SYSTES AND COMPONENTS FOR BUILDING DESIGN – LECTURE 3 PERSPECTIVE The art of drawing solid objects on a two-dimensional surface so as to give the right impression of their height, width, depth, and position in relation to each other when viewed from a particular point. *A soil type is a taxonomic unit in soil science. All soils that share a certain set of well-defined properties form a distinctive soil type. Soil type is a technical term of soil classification, the science that deals with the systematic categorization of soils. Every soil of the world belongs to a certain soil type COMMUNITY INFRASTRUCTURE ACCESSIBILITY Here we should consider the distance or accessibility of location e.g. From market, hospital, church and most especially the school. IDENTIFYING THE LOCATION CLIMATE CONDITION This is to know whether the site is a typhoon area, flooded area or near at sea. Once these area are determined, we can establish what is the design fitted for this location. Knowing the location, the design professionals can suggest what type of design will fit, but as the owner, you are the one to decide what you want to build. *Climatic conditions are unusual weather conditions etc., storms, floods, droughts, tidal waves, fires, hurricanes, earthquakes, landslides, or other catastrophes. GROUND STABILITY This is to know the type of soils whether it is sandy, adobe or fill. This is important to determine what type of foundation to be used. *Natural ground stability refers to the upward, lateral or downward movement of the ground that can be caused by a range of natural geological hazards, such movements are typically in the order of centimetres, but exceptional circumstances can be larger. *Community infrastructure is the framework of physical facilities needed to support and sustain a community of people to live and work. *Examples of fundable infrastructure include the following: public spaces and buildings that accommodate a range of services and facilities, such as educational, indoor recreational, cultural and health-related services, to support people in meeting their social needs and enhance their well-being and quality of life. The next step is to know the location if there is a lot title. *A property's title is a bundle of rights related to the ownership of said property. Each title carries its own set of regulations that you must abide Make sure that you perform a survey to know the boundary lines indicated on the lot to prevent overlapping adjacent lot. PLANNING DESIGN PROCESS Under planning, we have design Process. It is important to have house plans or sketches as guide. *The Design Process is an approach for breaking down a large project into manageable chunks. Architects, engineers, scientists, and other thinkers use the design process to solve a variety of problems. A design process generates a conceptual solution for a problem stated in the form of requirements. If you are encountering problems on interpreting house plans, it’s better to ask professionals like Engineers or Architects who are experts with regards to designing the house. A design process generates a conceptual solution for a problem stated in the form of requirements. *Concept design is followed by 'detailed design' or 'developed design' during which all the main components of the building and how they fit together are described The schematic design stage is the very first portion of the design process. The overall goal of the design process, as a whole, is to produce a complete design for the project. This includes all engineering considerations, as well as the specific materials, equipment, systems, and spaces included in the project. ESTIMATE FLOOR AREA = 8 * 10 = 80 sq.m. TOTAL COST = 80sq.m. * ? = ? The role of Architect is to create an schematic design and design solutions, but the owner is the one to decide if he wants a two-bedroom with common CR etc., After choosing and owner’s approval of the design, the next step is the rough estimate, It can be Lump Sum or per square meter for the owner to have an idea of the target budget. *A Rough Cost Estimate is an initial estimate that uses prior experience and other non-project data to estimate the cost of a project. After the Owner’s approval of the design, blue print of the final plans will follow. *Blueprint is a reproduction of a technical drawing or engineering drawing using a contact print process on light-sensitive sheets. the process allowed rapid and accurate production of an unlimited number of copies. Schematic design is a rough construction drawing that offers a general overview of a project's basic features and construction cost estimates, allowing you to determine if your concept fits within the project budget. BILL OF MATERIALS (BOM)/BILL OF QUANTITIES (BOQ) Once blue prints are produced, then we can proceed in making Bill of Materials. *A bill of materials is the list of all the raw materials, resources, components, assemblies and parts - and the quantities of each of them . Here we can find labor and material cost *A bill of materials (BOM) is a structured list identifying all materials and components required to construct a product, as well as the instructions for procuring and using the materials. An architect is a person who plans, designs and oversees the construction of buildings. A civil engineer is a person who practices civil engineering – the application of planning, designing, constructing, maintaining, and