BUREAU OF FIRE PROTECTION CITIZEN’S CHARTER BUREAU OF FIRE PROTECTION CITIZEN’S CHARTER 1 I. MANDATE The Bureau of Fire Protection was created by virtue of RA 6975 primarily to perform the following functions: 1. Be responsible for the prevention and suppression of all destructive fires on: a. Building, houses and other structures; b. Forest; c. Land transportation vehicles and equipment; d. Ships and vessels docked at piers or wharves anchored in major sea ports; e. Petroleum industry installations; f. Plane crashes; and g. Other similar activities 2. Be responsible for the enforcement of the Fire Code of the Philippines and other related laws; 3. Shall have the power to investigate all causes of fires and if necessary, file the proper complaint with the city or provincial prosecutor who has jurisdiction over the case; 4. In the time of national emergency, all elements of the BFP shall upon direction of the President, assist the AFP in meeting the national emergency; and 5. Shall establish at least one (1) fire station with adequate personnel, firefighting facilities and equipment in every provincial capital, city and municipality subject to standard rules and regulations as maybe promulgated by. II. VISION A modern fire service fully capable of ensuring a fire safe nation by 2034. III. MISSION We commit to prevent and suppress destructive fires, investigate its causes, enforce Fire Code and other related laws, respond to man-made and natural disasters and other emergencies. IV. SERVICE PLEDGE We commit to: 1. Ensure public safety. 2. Promote economic development through the prevention and suppression of all kinds of destructive fires. 3. Enforce all laws, rules and regulations to ensure adherence to standard fire prevention and safety measure. 4. All applicants or requesting parties who are within the premises of the office or agency concerned prior to the end of official working hours and during lunch break shall be attended to. 2 LIST OF SERVICES Fire Station or Lone District Fire Office Frontline Services Fire Safety Evaluation Clearance (FSEC) Application – Regular (Simple) 5-9 Fire Safety Evaluation Clearance (FSEC) Application – Regular (Complex) 10 - 14 Fire Safety Evaluation Clearance (FSEC) Application – Process at OSCP 15 - 22 Fire Safety Inspection Certificate (FSIC) Application – Regular (Simple) for Certificate of Occupancy 23 - 28 Fire Safety Inspection Certificate (FSIC) Application – Regular (Complex) for Certificate of Occupancy 29 - 34 Fire Safety Inspection Certificate (FSIC) Application – Process at OSCP for Certificate of Occupancy 35 - 41 Fire Safety Inspection Certificate (FSIC) Application for New Business with Valid FSIC Issued During Occupancy Permit Stage 42 - 45 Fire Safety Inspection Certificate (FSIC) for New Business Permit without Valid FSIC for Occupancy Issued and with Occupancy Certificate Not Filed After Nine (9) Months from Issuance 46 - 51 Fire Safety Inspection Certificate (FSIC) Application for Business Renewal 52 - 57 Fire Safety Inspection Certificate (FSIC) Application for Business Renewal 58 - 63 without Valid FSIC or Expired FSIC / with Existing Violation of the Fire Code / Included in the Negative List Issuance and Service of Notice to Comply (NTC) Procedure 64 - 68 Issuance and Service of Notice to Correct Violation (NTCV) Procedure 69 - 74 Issuance and Service of Abatement Order (AO) Procedure 75 - 80 Issuance and Service of Closure Order (Due to Non-payment of Administrative Fine) Procedure 81 - 84 Issuance and Service of Closure Order (Due to Expiration of Abatement Order) Procedure 85 - 88 Implementation of Closure Order 89 - 90 3 Fire Station or Lone District Fire Office Frontline Services 4 Fire Safety Evaluation Clearance (FSEC) Application - Regular (Simple) A document issued by the BFP as a prerequisite for the grant of Building Permit by the Office of Building Official having jurisdiction upon determination that the evaluated plans are compliant with Republic Act 9514 and its Revised Implementing Rules and Regulations. Office: Classification: Fire Station or Lone District Fire Office A. Simple Transaction Refers to applications for any of the following structures whose floor area does not exceed 1,500 square meters: 1) Single dwelling residential building of not more than three floors/storey, 2) Commercial buildings of not more than two (2) floors/storey, 3) Renovation within a mall with issued building permit, and 4) Warehouse storing non-hazardous substance. Processing Time: Three (3) working days Type of Transaction: 1. G2C – Government to Citizen 2. G2B – Government to Business Entity Who may avail: Owner, Contractor or Business Entity CHECKLIST OF REQUIREMENTS WHERE TO SECURE Accomplished application form for Fire Safety Evaluation Clearance (FSEC) 1 original copy Architectural documents 3 original copies Civil documents 3 original copies Electrical documents 3 original copies Mechanical documents 3 original copies Plumbing documents 3 original copies Electronics documents 3 original copies Sanitary documents 3 original copies Fire Station/ Lone District Fire Office Signed and sealed by the Designer/Contractor Fire Protection documents 3 original copies Cost Estimate of the building including labor cost duly 1 original copy Signed and sealed by the Designer/Contractor notarized Fire Safety Compliance 1 set of original Report (FSCR), if required copy Management Certification for Hot Works bearing the name of the PAI Fire Safety Practitioner 1 original copy Business Entity/ Contractor/ Owner 5 CLIENT STEPS AGENCY ACTION 1. Completely fill-out necessary information in the application form. 1. Issue a queuing number and application form and instruct the applicant to complete the necessary information. 2. Receive from the applicant all documents required in the checklist of requirements. 2. Submit the filled-out application form and the required documents in the checklist of requirements. FEES TO BE PAID 3. Check the completeness of the submitted documents. 4. Record to the Official Log Sheet the name of applicant and owner of the establishment, the time and date of application. (In case of lacking requirements, the CRO shall immediately return the application to the applicant together with the FSEC Application Disapproval Form for compliance.) 5. Endorse the bill of materials/ cost estimate to Fire Code Assessor (FCA) for assessment of fire code fees/taxes. PROCESSING TIME 10 Minutes 6 PERSON RESPONSIBLE Customer Relations Officer (CRO) CLIENT STEPS AGENCY ACTION 3. The applicant shall wait for the queuing number to be called by the Fire Code Assessor (FCA) for the release of Order of Payment. 6. Compute the fire code fees/taxes. 4. Receive the Order of Payment Slip (OPS). 7. Call the applicant’s queuing number and issue the Order of Formula: Payment Slip (OPS) Verified to the applicant. estimated value x 0.1%; 8. Call the Payment applicant’s queuing should be number. < Php50,000.00 5. The applicant shall present and pay the assessed amount indicated in the OPS to the Fire Code Collecting Agent (FCCA). 6. Receive the Official Receipt (OR) FEES TO BE PAID 1. Application Fee: Php200 2. One-tenth of one per centum (0.1%) of the verified estimated value of the building but not more than Php50,000.00 PROCESSING TIME 10 Minutes Example Computation: Example 1) Verified estimated amount = 51,000,000 10 Minutes PERSON RESPONSIBLE Fire Code Assessor (FCA) Fire Code Collecting Agent (FCCA) 9. Receive payment from applicant and issue Official FC fees = Receipt (OR), then (0.1*51,000,000) compile copy of /100 = 51,000 OR. FC fees > 50,000 7. Present the OR to the CRO. 8. Receive the Claim Stub. 10. Require the Therefore FC applicant to present fees = 50, 000 original copy of the only OR. 11. Check copy of OR and record to the Official Log Sheet the amount paid, OR Number, and Date of Payment, then issue Claim Stub to applicant. Example 2) Verified estimated amount = 25,000,000 FC fees = (0.1 * 25,000,000)/100 = 25,000 FC fees < 50,000 Therefore FC fees = 25,000 7 5 Minutes (Agency Action Step 10 to Step 12) CRO CLIENT STEPS AGENCY ACTION FEES TO BE PAID 12. Endorse the application documents together with the required sets of building plans as the case may be to Chief Fire Safety Enforcement Section/Unit (FSES/FSEU). 13. Assign Building Plan Evaluator (BPE) who will review/ evaluate the plans and specifications. 14. Review/ evaluate building plans and accomplish Fire Safety Checklist, FSEC or Notice of Disapproval (NOD) for FSEC as the case may be, and make appropriate recommendations/ findings. 15. Review/ evaluate the recommendations/ findings of BPE and recommends to City/Municipal Fire Marshal (C/MFM) or District Fire Marshal (for lone District Fire Office) the issuance of FSEC or NOD for FSEC as the case may be. PROCESSING TIME PERSON RESPONSIBLE CRO 16. Make the final review/evaluation of the Chief FSES/ FSEU’s recommendation for disposition. 8 15 Minutes Chief Fire Safety Enforcement Section/ Unit (FSES/FSEU) 1 ½ Days Maximum from the date of application. Building Plan Evaluator (BPE) 2 Hours Chief FSES/FSEU 2 Hours City/Municipal Fire Marshal (C/MFM) or District Fire Marshal (for Lone District Fire Office) CLIENT STEPS AGENCY ACTION FEES TO BE PAID 17. Approve/ disapprove, and sign three (3) copies of FSEC or NOD (for FSEC) as the case maybe. 18. Endorse application documents to the CRO. PROCESSING TIME PERSON RESPONSIBLE 20 Minutes C/MFM or District Fire Marshal (for Lone District Fire Office) 19. Record in the Official Log Sheet the FSEC or NOD as the case may be, number, date approved, name of applicant/owner and 10 Minutes name of establishment, OR number and amount paid. Provide duplicate copy of FSEC or NOD to the designated Records Custodian. CRO 9. Acknowledge in 20. Release FSEC or NOD as the case the logbook and may be, and other claim the FSEC/ pertinent NOD. documents to applicant or authorized representative upon 5 Minutes presentation of Claim Stub. Endorse one (1) set of plan to the BO as well as duplicate copy of FSEC, FSC or NOD as the case may be. HIGHLY TECHNICAL: i. Cases elevated to the National Office and Regional Offices that requires technical knowledge and expertise ii. Appeals iii. New Technologies, and iv. Special Structures. Fire Safety Compliance Report (FSCR) - A written report composed of plans, specifications and design analysis per building prepared by its Engineer/ Architect-of-Record and Fire Safety Practitioner. 9 Fire Safety Evaluation Clearance (FSEC) Application - Regular (Complex) A document issued by the BFP as a prerequisite for the grant of Building Permit by the Office of Building Official having jurisdiction upon determination that the evaluated plans are compliant with Republic Act 9514 and its Revised Implementing Rules and Regulations. Office: Classification: Fire Station or Lone District Fire Office A. Complex Transaction (Processing within seven (7) days) Applicable to all types of occupancies (e.g. Assembly, Educational, Day Care, etc.) except for the following: 1. Simple structures/buildings whose floor area does not exceed 1,500 square meters: a.) Single dwelling residential not more than three (3) storeys in height b.) Commercial building not more than two (2) storeys in height c.) Renovation to a mall with issued building permit; and d.) Warehouse storing non-hazardous materials. 2. Special structures (e.g. Aerodrome facilities, fixed guideway transit and passenger rail systems, wind turbine energy generating facilities, etc.) Type of Transaction: 1. G2C – Government to Citizen 2. G2B – Government to Business Entity Who may avail: Owner, Contractor or Business Entity CHECKLIST OF REQUIREMENTS WHERE TO SECURE Accomplished application form for Fire Safety 1 original copy Fire Station/ Lone District Fire Office Evaluation Clearance (FSEC) Architectural documents 3 original copies Civil documents 3 original copies Electrical documents 3 original copies Mechanical documents 3 original copies Signed and sealed by the Designer/Contractor Plumbing documents 3 original copies Electronics documents 3 original copies Sanitary documents 3 original copies Fire Protection documents 3 original copies Cost Estimate of the building including labor cost duly 1 original copy Signed and sealed by the Designer/Contractor notarized Fire Safety Compliance 1 set of original Report (FSCR), if required copy Management Certification for Hot Works bearing the 1 original copy name of the PAI Fire Safety Practitioner Business Entity/ Contractor/ Owner 10 CLIENT STEPS AGENCY ACTION 1. Completely fill-out necessary information in the application form. 1. Issue a queuing number and application form and instruct the applicant to complete the necessary information. 2. Receive from the applicant all documents required in the checklist of requirements. 2. Submit the filled-out application form and the required documents in the checklist of requirements. FEES TO BE PAID 3. Check the completeness of the submitted documents. 4. Record to the Official Log Sheet the name of applicant and owner of the establishment, the time and date of application. (In case of lacking requirements, the CRO shall immediately return the application to the applicant together with the FSEC Application Disapproval Form for compliance.) 5. Endorse the bill of materials/ cost estimate to Fire Code Assessor (FCA) for assessment of fire code fees/taxes. PROCESSING TIME 10 Minutes 11 PERSON RESPONSIBLE Customer Relations Officer (CRO) CLIENT STEPS AGENCY ACTION 3. The applicant shall wait for the queuing number to be called by the Fire Code Assessor (FCA) for the release of Order of Payment. 6. Compute the fire code fees/taxes. 4. Receive the Order of Payment Slip (OPS). 7. Call the applicant’s queuing number and issue the Order of Formula: Payment Slip (OPS) Verified to the applicant. estimated value x 0.001; 8. Call the Payment applicant’s queuing should be number. < Php50,000.00 5. The applicant shall present and pay the assessed amount indicated in the OPS to the Fire Code Collecting Agent (FCCA). FEES TO BE PAID 1. Application Fee: Php200 2. One-tenth of one per centum (0.1%) of the verified estimated value of the building but not more than Php50,000.00 PROCESSING TIME 10 Minutes Example Computation: Example 1) Verified estimated amount = 51,000,000 6. Receive the Official Receipt (OR) 9. Receive payment from applicant and issue Official Receipt (OR), then FC fees = (0.1*51,000,000) compile copy of /100 = 51,000 OR. 7. Present the OR to the CRO. 10. Require the applicant to present Therefore FC original copy of the fees = 50, 000 only OR. 8. Receive the Claim Stub. 11. Check copy of OR and record to the Official Log Sheet the amount paid, OR Number, and Date of Payment, then issue Claim Stub to applicant. 