Environmental Impact Assessment September 2017 Sri Lanka: Wind Power Generation Project Maps 1–7 Prepared by Ceylon Electricity Board, Ministry of Power and Renewable Energy, Democratic Socialist Republic of Sri Lanka for the Asian Development Bank. This is an updated version of the draft originally posted in May 2017 on https://www.adb.org/projects/documents/sri-49345002-eia This environmental impact assessment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section on ADB’s website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. MAPS Map 1: Map 2: Map 3: Map 4: Map 5: Map 6: Map 7: Project Boundary Locations of Wind turbines Laydown Areas Locations of Access Roads Locations of Cable trenches Access Road design Design of Toilets etc. MAPS 1-7 SRI: 100 MW Mannar Wind Power Project