from
the center of a row of rivet holes to the calking edges of
the plates, except rivet holes in the ends of buttstraps,
shall be not less than 1.5 times and not more than 1.75
times the diameter of the rivet holes.
where
A = required cross-sectional area, in.2 (mm2)
A C I = area bounded by inside calking, in.2 (mm2) (see
Figure PR-15.4-1)
A C O = area bounded by outside calking, in.2 (mm2) (see
Figure PR-15.4-1)
L R = load on rivets, lb (N)
P = maximum allowable working pressure, psi (MPa)
S R = allowable stress from Table PR-15.3-1, psi (MPa)
PR-14.3 The distance from centers of rivet holes of
circumferential joints to the edges of the plate in shells
or drums having heads that are supported by tubes or
through-stays shall be not less than 1.25 times the diameter of the rivet holes.
Figure PR-13-1
Typical Plate Edge Beveled for Sealing by Calking in a Riveted Joint
65 deg min.
75 deg max.
135
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PR-14.1 Edge distance shall be measured from the
center of the rivet holes (a line that passes through and
perpendicular to the axis of the rivet holes) to the calking
edge of the plate before calking.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
the area of rivet and tube holes, in square inches (square
millimeters), by the maximum allowable working pressure in pounds per square inch (megapascals) (see
PR-15.4).
(b) For reinforcing plates attached to the inside of a
shell, the load on rivets and tubes shall be determined
as in Figure PR-17.2-1, illustration (b), except the boundary of the area under consideration that runs parallel to
the axis of the shell shall be lines drawn radially from
the longitudinal edge of the reinforcing plate to the outside surface of the shell.
Table PR-15.3-1
Allowable Stress on Rivets in Tension
Material Specification and
Grade
SA-31 Grade A
SA-31 Grade B
Allowable Stress
9,000 psi (62 MPa)
11,600 psi (80 MPa)
PR-15.5 The rivets attaching nozzles shall be so
spaced as to avoid the possibility of the shell plate or
the nozzle flange failing by tearing around through the
rivet holes. An example illustrating the method of calculating is given in A-75.
PR-16
PR-17.3 Reinforcing Plates and Rivets.
PR-17.3.1 Sections of plates used to reinforce tube
openings and stayed by rivets shall meet the requirements of PG-46 using a value of 2.5 for C. The value of S
shall be multiplied by 0.7.
REINFORCEMENT OF OPENINGS
PR-17.3.2 The minimum cross-sectional area of the
rivet shall be calculated using the method in PR-15.4
using the maximum area supported by a single rivet less
the area of the rivet hole for the value of A C I or A C O .
The area of reinforcement shall be designed in accordance with the requirements of PG-32 through PG-39.
PR-17
REINFORCING SHELLS OF WATERTUBE
BOILERS
PR-17.3.3 The maximum spacing of rivets with respect to the tubes shall meet the requirements in PFT-27.
Plates used to reinforce the tube openings in the shells
of water tube boilers shall meet the requirements of
PR-17.1 through PR-17.4. Reinforcing plates shall be protected from the fire and products of combustion.
PR-17.4 Reinforcing Plates and Tubes.
PR-17.4.1 The minimum thickness or maximum allowable working pressure of sections of plates used to reinforce tube openings and stayed by tubes shall be
determined in accordance with PFT-31. The value of S
shall be multiplied by 0.7.
PR-17.1 Reinforcement plates may be attached to the
inside, outside, or both sides of the shell. In all cases, the
tubes shall be rolled into the shell and the reinforcing
plate or plates so the tubes act as a staybolt.
PR-17.2 For the purpose of calculating the total load
on stay tubes and rivets and laying out attachment rivets
relative to the tubes, the boundary of plates used to reinforce tube openings in drums shall be defined as follows:
(a) For reinforcing plates attached to the outside or
both sides of a shell [see Figure PR-17.2-1, illustration
(a)], the load on rivets and tubes shall be determined by
multiplying the area of the outside reinforcing plate less
Figure PR-15.4-1
Location of Seams in Inside and Outside Calking Boundaries
Location of
outside calking
Location of
inside calking
136
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PR-17.4.2 The minimum required cross-sectional
area of the tube shall be determined in accordance with
PG-49 and multiplying the allowable stress by 0.7.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PR-17.2-1
Boundary of Reinforcing Plate on Outside and Inside of Drum
Longitudinal boundary
for calculating the
total load on stay
tubes and rivets
(a) Reinforcing Plate on Outside of Drum
Longitudinal boundary
for calculating the
total load on stay
tubes and rivets
(b) Reinforcing Plate on Inside of Drum
PR-20
PR-18
PR-20.1 Buttstraps shall be formed to the curvature
of the shell with which they are to be used. This forming
shall be accomplished by applying pressure or by rolling.
Forming methods that involve strikes or blows shall not
be used.
GENERAL
The rules in PR-19 through PR-24 apply specifically to
the fabrication of boilers and parts thereof that are fabricated by riveting. These rules shall be used in conjunction
with the general requirements for fabrication in Part PG
and with the specific requirements for fabrication in the
applicable Parts of this Section that pertain to the type
of boiler under construction.
PR-19
BUTTSTRAPS
PR-20.2 The ends of inner buttstraps of riveted buttstrap longitudinal joints may be welded to the edges of
heads or of the adjoining shell plate or to circumferential
buttstraps for tightness in accordance with the requirements of Part PW. When a buttstrap of a longitudinal joint
does not extend the full length of the shell plate, as shown
in Figure PR-20.2-1, the abutting edges of the shell plate
may be welded provided the distance from the end of
the buttstrap to the edge of the flange or head or adjacent
shell plate is not greater than 2.5 in. (65 mm).
WELDED CONNECTIONS IN RIVETED
BOILERS
PR-19.1 For boilers and components fabricated with
a combination of welding and riveting, all welding requiring postweld heat treatment shall be completed and heat
treated before assembly by riveting.
PR-19.2 For welds that do not require postweld heat
treatment, care shall be taken so riveted joints and attachments are protected from welding, thermal cutting, and
any process that generates heat that will cause a change
to the physical characteristics of the riveted joint.
PR-21
RIVET HOLES
PR-21.1 Finished rivet holes shall not exceed 1.065
times the actual diameter of the rivet shank at ambient
temperature.
PR-21.2 All holes for rivets in plates, buttstraps,
heads, stays, and lugs shall be drilled. Alternatively, they
may be punched at least 1/8 in. (3 mm) less than full diameter for material not over 5/16 in. (8 mm) in thickness
137
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
FABRICATION
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PR-20.2-1
Allowable Welding of Plate Edges at Ends of Buttstraps
2½ in.
max.
Welded
and at least 1/4 in. (6 mm) less than full diameter for material over 5/16 in. (8 mm). Such holes shall not be punched
in material more than 5/8 in. (16 mm) in thickness.
PR-23.5 To maintain even temperature throughout
the joint during riveting, rivets shall be driven in an order
that prevents uneven heating of the material in the rivet
zone.
PR-21.3 For final drilling or reaming of the rivet hole
to full diameter, the parts shall be firmly bolted in position by tack bolts.
PR-21.4 The finished holes shall be true, cleaned of
burrs, and concentric.
PR-22
ASSEMBLY OF JOINTS
After drilling or reaming rivet holes, the plates and
buttstraps of longitudinal joints shall be separated, the
burrs and chips shall be removed, and the plates reassembled metal-to-metal with barrel pins fitting the holes
and with tack bolts.
PR-23
PR-23.7 To prevent the rivet from cooling too rapidly
during the upsetting process, the tooling that comes in direct contact with the rivet should be heated before use.
RIVETING
PR-23.1 Rivets shall be of sufficient length to fill the
rivet holes completely and form heads at least equal in
strength to the bodies of the rivets. Some forms of finished rivet heads that are acceptable are shown in ASME
B18.1.2.
PR-24
JOINT TIGHTNESS
PR-24.1 The calking edges of plates, buttstraps, and
vessel heads shall have the heat-affected zone created
by thermal cutting or other processes removed. Calking
shall be done with a tool of such form that there is no danger of scoring or damaging the plate underneath the calking edge, or splitting the calked sheet.
PR-23.2 Rivet snaps used on the factory head of the
rivet shall have less volume than the head. They shall first
make contact with the center of the head and then form
outward.
PR-23.3 Before driving, rivets shall be heated to a
temperature between 1,800°F (980°C) and 2,250°F
(1,230°C). Forming of the rivet shall be completed above
1,350°F (730°C). Complete filling of the hole and forming
of the head shall be achieved in a single operation.
PR-24.2 Prior to the hydrostatic test, a two-pass seal
weld having a throat thickness not to exceed 3/16 in.
(5 mm) may be used on calking edges of plates, buttstraps, and vessel heads provided all the requirements
of Part PW and (a) through (d) below are met. The heat
from welding shall not distort the plate or loosen the rivets in such a manner as to break the initial bond affected
in the riveted joint.
PR-23.4 Barrel pins shall be used to align finished
rivet holes. Tack bolts shall be used in all rivet holes to
hold the plates firmly together. A single tack bolt shall
be removed at a time and replaced with a rivet.
138
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PR-23.6 No riveting shall be done when the temperature of the base metal is less than 70°F (20°C). The surface
of all areas within 6 in. (150 mm) of the point where a rivet is to be driven should be heated to a temperature at
least hot enough to prevent the rivet from cooling too rapidly during the upsetting process. No riveting shall be
done when surfaces are wet or covered with ice, when
snow is falling on the surfaces to be riveted, or during
periods of high wind, unless the workers performing
the riveting and the work are properly protected.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PR-27
(a) Shell plates in circumferential-riveted lap joints
may be seal welded provided the shell plates are a minimum of 1.2 times thicker than a seamless shell of the
same size and material.
(b) Nozzle attachment flanges may be seal welded provided the shell plates are a minimum of 1.2 times thicker
than a seamless shell of the same size and material. The
nozzle attachment flange thickness must be 1.2 times
greater than that required when seal welding is not
applied.
(c) Unstayed dished heads may be seal welded with no
increase in head thickness. Seal welding shall not be applied closer than 1/2 in. (13 mm) to the point of tangency
of the knuckle of the flange.
(d) The inner buttstraps in locomotive-type boilers
may be seal welded with no increase in the shell or buttstrap thickness.
A hydrostatic test of the completed boiler or part shall
be conducted per the requirements of PG-99.
PR-28
GENERAL
In addition to the inspections required per PG-90, an inspection shall be made of the fit up of plates in riveted
joints prior to reaming the rivet holes and of the finished
rivet heads that will not be visible during the hydrostatic
test.
PR-26
DATA REPORTS
HAMMER TEST
After the rivets in a joint have cooled to ambient temperature, a hammer test shall be conducted of each rivet
by tapping one end of each rivet with a hammer. An unbroken and tensioned rivet should give a ringing sound,
whereas a broken or loose rivet will give a hollow or nonresponsive sound. Broken or loose rivets shall be
replaced.
139
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Boilers or parts fabricated by riveting or partially fabricated by riveting shall be documented on the appropriate
type of Data Report Form as required in PG-112. The following information shall be recorded on a Form P-6 Data
Report Supplementary Sheet and referenced in “Remarks” on the master data report:
(a) For longitudinal joints
(1) type of riveted joint (see A-2 through A-6)
(2) efficiency of joint (see PR-8)
(3) material specification, grade, and thickness of
buttstraps (if used)
(4) material specification, grade, and diameter of
rivets
(5) diameter and pitch of rivet holes
(b) For circumferential joints, the attachment of heads
and tube sheets, and mud rings
(1) type of riveted joint, lap, butt, or mud ring
(2) efficiency of joint (see PR-8)
(3) material specification, grade, and diameter of
rivets
(4) diameter, number of rows, and pitch of rivet
holes
(c) For all other types of riveted joints, including, but
not limited to, nozzle attachment, steam dome attachment, corner joints, and lap joints in stayed wrappers
(1) pattern of the rivets in the joint
(2) material specification, grade, and diameter of
rivets
(3) diameter, number of rows, and pitch of rivet
holes
INSPECTION, TESTS, AND DATA REPORTS
PR-25
HYDROSTATIC TEST
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PART PB
REQUIREMENTS FOR BOILERS FABRICATED BY BRAZING
GENERAL
PB-1
ordinarily be done by employees of the Manufacturer who
accepts the responsibility for Code construction of the
boiler or part being brazed. Alternatively, the Manufacturer may perform Code brazing using the services of individual brazers who are not in his employ provided all
the following conditions are met.
GENERAL
PB-1.1 Scope. The rules in Part PB are applicable to
pressure parts of boilers, including piping constructed under the provisions of this Section, that are fabricated by
brazing. These rules shall be used in conjunction with
the general requirements in Part PG and the specific requirements in the applicable Parts of this Section that pertain to the type of boiler under consideration. The rules in
Part PB are not applicable to nonpressure bearing attachments to pressure parts that have essentially no load‐
carrying function (such as extended heat transfer surface,
insulation support pins, etc.).
PB-1.4.1 All Code construction shall be the responsibility of the Manufacturer.
PB-1.4.2 All brazing shall be performed in accordance with Manufacturer’s brazing procedure specifications that have been qualified by the Manufacturer in
accordance with the requirements of Section IX and when
necessary, based on design temperature, with the additional requirements of this Section.
PB-1.1.1 Definition of Brazing. A group of welding
processes that produces coalescence of materials by heating them to the brazing temperature in the presence of a
filler metal having liquidus above 840°F (450°C) and below the solidus of the base metal. The filler metal is distributed between the closely fitted faying surfaces of the
joint by capillary action.
PB-1.4.3 All brazers shall be qualified by the Manufacturer in accordance with the requirements of Section
IX.
PB-1.4.4 The Manufacturer’s quality control system shall include the following as a minimum.
PB-1.4.4.2 Evidence of the Manufacturer’s
authority to assign and remove brazers at his discretion
without involvement of any other organization.
PB-1.4.4.3 A requirement for assignment of brazer identification symbols.
PB-1.4.4.4 Evidence that this program has been
accepted by the Manufacturer’s Authorized Inspection
Agency.
PB-1.2 Elevated Temperature. Maximum design
temperature is dependent on the brazing filler metal
and on the base metals being joined. The maximum design temperatures for some brazing filler metals are
shown in Table PB-1.
PB-1.4.5 The Manufacturer shall be responsible
for Code compliance of the brazement including Code
symbol stamping and providing Data Report Forms properly executed and countersigned by the Authorized
Inspector.
PB-1.3 Service Restrictions. Brazed components
may be used for service up to the temperatures as shown
in Table PB-1, provided acceptable qualification tests are
performed.
PB-1.4 Responsibility. Each Manufacturer27 (Certificate of Authorization Holder) is responsible for the brazing done by his organization and shall establish the
procedures and conduct the tests required by Section
IX, and when necessary those required by this Section
to qualify the brazing procedures used in the construction
of brazed assemblies and the performance tests of
brazers28 who apply these procedures. Such brazing will
MATERIALS
PB-5
GENERAL
PB-5.1 Materials used in brazed construction of pressure parts shall conform to one of the specifications given
in Section II and shall be limited to those specifically permitted in Parts PG, PWT, and PFT for which allowable
stress values are given in Section II, Part D, Subpart 1,
140
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PB-1.4.4.1 A requirement for complete and exclusive administrative and technical supervision of all
brazers by the Manufacturer.
PB-1.1.2 Brazing processes that are permitted for
use under this Part are classified by method of heating
as follows:
(a) torch brazing
(b) furnace brazing
(c) induction brazing
(d) resistance brazing
(e) dip brazing — salt and flux bath
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Table PB-1
Maximum Design Temperatures for Brazing Filler Metal
Filler Metal Classification
Temperature Below Which Section IX Tests Temperature Range Requiring Section IX and
Only Are Required, °F (°C)
Additional Tests, °F (°C)
BCuP
BAg
BCuZn
BCu
BAlSi
BNi
BAu
BMg
300 (150)
400 (205)
400 (205)
400 (205)
300 (150)
1,200 (650)
800 (425)
250 (120)
300–350 (150–175)
400–500 (205–260)
400–500 (205–260)
400–650 (205–345)
300–350 (150–175)
1,200–1,500 (650–815)
800–900 (425–480)
250–275 (120–135)
GENERAL NOTE: Temperatures based on AWS recommendations.
Tables 1A and 1B for Section I Construction, and for
which brazing group P‐Numbers are assigned in Section
IX.
design in Part PG, as well as with the specific requirements for design in the applicable Parts of this Section
that pertain to the type of boiler under consideration.
PB-5.2 Combinations of Dissimilar Metals. Combinations of dissimilar metals may be joined by brazing provided they meet the qualification requirements of Section
IX and this Section.
PB-9
PB-6
It is the responsibility of the Manufacturer to determine
from suitable tests or from experience that the specific
brazing filler metal selected can produce a joint which
will have adequate strength at design temperature. The
strength of the brazed joint shall not be less than the
strength of the base metal, or the weaker of the two base
metals in the case of dissimilar metal joints.
BRAZING FILLER METALS
PB-9.1 Qualification of Brazed Joints for Design
Temperatures Up to the Maximum Shown in Column 1
of Table PB-1. Satisfactory qualification of the brazing
procedure in accordance with Section IX is considered
evidence of the adequacy of the base materials, the brazing filler metal, the flux and/or atmosphere, and other
variables of the procedure.
PB-9.2 Qualification of Brazed Joints for Design
Temperatures in the Range Shown in Column 2 of Table
PB-1. For design temperatures in the range shown in Column 2 of Table PB-1, tests in addition to those in PB-9.1
are required. These tests shall be considered a part of
the qualification procedure. For such design temperatures, two tension tests on production type joints are required, one at the design temperature and one at 1.05T
[where T is the design temperature in degrees Fahrenheit
(or degrees Celsius)]. Neither of these production‐type
joints shall fail in the braze metal.
FLUXES AND ATMOSPHERES
Suitable fluxes or atmospheres or combinations of
fluxes and atmospheres shall be used to prevent oxidation
of the brazing filler metal and the surfaces to be joined.
Satisfactory qualification of the brazing procedure under
Section IX and when necessary, based on design temperature, with the additional requirements of this Section, is
considered proof of the suitability of the flux and/or
atmosphere.
PB-10
BRAZED JOINT EFFICIENCY
The joint efficiency factor to be used in design of boilers
with brazed joints shall be 1 for all joints.
DESIGN
PB-8
GENERAL
The rules in the following paragraphs apply to boilers
and parts thereof that are fabricated by brazing and shall
be used in conjunction with the general requirements for
141
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
The selection of the brazing filler metal for a specific
application shall depend upon its suitability for the base
metals being joined and the intended service. Satisfactory
qualification of the brazing procedure under Section IX
and when necessary based on design temperature, with
the additional requirements of this Section, is considered
proof of the suitability of the filler metal. Brazing with
brazing filler metals other than those listed in Section II,
Part C, SFA-5.8 shall be separately qualified for both procedure and performance qualification in accordance with
Section IX and when necessary with the additional requirements of this Section.
PB-7
STRENGTH OF BRAZED JOINTS
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PB-14
APPLICATION OF BRAZING FILLER METAL
is no thickness limitation when specimens are tested
without the test fixture shown in Section IX, Figure
QB-462.1(e).
The design of the joint shall provide for the application
of the brazing filler metal. Where practicable, the brazing
filler metal shall be applied in such a manner that it will
flow into the joint or be distributed across the joint and
produce visible evidence that it has penetrated the joint.
PB-16
The joint clearance shall be kept sufficiently small so
that the filler metal will be distributed by capillary action.
Since the strength of a brazed joint tends to decrease as
the joint clearance is increased, the clearance for the assembly of joints in pressure vessels or parts thereof shall
be within the tolerances set up by the joint design and
used for the corresponding qualification specimens made
in accordance with Section IX.
PB-14.1 Manual Application. The manual application of the brazing filler metal by face‐feeding to a joint
should be from one side only. Visual observation of the
other side of the joint will then show if the required penetration of the joint by the filler metal has been obtained.
PB-14.2 Preplaced Brazing Filler Metal. The brazing
filler metal may be preplaced in the form of slugs, powder,
rings, strip, cladding, spraying, or other means. After
brazing, the brazing filler metal should be visible on both
sides of the joint.
PB-15
JOINT CLEARANCE
NOTE: For guidance, see Table PB-16, which gives recommended
joint clearances at brazing temperature for varying types of brazing
filler metal. Brazing alloys will exhibit maximum strength if clearances are maintained within these limits.
PERMISSIBLE TYPES OF JOINTS
PB-17
Some permissible types of brazed joints are shown in
Figure PB-15. Lap joints shall have a sufficient overlap
to provide a higher strength in the brazed joint than in
the base metal.
The nominal thickness of base material used with lap
joints tested using the test fixture shown in Section IX,
Figure QB-462.1(e) shall not exceed 1/2 in. (13 mm). There
JOINT BRAZING PROCEDURE
A joint brazing procedure shall be developed for each
different type of joint of a brazed assembly. A recommended form for recording the brazing procedure is
shown in Section IX, Form QB-482. If more than one joint
occurs in a brazed assembly, the brazing sequence shall
be specified on the drawing or in instructions accompanying the drawing. If welding and brazing are to be done on
Lap
(a) Simple Lap Joint
(d) Scarf Joint
(b) Straight Butt Joint
(e) Butt Lap Joint
(c) Tee Joint
(f) Rabbet Joint
(g) Strapped Butt Joint
142
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Figure PB-15
Some Acceptable Types of Brazed Joints
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Table PB-16
Recommended Joint Clearance at Brazing Temperature
Clearance [Note (1)]
Brazing Filler Metal
BAlSi
BCuP
BAg
BCuZn
BCu
BNi
in.
mm
0.006–0.010 for laps
less than or equal to 1/4 in.
0.010–0.025 for laps
greater than 1/4 in.
0.001–0.005
0.002–0.005
0.002–0.005
0.000–0.002 [Note (2)]
0.001–0.005
0.15–0.25 for laps
less than or equal to 6 mm
0.25–0.64 for laps
greater than 6 mm
0.02–0.13
0.05–0.13
0.05–0.13
0.000–0.05 [Note (2)]
0.02–0.13
NOTES:
(1) In the case of round or tubular members clearance on the radius is intended.
(2) For maximum strength use the smallest possible clearance.
FABRICATION
the same assembly, the welding shall precede the brazing
unless it is determined that the heat of welding will not
adversely affect the braze previously made.
PB-18
PB-26
The rules in the following paragraphs apply specifically
to the fabrication of boilers and parts thereof that are fabricated by brazing and shall be used in conjunction with
the general requirements for fabrication in Part PG, as
well as the specific requirements for fabrication in the applicable Parts of this Section that pertain to the type of
boiler under consideration.
OPENINGS
PB-18.1 Openings for nozzles and other connections
shall be far enough away from any main brazed joint so
that the joint and the opening reinforcement plates do
not interfere with one another.
PB-28
QUALIFICATION OF BRAZING
PROCEDURE
PB-28.1 Each brazing procedure shall be recorded in
detail by the Manufacturer. Each brazing procedure shall
be qualified in accordance with Section IX and when necessary determined by design temperature with the additional requirements of this Section.
PB-28.2 Brazing of all test coupons shall be conducted by the Manufacturer. Testing of all test coupons
shall be the responsibility of the Manufacturer. Qualification of a brazing procedure by one Manufacturer shall not
qualify that procedure for any other Manufacturer, except
as provided in Section IX, QG-106.1(c).
BRAZED CONNECTIONS
PB-19.1 Connections such as saddle type fittings and
fittings inserted into openings formed by outward flanging of the vessel wall, in sizes not exceeding NPS 3
(DN 80), may be attached to boilers by lap joints of brazed
construction. Sufficient brazing shall be provided on
either side of the line through the center of the opening
parallel to the longitudinal axis of the shell to develop
the strength of the reinforcement through shear in the
brazing.
PB-29
QUALIFICATION OF BRAZERS AND
BRAZING OPERATORS
PB-29.1 The brazers and brazing operators used in
brazing pressure parts shall be qualified in accordance
with Section IX.
The qualification test for brazing operators of machine
or furnace brazing equipment shall be performed on a separate test plate prior to the start of brazing or on the first
work piece.
PB-19.2 For nozzle fittings having a bolting flange
and an integral flange for brazing, the thickness of the
flange attached to the boiler shall not be less than the
thickness of the neck of the fitting.
143
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PB-18.2 Openings for pipe connections in boilers
having brazed joints may be made by inserting pipe couplings, or similar devices not exceeding NPS 3 (DN 80) in
the shell or heads and securing them by welding provided
the welding is performed by welders who have been qualified under the provisions of Section IX for the welding
position and type of joint used. Such attachments shall
conform to the rules for welded connections PW-15 and
PW-16.
PB-19
GENERAL
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
INSPECTION AND TESTS
PB-29.2 Each brazer or brazing operator shall be assigned an identifying number, letter, or symbol by the
Manufacturer that shall be used to identify the work of
that brazer or brazing operator.
PB-46
GENERAL
PB-46.1 The rules in the following paragraphs apply
specifically to the inspection and testing of power boiler
parts that are fabricated by brazing and shall be used in
conjunction with the general requirements for inspection
and tests in Part PG as well as the specific requirements
for inspection and tests in the applicable Parts of this Section that pertain to the type of boiler under consideration.
PB-29.3 The Manufacturer shall maintain qualification records of the brazers and brazing operators showing the date and result of tests and the identification
mark assigned to each. These records shall be certified
by the Manufacturer by signature or some other method
of control in accordance with the Manufacturer’s Quality
Control System and be accessible to the Inspector.
PB-46.2 Inspection During Fabrication. The Manufacturer shall submit the boiler or other pressure part
for inspection at such stages of the work as may be designated by the Inspector.
PB-29.4 Brazing of all test coupons shall be conducted by the Manufacturer. Testing of all test coupons
shall be the responsibility of the Manufacturer. A performance qualification test conducted by one Manufacturer
shall not qualify a brazer or brazing operator to do work
for any other Manufacturer, except as provided in Section
IX, QG-106.2(g).
PB-47
CHECK OF BRAZING PROCEDURE
The surfaces to be brazed shall be clean and free from
grease, paint, oxides, scale, and foreign matter of any kind.
Any chemical or mechanical cleaning method may be used
that will provide a surface suitable for brazing.
PB-47.1 The Inspector shall assure himself that the
brazing procedure for each type of joint being produced
is qualified in accordance with the requirements of Section IX and when necessary the additional requirements
of this Section. He shall satisfy himself that each joint
has been fabricated in accordance with the procedure.
Where there is evidence of consistent poor quality, the Inspector shall have the right at any time to call for and witness tests of the brazing procedure.
PB-31
PB-48
PB-30
CLEANING OF SURFACES TO BE BRAZED
CLEARANCE BETWEEN SURFACES TO BE
BRAZED
PB-48.2 The Manufacturer shall make available to
the Inspector a certified copy of the record of the qualification tests of each brazer and brazing operator. The Inspector shall have the right at any time to call for and
witness tests of the ability of a brazer or brazing operator.
POSTBRAZING OPERATIONS
PB-49
Brazed joints shall be thoroughly cleaned of flux residue by any suitable means after brazing and prior to visual examination. 29 Other postbrazing operations such
as thermal treatments shall be performed in accordance
with the qualified procedure.
PB-33
VISUAL EXAMINATION
PB-49.1 When possible, both sides of each brazed
joint shall be visually examined after flux residue removal. It is recognized that for certain joints (blind joints)
this is not possible.
PB-49.2 When visually possible there shall be evidence that the brazing filler metal has penetrated the
joint. In a butt braze there shall be no concavity. The
braze may be repaired or rebrazed.
REPAIR OF DEFECTIVE BRAZING
Brazed joints that have been found to be defective may
be rebrazed, where feasible, after thorough cleaning, by
employing the same brazing procedure used for the original braze. If a different brazing procedure is employed,
i.e., torch repair of furnace brazed parts, a repair brazing
procedure shall be established and qualified.
When a repair brazing procedure is established it shall
meet Section IX and other conditions set forth in this
Section.
PB-49.3 The presence of a crack in the brazing filler
metal shall be cause for rejection. Liquid penetrant examination may be used if desired. The braze may be repaired
or rebrazed (see PB-33).
PB-49.4 The presence of a crack in the base metal adjacent to a braze shall be cause for rejection even if the
crack is filled with brazing alloy. Repair is not permitted.
144
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PB-48.1 The Manufacturer shall certify that the brazing on a boiler or part thereof has been done by brazers or
brazing operators who are qualified under the requirements of Section IX. The Inspector shall assure himself
that only qualified brazers or brazing operators have
been used.
The clearances between surfaces to be brazed shall be
maintained within the tolerances provided for by the joint
design and used in the qualifying procedure. If greater tolerances are to be used in production, the joint must be requalified for those greater tolerances. The control of
tolerances required may be obtained by using spot welding, crimping, or other means that will not interfere with
the quality of the braze. If such means are employed in
production, they must also be employed in qualification
of procedure, brazer, and operator.
PB-32
BRAZER AND BRAZING OPERATOR
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PB-49.5 Pinholes or open defects in the braze shall
be cause for rejection. The joint may be rebrazed.
strength. It shall however meet the requirements of those
qualification tests required by Section IX of the Code (see
PB-1.1, Scope).
PB-49.6 Rough fillets, particularly those with a convex appearance, are cause for rejection. Such joints may
be repaired or rebrazed.
PB-50
MARKING AND REPORTS
EXEMPTIONS
PB-51
Certain brazed joints regardless of their service temperatures may be exempt from the additional mechanical
testing of this Section providing that the design application does not assume any benefit from the brazed joint
GENERAL
The provisions for marking and reports given in
PG-104 through PG-113 shall apply to brazed boilers
and parts thereof.
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
145
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PART PL
REQUIREMENTS FOR LOCOMOTIVE BOILERS
ð15Þ
PL-4
INTRODUCTION
PL-1
GENERAL
MATERIALS
The rules in Part PL are applicable to steam locomotive
boilers and their parts and appurtenances. These rules
shall be used in conjunction with the general requirements in Part PG, and the specific requirements in the applicable Parts of this Section that apply to the method of
fabrication used.
PL-2
PL-5
GENERAL
Materials subject to stress due to pressure used in the
construction of pressure parts for locomotive-type boilers
shall conform to one of the specifications given in Section
II. These materials shall be limited to those for which allowable stress values for Section I construction are given
in Section II, Part D, Tables 1A and 1B, except as otherwise specifically permitted or limited in this Part and
Parts PG, PW, PWT, and PFT.
SCOPE
PL-2.1 All locomotive boilers of riveted construction
or partial riveted construction, regardless of size and capacity (including those that would otherwise fall under
the provisions of PL-2.3), shall have the riveting done in
accordance with the rules of this Part and Part PR.
PL-5.1 In addition to the uses permitted in Part PG
and the application notes in Section II, Part D, Table 1A,
S A - 6 75 G r a d e s 6 0 , 6 5 , a n d 7 0 m a y b e u s e d f or
pressure-retaining studs and bolts.
PL-2.3 With the exception of the requirements for
riveting in PL-2.1, the rules in this Part apply to all locomotive boilers equal to or larger than 30 in. (750 mm)
in outside diameter, to be attached to steam locomotives
operating on track gaged 24 in. (600 mm) and greater.
PL-5.3 For threaded staybolts, SA-31 Grade A or
SA-675 Grade 45, 50, or 55 shall be used.
PL-5.4 In addition to the uses permitted in Part PG
and the application notes in Section II, Part D, Table 1A,
SA-696 Grades B and C; SA-675 Grade 60, 65, or 70;
SA-216 Grade WCA; and SA-217 Grade WC1 may be used
for staybolt sleeves and caps.
TESTING AND STAMPING
PL-3.1 Locomotive boilers constructed without all
parts within the scope of PL-2.2 shall be hydrostatically
tested by blocking openings with temporary plugs or
plates where appliances are not installed. A Partial Data
Report, Form PL-1, shall be completed prior to stamping
and releasing the boiler as a “part” to the owner/operator/jurisdiction for final assembly.
PL-6
IN THE COURSE OF PREPARATION
PL-7
ALLOWABLE STRESS VALUES FOR
MATERIALS
PL-7.1 Unless otherwise provided by PL-7.2, allowable material stresses shall be taken as the lesser of (a)
or (b), as follows:
(a) the minimum ultimate tensile strength of the material at room temperature as required by the material
specification, divided by the regulatory design margin as
mandated by the applicable jurisdiction, but not less
than 4
PL-3.2 Locomotive boilers constructed with all parts
within the scope of PL-2.2 shall be hydrostatically tested
with all parts in place except for pressure relief valves.
The Manufacturer’s Data Report, Form PL-1, shall be completed and the boiler stamped.
146
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PL-5.2 In addition to the uses permitted in Part PG
and the application notes in Section II, Part D, Table 1A,
SA-675 and SA-696 bar stock may be used to make hollow
cylindrical pressure-retaining parts. The axis of the cylindrical part shall be aligned with the axis of the bar
stock, such that the material along the bar’s centerline
is removed in making the part.
PL-2.2 Boiler proper limits for locomotive boilers
with dome-type throttles are shown in Figure PL-2.2-1.
Boiler proper limits for locomotive boilers with frontend-type throttles are shown in Figure PL-2.2-2.
PL-3
IN THE COURSE OF PREPARATION
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PL-2.2-1
Steam Locomotive Boiler With Dome Throttle
Pressure relief valve(s)
Appliance(s) Header
Boiler feed(s)
Water gage glass(es)
Dome throttle
Steam
Dry pipe
Water
Fire
Blowoff
Administrative Jurisdiction and Technical Responsibility
Boiler External Piping and Joint — The ASME BPVC has total administrative jurisdiction
(mandatory certification by stamping the Certification Mark with appropriate Designator,
ASME Data Forms, and Authorized Inspection) of Boiler External Piping and Joint. The
ASME Section Committee B31.1 has been assigned technical responsibility.
Non-Boiler External Piping and Joint — Not Section I jurisdiction (see applicable ASME
B31 Code).
147
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Boiler Proper — The ASME Boiler and Pressure Vessel Code (ASME BPVC) has total
administrative jurisdiction and technical responsibility (refer to Section I Preamble).
Water column
(optional)
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PL-2.2-2
Steam Locomotive Boiler With Front-End Throttle
Pressure relief valve(s)
Boiler feed(s)
Appliance(s)
Header
Water gage glass(es)
Superheater and units
Steam
Dry pipe
Water
Fire
Front-end throttle
Blowoff
Administrative Jurisdiction and Technical Responsibility
Boiler External Piping and Joint — The ASME BPVC has total administrative jurisdiction
(mandatory certification by stamping the Certification Mark with appropriate Designator,
ASME Data Forms, and Authorized Inspection) of Boiler External Piping and Joint. The
ASME Section Committee B31.1 has been assigned technical responsibility.