10 Minutes PERSON RESPONSIBLE Fire Code Assessor (FCA) Fire Code Collecting Agent (FCCA) FC fees > 50,000 Example 2) Verified estimated amount = 25,000,000 FC fees = (0.1 * 25,000,000)/100 = 25,000 FC fees < 50,000 Therefore FC fees = 25,000 12 5 Minutes (Agency Action Step 10 to Step 12) CRO CLIENT STEPS AGENCY ACTION FEES TO BE PAID 12. Endorse the application documents together with the required sets of building plans as the case may be to Chief Fire Safety Enforcement Section/Unit (FSES/FSEU). 13. Assign Building Plan Evaluator (BPE) who will review/ evaluate the plans and specifications. 14. Review/ evaluate building plans and accomplish Fire Safety Checklist, FSEC or Notice of Disapproval (NOD) for FSEC as the case may be, and make appropriate recommendations/ findings. 15. Review/ evaluate the recommendations/ findings of BPE and recommends to City/Municipal Fire Marshal (C/MFM) or District Fire Marshal (for lone District Fire Office) the issuance of FSEC or NOD for FSEC as the case may be. PROCESSING TIME PERSON RESPONSIBLE CRO 15 Minutes 5 ½ Days Maximum from the date of application 16. Make the final review/evaluation of the Chief FSES/ FSEU’s recommendation for disposition. 13 Chief Fire Safety Enforcement Section/ Unit (FSES/FSEU) Building Plan Evaluator (BPE) 2 Hours Chief FSES/FSEU 2 Hours City/Municipal Fire Marshal (C/MFM) or District Fire Marshal (for Lone District Fire Office) CLIENT STEPS AGENCY ACTION FEES TO BE PAID 17. Approve/ disapprove, and sign three (3) copies of FSEC or NOD (for FSEC) as the case maybe. 18. Endorse application documents to the CRO. PROCESSING TIME PERSON RESPONSIBLE 20 Minutes C/MFM or District Fire Marshal (for Lone District Fire Office) 19. Record in the Official Log Sheet the FSEC or NOD as the case may be, number, date approved, name of applicant/owner and 10 Minutes name of establishment, OR number and amount paid. Provide duplicate copy of FSEC or NOD to the designated Records Custodian. CRO 9. Acknowledge in 20. Release FSEC or NOD as the case the logbook and may be, and other claim the FSEC/ pertinent NOD. documents to applicant or authorized representative upon 5 Minutes presentation of Claim Stub. Endorse one (1) set of plan to the BO as well as duplicate copy of FSEC, FSC or NOD as the case may be. HIGHLY TECHNICAL: i. Cases elevated to the National Office and Regional Offices that requires technical knowledge and expertise ii. Appeals iii. New Technologies, and iv. Special Structures. Fire Safety Compliance Report (FSCR) - A written report composed of plans, specifications and design analysis per building prepared by its Engineer/ Architect-of-Record and Fire Safety Practitioner. 14 Fire Safety Evaluation Clearance (FSEC) Application - Process at OSCP A document issued by the BFP as a prerequisite for the grant of Building Permit by the Office of Building Official having jurisdiction upon determination that the evaluated plans are compliant with Republic Act 9514 and its Revised Implementing Rules and Regulations. Office: One Stop Shop for Construction Permitting (OSCP) Classification: Simple Transaction Transaction processed within three (3) days - applicable to the following types of building whose floor area does not exceed 1,500 square meters: 1) Single dwelling residential building not more than 3 storey, 2) Commercial building not more 2 storey, 3) Renovation to a mall with issued building permit, and 4) Warehouse storing non-hazardous materials. 1. G2C – Government to Citizen 2. G2B – Government to Business Entity Owner, Contractor or Business Entity Who may avail: CHECKLIST OF REQUIREMENTS WHERE TO SECURE Accomplished Unified Application Form (UAF) or One-Stop Shop for Construction Permitting application form for Fire 1 original copy (OSCP) Safety Evaluation Clearance (FSEC) REQUIRED DOCUMENTS Type of Transaction: Note: includes design plans, calculations and specifications Architectural documents Civil documents Electrical documents Mechanical documents 3 original copies 3 original copies 3 original copies Signed and sealed by the Designer/Contractor 3 original copies Plumbing documents 3 original copies Electronics documents Sanitary documents 3 original copies 3 original copies Fire Protection documents 3 original copies Cost Estimate of the building Duly prepared by the Designer/Contractor and including labor cost duly 1 original copy duly notarized by the owner. notarized Fire Safety Compliance 1 set of original Fire Safety Practitioner Report (FSCR), if required copy Management Certificate for Hot Works bearing the name 1 original copy Business Entity/ Contractor/ Owner of the PAI Copy of valid professional 1 photocopy Professionals licenses 15 CLIENT STEPS AGENCY ACTION 1. Submit the filled-out Unified Application Form (UAF)/ BFP Application Form and complete 4 sets of documentary requirements at the receiving window of OSCP. 1. Receive from the OBO Monitoring Officer and acknowledge in the routing slip the receipt of all the documents required in the checklist of requirement. FEES TO BE PAID 2. Record the details of all the documents required in the checklist of requirement in the BFP logbook. PROCESSING TIME 20 Minutes 3. Forward all the documents required in the checklist of requirement to the BFP Liaison Personnel (BLP) for transmittal to the Fire Station. Note: Plan evaluation can be done in the OSCP backroom depending on the availability of BFP personnel. 16 PERSON RESPONSIBLE Customer Relations Officer/ Fire Code Assessor (CRO/FCA) CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME PERSON RESPONSIBLE 30 Minutes from its cut-off time BFP Liaison Personnel (BLP) 5. Assign Building Plan Evaluator (BPE) who will review/ evaluate the submitted design plans, calculations and its specifications in the checklist of requirements. 15 minutes Chief Fire Safety Enforcement Section/ Unit (FSES/FSEU) 6. Evaluate the design plans, calculations & its specifications of the required documents and provide necessary findings & recommendations reflected in the Fire Safety Checklist (FSC) and prepare either FSEC or Notice of Disapproval (NOD). 1 ½ Days Maximum from the date of application. Building Plan Evaluator (BPE) 4. Transmit all the documents required in the checklist of requirements to the Chief, FSES for the designation of Building Plan Evaluator (BPE). Note: Transmittal of documents shall be done twice a day. Application filed on or before 11:30 AM shall be transmitted to the Fire Station before noon, while those filed on or before 3:00 PM shall be transmitted to the Fire Station before 3:30 PM. 17 CLIENT STEPS AGENCY ACTION FEES TO BE PAID 7. Review/evaluate the recommendations/ findings of BPE and recommend to City/Municipal Fire Marshal (C/MFM) or District Fire Marshal (for Lone District Fire Office) the issuance of FSEC or NOD as the case may be. 8. Make the final review/evaluation of the Chief FSES/ FSEU’s recommendation for appropriate disposition. 9. Approve/ disapprove, and sign three (3) copies of FSC for FSEC or FSC for NOD as the case may be. Provide/assign the corresponding control number intended for the application. PROCESSING TIME PERSON RESPONSIBLE 2 Hours Chief FSES/FSEU 2 Hours 20 Minutes Note: In both cases of approval or disapproval, all 3 sets of plans shall bear the name and signature of the Fire Marshal and shall be stamped either “APPROVED” or “DISAPPROVED”. It shall also indicate the checklist number and date; FSEC number and date as the case may be. (Agency Action Step 9 to Step 10) 18 City/Municipal Fire Marshal (C/MFM) or District Fire Marshal (for Lone District Fire Office) CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME 10. Endorse back all the documents required in the checklist of requirements, including the 3 sets of FSC for FSEC or FSC for NOD as the case may be, to the BLP for transmittal to the CRO at the OSCP. PERSON RESPONSIBLE C/MFM or DFM 11. Transmit back all the documents required in the checklist of requirements, including the 3 sets of FSC for FSEC or FSC for NOD as the case may be, to the CRO at the OSCP. 30 Minutes 12. Receive from BLP all the documents required in the checklist of requirements, including the FSC for FSEC or FSC for NOD as the case may be. 15 Minutes 13. Endorse to the OBO Monitoring Officer the 3 sets of plans only if it is approved for review and approval. 19 BFP Liaison Personnel (BLP) CRO/FCA CLIENT STEPS AGENCY ACTION 14. Record in the logbook the details of the transmitted documents. For approved application, assess the Fire Code Construction Tax due to the owner/ applicant in coordination with the OBO and accomplish the Order of Payment Slip (OPS) and endorse to the OBO. 2. Present the claim stub and receive the OPS. Note: This is to be done through sharing of information for purposes of determining whichever the higher value between BFP or OBO; the higher value shall be the basis of assessment to be reflected in the OPS. 15. In cases of disapproved application, all the documents required in the checklist of requirements, including the FSC for NOD shall immediately endorse to the OBO for the speedy infomation to the client about the status of the application. 16. Issue the Order of Payment Slip (OPS) together with OBO. FEES TO BE PAID PROCESSING TIME PERSON RESPONSIBLE One-tenth of one per centum (0.1%) of the verified estimated value of the building but not more than Php50,000.00 Formula: Verified estimated value x 0.001; Payment should be < Php50,000.00 Example 1) Verified estimated amount = 51,000,000 10 Minutes CRO/ FCA FC fees = (0.1*51,000,000) /100 = 51,000 FC fees > 50,000 Therefore FC fees = 50, 000 only Example 2) Verified estimated amount = 25,000,000 FC fees = (0.1 * 25,000,000)/100 = 25,000 FC fees < 50,000 Therefore FC fees = 25,000 10 Minutes 20 CLIENT STEPS AGENCY ACTION 3. The applicant shall pay the assessed amount indicated in the OPS to the Fire Code Collecting Agent (FCCA) 17. Receive the amount due for the BFP through the Cashier, issue the corresponding OR to the applicant through the Cashier, keep a copy of the receipt and record in the OPS and logbook the details of the payment. FEES TO BE PAID PROCESSING TIME 10 Minutes PERSON RESPONSIBLE Fire Code Collecting Agent (FCCA) 18. Endorse to the CRO/FCA the OPS for the details to be reflected in the FSC and FSEC. 19. Receive and reflect the details of the payment in the FSC and FSEC. 20. Record in the Official Log Sheet the FSEC or NOD as the case may be, number, date approved, name of applicant/owner and name of establishment, OR number and amount paid. 10 Minutes CRO/FCA 21. Release the FSC and its FSEC or FSC and its NOD as the case may be to the OBO Releasing Officer and the 3 sets of required documents for proper distribution to Client, OBO and BFP. 5 minutes 21 CLIENT STEPS AGENCY ACTION 4. Claim and acknowledge the requirements mentioned in the FSC and the releasing logbook for FSEC or if not compliant, the FSC and its NOD together with the applied complete required documents as the case maybe. 22. Claim from the OBO Releasing Officer at the releasing window the released FSC and its FSEC for the archiving BFP copy, the one (1) set mentioned in the Checklist of requirements or the FSC and its NOD as the case may be. FEES TO BE PAID 23. Transmit the documents back to the Fire Station for profiling the duplicate copy of the FSC and its FSEC together with the one (1) set mentioned in the Checklist of requirements or the FSC and its NOD by the designated Records Custodian. PROCESSING TIME PERSON RESPONSIBLE 15 minutes CRO/FCA 30 Minutes BLP HIGHLY TECHNICAL: i. Cases elevated to the National Office and Regional Offices that requires technical knowledge and expertise ii. Appeals iii. New Technologies, and iv. Special Structures. Fire Safety Compliance Report (FSCR) - A written report composed of plans, specifications and design analysis per building prepared by its Engineer/ Architect-of-Record and Fire Safety Practitioner. 22 Fire Safety Inspection Certificate (FSIC) Application for Certificate of Occupancy - Regular (Simple) A document issued by the BFP as a prerequisite for the grant of Certificate of Occupancy by the Office of the Building Official upon determining that the required fire safety construction are in place, and fire protective and/or warning systems are properly installed in accordance with the approved plans and specifications and in compliance with Republic Act 9514 and its Revised Implementing Rules and Regulations. Office: Fire Station or Lone District Office Classification: A. Simple Transaction Refers to applications for any of the following structures whose floor area does not exceed 1,500 square meters: 1) Single dwelling residential building of not more than three floors/storey, 2) Commercial buildings of not more than two (2) floors/storey, 3) Renovation within a mall with issued building permit, and 4) Warehouse storing non-hazardous substance. Processing Time: Three (3) working days 1. G2C – Government to Citizen Type of Transaction: 2. G2B – Government to Business Entity Owner, Contractor or Business Entity Who may avail: CHECKLIST OF REQUIREMENTS WHERE TO SECURE Accomplished application form for Fire Safety 1 original copy Inspection Certificate (FSIC) Fire Station or Lone District Office Endorsement from the Office 1 original copy of Building Official (OBO) Office of Building Official (OBO) Certificate of Completion 1 original copy Contractor or Business Entity Certified true copy of assessment fee for securing Occupancy Permit from OBO 1 original copy OBO As-built plan, if necessary 1 original copy Owner, Contractor or Business Entity Fire Safety Compliance and Commissioning Report (FSCCR), if required 1 set of original copy Fire Safety Practitioner 23 CLIENT STEPS AGENCY ACTION 1. Completely fill-out and submit the application form. 1. Issue a queuing number and application form and instruct the applicant to complete the information. 2. Submit the filledout application form and the required documents in the checklist of requirements. 2. Receive from the applicant all documents required in the checklist of requirements. FEES TO BE PAID PROCESSING TIME PERSON RESPONSIBLE 10 Minutes Customer Relations Officer (CRO) 3. Check the completeness of the submitted documents . 4. Record to the Official Log Sheet the name of applicant, owner of the establishment, the time and date of application. (In case of lacking requirements, the CRO shall immediately return the application to the applicant together with the FSIC Application Disapproval Form for compliance.) 3. The applicant shall wait for the queuing number to be called by the Fire Code Assessor (FCA) for the release of Order of Payment Slip (OPS). 5. Endorse the Certificate of Completion/ Certified True Copy of Assessment Fee for securing Occupancy Permit from OBO to Fire Code Assessor (FCA) for assessment of fire code fees 24 CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME PERSON RESPONSIBLE 6. Compute the fire code fees. 4. Receive OPS. 7. Call the applicant’s queuing number and issue the Order of Payment Slip (OPS). Fifteen percent (15%) of all fees charged by LGU but in no case shall be lower than Php500.00 5. The applicant shall pay the assessed amount indicated in the OPS to the Fire Code Collecting Agent (FCCA). 