QUALITY SYSTEM PROCEDURES Maintenance Doc. No. : ---------Rev. No. : 00 Eff. Dt. : -------- Page No. : 1 1.0 Objective: To maintain all machinery and equipment related to production serviceable at all term. 2.0 Scope: All machinery, equipment, and utilities in use at Plant. 3.0 4.0 Process Owner: Process Performance Indicators: Maintenance Incharge 5.0 6.0 8.5.1.5 IATF Clause: Process Inputs & Outputs: 1. 2. 3. 4. 5. Breakdown hours Breakdown Cost MTTR (Mean Time to Repair) MTBF ( Mean Time between Failure) Preventive maintenance compliance S.NO. Inputs 6.1 Machine & Equipment Outputs Master list of machine 6.2 Machine Breakdown slip Machine History Card 6.3 Critical spare Master list of critical spares 6.4 Calibration plan for electronic devices Calibration record 6.5 Machine breakdown Maintenance Log book 6.6 PM Plan PM check sheet 6.7 Predictive abnormality Predictive maintenance sheet 6.8 History Card Periodic overhauling PREPARED BY: ISSUED BY: APPROVED BY: CONTROL STATUS: QUALITY SYSTEM PROCEDURES Maintenance Doc. No. : ---------Rev. No. : 00 Eff. Dt. : -------- Page No. : 2 7.0 Reference: S.No. 7.1 Machine Manual 7.2 Document Name Document No. Master list of machines & critical spare 8.0 Records: S.No. Document Name Document No. 8.1 Master List of machines & critical spare parts 8.2 Annual Preventive maintenance plan 8.3 PM check points 8.4 Breakdown Register 8.5 Breakdown intimation slip 8.6 Machine history card 8.7 Daily Check Sheet 8.8 Predictive maintenance check points 8.9 WHY-WHY analysis 8.10 Breakdown hours, MTTR & MTBF monitoring sheet 9.0 Procedure: S.No Process Sequence Responsibility 9.1 9.1.1 Breakdown Maintenance: Breakdown intimation shall be received from concern department. 9.1.2 Breakdown analysis shall be carried out by maintenance person as per top one breakdown time / critical machine. PREPARED BY: ISSUED BY: Concern department head/executive Maintenance Eng. / Sr. Manager APPROVED BY: Reference Documents & Records Breakdown intimation slip _ CONTROL STATUS: QUALITY SYSTEM PROCEDURES Maintenance Doc. No. : ---------Rev. No. : 00 Eff. Dt. : -------- Page No. : 3 9.1.3 Decision: If problem cannot be solved in-house Maintenance Eng. / Sr. Manager _ Maintenance Eng. / Sr. Manager _ Action: Outsource party shall be called for breakdown maintenance. 9.1.4 Decision: If problem can be solved in-house Action: Root cause analysis shall be performed in order to find the root cause of the problem/breakdown. 9.1.5 Check the availability of spare parts, if found not available than material indent shall be raise to procure the relevant spare parts Maintenance Eng. / Sr. Manager _ 9.1.9 A list of critical spare shall be maintained, reviewed and updated whenever the new spares procured and minimum stock of critical spare shall be maintained. Maintenance Eng. / Sr. Manager Master list of Machine & critical spares 9.1.7 Appropriate corrective action shall be taken to resolve the problem as per breakdown complaint. Maintenance Eng. / Sr. Manager _ 9.1.8 After resolving the problem, machine shall be handover to concern department Maintenance Eng. / Sr. Manager _ 9.1.9 Details of breakdown shall be entered in Machine history card and record shall be maintained. Maintenance Eng. / Sr. Manager Machine history card 9.20 Why- why analysis shall be carried out for repeated breakdowns Maintenance Eng. Why-why analysis 9.2 Preventive & Predictive Maintenance: 9.2.1 Master list of machine, equipment & utilities shall be prepared and maintained. Maintenance Eng. / Sr. Manager Master list of machines & critical spare PREPARED BY: ISSUED BY: APPROVED BY: CONTROL STATUS: QUALITY SYSTEM PROCEDURES Maintenance Doc. No. : ---------Rev. No. : 00 Eff. Dt. : -------- Page No. : 4 9.2.2 An annual preventive maintenance schedule shall be prepared taking input from following: Master list of machines Past history and records Related machine manual Maintenance