Non-Boiler External Piping and Joint — Not Section I jurisdiction (see applicable ASME
B31 Code).
148
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Boiler Proper — The ASME Boiler and Pressure Vessel Code (ASME BPVC) has total
administrative jurisdiction and technical responsibility (refer to Section I Preamble).
Water
column
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PL-18.4 Openings in Cylindrical Shell. Cylindrical
shell openings (nozzles) shall be designed in accordance
with PG-32 through PG-37, PW-15, PW-16, PR-15, and
PR-16.
(b) the allowable stress at operating temperature as
provided by Section II, Part D, Tables 1A and 1B
PL-7.2 Maximum allowable stresses of the following
components shall be adhered to by designs performed in
accordance with this Part:
(a) Staybolt stresses shall not exceed 7,500 psi
(52 MPa). Staybolts support the firebox sheets.
(b) Brace stresses shall not exceed 9,000 psi (62 MPa).
Braces shall be considered those structures other than
staybolts supporting the shell plates. Diagonal stays as defined in PFT-32 shall be considered braces under Part PL.
PL-8
IN THE COURSE OF PREPARATION
PL-9
IN THE COURSE OF PREPARATION
IN THE COURSE OF PREPARATION
PL-11
IN THE COURSE OF PREPARATION
PL-12
IN THE COURSE OF PREPARATION
PL-13
IN THE COURSE OF PREPARATION
PL-14
IN THE COURSE OF PREPARATION
PL-15
IN THE COURSE OF PREPARATION
PL-16
IN THE COURSE OF PREPARATION
REINFORCING AND DOUBLING PLATES
ON UNSTAYED PORTIONS OF THE BOILER
NOTE: Patch bolt is a term recognized within the locomotive industry, owing to its origin as a repair and construction technology. Many
years of successful postconstruction application have demonstrated
the technology to be robust enough for new construction. Further,
patch bolts may be the only feasible attachment method for certain
geometries of reinforcing or doubling plates.
(c) full-penetration welded stays
(d) fillet-welded pins with a radial fit of +0.000 in. to
+0.010 in. (+0.00 mm to +0.25 mm) so as to have full
bearing (contact) with the holes in the plates or other
attachments
(e) fillet welds
(f) a combination of the attachment methods in (a)
through (e)
Studs or staybolts threaded completely through the
shell and reinforcing plate may be credited as attachment
points. The thickness of a riveted doubling plate when
used to reinforce an opening must be at least 75% of
the shell thickness, and the material must be equal to or
greater in ultimate tensile strength than the shell plate.
No credit for extra material strength in the doubling plate
shall be taken. Riveted doubling plates should not have
fasteners on the longitudinal centerline of the opening
being reinforced. Doubling plates shall not be used where
the doubling plate or the plate it is attached to is exposed
to the direct products of combustion. See PL-27.5.
GENERAL
The rules in PL-18 through PL-48 apply specifically to
the design of steam locomotive boilers and parts thereof.
These rules shall be used in conjunction with the general
requirements for design in Part PG and with the specific
requirements for design in the applicable Parts of this
Section that apply to the method of fabrication used.
PL-18
PL-20
PL-20.1 Reinforcing and doubling plates may be attached with the following:
(a) rivets
(b) patch bolts, with or without nuts, having threads
meeting the requirements of ASME B1.1M, Class 2
DESIGN
PL-17
IN THE COURSE OF PREPARATION
PL-20.1.1 When applying doubling plates, the
plates shall be firmly drawn together by temporary fasteners or other suitable clamping means prior to application of the final fasteners.
CYLINDRICAL BOILER SHELL
PL-18.1 Maximum Allowable Working Pressure.
Maximum allowable working pressure for cylindrical
shells under internal pressure shall be determined using
PG-27 or A-317. Conical shell course stresses shall be calculated at the largest diameter of the course.
PL-18.2 Riveted Joints. Except as otherwise specified in this Part, riveted joints shall conform to Part PR
and its associated appendices.
PL-20.1.2 If a patch bolt is used to clamp two or
more structures together, only the structure farthest from
the head of the patch bolt shall be threaded. Clearance
holes shall be provided in the intervening structures.
Clearance holes shall be sized as appropriate to the service intended, whether to resist tension loading, shear
loading, or a combination of both types of loading.
PL-18.3 Welded Joints. Except as otherwise specified
in this Part, welded joints shall conform to PG-26 and Part
PW.
PL-20.2 Riveted plates with outside calking shall
have a total cross section of fasteners to comply with
PR-15.4.
149
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PL-10
PL-19
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PL-20.3 Riveted reinforcing plates or doubling plates
shall have enough fasteners so that the total shear
strength of the fasteners equals at least 82% of the total
ultimate tensile strength of the cross-sectional area of
shell metal removed on the longitudinal centerline of
the opening. Openings, nozzles, and reinforcement shall
be designed in accordance with PG-32 through PG-37,
PW-15, PW-16, PR-15, and PR-16.
PL-20.4.2 The efficiency of a diamond riveted
plate, as shown in Figure PL-20.4.2-1, shall be calculated
using the following equation:
where
A = factor for the angle of the patch
PL-20.4 The equations in PL-20.4.1 and PL-20.4.2 apply to reinforcing or doubling plates applied to the cylindrical shell of the boiler. The efficiency calculated should be
equal to or greater than the longitudinal seam efficiency
of the shell course to which the reinforcing or doubling
plate is attached. If the efficiency of the attachment is less
than the efficiency of the seam as calculated in PR-9, the
shell thickness in the area of the doubling plate shall be
calculated in PG-27 using the value of E calculated for
the reinforcing or doubling plate.
=
d = diameter of rivet holes, in. (mm)
E = efficiency
p = smallest pitch of rivet in the outside angular rivet
row, in. (mm)
PL-20.5 Attachment of Manhole Frames by Riveting. Manhole frames on shells or drums shall have a curvature to match the shell at the point of application before
final attachment. On boilers over 48 in. (1 200 mm) in diameter, manhole frames shall be riveted to the shell or
drum with two rows of rivets, which may be pitched as
shown in Figure PL-20.5-1.
Attachment of nozzles and reinforcement by riveting
shall meet the requirements of PR-15 and PR-16.
PL-20.4.1 The efficiency of a round riveted plate,
as shown in Figure PL-20.4.1-1, shall be calculated using
the following equation:
where
PL-21
REQUIREMENTS FOR DOMES OF
LOCOMOTIVE BOILERS
Domes of locomotive boilers shall meet the requirements of PFT-45.
PL-21.1 Domes of Welded Construction.
PL-21.1.1 Domes of welded construction shall
meet the requirements of PFT-45.1.
PL-21.1.2 Blind-flange dome lids for steam domes
may be designed using the rules in PG-31 or ASME B16.5.
Figure PL-20.4.1-1
Round Riveted Plate
B
A
150
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
A = longitudinal distance between the ends of arc B, in.
(mm)
B = length of arc between extreme rivet holes in the
half arc of holes completely above or below the horizontal centerline, in. (mm)
d = diameter of rivet holes, in. (mm)
E = efficiency
n = number of spaces between rivets in arc B
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PL-20.4.2-1
Diamond Riveted Plate
Angle
p
PL-21.2 Domes of Riveted Construction.
PL-21.2.1 The longitudinal joint of a riveted dome
24 in. (600 mm) or larger in inside diameter shall be of
butt- and double-strap construction. Alternatively, the
dome may be made without a seam of one piece of steel
pressed into shape; its flange shall be double-riveted to
the shell.
(c) The maximum allowable stress used in calculating
the minimum thickness or MAWP is 0.44 times the maximum allowable stress value at the design temperature
of the metal, as listed in the tables specified in PG-23
(see PG-27.4.2).
PL-21.2.2 A dome may have a longitudinal lap-type
seam, and its flange may be single-riveted to the shell,
provided all the following conditions are met:
(a) The dome inside diameter is less than 24 in.
(600 mm).
(b) The product of the inside diameter in inches (millimeters) and the maximum allowable working pressure in
pounds per square inch (megapascals) does not exceed
4,000 (700 for SI Units).
PL-21.3.2 Inward-facing flanges on domes with
lids of the type where the dome-lid bolt circle lies outside
the gasket may have through holes tapped to accept taper
Figure PL-20.5-1
Manhole Frame
151
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PL-21.3 Dome Construction — General.
PL-21.3.1 Where a dome has a bottom flange at the
attachment point to the boiler, it shall be formed with a
corner radius, measured on the inside radius, of at least
twice the thickness of the plate for plates 1 in. (25 mm)
in thickness or less, and at least 3 times the thickness of
the plate for plates over 1 in. (25 mm) in thickness, but
not to exceed 8 times the thickness of the dome flange.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
studs with a taper thread pitch of 11 threads per inch (per
25 mm) to 14 threads per inch (per 25 mm) and a diameter taper of 3/4 in. in 12 in. (19 mm in 300 mm). Thread
engagement shall be determined using the formula in
PG-39.4.
A m 1 = total cross-sectional area of the bolts required for
the operating conditions
= W m 1 /S b t
A m 2 = total cross-sectional area of bolts required for
gasket seating
= W m 2 /S b a
B = inside diameter of opening in dome head
b = effective gasket seating width
C = bolt circle diameter (not to exceed the flat portion of the head)
PL-21.3.3 Maximum allowable working pressure
for the cylindrical portion of the dome shall be determined using PG-27. In the case of a slightly tapered dome
due to the forming process, the largest diameter shall be
used.
C1 =
PL-21.3.4 Domes and manhole frames attached to
shells or heads of boilers may be riveted or welded to the
shell, along with any independent reinforcing or doubling
plates as needed to conform to PG-33. The thickness of
each independent riveted reinforcing or doubling plate
shall not be less than given in Table PL-21.3.4-1. Maximum stress in tension of rivets in manhole frames having
a thickness of 7/8 in. (22 mm) or less, and rivets in dome
flanges, shall not exceed 7,200 psi (50 MPa).
PL-21.4
C2 =
C3 =
C4 =
Unstayed Flat Dome Heads.
C5 =
PL-21.4.1 The minimum thickness of unstayed flat
dome heads with a centrally located flanged lid designed
in accordance with PG-31 and PL-21.1.2 shall conform to
the requirements given in this paragraph. This paragraph
applies to dome heads as shown in Figure PL-21.4.1-1. In
addition, the minimum flange length and minimum inside
corner radius requirements of Figure PG-31, illustration
(a), shall apply.
C6 =
C7 =
A b = cross-sectional area of the bolts using the root
diameter of the thread or least diameter of unthreaded position, if less
A m = total required cross-sectional area of the bolts,
taken as the greater of A m 1 and A m 2
C9 =
C10 =
C11 =
Table PL-21.3.4-1
Thickness of Riveted Reinforcing Rings for
Dome Openings
Thickness of Shell Plate,
in. (mm)
1
/4 (6) to 3/8 (10)
Over 3/8 (10) to 7/16 (11)
Over 7/16 (11) to 1/2 (13)
Over 1/2 (13) to 9/16 (14)
5
/8 (16) to 3/4 (19), incl.
7
/8 (22) to less than 1 (25)
1 (25) to less than 11/2 (38)
11/2 (38) to 2 (50), incl.
Over 2 (50)
d = inside diameter of steam dome head
G = diameter of gasket load reaction
H = cover hydrostatic end load
= 0.785G 2 P
H p = cover gasket contact surface compression load
= 2b (3.14)G mP
m = gasket factor
P = maximum allowable working pressure (see
PG-21)
S b a = bolt allowable stress at ambient temperature
S b t = bolt allowable stress at design temperature
S h a = head allowable stress at ambient temperature
S h t = head allowable stress at design temperature
t h = minimum required dome head thickness
Minimum Thickness of
Reinforcing Ring or Flange,
in. (mm)
1
/4
/16
3
/8
7
/16
1
/2
5
/8
11
/16
3
/4
1
5
(6)
(8)
(10)
(11)
(13)
(16)
(17)
(19)
(25)
152
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
C8 =
PL-21.4.2 The notations used in Figure
PL-21.4.1-1 and in PL-21.4.3 are defined as follows:
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PL-21.4.1-1
Steam Dome Top Flange
Bolted flat cover
C
G
th
Unstayed flat head
B
d
Cylindrical shell
GENERAL NOTE: See PL-21.4.2 for nomenclature.
(-2) Tangential
(-b) Moment due to bolt load
(-1) Radial
(-2) Tangential
NOTE: Variables b , G , m , and y are as defined in Section VIII, Division
1, Mandatory Appendix 2.
PL-21.4.3 The required thickness of dome heads
with bolted dome lids shall be calculated for both design
conditions and gasket seating using the following equations and the greater of the two values shall be used.
For design conditions, the value of P shall be the maximum allowable working pressure and S h t shall be used
for the allowable stress. For gasket seating, the value of
S h a shall be used for the allowable stress.
(-c) Moment due to pressure load
(-1) Radial
(-2) Tangential
(a) Design Conditions
(1) Calculate moments for design conditions, as
follows:
(-d) Total operating moment
(-1) Radial
(-a) Moment due to cover gasket contact compression load
(-1) Radial
(-2) Tangential
153
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
W = average of the required bolt load for gasket seating and the load available from the bolt area actually used
= S b a (A m + A b )/2
W m 1 = minimum required bolt load for operating
conditions
= H + Hp
W m 2 = minimum required bolt load for gasket seating
= 3.14bGy
y = gasket seating load
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
(-3) Maximum Absolute Moment. Values for M r o
or M t o may be negative; use their absolute value in calculating M o .
PL-22
IN THE COURSE OF PREPARATION
PL-23
IN THE COURSE OF PREPARATION
PL-24
FLUES
PL-24.1 Maximum allowable working pressure and
nominal wall thickness for flues shall be determined using
Table PL-24.1-1.
(2) The required thickness for design conditions is
PL-24.2 Except as otherwise specified in this Part,
flues shall be attached per the requirements of
PFT-12.2; however, flues shall not be attached by welding
alone.
(b) Gasket Seating
(1) Calculate moments for gasket seating, as follows:
(-a) Moment due to cover gasket contact compression load
(-1) Radial
PL-24.3 Flue-hole diameter shall not exceed 1/16 in.
(1.5 mm) greater than the outside diameter of the flue
at the swage or the full O.D., whichever is applicable. If
ferrules are used, they shall have a wall thickness no
greater than 1/16 in. (1.5 mm), and the hole inside diameter shall be no greater than 1/16 in. (1.5 mm) larger than
the O.D. of the ferrule when applied to the flue. Holes shall
be made round if they exceed 1/32 in. (0.8 mm) out of
round.
(-2) Tangential
(-2) Tangential
(-c) Total gasket seating moment
(-1) Radial
(-2) Tangential
PL-24.4.1 Flues shall be re-expanded upon completion of seal welding or beading, or both.
PL-24.4.2 When flues are applied by rolling and
seal welding, the seal weld shall protrude beyond the
sheet a distance of 1/8 in. to 1/4 in. (3 mm to 6 mm) inclusive [see Figure PFT-12.1, illustration (e)] and the end of
the flue shall not protrude past the weld. The end of the
flue shall be ground or polished to eliminate any sharp
edges.
(-3) Maximum Absolute Moment. Values for M r g
or M t g may be negative; use their absolute value in calculating M g .
(2) The required thickness for gasket seating is
PL-24.4.3 Prior to welding, beading, or both, ensure that the flue is satisfactorily seated in the sheet. Seal
welding may be done with water in the boiler, provided
the water is heated to between 100°F and 120°F (38°C
and 50°C).
(c) The required thickness of the steam dome head is
the greater of t h o and t h g .
PL-24.4.4 Some acceptable types of attachments
are shown in Figure PFT-12.1, illustrations (a) through
(g).
154
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PL-24.4 All flues smaller than 3 in. (75 mm) O.D. shall
be rolled and beaded or rolled and welded on the firebox
end. At least 1 in 10 distributed evenly on the front flue
sheet shall be rolled and beaded or rolled and welded.
All flues 3 in. (75 mm) O.D. and larger shall be rolled
and beaded or rolled and welded at both ends. All adjacent flues smaller than 3 in. (75 mm) O.D. that are within
the area occupied by the larger superheater flues shall be
rolled and beaded or rolled and welded at both ends. At
least 1 in 10 of the remaining flues smaller than 3 in.
(75 mm) O.D. shall be beaded or welded on the front flue
sheet, in addition to rolling. Where less than all flues are
welded or beaded on the front flue sheet, those welded or
beaded shall be distributed as evenly as practicable
throughout the flue pack.
(-b) Moment due to gasket seating bolt load
(-1) Radial
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Table PL-24.1-1
Maximum Allowable Working Pressure for Steel Flues for Firetube Locomotive Boilers
U.S. Customary Units
Nominal Wall Thickness, in.
Outside
Diameter
of Flue, in.
0.095
1
1.5
1.75
2
2.25
2.5
3
3.25
3.5
4
4.5
5
5.375
5.5
6
470
320
270
240
210
190
160
…
…
…
…
…
…
…
…
0.109
0.120
0.134
0.148
0.165
0.180
0.220
0.238
690
460
400
350
310
280
230
210
200
180
160
…
…
…
…
860
570
490
430
380
350
290
270
250
220
190
180
160
…
…
…
720
620
540
480
430
360
330
310
270
240
220
200
200
180
…
860
740
650
580
520
430
400
370
330
290
260
240
240
220
…
…
890
780
690
630
520
480
450
390
350
320
290
290
260
…
…
…
900
800
720
600
550
520
450
400
360
340
330
300
…
…
…
…
960
860
720
660
620
540
480
430
400
390
360
…
…
…
…
…
970
810
750
690
610
540
490
450
440
410
…
…
…
…
…
1,080
900
830
770
680
600
540
500
490
450
4.6
5.2
5.6
6.0
…
…
…
…
6.6
5.9
5.0
4.6
4.3
3.7
3.3
3.0
2.8
2.7
2.5
…
…
…
…
…
6.7
5.6
5.2
4.8
4.2
3.7
3.4
3.1
3.0
2.8
…
…
…
…
…
7.4
6.2
5.7
5.3
4.7
4.1
3.7
3.4
3.4
3.1
SI Units
Nominal Wall Thickness, mm
Outside
Diameter
of Flue, mm
2.5
2.8
3.0
25
38
44
51
57
64
76
83
89
102
114
127
137
140
152
3.2
2.2
1.9
1.7
1.4
1.3
1.1
…
…
…
…
…
…
…
…
4.8
3.2
2.8
2.4
2.1
1.9
1.6
1.4
1.4
1.2
1.1
…
…
…
…
5.9
3.9
3.4
3.0
2.6
2.4
2.0
1.9
1.7
1.5
1.3
1.2
1.1
…
…
3.4
3.8
4.2
Maximum Allowable Working Pressure, MPa
…
5.0
4.3
3.7
3.3
3.0
2.5
2.3
2.1
1.9
1.7
1.5
1.4
1.4
1.2
…
5.9
5.1
4.5
4.0
3.6
3.0
2.8
2.6
2.3
2.0
1.8
1.7
1.7
1.5
…
…
6.1
5.4
4.8
4.3
3.6
3.3
3.1
2.7
2.4
2.2
2.0
2.0
1.8
…
…
…
6.2
5.5
5.0
4.1
3.8
3.6
3.1
2.8
2.5
2.3
2.3
2.1
GENERAL NOTE: This Table applies to flues conforming to the material requirements of PG-9.
155
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
0.203
Maximum Allowable Working Pressure, psi
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PL-24.5 Ferrous or nonferrous ferrules may be used
on either or both ends of flues. When seal welding over
ferrous ferrules used in straight-rolled and seal-welded
flues, the weld shall attach to the sheet and not just to
the ferrule. Care shall be taken to avoid contamination
of seal welds when nonferrous ferrules are used.
PL-25
p = maximum pitch measured between straight lines
(horizontal, vertical, or inclined) passing through
the centers of the staybolts in different rows, in.
(mm); shall not exceed (7.62C t R )0.5 and shall not
exceed 32t
R = radius of sheet on convex side, in. (mm)
S = maximum allowable stress, psi (MPa) (see PL-7.1)
t = sheet thickness, in. (mm)
IN THE COURSE OF PREPARATION
PL-26
IN THE COURSE OF PREPARATION
PL-27
STAYED SURFACES
Stayed surfaces in locomotive boilers shall be defined
as the back head, wrapper, roof sheet, throat sheet, mud
ring, front flue sheet, combustion chamber, and firebox.
The boiler shell where it is stayed to the combustion
chamber shall not be considered a stayed surface. Volumetric examination of welds on stayed surfaces of P-No.
1, Group No. 1, 2, or 3 materials is not required except
for welds on knuckles within the stayed surfaces where
the weld on the knuckle is less than 45 deg to the longitudinal axis of the knuckle.
PL-27.1 Maximum allowable working pressure for
roof sheets over the firebox and combustion chamber
and above the horizontal centerline shall be determined
in accordance with PFT-23.2. Staybolt stress on the top
row of side-sheet staybolts as described in PL-30.3 shall
be considered, and support shall be provided as necessary to maintain a maximum staybolt stress of 7,500 psi
(52 MPa).
PL-27.2 Maximum allowable working pressure for
flat firebox, shell, and syphon sheets shall be determined
in accordance with PG-46.
PL-27.3 Maximum allowable working pressure for
curved stayed sheets with pressure on the concave side
shall be determined in accordance with PFT-23.1.
PL-27.4 Maximum allowable working pressure for
curved stayed sheets with pressure on the convex side
shall be determined as follows:
(U.S. Customary Units)
C = 2.1 for doubling plates attached by threaded staybolts only, patch bolts only, fillet-welded pins only,
or a combination of thereof
= 2.2 for doubling plates attached by a combination of
threaded staybolts and rivets, fillet-welded pins and
rivets, or patch bolts and rivets, provided that at
least half the attachment points are rivets, and the
perimeter may or may not be fillet welded
= 2.5 for doubling plates attached by rivets only
(SI Units)
where
If such a doubling plate is applied by continuous or intermittent fillet welds with the two plates held together with
welded stays meeting the requirements for stayed
C = factor from PG-46 according to sheet thickness and
stay attachment method
P = maximum allowable working pressure, psi (MPa)
156
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PL-27.5 When a flat shell plate not less than 3/8 in.
(10 mm) in thickness is strengthened with a securely fastened doubling plate covering the full area of the stayed
surface and having a thickness of not less than two-thirds
that of the shell plate, then the value of t used in accordance with PL-27.2 shall be three-fourths of the combined
thickness of the shell plate and doubling plate but not
more than 11/2 times the thickness of the shell plate. For
supporting points such as stays or braces, the applicable
value of C given in PG-46.1 may be increased 15%. See
PL-20.1 for doubling plates or liners used for reinforcement of openings. When applying doubling plates, the
plates shall be firmly drawn together by temporary fasteners or other suitable clamping means prior to application of the final fasteners.
The following shall be considered attachment points for
securing the doubling plate to the shell plate, which may
or may not provide a support point (see Figure
PL-27.5-1):
(a) a staybolt threaded through both plates, accounting
for any additional loads on the staybolt
(b) a patch bolt threaded through one plate, as required
in PL-20.1.2
(c) a staybolt through both plates attached by fullpenetration welds
(d) fillet-welded pins through both plates with a pin-tohole radial fit of +0.000 in. to +0.010 in. (+0.00 mm to
+0.25 mm) so as to have full bearing (contact) with the
holes in the plates or other attachments
(e) fillet welds wherever used to attach the doubling
plate to the flat shell plate
The maximum pitch between attachment points securing the doubling plate to the shell plate shall be determined using the equation in PG-46.1 using the following
values for C and the thickness of the shell plate alone:
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
Figure PL-27.5-1
Examples of Doubler Attachment Methods
t2
t1
Throughwelded
staybolts
Rivet
Fillet-welded pin
Threaded staybolt
GENERAL NOTES:
(a) The C value (see PL-27.4) shall be as follows:
C = 2.1 when using a combination of fillet-welded pins, patch bolts, and threaded staybolts
= 2.2 when using a combination of rivets and fillet-welded pins, patch bolts, or threaded staybolts on at least half of the attachment
points
= 2.5 when using rivets only
= 2.8 when using continuous or intermittent fillet welds, stay welded through both sheets
(b) The t value shall be as follows:
t = value of combined thickness used in equation
= .75t 2 but no more than 1.5t 1 provided t 1 ≥ .375 in. (9.5 mm)
157
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Patch bolt
No fu
surfaces, the value of C shall be 2.8. The maximum pitch
limitation of 81/2 in. (216 mm) in PG-46.5 shall not apply,
but in no case shall the pitch exceed 15 times the stay
diameter.
Cross-sectional tension stress on attachment points,
calculated as if the working pressure is attempting to separate the plates, shall not exceed 0.25 of the ultimate
tensile strength, as given in Section II, Part D, of the rivets,
stays, pins, or patch bolts. Stress shall be calculated in accordance with PFT-26. Cross-sectional tension stress taken at the throat of a fillet weld shall not exceed 0.25 of
the ultimate tensile strength of the shell plate, as given
in Section II, Part D.
t d = allowed combined thickness of both plates
= 1.5 times thickness of thicker plate maximum, in.
(mm)
T e = effective thickness of plate between support points
defined by length L , in. (mm)
PL-27.7 For stays at the upper corners of fireboxes,
the pitch from the staybolt next to the corner to the point
of tangency to the corner curve shall be given by the following equation (see Figure PL-27.7-1):
CAUTION: Doubling plates shall not be used on any stayed plate
that is exposed to the direct products of combustion.
where
C = factor for the thickness of plate and type of stay
used as required in PG-46
P = maximum allowable working pressure, psi (MPa)
p = maximum allowable pitch, in. (mm)
S = maximum allowable stress, psi (MPa), given in
PL-7.1
t = thickness of plate, in. (mm)
β = angle, deg, between 90 deg and 180 deg, inclusive
PL-27.6 Lap seams in stayed areas may be considered as doubling plates. The reinforced area shall be defined by the perimeter drawn through the centerline of
the outside fasteners of the seam. The rules in PL-27.5 apply to the doubled area. The value allowed for the combined thickness, t d , of the two plates shall not exceed
11/2 times the thickness of the thicker plate. To determine
the effective plate thickness to be used in calculating the
pitch between extreme support points using PG-46, the
proportionate lengths between support points of the
doubled thickness and the unreinforced plate thickness
shall be averaged in proportion to their respective
lengths.
PL-28
MUDRING (FIREBOX FOUNDATION RING)
The requirements of PL-28 shall be used for mudring
construction not covered by other Parts of this Code. Firebox mudrings may be made of one-piece shapes or weldments. Welding shall be in accordance with Part PW.
PL-28.1 Proportions. Firebox mudrings shall be proportioned such that the width of the ring is equal to or
greater than the minimum required width of the firebox
water legs. The height of the ring shall be sufficient to accommodate the fastening system used to attach the side
sheets. The height of the ring shall be sufficient for the design pressure, and the maximum width is determined by
the desired water leg width or PG-46, whichever is less.
PL-27.6.2 Single- or double-riveted lap seams may
be used within any stayed area. No credit for reinforcement shall be taken for a single-riveted lap seam.
PL-28.2 Connection Design. Figure PL-28.2-1 shows
some acceptable means of attaching the mudring to side
sheet. Exterior boiler sheets shall extend to the bottom
of the firebox mudring minus the distance to allow either
a fillet weld or calking edge (see Figure PL-28.2-1). The
interior and exterior firebox sheets shall be connected
to the mudring with sufficient fasteners to resist the applied shearing forces and bending moments. Where filletwelded pins are used, the cross-sectional area of the weld
in shear around the circumference of the pin shall be at
least 1.25 times the cross-sectional area of the pin.
PL-27.6.3 To determine the effective thickness of
the plate between two support points where a lap seam
is present, refer to Figure PL-27.6.3-1 and PL-27.6.3-2.
The following equation shall be used:
where
L = overall pitch, in. (mm)
L 1 = pitch between support points on one side of lap
seam, in. (mm)
L 2 = pitch between support points on lap seam, in. (mm)
L 3 = pitch between support points on other side of lap
seam, in. (mm)
t = actual thickness of first plate, in. (mm)
t 1 = actual thickness of second plate, in. (mm)
PL-28.3 Supports. Boiler supports, whether attached
to the wrapper or the mudring, shall accommodate boiler
expansion without introducing additional stress.
PL-28.4 Corners. If flanged corners are used for the
firebox, the minimum inside and outside radii of the
mudring shall be as shown in Table PL-28.4-1.
158
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PL-27.6.1 Fillet-welded lap seams where both
edges are welded may be used where the welds are not
exposed to the products of combustion. Weep holes shall
be provided at a distance of no more than 36 in.
(900 mm) along the longitudinal centerline of the seam
in the external sheet. Weep holes shall be at least 1/8 in.
(3 mm) in diameter.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PL-27.6.3-1
Double-Riveted Lap Seam in Stayed Area
L
L2
L1
t1
t
td
PL-28.5 Washout Plugs. Washout plugs shall be provided at various points above the mudring to allow the removal of sediments. The plugs shall be positioned such
that minimal material can collect behind the plug during
washing of the boiler. The plugs shall be of large enough
diameter to allow foreign material, such as staybolts, to
be removed, but not less than NPS 11/2 in. (DN 40).
PL-29
PL-30.1 Staybolts shall be fabricated and installed in
accordance with PG-47, PFT-28.2, PFT-28.3, and PFT-29,
except that staybolts attached by welding shall have telltale holes conforming to PG-47.1. Full-penetrationwelded staybolts shall be postweld heat treated in accordance with PW-39 after installation.
PL-30.2 Staybolt stress shall not exceed 7,500 psi
(52 MPa) at the smallest cross-sectional area of the
staybolt.
IN THE COURSE OF PREPARATION
PL-30.3 Location, area supported, and spacing of
staybolts shall be in accordance with PG-48, PG-49,
PFT-23, PFT-25, PFT-26, PFT-27, and PL-27, except that
the maximum staybolt stress allowed shall be 7,500 psi
(52 MPa).
STAYBOLTS
Staybolts shall be considered all round attachment bars
of any length between the firebox and the shell that are
used to support the firebox and flat areas of the shell.
Throat braces attached to the lower portion of the boiler
barrel and the throat sheet shall be considered braces.
Figure PL-27.6.3-2
Double-Fillet-Welded Lap Seam in Stayed Area
L
L1
L2
L3
t1
t
td
159
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PL-30
L3
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PL-27.7-1
Upper Corner of Firebox
t
p
r
p
GENERAL NOTE: Max. r = p as calculated by PG-46; min. r = 3t . If r exceeds the maximum, the curved plate shall be calculated as a flat plate in
accordance with PG-46.
PL-31
IN THE COURSE OF PREPARATION
PL-32
IN THE COURSE OF PREPARATION
PL-33
CROWN BARS
Crown bars shall be designed in accordance with
PFT-30. Crown bars shall stand clear of crown sheet by
no less than 11/2 in. (38 mm). See Figure PL-33-1.
PL-34
IN THE COURSE OF PREPARATION
PL-35
IN THE COURSE OF PREPARATION
PL-36
BRACES
CAUTION: While patch bolts may be used, they should be used
only when other means of attachment are not possible or practical, or where it can be shown that patch-bolt attachment is
superior.
PL-36.2
For steam locomotive boilers, braces shall be defined as
follows:
Front Flue-Sheet Supports.
PL-36.2.1 Area supported by the dry pipe and drypipe reinforcing ring shall be determined in accordance
with PL-36.2.2, and deducted from the area needing support as defined in this Part. See Figure PL-36.2.1-1.
back-head and flue-sheet braces: structural supports for
the back head and flue sheets, with one attachment point
on the shell of the boiler and the other end attached to the
back head or flue sheet.
PL-36.2.2 The area supported by the stiffening
ring shall be considered self-supporting provided that
the stiffening ring is thick enough for the span considered
as calculated in PG-46 for a solid plate equal in thickness
to the stiffening ring, and that the stiffening ring attachment locations to the flue sheet comply with the requirements in PL-36.1. The minimum thickness of the
stiffening ring should also accommodate the thickness required for the superheater header or Y-pipe mounting
studs. See Figure PL-36.2.1-1.
throat braces: typically attached to the rear flue sheet of
the firebox and the inside surface of the boiler shell to
support the rear flue sheet between flues and the highest
row of staybolts on the throat sheet.
through-braces: braces that support two opposing heads
or vertical sides of the shell.
PL-36.1 Braces may be diagonal or perpendicular
and may be attached by welding, rivets, crowfoot brace
and pins, or any combination thereof. Braces attached
by welding shall meet the requirements of PW-19 and
PL-36.2.3 Flue-sheet attachment to the shell shall
be in accordance with PR-11 or PFT-11.
160
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PFT-32. Gusset braces consisting of a flat plate either as
a full triangle or a truncated triangle on a diagonal may
be attached by welding, rivets, patch bolts (with nuts
when in tension), bolts, or any combination thereof. Tee
irons spanning an area needing support may be used in
lieu of braces, provided the support structures at the ends
of the tee-iron span are not stressed beyond what is allowed by this Section.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PL-28.2-1
Some Examples of Acceptable Mudring Construction
L
L
Rivet
Fillet-welded pin
D
D
L
L
(b) Fillet-Welded Pin Construction [Note (1)]
(a) Riveted Construction
Patch bolt
(c) Patch Bolt Construction
GENERAL NOTES:
(a) Mudrings may be attached by welding. See Figure PG-31 and Figure PFT-21.
(b) D = height of mudring
NOTE:
(1) L = fillet weld dimensions
= 3/8 in. (10 mm) min.
161
D
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Patch bolt
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PL-36.6 Braces attached to tee irons, brackets, crowfeet, or similar construction where the braces are either
pinned or integral with structures attached directly to
the supported plate shall be in accordance with
PL-36.6.1 through PL-36.6.12.
Table PL-28.4-1
Radii for Firebox Mudrings
Mudring Width,
in. (mm)
Minimum Inside
Radius, in. (mm)
Less than 4 (100)
11/2 (38)
4 (100) to less
than 6 (150)
21/2 (64)
6 (150) or greater
3 (75)
Maximum Outside Radius
Inside radius plus larger
mudring width at corner
considered
Inside radius plus larger
mudring width at corner
considered
Inside radius plus larger
mudring width at corner
considered
PL-36.6.1 The feet for braces to back head and
front flue sheet shall be distributed so as not to concentrate the load on any one section. No supporting value
shall be assigned to the stiffness of inside liner plates
on flat surfaces, except as provided in PL-27.5.
PL-36.6.2 All rivet and clevis pin holes shall conform to the requirements in Mandatory Appendix V, and
the pin diameter shall be made as close as practicable
to the hole diameter, but no less than 6% below the hole
diameter.
PL-36.3 The spacing of support locations, braces, rivets, or patch bolts shall be determined in accordance with
PG-48, PFT-25, PFT-26, and PFT-27, except that the maximum stress allowed shall be 9,000 psi (62 MPa).
PL-36.6.3 Determine the required cross-sectional
area of the brace by first computing the total load to be
carried by the brace, and dividing the total load by the
maximum allowable stress of the material, not to exceed
9,000 psi (62 MPa), in accordance with PL-36.5 and
PFT-32.
PL-36.4 Patch bolts may be used to fasten tee irons
and other brackets to which braces are attached and
these patch bolts shall have nuts applied.
PL-36.6.4 The cross-sectional area of pins required to resist double shear shall be at least 0.75 times
the required cross-sectional area of the brace.
PL-36.6.5 The material surrounding the eye of a
clevis or crowfoot stay shall be 1.25 times greater than
the required cross-sectional area of the brace.
PL-36.6.6 Cross-sectional areas through the
blades of diagonal braces at the attachment rivet hole(s)
where attached to the shell of the boiler shall be at least
equal to the required rivet section, that is, at least equal
to 1.25 times the required cross-sectional area of the
brace.
Figure PL-33-1
Example of Crown Bar Installation
Inside roof sheet
surface
Bracket welded
to shell
Bracket riveted
to shell
Weld
Sling stay
Nut
Crown stay
1½ in. (38 mm) min.
Crown bar
Crown sheet
162
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PL-36.5 Stresses in diagonal braces (see Figure
PL-36.5-1) shall be calculated in accordance with
PFT-32, except that the maximum brace stress allowed
shall be 9,000 psi (62 MPa). Stress for each brace shall
be calculated individually for the area supported by that
brace. Stresses in braces attached to a common tee iron
that are symmetrically spaced on the tee iron may be calculated by taking the total load on the tee iron and dividing by the number of braces attached to that tee iron.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PL-36.2.1-1
Support Perimeters
Perimeter of dry pipe support area
shall be the O.D. of the stiffening
Stiffening ring attachment points,
or ring may be welded in accordance
with PW-16.1
Single braces
attached by weld
Tee-iron fasteners
R
Legend:
R = inside radius of shell
PL-36.6.7 Each branch of a crowfoot shall be designed to carry at least 0.67 times the total load on the
brace.
PL-36.6.8 The net cross-sectional areas through
the sides of a crowfoot, tee iron, or similar fastening at
the rivet holes shall be at least 1.25 times greater than
the required cross-sectional area of a brace.
PL-36.6.9 The combined cross-sectional area of
the fasteners at each end of the brace shall be at least
1.25 times greater than the required cross-sectional area
of a brace.
PL-36.8 Through-braces shall be designed as outlined in PL-36.8.1 through PL-36.8.3.
PL-36.8.1 Welded through-braces may be fullpenetration or partial-penetration welded. In all cases
the area of the weld in shear measured parallel to the
brace and around the full diameter of the brace shall
not be less than 1.25 times the required cross-sectional
area of the brace. However, in no case shall the size of
the weld be less than 3/8 in. (10 mm).
PL-36.6.10 Where fillet welds are used for attachment or fabrication of a crowfoot, welds shall be in accordance with PW-19.
PL-36.6.11 Braces exceeding 120 diameters in
length shall comply with PG-46.8.
PL-36.6.12 Pin-connected braces shall be installed
in such a manner as to uniformly support the load on the
plate to which they are attached.
PL-36.8.2 Threaded through-braces, whether
threaded in the sheet or not, shall have a nut and washer
applied to stay on the outside of the sheet. Nuts with or
without washers may be applied to the brace on the inside, or pressure side, of the sheet. Nuts shall not be exposed to the products of combustion within the firebox.
Material shall be in accordance with PG-5.
PL-36.7 Gusset braces (see Figure PL-36.7-1) when
constructed of triangular right-angled web plates secured
to single- or double-angle bars along the two sides at right
angles shall have a cross-sectional area (in a plane at right
angles to the longest side and passing through the intersection of the two shorter sides) not less than 10%
PL-36.8.3
163
Through-braces shall conform to PG-46.
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
greater than would be required for a diagonal brace to
support the same surface. The cross-sectional area shall
be calculated by the equation of PFT-32.1, assuming the
diagonal brace is at the same angle as the longest side
of the gusset plate. Welds attaching gusset braces shall
be in accordance with PW-19.4.1 as it applies to the attachment on each shell plate. All material shall be as required by PG-5 and Mandatory Appendix V.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PL-36.5-1
Typical Forms of Diagonal Braces
Attachment blades
Rivets TYP
Riveted foot
Solid crowfoot
Riveted tee iron
(a)
Fillet weld
Fabricated crowfoot
Fillet
(b)
A
90 deg
Rivets TYP
A
Fillet weld TYP
Bolts TYP
Width of section
A-A
Patch bolt with nut
(a) Welded Gusset Brace
(b) Riveted Gusset Brace
164
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Figure PL-36.7-1
Typical Forms of Gusset Braces
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PL-36.9 Staying Segments of Heads With Structural
Shapes. Tee irons (see Figure PL-36.9-1 and Figure
PL-36.9-2) or other structural shapes may be used to support a sheet where other methods of support are not possible. Special consideration must be given to the
supporting structures at either end of the span being supported to ensure that those structures are not overstressed. The load on the structures at either end shall
be calculated for an area outlined as being halfway to
the next supporting structure and to the center of the
span of the structural shape.
ð1Þ
ð2Þ
ð3Þ
ð4Þ
where
b = width of cross part of tee fastened to shell, in. (mm)
d = total height of tee iron, including thickness of cross
part of tee, in. (mm)
h = height of vertical leg only, in. (mm)
I = moment of inertia, in.4 (mm4)
l = maximum span of tee iron between supports, in.
(mm)
S = surface fiber stress at center of span of tee iron, psi
(MPa), not to exceed 15,000 psi (103 MPa)
s = thickness of cross part of tee iron, in. (mm)
t = thickness of vertical leg, in. (mm)
W = total load on tee iron, lb (N)
y = distance from open end of vertical leg to neutral
axis, in. (mm)
Z = section modulus, in.3 (mm3)
Figure PL-36.9-1
Tee Iron
t
y
h
d
s
b
165
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PL-36.9.1 Stress at the center of the span in solid
tee irons or in tee irons meeting the following requirements shall be calculated as in (c)(2) eq. (1) through
(c)(2) eq. (4), with the maximum extreme fiber stress in
the structural shape being limited to 15,000 psi
(103 MPa):
(a) fabricated using two back-to-back angles to form
the leg
(b) fastened together by rivets on a pitch not exceeding
that required in PG-46 using a C factor according to the
thickness of the leg of the angle being fastened
(c) the load carried evenly by the tee iron, with fasteners meeting the following requirements:
(1) attached to the shell on a pitch not exceeding that
required in PG-46 using a C factor corresponding to the
thinner of the leg of the tee iron or the shell plate
(2) shall be calculated with eq. (1), with the maximum extreme fiber stress in the structural shape being
in accordance with PL-7.1, not to exceed 15,000 psi
(103 MPa)
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PL-36.9-2
Tee-Iron Support Area
A
Tangent point
=
=
Support point
=
Area supported by tee iron
and brace combined
=
Area supported
by brace
Tee-iron span
=
Support point
=
A
Perimeter as defined in PG-27
Flue
Section A-A
entire span of the tee iron, which is the length between
the extreme fasteners of the tee iron. The extreme fiber
stress on the tee iron shall not exceed 15,000 psi
(103 MPa).
PL-36.9.4 For reinforcement of flat heads, refer to
PL-20 and PL-27.
PL-37
IN THE COURSE OF PREPARATION
PL-38
IN THE COURSE OF PREPARATION
PL-39
ARCH TUBES, CIRCULATORS, AND
THERMIC SYPHONS
PL-39.1 Arch Tubes. Arch tubes (see Figure
PL-39.1-1) shall meet the requirements of PL-39.1.1 and
PL-39.1.2.
PL-39.1.1 A washout plug opening with a minimum diameter equal to the inside diameter of the arch
tube shall be provided on the exterior boiler sheet at each
arch tube end. Such washout plug openings shall be arranged to enable installation of a mechanical tube cleaner
and washout hose.
No credit for the strength of the tee iron may be taken for
support on the end with the brace, and the brace stress
shall not be more than 9,000 psi (62 MPa).
PL-36.9.3 To determine the extreme fiber stress
on a tee iron or structural shape supported at or near
one end only by a brace or stay, calculate the load carried
by the tee iron using the entire area supported by that tee
iron, then subtract the load carried by the brace as calculated in PL-36.9.1(c). The remaining load shall be used to
calculate the extreme fiber stress on the tee iron over the
PL-39.1.2 Arch tubes shall be installed per the requirements of PWT-11.1. Structural loading of the arch
tubes caused by the brick arch shall be accounted for by
using eq. (1) or (1M) to determine the minimum
thickness.
166
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PL-36.9.2 Where a tee iron or structural shape is
supported at or near one end only by a brace or stay,
and the remainder of the span is supported only by the
tee iron or structural shape, the area supported by the
brace or stay shall be the area defined by one of the
following:
(a) an outline halfway between the tee-iron rivets and
the nearest support structure on the sides and end where
the brace is located
(b) halfway between the edge of the flues and the nearest attachment point of the tee iron, and halfway between
the brace on the tee iron and the nearest support structure to the tee iron on the end opposite the brace
(c) halfway between the shell and the nearest attachment point on the tee iron for unflanged heads, and halfway between the point of tangency of the flange and the
nearest attachment point of the tee iron on flanged heads
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PL-39.1-1
Arch Tubes
Crown sheet
Door sheet
Back head
Rear flue sheet
Fire door opening
Arch tube
Wrapper plug hole equal to or
greater than I.D. of arch tube
on both ends of arch tube
Inside throat sheet
Washout plug (same on back head)
Outside throat sheet
ð1Þ
(SI Units)
PL-39.2.2 Circulators shall be fabricated using full
thickness butt welds. Volumetric examination and PWHT
shall be done as required in Part PW.
ð1MÞ
where
PL-39.3 Thermic Syphons. Thermic syphon walls
shall be designed in accordance with PL-27 and PL-30
(see Figure PL-39.3-1). Thermic syphon neck walls shall
be designed in accordance with PG-27 but shall not be
less than 3/8 in. (10 mm) thickness. Welds on the thermic
syphon unit shall be full penetration, and the unit shall be
stress relieved in accordance with PW-39. Volumetric examination is not required.
D = outside diameter of tube, in. (mm)
P = maximum allowable working pressure, psi (MPa)
t = thickness of tube wall, in. (mm)
PL-39.2 Circulators.
PL-39.2.1 Maximum allowable working pressure
for circulators (see Figure PL-39.2.1-1 and Figure
PL-39.2.1-2) shall be in accordance with PG-27; however,
the minimum wall thickness shall be 3/8 in. (10 mm). Circulators shall be inserted completely through the crown
sheet and shall be welded with a partial-penetration weld
and cover fillet weld on the fire side of the sheet in accordance with Figure PW-16.1, illustration (y). A cover fillet
weld at least as wide as the partial-penetration weld and
no less than 1/4 in. (6 mm) shall be done in accordance
with PW-16.2 and Figure PL-39.2.1-2. Attachment of the
circulator legs to the side sheets shall be made using a
flanged diaphragm or diaphragm plate that may be
flanged integrally with the sheet or may be inserted as
a flush patch. Circulator legs shall be inserted into the
PL-39.3.1 Flanges transitioning from the vertical
walls of the thermic syphon to the crown sheet shall be
long enough to include at least one row of crown bolts between the flange radius and the attachment weld. If
flanges are made separately from the vertical body of
the thermic syphon, they shall be attached to the body
with full-penetration butt welds and shall be long enough
to contain at least one row of staybolts in the vertical
body section as well as at least one row of crown bolts.
PL-39.3.2 Attachment welds to the crown sheet
shall be full-penetration butt welds. PWHT and volumetric examination are not required.
167
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
diaphragm plate at least 1 in. (25 mm) and fillet welded
with a t m i n in accordance with PW-16.2. If installed as
a flush patch, the diaphragm plate shall be large enough
to encompass at least one row of adjacent staybolts. Postweld heat treatment (PWHT) and volumetric examination
are not required.
(U.S. Customary Units)
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
Figure PL-39.2.1-1
Circulators
GENERAL NOTE: From Locomotive Cyclopedia, Fig. 3.176, p. 299, Simmons-Boardman Publishing Corp., 1944.
tmin per PW-16.2
¼ in. to ½ in.
(6 mm to 13 mm)
Side sheet
t
See Figure PW-16.1
Staybolt or fastener
t
Crown sheet
3t min.
Rivet or other
fastener
¼ in. (6 mm) min.
Fillet weld
1 in. min.
Vertical circulator leg
Diaphragm plate
Washout plug to accommodate mechanical cleaning device and washout hose
Staybolt or fastener
Doubling plate (see PL-27.5)
168
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Figure PL-39.2.1-2
Circulator Attachment Section Views
No fu
Figure PL-39.3-1
Example of Thermic Syphon Installation
GENERAL NOTE: From Locomotive Cyclopedia, Fig. 3.171, p. 295, Simmons-Boardman Publishing Corp., 1944.
PL-39.3.4 Flanged diaphragm plates for the thermic syphon necks shall be flanged integrally with the firebox sheets or shall be applied as flush patches with
full-penetration butt welds.
PL-40
IN THE COURSE OF PREPARATION
PL-41
IN THE COURSE OF PREPARATION
PL-42
WATER GAGE GLASSES AND WATER
COLUMNS
PL-42.1 General. Water gage glasses and water columns shall be installed in accordance with PG-12,
PG-60, PL-42.2, and PL-42.3.
PL-39.3.5 A washout plug opening shall be provided on the boiler exterior sheet at the top end of the
thermic syphon and at the neck. Each washout plug opening shall be arranged to enable access for a washout hose.
The neck washout plug opening shall be arranged to enable insertion of a mechanical tube cleaner.
PL-42.2 Water Gage Glass Number and Placement.
All locomotive boilers that meet the requirements of Part
PL shall have at least two water gage glasses. The lowest
reading of any gage glass shall be at least 3 in. (75 mm)
above the highest point of the crown sheet, for locomotive
boilers over 36 in. (900 mm) inside diameter.
PL-42.2.1 For locomotive boilers between 36 in.
(900 mm) and 30 in. (750 mm) inclusive in inside diameter, the lowest reading of any gage glass shall be at
least 2 in. (50 mm) above the highest point of the crown
sheet.
169
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PL-39.3.3 Thermic syphon necks shall slide inside
the diaphragm plate on the throat sheet at least 2 in.
(50 mm). A fillet weld shall be used to attach the thermic
syphon neck to the diaphragm plate, and the weld shall
have a t m i n in accordance with PW-16.2. PWHT and volumetric examination are not required.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PL-42.3.5 Tubular-type water-level indicators
shall be equipped with suitable safety shielding to prevent discharge of glass pieces into the locomotive cab if
the water gage glass breaks. Tubular-type water-level indicators shall be suitable for the design pressure and
temperature.
PL-42.2.2 Water gage glasses shall be mounted directly to the boiler proper. One of the required two water
gage glasses may be mounted on a water column that is
directly mounted to the boiler.
PL-42.2.3 The placement and height of the water
gage glass shall be such to ensure the water level can be
accurately determined for all operating conditions.
PL-42.3.6 Placement and illumination of the water
gage glasses shall be such that the water level may be
quickly observed by the operating crew when they are
in their normal operating positions within the locomotive
cab.
PL-42.2.4 The highest point on the crown sheet
when sitting on level track shall be indicated on the back
head of the boiler.
PL-42.3.7 Multiple water glasses and water columns shall not be attached to a single top or bottom connection or any type of shared connection with another
device. Each water glass and water column shall have
its own independent top and bottom connection to the
boiler.
PL-42.3 Water Gage Connection.
PL-42.3.1 The bottom mounting for the water gage
glass shall extend at least 11/2 in. (38 mm) into the boiler
but no farther than halfway between the inside and outside sheets of the waterleg, whichever is less, and shall extend beyond any obstruction directly above or below the
connection. The center of the bottom connection shall not
be located closer to the side and above any arch tube
opening within a boundary described by a semicircle
based on the horizontal centerline of the arch tube with
a radius of 6 in. (150 mm), described from the center
point of the arch tube. The connection passage shall be
straight and horizontal and shall be arranged to allow entry of a mechanical cleaner such as a reamer.
PL-42.3.8 The top and bottom water gage glass
and water column connections shall be arranged and provided with provision to allow mechanical cleaning of the
water passage to the boiler. Each connection passage shall
be straight without sags, pockets, or dips and shall be arranged to allow entry of a mechanical cleaner such as a
reamer.
PL-43
BOILER BLOWOFF SYSTEMS
Boiler blowoff piping may extend through only one
valve for bottom or surface blowoff systems.
PL-44
IN THE COURSE OF PREPARATION
PL-45
FEEDWATER SUPPLY
Feedwater supply shall be in accordance with PG-61.
Feedwater shall be discharged into the boiler from its delivery pipe at the coolest part of the boiler practicable,
and no closer to the firebox than a point halfway between
the front flue sheet and the firebox. Boilers under this
Part shall have at least two means of supplying water to
the boiler. At least one live steam injector shall be used.
PL-42.3.3 The top and bottom of the water gage
glass and associated piping shall be adequately supported
and braced to prevent movement and minimize vibration.
PL-42.3.4 The steam connection of a water gage
glass shall be connected above the highest visible water
level of the gage glass. The steam connection, and associated piping, shall be without sags, pockets, dips, or siphons in the piping that may allow the buildup of scale
and sediment. The steam connection shall be as close to
the top of the boiler (wrapper roof sheet) as practical
and no lower than the highest visible level of the gage
glass.
PL-46
IN THE COURSE OF PREPARATION
PL-47
IN THE COURSE OF PREPARATION
PL-48
DRY PIPE
Maximum allowable working pressure for the dry pipe
of a boiler with a dome-type throttle shall be determined
in accordance with PG-28.
170
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PL-42.3.2 Gage glasses shall have top and bottom
shutoff valves, of such construction as to provide a
smooth flow and to prevent the buildup of scale and sediment in the valve body. Globe-type valves shall not be
used. The bottom gage glass connection shall have a drain
valve of at least NPS 3/8 in. (DN 10) with associated piping
being no less than nominal NPS 3/8 in. (DN 10) with an inside diameter of no less than 3/8 in. (10 mm). The drain
piping shall be arranged to discharge below the locomotive cab.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PART PWT
REQUIREMENTS FOR WATERTUBE BOILERS
GENERAL
PWT-11
PWT-1
Tubes, pipe, and nipples may be attached to shells,
heads, headers, and fittings by one of the following
methods.
GENERAL
The rules in Part PWT are applicable to watertube boilers and parts thereof and shall be used in conjunction
with the general requirements in Part PG as well as with
the special requirements in the applicable Parts of this
Section that apply to the method of fabrication used.
The rules in Part PWT do not apply to external piping.
GENERAL
PWT-5.1 Materials used in the construction of pressure parts for watertube boilers shall conform to one of
the specifications in Section II and shall be limited to
those for which allowable stress values are given in Section II, Part D, Subpart 1, Tables 1A and 1B, for Section
I construction or as otherwise specifically permitted in
Part PG and Part PWT.
PWT-5.2 Mud drums of boilers shall be of either
wrought steel or cast steel as designated in SA-216.
DESIGN
PWT-8
GENERAL
The rules in the following paragraphs apply specifically
to the design of watertube boilers and parts thereof and
shall be used in conjunction with the general requirements for design in Part PG as well as with the specific requirements for design in the applicable Parts of this
Section that apply to the method of fabrication used.
PWT-9
PWT-11.2 Superheater, reheater, waterwall, or economizer tubes may be welded to tubular manifolds, headers, or drums and tube ends or weld necks may be welded
to drums, all without expanding or flaring, provided the
connections comply with the requirements of PW-15
and PW-16. The welds shall be postweld heat treated
when required by PW-39.
TUBES AND PIPE
PWT-9.1 Economizer, boiler generator, and superheater tubes shall comply with the specifications as listed
in PG-9.
PWT-9.2 Seamless steel pipe not exceeding NPS 11/2
(DN 40) complying with SA-53 or SA-106 may be
threaded into the tubesheet, drum, or steel fitting of a
watertube boiler. Steel fittings, if used, must fully cover
the threads.
PWT-11.3 Pipe used for tubes as provided in
PWT-9.2 may be attached by threading instead of expanding and flaring, provided the requirements in PG-39.5 are
conformed to.
PWT-9.3 A tube in which a fusible plug is to be installed shall be not less than 0.22 in. (5.6 mm) in thickness
at the plug in order to secure four full threads for the plug
(see also A-20).
171
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PWT-11.1 Tubes may be attached by expanding, flaring, beading, and seal welding in the following combinations illustrated in Figure PWT-11:
(a) expanded and flared [illustration (a)]
(b) expanded and beaded [illustration (b)]
(c) expanded, flared, seal welded, and re‐expanded
after welding [illustration (c)]
(d) expanded, seal welded, and re‐expanded after welding or seal welded and expanded after welding [illustration (d)] or
(e) expanded only, in tubesheets having a thickness not
less than 5/8 in. (16 mm), where the tube holes contain
one or more grooves, as shown in Figure PWT-11. Tube
hole grooves may have either a rounded or square profile.
The end of all tubes that are flared shall project through
the tubesheet or header not less than 1/4 in. (6 mm) nor
more than 3/4 in. (19 mm) before flaring. Where tubes enter at an angle, the maximum limit of 3/4 in. (19 mm) shall
apply only at the point of least projection. Tubes that are
expanded and flared without seal welding shall be flared
to an outside diameter of at least 1/8 in. (3.0 mm) greater
than the diameter of the tube hole. For tubes that are seal
welded, the maximum throat of seal welds shall be 3/8 in.
(10 mm). Tubes which are only expanded into grooved
tube holes shall project through the tubesheet or header
not less than 1/8 in. (3 mm) but not more than 3/4 in.
(19 mm).
MATERIALS
PWT-5
TUBE CONNECTIONS
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PWT-11
Examples of Acceptable Forms of Tube Attachment
1/16
1/4
in. (6 mm) min.
before flaring
3/4 in. (19 mm) max.
before flaring
in. (1.5 mm)
(a)
3/8
(b)
in. (10 mm) max.
3/8
(c)
in. (10 mm) max.
(d)
1/
in. (3 mm) min.
3/ in. (19 mm) max.
4
8
(e)
172
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Groove dimensions:
1/ in. (3 mm) min. width
8
1/ in. (0.5 mm) min. depth
64
Edge-to-edge separation:
1/ in. (3 mm) min. between
8
grooves or between groove
and tubesheet surface
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PWT-11.4 Watertubes not exceeding 2 in. (50 mm)
O.D. may be welded to tapered ferrules that are attached
to the drum by a driven interference fit. In addition to the
interference fit, the ferrules shall be held in place by retainer clamps attached to the drum with stud bolts. Welded
stud bolts shall comply with PW-27.2 and PW-28.6. When
tapped holes are provided for the studs, the stud bolts
shall comply with PG-39.4. The minimum cross‐sectional
area of the remaining studs shall be determined by the
following equation, but shall not be less than that of a
3
/8 in. (10 mm) stud.
PWT-13
where
These latches or fastenings shall be of the positive self‐
locking type. Friction contacts, latches, or bolts actuated
by springs shall not be used. The foregoing requirements
for latches or fastenings shall not apply to coal openings
of downdraft or similar furnaces.
The rules in PFT-25.2 shall be used to determine if staying is required.
PWT-14
PWT-12
All other doors, except explosion doors, not used in the
firing of the boiler may be provided with bolts or fastenings in lieu of self‐locking latching devices.
Explosion doors, if used and if located in the setting
walls within 7 ft (2.1 m) of the firing floor or operating
platform, shall be provided with substantial deflectors
to divert the blast.
STAYBOLTING BOX-TYPE HEADERS
AND WATERLEGS
The front and back sheets of staybolted box‐type headers and waterlegs may be joined together by welding by
any of the methods described in PFT-21 for fireboxes
and waterlegs, provided the thickness and header width
requirements of PFT-21 and Figure PFT-21 are met.
PWT-15
The minimum size of an access or fire door opening, in
which the minimum furnace dimension is 24 in.
(600 mm), shall be not less than 12 in. × 16 in.
(300 mm × 410 mm) or equivalent area, 11 in.
(280 mm) to be the least dimension in any case. A circular
opening shall be not less than 15 in. (380 mm) in
diameter.
Figure PWT-12.1
DELETED
ð15Þ
ACCESS AND FIRING DOORS
For furnace dimensions less than 24 in. (600 mm), the
opening should be 23/4 in. × 31/2 in. (70 mm × 89 mm) or
larger where possible. In cases where the size or shape of
the boiler prohibits an opening of that size, two openings
with a minimum size of 1 in. (25 mm) may be used, preferably oppposite each other, to permit inspection and
cleaning of the furnace. If the burner is removable so as
to permit inspection and cleaning through the burner
opening, a separate access opening need not be provided.
Figure PWT-12.2
DELETED
173
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
ð15Þ
FIRING DOORS
A watertube boiler shall have the firing doors of the
inward‐opening type, unless such doors are provided
with substantial and effective latching or fastening devices or otherwise so constructed as to prevent them,
when closed, from being blown open by pressure on the
furnace side.
A = the root area of the stud
D = the outside diameter of the ferrule at the inside surface of the drum
N = the number of fittings retained by the stud
P = the design pressure
S = the allowable stress of the stud material at its design temperature
ð15Þ
STAYING SEGMENT OF HEADS
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PART PFT
REQUIREMENTS FOR FIRETUBE BOILERS
GENERAL
PFT-10
PFT-1
Longitudinal and circumferential welded joints of a
shell or drum shall comply with the rules in Part PW.
GENERAL
The rules in Part PFT are applicable to firetube boilers
and parts thereof and shall be used in conjunction with
the general requirements in Part PG as well as with the
specific requirements in the applicable Parts of this Section that apply to the method of fabrication used.
PFT-11
ATTACHMENT OF HEADS AND
TUBESHEETS
Flat heads and tubesheets of firetube boilers shall be attached by one of the following methods:
MATERIALS
PFT-5
SHELL JOINTS
PFT-11.2 By flanging and butt welding in accordance
with Parts PG and PW.
GENERAL
PFT-11.3 By attaching an outwardly or inwardly
flanged tubesheet to the shell by fillet welding provided
the following requirements are met:
PFT-5.2 Waterleg and doorframe rings of vertical
firetube boilers and of locomotive and other type boilers
shall be of wrought iron or steel or cast steel as designated in the SA-216. The ogee or other flanged construction may be used as a substitute in any case.
PFT-11.3.2 The joint attaching an outwardly
flanged tubesheet is wholly within the shell and forms
no part thereof.
PFT-11.3.1
stays, or both.
PFT-11.3.3 Inwardly flanged tubesheets are full fillet welded inside and outside.
PFT-11.3.4 The throat dimension of the full fillet
weld is equal to not less than 0.7 of the thickness of the
head.
DESIGN
PFT-8
GENERAL
PFT-11.3.6 The construction conforms in all other
respects to the requirements of this Section, including
welding and postweld heat treating, except that volumetric examination is not required.
The rules in the following paragraphs apply specifically
to the design of firetube boilers and parts thereof and
shall be used in conjunction with the general requirements for design in Part PG as well as with the specific requirements for design in the applicable Parts of this
Section that apply to the method of fabrication used.
PFT-9
The tubesheet is supported by tubes, or
PFT-11.3.7 This construction shall not be used on
the rear head of a horizontal‐return tubular boiler and inwardly flanged tubesheets shall not be used on a boiler
with an extended shell.
THICKNESS REQUIREMENTS
PFT-9.1 Shell and Dome. The thickness after forming shall be as determined in accordance with the rules
in Part PG.
PFT-11.3.8 On inwardly flanged tubesheets, the
length of flange shall conform to the requirements of
PW-13 and the distance of the outside fillet weld to the
point of tangency of the knuckle radius shall be not less
than 1/4 in. (6 mm).
PFT-9.2 Tubesheet.
PFT-9.2.1 The thickness shall be as determined in
accordance with Part PG and Part PFT.
PFT-11.4 By attaching an unflanged tubesheet to the
shell by welding, provided the requirements of
PFT-11.4.1 through PFT-11.4.7 are met
PFT-9.2.2 When buttwelded to the shell of a firetube boiler, a formed tubesheet with a straight flange
longer than 11/2 times the tubesheet thickness shall have
a straight flange thickness not less than 0.75 times the
thickness of the shell to which it is attached.
PFT-11.4.1
stays, or both.
174
The tubesheet is supported by tubes, or
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PFT-5.1 Materials used in the construction of pressure parts for firetube boilers shall conform to one of
the specifications given in Section II and shall be limited
to those for which allowable stress values are given in
Section II, Part D, Subpart 1, Tables 1A and 1B, or as
otherwise specifically permitted in Parts PG and PFT.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PFT-11.4.2 The welded joint may be made through
the tubesheet or shell thickness. When the weld joint is
made through the shell, a minimum of 80% of the pressure load shall be carried by the tubes, stays, or both.
Tube ends attached by expanding and welding are subject to the provisions specified in PFT-12.2.1.1 through
PFT-12.2.1.3.
PFT-12.2.1.1 Where no bevel or recess is employed, the tube shall extend beyond the tubesheet not
less than a distance equal to the tube thickness or 1/8 in.
(3 mm), whichever is the greater, nor more than twice
the tube thickness or 1/4 in. (6 mm), whichever is the lesser [see Figure PFT-12.1, illustration (e)].
PFT-11.4.3 The weld is a full penetration weld
equal at least to the full thickness of the base metal applied from either or both sides. When the full penetration
weld is made through the shell, an external fillet weld
with a minimum throat of 1/4 in. (6 mm) shall be provided,
and no weld prep machining shall be performed on the
flat tubesheet. The distance from the edge of the completed weld to the peripheral edge of the tubesheet shall
not be less than the thickness of the tubesheet.
Figure PFT-12.1
Some Acceptable Forms of Tube Attachment on
Firetube Boilers
PFT-11.4.4 The shell or wrapper sheet, where exposed to primary furnace gases30 and not water cooled,
does not extend more than 1/8 in. (3 mm) beyond the outside face of the tubesheet.
PFT-11.4.5 The weld attaching a furnace or a lower tubesheet of a vertical firetube boiler to the furnace
sheet is wholly within the furnace sheet and is ground
flush with the upper or water side of the tubesheet.
(a)
PFT-11.4.6 The construction conforms in all other
aspects to the requirements of this Section including
welding, and postweld heat treatment, except that volumetric examination is not required.
(b)
PFT-11.4.7 This construction shall not be used on
the rear head of a horizontal‐return tubular boiler.
(c)
(d)
TUBES
Note (2)
PFT-12.1 Allowable Working Pressure.
PFT-12.1.1 The maximum allowable working presð15Þ
sure of tubes or flues of firetube boilers shall be as given
in PG-28.1 and PG-28.3. The minimum thickness requirement of PG-9.3 does not apply to firetubes.
Note (1)
Note (3)
T
PFT-12.1.2 The maximum allowable working pressure for copper tubes or nipples subjected to internal or
external pressure shall not exceed 250 psi (1.7 MPa).
The maximum temperature shall not exceed 406°F
(208°C).
The maximum allowable working pressure for copperclad tubes subjected to external pressure shall be determined by the formula in PG-28.3, in which t may be increased by one‐half the thickness of the cladding.
t
t
(e)
(f)
Note (4)
Note (3)
Accessible side
for welding Tubesheet
T
Weld
PFT-12.2 Attachment of Tubes.
PFT-12.2.1 Figure PFT-12.1 illustrates some of the
acceptable types of tube attachments. Such connections
shall be
(a) expanded and beaded as in illustrations (a), (b), and
(d)
(b) expanded and beaded and seal welded as in illustration (c)
(c) expanded and seal welded as in illustration (e)
(d) welded, as in illustrations (f) and (g)
Tube
t
(g)
(h)
NOTES:
(1) Not less than t or 1/8 in. (3 mm), whichever is the greater, nor
more than 2t or 1/4 in. (6 mm), whichever is the lesser.
(2) Not less than t or 1/8 in. (3 mm), whichever is the greater, nor
more than T /3 (see PFT-12.2.1.2).
(3) Not more than t .
(4) Not less than t or 1/8 in. (3 mm), whichever is the greater, nor
more than T /3 (see PFT-12.2.1.2).
175
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PFT-12
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PFT-12.2.1.2 The tubesheet hole may be beveled
or recessed. The depth of any bevel or recess shall not be
less than the tube thickness or 1/8 in. (3 mm), whichever is
greater, nor more than one‐third of the tubesheet thickness, except that when tube thicknesses are equal to or
greater than 0.150 in. (4 mm), the bevel or recess may exceed T /3. Where the hole is beveled or recessed, the projection of the tube beyond the tubesheet shall not exceed
a distance equal to the tube wall thickness [see Figure
PFT-12.1, illustrations (f) and (g)].
verify minimum weld thickness. The results shall be recorded and maintained with the performance qualification record.
(f) Each weld surface on the tube I.D. shall receive
either a magnetic particle or liquid penetrant examination
in accordance with A-260 or A-270 of Nonmandatory
Appendix A, as applicable. In addition, a visual examination of the weld surface on the tube O.D. shall be performed. The maximum practicable number of these
welds, but in no case fewer than 50%, shall be visually examined. Visual examination shall show complete penetration of the joint root and freedom from cracks.
PFT-12.2.1.3 On types of welded attachment
shown in Figure PFT-12.1, illustrations (c) and (e), the
tubes shall be expanded before and after welding. On
types shown in illustrations (f) and (g), the tubes may
be expanded.
COMBUSTION CHAMBERS
PFT-13
PFT-12.2.2 Expanding of tubes by the Prosser
method may be employed in combination with any
beaded or seal welded attachment method [see Figure
PFT-12.1, illustration (b)].
COMBUSTION CHAMBER TUBESHEET
PFT-13.1 The maximum allowable working pressure
on a tubesheet of a combustion chamber, where the
crown sheet is not suspended from the shell of the boiler,
shall be determined by the following equation:
PFT-12.2.3 After seal welding as shown by Figure
PFT-12.1, illustrations (c) and (e), a single hydrostatic test
of the boiler shall suffice.
(U.S. Customary Units)
PFT-12.2.4 The inner surface of the tube hole in
any form of attachment may be grooved or chamfered.
PFT-12.2.5 The sharp edges of tube holes shall be
taken off on both sides of the plate with a file or other
tool.
(SI Units)
where
D = least horizontal distance between tube centers on a
horizontal row
d = inside diameter of tubes
P = maximum allowable working pressure
t = thickness of tubesheet
W = distance from the tubesheet to opposite combustion chamber sheet
Where tubes are staggered, the vertical distance between the center lines of tubes in adjacent rows must
not be less than
Example: Required the maximum allowable working
pressure of a tubesheet supporting a crown sheet stayed
by crown bars. Horizontal distance between centers,
41/8 in.; inside diameter of tubes, 2.782 in.; thickness of
tubesheets 11/16 in.; distance from tubesheet to opposite
combustion‐chamber sheet, 341/4 in.; measured from outside of tubesheet to outside of back plate; material, steel.
Substituting and solving the following equation:
176
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PFT-12.2.6 Welded tube attachments as shown by
Figure PFT-12.1, illustration (h), may be made with partial or no insertion of the tube into the flat tubesheet.
The following requirements shall be met for these
attachments:
(a) The tube and tubesheet materials shall be restricted
to P‐No. 1, P‐No. 3, or P‐No. 4 materials.
(b) The maximum design temperature at the weld joint
shall not exceed 700°F (370°C).
(c) The weld shall be a full‐penetration weld made
from the I.D. of the tube. The throat of the weld shall be
equal to or greater than the thickness of the tube. The root
pass shall be made using the GTAW process.
(d) PWHT per PW-39 is mandatory. The exemptions to
PWHT noted in Tables PW-39-1 through PW-39-14 shall
not apply.
(e) In addition to meeting the performance qualification requirements of Section IX, before making a production weld each welder and welding operator shall
demonstrate his or her ability to achieve complete weld
penetration and minimum thickness by successfully welding six test pieces. The test pieces shall be welded in a
mockup of the production weld. The mockup shall be of
identical position, dimensions, and materials as that of
the production weld. The test pieces shall be visually examined to verify complete penetration and sectioned to
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PFT-13.2 Sling stays may be used in place of girders
in all cases covered in PFT-13.1, provided, however, that
when such sling stays are used, girders or screw stays of
the same sectional area shall be used for securing the bottom of the combustion chamber to the boiler shell.
Figure PFT-17.2
Acceptable Type of Ring-Reinforced Furnace
Tr
PFT-13.3 When girders are dispensed with and the
top and bottom of combustion chambers are secured by
sling stays, the sectional area of such stays shall conform
to the requirements of rules for stayed surfaces.
PFT-14
Alternate End Assemblies
Full penetration
continuous weld
both sides of rings
GENERAL
t
PFT-14.1 Furnaces may be constructed using seamless pipe, electric resistance welded pipe within the limitations of PG-9.5, or fusion welded plate of the double
welded butt type. A sample of the longitudinal weld, made
with the addition of filler metal, of each section of a furnace shall be subjected to a bend test in accordance with
PW-53. No volumetric examination of the longitudinal or
circumferential welds is required.
L
L
Hr
Tr
Hr
L
Do
PFT-14.2 When the longitudinal joint will be subjected to complete volumetric examination in accordance
with PW-51 or PW-52, the individual bend test for each
section of the furnace is not required.
PFT-15
PFT-17.6 The spacing L of the rings on the furnace is
not greater than 60t or 36 in. (900 mm), whichever is
smaller.
PLAIN CIRCULAR FURNACES
PFT-15.1 Plain circular furnaces may be made up to
any length, using sections where desired. The thickness
may not be less than 5/16 in. (8 mm).
PFT-17.8 The boiler design permits replacement of
the furnace. A flared or welded ogee ring is an acceptable
type of assembly.
PFT-17
PFT-17.10 The maximum allowable working pressure shall be determined in accordance with PG-28.3.
RING-REINFORCED TYPE
PFT-17.11 The design of stiffening rings is determined by the use of the symbols given in PG-28.3, and
the equation given in this paragraph.
Horizontal cylindrical flues or furnaces (Figure
PFT-17.2) may be constructed with circular stiffening
rings, provided the requirements of PFT-17.1 through
PFT-17.11.1 are met.
PFT-17.11.1 The moment of inertia for a stiffening
ring shall be determined by the following procedure.
Step 1. Assuming that the furnace has been designed
and Do, Ls, and t are known, select a rectangular member
to be used for a stiffening ring and determine its area A s
and its moment of inertia I . Then calculate B by the following equation:
PFT-17.1 The stiffening ring is rectangular in cross
section and is fabricated from one piece of plate, or from
plate sections or bars provided full penetration welds are
used in assembling.
PFT-17.2 The stiffening ring after fabrication has a
thickness of not less than 5/16 in. (8 mm) and not more
than 13/16 in. (21 mm) and in no case thicker than 11/4
times the furnace wall thickness.
where B = factor on the right‐hand side of the applicable
chart in Section II, Part D.
Step 2. Enter the right‐hand side of the chart at the value of B determined in Step 1.
Step 3. Follow horizontally to the material line for the
correct temperature.
Step 4. Move down vertically to the bottom of the chart
and read the value of A.
PFT-17.3 The ratio of the height of the stiffening ring
to its thickness, H r /T r , is not greater than 8 nor less than
3.
ð15Þ
PFT-17.4 The stiffening ring is attached to the furnace by a full penetration joint, welded from both sides.
PFT-17.5 The thickness of the furnace wall or flue is a
minimum of 5/16 in. (8 mm).
177
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PFT-15.2 The maximum allowable working pressure
shall be determined in accordance with PG-28.3.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Step 5. Compute the value of the required moment of
inertia I s by the following equation:
Figure PFT-18.1
Morison Furnace
8 in. (200 mm) max.
Step 6. If the required I s is greater than the moment of
inertia I for the section selected in Step 1, select a new
section with a larger moment of inertia and determine a
new value of I s .
R
If the required I s is smaller than I for the section selected in Step 1, that section should be satisfactory.
r
(r ≤ 1/2R)
11/4 in. (32 mm) min. depth suspension curve
PFT-18
CORRUGATED FURNACES
CL
PFT-18.1 The maximum allowable working pressure
on corrugated furnaces, such as the Leeds suspension
bulb, Morison, Fox, Purves, or Brown, having plain portions at the ends not exceeding 9 in. (230 mm) in length
(except flues especially provided for), when new and
practically circular, shall be computed as follows:
PFT-18.2 The thickness of a corrugated or ribbed furnace shall be ascertained by actual measurement by the
furnace manufacturer, by gaging the thickness of the corrugated portions. For the Brown and Purves furnaces, the
measuring point shall be in the center of the second flat;
for the Morison, Fox, and other similar types, in the center
of the top corrugation, at least as far in as the fourth corrugation from the end of the furnace.
where
PFT-19
COMBINED PLAIN CIRCULAR AND
CORRUGATED TYPE
Combination type furnaces for external pressure may
be constructed by combining a plain circular section
and a corrugated section provided
PFT-19.1 Each type of furnace is designed to be self‐
supporting, requiring no support from the other furnace
at their point of connection.
PFT-19.2 Paragraphs PG-28.3 and PFT-15 are used
for calculating the maximum allowable working pressure
of the plain section. In applying the length in the text, or L
in the equations, the value used shall always be twice the
actual length of the plain section. The actual length of the
plain section is the distance measured from the center
line of the head attachment weld to the center line of
the full penetration weld joining the two sections.
PFT-19.3 The maximum allowable working pressure
of the corrugated section shall be determined from
PFT-18.
PFT-19.4 The full penetration weld joining a plain
self‐supporting section to a corrugated self‐supporting
section shall be located as shown in Figure PFT-19.
PFT-20
ATTACHMENT OF FURNACES
PFT-20.2 Fillet Welded Construction. In a scotch
type boiler, a furnace may be attached to an outwardly
flanged opening in a front tubesheet by a circumferential
In calculating the mean diameter of the Morison furnace, the least inside diameter plus 2 in. (50 mm) may
be taken as the mean diameter.
178
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
C = 17,300 (119), a constant for Leeds furnaces, when
corrugations are not more than 8 in. (200 mm)
from center to center and not less than 2 1/4 in.
(57 mm) deep
= 15,600 (108), a constant for Morison furnaces,
when corrugations are not more than 8 in.
(200 mm) from center to center and not less than
11/4 in. (32 mm) deep, and the radius of the outer
corrugation r , is not more than one‐half of the radius of the suspension curve R (see Figure
PFT-18.1)
= 14,000 (97), a constant for Fox furnaces, when corrugations are not more than 8 in. (200 mm) from
center to center and not less than 1 1/2 in.
(38 mm) deep
= 14,000 (97), a constant for Purves furnaces, when
rib projections are not more than 9 in. (230 mm)
from center to center and not less than 1 3/8 in.
(35 mm) deep
= 14,000 (97), a constant for Brown furnaces, when
corrugations are not more than 9 in. (230 mm)
from center to center and not less than 1 5/8 in.
(41 mm) deep
D = mean diameter
P = maximum allowable working pressure
t = thickness, not less than 5/16 in. (8 mm) for Leeds,
Morison, Fox, and Brown, and not less than 7/16 in.
(11 mm) for Purves furnaces
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PFT-20.5 Furnace Sheets Attached by Welding. Vertical firetube boilers may be constructed by welding the
ogee bottom of the furnace sheet to the outside shell as
shown in Figure PFT-20, provided the requirements of
PFT-20.5.1 through PFT-20.5.7 are met.
Figure PFT-19
Connection Between Plain and Corrugated
Furnace
3
1
Max. 3tc or 11/2 in. (38 mm)
(whichever is less)
PFT-20.5.1 The tube or crown sheet is fully supported by tubes, or stays, or both.
PFT-20.5.2 The joint is wholly within the shell and
forms no part thereof.
PFT-20.5.3 The weld is not in contact with primary furnace gases.30
tc
Point of tangency
PFT-20.5.4 The throat dimension of the full fillet
weld is not less than 0.7 times the thickness of the furnace
sheet.
fillet weld, or a furnace may be attached to either tubesheet by flaring the end that extends beyond the outside
face of the head to an angle of 20 deg to 30 deg, and using
a circumferential fillet weld, provided the requirements
of PFT-20.2.1 through PFT-20.2.5 are met.
PFT-20.5.5 The maximum depth of the waterleg
does not exceed 4 in. (100 mm), and the radius of the ogee
is not greater than the inside width of the waterleg.
PFT-20.5.6 The pitch of the lower row of staybolts
meets the requirements of PFT-27.5.
PFT-20.2.1 The area of the head around the furnace is stayed by tubes, stays, or both in accordance with
the requirements of this Section.
PFT-20.2.2
PFT-20.5.7 The construction conforms in all other
respects to Code requirements including welding and
postweld heat treating, except that volumetric examination is not required.
The joint is wholly outside the furnace.
PFT-20.2.3 The throat dimension of the full fillet
weld is not less than 0.7 times the thickness of the head.
PFT-21
PFT-21.1 The width of waterlegs at the mudring in
vertical firetube and firebox boilers shall not exceed the
maximum allowable pitch calculated using eq.
PG-46.1(1), using 2.1 or 2.2 for the value of C depending
on the plate thickness. The bottom edges of the plates
forming a waterleg may be joined by flanging one or both
plates as shown in Figure PFT-21, illustrations (a)
through (c). Similar construction details are acceptable,
provided the pitch and waterleg width requirements are
met.
PFT-20.2.5 The construction conforms in all other
respects to the requirements of this Section including
welding and postweld heat treating, except that volumetric examination is not required.
ð15Þ
FIREBOXES AND WATERLEGS
PFT-20.3 Full Penetration Weld Construction. A furnace may be attached by a full penetration weld with the
furnace extending at least through the full thickness of the
tubesheet or head but not beyond the toe of the weld, and
the toe shall not project beyond the face of the tubesheet
or head by more than 3/8 in. (10 mm) unless protected
from overheating by refractory material or other means.
Alternatively, the furnace may abut the tubesheet or head
with a full-penetration weld made through the furnace.
The weld may be applied from either or both sides and
shall have an external fillet weld with a minimum throat
of 1/4 in. (6 mm). No weld preparation machining shall
be performed on the flat tubesheet or head. The edge of
the tubesheet or head shall be examined when required
by PG-93 and shall not extend beyond the edge of the furnace by more than 3/8 in. (10 mm) unless protected from
overheating by refractory material or other means.
PFT-21.2 As an alternative, the bottom edges of the
plates forming a waterleg may be joined using a flat plate,
or mudring, attached between the waterleg sides as
shown in Figure PFT-21, illustrations (d) and (e). The required thickness of the mudring shall be calculated using
eq. PG-46.1(1), using 2.1 or 2.2 for the value of C ,
Figure PFT-20
Welding Ogee Ring
1/
2
pitch (max.)
d (max.)
PFT-20.4 Throat Sheets. Throat sheets and inside
and outside front furnace sheets when fully stayed may
be attached as required in PFT-11.4.
179
d [max. = 4 in.
(100 mm)]
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PFT-20.2.4 Unless protected by refractory material, the furnace does not extend beyond the outside face of
the tubesheet a distance greater than the thickness of the
tubesheet. Any excess shall be removed before welding.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PFT-21
Some Acceptable Methods of Forming Waterleg Joints by Welding
p max.
p max.
p/2
max.
p/2 + r
max.
r
r
(a)
(b)
p max.
p max.
p max.
p/2 + 2
max.
p/2 + 2
max.
p/2 + 2
max.
(d)
PFT-23
depending on the plate thickness, and a value of p equal
to the waterleg inside width, but shall be not less than
1
/2 in. (13 mm).
WORKING PRESSURE FOR STAYED
CURVED SURFACES
PFT-23.1 The maximum allowable working pressure
for a stayed curved surface shall be the sum of the pressure as determined in PFT-23.1.1 and the lesser pressure
determined from either PFT-23.1.2 or PFT-23.1.3.
PFT-21.3 For waterlegs of vertical firetube boilers
that are attached to tubesheets or crownsheets, the unstayed distance from a line of support on the tubesheet
or crown sheet provided by tubes or stays to the inside
surface of the outer wall of the waterleg shall comply with
the spacing requirements of PFT-25.2 [see Figure A-8, illustration (p)].
PFT-23.1.1 The maximum working pressure computed without allowing for the holding power of the stays,
due allowance being made for the weakening effect of any
holes provided for construction.
PFT-23.1.2 The maximum working pressure obtained by the equation given in PG-46 using 1.3 for the
value of C.
STAYED SURFACES
PFT-22
(e)
GENERAL
The rules of Parts PG and PW pertaining to stays and
stayed surfaces that are applicable to firetube boilers
shall be used in conjunction with the following
requirements.
180
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
(c)
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PFT-23.1.3 The maximum working pressure obtained by the following equation:
Figure PFT-23.1
Stayed Wrapper Sheet of Locomotive-Type
Boiler
where
A1
A2
P1
S
=
=
=
=
cross‐sectional area of stay
maximum area supported by stay
pressure corresponding to the strength of the stay
allowable stress of stay as given in Section II, Part
D, Subpart 1, Table 1A
90 deg
PFT-23.2 The maximum allowable working pressure
for a stayed wrapper sheet of a locomotive‐type boiler
shall be the lesser of the value obtained in PFT-23.1 or
the value obtained in the following equation:
PFT-23.3.1 A furnace for a vertical firetube boiler
38 in. (970 mm) or less in outside diameter that requires
staying shall have the furnace sheet supported by one or
more rows of staybolts, the circumferential pitch not to
exceed 1.05 times that given by the equation in PG-46.
where
The longitudinal pitch between the staybolts shall not
exceed that given by the following equation:
(U.S. Customary Units)
(SI Units)
where
L
P
R
t
=
=
=
=
longitudinal pitch of staybolts
maximum allowable working pressure
outside radius of furnace
thickness of furnace sheet
The above equation applies to the longitudinal center
section of the wrapper sheet, and in cases where E is reduced at another section, the maximum allowable working pressure based on the strength at that section may
be increased in the proportion that the distance from
the wrapper sheet to the top of the crown sheet at the
center bears to the distance measured on a radial line
through the other section, from the wrapper sheet to a
line tangent to the crown sheet and at right angles to
the radial lines (see Figure PFT-23.1).
When values by this formula are less than the circumferential pitch, the longitudinal pitch may be as large as
the allowable circumferential pitch.
PFT-23.3 Furnaces of Vertical Boilers. In a vertical
firetube boiler, the furnace length, for the purpose of calculating its strength and spacing staybolts over its surface, shall be measured from the fire side face of flat
tubesheets or the point of tangency of flanged tubesheets
to the inside of the lower mud ring.
PFT-23.3.2 In furnaces over 38 in. (970 mm) in
outside diameter and combustion chambers not covered
by special rules in this Section, which have curved sheets
subject to pressure on the convex side, neither the circumferential nor longitudinal pitches of the staybolts
shall exceed 1.05 times that given by the rules in PG-46.
The stress in the staybolts shall not exceed the allowable stress given in Section II, Part D, Subpart 1, Table
1A, and determined by PFT-26.1.
181
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
a = angle any crown stay makes with the vertical axis of boiler
E = minimum efficiency of wrapper sheet
through joints or stay holes
P = maximum allowable working pressure
R = radius of wrapper sheet
S = allowable stress as given in Section II, Part
D, Subpart 1, Table 1A
s = transverse spacing of crown stays in the
crown sheet
t = thickness of wrapper sheet
Σ (s × sin a) = summated value of transverse spacing for
all crown stays considered in one transverse plane and on one side of the vertical
axis of the boiler
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PFT-26
PFT-23.4 Upper combustion chambers of vertical
submerged tubular boilers made in the shape of a frustrum of a cone when not over 38 in. (970 mm) in outside
diameter at the large end may be used without stays if
computed by the rule for plain cylindrical furnaces in
PFT-14, making D in the formula equal to the outside diameter at the large end, provided that the longitudinal
joint conforms to the requirements of PFT-14.
PFT-26.1 The full pitch dimensions of the stays shall
be employed in determining the area to be supported by a
stay, and the area occupied by the stay shall be deducted
therefrom to obtain the net area. The product of the net
area in square inches by the maximum allowable working
pressure in pounds per square inch gives the load to be
supported by the stay.
PFT-23.5 For furnaces of PFT-23.4 when over 38 in.
(970 mm) in outside diameter at the large end, that portion which is over 30 in. (760 mm) in diameter shall be
fully supported by staybolts, and PFT-23.3.2 shall apply.
The top row of staybolts shall be at a point where the cone
top is 30 in. (760 mm) or less in diameter.
In calculating the pressure permissible on the unstayed
portion of the cone, the vertical distance between the horizontal planes passing through the cone top and through
the center of the top row of staybolts shall be taken as L in
PG-28.3.1.1. D o in PG-28.3.1.1 shall be taken as the inside
diameter at the center of the top row of staybolts.
PFT-24
PFT-26.2 Where stays come near the outer edge of
the surfaces to be stayed and special allowances are made
for the spacing, the load to be carried by such stays shall
be determined by neglecting the added area provided for
by these special allowances.
Example: If the maximum pitch by PG-46 would make a
staybolt come 6 in. (150 mm) from the edge of the plate
and a special allowance would make it come 7 in.
(180 mm), the distance of 6 in. (150 mm) shall be used
in computing the load to be carried.
PFT-27
STAYING HORIZONTAL RETURN TUBE
BOILERS
MAXIMUM SPACING
PFT-27.1 The maximum distance between the edges
of tube holes and the centers of stays shall be p as determined by the formula in PG-46, using the value of C given
for the thickness of plate and type of stay used.
PFT-27.2 For a flanged head welded to the shell, the
maximum distance between the inner surface of the supporting flange and lines parallel to the surface of the shell
passing through the center of the stays shall be p as determined by the formula in PG-46, plus the inside radius of
the supporting flanges, using the C factor that applies to
the thickness of the head plate and type of stay used
[see Figure A-8, illustrations (i) and (j)].
STAYING SEGMENTS OF HEADS
PFT-25.1 A segment of a head shall be stayed by
head‐to‐head through stays or diagonal stays.
PFT-27.3 For unflanged heads, the maximum distance between the inner surface of the shell and the centers of stays shall not be more than one‐half the maximum
allowable pitch as determined by PG-46, using 2.5 for the
value of C , plus 2 in. (50 mm) [see Figure A-8, illustration
(k)].
PFT-25.2 Stays shall be used in the tubesheets of a
firetube boiler if the distance between the edges of the
tube holes exceeds the maximum pitch of staybolts for
the corresponding plate thickness and pressure given in
PG-46.
Any part of the tubesheet that comes between the tube,
furnace, or water‐cooled turnaround chamber, and the
shell need not be stayed if the greatest distance measured
along a radial line from the inner surface of the shell to
the center point of tangent to any two tube holes or tube
hole and furnace or water‐cooled turnaround chamber on
the shell side of such holes does not exceed 1.5 times the
value of p obtained by applying the formula of PG-46 with
C equal to 1.8 or 1.9 depending upon the plate thickness.
The tube holes, or tube hole and furnace or water‐cooled
turnaround chamber (see Figure PFT-25), to which a
common tangent may be drawn in applying this rule, shall
not be at a greater distance from edge to edge than the
maximum pitch referred to.
PFT-27.4 The pitch of diagonal stays attached by
welding between the shells and tubesheets of horizontal
tubular and scotch boilers, and for other stays when the
supported plate is not exposed to radiant heat, as determined by PG-46, may be greater than 81/2 in. (216 mm),
but shall not exceed 15 times the stay diameter.
PFT-27.5 The pitch of the lower row of staybolts of a
vertical firetube boiler, which is required to be stayed by
the rules in this Section, and which is fabricated by welding the ogee bottom of the furnace sheet to the outside
shell, shall not exceed one‐half the maximum allowable
pitch as determined by PG-46, measured from the center
of the staybolt to the tangent of the ogee (see Figure
PFT-20).
182
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
When stays are required, the portion of the heads below the tubes in a horizontal‐return tubular boiler shall
be supported by through‐stays attached by welding under
PW-19 or with nuts inside and outside at the front head
and by attachments which distribute the stress at the rear
head.
The distance in the clear between the bodies of the
stays or of the inside stays where more than two are used
shall not be less than 10 in. (250 mm) at any point.
PFT-25
AREA SUPPORTED BY STAY
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PFT-25
Example of Staying of Heads Adjacent to Cylindrical Furnaces
11/2 p
11/2 p
11/2 p
11/2 p
11/2 p
PFT-27.6 The spacing of staybolts around door holes
fabricated by fusion welding of the full penetration type of
two‐flanged sheets, which are required to be stayed by
the rules of this Section (see Figure PWT-12.2), shall
not exceed one‐half the maximum allowable pitch determined by PG-46, measured from the center of the staybolt
to the points of tangency of the flanges.
manhole and one‐half the maximum allowable pitch plus
the radius of the head flange for a flanged‐in manhole in a
flanged head.
PFT-27.9.2 The distance between the centers of
the first row of stays, or the edges of tube holes, and
the manhole opening does not exceed one‐half the maximum allowable pitch as determined by PG-46.
PFT-27.10 In applying these rules and those in PG-46
to a head or plate having a manhole or reinforced opening, the spacing applies only to the plate around the opening and not across the opening.
PFT-27.11 For stays at the upper corners of fireboxes, the pitch from the staybolt next to the corner to
the point of tangency to the corner curve shall be (see
Figure PFT-27)
PFT-27.8 The maximum distance from the first row
of stays to a full penetration weld in compression applied
from either or both sides of the tubesheet, attaching the
crown sheet of a furnace or combustion chamber to a
stayed head or tubesheet shall not exceed the pitch determined by PG-46, measured from the center of the stay to
the furnace or combustion chamber side of the head or
tubesheet [see Figure A-8, illustrations (o) and (p)].
where
C = factor for the thickness of plate and type of stay
used as required in PG-46
P = maximum allowable working pressure
S = maximum allowable stress value given in Section II,
Part D, Subpart 1, Table 1A
t = thickness of plate
β = angle, deg, 90 deg ≤ β ≤ 180 deg
PFT-27.9 When a flanged‐in manhole opening with a
flange depth of not less than three times the required
thickness of the head, or when an unflanged manhole ring
meeting the requirements of PG-32 through PG-39 is provided in a flat stayed head of a firetube boiler, as shown in
Figure A-8, illustrations (q) and (r), the load created by
the unsupported area of the manway shall be supported
by the stays surrounding the manway. When the manway
is in close proximity to the shell, the load may be shared
by the shell by reducing the area supported by the stays
by 100 in.2 (64 500 mm2), provided the requirements of
both PFT-27.9.1 and PFT-27.9.2 are met.
PFT-28
STAYBOLTS AND STAYS
PFT-28.1 The required area at the point of least net
cross section of staybolts and stays shall be as given in
PG-49. The maximum allowable stress per square inch
at point of least net cross‐sectional area of staybolts and
stays shall be given as in Section II, Part D, Subpart 1,
Table 1A. In determining the net cross‐sectional area of
drilled or hollow staybolts, the cross‐sectional area of
the hole shall be deducted.
PFT-27.9.1 The distance between the manhole
opening and the inside of the shell does not exceed one‐
half the maximum allowable pitch for an unflanged
183
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PFT-27.7 If the furnace sheets are required to be
stayed by the rules of this Section, the spacing of staybolts
around door holes and the spacing of the first row of staybolts from the bottom of a mud ring fabricated by fusion
welding of the full penetration type when either or both
sheets are not flanged [see Figure A-8, illustrations (l)
through (n)] shall not exceed one‐half the maximum pitch
determined by PG-46, plus 2 in. (50 mm), measured from
the center of the staybolt to the root of the weld.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PFT-27
Pitch of Staybolts Adjacent to Upper Corners of
Fireboxes
p
t
p
D1
d
P
p
t
W
r
Max. r = p as calculated
by PFT-27.11
Min. r = 3t
GENERAL NOTE: If the radius r exceeds the pitch, the curved plate
shall be stayed as a flat plate in accordance with PG-46.
Example: Given W = 34 in., p = 7.5 in., D 1 = 7.75 in., d =
7.5 in., t = 2 in.; three stays per girder, C = 10,000; then
substituting in the following equation:
PFT-28.2 The length of the stay between supports
shall be measured from the inner faces of the stayed
plates. The stresses are based on tension only. For computing stresses in diagonal stays, see PFT-32.
Sling stays, if used between crown bars and boiler shell
or wrapper sheet, shall be proportioned so as to carry the
entire load without considering the strength of the crown
bars.
PFT-30.2 In a form of reinforcement for crown
sheets where the top sheet of the firebox is a semicircle
and the top part of the circle not exceeding 120 deg in
arc is reinforced by arch bars extending over the top
and down below the top row of staybolts at the sides of
the furnace beneath the semicircular crown sheet, the
maximum allowable working pressure shall be determined by adding to the maximum allowable working
pressure for a plain circular furnace of the same thickness, diameter, and length determined by the formula in
PG-28.3, the pressure P 1 determined from the following
equation, which is a modification of the formula in
PFT-23:
FLEXIBLE STAYBOLTS
Flexible‐type staybolts having a cover cap welded under the provisions of PW-15 to the outer sheet may be
used in the construction of locomotive‐type boilers, provided the bolts are hollow‐drilled from the threaded
end into and partly through the ball head to allow for
proper inspection, and so that any breakage is disclosed
by leakage at the inner end. These welded joints need
not be postweld heat treated or volumetrically examined.
PFT-30
(U.S. Customary Units)
CROWN BARS AND GIRDER STAYS
PFT-30.1 Crown bars and girder stays for tops of
combustion chambers and back connections, or wherever
used, shall be proportioned to conform to the following
equation:
(SI Units)
where
where
C = 7,000 (48) when girder is fitted with one supporting bolt
b = net width of crown bar
D = two times the radius of the crown sheet
184
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PFT-28.3 When stay rods are screwed through
sheets and riveted over, they shall be supported at intervals not to exceed 6 ft (1.8 m). Stay rods over 6 ft
(1.8 mm) in length may be used without support if fitted
with nuts and washers or attached by welding under
PW-19, provided the least cross‐sectional area of the stay
rod is not less than that of a circle 1 in. (25 mm) in diameter and the requirements of PG-46.8 are met.
PFT-29
= 10,000 (69) when the girder is fitted with two or
three supporting bolts
= 11,000 (76) when the girder is fitted with four or
five supporting bolts
= 11,500 (79) when the girder is fitted with six or seven supporting bolts
= 12,000 (83) when the girder is fitted with eight or
more supporting bolts
= distance between girders from center to center
= depth of girder
= maximum allowable working pressure
= pitch of supporting bolts
= thickness of girder
= extreme distance between supports of, in a scotch
marine boiler, the distance from the fire side of
the tubesheet to the fire side of the back connection
plate
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PFT-32
D 1 = longitudinal spacing of crown bar that shall not exceed twice the maximum allowable staybolt pitch
d = depth of crown bar
PFT-32.1 To determine the required area of a diagonal stay, multiply the area of a direct stay required to support the surface by the slant or diagonal length of the stay,
and divide this product by the length of a line drawn at
right angles to surface supported to center of palm of diagonal stay, as follows:
provided that the maximum allowable working pressure
must not exceed that determined by the equation for furnaces of the ring‐reinforced type, in PG-28.3 when L is
made equal to D 1 , and also provided that the diameter
of the holes for the staybolts in the crown bars does not
exceed 1/3b , and the cross‐sectional areas of the crown
bars is not less than 4 in.2 (2 580 mm2). PG-46 governs
the spacing of the staybolts or bolts attaching the sheet
to the bars, and PFT-28, the size of the staybolts or bolts.
For constructions in which the crown sheet is not semicircular, or in which other features differ from those specified above, a test shall be made in accordance with
PG-18 and the working pressure shall be based thereon.
where
A = sectional area of diagonal stay
a = sectional area of direct stay
L = length of diagonal stay as indicated in Figure
PFT-32
l = length of line drawn at right angles to boiler head
or surface supported to center of palm of diagonal
stay, as indicated in Figure PFT-32, in. (mm)
PFT-30.3 Cast iron supporting lugs, legs, or ends
shall not be used.
PFT-31
STRESSES IN DIAGONAL STAYS
STAY TUBES
PFT-31.1 When tubes are used as stays in multitubular boilers to give support to the tubesheets, the required
cross‐sectional area of such tubes shall be determined in
accordance with PG-49.
Example: G i ve n dia me ter of d ir ec t s tay = 1 in. ,
a = 0.7854 in.2, L = 60 in., l = 48 in.; substituting and
solving
A = (0.7854 × 60)/48
= 0.98 sectional area, in.2
PFT-31.2 The required tubesheet thickness and maximum pitch of stay tubes shall be calculated using the following equations:
Diameter
(of diagonal stay) =
Consequently, the next larger standard size of 11/8 in. diameter is selected.
PFT-32.2 For staying segments of tubesheets such as
in horizontal‐return tubular boilers, where L is not more
than 1.15 times l for any stay, the stays may be calculated
as direct stays allowing 90% of the allowable stress value
given in Section II, Part D, Subpart 1, Table 1A.
where
2.1 for tubesheets not over 7/16 in. (11 mm) thick
2.2 for tubesheets over 7/16 in. (11 mm) thick
outside diameter of the tube
design pressure
maximum pitch measured between the centers of
tubes in different rows, which may be horizontal,
vertical, or inclined
S = maximum allowable stress value for the tubesheet
material given in Section II, Part D, Subpart 1, Table
1A
t = required thickness of tubesheet
C =
=
d =
P =
p =
Figure PFT-32
Measurements for Determining Stresses in
Diagonal Stays
l
PFT-31.3 No calculation need be made to determine
the availability of the required cross‐sectional area or the
maximum allowable pitch for tubes within or on the perimeter of a nest of tubes that are spaced at less than twice
their average diameter.
L
PFT-31.4 Stay tubes may be attached by any of the
acceptable means shown in Figure PFT-12.1.
185
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
= 1.118 in.2
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
the minimum size shall be NPS 11/2 (DN 40), except for
boilers 16 in. (400 mm) or less in inside diameter, the
minimum size shall be NPS 1 (DN 25).
DOORS AND OPENINGS
PFT-40
WELDED DOOR OPENINGS
Arc or gas welding may be used in the fabrication of
door holes provided the sheets are stayed around the
opening in accordance with the requirements of
PFT-27.6 and PFT-27.7.
No calculations need be made to determine the availability of compensation for door openings spanning between the plates of waterlegs. The required thickness of
circular access openings shall be determined in accordance with PG-28.3. The required thickness of door openings of other than circular shape shall be calculated using
eq. PG-46.1(1), using 2.1 or 2.2 for the value of C, depending on the plate thickness, and a value of p equal to the
waterleg inside width. Volumetric examination of the
joining welds is not required.
PFT-41
PFT-44
The opening or connection between the boiler and the
pressure relief valve shall have at least the area of the
valve inlet.
After the boiler Manufacturer provides for the opening
required by the Code, a bushing may be inserted in the
opening in the shell to suit a pressure relief valve that will
have the capacity to relieve all the steam that can be generated in the boiler and which will meet the Code requirements. The minimum size of the connection and opening
for the pressure relief valve shall be not less than NPS 1/2
(DN 15).
OPENINGS IN WRAPPER SHEETS
Openings located in the curved portion of the wrapper
sheet of a locomotive type boiler shall be designed in accordance with the rules in PG-32.
PFT-42
No valve of any description shall be placed between the
required pressure relief valve or valves and the boiler, or
on the discharge pipe between the pressure relief valve
and the atmosphere. When a discharge pipe is used, the
cross‐sectional area shall be not less than the full area
of the valve outlet or of the total of the areas of the valve
outlets discharging thereinto and shall be as short and
straight as possible and so arranged as to avoid undue
stresses on the valve or valves.
FIRESIDE ACCESS OPENINGS
DOMES
PFT-45
REQUIREMENTS FOR DOMES
PFT-45.1 The longitudinal joint of a dome may be
butt welded or the dome may be made without a seam
of one piece of steel pressed into shape. The dome flange
may be double full fillet lap‐welded to the shell if all welding complies fully with the requirements for welding in
Part PW. Volumetric examination of the fillet welds may
be omitted. The opening shall be reinforced in accordance
with PG-32 through PG-44.
PFT-45.3 When a dome is located on the barrel of a
locomotive‐type boiler or on the shell of a horizontal‐
return tubular boiler, the outside diameter of the dome
shall not exceed six‐tenths the inside diameter of the shell
or barrel of the boiler unless the portion of the barrel or
shell under the dome (the neutral sheet) is stayed to the
head or shell of the dome by stays which conform in spacing and size to the requirements given in PG-46. With
such stayed construction the outside diameter of a dome
located on the barrel or shell of a boiler is limited to eight‐
tenths of the barrel or shell inside diameter.
REQUIREMENTS FOR INSPECTION
OPENINGS
All firetube boilers shall have sufficient inspection
openings, handholes, or washout plugs with a minimum
of four openings to permit inspection of the waterside
of the tubesheets, furnaces, and tubes and to permit flushing of loose scale and sediment from the boiler. Except
where space restrictions would prohibit entry to the boiler, a manhole shall be provided in the upper portion of
the shell. All openings shall meet the requirements of
PG-32 through PG-44. Where washout plugs are used,
PFT-45.4 All domes shall be so arranged that any
water can drain back into the boiler.
186
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
The minimum size of an access or fire door opening, in
which the minimum furnace dimension is 24 in.
(600 mm), shall be not less than 12 in. × 16 in.
(300 mm × 400 mm) or equivalent area, 11 in.
(280 mm) to be the least dimension in any case. A circular
opening shall be not less than 15 in. (380 mm) in
diameter.
For furnace dimensions less than 24 in. (600 mm), the
opening should be 23/4 in. × 31/2 in. (70 mm × 89 mm) or
larger where possible. In cases where the size or shape of
the boiler prohibits an opening of that size, two openings
with a minimum size of 1 in. (25 mm) may be used, preferably oppposite each other, to permit inspection and
cleaning of the furnace. If the burner is removable so as
to permit inspection and cleaning through the burner
opening, a separate access opening need not be provided.
The bonnet or smoke hood of a vertical flue or tubular
boiler shall be provided with an access opening at least
6 in. × 8 in. (150 mm × 200 mm) for the purpose of inspection and cleaning the top head of the boiler.
PFT-43
OPENING BETWEEN BOILER AND
PRESSURE RELIEF VALVE
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PFT-45.5 Flanges of domes shall be formed with a
corner radius, measured on the inside, of at least twice
the thickness of the plate for plates 1 in. (25 mm) in thickness or less, and at least three times the thickness of the
plate for plates over 1 in. (25 mm) in thickness.
surface. The bracket plates shall be spaced at least
21/2 in. (64 mm) apart, but this dimension shall be increased if necessary to permit access for the welding
operation.
PFT-46.6 Wet‐bottom stationary boilers shall be
supported so as to have a minimum clearance of 12 in.
(300 mm) between the underside of the wet‐bottom
and the floor to facilitate inspection. Other types of firetube boilers set horizontally shall be supported so that
they have a minimum clearance of 12 in. (300 mm) between the metal surface of the shell and the floor. Boiler
insulation, saddles, or other supports shall be arranged
so that inspection openings are readily accessible.
PFT-45.6 In a locomotive‐type boiler with a dome on
a tapered course, the maximum allowable diameter of the
dome shall be based on that diameter of the tapered
course which intersects the axis or center line of the
dome.
SETTING
PFT-46
METHOD OF SUPPORT
PFT-46.1 The design and attachment of lugs, hangers, saddles, and other supports shall meet the requirements of PG-22.1 and PG-55.
PIPING, FITTINGS, AND APPLIANCES
PFT-46.2 In applying the requirements of PFT-46.1,
localized stresses due to concentrated support loads, temperature changes, and restraint against dilation of the
boiler due to pressure shall be provided for. Lugs, brackets, saddles, and pads shall conform satisfactorily to the
shape of the shell or surface to which they are attached
or with which they are in contact.
PFT-47.1 Boilers of the horizontal firetube type that
exceed 16 in. (400 mm) in inside diameter shall be so set
that when the water is at the lowest visible level in the
gage glass there shall be at least 3 in. (75 mm) above
the lowest permissible water level as determined by the
Manufacturer.
Horizontal firetube boilers that do not exceed 16 in.
(400 mm) in inside diameter shall have the lowest visible
level in the gage glass at least 1 in. (25 mm) above the
lowest permissible water level as determined by the
Manufacturer.
PFT-47
PFT-46.3 A horizontal‐return tubular boiler over
72 in. (1 800 mm) in diameter shall be supported from
steel hangers by the outside‐suspension‐type setting, independent of the furnace side walls.
WATER LEVEL INDICATORS
PFT-46.5 Figure PFT-46.2 illustrates an acceptable
design of hanger bracket for welded attachment to
welded horizontal‐return tubular boilers with the additional requirement that the hanger pin be located at the
vertical center line over the center of a welded contact
187
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PFT-47.2 Boilers of locomotives shall have at least
one gage glass provided with top and bottom shutoff
cocks and lamp.
The lowest visible level in the gage glass shall be not
less than 3 in. (75 mm) for boilers over 36 in.
(900 mm) in inside diameter, nor less than 2 in.
(50 mm) above the lowest permissible water level as determined by the Manufacturer for boilers 36 in. (900 mm)
or less but greater than 16 in. (400 mm) in inside diameter nor less than 1 in. (25 mm) above the lowest permissible water‐level as determined by the Manufacturer
for boilers 16 in. (400 mm) or less in inside diameter.
These are minimum dimensions, and on large locomotives and those operating on steep grades, the height
should be increased, if necessary, to compensate for
change of water level on descending grades.
The bottom mounting for the gage glass and for water
column if used must extend not less than 11/2 in. (38 mm)
inside the boiler and beyond any obstacle immediately
above it, and the passage therein must be straight and
horizontal.
Tubular gage glasses shall be equipped with a protecting shield.
PFT-46.4 A horizontal‐return tubular boiler, 14 ft
(4.3 m) or more in length, or over 54 in. (1 350 mm)
and up to and including 72 in. (1 800 mm) in diameter,
shall be supported by the outside‐suspension‐type setting
as specified in PFT-46.3, or, for wall‐supported boilers, at
four points by not less than eight steel lugs set in pairs. A
horizontal‐return tubular boiler up to and including 54 in.
(1 350 mm) in diameter shall be supported by the
outside‐suspension‐type setting as specified in PFT-46.3,
or, for wall‐supported boilers, by not less than two steel
lugs on each side. If more than four lugs are used on wall‐
supported boilers, they shall be set in four pairs, the lugs
of each pair to be spaced not over 2 in. (50 mm) apart and
the load to be equalized between them (see Figure
PFT-46.1). If the boiler is supported on structural steel
work, the steel supporting members shall be so located
that heat from the furnace cannot impair their strength.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PFT-46.1
Spacing and Weld Details for Wall-Support Lugs Set in Pairs on Horizontal-Return Tubular Boilers
t = not less than 1%
of the boiler diameter
2 in. (50 mm)
0.7t
t
0.7t
PFT-48
B
B
PFT-48.2 In vertical tubular boilers the feedwater
shall be introduced at a point not less than 12 in.
(300 mm) above the crown sheet. When the boiler is under pressure, feedwater shall not be introduced through
the openings or connections used for the water column
or gage glass. In closed systems the water may be introduced through any opening when the boiler is not under
pressure.
Dimension “R ” not
less than 11/2 ×
diameter of hole
20 deg min.
Dimension “T ” not
less than 1% of
boiler diameter
“T ”
21/2 in. (64 mm)
min.
PFT-49
“T ”
3/ T
4
3/ T
4
BLOWOFF PIPING
PFT-49.1 Blowoff piping of firetube boilers that is exposed to products of combustion shall be attached by
screwing into a tapped opening with provisions for a
screwed fitting or valve at the other end.
20 deg min.
PFT-49.2 Blowoff piping of firetube boilers which is
not exposed to products of combustion may be attached
by any method provided in this Section except by expanding into grooved holes.
3/ T
4
Section B - B
188
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Figure PFT-46.2
Welded Bracket Connection for
Horizontal-Return Tubular Boilers
“R ”
FEED PIPING
PFT-48.1 When a horizontal‐return tubular boiler
exceeds 40 in. (1 000 mm) in diameter, the feedwater
shall discharge at about three‐fifths the length from the
end of the boiler that is subjected to the hottest gases of
the furnace (except a horizontal‐return tubular boiler
equipped with an auxiliary feedwater heating and circulating device), above the central rows of tubes. The feed
pipe shall be carried through the head or shell farthest
from the point of discharge of the feedwater in the manner specified for a surface blowoff in PG-59.3.2, and be securely fastened inside the shell above the tubes.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PART PFH
OPTIONAL REQUIREMENTS FOR FEEDWATER HEATER (WHEN
LOCATED WITHIN SCOPE OF SECTION I RULES)
PFH-1
PFH-1.3 The design temperature of the tubes shall be
not less than the saturated steam temperature corresponding to the maximum allowable working pressure
of the shell. If the steam entering the shell side of the feedwater heater is superheated, the design temperature of
the tubes in the desuperheating zone shall be not less
than the saturation temperature corresponding to maximum allowable shell side working pressure plus 35°F
(20°C).
A feedwater heater is a heat exchanger in which feedwater to be supplied to a boiler is heated by steam or
water extracted from the boiler or the prime mover.
When such a feedwater heater is located within the limit
of Section I piping, as defined by PG-58.3, it falls within
the scope of Section I rules. With this arrangement, the
feedwater heater may be constructed in compliance with
Section VIII, Division 1, subject to the following
conditions.
PFH-1.4 The feedwater heater shall be stamped with
the Certification Mark with the “U” Designator and be
documented with the ASME U‐1 Data Form.
PFH-1.1 The feedwater heater shall conform with
Section VIII, Division 1 rules for unfired steam boilers
[UW‐2(c)].
PFH-1.5 A nameplate per UG-119 shall be furnished
and shall show the additional information “and Part
PFH of Section I.”
PFH-1.2 The maximum allowable working pressure
of the primary (feedwater) side of the heater shall be
not less than the design pressure requirements of ASME
B31.1, para. 122.1.3.
PFH-1.6 The Master Data Report for the completed
boiler unit (see PG-113) shall indicate “Feedwater heater
constructed to Section VIII, Division 1, as permitted by
Part PFH.”
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
189
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PART PMB
REQUIREMENTS FOR MINIATURE BOILERS
GENERAL
PMB-1
shall be equipped with at least one brass washout plug of
not less than 1/2 in. (13 mm) and shall be tested to a hydrostatic pressure of 600 psi (4 MPa).
GENERAL
The rules in Part PMB are applicable to miniature boilers and parts thereof and shall be used in conjunction
with the general requirements in Part PG as well as with
the special requirements in the applicable Parts of this
Section that apply to the method of fabrication used.
PMB-2
PMB-5.4 Heads or parts of miniature boilers, when
not exposed to the direct action of the fire, may be made
of cast iron or malleable iron provided it complies with a
specification permitted in this Section.
PMB-5.5 Due to the small size of parts of miniature
boilers, the requirements of Identification, PG-77.1, need
not be met, provided the Manufacturer certifies on the
Data Report accompanying the boiler that the material
is in accordance with the requirements of this Section.
Provisions shall be made by the Manufacturer whereby
he shall be able to supply complete information regarding
the material and details of construction of any boiler built
under the provisions of this Code.
SCOPE
PMB-2.1 The classification miniature boilers applies
to boilers that do not exceed the following limits:
(a) 16 in. (400 mm) inside diameter of shell
(b) 20 ft2 (1.9 m2) heating surface (not applicable to
electric boilers)
(c) 5 ft3 (0.14 m3) gross volume,31 exclusive of casing
and insulation
(d) 100 psig (700 kPa) maximum allowable working
pressure
DESIGN
PMB-8
The rules in the following paragraphs apply specifically
to the design of miniature boilers and parts thereof and
shall be used in conjunction with the general requirements for design in Part PG as well as with the specific requirements for design in the applicable Parts of this
Section that apply to the method of fabrication used.
MATERIALS
PMB-5
GENERAL
GENERAL
PMB-5.1 Unless specifically permitted elsewhere in
this Section, materials used in the construction of pressure parts for miniature boilers shall conform to one of
the specifications in Section II and shall be limited to
those for which allowable stress values are given in Section II, Part D, Subpart 1, Tables 1A and 1B. Miscellaneous
pressure parts shall conform to the requirements of
PG-11.
PMB-9
WELDING
PMB-5.2 Seamless and welded shells made from pipe
for miniature boilers shall be not less than 3/16 in.
(5.0 mm) in thickness. Shells or heads made from plate
shall be not less than 1/4 in. (6 mm) in thickness. Heads
used as tubesheets, with tubes expanded, shall be at least
5
/16 in. (8 mm) in thickness.
PMB-10.1 Every miniature boiler exceeding 12 in.
(300 mm) internal diameter or having more than 10 ft2
(0.9 m2) of heating surface shall be fitted with not less
than three brass washout plugs of 1 in. (25 mm), which
shall be screwed into openings in the shell near the bottom. Boilers not exceeding 12 in. (300 mm) internal diameter and having less than 10 ft2 (0.9 m2) of heating
surface need have not more than two 1 in. (25 mm) openings for cleanouts, one of which may be used for the attachment of the blowoff valve; these openings shall be
Miniature boilers may be constructed by fusion welding in accordance with all the requirements of this Section
except that postweld heat treatment, volumetric examination of the welded joints, and nondestructive examinations described in PG-93.1 are not required.
PMB-10
PMB-5.3 Steam boiler parts of not over 600 in. 3
(0.01 m3) in volume may be cast from copper alloy complying with requirements of SB-61 or SB-62 of wall thickness not less than 1/4 in. (6 mm). Such steam boiler parts
190
WASHOUT OPENINGS
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PMB-2.2 If a boiler meets the miniature classification, the rules in this Part shall supplement the rules for
power boilers and take precedence over them when there
is conflict. Where any of the limits in PMB-2.1 are exceeded, the rules for power boilers shall apply.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PMB-15
opposite to each other where possible. All threaded openings in the boiler shall be provided with a welded reinforcement, if necessary, to give four full threads therein.
PMB-15.1 Each miniature boiler shall be equipped
with a sealed pressure relief valve of not less than
NPS 1/2 (DN 15).
PMB-10.2 Miniature boilers of a design employing a
removable top cover flange for inspection and cleaning
need not be fitted with washout openings.
PMB-11
PRESSURE RELIEF VALVES
PMB-15.2 The minimum relieving capacity of the
pressure relief valve shall be determined in accordance
with PG-67.2.
FEEDWATER SUPPLY
PMB-11.1 Every miniature boiler shall be provided
with at least one feed pump or other feeding device, except where it is connected to a water main carrying sufficient pressure to feed the boiler or where it is operated
with no extraction of steam (such as in a closed system).
In the latter case, in lieu of a feeding device, a suitable
connection or opening shall be provided to fill the boiler
when cold. Feedwater openings or connections to miniature boilers shall be not less than NPS 1/2 (DN 15) for iron
or steel pipe and NPS 1/4 (DN 8) for brass or copper pipe.
PMB-15.3 All other provisions for pressure relief
valves in this Section shall be complied with.
PMB-11.2 The feed pipe shall be provided with a
check valve and a stop valve of a size not less than that
of the pipe. The feedwater may be delivered through
the blowoff opening if desired.
PMB-17
PMB-12
PMB-16
Each steam line from a miniature boiler shall be provided with a stop valve located as close to the boiler shell
or drum as is practicable, except when the boiler and
steam receiver are operated as a closed system.
BLOWOFF
PMB-21
HYDROSTATIC TESTS AND INSPECTION
WATER GAGES
PMB-21.1.1 A minimum metal temperature of 60°F
(15°C) is permitted during the hydrostatic test in
PMB-21.1, provided the shell thickness is 3/8 in.
(10 mm) or less and provided only P‐No. 8 or the following specific P‐No. 1 materials are used in the construction
of the pressure vessel:
– SA-53 Pipe Grade E or S
– SA-106 Pipe
– SA-516 Plate
– SA-105 Forgings
– SA-234 Fittings
PMB-21.2 Completed miniature boilers with mechanically assembled boiler external piping (BEP) and
trim shall be given a final hydrostatic test at a pressure
not less than 11/2 times the MAWP of the pressure vessel.
Miniature electric boilers shall be given a final hydrostatic
test in accordance with PEB-17.2
PMB-13.2 Miniature boilers shall have the lowest
visible part of the water gage located at least 1 in.
(25 mm) above the lowest permissible water level specified by the Manufacturer.
FIXTURES AND FITTINGS
PMB-21.3 For completed miniature boilers with
welded or brazed boiler external piping (BEP) or trim,
the inspection requirements of PG-90.1 and the hydrostatic test requirements of PG-99 apply.
All valves, pipe fittings, and appliances connected to a
miniature boiler shall be equal at least to the requirements of Class 125 (PN 20) or Class 150 (PN 20) of the
appropriate ASME Standard listed in PG-42.
191
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PMB-21.1 In addition to the inspections required
elsewhere in this Section, each miniature boiler pressure
vessel shall be inspected while being tested at a hydrostatic pressure equal to three times the maximum allowable working pressure.
PMB-13.1 Each miniature boiler for operation with a
definite water level shall be equipped with a water gage
glass for determining the water level. The lowest permissible water level of vertical boilers shall be at a point
one‐third of the height of the shell above the bottom head
or tubesheet. Where the boiler is equipped with an internal furnace, the lowest permissible water level shall be
not less than one‐third of the length of the tubes above
the top of the furnace tubesheet. In the case of small boilers operated in a closed system where there is insufficient
space for the usual water gage glass, water level indicators of the glass bull’s‐eye type may be used.
PMB-14
AUTOMATIC DEVICES
All miniature boilers operated with gas, electricity, oil,
or mechanical firing shall be provided with an automatic
low‐water fuel cutoff, except electric boilers of the electrode type as provided for in PEB-16.
Each miniature boiler shall be equipped with a blowoff
connection, not less than NPS 1/2 (DN 15), located to drain
from the lowest water space practicable. The blowoff
shall be equipped with a valve or cock not less than
NPS 1/2 (DN 15).
PMB-13
STEAM STOP VALVES
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PART PEB
REQUIREMENTS FOR ELECTRIC BOILERS
GENERAL
PEB-1
requirements of Part PEB, which are not requirements
of Section VIII, Division 1, and shall ensure that these requirements are satisfied.
GENERAL
The rules in Part PEB are applicable to electric boilers
and parts thereof and shall be used in conjunction with
the general requirements in Part PG as well as with the
special requirements in the applicable Parts of this Section that apply to the method of fabrication used.
PEB-2
PEB-3.2
PEB-3.2.1 The materials of construction shall comply with the requirements of PEB-5.1 and PEB-5.3.
PEB-3.2.2 Inspection openings shall comply with
the requirements of PEB-10.
SCOPE
PEB-2.1 This Part contains special rules for construction of electric boilers, both of the electrode and immersion resistance element type. This Part does not include
electric boilers where the heat is applied externally to
the boiler pressure vessel by electric resistance heating
elements, induction coils, or other electrical means. These
types of electric boilers shall be constructed in accordance with other applicable Parts of this Section.
PEB-3.3 The boiler pressure vessel shall be stamped
with the Certification Mark with the “U” Designator and
the letters “UB,” and be documented with the ASME U‐1
or U‐1A Data Report.
PEB-3.4 The master Data Report Form P-2A for the
Electric Boiler shall indicate “Boiler pressure vessel constructed to Section VIII, Division 1 as permitted by Part
PEB.”
MATERIALS
PEB-2.3 An electrode type boiler is defined as an
electric boiler in which heat is generated by the passage
of an electric current using water as the conductor.
PEB-5
GENERAL
PEB-5.1 Unless specifically permitted elsewhere in
this section, materials used in the construction of pressure parts for electric boilers shall conform to one of
the specifications in Section II and shall be limited to
those permitted by PG-6, PG-7, PG-8, and PG-9 for which
allowable stress values are given in Section II, Part D, Subpart 1, Tables 1A and 1B. Miscellaneous pressure parts
shall conform to the requirements of PG-11.
PEB-2.4 An immersion resistance element type boiler is defined as an electric boiler in which heat is generated by the passage of an electric current through a
resistance heating element directly immersed in water,
or enclosed in a pipe immersed in water.
PEB-2.5 Electric boilers may be field assembled provided the boiler is manufactured and assembled in compliance with the provisions and requirements of Part
PEB and other applicable Parts of this Section.
PEB-5.2 Seamless or welded shells, plates, or heads
of electric boilers shall not be less than 3/16 in. (5 mm)
in thickness.
OPTIONAL REQUIREMENTS FOR THE
BOILER PRESSURE VESSEL
PEB-5.3 Electric boilers of the immersion element
type may be fabricated of austenitic stainless steel type
304, 304L, 316, 316L, and 347 of any material specification listed in PG-6 and PG-9, provided that a precautionary statement indicating that the boiler shall be
operated using only deionized water, having a maximum
conductance of 1 microSiemen per cm (1 μS/cm) [minimum specific resistivity of 1 megohm per cm
(1 MΩ/cm)], is clearly marked on the boiler in a visible
location.
The boiler pressure vessel may be constructed in compliance with the ASME Pressure Vessel Code Section VIII,
Division 1, rules for unfired steam boilers [UW‐2(c)] subject to the conditions specified in PEB-3.1 through
PEB-3.4.
PEB-3.1 The Manufacturer who certifies and stamps
the completed boiler shall specify to the Certification
Holder with the “U” Designator all additional
192
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PEB-2.2 Electric boilers and parts thereof that do not
exceed the diameter, volume, or pressure limits of PMB-2
may be constructed using the applicable paragraphs of
Part PMB in conjunction with this Part.
PEB-3
These additional requirements are
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
DESIGN
PEB-8
resistance heating element type designed for steam service shall have an inspection opening or handhole at or
near the normal waterline.
GENERAL
PEB-8.1 The rules in the following paragraphs apply
specifically to the design of electric boilers and parts
thereof. They shall be used in conjunction with the general requirements for design in Part PG, any applicable requirements in Part PMB for miniature boilers, and with
the specific requirements for design in applicable Parts
of this Section that apply to the method of fabrication
used.
PEB-11
PEB-11.1 The feedwater source to electric boilers
shall be capable of meeting the applicable requirements
of PG-61. Feedwater connections to an electric boiler shall
not be smaller than NPS 1/2 (DN 15), except as permitted
by PMB-11.
PEB-11.2 Electric boilers that do not exceed the diameter, volume, or pressure limits of PMB-2, may have the
feedwater delivered through the blowoff opening if
desired.
PEB-8.2 Responsibility of design of electric boilers
bearing the “E” Designator shall be that of the Certification Holder with the “E” Designator.
ð15Þ
FEEDWATER SUPPLY
PEB-12
PEB-9
PEB-13.2 Electric boilers of the resistance element
type shall have at least one gage glass. The lowest visible
water level in the gage glass shall be at least 1 in. (25 mm)
above the lowest permissible water level as determined
by the Manufacturer. Each electric boiler of this type shall
also be equipped with an automatic low‐water cutoff on
each boiler pressure vessel so located as to automatically
cut off the power supply to the heating elements before
the surface of the water falls below the visible level in
the gage glass.
PEB-12.1 The blowoff piping for each electric boiler
pressure vessel having a normal water content not exceeding 100 gal (380 L) is required to extend through
only one valve.
PEB-12.2 The minimum size of blowoff pipes and fittings shall be NPS 1 (DN 25), except that for boilers of
200 kW input or less the minimum size of pipe and fittings may be NPS 3/4 (DN 20). Electric boilers that do
not exceed the diameter, volume, or pressure limits of
PMB-2 may have blowoff connections in accordance with
PMB-12.
PEB-13
WATER LEVEL INDICATORS
PEB-13.1 Electric boilers of the electrode type shall
have at least one gage glass. The gage glass shall be located as to indicate the water levels both at startup and
under maximum steam load conditions as established
by the Manufacturer.
WELDING
Electric boilers may be constructed by fusion welding
in accordance with all the requirements of this Section except that postweld heat treatment, volumetric examination of the welded joints, and the nondestructive
examinations described in PG-93.1 are not required when
the limitations in PMB-2.1 are not exceeded.
PEB-10
BLOWOFF
INSPECTION OPENINGS
PEB-10.1 Electric boilers of a design employing a removable cover, or removable internal electric heating elements that will permit access for inspection, and cleaning
and having an internal volume (exclusive of casing and insulation) of not more than 5 ft3 (0.14 m3) need not be
fitted with washout or inspection openings.
PEB-13.3 Tubular gage glasses on electric boilers
shall be equipped with protective rods or shields.
PEB-10.2 Electric boilers of more than 5 ft3 (0.14 m3)
not provided with a manhole, shall have an inspection
opening or handhole located in the lower portion of the
shell or head. The inspection opening shall not be smaller
than NPS 3 (DN 80). In addition, electric boilers of the
PEB-15
PEB-14
PRESSURE GAGES
Pressure gages shall meet the requirements of PG-60.6.
PRESSURE RELIEF VALVES
PEB-15.1 Each electric boiler shall have at least one
pressure relief valve. Electric boilers with a power input
more than 1,100 kW shall have two or more pressure relief valves.
193
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PEB-8.3 Electric immersion heating element support
plates shall be supplied using one of the following
options:
(a) by a Section I “S” or “M” Certificate Holder. The design shall be to the rules of PG-31 and PG-35.
(b) by a Section I “S” or “M” Certificate Holder, or by a
Section VIII, Division 1 “U” Certificate Holder. The design
shall be to the rules of Section VIII, Division 1, Mandatory
Appendix 41. In the “Remarks” section of the Section I
Manufacturer’s Data Report, the Manufacturer shall include the statement, “Electric immersion heater element
support plate(s) designed in accordance with Section VIII,
Division 1, Mandatory Appendix 41.” When the part is
manufactured by a “U” Certificate Holder, the Section VIII,
Division I, Form U-2, Manufacturer’s Partial Data Report
shall be referenced on Form P-2A, Manufacturer’s Data
Report.
(c) as a manufacturer’s standard pressure part per
PG-11.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PEB-15.2 The minimum pressure relief valve relieving capacity for electric boilers shall be 31/2 lb/hr/kW
(1.6 kg/hr/kW) input. The pressure setting shall be not
higher than the MAWP stamped on the completed boiler
(see PEB-18.3.2).
equivalent examination shall be in accordance with a
quality control procedure meeting the requirements of
PEB-18.2 and PEB-18.5.
PEB-18.1.1 Electric boilers exceeding the size limitations specified in PEB-18.1, and having only mechanically assembled external piping (BEP) and trim, shall
have a final inspection by the Authorized Inspector, who
shall also witness the hydrostatic test called for in
PEB-17.2.
PEB-15.3 Pressure relief valves shall be mounted in
accordance with PG-71.2 with the spindle vertical. Electric boilers that do not exceed the diameter, volume, or
pressure limits of PMB-2, may have a pressure relief
valve(s) installed in other than the vertical position, provided that
(a) the valve design is satisfactory for such position
(b) the valve is not larger than NPS 3/4 (DN 20)
(c) the maximum angle of deviation from vertical does
not exceed 30 deg
(d) the nozzle location is such that no material that
could interfere with the operation of the valve can accumulate at the valve inlet
(e) the discharge opening of the valve body and discharge piping is oriented so that drainage is adequate
PEB-16
PEB-18.1.2 For electric boilers having welded or
brazed boiler external piping (BEP) or trim, the inspection requirements of PG-90.1 and the hydrostatic test requirements of PG-99 apply.
PEB-18.2 Each electric boiler Manufacturer shall
comply with the applicable requirements of PG-104 and
PG-105.
PEB-18.2.1 An electric boiler Manufacturer or Assembler applying for or renewing the “E” stamp shall have
its facilities and organizations subject to a joint review by
its Authorized Inspection Agency and the legal jurisdiction involved (see last paragraph of PG-105.4).
AUTOMATIC DEVICES
Electric boilers shall be provided with pressure and/or
temperature controls and an automatic low‐water fuel
cutoff. No low‐water cutoff is required for electrode type
boilers.
PEB-17
HYDROSTATIC TEST
PEB-17.1 Each electric boiler pressure vessel shall be
hydrostatically tested at completion of fabrication in accordance with PG-99 or PMB-21, as applicable.
PEB-17.2 In addition to the above, after assembly of
the boiler pressure vessel and the mechanically assembled boiler external piping and trim, the completed
electric boiler shall be given a final hydrostatic test at a
pressure not less than the pressure relief valve setting.
PEB-18.3 The stamping of electric boilers shall conform to the requirements of PG-106. Completed electric
boilers shall be marked with the “S” or “M” Designator
by the Manufacturer of the boiler pressure vessel except
when the boiler pressure vessel is constructed under
the provisions of PEB-3(see PEB-18.4). When the trim,
fixtures and fittings (such as valves), threaded boiler external piping, and appurtenances are connected to an
electric boiler by a Manufacturer or Assembler not
authorized to apply the Certification Mark with the “S”
or “M” Designator, the boiler assembler shall apply a Certification Mark with the “E” Designator to the completed
assembly. Certification Holders with the “E” Designator
are limited to the use of assembly methods that do not require welding or brazing.
PEB-17.3 When the electric boiler is to be marked
with the “E” Designator, the Designator shall be applied
after completion of the hydrostatic test of PEB-17.2.
PEB-18
INSPECTION AND STAMPING OF
BOILERS
PEB-18.1 Inspection of electric boilers shall be as required by PG-90.1 and PG-90.3. Witness by the Authorized Inspector of the hydrotest required in PEB-17.2 for
the completed boiler may be omitted for electric boilers
that meet all the following limitations:
(a) 800 kW maximum per vessel
(b) 600 V maximum
(c) mechanically assembled boiler external piping
(BEP) only
When the Authorized Inspector does not perform a final inspection of the completed boiler, the Manufacturer
or Assembler shall make an equivalent examination. The
PEB-18.3.1 The stamping of the boiler pressure
vessel shall be located as called for in PG-111.8 and need
not indicate the kW input or the maximum designed
steaming capacity.
194
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PEB-18.2.2 A Manufacturer or Assembler assembling units where the final shop inspection by the Authorized Inspector is not mandatory (see PEB-18.1), shall be
subject to periodic review by its Authorized Inspection
Agency. The review shall be conducted on a quarterly basis or more frequently if deemed necessary by the Authorized Inspection Agency. The frequency of this review may
be reduced subject to written agreement between the
Manufacturer or Assembler and its inspection agency
and the written approval of the appropriate legal jurisdiction. However, in no case shall the review be less than
once every 6 months.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PEB-18.3.2 The stamping of the complete electric
boiler shall be on a separate metallic plate and shall be
in accordance with PG-106.4. The MAWP shall be that established by the completed boiler assembler holding the
Certification Mark with the “S,” “M,” or “E” Designator,
but in no case higher than the MAWP stamped on the boiler shell. The MAWP shall be listed on Part II of Form P-2A,
Manufacturers’ Data Report for All Types of Electric Boilers. This plate shall be located on the assembly so that it is
readily visible from the operating floor.
The Manufacturer or Assembler shall maintain a record
containing objective evidence of the Certified Individual’s
qualifications, training, and certification.
PEB-18.5.2 The duties of a Certified Individual (CI)
shall be to assure that each use of the Certification Mark
as permitted in PEB-18.3.3 is in accordance with the requirements of this Section and is documented on the Certificate of Conformance on Form P-2A, Manufacturers’
Data Report for All Types of Electric Boilers. The CI shall
also
(a) verify that each electric boiler, to which a Certification Mark is applied, meets all applicable requirements of
this Section
(b) sign the Certificate of Conformance, Form P-2A,
prior to release of control of the boiler
PEB-18.3.3 The stamping required by PEB-18.3.2
need not be done in the presence of the Authorized Inspector for electric boilers that do not receive final inspection by the Authorized Inspector (see PEB-18.1).
PEB-18.4 For boiler pressure vessels constructed under the provisions of PEB-3, the inspection and stamping
requirements of Section VIII, Division 1, UG‐116(c) for
special service pressure vessels (UB), shall be followed.
PEB-19
PEB-18.5 Those Manufacturers and Assemblers providing an equivalent examination of completed electric
boilers when final inspection is not witnessed by the
Authorized Inspector (see PEB-18.1), shall provide oversight by a Certified Individual (CI).
MANUFACTURER’S DATA REPORT FOR
ELECTRIC BOILERS
PEB-19.1 This form consists of two parts. Part I is to
be completed by the Manufacturer of the boiler pressure
vessel who is the Certification Holder with the “S” or “M”
Designator and his inspection agency. Part II is to be completed by the Manufacturer or Assembler responsible for
the completed electric boiler who shall be authorized to
use the Certification Mark with the “S,” “M,” or “E”
Designator.
PEB-19.2 When the boiler pressure vessel is constructed by a Certification Holder with the “U” Designator
and certified on a U‐1 or U‐1A Data Report, Part 1 shall be
completed by the Certification Holder with the “S,” “M,” or
“E” Designator to the extent indicated in Table A-351.1.
195
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PEB-18.5.1 A Certified Individual (CI) shall be an
employee of the Manufacturer or Assembler and shall
be qualified and certified by the Manufacturer or Assembler. Qualifications shall include as a minimum
(a) knowledge of the requirements of this Section for
the application of Certification Marks
(b) knowledge of the Manufacturer’s quality program
(c) training commensurate with the scope, complexity,
or special nature of the activities to which oversight is to
be provided
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PART PVG
REQUIREMENTS FOR ORGANIC FLUID VAPORIZERS
GENERAL
PVG-12
PVG-1
PVG-12.1 Pressure relief valves shall be of a totally
enclosed type so designed that vapors escaping beyond
the valve seat shall not discharge into the atmosphere, except through an escape pipe that will carry such vapors to
a safe point of discharge outside of the building. A suitable
condenser that will condense all the vapors discharged
from the pressure relief valve may be used in lieu of piping the vapors to the atmosphere. The pressure relief
valve shall not have a lifting lever. The vaporizer shall
be designed in accordance with the rules in this Code
for a working pressure of at least 40 psi (280 kPa) above
the operating pressure at which it will be used. Valve
body drains are not mandatory.