8. Call the applicant’s queuing number. 6. Receive the Official Receipt (OR). 9. Receive payment from applicant and Inspection Fee = issue Official (15% *10,000) = Receipt (OR), then 1,500 compile copy of OR 7. Present the OR to the CRO. > 500 10. Require the applicant to present original copy of the Therefore Inspection fee = 1,500 OR. 8. Receive the Claim Stub. 11. Check copy of OR and record to the Official Log Sheet the amount paid, OR Number, and Date of Payment, then issue Claim Stub to applicant. 10 Minutes Fire Code Assessor (FCA) Example Computation: Example 1) Fees charge by the LGU / PEZA = 10,000 10 Minutes Fire Code Collecting Agent (FCCA) Inspection Fee Example 2) Fees charge by the LGU / PEZA = 2,000 Inspection Fee = (15% *2,000) = 300 Inspection Fee < 500 12. Endorse the Therefore Inspecapplication documents to Chief tion fee = 500 Fire Safety Enforcement Section/Unit (FSES/FSEU). 25 5 Minutes CRO CLIENT STEPS 9. Acknowledges the IO and AIR. AGENCY ACTION FEES TO BE PAID PROCESSING TIME PERSON RESPONSIBLE 13.Receive application documents and retrieve FSEC and building plans with Fire Safety Checklist (FSC) or latest After Inspection Report (AIR) as the case may be, from the BFP Records Custodian to be attached to the application, assign Fire Safety Inspector and issue an Inspection Order 15 Minutes Chief Fire Safety Enforcement Section/ Unit (FSES/FSEU) 14. Proceed to the establishment and request acknowledgement of the IO from any responsible person in the building, structure or facility. Conduct Fire Safety Inspection and submit After Inspection Report (AIR) and supporting documents to Chief, FSES/FSEU with appropriate findings and recommendations, such as issuance of FSIC/Notice of Disapproval (NOD) for occupancy, as the case may be. If the building or establishment is already occupied/ operational, FSI shall recommend issuance of Notice to Comply (NTC) instead of NOD if there is a violation of the Fire Code and its RIRR. 1 ½ Days Maximum from the date of application Fire Safety Inspector (FSI) 26 CLIENT STEPS AGENCY ACTION FEES TO BE PAID 15. Review/ evaluate the recommendations/ findings of FSI and recommends to City/Municipal Fire Marshal (C/MFM) or District Fire Marshal (for Lone District Fire Office) the issuance of FSIC, NOD or NTC as the case may be. PROCESSING TIME PERSON RESPONSIBLE 2 Hours Chief FSES/FSEU 16. Make the final review/evaluation of the Chief FSES/ FSEU’s recommendation for disposition. 17. Approve/ disapprove, and sign three (3) copies of FSIC/ NOD or NTC (for FSIC) as the case may be. 2 Hours 18. Forward application documents to the CRO. 27 City/Municipal Fire Marshal (C/MFM) or District Fire Marshal (for Lone District Fire Office) CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME PERSON RESPONSIBLE 19. Record in the Official Log Sheet the FSIC/NOD/NTC as the case may be the number date approved, name of applicant/owner, name of establishment, OR number and amount paid. Provide duplicate copy of FSIC/NOD/NTC to the designated Records Custodian 10 Minutes together the application documents, retrieve FSEC and building plans with Fire Safety Checklist (FSC), CRO After Inspection Report (AIR) for during construction or latest After Inspection Report (AIR) as the case may be. 20. Release FSIC/ 10. Acknowledge in the logbook and NOD/NTC as the case may be, to claim the FSIC/ applicant or NOD/NTC authorized representative upon 5 Minutes presentation of Claim Stub. Endorse to OBO the duplicate copy of FSIC/NOD/NTC as the case may be. HIGHLY TECHNICAL: i. Cases elevated to the National Office and Regional Offices that requires technical knowledge and expertise ii. Appeals iii. New Technologies, and iv. Special Structures Fire Safety Compliance and Commissioning Report (FSCCR) - A compilation report of all approved submittals, test and acceptable forms of all fire protection and life safety features, which shall form part of the “as built” documents turned over by the contractor to the building owner. 28 Fire Safety Inspection Certificate (FSIC) Application for Certificate of Occupancy - Regular (Complex) A document issued by the BFP as a prerequisite for the grant of Certificate of Occupancy by the Office of the Building Official upon determining that the required fire safety construction are in place, and fire protective and/or warning systems are properly installed in accordance with the approved plans and specifications and in compliance with Republic Act 9514 and its Revised Implementing Rules and Regulations. Office: Fire Station or Lone District Fire Office A. Complex Transaction (Processing within seven (7) days) Applicable to all types of occupancies (e.g. Assembly, Educational, Day Care, etc.) except for the following: 1. Simple structures/buildings whose floor area does not exceed 1,500 square meters: Classification: a.) Single dwelling residential not more than three (3) storeys in height b.) Commercial building not more than two (2) storeys in height c.) Renovation to a mall with issued building permit; and d.) Warehouse storing non-hazardous materials. 2. Special structures (e.g. Aerodrome facilities, fixed guideway transit and passenger rail systems, wind turbine energy generating facilities, etc.) 1. G2C – Government to Citizen Type of Transaction: 2. G2B – Government to Business Entity Owner, Contractor or Business Entity Who may avail: CHECKLIST OF REQUIREMENTS WHERE TO SECURE Accomplished application form for Fire Safety 1 original copy Inspection Certificate (FSIC) Endorsement from the Office 1 original copy of Building Official (OBO) Certificate of Completion 1 original copy Fire Station or Lone District Office Office of Building Official (OBO) Contractor or Business Entity Certified true copy of assessment fee for 1 original copy securing Occupancy Permit from OBO As-built plan, if necessary 1 original copy Fire Safety Compliance 1 set of original and Commissioning Report copy (FSCCR), if required OBO Owner, Contractor or Business Entity Fire Safety Practitioner 29 CLIENT STEPS AGENCY ACTION 1. Completely fill-out and submit the application form. 1. Issue a queuing number and application form and instruct the applicant to complete the information. 2. Receive from the applicant all documents required in the checklist of requirements. 2. Submit the filled-out application form and the required documents in the checklist of requirements. FEES TO BE PAID 3. Check the completeness of the submitted documents . 4. Record to the Official Log Sheet the name of applicant, owner of the establishment, the time and date of application. (In case of lacking requirements, the CRO shall immediately return the application to the applicant together with the FSIC Application Disapproval Form for compliance.) 3. The applicant shall wait for the queuing number to be called by the Fire Code Assessor (FCA) for the release of Order of Payment Slip (OPS). PROCESSING TIME 10 Minutes 5. Endorse the Certificate of Completion and Certified True Copy of Assessment Fee for securing Occupancy Permit from OBO to Fire Code Assessor (FCA) for assessment of fire code fees. 30 PERSON RESPONSIBLE Customer Relations Officer (CRO) CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME PERSON RESPONSIBLE 6. Compute the fire code fees. 4. Receive OPS. 5. The applicant shall pay the assessed amount indicated in the OPS to the Fire Code Collecting Agent (FCCA). 6. Receive the Official Receipt (OR). 7. Present the OR to the CRO. 7. Call the applicant’s queuing number and issue the Order of Payment Slip (OPS). 8. Call the applicant’s queuing number. Fifteen percent (15%) of all fees charged by LGU but in no case shall be lower than Php500.00 10 Minutes Example Computation: 9. Receive payment from applicant and issue Official Receipt (OR), then compile copy of OR. Example 1) Fees charge by the LGU / PEZA = 10,000 10 Minutes Fire Code Assessor (FCA) Fire Code Collecting Agent (FCCA) Inspection Fee = (15% *10,000) = 1,500 10. Require the applicant to present Inspection Fee original copy of the > 500 OR. Therefore Inspection fee = 1,500 8. Receive the Claim Stub. 11. Check copy of OR and record to the Official Log Sheet the amount paid, OR Number, and Date of Payment, then issue Claim Stub to applicant. Example 2) Fees charge by the LGU / PEZA = 2,000 Inspection Fee = (15% *2,000) = 300 Inspection Fee < 500 12. Endorse the Therefore Inspecapplication tion fee = 500 documents to Chief Fire Safety Enforcement Section/Unit (FSES/ FSEU). 31 5 Minutes CRO CLIENT STEPS 9. Acknowledges the IO and AIR. AGENCY ACTION FEES TO BE PAID PROCESSING TIME PERSON RESPONSIBLE 13.Receive application documents and retrieve FSEC and building plans with Fire Safety Checklist (FSC) or latest After Inspection Report (AIR) as the case may be, from the BFP Records Custodian to be attached to the application, assign Fire Safety Inspector and issue an Inspection Order. 15 Minutes Chief Fire Safety Enforcement Section/ Unit (FSES/FSEU) 14. Proceed to the establishment and request acknowledgement of the IO from any responsible person in the building, structure or facility. Conduct Fire Safety Inspection and submit After Inspection Report (AIR) and supporting documents to Chief, FSES or FSEU with appropriate findings and recommendations, such as issuance of FSIC/ Notice of Disapproval (NOD) for occupancy, as the case may be. If the building or establishment is already occupied/ operational, FSI shall recommend issuance of Notice to Comply (NTC) instead of NOD if there is a violation of the Fire Code and its RIRR. 5 ½ Days Maximum from the date of application Fire Safety Inspector (FSI) 32 CLIENT STEPS AGENCY ACTION FEES TO BE PAID 15. Review/ evaluate the recommendations/ findings of FSI and recommend to City/Municipal Fire Marshal (C/MFM) or District Fire Marshal (for Lone District Fire Office) the issuance of FSIC, NOD or NTC as the case may be. 16. Make the final review/evaluation of the Chief, FSES/ FSEU’s recommendation for disposition. PROCESSING TIME PERSON RESPONSIBLE 2 Hours Chief FSES/FSEU 2 Hours City/Municipal Fire Marshal (C/MFM) or District Fire Marshal (for Lone District Fire Office) 17. Approve/ disapprove, and sign three (3) copies of FSIC/ NOD or NTC (for Occupancy) as the case may be. 20 Minutes 18. Forward application documents to the CRO 33 CLIENT STEPS AGENCY ACTION FEES TO BE PAID 19. Record in the Official Log Sheet the FSIC/NOD/NTC as the case may be the number date approved, name of applicant/owner, name of establishment, OR number and amount paid. Provide duplicate copy of FSIC/NOD/NTC to the designated Records Custodian together the application documents, retrieve FSEC and building plans with Fire Safety Checklist (FSC), After Inspection Report (AIR) for during construction or latest After Inspection Report (AIR) as the case may be. PROCESSING TIME PERSON RESPONSIBLE 10 Minutes CRO 20. Release FSIC/ NOD/NTC as the case may be, to applicant or authorized representative 5 Minutes upon presentation of Claim Stub. Endorse to OBO the duplicate copy of FSIC/ NOD/NTC as the case may be. HIGHLY TECHNICAL: i. Cases elevated to the National Office and Regional Offices that requires technical knowledge and expertise ii. Appeals iii. New Technologies, and iv. Special Structures Fire Safety Compliance and Commissioning Report (FSCCR) - A compilation report of all approved submittals, test and acceptable forms of all fire protection and life safety features, which shall form part of the “as built” documents turned over by the contractor to the building owner. 10. Acknowledge in the logbook and claim the FSIC/ NOD/NTC 34 Fire Safety Inspection Certificate (FSIC) Application for Certificate of Occupancy - Process at OSCP A document issued by the BFP as a prerequisite for the grant of Certificate of Occupancy by the Office of the Building Official upon determining that the required fire safety construction are in place, and fire protective and/or warning systems are properly installed in accordance with the approved plans and specifications and in compliance with Republic Act 9514 and its Revised Implementing Rules and Regulations. Office: One-Stop Shop for Construction Permitting (OSCP) Classification: A. Simple Transaction Refers to applications for any of the following structures whose floor area does not exceed 1,500 square meters: 1) Single dwelling residential building of not more than three floors/storey, 2) Commercial buildings of not more than two (2) floors/storey, 3) Renovation within a mall with issued building permit, and 4) Warehouse storing non-hazardous substance. Processing Time: Three (3) working days 1. G2C – Government to Citizen Type of Transaction: 2. G2B – Government to Business Entity Owner, Contractor or Business Entity Who may avail: CHECKLIST OF REQUIREMENTS WHERE TO SECURE Accomplished application form for Fire Safety Inspection Certificate (FSIC) 1 original copy One-Stop Shop for Construction Permitting or Unified Application Form (UAF) Endorsement from the Office 1 original copy of Building Official (OBO) Office of Building Official (OBO) Certificate of Completion 1 original copy Contractor or Business Entity Certified true copy of assessment fee for securing Occupancy Permit from OBO 1 original copy OBO As-built plan, if necessary 1 original copy Owner, Contractor or Business Entity Fire Safety Compliance and Commissioning Report (FSCCR), if required 1 set of original copy Fire Safety Practitioner 35 CLIENT STEPS AGENCY ACTION 1. Submit the filled-out Unified Application Form (UAF)/ BFP Application Form and complete 4 sets of documentary requirements at the receiving window of OSCP. 1. Receive from the OBO Monitoring Officer and acknowledges the routing slip the receipt of all the documents required in the checklist of requirement. FEES TO BE PAID 2. Record the details of all the documents required in the checklist of requirement in the BFP logbook. PROCESSING TIME 10 Minutes 3. Forwards all the documents required in the checklist of requirement to the BFP Liaison Personnel (BLP) for transmittal to the Fire Station. Note: The BLP shall verify to the OBO for JOINT INSPECTION TEAM (JIT) schedule in the conduct of joint inspection. 4. Transmit all the documents required in the checklist of requirements to the Chief, FSES for the designation of Fire Safety Inspector (FSI). 30 Minutes 36 PERSON RESPONSIBLE Customer Relations Officer/ Fire Code Assessor (CRO/FCA) BFP Liaison Officer (BLP) CLIENT STEPS 2. Acknowledges the IO and AIR. AGENCY ACTION FEES TO BE PAID 5. Receive all the documents required in the checklist of requirements and retrieve FSEC and its building plans with Fire Safety Checklist (FSC) and the latest After Inspection Report (AIR) as the case may be, from the BFP Records Custodian to be attached to the application, assign Fire Safety Inspector and issue an Inspection Order duly signed by the Fire Marshal. 