EQUIPMENT STARTUP/SHUTDOWN CHECKLIST
Date:
Equipement Name:
Shift:
Start up must follow the
order below
Machine startup
Housekeeping/5S
Power on machine at the wall
YES/NO:
Open the compressed air valve at
the wall
YES/NO:
Power on the machine at the side
panel
YES/NO:
Wait for the computer monitor to
boot up.
Saw dust and offcuts Bins have been
emptied
YES/NO:
Tools are in the designated areas
YES/NO:
The floor is well swepted and cleaned.
YES/NO:
Safety
The machine is well guaurded.
YES/NO:
There are no loose wiring on or around
the machine
YES/NO:
There are no unusual sounds as you
power up the machine.
YES/NO:
YES/NO:
Machine Operator Name & Sign
Production floor officer name & Sign
EQUIPMENT STARTUP/SHUTDOWN CHECKLIST
Date:
Equipement Name:
Shift:
Shut down must follow the
order below
Machine shutdown
Log out of the program and shut
down the computer moniter.
Clear the cache
YES/NO:
Power off the machine at the side
panel
YES/NO:
Power off the machine at the wall
YES/NO:
Close the compressed air valve.
Housekeeping/5S
Saw dust and offcuts Bins have been
emptied
YES/NO:
Tools are in the designated areas
YES/NO:
The floor is well swepted and cleaned.
YES/NO:
YES/NO:
Machine Operator Name & Sign
Production floor officer name & Sign
Safety
The machine is well guaurded.
YES/NO:
There are no loose wiring on or around
the machine
YES/NO:
There are no unusual sounds as you
power up the machine.
YES/NO: