CONTRACT NO. JOB TITLE: CONTRACT FOR CONSTRUCTION/REPAIR This Contract is made and entered into effective as of the _____ day of ___________ 14 ____, corresponding to the ______ day of ___________________ 19 _____, by and between SAUDI ARABIAN OIL COMPANY ("SAUDI ARAMCO"), a company of limited liability organized under the Laws of the Kingdom of Saudi Arabia and ___________________________________________________________ ("CONTRACTOR"), having offices at _______________________________, Commercial Registration Number ________________, issued at ________ ________________, on ____________________. This Contract consists of this signed document, the following attached schedules and all drawings, standards, specifications and other documents referred to in the schedules or in any of the referenced documents: SCHEDULE "A" General Terms and Conditions SCHEDULE "B" Job Specification SCHEDULE "C" Contract Price and Payment Provisions SCHEDULE "D" Safety, Health and Environmental Requirements SCHEDULE "E" Settlement of Disputes, Arbitration and Choice of Law SCHEDULE "F" Taxes, Duties and Related Obligations SCHEDULE "G" Materials, Tools and Equipment SCHEDULE "H" Special Terms and Conditions SCHEDULE "Q" Quality Assurance and Control, Inspection and Testing I C/R 4/89 Revised 09/00 CONTRACT NO. A reference in this Contract to any of the schedules listed above shall, in addition, be considered a reference to any attachments to said schedules and to all documents referred to in said schedules or attachments. Should there be any conflict between the said schedules and attachments, they shall be resolved by applying the following order of precedence: 1. Schedule “H” 2. Schedule “A” 3. Schedule “D” 4. Schedule “E” 5. Schedule “F” and its attachments 6. Schedule “C” and its attachments 7. Schedule “Q” and its attachments 8. Schedule “G” and its attachments 9. Schedule “B” 10. Attachments to Schedule “B” All notices, authorizations and approvals pertaining to this Contract shall be in writing. Except as otherwise provided below, all notices between the parties shall be sufficient when delivered in person or sent by telex or cable, or by certified or registered mail, to the appropriate address as follows: SAUDI ARAMCO: CONTRACTOR: Telex: Cable: Telex: Cable: The parties hereby designate the following agents for the purpose of receiving any notice of referral to arbitration and receiving any further notice and documents during the course of the proceedings, unless and until they have designated in writing another agent for that latter purpose: II C/R 4/89 Revised 09/00 CONTRACT NO. SAUDI ARAMCO: CONTRACTOR: General Counsel Law Department Saudi Arabian Oil Company Box 5000 Dhahran 31311 Saudi Arabia IN WITNESS WHEREOF the parties have executed this Contract in duplicate, intending each to serve as an original, as of the effective date set forth above. WITNESS: SAUDI ARABIAN OIL COMPANY (SAUDI ARAMCO) By: Title: Date: WITNESS: CONTRACTOR By: Title: Date: III C/R 4/89 Revised 09/00 CONTRACT NO. SCHEDULE "B" JOB SPECIFICATION 1. 2. INTRODUCTION 1.1 Because of the technical nature of this Job Specification, it has not been translated into Arabic. CONTRACTOR and SAUDI ARAMCO agree to be bound by the English text. 1.2 This Schedule establishes the scope of the WORK to be performed by CONTRACTOR pursuant to this Contract, and describes or references in Attachment I the technical requirements that CONTRACTOR shall satisfy or adhere to in accomplishing the WORK. SCHEDULE REQUIREMENTS CONTRACTOR shall achieve Mechanical Completion by __________14 _____ corresponding to ____________________ 19 _____ ("Scheduled Completion Date"). Separable portions of the WORK specified in Attachment II to this Schedule "B" shall be completed by the dates specified therein ("Critical Milestone Dates"). 3. GENERAL DESCRIPTION OF THE WORK 4. SPECIFIC DESCRIPTION OF THE WORK END OF SCHEDULE "B" B-1 C/R 4/89 Revised 4/89 CONTRACT NO. SCHEDULE "B" ATTACHMENT I DRAWINGS, STANDARDS, AND CALCULATION SHEETS Number Revision No. Title 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. CONTRACTOR shall perform the WORK in accordance with the applicable SAUDI ARAMCO Engineering Standards, SAUDI ARAMCO Construction Specifications, and the SAUDI ARAMCO Construction Safety Manual. B-I-1 of 1 C/R 4/89 CONTRACT NO. SCHEDULE "B" ATTACHMENT II CRITICAL MILESTONE DATES Milestone Event 1. Scheduled Date Complete mobilization and commence the WORK: 2. 3. 4. 5. 6. 7. 8. 9. 10. Mechanical Completion of all the WORK ("Scheduled Completion Date") END OF ATTACHMENT II B-II-1 of 1 C/R 4/89 CONTRACT NO. SCHEDULE "G" MATERIALS, TOOLS AND EQUIPMENT 1.0 SAUDI ARAMCO-SUPPLIED PERMANENT MATERIALS SAUDI ARAMCO shall furnish only the following permanent materials to be incorporated in the WORK: 2.0 SAUDI ARAMCO-SUPPLIED EXPENDABLE MATERIALS SAUDI ARAMCO shall furnish only the following expendable materials: G-1 C/R MP-IK-LS Revised 4/89 7/93 CONTRACT NO. 3.0 SAUDI ARAMCO-SUPPLIED TOOLS AND EQUIPMENT SAUDI ARAMCO shall furnish only the following tools and equipment: 4.0 5.0 CONTRACTOR-SUPPLIED MATERIALS, TOOLS AND EQUIPMENT 4.1 Except as provided in Paragraphs 1.0, 2.0, 3.0 and 5.0 hereof, CONTRACTOR shall supply all permanent materials, expendable materials, tools, equipment and all else required for the successful completion of the WORK. All materials supplied by CONTRACTOR shall be new and unused, except as otherwise provided in this Contract. Such materials shall meet all contractual standards, specifications and schedules and nothing contained elsewhere in this Schedule shall be deemed to limit or modify in any way this obligation. Such materials and their sources shall be selected solely on the basis of financial and technical criteria. 4.2 CONTRACTOR shall not include in the Contract Price Saudi Arab Customs duties for any CONTRACTOR-supplied tools and equipment to be used in connection with the WORK and then re-exported. If CONTRACTOR reexports such tools and equipment and is unable to obtain a refund of Saudi Arab Customs duties deposited with Saudi Arab Customs, SAUDI ARAMCO shall promptly reimburse CONTRACTOR for Saudi Arab Customs duties paid by CONTRACTOR on such tools and equipment. CONTRACTOR shall submit its invoice to SAUDI ARAMCO for such reimbursement accompanied with proof that CONTRACTOR has deposited the duties, re-exported the tools and equipment, and failed after reasonable effort to obtain a refund of deposited duties. ADDITIONAL MATERIALS, TOOLS AND EQUIPMENT If, through no fault of CONTRACTOR, CONTRACTOR is unable to furnish certain of those items specified in Paragraph 4 in time to meet the completion date specified for the WORK, SAUDI ARAMCO may, at its discretion, furnish CONTRACTOR with such items as are requested by CONTRACTOR. CONTRACTOR undertakes to pay for such additional materials, tools and equipment at the prices/usage rates established therefor by SAUDI ARAMCO. G-2 C/R 4/89 MP-IK-LS Revised 7/93 CONTRACT NO. 6.0 SUPPLY, TRANSPORTATION AND RETURN OF MATERIALS, TOOLS, AND EQUIPMENT CONTRACTOR shall receive and return, during normal working hours, the SAUDI ARAMCO-furnished materials, tools and equipment specified in this Schedule "G" at one or more SAUDI ARAMCO operated Material Supply FACILITIES, or elsewhere as specified by SAUDI ARAMCO. SAUDI ARAMCO shall be responsible only for loading and unloading SAUDI ARAMCO-furnished items within an SAUDI ARAMCO operated material supply facility or elsewhere as specified by SAUDI ARAMCO. CONTRACTOR shall be responsible for providing all equipment and personnel necessary to transport such items to the WORK Site and unload them there. All tools and equipment to be furnished by SAUDI ARAMCO shall be furnished on an "as is where is" basis. Upon completion of the WORK, or at any other time as directed by the Company Representative, CONTRACTOR shall properly pack, identify and reload all SAUDI ARAMCO-furnished materials, tools and equipment which are determined by the Company Representative to be reusable and shall transport such items to any SAUDI ARAMCO-designated location or locations; provided however, that such designated locations shall be no further from the WORK Site than the original point of SAUDI ARAMCO issue of such items. All materials at the WORK Site which are deemed by the Company Representative to be unusable shall, if so directed by the Company Representative, be loaded and transported by CONTRACTOR to the SAUDI ARAMCO Dhahran Reclamation Yard. 7.0 SUBSTITUTIONS SAUDI ARAMCO reserves the right to provide reasonably acceptable substitutes for the materials, tools and equipment listed in Paragraphs 1.0, 2.0 and 3.0, or requested by CONTRACTOR under Paragraph 5.0, of this Schedule. 8.0 CARE OF SAUDI ARAMCO-SUPPLIED MATERIALS, TOOLS AND EQUIPMENT During such periods as SAUDI ARAMCO-supplied materials, tools or equipment are in CONTRACTOR's care, custody or control, CONTRACTOR shall be responsible for safeguarding such items and ensuring that they are treated with due care and maintained, used and/or operated in a prudent manner. CONTRACTOR shall return all such unused materials, and all such tools and equipment, in as good a condition as when received, normal wear and tear excepted. CONTRACTOR shall take whatever measures Company Representative or the SAUDI ARAMCO Industrial Security Department may require to safeguard and care for such items. Matters relating to security and safeguarding of SAUDI ARAMCO-supplied items will be coordinated with the SAUDI ARAMCO Industrial Security Department. END OF SCHEDULE "G" G-3 C/R 4/89 MP-IK-LS Revised 7/93 CONTRACT NO: SCHEDULE "G" MATERIAL, TOOLS AND EQUIPMENT 1.0 SAUDI ARAMCO-SUPPLIED PERMANENT MATERIAL The material listed in Attachment I will be furnished by SAUDI ARAMCO to CONTRACTOR at the WORK Site in Saudi Arabia, or at a designated SAUDI ARAMCO issue point, as noted in such Attachment. Such material shall be furnished to CONTRACTOR at no cost and in usable condition subject only to repairs or reconditioning normal to material received at a fabrication yard or construction site. CONTRACTOR shall sign a receiving form attesting to such material's condition upon its receipt. 2.0 SAUDI ARAMCO-SUPPLIED EXPENDABLE MATERIALS SAUDI ARAMCO shall furnish only the following expendable material: None 3.0 SAUDI ARAMCO-SUPPLIED TOOLS AND EQUIPMENT SAUDI ARAMCO shall furnish only the following tools and equipment: None All tools and equipment shall be furnished on an "as is where is" basis. 4.0 CONTRACTOR-SUPPLIED MATERIAL, TOOLS AND EQUIPMENT 4.1 Except as provided in Paragraphs 1, 2 and 3, CONTRACTOR shall supply all other material, tools, equipment and all else required for the successful completion of the WORK. All material supplied by CONTRACTOR shall be new and unused. Material for the FACILITIES shall meet all contractual standards, specifications and schedules and nothing contained elsewhere in this Contract shall be deemed to limit or modify in any way this obligation. Requirements for additional CONTRACTOR procurement responsibilities are detailed in Attachment II, CONTRACTOR's Procurement Responsibilities. G-1 C/R-TK Revised 11/92 6/03 CONTRACTOR-supplied material and its sources shall be selected solely on the basis of financial and technical criteria, provided however that products of Saudi manufacturers shall be preferred. SAUDI ARAMCO places a significant portion of its materials requirements on Saudi vendors and encourages its contractors to do the same. 4.1.1 SAUDI ARAMCO may provide CONTRACTOR with a worldwide list of commercially and technically acceptable suppliers for certain materials. The list provided to CONTRACTOR is not to be considered exclusive. CONTRACTOR is encouraged to include other technically and financially qualified suppliers. SAUDI ARAMCO-supplied suppliers list is confidential and shall not be distributed outside CONTRACTOR's procurement office. CONTRACTOR shall develop its own suppliers list for categories of material for which SAUDI ARAMCO has not provided lists. 4.1.2 Saudi manufacturers are industrial establishments within Saudi Arabia who mine, manufacture or assemble products using reasonable amounts of local raw materials or local manpower in their production, as certified by the Ministry of Electricity and Industry. CONTRACTOR shall develop competitive quotations from at least three (3) SAUDI ARAMCO qualified Saudi manufacturers listed in SAUDI ARAMCO's Supplier Support Division (SSD) report if the material value exceeds $10,000. If less than three (3) Saudi manufacturers are listed then all shall receive quotation requests. If CONTRACTOR's books and records do not establish CONTRACTOR's compliance with the procedure described in this paragraph, CONTRACTOR shall pay SAUDI ARAMCO ten percent (10%) of the purchase price paid for any material procured in violation of that procedure as liquidated damages. 4.1.3 Saudi vendors are merchants or firms in Saudi Arabia which, in the normal course of business, represent, as agent or otherwise, manufacturers of products located outside Saudi Arabia. 4.2 CONTRACTOR shall submit to SAUDI ARAMCO a report, in a format acceptable to SAUDI ARAMCO, indicating the percentages of material for the FACILITIES by value purchased from Saudi vendors and Saudi manufacturers. The report shall be submitted at fifty percent (50%) and one hundred percent (100%) completion of procurement of material for the FACILITIES. 4.3 Anything in this Contract to the contrary notwithstanding, SAUDI ARAMCO shall be granted access to CONTRACTOR's books and records at any and all reasonable times during the term of this Contract, G-2 C/R-TK Revised 11/92 11/03 and for a period of two (2) years thereafter for the purpose of ascertaining CONTRACTOR's consideration of Saudi suppliers as required pursuant to Paragraph 4.1. 5.0 4.4 Should SAUDI ARAMCO determine for technical or financial reasons that certain material must be purchased from a specific vendor or be the product of a particular manufacturer, SAUDI ARAMCO may direct CONTRACTOR in writing to purchase from such vendor or manufacturer. However, any SAUDI ARAMCO-supplied material specification, whether a part of this Contract or otherwise, naming a specific brand or model of material, does so only for the purpose of establishing a standard of quality, unless otherwise indicated. CONTRACTOR is not limited by the named brands or models and may supply other brands or models of equivalent quality. 4.5 CONTRACTOR shall not include in the Contract Price Saudi Arab Customs duties for any CONTRACTOR-supplied tools and equipment to be used in connection with the WORK and then re-exported. If CONTRACTOR reexports such tools and equipment and is unable to obtain a refund of Saudi Arab Customs duties deposited with Saudi Arab Customs, SAUDI ARAMCO shall promptly reimburse CONTRACTOR for Saudi Arab Customs duties paid by CONTRACTOR on such tools and equipment. CONTRACTOR shall submit its invoice to SAUDI ARAMCO for such reimbursement accompanied with proof that CONTRACTOR has deposited the duties, re-exported the tools and equipment, and failed after reasonable effort to obtain a refund of deposited duties. STANDARDIZATION CONTRACTOR shall standardize material types, sizes and characteristics, so that, as far as practicable, products of Saudi manufacturers can be used as standard or acceptable alternative material. CONTRACTOR shall purchase material, as far as practicable, to be a duplicate of, or have interchangeable parts with, other similar material being used in the construction of the FACILITIES as well as material listed in the SAUDI ARAMCO Materials Stock (SAMS) catalog, unless otherwise specified. 6.0 ADDITIONAL MATERIALS Should CONTRACTOR require additional material, and in SAUDI ARAMCO’s sole discretion, SAUDI ARAMCO may make available certain materials for the FACILITIES. Such materials shall be transferred by agreed negative Change Order and shall be considered SAUDI ARAMCO-supplied. SAUDI ARAMCO shall accept the agreed transfer price as full and complete compensation for such transfers. G-3 C/R-TK Revised 11/92 10/99 7.0 SUPPLY, TRANSPORTATION AND RETURN OF MATERIALS, TOOLS AND EQUIPMENT 7.1 CONTRACTOR shall receive and return, during normal working hours, the SAUDI ARAMCO-furnished materials, tools and equipments required in this Schedule at one or more SAUDI ARAMCO operated material supply facilities, or elsewhere as specified by SAUDI ARAMCO. SAUDI ARAMCO shall be responsible only for loading and unloading SAUDI ARAMCOfurnished items within an SAUDI ARAMCO operated material supply facility. CONTRACTOR shall be responsible for providing all equipment and personnel necessary to transport such items to the WORK Site and unload them there. 7.2 Upon completion of the WORK, or at any other time as directed by Company Representative, CONTRACTOR shall document as required by SAUDI ARAMCO and properly pack, identify and reload all SAUDI ARAMCO furnished materials, tools and equipment which are determined by Company Representative to be reusable and shall transport such items to any SAUDI ARAMCO-designated location or locations; provided however, that such designated locations shall be no further from the WORK Site than the original issue point of such items. If CONTRACTOR has used containers owned or leased by SAUDI ARAMCO, CONTRACTOR shall return them to the Container Storage Yard located at the West Pipe Yard in Dhahran. 7.3 8.0 All material at the WORK Site which is deemed by Company Representative to be unusable shall, if so directed by Company Representative, be documented as required by SAUDI ARAMCO, loaded and transported by CONTRACTOR to SAUDI ARAMCO's Dhahran Reclamation Yard or other disposal area specified by SAUDI ARAMCO, where it shall be burned by the CONTRACTOR in accordance with Company Representative's instructions. SUBSTITUTIONS SAUDI ARAMCO reserves the right to provide reasonably acceptable substitutes for the materials, tools and equipment listed in Paragraphs 1.0, 2.0 and 3.0 of this Schedule. If SAUDI ARAMCO is unable to supply such materials, tools, and equipment, CONTRACTOR shall supply them upon reasonable notice from SAUDI ARAMCO and issuance of a Change Order to reflect the costs of such supply. G-4 C/R-TK Revised 11/92 10/99 9.0 CARE OF SAUDI ARAMCO-SUPPLIED MATERIALS, TOOLS AND EQUIPMENT During such periods as SAUDI ARAMCO-furnished materials, tools or equipment are in CONTRACTOR's care, custody or control, CONTRACTOR shall be responsible for safeguarding such items and ensuring that they are treated with due care and maintained, used and operated in a prudent manner. CONTRACTOR shall return all such unused materials, and all such tools and equipment, in as good a condition as when received, normal wear and tear excepted. CONTRACTOR shall take whatever measures Company Representative may require to safeguard and care for such items and CONTRACTOR shall be responsible to SAUDI ARAMCO for failure to discharge the obligations imposed by this Paragraph, subject however to the terms of Schedule "A". 10.0 (DELIBERATELY LEFT BLANK) 11.0 SAUDI ARAB STANDARDS ORGANIZATION CERTIFICATES ("SASO") CONTRACTOR supplied material shall meet the requirement of SASO and CONTRACTOR shall promptly forward to SAUDI ARAMCO a copy of any certificate approved by SASO. 12.0 PLANT TAGS CONTRACTOR shall proceed in strict accordance with General Instruction 202.305, which is incorporated by reference in this Contract, to assign plant numbers and affix tags. 13.0 CAPITAL SPARE PARTS, START-UP SPARE PARTS, OPERATING SPARE PARTS AND OPERATING MATERIALS 13.1 CAPITAL SPARE PARTS: “Capital Spare Parts” are those major replacement parts or complete units essential to continuous operation when long delivery or manufacturing economy is a significant factor. Capital Spare Parts are subject to Start-up and Operating Spare Parts support the same as Parent Equipment. CONTRACTOR shall procure the Capital Spare Parts listed in Attachment III of this Schedule “G” concurrently with the procurement of Parent Equipment. Prior to issuing purchase orders CONTRACTOR shall identify and recommend to SAUDI ARAMCO additional requirements for Capital Spare Parts not identified in Attachment III. The recommendations shall also include long lead time, machined, molded or cast parts which can best be supplied when included in the manufacturing schedule of the Parent Equipment, and their quoted material prices and any other information required for their justification. If SAUDI ARAMCO determines that additional Capital Spare Parts are necessary a Change Order will be issued. G-5 C/R-TK Revised 11/92 6/03 13.2 START-UP SPARE PARTS: “Start-Up Spare Parts” are parts or components required during construction, precommissioning, and commissioning. CONTRACTOR shall provide the Start-Up Spare Parts associated with all CONTRACTOR-furnished equipment and specifically identified SAUDI ARAMCO-furnished equipment. 13.3 OPERATING SPARE PARTS: “Operating Spare Parts” are spare parts or components that are required for continuous operation of the plant, equipment, or system after commissioning of the FACILITY. SAUDI ARAMCO shall purchase and ship all Operating Spare Parts for all CONTRACTOR-furnished equipment, SAUDI ARAMCO-furnished equipment, or Capital Spare Parts. 13.4 OPERATING MATERIALS: “Operating Materials” are consumable are consumed in the normal course of operations and, therefore, require periodic replenishment. CONTRACTOR shall supply all required quantities of chemicals, filtration materials, lubricants, desiccants, industrial gases, emulsifiers, batteries, transformer oils, and any other catalysts, operating fluids, consumable, and materials required for the initial charge, precommissioning and start-up, and commissioning of the FACILITIES. All unused materials provided in accordance with this Paragraph shall be properly packed and documented by CONTRACTOR and shall become the property of SAUDI ARAMCO. CONTRACTOR shall also provide a forecast of the initial charge and start-up quantities of all items referenced in this Paragraph to SAUDI ARAMCO no later than twelve (12) months prior to Mechanical Completion of the FACILITIES, or each separable portion thereof, achieving partial Mechanical Completion. The forecast shall include quantities expected during Start-up and normal maximum and minimum operating conditions as well as during summer and winter operating conditions, and any other limiting conditions. CONTRACTOR shall identify the SAMS stock numbers for the same or equivalent bulk chemicals and lubricants that are in the SAMS stock catalog. 14.0 DATA ACQUISITION FOR OPERATING SPARE PARTS AND OPERATING MATERIALS CONTRACTOR shall provide to SAUDI ARAMCO all Vendor and Sub-Vendor data on Operating Spare Parts and Operating Materials in strict accordance with the instructions contained in SAEP-3101. For the purposes of establishing Contract payments pursuant to Schedule “C”, procurement of any equipment or material item shall not be considered complete unless the CONTRACTOR has submitted, and COMPANY has approved, the Operating Spare Parts and Operating Materials Data required per SAEP-3101. 15.0 TRANSLATION G-6 C/R-TK Revised 11/92 6/03 Because of the technical nature of Attachment I, it has not been translated into Arabic. CONTRACTOR and SAUDI ARAMCO agree to be bound by the English text. END OF SCHEDULE "G" G-7 C/R-TK Revised 11/92 6/03 CONTRACT NO: SCHEDULE "G" ATTACHMENT I SAUDI ARAMCO-SUPPLIED MATERIAL DESCRIPTION UNIT QUANTITY PLACE OF DELIVERY END OF ATTACHMENT I G-I-1 of 1 C/R-TK 11/92 CONTRACT NO: SCHEDULE "G" ATTACHMENT II CONTRACTOR's PROCUREMENT RESPONSIBILITIES This Attachment further defines CONTRACTOR's procurement responsibilities and supplements those provisions appearing in Schedule "G". 