6. Receive the IO, coordinate, conduct of joint Fire Safety Inspection and submit After Inspection Report (AIR) and supporting documents to Chief, FSES/Chief, FSEU with appropriate findings and recommendations, such as issuance of FSIC or Notice of Disapproval (NOD) for occupancy, as the case may be. If the building or establishment is already occupied/ operational and found out non-compliant with the Fire Code & its RIRR, FSI shall recommend issuance of Notice to Comply (NTC). 37 PROCESSING TIME PERSON RESPONSIBLE 15 Minutes Chief Fire Safety Enforcement Section/ Unit (FSES/FSEU) 1 ½ Days Maximum from the date of application Fire Safety Inspector (FSI) CLIENT STEPS AGENCY ACTION FEES TO BE PAID 7. Review/evaluate the recommendations/ findings of FSI and recommends to City/Municipal Fire Marshal (C/MFM) or District Fire Marshal (for Lone District Fire Office) the issuance of FSIC or NOD or NTC as the case may be. PROCESSING TIME PERSON RESPONSIBLE 2 Hours Chief FSES/FSEU 8. Make the final review/evaluation of the Chief FSES/ FSEU’s recommendation for disposition. 9. Approve/ disapprove, and sign three (3) copies of FSIC/ NOD or NTC as the case may be. Provide/assign the corresponding control number intended for the application. 2 Hours City/Municipal Fire Marshal (C/MFM) or District Fire Marshal (for Lone District Fire Office) 10. Forward the required documents in the checklist of requirements including three (3) copies of FSIC/ NOD or NTC as the case may be to the BLP. 11. Transmit back all the documents required in the checklist of requirements, including the three (3) copies of FSIC/ NOD or NTC as the case may be, to the CRO at the OSCP. 30 Minutes 38 BFP LiaIson Personnel (BLP) CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME PERSON RESPONSIBLE 30 Minutes Customer Relation Officer/ Fire Code Assessor (CRO/FCA) 12. Record in the logbook the details of the transmitted documents. For approved application, assess the corresponding Fire Safety Inspection Fee due to the owner/ applicant in coordination with the OBO through sharing of information. 3. Present the claim stub and receive the OPS. 4. The applicant shall pay the assessed amount indicated in the OPS to the Fire Code Collecting Agent (FCCA) through OBO Treasurer/ Casher. Fifteen percent (15%) of all fees charged by LGU but in no case shall be lower than Php500.00 Example Computation: Note: This is to be done through sharing of information for purposes of determining whichever the higher value between BFP or OBO; the higher value shall be the basis of assessment to be reflected in the OPS. 13. Accomplish the Order of Payment Slip (OPS) and endorse to the Building Official (BO). Example 1) Fees charge by the LGU / PEZA = 10,000 14. Receive the OPS from the applicant through the OBO Treasurer/ Casher, validate the authenticity of the OPS. Inspection Fee < 500 Inspection Fee = (15% *10,000) = 1,500 Inspection Fee > 500 Therefore Inspection fee = 1,500 Example 2) Fees charge by the LGU / PEZA = 2,000 Inspection Fee = (15% *2,000) = 300 Therefore Inspection fee = 500 39 10 Minutes (Agency Action Step 14 to Step 16) Fire Code Collecting Agent (FCCA) CLIENT STEPS AGENCY ACTION 5. Receive the Official Receipt (OR) through OBO Treasurer/ Casher. 15. Receive the amount due for the BFP through the Cashier, issue the corresponding OR to the applicant through the Cashier, keep a copy of the receipt and record in the OPS and logbook the details of the payment. FEES TO BE PAID PROCESSING TIME PERSON RESPONSIBLE FCCA 16. Endorse to the CRO/FCA the OPS for the details to be reflected in the FSIC. 17. Receive and reflect/record the details of the OR number and amount paid, number, date approved, name of applicant/owner and name of establishment in the FSIC and at the official log sheet. 6. Claim at the OBO releasing window and acknowledge in the logbook for the receipt of the FSIC or NOD or NTC as the case maybe. 5 Minutes CRO/FCA 18. Release the FSIC or NOD or NTC as the case may be to the OBO Releasing Officer its corresponding documents for proper distribution to Client, OBO and BFP. 5 Minutes 40 CLIENT STEPS AGENCY ACTION FEES TO BE PAID 19. Claim from the OBO Releasing Officer at the releasing window the released FSIC or NOD or NTC for archiving BFP copy and the attached one (1) set mentioned in the Checklist of requirements as the case may be. 20. Transmit the documents back to the Fire Station for profiling the duplicate copy of the FSIC and its one (1) set mentioned in the Checklist of requirements or NOD or NTC as the case maybe to the designated Records Custodian. PROCESSING TIME PERSON RESPONSIBLE 15 Minutes CRO/FCA 30 Minutes BLP HIGHLY TECHNICAL: i. Cases elevated to the National Office and Regional Offices that requires technical knowledge and expertise ii. Appeals iii. New Technologies, and iv. Special Structures Fire Safety Compliance and Commissioning Report (FSCCR) - A compilation report of all approved submittals, test and acceptable forms of all fire protection and life safety features, which shall form part of the “as built” documents turned over by the contractor to the building owner. 41 Fire Safety Inspection Certificate (FSIC) Application for New Business Permit with Valid FSIC Issued During Occupancy Permit Stage A document issued by the BFP as a pre-requisite for the issuance of Business or Mayor’s Permit, Accreditation for Hospitals, Permit to Operate, PHILHEALTH Accreditation for Hospitals, DOH License to Operate and other permits and licenses being issued by other government agencies valid for one (1) year from the date of issuance unless revoked/cancelled. Fire Station/Lone District or Business One Stop Shop (BOSS) New Business with Valid FSIC issued during Occupancy Stage (Transaction processed within 1 day) The FSIC issued during the Occupancy Permit stage is already sufficient as basis for issuance of the FSIC for Business Permit, subject to the following conditions: 1. The nature of occupancy of the issued FSIC for occupancy is the same with that of the intended purpose for business operation. 2. The Business Permit is filed within nine (9) months from the issuance of Certificate of Occupancy. 3. The location of the said business application shall be the same Classification: as what is indicated in the Certificate of Occupancy. 4. The owner/applicant shall execute an Undertaking that from the time the of application for Business Permit that there was no substantial changes made on the building/establishment from the time that it was issued with FSIC for Occupancy Permit; if there is violation during validation inspection, the Business Permit is deemed automatically REVOKED. 5.That the owner/applicant shall pay the appropriate Fire Safety Inspection Fee for Business Permit application. 1. G2C – Government to Citizen Type of Transaction: 2. G2B – Government to Business Entity Owner, Contractor or Business Entity Who may avail: CHECKLIST OF REQUIREMENTS WHERE TO SECURE Accomplished application form for FSIC if applied at District or Business One Stop Fire Station/Lone District 1 original copy Fire Station/LoneShop (BOSS) or Unified Application Form (UAF) if applied at BOSS Certified True Copy of Valid 1 copy Office of Building Official (OBO) Certificate of Occupancy Assessment of Business Permit Fee/ Tax Assessment One Stop Shop (BOSS)/ Business Bill from Business 1 original copy Business Processing and Licensing Office (BPLO) Processing and Licensing Office (BPLO) Affidavit of Undertaking that there was no substantial Owner or Business Entity changes made on building/ 1 original copy establishment Fire Safety Maintenance 1 set of original Fire Safety Practitioner Report (FSMR), if required copy Copy of Fire Insurance, if 1 original copy Fire Insurance Company necessary Management Certificate for Hot Works Operations Business Entity/ Owner bearing the name of the PAI, 1 original copy if necessary Office: 42 CLIENT STEPS AGENCY ACTION 1. Completely fill-out necessary information in the application form 1. Issue a queuing number and application form and instruct the applicant to complete the necessary information. 2. Submit the filled-out application form and the required documents in the checklist of requirements. 2. Receive from the applicant all documents required in the checklist of requirements. FEES TO BE PAID PROCESSING TIME PERSON RESPONSIBLE 3. Check the completeness of the submitted documents. 4. Record to the Official Log Sheet the name of applicant, owner of the establishment, the time and date of application. (In case of lacking requirements, the CRO shall immediately return the application to the applicant together with the FSIC Application Disapproval Form for compliance). 3. The applicant shall wait for the queuing number to be called by the Fire Code Assessor (FCA) for the release of Order of Payment Slip (OPS). 10 Minutes 5. Endorse the application to the Fire Code Assessor (FCA) for assessment. 43 Customer Relations Officer (CRO) CLIENT STEPS 4. Receive OPS. 5. The applicant shall pay the assessed amount indicated in the OPS to the Fire Code Collecting Agent (FCCA). 6. Receive the Official Receipt (OR). 7. Present the OR to the CRO. 8. Receive the Claim Stub. AGENCY ACTION FEES TO BE PAID 6. Compute the fire code fees/ taxes. 7. Call the applicant’s queuing number and issue the Order of Payment Slip (OPS). 8. Call the applicant’s queuing number. 1. Fifteen percent (15%) of all fees charged by LGU but in no case shall be lower than Php500.00 9. Receive payment from applicant and issue Official Receipt (OR), then compile copy of OR. 10. Require the applicant to present original copy of the OR. 11. Check copy of OR and record to the Official Log Sheet the amount paid, OR Number, and Date of Payment, then issue Claim Stub to applicant. 12. Verify validity Certificate of Occupancy and refer the application documents to Chief Fire Safety Enforcement Section/Unit (FSES/FSEU) for issuance of FSIC for Business Operation. PROCESSING TIME 10 Minutes PERSON RESPONSIBLE Fire Code Assessor (FCA) Example Computation: Example 1) Fees charge by the LGU / PEZA = 10,000 Inspection Fee = (15% *10,000) = 1,500 10 Minutes Fire Code Collecting Agent (FCCA) Inspection Fee > 500 Therefore Inspection fee = 1,500 Example 2) Fees charge by the LGU / PEZA = 2,000 Inspection Fee = (15% *2,000) = 300 Inspection Fee < 500 5 Minutes Therefore Inspection fee = 500 2. If applicable, compute the appropriate fees in accordance to volume capacities provided in the following: a. Storage Fee b. Conveyance Fee 44 CRO 5 Minutes CLIENT STEPS AGENCY ACTION FEES TO BE PAID 13. Review/ evaluate the referral of CRO and forward his/ her recommendation to the City/ Municipal Fire Marshal (C/MFM) or District Fire Marshal (for Lone District Fire Office) for issuance of FSIC for Business Operation. 14. Approve and sign three (3) copies of FSIC for Business Operation and forward the same to the CRO. 15. Record in the Official Log Sheet the FSIC Number, date approved and validity. Provide duplicate copy of FSIC to the designated BFP Records Custodian. 16. Release the 9. Present the FSIC to the Claim Stub, acknowledge in the applicant or Authorized logbook and Representative claim the FSIC. upon presentation of the Claim Stub. Endorse copy of the FSIC to the Business Processing and Licensing Office (BPLO). PROCESSING TIME PERSON RESPONSIBLE 2 Hours Chief Fire Safety Enforcement Section/ Unit (FSES/FSEU) 20 Minutes City/Municipal Fire Marshal (C/MFM) or District Fire Marshal (for Lone District Fire Office) 10 Minutes CRO 5 Minutes HIGHLY TECHNICAL: i. Cases elevated to the National Office and Regional Offices that requires technical knowledge and expertise ii. Appeals iii. New Technologies, and iv. Special Structures Fire Safety Maintenance Report (FSMR) - A written report prepared by the building owner, his/her fire safety practitioner or authorized representative. This is a compilation of the maintenance and testing records kept by the building’s engineering and maintenance department, as a prerequisite for the issuance of FSIC for Business or Mayor’s Permit renewal, Certificate of Annual Inspection, Permit to Operate, PHILHEALTH Accreditation for Hospitals, DOH License to Operate and other permits or licenses being issued by other government agencies. Said report is required to private and public buildings, facilities and structures to be constructed, altered or modified, which by reason of their use, size and height are required to install any or combination of the following: 1) wet standpipe system; 2) automatic fire suppression system; and 3) automatic fire detection and alarm system 45 Fire Safety Inspection Certificate (FSIC) for New Business Permit without Valid FSIC for Occupancy Issued and with Occupancy Certificate Not Filed After Nine (9) Months from Issuance A document issued by the BFP as a pre-requisite for the issuance of Business or Mayor’s Permit, Accreditation for Hospitals, Permit to Operate, PHILHEALTH Accreditation for Hospitals, DOH License to Operate and other permits and licenses being issued by other government agencies valid for one (1) year from the date of issuance unless revoked/cancelled. Office: Classification: Fire Station/Lone District Fire Office or Business One Stop Shop (BOSS) Fire Safety Inspection Certificate (FSIC) for New Business Permit without Valid FSIC for Occupancy Issued and with Occupancy Certificate Not Filed After Nine (9) Months from Issuance (Transaction processed within 3 days) 1. G2C – Government to Citizen Type of Transaction: 2. G2B – Government to Business Entity Who may avail: Owner, Contractor or Business Entity CHECKLIST OF REQUIREMENTS WHERE TO SECURE Accomplished application form for Fire Safety Inspection Certificate (FSIC) District or Business One Stop if applied at Fire Station/ 1 original copy Fire Station/LoneShop (BOSS) Lone District or Unified Application Form (UAF) if applied at BOSS Assessment of Business Permit Fee/ Tax Assessment Bill from Business Process- 1 original copy ing and Licensing Office (BPLO) Business One Stop Shop (BOSS)/ Business Processing and Licensing Office (BPLO) Copy of Fire Insurance, if necessary 1 original copy Fire Insurance Company Fire Safety Maintenance Report (FSMR), if required 1 set of original copy Fire Safety Practitioner Management Certificate for Hot Works Operations bearing the name of the PAI, 1 original copy if necessary Business Entity/ Owner 46 CLIENT STEPS AGENCY ACTION 1. Completely fill-out necessary information in the application form 1.Issue a queuing number and application form and instruct the applicant to complete the information. 2. Submit the filled-out application form and the required docu-ments in the checklist of requirements. 