GENERAL
The rules in Part PVG are applicable to organic fluid vaporizers and parts thereof and shall be used in conjunction with the general requirements in Part PG as well as
with the special requirements in the applicable Parts of
this Section that apply to the method of fabrication used.
MATERIALS
PVG-5
GENERAL
PVG-5.1 Materials used in the construction of pressure parts for organic fluid vaporizers shall conform to
one of the specifications in Section II and shall be limited
to those for which allowable stress values are given in
Section II, Part D, Subpart 1, Tables 1A and 1B. Pressure
relief valve materials shall conform to PG-73.3.3.
PVG-12.2 Pressure relief valves shall be disconnected from the vaporizer at least once yearly, when they
shall be inspected, repaired if necessary, tested, and then
replaced on the vaporizer.
PVG-5.2 The requirements for materials given in
Part PG shall apply in all respects to organic fluid
vaporizers.
PVG-12.3.1 The cross‐sectional area of the connection to a vaporizer shall be not less than the required relief area of the rupture disk.
GENERAL
The rules in the following paragraphs apply specifically
to the design of organic fluid vaporizers and parts thereof
and shall be used in conjunction with the general requirements for design in Part PG as well as with the specific requirements for design in the applicable Parts of this
Section that apply to the method of fabrication used.
PVG-9
PVG-12.3.2 Every rupture disk shall have a specified bursting pressure at a specified temperature, shall
be marked with a lot number, and shall be guaranteed
by its manufacturer to burst within 5% (plus or minus)
of its specified bursting pressure.
GENERAL REQUIREMENTS
PVG-12.3.3 The specified bursting pressure at the
coincident specified temperature shall be determined by
bursting two or more specimens from a lot of the same
material and of the same size as those to be used. The
tests shall be made in a holder of the same form and pressure area dimensions as that with which the disk is to be
used.
The Manufacturer shall be responsible for providing in
the design the limited heat absorption rates, proper furnace proportions, etc., which will permit satisfactory
and safe operation of the vaporizers under all conditions
of operation.
PVG-10
GAGE GLASSES
PVG-12.3.4 A rupture disk may be installed between a pressure relief valve and the vaporizer provided
Gage glasses shall be of the flat glass type with forged
steel frames. Gage cocks shall not be used.
PVG-11
PVG-12.3.4.1 The maximum pressure of the
range for which the disk is designed to rupture does not
exceed the opening pressure for which the pressure relief
valve is set or the maximum allowable working pressure
of the vessel.
DRAIN VALVES
Suitable drain valves of the globe or angle type may be
used in lieu of the blowoff valve required in ASME B31.1.
196
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PVG-12.3 In order to minimize the loss by leakage of
material through the pressure relief valve, a rupture disk
may be installed between the pressure relief valve and
the vaporizer, provided the requirements of PVG-12.3.1
through PVG-12.3.4.3 are met.
DESIGN
PVG-8
PRESSURE RELIEF VALVES
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PVG-12.3.4.2 The opening provided through the
rupture disk, after breakage, is sufficient to permit a flow
equal to the capacity of the attached valve, and there is no
chance of interference with the proper functioning of the
valve, but in no case shall this area be less than the inlet
area of the valve.
Figure PVG-12
Constant, C , for Vapor Related to Ratio of
Specific Heats (k = c p /c v )
400
PVG-12.3.4.3 The space between a rupture disk
and the valve should be provided with a pressure gage,
try cock, free vent, or a suitable telltale indicator. This arrangement permits the detection of disk rupture or
leakage.32
390
380
370
Constant, C
PVG-12.4 Pressure relief valve discharge capacity
shall be determined from the following equation:
360
350
where
340
A = discharge area of pressure relief valve
C = constant for vapor that is a function of the ratio of
Specific Heats k = c p /c v (see Figure PVG-12). Note:
Where k is not known, k = 1.001.
K = coefficient of discharge for the design
M = molecular weight
P = (set pressure × 1.03) + Atmosphere Pressure
T = absolute temperature at inlet, °F + 460 (°C + 273)
W = flow of vapor
330
320
1.0
1.2
1.4
1.6
k
GENERAL NOTE: Flow formula calculations
PVG-12.5 Pressure relief valves for organic fluid vaporizers shall be tested and certified under PG-69, and
they shall be stamped per PG-110.
(U.S. Customary Units)
(SI Units)
where
C = maximum total weight or volume of fuel burned
per hour, lb (kg) or ft3 (m3)
H = heat of combustion of fuel, Btu/lb (J/kg) or Btu/ft3
(J/m3)(see A-17)
h = latent heat of heat transfer fluid at relieving pressure, Btu/lb (J/kg)
W = weight of organic fluid vapor generated per hour
The sum of the pressure relief valve capacities marked on
the valves shall be equal to or greater than W .
197
2.0
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PVG-12.6 The required minimum pressure relief
valve relieving capacity shall be determined from the following equation:
1.8
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PART PFE
REQUIREMENTS FOR FEEDWATER ECONOMIZERS
ð15Þ
PFE-1
GENERAL
PFE-2.2 The design temperature of the tubes shall be
the greater of either the saturated steam temperature
corresponding to the MAWP of the economizer or the
maximum mean metal temperature under operating
conditions.
A feedwater economizer is a heat exchanger in which
feedwater to be supplied to a boiler is heated by flue gases
exiting the boilers. When an economizer is provided with
a Section I boiler and resides within the limits of boiler external piping, it shall be constructed in accordance with
Section I rules. When the economizer is located outside
the limits of boiler external piping, the economizer shall
be constructed in accordance with the rules of either Section I or Section VIII, Division 1.
Data Reports for Section I economizers within the limits of boiler external piping shall be referenced and incorporated into the Master Data Report (see PG-113).
Section I or Section VIII, Division 1 economizers outside
the limits of boiler external piping are stand-alone pressure vessels, and Data Reports for such economizers
may be referenced on the Master Data Report for the completed boiler.
PRESSURE RELIEF
PFE-3.1 The economizer shall be provided with pressure relief valves in accordance with PG-67.2.1.6. Economizers constructed to Section VIII, Division 1 shall be
provided with overpressure protection in accordance
with the requirements of Section VIII, Division 1,
UG-125 through UG-140.
PFE-3.2 The pressure relief valves for Section I economizers shall be documented on Form P-7, Manufacturer’s Data Report for Pressure Relief Valves.
PFE-3.3 In all cases, for both Section I and Section
VIII, Division 1 economizers, the heat absorption of the
economizer shall be included in the economizer nameplate stamping.
DESIGN
PFE-2.1 The maximum allowable working pressure
(MAWP) of the primary (feedwater) side of the economizer shall be not less than the design pressure requirements
of ASME B31.1, para. 122.1.3(A.1). When selecting the
MAWP of the economizer, consideration should be given
to the dead head pressure of the feedwater pump as this
pressure may exceed the value selected above.
PFE-4
MATERIALS
When the feedwater-regulating valve is located between the boiler and economizer, the economizer may
be constructed using austenitic stainless steel, but materials shall be limited to those listed in PG-12.3.
198
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PFE-2
PFE-3
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
PART PHRSG
REQUIREMENTS FOR HEAT RECOVERY STEAM GENERATORS
PHRSG-1
GENERAL
PHRSG-3.2 Condensate removal piping as defined by
PHRSG-3.1 from superheaters or reheaters of different
pressure levels that are required to be opened or operated simultaneously, and which discharge into a common
collection device (e.g., manifold, blowdown tank, or flash
tank), shall be designed so that when discharging, a high
back pressure is not developed within the collection device that prevents flow or causes a reversal of flow. In addition, boiler components shall be designed such that
condensate cannot flow from one superheater or reheater
to another or from one part of a superheater or reheater
to another.
The rules of this Part, PHRSG, shall be used in conjunction with the general requirements of Part PG as well as
with the special requirements in the applicable parts of
this Section that apply to the method of fabrication used.
If a boiler meets the scope requirements of PHRSG-2,
the rules of this Part shall supplement the rules for power
boilers and take precedence over them when there is a
conflict.
PHRSG-2
SCOPE
PHRSG-3.3 Piping intended for removal of conden- ð15Þ
sate or unvaporized water from steam spaces, such as superheaters or reheaters when the boiler is under
pressure, shall extend through and include the second
valve. The design pressure of the piping as required by
PHRSG-3.1 and PHRSG-3.2 shall be equal to the MAWP
of the steam space that the condensate removal piping
is connected to plus the lesser of 25% of the MAWP or
225 psi (1.55 MPa).
The rules of this Part apply to a heat recovery steam
generator, HRSG, which has as its principal source of thermal energy a hot gas stream having high ramp rates and
temperatures such as the exhaust of a gas turbine.33 Such
an HRSG may utilize supplemental firing and may have
one or more superheaters, reheaters, evaporators, economizers, and/or feedwater heaters, which are housed in a
common gas path enclosure. The sections cannot be individually isolated from the gas stream.
REQUIREMENTS FOR
SUPERHEATER AND REHEATER
CONDENSATE REMOVAL
CONNECTIONS
PHRSG-3.1 Except as permitted by PHRSG-3.5, each
superheater and reheater shall be equipped with at least
one condensate detection and removal connection meeting all the following requirements:
(a) The detection device shall utilize drain pots with
dual element detection or single element detection with
time delay to close, or any other suitable detection and removal method.
(b) Connections shall be capable of being opened under
pressure so that condensate created during turbine purge
cycles can be removed.
(c) Connections shall be sized and located such that
condensate will be evacuated under all conditions.
(d) Condensate removal piping required to be opened
under pressure shall meet t he r equire ments o f
PHRSG-3.3 and PHRSG-3.4.
Connections for the purpose of removing condensate
are not limited in size as defined by PG-59.3.5 and are
permitted to serve also as the drain connection as required by PG-59.4.
PHRSG-3.5 When the HRSG is a multiple pressure
steam generator (see PG-106.12), the requirements of
PHRSG-3.1 through PHRSG-3.4 apply only to the superheater sections of the high-pressure section and to each
reheater. Drain requirements of PG-59.4 are applicable
for superheater sections not covered by PHRSG-3.
PHRSG-4
DESUPERHEATER DRAIN POTS
Where desuperheater spray water is injected into superheater or reheater piping as a means to control steam
temperature, the following shall be provided:
(a) Drain pots to detect and remove unvaporized spray
water shall be installed in the boiler proper or boiler external piping either upstream or downstream of the desuperheater to ensure malfunctions of these devices will not
allow water to enter hot boiler components. Drain pots
shall include automatic detection of water and automatic
199
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
PHRSG-3
PHRSG-3.4 All condensate removal piping systems
shall be made up of drain piping and two drain valves
in series and be routed to a blowdown tank, flash tank,
manifold, or other collection device. The piping and
valves shall provide draining capacity such that condensate pooling in superheaters and reheaters is prevented.
The collection device shall not be operated at a higher
pressure than the space being drained.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
(e) All desuperheater drain piping shall be routed to a
blowdown or flash tank, manifold, or other collection device. The collection device shall not operate at a higher
pressure than the space being drained.
operation of the drain pot valves as shown in Figure
PHRSG-4. Piping from the drain pot shall conform to the
requirements of PHRSG-3.
(b) Drain pot connection size shall be no smaller than
one NPS less than the pipe it is attached to, except it need
not be greater than NPS 12 (DN 300). See Table PHRSG-4.
(c) Drain pots, with single element level control with
time delay to close, are an acceptable method of detecting
and removing unvaporized spray water.
(d) Piping layouts shall be sloped in all operating conditions so that unvaporized spray water from the desuperheater cannot bypass the drain pot.
PHRSG-5
CERTIFICATION
Manufacturer’s Data Reports shall be prepared in accordance with the requirements specified in Part PG.
However, when the rules of Part PHRSG are used, each
component affected shall be identified on the Manufacturer’s Data Report with the appropriate PHRSG paragraph referenced.
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
200
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure PHRSG-4
Some Acceptable Desuperheater Spraywater Protection Device Arrangements
Superheater
or reheater
Superheater
or reheater
Boiler setting
Superheater
or reheater
Superheater
or reheater
Boiler setting
(b)
(a)
Superheater
or reheater
Reheater
Boiler setting
Desuperheater
Drain pot assembly
(d)
(c)
Administrative Jurisdiction and Technical Responsibilities
Boiler Proper—The ASME Boiler and Pressure Vessel Code (BPVC) has total administrative
jurisdiction and technical responsibility (refer to Section I Preamble).
Boiler External Piping and Joint—The ASME BPVC has total administrative jurisdiction
(mandatory certification by stamping the Certification Mark with appropriate Designator,
ASME Data Forms, and authorized inspection) of Boiler External Piping and Joint. The
ASME Section Committee B31.1 has been assigned technical responsibility.
Non-Boiler External Piping and Joint—Not Section I jurisdiction (see applicable ASME B31 Code)
201
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Boiler setting
Superheater
or reheater
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Table PHRSG-4
Minimum Drain Pot Size
Attaching Pipe Size,
NPS (DN)
4 (100)
6 (150)
8 (200)
10 (250)
12 (300)
14 (350) and larger
Minimum Drain Pot Size,
NPS (DN)
3
4
6
8
10
12
(75)
(100)
(150)
(200)
(250)
(300)
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
202
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
MANDATORY APPENDIX II
STANDARD UNITS FOR USE IN EQUATIONS
Table II-1
Standard Units for Use in Equations
Quantity
U.S. Customary Units
SI Units
Linear dimensions (e.g., length, height, thickness, radius, diameter)
Area
Volume
Section modulus
Moment of inertia of section
Mass (weight)
Force (load)
Bending moment
Pressure, stress, stress intensity, and modulus of elasticity
Energy (e.g., Charpy impact values)
Temperature
Absolute temperature
inches (in.)
square inches (in.2)
cubic inches (in.3)
cubic inches (in.3)
inches4 (in.4)
pounds mass (lbm)
pounds force (lbf)
inch‐pounds (in.-lb)
pounds per square inch (psi)
foot‐pounds (ft-lb)
degrees Fahrenheit (°F)
Rankine (°R)
millimeters (mm)
square millimeters (mm2)
cubic millimeters (mm3)
cubic millimeters (mm3)
millimeters4 (mm4)
kilograms (kg)
newtons (N)
newton‐millimeters (N⋅mm)
megapascals (MPa)
joules (J)
degrees Celsius (°C)
kelvin (K)
Fracture toughness
Angle
Boiler capacity
degrees or radians
Btu/hr
ksi square root inches (
MPa square root meters (
degrees or radians
watts (W)
)
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
203
)
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
MANDATORY APPENDIX III
CRITERIA FOR REAPPLICATION OF A CERTIFICATION MARK
III-1
INTRODUCTION
After an item has been certified under ASME Section I, if
the stamping of the Certification Mark with appropriate
Designator becomes indistinct or the nameplate is illegible or lost, but traceability to the original certification
can be established, the Certification Mark may be reapplied to the item. For the purpose of this Mandatory
Appendix, application of the Certification Mark with the
appropriate Designator shall be equivalent to the Code
Symbol stamping required by earlier Code editions and
addenda.
(d) The reapplication shall be authorized and witnessed by an Inspector from an ASME-accredited Authorized Inspection Agency, or by an authorized
representative of the Qualified Inspection Organization
or a Certified Individual, as applicable under the associated certification program.
(e) Reapplication of the Certification Mark shall be
documented on a Certificate of Conformance for Reapplication of the Certification Mark as shown in Form III-1A.
The completed Certificate of Conformance for Reapplication of the Certification Mark shall be retained as required
for the original Manufacturer’s Data Report.
III-2
III-3
CONDITIONS
RULES
Reapplication of the Certification Mark shall only be
provided to restore evidence of original compliance with
ASME Section I requirements. Reapplication of the Certification Mark shall not be applied for certification of the
current condition of the item or for certification to different requirements than originally constructed.
204
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Reapplication of the Certification Mark shall only be
permitted under the following conditions:
(a) The Owner has requested the reapplication.
(b) Where applicable, the jurisdiction has granted the
request for reapplication.
(c) The reapplication shall be performed by the original
Manufacturer of the Code item. Where responsibility for
the original Code certification has been maintained, reapplication by a successor organization to the original Manufacturer is permitted.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
FORM III-1A CERTIFICATE OF CONFORMANCE FOR REAPPLICATION OF THE CERTIFICATION MARK
In Accordance With Provisions of the ASME Boiler and Pressure Vessel Code
1
F
1. Manufactured by:
(Name and address)
2
F
2. Manufactured for:
(Name and address)
3
F
3. Location of Installation:
(Name and address)
4
F
4. Item Description:
5
F
(Mfg. Data Report Form)
(Boiler/pressure vessel, etc.)
6
F
5. Item Identification:
(Manufacturer’s Serial no.)
6. Original Construction Code:
6
F
(Name/Section/Division)
5
F
(Year built)
6
F
(National Board no.)
7
F
5
F
(Symbol Stamp or Designator applied)
7
F
6
F
(Jurisdiction no.)
7
F
(Edition/Addenda, if applicable)
(Other)
(Code Cases)
7. Traceability to Code Certification. (Attach a copy of the original Manufacturer’s Data Report.)
8
F
9
F
8. Remarks:
Authorization is requested to have the Certification Mark reapplied on the above described item in accordance with the
rules of the ASME Boiler and Pressure Vessel Code.
10
F
Owner
(Name and address)
Signature
11
F
11
F
Title
11
F
Date
(Authorized Representative)
Authorization is granted to reapply the Certification Mark on the above described item in accordance with the
rules of the ASME Boiler and Pressure Vessel Code.
13
F
Signature
13
F
Date
(Authorized Representative)
I certify that to the best of my knowledge and belief, the statements in this Certificate of Conformance are correct and that the reapplication
of the Certification Mark is in accordance with provisions of the ASME Boiler and Pressure Vessel Code. Furthermore, it is understood
that reapplication of the Certification Mark is provided to restore evidence of original compliance with the construction code and is not to
be construed as endorsement of the identified item in its current condition.
14
F
Name of Original Manufacturer
(Name and address)
15
F
Responsible Successor Organization
(Name and address)
16
F
Signature
16
F
Date
(Authorized Representative)
Designator
17
F
17
F
Certificate of Authorization No.
18
F
Inspected by
17
F
Expiration Date
19 AIA
Designated Oversight by F
QIO
CI
(Name of individual)
20
F
Employer
(Name and address)
Signature
21
F
Date
21
F
Commission
21
F
(Jurisdiction, if applicable)
(inspector)
(07/13)
205
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
12
F
Jurisdiction
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Guide for Completing the Certificate of Conformance for Reapplication of the Certification Mark
Reference
to Circled
Numbers in
the Form
Description
(1)
Name and address of the original Manufacturer responsible for Code construction.
(2)
Name and address of the Purchaser and/or Owner.
(3)
Name and address of plant or facility where the item is installed.
(4)
Name of the item documented by this Certificate of Conformance.
(5)
Identify the Manufacturer’s data report form, Code Symbol stamp or Designator as originally applied to the item, and year built.
(6)
Provide identification of the item by applicable numbers as assigned by the Manufacturer.
(7)
Identify the Code name, section, division, edition, addenda (if applicable), and any code cases, as used for construction.
(8)
Describe the basis for establishing traceability of the identified item to the original Code certification. Attach a copy of the
original Manufacturer’s data report. If reapplication is not performed under the same Certificate of Authorization number
as the original construction, also describe the basis for establishing continuity to the original Manufacturer.
(9)
Provide any clarifications or additional information as may be appropriate.
(10)
Name and address of the Owner.
(11)
Signature, date, and title of Owner’s authorized representative requesting reapplication of the Certification Mark with the
appropriate Designator of the item.
(12)
Name of the jurisdiction granting authorization for reapplication of the Certification Mark. If not applicable, so indicate.
(13)
Signature and date of authorized representative from the jurisdiction granting authorization for reapplication of the
Certification Mark. If not applicable, so indicate.
(14)
Name and address of the original Manufacturer.
(15)
Name and address of responsible successor organization to the original Manufacturer. If not applicable, so indicate.
(16)
Signature and date of authorized representative from the original Manufacturer or successor organization providing
reapplication of the Certification Mark.
(17)
Designator, Certificate of Authorization number, and current expiration date under which the reapplication
activity is performed.
Name of the individual providing verfication oversight of the reapplication activity.
Indicate the type of designated oversight in accordance with the associated certification program, i.e., ASME-accredited
Authorization Inspection Agency, Qualified Inspection Organization, or Certified Individual.
(20)
Identify the employer’s name and address of the individual providing verfication oversight of the reapplication activity.
(21)
Signature, date, and, if applicable, jurisdictional commission of the individual providing verification oversight of the
reapplication activity.
206
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
(18)
(19)
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
MANDATORY APPENDIX IV
LOCAL THIN AREAS IN CYLINDRICAL SHELLS AND IN SPHERICAL
SEGMENTS OF HEADS
IV-1
SCOPE
(2) N o e d g e o f a n L T A s h a l l b e c l o s e r t h a n
from a structural discontinuity such as a head
The rules of this Mandatory Appendix permit the thickness of local thin areas (LTAs) to be less than the required
thickness:
(a) in cylindrical shells under internal pressure required by PG-27
(b) in spherical segments of heads (such as hemispherical heads and the spherical portion of torispherical and ellipsoidal heads) under internal pressure on the concave
side required by PG-29.1 and PG-29.11
(c) Local thin areas on the inside or outside of cylindrical shells or spherical segments of heads designed for internal pressure are acceptable, provided they meet the
requirements of this Mandatory Appendix.
IV-2
or stiffener.
(3) The minimum axial distance between the edge of
the LTA and the edge of any nonreinforced opening shall
be equal to or greater than the inside diameter of the
opening plus
(4) The minimum axial distance between the edge of
the LTA and the reinforcement limit of a reinforced opening shall be equal to or greater than
CYLINDRICAL SHELLS
projected circumferential length of LTA, in.
projected axial length of LTA, in.
local thin area
minimum thickness of LTA, in.
see Figure IV-2-1
See PG-27.3 for other nomenclature used in this Mandatory Appendix.
(b) Single LTA
(1) The single LTA shall satisfy the following
equations:
ð1Þ
(2) When θ > 45 deg, both of the following shall be
met:
ð2Þ
(-a) The minimum axial separation shall be equal
to or greater than
ð3Þ
ð4Þ
(-b) The minimum circumferential separation
shall be equal to or greater than 2t .
207
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
=
=
=
=
=
.
(5) The blend between the LTA and the thicker surface shall be with a taper length not less than three times
the LTA depth as shown in Figure IV-2-1, illustration (b).
The minimum bottom blend radius shall be equal to or
greater than two times the LTA depth as shown in Figure
IV-2-1, illustration (b).
(6) The longitudinal stresses on the LTA from mechanical loads other than internal pressure shall not exceed 0.3S.
(7) These requirements shall only be applied at the
temperatures where the allowable stresses listed in allowable stress tables in Section II, Part D are not controlled by time-dependent properties.
(c) Multiple LTAs. A pair of local thin areas with finished axial length L 1 and L 2 are acceptable if the individual LTA satisfies the requirements of (b) above, either
condition in (c)(1) or (c)(2) below is met, and the requirements in (c)(3) through (c)(6) below are met.
(1) When θ ≤ 45 deg, the minimum axial separation
[see Figure IV-2-1, illustration (c)] shall be the greater of
The thickness of local thin areas on the inside or outside surface of a cylindrical shell designed for internal
pressure may be less than required by PG-27 provided
the local thin areas satisfy the following rules:
(a) Nomenclature (see Figure IV-2-1)
C
L
LTA
tL
θ
.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure IV-2-1
Symbols
Circumferential
direction
Chamfer or round
the corner
L
L or C
C
Axial
direction
LTA
LTA depth
Radius
(2) (LTA depth)
(b)
(a)
Taper
length
(3) (LTA depth)
L2
Axial
separation
LTA
L1
Circumferential
separation
LTA
(3) Multiple pairs of LTA are acceptable provided all
pairs meet the rules of a single pair specified in (2)(-b)
above.
(4) Multiple local thin areas may be combined as a
single LTA. The resultant single LTA is acceptable if it satisfies the rules of (2)(-a) above.
(d) Recording Location of LTAs. The required minimum
thickness t and the dimensions t L , L , and C of the LTA
shall be noted on the Manufacturer’s Data Report. The location of the LTA shall be specified in sufficient detail on
the Manufacturer’s Data Report to identify it clearly to the
end user and the in-service inspector.
(e) Code Requirements. All other applicable Code requirements shall be met.
(f) Manufacturer’s Data Report. The use of this Mandatory Appendix shall be shown on the Manufacturer’s Data
Report.
IV-3
and ellipsoidal heads) under pressure on the concave
side, may be less than required by PG-29.1 and
PG-29.11 provided the local thin areas satisfy the following conditions:
(a) Nomenclature (See Figures IV-3-1 through IV-3-5)
DL
LT A
R
t
tL
=
=
=
=
=
maximum dimension of LTA, in.
local thin area
inside radius for spherical segment, in.
required head thickness per PG-29, in.
minimum thickness of LTA, in.
(b) Single LTA
(1) The single LTA shall satisfy the following
equations:
ð1Þ
SPHERICAL SEGMENTS OF HEADS
The thickness of local thin areas on the inside or outside surface of spherical segments of heads (such as hemispherical heads and the spherical portion of torispherical
ð2Þ
208
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
(c)
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure IV-3-2
ð3Þ
Spherical portion LTA limit
(2) The minimum distance between the edge of the
LTA and the edge of any unreinforced opening shall be
equal to or greater than the inside diameter of the opening plus
Knuckle
.
(3) The minimum distance between the edge of the
LTA and the reinforcement limit of a reinforced opening
shall be equal to or greater than
.
(11) These rules shall only be applied at temperatures where the allowable stresses listed in the allowable
stress tables in Section II, Part D are not controlled by
time-dependent properties.
(c) Multiple LTAs
(1) Multiple LTAs may be combined and evaluated as
a single LTA. The encompassed areas of the combined
LTAs shall be within the D L dimension.
(2) Each LTA in the encompassed area shall meet the
rules of (b)(1) above.
(3) Multiple LTAs may be treated as single LTAs pro-
(4) N o e d g e s o f a n L T A s h a l l b e c l o s e r th a n
from a structural discontinuity.
vided their edges are no closer than
.
(d) Recording Locations of LTAs. The location and dimensions t L and D L of the LTA shall be noted on the Manufacturer’s Data Report.
(e) Code Requirements. All other applicable code requirements shall be met.
(f) Manufacturer’s Data Report. The use of this Mandatory Appendix shall be shown on the Manufacturer’s Data
Report.
Figure IV-3-1
Blend Requirements
Figure IV-3-3
Chamfer or round
the corner
0.8D LTA limit
DL
h
LTA depth
Radius 2 ⴛ
(LTA depth)
Taper length 3 ⴛ
(LTA depth)
D
209
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
(5) A constant thickness junction between head and
cylindrical shell is not considered a discontinuity for
LTA rules.
(6) The blend between the LTA and the thicker surface shall be with a taper length not less than three times
the LTA depth. The minimum bottom blend radius shall
be equal to or greater than two times the LTA depth.
The blend requirements are shown in Figure IV-3-1
(7) The LTA for a torispherical head must lie entirely
within the spherical portion of the head. See Figure
IV-3-2.
(8) The LTA for an ellipsoidal head must lie entirely
within a circle, the center of which coincides with the axis
of the vessel and the diameter of which is equal to 80% of
the shell inside diameter. See Figure IV-3-3.
(9) The LTA for a hemispherical head is acceptable
within any portion of the head except as limited by (b)
(4) above. See Figure IV-3-4.
(10) The provisions of these rules do not apply to the
knuckle portion of a torispherical or to the region outside
the region of an ellipsoidal head or to flat heads.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Head
Rt
2.5
Head
LTA limit
D
Figure IV-3-5
LTA limit [See IV-3(b)(3)]
D
210
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Shell
Shell
Figure IV-3-4
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
MANDATORY APPENDIX V
ADDITIONAL RULES FOR BOILERS FABRICATED BY RIVETING
V-1
SCOPE
shall be used with the longitudinal joint located below
the grate or protected by other means from contact with
the fire or products of combustion.
(e) Plain circular furnaces of riveted construction over
38 in. (950 mm) inside diameter shall be fully stayed as
flat surfaces per the requirements of PG-46 and PFT-27.
(f) When the longitudinal joint of a furnace is of
lap-riveted construction and supported by staybolts, a
staybolt in each circular row shall be located near the
longitudinal joint as shown in Figure V-2.2-2.
The rules of this Mandatory Appendix are for boilers or
component parts thereof that are fabricated by riveting.
V-2
FIREBOXES, COMBUSTION CHAMBERS,
AND FURNACES
V-2.1 General. Fireboxes, combustion chambers, and
furnaces of riveted construction shall meet the requirements of this Mandatory Appendix and Part PR.
V-2.3 Ring-Reinforced Type. Ring-reinforced furnaces shall be of seamless or welded construction and
shall meet the requirements of PFT-17.
V-2.2 Plain Circular Furnaces. Plain circular furnaces of riveted construction shall be 18 in. (450 mm) inside diameter minimum and shall meet the following
requirements:
(a) Circumferential and longitudinal joints shall have
an efficiency of E = 0.5 or
V-2.4 Corrugated Furnaces. Corrugated furnaces
shall be of seamless or welded construction and shall
meet the requirements of PFT-18.
V-2.5 Combined Plain Circular and Corrugated
Type. Plain circular and corrugated type furnaces may
be connected with a riveted circumferential joint meeting
the applicable requirements of V-2.2 and Part PR.
(U.S. Customary Units)
(SI Units)
V-2.7 Fireboxes and Waterlegs. Fireboxes and
waterlegs of riveted construction shall meet the requirements of Part PR and the applicable rules in this Mandatory Appendix.
whichever is greater, where
D = outside diameter, in. (mm)
P = MAWP, lb/in.2 (MPa)
r = thickness of furnace wall material, in. (mm)
To determine the MAWP, multiply the value P a as determined in PG-28 by the joint efficiency.
(b) When shell plates exceed 5/8 in. (16 mm) in thickness, the portion of the plates forming the laps of the circumferential joints, where exposed to the fire or products
of combustion, shall be machined down as shown in
Figure V-2.2-1 to a thickness not over 9/16 in. (14 mm)
and shall conform to the requirements of PR-11.
(c) Buttstrap seams shall be used only where they are
protected from contact with the fire or flame.
(d) Plain circular furnaces of riveted construction,
18 in. (450 mm) to 38 in. (950 mm) inside diameter
may have a riveted longitudinal joint of the lap type provided the furnace does not exceed 36 in. (900 mm) in
length. For a furnace that exceeds 36 in. (900 mm) in
length, a butt and single- or double-strap construction
Figure V-2.2-1
Riveted Circumferential Joint for Circular
Furnace Plates Over 5/8 in. (16 mm)
Not less than 1 in.
9
9
16 in.
Not less than 1 in.
211
16 in.
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
V-2.6 Attachment of Furnaces. Furnaces may be attached to an inwardly or outwardly flanged head or tubesheet by riveting in accordance with the rules of Part PR
and applicable rules in this Mandatory Appendix.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
V-4
Figure V-2.2-2
Proper Location of Staybolts Adjacent to
Longitudinal Joint in Furnace Sheet
V-3
STAYING OF UPPER SEGMENTS OF
TUBE HEADS BY STEEL STRUCTURAL
SHAPES
DESIGN OF STAY PINS AND RIVETED
STAY ATTACHMENTS
(a) All rivet holes and clevis pin holes shall conform to
the fabrication requirements of PR-21. Clevis pins shall
be machined with an outside diameter as close to the hole
size as practicable, but not less than 6% below the hole
size.
(b) The feet for stays or braces (crowfeet) attached to
heads and tubesheets shall be distributed as evenly as
practicable on the area being supported. No supporting
value shall be assigned to the stiffness of inside liner
plates on flat surfaces. Braces attached to tee irons, brackets, crowfeet, or similar construction where the braces
are either pinned or integral with structures attached directly to the supported plate shall be in accordance with
the following:
(1) The minimum required cross-sectional area of
the stay shall be determined by the rules in PFT-28.
(2) The area of pins required to resist double shear
shall be at least 0.75 times the required cross-sectional
area of the stay.
(3) The material surrounding the eye of a clevis or
crowfoot stay shall be 1.25 times greater than the required cross-sectional area of the stay.
(4) The cross-sectional area of the blade end of a diagonal stay at the attachment rivet hole(s) shall be 1.25
times greater than the required cross section of the stay.
(5) Each branch of a crowfoot shall be designed to
carry at least 0.67 times the total load on the stay.
(6) The net cross-sectional areas through the sides of
a crowfoot, tee iron, or similar fastening at the rivet holes
shall be at least 1.25 times greater than the required
cross-sectional area of a stay.
(7) The combined cross-sectional area of the rivets at
each end of the stay or brace shall be at least 1.25 times
greater than the required cross-sectional area of a stay.
V-5
RIVETED ATTACHMENTS
(a) Attachment of nozzles and reinforcement by riveting shall meet the requirements of PR-15 and PR-16.
(b) Manhole frames on shells or drums shall have the
proper curvature. Manhole frames on boilers over 48 in.
(1.2 mm) in diameter shall be riveted to the shell or drum
with two rows of rivets, which may be pitched as shown
in Figure V-5-1.
V-6
DOMES
(a) The longitudinal joint of a riveted dome 24 in.
(600 mm) or over in inside diameter shall be of buttand double-strap construction. Alternatively, the dome
may be made without a seam of one piece of steel pressed
into shape; its flange shall be double-riveted to the shell.
212
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
(a) When the shell of a boiler does not exceed 36 in.
(900 mm) in inside diameter and is designed for an
MAWP not exceeding 100 psi (0.7 MPa), the segment of
the head above the tubes may be stayed by structural
shapes. Sizes required are specified in Table V-4-1 and
Figure V-4-1. However, structural shapes of equal thickness and greater depth of outstanding leg (leg perpendicular to the head or tubesheet) may be substituted for
those specified in Table V-4-1.
(b) When the diameter of a shell falls between the shell
diameters in Table V-4-1 or is less than 30 in. (760 mm)
in inside diameter, the tabular values of the next largest
size shall be used. Rivets used to attach structural shapes
to heads and tubesheets and used to join the outstanding
legs of angled bar shall be the same diameter, after driving, as those used on the boiler shell long seam.
(c) The rivets attaching structural shapes to heads and
tubesheets shall be spaced not more than 4 in. (100 mm)
apart. The centers of the end rivets shall be not more than
3 in. (75 mm) from the ends of the structural shape. The
rivets through the outstanding legs shall be spaced not
more than 8 in. (200 mm) apart; the centers of the end
rivets shall not be more than 4 in. (100 mm) from the
ends of the structural shapes. The ends of the structural
shapes shall be considered those of the outstanding legs,
the ends of which overlap a circle 3 in. (75 mm) inside the
straight flange of the head or tubesheet as shown in
Figure V-4-1.
(d) The distance from the center of the structural
shapes to the boiler shell, marked “A” in Figure V-4-1,
shall not exceed the values in Table V-4-1, but in no case
shall the edge of the portion of the lower angle attached to
the head or tubesheet be closer than 2 in. (50 mm) to the
top of the tube holes.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Table V-4-1
Sizes of Angles Required for Staying Segments of Heads
Height of Segment Dimension, B , in Figure V-4-1, in. (mm)
10 (250)
11 (280)
12 (300)
13 (330)
14 (350)
15 (380)
16 (400)
…
…
1
/2 (13)
…
…
…
…
…
…
…
/8 (16)
3
/8 (10)
…
…
1
/2 (13)
…
…
…
Thickness, in. (mm)
30 (760) Shell Dia.
Angle 3 × 21/2 (75 × 64)
Angle 31/2 × 3 (89 × 75)
Angle 4 × 3 (100 × 75)
34 (860) Shell Dia.
Angle 31/2 × 3 (89 × 75)
Angle 4 × 3 (100 × 75)
Angle 5 × 3 (125 × 75)
36 (900) Shell Dia.
Angle 4 × 3 (100 × 75)
Angle 5 × 3 (125 × 75)
Angle 6 × 3 (150 × 75)
Dimension A in Figure V-4-1
3
/8 (10)
/16 (8)
5
/16 (8)
7
…
…
…
7
5
/16 (11)
3
/8 (10)
5
/16 (8)
/16 (11)
5
/16 (8)
5
/16 (8)
…
…
…
61/2 (165)
…
…
…
7 (175)
9
/16 (14)
/16 (11)
3
/8 (10)
7
1
/2 (13)
/16 (11)
5
/16 (8)
7
7
/16 (11)
5
/16 (8)
…
71/2 (190)
…
/16 (14)
7
/16 (11)
9
11
/16 (17)
/2 (13)
5
/16 (8)
1
9
/16 (14)
3
/8 (10)
…
8 (200)
5
5
/8 (16)
/16 (11)
3
/8 (10)
81/2 (215)
7
3
/4 (19)
/2 (13)
3
/8 (10)
9 (230)
1
…
/8 (16)
7
/16 (11)
91/2 (240)
5
GENERAL NOTE: The short legs of the angles are attached to the head of the boiler.
Not over 3 in.
Not over 8 in.
3 in.
B
See Table
V-4-1
Not less
than 2 in.
Not over 4 in.
213
A See Table V-4-1
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Figure V-4-1
Staying of Head With Steel Angles in Tubular Boiler
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
(b) A dome less than 24 in. (600 mm) in inside diameter, for which the product of the inside diameter in
inches (millimeters) and the maximum allowable working
pressure in pounds per square inch (megapascals) does
not exceed 4,000 for Customary Units (700 for SI Units),
may have a longitudinal seam of the lap type. Its flange
may be single-riveted to the shell, provided the value of
S is multiplied by 0.44 when calculating the minimum
thickness or maximum allowable working pressure of
the dome (see PG-27.2.2).
Figure V-5-1
Method of Riveting Manhole Frames to Shells
or Drums With Two Rows of Rivets
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
214
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
MANDATORY APPENDIX VI
ESTABLISHING GOVERNING CODE EDITIONS, ADDENDA, AND
CASES FOR BOILERS AND REPLACEMENT PARTS
VI-1
(c) It is permitted to provide a replacement part “in
kind” (i.e., identical in fit and material to the part being replaced) for an existing boiler and to certify the part as
meeting the Code Edition and Addenda to which the existing boiler is certified.
GENERAL
VI-2
VI-3
MATERIALS
For pressure-containing parts, the Manufacturer shall
use material conforming to one of the specifications listed
as approved for use in the Edition and Addenda specified
for design. Also, the material specification edition must be
listed as approved for use in the Guideline for Acceptable
ASTM Editions or in the Guideline for Acceptable NonASTM Editions in Section II, Part A or Part B.
For replacement parts provided “in kind,” the material
shall be produced in accordance with the material specification revision listed in Section II as described above at
the time the part is certified.
VI-4
FABRICATION
The Edition and Addenda used to govern fabrication
shall be either those governing design or the Edition
and Addenda approved and issued at the time the activity
is performed.
DESIGN
The Manufacturer of the completed boiler (see PG-104)
shall establish the Code Edition, Addenda, and Code Cases
to be used for design of a boiler, including parts thereof,
or a replacement part to be stamped with the ASME Certification Mark required by this Section.
(a) Except as provided in (b) and (c), the Code Edition
and Addenda used to design a boiler, parts thereof, and
replacement parts shall be either those that are mandatory on the date the boiler or replacement part is contracted, or those that have been approved and issued by
ASME prior to the contract date but are not yet mandatory (see VI-1).
(b) Existing pressure parts that have been stamped and
certified to an earlier or later edition and addenda than
those used for design, and that have never been placed
in service (i.e., they were placed in stock for future use)
may be used provided they are acceptable to the
Manufacturer.
VI-5
EXAMINATION
“Examination” refers to activities performed by the
Manufacturer that include nondestructive examination.
The Edition and Addenda used to govern examination
shall be either those governing design or the Edition
and Addenda approved and issued at the time the activity
is performed.
VI-6
INSPECTION
“Inspection” refers to activities performed by the Inspector. The Code Edition and Addenda used to govern inspection shall be the same as those governing design.
215
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
After Code revisions are approved by ASME, they may
be used beginning with the date of issuance shown on
the Code. Except as noted below, revisions become mandatory 6 months after the date of issuance. Code Cases are
permissible and may be used beginning with the date of
approval by ASME. Only Code Cases that are specifically
identified as being applicable to this Section may be used.
At the time a Code Case is applied, only the latest revision
may be used. Code Cases that have been incorporated into
this Section or have been annulled shall not be used.
Changes to the Code and Code Cases related to design,
material, fabrication, examination, inspection, testing,
overpressure protection, and field assembly made prior
to completion of the boiler or replacement part may be
critical to the intended service conditions of the boiler.
These changes must be considered by the Manufacturer.
Application of such changes shall be a matter of agreement between the Manufacturer and the user.
As used in this Mandatory Appendix, the term “Inspector” shall be considered to include “Authorized Inspector,”
“Qualified Inspector,” and “Certified Individual,” as
applicable.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
VI-7
TESTING
VI-9
The Code Edition and Addenda used to govern testing
of the item shall be the same as those governing design.
VI-8
FIELD ASSEMBLY
The Edition and Addenda used to govern field assembly
shall be either those governing design or the Edition and
Addenda approved and issued at the time the activity is
performed.
OVERPRESSURE PROTECTION
The Code Edition and Addenda used to govern overpressure protection shall be the same as those governing
design.
VI-10
CERTIFICATION
The Edition and Addenda used to govern Code certification shall be the same as those governing design.
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
216
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
NONMANDATORY APPENDIX A
EXPLANATION OF THE CODE CONTAINING MATTER NOT
MANDATORY UNLESS SPECIFICALLY REFERRED TO IN THE
RULES OF THE CODE
EFFICIENCY OF JOINTS
A-1
(d) Crushing strength of plate in front of one rivet
EFFICIENCY OF RIVETED JOINTS
Divide the lesser of (b), (c), or (d) by (a) to get the efficiency. Refer to Figure A-2-1.
A-1.1 Introduction. The efficiency of a riveted joint is
the ratio of the strength of a unit length of the joint to the
same unit length of the solid plate. The efficiency of the
joint may be calculated by the general method described
in the examples presented in A-2 through A-6.
A-3
DOUBLE-RIVETED LAP JOINT
(a) Strength of solid plate
A-1.2 Nomenclature. The notations in A-2 through
A-6 are defined as follows:
A-2
(b) Strength of plate between rivet holes
(c) Shearing strength of two rivets in single shear
(d) Crushing strength of plate in front of two rivets
Divide the lesser of (b), (c), or (d) by (a) to get the efficiency. Refer to Figure A-3-1.
Figure A-2-1
Single-Riveted Lap Joint, Longitudinal or
Circumferential
SINGLE-RIVETED LAP JOINT
(a) Strength of solid plate
P
(b) Strength of plate between rivet holes
(c) Shearing strength of one rivet in single shear
217
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
a = cross-sectional area of rivet after driving, in. 2
(mm2)
b = thickness of buttstrap, in. (mm)
c = crushing strength of plate, psi (MPa), as determined by testing or the values from PR-7
d = diameter of rivet after driving [diameter of rivet
hole (see PR-21.1)], in. (mm)
N = number of rivets in double shear in a unit length of
joint
n = number of rivets in single shear in a unit length of
joint
p = pitch of rivets on the row having the greatest pitch,
in. (mm)
S = shearing strength of rivet in double shear, psi
(MPa) (see PG-14.2)
s = shearing strength of rivet in single shear, psi (MPa)
(see PG-14.2)
T S = nominal tensile strength of plate, psi (MPa)
t = thickness of plate, in. (mm)
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
A-5
Figure A-3-1
Double-Riveted Lap Joint, Longitudinal or
Circumferential
TRIPLE-RIVETED BUTTSTRAP AND
DOUBLE-STRAP JOINT
(a) Strength of solid plate
(b) Strength of plate between rivet holes in the outer
row
P
(c) Shearing strength of four rivets in double shear plus
the shearing strength of one rivet in single shear
(d) Strength of plate between rivet holes in the second
row plus the shearing strength of one rivet in single shear
in the outer row
A-4
(e) Strength of plate between rivet holes in the second
row plus the crushing strength of the buttstrap in front of
one rivet in the outer row
DOUBLE-RIVETED BUTTSTRAP AND
DOUBLE-STRAP JOINT
(a) Strength of solid plate
(f) Crushing strength of plate in front of four rivets plus
the crushing strength of the buttstrap in front of one rivet
(b) Strength of plate between rivet holes in the outer
row
(c) Shearing strength of two rivets in double shear plus
the shearing strength of one rivet in single shear
Divide the lesser of (b), (c), (d), (e), (f), or (g) by (a) to
get the efficiency. Refer to Figure A-5-1.
(d) Strength of plate between rivet holes in the second
row plus the shearing strength of one rivet in single shear
in the outer row
Figure A-4-1
Double-Riveted Buttstrap and Double-Strap
Joint
(e) Strength of plate between rivet holes in the second
row plus the crushing strength of the buttstrap in front of
one rivet in the outer row
P
(f) Crushing strength of plate in front of two rivets plus
the crushing strength of the buttstrap in front of one rivet
(g) Crushing strength of plate in front of two rivets plus
the shearing strength of one rivet in single shear
Divide the lesser of (b), (c), (d), (e), (f), or (g) by (a) to
get the efficiency. Refer to Figure A-4-1.
218
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
(g) Crushing strength of plate in front of four rivets plus
the shearing strength of one rivet in single shear
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
(f) Strength of plate between rivet holes in the second
row plus the crushing strength of the buttstrap in front of
one rivet in the outer row
Figure A-5-1
Triple-Riveted Buttstrap and Double-Strap
Joint
(g) Strength of plate between rivet holes in the third
row plus the crushing strength of the buttstrap in front
of two rivets in the second row and one rivet in the outer
row
(h) Crushing strength of plate in front of eight rivets
plus the crushing strength of the buttstrap in front of
three rivets
(i) Crushing strength of plate in front of eight rivets
plus the shearing strength of two rivets in the second
row and one rivet in the outer row in single shear
Divide the lesser of (b), (c), (d), (e), (f), (g), (h), or (i)
by (a) to get the efficiency. Refer to Figures A-6-1 and
A-6-2.
Figure A-6-1
Quadruple-Riveted Buttstrap and Double-Strap
Joint
QUADRUPLE-RIVETED BUTTSTRAP AND
DOUBLE-STRAP JOINT
(a) Strength of solid plate
(b) Strength of plate between rivet holes in the outer
row
(c) Shearing strength of eight rivets in double shear
plus the shearing strength of three rivets in single shear
(d) Strength of plate between rivet holes in the second
row plus the shearing strength of one rivet in single shear
in the outer row
(e) Strength of plate between rivet holes in the third
row plus the shearing strength of two rivets in the second
row in single shear and one rivet in single shear in the
outer row
219
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
A-6
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure A-6-2
Joints That May Be Used to Avoid Eccentric Stresses
BRACED AND STAYED SURFACES
When ASME Standard threads are used, the equation
becomes
(See Figure A-8.)
A-8
The allowable loads based on the net cross‐sectional
areas of staybolts with V‐threads are computed from
the following equations. The use of Whitworth threads
with other pitches is permissible.
The equation for the diameter of a staybolt at the bottom of a V‐thread is
METHOD OF CHECKING PRESSURE RELIEF
VALVE CAPACITY BY MEASURING MAXIMUM
AMOUNT OF FUEL THAT CAN BE BURNED
A-12
The maximum quantity of fuel C that can be burned per
hour at the time of maximum forcing is determined by a
test. The maximum number of heat units per hour, or
where
D = diameter of staybolt over the threads
d = diameter of staybolt at bottom of threads
P = pitch of threads
= 1/number of threads/in. (25 mm)
1.732 = a constant
220
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
GENERAL NOTE: Illustration (a), which shows buttstraps of equal length, can have a joint efficiency between 82% and 84%. The sawtooth
joint can have a joint efficiency of between 92% and 94%.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure A-8
Detail Illustrations Showing Application of PG-48 and PFT-27 to the Staying of Boilers
Min. (see PW-13)
Fillet weld
(see PFT-11.3)
Full penetration
weld (see PFT-11.4)
P/2 + 2 in.
r
Max. r = 8t
p
Min. t = 3t
P = 3.2 ×
t = nominal thickness
of tubesheet
P = 3.2 ×
t 2s
p2
t
t 2s
p2
t
(a-2)
(a-1)
Screwed staybolt
with end riveted
over (see PG-47)
p
Door ring
Door ring
Welded staybolt
heads (see PW-19)
t
t
r
Full penetration
weld (see PW-11.4)
t
r
Fillet weld
(see PFT-11.3)
p/2 + 2 in. (50 mm)
p
Min. (see PW-13)
Full penetration
weld (see PFT-11.4)
C = 2.1 or 2.2
Max. r = 8t
Min. r = 3t
(b-1)
p/2 + 2 in. (50 mm)
2
P=C×
t s
p2
(b-2)
Combustion
chamber head
Boiler head
t
t
Full penetration
weld (see PW-19)
Full penetration
weld (see PW-11.4)
Full penetration
r
weld (see PW-19)
p
r
t
Screwed staybolt
with end riveted
over (see PG-47)
C = 2.1 or 2.2
p
Two fillet welds
Boiler shell
(see PFT-11.3)
Max. r = 8t
Min. r = 3t
t 2s
P=C×
p2
C = 2.1 or 2.2
(c)
221
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
t 2s
P=C×
p2
t
ð15Þ
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure A-8
Detail Illustrations Showing Application of PG-48 and PFT-27 to the Staying of Boilers (Cont'd)
Staybolt
p
See PG-48
p
p
Top of mudring p
p
See PG-48
Mudring
rivets
Example where rivets support sheet; not for unsupported lap joint
(g-2)
See PL-27.6
(g-1)
Full penetration
weld (see PW-11.4)
p
p
t
t
Screwed staybolt
with end riveted
over (see PG-47)
Full penetration
weld (see PW-19)
P = 2.2 ×
t 2s
×
p2
90
ß
2
ß = angularity of tangent
lines in degrees
(h)
222
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
ß
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
Figure A-8
Detail Illustrations Showing Application of PG-48 and PFT-27 to the Staying of Boilers (Cont'd)
r
Area
Area
r
(1) Weld in shear
PW-19.1
(2) Maximum pitch
15 times
stay diameter
PFT-27.2
(3) Max. r = 8t
Min. r = 3t
t = nominal
thickness of
tubesheet
p
t
(1) Weld in shear
PW-19.1
(2) Maximum pitch
15 times
stay diameter
PFT-27.2
(3) Max. r = 8t
Min. r = 3t
t = nominal
thickness of
tubesheet
p
t
(i)
(j)
p max.
p
+ 2 in.
2
(50 mm) max.
p
+ 2 in.
2
(50 mm) max.
(l) Door Opening
(m) Door Opening
or Mud Ring
Area
p
+ 2 in.
2
(50 mm)
(1) Weld in shear
PW-19.1
(2) Maximum pitch
15 times
stay diameter
PFT-27.3
(k)
11/2p max.
Full penetration weld
may be applied from
either or both sides
of tubesheet
p max.
Wrapper or
crown sheet
p max.
1/
2
in.
(13 mm) min.
(n) Door Opening
or Mud Ring
p
+ 2 in.
2
(50 mm)
Tube
Full penetration weld
may be applied
from either or
both sides
(o)
223
Grind
flush
p
(p)
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
p max.
No fu
Figure A-8
Detail Illustrations Showing Application of PG-48 and PFT-27 to the Staying of Boilers (Cont'd)
p
2
p
+ 2 in. (50 mm)
2
(PFT-27.3)
PFT
27.9.2
p
2
p
+ 2 in. (50 mm)
2
(PFT-27.3)
p
max.
2
PFT-27.9.1
p
2
p
11/ in.
16
p
p
p
2
p
PFT-27.1
(17 mm)
minimum
bearing
surface
(PG-44.3)
p
p
p max.
p (PFT-27.1)
Maximum pitch ”p “ may measured
circumferentially and radially only
Maximum pitch ”p“ may be measured
horizontally and vertically only
(1) Provide stay cross-sectional
(2) Provide the number of stays
area required by PG-49 based
required to not exceed the
upon allowable stresses from
maximum calculated pitch.
Section II, Part D, Subpart 1, Table 1A.
(3) Diagonal stay stresses must not
exceed limits computed from
PFT-32.
(q)
11/ in.
16
p
2
p
p
PFT
27.9.2
p
p
2
p
PFT-27.1
p max.
r
(17 mm)
minimum
bearing
surface
(PG-44.3)
(17 mm)
minimum
bearing
surface
p
p
p
r
PFT-27.2
p
max.
2
p
2
p
Maximum pitch ”p“ may be measured
circumferentially and radially only
p (PFT-27.1)
Maximum pitch ”p“ may be measured
horizontally and vertically only
(1) Provide stay cross-sectional
(2) Provide the number of stays
area required by PG-49 based
required to not exceed the
upon allowable stresses from
maximum calculated pitch.
Section II, Part D, Subpart 1, Table 1A.
(r)
GENERAL NOTE: “p” is same as given in PG-46.
224
(3) Diagonal stay stresses must not
exceed limits computed from
PFT-32.
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
p
2
PFT-27.2
11/ in.
16
p
max.
2
PFT-27.9.1
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
A-16
C H , is then determined, using the values of H given in
A-17. The weight of steam generated per hour is found
by the following equation:
EXAMPLE 4
A boiler fired with natural gas consumes 3,000 ft3/hr.
The working pressure is 150 psi gage.
(U.S. Customary Units)
A-17
(SI Units)
For the purpose of checking the pressure relief valve
capacity as described in A-12, the following values of
heats of combustion of various fuels may be used:
where
Fuel Type
C = total weight or volume of fuel burned/hr at time of
maximum forcing, lb/hr (kg/hr) or ft3/hr (m3/hr)
H = heat of combustion of fuel, Btu/lb (kJ/kg) or
Btu/ft3 (kJ/m3) (see A-17)
W = weight of steam generated/hr, lb (kg/hr)
Semibituminous coal
Anthracite
Screenings
Coke
Wood, hard or soft, kiln dried
Wood, hard or soft, air dried
Wood shavings
Peat, air dried, 25% moisture
Lignite
Kerosene
Petroleum, crude oil, Pennsylvania
Petroleum, crude oil, Texas
The sum of the pressure relief valve capacities marked
on the valves shall be equal to or greater than W .
A-13
EXAMPLE 1
H, Btu/lb (kJ/kg)
14,500
13,700
12,500
13,500
7,700
6,200
6,400
7,500
10,000
20,000
20,700
18,500
(34
(32
(29
(31
(18
(14
(14
(17
(23
(46
(48
(43
000)
000)
000)
000)
000)
000)
400)
000)
300)
500)
000)
000)
A boiler at the time of maximum forcing uses
2,150 lb/hr of Illinois coal with a heating value of
12,100 Btu/lb. Boiler pressure is 225 psi gage.
Fuel Type
Natural gas
960 (35 700)
Blast‐furnace gas
100 (3 700)
Producer gas
150 (5 600)
Water gas, uncarbureted
290 (11 000)
AUTOMATIC WATER GAGES
EXAMPLE 2
A-18
Wood shavings of heat of combustion of 6,400 Btu/lb
are burned under a boiler at the maximum rate of
2,000 lb/hr. Boiler pressure is 100 psi gage.
Automatic shutoff valves intended to restrict the flow
from a damaged water gage without human intervention
shall conform to the requirements of A-18.1 through
A-18.6.
A-18.1 Check valves in upper and lower fittings shall
be of solid noncorrosive metal ball type to avoid need for
guides.
A-15
A-18.2 Ball check valves in upper and lower fittings
must open by gravity and the lower ball check valve must
rise vertically to its seat.
EXAMPLE 3
An oil‐fired boiler at maximum forcing uses 1,000 lb/hr
of crude oil (Texas). Boiler pressure is 275 psi gage.
A-18.3 The check balls must be not smaller than
/2 in. (13 mm) in diameter, and the diameter of the circle
of contact with the seat must be not greater than
two‐thirds of the diameter of the check ball. The space
around each ball must be not less than 1/8 in. (3.0 mm),
and the travel movement from the normal resting place
to the seat must be not less than 1/4 in. (6 mm).
1
225
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
A-14
H, Btu/ft3 (kJ/m3)
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
A-18.4 The ball seat in the upper fitting must be a flat
seat with either a square or hexagonal opening, or otherwise arranged so that the steam passage can never be
completely closed by this valve.
A-20.2 The casing of the fusible plugs shall be made
of a composition conforming to SB-61 or from phosphor‐
bronze rods conforming to ASTM B139.
A-20.3 Typical designs of fusible plugs are given in
Figure A-19.
A-18.5 The shutoff valve in the upper fitting must
have a projection that holds the ball at least 1/4 in.
(6 mm) away from its seat when the shutoff valve is
closed.
A-20.4 The bore of the casing shall be tapered continuously from the water end of the casing for a distance
of at least 1 in. to a diameter of not less than 3/8 in.
(10 mm) at a point not less than 1/2 in. (13 mm) from
the fire end. The diameter of the bore at either end shall
be not less than 1/2 in. (13 mm). The hole on the fire end
shall be as large as possible and may be of any shape provided the cross‐sectional area at all points is greater than
the area of the least cross section of the fusible metal.
A-18.6 The balls must be accessible for inspection.
Means must be provided for removal and inspection of
the lower ball check valve while the boiler is under steam
pressure.
These restrictions do not apply to closing the valves by
external methods.
A-20.5 A fusible plug shall be of such length that
when installed it shall project at least 3/4 in. (19 mm) on
the water side of the plate, tube, or flue. It shall extend
through the plate, tube, or flue on the fire side as little
as possible but not more than 1 in. (25 mm).
FUSIBLE PLUGS
(See Figure A-19.)
A-19
A-20.6 A fire-side plug may be designed so as to be
inserted by means of a plug-type wrench, so as to reduce
the projection on the fire side.
A-19.1 Fire‐actuated fusible plugs, if used, except as
provided in A-20.9, shall be filled with tin of the following
composition, having a melting point between 445°F
and 450°F (229°C and 232°C):
Pure tin, min. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
99.3%
Copper, max. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
00.5%
Lead, max. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
00.1%
Total impurities
..........................
A-20.7 If a fire‐actuated fusible plug is inserted in a
tube, the tube wall at the plug shall not be less than
0.22 in. (5.6 mm) thick, or sufficient to give four full
threads.
A-19.2 The fusible metal shall extend from the water
end of the plug to the point of least diameter of the hole
and shall be carefully alloyed to the casing. A test shall
be made to determine that the fusible metal is not loose
in the plug.
A-20.9 Fusible metal, other than tin as specified in
A-19.1, for use under temperatures exceeding 450°F
(229°C), may be used and the casing may be made of
other material and shape than specified in A-20.2 through
A-20.4 if the metal and the casing are approved by the administrative authority. Such plugs shall not be marked as
“ASME Std.”
A-19.3 Fusible plugs shall be replaced at least once
each year. Casings that have been used shall not be
refilled.
A-19.4 Fusible plugs filled with tin as specified in
A-19.1 shall not be used for pressures and temperatures
that will cause the plug to fail while it is submerged in
the boiler water.
The fusible metal may be partly replaced by a bronze
plug loosely fitted to the hole and of such size that it will
pass freely through the hole on the fire side, from which
side it must be inserted into the casing. Such plug shall
be properly alloyed to the casing with the same fusible
metal as required by A-19.1.
A-21
Fire‐actuated fusible plugs, if used, shall be located at
the lowest permissible water level as determined by the
boiler Manufacturer; steam‐actuated plugs, if used, shall
be so located that they will operate when the water level
is at the point where a fire‐actuated fusible plug would be
located.
PROOF TESTS TO ESTABLISH MAXIMUM
ALLOWABLE WORKING PRESSURE
A-20
A-22
A-20.1 Water-side plugs are fusible plugs that are inserted from the water side of the plate, flue, or tube to
which they are attached. Fire-side plugs are fusible plugs
inserted from the fire side of the plate, flue, or tube to
which they are attached.
A-22.1 Scope. The maximum allowable working
pressure for pressure parts of boilers for which the
strength cannot be computed with a satisfactory assurance of accuracy shall be established in accordance with
226
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
A-20.8 Fusible plugs that comply with the requirements of A-19 and A-20 must be stamped on the casing
with the name of the manufacturer, and on the water
end of the fusible metal “ASME Std.”
00.7%
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure A-19
Typical Forms of Fusible Plugs
1/
2
in. (13 mm)
3/
4
1 in. (25 mm)
3/
8
in.
(10 mm)
1/
2
1/
2
in.
(19 mm)
in. (13 mm)
in. (13 mm)
Installation
Plug type
(a) Water-Side Plugs
1/
2
in. (13 mm)
3/ in.
4
(19 mm)
1 in. (25 mm)
3/
8
in.
(10 mm)
1/ in.
2
1/
2
(13 mm)
1 in.
(25 mm)
max.
in. (13 mm)
Installation
Plug type
1/
2
in. (13 mm)
3/ in.
4
1 in. (25 mm)
in.
(10 mm)
1/ in.
2
(13 mm)
Plug type
Installation
(b) Fire-Side Plugs
A-22.2.1.1 Tests based on yielding of the part to
be tested. These tests are limited to materials with a ratio
of minimum specified yield to minimum specified ultimate strength of 0.625 or less.
the requirements of this paragraph, using one of the test
procedures applicable to the type of loading and to the
material used in its construction.
The tests in these paragraphs may be used only for the
purpose of establishing the maximum allowable working
pressure of those elements or component parts for which
the thickness cannot be determined by means of the design rules given in this Code. The maximum allowable
working pressure of all other elements or component
parts shall not be greater than that determined by means
of the applicable design rules.
A-22.2.1.2
Tests based on bursting of the part.
A-22.2.2 Retests. A retest shall be allowed on a duplicate pressure part if errors or irregularities are obvious
in the test results.
A-22.2.3 Precautions. Safety of testing personnel
should be given serious consideration when conducting
proof tests, and particular care should be taken during
bursting tests in A-22.6.3.
A-22.2 Tests.
A-22.2.1 Types. Provision is made for two types of
tests for determining the internal maximum allowable
working pressure
A-22.3 Pressure.
A-22.3.1 Previously Applied. The pressure parts
for which the maximum allowable working pressure is
to be established shall not previously have been subjected
227
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
3/
8
(19 mm)
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
to a pressure greater than 11/2 times the desired or anticipated maximum allowable working pressure, adjusted for
design temperature as provided in A-22.8.
may be cut from this excess stock. The specimens shall
not be removed by flame cutting or any other method involving sufficient heat to affect the properties of the
specimen.
If yield or tensile strength are not determined by test
specimens from the pressure part tested, alternative
methods are given in A-22.6.1, A-22.6.2, and A-22.6.3
for evaluation of proof test results to establish the maximum allowable working pressure.
A-22.3.2 Application. In the procedures given in
A-22.6.1 for the Strain Measurement Test, and A-22.6.2
for the Displacement Measurement Test, the hydrostatic
pressure in the pressure part shall be increased gradually
until approximately one‐half the anticipated maximum allowable working pressure is reached. Thereafter, the test
pressure shall be increased in steps of approximately one‐
tenth or less of the anticipated maximum allowable working pressure until the pressure required by the test procedure is reached. The pressure shall be held stationary at
the end of each increment for a sufficient time to allow
the observations required by the test procedure to be
made, and shall be released to zero to permit determination of any permanent strain or displacement after any
pressure increment that indicates an increase in strain
or displacement over the previous equal pressure
increment.
A-22.6 Procedure.
A-22.6.1 Strain Measurement Test.
A-22.6.1.1 Subject to limitations of A-22.2.1.1,
this procedure may be used for pressure parts under internal pressure, constructed of any material permitted
to be used under the rules of Section I. Strains shall be
measured in the direction of the maximum stress at the
most highly stressed parts (see A-22.4) by means of strain
gages of any type capable of indicating strains to
0.00005 in./in. Pressure shall be applied as provided in
A-22.3.2.
A-22.4 Critical Areas. As a check that the measurements are being taken on the most critical areas, the Inspector may require a brittle coating to be applied on
all areas of probable high stress concentrations in the test
procedures given in A-22.6.1 and A-22.6.2. The surfaces
shall be suitably clean before the coating is applied in order to obtain satisfactory adhesion. The technique shall
be suited to the coating material.
A-22.6.1.2 After each increment of pressure has
been applied, readings of the strain gages and the hydrostatic pressure shall be taken and recorded. The pressure
shall be released and any permanent strain at each gage
shall be determined after any pressure increment that indicates an increase in strain for this increment over the
previous equal pressure increment. Only one application
of each increment of pressure is required.
A-22.6.1.3 Two curves of strain against test
pressure shall be plotted for each gage line as the test progresses, one showing the strain under pressure and one
showing the permanent strain when the pressure is removed. The test may be discontinued when the test pressure reaches the value H , which will, by the equation,
justify the desired working pressure but shall not exceed
the pressure at which the plotted points for the most
highly strained gage line reaches the value given below
for the material used.
A-22.5 Yield Strength and Tensile Strength. For
proof tests based on yielding, A-22.6.1 or A-22.6.2, the
yield strength (or yield point for those materials which
exhibit that type of yield behavior indicated by a “sharpkneed” portion of the stress–strain diagram) of the material in the part tested, shall be determined in accordance
with the method prescribed in the applicable material
specification and as described in ASTM E8, Tension Testing of Metallic Materials. For proof tests based on bursting, A-22.6.3, the tensile strength instead of the yield
strength of the material in the part tested shall be similarly determined.
Yield or tensile strength so determined shall be the
average from three or four specimens cut from the part
tested after the test is completed. The specimens shall
be cut from a location where the stress during the test
has not exceeded the yield strength. The specimens shall
not be oxygen cut because this might affect the strength of
the material.
When excess stock from the same piece of wrought material is available and has been given the same postweld
heat treatment as the pressure part, the test specimens
A-22.6.1.3.1 0.2% permanent strain for carbon, low‐alloy and high‐alloy steels.
A-22.6.1.3.2
copper‐base alloys.
0.5% strain under pressure for
A-22.6.1.3.3
0.2% permanent strain for nickel
alloys.
A-22.6.1.4 The maximum allowable working
pressure P in pounds per square inch at test temperature
for parts tested under this paragraph shall be computed
by one of the following equations.
A-22.6.1.4.1
determined by A-22.5
228
If the average yield strength is
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
NOTE: Strains should be measured as they apply to membrane stresses and to bending stresses within the following range. It is recognized that high localized and secondary bending stresses may exist
in pressure parts designed and fabricated in accordance with these
rules. Insofar as practical, design rules for details have been written
to hold such stresses at a safe level consistent with experience.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
A-22.6.1.4.2 If the actual average yield
strength is not determined by test specimens
pressure. Permanent deformation at the beginning of
the curve that results from the equalization of stresses
and irregularities in the material may be disregarded.
The maximum allowable working pressure P in pounds
per square inch at test temperature for parts tested under
this paragraph shall be computed by one of the following
equations.
where
H = hydrostatic test pressure, at which the test was
stopped in accordance with A-22.6.1.3
Y a = yield strength — actual average from test
specimens
Y s = yield strength — specified minimum
A-22.6.2.4.1
determined by A-22.5
If the average yield strength is
The maximum allowable working pressure at other
temperatures shall be determined as provided in A-22.8.
A-22.6.2.4.2 In order to eliminate the necessity of cutting tensile specimens and determining the actual yield strength of the material under test, one of the
following equations may be used to determine the maximum allowable working pressure.
A-22.6.2 Displacement Measurement Test.
A-22.6.2.1 Subject to the limitations of
A-22.2.1.1 this procedure may be used only for pressure
parts under internal pressure, constructed of materials
having a definitely determinable yield point. Displacement shall be measured at the most highly stressed parts
(see A-22.4) by means of measuring devices of any type
capable of measuring to 0.001 in. (0.02 mm). This displacement may be measured between two diametrically
opposed reference points in a symmetrical structure, or
between a reference point and a fixed base point. Pressure shall be applied as provided in A-22.3.2.
A-22.6.2.4.2.1 For carbon steel, meeting an
acceptable Code specification, with a specified minimum
tensile strength of not over 70,000 psi (480 MPa)
(U.S. Customary Units)
(SI Units)
A-22.6.2.4.2.2 For any material listed in
Section II, Part D, Subpart 1, Tables 1A and 1B, as acceptable for Section I construction
where
H = hydrostatic test pressure coincident with the proportional limit of the weakest element of the component part tested
S = specified minimum tensile strength
Y a = yield strength — actual average from test
specimens
Y s = yield strength — specified minimum
A-22.6.2.3 Two curves of displacement against
test pressure shall be plotted for each reference point
as the test progresses, one showing the displacement under pressure, and one showing the permanent displacement when the pressure is removed. The application of
pressure shall be stopped when it is evident that the
curve through the points representing displacement under pressure has deviated from a straight line.