1.0 DEFINITION CONTRACTOR's procurement responsibilities include purchasing, expediting, inspection, handling, shipping, customs clearance, payment of all duties and levies, storage and all other activities necessary to deliver materials to the WORK Site as required by the WORK Schedule. 2.0 PURCHASE ORDER 2.1 CONTRACTOR shall, if requested by SAUDI ARAMCO, provide copies of all technical quotation request documents (including purchase specifications with pertinent attachments) to SAUDI ARAMCO at the same time as they are issued to bidders. 2.2 CONTRACTOR shall, if requested by SAUDI ARAMCO, provide the technical details of any proposed placement or any order after placement. If SAUDI ARAMCO determines that any placement or proposed placement is not technically sufficient or does not conform to the Job Specifications, SAUDI ARAMCO shall provide CONTRACTOR with a written explanation for the basis of its determination. CONTRACTOR shall take action to ensure technical sufficiency and/or conformance to Job Specifications. 2.3 MATERIALS WARRANTIES CONTRACTOR shall require all its suppliers to agree their materials warranties may be enforced directly against them by SAUDI ARAMCO. Nothing in this paragraph limits or modifies CONTRACTOR's warranty obligations under this Contract. G-II-1 of 2 C/R-TK Revised 11/92 7/93 2.4 NONMATERIAL REQUIREMENTS CONTRACTOR shall supply copies of all vendor brochures, drawings, specifications, parts lists, maintenance and operating instructions for CONTRACTOR-supplied materials and in quantities designated by the Company Representative for SAUDI ARAMCO's internal uses. CONTRACTOR shall deliver this literature to the Company Representative prior to final payment for the CONTRACTOR-supplied materials to which such literature relates. 2.5 VENDOR REPRESENTATIVES CONTRACTOR shall obtain qualified technical representatives from its vendors as necessary to install and commission CONTRACTOR-supplied materials. 2.6 VENDOR INSPECTION CONTRACTOR shall obtain for the Company Representative or his designate the right to inspect the production and handling of CONTRACTORsupplied materials in its vendors' or their sub-suppliers' shops. The exercise of such right shall not relieve CONTRACTOR of its obligation to supply materials which meet the requirements of this Contract. 2.7 PURCHASE ORDER NUMBERING All CONTRACTOR’s requisitions and purchase orders shall also be numbered using SAUDI ARAMCO’s purchase order numbering system. SAUDI ARAMCO’s number shall be used on all documentation and shall be listed in CONTRACTOR reports as directed by SAUDI ARAMCO. 3.0 RECORD OF ORDERS CONTRACTOR shall issue a Record of Orders report monthly, or as otherwise requested, reporting on the status of each order. Standard CONTRACTOR reports may be used if such reports are acceptable to SAUDI ARAMCO. The report shall include information on at least the following: 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 Quotation request number and date. Order number and date placed, and corresponding SAUDI ARAMCO Order number. Vendor and country of manufacture. Brief description. Item and tag number. Required delivery date for design data. Delivery date for equipment/materials. Delivery date for principal spare parts. END OF ATTACHMENT II G-II-2 of 2 C/R-TK Revised 11/92 12/98 SCHEDULE "G" ATTACHMENT III CAPITAL SPARE PARTS END OF ATTACHMENT III G-III-1 of 1 C/R-TK Revised 11/92 12/98 CONTRACT NO. SCHEDULE Q QUALITY REQUIREMENTS TABLE OF CONTENTS Page 1. General 2 2. Quality Management System Requirements 3 3. Documentation Requirements 3 4. Management Responsibility 5 5. Resource Management 5 6. Project Realization/Execution 7 7. Measurement, Analysis and Improvement 8 Attachment I CONTRACTOR and Subcontractor Quality Personnel Qualification Requirements Attachment II SAUDI ARAMCO Standards and Procedures Containing Quality Requirements Attachment III Quality Requirements for Contractor Supplied Materials Attachment IV Quality Requirements for the Construction Phase Attachment V Summary of Quality System Deliverables Attachment VI Project Specific Quality Requirements Q - 1 of 13 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. 1. GENERAL 1.1. For the purposes of this Schedule “Q”, SAUDI ARAMCO shall have the same meaning as COMPANY for contracts with Aramco Services Company and Aramco Overseas Company. 1.2. This Schedule describes SAUDI ARAMCO’s minimum requirements for CONTRACTOR’s Quality System. 1.3. CONTRACTOR shall be totally responsible for the quality of WORK required by this Contract. Except as provided in Paragraph 5.4 of this Schedule “Q”, CONTRACTOR’s responsibilities as described herein may not be delegated without the express written consent of the Company Representative. 1.4. CONTRACTOR shall inspect, test and accept all parts of the WORK as defined in Schedule “B”, including its subcontractors' work, in conformance with all drawings, specifications and standards applicable to the WORK. 1.5. CONTRACTOR shall perform Quality Management functions for all parts of the WORK, including its subcontractors', vendors', manufacturers' and suppliers' WORK as specified in the CONTRACTOR's Quality Manual and approved Quality Plan(s). 1.6. SAUDI ARAMCO shall be entitled to have the Company Representative or his nominee present at all locations where CONTRACTOR or its subcontractors and suppliers are engaged in the performance of the WORK, at any and all times, to review all aspects of CONTRACTOR's Quality activities and to witness whatever inspection and testing is required by this Contract. SAUDI ARAMCO retains the right to conduct whatever additional tests or inspections it deems necessary to assure itself that the materials meet the requirements of the Contract. CONTRACTOR shall not refuse access to technical or other data which CONTRACTOR considers proprietary or confidential, and which is reasonably required to inspect CONTRACTOR's performance of the WORK, except where the nominee of SAUDI ARAMCO’s Company Representative is a competitor of CONTRACTOR in the sale, engineering, or installation of systems similar to the FACILITIES or is related to or affiliated with such a firm, in which event the Company Representative may nominate an alternate. Q - 2 of 13 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. 1.7. SAUDI ARAMCO will complete its review of CONTRACTOR’s Quality documents and personnel qualifications no more than thirty (30) calendar days after submittal of a document or its subsequent modifications. Following its initial review, SAUDI ARAMCO will approve or provisionally approve the submitted document or personnel qualification, or it will reject the document with comments. 1.8. For any inspection or any test required to be witnessed by SAUDI ARAMCO, including any required by applicable laws, rules and regulations of Saudi Arabia, CONTRACTOR shall provide notice of said inspection or test as specified in the approved Inspection and Test Plans (ITP’s) to enable the Company Representative to attend. If any part of the WORK or the FACILITIES is closed or covered before the required inspection or witnessing has been performed or without agreement by SAUDI ARAMCO, it must, if required by SAUDI ARAMCO, be opened or uncovered for inspection or witnessing and reclosed or recovered at CONTRACTOR's expense. 1.9. If any inspection or test directed or performed by SAUDI ARAMCO, or by another party at the direction of SAUDI ARAMCO, reveals any defect in CONTRACTOR-supplied materials or in the WORK, CONTRACTOR shall bear the cost of such inspection and testing and shall promptly correct such defect at CONTRACTOR's expense. 1.10. If CONTRACTOR does not adhere to the Quality requirements of this schedule, SAUDI ARAMCO may, after two weeks notification to CONTRACTOR, supply sufficient inspection and testing services to assure that the WORK is being done as required by this Contract. CONTRACTOR shall bear the cost of such inspection and testing. 2. QUALITY MANAGEMENT SYSTEM REQUIREMENTS CONTRACTOR shall implement for this Contract a Quality Management System according to the latest version of ISO 9001 (Quality management systems – Requirements), which is incorporated herein by reference and this Schedule “Q”. Definitions contained in ISO 9000, (Quality Management Systems – Fundamentals and Vocabulary) latest version shall apply. In case of conflict between ISO 9001 and this Schedule, the requirements of this Schedule shall have precedence. 3. DOCUMENTATION REQUIREMENTS Q - 3 of 13 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. 3.1. CONTRACTOR shall plan, organize, control and execute all WORK in accordance with CONTRACTOR’s Quality Plans, Inspection and Test Plans (ITP) and documented procedures. The Quality Plans must ensure that quality personnel and processes, including those of subcontractors, are effective and that the WORK is completed in strict compliance with all provisions of schedule “B” of this Contract. 3.2. CONTRACTOR shall prepare the project specific Quality Plan covering as applicable, design, procurement, construction and precommissioning activities as specified in SAEP-1154 (Guidelines for Contractor’s Quality Plan) and submit it to the Company Representative for review and approval no later than thirty (30) calendar days after the effective date of this Contract. 3.3. CONTRACTOR shall not release requisitions for equipment quotations or start any construction activities prior to SAUDI ARAMCO’s approval of the Quality Plan unless specifically approved in writing by the Company Representative. 3.4. CONTRACTOR shall submit Procurement Inspection and Test Plans in accordance with paragraph 3.2 of Attachment III to this Schedule “Q”. Pending Saudi Aramco approval of the Inspection and Test Plans, CONTRACTOR shall not permit fabrication to begin on any item required to have ITP’s. 3.5. CONTRACTOR shall prepare and submit Construction Inspection and Test Plan(s) in accordance with paragraph 1 of Attachment IV to this Schedule “Q”. CONTRACTOR shall not start specific construction or pre-commissioning activities prior to SAUDI ARAMCO’s approval of the applicable ITP. 3.6. CONTRACTOR shall modify its Quality Plans to reflect any significant changes identified by CONTRACTOR or SAUDI ARAMCO. CONTRACTOR’s revised Quality Plans shall then be resubmitted for SAUDI ARAMCO’s approval. 3.7. The latest revision of CONTRACTOR’s Quality Manual and applicable Quality Plans and all referenced documentation shall be available for SAUDI ARAMCO’s use at the CONTRACTOR's design, procurement, fabrication and installation or construction locations . Reference documents include all those contained in drawings, specifications and Q - 4 of 13 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. procedures for the inspection of equipment and materials to be fabricated or constructed at the applicable site. 4. 5. MANAGEMENT RESPONSIBILITY 4.1. In accordance with ISO 9001, CONTRACTOR's top management shall review the project specific Quality System every six months to ensure that the system is suitable, adequate and effective. Top management reviews shall be scheduled events included in the quality audit schedule approved by the Company Representative as provided in Paragraph 7.2.2 of this Schedule “Q”. 4.2. Within two (2) weeks after the scheduled review date, CONTRACTOR shall advise the Company Representative in writing of the results and recommended actions of such reviews. Changes to the Quality System that result from CONTRACTOR’s Top Management Reviews shall be incorporated in the project Quality Plans, with the approval of the Company Representative. RESOURCE MANAGEMENT 5.1. CONTRACTOR shall provide resources to implement the Quality System as set forth in this Contract. For all procurement, construction, and pre-commissioning activities, sufficient SAUDI ARAMCO approved Quality personnel identified in Attachment VI of this Schedule “Q” shall be on-site prior to the start of the applicable WORK. 5.2. CONTRACTOR shall provide resumes of all CONTRACTOR and subcontractor Quality personnel to SAUDI ARAMCO for review and approval prior to the start of work for each individual. SAUDI ARAMCO shall have the right to interview and/or test assigned inspectors. SAUDI ARAMCO has the right to reject proposed candidates if they do not comply with the requirements in Attachment I or if SAUDI ARAMCO has had prior poor experience with such candidates. 5.3. When specified in Attachment VI of this Schedule “Q:, CONTRACTOR shall designate the Quality Assurance Manager for this Contract within seven calendar days of the effective date of this Contract. The Quality Assurance Manager shall be assigned to the WORK through Mechanical Completion. Q - 5 of 13 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. 5.4. CONTRACTOR may subcontract inspection services, subject to SAUDI ARAMCO’s review and approval. 5.5. CONTRACTOR’s, subcontractor’s and third party agency’s Quality personnel assigned to the WORK shall meet the minimum qualification requirements of Attachment I of this Schedule “Q”, and must be technically competent to perform their duties. Records must be maintained for SAUDI ARAMCO’s reviews that document the qualifications of CONTRACTOR’s Quality Personnel. 5.6. CONTRACTOR’s Quality personnel shall be dedicated to the WORK described in this Schedule “Q” and shall perform no other function on this Contract. CONTRACTOR’s quality personnel shall have sufficient and well-defined responsibility, qualifications, authority, and organizational freedom to identify quality problems and areas of nonconformance and to initiate, recommend and substantiate corrective actions. 5.7. The CONTRACTOR’s Quality Managers shall have organizational authority at least equal to that of the line manager directly responsible for execution of the WORK. During all phases of the WORK, CONTRACTOR’s QC Supervisor(s) shall functionally report to the CONTRACTOR Quality Assurance Manager or Quality Control Manager. 5.8. CONTRACTOR shall submit to the Company Representative within thirty (30) calendar days from the effective date of this Contract and update with changes shown as part of the monthly Quality Management Report (See Para. 7.5.1) a listing, sorted by discipline for each WORK Phase, of: 5.9. 1) Approved personnel forecast to be mobilized in the next sixty (60) days 2) Personnel forecast to be demobilized in the next sixty (60) days CONTRACTOR shall provide organization chart(s) clearly showing assignments of personnel including: 5.9.1. all planned quality personnel for the project in accordance with Attachment VI of this schedule “Q”. Q - 6 of 13 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. 5.9.2. reporting relationships from the inspector through to level above the CONTRACTOR’s project manager for this contract. 5.9.3. internal and external lines of communication. 5.9.4. interfaces between the CONTRACTOR and its subcontractors and suppliers, and between CONTRACTOR and SAUDI ARAMCO. 5.9.5. mobilization and de-mobilization dates for all planned quality personnel. 5.10. Planned staffing levels shall comply with SAUDI ARAMCO approved Quality Plan and Attachment VI of this Schedule “Q”; any reduction from the required levels must be approved in advance in writing by the Company Representative. 5.11. CONTRACTOR shall make quality personnel changes required due to vacations, illness, temporary assignments, emergency leave, resignations or other reasons as necessary to maintain required Quality coverage. CONTRACTOR shall advise the Company Representative of such personnel and quality coverage at least thirty (30) calendar days in advance of scheduled absences or changes and as soon as possible for other changes. 5.12. Contractor shall implement an ongoing training program to introduce and familiarize all CONTRACTOR and sub-contractor personnel with the project quality requirements for their area of responsibility. 6. PROJECT REALIZATION/EXECUTION 6.1. Design Phase Quality Activities 6.1.1. CONTRACTOR shall comply with the Design Phase requirements of CONTRACTOR’s approved Quality Plan and this Schedule “Q”. 6.1.2. CONTRACTOR shall perform Design Reviews at appropriate stages during the Design Phase. CONTRACTOR shall notify the Company Representative two weeks prior to the start of any Design Reviews. As a minimum, these reviews shall be Q - 7 of 13 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. completed prior to the SAUDI ARAMCO scheduled Design Reviews stated in schedule “B”. CONTRACTOR shall maintain records of such CONTRACTOR Design Reviews in accordance with the Quality Plan, including solicitation, recording and resolution of all comments. 6.2. Procurement Phase Quality Control Activities CONTRACTOR shall comply with the Procurement quality requirements of CONTRACTOR’s approved Quality Plan and Attachment III of this Schedule “Q”. 6.3. Construction Phase Quality Control Activities CONTRACTOR shall comply with the Construction quality requirements of CONTRACTOR’s approved Quality Plan and Attachment IV of this Schedule “Q”. 6.4. 7. Pre-Commissioning Phase Quality Control Activities 6.4.1. CONTRACTOR shall comply with the Pre-commissioning quality requirements of CONTRACTOR’s approved Quality Plan and Schedule “B”. 6.4.2. Prior completion of the WORK, CONTRACTOR shall perform the inspections required by Schedule “B” to complete precommissioning activities and document and correct any nonconformances. A copy of the inspection results and status of the correction of non-conformances shall be submitted to the Company Representative each week until the acceptance of the applicable system. MEASUREMENT, ANALYSIS AND IMPROVEMENT 7.1. Inspection Schedules CONTRACTOR shall submit each week a two-week look ahead schedule of all planned quality activities to the Company Representative during the Procurement, Construction and Precommissioning WORK Phases as specified in Schedule “A”. The Q - 8 of 13 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. schedule shall be sent electronically in a format acceptable to SAUDI ARAMCO. 7.2. Internal Audits 7.2.1. CONTRACTOR shall conduct internal audits covering WORK Phases with a duration of six months or longer. This shall include audits of the CONTRACTOR's quality function and obligations as described in the Saudi Aramco approved quality plans, this Contract, and ISO 9001. This program shall also include scheduled Quality System audits for subcontracts with work scheduled to exceed six months in duration. 7.2.2. CONTRACTOR shall submit a quality audit schedule to the Company Representative for review and approval within thirty (30) calendar days from the effective date of this Contract. As a minimum, full quality system audits shall be carried out at fifteen percent (15%) and sixty percent (60%) of completion stage for the Design, Procurement, and Construction WORK Phases. CONTRACTOR’s audits may be rescheduled only with the approval of the Company Representative. 7.2.3. All audits shall be executed by quality auditors (qualified in accordance with Attachment I of this Schedule “Q”) not directly responsible for the area being audited or by an approved third party agency. 7.2.4. CONTRACTOR shall investigate root causes and initiate corrective actions for nonconformities identified in each audit. CONTRACTOR shall verify implementation and closeout of corrective actions prior to the next scheduled audit. 7.2.5. CONTRACTOR shall submit to the Company Representative a copy of each audit report within two (2) weeks of its completion. 7.2.6. The Company Representative or his nominee shall be invited to participate in all audits. Audit notifications and agenda shall be submitted to the Company Representative fourteen (14) calendar days in advance. Q - 9 of 13 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. 7.3. Control of Non-Conformance 7.3.1. CONTRACTOR shall control CONTRACTOR and subcontractor supplied materials and fabricated assemblies that do not conform to requirements as indicated in 7.3.2, 7.3.5, and 7.3.6 below. Controls to restrict further processing or installation of nonconforming or defective items, pending decisions on disposition shall be established and maintained. 7.3.2. CONTRACTOR shall issue Non-Conformance Reports (NCRs) for all violations by the CONTRACTOR, subcontractors, manufacturers and/or suppliers to Contract requirements and SAUDI ARAMCO approved CONTRACTOR quality plan(s), inspection & test plans, and procedures. CONTRACTOR shall submit a copy of each NCR to the Company Representative within 48 hours of issue. CONTRACTOR shall maintain a summary of the open NCRs, and submit it at the regular project progress meetings. CONTRACTOR shall notify the Company Representative prior to final closure of each NCR for inspection/verification by SAUDI ARAMCO. 7.3.3. CONTRACTOR shall respond to all NCRsissued by SAUDI ARAMCO in writing within 48 ho urs of receiving notification of non-conformance, including his proposed corrective action. 7.3.4. CONTRACTOR shall investigate the root causes of nonconforming items, and initiate corrective actions to prevent recurrence of nonconformities. 7.3.5. CONTRACTOR shall rework or repair and re-inspect items in accordance with SAUDI ARAMCO approved procedures. Those items rejected will be managed as stated in 7.3.6 or 7.3.7 below. 7.3.6. CONTRACTOR shall submit an application for a waiver to SAUDI ARAMCO standards to the Company Representative for items that do not comply with SAUDI ARAMCO standards but are still considered usable. The item may be used in the WORK only if SAUDI ARAMCO approves the waiver. Q - 10 of 13 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. 7.3.7. 7.4. 7.5. CONTRACTOR shall segregate all other non-conforming materials and assemblies to a clearly designated rejection site. CONTRACTOR shall track and control all nonconforming equipment or materials until it is reused, exported, or otherwise disposed of. All imported rejected materials shall be disposed of in accordance with Schedule “G”. CONTRACTOR shall notify the Company Representative of the disposition of all rejected materials on a monthly basis as part of the Quality Management Report. Waivers 7.4.1. CONTRACTOR shall not waive the requirements of any CONTRACTOR Quality Plan or ITP previously accepted by the Company Representative without the express written consent of the Company Representative. 7.4.2. The CONTRACTOR shall maintain a log detailing all waivers from SAUDI ARAMCO or CONTRACTOR Quality and inspection requirements obtained during all WORK phases. This log must indicate the status of the waiver, a brief description and details of the applicable purchase order and equipment or construction process. 7.4.3. The CONTRACTOR shall also maintain a log detailing all waivers to SAUDI Armco standards obtained during all phases, including those initiated by SAUDI ARAMCO (during or prior to the start of WORK) or CONTRACTOR. This log must indicate the status of the waiver, a brief description and details of the applicable purchase order and equipment or construction process. Analysis of Data CONTRACTOR shall prepare and submit a monthly Quality Management Report in a format acceptable to SAUDI ARAMCO to demonstrate effective implementation of the CONTRACTOR's Quality System. The report shall include the following items as a minimum: 7.5.1. General Items: Q - 11 of 13 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. 7.5.2. 7.5.3. 7.5.4. a) Listing of quality audits completed (internal and subcontractor), in progress, and planned for the next month. b) Status of open corrective actions for Non-conformance reports, audits and management reviews. c) Quality Personnel Listing by Discipline as specified in Paragraph 5.7 and mobilization/demobilization plan for the next month. d) Listing and status of engineering waivers requested Design and Procurement Phase Items: a) Listing of supplier surveys performed with a summary of findings, and planned surveys for the next month. b) Listing of Pre-inspection Meetings conducted and planned for the next month. c) Listing of supplier inspections performed versus scheduled inspections, and those planned for the next month. d) Non-conformance reports issued by SAUDI ARAMCO or CONTRACTOR during design or procurement: number issued, closed out, and pending for the month. Construction Phase Items: a) Non-conformance reports issued by SAUDI ARAMCO or CONTRACTOR during Construction: number issued, closed out, and pending for the month. b) Listing and disposition of all defective or rejected material or equipment received at jobsite by CONTRACTOR and subcontractor. c) Welding rejection rate reported on per joint and/or linear inch basis for piping and alloy welds. A chart showing the historical performance during the project shall be included. Narrative Section for Process Improvement Activities: Q - 12 of 13 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. This section shall describe CONTRACTOR and subcontractor activities during the month to continually improve its processes, correct and eliminate non-conformities, prevent potential problems, and improve schedules, etc. It should include trend analysis for weld reject rates, CONTRACTOR & SAUDI ARAMCO NCRs and other specific variable measurement required by Attachment VI, root cause analyses, and initiatives to improve the weakest areas. 7.6. Improvement 7.6.1. CONTRACTOR’s procedure(s) for Continual Improvement shall ensure measurement, analysis and improvement of the key variables and objectives identified in Attachment VI of this Schedule “Q”. 7.6.2. CONTRACTOR’s procedure(s) for Preventive Actions shall describe the requirements for evaluating the need for actions to prevent occurrence of mistakes from previous Lessons Learned by CONTRACTOR and SAUDI ARAMCO. Specific SAUDI ARAMCO Lessons Learned to be implemented are identified in Attachment VI of this Schedule “Q”. END OF SCHEDULE “Q” Q - 13 of 13 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. ATTACHMENT I TO SCHEDULE “Q” CONTRACTOR and SUBCONTRACTOR QUALITY PERSONNEL QUALIFICATION REQUIREMENTS Quality personnel employed by CONTRACTOR and its subcontractors to perform the WORK described in this Contract shall meet, as a minimum, the following qualification and experience requirements. An inspector can be assigned to multiple inspection disciplines, provided he meets the minimum requirements specified on this attachment for each of the discipline. SAUDI ARAMCO shall be the final authority for the determination of equivalency for all qualifications, certifications, or minimum number of years of experience as specified in this Schedule upon successful completion of required examinations and/ or interviews. 1. 2. DESIGN, PROCUREMENT & CONSTRUCTION PHASES 1.1. Quality Assurance Manager: Shall have demonstrated knowledge and training in the ISO-9000 Series international standards, or equivalent. He shall be able to exercise judgment against the criteria of the standards. He shall have a university degree or equivalent with a minimum of ten (10) years of direct experience in Quality Assurance system activities of which five (5) years must be in managing quality systems relating to the Contract Scope of WORK (e.g.; oil, gas and petrochemical projects, Infrastructure, communication) 1.2. Quality System Auditors: Shall have 5 years Quality System experience in auditing activities in the discipline he is working in. Auditors shall be qualified as stated in ISO-19011 and competent in the discipline being audited, familiar with Quality System standards and be able to exercise judgment against the criteria of the standards. Auditors must be able to communicate clearly in writing and orally. Auditors shall have satisfactorily completed a training course and passed the course examination. Auditors shall have participated in a minimum of four audits for a total of at least 20 days including documentation review, actual audit activities and audit reporting during the past three years. DESIGN & PROCUREMENT PHASES Q - Att. I - 1 of 9 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. 2.1. Procurement Quality Control Supervisor: He shall have a university degree or equivalent and seven (7) years inspection experience or a high school diploma with ten years inspection experience with a minimum of three (3) years directly relating to supervision of vendor inspection activities in the Contract Scope of WORK (e.g.; oil, gas and petrochemical projects, Infrastructure, communication) 2.2. Vendor Inspector: as a minimum, he shall be a High School graduate, or equivalent. He shall be able to read, write and speak the English Language. He shall have 6 years inspection experience in manufacturing plants, including 2 years of this inspection experience in the specific commodity and processes to be inspected. He shall be fully conversant with applicable Industry standards, specifications, and fabrication methods and shall perform a variety of inspection functions with minimal supervision as required to verify supplier compliance with the purchase order requirements. He shall be able to read engineering drawings. He shall have knowledge and understanding of ISO-9001 quality system requirements and implementation. He shall meet all additional minimum requirements for each specific inspection discipline, as follows: 2.2.1. Welding and NDT: Inspector shall be certified as an American Welding Society CWI, CSWIP 3.1 Certified Welding Inspector, or approved equivalent. Inspector shall have a demonstrated background and thorough knowledge of codes such as ANSI B 31.3, 31.4 and 31.8, ASME Section V and IX, API 620 and 650, AWS D1.1, required for the execution of the WORK. Where Nondestructive Testing (NDT) forms part of the WORK, and Inspector is required to review or ensure NDT programs and results, he shall have been previously qualified and certified to a minimum ASNT Level II in the relevant method(s). When performing, reviewing or ensuring Nondestructive Testing in VT, MT, PT, RT or UT, he shall be certified in the specific method(s). When performing, reviewing or ensuring Radiographic Testing Film Interpretation (RTFI), Inspector shall be certified in RTFI. 2.2.2. Heat Treatment: Inspector shall have direct knowledge of all aspects of heat treatment and with the types of equipment to be used for the WORK, such as electrical resistance heating Q - Att. I - 2 of 9 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. elements, induction coils, or gas fired heaters. He shall be able to verify the heat treatment parameters to approved heat treatment procedures. If applicable, Inspector shall be thoroughly familiar with the heat-treating requirements of ASME B31.3 and ASME Section VIII Division 1. 2.2.3. Mechanical: Inspector shall demonstrate working knowledge of codes as required by the purchase order, such as ASME Sec I, V, VIII and IX, ANSI B31.3/4/8, NACE, and API 620/650 and AWS D1.1, and testing equipment including Positive Material Identification test equipment required for the inspection of mechanical commodities such as pipes, piping, fittings, valves, structural steel, and fasteners, … etc. , 2.2.4. Positive Materials Identification (PMI): Inspector shall have knowledge about all aspects of PMI test methods and the operation of PMI test equipment used on the job. 2.2.5. Coating: Inspector shall demonstrate a thorough working knowledge and proven ability of all phases and types coating applications and methods and recognized industry standards. For critical coatings per Saudi Aramco SAES “H” series, Inspector shall be additionally qualified to NACE Level II Critical Coatings Certification, CSWIP Level II, or equivalent. 2.2.6. HVAC System: Inspector shall demonstrate a thorough working knowledge of codes such as the Sheet Metal and Air Conditioning Contractors National Association (SMACNA) codes Uniform Mechanical Code, NFPA 90A, ASHRAE Handbooks and/or equivalent standards. 2.2.7. Lifting Equipment/Crane: Inspector shall demonstrate a thorough working knowledge of codes such as ANSI-A17.1 and 17.2, ANSI-B30.1 through B30.16, or equivalent standards. 2.2.8. Electrical: Inspector shall demonstrate a thorough working knowledge of the National Electric Code/NFPA 70, IEC or equivalent standards. Where, inspection of Cathodic Protection equipment is required, inspector must be able to Q - Att. I - 3 of 9 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. demonstrate a thorough knowledge of applicable requirements of NACE or equivalent corrosion standards. 2.2.9. Instrumentation: Inspector shall have three (3) years documented experience in the field of instrumentation and control systems. He shall be familiar with the international Industry Codes and Standards related to Intrinsically Safe Systems and Electrical Systems for Instrumentation such as; ISA RP12.6, ISA RP12.2.02, ISA TR12., ANSI MC96.1, IEEE 518, IEEE 1100, IEC 60529, NEMA ICS 6, NEMA 250, NEMA VE 1, NEMA VE 2, NFPA 70/NEC and UL 94. As a minimum, he shall be able to inspect complete loop checking, wiring continuity, color coding, and start up. When required, he shall be able to evaluate Factory Acceptance Test and demonstrate a thorough working knowledge of international codes and standards related to packaged units instrumentation such as, Distributed Control System (DCS), Supervisory Control and Data Acquisition (SCADA) Systems, Remote Terminal Unit, and Emergency Shutdown (ESD) systems. 2.2.10. Rotating Equipment: He shall have minimum 4 years hands-on inspection experience of rotating machineries such as pumps, compressors, generators, turbines, gears and motors, including attending and assessing Factory Acceptance Test (FAT) and reporting dynamic, vibration and/ or high temperature problems. 3. CONSTRUCTION & PRE COMMISSIONING PHASES 3.1. Quality Control Manager: He shall have a university degree or equivalent and a total of seven years inspection experience or a high school diploma with a total of ten years inspection experience. As minimum, he shall have five (5) years directly relating to supervision of construction activities in the Contract Scope of WORK (e.g.; oil, gas and petrochemical projects, Infrastructure, communication) . 3.2. Quality Control Supervisor: He shall have a university degree or equivalent and a total of seven years inspection experience or a high school diploma with a total of ten years inspection experience. As minimum, he shall have three (3) years directly relating to supervision Q - Att. I - 4 of 9 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. of construction activities in the Contract Scope of WORK (e.g.; oil, gas and petrochemical projects, Infrastructure, communication….) 3.3. Quality Control Inspectors: Inspector shall be High School graduate, or equivalent; shall be able to read, write and speak English Language; shall be fully conversant with applicable Industry Standards and Specifications; and shall perform a variety of inspection functions with minimal supervision. Personnel employed by CONTRACTOR or its subcontractors to perform the WORK described in this Contract shall meet, as a minimum, the following years of relevant experience: Number of years of experience Inspector Title Overall Inspection Specialty Contract Scope of Work* Sr. Inspector 8 5 3 Inspector 5 3 2 Assistant Inspector (Saudi Arabs Only) High School with 3 years working experience Technical college Diploma with 2 years working experience, or BS Degree in Engineering (ME, EE, CE, etc.) *e.g.; oil, gas and communication …etc. petrochemical projects, Infrastructure, Note: An Assistant Inspector may be utilized in place of an Inspector if there is more than one QC Inspector of a particular discipline required under the Contract. Additional requirements shall apply for specific disciplines as follows: 3.3.1. Welding: Inspector shall be certified as an American Welding Society CWI, CSWIP 3.1 Certified Welding Inspector, or SAUDI ARAMCO approved equivalent. Inspector shall have a demonstrated background and thorough knowledge of codes such as ANSI B 31.3, 31.4 and 31.8, ASME Section V and IX, API 620 and 650, AWS D1.1, required for the execution of the Q - Att. I - 5 of 9 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. WORK. Where Nondestructive Testing (NDT) forms part of the WORK, and Inspector is required to review or ensure NDT programs and results, he shall have been previously qualified and certified to a minimum ASNT Level II in the relevant method(s). When performing, reviewing or ensuring Nondestructive Testing in VT, MT, PT, RT or UT, he shall be certified in the specific method(s). When performing, reviewing or ensuring Radiographic Testing Film Interpretation (RTFI), Inspector shall be certified in RTFI. 3.3.2. Plant and Equipment: Inspector shall demonstrate working knowledge of codes, as required by the scope of the Contract, such as ASME Sec I, V, VIII and IX, ANSI B31.3/4/8 and API 620/650 and AWS D1.1, required for the execution of the inspection work. As a minimum, he shall have experienced with: a) Installation of equipment such as, Pumps, Motors, Skids, Valves, Vessels, Compressors, Fired Heaters, Auxiliary Equipment, Packaged Equipment in plant construction….etc b) Piping systems and pipe line, c) Hot tap procedure, d) Vessels, tanks and spheres construction e) structural steel erection f) Hot/Cold Insulation. 3.3.3. Heat Treatment: Inspector shall have direct knowledge of all aspects of heat treatment with the types of equipment such as electrical resistance heating elements, induction coils, or gas fired heaters. He shall be able to verify process parameters to approved heat treatment procedures. Inspector shall also be thoroughly familiar with the heat-treating requirements of ASME B31.3 and ASME Section VIII Division 1. 3.3.4. Positive Materials Identification (PMI): Inspector shall have knowledge about all aspects of PMI test methods and the operation of PMI test equipment used on the job. Q - Att. I - 6 of 9 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. 3.3.5. Civil: Inspector shall demonstrate a thorough working knowledge of recognized building codes such as the Uniform Building Code (UBC) or equivalent standards. As applicable for the work, he shall demonstrate thorough knowledge and proven ability in construction techniques with emphasis on soil mechanics, foundations, retaining walls, structural steel, masonry, building interiors, building finishes, roof systems, and asphalt. 3.3.6. Batch Plant: Inspector shall have direct experience in inspection of asphalt/concrete mix ingredients in accordance with the applicable ASTM, AASHTO or ACI procedures and guidelines. He shall be able to assess the plant QC laboratory to determine that their equipment, procedures /techniques, sample recording and result reporting compliance with the applicable standards. He shall be able to evaluate batch plants capability and safety that meet company requirements. He shall review and performs full-scale plant trials to determine the required engineering properties. 3.3.7. Coating: Inspector shall demonstrate a thorough working knowledge and proven ability of all phases and types of critical coating applications and methods and recognized industry standards and critical coatings. Inspector shall be qualified per the requirements of SAEP 316. 3.3.8. Plumbing: Inspector shall demonstrate a thorough knowledge of codes such as the Uniform Plumbing or equivalent standards. 3.3.9. HVAC System: Inspector shall demonstrate a thorough working knowledge of codes such as the Sheet Metal and Air Conditioning Contractors National Association (SMACNA) codes Uniform Mechanical Code, NFPA 90A, ASHRAE Handbooks and/or equivalent standards. 3.3.10. Lifting Equipment/Crane (Fixed, Overhead, Elevators): Inspector shall demonstrate a thorough working knowledge of codes such as ANSI-A17.1 and 17.2, ANSI-B30.1 through B30.16, or equivalent standards. Q - Att. I - 7 of 9 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. 3.3.11. Electrical: Inspector shall demonstrate a thorough working knowledge of the National Electric Code/NFPA 70, IEC or equivalent standards. He shall also have working knowledge of electrical installations including materials, methods, specifications, and hazardous location identification for oil and gas or petrochemical industries. 3.3.12. Communication: Inspector shall demonstrate a thorough working knowledge of telecommunications, and be familiar with North American or International Telecommunications Standards; Building Industry Consulting Services International - Telecommunications Distribution Methods Manual (BICSITDMM); National Electrical Codes; and National Electrical Safety Codes, or their equivalents. 3.3.13. Instrumentation: Inspector shall be familiar with the international Industry Codes and Standards related to Intrinsically Safe Systems and Electrical Systems for Instrumentation such as; ISA RP12.6, ISA RP12.2.02, ISA TR12., ANSI MC96.1, IEEE 518, IEEE 1100, IEC 60529, NEMA ICS 6, NEMA 250, NEMA VE 1, NEMA VE 2, NFPA 70/NEC and UL 94. As a minimum, he shall be able to inspect complete loop checking, wiring continuity and color coding, start up, and troubleshooting. When required, he shall be able to evaluate Factory Acceptance Test and demonstrate a thorough working knowledge of international codes and standards related to packaged units instrumentation such as, Distributed Control System (DCS), Supervisory Control and Data Acquisition (SCADA) Systems, Remote Terminal Unit, and Emergency Shutdown (ESD) systems. 3.3.14. Cathodic Protection: Inspector shall have two (2) years documented experience in the field of cathodic protection for the required specific application. He shall be able to demonstrate a thorough working knowledge of international codes and standards related to inspecting Cathodic Protection System and its components, such as anode installation, cable installation, and positive and negative cable hookups to rectifier. He shall be able to interpret and assess cathodic Q - Att. I - 8 of 9 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. protection design packages to ensure compliance with the contractual requirements. 3.3.15. Nondestructive Testing (NDT) Personnel: All CONTRACTOR and subcontractor personnel located in Saudi Arabia responsible for performing NDT operations, or interpreting, reviewing, ensuring or auditing NDT operations shall meet SAUDI ARAMCO’s requirement as listed in SAEP-1142. All CONTRACTOR and subcontractor NDT and personnel shall hold current certification where outlined below attesting to their NDT qualifications. 3.3.15.1. Nondestructive Testing NDT Level III personnel: such personnel shall have been tested and certified by ASNT (or equivalent nationally recognized program as approved by SAUDI ARAMCO) in the required NDT method(s) specified by the Contract and shall be required to fulfill the full scope of a practicing Level III including, but not limited to: method application, interpretation of results, interpretation of codes and standards, preparation of procedures, and training of Level I and Level II personnel. 3.3.15.2. Radiograph Film Interpretation Technician: such personnel shall be certified by SAUDI ARAMCO in Radiographic Testing Film Interpretation (RTFI) when performing, reviewing, ensuring or auditing RTFI. END OF SCHEDULE “Q” ATTACHMENT I Q - Att. I - 9 of 9 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. ATTACHMENT II TO SCHEDULE “Q” SAUDI ARAMCO STANDARDS AND PROCEDURES CONTAINING QUALITY REQUIREMENTS CONTRACTOR shall comply with all applicable SAUDI ARAMCO Material System Specifications (SAMSS), SAUDI ARAMCO Engineering Standards (SAES), and other SAUDI ARAMCO standards and specifications including, but not limited to the following procedures relating to Quality requirements: 1. SAEP-122 Project Records 2. SAEP-124 Producing, Processing and Controlling CADD Drawings Within Saudi Aramco 3. SAEP-127 Security and Control o f Saudi Aramco Engineering Data 4. SAEP-133 Instructions for the Development of "Regulated Vendors List" Engineering Standards 5. SAEP-302 Instructions for Obtaining a Waiver of a Saudi Aramco Engineering Requirement 6. SAEP-303 Engineering Reviews of Project Proposal and Detail Design Documentation 7. SAEP-311 Installation of Hot Tapped Connections 8. SAEP-316 Performance Qualification of Coating Personnel 9. SAEP-318 Pressure Relief Valve Program Authorization for Installation, Deletion and Changes 10. SAEP-324 Certification Review and Registration of Project Welders and Brazers 11. SAEP-334 Certification and Submittal of Saudi Aramco Engineeri ng Drawings 12. SAEP-352 Welding Procedures and Approval 13. SAEP-1101 through SAEP-1117: Welding and Brazing Test Supplements for Welder Performance Qualification 14. SAEP-1131 Pressure Relief Valve Program Use of Form 3099A, RV Authorization 15. SAEP-1133 Form 3750, Pressuring Relieving Device Test Report 16. SAEP-1141 Industrial Radiation Safety Q - Att. II - 1 of 2 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. 17. SAEP-1142 Qualification of Non-Saudi Aramco NDT Personnel 18. SAEP-1143 Radiographic Examination 19. SAEP-1144 Magnetic Particle Examination 20. SAEP-1145 Liquid Penetrant Examina tion 21. SAEP-1154 Guidelines for Contractor’s Quality Plans 22. SAEP-1634 Factory Acceptance Test 23. SAEP-1636 Installation And Checkout Plan 24. SAEP-1638 Site Acceptance Test Plan 25. SAEP-3101 Spare Parts Data Requirements for Contractor Procured Equipment 26. SAER 1972 SAUDI ARAMCO Inspection Requirements (Form 175) 27. SAUDI ARAMCO Drafting Manual END OF SCHEDULE “Q” ATTACHMENT II Q - Att. II - 2 of 2 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. ATTACHMENT III TO SCHEDULE “Q” QUALITY REQUIREMENTS FOR CONTRACTOR SUPPLIED MATERIALS 1. PROCUREMENT PROCESS 1.1. CONTRACTOR shall provide and document Quality services in the procurement of equipment and material to be used or installed during the construction and installation of the facilities as specified in the requirements of the Contract. 1.2. CONTRACTOR or its SAUDI ARAMCO approved third party inspector shall perform Quality activities at the supplier and sub-supplier locations as required by the inspection level assigned for the materials and equipment identified in SAER-1972 Inspection Requirements. Subject to SAUDI ARAMCO approval, CONTRACTOR may change the assigned code of inspection during the course of the work as a result of supplier performance. 1.3. Supplier Selection 1.3.1. Except as provided in Paragraph 1.3.5 of this Attachment III to Schedule “Q”, for all equipment and materials for which inspection requirements are specified on the applicable SAUDI ARAMCO Form 175, CONTRACTOR shall prequalify each manufacturer and its specific manufacturing site as described in 1.3.1 through 1.3.3 of this Attachment III to Schedule “Q”. Evidence of the prequalification shall be provided to SAUDI ARAMCO for its review at least two weeks prior to placement of the purchase order. 