FEASIBILITY STUDY FOR THE Urban Amusement and Recreation Park Name of Owner Address: Cell Phone: Submitted to: Feneta Muhamed Motta city Administration +251 9 77 37 78 52 Hulet Eju Enessie Woreda Land Office June 2022 Motta Table of Contents PROJECT INFORMATION ................................................ Ошибка! Закладка не определена. Executive Summary ............................................................. Ошибка! Закладка не определена. 1. Introduction ................................................................................................................................. 6 1.1. General Background ............................................................................................................. 6 1.2. Project Rationale .................................................................................................................. 8 1.3. Objective of the project ...................................................................................................... 10 2.4. The significance of the project .................................. Ошибка! Закладка не определена. 2.5. Background of the Project Location .......................... Ошибка! Закладка не определена. 2.6. Proposed Project Location.................................................................................................. 16 2. Service Description and Application ......................................................................................... 16 3. Market Study and Service Capacity .......................................................................................... 17 3.1. Market Study ...................................................................................................................... 17 3.1.1. Past Supply and Present Demand ............................................................................... 17 3.1.2. Projected Demand .............................................. Ошибка! Закладка не определена. 3.1.3. Pricing................................................................ Ошибка! Закладка не определена. 3.1.4. Marketing promotion and strategy ..................... Ошибка! Закладка не определена. 3.1.5. Marketing and Sales Strategy ............................ Ошибка! Закладка не определена. 3.2. Plant capacity ..................................................................................................................... 21 3.3. Service delivery program ................................................................................................... 21 4. Materials and Consumables and Inputs ............................ Ошибка! Закладка не определена. 4.1. Materials and Consumables....................................... Ошибка! Закладка не определена. 5. Technology and Engineering ..................................................................................................... 22 5.1. Technology ......................................................................................................................... 22 5.2 Civil Engineering Cost ........................................................................................................ 23 5.2.1. Locations and Site ...................................................................................................... 24 5.2.2. Project implementation ............................................................................................... 24 6. Manpower and Training Requirement ....................................................................................... 25 6.1. Manpower Requirement ..................................................................................................... 25 6.2. Training Requirement ........................................................................................................ 27 7. Financial Analysis ..................................................................................................................... 27 7.1. Underlying Assumption ..................................................................................................... 27 7.2. Total Initial Investment Cost .............................................................................................. 28 7.3. Operation Cost ................................................................................................................... 29 7.4. Financial Evaluation ........................................................................................................... 30 PROJECT INFORMATION Proposed Project: Establishment of new recreation center Project Location: East Gojam Amhara Regional State, Motta town Hulet Eju Enessie Woreda Ayen Berhan Keble Near to zendo weha River. Project Type: Service Industry Requested Area: The site is 5,000 karemeter square in area, located at Motta town Ayen Berhan Keble. Total investment cost: 15 Million Our value:• Loyalty and Reliability • Customer focus • Innovative culture • Cost effectiveness • Social responsibility • Care for the environment • Compliance with code of conduct Facilities will be provided: Recreational centers are places where people get entertainment and enjoyment. The facilities provided include various indoor and outdoor games, swimming pools, cinema halls and facilities to stage theaters and music shows. Job opportunity: The project will create employment opportunities for 67 persons Need and Desirability: The envisaged project deemed to add to the economic development of the nation in general and zone and town in specific with following ways: A. Source of Revenue B. Employment opportunity C. Sources of social service D. Income E. Source of Fund F. Hospitality–focus on the customers, promoting an exceptional guest experience. G. Efficiency – offer a good service with the adequate resources. H. Superior Customer Service Source Of Fund: 40 % equity & 60% loan Implementation Period: two year Social and Economic Benefit: Provide better Building service, employment opportunities, generation of income and benefits for the local people. Objective: • To construct and provide excellent child play care in a kid-friendly atmosphere while ensuring our customers, both parent and child, receive excellent service in a playful, • Establish recreation facilities and services to meet the needs of the Community. • create both short and long term job opportunity for the local community and develop the local skills base. Executive Summary This profile envisages the establishment of recreational center in Motta town Amhara Regional State. Demand projection divulges that there is high Demand for recreational centers in the region. Accordingly, the planned plant is set to provide recreational services in zonal capitals. The proposed Recreation Centre will meet the current and long-term needs of the community of Motta. The total investment cost of the project including working capital is estimated at Birr 15 million and creates 67 job opportunity .The proposed infrastructure will support the Government’s objective to provide conditions and services. The proposed recreation facility will enhance the tourism experience in many ways and create opportunities for residents and businesses in Motta town. The financial result indicates that the project will generate profit beginning from the first year of operation. Moreover, the project will break even at 29.6% of capacity utilization and it wills payback fully the initial investment less working capital in 3 years. The result further show that the calculated IRR of the project is 25.7% and NPV discounted at 18% of Birr 351,871.79 .In addition to this, the Proposed project possesses wide range of economic and social benefits such as increasing the level of investment, tax revenue and employment creation. Generally’ the project is technically feasible, financially and commercially viable as well as socially and economically acceptable. Hence the project is worth implementing. To this effect, the promoter the owner of the envisaged project, planned to establishment of recreational center in Motta town and undertaken this project study to check the market, technical and financial feasibility of this project. The promoter is very ambitious and committed to realize the project. Hence, they expects to get the necessary support from Motta investment and city administration to make the project to be operational. 1. Introduction 1.1. General Background Ethiopia is now well-known as among the five1/ fastest growing economies of the world. According to IMF, the average growth of the economy is about 10.7% for the last 11 consecutive years, up to 2013/14. The development is broad-based and in paradigm transformation. It is apparent that the development policy and strategy of the Government created an enabling environment for the participation of all citizens, who reside both in and outside of the country, and contributed for the achievement of the stated fruits of development. At this juncture all the development actors in general and the government in particular is determined to sustain the pace of on-going growth and transformation of the economy and it is explicitly indicated in the Second Five Year (2015/16-2019/20) of Growth and Transformation Plan. The stated economic growth of the country brought a wide range of positive social and economic outcomes, which includes, among others, the expansion of all rounded business and investments. The project has multifaceted contributions for the socio-economic development of a nation. In addition to the inclusive provision of best goods and quality services, it is also beneficial in terms of job creation, revenue generation for the government, an induced role in business and investment expansion and facilitation, tourist attraction, etc. It is in this view that the promoter of establishment of recreational center in Motta town has to first implement a plan to bridge the demand gap of the country in general and to the city of Motta in particular. The current fast and dynamic economic growth of Ethiopia especially in urban area necessitates equivalent growth of building and construction sector. The sector should expand rapidly to support the overall economic development sustainable. Service delivery is the provision of comprehensive and coordinated services to people in need. Human service delivery is complex in contemporary Eastern societies, with high community expectations, competing demands and often delivered under fiscal constraints. Specializations can mean that individual service providers or agencies develop the expertise to deliver a very specific service, yet individuals, families and communities often experience multiple needs and interrelated problems The Government of the Federal Democratic Republic of Ethiopia, after closely examining youth issues, gave attention to youth problems and established the Ministry of Youth, Sports and Culture in October 2001. This ministry has the duty and responsibility to follow up, direct and coordinate youth affairs. The Ministry of Youth, Sport and culture formulated a new National Youth Policy in 2004. Following formulation government of the National Youth Policy, the the Ethiopian developed an Urban and Rural Youth Development Package in 2006 and has started partnering with different local governmental organizations, community based organizations and international agencies for program implementation. The Urban Youth Development Package is a comprehensive development package that is designed to solve the socio- economic problems of urban youth. In Ethiopia youth Perception towards youth center service delivery have not as such received significant research attention of concerned bodies. This has resulted in scarce literature, low practice and intervention on the area of youth services delivery. To this effect, the owner of the envisioned establishment of recreational center in Motta town Amhara Regional State who has been living for long time in this town, planned to establishment of recreational center in Motta and undertaken this project study to check the market, technical and financial feasibility of this project. The promoter is very ambitious and committed to realize the project. Hence, expects to get the necessary support from the city administration to make the project to be operational. To this effect, the promoters of establishment of recreational center in Motta committed to developing in south Eest of Gojjam Motta town. Besides, the government policies and incentives for the private sector investment are very promising that initiate the promoter to engage in establishment of recreational center in Motta project. 1.2. Project Rationale Man's struggle for self-realization assumes many forms and has many parts. The road to individual integrity and dignity requires the exercise of our rights and freedoms in responsible and constructive ways. Important among these is the way each person chooses to exercise the right to enjoy in-caressingly longer periods of respite from work and other responsibilities. We are changing from a workcentered society to one in which people have a better opportunity to balance their work with meaningful recreation experiences, these leisure experiences should bring a greater measure of satisfaction and fulfillment into our daily lives. As we balance our individual lives in this manner, we contribute to the proper balance of society. Whether individually or as part of a group such as the family, are find much of the balancing experience through some form of recreation activity. The nature and quality of the experience, which we call recreation, determines in large measure the nature and quality of our lives. The values we experience and demonstrate in our leisure behavior reflect the values we hold as individuals and as a community of human beings. Recreation is first and foremost a personal matter. It is something that a person does voluntarily during his leisure because he believes that it will be satisfying to him. Enjoyment of the activity is basic to the recreation experience, but the values of recreation which give it depth and fullness of meaning include the maintenance and improvement of physical and psychic well-being, the growth and development of personality, and the easing of social adjustments. Recreation is one of the keys to abundant living. Because of its importance in the building of our social fabric, recreation is more than a personal responsibility. As ingenious and resourceful as man may be, his attempts to provide for himself recreationally, meets an impasse unless he pools his resources with those of his fellow man to enable provision of certain kinds of recreation opportunity. The very things that have given us increased freedom and leisure have also worked in many ways to our disadvantage. The rapid increase in population and the new leisure have created vast new economic markets and helped to promote financial affluence. During the past quarter century while we have been depleting our recreation resource potential, the recreation needs and demands of the population have increased many times over. Scientific and technological advances have prolonged life, produced labor-saving devices, increased production per man-hour of work, and reduced the work day and the work week. Longer life combined with compulsory retirement practices has produced a new leisure group of "senior citizens." The increase in leisure provides for small allotments of time on weekdays, larger allotments on weekends and occasional holidays, and substantial blocks of time for vacations. If this time is to be enjoyed and used in a manner that will contribute to the positive growth of our culture, opportunities must be conveniently accessible. suitable recreation 1.3. Objective of the project The major goal of this project is to contribute towards the growth of the trade sector in Motta town. Its specific objectives include the following: To provide excellent child play care in a kid-friendly atmosphere while ensuring our customers, both parent and child, receive excellent service in a playful, educational, and safe environment. Establish recreation facilities to meet the needs of the population; Provide basic recreation services to the Community. The proposed infrastructure upgrade will create both short and long term job opportunity for the local community and develop the local skills base. To create a service-based company this exceeds customers’ expectations. Become an established community destination by end of first year. Educate the community on what the company has to offer. To create employment opportunities for the population in the town and Contribute towards the beautification of the town through the construction of modern building infrastructure and facilities. 2.4. The significance of the project The proposed development will have numerous positive impacts to the area residents and to the general area. Some of the anticipated benefits include:A. Source of Revenue As public policy of any nation, the government collects different forms of taxes from different business organizations and individuals. Among the different forms of taxes, business income taxes, payroll income tax and VAT are collected from undertaking business activities. Therefore, the building will serve as sources of revenue for the town as well as for the region. B. Employment opportunity One of the problems that our country faced is unemployment. Therefore, the current objective of the government is working on tackling the problem of unemployment and fostering the development process either through creating self-employment or employment in other organization. This will be a significant impact since unemployment is currently quite high in this area hence, this project will hire 85 individuals C. Sources of social service In addition to serving as a source of employment and income for the region, the project renders social services for different group of people. Hence, it is also providing the following services; • Serve as a source of mental satisfaction for the different users, • Since, the center encompasses different recreational areas; it will divert the attention of the users from different evil deeds. • It deemed to minimize the demand of services in the area. 2.5. Background of the Project Location As aforementioned on the introductory part the envisioned project is intended to be located in East Gojjam zone Motta town. Mota is a town in North West Ethiopia. Located in the East Gojjam Zone of the Amhara Region, and on the secondary road that links Dejen with Bahir Dar overlooking the Abay River, this town has a latitude and longitude of 11°5′N 37°52′E with an elevation of 2,487 meters above sea level. One local landmark is Sebara Deldiy or 'the Broken Bridge', a stone footbridge built during the reign of Emperor Fasilides. Another landmark is the church of Weyzazirt Kidhane Mihret, which was constructed by Woizero Seble Wengel, the daughter of Emperor Fasilides. She and her husband are buried there. Due to the presence of Sebara Deldey, one of only two bridges across the Abay River until the late 19th century, Mota became a major commercial center, which was described by at least one group of European travellers as 'the most considerable market' in Gojjam; it attracted merchants from as far away as Begemder, Gondar and Tigray. To reinstate the commerce prior to the bridge being broken, Bridges to Prosperity is building a 100-meter suspended pedestrian bridge to provide safe access Those crossing the river are able to obtain cotton cloth, cattle, and horses. Likewise, Mota was the seat of an important royal fiefdom during the Gondarine period, and a notable place for asylum in the early 19th century. The artist Aleqa Elyas Hailu, believed to be Ethiopia's first foreign-trained artist, was born in Mota around 1861. He worked mostly in Shewa where he decorated manuscripts and many churches, although he also decorated one in his native town. His son Aleqa Gebre Ezgziabher Elyas was a man of literature, writing the Royal Chronicle of Lij Iyasu and the Empress Zewditu. During the 1930s, its market day was on Thursday. During the East African Campaign, units of Gideon Force managed to bluff the Italian garrison into surrendering 24 April 1941. After the war, Mota was the administrative center of the Mota awraja or district, which was one of the hotspots of the Gojjam peasant revolt in 1968. The geographical coordinates of the Motta city: latitude: 11.078501, longitude: 37.877756. The geographical coordinates of the Motta city in the Universal Transverse Mercator (UTM) coordinates: X (easting): 377427.010931, Y (northing): 1224890.088364, zone: 37, northern hemisphere. Location Motta town is located in Amhara National Regional State, East Gojam Zone, Motta Town at a distance of 371 km from Addis Ababa and 120 km from Bahir dar, seat of the regional government. Its astronomical location is 11º 04’ East Latitude and 37º 52’ North Longitude. Foundation Motta town was founded in 1754. Population According to the projection of Central Statistical Authority, the population of the town in 2013 was 33,500. Out of this 17060 (51%) were males and 16440 (49%) females. The coverage of basic infrastructure facilities are increasing dramatically in recent years following free market policy of the Federal Democratic Republic of Ethiopia’s (FDRE) in general and Regional Government of Amhara in particular. As has been the case in the past, Government continues its commitment to give an opportunity for its national to invest on various feasible projects, with positive present value when compared to that of without project case. The coverage of basic infrastructure facilities are increasing dramatically in recent years following free market policy of the Federal Democratic Republic of Ethiopia’s (FDRE) in general and Regional Government of Amhara in particular. With this understanding and inspired by current fast development of the city, the applicant has developed strong desire of investing in the town to construct and operates recreation center. Ecologically Motta city lies in wet land Ecosystem .It is bounded by wet evergreen mountain forest land ecosystem. Because of the climatic stability the green coverage of the city, is very significant and estimated to be about 35% including farmlands & vacant places. In the