When the equation in A-22.6.2.4.2.1 or A-22.6.2.4.2.2 is
used, the material in the pressure part shall have had no
appreciable cold working or other treatment that would
tend to raise the yield strength above the normal.
The maximum allowable working pressure at other
temperatures shall be determined as provided in A-22.8.
A-22.6.2.4 The pressure coincident with the
proportional limit of the material shall be determined
by noting the pressure at which the curve representing
displacement under pressure deviates from a straight
line. The pressure at the proportional limit may be
checked from the curve of permanent displacement by locating the point where the permanent displacement begins to increase regularly with further increases in
A-22.6.3 Bursting Tests.
A-22.6.3.1 This procedure may be used for pressure parts under internal pressure when constructed of
any material permitted to be used under the rules of
229
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
A-22.6.2.2 After each increment of pressure has
been applied, readings of the displacement and the hydrostatic pressure shall be taken and recorded. The pressure
shall be released and any permanent displacement shall
be determined after any pressure increment that indicates an increase in measured displacement for this increment over the previous equal pressure increment. Only
one application of each increment is required. Care must
be taken to assure that the readings represent only displacements of the parts on which measurements are
being made and do not include any slip of the measuring
devices or any movement of the fixed base points or of the
pressure part as a whole.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Section I. The maximum allowable working pressure of
any component part proof tested by this method shall
be established by a hydrostatic test to failure by rupture
of a full‐size sample of such pressure part. The hydrostatic pressure at which rupture occurs must be determined. Alternatively, the test may be stopped at any
pressure before rupture that will satisfy the requirements
for the desired maximum allowable working pressure.
The item so tested shall not be used for Code
construction.
A-22.8 Higher Temperatures. The maximum allowable working pressure for pressure parts that are designed for temperatures at which the allowable stress
value of the material is less than that at the test temperature shall be determined by the following equation:
A-22.6.3.2 The maximum allowable working
pressure P in pounds per square inch at test temperature
for parts tested under this paragraph shall be computed
by one of the following equations.
P o = maximum allowable working pressure at design
temperature
P t = maximum allowable working pressure at test
temperature
S o = maximum allowable stress value at the design temperature, as given in Section II, Part D, Subpart 1,
Table 1A or Table 1B
S t = maximum allowable stress value at test temperature as given in Section II, Part D, Subpart 1, Table
1A or Table 1B
where
A-22.6.3.2.1 Parts constructed of materials
other than cast materials
A-22.6.3.2.2
A-22.6.3.2.3
Parts constructed of cast iron
Parts constructed of nodular
iron
A-22.6.3.2.4 For parts constructed of cast materials, except cast iron and nodular iron
A-22.10 Inspection. Tests to establish the maximum
allowable working pressure for pressure parts shall be
witnessed and approved by an Authorized Inspector.
A-22.11 Test Gages.
A-22.11.1 An indicating gage shall be connected directly to the pressure parts. If the indicating gage is not
readily visible to the operator controlling the pressure applied, an additional indicating gage shall be provided
where it will be visible to the operator throughout the
duration of the test. For large pressure parts, it is recommended that a recording gage be used in addition to indicating gages.
where
B
f
S
Sa
Sb
Sm
=
=
=
=
=
=
bursting test pressure
casting quality factor as defined in PG-25
specified minimum tensile strength
average actual tensile strength of test specimens
minimum tensile strength of test bar
maximum tensile strength of range of specification
For all materials except cast iron and nodular iron, the
maximum allowable working pressure at other temperatures shall be determined as provided in A-22.8.
A-22.11.2 Pressure gages used in testing shall comply with PG-99.4.
A-22.7 Parts Subject to Collapse.
A-22.7.1 Parts of the boiler normally subject to collapse for which specified rules are not provided in this
Section shall withstand without excessive deformation a
hydrostatic test of not less than three times the desired
maximum allowable working pressure.
A-22.11.3 All gages used in proof testing shall be
calibrated against a standard deadweight tester or a calibrated master gage before the proof test is begun. Gages
shall be recalibrated at any time that there is reason to believe they are in error.
A-22.7.2 The maximum allowable working pressure at other than test temperatures shall be determined
as provided in A-22.8.
A-24
TABLE PG-23.1
See Section II, Part D, Subpart 1, Table 1A.
230
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
A-22.9 Duplicate Parts. When the maximum allowable working pressure of a pressure part has been established by a proof test, duplicate parts of the same
materials, design and construction need not be proof
tested but shall be given the standard hydrostatic test
at 11/2 times the maximum allowable working pressure.
The dimensions and minimum thickness of the structure
to be tested should not vary materially from those actually used. A geometrically similar part may be qualified
by a series of tests covering the complete size range of
the pressure part.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
A-25
TABLE PG-23.2
Table A-44
Guide for Estimating Steaming Capacity
Based on Heating Surface
See Section II, Part D, Subpart 1, Table 1B.
A-26
TABLE PG-23.3
U.S. Customary Units
Pounds of Steam/(hr ft2)
See Section II, Part D, Subpart 1, Table 1B.
A-27
See Section II, Part D, Subpart 1, Table Y-1.
A-28
Firetube
Boilers
Watertube
Boilers
Boiler heating surface
Hand fired
Stoker fired
Oil, gas, or pulverized fuel fired
5
7
8
6
8
10
Waterwall heating surface
Hand fired
Stoker fired
Oil, gas, or pulverized fuel fired
8
10
14
8
12
16
Type of Surface
TABLE PG-23.4
FIGURES G AND CS-1 THROUGH CS-6
See Section II, Part D, Subpart 3, External Pressure
Charts.
SI Units
SUGGESTED RULES COVERING EXISTING
INSTALLATIONS
Kilograms of Steam/
(hr m2)
A-30
Type of Surface
Firetube
Boilers
Watertube
Boilers
For existing riveted construction, use suggested rules
in the 1971 Edition of Section I.
Boiler heating surface
Hand fired
Stoker fired
Oil, gas, or pulverized fuel fired
24
34
39
29
39
49
PRESSURE RELIEF VALVES FOR POWER
BOILERS
Waterwall heating surface
Hand fired
Stoker fired
Oil, gas, or pulverized fuel fired
39
49
68
39
59
78
A-44
A-46
If the pressure relief valve capacity cannot be determined or if it is desirable to verify the computations,
the capacity may be checked in one of the three following
ways, and if found insufficient, additional capacity shall be
provided.
A-46.1 By making an accumulation test, that is, by
shutting off all other steam‐discharge outlets from the
boiler and forcing the fires to the maximum. The pressure
relief valve equipment shall be sufficient to prevent an excess pressure beyond that specified in PG-67.2. This
method should not be used on a boiler with a superheater
or reheater or on a high‐temperature water boiler.
A-45
When boilers of different maximum allowable working
pressures with minimum pressure relief valve settings
varying more than 6% are so connected that steam can
flow toward the lower pressure units, the latter shall be
protected by additional pressure relief valve capacity, if
necessary, on the lower pressure side of the system.
The additional safety valve capacity shall be based upon
the maximum amount of steam that can flow into the lower pressure system. The additional pressure relief valves
shall have at least one valve set at a pressure not to exceed the lowest allowable pressure and the other valves
shall be set within a range not to exceed 3% above that
pressure.
A-46.2 By measuring the maximum amount of fuel
that can be burned and computing the corresponding evaporative capacity upon the basis of the heating value of
the fuel (see A-12 through A-17).
A-46.3 By determining the maximum evaporative capacity by measuring the feedwater. The sum of the pressure relief valve capacities marked on the valves shall be
231
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
GENERAL NOTE: When a boiler is fired only by a gas having a
heat value not in excess of 200 Btu/ft3 (2 000 Whr/m3), the
minimum pressure relief valve relieving capacity may be based
on the values given for hand‐fired boilers above.
The minimum pressure relief valve relieving capacity
for other than electric boilers, waste heat boilers, organic
fluid vaporizers, and forced‐flow steam generators with
no fixed steam and waterline, when provided in accordance with PG-67.4.3, may be estimated on the basis of
the pounds of steam generated per hour per square foot
(kilogram per hour per square meter) of boiler heating
surface and waterwall heating surface, as given in Table
A-44.
In many cases, a greater relieving capacity of pressure
relief valves will have to be provided than that estimated
using Table A-44, in order to meet the requirements of
the first paragraph of PG-67.2.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
as used in these examples. (S n denotes allowable stress of
the nozzle material, S v denotes allowable stress of the
vessel material, R n denotes radius of nozzle, etc.) The values t and t n are assumed to be minimum in these
examples.
equal to or greater than the maximum evaporative capacity of the boiler. This method shall not be used on high‐
temperature water boilers.
A-48
When operating conditions are changed, or additional
heating surface such as water screens or waterwalls is
connected to the boiler circulation, the pressure relief
valve capacity shall be increased, if necessary, to meet
the new conditions and be in accordance with PG-67.2.
The additional valves required on account of changed
conditions may be installed on the piping between the
boiler and the main stop valve except when the boiler is
equipped with a superheater or other piece of apparatus.
In the latter case they may be installed on the piping between the boiler drum and the inlet to the superheater or
other apparatus, provided that the piping between the
boiler and pressure relief valve (or valves) connection
has a cross‐sectional area of at least three times the combined areas of the inlet connections to the pressure relief
valves applied to it.
A-65
A boiler shell, designed for 595 psig maximum allowable working pressure, has an inside diameter of 36 in.
and is made of 1/2 in. thick plate. Is it permissible to install
an NPS 2 (DN 50) connection by tapping a hole for the
pipe directly into the shell?
The NPS 2 (DN 50) connection complies with the
pressure‐size limitations in PG-39.5.2 and qualifies for
the exception provided in PG-32.1.4 permitting the opening without requiring a calculation to determine the availability of compensation in the shell. PG-39.5.1 and Table
PG-39, however, require a minimum plate thickness and
thread engagement greater than that provided by the
shell thickness. Therefore, the connection cannot be made
as originally stated; however, either a heavier shell plate
or a built-up pad or properly attached plate or fitting
could be used to provide the minimum metal thickness
and number of threads as required by PG-39 and Table
PG-39. Should a plate or fitting, attached by welding, be
used, the rules in PG-37, PW-15, and PW-16 shall be met.
A-63
A-63.2 During a hydrostatic test of a boiler, the safety
valve or valves shall be removed or each valve disk shall
be held to its seat by means of a testing clamp and not by
screwing down the compression screw upon the spring.
A-64
A-66
Where repairs are necessary that in any way affect the
working pressure or safety of a boiler, a state inspector,
municipal inspector, or an inspector employed regularly
by an insurance company, which is authorized to do a
boiler insurance business in the state in which the boiler
is used, shall be called for consultation and advice as to
the best method of making such repairs; after such repairs are made they shall be subject to the approval of a
state inspector, municipal inspector, or an inspector regularly employed by an insurance company that is authorized to do a boiler insurance business in the state in which
the boiler is used.
EXAMPLES OF METHODS OF COMPUTATION
OF OPENINGS IN VESSEL SHELLS
Application of the rules in PG-32, PG-33, PG-36 through
PG-39, PW-15, and PW-16 are given in the following examples. Common assumptions in all the examples are that
the design temperature corresponds to the temperature
of saturated steam at the maximum allowable working
pressure, that all areas are expressed in terms of equivalent area of the vessel material (see PG-37), that the corrosion/erosion allowance is zero, and that all openings
are single openings unless otherwise noted. Subscripts
have been provided where necessary to eliminate confusion where an algebraic value has more than one meaning
232
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
A forged steel fitting as shown in Figure A-66, with a female 3 in. nominal pipe thread over the full fitting depth
is to be inserted and welded into a vessel shell. The maximum allowable stress is 15,000 psi for the fitting material and 17,500 psi for the vessel shell material. The
maximum allowable working pressure of the vessel is
375 psig. See Figure A-66 for nozzle and vessel
dimensions.
The fitting complies with the size, pressure, and thread
depth limitations provided in PG-39.5 and Table PG-39.
The welded attachment does not qualify for the exception
that exempts the design from calculation of the required
reinforcement as provided in PG-32 and must, therefore,
comply with PG-33 as follows:
Minimum required thickness for reinforcement
consideration
REPAIRS TO EXISTING BOILERS
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure A-66
Example for Typical Nozzle Computations
41/4 in. dia.
3/ in.
8
5/ in.
8
WL1 = 3/8 in.
31/2 in.
Limits of
reinforcements
5/ in.
8
3/ in.
4
3 in. NPT
51/4 in. O.D. lip
WL3 = 3/8 in.
48 in. inside diameter
vessel
2 in.
GENERAL NOTE: This example was performed using computer software. The example was generated by performing the entire calculation
without rounding off during each step. Accuracy of the final results beyond three significant figures is not intended or required.
In that the actual nozzle projection is less than that permitted within the limits of reinforcement, modification of
the equation provided in PG-33.1 will be required to reflect the actual area available for reinforcement.
Area of reinforcement required (see PG-33.3 and
Figure PG-33.1)
Area of reinforcement available in vessel wall (see
PG-33.3, PG-36.4.1, and Figure PG-33.1) with wd = 0
Area of reinforcement available in attachment welds
(see PG-36.4.3 and Figure PG-33.1)
Area of reinforcement available in the nozzle wall external of the vessel (see PG-33.3, PG-36.4.2, and Figure
PG-33.1)
233
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Area of reinforcement available in the nozzle and nozzle lip internal of the vessel (see PG-33.3, PG-36.4.2, and
Figure PG-33.1). Due to the nozzle lip, modification of
the equation provided in Figure PG-33.1 will be required
to reflect the actual area present.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Total area of reinforcement available
Verification
as required for demonstration of compliance with PG-33.
Compliance with PG-37 and PW-15 is demonstrated by
the following calculations:
Required minimum strength to be provided by the
welds (see PG-37 and PW-15)
As verified by the above demonstrations, the design is
proved to be in compliance with the requirements of Section I.
A-67
A vessel shell has a studding outlet connection
mounted as shown in Figure A-67. The maximum allowable stress of both the vessel and studding outlet material
is 12,500 psi. The maximum allowable working pressure
of the design is 325 psig. See Figure A-67 for vessel and
studding outlet dimensions.
The studding outlet conforms to the requirements of
PG-39.4, both in arrangement and in tapped stud hole requirements. The welded attachment does not qualify for
the exception provided in PG-32 and must therefore comply with PG-33 as follows:
Minimum required thickness for reinforcement
consideration
Strength of the welds (see PG-37 and PW-15)
Internal fillet weld in shear
External fillet weld in shear
Nozzle t r n = 0.0 [see Figure PG-33.2, illustration (a)]
Area of reinforcement required (see PG-33.2)
Area of reinforcement available in the vessel wall (see
PG-36.4.1)
Actual per Figure A-66
Area of reinforcement available in attachment welds
(see PG-36.4.3)
234
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
The combined strength of the welds equals
44,384 lb ≥ W as required for compliance with PG-37
and PW-15.
Verification of the minimum weld sizing as required by
PW-16.1 and Figure PW-16.1, illustration (u‐2), is demonstrated by the following:
Required per Figure PW-16.1, illustration (u‐2)
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure A-67
Example for Typical Nozzle Computations
7/ in.
8
9 Thd./in. Class 2B fit
by 15/16 in. tapped depth
15 in. limit of reinforcement
121/2 in.
WL1 =
17/ in.
32
6 in.
11/2 in. (te )
71/2 in.
vessel
WL3 = 3/4 in.
60 in.
inside diameter
1 in.
GENERAL NOTES:
(a) Stud holes are staggered about the line of the longitudinal section and are shown for clarification only.
(b) This example was performed using computer software. The example was generated by performing the entire calculation without rounding off during each step. Accuracy of the final results beyond three significant figures is not intended or required.
Area of reinforcement available in pad (see PG-36.4.3)
External fillet weld in shear
Internal fillet weld in shear
as required for demonstration of compliance with PG-33.
Compliance with PG-37 and PW-15 is demonstrated by
the following calculations:
Required minimum strength to be provided by the
welds (see PG-37 and PW-15)
The combined strength of the welds equals
115,313 lb ≥ W as required for compliance with PG-37
and PW-15.
Verification of the minimum weld sizing as required by
PW-16.1 and Figure PW-16.1, illustration (t) is demonstrated by the following:
Strength of the welds (see PG-37 and PW-15)
Required per Figure PW-16.1, illustration (t)
External fillet weld
throat ≥ 1/2t m i n
Internal fillet weld
throat ≥ 0.7t m i n
235
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Total area of reinforcement available
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Actual per Figure A-67
External fillet weld throat
13,700 psi for the boiler shell material. The maximum allowable working pressure of the boiler is 250 psig. See
Figure A-68 for pipe and shell dimensions.
Check to determine if the welded attachment qualifies
for the exception provided in PG-32.
Internal fillet weld throat
From PG-32.1.2 and PG-32.1.4, determine the maximum size of opening with inherent compensation.
Verification
(External fillet weld throat = 0.376)
Nominal I.D. of NPS 4 extra strong pipe is
(Internal fillet weld throat = 0.530)
Since I.D. is less than 4.35 in., no calculation need be
made to demonstrate compliance with the compensation
requirements of PG-33.
A-68
A-69
A boiler has an NPS 4 extra‐strong pipe connection
mounted as shown in Figure A-68. The maximum allowable stress is 12,000 psi for the pipe material and
A vessel has a series of welded connections in a definite
pattern as shown in Figure A-69. The maximum allowable
stress of all nozzle and vessel material is 17,500 psi. The
Figure A-68
Example for Typical Nozzle Computations
0.29487 in. min.
(See PG-27.3 and
PG-27.4.7)
4.5 in.
3.826 in.
Limit of reinforcement
0.73717 in.
45 deg
7.652 in. limit of
reinforcement
236
vessel
7/ in.
16
30 in.
inside diameter
4 in. extra
strong pipe
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
As verified by the above demonstrations, the design is
proved to be in compliance with the requirements of Section I.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Figure A-69
Example for Typical Nozzle Computations
d1
+ tn1 + t = 5.5 in.
2
d2
+ tn 2 + t = 5.75 in.
2
D1 = 9 in.
dl1 = 41/2 in.
dl2 = 5 in.
tn1 = 7/8 in.
tn2 = 1 in.
d1
d2
D1 x
= 4.304 in. D1 x
= 4.695 in.
d1 + d2
d1 + d2
Limit of
reinforcement
21/2 in. (2.5 tn2)
WL1 = 11/8 in.
Wd1 = 1 in.
3/ in.
4
vessel
60 in.
inside diameter
Wd3 = 11/4 in.
Wd4 = 11/4 in.
CL
Wd2 = 1 in.
CL
t = 31/4 in.
WL3 = 11/4 in.
Nozzle No. 2
Nozzle No. 1
23/16 in. (2.5 tn1)
3/
4 in.
d1 = 2.75 in.
d2 = 3.0 in.
WL2 = 1/2 in.
D1 = 9 in.
dl1 = 41/2 in.
No. 1
dl1 = 41/2 in.
dl2 = 5 in.
No. 2
No. 1
Longitudinal
line
D3
D2 = 61/2 in.
i n.
1/4
8
=
No. 3
dl3 = 5 in.
30 deg
30 deg
No. 4
dl4 = 41/2 in.
No. 4
dl4 = 41/2 in.
GENERAL NOTES:
(a) Nozzles 1 and 4 are identical dimensionally and nozzles 2 and 3 are identical dimensionally.
(b) This example was performed using computer software. The example was generated by performing the entire calculation without rounding off during each step. Accuracy of the final results beyond three significant figures is not intended or required.
237
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
D1 = 9 in.
WL4 = 1/2 in.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
maximum allowable working pressure of the design is
1,500 psig. See Figure A-69 for all nozzle and vessel
dimensions.
The welded attachments do not qualify for the exception provided in PG-32 and must therefore comply with
PG-33 as follows:
Minimum required thickness for reinforcement
consideration
The sum of the limits of reinforcement on the diagonal
between nozzles 3 and 4 is
Each of the above conditions is greater than the center‐
to‐center distance, for the condition considered, between
the openings; therefore, the limits of reinforcement overlap and the rule of PG-38.1 shall apply.
Nozzles 1 and 4 — area of reinforcement required in
the longitudinal plane
Nozzles 2 and 3 — area of reinforcement required in
the longitudinal plane
Nozzles 2 and 3 — area of reinforcement required in
the circumferential plane
Nozzle 3 — area of reinforcement required in the diagonal plane
The sum of the limits of reinforcement on the circumferential axis between nozzles 2 and 3 is
Nozzle 4 — area of reinforcement required in the diagonal plane
Area of reinforcement provided in nozzle 1 in the longitudinal plane
238
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Check for overlapping limits
The sum of the limits of reinforcement on the longitudinal axis between nozzles 1 and 2, as permitted under
PG-36.2.2, is
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Since wd = 0 and due to the overlapping limits of reinforcement, the equation for A 1 (given in Figure PG-33.1)
will require modification. To prevent any reinforcement
available between the nozzles from being counted more
than once, the reinforcement limit is reduced such that
the available reinforcement in the shell is divided and attributed to either nozzle’s compensation in proportion to
its relative size. For nozzle 1, this limit is D 1 [d 1 /
(d 1 + d 2 )]. The limit on the other side remains unchanged
as d 1 /2 + t n 1 + t.
Since nozzle 2 has its limits of reinforcement restricted
on both sides by nozzle 1, the reduced limit of D 1 [d 2 /
(d 1 + d 2 )] is applicable to both sides.
Total area of available reinforcement provided by nozzle 2 in the longitudinal plane
Area of reinforcement provided in nozzle 2 or 3 in the
circumferential plane
Total area of available reinforcement provided by nozzle 1 in the longitudinal plane
as required for demonstration of compliance with PG-33.
Area of reinforcement provided in nozzle 2 in the longitudinal plane
239
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
as required for demonstration of compliance with PG-33.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Total area of available reinforcement provided by nozzle 2 or 3 in the circumferential plane
Area of reinforcement provided in nozzle 4 in the diagonal plane
as required for demonstration of compliance with PG-33.
Area of reinforcement provided by nozzle 3 in the diagonal plane
Although nozzle 1 does not lie exactly in the same plane
as nozzles 3 and 4 and is slightly farther away, for simplicity the limit on both sides of nozzle 3 are restricted to the
reduced limit between nozzles 3 and 4.
Total area of available reinforcement provided by nozzle 4 in the diagonal plane
Total area of available reinforcement provided by nozzle 3 in the diagonal plane
as required for demonstration of compliance with PG-33.
Net area provided in vessel wall
240
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
as required for demonstration of compliance with PG-33.
The rule of PG-38.4 for the minimum required net
cross‐sectional area between any two finished openings
shall apply as follows:
Net area required in longitudinal plane between nozzles 1 and 2
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Net area provided in nozzle wall fused to vessel wall
Net area provided in vessel wall
Net area provided in the nozzle wall fused to the vessel
wall
Total net area provided in the longitudinal plane between nozzles 1 and 2
as required for demonstration of compliance with
PG-38.4.
Net area required in the circumferential plane between
nozzles 2 and 3
Total net area provided in the diagonal plane between
nozzles 3 and 4
as required for demonstration of compliance with
PG-38.4.
Net area provided in vessel wall
Nozzles 1 and 4 — The required minimum strength to
be provided by the combined load‐carrying elements
through each load‐carrying path (see PG-37 and PW-15)
Strength of the welds
Fillet welds in shear
Total net area provided in the circumferential plane between nozzles 2 and 3
Groove welds in tension
as required for demonstration of compliance with
PG-38.4.
Net area required in the diagonal plane between nozzles 3 and 4
The combined strength equals 281,571 lb ≥ W as required for demonstration of compliance with PG-37 and
PW-15.
241
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Net area provided in the nozzle wall fused to the vessel
wall
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
Nozzles 2 and 3 — The required minimum strength of
the welds (see PG-37 and PW-15)
Verification
Strength of the welds
Nozzles 2 and 3 — Verification of minimum weld sizing
as required by PW-16.1 and Figure PW-16.1, illustration
(f)
Required per Figure PW-16.1, illustration (f)
Fillet welds in shear
Groove welds in tension
Actual per Figure A-69
The combined strength of path number 3 equals
372,132 lb ≥ W as required for demonstration of compliance with PG-37 and PW-15.
Required per Figure PW-16.1, illustration (f)
Verification
Actual per Figure A-69
As verified by the above demonstrations, the design is
proved to be in compliance with the requirements of Section I.
A-70
A-70.1 A vessel constructed of SA-387 Grade 91 Class
2 plate with a longitudinal weld seam has an SA-335 P91
NPS 4 XXS pipe nozzle attached as shown in Figure
A-70.1. The maximum allowable working pressure is
1,900 psig at 1,000°F. The maximum allowable stress is
16,300 psi for both the vessel and the pipe connection.
The vessel has received subcritical PWHT in accordance
with PW-39 after welding.
242
ð15Þ
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Nozzles 1 and 4 — Verification of minimum weld sizing
as required by PW-16.1 and Figure PW-16.1, illustration
(f)
No fu
ð15Þ
Figure A-70.1
Example for Typical Nozzle Computations
4.5 in.
3.152 in.
18-in. outside diameter
2 in.
From PG-27.4.1, E = 1.0 for seamless cylinders without
openings spaced to form ligaments. Inside radius of NPS 4
XXS pipe is (4.5/2) − 0.674 = 1.576 in.
Considering the 12.5% thinning allowance of pipe in
ASME B36.10M per PG-27.4.7, the minimum thickness
of the nozzle neck is 0.875 × 0.674 = 0.59 in., and this
thickness is greater than 0.190 in. and therefore satisfies
the requirements of PG-27.
The thickness of the vessel is greater than 1.804 in. and
therefore satisfies the requirements of PG-26 and PG-27.
243
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
From Table PG-26, the weld strength reduction factor
for CSEF (subcrit.) at 1,000°F is w = 0.5. As indicated in
PG-27.4.1, E = w . From PG-27.4.6, y = 0.7. From
PG-27.4.3, C = 0.
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
A-70.1.1 Check to determine if the nozzle opening
qualifies for the exception provided in PG-32.1.4.
A-70.2 The vessel is the same as provided in A-70.1,
except for the following four changes (see Figure A-70.2):
(a) wall thickness of the vessel = 1.25 in.
(b) wall thickness of the nozzle = 0.531 in. (NPS 4 Sch.
160 pipe )
(c) nozzle attachment per Figure PW-16.1, illustration
(d), using equal fillet welds with leg sizes 1/2 in. on inside
and outside; nozzle internal projection from the bottom
surface of the vessel wall = 1.3275 in.
Opening size limit established by PG-32.1.4(a)
(d) normalizing + tempering (N + T) PWHT per Table
PG-26, Note (10)
A-70.2.1 Check to determine if the welded attachment qualifies for the exception provided in PG-32.
Nominal I.D. of NPS 4 XXS pipe is 4.5 − 2(0.674) = 3.152
in.
Opening size limit established by PG-32.1.4(b) = MIN
(2.375, {[18 − (2 × 2)]/4}) = 2.375 in.
From PG-32.1.4, the maximum size of opening with inherent compensation = MAX [opening size limit established by PG-32.1.4(a), opening size limit established by
PG-32.1.4(b)] = 6.82 in.
Opening size limit established by PG-32.1.4(a)
Since the finished opening size, 3.152 in., is less than
6.82 in., no calculation need be made to demonstrate compliance with the compensation requirements of PG-33.
Nominal I.D. of NPS 4 pipe with wall thickness 0.531 in.
is 4.5 − 2(0.531) = 3.438 in.
Based on PW-15.1.6, the use of Figure PW-16.1, illustration (a) does not require strength calculations for the nozzle attachment weld.
Opening size limit established by PG-32.1.4(b) = MIN
(2.375, {[18 − (2 × 1.25)]/4}) = 2.375 in.
From PG-32.1.4, the maximum size of opening with inherent compensation = MAX [opening size limit established by PG-32.1.4(a), opening size limit established by
PG-32.1.4(b)] = 3.317 in.
A-70.1.3 Verification of minimum weld size as required by PW-16.1 and Figure PW-16.1, illustration (a)
Required per Figure PW-16.1, illustration (a), t c must
be greater than the smaller of 1/4 in. or 0.7t m i n .
Since the finished opening size, 3.438 in., is greater than
3.317 in., the vessel does not qualify for the exception in
PG-32.1.4 and therefore must comply with PG-26, PG-27,
and PG-33.
A-70.2.2 From Table PG-26, the weld strength reduction factor for CSEF (N + T) at 1,000°F is w = 0.95.
As indicated in PG-27.4.1, E = w . From PG-27.4.6, y =
0.7. From PG-27.4.3, C = 0.
Actual per Figure A-70.1
The thickness of the vessel is greater than 1.017 in. and
therefore satisfies the requirements of PG-26 and PG-27.
therefore the weld size is adequate.
244
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
A-70.1.2 Verification of welded connection
strength as required by PW-15
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
ð15Þ
Figure A-70.2
Example for Typical Nozzle Computations
4.5 in.
3.438 in.
Limit of reinforcement
1.3275 in.
1.3275 in.
7.0 in.
18-in. outside diameter
1.25 in.
Limit of reinforcement parallel to the vessel wall is the
greater of
Considering the 12.5% thinning allowance of pipe in
ASME B36.10M per PG-27.4.7, the minimum thickness
of the nozzle neck is 0.875 × 0.531 = 0.465 in.; this thickness is greater than 0.208 in. and therefore satisfies the
requirements of PG-27.
Limit of reinforcement normal to the vessel wall is the
smaller of
245
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
Area of reinforcement required in the longitudinal
plane
Minimum required thickness for reinforcement
consideration
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
Area of reinforcement available ( f r 1 = 1)
Actual weld sizes per Figure A-70.2
therefore the weld sizes are adequate.
A-70.2.4 Compliance with PG-37 and PW-15 is demonstrated by the following calculations:
Required minimum strength to be provided by the
welds (see PG-37 and PW-15)
Inside and outside fillet welds in shear
therefore the opening is adequately reinforced.
EXAMPLES OF COMPUTATION OF
ALLOWABLE LOADING ON STRUCTURAL
ATTACHMENTS TO TUBES
A-70.2.3 Verification of minimum weld size as required by PW-16.1 and Figure PW-16.1, illustration (d)
A-71
A tube is suspended by a welded attachment with the
loads and dimensions as shown in Figure A-71. This is a
condition of direct radial loading on the tube.
The allowable lug loading is calculated for the following
conditions:
Required per Figure PW-16.1, illustration (d), t c must
be greater than the smaller of 1/4 in. or 0.7t m i n .
1
/4 in. thick lug
7 deg attachment angle
246
ð15Þ
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
The combined strength of the welds equals 62,730 lb ≥ W ,
as required for compliance with PG-37 and PW-15.
Total area available for reinforcement
No fu
Figure A-72
Structural Attachment With Eccentric Load
7/
8
in.
860 lb
2 in.
11/8 in.
From Table PG-56.2, K = 1.07
From Figure PG-56.2, or from PG-56.2, Step 2(a) or
PG-56.2, Step 2(b)
4 in.
4 in. O.D.
× 0.300 in.
Compression L f = 0.0326
Tension L f = 0.0405
Compression L a = (1.07)(0.0326)(15,000)
= 523 lb/in.
Tension L a = (1.07)(1.0)(0.0405)(15,000)
= 650 lb/in.
Actual load
The actual loading does not exceed values of allowable
loading.
A-73
A-73.1 A load is supported from a vertical tube with a ð15Þ
welded bracket attachment as shown in Figure A-73. This
example illustrates a condition of eccentric loading where
the direct loading is not additive.
The allowable lug loading is calculated for the following
conditions:
The loading indicated is therefore within the values allowed by the chart in Figure PG-56.2.
A load is supported on a rubbing strip welded to a tube,
as shown in Figure A-72. This problem illustrates a condition where the load is not applied on the center of welded
attachment.
The allowable lug loading is calculated for the same
conditions given in example A-71
Compression L a = (1.07)(1.0)(0.0326)(15,000)
= 523 lb/in.
Tension L a = (1.07)(1.0)(0.0405)(15,000)
= 650 lb/in.
Actual unit load
1
/4 in. thick lug
10 deg attachment angle
Figure A-73
Structural Attachment With Moment Load
Figure A-71
Structural Attachment With Radial Load
11/2 in.
440 lb
1,500 lb
11/2 in.
2 in.
31/4 in. O.D.
× 0.375 in.
3 in.
4 in. O.D.
× 0.300 in.
247
This copy downloaded on 2015-07-31 23:27:17 -0500 by authorized user logan ahlstrom.
A-72
Copyrighted material licensed to University of Toronto by Thomson Scientific, Inc. (www.techstreet.com).
ASME BPVC.I-2015
No fu
A-73.2.2 The test is conducted in accordance with
the requirements of A-22 with the exception that the hydrostatic pressure shall be held at expected design pressure, and the loading on the support shall be increased
until permanent set occurs.
Figure A-74
Structural Attachment on Tube Bend
3 in. R
A-73.2.3 The maximum load P, allowed on the attachment at or below the pressure corresponding to the
hydrostatic pressure, is given by the following equation:
21/2 in.
11/4
2 in. O.D.
× 0.300 in.
3/
in.
4
in.
1,200 lb
750 lb
where
E = average proportional limit of the tube material, psi
H = test load at the proportional limit of the structure,
lb
P = maximum allowable load on attachment, lb
S = working stress permitted in Section II, Part D, Subpart 1, Table 1A, for the tube material at the design
temperature that in no case shall be taken at less
than 700°F, psi
From Table PG-56.2, K = 1.108
From Figure PG-56.2, or from PG-56.2, Step 2(a) or
PG-56.2, Step 2(b)
A-74
A superheater section is supported by welded attachment to the short‐radius return bend section as shown
in Figure A-74. This example illustrates a condition where
a direct and eccentric load is applied to a bent tube
section.
The allowable lug loading is calculated for the following
conditions:
Compression L f = 0.0637
Tension L f = 0.090
1
/4 in. thick lug
15 deg attachment angle
The actual loading does not exceed values of allowable
loading.
A-73.2 To determine the maximum allowable loading
on structural attachments to tubes, a test may be conducted on a full‐size section of tube with a
Download