2. Receive from the applicant the accomplished application form along with the required sets of documents. 3. The applicant shall wait for the queuing number to be called by the Fire Code Assessor (FCA) for the release of Order of Payment Slip (OPS). FEES TO BE PAID 3. Check the completeness of the submitted documents. 4. Record to the Official Log Sheet the name of applicant, owner of the establishment, the time and date of application. (In case of lacking requirements, the CRO shall immediately return the application to the applicant together with the FSIC Application Disapproval Form for compliance). 5. Endorse the application to the Fire Code Assessor (FCA) for assessment. 47 PROCESSING TIME PERSON RESPONSIBLE 10 Minutes Customer Relations Officer (CRO) CLIENT STEPS AGENCY ACTION 6. Compute the fire code fees/taxes. 4. Receive OPS. 7. Call the applicant’s queuing number and issue the Order of Payment Slip (OPS) 5. The applicant shall pay the assessed amount indicated in the OPS to the Fire Code Collecting Agent (FCCA) 8. Call the applicant’s queuing number. 6. Receive the Official Receipt (OR) 9. Receive payment from applicant and issue Official Receipt (OR), then compile copy of OR 7. Present the OR to the CRO 8. Receive the Claim Stub FEES TO BE PAID 1. Fifteen percent (15%) of all fees charged by LGU but in no case shall be lower than Php500.00 PROCESSING TIME PERSON RESPONSIBLE 10 Minutes Fire Code Assessor (FCA) Example Computation: Example 1) Fees charge by the LGU / PEZA = 10,000 Inspection Fee = (15% *10,000) = 1,500 Inspection Fee > 500 Therefore Inspection fee = 1,500 Example 2) Fees charge by the LGU / PEZA = 2,000 10 Minutes Fire Code Collecting Agent (FCCA) Inspection Fee = (15% *2,000) = 300 Inspection Fee < 500 Therefore Inspection fee = 500 10. Require the applicant to present 2. If original copy of the applicable, OR compute the appropriate fees in 11. Check copy accordance to of OR and record volume to the Official Log capacities Sheet the amount provided in the paid,OR Number, following: and Date of a. Storage Fee Payment, then b. Conveyissue Claim Stub to ance Fee c. Hotworks applicant. Fee 48 5 Minutes CRO CLIENT STEPS AGENCY ACTION FEES TO BE PAID 12. Schedule the fire safety inspection, assign Fire Safety Inspector (FSI), and issue an Inspection Order (IO) 9. Acknowledges the IO and AIR. 13. Proceed to the establishment and request acknowledgement of the IO from any responsible person in the building, structure or facility. Conduct validation of the tax bill for possible uncollected payment of fees/ taxes prescribed under RA 9514 and IRR and conduct fire safety inspection and immediately prepare an After Inspection Report (AIR) and recommend for issuance of FSIC for business. Before leaving the premises, establishment/ building owner, occupant, or any duly authorized representative shall acknowledge the After Inspection Report (AIR) and furnished with a copy. PROCESSING TIME PERSON RESPONSIBLE 20 Minutes Chief Fire Safety Enforcement Section/ Unit (FSES/FSEU) Within one (1) day (Agency Action Step 13 to Step 14) 49 Fire Safety Inspector (FSI) CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME PERSON RESPONSIBLE 14. Submit a copy of the AIR to the Chief, FSES/Chief, FSEU. FSI 15. Review/ evaluate the findings of FSI and recommend to the City/Municipal Fire Marshal (C/MFM) or District Fire Marshal (for Lone District Fire Office) the issuance of FSIC or NTC as the case maybe. 3 Hours 16. Approve and sign three (3) copies of FSIC or NTC in case there is a violation of the Fire Code and forwards the same to the CRO or releasing clerk, for release. 3 Hours 50 Chief FSES/ FSEU City/Municipal Fire Marshal (C/MFM) or District Fire Marshal (for Lone District Fire Office) CLIENT STEPS AGENCY ACTION FEES TO BE PAID 17. Record in the Official Log Sheet the FSIC Control number, date approved. Provide duplicate copy of FSIC/NTC in case there is a violation of the Fire Code to the designated Records Custodian. 10. Present the Claim Stub, acknowldege in the logbook and claim the FSIC/NTC. PROCESSING TIME PERSON RESPONSIBLE 10 Minutes 18. Release the FSIC to the applicant or Authorized Representative upon presentation of the Claim Stub. For NTC forward to FSI and shall be served to the applicant or Authorized Representative. Endorse copy of FSIC/NTC as the case maybe to the Business Processing and Licensing Office (BPLO). CRO 5 Minutes HIGHLY TECHNICAL: i. Cases elevated to the National Office and Regional Offices that requires technical knowledge and expertise ii. Appeals iii. New Technologies, and iv. Special Structures. Fire Safety Maintenance Report (FSMR) - A written report prepared by the building owner, his/her fire safety practitioner or authorized representative. This is a compilation of the maintenance and testing records kept by the building’s engineering and maintenance department, as a prerequisite for the issuance of FSIC for Business or Mayor’s Permit renewal, Certificate of Annual Inspection, Permit to Operate, PHILHEALTH Accreditation for Hospitals, DOH License to Operate and other permits or licenses being issued by other government agencies. Said report is required to private and public buildings, facilities and structures to be constructed, altered or modified, which by reason of their use, size and height are required to install any or combination of the following: 1) wet standpipe system; 2) automatic fire suppression system; and 3) automatic fire detection and alarm system. 51 Fire Safety Inspection Certificate (FSIC) Application for Renewal of Business A document issued by the BFP as a pre-requisite for the issuance of Business or Mayor’s Permit, Accreditation for Hospitals, Permit to Operate, PHILHEALTH Accreditation for Hospitals, DOH License to Operate and other permits and licenses being issued by other government agencies valid for one (1) year from the date of issuance unless revoked/cancelled Office: Fire Station/Lone District Fire Office or Business One Stop Shop (BOSS) Classification: Renewal of Business Included in the Positive List (Transaction processed within 1 day) 1. G2C – Government to Citizen Type of Transaction: 2. G2B – Government to Business Entity Owner, Contractor or Business Entity Who may avail: CHECKLIST OF REQUIREMENTS WHERE TO SECURE Accomplished application form for Fire Safety Inspection Certificate (FSIC) District or Business One Stop if applied at Fire Station/ 1 original copy Fire Station/LoneShop (BOSS) Lone District or Unified Application Form (UAF) if applied at BOSS Assessment of Business Permit Fee/ Tax Assessment Bill from Business 1 original copy Processing and Licensing Office (BPLO) Business One Stop Shop (BOSS)/ Business Processing and Licensing Office (BPLO) Copy of Fire Insurance, if necessary 1 original copy Fire Insurance Company Fire Safety Maintenance Report (FSMR), if required 1 set of original copy Fire Safety Practitioner Management Certification for Hot Works Operations bearing the name of the PAI, 1 original copy if necessary Business Entity/ Owner 52 CLIENT STEPS AGENCY ACTION FEES TO BE PAID 1. Issue a queuing number and application form and instruct the applicant to complete the information. 2. Submit the filled- 2. Receive from the out application applicant all form and the documents required required in the checklist of requirements. documents in the checklist of requirements. 3. Check the completeness of the submitted documents. 4. Record to the Official Log Sheet the name of applicant, owner of the establishment, the time and date of application. (In case of lacking requirements, the CRO shall immediately return the application to the applicant together with the FSIC Application Disapproval Form for compliance.) PROCESSING TIME PERSON RESPONSIBLE 1. Completely fill-out necessary information in the application form. 3. The applicant shall wait for the queuing number to be called by the Fire Code Assessor (FCA) for the release of Order of Payment Slip (OPS). 10 Minutes 5. Endorse the application to the Fire Code Assessor (FCA) for assessment. 53 Customer Relations Officer (CRO) CLIENT STEPS 4. Receive OPS. 5. The applicant shall pay the assessed amount indicated in the OPS to the Fire Code Collecting Agent (FCCA). 6. Receive the Official Receipt (OR). AGENCY ACTION 6. Compute the fire code fees/taxes. 7. Call the applicant’s queuing number. 8. Call the applicant’s queuing number. 9. Receive payment from applicant and issue Official Receipt (OR), then compile copy of OR. 7. Present the OR 10. Require the to the CRO. applicant to present original copy of the OR. 8. Receive the 11. Verify Positive Claim Stub and List or Negative proceed to the BP- List. Check copy LO’s processes for of OR and record issuance of Busito the Official Log ness Permit. Sheet the amount paid, OR Number, and Date of Payment, then issue Claim Stub to applicant. Positive List endorsed to BPLO will serve as basis for the BPLO to renew the Business Permit. (Note: The Claim Stub shall be stamped: “New FSIC will be issued one (1) month before the expiration of the FSIC). FEES TO BE PAID “ORDINARY INSPECTION FEE” PROCESSING TIME 10 Minutes Fifteen percent (15%) of all fees charged by LGU but in no case shall be lower than Php500.00 Example Computation: 10 Minutes PERSON RESPONSIBLE Fire Code Assessor (FCA) Fire Code Collecting Agent (FCCA) Example 1) Fees charge by the LGU / PEZA = 10,000 Inspection Fee = (15% *10,000) = 1,500 Inspection Fee > 500 Therefore Inspection fee = 1,500 Example 2) Fees charge by the LGU / PEZA = 2,000 Inspection Fee = (15% *2,000) = 300 Inspection Fee < 500 Therefore Inspection fee = 500 54 20 Minutes CRO CLIENT STEPS FEES TO BE PROCESSING PERSON PAID TIME RESPONSIBLE CONDUCT OF FIRE SAFETY SHALL BE DONE ONE (1) MONTH BEFORE EXPIRATION OF THE FSIC 12. Schedule the fire safety inspecChief Fire tion one (1) month Safety before the expiraEnforcement tion of FSIC, assign Section/ Unit 15 Minutes Fire Safety Inspec(Chief, FSES/ tor (FSI), and issue FSEU) an Inspection Order (IO) to FSI. 9. Acknowledges the IO and AIR. AGENCY ACTION 13. Proceed to the establishment and request acknowledgement of the IO from any responsible person in the building, structure or facility. Conduct fire safety inspection and immediately prepare an After Inspection Report (AIR). Before leaving the premises, establishment/building owner, occupant, or any duly authorized representative shall acknowledge the After Inspection Report (AIR) and furnished with a copy. Informed and advised his/her about the applicable fees in accordance to his/her business operation before the release of the FSIC as the case maybe. Within one (1) day (Agency Action Step 13 to Step 14) 55 FSI CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME 14. Submit a copy of the AIR to the Chief, FSES/Chief, FSEU. 10. Present claim stub. 11. The applicant shall wait for the queuing number to be called by the Fire Code Assessor (FCA) for the release of Order of Payment Slip (OPS). 12. The applicant shall pay the assessed amount indicated in the OPS to the Fire Code Collecting Agent (FCCA). FSI 15. Verify the claim stub and Issue queuing number as the case maybe and check the status of the application. Forwards to FCA for validation and payment of appropriate fire code fees if applicable. 16. Compute the Fire Code fees. Call the queuing number and issue the Order of Payment Slip. 17. Receive the payment and issue Official Receipt. Forwards to the Chief FSES. PERSON RESPONSIBLE 2. If applicable, compute the appropriate fees in accordance to volume capacities provided in the following: a. Storage Fee b. Conveyance Fee c. Hotworks Fee 18. Review/evaluate the findings of FSI, prepare and recommend to the City/Municipal Fire Marshal (C/MFM) or District Fire Marshal (for Lone District Fire Office) the issuance of FSIC or NTC as the case maybe. 56 10 minutes CRO 10 minutes FCA 10 minutes FCCA 45 Minutes Chief, FSES/FSEU CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME PERSON RESPONSIBLE 19. Approve and City/Municipal sign three (3) copFire Marshal ies of FSIC or NTC (C/MFM) or in case there is a District Fire violation of the Fire 45 Minutes Marshal (for Code and forwards Lone District Fire the same to the Office) CRO or releasing clerk, for release. 20. Record in the Official Log Sheet the FSIC Control number, date approved. Provide duplicate copy of 10 Minutes FSIC/NTC in case there is a violation of the Fire Code to the designated Records Custodian. 13. Present the 21. Release the CRO Claim Stub, FSIC/NTC as the acknowledge in the case may be, to the logbook and claim applicant or Authothe FSIC/NTC. rized Representative upon presentation of the Claim 5 Minutes Stub. Endorse copy of FSIC/NTC as the case maybe to the Business Processing and Licensing Office (BPLO). HIGHLY TECHNICAL: i. Cases elevated to the National Office and Regional Offices that requires technical knowledge and expertise ii. Appeals iii. New Technologies, and iv. Special Structures Fire Safety Maintenance Report (FSMR) - A written report prepared by the building owner, his/her fire safety practitioner or authorized representative. This is a compilation of the maintenance and testing records kept by the building’s engineering and maintenance department, as a prerequisite for the issuance of FSIC for Business or Mayor’s Permit renewal, Certificate of Annual Inspection, Permit to Operate, PHILHEALTH Accreditation for Hospitals, DOH License to Operate and other permits or licenses being issued by other government agencies. Said report is required to private and public buildings, facilities and structures to be constructed, altered or modified, which by reason of their use, size and height are required to install any or combination of the following: 1) wet standpipe system; 2) automatic fire suppression system; and 3) automatic fire detection and alarm system 57 Fire Safety Inspection Certificate (FSIC) Application for Renewal of Business without Valid FSIC or Expired FSIC / with Existing Violation of the Fire Code / Included in the Negative List A document issued by the BFP as a pre-requisite for the issuance of Business or Mayor’s Permit, Accreditation for Hospitals, Permit to Operate, PHILHEALTH Accreditation for Hospitals, DOH License to Operate and other permits and licenses being issued by other government agencies valid for one (1) year from the date of issuance unless revoked/cancelled Office: Fire Station/Lone District Fire Office or Business One Stop Shop (BOSS) Renewal of Business Without Valid FSIC or Expired FSIC/ With Existing Violation of the Fire Code/ Included in the Negative List (Transaction processed within 3 days) 1. G2C – Government to Citizen Type of Transaction: 2. G2B – Government to Business Entity Owner, Contractor or Business Entity Who may avail: CHECKLIST OF REQUIREMENTS WHERE TO SECURE Classification: Accomplished application form for Fire Safety Inspection Certificate (FSIC) District or Business One Stop if applied at Fire Station/ 1 original copy Fire Station/LoneShop (BOSS) Lone District or Unified Application Form (UAF) if applied at BOSS Assessment of Business Permit Fee/ Tax Assessment Bill from Business 1 original copy Processing and Licensing Office (BPLO) Business One Stop Shop (BOSS)/ Business Processing and Licensing Office (BPLO) Copy of Fire Insurance, if necessary 1 original copy Fire Insurance Company Fire Safety Maintenance Report (FSMR), if required 1 set of original copy Fire Safety Practitioner Management Certification for Hot Works Operations bearing the name of the PAI, 1 original copy if necessary Business Entity/ Owner 58 CLIENT STEPS AGENCY ACTION 1. Completely fill-out necessary information in the application form. 1. Issue a queuing number and application form and instruct the applicant to complete the necessary information. 