1.3.2. CONTRACTOR shall evaluate supplier’s capabilities to meet the technical, quality and schedule requirements of the WORK. Such evaluation shall include technical review of products to ensure compliance with applicable SAUDI ARAMCO standards. 1.3.3. CONTRACTOR shall evaluate suppliers’ Quality System, which shall meet ISO 9001 system requirements. Reliance solely on certification to ISO Quality Systems is unacceptable. CONTRACTOR's prior audits findings are considered current Q - Att. III - 1 of 6 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. if completed within 24-months prior to the proposed equipment purchase and do not include any major technical or quality deficiencies. 2. 1.3.4. CONTRACTOR shall complete a physical surve y of proposed suppliers for any equipment requiring an inspection level of 2, 3, or 4 as specified in SAER-1972. CONTRACTOR supplier evaluations shall, at a minimum, be carried out by a certified lead auditor per the requirements of Attachment I to this Schedule “Q” and a technical expert for the equipment under consideration. 1.3.5. CONTRACTOR shall notify SAUDI ARAMCO at least two weeks ahead of all planned supplier surveys. 1.3.6. Quality System evaluations are not required for manufacturers or suppliers currently specified in SAUDI ARAMCO Engineering Standards (SAES) or in Schedule “G”. For equipment and materials not covered by SAES, Quality System evaluations are not required if the proposed supplier is on a specific listing provided by SAUDI ARAMCO for reference on this project. PROCUREMENT INFORMATION 2.1. CONTRACTOR shall review and ensure the quality of all requisitions prior to submittal for Saudi Aramco review, including all technical and quality requirements specified in Schedule “G”. 2.2. CONTRACTOR shall review its supplier's sub-orders to ensure that all relevant SAUDI ARAMCO technical and inspection requirements are passed on to sub-suppliers. 2.3. CONTRACTOR shall ensure that all suppliers and manufacturers of inspectable equipment and material have and maintain acceptable Quality programs in accordance with the ISO-9001 quality standard. 2.4. CONTRACTOR shall complete and submit a weekly inspection/fabrication status report to the Company Representative in an electronic format acceptable to SAUDI ARAMCO. The report sha ll Q - Att. III - 2 of 6 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. include, as a minimum, the following information for each purchase order: 2.4.1. 2.4.2. 2.4.3. 2.4.4. 2.4.5. 2.4.6. 2.4.7. 2.4.8. 2.4.9. 2.4.10. 2.4.11. 2.4.12. 2.4.13. 2.5. 3. Purchase Order Number and Date Material Description Vendor Name and Location Inspection Assignment Package submittal date as specified in Paragraph 3.7 of this Attachment III. Level of Inspection as specified in SAER-1972” Pre-inspection Meeting Date Fabrication Start Date and progress to date Scheduled and Forecast Delivery Date Inspector and Agency (qualified as specified in Attachment I of Schedule “Q”) Special Process Procedures (approved as specified in Paragraph 3.5 of this Attachment III) Open and Closed NCR’s Closeout Date Disposition Report submittal date SAUDI ARAMCO shall have access to all purchase order inspection report files VERIFICATION OF PURCHASED MATERIALS/EQUIP MENT 3.1. CONTRACTOR shall maintain an effective system for continuity of order identification that ensures drawings, specifications, and inspection requirements are properly transmitted to suppliers at all tiers of order placement. 3.2. CONTRACTOR and/or its suppliers shall prepare detailed Inspection and Test Plans (ITPs) in accordance with paragraph 3.4 of this Attachment for all equipment and materials assigned a level 2, 3, or 4 in SAER-1972, and for any other equipment deemed necessary by CONTRACTOR. 3.3. CONTRACTOR shall review the Quality requirements in all applicable SAUDI ARAMCO standards and procedures listed in Attachment II to this Schedule “Q” and include appropriate Quality requirements in the Q - Att. III - 3 of 6 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. ITPs. Each ITP shall identify, as a minimum the inspection level and detail all witness, hold and certification review points as specified in the SAUDI ARAMCO Form175 (Inspection Requirements). 3.4. CONTRACTOR shall prepare a Special form 175 for approval by the Company Representative: 3.4.1. 3.4.2. 3.5. If no existing form 175 is applicable to the equipment, or For changes to the existing form 175; As a minimum, each ITP shall include the following information: 3.5.1. 3.5.2. 3.5.3. 3.5.4. 3.5.5. 3.5.6. 3.5.7. 3.5.8. Process description Quality control requirements Notification requirements for supplier inspection, witness and hold points (minimum 5 calendar days) Responsibility for inspection/test Applicable procedures Acceptance criteria (Saudi Aramco and International Industry Standards) Verifying documents Inspection points (Hold, Witness & Review) 3.6. When required by SAUDI ARAMCO’s standards, CONTRACTOR shall submit for SAUDI ARAMCO’s review and approval all supplier procedures for refractory installation, welding, welding repair, NDT (inKingdom only) , heat treatment, and alloy verification (PMI) as applicable, no later than 30 days prior to the start of the specific work activity. 3.7. Supplier and sub supplier personnel for NDT, Positive Material Identification, and welding shall be qualified as specified by SAUDI ARAMCO’s Standards and Attachment I of this Schedule “Q”. CONTRACTOR shall review and approve such qualifications prior to the start of manufacturing. 3.8. The qualification and certification of Out of Kingdom Nondestructive Testing (NDT) personnel shall be in accordance with a nationally recognized program as listed in SAEP-1142. CONTRACTOR’s certified Level III Inspector shall review and approve all supplier and sub supplier NDT personnel qualification and certification programs as well as all NDT procedures prior to commencements of any NDT operation. Copies of approved procedures shall be submitted to SAUDI ARAMCO. Q - Att. III - 4 of 6 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. 3.9. CONTRACTOR shall make supplier and sub-supplier NDT personnel records and Welder Qualification Records available to the Company Representative on request. 3.10. CONTRACTOR shall compile and forward to the Company Representative no later than twenty-one (21) calendar days prior to the pre-inspection meeting and start of any fabrication, either at the prime supplier or a major sub -supplier, one electronic version on compact disc (CD) and two (2) hard copy sets of the CONTRACTOR's Inspection Assignment Package. 3.10.1. Inspection assignment package is a set of documents that include details of purchased material/equipment and their quality requirements needed to perform full inspection at the vendor/sub -vendor facility. This package shall include the following documents: 3.10.1.1. A complete copy of the CONTRACTOR's unpriced purchase order or subcontract, material requisition, and attachments. 3.10.1.2. Copies of sub-supplier's applicable unpriced purchase orders. (If these are not available, CONTRACTOR shall provide them to the Company Representative upon placement by the supplier.) 3.10.1.3. Inspection requirements as specified applicable SAUDI ARAMCO Form 175. in the 3.10.1.4. Inspection assignment sheet specifying inspector(s) that will perform the inspections. the 3.10.1.5. Inspection and Test Plans 3.10.1.6. The level of CONTRACTOR inspection (as required by SAER-1972 or Att. VI to this Schedule “Q”.) 3.10.1.7. Agenda for each pre-inspection meeting where appropriate. 3.11. CONTRACTOR or its approved third party inspector shall schedule and perform source inspection at supplier and sub -supplier fabrication sites as specified in the approved Inspection and Test Plans. 3.12. Contractor shall provide Pre-inspection Meeting Reports and subsequent Vendor Inspection Reports to the Company Representative within 10 calendar days of each shop visit. Q - Att. III - 5 of 6 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. 3.13. If SAUDI ARAMCO waives a plant inspection visit, CONTRACTOR shall obtain from suppliers and sub-suppliers such inspection records as may be required to meet the requirements of Paragraph 3.8, and include the inspection records in the Inspection Disposition Reports (Paragraph 3.12). Such waiver shall not release CONTRACTOR from any other obligations contained in this Schedule “Q”. 3.14. CONTRACTOR shall require its Subcontractors / suppliers to submit manufacturing and test reports as specified on each form SA-175. The CONTRACTOR shall review and indicate its acceptance of these inspection records prior to issuing the inspection (or shipping) release. A copy shall be provided to SAUDI ARAMCO with the Inspection Disposition Report. 3.15. Within two weeks of acceptance of material or equipment, CONTRACTOR shall prepare and issue to the Company Representative a final disposition report. This report shall be based upon CONTRACTOR's review of the inspection file and include as a minimum: 3.15.1. Narrative details of Quality activities performed during manufacturing and fabrication of the equipment or material. 3.15.2. Copies of SAUDI ARAMCO approved waivers to SAUDI ARAMCO’s requirements. 3.15.3. All SA-175 CONTRACTOR witnessed inspections. 3.15.4. Copies of supplier quality records as specified in SA-175. 3.15.5. Copies of all NCR's with final dispositions and resolutions. 3.15.6. Outstanding punch list items from pre-shipment inspections. 3.15.7. In cases where the supplier is responsible for export packing, the final disposition report shall be prepared after export packing has been inspected and accepted by CONTRACTOR. END OF SCHEDULE “Q” ATTACHMENT III Q - Att. III - 6 of 6 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. ATTACHMENT IV TO SCHEDULE “Q” QUALITY REQUIREMENTS FOR THE CONSTRUCTION PHASE 1. CONTROL OF CONSTRUCTION ACTIVITIES 1.1. Unless submitted with the Project Quality Plan in accordance with paragraph 3.2 of Schedule Q, one month prior to the start of the applicable WORK, CONTRACTOR shall submit for review and approval a detailed Inspection and Test Plan (ITP) along with related procedures/work instructions for all construction processes to be executed by CONTRACTOR or subcontractors. CONTRACTOR shall review the quality requirements in all applicable SAUDI ARAMCO standards and procedures listed in Attachment II to this Schedule “Q” and include appropriate Quality requirements in each ITP. Each ITP shall detail all review, witness, and hold points for SAUDI ARAMCO, CONTRACTOR, and subcontractors as specified in this Contract. It shall also include the methods, extent and timing for examinations, measurements or tests. 1.2. As a minimum, each ITP shall include the following information: 1.2.1. Process description 1.2.2. Quality control requirements 1.2.3. Notification requirements for Requests For Inspections (RFI) (minimum 24 hours for site work, 48 hours for weekend inspections, except when SAUDI ARAMCO personnel will require special qualifications.) 1.2.4. Responsibilities 1.2.5. Applicable procedures 1.2.6. Acceptance criteria 1.2.7. Percentage of tests to be done (including increased inspection levels when performance requirements are not met.) 1.2.8. Verifying documents 1.2.9. Review, Witness and Hold points Q - Att. IV - 1 of 5 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. 2. 1.3. Inspection and Test Plans and related procedures shall include provisions to ensure that test prerequisites have been met, that adequate calibrated instrumentation is available and used, and that the necessary inspection is performed. 