operating CONSULT TO THE RIGHT CONSTRUCTION PROFESSIONALS After the house process, we should know the budget. It is important to have enough budget to know what part of the house to be constructed first or to know the priority. Determine first if the budget is already enough to occupy the house for security and comfort and think of aesthetic aspect of the house as additional budget comes later. BUDGET A master plumber is a person who has earned the highest professional level of plumbing. To become a master plumber, you must complete an apprenticeship, become a licensed journeyman and earn a license to be a master plumber. Master plumbers can choose to specialize in one area of plumbing. Considering the above factors, you can now live in a secured house where there is an ample supply of water and electricity. Sanitary engineers design and direct the construction and operation of hygienic projects such as waterworks, sewage, garbage, and trash disposal plants. TIME MANAGEMENT Structural Engineering is a specialty within Civil Engineering. Structural Engineers create drawings and specifications, perform calculations, review the work . Time management helps you prioritize your tasks so that you ensure you have enough time available to complete every project. The quality of your work increases when you're not rushing to complete it ahead of a fast approaching deadline. Structural Engineer makes sure the house will prevent collapse or construction failures. Construction failures are structural failures occurring during the course of construction. These include not only partial or total collapse of a structure but also excessive deformations, cracks and misalignments. In terms of the safety of workers, it is partial or total collapse that causes most deaths and injuries. Design Professionals means, collectively, the architects, engineers, consultants and professionals that perform services related to the design of any Work at the Project or portions thereof, or otherwise involved on the Project to review and test performance of various Project elements or confirm compliance thereof. For building permit issuance, you should provide the Building Official the above building plans duly signed by designated professionals. MANPOWER -arawan -pakyawan BUILDING PERMIT -contractor Usually, a building official or a municipality requires approved permits before constructing a house. Particularly if the construction is through PAG - IBIG FUND that requires approved building permit. It is very important to know where to construct with less expenses and check if the workmanship is of good quality in constructing a house. A Building Permit is a document issued by the Building Official to an owner/applicant to proceed with the construction, installation, addition, alteration, renovation, conversion, repair, demolition or other work activity of a specific project/building/structure after the accompanying principal plans and specifications . ARAWAN: It is the daily salary or it can be in a weekly basis. Applying this, you must have enough time to do supervisory work or you can hire a Civil Engineer or Architect to do the same You can hire them anytime you want Excavation for foundations PAKYAWAN: allows you to hire labor for a specific sum, depending on the work done over a specified period of time. Formworks and rebars - Formwork is the term used for the process of creating a temporary mould into which concrete is poured and formed. Traditional formwork is fabricated using timber, but it can also be constructed from steel, glass fibre reinforced plastics and other materials Masonry Works - Masonry is the building of structures from individual units, which are often laid in and bound together by mortar; the term masonry can also refer to the units themselves. TILE Works - The tiled surfaces of something, or the arrangement of tiles on a surface. Decorative tilework typically takes the form of mosaic upon the walls, floor, or ceiling of a building. Plumbing Works - Plumbing, system of pipes and fixtures installed in a building for the distribution and use of potable (drinkable) water and the removal of waterborne wastes. It is usually distinguished from water and sewage systems that serve a group of buildings or a city. Ceiling Works - A ceiling can be defined as an overhead interior surface that covers the upper limits of a room. Ceilings are not structural elements, but rather the finished surfaces below a roof or concrete slab CONTRACTOR If you have the budget and has the capability of getting a Contractor, why not, but who will be the Contractor? They are the one who will construct the building with a complete team, the Design Professionals down to the helpers. *The Contractor is a person or company that undertakes a contract to provide materials or labor to perform a service or do a job The Contractor or the Design Professionals will be of great help for you not worrying about the (1)permits, (2)supervision and (3)getting the manpower If you hire a Contractor, what you need is the money or your budget and also your 100% supervision. In construction contracts, overheads are often priced proportionately against a project and are the calculated costs of running the company contracted to carry out a project. Often these costs are described as head office administrative costs (in some cases there may also be factory or manufacturing overheads) Supplies, Materials, and Equipment are examples.