2. Submit the filledout application form and the required documents in the checklist of requirements. 2. Receive from the applicant all documents required in the checklist of requirements. FEES TO BE PAID 3. Check the completeness of the submitted documents. 4. Record to the Official Log Sheet the name of applicant, owner of the establishment, the time and date of application. (In case of lacking requirements, the CRO shall immediately return the application to the applicant together with the FSIC Application Disapproval Form for compliance). PROCESSING TIME 10 Minutes (Agency Action Step 1 to Step 5) Note: 1) For application without valid or expired FSIC shall proceed to the next step (Agency Action Step 5) 59 PERSON RESPONSIBLE Customer Relations Officer (CRO) CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME PERSON RESPONSIBLE Continuation of Step 4: 2) For application for Business Renewal on the building/ establishment/ facilities with existing Violation with the Fire Code/included in the Negative List that has imposition of administrative courses of action, processes shall be in accordance to its procedure. Appropriate inspection fees, storage fees and conveyance fees shall be held in abeyance. Issue the application of FSIC Application Disapproval Form. 3. The applicant shall wait for the queuing number to be called by the Fire Code Assessor (FCA) for the release of Order of Payment Slip (OPS). 5. Endorse the application to the Fire Code Assessor (FCA) for assessment. CRO 60 CLIENT STEPS 4. Receive OPS. AGENCY ACTION FEES TO BE PAID 6. Compute the fire 1) Fifteen code fees/taxes and percent (15%) of all fees fines. charged by 7. Call the appliLGU but in cant’s queuing no case shall number and issue be lower than Php500.00 the Order of Payment Slip (OPS) 5. The applicant shall pay the assessed amount indicated in the OPS to the Fire Code Collecting Agent (FCCA). 8. Call the applicant’s queuing number. 6. Receive the Official Receipt (OR). 9. Receive payment from applicant and issue Official Receipt (OR), then compile copy of OR. 10. Require the applicant to present original copy of the OR. 11. Check copy of OR and record to the Official Log Sheet the amount paid, OR Number, and Date of Payment, then issue Claim Stub to applicant. 12. Schedule the fire safety inspection, assign Fire Safety Inspector (FSI), and issue an Inspection Order (IO). 7. Present the OR to the CRO. 8. Receive the Claim Stub. 9. Acknowledges the IO. 13. Proceed to the establishment and request acknowledgement of the IO from any responsible person in the building, structure or facility PROCESSING TIME 10 Minutes PERSON RESPONSIBLE Fire Code Assessor (FCA) Example Computation: Example 1) Fees charge by the LGU / PEZA = 10,000 Inspection Fee = (15% *10,000) = 1,500 10 Minutes Fire Code Collecting Agent (FCCA) Inspection Fee > 500 Therefore Inspection fee = 1,500 Example 2) Fees charge by the LGU / PEZA = 2,000 Inspection Fee = (15% *2,000) = 300 5 Minutes CRO 20 Minutes Chief Fire Safety Enforcement Section/ Unit (Chief, FSES/ FSEU) Inspection Fee < 500 Therefore Inspection fee = 500 2. If applicable, compute the appropriate fees in accordance to volume capacities provided in the following: a. Storage Fee b. Conveyance Fee 3. Applicable Administrative fine. 61 Within one (1) day (Agency Action Step 13 to Step 15) Fire Safety Inspector (FSI) CLIENT STEPS 9. Acknowledges the AIR. AGENCY ACTION FEES TO BE PAID PROCESSING TIME 14. Conduct validation of the tax bill for possible uncollected payment of fees/taxes prescribed under RA 9514 and IRR and conduct fire safety inspection and immediately prepare an After Inspection Report (AIR) and recommend for issuance of FSIC for business. Before leaving the premises, establishment/ building owner, occupant, or any duly authorized representative shall acknowledge the After Inspection Report (AIR) and furnished with a copy. PERSON RESPONSIBLE FSI 15. Submit a copy of the AIR to the Chief, FSES/Chief, FSEU. 16. Review/evaluate the findings of FSI and recommend to the City/ Municipal Fire Marshal (C/MFM) or District Fire Marshal (for Lone District Fire Office) the issuance of FSIC or NTC as the case maybe. 17. Approve and sign three (3) copies of FSIC or NTC in case there is a violation of the Fire Code and forwards the same to the CRO or releasing clerk, for release. 3 Hours 3 Hours 62 Chief FSES/ FSEU City/Municipal Fire Marshal (C/MFM) or District Fire Marshal (for Lone District Fire Office) CLIENT STEPS AGENCY ACTION FEES TO BE PAID 18. Record in the Official Log Sheet the FSIC Control number, date approved. Provide duplicate copy of FSIC/NTC in case there is a violation of the Fire Code to the designated Records Custodian. . 10. Present the Claim Stub, acknowledge in the logbook and claim the FSIC/NTC. PROCESSING TIME PERSON RESPONSIBLE 10 Minutes CRO 19. Release the FSIC/NTC as the case may be, to the applicant or Authorized Representative upon presentation of the Claim Stub. Endorse copy of FSIC/NTC as the case maybe to the Business Processing and Licensing Office (BPLO) 5 Minutes HIGHLY TECHNICAL: i. Cases elevated to the National Office and Regional Offices that requires technical knowledge and expertise ii. Appeals iii. New Technologies, and iv. Special Structures Fire Safety Maintenance Report (FSMR) - A written report prepared by the building owner, his/her fire safety practitioner or authorized representative. This is a compilation of the maintenance and testing records kept by the building’s engineering and maintenance department, as a prerequisite for the issuance of FSIC for Business or Mayor’s Permit renewal, Certificate of Annual Inspection, Permit to Operate, PHILHEALTH Accreditation for Hospitals, DOH License to Operate and other permits or licenses being issued by other government agencies. Said report is required to private and public buildings, facilities and structures to be constructed, altered or modified, which by reason of their use, size and height are required to install any or combination of the following: 1) wet standpipe system; 2) automatic fire suppression system; and 3) automatic fire detection and alarm system 63 Issuance and Service of Notice to Comply (NTC) Procedure A notice issued to the owner or administrator of buildings, structures or facilities with a grace period to comply violation/s. Office: Fire Station/Lone District Fire Office Classification: NOTICE TO COMPLY (Applicable to All Transactions either Simple, Complex or Highly Technical) 1. G2C – Government to Citizen Type of Transaction: 2. G2B – Government to Business Entity Owner, Contractor or Business Entity Who may avail: CLIENT STEPS AGENCY ACTION FEES TO BE PROCESSING PERSON PAID TIME RESPONSIBLE 1. Submits After Inspection Report (AIR) to the Chief, FSES/FSEU, using the prescribed format, indicating the Fire Safety violations or 15 Minutes Inspector deficiencies of the (FSI) fire safety requirements imposed by RA 9514 (Fire Code of the Philippines of 2008). 2. Review/evaluate the recommendations/ findings of FSI and recommends to C/ MFM or District Fire Marshal (for Lone District Fire Office) Within one (1) the issuance of day after the NTC as the case Chief Fire submission of may be. Safety the Enforcement AIR Prepares the Notice Section/Chief to Comply (NTC) Fire Safety (Agency Action and affixes initial. Enforcement Unit Step 2 to Step Such Notice shall (Chief, FSES/ 3) include, among FSEU) others, a citation of (Note: As per BFP specific provision/s Operational Manual) of RA 9514 and its RIRR violated and the specific action/ corrections that should be complied for period of not exceeding fifteen (15) days. 64 CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME 3. Endorses the Notice to Comply to the City/ Municipal Fire Marshal (C/ MFM) or District Fire Marshal (for Lone District Fire Office) for his/her signature PERSON RESPONSIBLE Chief, FSES/ FSEU 4. Make the final review/evaluation of the Chief, FSES/ Chief, FSEU recommendation for disposition and signs three (3) copies of NTC. City/ Within three (3) Municipal Fire days after the submission of Marshal (C/MFM) or District Fire the AIR Marshal (for (Note: As per BFP Lone District Fire Operational Manual) Office) 5. Endorse the three (3) copies of NTC to CRO. 6. Record in the Official Log Sheet the date and NTC number. Provide duplicate copy of NTC to the designated Records Custodian. 15 Minutes 7. Release the NTC to the FSI. 65 Customer Relation Officer (CRO) CLIENT STEPS AGENCY ACTION 1. Acknowledges the NTC with proper receipt by writing his/her name, the date & time and affixing his /her signature above the name. 8. Shall serve the NTC to the owner or responsible person of the Building/ establishment. FEES TO BE PAID NOTE: In case the owner/responsible person refuses to accept the copy of the notice, through coordination with the barangay official, a copy thereof is to be posted at a conspicuous place in the building/establishment, witnessed by any barangay official and/ or another original copy is to be sent to the owner/responsible person through registered mail with return card. Fire Safety Inspector request Barangay Official who has witnessed the serving of NTC to sign at the receiving copy as witness. PROCESSING TIME PERSON RESPONSIBLE Within five (5) days from the submission of the report FSI (Note: As per BFP Operational Manual) Upon the receipt of the NTC, shall return it to the Chief, FSES for proper archiving. 66 CLIENT STEPS 2.Comply the violations or deficiencies as stated in the NTC within the prescribed period. AGENCY ACTION FEES TO BE PAID 9. Maintains the establishment’s records and monitors the establishment’s status of compliance. PROCESSING TIME PERSON RESPONSIBLE Maximum of fifteen (15) days after receipt of NTC Office of the Chief, FSES/ FSEU 15 Minutes Chief, FSES/ FSEU 10 Minutes C/MFM or District Fire Marshal (for Lone District Fire Office) 10. On the last day of the period indicated in the NTC, shall assign, prepare and issue Inspection Order (IO) to the designated FSI for the conduct of re-inspection. 11. Forward the IO together with NTC as reference document to CFM/ MFM or District Fire Marshal (for Lone District Fire Office) for his/her approval and signature. 12. Approve and signs the IO then return to C, FSES/C, FSEU for the receipt of the FSI. 67 CLIENT STEPS 3.Acknowledges the IO and AIR. AGENCY ACTION FEES TO BE PAID 13. Proceed to the establishment, conducts re-inspection on the first day after the lapse of the grace period indicated in the Notice to Comply and prepare an After Inspection Report (AIR) and recommend for issuance of FSIC (if compliant) or NTCV (if non-compliant). Before leaving the premises, establishment/building owner, occupant, or any duly authorized representative shall acknowledge the After Inspection Report (AIR) and furnished with a copy. PROCESSING TIME PERSON RESPONSIBLE Within one (1) day after receipt of Inspection Order (IO) FSI NOTE: 1) Any party aggrieved by the action(s) or findings of the C/MFM may challenge the same by filing a VERIFIED PROTEST to the Office of the Provincial Fire Marshal or District Fire Marshal, as the case may be, within five (5) days from receipt of a notice or order. In case the action to be protested is rendered by a Provincial Fire Marshal or District Fire Marshal, the same shall be filed before the Office of the Regional Director. 2) Resolutions by the Provincial Fire Marshal, District Fire Marshal or the Regional Director over a protest may be challenged by filing a verified appeal to the next higher authority within five (5) days from the receipt of the decision or resolution appealed from. The decision of the Regional Director in the exercise of its appellate jurisdiction shall be final and executory, except decision on closure order in which case said decision may be appealed to the Chief, BFP then to the Secretary of the DILG. 3) During re-inspection, if initial compliance is effected by the owner, the NTCV or Abatement Order may not be issued. In lieu thereof, the owner may be allowed to execute an Affidavit of Undertaking, specifically containing, among others, the period of completion of work, which shall not exceed up to a period of six (6) months. If a longer period is required for its completion, it may be extended for another duration not exceeding six (6) months. IF THE BUILDING/ESTABLISHMENT IS NON -COMPLIANT (SEE SUBSEQUENT PROCEDURE - ISSUANCE OF NTCV) 68 Issuance and Service of Notice to Correct Violation (NTCV) Procedure A notice given to the owner or administrator of buildings, structures or facilities after the period provided in the notice to comply has lapsed. This notice likewise includes an administrative fine and posting of warning sign. Office: Fire Station/Lone District Fire Office NOTICE TO CORRECT VIOLATION (Applicable to All Transactions either Simple, Complex or Highly Technical) Classification: Type of Transaction: 1. G2C – Government to Citizen 2. G2B – Government to Business Entity Who may avail: Owner, Contractor or Business Entity CLIENT STEPS AGENCY ACTION FEES TO BE PAID 1. Submits After Inspection Report (AIR) to the Chief, FSES/FSEU, using the prescribed format, indicating the violations or deficiencies of the fire safety requirements imposed by RA 9514 (Fire Code of the Philippines of 2008). 69 PROCESSING TIME PERSON RESPONSIBLE Within one (1) day after receipt of Inspection Order (IO) Fire Safety Inspector (FSI) CLIENT STEPS AGENCY ACTION FEES TO BE PROCESSING PAID TIME 2. Review/evaluate Computation of Amount of the recommendafines to be tions/ findings of FSI, prepare appro- imposed: a) Deterpriate documents, mining the affixes initial and amount of recommends to C/ fine per MFM or District violation Fire Marshal (DFM) prescribed the issuance of the in Section following: 12.0.0.4 1) Put up a sign in para B of front of the RIRR of RA building or 9514 ; and structure that it is a fire hazard. b) Fixing Specifically, the the amount notice shall bear per the words violation “WARNING: THIS prescribed BUILDING/ in Rule 13 STRUCTURE IS A of the RIRR FIRE HAZARD”; of RA 9514; 2) Imposition of corresponding administrative fine; and Within one (1) day after the submission of the AIR 3) NTCV (Note: As per BFP Operational Manual) 3. Endorse the NTCV with an Order to Pay Administrative Fine and posting of sign “WARNING: THIS BUILDING/ STRUCTURE IS FIRE HAZARD” for signature of C/ MFM or District Fire Marshal (for Lone District Fire Office). 