Uploaded by Jos See

WORK PLAN PROPOSAL - GANGWAY INSTALLATION ALTERNATIVE M3DR-A (R2)

advertisement
OCEAN VANTAGE ENGINEERING SDN. BHD.
WORK PLAN PROPOSAL
GANGWAY INSTALLATION ON M3DR-A
Company
Ocean Vantage Engineering Sdn. Bhd.
Document Title
Work Plan Proposal – Gangway Installation on M3DR-A
Client
Tanjung Offshore Services Sdn. Bhd.
Rig
GHAZI 461 & Blooming Wisdom
Location
M3
Document No.
OVE/WPP/M3DRA/001/R1
Revision No.
2
Issued Date
12 December 2022
Prepared By
Rizal Aizad
WORK PLAN PROPOSAL
Tanjung Offshore Services Sdn. Bhd.
Ocean Vantage Engineering Sdn. Bhd.
OVE/WPP/M3DRA/001/R2
Contents
ALTERNATIVE GANGWAY INSTALLATION PROPOSAL .............................................................................................. 3
PROPOSAL 1: SHIFT GANGWAY LOCATION TO SOUTH (WITHOUT TUGGER UNIT) ......................................... 3
LIFTING ACCESSORIES AND CONSUMABLES READINESS ...................................................................................... 8
LIFTING ACCESSORIES CERTIFICATE (10T CHAIN BLOCK) ..................................................................................... 9
WORK PLAN PROPOSAL
Tanjung Offshore Services Sdn. Bhd.
Ocean Vantage Engineering Sdn. Bhd.
OVE/WPP/M3DRA/001/R1
ALTERNATIVE GANGWAY INSTALLATION PROPOSAL
PROPOSAL 1: SHIFT GANGWAY LOCATION TO SOUTH (WITHOUT TUGGER UNIT)
FIGURE (1)
Comments:
Proposal (1) is to shift gangway landing point to south, eliminate the use of air tugger (significant reduction of weight).
Rigging up of gangway and tensioning of slings using 4 units of 10MT chain blocks (configuration, hooking points
based on drawing no. T7-PCSB-AIP-DWG-022-22. Suggest to replace chain block with turnbuckle once the gangway
in the position for long term at Platform M3DR-A. High tide or low tide use to be adjusted from PAP at barge. PAP
can be repositioned, secured with choke and elevation can be adjusted accordingly using scaffolding board.
WORK PLAN PROPOSAL
Tanjung Offshore Services Sdn. Bhd.
Ocean Vantage Engineering Sdn. Bhd.
OVE/WPP/M3DRA/001/R1
FIGURE (2)
Comments:
After survey perform at Platform M3DR-A on 11/12/2022, OVE propose reposition the primary line to reduce the
tension and avoid air tugger winch handrail removal. Also, the secondary line shall relocate from the cellar deck main
beam (W36 X 210) to Universal beam (W24 X68). For lateral hold back line shall remain for movement of the
gangway.
WORK PLAN PROPOSAL
Tanjung Offshore Services Sdn. Bhd.
Ocean Vantage Engineering Sdn. Bhd.
OVE/WPP/M3DRA/001/R1
OPTION 1A (WITHOUT PADEYES):
WORK PLAN PROPOSAL
Tanjung Offshore Services Sdn. Bhd.
Ocean Vantage Engineering Sdn. Bhd.
OVE/WPP/M3DRA/001/R1
Comments for Option 1A (without padeyes) :
For primary line requires cutting work on maindeck to remove both side top plate and secondary line on cellar deck
remove two side for (single basket hitch) top plate to access main beam tie point.
WORK PLAN PROPOSAL
Tanjung Offshore Services Sdn. Bhd.
Ocean Vantage Engineering Sdn. Bhd.
OVE/WPP/M3DRA/001/R1
OPTION 1B (WITH PADEYES):
Comments for Option 1B (with padeyes):
For both primary and secondary line requires 8.5T padeye design as anchor points. For this option require longer
lead time to supply the materials (EH36) 4 - 5 working working weeks including fabrication in Labuan. Furthermore,
the padeyes installation should include additional workscope of welding habitat, MPI and Loadtest that high
possibilities to impact cost and schedule.
WORK PLAN PROPOSAL
Tanjung Offshore Services Sdn. Bhd.
Ocean Vantage Engineering Sdn. Bhd.
OVE/WPP/M3DRA/001/R1
LIFTING ACCESSORIES AND CONSUMABLES READINESS
WORK PLAN PROPOSAL
Tanjung Offshore Services Sdn. Bhd.
Ocean Vantage Engineering Sdn. Bhd.
OVE/WPP/M3DRA/001/R1
LIFTING ACCESSORIES CERTIFICATE (10T CHAIN BLOCK)
Download