city green areas are found long streets, in urban parks, in public & private gardens, along stream banks and flood plains, in stream and downstream, ridges and hills and left over spaces. In spite of the rapid urban population growth and associated growing demand for greenery during the past 17 years, only few planned green structures, i.e. one municipal park (Motta), Aviation recreation area, Area: Based on the 2007 Census conducted by the Central Statistical Agency of Ethiopia (CSA), this Zone has a total population of 2,153,937, an increase of 26.68% over the 1994 census, of whom 1,066,716 are men and 1,087,221 women; with an area of 14,004.47 square kilometers, East Gojjam has a population density of 153.80. While 213,568 or 9.92% are urban inhabitants, a further 8 individuals are pastoralists. A total of 506,520 households were counted in this Zone, which results in an average of 4.25 persons to a household, and 492,486 housing units. The largest ethnic group reported in East Gojjam was the Amhara (99.82%); all other ethnic groups made up 0.12% of the population. Amharic is spoken as a first language by 99.81%; the remaining 0.19% spoke all other primary languages reported. 97.42% of the population said they practiced Ethiopian Orthodox Christianity, and 2.49% were Muslim.[3] The 1994 national census reported a total population for this Zone of 1,700,331 in 381,993 households, of whom 845,980 were men and 854,351 women; 145,295 or 8.55% of its population were urban dwellers at the time. The largest ethnic group reported in East Gojjam was the Amhara (99.83%); all other ethnic groups made up 0.17% of the population. Amharic was spoken as a first language by 99.88%; the remaining 0.12% spoke all other primary languages reported. 96.71% practiced Ethiopian Orthodox Christianity, and 3.18% of the population said they were Muslim.[4] According to a May 24, 2004 World Bank memorandum, 8% of the inhabitants of East Gojjam have access to electricity, this zone has a road density of 24.2 kilometers per 1000 square kilometers (compared to the national average of 30 kilometers),[5] the average rural household has 1.1 hectares of land (compared to the national average of 1.01 hectare of land and an average of 0.75 for the Amhara Region)[6] and the equivalent of 0.6 heads of livestock. 11.4% of the population is in non-farm related jobs, compared to the national average of 25% and a Regional average of 21%. 66% of all eligible children are enrolled in primary school, and 13% in secondary schools. 61% of the zone is exposed to malaria, and 30% to Tsetse fly. The memorandum gave this zone a drought risk rating of 447. 2.6. Proposed Project Location For the proposed development to be feasible, accessibility plays a major role Before choosing project we conducted feasibility studies and market analysis and identify the location that serve the market and benefit greatly and decided to settle at Motta town,Zendo wuha Ayene Birehan kebele.The proposed development site is located within the 2 Ejju enese woreda administrative city Ayene Birehan kebele within the urban industrial area of Motta town.The proposed project site is approximately 5,000m2. 2. Service Description and Application Recreational centers are places where people get entertainment and enjoyment. The facilities provided include various indoor and outdoor games, swimming pools, cinema halls and facilities to stage theaters and music shows. At the same time these facilities also serve for conducting various ceremonies such as wedding, and other assemblies. The dedicated sports facility is proposed to be provided by way of a new Community Recreation Centre (including swimming pool, multi-use recreation hall, change rooms and ancillary rooms and service areas). It is to be integrated with the adjacent existing community sports oval. The proposed facilities are intended to balance the commercial and social benefits for all community. to create a welcoming space to help cultivate a strong sense of community, promote health and wellness in our community and support for the needs of local residents. There will also be indirect benefits from complimentary development which will occur adjacent to the facility, promoting greater business investment interest, regional awareness and tourism opportunities. The proposed recreation facility will enhance the tourism experience in many ways and create opportunities for residents and businesses in Motta. 3. Market Study and Service Capacity 3.1. Market Study 3.1.1. Past Supply and Present Demand At present the recreational facilities available in the various are very inadequate in terms of the type of service and standards. As a matter of fact, with the decentralization of government structures zonal capitals have become centers of important administrative functions as well as commerce, industry, education, etc. Accordingly, the population of the urban centers which are designated to be capitals of respective zones has increased substantially. At the same time in these and other urban centers of the region the population number is increasing substantially. Nonetheless, there has not been a corresponding increase in recreational facilities. For example, no indoor and outdoor games, no swimming pools, no musical shows, and no theaters in most of the places. For example if we assume that 10% of the population do pay visit to well established recreational centers once in a week, then the number of individuals in the target group would amount to 20,956 every month. This can be fairly assumed as the current level of demand and at the same time suggests the existence of ample demand. Therefore, if well-equipped recreation facilities are established in zonal capitals, they will definitely have enough customers. 