70 PERSON RESPONSIBLE Chief Fire Safety Enforcement Section/Chief Fire Safety Enforcement Unit (Chief, FSES/ FSEU) CLIENT STEPS AGENCY ACTION FEES TO BE PAID 4. Make the final review/evaluation of the Chief-FSES/ CHIEF, FSEU recommendation for disposition and sign three (3) copies of NTCV with an Order to Pay Administrative Fine (The NTCV shall include, among others, a citation of the specific provision/s of RA 9514 and its RIRR violated and the specific actions/ corrections that should be complied for a period not exceeding fifteen (15) days) and posting of sign “WARNING: THIS BUILDING/STRUCTURE IS FIRE HAZARD” in front of the building or structure that it is a fire hazard, which shall remain posted until such time that the owner, administrator, occupant or other persons responsible for the condition of the building, structure and their premises or facilities correct the same, but such period shall not exceed fifteen (15) days from the lapse of the initial period given in the notice/ order to comply. PROCESSING TIME PERSON RESPONSIBLE Within two (2) days after the submission of the AIR City/ Municipal Fire Marshal (C/MFM) or District Fire Marshal (for Lone District Fire Office) (Note: As per BFP Operational Manual) 5. Endorse the three (3) copies of NTCV with an Order to Pay Administrative Fine and posting of sign “WARNING: THIS BUILDING/STRUCTURE IS FIRE HAZARD” to CRO. 71 CLIENT STEPS 1. Acknowledges the NTCV with proper receipt by writing his/her name, the date & time and affixing his /her signature above the name. AGENCY ACTION FEES TO BE PAID 6. Record in the Official Log Sheet the date and NTCV number. Provide duplicate copy of NTCV to the designated Records Custodian. 7. Release the NTCV to the FSI. 8. Serve the original copy of NTCV with an Order to Pay Administrative Fine to the owner, administrator or occupant of the building, and their premises or facilities, put a corresponding signage in front of the building. The Notice bears the words “WARNING: THIS BUILDING/ STRUCTURE IS A FIRE HAZARD”. Note: If necessary or if the situation so requires, requests/ coordinates with the PNP and/or Barangay Officials having jurisdiction to assist in the posting of warning signs, in case the owner/responsible person refuses to accept the copy of the NTCV, through coordination with the Barangay Official, copy thereof is left/posted at the conspicuous place in the building / establishment which is witnessed by any Barangay Official and the original copy shall be sent to the owner/ responsible person through registered mail with return card. The Barangay Official who witnessed the serving of the NTCV shall sign at the receiving copy of the notice as witnesses. PROCESSING TIME PERSON RESPONSIBLE 15 Minutes Customer Relation Officer (CRO) Within five (5) days from the submission of the report (Note: As per BFP Operational Manual) 72 FSI CLIENT STEPS AGENCY ACTION 2. Pay Administrative Fine 9. Monitors compliance with the order to pay Administrative fine. 3. Comply the violations or deficiencies as stated in the NTCV within the prescribed period. 10. Maintains the establishment’s records and monitors the status of compliance. FEES TO BE PAID PROCESSING TIME PERSON RESPONSIBLE Within three (3) days after receipt of the NTCV Chief, FSES/ FSEU Maximum of fifteen (15) Days Grace Period after receipt of NTCV Office of the Chief, FSES/ FSEU 15 Minutes Chief, FSES/ FSEU 10 Minutes C/MFM or District Fire Marshal (for Lone District Fire Office) 11. On the last day of the grace period indicated in the NTCV, shall assign, prepare and issue Inspection Order to the designated FSI for the conduct of re-inspection. 12. Forward the IO together with NTCV as reference document to CFM/ MFM for its approval and signature. 13. Approve and signs the IO then return to Chief, FSES/FSEU for the receipt of the FSI. 73 CLIENT STEPS 4. Acknowledge IO and AIR. AGENCY ACTION FEES TO BE PAID 14. Proceed to the establishment for the conduct of re-inspection on the first day after the lapse of the grace period indicated in the Notice to Correct Violation. Prepare an After Inspection Report (AIR) and recommend for issuance of FSIC (if compliant) or Abatement Order (if non-compliant). Before leaving the premises, establishment/building owner, occupant, or any duly authorized representative shall acknowledge the After Inspection Report (AIR) and furnished with a copy. PROCESSING TIME PERSON RESPONSIBLE Within one (1) day after receipt of Inspection Order (IO) FSI NOTE: 1) Any party aggrieved by the action(s) or findings of the C/MFM may challenge the same by filing a VERIFIED PROTEST to the Office of the Provincial Fire Marshal or District Fire Marshal, as the case may be, within five (5) days from receipt of a notice or order. In case the action to be protested is rendered by a Provincial Fire Marshal or District Fire Marshal, the same shall be filed before the Office of the Regional Director. 2) Resolutions by the Provincial Fire Marshal, District Fire Marshal or the Regional Director over a protest may be challenged by filing a verified appeal to the next higher authority within five (5) days from the receipt of the decision or resolution appealed from. The decision of the Regional Director in the exercise of its appellate jurisdiction shall be final and executory, except decision on closure order in which case said decision may be appealed to the Chief, BFP then to the Secretary of the DILG. 3) During re-inspection, if initial compliance is effected by the owner, the NTCV or Abatement Order may not be issued. In lieu thereof, the owner may be allowed to execute an Affidavit of Undertaking, specifically containing, among others, the period of completion of work, which shall not exceed up to a period of six (6) months. If a longer period is required for its completion, it may be extended for another duration not exceeding six (6) months. IF THE BUILDING/ESTABLISHMENT IS NON -COMPLIANT (SEE SUBSEQUENT PROCEDURE - ISSUANCE OF ABATEMENT ORDER) 74 Issuance and Service of Abatement Order (AO) Procedure A notice/order given to the owner or administrator of buildings, structures or facilities after the period provided in the notice to correct violation/s has lapsed. This notice/order likewise includes an administrative fine. Office: Fire Station/Lone District Fire Office Classification: Abatement Order (Applicable to All Transactions either Simple, Complex or Highly Technical) G2C – Government to Citizen Type of Transaction: 1. 2. G2B – Government to Business Entity Who may avail: CLIENT STEPS Owner, Contractor or Business Entity AGENCY ACTION FEES TO BE PAID 1. Submits copy of After Inspection Report (AIR) indicating non-compliance with the Notice to Correct Violation (NTCV) to the Chief, FSES/FSEU. PROCESSING TIME Within one (1) day after receipt of Inspection Order (IO) 75 PERSON RESPONSIBLE Fire Safety Inspector (FSI) CLIENT STEPS AGENCY ACTION FEES TO BE PROCESSING PERSON PAID TIME RESPONSIBLE 2. Review/evaluate Computation the recommendaof Amount of tions/ findings of fines to be FSI, prepare the imposed: corresponding a) Deterdocument, affixes mining the his/her initial and amount of recommends to C/ fine per MFM or District Fire violation Marshal (for Lone prescribed District Fire Office) in Section the following: 12.0.0.4 para B of 1) Continuous RIRR of RA posting 9514 ; and of the sign in front of the building or b) Fixing structure that it is the amount a fire hazard. per Specifically, the violation notice shall bear prescribed the words in Rule 13 “WARNING: THIS of the RIRR BUILDING/ of RA 9514; Within one (1) STRUCTURE IS Chief Fire A FIRE HAZARD”; day after the Safety submission of Enforcement 2) Imposition of the AIR Section/Chief corresponding Fire Safety administrative Enforcement Unit fine;and (Chief FSES/ (Note: As per BFP FSEU) 2) Issuance of Operational Manual) abatement order to the owner, administrator or occupant of the building, structure and their premises or facilities for a period not exceeding fifteen (15) days. 3.Endorse the AO with an Order to Pay Administrative Fine and the continuous posting of sign “WARNING: THIS BUILDING/ STRUCTURE IS FIRE HAZARD” for signature of C/ MFM or District Fire Marshal (for Lone District Fire Office). 76 CLIENT STEPS AGENCY ACTION FEES TO BE PAID 4. Make the final review/evaluation of the Chief FSES/CHIEF, FSEU, recommendation for disposition and signs three (3) copies of AO with an Order to Pay Administrative Fine and effect the continuous posting of sign “WARNING: THIS BUILDING/STRUCTURE IS FIRE HAZARD” in front of the building or structure that it is a fire hazard, which shall remain posted until such time that the owner, administrator, occupant or other persons responsible for the condition of the building, structure and their premises or facilities correct the same, but such period shall not exceed fifteen (15) days from the lapse of the period given in the Notice to Correct Violations. PROCESSING TIME PERSON RESPONSIBLE Within 3 days after the submission of the AIR City/ Municipal Fire Marshal (C/MFM) or District Fire Marshal (for Lone District Fire Office) (Note: As per BFP Operational Manual) 5. Endorse the three (3) copies of AO with an Order to Pay Administrative Fine and effect the continuous posting of sign “WARNING: THIS BUILDING/STRUCTURE IS FIRE HAZARD” to CRO. 6. Record in the Official Log Sheet the date and AO number. Provide duplicate copy of AO to the designated Records Custodian. 7. Release the AO to the FSI. 15 minutes 77 Customer Relation Officer (CRO) CLIENT STEPS AGENCY ACTION 1. Acknowledges the AO with proper receipt by writing his/her name, the date & time and affixing his /her signature above the name. 8. Serve the original copy of AO with an Order to Pay Administrative Fine to the owner, administrator or occupant of the building, and their premises or facilities and continuous posting of warning sign “WARNING: THIS BUILDING/ STRUCTURE IS A FIRE HAZARD” in front of the building. FEES TO BE PAID Note: If necessary or if the situation so requires, requests/coordinates with the PNP and/ or Barangay Officials having jurisdiction to assist in the posting of warning signs, in case the owner/ responsible person refuses to accept the copy of the AO, through coordination with the Barangay Official, a copy thereof is left/posted at the conspicuous place in the building/ establishment which is witnessed by any Barangay Official and the original copy shall be sent to the owner/ responsible person through registered mail with return card. The Barangay Official who witnessed the serving of the AO shall sign at the receiving copy of the notice as witnesses. PROCESSING TIME Within five (5) days from the submission of the report (Note: As per BFP Operational Manual) 78 PERSON RESPONSIBLE FSI CLIENT STEPS 2. Pay Administrative Fine. 3. Comply the violations or deficiencies as stated in the AO within the prescribed period AGENCY ACTION FEES TO BE PAID 9. Monitors compliance with the order to pay Administrative fine. 10. Maintains the establishment’s records and monitors the status of compliance. PROCESSING TIME PERSON RESPONSIBLE Within three (3) days after receipt of AO Chief, FSES/ FSEU Maximum of fifteen (15) Days Grace Period after receipt of AO Office of the Chief, FSES/ FSEU 11. On the last day of the period indicated in the Abatement Order, shall assign, prepare and issue Inspection Order to the desinated FSI for the conduct of re-inspection. 12. Forward the IO together with Abatement Order (AO) as reference document to C/MFM or District Fire Marshal (for Lone District Fire Office) for its approval and signature. 15 Minutes 79 Chief, FSES/ FSEU CLIENT STEPS 4. Acknowledge IO and AIR. AGENCY ACTION FEES TO BE PAID 13. Approve and signs the IO then return to C, FSES/C, FSEU for the receipt of the FSI. 15. Proceed to the establishment for the conduct of re-inspection on the first day after the lapse of the grace period indicated in the Abatement Order. Prepare an After Inspection Report (AIR) and recommend for issuance of FSIC (if compliant) or Closure Order (if non-compliant). Before leaving the premises, establishment/ building owner, occupant, or any duly authorized representative shall acknowledge the After Inspection Report (AIR) and furnished with a copy. PROCESSING TIME PERSON RESPONSIBLE 10 Minutes C/MFM or District Fire Marshal (for Lone District Fire Office) Within one (1) day after receipt of Inspection Order (IO) FSI NOTE: 1) Any party aggrieved by the action(s) or findings of the C/MFM may challenge the same by filing a VERIFIED PROTEST to the Office of the Provincial Fire Marshal or District Fire Marshal, as the case may be, within five (5) days from receipt of a notice or order. In case the action to be protested is rendered by a Provincial Fire Marshal or District Fire Marshal, the same shall be filed before the Office of the Regional Director. 2) Resolutions by the Provincial Fire Marshal, District Fire Marshal or the Regional Director over a protest may be challenged by filing a verified appeal to the next higher authority within five (5) days from the receipt of the decision or resolution appealed from. The decision of the Regional Director in the exercise of its appellate jurisdiction shall be final and executory, except decision on closure order in which case said decision may be appealed to the Chief, BFP then to the Secretary of the DILG. IF THE BUILDING IS NON COMPLIANT (SEE SUBSEQUENT PROCEDURE - ISSUANCE OF CLOSURE ORDER DUE TO EXPIRATION OF ABATEMENT ORDER) 80 Issuance and Service of Closure Order (Due to Non-Payment of Administrative Fine) Procedure An order issued when the owner or administrator of buildings, structures or facilities failed to comply with the abatement order or when the deficiency constitutes a clear and imminent danger to life and property. Office: Classification: Fire Station/Lone District Fire Office Closure Order (Due to Non-Compliance of Abatement Order) (Applicable to All Transactions either Simple, Complex or Highly Technical) G2C – Government to Citizen Type of Transaction: 1. 2. G2B – Government to Business Entity Who may avail: Owner, Contractor or Business Entity CLIENT STEPS AGENCY ACTION 1. Failure on the part of the violator to pay the administrative fine within the period fixed in the Notice shall constitute a ground for the issuance of Closure Order for the building or the portion thereof. 