1.4. Revision Control - CONTRACTOR shall revise each ITP and obtain approval for such revisions from the Company Representative as needed throughout the WORK. CONTRACTOR and subcontractor inspectors shall maintain copies of every currently approved subcontractor ITP. VALIDATION OF CONSTRUCTION PROCESSES 2.1. The following special processes require SAUDI ARAMCO’s review and/or approval of work procedures, personnel qualifications, or personnel qualification procedures. CONTRACTOR shall ensure that these special processes are accomplished under controlled conditions as specified in all applicable standards and specifications. All process parameters shall be identified with acceptance criteria specified and monitored. All Procedures and Personnel Qualification shall be submitted for review and/or approval at least thirty (30) calendar days prior to the start of WORK. Special Process Welding/Brazing Nondestructive Testing/examination High Voltage Cable splicing/termination Alloy verification (PMI) Coatings Concrete & Asphalt Mix Design Cable and Conduit Seal Installation Gasket Installation Concrete Installation Structural Bolt Tensioning Gap Control for socket weld and back welded threaded fittings. Hydro-testing Work Personnel Personnel Procedure Qualification Qualification Approval (A) Procedure Approval or Review Approval Required (R) Required Required A Yes Yes A Yes* Yes R Yes Yes A Yes Yes A No Yes A No No R No No R No No R No No R No No R No No A No No Q - Att. IV - 2 of 5 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. Heat Treatment A No No Hot Tap Procedures (Calculation Sheets) A No No Refractory Installation A No No RTR Pipe work R No Yes HVAC Testing & Balancing R No No Fiberoptic cable installation A No No *Note: Approval of personnel qualification procedure is not required when the work is subcontracted to an approve NDT contractor. 3. 4. IDENTIFICATION AND TRACEABILITY 3.1. CONTRACTOR shall include in the Construction Phase Quality Plan procedures to identify inspection and test status. The status report shall identify all CONTRACTOR and subcontractor required inspection and tests for each system, when it is scheduled, when it was completed, and any non-conformances discovered during the test or inspection. Inspection status reports shall be kept current and shall be available for SAUDI ARAMCO’s review at all times. 3.2. CONTRACTOR shall implement an identification procedure for all materials, parts and components, including partially fabricated assemblies. Identification of an item shall be addressed either by using tags, stamps, color coding, stencils or labels. The location and the method of identification shall not affect the function or quality of the item being identified. The procedure shall require that verification of correct identification of material, parts and components be made and documented prior to installation. 3.3. Traceability shall be maintained on equipment, materials, parts and components, as specified in SAUDI ARAMCO standards and manufacturer’s specifications. Documents and records shall enable an item to be traced throughout fabrication, erection, installation, repair, modification and use of the item. CUSTOMER PROPERTY CONTRACTOR shall implement a documented control system for all SAUDI ARAMCO’s supplied material or equipment. The written procedure shall provide for receiving inspection, proper storage, and maintenance of such material and equipment. This procedure shall have provisions for dealing Q - Att. IV - 3 of 5 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. with losses, damage or other problems discovered with such material and equipment. 5. PRESERVATION CONTRACTOR shall include procedures for handling, storage, and preservation of material as specified in all applicable specifications, manufacturer recommendations and SAUDI ARAMCO’s standards. The procedure shall list all inspection schedules for maintaining the quality of the material or equipment as well as provide for documentation that the required activities have been performed. Individuals responsible for special handling, storage and preservation shall be fully qualified to do so, and supplied with predetermined WORK and inspection instructions. Data concerning handling, storage and preservation shall be included on the Monthly Materials Procurement Status Report as specified in Schedule “G”. 6. CONTROL OF MONITORING AND MEASURING DEVICES 6.1. CONTRACTOR shall include procedures for the control of inspection, measuring and testing equipment. Specific tools and equipment shall be identified to make and perform tests in the field with instructions for their use, calibration, and storage. The CONTRACTOR shall identify, maintain, control, adjust, and calibrate all tools, gauges, instruments and other measuring and testing devices used for controlling quality. Calibration shall be performed at established periods as specified in the most stringent of SAUDI ARAMCO standards, other applicable standards, or manufacturer recommendations; if no standards apply, the calibration cycle shall not exceed six months. CONTRACTOR shall provide backup equipment when the primary equipment is being calibrated or tested. 6.2. CONTRACTOR personnel performing tests and calibrations shall be trained per applicable international or manufacturer requirements. CONTRACTOR testing and calibration personnel as well as testing facilities shall be subject to Saudi Aramco approval. If CONTRACTOR personnel do not perform tests and calibrations , CONTRACTOR shall use Saudi Aramco approved agencies or the manufacturer. 6.3. CONTRACTOR shall review and document the validity of previous inspection and test results when inspection, measuring and test Q - Att. IV - 4 of 5 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. equipment is found to be out of calibration. A copy of the report shall be submitted to Saudi Aramco. 7. MONITORING OF CONSTRUCTION PROCESSES 7.1. CONTRACTOR shall visually inspect all incoming equipment for damage and for conformance to all applicable requirements, including the supplier inspection release with verified Material Test Reports (MTR). If the equipment does not have the required inspection release and MTR, CONTRACTOR shall verify and document the compliance of the equipment with applicable standards and specifications prior to release to be used as part of the WORK. Data concerning receiving inspections shall be included on the Monthly Materials Procurement Status Report as specified in Schedule “G”. 7.2. CONTRACTOR shall submit its test reports and its subcontractors test reports to the Company Representative as specified by the applicable SAUDI ARAMCO standards. The CONTRACTOR shall review its subcontractor’s test reports prior to submittal. 7.3. CONTRACTOR shall review/witness and accept results of all NDT performed by subcontractors and submit test results to company. END OF SCHEDULE “Q” ATTACHMENT IV Q - Att. IV - 5 of 5 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. ATTACHMENT V TO SCHEDULE “Q” SUMMARY OF QUALITY SYSTEM DELIVERABLES No. First Submittal to SAUDI ARAMCO Title Subsequent submittals to SAUDI ARAMCO 1. Quality Plan: Paragraph 3.2 of Schedule “Q” 30 days after Contract Award Within 7 calendar days of each revision requirement 2. Organization Chart(s) Paragraph 5.2 of Schedule “Q” With Quality Plan submittal Monthly Prior to assignment of personnel on the project Prior to bringing new Quality personnel on the project. 3. Quality Personnel Qualifications: Paragraph 5. 3 of Schedule “Q” Quality Audit Schedule: Paragraph 7.2.2 of Schedule “Q” 8. Within thirty (30) calendar days of the effective date of the Contract Audit Report: Paragraph 7.2.5 of Within fourteen (14) calendar days Schedule “Q” of completion of the audit and reaudit. Inspection Schedules: Paragraph 7.1 Fourteen (14) calendar days before of Schedule “Q” the start of any related activities CONTRA CTOR, Vendor and Within 48 hours of reporting each Subcontractor NCR’s: Paragraph non-conformance 7.3.1 of Schedule “Q” NCR Summary: Paragraph 7.3.2 of After the first NCR is issued Schedule “Q” 9. Quality Management Report Paragraph 7.5 of Schedule “Q” Sixty (60) calendar days after the effective date of the Contract Monthly Inspection/Fabrication Status Report: Paragraph 2.4 of Attachment III Inspection Assignment Package; Paragraph 3. 9 of Attachment III (including Procurement ITP’s) Pre-inspection Meeting Reports Paragraph 3. 11 of Attachment III Vendor Inspection Reports Paragraph 3. 11 of Attachment III One week after the first purchase order is awarded for the Contract Weekly 4. 5. 6. 7. 10. 11. 12. 13. 14. 15. 16. Twenty one (21) calendar days prior to pre-inspection meeting or start of fabrication Ten (10) calendar days after preinspection meeting Ten (10) calendar days after the first inspection visit for each supplier Whenever materials are released for shipment Inspection Disposition Report Paragraph 3. 14 of Attachment III Special Process Procedures and Personnel Qualification Procedures: Thirty (30) calendar days prior to Paragraph 3. 5 & 3.7 of Attachment III operation or test and Paragraph 2 of Attachment IV Construction Inspection and Test Plans: Paragraph 1.1 of Attachment One month prior to start of WORK IV Within 7 calendar days of revisions Updated Weekly Notification of clearance required Weekly for the Project Progress Meeting Ten (10) calendar days after each inspection visit Revision Approval prior to execution Revision Approval prior to execution END OF SCHEDULE “Q” ATTACHMENT V Q - Att. V - 1 of 1 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. ATTACHMENT VI TO SCHEDULE “Q” PROJECT SPECIFIC QUALITY REQUIREMENTS 1. PROCUREMENT PHASE PROJECT SPECIFIC QUALITY REQUIREMENTS 1.1. Minimum inspection levels for CONTRACTOR supplied equipment and materials are indicated in SAER 1972. CONTRACTOR shall submit its supplier inspection and test plans according to these minimum inspection levels. When vendor performance does not meet the specified requirements in the purchase order, CONTRACTOR shall increase the inspection level to the next highest level for the purchase order without additional cost to SAUDI ARAMCO. For any equipment items that have no specified inspection levels, CONTRACTOR shall prepare a special form 175 for approval by the Company Representative. 1.2. For the following equipment items in Table VI-1, CONTRACTOR shall provide additional inspection personnel for coverage at the specified inspection level as indicated: Table VI-1 Material and Equipment requiring multiple Inspection disciplines Item 2. Material Description Inspection Level Remarks CONSTRUCTION AND PRECOMMISSIONING PHASE PROJECT SPECIFIC QUALITY REQUIREMENTS 2.1. As a minimum, CONTRACTOR shall assign, or require its subcontractor to assign SAUDI ARAMCO approved quality personnel to the WORK in accordance with the following table VI-2. With SAUDI ARAMCO approval, inspectors may be qualified to inspect more than one discipline; in this case, however, he may not fulfill more than one full time position at any time. Q - Att. VI - 1 of 3 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. Table VI-2 Construction Phase Quality Personnel Requirements Position Primary CONTRACTOR Subcontractor(s) Primary Inspectors (CONTRACTOR or subcontractor) CONTRACTOR Supervising Inspectors Quality Assurance Manager Quality Control Manager Quality Control Supervisor Construction Discipline Precommissioning Inspectors Inspection Discipline: Inspection Discipline: Inspection Discipline: Inspection Discipline: Q - Att. VI - 2 of 3 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03 CONTRACT NO. (Note: expand discipline list for Inspectors as applicable to the scope of work.) 3. CONTINUAL IMPROVEMENTS: (Note: Include requirement in Schedule Q for monthly reporting of quality improvements.) 4. OTHER PROJECT SPECIFIC REQUIREMENTS: 5. EXCLUSIONS AND MODIFICATIONS TO SCHEDULE “Q”: END OF SCHEDULE “Q” ATTACHMENT VI Q - Att. VI - 3 of 3 MP-IK-LSTK, MP-OK-LSTK, MP-LSTK, C/R, MP-IK-LS, MP-IK-LSPB, OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS 11/03