Proposal for Running VPU rake Dimension of VPU Length Width Height Payload Volume Rake Size 22.290m 3.245m 3.105m 23-24MT 224.588 Cum 20 Important Points: 1. Reserve price for round trip/Rail Freight: For all origin-destinations-1.25 times of single journey freight at Scale–P (Freight Table included) Illustration: Origin-KOKG (Chennai) Destination: BVH (Ballabgarh) Rail Distance: 2146.87 Round Trip Freight: 503.51 (Base Freight for 100Kg)x10(For MT)x20 (VPUs)x24 (CC of VPU and 4 MT SLR i.e total CC 483 MT)x1.25=3039941.625/Freight to be paid at origin Round Trip Freight/2=1519970 Development Surcharge: 2% GST: 5% 2. Duration of contract: 6 Years 3. Budgetary increase in freight: No for 3 years then 10% from 4th year 4. Route: As per convenience 5. Frequency of Service: Minimum 2 per Month 6. Nominated day’s service: The service may be on nominated days as per round trip turn round giving proper spacing to service. 7. Rescheduling of train: When loading is not possible on scheduled day, CCM(FM) can reschedule the train for any other day with mutual consent of the lease operator. 8. Punctuality of train: The Parcel Express train will run on fixed path with scheduled time table as far as possible. 9. Free time for stacking and removal of parcels:- One day advance stacking and one day removal time will be given at both ends 10. Failure to operate contract: The successful bidder shall start service within 30 days from the date of receipt of the acceptance letter. If the successful bidder fails to start loading within the stipulated period due to any reason, the “Earnest Money” of such bidder may be forfeited. If the lease operator fails to operate the contract during the contractual period due to any reason without giving prior notice, the “Security/Performance Guarantee” may be forfeited. If it is not feasible to continue the contract due to any reason, either the lease operator or Railway administration can terminate the contract by giving two months’ notice. In such cases, ‘Security deposit/Performance guarantee’ will not be forfeited. 11. Frequency Increase: The service will be provided with minimum frequency of at least two trips per month. The frequency can be increased in view of demand, availability of stock and operational feasibility with mutual consent at the same rates without increase in performance guarantee. 12. Stop (Enroute loading /unloading): 5 for more than 2000Kms 13. Operations Time: Origin and Destination: 7 Hrs. Enroute Loading and Unloading Operations: 2 Hrs at Railways Goods Shed and 15 Minutes at stations 14. Wharfage/Demurrage charges: - Normal rules for detention of rolling stock and delay in removal of parcels shall be applicable. 15. Free space to leaseholder: - Free space of 15’ x 15’ may be provided, till the period of operation of contract, at suitable location (wherever feasible) for development of office at originating and destination parcel terminals. 16. Free escort with Parcel Express train:- One representative of the leaseholder shall be allowed to travel free from train’s originating to terminating station by the same train for security purposes and handling of parcels at intermediate stations 17. Eligibility criterion: 10Cr turn over 18. Tender Document value: 10000/19. Earnest money:-10L 20. Security/Performance Guarantee:-5% of annual tender Value Illustration: For S.No 1 route KOKG to BVH: VPU and 4 MT SLR i.e total CC 483 MT)x1.25=3039941.625/Minimum trip=2 Monthly Value=3039941.625/-x2=6079883.25 Yearly Value=6079883,25x12=72958599/Security/Performance Guarantee:-5% of annual tender Value i.e 72958599x5%=3647929.95/No extra Performance Guarantee for increased frequency 21. Proposed Route: Korukkupet Goods (Chennai)- Elavur (Sri City)- Krishna Canal Jn(Vijaywada)- Ajni(Nagpur)- Mandi Dip(Bhopal)- Ballabgarh(Faridabad) As movement is under time table so marketing of rake is easier than any other goods train. We could advertise in newspaper for carrying parcel apart from Industrial Goods. A focused approach is only needed.