1. After serving the original copy of the Notice to Correct Violation (NTCV) or Abatement Order (AO) or other Administrative courses of action, with an Order to Pay Fine, to the responsible person/ owner in the building/ establishment,verify with the Collecting Officer whether or not the imposed administrative fines have been paid in the 4th day after the service of the latter. (Reference: Section 13.0.0.2 para B of RIRR of RA 9514) FEES TO BE PAID 81 PROCESSING TIME PERSON RESPONSIBLE Within 5 Minutes Chief Fire Safety Enforcement Section/Chief Fire Safety Enforcement Unit (Chief FSES/ FSEU) CLIENT STEPS AGENCY ACTION FEES TO BE PAID 2. In case of non-payment, prepare, affixes initial and recommends to C/MFM or District Fire Marshal (for Lone District Fire Office) the issuance of Closure Order. 3. Endorse his/her recommendation to the City/Municipal Fire Marshal (C/ MFM) or District Fire Marshal (for Lone District Fire Office) for his/her signature. 4. Make the final review/evaluation of the Chief-FSES/ CHIEF, FSEU recommendation for disposition and sign three (3) copies of Closure Order and effect the continuous posting of the sign “WARNING: THIS BUILDING/ STRUCTURE IS A FIRE HAZARD” in front of the building or structure that it is a fire hazard, and additional posting of signage bear the words “WARNING: THIS BUILDING/ ESTABLISHMENT HAS BEEN ORDERED CLOSED BY THE BUREAU OF FIRE PROTECTION PURSUANT TO R.A. 9514 AND ITS IRR” also in front of the building. PROCESSING TIME PERSON RESPONSIBLE Within one (1) day Chief FSES/ FSEU City/ Municipal Fire Within two (2) Marshal (C/MFM) days or District Fire Marshal (for (Agency Action Step 4 to Step Lone District Fire Office) 5) 82 CLIENT STEPS 1. Acknowledges the Closure Order with proper receipt by writing his/her name, the date & time and affixing his /her signature above the name AGENCY ACTION FEES TO BE PAID 5. Endorse the three (3) copies of Closure Order and effect the continuous posting sign “WARNING: THIS BUILDING/ STRUCTURE IS A FIRE HAZARD” in front of the building or structure that it is a fire hazard and additional posting of signage bear the words “WARNING: THIS BUILDING/ ESTABLISHMENT HAS BEEN ORDERED CLOSED BY THE BUREAU OF FIRE PROTECTION PURSUANT TO R.A. 9514 AND ITS IRR” also in front of the building. 6. Record in the Official Log Sheet the date and Closure Order number. Provide duplicate copy of Closure Order to the designated Records Custodian. 7. Release Closure Order to the FSI 8. Serve the original copy of Closure Order to the owner/ responsible person in the building/establishment and effect the continuous posting of the sign “WARNING: THIS BUILDING/ STRUCTURE IS A FIRE HAZARD” in front of the building. PROCESSING TIME PERSON RESPONSIBLE C/MFM or District Fire Marshal (for Lone District Fire Office) A signage shall also be posted in front of the building. The signage bear the words “WARNING: THIS BUILDING/ESTABLISHMENT HAS BEEN ORDERED CLOSED BY THE BUREU OF FIRE PROTECTION PURSUANT TO R.A. 9514 AND ITS IRR” 83 Within 15 Minutes Customer Relation Officer (CRO) Within one (1) day FSI or Office of the C/MFM or District Fire Marshal (for Lone District Fire Office) CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME PERSON RESPONSIBLE Within 20 Minutes CRO Continuation of Step 8: Note: If necessary or if the situation so requires, requests/coordinates with the PNP and/ or Barangay Officials having jurisdiction to assist in the posting of warning signs, in case the owner/ responsible person refuses to accept the copy of the Closure Order, a copy thereof is left/posted at the conspicuous place in the building / establishment which is witnessed by any Barangay Official and the original copy shall be sent to the owner/ responsible person through registered mail with return card. The Barangay Official, who witnessed the serving of the Closure Order shall sign at the receiving copy of the notice as witnesses. 9. After service to the owner/responsible person in the building/establishment, a copy of the Order is sent to the offices of the Mayor, Business Permit and License Office, Building Official/Municipal Engineer and the Barangay. 84 Issuance and Service of Closure Order (Due to Expiration of Abatement Order) Procedure An order issued when the owner or administrator of buildings, structures or facilities failed to comply with the abatement order or when the deficiency constitutes a clear and imminent danger to life and property. Office: Classification: Fire Station/Lone District Fire Office Closure Order ( Due to Non-Payment of Administrative Fine ) (Applicable to All Transactions either Simple, Complex or Highly Technical) 1. G2C – Government to Citizen Type of Transaction: 2. G2B – Government to Business Entity Owner, Contractor or Business Entity Who may avail: CLIENT STEPS AGENCY ACTION FEES TO BE PROCESSING PERSON PAID TIME RESPONSIBLE 1. Submits copy Within one (1) of AIR indicating day after non-compliance receipt of the with the AO to the Inspection Chief, FSES/Chief, Order (IO) FSEU. 2. Review/evaluate the recommendations/ findings of FSI, prepare, affixes initial and recommends to C/MFM or District Fire Marshal Chief Fire Within 24 hours (for Lone District Safety upon the receipt Fire Office) the Enforcement of the AIR issuance of Closure Section/Chief Order. Fire Safety (Note: As per BFP Enforcement 3. Endorse his/her Operational Manual) Unit (C, FSES/C, recommendation to FSEU) the City/Municipal Fire Marshal (C/ MFM) or District Fire Marshal (for Lone District Fire Office) for his/her signature. 85 CLIENT STEPS AGENCY ACTION FEES TO BE PAID 4. Make the final review/evaluation of the Chief-FSES/ CHIEF, FSEU recommendation for disposition and signs three (3) copies of Closure Order and effect the continuous posting of the sign “WARNING: THIS BUILDING/ STRUCTURE IS A FIRE HAZARD” in front of the building and additional posting of signage bear the words “WARNING: THIS BUILDING/ ESTABLISHMENT HAS BEEN ORDERED CLOSED BY THE BUREAU OF FIRE PROTECTION IN PURSUANT TO R.A. 9514 AND ITS IRR” also in front of the building. PROCESSING TIME Within two (2) days upon receipt of the AIR PERSON RESPONSIBLE City/ Municipal Fire Marshal (C/MFM) or District Fire (Agency Action Marshal (for Step 4 to Step Lone District Fire 5) Office) (Note: As per BFP Operational Manual) 86 CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME 5. Endorse the three (3) copies of Closure Order and effect the continuous posting sign “WARNING: THIS BUILDING/ STRUCTURE IS A FIRE HAZARD” in front of the building or structure that it is a fire hazard and additional posting of signage bear the words “WARNING: THIS BUILDING/ ESTABLISHMENT HAS BEEN ORDERED CLOSED BY THE BUREAU OF FIRE PROTECTION PURSUANT TO R.A. 9514 AND ITS IRR” also in front of the building. PERSON RESPONSIBLE C/MFM or District Fire Marshal (for Lone District Fire Office) 6. Record in the Official Log Sheet the date and Closure Order number. Provide duplicate copy of Closure Order to the designated Records Custodian. Within 15 Minutes Customer Relation Officer (CRO) Within one (1) day FSI or Office of the C/MFM or District Fire Marshal (for Lone District Fire Office) 7. Release Closure Order to the FSI 1. Acknowledges the Closure Order with proper receipt by writing his/her name, the date & time and affixing his /her signature above the name. 8. Serve the original copy of Closure Order to the owner/responsible person in the building/establishment and effect the continuous posting of the sign “WARNING: THIS BUILDING/ STRUCTURE IS A FIRE HAZARD” in front of the building. 87 CLIENT STEPS AGENCY ACTION FEES TO BE PAID PROCESSING TIME PERSON RESPONSIBLE Within 20 Minutes CRO Continuation of Step 8: A signage shall also be posted in front of the building. The signage bear the words “WARNING: THIS BUILDING/ESTABLISHMENT HAS BEEN ORDERED CLOSED BY THE BUREU OF FIRE PROTECTION PURSUANT TO R.A. 9514 AND ITS IRR” Note: If necessary or if the situation so requires, requests/ coordinates with the PNP and/or Barangay Officials having jurisdiction to assist in the posting of warning signs, in case the owner/responsible person refuses to accept the copy of the Closure Order, a copy thereof is left/posted at the conspicuous place in the building / establishment which is witnessed by any Barangay Official and the original copy shall be sent to the owner/ responsible person through registered mail with return card. The Barangay Official, who witnessed the serving of the Closure Order shall sign at the receiving copy of the notice as witnesses. 9. After service to the owner/responsible person in the building/establishment, a copy of the Order is sent to the offices of the Mayor, Business Permit and License Office, Building Official/Municipal Engineer and the Barangay. 88 Implementation of Closure Order Procedure An order issued when the owner or administrator of buildings, structures or facilities failed to comply with the abatement order or when the deficiency constitutes a clear and imminent danger to life and property. Office: Classification: Fire Station/Lone District Fire Office Closure Order ( Due to Non-Payment of Administrative Fine ) (Applicable to All Transactions either Simple, Complex or Highly Technical) G2C – Government to Citizen Type of Transaction: 1. 2. G2B – Government to Business Entity Who may avail: CLIENT STEPS Owner, Contractor or Business Entity AGENCY ACTION FEES TO BE PAID 1. Send letter to the to the Office of the Chief of Police having jurisdiction, Office of the Mayor and Office of the Punong Barangay for assistance in the implementation of the Closure Order not later than the fourth (4th) day after the service of the said Order. The letter specifically states the date and time for which the Closure will be effected, which shall not be later than 10 days after the service of the Order. 89 PROCESSING TIME PERSON RESPONSIBLE Within one (1) day C/MFM or District Fire Marshal (for Lone District Fire Office) CLIENT STEPS AGENCY ACTION FEES TO BE PAID 2. The office of the City/Municipal Fire Marshal, with the assistance of any from the Office of the Chief of Police having jurisdiction, Office of the Mayor and Office of the Punong Barangay, proceeds to the building or establishment for which closure shall be effected, and makes sure that nobody is left inside the building or establishment. Likewise, all utilities (electricity, water, etc.) is to be properly turned off. 1.Upon the request of the owner, administrator, occupant or other persons responsible to commence compliance until full compliance with the requirements with RA 9514 and its RIRR. The building or establishment is then provided with a sticker bearing the words “WARNING: THIS BUILDING/ ESTABLISHMENT HAS BEEN ORDERED CLOSED BY THE BUREU OF FIRE PROTECTION PURSUANT TO R.A. 9514 AND ITS IRR” at the door. 4. The signage posted during the service of the Order shall be continuously posted until compliance of all fire safety Requirements. PROCESSING TIME PERSON RESPONSIBLE Within one (1) day C/MFM or District Fire Marshal (for Lone District Fire Office) Time or period to accomplished full compliance with the requirements of RA 9514 and its RIRR. 90 Feedback and Complaints Mechanism FEEDBACK AND COMPLAINTS MECHANISMS How to send a feedback Answer the Customer Satisfaction Survey Form and drop it at the designated drop box in front of the Customer Relations Officer. How feedback is processed Every Friday, the Customer Relations Officer opens the drop box and compiles and records all feedback submitted. Feedback requiring answers are forwarded to the relevant offices and they are required to answer within three (3) days of the receipt of the feedback. The answer of the office is then relayed to the citizen. For inquiries and follow-ups, clients may contact the following: (Telephone Number/Email Address of the Fire Station) How to file complaints Answer the Customer Satisfaction Survey Form and drop it at the designated drop box in front of the Customer Relations Officer. Complaints can also be filed via telephone or e-mail. Make sure to provide the following information: - Name of person being complained - Incident - Evidence For inquiries and follow-ups, clients may contact the following: (Telephone Number/Email Address of the Fire Station) How complaints are processed The Customer Relations Officer opens the complaints drop box on a daily basis and evaluates each complaint. Upon evaluation, the Customer Relations Officer shall start the investigation and forward the complaint to the relevant office for their explanation. The Customer Relations Officer will create a report after the investigation and shall submit it to the City/Municipal Fire Marshal for appropriate action. 91 FEEDBACK AND COMPLAINTS MECHANISMS The Customer Relations Officer will give the feedback to the client. For inquiries and follow-ups, clients may contact the following: (Telephone Number/Email Address of the Fire Station) Contact Information (Fire Marshal) (BFP Fire Station) (Telephone Number) (Email-address) 92 Office Address Contact Information Head Office (BFP National Headquarters - Office of the Fire Chief) Address Hotline Number Regional Office (Regional Director’s Office) Address Hotline Number Provincial Office ( Office of the Provincial Fire Marshal or Office of the District Fire Marshal ) Address Hotline Number Field Office (Office of the District Fire Marshal for Lone District Fire Office or Office of the City Fire Marshal/ Municipal Fire Marshal) Address Hotline Number 93 Republic of the Philippines Department of Interior and Local Government BUREAU OF FIRE PROTECTION (FIRE STATION NAME) (Fire Station/Co-Location Address) CUTOMER SATISFACTION SURVEY FORM Kindly fill-out the information details and check the corresponding transaction. Date: ______________ I am ..... (tick as applicable) M F Senior Citizen TRANSACTION FOR : 3 days for Simple Transaction 7 days for Complex Transaction PWD For Construction Application FSEC Application FSIC for Occupancy For Business Application FSIC for Business (New) FSIC for Business (Renewal) As part of our continuing effort to evaluate our service, please complete the questionnaire below and drop it in the designated box. Please encircle the response that most closely describes your level of satisfaction. 1. How satisfied are you with the speed in which the service was delivered? 2. How satisfied are you with the clarity of information or advice provided by the frontline office staff? 3.Were you guided by the Citizen’s Charter posted in the BFP station and were the procedures in securing Fire Safety Evaluation Clearance and Fire Safety Inspection Certificate being followed? 4. How satisfied are you with the corteousness and accomodation of staff 5. How satisfied are you overall with the service you received? Comments and Suggestions 94 Bad Ok Good Great Bad Ok Good Great Bad Ok Good Great Bad Ok Good Great Bad Ok Good Great