3.1.2. Projected Demand The future demand for recreational services in the zonal capital will increases mainly due to population increase. Moreover, the growth of urbanization will attract additional traders, social workers and families into the towns. Consequently, the number of individuals that do visit the envisaged type of recreational services will also increase. In this connection if we assume that the number of population in general increases by 3%, the target population will increases substantially as shown in table 1 below. Table 1: Projected Demand for Recreational Center (per week) Year Bahir Dar Gondor Dessie Debre Markos Debre Birhan 2007/08 20,956 25,458 19,880 10,724 8,424 2008/09 21,585 26,222 20,476 11,046 8,677 2009/10 22,232 27,008 21,091 11,377 8,937 2010/11 22,899 27,819 21,723 11,718 9,205 2011/12 23,586 28,653 22,375 12,070 9,481 2012/13 24,294 29,513 23,046 12,432 9,766 2013/14 25,023 30,398 23,738 12,805 10,059 2014/15 25,773 31,310 24,450 13,189 10,360 2015/16 26,546 32,249 25,183 13,585 10,671 2016/17 27,343 33,217 25,939 13,992 10,991 2017/18 28,163 34,214 26,717 14,412 11,321 2018/19 29,008 35,240 27,519 14,844 11,660 2019/20 29,878 36,297 28,344 15,289 12,010 According to the forecasted demand presented in table 1 above, the future is very promising provided that quality and customer centered services are rendered by the recreational centers. 3.1.3. Pricing The envisaged plant as a startup will focus on providing entertainment activities such as video games, snooker, watching of video films and refreshment drinks. Moreover, the center shall rent its hall and compound for weeding and meeting purposes. Based on the market research result and the capacity of the envisaged plant, the following selling price is set. • Birr 3 for one session video game • Birr 5 per snooker played • Birr 2,000 for renting the hall for weeding ceremony • Birr 600 per day for renting the hall for assembly purpose • Birr 5 per person for watching video film and; • Birr 15 on average per person for soft drinks, hot drinks and food. 3.1.4. Marketing promotion and strategy Nowadays the sphere of professional commercial activity is being developed rapidly in Ethiopia. There are several operating modern hotel centers in large cities, the large amount of projects are in development and are going to entry into the market in the coming years. According to the plan mentioned above for developing of the consumer market by means of complete meeting clients’ requirements, providing them with safe and high quality goods and services in civilized way, and also for making-up principally new ways of market wholesale trade providing goods that are high-performance and high-demand on inner and outer market. In order to penetrate and gain considerable market share, one of the major marketing strategies for the project is consistently rendering quality service to its tenants. Due emphasis must be placed on improving quality of service and facilities. The major marketing strategies to promote the project and gain considerable market share include: • Advertising through different means focusing on the existing service and facilities Promote in association to the key location and nearby business working on sustained promotional work. • Organization with a capacity of making decision. • improving with changing situations. 3.1.5. Marketing and Sales Strategy The marketing strategy for this new hotel is going to be driven basically by making available standard excellent customer service and provision of complimentary services. We will work hard to build a loyal customer base; customers that will always patronize us over and over again and as well help us use word of mouth publicity to get their friends and acquaintance to patronize us. Our marketing strategy is a simple one: satisfied customers are our best marketing tool. When a customer leaves our business, they know that they got the best price and service money can buy, our name and service will stand on its own via our cheaper process and very competitive prices. In view of that, we are going to adopt the following strategies to ensure that we do not only attract customers but ensure that they become loyal customer. Part of the marketing strategies that we will adopt is; introduce our hotel by sending introductory • Open our business with a party so as to capture the attention of residence that is our first targets • Advertise our our hotel on national dailies, local TV stations and local radio station. • Promote online via our official website and all available social media platforms and Continuous improving the performance of our brands • Hire the services of experts to make our brands the first choice • delivering consistent customer experiences to all our clients; making our first impression count positively. 3.2. Plant capacity Thus, given the expected demand for the service, and the planned technology, the envisaged plant is set to attract the following number of visitors. • 50 individuals per day for video game • 50 visitors per day to play snooker • 120 individuals per day to watch video film in two programs • Accommodate 50 wedding ceremonies in a year • Accommodate 25 meeting programs and workshops in a year that take on average 3 days per program. • Cater food and beverage for 100 individuals per day. 3.3. Service delivery program The program is scheduled based on the consideration that the envisaged plant will work 300 days from 8 A.M till 8 P.M where the remaining days will be for maintenance. During the first year of operation the plant will operate at 70 percent capacity and then it grows to 85 percent in the 2ndyear. The capacity will grow to 100 percent starting from the 3rd year. This consideration is developed based on the assumption that market and logistics barriers would be eliminated gradually within the first two years of operation. 4. Materials and Consumables and Inputs 4.1. Materials and Consumables The raw materials used in providing the cervices stated earlier are mainly beverages and various ingredients used to prepare food. 4.2 Annual Requirement and Cost of Raw Materials and Utilities The annual raw material and utility requirement and the associated cost for the envisaged plant is listed in table 2 here under. Table 2: Material and Utility Requirement Material and Input QUANTITY Total Cost L.C Various ingredients to prepare food Lump sum 1,988.85 300 kg 45,000 Milk 3,000 lit 60,000 Tea 400 kg 14,000 15,000 bottle 150,000 Roasted coffee Soft Drinks TOTAL MATERIAL COST F.C 2,257.85 Utility Electricity 25,000 kwh 13,750 Kerosine 5,000 lit 20,000 Water 3,500 m2 9,275 Total utility cost 43,025 2,300.87 According to the above table the annual cost of material and utility at full capacity of operation is estimated to be Birr 2 million 5. Technology and Engineering 5.1. Technology The machineries and equipment required for providing the various services stated earlier is detailed in table 3 below. Table 3: Machinery and Equipment Machinery and Equipment QUANTITY Video Game Equipment’s 5 Refrigerator 2 Coffee Machine 3 Snooker Table 2 Various Tools As required The, total cost of machinery and equipment including is estimated to be about Birr 5 million. 5.2 Civil Engineering Cost The total site area for the envisaged plant is estimated to be 5,000 m2 is allocated to the building for the various game playing area, hall, café and related activities. The remaining space is left open compound. The following outlines the functional components of the proposed multiple use. Recreation Centre: Lobby/Foyer; Reception, Staff administration offices; Kitchen / Kiosk; Public toilets/change rooms; staff toilets; Creche/Child minding facilities, a multipurpose sports hall to cater for net ball, volley ball, basketball, equipment stores, hall viewing and seating, multi-purpose activity room, Gymnasium, First aid, 25m pool, External paving / Hardstand for pedestrians, Car parking and drop off facilities, General power and site lighting, Sewage collection from toilet facilities, Stormwater and runoff collection, treatment and disposal and screen fencing. Gymnasium The envisaged gymnasium will composed of one machine room (200sq.mt), one Aerobics studio (100 sq. mt) Laundry Center The laundry center provides in-house cleaning service to bed room, and sauna/stem bathrooms by providing clean towels, linens, covers and uniform of the employees with the required time and quantity. The main processes of laundry center are sewing (if any), washing, and squeezing drying, folding and pressing. The laundry center will have a daily capacity of providing 200 clean sets of towels, 300 sets of linen and cover 100 sets of uniforms and other miscellaneous items. Children’s Play Ground The facilities included in the children’s playground are swings, sliding stands, tunnels, merry go round, sand filled pits, and coin operated toy vehicles and different kinds of arcade video games. The whole area of the playground shall be free from any obstruction that could result in accident and the recreational tools are installed in such a way that they will not cause any accident. The arcade coin operated video game room having an area of about 100 m2will be constructed from prefabricated material with ventilation and lighting, and it will be carpeted. It should also be free from any visible electrical connections and free from an accident or hazard. The provision of such service doesn't have any adverse impact on environment. 5.2.1. Locations and Site The appropriate locations for the envisaged project in view of the availability of infrastructure as well as market for the output are Motta city Ayen Berhan Kebele. 5.2.2. Project implementation The project’s implementation is expected to take 24 months. The major activities include Bank loan processing construction of the building, cleaning the area around the building, Procurement of equipment and start rendering services. The time schedule for the above matured major activities is presented below: Table: project Implementation schedule Activity June July Aug Sept Oct Nov Dec Marc April Jan Feb May 2022/2023 Land acquisition Done Document Preparation Construction of Factory Buildings Debt Financing Import of Machinery Purchase of Vehicles & Equip Recruitment, Installation and Commissioning Operation Grace Period 6. Manpower and Training Requirement 6.1. Manpower Requirement The envisaged hotel requires 85 labor forces. The list of manpower and the annual cost of labor is indicated in Table Table 6.1 Manpower Requirement and Annual Labour Cost Human resource plan SN Position No Qualification Monthly in Annual In salary salary Birr Birr 3000 36,000 1 General manager 1 BA in management 2 Building admin 1 BA in Acct/Mgt 2500 30,000 3 Secretary 1 10+2 in secretariat science 900 10,800 4 HRM Officer 1 10+2 in HRM/Management 950 11,400 5 1 Diploma in building maintenance 1500 18,000 6 Technical and maintenance manager Finance head 1 BA in Accounting 2500 30,000 7 IT Technician 1 Diploma in computer science/IT 1150 13,800 8 Marketer 1 Diploma in marketing 1150 13,800 9 Accountant 1 Diploma in accounting 1150 13,800 10 Guards/Security 8 Basic 500 48,000 11 General Service head 1 Diploma in Management 1500 18,000 12 Purchaser 2 Diploma in purchasing &Sup Mgt 1150 27,600 13 Electrician 1 10+2 in general electricity 1000 12,000 14 Plumber 2 10+2 in general mechanic 1000 24,000 15 Casher 4 10+1 in bookkeeping 850 40,800 16 Cleaner 10 Unskilled 450 54,000 17 Maintenance officer 2 10+2 in General mechanic 1000 24,000 18 Driver 3 10 completed 850 30,600 19 Guard 15 800 144,000 20 waitress 10 1000 120,000 Total 67 975,67 Benefit (20%) 243,93 Grand Total 1,219,580 6.2. Training Requirement All the staffs, in the catering and recreation sections, including physiotherapists, and supervisors should be given at least two weeks on the-job-training by the equipment supplier’s expert during commissioning. The management members should also be given a two weeks training in local training centers. The total cost of training is estimated at Birr 200,000. 7. Financial Analysis The financial analysis of the international standard hotel project is based on the data presented in the previous chapters and the following assumptions:- 7.1. Underlying Assumption The financial analysis of milk powder producing plant is based on the data provided in the preceding chapters and the following assumptions. Construction and Finance Depreciation Working Capital (Minimum Days of Coverage) 7.2. Total Initial Investment Cost The total investment cost of the project including working capital is estimated at Birr 15 million. The major breakdown of the total initial investment cost is shown in Table 7.1. Table 7.1 Initial Investment Cost Items L.C F.C Total Land lease 1,000,000 Building and civil work 6,000,000 Office equipment Vehicles plant machinery & equipment Total fixed investment cost 500,000 700,000 5,000,000 13,200,000 Pre-production capital expenditure 200,000 Total initial investment 13,400,000 Working capital at full capacity 1,600,000 Total 15,000,000 N.B Pre-production expenditure includes interest during construction, training (Birr 200 thousand) and Birr 25000 costs of registration, licensing and formation of the company including legal fees, commissioning expenses, etc. 7.3. Operation Cost The annual production cost at full operation capacity is estimated at Birr 12.06 million (see Table 7.2). The major components of the production cost depreciation, financial cost and material and input which account for 26.82%, 22.63% and 18.72%, respectively. The remaining 31.82% is the share of direct labour, utility, repair and maintenance, labour over head and other administration cost. Table 7.2 Annual Production Cost at Full Capacity ('000 Birr) Items Cost % Material and Inputs 2,257.85 18.72 Utilities 1,544.44 12.81 Maintenance and repair 500.07 4.15 Labour direct 975.67 7.14 Labour overheads 243.93 2.97 Administration cost 573.92 4.76 - - 6,095.86 50.54 Land Lease TOTAL OPERATING COST Deprcciation 3,235.15 26.82 Cost of finance 2,729.82 22.63 12,060.83 100 TOTAL PRODUCTION COST 7.4. Financial Evaluation I. Profitability According to the projected income statement attached in the annex part (see annex 4) the project will generate profit beginning from the first year of operation. Ratios such as the percentage of net profit to total sales, return on equity and return on total investment are 10%, 14% and 22% in the first year and are gradually rising. Furthermore, the income statement and other profitability indicators show that the project is viable. II. Breakeven Analysis The breakeven point of the project is estimated by using income statement projection. Accordingly, the project will break even at 29.6% of capacity utilization. III. Payback Period Investment cost and income statement projection are used in estimating the project payback period. The projects will payback fully the initial investment less working capital in 3 years. IV. Simple Rate of Return For the envisaged plant the simple rate of return equals to 25.1% V. Internal Rate of Return and Net Present Value Based on cash flow statement described in the annex part, the calculated IRR of the project is 25.7% and the net present value at 18 % discount VI. Sensitivity Analysis The envisaged plant is profitable even with considerable cost increment. That is the plant maintains to be profitable starting from the first year when 10 % cost increment takes place in the sector. This result is accompanied with payback period of 3 years and 5 months. 9 Economic and Social Benefit and Justification The envisaged project possesses wide range of benefits that promotes the socio-economic goals and objectives stated in the strategic plan of the motta town Amhara regional state. It also plays a role in diversifying the economic activity of the region. These other benefits are listed as follows A. Profit Generation The project is found to be financially viable and earns a profit of Birr 2.48 million Within the project life. B. Tax Revenue In the project life under consideration, the region will collect about Birr about 1million from corporate tax payment alone (i.e. excluding income tax and). Such result create additional fund for the regional government that will be used in expanding social and other basic services in the region C, Employment and Income Generation The proposed project is expected to create employment opportunity to several citizens of the region. That is, it will provide permanent employment to 67 professionals as well as support stuffs. ANNEXES