Eng. / Sr. Manager Annual PM Plan 9.2.4 Annual PM plan shall be circulated to concern departments Maintenance Eng. / Sr. Manager _ 9.2.5 Intimation for releasing the machine shall be given to the concern department one day before PM schedule through E-mail/ phone. Maintenance Eng. / Sr. Manager _ 9.2.9 If on the day of PM schedule, machine is not available for preventive maintenance than rescheduling shall be done for the same machine and update the annual and monthly PM schedule. Maintenance Eng. / Sr. Manager _ 9.2.7 Preventive maintained shall be carried out as per monthly PM schedule and maintain the record in machine wise PM check sheet. Maintenance Eng. / Sr. Manager PM Check Sheet 9.2.8 If any abnormality found during preventive Maintenance Eng. / maintenance than repair activities shall be carried Sr. Manager out to resolve the issue. PM Check Sheet 9.2.9 In case of major issues, details shall be entered in Maintenance Eng. / Sr. Manager machine history card and record is maintained. _ 9.2.10 After preventive maintenance machine shall be Maintenance Eng. / Sr. Manager handover to concern department. _ 9.2.11 PM plan shall be reviewed at least once in a year Maintenance Eng. / for any amendment, changes, adjustment need to be Sr. Manager done for achieve PM plan compliance _ 9.2.12 Daily preventive maintenance activities shall be Maintenance Eng. carried out for sand plant and record shall be maintained in daily check list maintenance Daily check sheet 9.2.13 The predictive maintenance methods such as Maintenance Eng. / correlation of SPC data, daily machine performance Sr. Manager through production reports, any abnormalities observed or unusual problems reported by the machine operator / supervisor are recorded on Predictive maintenance check points PREPARED BY: ISSUED BY: APPROVED BY: CONTROL STATUS: QUALITY SYSTEM PROCEDURES Maintenance Doc. No. : ---------Rev. No. : 00 Eff. Dt. : -------- Page No. : 5 Predictive Mnt. Reg. & these are reviewed monthly & are in-built into planned maintenance schedules as appropriate. 9.3 Overhauling: 9.3.1 Identify the machines and situations based on history for which the over hauling is required. Maintenance Eng. / Sr. Manager _ 9.3.2 Maintenance Eng. / Machine overhauling shall be planed taking input Sr. Manager from following: _ Master list of machines History card and records Related machine manual 9.3.3 Intimation for releasing the machine shall be given Maintenance Eng. / to the concern department one day before Sr. Manager overhauling schedule through E-mail/ phone. _ 9.3.4 Carryout machine overhauling and enter the overhauling details in machine history card and maintain the record Machine history card 9.4 Maintenance Objectives: 9.4.1 Top management shall define the objectives for Top Management maintenance process. _ 9.4.2 Maintenance objectives like breakdown hours, Maintenance Sr. preventive maintenance compliance, MTTR & Manager MTBF shall be monitored and maintained. Breakdown hours, MTTR & MTBF monitoring sheet 9.4.3 Performance of maintenance plan and objectives shall be reviewed in MRM. Maintenance Sr. Manager _ 9.4.4 Action plan shall be prepared when objective not achieved and shall contain the following inputs action taken, responsibility, target date and resource required. Maintenance Sr. Manager Action Plan PREPARED BY: ISSUED BY: Maintenance Eng. / Sr. Manager APPROVED BY: CONTROL STATUS: QUALITY SYSTEM PROCEDURES Maintenance Doc. No. : ---------Rev. No. : 00 Eff. Dt. : -------- Page No. : 6 10.0 Amendment Sheet: S.No. Date Amendment Details 10.1 02/01/2018 11.0 Abbreviations: S.No. Abbreviation 1 2 4 5 6 7 MNT MRM MTTR MTBF PM SPC PREPARED BY: Revision No. New release as per IATF requirements 00 Description Maintenance Management Review Meeting Mean time to repair Mean time between failure Preventive maintenance Statistical Process Control ISSUED BY: APPROVED BY: CONTROL STATUS: